|
|
Line 13: |
Line 13: |
| | document type = Annual Operating Report, Letter | | | document type = Annual Operating Report, Letter |
| | page count = 7 | | | page count = 7 |
| | | project = TAC:ME1592 |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:0.-t'> INSTITUTE FOR RESEARCH IN 18 * . 56 ELECTRONICS . & APPLIED PHYSICS Sept 29, 2016 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Dr. Timothy W. Koeth Associate Research Professor Director, Nuclear Reactor & Radiation Facilities Energy Research Facility, Building 223, Paint Branch Drive, College Park, MD 20742-3511 TEL: 301.405.4952 -FAX 301.314.9437 -koeth@umd.edu RE: Annual Report: July 1, 2015 -June 30, 2016 for the Maryland University Training Reactor, Docket No. 50-166, License No. R-70 (TAC NO. ME 1592), University of Maryland. Enclosed please find the University of Maryland's Annual Report for the period beginning July 1 2015 and ending June 30, 2016 for the MUTR, Docket No. 50-166, License No. R-70 I declare under penalty of perjury that the foregoing response is true and correct. Jr/_d -f .-v::; U /(tr' Timothy W. Koeth 18 56 Annual Operating Report: July 1, 2015 -June 30, 2016 lV{UTR Technical Specification 6.7.1 License No. R-70, Docket No. 50-166 A. James Clark School of Engineering Department of Materials Science and Engineering University of Maryland, College Park, MD 20742 Maryland University Training Reactor Annual Operating Report, FY 15-16 Contents 1 Introduction 2 Reactor Usage 3 Surveillance Tests and Inspections 3.1 Maintenance Operations ..... . 2 2 2 3 4 Changes to Facility 3 5 Environmental Surveys of Surrounding Areas 3 6 Radioactive Release and Discharge to the Environment 4 6.1 Liquid . . . . . . . . . 4 6.2 Gaseous and Argon-41 . . . . . . . . . . . . . . . . . . . . 5 7 Summary of Exposure Received by Facility Personnel and Vis-itors 5 8 Unscheduled Shutdown/Reportable Occurrences 5 9 Special Experiments 5 10 Changes in Facility Staff 5 Page 1 Maryland University Training Reactor Annual Operating Report, FY 15-16 1 Introduction The University of Maryland Training Reactor (MUTR) is an open-pool type, TRJGA facility licensed for operation at 250 kW thermal power. The MUTR is primarily used for operator training and tours for groups internal and external to the campus. In addition, the facility provides neutron and gamma irradiations, and neutron activation analysis experiments for undergraduate lab classes and graduate research. 2 Reactor Usage Between July 1, 2015 to June 30, 2016, the MUTR operated for a total of 96 runs, which are categorized as follows: Operator Training and Requalification 27 runs Tours, Labs, and Demonstrations 24 runs Calibration, Maintenance, and Surveillance 18 runs Irradiations or Activations 28 runs The total energy produced during this period was 22.96MWh with a sponding burnup of 1.30 grams of U-235. 3 Surveillance Tests and Inspections All required surveillance tests and inspections were preformed at the intervals required by Technical Specification 4.0. WATER SAMPLE TESTS AIR SAMPLE TESTS RADIATION SURVEYS CONTROL ROD INSPECTION CONTROL ROD DROP TEST RAM CALIBRATION SNM INVENTORIES ALARA REVIEW Page 2 Maryland University Training Reactor Annual Operating Report, FY 15-16 3.1 Maintenance Operations In addition to the above surveillance items, the following maintenance tions were performed on the indicated dates: 9/13/15 9/8/15 11/11/15 11/11/15 12/22/15 11/11/15 3/8/16 4/22/16 6/7/16 Replaced primary filter Dri-rite replaced Replaced PuBe source string Replaced microswitches for Shim 1 magnet down, Shim 2 and Regulating Rod up Dri-rite replaced Replaced microswitch for Shim 2 magnet down Dri-rite replaced Replaced primary resin Dri-rite replaced Additional minor maintenance was performed such as light bulb replacement and fine-tuning of equipment as necessary. 4 Changes to Facility There were no significant changes to the facility during this reporting period. 5 Environmental Surveys of Surrounding Areas Environmental surveys include the routine environmental dosimeter ments at the facility perimeter and the remainder of the locations on .campus. With the exception of recently positioned monitors [10, 11 and 12], the net measurements in millirem (mrem) tabulated below represent the July 1, 2015 to June 30, 2016 reporting period. Measurements at all points were well within the historical norms. Page 3 |
| | ... ' Maryland University Training Reactor Annual Operating Report, FY 15-16 Environmental Survey Results for the Maryland University Training Reactor July 1, 2015 to June 30, 2016 MONITOR LOCATION DOSE (MREM) 2 308 m NE of MUTR 48a 3 1.1 km SW of MUTR 5 4 758 m NW of MUTR 2 5 387 m SE of MUTR 9 6 North, side MUTR fence line 2 7 East, adjacent to MUTR and IRR 2 8 West, adjacent to MUTR 5 9 606 m S of MUTR 16 lOb 950 m W of MUTR 5 11 b South, courtyard adjacent to MUTR 12 12b 248 m NW of MUTR 6 anose received is attributed to naturally occurring radioactive material (NORM) in the construction bricks of the building. bMonitoring period from January 1, 2016 to June 30, 2016 Figure 1: Location of dosimeters and MUTR 6 Radioactive Release and Discharge to the vironment 6.1 Liquid The Reactor Storage Sump was not discharged during this reporting period. Page 4 Maryland University Training Reactor Annual Operating Report, FY 15-16 6.2 Gaseous and Argon-41 The only release from the MUTR to the environment consists of Argon-41 duced from the activation of natural Argon dissolved in pool water and natural Argon present in air within the interstitial spaces of beams and ports. Argon-41 escapes from the pool and spaces into the MUTR reactor building and then leaks to areas outside the building. The two main areas for assessment of public dose due to effluent release are outside the roll-up door on the north side of the reactor building and outside the lower reception room into the hallway 1398. For this reporting period the reactor was operated for 304.93 hours. EPA CAP88 was utilized to determine the dose outside the roll-up door to be 1.98 x 10-1 mrem. The dose in the hallway 1398 from any effluent release is 5.64 x 10-4 mrem. 7 Summary of Exposure Received by Facility Personnel and Visitors As part of the annual ALARA audit, facility management reviewed exposure records and found all badged personnel received less than 10% of their annual dose limit. The pocket dosimeters recorded minimal exposure for all guests and service personnel. 8 Unscheduled Shutdown/Reportable Occurrences During this reporting period, there were 5 unscheduled shutdowns resulting in the reactor SCRAM. |
| | * Run# 4476 Safety 2 High Voltage on January 8, 2016 |
| | * Run# 4478 loss of power to Regulating Rod on January 15, 2016 |
| | * Run# 4481 period scram on Feb. 10, 2016 |
| | * Run# 4506 external scram, undercount on exhaust ram on April 11, 2016 |
| | * Run# 4510 AC power glitch on April 14, 2016 There were no reportable occurrences during this reporting period. 9 Special Experiments There were no new special experiments performed during this reporting period. 10 Changes in Facility Staff There were no signifcant staff changes during this period. Page 5 |
| }} | | }} |
Revision as of 06:16, 21 March 2018
Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Results
Other: ML102080241, ML110940236, ML11171A566, ML11363A176, ML13095A006, ML13303B562, ML14364A086, ML16022A184, ML16070A009, ML16279A078, ML16337A343
|
MONTHYEARML1020802412010-07-26026 July 2010 University of Maryland - Determination of Acceptability and Sufficiency for Docketing and Opportunity for a Hearing Regarding the Application for Renewal of Facility Operating License No. R-70 for Maryland University Reactor Project stage: Other ML1021100492010-07-28028 July 2010 University of Maryland Responses Request for Additional Information Regarding the License Renewal for Maryland University Training Reactor Project stage: Request ML1024401162010-08-27027 August 2010 University of Maryland, Request for Extension to Submit Reply to Request #2 in Nrc'S April 6, 2010 Additional Information Request Project stage: Request ML1027105562010-09-22022 September 2010 University of Maryland, Request for Additional Information Regarding the License Renewal for the Maryland University Training Reactor Project stage: Request ML1035001312010-12-14014 December 2010 University of Maryland, Maryland University Training Reactor (Mutr), Request for an Extension of Time to Submit the Final Calculation File to RAIs 2a and 2b and to Respond to Questions to Be Raised Regarding the Remaining 16 Technical Speci Project stage: Request ML1101903472011-01-20020 January 2011 University of Maryland - Approval of Request for an Extension, University of Maryland Request for Additional Information Dated August 20, 2010 (TAC No. Me1592) Project stage: RAI ML1109402122011-02-17017 February 2011 University of Maryland, Note to File from Project Manager, Spyros Traiforos Regarding Review of Request for Additional Information Responses Dated January 31, 2011 from University of Maryland and Documenting Upcoming Site Visit on February Project stage: RAI ML1109402362011-03-0404 March 2011 University of Maryland, Milestones Provided to University of Maryland Via E-mail Dated March 4, 2011 and Included as an Attachment to the Summary of the Site Visit Project stage: Other ML11124A1242011-05-0202 May 2011 University of Maryland, Maryland University Training Reactor (Mutr), Technical Specifications, Response to February 18, 2011, Request for Additional Information (RAI) Regarding Remaining Technical Specifications Project stage: Request ML11171A5662011-06-22022 June 2011 University of Maryland, NRC Response to Letter Dated May 2, 2011 Project stage: Other ML11277A0262011-09-28028 September 2011 University of Maryland, Request for Additional Information Regarding License Renewal for Maryland University Training Reactor Project stage: Request ML11286A3372011-10-12012 October 2011 University of Maryland - Request for Additional Information Regarding the License Renewal for the Maryland University Training Reactor Project stage: Request ML1133300302011-11-23023 November 2011 University of Maryland, E-mail from M. Al-Sheikhly, Umd to J. Lising, NRC Request for Additional Information Extension Request (Tac No. ME1592) Project stage: Request ML1133300392011-12-0101 December 2011 University of Maryland - Approval for Request for Additional Time to Respond to NRC Request for Additional Information Project stage: RAI ML11363A1762011-12-19019 December 2011 Annual Report: July 1, 2010 - June 30, 2011 for the Maryland University Training Reactor (Mutr) Project stage: Other ML1201702562012-01-0606 January 2012 University of Maryland, E-mail Requesting Extension to NRC Request for Additional Information AR-41 Measurements and Analyses (Tac No. ME1592) Project stage: Request ML12060A3442012-02-0909 February 2012 University of Maryland - Response to NRC Request for Additional Information Regarding the License Renewal for the Maryland University Training Reactor Project stage: Response to RAI ML12172A1392012-05-22022 May 2012 University of Maryland, Request for Additional Information Regarding the License Renewal for the Maryland University Training Reactor (Mutr) Project stage: Request ML12255A4002012-08-29029 August 2012 University of Maryland, Response to Request for Additional Information Regarding the License Renewal for the Training Reactor (Mutr) Project stage: Response to RAI ML13095A0062013-03-21021 March 2013 University of Maryland - License Renewal for the Maryland University Training Reactor (Mutr), TAC ME1592 Project stage: Other ML13303B5622013-10-22022 October 2013 Annual Report: July 1, 2013 for the Maryland University Training Reactor, Docket No. 05000166, License No. R-70 (TAC ME1592), University of Maryland Project stage: Other ML14064A3692014-03-11011 March 2014 University of Maryland, College Park Request for Additional Information Review of the Emergency Plan for License Renewal for the University of Maryland Training Reactor Project stage: RAI ML14141A6302014-06-0202 June 2014 University of Maryland, College Park Request for Additional Information Financial Update for License Renewal for the University of Maryland, College Park Training Reactor Project stage: RAI ML14176A0782014-06-18018 June 2014 University of Maryland Training Reactor - Report on AR-41 Mitigation Project stage: Request ML14266A6582014-09-25025 September 2014 University of Maryland - Request for Additional Information Review of the Argon-41 Radiological Dose Assessment for License Renewal Project stage: RAI ML14332A3002014-11-25025 November 2014 University of Maryland - Request for Additional Information Review of the ARGON-41 Radiological Dose Assessment for License Renewal of the Maryland University Training Reactor Project stage: Request ML14342A5632014-11-25025 November 2014 University of Maryland, Response to Request for Additional Information Regarding Financial Update for License Renewal Project stage: Response to RAI ML14364A0862014-12-19019 December 2014 University of Maryland - Revised Physical Security Plan for License Renewal of the Maryland University Training Reactor (TAC ME1592) License No. 70; Docket No. 50-166 Project stage: Other ML15058A2762015-03-12012 March 2015 Letter Request for Additional Information Physical Security Plan Review for License Renewal Project stage: RAI ML15084A6122015-04-0101 April 2015 University of Maryland - Request for Additional Information Financial Qualification for License Renewal for the Maryland University Training Reactor Project stage: RAI ML15190A3432015-07-0101 July 2015 University of Maryland - Request for Additional Information Review of the Physical Security Plan for the License Renewal for University for Maryland Training Reactor Project stage: Request ML15205A0912015-08-0707 August 2015 University of Maryland Dismissal of Request for Additional Information Dated April 1, 2015 to the Maryland University Training Reactor Project stage: RAI ML15219A4712015-09-10010 September 2015 University of Maryland - Request for Additional Information for License Renewal of the Maryland University Training Reactor Pertaining to Thermal Hydraulics Project stage: RAI ML16022A1842015-11-23023 November 2015 Univ. of Maryland - Updated Physical Security Plan for License Renewal Project stage: Other ML15349A8942015-12-0202 December 2015 University of Maryland - Request for Additional Information for License Renewal Pertaining to Thermal Hydraulics Project stage: Request ML16070A0092016-02-10010 February 2016 University of Maryland - Revised Physical Security Plan for License Renewal of the Training Reactor Project stage: Other ML16279A0782016-09-29029 September 2016 Univ. of Maryland - Submittal of Annual Operating Report for 07/01/2015 - 06/30/2016 Project stage: Other ML16312A0662016-11-0101 November 2016 University of Maryland, Research Reactor, License Amendment Request Project stage: Request ML16323A4462016-11-17017 November 2016 University of Maryland - Request for Additional Information Regarding the Review of License Renewal for the Maryland University Training Reactor Project stage: Request ML16337A3432016-12-0202 December 2016 Conversation Record - Changes to the Technical Specifications in Support of License Renewal Project stage: Other 2013-10-22
[Table View] |
|
---|
Category:Annual Operating Report
MONTHYEARML24081A1652024-02-26026 February 2024 Annual Report for the Maryland University Training Reactor (Mutr), License No. R-70 ML23080A1042023-03-0606 March 2023 Univ. of Maryland - College Park, Submittal of Annual Report for 2022 ML20070H6372020-03-0505 March 2020 Univ. of Maryland - College Park - Transmittal of Annual Report for the Period Beginning January 1, 2019 and Ending December 31, 2019 ML19094A2582019-03-25025 March 2019 Annual Report: January 1, 2018 - December 31, 2018 for the Maryland University Training Reactor, License No. R-70, University of Maryland ML18094A1162018-03-27027 March 2018 MD University, Submittal of Annual Report for January 1, 2017 and Ending December 31, 2017 ML16279A0782016-09-29029 September 2016 Univ. of Maryland - Submittal of Annual Operating Report for 07/01/2015 - 06/30/2016 ML16028A0802015-06-30030 June 2015 Annual Report: July 1, 2014 - June 30, 2015 for the Maryland University Training Reactor ML13303B5622013-10-22022 October 2013 Annual Report: July 1, 2013 for the Maryland University Training Reactor, Docket No. 05000166, License No. R-70 (TAC ME1592), University of Maryland ML1235500222012-12-12012 December 2012 Univ. of Maryland - Annual Report for the Period Beginning July 1, 2012 and Ending June 30, 2012 ML11363A1762011-12-19019 December 2011 Annual Report: July 1, 2010 - June 30, 2011 for the Maryland University Training Reactor (Mutr) ML1027803972010-09-29029 September 2010 Annual Report: July 1, 2009 - June 30, 2010 for Maryland University Training Reactor ML1015502712010-06-0202 June 2010 Letter Annual Report Correction ML1003311472009-06-30030 June 2009 University of Maryland Training Reactor (Mutr) Annual Operating Report for July 2008 - June 2009 ML0824202782008-08-27027 August 2008 Submittal of Annual Report: July 1, 2007 - June 30, 2008 for the Maryland University Training Reactor ML1003311462008-06-30030 June 2008 University of Maryland Training Reactor (Mutr) Annual Operating Report for July 2007 - June 2008 ML1003311422005-06-30030 June 2005 University of Maryland Training Reactor (Mutr) Annual Operating Report for July 2004 - June 2005 ML1003311412004-06-30030 June 2004 University of Maryland Training Reactor (Mutr) Annual Operating Report for July 2003 - June 2004 ML1003311392003-06-30030 June 2003 University of Maryland Training Reactor (Mutr) Annual Operating Report for July 2002 - June 2003 2024-02-26
[Table view] Category:Letter
MONTHYEARML24225A1882024-07-10010 July 2024 Univ of Maryland - College Park, Notification of Change in Level 1 Management ML24135A0102024-05-30030 May 2024 Examination Report Letter No. 50-166/OL-24-01, University of Maryland ML24067A2982024-03-15015 March 2024 Examination Confirmation Letter Umd OL 24-01 ML24081A1652024-02-26026 February 2024 Annual Report for the Maryland University Training Reactor (Mutr), License No. R-70 IR 05000166/20232032024-01-16016 January 2024 University of Maryland - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000166/2023203 IR 05000166/20232022023-10-0505 October 2023 University of Maryland - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000166/2023202 (Public) IR 05000166/20232012023-07-31031 July 2023 University of Maryland - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000166/2023201 - Cover Letter and Enclosure ML23102A1682023-07-27027 July 2023 Examination Report No. 50-166/OL-23-01, University of Maryland ML23102A1692023-07-27027 July 2023 Examination Result Letter No. 50-166/OL-23-01 ML23080A1042023-03-0606 March 2023 Univ. of Maryland - College Park, Submittal of Annual Report for 2022 ML22077A6732022-03-30030 March 2022 Examination Confirmation Letter No. 50-166/OL-22-01, University of Maryland ML22101A0492022-03-28028 March 2022 Logbook Entry 61904, Maryland University Training Reactor, License No. R-70 IR 05000166/20212022021-11-0808 November 2021 University of Maryland Nuclear Regulatory Commission Routine Inspection Report 05000166/2021202 ML21328A1942021-10-0101 October 2021 Notification of Change in Level 1 Management for the Maryland University Training Reactor IR 05000166/20212012021-06-10010 June 2021 University of Maryland Nuclear Regulatory Commission Routine Inspection Report No.05000166/2021201 ML21139A1262021-05-12012 May 2021 University of Maryland - Applicant Withdrawal from Exam Dated May 24, 2021 ML21097A1512021-04-0707 April 2021 Examination Confirmation Letter No. 50-166/OL-21-01, University of Maryland ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20241A1792020-09-15015 September 2020 University of Maryland - Approval of Exemption from Select Requirements of 10 CFR Part 55, Operators' Licenses ML20241A1762020-08-24024 August 2020 Ltr from Ajohnson, Maryland University Training Reactor (R-070): Request for Exemption from the Medical Examination Requirements of 10 CFR 55.21 and 10 CFR 55.53(i) for a Reactor Operator - Redacted ML20069J3912020-05-29029 May 2020 Letter, University of Maryland-Issuance of Amendment No. 10 to Renewed Facility Operating License No. R-70 for the Maryland University Training Reactor for the Use of 16 Additional Triga Fuel Elements ML20142A2882020-05-22022 May 2020 University of Maryland - Exemption from Select Requirement of 10 CFR Part 55, Operator' Licenses ML20133K1212020-05-12012 May 2020 University of Maryland License Amendment Request for the Maryland University Training Reactor, License No. R-070 for the Use of Additional Fuel ML20111A1162020-04-0101 April 2020 Notification of Change in Level 1 Management for the Maryland University Training Reactor, License No. R-070 ML20076C3472020-03-10010 March 2020 Univ. of Maryland - College Park - Supplemental Information Regarding RAI 1.3 Response Submitted on January 13, 2020 (ML20016A314) ML20070H6372020-03-0505 March 2020 Univ. of Maryland - College Park - Transmittal of Annual Report for the Period Beginning January 1, 2019 and Ending December 31, 2019 ML20062A1692020-02-24024 February 2020 Univ of Maryland - College Park - Proposed Change to Remove the a from License Condition 2.B.3 ML20016A3142020-01-13013 January 2020 University of Maryland Response to Requests for Additional Information Issued on November 22, 2019 ML19312C3762019-11-22022 November 2019 University of Maryland - Second Request for Additional Information License Amendment Request for the Use of 16 Additional Fuel Elements in the Maryland University Training Reactor IR 05000166/20192012019-09-18018 September 2019 University of Maryland - Nuclear Regulatory Commission Routine Inspection Report 05000166/2019201 ML19254A7602019-09-11011 September 2019 Examination Confirmation Letter No. 50-166/OL-20-01, University of Maryland ML19214A2322019-08-0606 August 2019 University of Maryland - Regulatory Audit for License Amendment Request for the Use of 16 Additional Fuel Elements in the Maryland University Training Reactor ML19205A0852019-07-15015 July 2019 Notification of Change in Level 1 Management for the Maryland University Training Reactor, License No. R-070 ML19165A0212019-06-0606 June 2019 Univ. of Maryland - College Park - Transmittal of Responses to Request for Additional Information Dated April 16, 2019 ML19024A2912019-04-16016 April 2019 University of Maryland - Request for Additional Information of Requested Licensing Action Amendment Request for the Use of 16 Additional Fuel Elements in the Maryland University Training Reactor ML19094A2582019-03-25025 March 2019 Annual Report: January 1, 2018 - December 31, 2018 for the Maryland University Training Reactor, License No. R-70, University of Maryland ML19071A1042019-03-0808 March 2019 Univ. of Maryland - College Park, Change in Level 2 Personnel Update ML18276A2122018-10-0404 October 2018 Examination Confirmation Letter No. 50-166/OL-19-01, University of Maryland ML18177A0562018-06-25025 June 2018 Letter to T. Koeth, University of Maryland, from L. Lund, NRC, NRC Office of Investigations Report No. 1-2017-018 - Release of OI Synopsis. ML18156A1962018-06-12012 June 2018 National Level Exercise 2018 Eagle Horizon ML18101A1122018-04-26026 April 2018 University of Maryland-Acceptance of Requested Licensing Action Amendment Request the Use of 16 Additional Training Reactor and Isotopes Production, General Atomics Fuel Elements in the Maryland University Training Reactor ML18094A1162018-03-27027 March 2018 MD University, Submittal of Annual Report for January 1, 2017 and Ending December 31, 2017 ML18092A0862018-03-26026 March 2018 Submittal of Request for License Amendment Authorizing Changes to Technical Specifications for the Use of 16 Additional Triga Fuel Elements in the Maryland University Training Reactor ML18060A0482018-03-0909 March 2018 University of Maryland - Supplemental Information Needed for Acceptance of Requested Licensing Action Request for License Amendment Authorizing Changes to Technical Specifications for the Use of 16 Additional Training Reactor and Isotopes . ML18033B3292018-02-0606 February 2018 University of Maryland - Change of Facility Project Manager ML18032A0962018-01-29029 January 2018 University of Maryland, Submittal of Request for License Amendment Authorizing Changes to Technical Specifications for the Use of 16 Additional Triga Fuel Elements in the Maryland University Training Reactor ML17354A6562017-12-26026 December 2017 Examination Report No. 50-166/OL-18-01, University of Maryland ML17257A0072017-09-14014 September 2017 Examination Confirmation Letter No. 50-166/OL-18-01, University of Maryland ML17081A2862017-04-21021 April 2017 University of Maryland - U.S. Nuclear Regulatory Commission Inspection Report No. 50-166/2017-202 - Cover Letter ML17089A7832017-04-19019 April 2017 University of Maryland Closure of Confirmatory Action Letter No. NRR-04-004 on the Site-Specific Compensatory Measures Implementation Plan for the Maryland University Training Reactor 2024-07-10
[Table view] |
Text
0.-t'> INSTITUTE FOR RESEARCH IN 18 * . 56 ELECTRONICS . & APPLIED PHYSICS Sept 29, 2016 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Dr. Timothy W. Koeth Associate Research Professor Director, Nuclear Reactor & Radiation Facilities Energy Research Facility, Building 223, Paint Branch Drive, College Park, MD 20742-3511 TEL: 301.405.4952 -FAX 301.314.9437 -koeth@umd.edu RE: Annual Report: July 1, 2015 -June 30, 2016 for the Maryland University Training Reactor, Docket No. 50-166, License No. R-70 (TAC NO. ME 1592), University of Maryland. Enclosed please find the University of Maryland's Annual Report for the period beginning July 1 2015 and ending June 30, 2016 for the MUTR, Docket No. 50-166, License No. R-70 I declare under penalty of perjury that the foregoing response is true and correct. Jr/_d -f .-v::; U /(tr' Timothy W. Koeth 18 56 Annual Operating Report: July 1, 2015 -June 30, 2016 lV{UTR Technical Specification 6.7.1 License No. R-70, Docket No. 50-166 A. James Clark School of Engineering Department of Materials Science and Engineering University of Maryland, College Park, MD 20742 Maryland University Training Reactor Annual Operating Report, FY 15-16 Contents 1 Introduction 2 Reactor Usage 3 Surveillance Tests and Inspections 3.1 Maintenance Operations ..... . 2 2 2 3 4 Changes to Facility 3 5 Environmental Surveys of Surrounding Areas 3 6 Radioactive Release and Discharge to the Environment 4 6.1 Liquid . . . . . . . . . 4 6.2 Gaseous and Argon-41 . . . . . . . . . . . . . . . . . . . . 5 7 Summary of Exposure Received by Facility Personnel and Vis-itors 5 8 Unscheduled Shutdown/Reportable Occurrences 5 9 Special Experiments 5 10 Changes in Facility Staff 5 Page 1 Maryland University Training Reactor Annual Operating Report, FY 15-16 1 Introduction The University of Maryland Training Reactor (MUTR) is an open-pool type, TRJGA facility licensed for operation at 250 kW thermal power. The MUTR is primarily used for operator training and tours for groups internal and external to the campus. In addition, the facility provides neutron and gamma irradiations, and neutron activation analysis experiments for undergraduate lab classes and graduate research. 2 Reactor Usage Between July 1, 2015 to June 30, 2016, the MUTR operated for a total of 96 runs, which are categorized as follows: Operator Training and Requalification 27 runs Tours, Labs, and Demonstrations 24 runs Calibration, Maintenance, and Surveillance 18 runs Irradiations or Activations 28 runs The total energy produced during this period was 22.96MWh with a sponding burnup of 1.30 grams of U-235. 3 Surveillance Tests and Inspections All required surveillance tests and inspections were preformed at the intervals required by Technical Specification 4.0. WATER SAMPLE TESTS AIR SAMPLE TESTS RADIATION SURVEYS CONTROL ROD INSPECTION CONTROL ROD DROP TEST RAM CALIBRATION SNM INVENTORIES ALARA REVIEW Page 2 Maryland University Training Reactor Annual Operating Report, FY 15-16 3.1 Maintenance Operations In addition to the above surveillance items, the following maintenance tions were performed on the indicated dates: 9/13/15 9/8/15 11/11/15 11/11/15 12/22/15 11/11/15 3/8/16 4/22/16 6/7/16 Replaced primary filter Dri-rite replaced Replaced PuBe source string Replaced microswitches for Shim 1 magnet down, Shim 2 and Regulating Rod up Dri-rite replaced Replaced microswitch for Shim 2 magnet down Dri-rite replaced Replaced primary resin Dri-rite replaced Additional minor maintenance was performed such as light bulb replacement and fine-tuning of equipment as necessary. 4 Changes to Facility There were no significant changes to the facility during this reporting period. 5 Environmental Surveys of Surrounding Areas Environmental surveys include the routine environmental dosimeter ments at the facility perimeter and the remainder of the locations on .campus. With the exception of recently positioned monitors [10, 11 and 12], the net measurements in millirem (mrem) tabulated below represent the July 1, 2015 to June 30, 2016 reporting period. Measurements at all points were well within the historical norms. Page 3
... ' Maryland University Training Reactor Annual Operating Report, FY 15-16 Environmental Survey Results for the Maryland University Training Reactor July 1, 2015 to June 30, 2016 MONITOR LOCATION DOSE (MREM) 2 308 m NE of MUTR 48a 3 1.1 km SW of MUTR 5 4 758 m NW of MUTR 2 5 387 m SE of MUTR 9 6 North, side MUTR fence line 2 7 East, adjacent to MUTR and IRR 2 8 West, adjacent to MUTR 5 9 606 m S of MUTR 16 lOb 950 m W of MUTR 5 11 b South, courtyard adjacent to MUTR 12 12b 248 m NW of MUTR 6 anose received is attributed to naturally occurring radioactive material (NORM) in the construction bricks of the building. bMonitoring period from January 1, 2016 to June 30, 2016 Figure 1: Location of dosimeters and MUTR 6 Radioactive Release and Discharge to the vironment 6.1 Liquid The Reactor Storage Sump was not discharged during this reporting period. Page 4 Maryland University Training Reactor Annual Operating Report, FY 15-16 6.2 Gaseous and Argon-41 The only release from the MUTR to the environment consists of Argon-41 duced from the activation of natural Argon dissolved in pool water and natural Argon present in air within the interstitial spaces of beams and ports. Argon-41 escapes from the pool and spaces into the MUTR reactor building and then leaks to areas outside the building. The two main areas for assessment of public dose due to effluent release are outside the roll-up door on the north side of the reactor building and outside the lower reception room into the hallway 1398. For this reporting period the reactor was operated for 304.93 hours0.00108 days <br />0.0258 hours <br />1.537698e-4 weeks <br />3.53865e-5 months <br />. EPA CAP88 was utilized to determine the dose outside the roll-up door to be 1.98 x 10-1 mrem. The dose in the hallway 1398 from any effluent release is 5.64 x 10-4 mrem. 7 Summary of Exposure Received by Facility Personnel and Visitors As part of the annual ALARA audit, facility management reviewed exposure records and found all badged personnel received less than 10% of their annual dose limit. The pocket dosimeters recorded minimal exposure for all guests and service personnel. 8 Unscheduled Shutdown/Reportable Occurrences During this reporting period, there were 5 unscheduled shutdowns resulting in the reactor SCRAM.
- Run# 4476 Safety 2 High Voltage on January 8, 2016
- Run# 4478 loss of power to Regulating Rod on January 15, 2016
- Run# 4481 period scram on Feb. 10, 2016
- Run# 4506 external scram, undercount on exhaust ram on April 11, 2016
- Run# 4510 AC power glitch on April 14, 2016 There were no reportable occurrences during this reporting period. 9 Special Experiments There were no new special experiments performed during this reporting period. 10 Changes in Facility Staff There were no signifcant staff changes during this period. Page 5