ML18234A517: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML18234A517 | | number = ML18234A517 | ||
| issue date = 08/22/2018 | | issue date = 08/22/2018 | ||
| title = Acceptance of Requested Licensing Action Remove Containment Valve Injection Water from Specified CIVs | | title = NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2 - Acceptance of Requested Licensing Action Remove Containment Valve Injection Water from Specified CIVs | ||
| author name = Mahoney M | | author name = Mahoney M | ||
| author affiliation = NRC/NRR/DORL/LPLII-1 | | author affiliation = NRC/NRR/DORL/LPLII-1 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:1 NRR-DMPSPEm Resource From: | ||
Mahoney, Michael Sent: | |||
Wednesday, August 22, 2018 11:39 AM To: | |||
Carrie Wilson Cc: | |||
Cecil Fletcher | |||
==Subject:== | |||
Catawba Nuclear Station, Units 1 and 2 - Acceptance of Requested Licensing Action Re: Remove Containment Valve Injection Water from Specified CIVs (EPID L-2018-LLA-0200) | |||
Carrie, By {{letter dated|date=July 19, 2018|text=letter dated July 19, 2018}}, Duke Energy submitted a license amendment request (LAR) for Catawba Nuclear Station, Units 1 and 2 (Catawba). The proposed license amendment request (LAR) revises Catawbas Updated Final Safety Analysis Report (UFSAR), Section 6.2.4.2.2, Containment Valve Injection Water System, to remove the Containment Valve Injection Water System (NW or CVIWS) Supply from specified Containment Isolation Valves (CIVs) and to exempt these CIVs from Type-C Local Leak Rate Testing (LLRT). | |||
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | |||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | |||
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 300 hours to complete. The NRC staff expects to complete this review in approximately 12 months, which is August, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. | |||
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. | |||
If you have any questions, please contact me. | |||
Thanks Mike Michael Mahoney McGuire and Catawba Project Manager, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Desk: (301)-415-3867 Email: Michael.Mahoney@NRC.GOV | |||
2 | |||
Hearing Identifier: | |||
NRR_DMPS Email Number: | |||
531 Mail Envelope Properties (DM6PR09MB2619687EF6C2AEB8CF2B3A30E5300) | |||
==Subject:== | |||
Catawba Nuclear Station, Units 1 and 2 - Acceptance of Requested Licensing Action Re: Remove Containment Valve Injection Water from Specified CIVs (EPID L-2018-LLA-0200) | |||
Sent Date: | |||
8/22/2018 11:38:51 AM Received Date: | |||
8/22/2018 11:38:53 AM From: | |||
Mahoney, Michael Created By: | |||
Michael.Mahoney@nrc.gov Recipients: | |||
"Cecil Fletcher " <Cecil.Fletcher@duke-energy.com> | |||
Tracking Status: None "Carrie Wilson" <Carrie.Wilson@duke-energy.com> | |||
Tracking Status: None Post Office: | |||
DM6PR09MB2619.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3005 8/22/2018 11:38:53 AM Options Priority: | |||
Standard Return Notification: | |||
No Reply Requested: | |||
No Sensitivity: | |||
Normal Expiration Date: | |||
Recipients Received:}} |
Latest revision as of 14:05, 5 January 2025
ML18234A517 | |
Person / Time | |
---|---|
Site: | Catawba |
Issue date: | 08/22/2018 |
From: | Michael Mahoney Plant Licensing Branch II |
To: | Wilson C Duke Energy Carolinas |
References | |
L-2018-LLA-0200 | |
Download: ML18234A517 (3) | |
Text
1 NRR-DMPSPEm Resource From:
Mahoney, Michael Sent:
Wednesday, August 22, 2018 11:39 AM To:
Carrie Wilson Cc:
Cecil Fletcher
Subject:
Catawba Nuclear Station, Units 1 and 2 - Acceptance of Requested Licensing Action Re: Remove Containment Valve Injection Water from Specified CIVs (EPID L-2018-LLA-0200)
Carrie, By letter dated July 19, 2018, Duke Energy submitted a license amendment request (LAR) for Catawba Nuclear Station, Units 1 and 2 (Catawba). The proposed license amendment request (LAR) revises Catawbas Updated Final Safety Analysis Report (UFSAR), Section 6.2.4.2.2, Containment Valve Injection Water System, to remove the Containment Valve Injection Water System (NW or CVIWS) Supply from specified Containment Isolation Valves (CIVs) and to exempt these CIVs from Type-C Local Leak Rate Testing (LLRT).
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is August, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
If you have any questions, please contact me.
Thanks Mike Michael Mahoney McGuire and Catawba Project Manager, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Desk: (301)-415-3867 Email: Michael.Mahoney@NRC.GOV
2
Hearing Identifier:
NRR_DMPS Email Number:
531 Mail Envelope Properties (DM6PR09MB2619687EF6C2AEB8CF2B3A30E5300)
Subject:
Catawba Nuclear Station, Units 1 and 2 - Acceptance of Requested Licensing Action Re: Remove Containment Valve Injection Water from Specified CIVs (EPID L-2018-LLA-0200)
Sent Date:
8/22/2018 11:38:51 AM Received Date:
8/22/2018 11:38:53 AM From:
Mahoney, Michael Created By:
Michael.Mahoney@nrc.gov Recipients:
"Cecil Fletcher " <Cecil.Fletcher@duke-energy.com>
Tracking Status: None "Carrie Wilson" <Carrie.Wilson@duke-energy.com>
Tracking Status: None Post Office:
DM6PR09MB2619.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3005 8/22/2018 11:38:53 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: