|
|
(2 intermediate revisions by the same user not shown) |
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:t NAltRATIVE StANAltY OF OPERATING EXPERIENCE DOCKET NO. |
| | 50-263 LNIT hbnticello DATE 3-4-80 CCNPLETED BY A. L. Myrabo TELEPfiONE 612/295-5151 htymi Febnsary 2/1/80 Shutdown to complete primary containment isolation reset logic to modification for NUREG 0578, item 2.1.4 implementation. Outage 2/3/80 extended due to spurious IR\\f scram on startup. |
| | 2/4/80 to Power operation during end-of-cycle coastdown. |
| | 2/13/80 2/14/80 Reduced power to 60% after one feedwater pump removed from service due to bearing failure. |
| | 2/16/80 Reduced power to 30% to perfom main condenser tube leak inspection. |
| | 2/17/80 to Power operation at 60%. |
| | 2/21/80 2/22/80 to Shutdown for 1980 refueling outage. |
| | 2/29/80 |
| | |
| | ~ |
| | MAR 0 7 1980 OPERATING DATA REPORT DOCKET NO. |
| | 50-263______ |
| | DATE 3-4-80_..__ |
| | COMPLETED BY A. |
| | L. Myrabo TELEPHONE 612/295-5151 CPERATING STATUS INotes i |
| | 1. |
| | J1it Name |
| | ________________________Monticelto l |
| | l 2. |
| | Peporting period: ___________________ FEBRUARY l |
| | ( |
| | : 3. Licensed Thermal Power (MWt) |
| | _______..____1670 l |
| | l 4 |
| | Nameplate Rating (Gross MWe): |
| | ______.______569 l |
| | [ |
| | 5. |
| | Design Electrical Rating (Net MWe): |
| | _____545.4 I |
| | i 6. |
| | Maximum Dependable Capacity (Gross MWe) |
| | __564 l |
| | l 7. |
| | Maximum Dependable Capacity (Net MWe): |
| | ____536 l__________________________l |
| | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: |
| | __N/A__________________________________________,.__ |
| | 9. |
| | Power Level Ta Which Restricted, If Any (Net MWe): |
| | ___N/A______________.__.._ |
| | : 10. Reasons For destrictions, If Any: __N/A________________..____________________ |
| | This Month Yr.-to-Date Cumulative |
| | : 11. Hours In Reporting Period |
| | _____696 |
| | _____1440 |
| | ____ 75985 |
| | : 12. Number Of Hours Reactor Was Critical |
| | ___479.6 |
| | ___1223.6 62754.5 |
| | : 13. Reactor Reserve Shutdown Hours |
| | _____0.0 |
| | ______0.0 |
| | _____940.7 14 Hours Generator On-Line |
| | ___467.1 |
| | ___1211.1 |
| | __ 61181.2 |
| | : 15. Unit Reserve Shutdown Hours |
| | _____0.0 |
| | ______0.0 |
| | ____.__0.0 |
| | : 16. Gross Thermal Energy Generated (MWH) |
| | _ 530513 |
| | _ 1553878 |
| | _100496740 |
| | : 17. Gross Electrical Energy Generated (MWH) __175800 |
| | __ 521150 |
| | __31499210 |
| | : 18. Net Electrical Energy Genera ~ted (MWH) |
| | __i66768 |
| | __ 497094 |
| | __30129290 |
| | : 19. Unit Service Factor |
| | __ 67.1 % |
| | ___ 84.1% |
| | ___. 80.5% |
| | : 20. Unit Availability Factor |
| | __ 67.1% |
| | ___ 84.1% |
| | ____ 80.5% |
| | : 21. Unit Capacity Factor (Using MDC Net) |
| | __ 44.7% |
| | ___ 64.4% |
| | ____ 74.0% |
| | : 22. Unit Capacity Factor (Using DER Net) |
| | __ 43.9% |
| | ___ 63.3% |
| | ____ 72.7% |
| | : 23. Unit Forced Outage Rate i.7% |
| | O.7% |
| | 6.3% |
| | : 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of |
| | __None_______________________________________________________ |
| | : 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:__03-28-80__ |
| | : 26. Units In Test Status (Prior to Commerc ia L Opera t ion)- N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION |
| | |
| | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. |
| | 50-263______ |
| | UNIT Monticello__ |
| | DATE 3-4-80..___ |
| | COMPLETED BY A. |
| | L. Myrabo TELEPHONE 612/295-5151 MONTH ______ FEBRUARY _______ |
| | DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY F0WER LEVEL (MWe-Net) |
| | (MWe-Net) i |
| | __________204____________ |
| | 17 |
| | __________333____________ |
| | 2 |
| | -4____________ |
| | 18 |
| | __________326_______.__.._ |
| | 3 13____________ |
| | 19 |
| | __________326____________ |
| | 4 |
| | __________349____________ |
| | 20 |
| | __________324____________ |
| | 5 |
| | __________434____________ |
| | 21 |
| | __________322____________ |
| | 6 |
| | __________411____________ |
| | 22 |
| | __________167____.._______ |
| | 7 |
| | __________409____________ |
| | 23 |
| | -4____________ |
| | 8 |
| | __________410____________ |
| | 24 |
| | -4____________ |
| | 9 |
| | __________410____________ |
| | 25 |
| | -4_____..______ |
| | 10 |
| | __________408____________ |
| | 26 |
| | -3_______..____ |
| | 11 |
| | __________405____________ |
| | 27 |
| | -3_.____ |
| | 12 |
| | __________405____________ |
| | 28 |
| | -3____________ |
| | 13 |
| | __________402____________ |
| | 29 |
| | -3________.___ |
| | 14 |
| | __________352____________ |
| | 30 15 |
| | __________335____________ |
| | 31 16 |
| | __________236____________ |
| | INSTRUCTIONS On this format, list the average daily unit power level in NWe-Net for each day in the reporting month. |
| | Compute to the nearest whole megawatt. |
| | |
| | a UNIT SilUIDOWNS %ND POhER REDUCTIONS DOCKET NO. |
| | 50-263 UNIT N AME Monticello DATE 3-4-80 February COMPLETED BY A. L Mvrnhn REPOR T MON Til TELEPilONE 612/295-151 |
| | .5 2 h |
| | h$ |
| | thesace 8 4., |
| | Cause & Correstise |
| | \\" |
| | Date i |
| | 5? |
| | 4 |
| | .5 s $ |
| | Esem s? |
| | [> |
| | Asimn to |
| | $5 5 |
| | 5ig Report = |
| | AL |
| | ,5 '-' |
| | Preseni Recurrense H |
| | o |
| | :i 1 |
| | 2-1-80 S |
| | 45.3 D |
| | 1 N/A SD INSilU-X Primary Containment Isolation Reset Logic Modification. NUREG 0578, Itmi 2.1.4 implementation. |
| | 2 2-3-80 F |
| | 8.2 A |
| | 3 N/A IA INSTRU-E Full IRM scram occurred from a spur-ious upscale spike on IRM channel 14. |
| | Earlier trip on "B" RPS channel was not fully reset. |
| | 3 2-16-80 S |
| | 0 B |
| | 4 N/A FC FilHOI Reduced power to 30% to perform conder ser tube leak test. |
| | e 4 |
| | 2-22-80 S |
| | 175.4 C |
| | 1 N/A ZZ ZZZZZZ End of cycle 7 refueling ontage. |
| | i 3 |
| | 4 F-Forced Reason. |
| | Method: |
| | Edubit G Instructions S. Scheduled A. Equipment Failure (Esplain) l-Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram. |
| | Entry Sheets for Licensee C Refueling 3 Automaine Strain-Esent Report (LER) Fi!c iNUREG-l D-Regulatory Restriction 4-Other (Explain i 0161) |
| | EOperator Training A Li, ens: Eumination F-Administrati.e 5 |
| | G Overational Ereor (Esplam E dubit I - Same Source (9/77) 11 Other ( E splau;)}} |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D1261999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With ML20216E7031999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With ML20210Q6611999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With ML20209F7901999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With ML20195H0351999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Monticello Nuclear Generatintg Plant.With ML20206N1721999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Monticello Nuclear Generating Plant.With ML20205P5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Monticello Nuclear Generating Plant.With ML20205G7391999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Monticello Nuclear Generating Plant.With ML20199F6211998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Mngp.With ML20198B2531998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Monticello Nuclear Generating Plant.With ML20195D2381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Monticello Nuclear Generating Plant.With ML20154L3471998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Monticello Nuclear Generating Plant.With ML20153B0861998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Monticello Nuclear Generating Plant.With ML20237B8461998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Monticello Nuclear Generating Plant ML20236R1941998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Monticello Nuclear Generating Plant ML20249A5861998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Monticello Nuclear Generating Plant ML20247K3971998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Monticello Nuclear Generating Plant ML20217F6431998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Monticello Nuclear Generating Plant ML20216H6481998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Monticello Nuclear Generating Plant ML20203B2821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Monticello Nuclear Generating Station ML20198P2201997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Monticello Nuclear Generating Plant ML20203J7131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20199H8181997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Monticello Nuclear Generating Plant ML20217K2081997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Monticello Nuclear Generating Plant ML20216H7771997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Monticello Nuclear Generating Plant ML20217K2741997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Monticello Nuclear Generating Plant ML20149E2921997-06-30030 June 1997 Monthly Operating Rept for June 1997 for MNGP ML20141C2841997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Monticello Nuclear Generating Plant ML20137W2621997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Monticello Nuclear Generating Plant ML20136H1671997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Monticello Nuclear Generating Plant ML20134M7071997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Monticello Nuclear Generating Plant ML20133J1401996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Monticello Nuclear Generating Plant ML20132A8771996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Monticello Nuclear Generating Plant ML20134L2761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Monticello Nuclear Generating Plant ML20128Q7831996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Monticello Nuclear Generating Plant ML20117M8161996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Monticello Nuclear Generating Plant ML20116M2991996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Monticello Nuclear Generating Plant ML20115H5651996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Monticello Nuclear Generating Plant ML20112J1921996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Monticello Nuclear Generating Plant ML20112A3121996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Monticello Nuclear Generating Plant ML20107E9831996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Monticello Nuclear Generating Plant ML20106H0591996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Monticello Nuclear Generating Plant ML20100G5031996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Monticello Nuclear Generating Plant ML20096C8061995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Monticello Nuclear Plant ML20095G0231995-11-30030 November 1995 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20094L1921995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Monticello Nuclear Generating Plant ML20093E6241995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Monticello Nuclear Generating Plant ML20092F4121995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Monticello Nuclear Generating Plant ML20087H3011995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Monticello Nuclear Generating Plant ML20086K1731995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Monticello Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2061999-10-12012 October 1999 Safety Evaluation Supporting Amend 106 to License DPR-22 ML20217D1261999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With ML20216E7031999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With ML20210Q0521999-08-0404 August 1999 Safety Evaluation Approving Relief Request 10 to License DPR-22 Per 10CFR50.55a(g)(6)(i).Inservice Exam for Relief Request 10,Parts A,B,C,D & E Impractical & Reasonable Assurance of Structural Integrity Provided ML20210Q6611999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With 05000263/LER-1999-007, :on 990610,HPCI Test Return Valve Was Unable to Close Against Max Expected Differential Pressure.Caused by Failure to Accurately Predict Valve Performance.Procedure Revised.With1999-07-0909 July 1999
- on 990610,HPCI Test Return Valve Was Unable to Close Against Max Expected Differential Pressure.Caused by Failure to Accurately Predict Valve Performance.Procedure Revised.With
05000263/LER-1999-006-01, :on 990602,during Quarterly Surveillance Hcpi Was Declared Inoperable.Caused by Drain Pot Alarm.Revised HPCI Surveillance Test Procedure.With1999-07-0202 July 1999
- on 990602,during Quarterly Surveillance Hcpi Was Declared Inoperable.Caused by Drain Pot Alarm.Revised HPCI Surveillance Test Procedure.With
ML20209F7901999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With 05000263/LER-1999-005, :on 990508,personnel Inserted Manual Scram When Pressure Transient Closed Air Ejector Suction Isolation Valves & Tripped off-gas Sys.Caused by Recombiner Catalyst Migration.Catalyst Was Removed.With1999-06-0707 June 1999
- on 990508,personnel Inserted Manual Scram When Pressure Transient Closed Air Ejector Suction Isolation Valves & Tripped off-gas Sys.Caused by Recombiner Catalyst Migration.Catalyst Was Removed.With
ML20195H0351999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Monticello Nuclear Generatintg Plant.With 05000263/LER-1999-004-01, :on 990422,low Reactor Water Level Scram,Group 2 & 3 Isolations & Subsequent HPCI Became Inoperable.Caused by Feedwater Controller Power Supply Failure.Three Power Supplies Replaced & Connections Cleaned.With1999-05-24024 May 1999
- on 990422,low Reactor Water Level Scram,Group 2 & 3 Isolations & Subsequent HPCI Became Inoperable.Caused by Feedwater Controller Power Supply Failure.Three Power Supplies Replaced & Connections Cleaned.With
05000263/LER-1999-003-01, :on 990412,HPCI & Division 1 ECCS Equipment Were Declared Inoperable Due to Svc Water Pump Failure.Pump Shaft Was Mechanically Freed,Check Valve Was Repaired & Pump Was Successfully Tested.With1999-05-12012 May 1999
- on 990412,HPCI & Division 1 ECCS Equipment Were Declared Inoperable Due to Svc Water Pump Failure.Pump Shaft Was Mechanically Freed,Check Valve Was Repaired & Pump Was Successfully Tested.With
05000263/LER-1999-002-01, :on 990329,event Sequence That Results in Available ECCS Being Reduced to Less than That Assumed in Current Safety Analysis.Caused by Failure of Edg.Plant Operating Procedures Revised.With1999-05-11011 May 1999
- on 990329,event Sequence That Results in Available ECCS Being Reduced to Less than That Assumed in Current Safety Analysis.Caused by Failure of Edg.Plant Operating Procedures Revised.With
ML20206N1721999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Monticello Nuclear Generating Plant.With ML20205N0861999-04-12012 April 1999 Safety Evaluation Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20205P5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Monticello Nuclear Generating Plant.With ML20205C1651999-03-19019 March 1999 Safety Evaluation Supporting Amend 105 to License DPR-22 ML20204H4951999-03-18018 March 1999 SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello.Therefore Staff Concludes Licensee Adequately Addressed Action Required in GL 96-05 05000263/LER-1999-001-02, :on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With1999-03-17017 March 1999
- on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With
ML20205G7391999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Monticello Nuclear Generating Plant.With ML20202F7901999-01-25025 January 1999 1999 Four Year Simulator Certification Rept for MNGP Simulation Facility ML20199E4871999-01-0606 January 1999 SER Accepting Licensee 951116,960214 & 0524 Responses to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20199F6211998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Mngp.With ML20198P0691998-12-28028 December 1998 Safety Evaluation Concluding That NSP Proposed Alternative to Paragraph III-3411 of App III to 1986 Edition of Section XI of ASME Code Provides Acceptable Level of Quality & Safety.Alternative Authorized ML20198M8221998-12-24024 December 1998 Safety Evaluation Supporting Amend 104 to License DPR-22 ML20198M6901998-12-23023 December 1998 Safety Evaluation Supporting Amend 103 to License DPR-22 ML20198D0751998-12-10010 December 1998 Safety Evaluation Supporting NSP Proposed Change to EOPs to Use 2/3 Core Height as Potential Entry Condition Into Containment Flooding ML20198B2531998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Monticello Nuclear Generating Plant.With ML20195E3691998-11-12012 November 1998 Safety Evaluation Concluding That Licensee USI A-46 Implementation Has Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20195D2381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Monticello Nuclear Generating Plant.With ML20198J4451998-10-22022 October 1998 Rev 2 to SIR-97-003, Review of Test Results of Two Surveillance Capsules & Recommendations for Matls Properties & Pressure-Temp Curves to Be Used for Monticello Rpv 05000263/LER-1998-005-01, :on 980921,HPCI Was Removed from Service to Repair Steam Leak in Drain Trap by Pass.Caused by Localized Erosion of Valve Body.Valve Was Declared Inoperable & Was Replaced with Manual Valve1998-10-21021 October 1998
- on 980921,HPCI Was Removed from Service to Repair Steam Leak in Drain Trap by Pass.Caused by Localized Erosion of Valve Body.Valve Was Declared Inoperable & Was Replaced with Manual Valve
05000263/LER-1998-004-02, :on 980909,manual Scram Was Inserted Following Pressure Transient Closed Air Ejector Suction Isolation Valves & Trips Offgas Recombiners,Occurred.Caused by Seat Leakage.Leaking Valve Seat Was Reworked1998-10-0909 October 1998
- on 980909,manual Scram Was Inserted Following Pressure Transient Closed Air Ejector Suction Isolation Valves & Trips Offgas Recombiners,Occurred.Caused by Seat Leakage.Leaking Valve Seat Was Reworked
ML20154L3471998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Monticello Nuclear Generating Plant.With ML20153F0511998-09-21021 September 1998 Rev 2 to MNGP Colr,Cycle 19 ML20153E9361998-09-0808 September 1998 Rev 1 to MNGP Colr,Cycle 19 ML20153B0861998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Monticello Nuclear Generating Plant.With ML20151T0981998-08-28028 August 1998 Safety Evaluation Supporting Amend 101 to License DPR-22 ML20237B8461998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Monticello Nuclear Generating Plant ML20236W5041998-07-21021 July 1998 ISI Exam Summary Rept - Refueling Outage 19 ML20236R1941998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Monticello Nuclear Generating Plant ML20249A5861998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Monticello Nuclear Generating Plant 05000263/LER-1998-003-01, :on 980417,transgranular Stress Corrosion Cracking Was Identified in Control Rod Drive Lines.Caused by chloride-induced Transgranular stress-corrosion Cracking. Affected Sections of Two Lines Replaced1998-05-14014 May 1998
- on 980417,transgranular Stress Corrosion Cracking Was Identified in Control Rod Drive Lines.Caused by chloride-induced Transgranular stress-corrosion Cracking. Affected Sections of Two Lines Replaced
05000263/LER-1998-002-02, :on 980415,main Steam Isolation Valve Position Setpoint Outside Allowed Range,Was Found.Caused by Previous Testing Technique & Use of Particular Switch Model.Eight New Position Switches W/Less Deadband Installed1998-05-14014 May 1998
- on 980415,main Steam Isolation Valve Position Setpoint Outside Allowed Range,Was Found.Caused by Previous Testing Technique & Use of Particular Switch Model.Eight New Position Switches W/Less Deadband Installed
ML20247K3971998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Monticello Nuclear Generating Plant 05000263/LER-1998-001-02, :on 980323,discovered Containment Isolation Valve Leakage Exceeded TS Limit.Caused by Foreign Matl Found on Valve Seat.Repaired Subject Valves & Developed Process to Ensure Cleanliness of Testing Equipment1998-04-22022 April 1998
- on 980323,discovered Containment Isolation Valve Leakage Exceeded TS Limit.Caused by Foreign Matl Found on Valve Seat.Repaired Subject Valves & Developed Process to Ensure Cleanliness of Testing Equipment
ML20217E9611998-04-20020 April 1998 Safety Evaluation Supporting Amend 100 to License DPR-22 ML20217D8731998-04-13013 April 1998 Rev 0 to MNGP Colr,Cycle 19 ML20217F6431998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Monticello Nuclear Generating Plant 1999-09-30
[Table view] |
Text
t NAltRATIVE StANAltY OF OPERATING EXPERIENCE DOCKET NO.
50-263 LNIT hbnticello DATE 3-4-80 CCNPLETED BY A. L. Myrabo TELEPfiONE 612/295-5151 htymi Febnsary 2/1/80 Shutdown to complete primary containment isolation reset logic to modification for NUREG 0578, item 2.1.4 implementation. Outage 2/3/80 extended due to spurious IR\\f scram on startup.
2/4/80 to Power operation during end-of-cycle coastdown.
2/13/80 2/14/80 Reduced power to 60% after one feedwater pump removed from service due to bearing failure.
2/16/80 Reduced power to 30% to perfom main condenser tube leak inspection.
2/17/80 to Power operation at 60%.
2/21/80 2/22/80 to Shutdown for 1980 refueling outage.
2/29/80
~
MAR 0 7 1980 OPERATING DATA REPORT DOCKET NO.
50-263______
DATE 3-4-80_..__
COMPLETED BY A.
L. Myrabo TELEPHONE 612/295-5151 CPERATING STATUS INotes i
1.
J1it Name
________________________Monticelto l
l 2.
Peporting period: ___________________ FEBRUARY l
(
- 3. Licensed Thermal Power (MWt)
_______..____1670 l
l 4
Nameplate Rating (Gross MWe):
______.______569 l
[
5.
Design Electrical Rating (Net MWe):
_____545.4 I
i 6.
Maximum Dependable Capacity (Gross MWe)
__564 l
l 7.
Maximum Dependable Capacity (Net MWe):
____536 l__________________________l
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
__N/A__________________________________________,.__
9.
Power Level Ta Which Restricted, If Any (Net MWe):
___N/A______________.__.._
- 10. Reasons For destrictions, If Any: __N/A________________..____________________
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
_____696
_____1440
____ 75985
- 12. Number Of Hours Reactor Was Critical
___479.6
___1223.6 62754.5
- 13. Reactor Reserve Shutdown Hours
_____0.0
______0.0
_____940.7 14 Hours Generator On-Line
___467.1
___1211.1
__ 61181.2
- 15. Unit Reserve Shutdown Hours
_____0.0
______0.0
____.__0.0
- 16. Gross Thermal Energy Generated (MWH)
_ 530513
_ 1553878
_100496740
- 17. Gross Electrical Energy Generated (MWH) __175800
__ 521150
__31499210
- 18. Net Electrical Energy Genera ~ted (MWH)
__i66768
__ 497094
__30129290
- 19. Unit Service Factor
__ 67.1 %
___ 84.1%
___. 80.5%
- 20. Unit Availability Factor
__ 67.1%
___ 84.1%
____ 80.5%
- 21. Unit Capacity Factor (Using MDC Net)
__ 44.7%
___ 64.4%
____ 74.0%
- 22. Unit Capacity Factor (Using DER Net)
__ 43.9%
___ 63.3%
____ 72.7%
- 23. Unit Forced Outage Rate i.7%
O.7%
6.3%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of
__None_______________________________________________________
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:__03-28-80__
- 26. Units In Test Status (Prior to Commerc ia L Opera t ion)- N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263______
UNIT Monticello__
DATE 3-4-80..___
COMPLETED BY A.
L. Myrabo TELEPHONE 612/295-5151 MONTH ______ FEBRUARY _______
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY F0WER LEVEL (MWe-Net)
(MWe-Net) i
__________204____________
17
__________333____________
2
-4____________
18
__________326_______.__.._
3 13____________
19
__________326____________
4
__________349____________
20
__________324____________
5
__________434____________
21
__________322____________
6
__________411____________
22
__________167____.._______
7
__________409____________
23
-4____________
8
__________410____________
24
-4____________
9
__________410____________
25
-4_____..______
10
__________408____________
26
-3_______..____
11
__________405____________
27
-3_.____
12
__________405____________
28
-3____________
13
__________402____________
29
-3________.___
14
__________352____________
30 15
__________335____________
31 16
__________236____________
INSTRUCTIONS On this format, list the average daily unit power level in NWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
a UNIT SilUIDOWNS %ND POhER REDUCTIONS DOCKET NO.
50-263 UNIT N AME Monticello DATE 3-4-80 February COMPLETED BY A. L Mvrnhn REPOR T MON Til TELEPilONE 612/295-151
.5 2 h
h$
thesace 8 4.,
Cause & Correstise
\\"
Date i
5?
4
.5 s $
Esem s?
[>
Asimn to
$5 5
5ig Report =
AL
,5 '-'
Preseni Recurrense H
o
- i 1
2-1-80 S
45.3 D
1 N/A SD INSilU-X Primary Containment Isolation Reset Logic Modification. NUREG 0578, Itmi 2.1.4 implementation.
2 2-3-80 F
8.2 A
3 N/A IA INSTRU-E Full IRM scram occurred from a spur-ious upscale spike on IRM channel 14.
Earlier trip on "B" RPS channel was not fully reset.
3 2-16-80 S
0 B
4 N/A FC FilHOI Reduced power to 30% to perform conder ser tube leak test.
e 4
2-22-80 S
175.4 C
1 N/A ZZ ZZZZZZ End of cycle 7 refueling ontage.
i 3
4 F-Forced Reason.
Method:
Edubit G Instructions S. Scheduled A. Equipment Failure (Esplain) l-Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automaine Strain-Esent Report (LER) Fi!c iNUREG-l D-Regulatory Restriction 4-Other (Explain i 0161)
EOperator Training A Li, ens: Eumination F-Administrati.e 5
G Overational Ereor (Esplam E dubit I - Same Source (9/77) 11 Other ( E splau;)