ML20244B029: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES, TEXT-SAFETY REPORT
| document type = SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES, TEXT-SAFETY REPORT
| page count = 1
| page count = 1
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:-;-            -              --                                            -_      .-
{{#Wiki_filter:-;-
a :T q l
a :T q l
w ,.                                                                         -
w,.
                      . .;                                                                                              a x
x a
JUN '2 1989             .
JUN
i p
'2 1989 i
DOCKET N0i:       70 371 LICENSEE:         UNC,-Inc.
p DOCKET N0i:
          =
70 371 LICENSEE:
UNC Naval Products Division Montville, CT
UNC,-Inc.
                            ~  
UNC Naval Products Division
=
Montville, CT
~  


==SUBJECT:==
==SUBJECT:==
        . SAFETY EVALUATION ~ REPORT, APPLICATION DATED MAY 22, 1989,-.
. SAFETY EVALUATION ~ REPORT, APPLICATION DATED MAY 22, 1989,-.
RE ONSITE WIND MEASURING SYSTEM
RE ONSITE WIND MEASURING SYSTEM
                                                                                                                          -l
-l
: Background                                                                                 j
: Background j
                            'UNC's . license' requires that a wind measuring system' for collecting .
'UNC's. license' requires that a wind measuring system' for collecting.
                            . meteorological data be operating onsite.. By letter dated May' 22, 1989,,UNC
. meteorological data be operating onsite.. By letter dated May' 22, 1989,,UNC
                            -requested a 6-8 week suspension from this; requirement.
-requested a 6-8 week suspension from this; requirement.
                                                                                                              ~
~
Discussion' l
Discussion' l
Because-UNC's wind measuring system has malfunctioned, they need 6-8 weeks to'             ,]
Because-UNC's wind measuring system has malfunctioned, they need 6-8 weeks to'
replace and ' upgrade the system.- During the interim, UNC has made arrangements             j Lto acquire the meteorological data from two' nearby: facilities. The. staff has u           j determined that UNC's request:is acceptable.
,]
replace and ' upgrade the system.- During the interim, UNC has made arrangements j
Lto acquire the meteorological data from two' nearby: facilities. The. staff has u j
determined that UNC's request:is acceptable.
Conclusion / Recommendation i
Conclusion / Recommendation i
1 Based on the above discussion, the staff believes the amendment can be issued:
1 Based on the above discussion, the staff believes the amendment can be issued:
                            - without undue risk to the workers, public, or environment. Approval of the~
- without undue risk to the workers, public, or environment. Approval of the~
application is recommended.
application is recommended.
                                                                                                            ~
~
i
i
                            .The Region I Principal Inspector has no objection to this proposed action.                   !
.The Region I Principal Inspector has no objection to this proposed action.
l,
l,
                                                                          @@R815gned By;.                                 I
@@R815gned By;.
                                                                          .Sean Soong-Uranium Fuel Section Fuel Cycle Safety Branch-                       !
I
Division of Industrial and                       j
.Sean Soong-Uranium Fuel Section Fuel Cycle Safety Branch-Division of Industrial and j
                                                        .                      Medical Nuclear Safety, NMSS                 i
Medical Nuclear Safety, NMSS i
                                                    .[l@.B@l S800d By:
.[l@.B@l S800d By:
                        ' , Approved by:           s'                                                                   j George.H. Bidinger, Section Leader
', Approved by:
                                    ...b.....__...__                 .__........__ ..          2N...........__.......
s' j
NAME:SSoong:                   VL     pe:               GHBidinger:                         I sa;p;;r-- 7;;i;;r---                                     nir---------                         .
George.H. Bidinger, Section Leader
OFFICIAL RECORD COPY                                   I I
...b.....__...__
8906120235 DR            890602             ?
2N...........__.......
ADOCK 07000371                                                             i PDC
NAME:SSoong:
_ _ _ _              - _                                                                                                  l}}
VL pe:
GHBidinger:
I sa;p;;r--
7;;i;;r--- nir---------
OFFICIAL RECORD COPY I
I 8906120235 890602
?
DR ADOCK 07000371 i
PDC l}}

Latest revision as of 04:25, 2 December 2024

SER Supporting 890522 Application to Suspend Onsite Wind Measuring Sys Due to Sys Malfunction.Vendor Will Acquire Meteorological Data from Two Nearby Facilities
ML20244B029
Person / Time
Site: 07000371
Issue date: 06/02/1989
From: Bidinger G, Soong S
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML20244B027 List:
References
NUDOCS 8906120235
Download: ML20244B029 (1)


Text

-;-

a :T q l

w,.

x a

JUN

'2 1989 i

p DOCKET N0i:

70 371 LICENSEE:

UNC,-Inc.

UNC Naval Products Division

=

Montville, CT

~

SUBJECT:

. SAFETY EVALUATION ~ REPORT, APPLICATION DATED MAY 22, 1989,-.

RE ONSITE WIND MEASURING SYSTEM

-l

Background j

'UNC's. license' requires that a wind measuring system' for collecting.

. meteorological data be operating onsite.. By letter dated May' 22, 1989,,UNC

-requested a 6-8 week suspension from this; requirement.

~

Discussion' l

Because-UNC's wind measuring system has malfunctioned, they need 6-8 weeks to'

,]

replace and ' upgrade the system.- During the interim, UNC has made arrangements j

Lto acquire the meteorological data from two' nearby: facilities. The. staff has u j

determined that UNC's request:is acceptable.

Conclusion / Recommendation i

1 Based on the above discussion, the staff believes the amendment can be issued:

- without undue risk to the workers, public, or environment. Approval of the~

application is recommended.

~

i

.The Region I Principal Inspector has no objection to this proposed action.

l,

@@R815gned By;.

I

.Sean Soong-Uranium Fuel Section Fuel Cycle Safety Branch-Division of Industrial and j

Medical Nuclear Safety, NMSS i

.[l@.B@l S800d By:

', Approved by:

s' j

George.H. Bidinger, Section Leader

...b.....__...__

2N...........__.......

NAME:SSoong:

VL pe:

GHBidinger:

I sa;p;;r--

7;;i;;r--- nir---------

OFFICIAL RECORD COPY I

I 8906120235 890602

?

DR ADOCK 07000371 i

PDC l