ML21349B364: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com
 
10 CFR 50.90 10 CFR 50.69
 
December 15, 2021
 
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN: Document Control Desk
 
Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
 
==Subject:==
Supplement - Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categori zation Process, and an Alternate Seismic Categorization Process in Acc ordance with the Requirements of 10 CFR 50.69, "Risk-Informed Categoriz ation and Treatment of Structures, Systems and Components for Nuclear Pow er Reactors"
 
==References:==
: 1. Exelon Generation Company, LLC letter to the U.S. Nuclear Regulatory Commission, Limerick Generating Station, Units 1 and 2, "Applic ation to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categorization Process in Accordance with the Requirements of 10 CFR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Pow er Reactors,'" dated March 11, 2021 (ADAMS Accession No. ML21070A412).
: 2. Email from A. Klett (U.S. Nuclear Regulatory Commission) to G. Stewart (Exelon Generation Company, LLC), "Supplement to Limerick 50.69 Audit Plan dated October 1, 2021 (L-2021-LLA-0042)," dated October 20, 2021 (ADAMS Accession No. ML21295A036).
: 3. Alternative Approaches for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization, EPRI, Palo Alto, CA: 2020. 300201 7583.
: 4. Exelon Generation Company, LLC letter to the U.S. Nuclear Regulatory Commission, Limerick Generating Station, Units 1 and 2, "Supple ment -
Application to Implement an Alternate Defense-in-Depth Categori zation Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categorization Process in Accordance w ith the Requirements of 10 CFR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Pow er Reactors,'" dated May 5, 2021 (ADAMS Accession No. ML21125A215).
 
Supplement - License Amendment Request 10 CFR 50.69 Alternate Categorization Processes Docket Nos. 50-352 and 50-353 December 15, 2021 Page 2
 
In Reference [1], Exelon Generation Company, LLC (Exelon) submi tted an application for amendment of the Renewed Facility Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (Limerick), Units 1 and 2, respecti vely.
 
The proposed amendments would modify the licensing basis by rev ising the related License Condition in Appendix C to allow the use of an alternate defense-in-depth categorization process, an alternate pressure boundary categorization process, and an alternate seismic categorization process for implementation of the risk-informed categorization and treatment of structures, systems, and components for Limerick in accordance with the requirements of 10 CFR 50.69.
 
By email dated October 20, 2021 (Reference [2]), the NRC notifi ed Exelon of their intent to conduct a regulatory virtual audit the week of November 15, 2021 with Exelon staff and associated contractors in support of the license amendment requ est (LAR) in Reference [1].
The email contained a supplemented regulatory virtual audit plan with attached audit questions. During the audit, questions were raised by the NRC concerning the acceptability of the application of the alternate Seismic Tier 1 categorizati on process to Limerick.
Although Exelon continues to believe that Limerick is a Tier 1 plant based on the guidance provided in Electric Power Research Institute (EPRI) Report 300 2017583, "Alternative Approaches for Addressing Seismic Risk in 10 CFR 50.69 Risk-Inf ormed Categorization,"
dated February 2020 (Reference [3]), Exelon has decided to purs ue the alternate Seismic Tier 2 categorization process provided in the same EPRI Report in order to move forward with the review of this LAR.
 
Therefore, this letter is a supplement to the Reference [1] LAR. Attachment 1 to this letter provides the information needed to justify the application of t he alternate Seismic Tier 2 categorization process for implementation of the risk-informed categorization and treatment of structures, systems, and components for Limerick in accordance with the requirements of 10 CFR 50.69. The information is identified by the Sections wi thin the original Reference [1]
LAR that discussed the alternate seismic approach and supersede s that information in its entirety. In addition, the alternate Seismic Tier 1 information provided in Section 2 of Exelon supplement {{letter dated|date=May 5, 2021|text=letter dated May 5, 2021}} (Reference [4]) is no longer relevant or necessary for this LAR since Exelon is now submitting Limerick as an alternat e Seismic Tier 2 site.
 
As a result of submitting this supplement to transition to the alternate Seismic Tier 2 approach, a minor change is required to the Facility Operating License (FOL) Appendix C License Condition wording that was proposed in the original Ref erence [1] LAR. Attachment 2 provides the revised FOL Appendix C License Condition markups.
 
Exelon has reviewed the information supporting the No Significant Hazards Consideration and the Environmental Consideration that was previously provide d to the NRC in the Reference [1] LAR. The information in this LAR supplement does not impact the conclusion that the proposed license amendments do not involve a significant hazards consideration. However, since the No Significant Hazards Consi deration information provided in the original LAR made specific mention of the alternate Seismic Tier 1 categorization process, a revised No Significant Hazards Consid eration discussion is provided in the attachment to remove the Tier 1 wording. The i nformation in Attachment 1 Supplement - License Amendment Request 10 CFR 50.69 Alternate Categorization Processes Docket Nos. 50-352 and 50-353 December 15, 2021 Page 3
 
also does not impact the conclusion that there is no need for an environmental assessment to be prepared in support of the proposed amendments.
 
There are no regulatory commitments contained in this supplement.
 
In accordance with 10 CFR 50.91, "Notice for public comment; State consultation,"
paragraph (b), Exelon is notifying the Commonwealth of Pennsylv ania of this license amendment request supplement by transmitting a copy of this letter to the designated State Official.
 
If you should have any questions regarding this submittal, plea se contact Glenn Stewart at 610-765-5529.
 
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 15th day of December 2021.
 
Respectfully,
 
David P. Helker Sr. Manager - Licensing and Regulatory Affairs Exelon Generation Company, LLC
: License Amendment Request Supplement - Application to Implement Alternate Categorization Processes in Accordance with the Requi rements of 10 CFR 50.69. : Revised Proposed FOL Appendix C License Condition Mark-ups
 
cc: Regional Administrator - NRC Region I w/ attachments NRC Senior Resident Inspector - Limerick Generating Station "
NRC Project Manager, NRR - Limerick Generating Station "
Director, Bureau of Radiation Protection - Pennsylvania Departm ent of Environmental Protection "
 
ATTACHMENT 1
 
License Amendment Request Supplement
 
Limerick Generating Station, Units 1 and 2 NRC Docket Nos. 50-352 and 50-353
 
Application to Implement an Alternate Defense-in-Depth Categori zation Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Categorization Process in Accordance with the Requirements of 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor s"
 
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 1 of 24 Docket Nos. 50-352 and 50-353
 
In Reference [1], Exelon Generation Company, LLC (Exelon) submi tted an application for amendment of the Renewed Facility Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (Limerick), Units 1 and 2, respectively.
 
The proposed amendments would modify the licensing basis by rev ising the related License Condition in Appendix C to allow the use of an alternate defense-in-depth categorization process, an alternate pressure boundary categorization process, and an alternate seismic categorization process for implementation of the risk-informed categorization and treatment of structures, systems, and components for Limerick in accordance with the requirements of 10 CFR 50.69.
 
By email dated October 20, 2021 (Reference [2]), the NRC notifi ed Exelon of their intent to conduct a regulatory virtual audit the week of November 15, 2021 with Exelon staff and associated contractors in support of the license amendment requ est (LAR) in Reference [1].
The email contained a supplemented regulatory virtual audit pla n with attached audit questions.
During the audit, questions were raised by the NRC concerning t he acceptability of the application of the alternate Seismic Tier 1 categorization process to Limerick. Although Exelon continues to believe that Limerick is a Tier 1 plant based on t he guidance provided in Electric Power Research Institute (EPRI) Report 3002017583, "Alternative Approaches for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization," dat ed February 2020 (Reference
[3]), Exelon has decided to pursue the alternate Seismic Tier 2 categorization process provided in the same EPRI Report in order to move forward with the review of this LAR.
 
Therefore, this letter is a supplement to the Reference [1] LAR. This attachment provides the information needed to justify the application of the seismic Ti er 2 alternative categorization process for implementation of the risk-informed categorization and treatment of structures, systems, and components for Limerick in accordance with the req uirements of 10 CFR 50.69.
The information is identified by the Sections within the origin al Reference [1] LAR that discussed the alternate seismic approach and supersedes that information in its entirety. In addition, the alternate Seismic Tier 1 information provided in Section 2 of E xelon supplement {{letter dated|date=May 5, 2021|text=letter dated May 5, 2021}} (Reference [4]) is no longer relevant or necessary for this LAR since Exelon is now submitting Limerick as an alternate Seismic Tier 2 site.
 
Also, because of submitting this supplement to transition to the alternate Seismic Tier 2 approach, a minor change is required to the Facility Operating License (FOL) Appendix C License Condition wording that was proposed in the original Ref erence [1] LAR. Attachment 2 provides the revised FOL Appendix C License Condition markups.
 
2.1 REASON FOR PROPOSED CHANGE
 
(NOTE: The only change in this Section was to replace Tier 1 wi th Tier 2 and to include the references to the LaSalle Tier 2 NRC issued amendment and safet y evaluation (SE) and the EPRI markups provided in Attachment 2 of the LaSalle responses to the NRC Requests for Additional Information.)
 
During the implementation of 10 CFR 50.69 by various licensees, it was determined that several processes are overly conservative when performing the 10 CFR 50.69 categorization and are resource intensive, without providing a commensurate benefit to the health and safety of the public. For example, when evaluating core damage defense-in-de pth, credit cannot be taken for License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 2 of 24 Docket Nos. 50-352 and 50-353
 
multiple identical, redundant trains. To address this, an alternate approach has been developed in lieu of the current defense-in-depth categorization process, the current pressure boundary categorization process (previously referred to as passive categ orization as discussed in Section 3.5.4 of the Safety Evaluation (SE) that was issued for Limerick, Units 1 and 2, to implement 10 CFR 50.69 (Reference [5]), and the current seismic categorizati on process. The alternate defense-in-depth categorization process, the alternate pressure boundary categorization process, and the alternate Seismic Tier 2 categorization proces s are in compliance with 10 CFR 50.69; however, these processes allow additional focus on Risk-Informed Safety Class (RISC)
RISC-1 and RISC-2 structures, systems and components (SSCs). T he use of the alternate defense-in-depth categorization process, the alternate pressure boundary categorization process, and the alternate Seismic Tier 2 categorization proces s improves consistency and removes subjectivity while reducing the 10 CFR 50.69 implement ation effort to categorize systems.
 
The alternate seismic categorization process is briefly discussed below (Note: only the alternative seismic information is provided since the alternate defense-in-depth and pressure boundary categorization processes remain unchanged):
: 3. Alternate Seismic Tier 2 Categorization Process
: a. The current seismic risk asse ssment method is a Seismic Marg ins Assessment (SMA). All SSCs included on the SMA Safe Shutdown Equipment Li st (SSEL), i.e.,
Success Path Component List (SPCL), conservatively default to H SS. The alternate Seismic Tier 2 categorization process employs a systematic proc ess to evaluate the seismic hazard which is integrated into the categorization proc ess. It considers likelihood and magnitude of the seismic hazard and margin to the site-specific design basis. The alternate Seismic Tier 2 categorization process is described in EPRI 3002017583 (Reference [3]).
: b. EPRI 3002017583 is an update to EPRI 3002012988, "Alternative Approaches for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categoriz ation," July 2018 which was referenced in the NRC issued amendment and SE for Cal vert Cliffs Nuclear Power Plant, Units 1 and 2, to implement 10 CFR 50.69 a s noted below:
* Calvert Cliffs Nuclear Power Plant, Units 1 and 2, "Issuance of Amendment Nos. 332 and 310 Re: Risk-Informed Categorization and Treatment of Systems, Structures, and Components (EPID L-2018-LLA-0482)," Fe bruary 28, 2020. (ADAMS Accession No. ML19330D909) (Reference [6]).
: c. This license amendment request incorporates by Reference the Clinton Power Station, Unit 1 response to request for additional information letter of November 24, 2020 (ML20329A433) (Reference [7]), in particular, the response to the question regarding the differences between the initial EPRI 3002012988 a nd the current EPRI 3002017583 as well as Exelons proposed approach for the 50.69 Seismic Alternative Tier 1.
: d. This license amendment request follows the same categorizati on approach for Tier 2 seismic risk as approved for LaSalle County Station, Units 1 and 2, as identified in Reference [8] with no deviations.
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 3 of 24 Docket Nos. 50-352 and 50-353
* The alternative seismic approach described herein is consisten t with EPRI 3002017583 (Reference [3]), including the EPRI markups provided in Attachment 2 of Exelon's responses to the NRC Requests for Addi tional Information in References [9] and [10].
 
==2.2 DESCRIPTION==
OF THE PROPOSED CHANGE
 
The license condition in Appendix C currently states:
 
"Exelon is approved to implement 10 CFR 50.69 using the process es for categorization of Risk-Informed Safety Class (RISC)-1, RISC-2, RISC-3, and RISC-4 structures, systems, and components (SSCs) using: Probabilistic Risk Assessment (PRA ) models to evaluate risk associated with internal events, including internal floodi ng, and internal fire; the shutdown safety assessment process to assess shutdown risk; the Arkansas Nuclear One, Unit 2 (ANO-2) passive categorization method to assess passive component risk for Class 2 and Class 3 SSCs and their associated supports; and the results of non-PRA evaluations that are based on the IPEEE Screening Assessment for External H azards, i.e., seismic margin analysis (SMA) to evaluate seismic risk, and a screening of other external hazards updated using the external hazard screening significance proces s identified in ASME/ANS PRA Standard RA-Sa-2009; as specified in Unit [1] License Amendment No. [230] dated July 31, 2018.
 
Exelon will complete the implementation items listed in Attachm ent 2 of Exelon letter to NRC dated April 23, 2018 prior to implementation of 10 CFR 50.69. A ll issues identified in the attachment will be addressed and any associated changes will be made, focused-scope peer reviews will be performed on changes that are PRA upgrades as defined in the PRA standard (ASME/ANS RA-Sa-2009, as endorsed by RG 1.200, Revisio n 2), and any findings will be resolved and reflected in the PRA of record prior to implementation of the 10 CFR 50.69 categorization process.
 
Prior NRC approval, under 10 CFR 50.90, is required for a chang e to the categorization process specified above (e.g., change from a seismic margins ap proach to a seismic probabilistic risk assessment approach)."
 
The license condition in Appendix C is proposed to be revised a s follows:
 
(NOTE: The only change was to add "and associated supplements" to the Exelon {{letter dated|date=March 11, 2021|text=letter dated March 11, 2021}} in the second paragraph.)
 
"Exelon is approved to implement 10 CFR 50.69 using the process es for categorization of Risk-Informed Safety Class (RISC)-1, RISC-2, RISC-3, and RISC-4 structures, systems, and components (SSCs) using: Probabili stic Risk Assessment (PRA) models to evaluate risk associated with internal events, including internal flooding, and internal fire; the shutdown safety assessment process to assess shutdown risk; the Arkansas Nuclear One, Unit 2 (ANO-2) passive categorization method to assess passive compone nt risk for Class 2 and Class 3 SSCs and their associated supports; and the results of non-PRA evaluations that are based on the IPEEE Screening Assessment for External Hazard s, i.e., seismic margin analysis (SMA) to evaluate seismic risk, and a screening of oth er external hazards updated License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 4 of 24 Docket Nos. 50-352 and 50-353
 
using the external hazard screening significance process identi fied in ASME/ANS PRA Standard RA-Sa-2009; as specified in Unit [1] License Amendment No. [230] dated July 31, 2018.
 
In addition, Exelon is approved to implement 10 CFR 50.69 using any of the following alternate processes for categorization of RISC-1, RISC-2, RISC-3, and RISC-4 SSCs: the defense-in-depth approach contained in PWROG-20015-NP; the passive pressure boundary categorization approach described in EPRI 3002015999; and the alternative seismic approach as described in Exelon's submittal {{letter dated|date=March 11, 2021|text=letter dated March 11, 2021}}, and associated supplements, as specified in Unit [1] License Amendment No. [XX X] dated [DATE].
 
Prior NRC approval, under 10 CFR 50.90, is required for a chang e to the categorization process specified above (e.g., change from a seismic margins ap proach to a seismic probabilistic risk assessment approach)."
 
Note: The implementation items listed in Attachment 2 of Exelon letter to NRC dated April 23, 2018 were completed as required by the original license conditi on prior to the implementation of the 10 CFR 50.69 categorization process at Limerick which began in October 2018. Therefore, the paragraph specific to the implementation items is no longer applicable and is proposed to be deleted from the revised license condition for this license amendment request and replaced with the new insert paragraph for the alternate categorization processes as indicated above and in the proposed license condition markups in Enclosure 2.
: 3. TECHNICAL EVALUATION
 
3.1 CATEGORIZATION PROCESS DESCRIPTION (10 CFR 50.69(b)(2)(i))
 
3.1.4 Alternate Seismic Tier 2 Categorization Process
 
(NOTE: This section is a complete re-write.)
 
The NRC previously issued its Safety Evaluation for Limerick ap proving the 10 CFR 50.69 process (Reference [5]).
 
10 CFR 50.69(c)(1) requires the use of PRA to assess risk from internal events. For other risk hazards, such as seismic, 10 CFR 50.69 (b)(2) allows, and NEI 00-04 (Reference [11])
summarizes, the use of other methods for determining SSC functional importance in the absence of a quantifiable PRA (such as Seismic Margin Analysis or IPEEE Screening) as part of an integrated, systematic process. For the Limerick seismic hazard assessment, Exelon proposes to use a risk informed graded approach that meets the requirements of 10 CFR 50.69 (b)(2) as an alternative to those listed in NEI 00-04 sec tions 1.5 and 5.3. This approach is specified in Reference [3] with the EPRI markups provided in Attachment 2 of References [9] and [10], and includes additional considerations that are discussed in this section.
 
(Note: The discussion below pertaining to Reference [3] includ es the markups provided in Attachment 2 of References [9] and [10].)
 
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 5 of 24 Docket Nos. 50-352 and 50-353
 
The proposed categorization approach for Limerick is a risk inf ormed graded approach that is demonstrated to produce categorization insights equivalent to a seismic PRA. This approach relies on the insights gained from the seismic PRAs examined in Reference [3] and plant specific insights considering seismic correlation effects and s eismic interactions.
 
Following the criteria in Reference [3], the Limerick site meet s the EPRI 3002017583 Tier 1 criteria for a "Low Seismic Hazard/High Seismic Margin" site. The Tier 1 criteria are as follows:
 
"Tier 1: Plants where the GMRS [Ground Motion Response Spectrum] peak acceleration is at or below approximatel y 0.2g or where the GMRS is below or approximately equal to the SSE [Safe Shutdown Earthquake] between 1.0 Hz and 10 Hz. Examples are shown in Figures 2-1 and 2-2. At these sites, the GMRS is either very low or within the range of the SSE such that unique seismic categor ization insights are not expected."
 
Exelon considers the Limerick site to be a Tier 1 site in accor dance with the above EPRI Tier 1 criteria. However, during the NRC Audit conducted November 15 - 17, 2021 for this License Amendment Request (Reference [2]), questions were raised by the NRC concerning the acceptability of the application of the alternate Seismic Tier 1 approach. As a result, Exelon is submitting Limerick as a Tier 2 site. Per Reference [3], for Tier 2 sites, the site Ground Motion Response Spectrum (GMRS) to SSE (Safe Shutdown Earthquake) comp arison is above the Tier 1 threshold but not high enough that the NRC required the plant to perform an SPRA to respond to Recommendation 2.1 of the Near-Term Task Force 50.54(f) letter (Reference [12]).
Reference [3] also demonstrates that seismic risk is adequately addressed for Tier 2 sites by the results of additional qualitative assessments discussed in this section and existing elements of the §50.69 categorization process specified in NEI 00-04.
 
The trial studies in Reference [3], as amended by their RAI res ponses and amendments (References [13], [14], [15], [16], [17], [18], [19], [20], and [21]) show that seismic categorization insights are overlaid by other risk insights even at plants where the GMRS is far beyond the seismic design basis. Therefore, the basis for the Tier 2 classification and resulting criteria is that consideration of the full range of the seismic hazard produces limited unique insights to the categorization process. That is the basis for the following statements in Table 4-1 of Reference [3].
 
"At Tier 2 sites, there may be a limited number of unique seismic insights, most likely attributed to the possibility of seismically correlated failures, appropriate for consideration in determining HSS SSCs. The special seismic risk evaluation process recommended using a Common Cause impact approach in the FPIE PRA can identify the appropriate seismic insights to be considered with the other categorization insights by the Integrated Decision-making Panel for the final HSS determinations."
 
At sites with moderate seismic demands (i.e., Tier 2 range), there is no need to perform more detailed evaluations to demonstrate the inherent seismic capaci ties documented in industry sources such as Reference [22]. Tier 2 seismic demand sites have a lower likelihood of seismically induced failures and less challenges to plant systems than trial study plants. This, therefore, provides the technical basis for allowing use of a graded approach for addressing seismic hazards at Limerick.
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 6 of 24 Docket Nos. 50-352 and 50-353
 
Test cases described in Section 3 of Reference [3], as amended by their RAI responses and amendments (References [13], [14], [15], [16], [17], [18], [19], [20], [21]) showed that there are very few, if any, SSCs that would be designated HSS for seismic unique reasons. The test cases identified that the unique seismic insights were typicall y associated with seismically correlated failures and led to unique HSS SSCs. While it would be unusual even for moderate hazard plants to exhibit any unique seismic insights, it is prudent and recommended by Reference [3] to perform additional evaluations to identify the conditions where correlated failures and seismic interactions may occur and determine their impact in the 10 CFR 50.69 categorization process. The special sensitivity study recommen ded in Reference [3] uses common cause failures, similar to the approach taken in a FPIE PRA and can identify the appropriate seismic insights to be considered with the other ca tegorization insights by the IDP for the final HSS determinations.
 
Exelon is using test case information from Reference [3] develo ped by other licensees. The test case information is being incorporated by Reference into t his application; specifically, Case Study A (Reference [13], [14], [15]), Case Study C (Reference [ 23]), Case Study D (Reference
[24]), as well as RAI responses and amendments (References [13], [14], [15], [16], [17], [18],
[19], [20], and [21]) that clarify aspects of these case studie s.
 
Basis for Limerick being a Tier 2 Plant
 
As defined in Reference [3], Limerick meets the aforementioned Tier 1 criteria for a "Low Seismic Hazard / High Seismic Margin" site. However, as previously mentioned, Exelon is submitting Limerick as a Tier 2 site. The Tier 2 criteria are as follows:
 
"Tier 2: Plants where the GMRS [Ground Mo tion Response Spectrum] to SSE [Safe Shutdown Earthquake] comparison between 1.0 Hz and 10 Hz is greater than in Tier 1 but not high enough to be treated as Tier 3. At these sites, the unique seismic categorization insights are expected to be limited."
 
Note: Reference [3] applies to the Tier 2 sites in its entirety except for Sections 2.2 (Tier 1 sites) and 2.4 (Tier 3 sites).
 
For comparison, Tier 1 plants are defined as having a GMRS peak acceleration at or below approximately 0.2g or where the GMRS is below or approximately equal to the SSE between 1.0 Hz and 10 Hz. Tier 3 plants are defined where the GMRS to SSE comparison between 1.0 Hz and 10 Hz is high enough that the NRC requ ired the plant to perform an SPRA to respond to the Fukushima 50.54(f) letter (Reference [12]).
 
As shown in Figure 1, comparing the Limerick GMRS (derived from the seismic hazard) to the SSE (i.e., seismic design basis capability), the GMRS is below the SSE up to approximately 11 Hz and exceeds the SSE above 11 Hz up to 100 Hz (Reference [25] ). The NRC screened out Limerick from performing a seismic PRA in response to the NTTF 2.1 50.54(f) letter (Reference
[26]). As such, it is appropriate that Limerick is considered a Tier 1 plant; however, as previously mentioned, Exelon is su bmitting Limerick as a Tier 2 site in order to address NRC concerns. The basis for Limerick being Tier 2 will be document ed and presented to the IDP for each system categorized.
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 7 of 24 Docket Nos. 50-352 and 50-353
 
Figure 1: GMRS and SSE Response Spectra for Limerick 1
 
The following paragraphs describe additional background and the process to be utilized for the graded approach to categorize the seismic hazard for a Tier 2 p lant.
 
Implementation of the Recommended Process
 
Reference [3] recommends a risk informed graded approach for ad dressing the seismic hazard in the 10 CFR 50.69 categorization process. There are a number of seismic fragility fundamental concepts that support a graded approach and there are important characteristics about the comparison of the seismic design basis (represented b y the SSE) to the site-specific seismic hazard (represented by the GMRS) that support the selec ted thresholds between the three evaluation Tiers in the report. The coupling of these co ncepts with the categorization process in NEI 00-04 are the key elements of the approach defin ed in Reference [3] for identifying unique seismic insights.
 
The seismic fragility o f an SSC is a function of the margin bet ween an SSC's seismic capacity and the site-specific seismic dem and. References such as EPRI NP 6041 (Reference [22])
provide inherent seismic capacities for most SSCs that are not directly related to the site-specific seismic demand. This inherent seismic capacity is bas ed on the non-seismic design loads (pressure, ther mal, dead weight, etc.) and the required f unctions for the SSC. For example, a pump has a relatively high inherent seismic capacity based on its design and that
 
1 From Reference [27] Table 2.4-1 (GMRS) and Table 3.1-1 (SSE)
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 8 of 24 Docket Nos. 50-352 and 50-353
 
same seismic capacity applies at a site with a very low demand and at a site with a very high demand.
 
There are some plant features such as equipment anchorage that have seismic capacities more closely associated with the site-specific seismic demand s ince those specific features are specifically designed to meet that demand. However, even for these features, the design basis criteria have intended conservati sms that result in significant seismic margins within SSCs.
These conservatisms are reflected in key aspects of the seismic design process. The SSCs used in nuclear power plants are intentionally designed using c onservative methods and criteria to ensure that they have margins well above the required design bases. Experience has shown that design practices result in margins to realistic seismic capacities of 1.5 or more.
 
In applying the Reference [3] process for Tier 2 sites to the Limerick 10 CFR 50.69 categorization process, the IDP will be provided with the rationale for applying the Reference
[3] guidance and informed of plant SSC specific seismic insights that the IDP may choose to consider in their HSS/LSS deliberations. As part of the categorization team's preparation of the System Categorization document (SCD) that is presented to the IDP, a section will be included that provides identified plant seismic insights as well as the basis for applicability of the Reference [3] study and the bases for Limerick being a Tier 2 plant. The discussion of the Tier 2 bases will include such factors as:
* The moderate seismic hazard for the plant,
* The definition of Tier 2 in the EPRI study, and
* The basis for concluding Limerick is a Tier 2 plant.
 
At several steps of the categorization process, (e.g., as noted in Figure 2 and Table 1) the categorization team will consider the available seismic insight s relative to the system being categorized and document their conclusions in the SCD. Integrated importance measures over all modeled hazards (i.e., internal events, including internal flooding, and internal fire for Limerick) are calculated per Section 5.6 of NEI 00-04, and components for which these measures exceed the specified criteria are preliminary HSS whic h cannot be changed to LSS.
For HSS SSCs uniquely identified by the Limerick PRA models but having design basis functions during seismic events or functions credited for mitig ation and prevention of severe accidents caused by seismic events, these will be addressed using non-PRA based qualitative assessments in conjunction with any seismic insights provided b y the PRA.
 
For components that are HSS due to fire PRA but not HSS due to internal events PRA, the categorization team will review d esign basis functions during s eismic events or functions credited for mitigation and prevention of severe accidents caus ed by seismic events and characterize these for presentation to the IDP as additional qu alitative inputs, which will also be described in the SCD.
 
The categorization team will review available Limerick plant specific seismic reviews and other resources such as those identified above. The objective of the seismic review is to identify plant specific seismic insights that might include potentially important impacts such as:
* Impact of relay chatter
* Implications related to potential seismic interactions such as with block walls License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 9 of 24 Docket Nos. 50-352 and 50-353
* Seismic failures of passive SSCs such as tanks and heat exchan gers
* Any known structural or anchorage issues with a particular SSC
* Components implicitly part of PRA modeled functions (including relays)
 
For each system categorized, the categorization team will evalu ate correlated seismic failures and seismic interactions between SSCs. This process is detaile d in Reference [3] Section 2.3.1 and is summarized in Figure 3.
 
Determination of seismic insi ghts will make use of the full pow er internal events PRA model supplemented by focused seismic walkdowns. An overview of the process to determine the importance of SSCs for mitigating seismic events follows and is utilized on a system basis:
o Identify SSCs within the system to be categorized o Group SSCs within the system into the classes of equipment and distributed systems used for SPRAs.
o Refine the list and screen out the following SSCs from consideration of functional correlated seismic failures:
* Inherently rugged components
* Components not used in safety functions that support mitigation of core damage or containment performance
* Components already identified as HSS components from the Inter nal Events PRA or Integrated assessment o Perform a seismic walkdown:
* For SSCs screened IN look for correlation
* For SSCs screened IN or OUT assess for spatial interaction con cerns that could fail multiple components in the system, or could fail a single compo nent in the system due to either seismic interaction or direct component failure m odes, that result in total loss of a multi-train system and where there is not another system that independently provides the same function o Based on the seismic walkdown:
* Screen out IF SSCs have high seismic capacity AND not included in seismically correlated groups or correlated interaction groups o Add surrogate events to the FPIE model that simulate spatial interaction or Correlation (for the system being categorized) - set the probability of fai lure to 1E-04.
o Quantify the FPIE model (for the system being categorized) for LOOP and Small LOCA (SLOCA) initiated accident sequences setting (1) the LOOP initi ating event frequency to 1.0/yr, (2) the SLOCA initiating event frequency to 1E-02/yr, and (3) the initiating event frequency for all initiators other than LOOP and small LOCA ini tiators to 0 (zero), and also removing credit for restorat ion of offsite power in LOOP/S BO accident sequences as well as other functional recoveries License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 10 of 24 Docket Nos. 50-352 and 50-353
 
o Utilize the Importance Measures from this sensitivity study to identify appropriate SSCs (in the system being categorized) that should be HSS due to correlation or seismic interactions
 
Seismic impacts would be compiled on an SSC basis. As each system is categorized, the system specific seism ic insights will be documented in the cate gorization report and provided to the IDP for consideration as part of the IDP review process (e.g., Figure 2). The IDP cannot challenge any candidate HSS recommendation for any SSC from a s eismic perspective if they believe there is a basis, except for certain conditions identif ied in Step 10 of Section 2.3.1 of Reference [3]. Any decision by the IDP to downgrade preliminar y HSS components to LSS will consider the applicable seismic i nsights in that decision. SSCs identified from the Fire PRA as candidate HSS, which are not HSS from the internal events PRA or integrated importance measure assessment, will be reviewed for their design basis fun ction during seismic events or functions credited for mitigation and prevention of severe acci dents caused by seismic events.
These insights will provide the IDP a means to consider potential impacts of seismic events in the categorization process.
 
If the Limerick seismic hazard changes from medium risk (i.e., Tier 2) at some future time, prior NRC approval, under 10 CFR 50.90, will be requested if Limerick 's feedback process determines that a process different from the proposed alternati ve seismic approach is warranted for seismic risk consideration in categorization unde r 10 CFR 50.69. After receiving NRC approval, Exelon will follow its categorization review and adjustment process to review the changes to the plant and update, as appropriate, the SSC ca tegorization in accordance with 10 CFR 50.69(e) and the EPRI 3002017583 SSC categorization criteria for the updated Tier. This includes use of the Exelon corrective action process (CAP).
 
If the seismic hazard is reduced such that it meets the criteri a for Tier 1 in EPRI 3002017583, Exelon will implement the following process.
 
a) For previously completed syst em categorizations, Exelon may review the categorization results to determine if use of the criteria in EPRI 3002017583 Section 2.2, "Low Seismic Hazard / High Seismic Margin Sites," would lead to categorizati on changes. If changes are warranted, they will be implemented through the Exelon desi gn control and corrective action programs and NEI 00-04, Section 12.
 
b) Seismic considerations for s ubsequent system categorization activities will be performed in accordance with the guidance in EPRI 3002017583 Section 2.2, "Low Seismic Hazard / High Seismic Margin Sites."
 
If the seismic hazard increases to the degree that a seismic probabilistic risk assessment (SPRA) becomes necessary to dem onstrate adequate seismic safety, Exelon will implement the following process following completion of the SPRA, includi ng adequate closure of Peer Review Findings and Observations.
 
For previously completed system categorizations, Exelon will re view the categorization results using the SPRA insights as prescribed in NEI 00-04 Section 5.3, Seismic Assessment and Section 5.6, "Integral Assessment". If changes are warranted, they will be implemented through the Exelon design control and corrective action program s and NEI 00-04 Section 12.
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 11 of 24 Docket Nos. 50-352 and 50-353
 
Seismic considerations for subsequent system categorization activities will follow the guidance in NEI 00-04, as recommended in EPRI 3002017583 Section 2.4, "H igh Seismic Hazard / Low Seismic Margin Sites".
 
Historical Seismic References for Limerick
 
The Limerick GMRS and SSE curves fr om the seismic hazard and sc reening response are shown in Section 2.4 and 3.1, respectively, in the seismic haza rd and screening report of Reference [27]. The LG SSE and GMRS curves from Reference [27] are shown in Figure 1.
The NRC's Staff assessm ent of the Limerick s eismic hazard and s creening response is documented in Reference [26]. In the Staff Confirmatory Analysis (Section 3.4 of Reference
[26]), the NRC concluded that the methodology used by Exelon in determining the GMRS was acceptable and that the GMRS determined by Exelon adequately ch aracterizes the reevaluated hazard for the Limerick site.
 
Section 1.1.3 of Reference [3] cites various post Fukushima sei smic reviews performed for the U.S. fleet of nuclear power plants. For Limerick, the specific seismic reviews prepared by the licensee and the NRC's staff assessments are prov ided here. Th ese licensee documents were submitted under oath and affirmation to the NRC.
: 1. NTTF Recommendation 2.1 seismic hazard screening (References [27], [26]).
: 2. NTTF Recommendation 2.3 seismic walkdowns (References [28], [29], [30]).
: 3. NTTF Recommendation 4.2 seismic mitigation strategy assessme nt (S-MSA)
(References [31], [32]).
 
The following additional post Fukushima seismic reviews were pe rformed for Limerick:
: 4. NTTF Recommendation 2.1 seismic High Frequency Evaluation (References [33], [34]).
 
Summary
 
Based on the above, the Summary from Section 2.3.3 of Reference [3] applies to Limerick; namely, Limerick is a Tier 2 plant for which there may be a limited number of unique seismic insights, most likely attributed to the possibility of seismica lly correlated failures, appropriate for consideration in determining HSS SSCs. References [9], [10], and [35] 2 are incorporated into this LAR as they provide additional supporting bases for Tier 2 plants. In addition, References
[36], [37], and [38] are incorporated into this LAR as they pro vide additional supporting bases for Tier 1 plants that are also used for Tier 2 plants. The sp ecial sensitivity study recommended using common cause failures, similar to the approac h taken in a FPIE PRA, can identify the appropriate seismic i nsights to be considered with the other categorization insights by the Integrated Decision-making Panel (IDP) for the final HSS determinations. Use of the EPRI approach outlined in Reference [3] to assess seismic hazar d risk for §50.69 with the additional reviews discussed above will provide a process for c ategorization of RISC-1, RISC-2, RISC-3, and RISC-4 SSCs that satisfies the requirements of §50.69(c).
 
2 Excludes RAI APLC 50.69-RAI No. 12 that addresses a non-seismic topic (external events).
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 12 of 24 Docket Nos. 50-352 and 50-353
 
Figure 2: Categorization Process Overview 3
 
Table 1: Categorization Evaluation Summary 4
 
IDP Drives Element Categorization Step Evaluation Level Change Associated
- NEI 00-04 Section HSS to LSS Functions
 
Internal Events Base Case - Not Allowed Yes Section 5.1 Risk (PRA Fire, Seismic and Component Modeled) Other External Events Allowable No Base Case PRA Sensitivity Studies Allowable No
 
3 Figure 2 is an update to Figure 5-1 in Reference [39].
4 Table 1 is an update to Table 1 in Reference [1]. Specifically, the "EPRI Tier 2 Seismic" item is new for this Limerick application.
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 13 of 24 Docket Nos. 50-352 and 50-353
 
Table 1: Categorization Evaluation Summary 4
 
IDP Drives Element Categorization Step Evaluation Level Change Associated
- NEI 00-04 Section HSS to LSS Functions
 
Integral PRA Assessment - Not Allowed Yes Section 5.6
 
Fire, Seismic, and Other External Component Not Allowed No Hazards
 
Risk (Non-Allowed modeled) EPRI Tier 2 Seismic Function/Component (Note 2) No
 
Shutdown Section 5.5 Function/Component Not Allowed No Core Damage -
Section 6.1 Function/Component Not Allowed Yes Defense-in-Containment -
Depth Section 6.2 Component Not Allowed Yes PWROG Alternate DID Function/Component Not Allowed Yes Qualitative Considerations -
Criteria Section 9.2 Function Allowable (Note 1) N/A
 
Passive - Section 4 Segment/Component Not Allowed No Passive EPRI Enhanced Passive Segment/Component Not Allowed No
 
Notes
 
Note 1: The assessments of the qualitative considerations are agree d upon by the IDP in accordance with NEI 00-04 Section 9.2. In some cases, a 50.69 categorization team may provide preliminary assessments of the seven considerations for the IDPs consideration; however, the final assessments of the seven considerations are the direct responsibility of the IDP.
 
The seven considerations are addressed preliminarily by the 50.69 categorization team for at least the system functions that are not found to be HSS due to any other categorization step.
Each of the seven considerati ons requires a supporting justification for confirming (true
 
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 14 of 24 Docket Nos. 50-352 and 50-353
 
response) or not confirming (false response) that consideration. If the 50.69 categorization team determines that one or more of the seven considerations cannot be confirmed, then that function is presented to the IDP as preliminary HSS. Conversely, if all seven considerations are confirmed, then the function is presented to the IDP as preliminary LSS.
 
The System Categorization Document, including the justifications provided for the qualitative considerations, is reviewed by the IDP. The IDP is responsible for reviewing the preliminary assessment to the same level of detail as the 50.69 team (i.e., all considerations for all functions are reviewed). The IDP may confirm the preliminary function risk and associated justification or may direct that it be changed based upon their expert knowledge. Because the Qualitative Criteria are the direct respons ibility of the IDP, changes may be made from preliminary HSS to LSS or from preliminary LSS to HSS at the discretion of the IDP. If the IDP determines any of the seven considerations cannot be confirmed (false response) for a function, then the final categorization of that function is HSS.
 
Note 2 : IDP consideration of seismic insights can also result in an LSS to HSS determination.
 
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 15 of 24 Docket Nos. 50-352 and 50-353
 
Figure 3: Seismic Correlated Failure Assessment for Tier 2 Plants 5
 
5 Reproduced from Reference [3] Figure 2-3 including the markups provided in Attachment 2 of References [9] and [10].
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 16 of 24 Docket Nos. 50-352 and 50-353
 
3.3 RISK EVALUATIONS (10 CFR 50.69(b)(2)(iv))
 
(NOTE: The only change was to replace Tier 1 with Tier 2 in first paragraph.)
 
Exelon may implement the alternate defense-in-depth categorizat ion process, the alternate pressure boundary categorization process, and/or the alternate Seismic Tier 2 categorization process discussed in Section 3.1. The processes identified in the current license condition may continue to be used.
 
The overall risk evaluation process discussed in PWROG-20015-NP, EPRI 3002015999, EPRI 3002017583 addresses both known degradation mechanisms and common cause interactions and meets the requirements of 10 CFR 50.69(b)(2)(iv).
 
The sensitivity studies discussed in Section 8 of NEI 00-04, wi ll be used to confirm that the categorization process results in acceptably small increases to CDF and LERF.
 
The SSC failure rates and initiating event frequencies used in the Limerick PRA include the quantifiable impacts from known degradation mechanisms, as well as other mechanisms (e.g.,
design errors, manufacturing deficiencies, human errors, etc.).
 
Subsequent performance monitoring and PRA updates as required by 10 CFR 50.69 will continue to include this data and provide timely insights into the need to account for any important new degradation mechanisms.
 
3.4 FEEDBACK AND ADJUSTMENT PROCESS
 
(NOTE: The only change was to replace Tier 1 with Tier 2 in sec ond paragraph.)
 
If significant changes to the plant risk profile are identified, or if it is identified that a RISC-3 or RISC-4 SSC can (or actually did) prevent a safety significant function from being satisfied, an immediate evaluation and review will be performed prior to the normally scheduled periodic review. Otherwise, the assessment of potential equipment performance changes and new technical information will be performed during the normally sch eduled periodic review cycle.
 
To address the feedback and adjustment more specifically (i.e., performance monitoring) process as it pertains to the proposed Seismic Tier 2 approach discussed in section 3.1.4 above, implementation of the Exelon design control and corrective action programs will ensure the inputs for the qualitative determinations for seismic conti nue to remain valid to maintain compliance with the requirements of 10 CFR 50.69(e).
 
The performance monitoring process is described in Exelon's 10 CFR 50.69 program documents. The program requires that the periodic review assess changes that could impact the categorization results and provides the Integrated Decision -making Panel (IDP) with an opportunity to recommend categorization and treatment adjustments. Station personnel from engineering, operations, risk management, regulatory assurance, and others have responsibilities for preparing and conducting various performance monitoring tasks that feed into this process. The intent of the performance monitoring re views is to discover trends in component reliability; to help catch and reverse negative perfo rmance trends and take corrective action if necessary.
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 17 of 24 Docket Nos. 50-352 and 50-353
 
The Exelon configuration control process ensures that changes to the plant, including a physical change to the plant and changes to documents, are evaluated to determine the impact to drawings, design bases, licensing documents, programs, procedur es, and training. The configuration control program has been updated to include a che cklist of configuration activities to recognize those systems that have been categorized in accord ance with 10 CFR 50.69, to ensure that any physical change to the plant or change to plant documents is evaluated prior to implementing those changes.
 
The checklist includes:
* A review of the impact on the System Categorization Document (S CD) for configuration changes that may impact a categorized system under 10 CFR 50.69.
* Steps to be performed if redundancy, diversity, or separation r equirements are identified or affected. These steps include identifying any potential seis mic interaction between added or modified components and new or existing safety related or safe shutdown components or structures.
* Review of impact to seismic loading, safe shutdown earthquake (SSE) seismic requirements, as well as the method of combining seismic compon ents.
* Review of seismic dynamic qualification of components if the configuration change adds, relocates, or alters Seismic Category I mechanical or electrical components.
 
Exelon has a comprehensive problem identification and correctiv e action program that ensures that issues are identified and resolved. Any issue that may impact the 10 CFR 50.69 categorization process will be identified and addressed through the problem identification and corrective action program, including seismic-related issues.
 
The Exelon 10 CFR 50.69 program requires that SCDs cannot be approved by the IDP until the panel's comments have been resolved to the satisfaction of the IDP. This includes issues related to system-specific seismic insights considered by the I DP during categorization.
 
Scheduled periodic reviews no longer than once every two refuel ing outages will evaluate new insights resulting from available risk information (i.e., PRA model or other analysis used in the categorization) changes, design changes, operational changes, a nd SSC performance. If it is determined that these changes have affected the risk informatio n or other elements of the categorization process such that the categorization results are more than minimally affected, then the risk information and the categorization process will b e updated. This scheduled review will include:
* A review of plant modifications since the last review that coul d impact the SSC categorization.
* A review of plant specific operating experience that could impa ct the SSC categorization.
* A review of the impact of the updated risk information on the c ategorization process results.
* A review of the importance measures used for screening in the c ategorization process.
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 18 of 24 Docket Nos. 50-352 and 50-353
* An update of the risk sensitivity study performed for the categ orization.
 
In addition to the normally scheduled periodic reviews, if a PRA model or other risk information is upgraded, a review of the SSC categorization will be perform ed.
 
The periodic monitoring requirements of the 10 CFR 50.69 proces s will ensure that these issues are captured and addressed at a frequency commensurate with the issue severity. The 10 CFR 50.69 periodic monitoring program includes immediate and periodic reviews, that include the requirements of the regulation, to ensure that all issues that could affect 10 CFR 50.69 categorization are addressed. The periodic monitoring process also monitors the performance and condition of categorized SSCs to ensure that the assumption s for reliability in the categorization process are maintained.
: 4. REGULATORY EVALUATION
 
4.2 NO SIGNIFICANT HAZARDS CONSIDERATION ANALYSIS
 
(NOTE: The only change was to delete "Tier 1" from the discussi on and responses below.)
 
In accordance with the provisions of 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Pow er Reactors," and 10 CFR 50.90, "Application for amendment of license, construction perm it, or early site permit," Exelon Generation Company, LLC (Exelon) is requesting a revision to the license condition in Appendix C in the Renewed Facility Operating License Nos. NPF-39 and NPF -85 for Limerick Generating Station (Limerick), Units 1 and 2, respectively.
 
The NRC issued Amendments Nos. 230/193 and the Safety Evaluatio n for Limerick Units 1 and 2, respectively, to implement the requirements of 10 CFR 50.69 in Reference [5]. The amendments added a new license condition to the Renewed Facilit y Operating Licenses to allow the implementation of risk-informed categorization and treatment of structures, systems, and components for Limerick in accordance with Title 10 of the Code of Federal Regulations Section 50.69.
 
The proposed amendments would modify the licensing basis by revising the license condition in Appendix C to allow the use of an alternate defense-in-depth categorization process, an alternate pressure boundary categorization process, and an alte rnate seismic categorization process.
 
Exelon has evaluated whether a significant hazards consideratio n is involved with the proposed amendments by focusing on the three standards set forth in 10 C FR 50.92, "Issuance of amendment," as discussed below:
: 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
 
Response: No.
 
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 19 of 24 Docket Nos. 50-352 and 50-353
 
The proposed change will permit the use of the alternate defens e-in-depth categorization process, the alternate pressure boundary categorization process, and the alternate seismic categorization process for the 10 CFR 50.69 risk-informed categorization process to modify the scope of SSCs subject to NRC special treatment requirements and to implement alternative treatments per the regulations. The process used to evaluate structures, systems, and components (SSCs) for changes to NRC special treatment requirements and the use of alternative requirements ensures the ability of the SSCs to perform their design function. The potential change to special treatment requirements does not change the design and operation of the SS Cs. As a result, the proposed change does not significantly affect any initiators to accidents previously evaluated or the ability to mitigate any accidents previously evaluated. The consequences of the accidents previously evaluated are not affected because the mitigation functions performed by the SSCs assumed in the safety analysis are not being modified. The SSCs required to safely shut down the reactor and maintain it in a safe shutdown condition following an accident will continue to perform their design functions.
 
Therefore, the proposed change does not involve a significant i ncrease in the probability or consequences of an accident previously evaluated.
: 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
 
Response: No.
 
The proposed change will permit the use of the alternate defens e-in-depth categorization process, the alternate pressure boundary categorization process, and the alternate seismic categorization process for the 10 CFR 50.69 risk-informed categorization process to modify the scope of SSCs subject to NRC special treatment requirements and to implement alternative treatments per the regulations. The proposed change does not change the functional requirements, configuration, or metho d of operation of any SSC. Under the proposed change, no additional plant equipment will be installed.
 
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
: 3. Does the proposed change involve a significant reduction in a margin of safety?
 
Response: No.
 
The proposed change will permit the use of the alternate defens e-in-depth categorization process, the alternate pressure boundary categorization process, and the alternate seismic categorization process for the 10 CFR 50.69 risk-informed categorization process to modify the scope of SSCs subject to NRC special treatment requirements and to implement alternative treatments per the regulations. The proposed change does not affect any Safety Limits or operating parameters used to establish a safety margin.
The safety margins included in analyses of accidents are not affected by the proposed change. The regulation requires that there be no significant effect on plant risk due to any change to the special treatment requirements for SSCs and that the SSCs continue License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 20 of 24 Docket Nos. 50-352 and 50-353
 
to be capable of performing their design basis functions, as we ll as to perform any beyond design basis functions consistent with the categorizatio n process and results.
 
Therefore, the proposed change does not involve a significant r eduction in a margin of safety.
 
Based on the above, Exelon concludes that the proposed change p resents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
 
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 21 of 24 Docket Nos. 50-352 and 50-353
: 6. REFERENCES
 
[1] Exelon Generation Company, LLC letter to the U.S. Nuclear Regulatory Commission, Limerick Generating Station, Units 1 and 2, "Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categorization Process [...]," dated March 11, 2021 (ADAMS Accession No. ML21070A412).
[2] Email from A. Klett (U.S. Nuclear Regulatory Commission) t o G. Stewart (Exelon Generation Company, LLC), "Supplement to Limerick 50.69 Audit P lan dated October 1, 2021 (L-2021-LLA-0042)," dated October 20, 2021 (ADAMS Accessio n No.
ML21295A036).
[3] Alternative Approaches for Addressing Seismic Risk in 10 C FR 50.69 Risk-Informed Categorization, EPRI, Palo Alto, CA: 2020. 3002017583.
[4] Exelon Generation Company, LLC letter to the U.S. Nuclear Regulatory Commission, Limerick Generating Station, Units 1 and 2, "Supplement - Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categor ization Process [...],"
dated May 5, 2021 (ADAMS Accession No. ML21125A215).
[5] Limerick Generating Station, Units 1 And 2 - Issuance of A mendment Nos. 230 and 193 to Adopt Title 10 of the Code of Federal Regulations Section 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors," (CAC NOS. MF9873 AND MF9874; EPID L-2017-LLA-0275), July 31, 2018 (ML18165A162).
[6] Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Issuan ce Of Amendment Nos. 332 and 310, "Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors," (EPID L-2018-LLA-0482) February 28, 2020, ADAMS Accession No. ML19330D909.
[7] Clinton Power Station, Unit 1, "Response to Request for Ad ditional Information Regarding License Amendment Requests to Adopt TSTF-505, Revision 2, and 1 0 CFR 50.69,"
November 24, 2020, ADAMS Accession No. ML20329A433.
[8] LaSalle County Station, Unit Nos. 1 and 2 - Issuance of Am endment Nos. 249 and 235 to Adopt 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems, and Components For Nuclear Power Reactors" (EPID L-202 0-LLA-0017), May 27, 2021 (ADAMS Accession No. ML2108A422).
[9] Exelon Generation Company, LLC. Letter to NRC, LaSalle Cou nty Station, Units 1 and 2, Renewed Facility Operating License Nos. NPF-11 and NPF-18, NRC Docket Nos. 50-373 and 50-374, Response to Request for Additional Information [... ], "LaSalle License Amendment Request to Renewed Facility Operating Licenses to Ado pt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Syste ms, and Components for Nuclear Power Reactors," (EPID L-2020-LLA-0017), October 16, 20 20 ADAMS Accession No. ML20290A791.
[10] Exelon Generation Company, LLC. Letter to NRC, LaSalle Cou nty Station, Units 1 and 2, Renewed Facility Operating License Nos. NPF-11 and NPF-18, NRC Docket Nos. 50-373 and 50-374, "Response to Request for Additional Information Reg arding the License Amendment Request to Adopt 10 CFR 50.69 (EPID L-2020-LLA-0017), " January 22, 2021 ADAMS Accession No. ML21022A130.
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 22 of 24 Docket Nos. 50-352 and 50-353
 
[11] Nuclear Energy Institute (NEI) 00-04, "10 CFR 50.69 SSC Ca tegorization Guideline,"
Revision 0, July 2005.
[12] NRC letter to all Power Reactor Licensees, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(F) Regarding Recommendati ons 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushi ma Dai-ichi Accident,"
March 12, 2012, ADAMS Accession No ML12053A340.
[13] Peach Bottom Atomic Power Station, Units 2 and 3, Seismic Probabilistic Risk Assessment Report, "Response to NRC Request Regarding Recommend ation 2.1 of the Near Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," August 28, 2018 (RS-18-098) (ML18240A065).
[14] Peach Bottom Atomic Power Station, Units 2 and 3 - Staff R eview of Seismic Probabilistic Risk Assessment, "Associated with Reevaluated Seismic Hazard Implementation of the Near-Term Task Force Recommendation 2.1: Seismic," (EPID NO. L-2018-JLD-0010),
June 10, 2019, ADAMS Accession No. ML19053A469.
[15] Peach Bottom Atomic Power Station, Units 2 and 3 - Correction Regarding Staff Review of Seismic Probabilistic Risk Assessment, "Reevaluated Seismic Haz ard Implementation of the Near-Term Task Force Recommendation 2.1: Seismic," (EPID NO. L-2018-JLD-0010),
October 8, 2019, ADAMS Accession No. ML19248C756.
[16] Plant C Nuclear Plant, Units 1 and 2, "License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process," June 22, 2017, ADAMS Acce ssion No.
ML17173A875.
[17] Plant C Nuclear Plant, Units 1 and 2, "Issuance of Amendme nts Regarding Application of Seismic Probabilistic Risk Assessment Into the Previously Approved 10 CFR 50.69 Categorization Process (EPID L-2017-LLA-0248)," August 10, 2018 (ML18180A062).
[18] Seismic Probabilistic Risk Assessment for Plant D Nuclear Plant, Units 1 and 2, "Response to NRC Request for Information Pursuant to 10 CFR 50. 54(f) Regarding Recommendation 2.1 of the NTTF Review of Insights from the Fuku shima Dai-ichi Accident," June 30, 2017 (ML17181A485).
[19] Plant D Nuclear Plant, Units 1 and 2, Seismic Probabilisti c Risk Assessment Supplemental Information, April 10, 2018, ADAMS Accession No. ML18100A966.
[20] Plant D Nuclear Plant, Units 1 and 2 - Staff Review of Sei smic Probabilistic Risk Assessment Associated With Reevaluated Seismic Hazard Implementation of the NTTF Recommendation 2.1, Seismic (CAC NOS. MF9879 AND MF9880; EPID L -2017-JLD-0044) July 10, 2018, ADAMS Accession No. ML18115A138.
[21] Plant D Nuclear Plant, Units 1 And 2 - Issuance of Amendme nt Nos. 134 And 38 Regarding Adoption of 10 CFR 50.69, "Risk-Informed Categorizati on and Treatment Of Structures, Systems, and Compone nts For Nuclear Power Plants ( EPID L-2018-LLA-0493) April 30, 2020 NRC ADAMS Accession No. ML20076A194.
[22] Electric Power Research Institute (EPRI) NP-6041-SL, "A Me thodology for Assessment of Nuclear Power Plant Seismic Margin", Revision 1, August 1991.
[23] Southern Nuclear Operating Company, Inc. letter to NRC, "V ogtle Electric Generating Plant, Units 1 & 2, "License Amendment Request to Incorporate S eismic Probabilistic Risk Assessment into 10 CFR 50.69, Response to Request for Additional Information (RAIs 4-11)," February 21, 2018, ADAMS Accession No. ML18052B342.
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 23 of 24 Docket Nos. 50-352 and 50-353
 
[24] Plant D Nuclear Plant, Units 1 and 2,Application to Adopt 10 CFR 50.69, "Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors," November 29, 2018 ADAMS Accession No. ML18334A363.
[25] NRC Memorandum, "Support Document for Screening and Priori tization Results Regarding Seismic Hazard Re-Evaluations for Operating Reactors in the Central and Eastern United States," May 21, 2014 ADAMS Accession No. ML1413 6A126.
[26] Limerick Generating Station, Units 1 and 2 - Staff Assessment of Information Provided Pursuant to 10 CFR 50.54(f), "Seismic Hazard Reevaluations for Recommendation 2.1 of the NTTF Review of Insights from the Fukushima Dai-Ichi Acciden t," (TAC NOS. MF3864 and MF3865), November 6, 2015 (ML15296A492).
[27] Limerick Generating Station, Units 1 and 2, Exelon Generat ion Company, LLC, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites),
Response to NRC Request for Information Pursuant to 10 CFR 50.54(f), Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fuk ushima Dai-ichi Accident, March 31, 2014 (ML14090A236).
[28] Limerick, Units 1 and 2, 180-Day Response to NRC Request f or Information Pursuant to 10 CFR 50.54(f), "Seismic Aspects of Recommendation 2.3 of the NTTF Review of Insights from the Fukushima Dai-ichi Accident," Release Date December 17, 2012 (ADAMS Package ML123420141).
[29] Limerick Generating Station, Unit 1-Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendatio n 2.3, Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC NO. MF0138 ), April 14, 2014 (ML14058B156).
[30] Limerick Generating Station, Unit 2-Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendatio n 2.3, Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC NO. MF0139 ), April 14, 2014 (ML14058B120).
[31] Limerick Generating Station, Units 1 and 2, Mitigating Str ategies Assessment (MSA)
Report for the Reevaluated Seismic Hazard Information - NEI 12- 06, Appendix H, Revision 2, H.4.2 Path 2: GMRS < 2x SSE with High Frequency Exceedances, December 1, 2016 (ML16336A442).
[32] Limerick Generating Station, Units 1 And 2 - Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed In Response to the March 12, 2012, 50.54(f) Letter, April 12, 201 7 (ML17087A066).
[33] Limerick Generating Station, Units 1 and 2, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Informatio n Pursuant to 10 CFR 50.54(f), "Recommendation 2.1 of the Near-Term Task Force Revie w of Insights from the Fukushima Dai-ichi Accident," November 28, 2016 (ML16333A084).
[34] Limerick Generating Station, Units 1 and 2 - Staff Review of High Frequency Confirmation Associated With Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1, February 6, 2017 (ML17031A415).
[35] Exelon Generation Company, LLC. Letter to NRC, LaSalle Cou nty Station, Units 1 and 2, Renewed Facility Operating License Nos. NPF-11 and NPF-18, NRC Docket Nos. 50-373 and 50-374, "Response to Request for Additional Information Reg arding the License Amendment Request to Adopt 10 CFR 50.69 (EPID L-2020-LLA-0017), " October 1, 2020, ADAMS Accession Number ML20275A292.
License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 24 of 24 Docket Nos. 50-352 and 50-353
 
[36] Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Renewed Facility Operating License Nos. DPR-53 and DPR-69, Docket Nos. 50-317 and 50-318, "Response to Request for Additional Information Regarding the Application to Adopt 10 CF R 50.69, 'Risk-informed categorization and treatment of s tructures, systems, and compon ents for nuclear power reactors'," July 1, 2019, ADAMS Accession No. ML19183A012.
[37] Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Renewed Facility Operating License Nos. DPR-53 and DPR-69, Docket Nos. 50-317 and 50-318, "Response to Request for Additional Information Regarding the Application to Adopt 10 CF R 50.69, 'Risk-informed categorization and treatment of s tructures, systems, and compon ents for nuclear power reactors'," July 19, 2019, ADAMS Accession No. ML19200A216.
[38] Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Renewed Facility Operating License Nos. DPR-53 and DPR-69, Docket Nos. 50-317 and 50-318, "Revised Response to Request for Additional Information Regarding the Application to Adopt 10 CFR 50.69,
'Risk-Informed Categorization and Treatment of Structures, Syst ems, and Components for Nuclear Power Reactors,' July 19, 2019," August 5, 2019, ADAMS Accession No. ML19217A143.
[39] Limerick Generating Station, Units 1 and 2, Response to Re quest for Additional Information: Application to Adopt 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems, and Components (SSCs) for Nuclear Power Plants,"
January 19, 2018 (ML18019A091).
 
Attachment 2
 
License Amendment Request Supplement
 
Limerick Generating Station, Units 1 and 2 Docket Nos. 50-352 and 50-353
 
Application to Implement an Alternate Defense-in-Depth Categori zation Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Categorization Process in Accordance with the Requireme nts of 10 CFR 50.69, "Risk-Informed Categorization and Treatment of S tructures, Systems and Components for Nuclear Power Reactors"
 
Revised Proposed FOL Appendix C License Condition Mark-Ups
 
APPENDIX C
 
ADDITIONAL CONDITIONS OPERATING LICENSE NO. NPF-39
 
Exelon Generation Company, LLC shall comply with the following conditions on the schedule noted below:
Amendment No. Additional Conditions
 
230[XXX] Exelon is approved to implement 10 CFR 50.69 using the processes for categorization of Risk-Informed Safety Class (RISC)-1, RISC-2, RISC-3, and RISC-4 structures, systems, and components (SSCs) using: Probabilistic Risk Assessment (PRA) models to evaluate risk associated with internal events, including internal flooding, and internal fire; the shutdown safety assessment process to assess shutdown risk; the Arkansas Nuclear One, Unit 2 (ANO-2) passive categorization method to assess passive component risk for Class 2 and Class 3 SSCs and their associated supports; and the results of non-PRA evaluations that are based on the IPEEE Screening Assessment for External Hazards, i.e.,
seismic margin analysis (SMA) to evaluate seismic risk, and a screening of other external hazards updated using the external hazard screening significance process identified in ASME/ANS PRA Standard RA-Sa-2009; as specified in Unit 1 License Amendment No. 230 dated July 31, 2018.
Exelon will complete the implementation items listed in Attachment 2 of Exelon letter to NRC dated April 23, 2018 prior to implementation of 10 CFR 50.69. All issues identified in the attachment will be addressed and any associated changes will be made, focused-scope peer reviews will be performed on changes that are PRA upgrades as defined in the PRA standard (ASME/ANS RA-Sa-2009, as endorsed by RG 1.200, Revision 2), and any findings will be resolved and reflected in the PRA of record prior to implementation of the 10 CFR 50.69 categorization process.
Prior NRC approval, under 10 CFR 50.90, is required for a change to the categorization process specified above (e.g., change from a seismic margins approach to a seismic probabilistic risk assessment approach).
 
Renewed License No. NPF-39 Amendment No. 128, 131, 147, 184, 230 UNIT 1 FOL INSERT
 
In addition, Exelon is approved to implement 10 CFR 50.69 using any of the following alternative processes for categorization of RISC-1, RISC-2, RISC-3, and RISC-4 SSCs: the defense-in-depth approach contained in PWROG-20015-NP; the passive pressure boundary categorization approach described in EPRI 3002015999; and the alternative seismic approach as described in Exelon's submittal {{letter dated|date=March 11, 2021|text=letter dated March 11, 2021}}, and associated supplements, as specified in Unit 1 License Amendment No. [XXX] dated [DATE].
APPENDIX C
 
ADDITIONAL CONDITIONS OPERATING LICENSE NO. NPF-85
 
Exelon Generation Company, LLC shall comply with the following conditions on the schedule noted below:
 
Amendment No. Additional Conditions
 
193 [YYY] Exelon is approved to implement 10 CFR 50.69 using the processes for categorization of Risk-Informed Safety Class (RISC)-1, RISC-2, RISC-3, and RISC-4 structures, systems, and components (SSCs) using: Probabilistic Risk Assessment (PRA) models to evaluate risk associated with internal events, including internal flooding, and internal fire; the shutdown safety assessment process to assess shutdown risk; the Arkansas Nuclear One, Unit 2 (AN0-2) passive categorization method to assess passive component risk for Class 2 and Class 3 SSCs and their associated supports; and the results of non-PRA evaluations that are based on the IPEEE Screening Assessment for External Hazards, i.e., seismic margin analysis (SMA) to evaluate seismic risk, and a screening of other external hazards updated using the external hazard screening significance process identified in ASME/ANS PRA Standard RA-Sa-2009; as specified in Unit 2 License Amendment No. 193 dated July 31, 2018.
 
Exelon will complete the implementation items listed in Attachment 2 of Exelon letter to NRC dated April 23, 2018 prior to implementation of 10 CFR 50.69. All issues identified in the attachment will be addressed and any associated changes will be made, focused-scope peer reviews will be performed on changes that are PRA upgrades as defined in the PRA standard (ASME/ANS RA -Sa-2009, as endorsed by RG 1.200, Revision 2),
and any findings will be resolved and reflected in the PRA of record prior to implementa tion of the 10 CFR 50.69 categorization process.
 
Prior NRC approval, under 10 CFR 50.90, is required for a change to the categorization process specified above (e.g., change from a seismic margins approach to a seismic probabilistic risk assessment approach).
 
Renewed License No. NPF -85 Amendment No. 193 UNIT 2 FOL INSERT
 
In addition, Exelon is approved to implement 10 CFR 50.69 using any of the following alternative processes for categorization of RISC-1, RISC-2, RISC-3, and RISC-4 SSCs: the defense-in-depth approach contained in PWROG-20015-NP; the passive pressure boundary categorization approach described in EPRI 3002015999; and the alternative seismic approach as described in Exelon's submittal {{letter dated|date=March 11, 2021|text=letter dated March 11, 2021}}, and associated supplements, as specified in Unit 2 License Amendment No. [YYY] dated [DATE].}}

Latest revision as of 03:19, 19 November 2024

Supplement - Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Categorization Process in Accordance
ML21349B364
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/15/2021
From: David Helker
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML21349B364 (33)


Text

200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com

10 CFR 50.90 10 CFR 50.69

December 15, 2021

U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN: Document Control Desk

Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Supplement - Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categori zation Process, and an Alternate Seismic Categorization Process in Acc ordance with the Requirements of 10 CFR 50.69, "Risk-Informed Categoriz ation and Treatment of Structures, Systems and Components for Nuclear Pow er Reactors"

References:

1. Exelon Generation Company, LLC letter to the U.S. Nuclear Regulatory Commission, Limerick Generating Station, Units 1 and 2, "Applic ation to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categorization Process in Accordance with the Requirements of 10 CFR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Pow er Reactors,'" dated March 11, 2021 (ADAMS Accession No. ML21070A412).
2. Email from A. Klett (U.S. Nuclear Regulatory Commission) to G. Stewart (Exelon Generation Company, LLC), "Supplement to Limerick 50.69 Audit Plan dated October 1, 2021 (L-2021-LLA-0042)," dated October 20, 2021 (ADAMS Accession No. ML21295A036).
3. Alternative Approaches for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization, EPRI, Palo Alto, CA: 2020. 300201 7583.
4. Exelon Generation Company, LLC letter to the U.S. Nuclear Regulatory Commission, Limerick Generating Station, Units 1 and 2, "Supple ment -

Application to Implement an Alternate Defense-in-Depth Categori zation Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categorization Process in Accordance w ith the Requirements of 10 CFR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Pow er Reactors,'" dated May 5, 2021 (ADAMS Accession No. ML21125A215).

Supplement - License Amendment Request 10 CFR 50.69 Alternate Categorization Processes Docket Nos. 50-352 and 50-353 December 15, 2021 Page 2

In Reference [1], Exelon Generation Company, LLC (Exelon) submi tted an application for amendment of the Renewed Facility Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (Limerick), Units 1 and 2, respecti vely.

The proposed amendments would modify the licensing basis by rev ising the related License Condition in Appendix C to allow the use of an alternate defense-in-depth categorization process, an alternate pressure boundary categorization process, and an alternate seismic categorization process for implementation of the risk-informed categorization and treatment of structures, systems, and components for Limerick in accordance with the requirements of 10 CFR 50.69.

By email dated October 20, 2021 (Reference [2]), the NRC notifi ed Exelon of their intent to conduct a regulatory virtual audit the week of November 15, 2021 with Exelon staff and associated contractors in support of the license amendment requ est (LAR) in Reference [1].

The email contained a supplemented regulatory virtual audit plan with attached audit questions. During the audit, questions were raised by the NRC concerning the acceptability of the application of the alternate Seismic Tier 1 categorizati on process to Limerick.

Although Exelon continues to believe that Limerick is a Tier 1 plant based on the guidance provided in Electric Power Research Institute (EPRI) Report 300 2017583, "Alternative Approaches for Addressing Seismic Risk in 10 CFR 50.69 Risk-Inf ormed Categorization,"

dated February 2020 (Reference [3]), Exelon has decided to purs ue the alternate Seismic Tier 2 categorization process provided in the same EPRI Report in order to move forward with the review of this LAR.

Therefore, this letter is a supplement to the Reference [1] LAR. Attachment 1 to this letter provides the information needed to justify the application of t he alternate Seismic Tier 2 categorization process for implementation of the risk-informed categorization and treatment of structures, systems, and components for Limerick in accordance with the requirements of 10 CFR 50.69. The information is identified by the Sections wi thin the original Reference [1]

LAR that discussed the alternate seismic approach and supersede s that information in its entirety. In addition, the alternate Seismic Tier 1 information provided in Section 2 of Exelon supplement letter dated May 5, 2021 (Reference [4]) is no longer relevant or necessary for this LAR since Exelon is now submitting Limerick as an alternat e Seismic Tier 2 site.

As a result of submitting this supplement to transition to the alternate Seismic Tier 2 approach, a minor change is required to the Facility Operating License (FOL) Appendix C License Condition wording that was proposed in the original Ref erence [1] LAR. Attachment 2 provides the revised FOL Appendix C License Condition markups.

Exelon has reviewed the information supporting the No Significant Hazards Consideration and the Environmental Consideration that was previously provide d to the NRC in the Reference [1] LAR. The information in this LAR supplement does not impact the conclusion that the proposed license amendments do not involve a significant hazards consideration. However, since the No Significant Hazards Consi deration information provided in the original LAR made specific mention of the alternate Seismic Tier 1 categorization process, a revised No Significant Hazards Consid eration discussion is provided in the attachment to remove the Tier 1 wording. The i nformation in Attachment 1 Supplement - License Amendment Request 10 CFR 50.69 Alternate Categorization Processes Docket Nos. 50-352 and 50-353 December 15, 2021 Page 3

also does not impact the conclusion that there is no need for an environmental assessment to be prepared in support of the proposed amendments.

There are no regulatory commitments contained in this supplement.

In accordance with 10 CFR 50.91, "Notice for public comment; State consultation,"

paragraph (b), Exelon is notifying the Commonwealth of Pennsylv ania of this license amendment request supplement by transmitting a copy of this letter to the designated State Official.

If you should have any questions regarding this submittal, plea se contact Glenn Stewart at 610-765-5529.

I declare under penalty of perjury that the foregoing is true and correct. Executed on this 15th day of December 2021.

Respectfully,

David P. Helker Sr. Manager - Licensing and Regulatory Affairs Exelon Generation Company, LLC

License Amendment Request Supplement - Application to Implement Alternate Categorization Processes in Accordance with the Requi rements of 10 CFR 50.69. : Revised Proposed FOL Appendix C License Condition Mark-ups

cc: Regional Administrator - NRC Region I w/ attachments NRC Senior Resident Inspector - Limerick Generating Station "

NRC Project Manager, NRR - Limerick Generating Station "

Director, Bureau of Radiation Protection - Pennsylvania Departm ent of Environmental Protection "

ATTACHMENT 1

License Amendment Request Supplement

Limerick Generating Station, Units 1 and 2 NRC Docket Nos. 50-352 and 50-353

Application to Implement an Alternate Defense-in-Depth Categori zation Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Categorization Process in Accordance with the Requirements of 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor s"

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 1 of 24 Docket Nos. 50-352 and 50-353

In Reference [1], Exelon Generation Company, LLC (Exelon) submi tted an application for amendment of the Renewed Facility Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (Limerick), Units 1 and 2, respectively.

The proposed amendments would modify the licensing basis by rev ising the related License Condition in Appendix C to allow the use of an alternate defense-in-depth categorization process, an alternate pressure boundary categorization process, and an alternate seismic categorization process for implementation of the risk-informed categorization and treatment of structures, systems, and components for Limerick in accordance with the requirements of 10 CFR 50.69.

By email dated October 20, 2021 (Reference [2]), the NRC notifi ed Exelon of their intent to conduct a regulatory virtual audit the week of November 15, 2021 with Exelon staff and associated contractors in support of the license amendment requ est (LAR) in Reference [1].

The email contained a supplemented regulatory virtual audit pla n with attached audit questions.

During the audit, questions were raised by the NRC concerning t he acceptability of the application of the alternate Seismic Tier 1 categorization process to Limerick. Although Exelon continues to believe that Limerick is a Tier 1 plant based on t he guidance provided in Electric Power Research Institute (EPRI) Report 3002017583, "Alternative Approaches for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization," dat ed February 2020 (Reference

[3]), Exelon has decided to pursue the alternate Seismic Tier 2 categorization process provided in the same EPRI Report in order to move forward with the review of this LAR.

Therefore, this letter is a supplement to the Reference [1] LAR. This attachment provides the information needed to justify the application of the seismic Ti er 2 alternative categorization process for implementation of the risk-informed categorization and treatment of structures, systems, and components for Limerick in accordance with the req uirements of 10 CFR 50.69.

The information is identified by the Sections within the origin al Reference [1] LAR that discussed the alternate seismic approach and supersedes that information in its entirety. In addition, the alternate Seismic Tier 1 information provided in Section 2 of E xelon supplement letter dated May 5, 2021 (Reference [4]) is no longer relevant or necessary for this LAR since Exelon is now submitting Limerick as an alternate Seismic Tier 2 site.

Also, because of submitting this supplement to transition to the alternate Seismic Tier 2 approach, a minor change is required to the Facility Operating License (FOL) Appendix C License Condition wording that was proposed in the original Ref erence [1] LAR. Attachment 2 provides the revised FOL Appendix C License Condition markups.

2.1 REASON FOR PROPOSED CHANGE

(NOTE: The only change in this Section was to replace Tier 1 wi th Tier 2 and to include the references to the LaSalle Tier 2 NRC issued amendment and safet y evaluation (SE) and the EPRI markups provided in Attachment 2 of the LaSalle responses to the NRC Requests for Additional Information.)

During the implementation of 10 CFR 50.69 by various licensees, it was determined that several processes are overly conservative when performing the 10 CFR 50.69 categorization and are resource intensive, without providing a commensurate benefit to the health and safety of the public. For example, when evaluating core damage defense-in-de pth, credit cannot be taken for License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 2 of 24 Docket Nos. 50-352 and 50-353

multiple identical, redundant trains. To address this, an alternate approach has been developed in lieu of the current defense-in-depth categorization process, the current pressure boundary categorization process (previously referred to as passive categ orization as discussed in Section 3.5.4 of the Safety Evaluation (SE) that was issued for Limerick, Units 1 and 2, to implement 10 CFR 50.69 (Reference [5]), and the current seismic categorizati on process. The alternate defense-in-depth categorization process, the alternate pressure boundary categorization process, and the alternate Seismic Tier 2 categorization proces s are in compliance with 10 CFR 50.69; however, these processes allow additional focus on Risk-Informed Safety Class (RISC)

RISC-1 and RISC-2 structures, systems and components (SSCs). T he use of the alternate defense-in-depth categorization process, the alternate pressure boundary categorization process, and the alternate Seismic Tier 2 categorization proces s improves consistency and removes subjectivity while reducing the 10 CFR 50.69 implement ation effort to categorize systems.

The alternate seismic categorization process is briefly discussed below (Note: only the alternative seismic information is provided since the alternate defense-in-depth and pressure boundary categorization processes remain unchanged):

3. Alternate Seismic Tier 2 Categorization Process
a. The current seismic risk asse ssment method is a Seismic Marg ins Assessment (SMA). All SSCs included on the SMA Safe Shutdown Equipment Li st (SSEL), i.e.,

Success Path Component List (SPCL), conservatively default to H SS. The alternate Seismic Tier 2 categorization process employs a systematic proc ess to evaluate the seismic hazard which is integrated into the categorization proc ess. It considers likelihood and magnitude of the seismic hazard and margin to the site-specific design basis. The alternate Seismic Tier 2 categorization process is described in EPRI 3002017583 (Reference [3]).

b. EPRI 3002017583 is an update to EPRI 3002012988, "Alternative Approaches for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categoriz ation," July 2018 which was referenced in the NRC issued amendment and SE for Cal vert Cliffs Nuclear Power Plant, Units 1 and 2, to implement 10 CFR 50.69 a s noted below:
  • Calvert Cliffs Nuclear Power Plant, Units 1 and 2, "Issuance of Amendment Nos. 332 and 310 Re: Risk-Informed Categorization and Treatment of Systems, Structures, and Components (EPID L-2018-LLA-0482)," Fe bruary 28, 2020. (ADAMS Accession No. ML19330D909) (Reference [6]).
c. This license amendment request incorporates by Reference the Clinton Power Station, Unit 1 response to request for additional information letter of November 24, 2020 (ML20329A433) (Reference [7]), in particular, the response to the question regarding the differences between the initial EPRI 3002012988 a nd the current EPRI 3002017583 as well as Exelons proposed approach for the 50.69 Seismic Alternative Tier 1.
d. This license amendment request follows the same categorizati on approach for Tier 2 seismic risk as approved for LaSalle County Station, Units 1 and 2, as identified in Reference [8] with no deviations.

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 3 of 24 Docket Nos. 50-352 and 50-353

  • The alternative seismic approach described herein is consisten t with EPRI 3002017583 (Reference [3]), including the EPRI markups provided in Attachment 2 of Exelon's responses to the NRC Requests for Addi tional Information in References [9] and [10].

2.2 DESCRIPTION

OF THE PROPOSED CHANGE

The license condition in Appendix C currently states:

"Exelon is approved to implement 10 CFR 50.69 using the process es for categorization of Risk-Informed Safety Class (RISC)-1, RISC-2, RISC-3, and RISC-4 structures, systems, and components (SSCs) using: Probabilistic Risk Assessment (PRA ) models to evaluate risk associated with internal events, including internal floodi ng, and internal fire; the shutdown safety assessment process to assess shutdown risk; the Arkansas Nuclear One, Unit 2 (ANO-2) passive categorization method to assess passive component risk for Class 2 and Class 3 SSCs and their associated supports; and the results of non-PRA evaluations that are based on the IPEEE Screening Assessment for External H azards, i.e., seismic margin analysis (SMA) to evaluate seismic risk, and a screening of other external hazards updated using the external hazard screening significance proces s identified in ASME/ANS PRA Standard RA-Sa-2009; as specified in Unit [1] License Amendment No. [230] dated July 31, 2018.

Exelon will complete the implementation items listed in Attachm ent 2 of Exelon letter to NRC dated April 23, 2018 prior to implementation of 10 CFR 50.69. A ll issues identified in the attachment will be addressed and any associated changes will be made, focused-scope peer reviews will be performed on changes that are PRA upgrades as defined in the PRA standard (ASME/ANS RA-Sa-2009, as endorsed by RG 1.200, Revisio n 2), and any findings will be resolved and reflected in the PRA of record prior to implementation of the 10 CFR 50.69 categorization process.

Prior NRC approval, under 10 CFR 50.90, is required for a chang e to the categorization process specified above (e.g., change from a seismic margins ap proach to a seismic probabilistic risk assessment approach)."

The license condition in Appendix C is proposed to be revised a s follows:

(NOTE: The only change was to add "and associated supplements" to the Exelon letter dated March 11, 2021 in the second paragraph.)

"Exelon is approved to implement 10 CFR 50.69 using the process es for categorization of Risk-Informed Safety Class (RISC)-1, RISC-2, RISC-3, and RISC-4 structures, systems, and components (SSCs) using: Probabili stic Risk Assessment (PRA) models to evaluate risk associated with internal events, including internal flooding, and internal fire; the shutdown safety assessment process to assess shutdown risk; the Arkansas Nuclear One, Unit 2 (ANO-2) passive categorization method to assess passive compone nt risk for Class 2 and Class 3 SSCs and their associated supports; and the results of non-PRA evaluations that are based on the IPEEE Screening Assessment for External Hazard s, i.e., seismic margin analysis (SMA) to evaluate seismic risk, and a screening of oth er external hazards updated License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 4 of 24 Docket Nos. 50-352 and 50-353

using the external hazard screening significance process identi fied in ASME/ANS PRA Standard RA-Sa-2009; as specified in Unit [1] License Amendment No. [230] dated July 31, 2018.

In addition, Exelon is approved to implement 10 CFR 50.69 using any of the following alternate processes for categorization of RISC-1, RISC-2, RISC-3, and RISC-4 SSCs: the defense-in-depth approach contained in PWROG-20015-NP; the passive pressure boundary categorization approach described in EPRI 3002015999; and the alternative seismic approach as described in Exelon's submittal letter dated March 11, 2021, and associated supplements, as specified in Unit [1] License Amendment No. [XX X] dated [DATE].

Prior NRC approval, under 10 CFR 50.90, is required for a chang e to the categorization process specified above (e.g., change from a seismic margins ap proach to a seismic probabilistic risk assessment approach)."

Note: The implementation items listed in Attachment 2 of Exelon letter to NRC dated April 23, 2018 were completed as required by the original license conditi on prior to the implementation of the 10 CFR 50.69 categorization process at Limerick which began in October 2018. Therefore, the paragraph specific to the implementation items is no longer applicable and is proposed to be deleted from the revised license condition for this license amendment request and replaced with the new insert paragraph for the alternate categorization processes as indicated above and in the proposed license condition markups in Enclosure 2.

3. TECHNICAL EVALUATION

3.1 CATEGORIZATION PROCESS DESCRIPTION (10 CFR 50.69(b)(2)(i))

3.1.4 Alternate Seismic Tier 2 Categorization Process

(NOTE: This section is a complete re-write.)

The NRC previously issued its Safety Evaluation for Limerick ap proving the 10 CFR 50.69 process (Reference [5]).

10 CFR 50.69(c)(1) requires the use of PRA to assess risk from internal events. For other risk hazards, such as seismic, 10 CFR 50.69 (b)(2) allows, and NEI 00-04 (Reference [11])

summarizes, the use of other methods for determining SSC functional importance in the absence of a quantifiable PRA (such as Seismic Margin Analysis or IPEEE Screening) as part of an integrated, systematic process. For the Limerick seismic hazard assessment, Exelon proposes to use a risk informed graded approach that meets the requirements of 10 CFR 50.69 (b)(2) as an alternative to those listed in NEI 00-04 sec tions 1.5 and 5.3. This approach is specified in Reference [3] with the EPRI markups provided in Attachment 2 of References [9] and [10], and includes additional considerations that are discussed in this section.

(Note: The discussion below pertaining to Reference [3] includ es the markups provided in Attachment 2 of References [9] and [10].)

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 5 of 24 Docket Nos. 50-352 and 50-353

The proposed categorization approach for Limerick is a risk inf ormed graded approach that is demonstrated to produce categorization insights equivalent to a seismic PRA. This approach relies on the insights gained from the seismic PRAs examined in Reference [3] and plant specific insights considering seismic correlation effects and s eismic interactions.

Following the criteria in Reference [3], the Limerick site meet s the EPRI 3002017583 Tier 1 criteria for a "Low Seismic Hazard/High Seismic Margin" site. The Tier 1 criteria are as follows:

"Tier 1: Plants where the GMRS [Ground Motion Response Spectrum] peak acceleration is at or below approximatel y 0.2g or where the GMRS is below or approximately equal to the SSE [Safe Shutdown Earthquake] between 1.0 Hz and 10 Hz. Examples are shown in Figures 2-1 and 2-2. At these sites, the GMRS is either very low or within the range of the SSE such that unique seismic categor ization insights are not expected."

Exelon considers the Limerick site to be a Tier 1 site in accor dance with the above EPRI Tier 1 criteria. However, during the NRC Audit conducted November 15 - 17, 2021 for this License Amendment Request (Reference [2]), questions were raised by the NRC concerning the acceptability of the application of the alternate Seismic Tier 1 approach. As a result, Exelon is submitting Limerick as a Tier 2 site. Per Reference [3], for Tier 2 sites, the site Ground Motion Response Spectrum (GMRS) to SSE (Safe Shutdown Earthquake) comp arison is above the Tier 1 threshold but not high enough that the NRC required the plant to perform an SPRA to respond to Recommendation 2.1 of the Near-Term Task Force 50.54(f) letter (Reference [12]).

Reference [3] also demonstrates that seismic risk is adequately addressed for Tier 2 sites by the results of additional qualitative assessments discussed in this section and existing elements of the §50.69 categorization process specified in NEI 00-04.

The trial studies in Reference [3], as amended by their RAI res ponses and amendments (References [13], [14], [15], [16], [17], [18], [19], [20], and [21]) show that seismic categorization insights are overlaid by other risk insights even at plants where the GMRS is far beyond the seismic design basis. Therefore, the basis for the Tier 2 classification and resulting criteria is that consideration of the full range of the seismic hazard produces limited unique insights to the categorization process. That is the basis for the following statements in Table 4-1 of Reference [3].

"At Tier 2 sites, there may be a limited number of unique seismic insights, most likely attributed to the possibility of seismically correlated failures, appropriate for consideration in determining HSS SSCs. The special seismic risk evaluation process recommended using a Common Cause impact approach in the FPIE PRA can identify the appropriate seismic insights to be considered with the other categorization insights by the Integrated Decision-making Panel for the final HSS determinations."

At sites with moderate seismic demands (i.e., Tier 2 range), there is no need to perform more detailed evaluations to demonstrate the inherent seismic capaci ties documented in industry sources such as Reference [22]. Tier 2 seismic demand sites have a lower likelihood of seismically induced failures and less challenges to plant systems than trial study plants. This, therefore, provides the technical basis for allowing use of a graded approach for addressing seismic hazards at Limerick.

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 6 of 24 Docket Nos. 50-352 and 50-353

Test cases described in Section 3 of Reference [3], as amended by their RAI responses and amendments (References [13], [14], [15], [16], [17], [18], [19], [20], [21]) showed that there are very few, if any, SSCs that would be designated HSS for seismic unique reasons. The test cases identified that the unique seismic insights were typicall y associated with seismically correlated failures and led to unique HSS SSCs. While it would be unusual even for moderate hazard plants to exhibit any unique seismic insights, it is prudent and recommended by Reference [3] to perform additional evaluations to identify the conditions where correlated failures and seismic interactions may occur and determine their impact in the 10 CFR 50.69 categorization process. The special sensitivity study recommen ded in Reference [3] uses common cause failures, similar to the approach taken in a FPIE PRA and can identify the appropriate seismic insights to be considered with the other ca tegorization insights by the IDP for the final HSS determinations.

Exelon is using test case information from Reference [3] develo ped by other licensees. The test case information is being incorporated by Reference into t his application; specifically, Case Study A (Reference [13], [14], [15]), Case Study C (Reference [ 23]), Case Study D (Reference

[24]), as well as RAI responses and amendments (References [13], [14], [15], [16], [17], [18],

[19], [20], and [21]) that clarify aspects of these case studie s.

Basis for Limerick being a Tier 2 Plant

As defined in Reference [3], Limerick meets the aforementioned Tier 1 criteria for a "Low Seismic Hazard / High Seismic Margin" site. However, as previously mentioned, Exelon is submitting Limerick as a Tier 2 site. The Tier 2 criteria are as follows:

"Tier 2: Plants where the GMRS [Ground Mo tion Response Spectrum] to SSE [Safe Shutdown Earthquake] comparison between 1.0 Hz and 10 Hz is greater than in Tier 1 but not high enough to be treated as Tier 3. At these sites, the unique seismic categorization insights are expected to be limited."

Note: Reference [3] applies to the Tier 2 sites in its entirety except for Sections 2.2 (Tier 1 sites) and 2.4 (Tier 3 sites).

For comparison, Tier 1 plants are defined as having a GMRS peak acceleration at or below approximately 0.2g or where the GMRS is below or approximately equal to the SSE between 1.0 Hz and 10 Hz. Tier 3 plants are defined where the GMRS to SSE comparison between 1.0 Hz and 10 Hz is high enough that the NRC requ ired the plant to perform an SPRA to respond to the Fukushima 50.54(f) letter (Reference [12]).

As shown in Figure 1, comparing the Limerick GMRS (derived from the seismic hazard) to the SSE (i.e., seismic design basis capability), the GMRS is below the SSE up to approximately 11 Hz and exceeds the SSE above 11 Hz up to 100 Hz (Reference [25] ). The NRC screened out Limerick from performing a seismic PRA in response to the NTTF 2.1 50.54(f) letter (Reference

[26]). As such, it is appropriate that Limerick is considered a Tier 1 plant; however, as previously mentioned, Exelon is su bmitting Limerick as a Tier 2 site in order to address NRC concerns. The basis for Limerick being Tier 2 will be document ed and presented to the IDP for each system categorized.

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 7 of 24 Docket Nos. 50-352 and 50-353

Figure 1: GMRS and SSE Response Spectra for Limerick 1

The following paragraphs describe additional background and the process to be utilized for the graded approach to categorize the seismic hazard for a Tier 2 p lant.

Implementation of the Recommended Process

Reference [3] recommends a risk informed graded approach for ad dressing the seismic hazard in the 10 CFR 50.69 categorization process. There are a number of seismic fragility fundamental concepts that support a graded approach and there are important characteristics about the comparison of the seismic design basis (represented b y the SSE) to the site-specific seismic hazard (represented by the GMRS) that support the selec ted thresholds between the three evaluation Tiers in the report. The coupling of these co ncepts with the categorization process in NEI 00-04 are the key elements of the approach defin ed in Reference [3] for identifying unique seismic insights.

The seismic fragility o f an SSC is a function of the margin bet ween an SSC's seismic capacity and the site-specific seismic dem and. References such as EPRI NP 6041 (Reference [22])

provide inherent seismic capacities for most SSCs that are not directly related to the site-specific seismic demand. This inherent seismic capacity is bas ed on the non-seismic design loads (pressure, ther mal, dead weight, etc.) and the required f unctions for the SSC. For example, a pump has a relatively high inherent seismic capacity based on its design and that

1 From Reference [27] Table 2.4-1 (GMRS) and Table 3.1-1 (SSE)

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 8 of 24 Docket Nos. 50-352 and 50-353

same seismic capacity applies at a site with a very low demand and at a site with a very high demand.

There are some plant features such as equipment anchorage that have seismic capacities more closely associated with the site-specific seismic demand s ince those specific features are specifically designed to meet that demand. However, even for these features, the design basis criteria have intended conservati sms that result in significant seismic margins within SSCs.

These conservatisms are reflected in key aspects of the seismic design process. The SSCs used in nuclear power plants are intentionally designed using c onservative methods and criteria to ensure that they have margins well above the required design bases. Experience has shown that design practices result in margins to realistic seismic capacities of 1.5 or more.

In applying the Reference [3] process for Tier 2 sites to the Limerick 10 CFR 50.69 categorization process, the IDP will be provided with the rationale for applying the Reference

[3] guidance and informed of plant SSC specific seismic insights that the IDP may choose to consider in their HSS/LSS deliberations. As part of the categorization team's preparation of the System Categorization document (SCD) that is presented to the IDP, a section will be included that provides identified plant seismic insights as well as the basis for applicability of the Reference [3] study and the bases for Limerick being a Tier 2 plant. The discussion of the Tier 2 bases will include such factors as:

  • The moderate seismic hazard for the plant,
  • The definition of Tier 2 in the EPRI study, and
  • The basis for concluding Limerick is a Tier 2 plant.

At several steps of the categorization process, (e.g., as noted in Figure 2 and Table 1) the categorization team will consider the available seismic insight s relative to the system being categorized and document their conclusions in the SCD. Integrated importance measures over all modeled hazards (i.e., internal events, including internal flooding, and internal fire for Limerick) are calculated per Section 5.6 of NEI 00-04, and components for which these measures exceed the specified criteria are preliminary HSS whic h cannot be changed to LSS.

For HSS SSCs uniquely identified by the Limerick PRA models but having design basis functions during seismic events or functions credited for mitig ation and prevention of severe accidents caused by seismic events, these will be addressed using non-PRA based qualitative assessments in conjunction with any seismic insights provided b y the PRA.

For components that are HSS due to fire PRA but not HSS due to internal events PRA, the categorization team will review d esign basis functions during s eismic events or functions credited for mitigation and prevention of severe accidents caus ed by seismic events and characterize these for presentation to the IDP as additional qu alitative inputs, which will also be described in the SCD.

The categorization team will review available Limerick plant specific seismic reviews and other resources such as those identified above. The objective of the seismic review is to identify plant specific seismic insights that might include potentially important impacts such as:

  • Impact of relay chatter
  • Implications related to potential seismic interactions such as with block walls License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 9 of 24 Docket Nos. 50-352 and 50-353
  • Seismic failures of passive SSCs such as tanks and heat exchan gers
  • Any known structural or anchorage issues with a particular SSC
  • Components implicitly part of PRA modeled functions (including relays)

For each system categorized, the categorization team will evalu ate correlated seismic failures and seismic interactions between SSCs. This process is detaile d in Reference [3] Section 2.3.1 and is summarized in Figure 3.

Determination of seismic insi ghts will make use of the full pow er internal events PRA model supplemented by focused seismic walkdowns. An overview of the process to determine the importance of SSCs for mitigating seismic events follows and is utilized on a system basis:

o Identify SSCs within the system to be categorized o Group SSCs within the system into the classes of equipment and distributed systems used for SPRAs.

o Refine the list and screen out the following SSCs from consideration of functional correlated seismic failures:

  • Inherently rugged components
  • Components not used in safety functions that support mitigation of core damage or containment performance
  • Components already identified as HSS components from the Inter nal Events PRA or Integrated assessment o Perform a seismic walkdown:
  • For SSCs screened IN look for correlation
  • For SSCs screened IN or OUT assess for spatial interaction con cerns that could fail multiple components in the system, or could fail a single compo nent in the system due to either seismic interaction or direct component failure m odes, that result in total loss of a multi-train system and where there is not another system that independently provides the same function o Based on the seismic walkdown:
  • Screen out IF SSCs have high seismic capacity AND not included in seismically correlated groups or correlated interaction groups o Add surrogate events to the FPIE model that simulate spatial interaction or Correlation (for the system being categorized) - set the probability of fai lure to 1E-04.

o Quantify the FPIE model (for the system being categorized) for LOOP and Small LOCA (SLOCA) initiated accident sequences setting (1) the LOOP initi ating event frequency to 1.0/yr, (2) the SLOCA initiating event frequency to 1E-02/yr, and (3) the initiating event frequency for all initiators other than LOOP and small LOCA ini tiators to 0 (zero), and also removing credit for restorat ion of offsite power in LOOP/S BO accident sequences as well as other functional recoveries License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 10 of 24 Docket Nos. 50-352 and 50-353

o Utilize the Importance Measures from this sensitivity study to identify appropriate SSCs (in the system being categorized) that should be HSS due to correlation or seismic interactions

Seismic impacts would be compiled on an SSC basis. As each system is categorized, the system specific seism ic insights will be documented in the cate gorization report and provided to the IDP for consideration as part of the IDP review process (e.g., Figure 2). The IDP cannot challenge any candidate HSS recommendation for any SSC from a s eismic perspective if they believe there is a basis, except for certain conditions identif ied in Step 10 of Section 2.3.1 of Reference [3]. Any decision by the IDP to downgrade preliminar y HSS components to LSS will consider the applicable seismic i nsights in that decision. SSCs identified from the Fire PRA as candidate HSS, which are not HSS from the internal events PRA or integrated importance measure assessment, will be reviewed for their design basis fun ction during seismic events or functions credited for mitigation and prevention of severe acci dents caused by seismic events.

These insights will provide the IDP a means to consider potential impacts of seismic events in the categorization process.

If the Limerick seismic hazard changes from medium risk (i.e., Tier 2) at some future time, prior NRC approval, under 10 CFR 50.90, will be requested if Limerick 's feedback process determines that a process different from the proposed alternati ve seismic approach is warranted for seismic risk consideration in categorization unde r 10 CFR 50.69. After receiving NRC approval, Exelon will follow its categorization review and adjustment process to review the changes to the plant and update, as appropriate, the SSC ca tegorization in accordance with 10 CFR 50.69(e) and the EPRI 3002017583 SSC categorization criteria for the updated Tier. This includes use of the Exelon corrective action process (CAP).

If the seismic hazard is reduced such that it meets the criteri a for Tier 1 in EPRI 3002017583, Exelon will implement the following process.

a) For previously completed syst em categorizations, Exelon may review the categorization results to determine if use of the criteria in EPRI 3002017583 Section 2.2, "Low Seismic Hazard / High Seismic Margin Sites," would lead to categorizati on changes. If changes are warranted, they will be implemented through the Exelon desi gn control and corrective action programs and NEI 00-04, Section 12.

b) Seismic considerations for s ubsequent system categorization activities will be performed in accordance with the guidance in EPRI 3002017583 Section 2.2, "Low Seismic Hazard / High Seismic Margin Sites."

If the seismic hazard increases to the degree that a seismic probabilistic risk assessment (SPRA) becomes necessary to dem onstrate adequate seismic safety, Exelon will implement the following process following completion of the SPRA, includi ng adequate closure of Peer Review Findings and Observations.

For previously completed system categorizations, Exelon will re view the categorization results using the SPRA insights as prescribed in NEI 00-04 Section 5.3, Seismic Assessment and Section 5.6, "Integral Assessment". If changes are warranted, they will be implemented through the Exelon design control and corrective action program s and NEI 00-04 Section 12.

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 11 of 24 Docket Nos. 50-352 and 50-353

Seismic considerations for subsequent system categorization activities will follow the guidance in NEI 00-04, as recommended in EPRI 3002017583 Section 2.4, "H igh Seismic Hazard / Low Seismic Margin Sites".

Historical Seismic References for Limerick

The Limerick GMRS and SSE curves fr om the seismic hazard and sc reening response are shown in Section 2.4 and 3.1, respectively, in the seismic haza rd and screening report of Reference [27]. The LG SSE and GMRS curves from Reference [27] are shown in Figure 1.

The NRC's Staff assessm ent of the Limerick s eismic hazard and s creening response is documented in Reference [26]. In the Staff Confirmatory Analysis (Section 3.4 of Reference

[26]), the NRC concluded that the methodology used by Exelon in determining the GMRS was acceptable and that the GMRS determined by Exelon adequately ch aracterizes the reevaluated hazard for the Limerick site.

Section 1.1.3 of Reference [3] cites various post Fukushima sei smic reviews performed for the U.S. fleet of nuclear power plants. For Limerick, the specific seismic reviews prepared by the licensee and the NRC's staff assessments are prov ided here. Th ese licensee documents were submitted under oath and affirmation to the NRC.

1. NTTF Recommendation 2.1 seismic hazard screening (References [27], [26]).
2. NTTF Recommendation 2.3 seismic walkdowns (References [28], [29], [30]).
3. NTTF Recommendation 4.2 seismic mitigation strategy assessme nt (S-MSA)

(References [31], [32]).

The following additional post Fukushima seismic reviews were pe rformed for Limerick:

4. NTTF Recommendation 2.1 seismic High Frequency Evaluation (References [33], [34]).

Summary

Based on the above, the Summary from Section 2.3.3 of Reference [3] applies to Limerick; namely, Limerick is a Tier 2 plant for which there may be a limited number of unique seismic insights, most likely attributed to the possibility of seismica lly correlated failures, appropriate for consideration in determining HSS SSCs. References [9], [10], and [35] 2 are incorporated into this LAR as they provide additional supporting bases for Tier 2 plants. In addition, References

[36], [37], and [38] are incorporated into this LAR as they pro vide additional supporting bases for Tier 1 plants that are also used for Tier 2 plants. The sp ecial sensitivity study recommended using common cause failures, similar to the approac h taken in a FPIE PRA, can identify the appropriate seismic i nsights to be considered with the other categorization insights by the Integrated Decision-making Panel (IDP) for the final HSS determinations. Use of the EPRI approach outlined in Reference [3] to assess seismic hazar d risk for §50.69 with the additional reviews discussed above will provide a process for c ategorization of RISC-1, RISC-2, RISC-3, and RISC-4 SSCs that satisfies the requirements of §50.69(c).

2 Excludes RAI APLC 50.69-RAI No. 12 that addresses a non-seismic topic (external events).

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 12 of 24 Docket Nos. 50-352 and 50-353

Figure 2: Categorization Process Overview 3

Table 1: Categorization Evaluation Summary 4

IDP Drives Element Categorization Step Evaluation Level Change Associated

- NEI 00-04 Section HSS to LSS Functions

Internal Events Base Case - Not Allowed Yes Section 5.1 Risk (PRA Fire, Seismic and Component Modeled) Other External Events Allowable No Base Case PRA Sensitivity Studies Allowable No

3 Figure 2 is an update to Figure 5-1 in Reference [39].

4 Table 1 is an update to Table 1 in Reference [1]. Specifically, the "EPRI Tier 2 Seismic" item is new for this Limerick application.

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 13 of 24 Docket Nos. 50-352 and 50-353

Table 1: Categorization Evaluation Summary 4

IDP Drives Element Categorization Step Evaluation Level Change Associated

- NEI 00-04 Section HSS to LSS Functions

Integral PRA Assessment - Not Allowed Yes Section 5.6

Fire, Seismic, and Other External Component Not Allowed No Hazards

Risk (Non-Allowed modeled) EPRI Tier 2 Seismic Function/Component (Note 2) No

Shutdown Section 5.5 Function/Component Not Allowed No Core Damage -

Section 6.1 Function/Component Not Allowed Yes Defense-in-Containment -

Depth Section 6.2 Component Not Allowed Yes PWROG Alternate DID Function/Component Not Allowed Yes Qualitative Considerations -

Criteria Section 9.2 Function Allowable (Note 1) N/A

Passive - Section 4 Segment/Component Not Allowed No Passive EPRI Enhanced Passive Segment/Component Not Allowed No

Notes

Note 1: The assessments of the qualitative considerations are agree d upon by the IDP in accordance with NEI 00-04 Section 9.2. In some cases, a 50.69 categorization team may provide preliminary assessments of the seven considerations for the IDPs consideration; however, the final assessments of the seven considerations are the direct responsibility of the IDP.

The seven considerations are addressed preliminarily by the 50.69 categorization team for at least the system functions that are not found to be HSS due to any other categorization step.

Each of the seven considerati ons requires a supporting justification for confirming (true

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 14 of 24 Docket Nos. 50-352 and 50-353

response) or not confirming (false response) that consideration. If the 50.69 categorization team determines that one or more of the seven considerations cannot be confirmed, then that function is presented to the IDP as preliminary HSS. Conversely, if all seven considerations are confirmed, then the function is presented to the IDP as preliminary LSS.

The System Categorization Document, including the justifications provided for the qualitative considerations, is reviewed by the IDP. The IDP is responsible for reviewing the preliminary assessment to the same level of detail as the 50.69 team (i.e., all considerations for all functions are reviewed). The IDP may confirm the preliminary function risk and associated justification or may direct that it be changed based upon their expert knowledge. Because the Qualitative Criteria are the direct respons ibility of the IDP, changes may be made from preliminary HSS to LSS or from preliminary LSS to HSS at the discretion of the IDP. If the IDP determines any of the seven considerations cannot be confirmed (false response) for a function, then the final categorization of that function is HSS.

Note 2 : IDP consideration of seismic insights can also result in an LSS to HSS determination.

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 15 of 24 Docket Nos. 50-352 and 50-353

Figure 3: Seismic Correlated Failure Assessment for Tier 2 Plants 5

5 Reproduced from Reference [3] Figure 2-3 including the markups provided in Attachment 2 of References [9] and [10].

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 16 of 24 Docket Nos. 50-352 and 50-353

3.3 RISK EVALUATIONS (10 CFR 50.69(b)(2)(iv))

(NOTE: The only change was to replace Tier 1 with Tier 2 in first paragraph.)

Exelon may implement the alternate defense-in-depth categorizat ion process, the alternate pressure boundary categorization process, and/or the alternate Seismic Tier 2 categorization process discussed in Section 3.1. The processes identified in the current license condition may continue to be used.

The overall risk evaluation process discussed in PWROG-20015-NP, EPRI 3002015999, EPRI 3002017583 addresses both known degradation mechanisms and common cause interactions and meets the requirements of 10 CFR 50.69(b)(2)(iv).

The sensitivity studies discussed in Section 8 of NEI 00-04, wi ll be used to confirm that the categorization process results in acceptably small increases to CDF and LERF.

The SSC failure rates and initiating event frequencies used in the Limerick PRA include the quantifiable impacts from known degradation mechanisms, as well as other mechanisms (e.g.,

design errors, manufacturing deficiencies, human errors, etc.).

Subsequent performance monitoring and PRA updates as required by 10 CFR 50.69 will continue to include this data and provide timely insights into the need to account for any important new degradation mechanisms.

3.4 FEEDBACK AND ADJUSTMENT PROCESS

(NOTE: The only change was to replace Tier 1 with Tier 2 in sec ond paragraph.)

If significant changes to the plant risk profile are identified, or if it is identified that a RISC-3 or RISC-4 SSC can (or actually did) prevent a safety significant function from being satisfied, an immediate evaluation and review will be performed prior to the normally scheduled periodic review. Otherwise, the assessment of potential equipment performance changes and new technical information will be performed during the normally sch eduled periodic review cycle.

To address the feedback and adjustment more specifically (i.e., performance monitoring) process as it pertains to the proposed Seismic Tier 2 approach discussed in section 3.1.4 above, implementation of the Exelon design control and corrective action programs will ensure the inputs for the qualitative determinations for seismic conti nue to remain valid to maintain compliance with the requirements of 10 CFR 50.69(e).

The performance monitoring process is described in Exelon's 10 CFR 50.69 program documents. The program requires that the periodic review assess changes that could impact the categorization results and provides the Integrated Decision -making Panel (IDP) with an opportunity to recommend categorization and treatment adjustments. Station personnel from engineering, operations, risk management, regulatory assurance, and others have responsibilities for preparing and conducting various performance monitoring tasks that feed into this process. The intent of the performance monitoring re views is to discover trends in component reliability; to help catch and reverse negative perfo rmance trends and take corrective action if necessary.

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 17 of 24 Docket Nos. 50-352 and 50-353

The Exelon configuration control process ensures that changes to the plant, including a physical change to the plant and changes to documents, are evaluated to determine the impact to drawings, design bases, licensing documents, programs, procedur es, and training. The configuration control program has been updated to include a che cklist of configuration activities to recognize those systems that have been categorized in accord ance with 10 CFR 50.69, to ensure that any physical change to the plant or change to plant documents is evaluated prior to implementing those changes.

The checklist includes:

  • A review of the impact on the System Categorization Document (S CD) for configuration changes that may impact a categorized system under 10 CFR 50.69.
  • Steps to be performed if redundancy, diversity, or separation r equirements are identified or affected. These steps include identifying any potential seis mic interaction between added or modified components and new or existing safety related or safe shutdown components or structures.
  • Review of impact to seismic loading, safe shutdown earthquake (SSE) seismic requirements, as well as the method of combining seismic compon ents.
  • Review of seismic dynamic qualification of components if the configuration change adds, relocates, or alters Seismic Category I mechanical or electrical components.

Exelon has a comprehensive problem identification and correctiv e action program that ensures that issues are identified and resolved. Any issue that may impact the 10 CFR 50.69 categorization process will be identified and addressed through the problem identification and corrective action program, including seismic-related issues.

The Exelon 10 CFR 50.69 program requires that SCDs cannot be approved by the IDP until the panel's comments have been resolved to the satisfaction of the IDP. This includes issues related to system-specific seismic insights considered by the I DP during categorization.

Scheduled periodic reviews no longer than once every two refuel ing outages will evaluate new insights resulting from available risk information (i.e., PRA model or other analysis used in the categorization) changes, design changes, operational changes, a nd SSC performance. If it is determined that these changes have affected the risk informatio n or other elements of the categorization process such that the categorization results are more than minimally affected, then the risk information and the categorization process will b e updated. This scheduled review will include:

  • A review of plant modifications since the last review that coul d impact the SSC categorization.
  • A review of plant specific operating experience that could impa ct the SSC categorization.
  • A review of the impact of the updated risk information on the c ategorization process results.
  • A review of the importance measures used for screening in the c ategorization process.

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 18 of 24 Docket Nos. 50-352 and 50-353

  • An update of the risk sensitivity study performed for the categ orization.

In addition to the normally scheduled periodic reviews, if a PRA model or other risk information is upgraded, a review of the SSC categorization will be perform ed.

The periodic monitoring requirements of the 10 CFR 50.69 proces s will ensure that these issues are captured and addressed at a frequency commensurate with the issue severity. The 10 CFR 50.69 periodic monitoring program includes immediate and periodic reviews, that include the requirements of the regulation, to ensure that all issues that could affect 10 CFR 50.69 categorization are addressed. The periodic monitoring process also monitors the performance and condition of categorized SSCs to ensure that the assumption s for reliability in the categorization process are maintained.

4. REGULATORY EVALUATION

4.2 NO SIGNIFICANT HAZARDS CONSIDERATION ANALYSIS

(NOTE: The only change was to delete "Tier 1" from the discussi on and responses below.)

In accordance with the provisions of 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Pow er Reactors," and 10 CFR 50.90, "Application for amendment of license, construction perm it, or early site permit," Exelon Generation Company, LLC (Exelon) is requesting a revision to the license condition in Appendix C in the Renewed Facility Operating License Nos. NPF-39 and NPF -85 for Limerick Generating Station (Limerick), Units 1 and 2, respectively.

The NRC issued Amendments Nos. 230/193 and the Safety Evaluatio n for Limerick Units 1 and 2, respectively, to implement the requirements of 10 CFR 50.69 in Reference [5]. The amendments added a new license condition to the Renewed Facilit y Operating Licenses to allow the implementation of risk-informed categorization and treatment of structures, systems, and components for Limerick in accordance with Title 10 of the Code of Federal Regulations Section 50.69.

The proposed amendments would modify the licensing basis by revising the license condition in Appendix C to allow the use of an alternate defense-in-depth categorization process, an alternate pressure boundary categorization process, and an alte rnate seismic categorization process.

Exelon has evaluated whether a significant hazards consideratio n is involved with the proposed amendments by focusing on the three standards set forth in 10 C FR 50.92, "Issuance of amendment," as discussed below:

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 19 of 24 Docket Nos. 50-352 and 50-353

The proposed change will permit the use of the alternate defens e-in-depth categorization process, the alternate pressure boundary categorization process, and the alternate seismic categorization process for the 10 CFR 50.69 risk-informed categorization process to modify the scope of SSCs subject to NRC special treatment requirements and to implement alternative treatments per the regulations. The process used to evaluate structures, systems, and components (SSCs) for changes to NRC special treatment requirements and the use of alternative requirements ensures the ability of the SSCs to perform their design function. The potential change to special treatment requirements does not change the design and operation of the SS Cs. As a result, the proposed change does not significantly affect any initiators to accidents previously evaluated or the ability to mitigate any accidents previously evaluated. The consequences of the accidents previously evaluated are not affected because the mitigation functions performed by the SSCs assumed in the safety analysis are not being modified. The SSCs required to safely shut down the reactor and maintain it in a safe shutdown condition following an accident will continue to perform their design functions.

Therefore, the proposed change does not involve a significant i ncrease in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The proposed change will permit the use of the alternate defens e-in-depth categorization process, the alternate pressure boundary categorization process, and the alternate seismic categorization process for the 10 CFR 50.69 risk-informed categorization process to modify the scope of SSCs subject to NRC special treatment requirements and to implement alternative treatments per the regulations. The proposed change does not change the functional requirements, configuration, or metho d of operation of any SSC. Under the proposed change, no additional plant equipment will be installed.

Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No.

The proposed change will permit the use of the alternate defens e-in-depth categorization process, the alternate pressure boundary categorization process, and the alternate seismic categorization process for the 10 CFR 50.69 risk-informed categorization process to modify the scope of SSCs subject to NRC special treatment requirements and to implement alternative treatments per the regulations. The proposed change does not affect any Safety Limits or operating parameters used to establish a safety margin.

The safety margins included in analyses of accidents are not affected by the proposed change. The regulation requires that there be no significant effect on plant risk due to any change to the special treatment requirements for SSCs and that the SSCs continue License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 20 of 24 Docket Nos. 50-352 and 50-353

to be capable of performing their design basis functions, as we ll as to perform any beyond design basis functions consistent with the categorizatio n process and results.

Therefore, the proposed change does not involve a significant r eduction in a margin of safety.

Based on the above, Exelon concludes that the proposed change p resents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 21 of 24 Docket Nos. 50-352 and 50-353

6. REFERENCES

[1] Exelon Generation Company, LLC letter to the U.S. Nuclear Regulatory Commission, Limerick Generating Station, Units 1 and 2, "Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categorization Process [...]," dated March 11, 2021 (ADAMS Accession No. ML21070A412).

[2] Email from A. Klett (U.S. Nuclear Regulatory Commission) t o G. Stewart (Exelon Generation Company, LLC), "Supplement to Limerick 50.69 Audit P lan dated October 1, 2021 (L-2021-LLA-0042)," dated October 20, 2021 (ADAMS Accessio n No.

ML21295A036).

[3] Alternative Approaches for Addressing Seismic Risk in 10 C FR 50.69 Risk-Informed Categorization, EPRI, Palo Alto, CA: 2020. 3002017583.

[4] Exelon Generation Company, LLC letter to the U.S. Nuclear Regulatory Commission, Limerick Generating Station, Units 1 and 2, "Supplement - Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categor ization Process [...],"

dated May 5, 2021 (ADAMS Accession No. ML21125A215).

[5] Limerick Generating Station, Units 1 And 2 - Issuance of A mendment Nos. 230 and 193 to Adopt Title 10 of the Code of Federal Regulations Section 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors," (CAC NOS. MF9873 AND MF9874; EPID L-2017-LLA-0275), July 31, 2018 (ML18165A162).

[6] Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Issuan ce Of Amendment Nos. 332 and 310, "Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors," (EPID L-2018-LLA-0482) February 28, 2020, ADAMS Accession No. ML19330D909.

[7] Clinton Power Station, Unit 1, "Response to Request for Ad ditional Information Regarding License Amendment Requests to Adopt TSTF-505, Revision 2, and 1 0 CFR 50.69,"

November 24, 2020, ADAMS Accession No. ML20329A433.

[8] LaSalle County Station, Unit Nos. 1 and 2 - Issuance of Am endment Nos. 249 and 235 to Adopt 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems, and Components For Nuclear Power Reactors" (EPID L-202 0-LLA-0017), May 27, 2021 (ADAMS Accession No. ML2108A422).

[9] Exelon Generation Company, LLC. Letter to NRC, LaSalle Cou nty Station, Units 1 and 2, Renewed Facility Operating License Nos. NPF-11 and NPF-18, NRC Docket Nos. 50-373 and 50-374, Response to Request for Additional Information [... ], "LaSalle License Amendment Request to Renewed Facility Operating Licenses to Ado pt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Syste ms, and Components for Nuclear Power Reactors," (EPID L-2020-LLA-0017), October 16, 20 20 ADAMS Accession No. ML20290A791.

[10] Exelon Generation Company, LLC. Letter to NRC, LaSalle Cou nty Station, Units 1 and 2, Renewed Facility Operating License Nos. NPF-11 and NPF-18, NRC Docket Nos. 50-373 and 50-374, "Response to Request for Additional Information Reg arding the License Amendment Request to Adopt 10 CFR 50.69 (EPID L-2020-LLA-0017), " January 22, 2021 ADAMS Accession No. ML21022A130.

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 22 of 24 Docket Nos. 50-352 and 50-353

[11] Nuclear Energy Institute (NEI) 00-04, "10 CFR 50.69 SSC Ca tegorization Guideline,"

Revision 0, July 2005.

[12] NRC letter to all Power Reactor Licensees, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(F) Regarding Recommendati ons 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushi ma Dai-ichi Accident,"

March 12, 2012, ADAMS Accession No ML12053A340.

[13] Peach Bottom Atomic Power Station, Units 2 and 3, Seismic Probabilistic Risk Assessment Report, "Response to NRC Request Regarding Recommend ation 2.1 of the Near Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," August 28, 2018 (RS-18-098) (ML18240A065).

[14] Peach Bottom Atomic Power Station, Units 2 and 3 - Staff R eview of Seismic Probabilistic Risk Assessment, "Associated with Reevaluated Seismic Hazard Implementation of the Near-Term Task Force Recommendation 2.1: Seismic," (EPID NO. L-2018-JLD-0010),

June 10, 2019, ADAMS Accession No. ML19053A469.

[15] Peach Bottom Atomic Power Station, Units 2 and 3 - Correction Regarding Staff Review of Seismic Probabilistic Risk Assessment, "Reevaluated Seismic Haz ard Implementation of the Near-Term Task Force Recommendation 2.1: Seismic," (EPID NO. L-2018-JLD-0010),

October 8, 2019, ADAMS Accession No. ML19248C756.

[16] Plant C Nuclear Plant, Units 1 and 2, "License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process," June 22, 2017, ADAMS Acce ssion No.

ML17173A875.

[17] Plant C Nuclear Plant, Units 1 and 2, "Issuance of Amendme nts Regarding Application of Seismic Probabilistic Risk Assessment Into the Previously Approved 10 CFR 50.69 Categorization Process (EPID L-2017-LLA-0248)," August 10, 2018 (ML18180A062).

[18] Seismic Probabilistic Risk Assessment for Plant D Nuclear Plant, Units 1 and 2, "Response to NRC Request for Information Pursuant to 10 CFR 50. 54(f) Regarding Recommendation 2.1 of the NTTF Review of Insights from the Fuku shima Dai-ichi Accident," June 30, 2017 (ML17181A485).

[19] Plant D Nuclear Plant, Units 1 and 2, Seismic Probabilisti c Risk Assessment Supplemental Information, April 10, 2018, ADAMS Accession No. ML18100A966.

[20] Plant D Nuclear Plant, Units 1 and 2 - Staff Review of Sei smic Probabilistic Risk Assessment Associated With Reevaluated Seismic Hazard Implementation of the NTTF Recommendation 2.1, Seismic (CAC NOS. MF9879 AND MF9880; EPID L -2017-JLD-0044) July 10, 2018, ADAMS Accession No. ML18115A138.

[21] Plant D Nuclear Plant, Units 1 And 2 - Issuance of Amendme nt Nos. 134 And 38 Regarding Adoption of 10 CFR 50.69, "Risk-Informed Categorizati on and Treatment Of Structures, Systems, and Compone nts For Nuclear Power Plants ( EPID L-2018-LLA-0493) April 30, 2020 NRC ADAMS Accession No. ML20076A194.

[22] Electric Power Research Institute (EPRI) NP-6041-SL, "A Me thodology for Assessment of Nuclear Power Plant Seismic Margin", Revision 1, August 1991.

[23] Southern Nuclear Operating Company, Inc. letter to NRC, "V ogtle Electric Generating Plant, Units 1 & 2, "License Amendment Request to Incorporate S eismic Probabilistic Risk Assessment into 10 CFR 50.69, Response to Request for Additional Information (RAIs 4-11)," February 21, 2018, ADAMS Accession No. ML18052B342.

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 23 of 24 Docket Nos. 50-352 and 50-353

[24] Plant D Nuclear Plant, Units 1 and 2,Application to Adopt 10 CFR 50.69, "Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors," November 29, 2018 ADAMS Accession No. ML18334A363.

[25] NRC Memorandum, "Support Document for Screening and Priori tization Results Regarding Seismic Hazard Re-Evaluations for Operating Reactors in the Central and Eastern United States," May 21, 2014 ADAMS Accession No. ML1413 6A126.

[26] Limerick Generating Station, Units 1 and 2 - Staff Assessment of Information Provided Pursuant to 10 CFR 50.54(f), "Seismic Hazard Reevaluations for Recommendation 2.1 of the NTTF Review of Insights from the Fukushima Dai-Ichi Acciden t," (TAC NOS. MF3864 and MF3865), November 6, 2015 (ML15296A492).

[27] Limerick Generating Station, Units 1 and 2, Exelon Generat ion Company, LLC, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites),

Response to NRC Request for Information Pursuant to 10 CFR 50.54(f), Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fuk ushima Dai-ichi Accident, March 31, 2014 (ML14090A236).

[28] Limerick, Units 1 and 2, 180-Day Response to NRC Request f or Information Pursuant to 10 CFR 50.54(f), "Seismic Aspects of Recommendation 2.3 of the NTTF Review of Insights from the Fukushima Dai-ichi Accident," Release Date December 17, 2012 (ADAMS Package ML123420141).

[29] Limerick Generating Station, Unit 1-Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendatio n 2.3, Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC NO. MF0138 ), April 14, 2014 (ML14058B156).

[30] Limerick Generating Station, Unit 2-Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendatio n 2.3, Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC NO. MF0139 ), April 14, 2014 (ML14058B120).

[31] Limerick Generating Station, Units 1 and 2, Mitigating Str ategies Assessment (MSA)

Report for the Reevaluated Seismic Hazard Information - NEI 12- 06, Appendix H, Revision 2, H.4.2 Path 2: GMRS < 2x SSE with High Frequency Exceedances, December 1, 2016 (ML16336A442).

[32] Limerick Generating Station, Units 1 And 2 - Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed In Response to the March 12, 2012, 50.54(f) Letter, April 12, 201 7 (ML17087A066).

[33] Limerick Generating Station, Units 1 and 2, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Informatio n Pursuant to 10 CFR 50.54(f), "Recommendation 2.1 of the Near-Term Task Force Revie w of Insights from the Fukushima Dai-ichi Accident," November 28, 2016 (ML16333A084).

[34] Limerick Generating Station, Units 1 and 2 - Staff Review of High Frequency Confirmation Associated With Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1, February 6, 2017 (ML17031A415).

[35] Exelon Generation Company, LLC. Letter to NRC, LaSalle Cou nty Station, Units 1 and 2, Renewed Facility Operating License Nos. NPF-11 and NPF-18, NRC Docket Nos. 50-373 and 50-374, "Response to Request for Additional Information Reg arding the License Amendment Request to Adopt 10 CFR 50.69 (EPID L-2020-LLA-0017), " October 1, 2020, ADAMS Accession Number ML20275A292.

License Amendment Request Supplement Attachment 1 10 CFR 50.69 Alternate Categorization Processes Page 24 of 24 Docket Nos. 50-352 and 50-353

[36] Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Renewed Facility Operating License Nos. DPR-53 and DPR-69, Docket Nos. 50-317 and 50-318, "Response to Request for Additional Information Regarding the Application to Adopt 10 CF R 50.69, 'Risk-informed categorization and treatment of s tructures, systems, and compon ents for nuclear power reactors'," July 1, 2019, ADAMS Accession No. ML19183A012.

[37] Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Renewed Facility Operating License Nos. DPR-53 and DPR-69, Docket Nos. 50-317 and 50-318, "Response to Request for Additional Information Regarding the Application to Adopt 10 CF R 50.69, 'Risk-informed categorization and treatment of s tructures, systems, and compon ents for nuclear power reactors'," July 19, 2019, ADAMS Accession No. ML19200A216.

[38] Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Renewed Facility Operating License Nos. DPR-53 and DPR-69, Docket Nos. 50-317 and 50-318, "Revised Response to Request for Additional Information Regarding the Application to Adopt 10 CFR 50.69,

'Risk-Informed Categorization and Treatment of Structures, Syst ems, and Components for Nuclear Power Reactors,' July 19, 2019," August 5, 2019, ADAMS Accession No. ML19217A143.

[39] Limerick Generating Station, Units 1 and 2, Response to Re quest for Additional Information: Application to Adopt 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems, and Components (SSCs) for Nuclear Power Plants,"

January 19, 2018 (ML18019A091).

Attachment 2

License Amendment Request Supplement

Limerick Generating Station, Units 1 and 2 Docket Nos. 50-352 and 50-353

Application to Implement an Alternate Defense-in-Depth Categori zation Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Categorization Process in Accordance with the Requireme nts of 10 CFR 50.69, "Risk-Informed Categorization and Treatment of S tructures, Systems and Components for Nuclear Power Reactors"

Revised Proposed FOL Appendix C License Condition Mark-Ups

APPENDIX C

ADDITIONAL CONDITIONS OPERATING LICENSE NO. NPF-39

Exelon Generation Company, LLC shall comply with the following conditions on the schedule noted below:

Amendment No. Additional Conditions

230[XXX] Exelon is approved to implement 10 CFR 50.69 using the processes for categorization of Risk-Informed Safety Class (RISC)-1, RISC-2, RISC-3, and RISC-4 structures, systems, and components (SSCs) using: Probabilistic Risk Assessment (PRA) models to evaluate risk associated with internal events, including internal flooding, and internal fire; the shutdown safety assessment process to assess shutdown risk; the Arkansas Nuclear One, Unit 2 (ANO-2) passive categorization method to assess passive component risk for Class 2 and Class 3 SSCs and their associated supports; and the results of non-PRA evaluations that are based on the IPEEE Screening Assessment for External Hazards, i.e.,

seismic margin analysis (SMA) to evaluate seismic risk, and a screening of other external hazards updated using the external hazard screening significance process identified in ASME/ANS PRA Standard RA-Sa-2009; as specified in Unit 1 License Amendment No. 230 dated July 31, 2018.

Exelon will complete the implementation items listed in Attachment 2 of Exelon letter to NRC dated April 23, 2018 prior to implementation of 10 CFR 50.69. All issues identified in the attachment will be addressed and any associated changes will be made, focused-scope peer reviews will be performed on changes that are PRA upgrades as defined in the PRA standard (ASME/ANS RA-Sa-2009, as endorsed by RG 1.200, Revision 2), and any findings will be resolved and reflected in the PRA of record prior to implementation of the 10 CFR 50.69 categorization process.

Prior NRC approval, under 10 CFR 50.90, is required for a change to the categorization process specified above (e.g., change from a seismic margins approach to a seismic probabilistic risk assessment approach).

Renewed License No. NPF-39 Amendment No. 128, 131, 147, 184, 230 UNIT 1 FOL INSERT

In addition, Exelon is approved to implement 10 CFR 50.69 using any of the following alternative processes for categorization of RISC-1, RISC-2, RISC-3, and RISC-4 SSCs: the defense-in-depth approach contained in PWROG-20015-NP; the passive pressure boundary categorization approach described in EPRI 3002015999; and the alternative seismic approach as described in Exelon's submittal letter dated March 11, 2021, and associated supplements, as specified in Unit 1 License Amendment No. [XXX] dated [DATE].

APPENDIX C

ADDITIONAL CONDITIONS OPERATING LICENSE NO. NPF-85

Exelon Generation Company, LLC shall comply with the following conditions on the schedule noted below:

Amendment No. Additional Conditions

193 [YYY] Exelon is approved to implement 10 CFR 50.69 using the processes for categorization of Risk-Informed Safety Class (RISC)-1, RISC-2, RISC-3, and RISC-4 structures, systems, and components (SSCs) using: Probabilistic Risk Assessment (PRA) models to evaluate risk associated with internal events, including internal flooding, and internal fire; the shutdown safety assessment process to assess shutdown risk; the Arkansas Nuclear One, Unit 2 (AN0-2) passive categorization method to assess passive component risk for Class 2 and Class 3 SSCs and their associated supports; and the results of non-PRA evaluations that are based on the IPEEE Screening Assessment for External Hazards, i.e., seismic margin analysis (SMA) to evaluate seismic risk, and a screening of other external hazards updated using the external hazard screening significance process identified in ASME/ANS PRA Standard RA-Sa-2009; as specified in Unit 2 License Amendment No. 193 dated July 31, 2018.

Exelon will complete the implementation items listed in Attachment 2 of Exelon letter to NRC dated April 23, 2018 prior to implementation of 10 CFR 50.69. All issues identified in the attachment will be addressed and any associated changes will be made, focused-scope peer reviews will be performed on changes that are PRA upgrades as defined in the PRA standard (ASME/ANS RA -Sa-2009, as endorsed by RG 1.200, Revision 2),

and any findings will be resolved and reflected in the PRA of record prior to implementa tion of the 10 CFR 50.69 categorization process.

Prior NRC approval, under 10 CFR 50.90, is required for a change to the categorization process specified above (e.g., change from a seismic margins approach to a seismic probabilistic risk assessment approach).

Renewed License No. NPF -85 Amendment No. 193 UNIT 2 FOL INSERT

In addition, Exelon is approved to implement 10 CFR 50.69 using any of the following alternative processes for categorization of RISC-1, RISC-2, RISC-3, and RISC-4 SSCs: the defense-in-depth approach contained in PWROG-20015-NP; the passive pressure boundary categorization approach described in EPRI 3002015999; and the alternative seismic approach as described in Exelon's submittal letter dated March 11, 2021, and associated supplements, as specified in Unit 2 License Amendment No. [YYY] dated [DATE].