ML20057G175: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 22: Line 22:
==Subject:==
==Subject:==
Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-566, "Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems" (EPID L-2020-LLA-0010)
Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-566, "Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems" (EPID L-2020-LLA-0010)
By letter dated February 24, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20024F216), Entergy Operations, Inc. submitted a license amendment request (LAR) to revise Technical Specifications (TSs) to Adopt TSTF-566, Revise Actions for Inoperable RHR [Residual Heat Removal]-Shutdown Cooling [SHC] Subsystems, Revision 0, dated January 19, 2018 (ADAMS Accession No. ML180198B187), for Grand Gulf Nuclear Station and River Bend Station, Unit 1. The proposed amendment revises TS actions applicable when a RHR SHC subsystem is inoperable.
By {{letter dated|date=February 24, 2020|text=letter dated February 24, 2020}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20024F216), Entergy Operations, Inc. submitted a license amendment request (LAR) to revise Technical Specifications (TSs) to Adopt TSTF-566, Revise Actions for Inoperable RHR [Residual Heat Removal]-Shutdown Cooling [SHC] Subsystems, Revision 0, dated January 19, 2018 (ADAMS Accession No. ML180198B187), for Grand Gulf Nuclear Station and River Bend Station, Unit 1. The proposed amendment revises TS actions applicable when a RHR SHC subsystem is inoperable.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review for the LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review for the LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment.

Latest revision as of 14:06, 12 November 2023

NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems
ML20057G175
Person / Time
Site: Grand Gulf, River Bend  Entergy icon.png
Issue date: 02/24/2020
From: Siva Lingam
NRC/NRR/DORL/LPL4
To: Gaston R
Entergy Nuclear Operations
Wengert T
References
L-2020-LLA-0010
Download: ML20057G175 (3)


Text

From: Lingam, Siva Sent: Monday, February 24, 2020 1:56 PM To: Gaston, Ronald William; SPYLE@entergy.com Cc: Dixon-Herrity, Jennifer; Cusumano, Victor; Wengert, Thomas; Drake, Jason; Tilton, Caroline; Shaw, Jim; Schenk, Timothy A; bjohns@entergy.com; Schrage, John

Subject:

Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-566, "Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems" (EPID L-2020-LLA-0010)

By letter dated February 24, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20024F216), Entergy Operations, Inc. submitted a license amendment request (LAR) to revise Technical Specifications (TSs) to Adopt TSTF-566, Revise Actions for Inoperable RHR [Residual Heat Removal]-Shutdown Cooling [SHC] Subsystems, Revision 0, dated January 19, 2018 (ADAMS Accession No. ML180198B187), for Grand Gulf Nuclear Station and River Bend Station, Unit 1. The proposed amendment revises TS actions applicable when a RHR SHC subsystem is inoperable.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review for the LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> to complete. The NRC staff expects to complete this review by March 1, 2021, or earlier. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, or unanticipated addition of scope to the review.

If you have any questions, please contact me at (301) 415-1564.

Siva P. Lingam

U.S. Nuclear Regulatory Commission Project Manager Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Grand Gulf Nuclear Station Entergy Fleet Location: O-9E22; Mail Stop: O-9E03 Telephone: 301-415-1564 E-mail address: Siva.Lingam@nrc.gov

Hearing Identifier: NRR_DRMA Email Number: 457 Mail Envelope Properties (MN2PR09MB516143E63D4AC2EADCC1DCBAF6EC0)

Subject:

Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-566, "Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems" (EPID L-2020-LLA-0010)

Sent Date: 2/24/2020 1:55:45 PM Received Date: 2/24/2020 1:55:46 PM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:

"Dixon-Herrity, Jennifer" <Jennifer.Dixon-Herrity@nrc.gov>

Tracking Status: None "Cusumano, Victor" <Victor.Cusumano@nrc.gov>

Tracking Status: None "Wengert, Thomas" <Thomas.Wengert@nrc.gov>

Tracking Status: None "Drake, Jason" <Jason.Drake@nrc.gov>

Tracking Status: None "Tilton, Caroline" <Caroline.Tilton@nrc.gov>

Tracking Status: None "Shaw, Jim" <jshaw5@entergy.com>

Tracking Status: None "Schenk, Timothy A" <TSCHENK@entergy.com>

Tracking Status: None "bjohns@entergy.com" <bjohns@entergy.com>

Tracking Status: None "Schrage, John" <jschrag@entergy.com>

Tracking Status: None "Gaston, Ronald William" <rgasto1@entergy.com>

Tracking Status: None "SPYLE@entergy.com" <SPYLE@entergy.com>

Tracking Status: None Post Office: MN2PR09MB5161.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3083 2/24/2020 1:55:46 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: