Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project) ML17229A7201998-05-0404 May 1998 Five Yr Population Estimates for Ten Mile Area Surrounding for St Lucie Plant ML17229A6771998-03-27027 March 1998 Status Meeting. ML17229A4861997-09-22022 September 1997 Status Meeting ML17229A4521997-08-14014 August 1997 Status Meeting for Units 1 & 2. ML17229A4201997-07-11011 July 1997 Status Meeting. ML17229A3901997-06-17017 June 1997 Rev 0 to ER-97-010, Preliminary Waste Characterization of St Lucie Sgs. L-97-141, Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 Nuclear Power Plant Using NUREG-0800 Std Review Plan Section 15.1.5, App a, Rev 11997-04-29029 April 1997 Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 Nuclear Power Plant Using NUREG-0800 Std Review Plan Section 15.1.5, App a, Rev 1 ML20137K9611997-04-0202 April 1997 Rev 0 to JPN-PSL-SENP-95-100, Letdown Pressure Controller PIC-2201 Set Pressure Reduction ML20137L0161997-04-0202 April 1997 Undated Rev 2 to JPN-PSL-SENP-95-101, Engineering Evaluation,Assessment of Effects on Plant Operation of Lifting LPSI Pump Discharge Header Thermal Relief Valve ML20137K7611997-03-25025 March 1997 Maint Rule Baseline Insp Notebook ML17229A2491997-02-21021 February 1997 Status Meeting. ML17229A1901997-01-0707 January 1997 Response to Supplemental RAI Re NRC GL 88-20, Ipe ML17229A1841996-12-18018 December 1996 Rev 1 to St Lucie Unit 1 Small Break LOCA Analysis w/30% SG Tube Plugging. ML20137M2121996-12-17017 December 1996 Monthly Indicator Rept, Nov 1996 ML17229A1691996-12-11011 December 1996 Status Meeting on 961211 ML17229A0931996-10-31031 October 1996 Analysis of Odscc/Iga at Tubesheet & Tube Support Locations at St Lucie Unit 1. ML20137M9261996-10-31031 October 1996 Monthly Indicator Rept ML17229A0921996-10-24024 October 1996 Steam Generator Run Time Analysis,Cycle 14, for St Lucie Unit 1 ML20137K6641996-10-18018 October 1996 Rev 1,Self Assessment for St Lucie Npp ML17229A1021996-10-17017 October 1996 Status Meeting on 961017. ML20137N1941996-10-17017 October 1996 Monthly Indicator Rept, Sept 1996 ML17229A0611996-09-30030 September 1996 Psl Self-Assessment. ML20137P4401996-09-13013 September 1996 Rev 31 to St Lucie Plant Radiological Emergency Plan ML20137K8031996-09-0404 September 1996 Evaluation of Temporary Operating Configuration w/1B Main Transformer Out of Svc,For St Lucie Np,Unit 1 ML20137K8221996-09-0303 September 1996 Evaluation of Temporary Operating Configuration w/1B Main Transformer Out of Svc,For St Lucie Np,Unit 1 ML17229A1791996-08-27027 August 1996 Rev 0 to JPN-PSL-SEES-96-059, Engineering Evaluation of Application of Thermo-Lag to Meet Rg 1.75 Requirements. ML20137L0091996-08-22022 August 1996 Rev 0 to JPN-PSL-SEIP-96-067, Engineering Evaluation,Impact of Past Incorrect Calibration of S/G Level Transmitters on Low S/G Level Trip Setpoints ML20137K9451996-07-22022 July 1996 Rev 0 to JPN-PSL-SEMS-96-051, Engineering Evaluation,2B Charging Pump Seal Leakage Evaluation ML20137N7911996-06-28028 June 1996 Scoping Document for Implementation of Maint Rule for Monitoring Effectiveness of Maint on Structures ML20137N2051996-06-14014 June 1996 Monthly Indicator Rept, May 1996 ML20137L3891996-06-10010 June 1996 Rev 0 to JPN-PSL-SENS-96-039, 10CFR50.59 Safety Evaluation, Temporary Configuration for CEDMCS Cooling Sys & Encl ML17228B5051996-05-31031 May 1996 Chapter 15 Event Review & Analysis for 30% SG Tube Plugging. ML20137L3591996-05-24024 May 1996 Rev 1 to JPN-PSL-SEIS-96-028, Safety Evaluation,Wide Range Ni Temporary Sys Alteration ML20137N2111996-05-14014 May 1996 Monthly Indicator Rept, Apr 1996 ML20137L2261996-05-11011 May 1996 Rev 2 to JPN-PSL-SEFJ-96-020, Safety Evaluation,Refueling Equipment Underload & Overload Settings ML20137L2051996-05-0808 May 1996 Rev 1 to JPN-PSL-SEFJ-96-020, Engineering Evaluation, Refueling Equipment Underload & Overload Settings ML20137L1911996-04-29029 April 1996 Rev 0 to JPN-PSL-SEFJ-96-020, Engineering Evaluation, Refueling Equipment Underload & Overload Settings ML17228B4781996-04-18018 April 1996 Plant,Status Meeting for Units 1 & 2. ML20137N2201996-04-17017 April 1996 Monthly Indicator Rept, Mar 1996 ML20137N3431996-03-29029 March 1996 Rev 0 to JPN-PSL-SEMS-96-007, 10CFR50.59 Safety Evaluation for Addition of Three Manual Isolation Valves within Rcgvs Process Vent Lines ML20137N2381996-03-19019 March 1996 Monthly Indicator Rept, Feb 1996 ML17228B4381996-03-15015 March 1996 Status Meeting for Units 1 & 2. ML20137L3461996-03-0505 March 1996 Rev 3 to JPN-PSL-SEFJ-95-023, Safety Evaluation for 1995 Boraflex Blackness Testing Results ML20137L0551996-02-22022 February 1996 Impact of Past Incorrect Calibration of SG Levels of Afas Setpoints,Rev 0. Actual Rept Number JPN-PSL-SEIP-96-068 Rev 0 ML20137R3171996-02-15015 February 1996 Rev 0 to JPN-PSL-SENS-96-003, 10CFR50.59 Safety Evaluation for Chemical & Volume Control System Operation ML17228B0231995-12-31031 December 1995 Plant Ref Simulator Certification Rept ML20137M4161995-12-21021 December 1995 Independent Assessment of Maint Rule Implementation at Plant, 951211-15 ML20137N3661995-12-18018 December 1995 Monthly Performance Monitoring Mgt Info Rept, Nov 1995 1999-04-07
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4921999-10-12012 October 1999 Safety Evaluation Accepting Licensee 990831 Request for Relief from Certain Provisions of ASME B&PV Code,Section XI, Contained in Third 10-year Interval ISI Program for Plant, Unit 1 ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr 05000335/LER-1999-004-01, :on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With1999-10-0707 October 1999
- on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With
ML17241A4801999-10-0404 October 1999 Safety Evaluation Supporting Amend 104 to License NPF-16 L-99-220, Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With L-99-203, Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4331999-08-10010 August 1999 SER Accepting Licensee Relief Request RR-04,proposed Alternative to Code Requirement Pursuant to 10CFR50.55a(a)(3)(i) L-99-177, Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With ML17241A4261999-07-29029 July 1999 Safety Evaluation Supporting Relief from ASME Code Requirements Related to Inservice Insp Program Second 10-year Interval for Unit 2 05000389/LER-1999-007, :on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With1999-07-16016 July 1999
- on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With
ML17241A4211999-07-16016 July 1999 SER Accepting Response to GL-95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Unit 2 ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr 05000389/LER-1999-006, :on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With1999-07-0606 July 1999
- on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With
ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr 05000389/LER-1999-005, :on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With1999-07-0606 July 1999
- on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With
ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 05000389/LER-1999-004, :on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With1999-06-30030 June 1999
- on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With
ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr L-99-161, Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr 05000335/LER-1999-002-01, :on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With1999-06-0404 June 1999
- on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With
L-99-133, Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With ML17241A4001999-05-21021 May 1999 Safety Evaluation Supporting Draft Amends to Licenses DPR-67 & NPF-16,respectively ML17241A3261999-05-0606 May 1999 Safety Evaluation Supporting Amend 101 to License NPF-16 05000389/LER-1999-003, :on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With1999-05-0606 May 1999
- on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With
L-99-113, Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr 05000335/LER-1999-001-01, :on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With1999-04-0707 April 1999
- on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With
ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr 05000389/LER-1999-002, :on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With1999-04-0707 April 1999
- on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With
L-99-088, Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With ML17241A3721999-03-31031 March 1999 SER for Environmental Qualification of Terry Turbine Woodward Governor Controls for Unit 1.Staff Recommends This Matter Not Be Pursued Further Unless Far Greater Safety Significance Can Be Established ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2791999-03-26026 March 1999 Safety Evaluation Concluding That No Outstanding Ampacity Derating Issues as Identified in GL 92-08 for Plants 05000389/LER-1999-001, :on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With1999-03-10010 March 1999
- on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With
L-99-061, Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 05000335/LER-1998-002, :on 980105,CIS Bistable in Bypass Resulted in Condition Prohibited by Tss.Caused by Personnel Error. Restored Channel C of ESFAS Containment Isolation Signal to Operable Status1999-02-18018 February 1999
- on 980105,CIS Bistable in Bypass Resulted in Condition Prohibited by Tss.Caused by Personnel Error. Restored Channel C of ESFAS Containment Isolation Signal to Operable Status
L-99-036, Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 05000335/LER-1998-009, :on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With1999-01-20020 January 1999
- on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With
ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept 05000389/LER-1998-010, :on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With1999-01-0404 January 1999
- on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With
ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr L-99-001, Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 05000389/LER-1997-002, :on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With1998-12-22022 December 1998
- on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With
05000389/LER-1998-008-01, :on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With1998-12-15015 December 1998
- on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With
ML17229B0021998-12-15015 December 1998 SER Accepting Licensee IPEEE Submittal on Plant,Units 1 & 2 1999-09-30
[Table view] |