ML20065K052: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20065K052
| number = ML20065K052
| issue date = 04/13/1994
| issue date = 04/13/1994
| title = Responds to 940214 Ltr Which Provided Results of NRC Safety Audit of Svc Pond Dam Conducted on 930202 & 03.Corrected Data Sheets of Data Sheets Provided by Subj NRC Ltr Encl
| title = Responds to Which Provided Results of NRC Safety Audit of Svc Pond Dam Conducted on 930202 & 03.Corrected Data Sheets of Data Sheets Provided by Subj NRC Ltr Encl
| author name = Morey D
| author name = Morey D
| author affiliation = SOUTHERN NUCLEAR OPERATING CO.
| author affiliation = SOUTHERN NUCLEAR OPERATING CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9404190119
| document report number = NUDOCS 9404190119
| title reference date = 02-14-1994
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 3
| page count = 3
Line 22: Line 23:
                                                                                                                                 )
                                                                                                                                 )
               $IefN$fE                                                                  the soothem elec*nc system April 13,1994 Docket Nos. 50-348 50-364' U. S. Nucie er Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant Response to NRC Safety Audit Of The Service Water Pond Dam on February 2 & 3.1993 Gentlemen:
               $IefN$fE                                                                  the soothem elec*nc system April 13,1994 Docket Nos. 50-348 50-364' U. S. Nucie er Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant Response to NRC Safety Audit Of The Service Water Pond Dam on February 2 & 3.1993 Gentlemen:
This letter is in response to the Nuclear Regulatory Commission (NRC) letter dated February 15,1994, which provided the results of the NRC safety audit of the Service Water Pond Dam conducted on February 2 and 3,1993.
This letter is in response to the Nuclear Regulatory Commission (NRC) {{letter dated|date=February 15, 1994|text=letter dated February 15,1994}}, which provided the results of the NRC safety audit of the Service Water Pond Dam conducted on February 2 and 3,1993.
Enclosure 2 and 3 of the NRC letter contained a copy of the data sheets provided by the NRC to the NationalInventory of Dams plus instructions for completing the data sheets.
Enclosure 2 and 3 of the NRC letter contained a copy of the data sheets provided by the NRC to the NationalInventory of Dams plus instructions for completing the data sheets.
The NRC letter stated, "Within 60 days of receipt of this letter, it is requested that you review these data sheets and provide the staff any corrections or missing information."
The NRC letter stated, "Within 60 days of receipt of this letter, it is requested that you review these data sheets and provide the staff any corrections or missing information."

Latest revision as of 18:42, 31 May 2023

Responds to Which Provided Results of NRC Safety Audit of Svc Pond Dam Conducted on 930202 & 03.Corrected Data Sheets of Data Sheets Provided by Subj NRC Ltr Encl
ML20065K052
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/13/1994
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9404190119
Download: ML20065K052 (3)


Text

7, l

Southern Nuclear Operating Company Post Off:ce Box 1295 i

. Durungham. Alabama 35201 j f Teiephone (205) 868 5131 1 L

Dave Morey Southern Nudear Operating Company ~

)

$IefN$fE the soothem elec*nc system April 13,1994 Docket Nos. 50-348 50-364' U. S. Nucie er Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant Response to NRC Safety Audit Of The Service Water Pond Dam on February 2 & 3.1993 Gentlemen:

This letter is in response to the Nuclear Regulatory Commission (NRC) letter dated February 15,1994, which provided the results of the NRC safety audit of the Service Water Pond Dam conducted on February 2 and 3,1993.

Enclosure 2 and 3 of the NRC letter contained a copy of the data sheets provided by the NRC to the NationalInventory of Dams plus instructions for completing the data sheets.

The NRC letter stated, "Within 60 days of receipt of this letter, it is requested that you review these data sheets and provide the staff any corrections or missing information."

SNC has reviewed the data sheets. The corrected data sheets are included as an attachment to this letter.

If there are any questions or if additionalinformation is needed, please advise.

Respectfully submitted,

{lf })lf,< '

Dave Morey- [

AJP/EFB/ cit:swpondau. doc Attachment cc: Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T. M. Ross 9404190119 940413 ' Sh- l PDR ADOCK 05000348 \ l l P PDR <

j

52 .

, PAGE 1/2 ATTACHMENT NATDAM INVENTORY OF DAMS INVENTORY DATA FARLEY CAT.1 COOLING WATER STORAGE POND Al.-HOUSTON COUNTY DAM INFORMATION NATIONAL INVENTORY FIELDS 1- - 1. DAM NAME , . . . ... .. . FARLEY CAT.1 COOL. WATER STORAGE POND

2. OTHER DAM NAMES . . . . . CALHOUN POND DAM
3. FEDERAL AGENCY ID . ... . .. NRC AL1
4. NATIONAL ID . . ..... .. AL83101 i 5. LATITUDE DEG , . 31
6. LATITUDE MIN . . . . 13
7. LATITUDE SEC . .. 21
8. LONGITUDE DEG . . . 85
9. LONGITUDE MIN . . .. .. . 6 -
10. LONGITUDE SEC . . . . . . . . . 42
11. SECTION, TOWNSHIP, RANGE . NA 12, COUNTY . . ... .. . . HOUSTON
13. RIVER OR STREAM , , . . . OFFSTREAM - CHATAHOOCHIE
14. NEAREST CITY-TOWN . . . GORDON
15. DISTANCE CITY-TWN (M!LE) . 2 MILES ,
16. OWNER NAME . . . .

. ... . ALABAMA POWER COMPANY

17. OWNER TYPE . . . .. .. . U
18. NONFED DAM ON FED PROP . , NO
19. DAM TYPE , . .. . . .. RE
20. PURPOSE . . . . . ... .... . - O-CAT 1 COOLING POND FOR ULT HEAT SINK
21. YEAR COMPLETED . .... .. 1976
22. DAM LENGTH (FT), , .. . 3900-
23. DAM HEIGHT (FT) . 63 24.- STRUCTURAL HEIGHT (FT) . 98
25. HYDRAULIC HEIGHT (FT) . . . . .. 51
26. MAXIMUM DISCHARGE (CU FT) . . . 2020
27. MAXIMUM STORAGE (ACRE FT) . . 2674 ,

28.- NORMAL STORAGE (ACRE FT) . 1400 @ ELEV 184 FT

29. SURFACE AREA (ACRES) . 95

v7

.s' s.~

, , PAGE 2/2

"~

DAM INFORMATION NATIONAL INVENTORY FIELDS

30. DRAINAGE AREA (SQ MILES) . . . . 0.5
31. DOWNSTREAM HAZARD . . . .. LOW 32 EMERGENCY ACTION PLAN . . NR
33. PHASE I INSPECTION , . . . . NO 34.- INSPECTION DATE . . . . . . . 2/02/93
35. SPILLWAY TYPE . . . . . ... . UNCONTROLLED
36. SPILLWAY WIDTH (FT) . ... 48
37. VOLUME OF DAM (CU YARDS) . 1400000
38. NUMBER OF LOCKS . . ... 0
39. LENGTH OF LOCKS . , .. . . 0
40. WIDTH OF LOCKS (FT) . . 0
41. FED AGENCY INV FUNDING . .. NO '
42. FED AGENCY INV DESIGN . .. . NO
43. FED AGENCY INV CONSTRUCTN . NO
44. FED AGENCY INV REGULATORY . YES
45. FED AGENCY INV INSPECTION . YES
46. FED AGENCY INV OPERATION , NO
47. FED AGENCY INV OWNER . . NO
48. FED AGENCY INV OTHER . . . . NO
49. FEDERAL REGULATORY AGENCY NRC l OWNER INFORMATION
1. OWNER NAME . . ....... . .. ALABAMA POWER COMPANY
2. OWNER TYPE . . . . ... U
3. CONTACT NAME . . MR. R. D. HILL, JR.
4. CONTACT TITLE . . GENERAL MANAGER-NUCLEAR PLANT ~
5. CONTACT SALUTATION . . NA
6. ADDRESS 1. ... .. . . . . SOUTHERN NUCLEAR CO., INC.

7 ADDRESS 2. .. .. . . .. FARLEY NUCLEAR PLANT

8. ADDRESS 3... .. ... . P. O. DRAWER 470
9. CITY . . ... . .... . .... . ASHFORD
10. STATE . ......... . ....... ALABAMA
11. ZIP . . . .. .. .. . ... 36312
12. PHON E . . . . . . . . .. . . 205-899-5156
13. FAX . . . ... . . 205-899-5156 EXT 6049
14. ' EMERGENCY CONTACT NAME . MR. R. D. HILL, JR.
15. EMERGENCY CONTACT PHONE . 205-899-5156
16. OWNER NOTE . . .... . ,.. .. NA
17. DATE . ... . ...... .. 4-13-94

,