| | title = LER#78-002/01X-1 on 780322:elec Degradation Observed on a GE Terminal Block Type Eb & 25 Mounted in Aluminum Terminal Box.Failure Traced to Interfacing W/Aluminum Boxes.Aluminum Boxes Replaced W/Steel Boxes | | | title = /01X-1 on 780322:elec Degradation Observed on a GE Terminal Block Type Eb & 25 Mounted in Aluminum Terminal Box.Failure Traced to Interfacing W/Aluminum Boxes.Aluminum Boxes Replaced W/Steel Boxes |
| | author name = Fleming S | | | author name = Fleming S |
| | author affiliation = CONNECTICUT YANKEE ATOMIC POWER CO. | | | author affiliation = CONNECTICUT YANKEE ATOMIC POWER CO. |
|
---|
Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K3301999-10-19019 October 1999 Safety Evaluation Supporting Amend 195 to License DPR-61 ML20206C8761999-04-28028 April 1999 Safety Evaluation Supporting Amend 194 to License DPR-61 CY-99-047, Ro:On 981217,identified Unsuccessful Dewatering of Cnsi HIC, Model PL8-120R,containing Resins.Caused by Apparent Failure of Dewatering Tree.Other HICs Have Been Procured,Recertified & Returned to Plant for Use1999-03-23023 March 1999 Ro:On 981217,identified Unsuccessful Dewatering of Cnsi HIC, Model PL8-120R,containing Resins.Caused by Apparent Failure of Dewatering Tree.Other HICs Have Been Procured,Recertified & Returned to Plant for Use ML20206F1971998-12-31031 December 1998 Annual Rept for 1998 for Cyap. with CY-99-027, Annual Rept for 10CFR50.59, for Jan-Dec 1998.With1998-12-31031 December 1998 Annual Rept for 10CFR50.59, for Jan-Dec 1998.With ML20198G9101998-12-22022 December 1998 Proposed Rev 2 of Cyap QAP for Haddam Neck Plant. Marked Up Rev 1 Included ML20238F2131998-08-28028 August 1998 SER Accepting Defueled Emergency Plan for Emergency Planning for Connecticut Yankee Atomic Power Co CY-98-136, Ro:On 980727,flow Blockage Occurred & Caused Pressure in Sys to Increase,Resulting in Relief Valve Lifting & Pipe Vibration,Which Caused Leaks to Develop.Caused by Nearly Closed post-filter Inlet Valve.Repaired 2 Leaks in Line1998-08-12012 August 1998 Ro:On 980727,flow Blockage Occurred & Caused Pressure in Sys to Increase,Resulting in Relief Valve Lifting & Pipe Vibration,Which Caused Leaks to Develop.Caused by Nearly Closed post-filter Inlet Valve.Repaired 2 Leaks in Line ML20237B7461998-07-22022 July 1998 1998 Defueled Emergency Plan Exercise Scenario Manual, Conducted on 980722 ML20202D1621998-06-30030 June 1998 Safety Evaluation Supporting Amend 193 to License DPR-61 CY-98-068, Follow-up to Verbal Notification on 980413 of Film on Discharge Canal.Investigation Continuing.Samples Collected for Petroleum Analyses & Biological Characterization at Intake Structure & Discharge Canal.Replaced Sorbent Booms1998-04-15015 April 1998 Follow-up to Verbal Notification on 980413 of Film on Discharge Canal.Investigation Continuing.Samples Collected for Petroleum Analyses & Biological Characterization at Intake Structure & Discharge Canal.Replaced Sorbent Booms CY-98-045, Ro:On 980212,0219,0225 & 0312,separate Sheens of Approx One Cup of oil-like Substance Was Observed at Discharge Canal. Cause Has Not Been Clearly Identified.Called in Vendor Spill to Install Sorbent Booms to Absorb Sheen.W/One Drawing1998-04-13013 April 1998 Ro:On 980212,0219,0225 & 0312,separate Sheens of Approx One Cup of oil-like Substance Was Observed at Discharge Canal. Cause Has Not Been Clearly Identified.Called in Vendor Spill to Install Sorbent Booms to Absorb Sheen.W/One Drawing ML20217F0611998-03-31031 March 1998 Historical Review Team Rept ML20217A0001998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Haddam Neck Plant ML20217K2101998-03-27027 March 1998 Safety Evaluation Supporting Amend 192 to License DPR-61 CY-98-046, Follow-up to 980311 Verbal Notification of Film on Discharge Canal.Cause Not Yet Determined.Film Is Contained & Will Be Absorbed by Containment & Sorbent Booms That Were in Place in Discharge Canal1998-03-12012 March 1998 Follow-up to 980311 Verbal Notification of Film on Discharge Canal.Cause Not Yet Determined.Film Is Contained & Will Be Absorbed by Containment & Sorbent Booms That Were in Place in Discharge Canal ML20216D6531998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Haddam Neck Plant ML20217D7381998-02-28028 February 1998 Revised MOR for Feb 1998 Haddam Neck Plant CY-98-012, Monthly Operating Rept for Jan 1998 for Connecticut Yankee Haddam Neck Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Connecticut Yankee Haddam Neck Plant CY-98-010, Annual Rept for 10CFR50.59,Jan-Dec,19971997-12-31031 December 1997 Annual Rept for 10CFR50.59,Jan-Dec,1997 ML20198N6681997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Haddam Neck Plant ML20217P4861997-12-31031 December 1997 1997 Annual Financial Rept, for Cyap ML20199L5891997-12-24024 December 1997 Independent Analysis & Evaluation of AM-241 & Transuranics & Subsequent Dose to Two Male Workers at Connecticut Yankee Atomic Power Plant ML20203K4271997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Haddam Neck Plant ML20199B1141997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Haddam Neck Plant ML20198M8101997-10-14014 October 1997 SER Accepting Proposed Revs to Util Quality Assurance Program at Facility ML20198J8811997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Haddam Neck Plant ML20210P8721997-08-31031 August 1997 Post Decommissioning Activities Rept, for Aug 1997 ML20217Q3171997-08-31031 August 1997 Addl Changes to Proposed Rev 1 to QA Program ML20210U9301997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Haddam Neck Plant CY-97-082, Special Rept:On 970708,routine Surveillance Testing of Seismic Monitoring Sys Instrumentation Revealed,Data Was Not Being Reproduced by Portion of Playback Sys.Station Presently Pursuing Replacement of Seismic Monitoring Sys1997-08-14014 August 1997 Special Rept:On 970708,routine Surveillance Testing of Seismic Monitoring Sys Instrumentation Revealed,Data Was Not Being Reproduced by Portion of Playback Sys.Station Presently Pursuing Replacement of Seismic Monitoring Sys ML20210L0521997-07-31031 July 1997 Monthly Operating Rept for July 1997 for HNP ML20149E4451997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Haddam Neck Plant ML20141A0041997-05-31031 May 1997 Independent Assessment of Radiological Controls Program at Cyap Haddam Neck Plant Final Rept May 1997 ML20140H5241997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Haddam Neck Plant ML20141K4201997-05-22022 May 1997 Safety Evaluation Supporting Amend 191 to License DPR-61 ML20141D4141997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Connecticut Yankee Haddam Neck ML20138G5901997-04-25025 April 1997 Proposed Rev 1 to Cyap QA Program for Haddam Neck Plant ML20137W8051997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Haddam Neck Plant ML20137H3031997-03-31031 March 1997 Rev 2 to Nuclear Training Loit/Lout Audit Reviews ML20137C6281997-03-14014 March 1997 Redacted Version of Rev 1 to Nuclear Training Loit/Lout Audit Reviews ML20137A0801997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Haddam Neck Plant ML20135C5101997-02-26026 February 1997 1996 Refuel Outage ISI Summary Rept for CT Yankee Atomic Power Co B16268, Special Rept:On 970205,declared Main Stack-Wide Range Noble Gas Monitor Inoperable.Caused by Inadequate Calibr Methods. Will Revise Calibr Procedure to Technique to Demonstrate Accuracy & Linearity Over Intended Range of Monitor1997-02-19019 February 1997 Special Rept:On 970205,declared Main Stack-Wide Range Noble Gas Monitor Inoperable.Caused by Inadequate Calibr Methods. Will Revise Calibr Procedure to Technique to Demonstrate Accuracy & Linearity Over Intended Range of Monitor ML20135E3221997-02-13013 February 1997 Independent Review Team Rept 1996 MP -1 Lout NRC Exam Failures ML20134L2751997-02-0303 February 1997 Draft Rev to GPRI-30, Spent Fuel Storage Facility Licensing Basis/Design Basis ML20138K5721997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Haddam Neck Plant.W/ ML20134L2791997-01-10010 January 1997 Rev 0 to QA Program Grpi ML20134L2911997-01-0808 January 1997 Rev 0 to UFSAR Rev Grpi ML20134L2721996-12-31031 December 1996 Commitment Mgt Grpi 1999-04-28
[Table view] |
Text
,
U. S. NUCLE AR REGULAIoHY CONNdistOd
,b, , F OnM 3GG
'.\/. r 71 LICENSEE EVENT REPORT w
(PLtASE PRINT CA TYPt ALL MEQUtnED INroRMATIONI doNTnOL eLocx: l l l l l } l@
l i
o l ia l t l l C l T l Il l N l P l l ]@[ 0LICEl %t0huMcLH 14 13 l - ( 0 l 0 l 0 l .o010LtCl-
.s c'.S l 0PLlJJ0 l@!
tr> d! CA) bd 4l1l1l1
' 8 9 LicEMLE CODE 4
CowT 1o( l "E*C"'
l1j@l0l5l0j-jol2l1l3}g 0l3l2l217l8t@l0l9l2l5!7l8J@ W W EVENT CATE b D HEPoRT DAT L d0 w us coCKET NUMOLH
- I- e EVENT DESCRIPTION AND PROB AOLE CONSEQUENCES hDuring full s f f o 12 ( l ;
combinations, (March 16 to 22, 1978) similar to equipment recently installed pg,3, ; j i inside containment for the electrical circuits of core deluge motor operated f f a f 4i l l i j
- valves, electrical degradation was observed at one point on a General E ectr c g g ,3, ,
The ;
Company terminal block type EB-25 mounted in an aluminum terminal box.
- o g, j l l
block / box combination had successfully passed screening environmental l lg;,; l ;
temperature CONTINUED ON ATTACHED gg;g; qualification tests under pressure, 60 l CoVP. VALVE I 7 8 9 CAUSE CAUSE SUSCoOE SUD,qoDE
$YST EM COMPONENT CODE Dg jejg lN lE J T }R g CODE CODE SUSCoOE
! d [SI Fj g lE g lA l g lP lE 12 IJ 1d 19 REPCflT 20 R E VISloN 9 10 ti OCCUR RENCE 7 8 SEoVE NTI AL TYP6 N .
Co0E
+
EVFNT YEAR DEvoHT N l0 l1 j l l
- _; l j a
LE R
@ nyg/Ro 1 7 18 l l_l [0 l0 l . stil [gj 21 28 ;0 30 31 J7 j ,,,,,21 22 ;3 74 MAN T AER Fo i 8. SU PL E o i PL T HoVRS S6 i
l43A l@ l Gl 0] 8l Ojg T N A 1d. {hj@l I I I I l l@ l42 Ni@
l^I@
4; 44 i
l ^J@hCNl@
s3 34 a a 3/ 40 48 CAUSE D[SCRIPTION AND CORRECTIVE ACTf 0NS ;
the failure of the General Electric terminal l li jbj ] Preliminary test results indicate No failures were l
[, g , j l block was related to its interface with the aluminum box.
3 Therefore, l 1
experienced with the General Electric block / steel box combination.
- - , , , ., j l _j replacement of the aluminum boxes with stee'. boxes was commenced on g , ; ., j l l
CONTINUED ON ATTACHED.
March 23,1978 after appropriate review per CO j ji,4; ;
? 8 9 oISCoVERY DESCRf' Tion H R STATUS 1500 RY J
(
ST S *6 P WE l lCj@l Qualification Test
[i ls l l j@ l1 l l0l@l A( TlVITY CC TENT location oF RELEASE 4
AMOUNT OF ACTIVITY l
? _ME LE ASED of itELE ASE l l N/A N/A 80 a () lGl 7 8 9 I ZIh b@l 10 ff 44 46 PERSONNEL EXPOSURES
, l A-
[0l@l @l l1l 7l l 0 PE ASoNNE L INJU lES } } J N UV H E Ft DESCHLP floN lil4j l 0 } O l 0 l@l N/A CG 8 9 11 12 $
7
- L O*,5 or ott nAuAGE to F ACillTY l TYPE Of f, niPTloN
' N/A w liloj l JG"liu -
r a u
_ IS*.UE t DESCntPTioN l lllllIIIl!lIl 4
k/A I?lol l lhl tb 08 09 j 203-267-2556 10 -
- 7 H. 3 S. T. Pleming PHONE:
s it A!AE OF PnEPAHEH
o ,
I
. o-l
^
. l 1
+ !
A*17ACHMEJ1T 1 (
I'YENT' DESCRIPTION AND PROBABLE CONSEQUENCES CONTINUED
\
and humidity conditions conservatively simulating the post accident
- cavironment. ,
i Although it is believed that the installed General Electric terminal
- blocks in aluminum boxes would have performed their intended function i based on the time that failure occurred (30 minutes into test)it was
- decided to replace the aluminum boxes with steel boxes. Note that the i only General Electric block / aluminum box application was in the core deluge valve 871A and 871B circuits (located at the Reactor Pressure l Vessel Head). The General Electric block / steel box combination was
} determined to be environmentally qualified based upon the same
- qualification testing. -
i Also during the testing, a Westinghouse terminal block mo~unted in an aluminum box was determined to have failed at one terminal point. l i
i I '
1
$ i
![
. i j CAUSS DESCRIPTION AND CORRECTIVE ACTIONS CONTINUED j
1:ortheast Utilities Quality. Assurance procedures (See D. C. Switzer l
- letter to D. Zeimann, dated March 29, 1978).
I Preliminary investigation of the terminal point failure on the Uestinghouse block revealed the terminal block had a crack that l appeared to be the result of excessive torque on one of the mounting l
) screws. All safety-related terminal blocks ' have had the mounting l
=
screws retorqued to 25 inch-pounds, as recommended by Westinghouse.
Additionally all of these blocks hav'c been visually inspected with j a strong light source to insure no cracks exist.
l Additional failure mode evaluations are in progress.
5 5
e 4
1 1
e '
)
6 e
,}}