i

)

Docket Number 50-213 CY-98-061 l

l l

I l

l l

Attachment 1  ;

i

! Haddam Neck Plant Monthly Operoting Report Number 98-03 i for the Month of March 1998 I

l i

i April 1998 i

i 9804220123 990414 PDR ADOCK 05000213 R PDR

Plant Operating Summary The Haddam Neck Plant has been shut down since July 22,1996, and on December 4,1996, the Connecticut Yankee Atomic Power Company (CYAPCO) Board of Directors voted to permanently and immediately cease operations prior to expiration of its license.

The removal of fuel from the reactor vessel started on November 13, 1996. As of November 15,1996, all fuel assemblies were permanently removed from the reactor and placed in the spent fuel pool for temporary storage.

On December 5,1996, pursuant to 10CFR50.82(a)(1)(i) and 10CFR50.82(a)(1)(ii),

CYAPCO provided docketed certification to the NRC that it has decided to permanently cease operations at the Haddam Neck Plant and that fuel has been permanently removed from the reactor.

CYAPCO submitted the Post-Shutdown Decommissioning Activities Report and the site-specific decommissioning cost estimate in accordance with 10CFR50.82 on August 22,1997.

l t

j .

l I

NRC OPERATING STATUS REPORT l

i

. Haddam Neck i

i

! 1. Dockets 50-213

2. Reporting Period: 03/98 Outage 4 On-line Hours: 744.0 + 0.0 = 744,0
3. Utility Contacts K.W. Emmons (203) 267-3654 l 4. Licensed Thermal Power (MWt): 1825 l

l S. Nameplate Rating (Cross MWe): 667 x 0.9 = 600.3 l 6. Design Electrical Rating (Net MWe): 582

7. Maximum Dep mdable Capacity (Gross MWe)
586.9
8. Maximum Dependable Capacity (Net MWe): 560.1 l 9. If changes occur above since last report, reasons are NONE I 10. Power level to which restricted, if any (Net MWe): N/A l 11, Reasonu for restriction, if any: N/A i

! MONTH YEAR-TO-DATE CUMULATIVE

12. Report period hours 744.0 2,160.0 265,152.0 13, Hours reactor critical: 0.0 0.0 199,493.6 l

t I

14. Reactor reserve shutdown hours: 0.0 0.0 1,285.0
15. Hours generator on line: 0.0 0.0 193,539.3 I

i.

' I

16. Unit reserve shutdown hours: 744.0 2,160.0 11,965.0 I

i

17. Gross thermal energy generated (MWtH): 0.0 0.0 335,551,174.0 *
18. Gross electrical energy generated (MWeH): 0.0 0.0 110,009,804.0
  • l
19. Net electrical energy generated (MWeH): -1,570.2 -4,730.5 104.492,933.6 * '

l

20. Unit service factor 0.0 0.0 *o.O i

(

21.' Unit availability factor: 100.0 100.0 77.5 l'

l 22. Unit capacity factor using MDC net: 0.0 0.0 71.3

23. Unit capacity factor using DER nets 0.0 0.0 67.7
24. Unit forced outage rate
0.0 0.0 6.3 i

f I 25. Forced outage hours: 0.0 0.0 12,970,0

26. Shutdowns scheduled over next 6 months (type,date, duration) : NONE
27. If currently shutdown, estimated startup dates N/A
  • Cumulative values from the first criticality (07/24/67). (The remaining cumulative values ace from the first date of commercial operation, 01/01/68).

i l

CUMULATIVE REPORT i

i 03/98 I

CUMULATIVE

1. Report period hours: 269,016.0
2. Hours generator on-lines 195,083.9
3. Hours reactor criticals 201,702.3
4. On-line net electrical energy generated U4WeH)2 104,749 !54.2 l
5. Off-line station service electrical energy utilized 04We. 277,490.1
6. Transformer losses U4WeH): 276,153.1 i

i

!- 7. Effective full power days: 7,734.1

8. Effective full power hourst 185,617.3 I

L 9 Core burn-up (MWtD/MTU): 218.701.8

10. Number of reactor shutdowns: 307 Notes all values are cumulative from the first criticalit- (0104 hrs, 07/24/67).

l l

I r

l l

l

3 AVERAGE DAILY UNIT POWER LEVEL i

l DOCKET NO. 50-213 j l UNIT Haddam Neck j DATE 04/09/98 COMPLETED BY K. W. Emmons TELEPHONE (860)A47-1791 Ext. 6572 1

l MONTH: Mar-98 l

DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 l 6 0 22 0 -

l l 7 0 23 0 L

l 8 0 24 0 9 0 25 _

0 10 0 26 0 l

11 0 27 0 12 0 28 0 l 13 0 29 0 14 0 30 0 15 _

0 31 0 l 16 0 INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

l L

l

lllI il il l)l)!  : )lIl l j

s 2 k n c

e o 57 n i , n N m 6 s en d n 3 sid m X 8 e e 4 co a 8 ec net 3 a 9 m / E 1 v c n 8iit t 9it io atn 9 it n a 9 ca s 1- ct a le e d 9 1

c e lp t 2- d 0 W 7 e r r

1 acf n Ar a ic R n "r s a 4

- r i a "s

/ . 1 r ou g 5Pi t 3Pfid o e 0 H K 7- r n 0 d n P e l

0 npi 5 0 ot c i d n ami t f 4 Cn e n 8 eer it 8 e e t

&i oR 4 o d dd ei dr d nitd Ce son l

r nI wi c i

Y) s daemoa

.E t t O MT E B06 e cn ids ae e an d i

N AAD 8 sAe v u meu n mePF dn mul qP sn TNDE(T a e r mn amt oy s ra d e ami eo E C P t t o nri ti t KTI ELE oi t c n ScSlet ca ScUeiwic l cn eo E e E e r CN E Ror NR l

OU P N Dc E" f ue ERo oau E" f PFF D MO

  • l SI OH t n

CP e A E n /

L E o p

N )

T e h0 t

m'd n o=

oo CC Mno si ua t S

ioru v

N eD O

I tm e 'e sd A

/ mP no r (

T yo N ami) r C SC mcot n ci U 8 aS r r f ula D 9 ccd d p E 9 Si t e ex R 1 a uRE(

  1. l nr R

E h

c e

s t r t laamier uu nn ot e W r a en ep no d aa t

uoot nwh O M ic ve A

/ oMMACPO P LER N h

t - - - - - -

D H e 1 23456 N T '

M A N O 'r S o N M t c n W T f o a o R e O O d ]n t R it a

D P oin t n T h 4 U

E R

t eh o uw t

im a

H MSD x S E T ) e I

N n s n

)

U ia e in n lp c la o x ni L p s

F Et s o x a E R

e

(

eT r

e c&

it ig r

(

r ur tsi n o r )

lia o ene r Ein F e c

Riv ai a n yT ra t lap l

t n n r r n x i o )s 4 e agor t oE t r au 4 nnt osi meli at i t (

r o ipt D(uH 7 ui f nuelur gemeh a inar r e nqa eepd pt oEMRROA s OO a - - - - - - - -

'ep R eABCDEFGH y S '

T 6

9 t

e /

2 d a 2 e D /

7 lu 0 de d c he r

5 0 FS oc

o. 6  : :

N 9 '

FS l

I- ,

i I

I REFUELING INFORMATION REQUEST March 1998 l

1. Name of the facility: Haddam Neck
2. Scheduled date for next refueling outage: n/a (decommissioning)
3. Scheduled date for restart following refueling: n/a (decommissioning)
4. (a) Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

nLa (b) If answer is yes, what, in general, will these be?

n/a (c) If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine if any unreviewed safety questions are associated with the core reload?

Dia (d) If no such review has taken place, when is it scheduled?

n/a

5. Scheduled date(s) for submitting licensing action and supporting information:

n/a

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis i methods, significant changes in fuel design, new operating procedures:

nLa

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage  ;

pool: l In Core: (a) Q In Spent Fuel Pool: (b) 1019

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present storage caoacitv: 1480

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming present license capacity:

nLa