ML21116A207: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:May 04, 2021 Ms. Kim Maza Site Vice President Shearon Harris Nuclear Power Plant Mail Code NHP01 5413 Shearon Harris Road New Hill, NC 27562-9300
 
==SUBJECT:==
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - CORRECTION TO AMENDMENT NO. 184 REGARDING TECHNICAL SPECIFICATIONS TASK FORCE (TSTF) TRAVELER TSTF-505, REVISION 2, PROVIDE RISK INFORMED EXTENDED COMPLETION TIMES - RITSTF INITIATIVE 4B (EPID L-2019-LLA-0218)
 
==Dear Ms. Maza:==
 
On April 2, 2021 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML21047A314), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 184 to Renewed Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1. This amendment was in response to your application dated October 7, 2019, as supplemented by letters dated July 27, 2020, and November 11, 2020.
The amendment revised Technical Specification (TS) requirements to permit the use of risk-informed completion times (RICT) for actions to be taken when limiting conditions for operation are not met. The changes are consistent with Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, dated July 2, 2018.
Subsequent to issuance of the amendment, a discrepancy was identified with TS page 3/4 3-26.
Your supplement dated July 27, 2020, indicated that Table 3.3-3 Functional Unit 6.f was initially planned for inclusion within the scope of the RICT Program by updating Action 15 on TS Page 3/4 3-26 to include or in accordance with the Risk-Informed Completion Time Program.
However, as noted in your supplement dated July 27, 2020, with removing Functional Unit 6.f from the scope of the Program, there was no longer a need to update Action 15. Page 9 of the safety evaluation has been updated to reflect the removal of Action 15 from the individual limiting conditions for operation Action statements. The NRC staff has determined that this error was made inadvertently.
The purpose of this letter is to issue a correction to TS page 3/4 3-26 for Amendment No. 184 and revise page 9 of the safety evaluation. The NRC concludes that the correction is entirely editorial in nature and does not change the staffs previous conclusion in the safety evaluation for Amendment No. 184, nor does it affect the no significant hazards consideration, as published in the Federal Register on January 14, 2020 (85 FR 2160). Enclosed, please find the corrected TS page 3/4 3-26 and page 9 of the safety evaluation.
 
K. Maza                                      If you have any questions regarding this matter, please contact me at (301) 415-1387 or by e-mail at Tanya.Hood@nrc.gov.
Sincerely,
                                            /RA/
Tanya E. Hood, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
 
==Enclosures:==
: 1. Correction to Technical Specifications page 3/4 3-26 for Amendment No. 184
: 2. Corrected page 9 of Safety Evaluation cc: Listserv
 
ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 CORRECTION TO TECHNICAL SPECIFICATIONS PAGE 3/4 3-26 FOR AMENDMENT NO. 184
 
TABLE 3.3-3 (Continued)
TABLE NOTATIONS
#Trip function may be blocked in this MODE below the P-11 (Pressurizer Pressure Interlock)
Setpoint.
**During CORE ALTERATIONS or movement of irradiated fuel in containment, refer to Specification 3.9.9.
***Trip function automatically blocked above P-11 and may be blocked below P-11 when Safety Injection on low steam line pressure is not blocked.
ACTION STATEMENTS ACTION 14 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 6 hours or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours; however, one channel may be bypassed for up to 4 hours for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.
ACTION 15 - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed until performance of the next required CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour.
ACTION 15a - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the tripped condition within 1 hour. With less than the minimum channels OPERABLE, operation may proceed provided the minimum number of channels is restored within one hour, otherwise declare the affected diesel generator inoperable. When performing surveillance testing of either primary or secondary undervoltage relays, the redundant emergency bus and associated primary and secondary relays shall be OPERABLE.
ACTION 16 - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypassed condition within 6 hours and the Minimum Channels OPERABLE requirement is met. One additional channel may be bypassed for up to 4 hours for surveillance testing per Specification 4.3.2.1.
ACTION 17 - With less than the Minimum Channels OPERABLE requirement, operation may continue provided the Containment Purge Makeup and Exhaust Isolation valves are maintained closed while in MODES 1, 2, 3 and 4 (refer to Specification 3.6.1.7). For MODE 6, refer to Specification 3.9.4.
ACTION 18 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
SHEARON HARRIS - UNIT 1                          3/4 3-26                    Amendment No. 184
 
ENCLOSURE 2 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 CORRECTED SAFETY EVALUATION PAGE 9
 
LCO 3.3.2    Engineered Safety Features Actuation System Instrumentation Action 14          With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 6 hours or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY Action 18          With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY Action 19a.        The inoperable channel is placed in the tripped condition within 6 hours or in accordance with the Risk-Informed Completion Time Program, and Action 21          With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 6 hours or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY Action 24          With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 6 hours or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY LCO 3.4.4    Relief Valves Action b.1.        With only one safety grade PORV [Power Operated Relief Valve]
OPERABLE, restore at least a total of two safety grade PORVs to OPERABLE status within the following 72 hours or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY LCO 3.5.2    ECCS [Emergency Core Cooling Systems] Subsystems - Tavg [average coolant temperature] Greater Than or Equal to 350°F [degrees Fahrenheit]
Action a.          With one ECCS subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 72 hours* or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY...
LCO 3.6.1.3    Containment Air Locks Action c.3.        Within 24 hours or in accordance with the Risk-Informed Completion Time Program, restore air lock to OPERABLE status, or
 
ML21116A207                                      *via e-mail OFFICE        NRR/DORL/LPL2-2/PM*    NRR/DORL/LPL2-2/LA* NRR/DORL/LPL2-2/BC*
NAME          THood                  RButler            DWrona DATE          04/23/2021            04/27/2021          05/04/2021 OFFICE        NRR/DORL/LPL2-2/PM*
NAME          THood DATE          05/04/2021}}

Latest revision as of 15:28, 19 January 2022

Correction to Amendment No. 184 Regarding TSTF Traveler TSTF-505, Rev. 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B
ML21116A207
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/04/2021
From: Tanya Hood
Plant Licensing Branch II
To: Maza K
Duke Energy Carolinas
Hood, T.
References
EPID L-2019-LLA-0218
Download: ML21116A207 (7)


Text

May 04, 2021 Ms. Kim Maza Site Vice President Shearon Harris Nuclear Power Plant Mail Code NHP01 5413 Shearon Harris Road New Hill, NC 27562-9300

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - CORRECTION TO AMENDMENT NO. 184 REGARDING TECHNICAL SPECIFICATIONS TASK FORCE (TSTF) TRAVELER TSTF-505, REVISION 2, PROVIDE RISK INFORMED EXTENDED COMPLETION TIMES - RITSTF INITIATIVE 4B (EPID L-2019-LLA-0218)

Dear Ms. Maza:

On April 2, 2021 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML21047A314), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 184 to Renewed Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1. This amendment was in response to your application dated October 7, 2019, as supplemented by letters dated July 27, 2020, and November 11, 2020.

The amendment revised Technical Specification (TS) requirements to permit the use of risk-informed completion times (RICT) for actions to be taken when limiting conditions for operation are not met. The changes are consistent with Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, dated July 2, 2018.

Subsequent to issuance of the amendment, a discrepancy was identified with TS page 3/4 3-26.

Your supplement dated July 27, 2020, indicated that Table 3.3-3 Functional Unit 6.f was initially planned for inclusion within the scope of the RICT Program by updating Action 15 on TS Page 3/4 3-26 to include or in accordance with the Risk-Informed Completion Time Program.

However, as noted in your supplement dated July 27, 2020, with removing Functional Unit 6.f from the scope of the Program, there was no longer a need to update Action 15. Page 9 of the safety evaluation has been updated to reflect the removal of Action 15 from the individual limiting conditions for operation Action statements. The NRC staff has determined that this error was made inadvertently.

The purpose of this letter is to issue a correction to TS page 3/4 3-26 for Amendment No. 184 and revise page 9 of the safety evaluation. The NRC concludes that the correction is entirely editorial in nature and does not change the staffs previous conclusion in the safety evaluation for Amendment No. 184, nor does it affect the no significant hazards consideration, as published in the Federal Register on January 14, 2020 (85 FR 2160). Enclosed, please find the corrected TS page 3/4 3-26 and page 9 of the safety evaluation.

K. Maza If you have any questions regarding this matter, please contact me at (301) 415-1387 or by e-mail at Tanya.Hood@nrc.gov.

Sincerely,

/RA/

Tanya E. Hood, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosures:

1. Correction to Technical Specifications page 3/4 3-26 for Amendment No. 184
2. Corrected page 9 of Safety Evaluation cc: Listserv

ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 CORRECTION TO TECHNICAL SPECIFICATIONS PAGE 3/4 3-26 FOR AMENDMENT NO. 184

TABLE 3.3-3 (Continued)

TABLE NOTATIONS

  1. Trip function may be blocked in this MODE below the P-11 (Pressurizer Pressure Interlock)

Setpoint.

    • During CORE ALTERATIONS or movement of irradiated fuel in containment, refer to Specification 3.9.9.
      • Trip function automatically blocked above P-11 and may be blocked below P-11 when Safety Injection on low steam line pressure is not blocked.

ACTION STATEMENTS ACTION 14 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.

ACTION 15 - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed until performance of the next required CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

ACTION 15a - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. With less than the minimum channels OPERABLE, operation may proceed provided the minimum number of channels is restored within one hour, otherwise declare the affected diesel generator inoperable. When performing surveillance testing of either primary or secondary undervoltage relays, the redundant emergency bus and associated primary and secondary relays shall be OPERABLE.

ACTION 16 - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypassed condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and the Minimum Channels OPERABLE requirement is met. One additional channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1.

ACTION 17 - With less than the Minimum Channels OPERABLE requirement, operation may continue provided the Containment Purge Makeup and Exhaust Isolation valves are maintained closed while in MODES 1, 2, 3 and 4 (refer to Specification 3.6.1.7). For MODE 6, refer to Specification 3.9.4.

ACTION 18 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SHEARON HARRIS - UNIT 1 3/4 3-26 Amendment No. 184

ENCLOSURE 2 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 CORRECTED SAFETY EVALUATION PAGE 9

LCO 3.3.2 Engineered Safety Features Actuation System Instrumentation Action 14 With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY Action 18 With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY Action 19a. The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or in accordance with the Risk-Informed Completion Time Program, and Action 21 With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY Action 24 With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY LCO 3.4.4 Relief Valves Action b.1. With only one safety grade PORV [Power Operated Relief Valve]

OPERABLE, restore at least a total of two safety grade PORVs to OPERABLE status within the following 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY LCO 3.5.2 ECCS [Emergency Core Cooling Systems] Subsystems - Tavg [average coolant temperature] Greater Than or Equal to 350°F [degrees Fahrenheit]

Action a. With one ECCS subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s* or in accordance with the Risk-Informed Completion Time Program or be in at least HOT STANDBY...

LCO 3.6.1.3 Containment Air Locks Action c.3. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or in accordance with the Risk-Informed Completion Time Program, restore air lock to OPERABLE status, or

ML21116A207 *via e-mail OFFICE NRR/DORL/LPL2-2/PM* NRR/DORL/LPL2-2/LA* NRR/DORL/LPL2-2/BC*

NAME THood RButler DWrona DATE 04/23/2021 04/27/2021 05/04/2021 OFFICE NRR/DORL/LPL2-2/PM*

NAME THood DATE 05/04/2021