RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications | 31 May 2023 | License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications | Safe Shutdown Boric Acid High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Probabilistic Risk Assessment Incorporated by reference Locked High Radiation Area Surveillance Frequency Control Program Process Control Program |
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | 16 February 2023 | Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Pressure Boundary Leakage |
RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications | 7 February 2023 | License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications | Anticipated operational occurrence Incorporated by reference Liquid penetrant |
RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition | 24 February 2022 | Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition | Safe Shutdown Shutdown Margin Packing leak Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage |
RA-21-0213, License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown | 23 September 2021 | License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program Offsite Circuit |
RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | 16 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Shutdown Margin Non-Destructive Examination Nondestructive Examination |
ML21116A207 | 4 May 2021 | Correction to Amendment No. 184 Regarding TSTF Traveler TSTF-505, Rev. 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B | |
RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation | 3 December 2020 | Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation | Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program |
ML20237F435 | 4 September 2020 | Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations | Safe Shutdown Time of Discovery Post Accident Monitoring Probabilistic Risk Assessment Missed surveillance Significance Determination Process Surveillance Frequency Control Program Large early release frequency Offsite Circuit Power change |
RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 27 July 2020 | Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Hot Short Safe Shutdown Boric Acid High winds Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation FLEX Tornado-Generated Missile Tornado Generated Missile Large early release frequency Offsite Circuit Fire Protection Program Very Early Warning Fire Detection |
RA-20-0148, Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications | 27 May 2020 | Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications | High Radiation Area Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
RA-20-0105, Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies | 16 April 2020 | Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies | High Radiation Area |
RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | 6 February 2020 | Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | Safe Shutdown Time of Discovery Hydrostatic Past operability Incorporated by reference Surveillance Frequency Control Program Offsite Circuit |
RA-19-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 7 October 2019 | License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
RA-19-0123, License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications | 25 July 2019 | License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications | Unanalyzed Condition Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Offsite Circuit |
RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description | 8 July 2019 | License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description | Coatings |
RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications | 10 May 2018 | Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications | Post Accident Monitoring Surveillance Frequency Control Program Recently irradiated fuel |
ML18130A807 | 10 May 2018 | Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications | Post Accident Monitoring Surveillance Frequency Control Program Recently irradiated fuel |
RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications | 10 May 2018 | Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications | Ultimate heat sink Post Accident Monitoring Hydrostatic Surveillance Frequency Control Program Recently irradiated fuel |
HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses | 13 April 2018 | Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses | Time to boil Incorporated by reference FLEX Fuel cladding |
RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing | 7 November 2017 | Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing | |
RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses | 19 October 2017 | Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses | Boric Acid Shutdown Margin Anticipated operational occurrence Post Accident Monitoring Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
HNP-17-041, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete | 22 May 2017 | Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Du | |
ML17066A299 | 28 March 2017 | 2nd Correction to License Amendment No. 154 Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program | Hydrostatic Surveillance Frequency Control Program |
HNP-11-038, License Amendment Request for Extension of Refueling Water Storage Tank Allowed Outage Time | 2 September 2011 | License Amendment Request for Extension of Refueling Water Storage Tank Allowed Outage Time | Boric Acid High winds Shutdown Margin Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Large early release frequency License Renewal Earthquake Maintenance Rule Program |
HNP-09-016, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors | 26 February 2009 | Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors | Incorporated by reference |
ML082830137 | 6 October 2008 | License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 | Safe Shutdown Fitness for Duty |
HNP-08-019, Supplement to Request for License Amendment to Relocate and Revise Technical Specifications Surveillance Requirement 4.0.5 | 6 March 2008 | Supplement to Request for License Amendment to Relocate and Revise Technical Specifications Surveillance Requirement 4.0.5 | |
HNP-07-094, Request for License Amendment to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process | 4 January 2008 | Request for License Amendment to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process | Safe Shutdown Ultimate heat sink Incorporated by reference Fire Protection Program |
ML072070547 | 23 July 2007 | Technical Specification 6.12, High Radiation Area (TAC MD38895) | High Radiation Area Offsite Dose Calculation Manual Locked High Radiation Area Process Control Program |
HNP-07-040, Request for License Amendment to Use Other Containment Sump Water Level Instruments | 30 April 2007 | Request for License Amendment to Use Other Containment Sump Water Level Instruments | Anticipated operational occurrence |
ML042950619 | 15 October 2004 | Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process | Incorporated by reference |
HNP-04-071, Request for License Amendment Technical Specification Surveillance Requirements (SR) 4.0.5.A and Associated Bases | 5 May 2004 | Request for License Amendment Technical Specification Surveillance Requirements (SR) 4.0.5.A and Associated Bases | Time of Discovery Grace period |
HNP-04-008, License Amendment Request: Steam Generator Water Level Instrumentation Usage, Technical Specifications 4.4.1.3.2 and 3.4.1.4.1.b, and Administrative Update to the Index | 4 February 2004 | License Amendment Request: Steam Generator Water Level Instrumentation Usage, Technical Specifications 4.4.1.3.2 and 3.4.1.4.1.b, and Administrative Update to the Index | Shutdown Margin High Radiation Area Ultimate heat sink Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
HNP-03-116, Request for License Amendment Regarding Technical Specification 4.4.5.3a | 8 December 2003 | Request for License Amendment Regarding Technical Specification 4.4.5.3a | Operating Basis Earthquake |
HNP-02-113, Request for License Amendment, Response Time Testing Elimination | 30 August 2002 | Request for License Amendment, Response Time Testing Elimination | Shutdown Margin Packing leak Process Control Program Pressure Boundary Leakage |
HNP-02-088, Request for License Amendment, Technical Specifications 3/4.8.1.1 and 3/4.8.1.2 | 8 July 2002 | Request for License Amendment, Technical Specifications 3/4.8.1.1 and 3/4.8.1.2 | Offsite Circuit |