|
|
Line 2: |
Line 2: |
| | number = ML20150A793 | | | number = ML20150A793 |
| | issue date = 10/10/1978 | | | issue date = 10/10/1978 |
| | title = Responds to NRC 780927 Ltr Re Alternative Sites.Both Selected Sites Appear Unrealistic Based on Listed Reasons | | | title = Responds to NRC Re Alternative Sites.Both Selected Sites Appear Unrealistic Based on Listed Reasons |
| | author name = Varin D | | | author name = Varin D |
| | author affiliation = RHODE ISLAND, STATE OF | | | author affiliation = RHODE ISLAND, STATE OF |
Line 11: |
Line 11: |
| | contact person = | | | contact person = |
| | document report number = NUDOCS 7810180084 | | | document report number = NUDOCS 7810180084 |
| | | title reference date = 09-27-1978 |
| | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, STATE/LOCAL GOVERNMENT TO NRC | | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, STATE/LOCAL GOVERNMENT TO NRC |
| | page count = 4 | | | page count = 4 |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20235B4531987-09-22022 September 1987 Final Response to FOIA Request for Documents Re Specified Dockets.Documents in App a Already Available in Pdr.Forwards App B Documents.App B Documents Also Available in Pdr. Documents for Listed Dockets Could Not Be Located ML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML19294B9991980-01-0808 January 1980 Forwards Constituent Ltr of Concern About Plans to Cancel Facility Const ML19211A7631979-12-0303 December 1979 Requests Data on Positive Points of Nuclear Energy,For Use in Class Debate ML20150F3141979-09-24024 September 1979 Forwards Impact of Const & Operation of Cooling Water Sys, App G,Section 316,Type II Demonstration,In Support of 770228 Application for Const & Operation of once-through Cooling Sys ML19208B0131979-09-12012 September 1979 Notifies That EPA Is Suspending Review of Des & Util Application for NPDES Permit in Response to NRC Suspension of CP Review ML19253A5711979-08-29029 August 1979 Forwards Three Technical Reviews of Des Including Reviews of Economic Analysis of alternatives,NUREG-0529,need for Plant, Cost - Benifit Summary & Environ Impacts of Plant Operation ML19208B6651979-08-20020 August 1979 Advises That Antitrust Hearing Is Unnecessary Re Proposed Purchase of Ownership Interests in New England Power by Ma Municipal Wholesale Electric Co & Me Public Svc Co (Per Section 105C,Atomic Energy Act of 1954,as Amended) ML19249A2781979-08-17017 August 1979 Forwards Comments on Des by Natl Weather.Notes Two Meteorological Deficiencies Re Fastest Mile Wind Speeds & Storm Surge from Hurricanes & Tropical Storms ML19275A0641979-08-12012 August 1979 Submits Comments on Des.Comparison of Health Consequences to Background Is Totally Irrelevant & Contrary to NEPA ML19275A0591979-08-0808 August 1979 Forwards Comments Re Review of Draft Eis.Statement of Compliance W/Epa U Fuel Cycle Std Needed.Transportation Section Requires Inclusion of Measures to Insure Public Safety During Shipment ML19225D1381979-08-0707 August 1979 Submits Comments Re Review of Des,Including Daily Commuting of Laborers & Evaluation of Energy Needed to Operate Cooling Alternatives ML19242C4851979-08-0303 August 1979 Forwards Technical Reviews of Des. Comments Are Provisional in Nature ML19242B4581979-07-30030 July 1979 Comments on Draft EIS Submitted by Conservation Law Foundation of Ri.Statement on long-term Negative Impact on Terrestial & Aquatic Wildlife Made W/Paucity of Data. Unclear Justification for Use of once-through Cooling Sys ML19225A5471979-07-13013 July 1979 Forwards Request from Concerned Citizens of Ri,Point Judith Fishermen'S Cooperative & Tl Arnold Trust for Show Cause Order Re Dismissal of CPs ML19246B0101979-07-0303 July 1979 Comments on Des.More Detailed Analysis of Transmission Facilities & Corridors Should Have Been Conducted.Analysis Re Slurry Walls Seems Contradictory.Futher Analysis of Sediment Grain Profile within Trench Site Must Be Included ML19224C9711979-07-0202 July 1979 Forwards Corrected Version of Section 4 to Biological Modeling of Effect of Entrainment on Four Selected Fish Species at New England Power 1 & 2 Site,Charlestown,Ri. W/O Encl ML19224D5381979-06-27027 June 1979 Forwards Decision Paper Re Disposed of Naval Auxiliary Landing Field at Charlestown,Ri. ML19270G9281979-06-15015 June 1979 No Comments on Des Re Plant Const ML19273B9241979-06-13013 June 1979 Forwards Revised Pages to Psar,Indicating That Ref to Westinghouse Resar,Revision 3,includes Amends 1-6.Info Will Be Included in Amend N13 of PSAR ML19259C1331979-06-0505 June 1979 Offers No Comment on Des ML19259C0571979-06-0505 June 1979 Forwards Population Statistics & Commercial Catch Rate of American Lobster (Humarus Americanus) in Charlestown- Matunuck,Ri Region of Block Island Sound. ML19225A3341979-05-25025 May 1979 Comments on AEC Rept, Site Visit to Naval for Facility, Dtd 740103.Town Officials Had No Basis for Giving Assurances Regarding Support for Nuclear Plant Const within Township ML19291A5111979-05-0808 May 1979 Response to 790419 Ltr Re Section 8.5.2 of Des on Economics of Early Operation.Defends Method of Analysis & Capacity Factor Assumptions.Forwards JW Dick 790430 Memo Re Assumptions Used in Section 8 ML19261C7321979-03-22022 March 1979 Evaluates Effect of Total Loss of Onsite & Offsite AC Electrical Power.Similtaneous Loss of Both Sources Is Highly Unlikely Since Multiple Single Failures Are Required for Such Occurrence ML19276F3351979-03-20020 March 1979 Forwards Affidavit of Distribution of PSAR Amend 12 ML19263D3271979-03-20020 March 1979 Forwards 790124 Ltr to C Andrus from Ak Morse Re Location of Proposed Moonstone Beach Facility.Requests Rept of Siting Studies & Proposals for Nuclear Facilities in Ri ML19296A3231979-03-13013 March 1979 Forwards Amend N12 to PSAR ML19261C2021979-02-16016 February 1979 Forwards Notice of Withdrawal of Appearance & New Entry ML19263C4051979-02-13013 February 1979 Forwards Affidavit Re Distribution of Revision 3 to General & Financial Info Portion of Application ML20062G8171979-02-0909 February 1979 Forwards Vol 4 of Revision 3 to General & Financial Info W/Affidavit for Withholding.Encl Withheld (Ref 10CFR2.790) ML19261D3641979-02-0909 February 1979 Applies for Order Withholding Financial Info from Public Disclosure.Forwards Revision 3 in Response to 781016 Ltr. Supporting Affidavit Encl ML19282B2821979-02-0808 February 1979 Requests Consideration of 790122 Ltr from J Feldman Re Use of Nuclear Power ML19261A7101979-02-0202 February 1979 Comments on Environ Rept,Revision 5.Suggests Addl Attention to Historical & Archaeological Matters.Recommends Consultation W/State Preservation Officers Re Identification of Sites for Inclusion in Natl Register ML19270F3081979-01-31031 January 1979 Forwards Suppl Info Requested by NRC on 790104 on Alternate Sites,Which Will Be Included in Revision 6 of Environ Rept ML19270F3781979-01-31031 January 1979 Advises of Inaccuracy in 790115 Ltr to NRC Re Antitrust Review of Me Public Svc Co Interest in Millstone Station; Info Came from 781219 Ltr to NRC from the Atty General Which Was Also Inaccurate ML19289D0861979-01-25025 January 1979 Justifies Use of Quality Group D Main Feedwater Isolation Valves Re NRC 780627 Ltr.Believes Valves Are Presently Designed to Perform Safety Function.Upgrading Would Not Enhance Safety Aspects ML19289D1161979-01-22022 January 1979 Responds to NRC 781122 Request for Addl Info.Info Already Contained in Environ Rept Is Too Detailed & Hypothetical. Some Related Info Is Contained in 781010 Ri Statewide Planning Program Ltr to NRC ML19269C8151979-01-15015 January 1979 Informs of Transfers of Ownership Shares to Ma Municipal Wholesale Elec Co,Me Public Svc Co & Bangor Hydro-Electric Co.Provides Pertinent Info to Facilitate Required Antitrust Review ML19289C3881979-01-0909 January 1979 Forwards Affidavit Avering That Distribution of Required Copies of Revision 5 to Environ Rept Has Been Completed. Distribution List Encl ML19267A3151979-01-0202 January 1979 Forwards Revision 5 to Environ Rept,Including Responses to 780613 & 780711 NRC Questions ML19274D3241978-12-28028 December 1978 Requests Copies of Marked Maps Showing Proposed rights-of- Way.Questions Legality of rights-of-way Authorizing Routes Through Narragansett Tribal Reservation,Which Is Protected by Historical Landmark Legislation ML20147J3581978-12-0606 December 1978 Emphasizes Importance of Submitting Accurate & Complete Info to NRC by Licensees & Applicants.Info Submitted Must Be Substantiated by Data & Calculations.Licensee Must Notify NRC of Any Inaccuracies or Enforcement Action Will Result ML20147D8671978-12-0101 December 1978 Forwards Affidavit Requesting W/Holding of CAW-78-57 Pursuant to 10CFR Part 2.790(b) ML20150C9931978-11-27027 November 1978 Discusses Question of Eminent Domain in Ri Re Review of Alternate Sites for Subj Facil.Counsel Finds No Subsidiary of New Engl Elec Sys Has Pwr of Eminent Domain in Ri for Constr of Pipes or Tunnels for Facil Cooling Sys ML20148S4141978-11-22022 November 1978 Forwards Ltr from Town of Westerly(Ano 7810060173) & State of Ri Re Subj Facil Appl.Requests Submittal of Responses ML20153B2021978-11-20020 November 1978 Follows Up .Purpose of SRI Conservation District Is to Help Landowners & Govt to Improve & Protect Resources. Info Requested in 780927 NRC Ltr Is Extremely Complex.Sri Can Advise Re Soil Suitability,Erosion & Sediment Control ML19256A2821978-11-15015 November 1978 Responds to 781107 NRC Request for New Lic Appl Plan.No New Lic Appl Plans.Unit 1&2 Constr Completion Planned for 861101 & 881101 If Constr Permit Is Received by 791101 ML20197D0851978-11-0808 November 1978 Forwards Amend Version of Appl to Discharge Waste Water Submitted to EPA on 770228.Amends Deal W/Change from Buried Pipes to Hard Rock Tunnels,Change in Dewatering Methods & Combining Backflush Oper ML20148H0841978-11-0303 November 1978 Finds Affidavit AW-76-29 Does Not Meet 2.790 Qual Re Confidentiality.Recipient Has 30 Days to Appeal 1987-09-22
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML19294B9991980-01-0808 January 1980 Forwards Constituent Ltr of Concern About Plans to Cancel Facility Const ML19211A7631979-12-0303 December 1979 Requests Data on Positive Points of Nuclear Energy,For Use in Class Debate ML19208B0131979-09-12012 September 1979 Notifies That EPA Is Suspending Review of Des & Util Application for NPDES Permit in Response to NRC Suspension of CP Review ML19253A5711979-08-29029 August 1979 Forwards Three Technical Reviews of Des Including Reviews of Economic Analysis of alternatives,NUREG-0529,need for Plant, Cost - Benifit Summary & Environ Impacts of Plant Operation ML19208B6651979-08-20020 August 1979 Advises That Antitrust Hearing Is Unnecessary Re Proposed Purchase of Ownership Interests in New England Power by Ma Municipal Wholesale Electric Co & Me Public Svc Co (Per Section 105C,Atomic Energy Act of 1954,as Amended) ML19249A2781979-08-17017 August 1979 Forwards Comments on Des by Natl Weather.Notes Two Meteorological Deficiencies Re Fastest Mile Wind Speeds & Storm Surge from Hurricanes & Tropical Storms ML19275A0641979-08-12012 August 1979 Submits Comments on Des.Comparison of Health Consequences to Background Is Totally Irrelevant & Contrary to NEPA ML19275A0591979-08-0808 August 1979 Forwards Comments Re Review of Draft Eis.Statement of Compliance W/Epa U Fuel Cycle Std Needed.Transportation Section Requires Inclusion of Measures to Insure Public Safety During Shipment ML19225D1381979-08-0707 August 1979 Submits Comments Re Review of Des,Including Daily Commuting of Laborers & Evaluation of Energy Needed to Operate Cooling Alternatives ML19242C4851979-08-0303 August 1979 Forwards Technical Reviews of Des. Comments Are Provisional in Nature ML19242B4581979-07-30030 July 1979 Comments on Draft EIS Submitted by Conservation Law Foundation of Ri.Statement on long-term Negative Impact on Terrestial & Aquatic Wildlife Made W/Paucity of Data. Unclear Justification for Use of once-through Cooling Sys ML19225A5471979-07-13013 July 1979 Forwards Request from Concerned Citizens of Ri,Point Judith Fishermen'S Cooperative & Tl Arnold Trust for Show Cause Order Re Dismissal of CPs ML19246B0101979-07-0303 July 1979 Comments on Des.More Detailed Analysis of Transmission Facilities & Corridors Should Have Been Conducted.Analysis Re Slurry Walls Seems Contradictory.Futher Analysis of Sediment Grain Profile within Trench Site Must Be Included ML19224C9711979-07-0202 July 1979 Forwards Corrected Version of Section 4 to Biological Modeling of Effect of Entrainment on Four Selected Fish Species at New England Power 1 & 2 Site,Charlestown,Ri. W/O Encl ML19224D5381979-06-27027 June 1979 Forwards Decision Paper Re Disposed of Naval Auxiliary Landing Field at Charlestown,Ri. ML19270G9281979-06-15015 June 1979 No Comments on Des Re Plant Const ML19273B9241979-06-13013 June 1979 Forwards Revised Pages to Psar,Indicating That Ref to Westinghouse Resar,Revision 3,includes Amends 1-6.Info Will Be Included in Amend N13 of PSAR ML19259C0571979-06-0505 June 1979 Forwards Population Statistics & Commercial Catch Rate of American Lobster (Humarus Americanus) in Charlestown- Matunuck,Ri Region of Block Island Sound. ML19259C1331979-06-0505 June 1979 Offers No Comment on Des ML19225A3341979-05-25025 May 1979 Comments on AEC Rept, Site Visit to Naval for Facility, Dtd 740103.Town Officials Had No Basis for Giving Assurances Regarding Support for Nuclear Plant Const within Township ML19291A5111979-05-0808 May 1979 Response to 790419 Ltr Re Section 8.5.2 of Des on Economics of Early Operation.Defends Method of Analysis & Capacity Factor Assumptions.Forwards JW Dick 790430 Memo Re Assumptions Used in Section 8 ML19261C7321979-03-22022 March 1979 Evaluates Effect of Total Loss of Onsite & Offsite AC Electrical Power.Similtaneous Loss of Both Sources Is Highly Unlikely Since Multiple Single Failures Are Required for Such Occurrence ML19276F3351979-03-20020 March 1979 Forwards Affidavit of Distribution of PSAR Amend 12 ML19263D3271979-03-20020 March 1979 Forwards 790124 Ltr to C Andrus from Ak Morse Re Location of Proposed Moonstone Beach Facility.Requests Rept of Siting Studies & Proposals for Nuclear Facilities in Ri ML19296A3231979-03-13013 March 1979 Forwards Amend N12 to PSAR ML19261C2021979-02-16016 February 1979 Forwards Notice of Withdrawal of Appearance & New Entry ML19263C4051979-02-13013 February 1979 Forwards Affidavit Re Distribution of Revision 3 to General & Financial Info Portion of Application ML19261D3641979-02-0909 February 1979 Applies for Order Withholding Financial Info from Public Disclosure.Forwards Revision 3 in Response to 781016 Ltr. Supporting Affidavit Encl ML20062G8171979-02-0909 February 1979 Forwards Vol 4 of Revision 3 to General & Financial Info W/Affidavit for Withholding.Encl Withheld (Ref 10CFR2.790) ML19282B2821979-02-0808 February 1979 Requests Consideration of 790122 Ltr from J Feldman Re Use of Nuclear Power ML19261A7101979-02-0202 February 1979 Comments on Environ Rept,Revision 5.Suggests Addl Attention to Historical & Archaeological Matters.Recommends Consultation W/State Preservation Officers Re Identification of Sites for Inclusion in Natl Register ML19270F3081979-01-31031 January 1979 Forwards Suppl Info Requested by NRC on 790104 on Alternate Sites,Which Will Be Included in Revision 6 of Environ Rept ML19270F3781979-01-31031 January 1979 Advises of Inaccuracy in 790115 Ltr to NRC Re Antitrust Review of Me Public Svc Co Interest in Millstone Station; Info Came from 781219 Ltr to NRC from the Atty General Which Was Also Inaccurate ML19289D0861979-01-25025 January 1979 Justifies Use of Quality Group D Main Feedwater Isolation Valves Re NRC 780627 Ltr.Believes Valves Are Presently Designed to Perform Safety Function.Upgrading Would Not Enhance Safety Aspects ML19289D1161979-01-22022 January 1979 Responds to NRC 781122 Request for Addl Info.Info Already Contained in Environ Rept Is Too Detailed & Hypothetical. Some Related Info Is Contained in 781010 Ri Statewide Planning Program Ltr to NRC ML19269C8151979-01-15015 January 1979 Informs of Transfers of Ownership Shares to Ma Municipal Wholesale Elec Co,Me Public Svc Co & Bangor Hydro-Electric Co.Provides Pertinent Info to Facilitate Required Antitrust Review ML19289C3881979-01-0909 January 1979 Forwards Affidavit Avering That Distribution of Required Copies of Revision 5 to Environ Rept Has Been Completed. Distribution List Encl ML19267A3151979-01-0202 January 1979 Forwards Revision 5 to Environ Rept,Including Responses to 780613 & 780711 NRC Questions ML19274D3241978-12-28028 December 1978 Requests Copies of Marked Maps Showing Proposed rights-of- Way.Questions Legality of rights-of-way Authorizing Routes Through Narragansett Tribal Reservation,Which Is Protected by Historical Landmark Legislation ML20147D8671978-12-0101 December 1978 Forwards Affidavit Requesting W/Holding of CAW-78-57 Pursuant to 10CFR Part 2.790(b) ML20150C9931978-11-27027 November 1978 Discusses Question of Eminent Domain in Ri Re Review of Alternate Sites for Subj Facil.Counsel Finds No Subsidiary of New Engl Elec Sys Has Pwr of Eminent Domain in Ri for Constr of Pipes or Tunnels for Facil Cooling Sys ML20153B2021978-11-20020 November 1978 Follows Up .Purpose of SRI Conservation District Is to Help Landowners & Govt to Improve & Protect Resources. Info Requested in 780927 NRC Ltr Is Extremely Complex.Sri Can Advise Re Soil Suitability,Erosion & Sediment Control ML19256A2821978-11-15015 November 1978 Responds to 781107 NRC Request for New Lic Appl Plan.No New Lic Appl Plans.Unit 1&2 Constr Completion Planned for 861101 & 881101 If Constr Permit Is Received by 791101 ML20148E8151978-11-0202 November 1978 Responds to 780925 Request for Review & Comment on Proposed Site & Alternate Sites.Concerns Raised Re Impact on Recreational Facilities Near Hydroelectric Sites & Use of Major Recreational Areas Near Proposed Sites ML20148J8121978-11-0101 November 1978 Responds to 780927 NRC Request for Info Re 3 Ma Sites Being Considered as Alternatives for Subj Facil.Gill & Erving Sites Had More Attention than Rowe,As Rowe Is Less Desirable from Water Availability Standpoint.W/Encl Documentation ML20148E0771978-10-31031 October 1978 Forwards Suppl Info Requested by NRC Re Alternate Sites Including,Revised Transmission Section for Each Candidate Site & Revised Environ Rept Table 9.3-1.Info Will Be Incorporated in Rev 5 to Environ Rept ML20148C1791978-10-27027 October 1978 Responds to 780927 NRC Ltr Re 3 Proposed Sites W/In SRI District.Requests That Recipient Contact M.Puchalski or R.Lee,Soil Conservationist ML20148B1501978-10-24024 October 1978 Advises That Doi Has Reviewed Proposed Facility & Offers No Comments,In Response to NRC 780929 Technical Assistance Request ML20147H8661978-10-23023 October 1978 Responds to 780925 NRC Ltr Requesting Tech Info Re Sites for Nuc Pwr Plant at Charlestown,Wash County,Ri.Gsa'S Draft Er Contained Contradictory Info on Possible Bedrock Fault & the Possiblity Should Be Clarified by NRC in Any Future Es 1987-08-25
[Table view] Category:STATE/LOCAL GOVERNMENT TO NRC
MONTHYEARML19242C4851979-08-0303 August 1979 Forwards Technical Reviews of Des. Comments Are Provisional in Nature ML20153B2021978-11-20020 November 1978 Follows Up .Purpose of SRI Conservation District Is to Help Landowners & Govt to Improve & Protect Resources. Info Requested in 780927 NRC Ltr Is Extremely Complex.Sri Can Advise Re Soil Suitability,Erosion & Sediment Control ML20148J8121978-11-0101 November 1978 Responds to 780927 NRC Request for Info Re 3 Ma Sites Being Considered as Alternatives for Subj Facil.Gill & Erving Sites Had More Attention than Rowe,As Rowe Is Less Desirable from Water Availability Standpoint.W/Encl Documentation ML20148C1791978-10-27027 October 1978 Responds to 780927 NRC Ltr Re 3 Proposed Sites W/In SRI District.Requests That Recipient Contact M.Puchalski or R.Lee,Soil Conservationist ML20150A7931978-10-10010 October 1978 Responds to NRC Re Alternative Sites.Both Selected Sites Appear Unrealistic Based on Listed Reasons ML20147B7071978-10-0202 October 1978 Responds to 780927 NRC Ltr Re State Standards for Nuc Pwr Plants.Applicable Reg:Ma Gen Laws Ch.30 Sec 61 & Related Regs Which Provide for Filing of State Environ Repts 1979-08-03
[Table view] |
Text
- - - - -. . - - -- - - -
g n. -
g_fQ
~
~
STATE OF RHODE ISLA'ND AND.PROVIDENCF PLANTATIONS f
Depanmentof Adnunistration .
E STATEWIDE PLANNING PROGRAM -
2M Melr<me Seeet .
Providence,IGodelslznd o2907 i October 10, 1978 Mr. ' Ronald L. J Ballard , ' Chief Environmental Projects' Branch 1 Division of Site Safety-and
-Environmental Analysis
-United States Nuclear. Regulatory Commission- !
Washington, D.C. 20555
Dear ~ Mr. Ballard:
I am writing in response'to your September.27, 1978-letter to Mr. Robert.Rahill concerning informationson the
. alternative sites for NEP 1 & 2. A copy of.your letter was directed to this office. Incidentally,:Mr. Eric;Jankel has replaced Mr. Rahill as. Executive AssistantLfor Policy.
The Statewide Pl'anning Program, established by_the '
General Laws of Rhode Island as the' central planning, agency for the state, maintains a computerized environmental inventory of the natural and manmade features of Rhode Island.
The data in the inventory is obtained from many sources-and is mapped, predominantely on U.S.G.S. 1:24,000 Quadrangle maps, before computer entry. The data.are coded by 10 acre grid cells, and are retrievable by cell coordinates, by city or town, or by analysis zone.
Retrieving by-analysis zone, the Program. staff prepared a set of single factor computer edit maps for the Westerly-and Rome Point _ sitesf and-their surrounding area, calling for the following. factors: (1) natural or, wildlife habitats; (2)_ historic sites; :(3) public school locations; (4 ) topo-
. graphy; (5). vegetation;: (6) general ~ soils; (7) ground water;.
(8) water service areas; (9) sewer service areas; (10) recrea--
tion; areas; (11) wetlands; (12) municipal zoning;' and (13) 1970 land use. The Westerly site and surrounding area called for analysis zones 614, 619,,620,-623,.626, ~627,:46 andH48;.and .
t the Rome Point site and surrounding area called .for analysis zones 297, 398, 300, 301, and 685.
y J:
l7(rioIY 00 fV f L)l!
A.
October 10, 1978 Page 2 Copies of the edit maps, accompanied by a transparent overlay of each site, are enclosed for your information.
The site can be aligned on the edit map by placing the orange border along the inside edge of the coordinate listing. To insure accuracy, align on the lower lefthand cell of the Westerly site which is coordinates 5809/2705; and the lower lef thand cell of the Rome Point site which is coordinates 6011/2965.
Staff evaluation of the single factor data has produced the following comments:
Rome Point Natural Habitat - Approximately 100 acres of the site are rated #1, "Best" excellent wildlife habitat, potential for sustaining a diversified maximum wildlife habitat, potential for sustaining a diversified maximum wildlife population is high; Historic Sites - None on site; School location - None on site; Slope - Approximately 140 acres at 1.5 percent or less and the remaining acreage is between 3 and 4.5 percent; Vegetation - The area is predominantely deciduous trees 21 to 40 feet in height with approximately 80 acres in some form of agricultural or potential agricultural use; Soils - The coastal and coastal adjacent areas are well drained or moderately well drained soils and approxi-mately 100 acres are classified as poorly drained mineral soils; Ground water recharge areas - The entire siti is classified as either a recharge area or a ground water reservoir; Sewer service - There is none on the site; Water service - Approximately 10 acres are shown as sewered or as having the potential for service and approximately 20 acres are indicated as served by a 12 inch main;
A *t Mr. Ronald L. Ballard October 10, 1978 Page 3 Flood hazard areas - Approximately 160 acres of the coastal portions of_the site are in a flood-hazard area; Recreation areas - The site has no official recreation areas; Municipal zoning - The-site is zoned for medium-low density residential and industrial use; and 1970 Land use - The site is predominantely forested with approximately 70-80 acres classified as agricultural or open area and water based recreation activities consume approximately 10 acres of the coastal portions of the site.
Westerly Site Natural areas - None coded for the site; Historic Sites - None in the site; School location - None in the site; Slope - Predominantely 4.5 percent or less; Vegetation - Predominately deciduous trees 21 to 40 feet in height; Soils - mixture of very poorly drained soils and well drained / moderately well drained soils without herdpan; Ground water recharge area - Nearly 100 percent of the site is classified as a recharge area; Public sewer service - None at the site; Public water supply - Some service or potential for service near Route US-1; Flood hazard area - none on site; Wetlands - Interspersed throughout are marsh and organic; and mineral swamps totalling approximately 100 acres;
l 1
e i . O I
j Mr. Ronald L. Ballard October 10, 1978 Page 4 Recreation Areas - No official recreation areas at the site, but the site is located between two major state facilities, Burlingame State Park and Woody Hill Management Area; Municipal zoning - The site is zoned for medium-low residential density; and 1970 Land Use - The entire use is classified as forest type.
Concerning the acceptability of NEP 1 & 2 at either site, I think one could safely assume the coastal impacts associated with the Charlestown site would apply or be very similar at the Westerly site, and would be much greater at the Rome Point site if the facility employs a once-through cooling system. The proximity of the Rome Point site to the heavily populated areas of the state, can also be considered a severe liability. The transmission lines right-of-way issue is being addressed by the Charlestown site proposal and may not be appreciably altered by the Westerly site, but would pose some serious questions at Rome Point. Both sites may raise serious questions concerning the impacts on ground water recharge areas. In summary, the Rome Point alternative appears wholly unrealistic. Its value as an alternative is very <
dubious. The Westerly site is almost certain to be viewed in the same manner as the Charlestown site, but without the GSA land transfer problem clouding the issue.
Your very truly,
/j/f /L Daniel W. Varin Chief DWV/LRW/msb Enclosures cc: Mr. Eric Jankel Mr. John A. Lyons, Chairman CRMC Mr. Leo McAloon, CZ Program Manager
~ - . . .. . - -. - .- ,