{{#Wiki_filter:UU.L * .l.0 1 L.UL..L Page        1        of    2
{{#Wiki_filter:}}
* MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2021-11127 USER INFORMATION:
GERLACH*ROSEY M        EMPL#: 028401  CA#:  0363 Address: NUCSA2 Phone#:  542-3194 TRANSMITTAL INFORMATION:
TO:    GERLACH*ROSEY M      07/16/2021 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS OM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF
* RORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS    DATE: 07/01/2021 ADD    MANUAL TABLE OF CONTENTS  DATE: 07/15/2021 CATEGORY: DOCUMENTS  TYPE: TRM2
 
UU.1... * .LO I L.UL..L Page          2      of    2
*ID: TEXT 3.3.7 ADD:    REV: 3 REMOVE:    REV:2 CATEGORY: DOCUMENTS  TYPE: TRM2 ID: TEXT B3.3.7 REMOVE :    REV: 2 ADD:    REV: 3 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX .
 
SSES MANUAL Manual Name:      TRM2
.anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:              07/15/2021 Procedure Name                                                    Rev              _Issue Date                                        Change ID                                Change Number TEXT LOES                                                          99                  01/03/2019
 
==Title:==
LIST OF EFFECTIVE SECTIONS TEXT TOC                                                            27                  03/05/2019
 
==Title:==
TABLE OF CONTENTS                                                                                                                                  </~~~,,            \I
                                                                                                                                                      /
                                                                                                                                                    //,,
                                                                                                                                                          / ) ~, ' , ,
                                                                                                                                                                            **,/
                                                                                                                                                                                /
                                                                                                                                                                                  /
TEXT 1.1                                                            0                  11/19/2002                                            (      \_ / ) A'*./
                                                                                                                                                    ', '  '/
                                                                                                                                                              ~.. _/
                                                                                                                                                                    //
 
==Title:==
USE AND APPLICATION DEFINITIONS                                                                                                            ,~'-...//
                                                                                                                                        "'"'-..._,,,/,./
                                                                                                                                      /"-c_
                                                                                                                                    \.,,  \,,.            A      ;
                                                                                                                                                        /)
TEXT 2.1                                                            1                  02/04/2005                          ~
                                                                                                                            </'"'              ........
 
==Title:==
PLANT PROGRAMS AND SETPOINTS PLANT PROG~S"'                                                                                  /\v 01/31/401~ ,) .
                                                                                                                    /-----.__,_
( (~',,,    ')':.::,/
                                                                                                                                  ' " - / ,I TEXT 2.2                                                            11
_,.,..---... \ .. ,.
 
==Title:==
PLANT PROGRAMS AND SETPOINTS IN                                                          STRUMEN.'I'
                                                                                                              \ J        -
TRIP SETPOINT TABLE
                                                                                          <! 7,_ ./J/.._--.....__ '7
                                                                        .            /'. '*,
TEXT 3.0                                                            s / / ( o3'1/,1,sYj 021
 
==Title:==
APPLICABILITY TECHNIC&#xa5;~R'EQU}R~MEflT FOR OPERATION (TRO) APPLICABILITY
                                                                    . ,">,,,"-..          *. . . *,)
                                                    ,/
                                                        ~,,....---....__
                                                      *, :-                                                                        -~
                                                                                        ;,11/09/2007 TEXT 3.1.1
                                            .....----- ' ' '\,,,_ _____,,                                                                            WITHOUT SCRAM ALTERNATE ROD
 
==Title:==
REACTIVITY CONTROL        , . .-,, 'SYS.TEMS  \'-'> ANTICIPATED TRANSIENT INJECTION (ATws \ARI~ rns+/-RUMENTATION TEXT 3 . 1. 2
                            , ----:>\&deg;',., **.
                              ,r~ /
                                                        \
                                                *,....J /
                                              ~- _ /
                                                                )
0                  11 / 19 / 2 0 0 2
 
==Title:==
REACTIVIi~\CON?ROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT
                          \.,-~.. ___,__,,/))
TEXT 3.1.3                                                          5                  12/18/2017
 
==Title:==
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4                                                          1                  10/12/2020
 
==Title:==
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1                                                          19                03/31/2021
 
==Title:==
CORE OPERATING LIMITS REPORT (COLR)
Page 1      of    15                                                                                                                                                          Report Date: 07/16/21
 
SSES MANUAL Manual Name:    TRM2
  ~anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1                        0      11/19/2002
 
==Title:==
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2                        3      03/31/2011
 
==Title:==
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3                        2      11/09/2007
 
==Title:==
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4                        11  . 07/21/2017
 
==Title:==
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5                        0      11/19/2002
 
==Title:==
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK
    ~EXT 3. 3. 6                    5      03/05/2019
 
==Title:==
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7                        3      07/15/2021
 
==Title:==
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8                        1      10/22/2003
 
==Title:==
INTENTIONALLY LEFT BLANK TEXT 3.3.9                        3      05/14/2009
 
==Title:==
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10                      1      12/14/2004
 
==Title:==
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11                      1      10/22/2003
 
==Title:==
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12                      2      04/02/2019
 
==Title:==
WATER MONITORING INSTRUMENTATION Page 2      of  15                                                      Report Date: 07/16/21
 
SSES MANUAL Manual Name:    TRM2
.1anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1                      1    03/05/2015
 
==Title:==
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2                      0    11/19/2002
 
==Title:==
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3                      1    04/26/2006
 
==Title:==
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6                        3    06/04/2012
 
==Title:==
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7                        2    09/05/2008
 
==Title:==
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMI'C RADIATION MONITORING INSTRUMENTATION
-~EXT 3.7.8                          9    03/05/2015
 
==Title:==
PLANT SYSTEMS SNUBBERS TEXT 3.7.9                        2    03/05/2019
 
==Title:==
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10                      2    04/29/2014
 
==Title:==
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11                      2    11/01/2018
 
==Title:==
PLANT SYSTEMS TEXT 3.8.1                        3    06/20/2012
 
==Title:==
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1                      2    11/09/2007
 
==Title:==
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS 06/23/2021 TEXT 3.8.2.2                      3
 
==Title:==
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page 5      of  15                                                        Report Date: 07/16/21
 
SSES MANUAL Manual Name:        TRM2
  ~anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 11/19/2002 TEXT 3.6.4                        0
 
==Title:==
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1                        0    11/19/2002
 
==Title:==
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2                        0. 11/19/2002
 
==Title:==
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT. 3.7.3.1                    6    02/13/2020
 
==Title:==
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2                      3    04/16/2009
 
==Title:==
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS 1'EXT 3.7.3.3                    4
 
==Title:==
PLANT SYSTEMS CO2 SYSTEMS TEXT 3.7.3.4                      2 05/16/2016 04/16/2009
 
==Title:==
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5                      2    04/16/2009
 
==Title:==
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6                      2    04/16/2009
 
==Title:==
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7                      1    04/26/2006
 
==Title:==
PLANT SYSTEMS FIRE RATED AS.SEMBLIES TEXT 3 . 7 . 3 .-8                14    12/18/2017
 
==Title:==
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4                        l      04/26/2006
 
==Title:==
PLANT SYSTEMS SOLID RADWASTE SYSTEM Page 4      of    15                                                    Report Date: 07/16/21
 
SSES MANUAL Manual Name:    TRM2
-~anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.l                        1      04/26/2006
 
==Title:==
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2                        1      04/16/2009
 
==Title:==
INTENTIONALLY LEFT BLANK TEXT 3.4.3                        1      11/09/2007
 
==Title:==
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4                        2      05/14/2009
 
==Title:==
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5                        1      04/26/2006
 
==Title:==
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS
.i:'EXT 3.4.6                          1      04/25/2013
 
==Title:==
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1                        2      03/05/2019
 
==Title:==
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT 3.5.2                        2      03/05/2019
 
==Title:==
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT 3.5.3                        1      03/05/2019
 
==Title:==
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1                        0      11/19/2002
 
==Title:==
CONTAINMENT VENTING OR PURGING TEX!I' 3.6.2                      3      01/03/2019
 
==Title:==
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION 11/19/2002 TEXT 3.6.3                        0
 
==Title:==
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3      of  15                                                      Report Date: 07/16/21
 
SSES MANUAL Manual Name:      TRM2
  ~anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3                        4      01/28/2020
 
==Title:==
ELE~TRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4                          1    02/04/2005
 
==Title:==
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5                        1      11/14/2013
 
==Title:==
ELECTRICAL POWER DEGRADED VOLTAGE 'PROTECTION TEXT 3.8.6                          3    03/05/2019
 
==Title:==
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7                          3    02/25/2021
 
==Title:==
BATTERY MAINTENANCE AND MONITORING PROGRAM
    -:'EXT 3. 9 .1                    0    11/19/2002
 
==Title:==
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2                          0    11/19/2002
 
==Title:==
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3                          1    03/12/2019
 
==Title:==
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1                        1    04/26/2006
 
==Title:==
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2                        1    04/09/2007
 
==Title:==
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3                        3    10/17/2019
 
==Title:==
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) 04/17/2009 TEXT 3.10.4                        2
 
==Title:==
INTENTIONALLY LEFT BLANK Page 6        of  15                                                      Report Date: 07/16/21
 
SSES MANUAL Manual Name:      TRM2
-~anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3 . 11 . 1. 1              1      04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3 . 11 . 1. 2              1      04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3 . 11 . 1. 3              1      04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3 . 11 . 1. 4              2      10/09/2012
 
==Title:==
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5                    3      03/05/2015
 
==Title:==
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION
.rEXT 3.11.2.1                      4      03./12/2019
 
==Title:==
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3 . 11. 2 . 2              1      04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3. 11. 2. 3                1      04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4                    0    11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3 . 11. 2 . 5              4      07/03/2013
 
==Title:==
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6                    8    07/21/2017
 
==Title:==
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3                      1    04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS TOTAL DOSE Page 7      of    15                                                    Report Date: 07/16/21
 
SSES MANUAL Manual Name:        TRM2
  ~anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 03/05/2015 TEXT 3 . 11. 4 . 1                4
 
==Title:==
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2                      2    04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3 . 11 . 4 . 3                1    04/26/2006
 
==Title:==
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1                        0    11/19/2002
 
==Title:==
LQADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2                        4    04/17/2008
 
==Title:==
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS
  ':'EXT 3 .12. 3                    0    11/19/2002
 
==Title:==
LOADS CONTROL PROGRAM LIGHT LO.ADS REQUIREMENTS TEXT 4.1                          0    09/27/2003
 
==Title:==
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2                          1    01/03/2019
 
==Title:==
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3                          1    01/03/2019
 
==Title:==
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4                          1    12/18/2008
 
==Title:==
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5                          1    07/01/2021
 
==Title:==
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6                            0    09/27/2003
 
==Title:==
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM Page 8        of  15                                                    Report Date: 07/16/21
 
SSES MANUAL Manual Name:      TRM2
. a n u a l
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.7                          0      09/27/2003
 
==Title:==
ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0                        7      03/18/2021
 
==Title:==
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.l                      2      04/29/2014
 
==Title:==
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.l.2                      0      11/19/2002
 
==Title:==
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3 .1. 3                    4      12/18/2017
      .Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION
. E X T B3 .1. 4 .                    1      10/12/2020
 
==Title:==
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.l                      0      11/19/2002
 
==Title:==
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.l                      1      01/31/2014
 
==Title:==
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2                      2      03/31/2011
 
==Title:==
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3                      2      11/09/2007
 
==Title:==
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION*
TEXT B3.3.4                      7      07/21/2017
 
==Title:==
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5                      2      11/09/2007
 
==Title:==
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Page 9      of  15.                                                    Report Date: 07/16/21
 
SSES MANUAL Manual Name:        TRM2
    ~anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 03/05/2019
  .TEXT B3.3.6                        6
 
==Title:==
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7                        3    07/15/2021
 
==Title:==
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8                        1    10/22/2003
 
==Title:==
INTENTIONALLY BLANK TEXT B3.3.9                        4    01/03/2019
 
==Title:==
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10                      3    02/22/2012
 
==Title:==
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS
    ':'EXT B3 . 3 . 11                1    10/22/2003
 
==Title:==
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12                      1    04/02/2019
 
==Title:==
WATER MONITORING INSTRUMENTATION.
TEXT B3.4.l                        0    11/19/2002
 
==Title:==
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2                        1    04/16/2009
 
==Title:==
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3                        1    11/09/2007
 
==Title:==
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4                        1    01/03/2019
 
==Title:==
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5                        0    11/19/2002
 
==Title:==
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page 10        of    15                                                    Report Date:  07/16/21
 
SSES MANUAL Manual Name:      TRM2
-~anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.6                      2      01/03/2019
 
==Title:==
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3:5.l                      2      03/17/2020
 
==Title:==
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT B3.5.2                      2      03/05/2019
 
==Title:==
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT B3.5.3                      2      03/05/2019
 
==Title:==
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1                      0      11/19/2002
 
==Title:==
CONTAINMENT BASES VENTING OB PURGING
.1:EXT B3 . 6 . 2    *    .          0      11/19/2002 Ti tl.e: CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3                        1      04/19/2007
 
==Title:==
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4                        1      12/14/2004
 
==Title:==
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.l                        0      11/19/2002
 
==Title:==
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2                        0      11/19/2002
 
==Title:==
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL, TEXT B3.7.3.l                      4      02/16/2017
 
==Title:==
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2                      2      04/26/2006
 
==Title:==
* PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11      of  15                                                      Report Date:  07/16/21
 
SSES MANUAL Manual Name:    TRM2
  ~anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.3                      0    11/19/2002
 
==Title:==
PLANT SYSTEMS BASES CO2 SYSTEMS TEXT B3.7.3.4                      3    06/19/2019
 
==Title:==
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5                      1    04/26/2006
 
==Title:==
.PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B:3.7.3.6                    1    04/26/2006
 
==Title:==
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7                      0    11/19/2002
 
==Title:==
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES
    ~EXT B3.7.3.8                    3    09/27/2012
 
==Title:==
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4                        0    11/19/2002
 
==Title:==
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.l                      0    11/19/2002
 
==Title:==
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2                      0    11/19/2002
 
==Title:==
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3                      0    11/19/2002
 
==Title:==
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6                        4    06/04/2013
 
==Title:==
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7                        2    01/31/2008
 
==Title:==
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 12    of  15                                                      Report Date: 07/16/21
 
SSES MANUAL Manual Name:    TRM2
-~anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.8                      4      01/31/2014
 
==Title:==
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9                      3      03/05/2019
 
==Title:==
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10                      1      12/14/2004
 
==Title:==
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.ll                      3      11/01/2018
 
==Title:==
STRUCTURAL INTEGRITY TEXT B3.8.l                      2      03/10/2010
 
==Title:==
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROT.ECTIVE DEVICES
-~EXT B3.8.2.1                        0    11/19/2002
 
==Title:==
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) .THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2                    2      06/23/2021
 
==Title:==
ELECTRICAL POWER BASES MOTOR OPERATED VALVES  (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3                        0    11/19/2002.
 
==Title:==
EL.ECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4                        0    11/19/2002
 
==Title:==
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5                        1    11/14/2013
 
==Title:==
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6                        4    03/05/2019
 
==Title:==
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 02/25/2021 TEXT B3.8.7                        3
 
==Title:==
BATTERY MAINTENANCE AND MONITORING PROGRAM Page 13    of  15                                                      Report Date: 07/16/21
 
SSES MANUAL Manual Name:        TRM2
  ~anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 11/19/2002 TEXT B3.9.l                      0
 
==Title:==
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2                      0    11/19/2002
 
==Title:==
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3                      1    03/12/2019
 
==Title:==
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.l                      0    11/19/2002
 
==Title:==
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2                      1    04/10/2007
 
==Title:==
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3                      2    10/17/2019
 
==Title:==
M.ISCELLANEOUS BASES INDEPENDENT SPENT .FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3 . 11. 1 . 1              1    05/10/2016
 
==Title:==
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.ll.l.2                    0    11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.ll.l.3                    0    11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3. 11. 1. 4                0    11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.ll.l.5                    0    11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 12/14/2004 TEXT B3.ll.2.l                    1
 
==Title:==
RADIOACTIVE EFFLUENTS BASES DOSE RATE Page 14    of  15                                                      Report Date: 07/16/21
 
SSES MANUAL Manual Name:          TRM2
-~anual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.ll.2.2                    0    11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.ll.2.3                  0      11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3 . 11 . 2 .. 4            0      11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES GASEOUS. RADWASTE TREATMENT SYSTEM TEXT B3.ll.2.5                  5      07/03/2013
 
==Title:==
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3 .11. 2. 6                2      09/08/2016
 
==Title:==
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION
.TEXT B3.ll.3                        0      11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.ll.4.1                  5      03/05/2015
 
==Title:==
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3. 11. 4. 2                0    11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3 .11. 4. 3                0    11/19/2002
 
==Title:==
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.l                      1    10/04/2007
 
==Title:==
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2                      1    12/03/2010
 
==Title:==
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3                      0    il/19/2002
 
==Title:==
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 15    of    15                                                    Report Date: 07/16/21
 
Main Turbine Overspeed Protection System Rev.3                                                                                    3.3.7 3.3      Instrumentation 3.3. 7  Main Turbine Overspeed Protection System TRO 3.3.7      One Main Turbine Overspeed Protection system shall be OPERABLE.
Applicability:  MODES 1 and 2 ACTIONS CONDITION                    REQUIRED ACTION                COMPLETION TIME A. Two of eight stop valves  A.1.1  Close one of the inoperable    72 hours and control valves                valves.
inoperable.
A.1.2  Limit THERMAL POWER            12 hours following
:5 75% RTP.                    closure of the inoperable valve AND A.1.3  Apply the following limits for 12 hours following a closed Turbine Stop Valve    closure of the or Turbine Control Valve as    inoperable valve specified in the COLR:
: a. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR),"
: b. LCO 3.2.3, "LINEAR HEAT GENERATION RATE (LHGR)."
OR A.2      Isolate main turbine from the 72 hours steam supply .
* SUSQUEHANNA - UNIT 2                      TRM / 3.3-17
 
Main Turbine Overspeed Protection System Rev. 3                                                                          3.3.7 ACTIONS (continued)
CONDITION              REQUIRED ACTION              COMPLETION TIME
: 8. Two of twelve intercept 8.1 Close either the intercept    72 hours valves and intermediate    valve or the intermediate stop valves inoperable. stop valve within one of the affected combined intermediate valves.
OR 8.2 Isolate main turbine from the  72 hours steam supply.
C. Turbine Overspeed      C.1 Isolate main turbine from the  6 hours Protection System          steam supply.
inoperable for reasons other than Condition A or 8 .
* SUSQUEHANNA - UNIT 2            TRM / 3.3-17a
 
Main Turbine Overspeed Protection System Rev. 3                                                                                    3.3.7 TECHNICAL REQUIREMENT SURVEILLANCE
                                          ---NOTE---------*----------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed up to 6-hours provided the redundant overspeed trip device is OPERABLE.
SURVEILLANCE                                    FREQUENCY TRS 3.3.7.1                --*--NOTE------
The provisions of TRS 3.0.4 are not applicable Cycle each high pressure turbine control valve from the    122 days running position and observe valve closure.
TRS 3.3.7.2      ---------NOTE------------------------*---
The provisions of TRS 3.0.4 are not applicable
* Cycle each low pressure turbine combined intermediate valve from the running position and observe valve closure.
122 days TRS 3.3.7.3              ------NOTE----------------------
The provisions of TRS 3.0.4 are not applicable Cycle each high pressure turbine stop valve from the        122 days running position and observe valve closure.
TRS 3.3.7.4    Perform a CHANNEL CALIBRATION of main turbine              24 months overspeed protection instrumentation TRS 3.3.7.5    Disassemble one of each type valve identified in            40 months on a TRS 3.3.7.1, TRS 3.3.7.2, and TRS 3.3.7.3, perform a        STAGGERED visual and surface inspection of valve seats, disks and    TEST BASIS stems and verify rio unacceptable flaws or corrosion.
** SUSQUEHANNA - UNIT 2                      TRM / 3.3-18
 
Main Turbine Overspeed Protection System Rev. 3                                                                      B 3.3.7 BASES REFERENCES  1. FSAR Section 7.7.1.5.
: 2. FSAR Section 10.2.2.6.
: 3. FSAR Section 10.2.3.6.
: 4. FSAR Section 3.5.1.3 .
* SUSQUEHANNA - UNIT 2          TRM / B 3.3-14c
 
Main Turbine Overspeed Protection System Rev. 3                                                                                      B 3.3.7 B 3.3  Instrumentation B 3.3.7 Main Turbine Overspeed Protection System BASES TRO            The Main Turbine Overspeed Protection System is designed to protect the main turbine from excessive overspeed by initiating a turbine trip by fast closure of the turbine control valves and closure of the intercept valves to essentially secure all steam flow to the turbine (Ref. 1).
To protect the turbine generator from overspeed conditions, two trip devices are provided. Either device, when initiated, will close the main stop valves, control valves, and combined intermediate valves thus isolating the turbine (Ref. 2).
These two trip devices are as follows:
* A mechanical overspeed trip which is initiated if the turbine speed reaches approximately 10% above rated speed, and
* An electrical overspeed trip which serves as a backup to the mechanical trip and is initiated at approximately 12% above rated speed .
OPERABILITY of at least 1 of the 2 overspeed protection systems is required for the Turbine Overspeed Protection System to be considered OPERABLE.
Main Turbine Overspeed Protection System (MTOPS) OPERABILITY is also based upon the ability of the valves that control steam flow to the turbine to close following the receipt of a closure signal. The 4 stop valves, 4 control valves, 6 intermediate stop valves, and 6 intercept valves make up a system of 20 valves. A single failure to any one of the above system of 20 valves will not prevent a turbine trip (Ref. 2). Hence, if 19 of the 20 noted valves are OPERABLE, the MTOPS is OPERABLE. Note that for this statement to be true, the intermediate stop valves and intercept valves are considered separate valves. Overspeed protection is only disabled on a CIV failure if both valves within a CIV are inoperable. Failure of only one valve in a CIV does not prevent an overspeed trip, and does not affect operability. Actions to close one inoperable valve if two valves are inoperable maintain the unit within the analysis in Ref. 2. However, redundancy is reduced and repairs should be completed in accordance with the corrective action program.
Excessive turbine overspeed could generate potentially damaging missiles that could present a personnel and equipment hazard. MTOPS is not necessary to provide adequate protection of the public health and safety and is not required
* to obviate the possibility of an abnormal situation or event giving rise to an immediate threat to the public health and safety .
* SUSQUEHANNA - UNIT 2                      TRM / B 3.3-14
 
Main Turbine Overspeed Protection System Rev.3                                                '                                B 3.3.7 BASES ACTIONS  The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
A.1.1. A.1.2. A.1.3, and A.2 If two of eight stop valves and control valves are inoperable, action must be taken to restore at least one of the valves to OPERABLE status in 72 hours.
This action ensures steam isolation to the turbine in the event of an overspeed condition, and maintains the unit within the bounds of the FSAR analysis. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner if required without challenging plant systems. The required action if the problem is not resolved is to close one of the inoperable valves, or to isolate the main turbine from the steam supply. If one of the inoperable valves is closed, then limit thermal power to less than or equal to 75% of rated power, and apply Minimum Critical Power Ratio (MCPR) and Linear Heat Generation Rate (LHGR) limits as specified in the COLR within 12 hours. Restricting thermal power to less than or equal to 75% of rated power eliminates possible shock loads to the turbine blades that could occur from a non-uniform circumferential steam flow distribution entering the turbine for this configuration. - If the MCPR and LHGR limits are not in compliance with the applicable requirements at the end of this period, the ACTIONS required by the applicable specifications must be implemented. This time is provided to stabilize operation with a closed Turbine Stop Valve or Turbine Control Valve.
8.1 and 8.2 If two of twelve intercept valves and intermediate stop valves are inoperable, action must be taken to restore at least one of these valves to OPERABLE status in 72 hours. This action ensures steam isolation to the turbine in the event of an overspeed condition. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner if required without challenging plant systems. The required action if the problem is not resolved is to close either the intercept valve or the intermediate stop valve within one of the affected combined intermediate valves, or to isolate the main turbine from the steam supply.
C.1 If the MTOPS is inoperable for reasons other than conditions A or 8, then action must be taken to isolate the main turbine from the steam supply.
6 hours allows a reasonable amount of time to complete the plant shutdown associated with isolating the main turbine from the steam supply .
* SUSQUEHANNA - UNIT 2                TRM / B 3.3-14a
 
Main Turbine Overspeed Protection System Rev. 3                                                                                B 3.3.7 BASES TRS        The TRSs are performed at the specified Frequency to ensure that the turbine overspeed protection function is maintained OPERABLE.
The TRSs are modified by a Note to indicate that when a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the redundant overspeed trip device is OPERABLE. Upon completion of the Surveillance, or expiration of the 6 hour allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken. This Note is based on the average time required to perform channel Surveillance. The 6 hour testing allowance does not significantly reduce the probability that the Main Turbine Overspeed Protection System will function when necessary.
TRS 3.3.7.1, TRS 3.3.7.2, and TRS 3.3.7.3 Verification of the movement of each of the four high pressure turbine control valves, six low pressure turbine combined intermediate valves (composed of 6 intermediate stop valves and 6 intercept valves), and four high pressure turbine stop valves ensures the OPERABILITY of each valve and that it will be able to close in the event of a turbine trip condition. The Frequency ensures the assumptions of the turbine missile probability analysis remain valid (Ref. 4).
TRS 3.3.7.4 This TRS is for the performance of a CHANNEL CALIBRATION of the required main turbine overspeed protection instrumentation. The calibration is a complete check of the instrument channel from the sensing device to main turbine trip initiation. The Frequency of 24 months is a typical refueling cycle and considers channel reliability.
TRS 3.3.7.5 The disassembly and inspection of the valves referenced ensures that abnormal wear is not occurring which could result in the valves inability to close upon receipt of a close signal. The Frequency is such that only one of each type valve (i.e., high pressure turbine stop; high pressure turbine control; and low pressure turbine combined intermediate), is required to be inspected within a 40 month period. If unacceptable flaws or excessive corrosion are found in a valve, all valves of its type are inspected (Ref. 3). Valve bushings are inspected and cleaned, and bore diameters are checked for proper clearance .
* SUSQUEHANNA - UNIT 2                TRM / B 3.3-14b
 
Main Turbine Overspeed Protection System Rev. 3                                                                        B 3.3.7 BASES REFERENCES  1. FSAR Section 7.7.1.5.
: 2. FSAR Section 10.2.2.6. *
: 3. FSAR Section 10.2.3.6.
: 4. FSAR Section 3.5.1.3 .
* SUSQUEHANNA - UNIT 2          TRM / B 3.3-14c}}

Revision as of 01:33, 8 September 2021

Technical Requirements Manual
ML21209A521
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 07/16/2021
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML21209A521 (25)


Text