| By letter dated July 26, 2019, as supplemented April 29, 2020 and June 10, 2020, Northern States Power Company (NSPM) submitted proposed Amendment No. 11 to Special Nuclear Materials License No. 2506 for the Prairie Island Independent Spent Fuel Storage Installation. | | By {{letter dated|date=July 26, 2019|text=letter dated July 26, 2019}}, as supplemented April 29, 2020 and June 10, 2020, Northern States Power Company (NSPM) submitted proposed Amendment No. 11 to Special Nuclear Materials License No. 2506 for the Prairie Island Independent Spent Fuel Storage Installation. |
| The application proposed to increase the storage capacity of the Prairie Island Independent Spent Fuel Storage Installation and sought approval for the design of a new storage pad to be built at the existing facility. | | The application proposed to increase the storage capacity of the Prairie Island Independent Spent Fuel Storage Installation and sought approval for the design of a new storage pad to be built at the existing facility. |
| The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the NSPM application, as revised and supplemented, and finds reasonable assurance that: (i) the activities authorized by the amended license can be conducted without endangering the health and safety of the public, and (ii) these activities will be conducted in compliance with the applicable regulations. NRC staff further finds the issuance of the amendment will not be inimical to the common defense and security. In connection with the issuance of the license, an environmental assessment and finding of no significant impact was noticed in the Federal Register on October 8, 2020 (85 FR 63588). | | The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the NSPM application, as revised and supplemented, and finds reasonable assurance that: (i) the activities authorized by the amended license can be conducted without endangering the health and safety of the public, and (ii) these activities will be conducted in compliance with the applicable regulations. NRC staff further finds the issuance of the amendment will not be inimical to the common defense and security. In connection with the issuance of the license, an environmental assessment and finding of no significant impact was noticed in the Federal Register on October 8, 2020 (85 FR 63588). |
Latest revision as of 16:26, 9 March 2021
Letter Sequence Other |
---|
EPID:L-2019-LLA-0169, Summary of the Public Open House to Discuss NRC Activities and the 2018 End-of-Cycle Performance Assessment (Approved, Closed) |
|
MONTHYEARML19301D2852019-10-28028 October 2019 License Amendment Request - Accepted for Review Project stage: Other ML20022A1982020-01-17017 January 2020 Summary of the Public Open House to Discuss NRC Activities and the 2018 End-of-Cycle Performance Assessment Project stage: Request ML20049C5192020-02-18018 February 2020 Screenshots/Referenced Used in Environmental Assessment Prepared for the Proposed License Amendment for the Prairie Island Independent Spent Fuel Storage Installation (Dkt No. 72-10) Project stage: Other ML20077K6242020-04-13013 April 2020 License Amendment Request - Request for Additional Information Project stage: RAI ML20111A2942020-04-20020 April 2020 Independent Spent Fuel Storage Installation, Letter to Request Submittal Date Extension for Response to Request for Additional Information Regarding Licensing Amendment Request to Expand the Storage Capacity Project stage: Response to RAI ML20118C3552020-04-24024 April 2020 PIIC Enrolled Tribal Members 2019 Project stage: Request ML20140A1152020-05-28028 May 2020, 31 May 2020 Package: PI ISFSI Expansion Project stage: Request ML20163A4262020-06-10010 June 2020 Package: Minnesota Pollution Control Agency’S Comments on the Prairie Island Independent Spent Fuel Storage Installation Project Environmental Assessment and Transmittal Email Project stage: Request L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) Project stage: Response to RAI ML20253A2782020-09-0909 September 2020 E-Mail Submitting Proposed New License Condition Project stage: Request ML20275A3422020-10-0101 October 2020 Environmental Assessment for the Proposed Amendment of the U.S. Nuclear Regulatory Commission License Number SNM-2506 for the Prairie Island Independent Spent Fuel Storage Installation in Goodhue County, Minnesota Project stage: Request ML20237F3662020-10-29029 October 2020 Amendment No. 11 to Materials License No. SNM-2506 for the Prairie Island Independent Spent Fuel Storage Installation Transmittal Letter Project stage: Other ML20237F3652020-10-29029 October 2020, 30 October 2020 Amendment No. 11 to Materials License No. SNM-2506 for the Prairie Island Independent Spent Fuel Storage Installation Project stage: Request ML20237F3682020-10-29029 October 2020 Amendment No. 11 to Materials License No. SNM-2506 for the Prairie Island Independent Spent Fuel Storage Installation Safety Evaluation Report Project stage: Approval ML20237F3672020-10-29029 October 2020 Amendment No. 11 to Materials License No. SNM-2506 for the Prairie Island Independent Spent Fuel Storage Installation Project stage: Other 2020-04-13
[Table View] |
|
---|
Category:Letter
MONTHYEARML24298A0552024-10-30030 October 2024 Response to Alternative RR-10, Auxiliary Feedwater Valve Testing IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 To Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds 05000282/LER-2023-001-01, Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables2024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) 2024-09-27
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 29, 2020 Mr. Christopher P. Domingos, Site Vice President Prairie Island Nuclear Generating Company Northern States Power Company - Minnesota 1717 Wakonade Drive East Welch, Minnesota 55089-9642
SUBJECT:
AMENDMENT NO. 11 TO MATERIALS LICENSE NO. SNM-2506 FOR THE PRAIRIE ISLAND INDEPENDENT SPENT FUEL STORAGE INSTALLATION (EPID NO. L-2019-LLA-0169)
Dear Mr. Domingos:
By letter dated July 26, 2019, as supplemented April 29, 2020 and June 10, 2020, Northern States Power Company (NSPM) submitted proposed Amendment No. 11 to Special Nuclear Materials License No. 2506 for the Prairie Island Independent Spent Fuel Storage Installation.
The application proposed to increase the storage capacity of the Prairie Island Independent Spent Fuel Storage Installation and sought approval for the design of a new storage pad to be built at the existing facility.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the NSPM application, as revised and supplemented, and finds reasonable assurance that: (i) the activities authorized by the amended license can be conducted without endangering the health and safety of the public, and (ii) these activities will be conducted in compliance with the applicable regulations. NRC staff further finds the issuance of the amendment will not be inimical to the common defense and security. In connection with the issuance of the license, an environmental assessment and finding of no significant impact was noticed in the Federal Register on October 8, 2020 (85 FR 63588).
The NRC staff approved the requested license amendment and revised renewed license condition numbers 22, 23 and 24. In addition, editorial changes were made to the license. The attached amended license supersedes Special Nuclear Materials License No. SNM-2506 dated December 9, 2015. Changes made to the attached license pages are indicated by vertical lines in the right margin. The safety evaluation report and the Federal Register notice of issuance for the amended license are also attached.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the publicly available records component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html.
C. Domingos 2 If you have any questions regarding this matter, you may contact me at (301) 415-5722 or you may contact Chris Allen of my staff at (301) 415-6877.
Sincerely, Digitally signed by John B.
John B. McKirgan McKirgan Date: 2020.10.28 11:50:52 -04'00' John McKirgan, Chief Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-10 EPID No.: L-2019-LLA-0169 Attachments:
- 1. Materials License No. SNM-2506 Amendment No. 11
- 2. Safety Evaluation Report
- 3. Federal Register Notice of Issuance of Amendment
C. Domingos 3
SUBJECT:
AMENDMENT NO. 11 TO MATERIALS LICENSE NO. SNM-2506 FOR THE PRAIRIE ISLAND INDEPENDENT SPENT FUEL STORAGE INSTALLATION (EPID NO. L-2019-LLA-0169)
DATED: October 29, 2020 DISTRIBUTION:
DFM r/f NMSS r/f File Location: G:\SFST\Prairie Island\Amendment 11\Notices\Issuance\FRN.docx File Location: G:\SFST\Prairie Island\Amendment 11\Issue\Final\Letter.doc
\License.docx
\SER.docx ADAMS Package Accession Number: ML20237F365 *via email OFFICE DFM DFM DFM DFM NAME WAllen WWheatley* JWise* JPiotter*
DATE 9/1/2020 9/2/2020 8/24/2020 8/24/2020 OFFICE DFM DFM DFM DFM NAME ASotomayor* RRodriguez* TBoyce* RChang*
DATE 8/27/2020 8/27/2020 8/27/2020 8/27/2020 OFFICE DFM OGC/HLW DFM NAME MDiaz* PJehle JMcKirgan DATE 8/24/2020 10/27/2020 10/28/2020 OFFICIAL RECORD COPY