ML20065J105: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:__ _ _ _ .
REACTIVITY CONTROL SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)
ACIION:    (Continued)
: 2. If the inoperable control rod (s)'is inserted:
a)      Within one hour disarm.the associated directional control valves either:,
: 1)  Electrically, or
: 2)  Hydraulically by closing the drive water and exhaust water Asolation valves.                                                              ,
b)      Otherwise, be in at least HOT SHUTDOWN within the next.12                            l hours.
: c. With more than 8 control rods inoperable, be in at least HOT SETDOWN within 12 hours.                                                          u SURVEILLANCE REQUIREMENTS 4.1.3.1.1    The scram diuharge volume drain and vent. valves shall be demonstrated OPERABLE. ac least once per 3L days by:*-
1                            a. Verifying each valve to be open.                                                            .
: b. Cycling each valve at least ore complete cycle of full travel.
.                      4.1.3.1.2 All withdrawn control rods not required to have their directional control valves disarmed electrically or hydraulically shall.be: demonstrated OPERABLE by moving each control rod at least one notch:-
: a. At least once per 7 days when above the preset power level of the RWM and RSCS, and
: b. At least once per 24 hours when above the preset power level of the RWM and RSCS' and any control rod is immovable as a result of excessive friction or mechanical interference.
                      '4.1.3.1.3 All withdrawn control rods shall be determined CPERABLE by
;                    demonstrating the scram discharge; volume drain and vent valves 0PERABLE, when
:                    the reactor protection system logic. is tested per Specificatiou 4.3.1.2, by verifying that the drain and vent valves:
: a. Close- within 30 seconds af ter receipt of a signal for. control rods to scram, and
: b. Open when the scram signal is reset or the scram discharge volur ae                          '
trip is bypassed.
4
                      *These valves may be closed intermittently for testing under administrative -
Control.
;                      BRUNSWICK - UNIT I                          3/4 1-4                                Amendment Ns,
    .8210050371 920929                  F PDR ADOCM_05000324                  1 P  , _ -                  PDR      L,
 
    . ' REACTIVITY CONTROL SYSTEMS LIMITING CONDITION FOR OPCRATION ((bntinued)
ACTION:    (Continued)                                                                                y
: 2. If the inoperable control rod (s) is inserted:
a)  Within one hour disarm the associated directional control valves either:
: 1)  Electrically, or
: 2)  Hydraulically by closing the drive water and exhaust water isolation valves.
b)  Otherwise, be in at least HOT SHUTDOWN within the next 12 hours.
!        c. With more than 8 control rods inoperable, be in at least HOT SHUTDOWN I              within 12 hours.
SURVEILLANCE REQUIREMENTS 4.1.3.1.1    The scram discharge volume drain and vent valves shall be demonstrated OPERABLE at least once per 31 days-by:*
: a. Verifying each valve to be open.
: b. Cycling each valve at least one complete cycle ot full travel.
4.1.3.1.2    All withdrawn control rods not required to have their directional control valves disarmed electrically or hydraulically shall be demonstrated OPERABLE by moving each control rod at least one noten:
: a. At least once per 7 days when above the preset power level of the RWM and RSCS, and                  j g.
: b. At least once per 24 hours when above the preset power level of the RWM and RSCS and any cont! rol rod is immovable as a result of excessive friction or mechanical interference.
4.1.3.1.3 All withdrawn control rods shall be determined OPERABLE by demonstrating the scram discharge volume drain and vent valves OPERABLE, when
        .the reactor protection system logic is tested per Specification 4.3.1.2, by verifying that the drain and vent valves:
: a. Close within 30 seconds after receipt of a signal for control rods to scram, and
: b. Open when the scram signal is reset or the scram discharge volume trip is bypassed.
        *These valves may be closed in' armittently for testing under administrative control.
BRUNSWICK - UNIT 2                                    3/4 1-4                                          Amendment No.
  "                                                        -      _ _ _ - _ - _ _ _ _ _ - - _ _ - _ _ _ -        _ -_ _ - _ - __ _ _ _ _ _ - _ _ _}}

Revision as of 07:57, 6 January 2021

Prposed Tech Spec 4.1.3.1.1 Re Surveillance Requirements Verifying Operability of Scram Discharge Vol Vent & Drain Valves
ML20065J105
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/29/1982
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20065J086 List:
References
NUDOCS 8210050371
Download: ML20065J105 (2)


Text

__ _ _ _ .

REACTIVITY CONTROL SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

ACIION: (Continued)

2. If the inoperable control rod (s)'is inserted:

a) Within one hour disarm.the associated directional control valves either:,

1) Electrically, or
2) Hydraulically by closing the drive water and exhaust water Asolation valves. ,

b) Otherwise, be in at least HOT SHUTDOWN within the next.12 l hours.

c. With more than 8 control rods inoperable, be in at least HOT SETDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. u SURVEILLANCE REQUIREMENTS 4.1.3.1.1 The scram diuharge volume drain and vent. valves shall be demonstrated OPERABLE. ac least once per 3L days by:*-

1 a. Verifying each valve to be open. .

b. Cycling each valve at least ore complete cycle of full travel.

. 4.1.3.1.2 All withdrawn control rods not required to have their directional control valves disarmed electrically or hydraulically shall.be: demonstrated OPERABLE by moving each control rod at least one notch:-

a. At least once per 7 days when above the preset power level of the RWM and RSCS, and
b. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when above the preset power level of the RWM and RSCS' and any control rod is immovable as a result of excessive friction or mechanical interference.

'4.1.3.1.3 All withdrawn control rods shall be determined CPERABLE by

demonstrating the scram discharge; volume drain and vent valves 0PERABLE, when
the reactor protection system logic. is tested per Specificatiou 4.3.1.2, by verifying that the drain and vent valves:
a. Close- within 30 seconds af ter receipt of a signal for. control rods to scram, and
b. Open when the scram signal is reset or the scram discharge volur ae '

trip is bypassed.

4

  • These valves may be closed intermittently for testing under administrative -

Control.

BRUNSWICK - UNIT I 3/4 1-4 Amendment Ns,

.8210050371 920929 F PDR ADOCM_05000324 1 P , _ - PDR L,

. ' REACTIVITY CONTROL SYSTEMS LIMITING CONDITION FOR OPCRATION ((bntinued)

ACTION: (Continued) y

2. If the inoperable control rod (s) is inserted:

a) Within one hour disarm the associated directional control valves either:

1) Electrically, or
2) Hydraulically by closing the drive water and exhaust water isolation valves.

b) Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

! c. With more than 8 control rods inoperable, be in at least HOT SHUTDOWN I within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.1.3.1.1 The scram discharge volume drain and vent valves shall be demonstrated OPERABLE at least once per 31 days-by:*

a. Verifying each valve to be open.
b. Cycling each valve at least one complete cycle ot full travel.

4.1.3.1.2 All withdrawn control rods not required to have their directional control valves disarmed electrically or hydraulically shall be demonstrated OPERABLE by moving each control rod at least one noten:

a. At least once per 7 days when above the preset power level of the RWM and RSCS, and j g.
b. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when above the preset power level of the RWM and RSCS and any cont! rol rod is immovable as a result of excessive friction or mechanical interference.

4.1.3.1.3 All withdrawn control rods shall be determined OPERABLE by demonstrating the scram discharge volume drain and vent valves OPERABLE, when

.the reactor protection system logic is tested per Specification 4.3.1.2, by verifying that the drain and vent valves:

a. Close within 30 seconds after receipt of a signal for control rods to scram, and
b. Open when the scram signal is reset or the scram discharge volume trip is bypassed.
  • These valves may be closed in' armittently for testing under administrative control.

BRUNSWICK - UNIT 2 3/4 1-4 Amendment No.

" - _ _ _ - _ - _ _ _ _ _ - - _ _ - _ _ _ - _ -_ _ - _ - __ _ _ _ _ _ - _ _ _