ML20065U187: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:k      '
B ALTIMORE
  ,                                                OAS AND ELECTRIC CHARLES CENTER
* P.O. BOX 1475
* BALTIMORE, MARYLAND 21203 1475 (301) 234 5000 Decemher 21,1990 Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 i
 
==Subject:==
Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Safeguards Contingency Plen, PrMion lla
 
==Dear Sirs:==
 
Enclosed is Revision lla to the Safeguards Contingency Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2. The changes made do not decreee 'Se effectiveness of the Plan and therefore are being submitted under the provisions of 10 C,    30.54 (p).
1 l            Details of the changes made by this revision have been provided in an enclosure to this letter.
My staff and I are at your disposal should you have any questions regarding these changes.
This letteris not subjectto protective requiremente. The                                              Sincerely, attachment / enclosures are subject to Safeguards Information protection in pjf,                          .
accordance with 100FR73.21                                        G. Dowell Schwartz, Jr.
Vice President General Services Division Enclosure cc:    Mr. G. C. Creel, Vice President, Nucle.. Energy Division                            d    r (w/o enclosure)
Mr. W. T. Russell, USNRC, Region I Administrator                              J[f/4#Io /f (w/enck sure)
Mr. G. L Bell, NSPD/ Compliance p
(w/o enclosure)              ,                                                ,
ngmansk F}}

Latest revision as of 02:08, 6 January 2021

Forwards Rev 11a to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21)
ML20065U187
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/21/1990
From: Schwartz G
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9101020135
Download: ML20065U187 (1)


Text

k '

B ALTIMORE

, OAS AND ELECTRIC CHARLES CENTER

  • P.O. BOX 1475
  • BALTIMORE, MARYLAND 21203 1475 (301) 234 5000 Decemher 21,1990 Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 i

Subject:

Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Safeguards Contingency Plen, PrMion lla

Dear Sirs:

Enclosed is Revision lla to the Safeguards Contingency Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2. The changes made do not decreee 'Se effectiveness of the Plan and therefore are being submitted under the provisions of 10 C, 30.54 (p).

1 l Details of the changes made by this revision have been provided in an enclosure to this letter.

My staff and I are at your disposal should you have any questions regarding these changes.

This letteris not subjectto protective requiremente. The Sincerely, attachment / enclosures are subject to Safeguards Information protection in pjf, .

accordance with 100FR73.21 G. Dowell Schwartz, Jr.

Vice President General Services Division Enclosure cc: Mr. G. C. Creel, Vice President, Nucle.. Energy Division d r (w/o enclosure)

Mr. W. T. Russell, USNRC, Region I Administrator J[f/4#Io /f (w/enck sure)

Mr. G. L Bell, NSPD/ Compliance p

(w/o enclosure) , ,

ngmansk F