UNITED STATES OF AMERICA N
NUCLEARREGULATORYCOMR{E((D' BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
                                            '85 DEC 16 A11 :16 In the Matter of                        )
t} p.t 0F 5!.CRti /A COMMONWEALTH EDISON COMPANY f)) M } k h Nos. 50-4560L-50-457 (Braidwood Station Units 1 and 2)      )
APPLICANT'S FOURTH PARTIAL' RESPONSE TO ROREM'S SECOND SET OF QUALITY ASSURANCE INTERROGATORIES AND REQUESTS TO PRODUCE On October 21, 1985, Intervenors Rorem, et. al.
("Intervenors") filed their Second Set of Quality Assurance Interrogatories and Requests to Produce.
Applicant filed a first partial response on November 15, 1985 and responded to the remainder of the specific interrogatories in Intervenors' Second Set on November 22, 1985.      On December 6, 1985, Applicant filed a third partial response which included indices to DCAP documents. This submission which is Applicant's Fourth              i Partial Response supplements the indices in the Third Partial Response and provides indices to BCAP documents maintained by Sargent & Lundy.
BCAP DOCUMENTS
                's indicated in Applicant's Third Pa.tial Response, therr < a massive volume of BCAP documentation created or taintained by the BCAP Task Force, BCAP QA, and Sargent &
Lundy. Applicant will make these documents available where Q
                                                                      \303 ;
 
they are stored for Intervenors' inspection and copying.
Most of the BCAP Task Force and BCAP-QA documents are stored on the Braidwood site. Sargent & Lundy documents are maintained at either the Braidwood site or at Sargent &
Lundy's downtown offices located at 55 East Monroe Street, Chicago, Illinois 60603. Applicant needs at least one week's notice to arrange inspection of documents at the Braidwood site or at Sargent & Lundv's downtown offices.
Documents for which Applicant is asserting privi-lege have not been provided and are not available for inspection or copying. A privilege index will be provided indicating whether attorney client ("AC") or attorney work product ("WP") privilege is being asserted.
The first two attachments supplement the indices for the BCAP Task Force and BCAP QA provided in the Appli-cant's Third Partial Response. Attachment 1 supplements the Index Listing of BCAP Informal Files (Attachment 4 of Applicant's Third Partial Response). Attachment 2 is a listing of personnel associated with BCAP over the life of the program and their positions. Further investigation is proceeding to identify any other documents that concern BCAP. Supplements to indices will be provided as this process is completed.
Sargent & Lundy files which relate to BCAP are maintained by each of three departments within Sargent &
Lundy:  Structural, Electrical and Mechanical. Files for J
 
0 6
the Structural and Electrical disciplines are located at Sargent & Lundy's downtown offices; files for the Mechanical discipline are located at the Braidwood site.
Sargent & Lunay_ files for the Mechanical discipline cover all piping populations (M-001 through M-015) and some HVAC/ Mechanical (H 002, H-005, H-006, and H-008). They consist of:
: 1)    4 Binders indexed by population number which typically contain for each population
              - NCR signoff
              - Copy of the inspection counting form
              - Copy of the discrepancy counting form
              - S&L write-up for that population
              - Supplemental materials
: 2)    1 Calculation book organized by population number which contain copies of relevant calculations from Project Management Division (PMD)
: 3)    2 Boxes organized by population number which contain copies of observation records used for S&L evaluations related to that population.
The Structural Department calculations which relate to BCAP include calculations on the determination of the more highly stressed elements, inspection point counts and design significance of observations.      Attach-ments 3 and 4 are indices for these calculations. Attach-ment 5 is an index of Structural Department's calculations for BCAP Trending.
Attachment 6 is a file index for the Electrical Department. The total volume of these files is approximately one file drawer and three binders. Calculations prepared by Structural Department to resolve discrepancies found by i
Electrical-Department have been integrated.with other calculations maintained by Structural Department.
Investigation continues for Sargent & Lundy documents which are not maintained in formal official filing systems.
i l
b i
l t
r l
1 I
i l
l i
l l
1.
 
1 ATTAC11 MENT 1' INDEX LISTING OF BCAP INFORMAL FILES ADDITIONS 325. Box of Observation Audit files - Load Forms RSCAP CSR-R.G. CEA CSR-R.G. CTG CSR-R.G. ELE.
CSR-R.C. 999 CSR-I.E. EIN CSR-I.E. CBP CSR-I.E. CND CSR-I.E. CBL                                  < .
CSR-I.E. COH CSR-I.E.'CPH CSR-R.E. CBL CSR-R.E. CBP CSR-R.E. CND CSR-R.E. COH CSR-R.E. CPH CSR-R.E. EIN CSR-I.H. 001 CSR-I.H. 002 CSR-I.H. 003 CSR-I.H. 004 CSR-I.H. 005 CSR-I.H. 006 CSR-I.H. 007 CSR-I.H. 008 CSR-I.H. 010 CSR-R.H. 001 CSR-R.H. 002 CSR-R.H. 003 CSR-R.H. 004 CSR-R.H. 005 CSR-R.H. 006 CSR-R.H. 007 CSR-R.H. 008 CSR-R.H. 010 CSR-I.M. 001 CSR-I.M. 002 CSR-I.M. 003 CSR-I.M. 004 CSR-I.M. 005 CSR-I.M. 006 CSR-I.M. 007 CSR-I.M. 009 CSR-I.M. 011 CSR-I.M. 012 CSR-I.M. 015 0550H/ December 12, 1985
 
E CSR-R.M. 001 CSR-R.M. 002 CSR-R.M. 003 CSR-R.M. 004 CSR-R.M. 005 CSR-R.M. 006
                        .CSR-R.M.'007 CSR-R.M. 009 CSR-R.M. 011 CSR-R.M. 012 CSR-R.M. 015 CSR-R.S. 001 CSR-R.S. 002
                        -CSR-R.S. 003 CSR-R.S. 004 CSR-R.S. 005 CSR-R.S. 006 CSR-R.S. 007 326. Box of files containing documents under QG 69.30.4 thru 69.30.7 which d1d not go to QA Vault.
Q.C. 69.30.6.6          C-ELE AWS D1.1 Welds (Electrical Work)
Q.G. 69.30.6.6          G-ND1 Review of NDE Documentation Q.C. 69.30.6.6      ~G-NFS Visual Inspection of ASME Welds (NF)
Q.G. 60.30.6.6          CEA Assemblies Q.G. 69.30.6.6          G-ASM Visual Inspection of ASME Welds, NB, NC, ND Q.G. 69.30.6.6          C-CTC Visual Inspect 1on of Coatings
                      ~Q.G. 69.30.6.6          G-D13 AWS D1.3 Visual Weld Inspection Q.G. 69.30.6.6          G-NEW AWS D1.1 Welds (Stiffeners for Electrical Work)
Q.G. 69.30.6.6          G-Dil AWS D1.1 Visual Inspection Q.C. 69.30.7.7          EIN Electrical Equipment Installatlon
                    -Q.C. 69.30.4.1          EIN Electrical Equipment Installatlon Q.G. 69.30.4.1          COM Category I Condult Hangers Q.G. 69.30.7.7          COM Category I Conduit Hangers Q.G. 69.30.7.9          CND Conduit Q.C. 69.30.4            CND Conduit Q.G. 69.30.4            CPN Category I Cable Pan Hangers Q.G. 69.30.7            CPH Category I Cable Pan Hangers Q.G. 69.30.4.1          CBL Cables Q.G. 69.30.7.7          CBL Cables Q.G. 69.30.4.1          CBP Cable Pars Q.C. 69.30.4.3          CBP Cable Panu Q.G. 69.30.7.7          CBP Cable Pant Q.G. 69.30.4.1          (H-10) NSSS F.qulpment Support Q.C. 69.30.4.1          (H-08) MSSS Equipment Installation Q.C. 69.30.4.1          (H-07) Touch Up Galvanizing for HVAC Sheet Metal Duct Welds Q.G. 69.30.4.1          (H-06) Mechanical Equipment Installation
* Q.G. 69.30.4.1          (H-05) Mechanleal Equipment-Fleid Fabricated Tanks Q.G. 69.30.4.1          (H-04) HVAC Houslng & Plenums Fabrication Q.C. 69.30.4.1          (H-03) HVAC Hangers and Aux. Steel Q.G. 69.30.4.1          (H-02) HVAC Equlpment Installation 4
0550H/ December 12, 1985
 
                                      .s Q.C. 69.30.7.7    (H-01) HVAC Duct HVAC-N-01 Q.C. 69.30.4.1    M-1 Small Bore Piping Configuration Q.G. 69.30.4.1    M-2 Large Bore Rigid Pipe Supports ITT Grinnell, ELECEN and Corner & LADA Catalogs CSR-I-M-2, CSR-I-N-3, CSR-I-M-6
  ,                  Q.G. 69.30.7.7    M-2 Large Bore Rigid Pipe Supports Q.C. 69.30.4.1    M-3 Large Bore Non-Rigid Pipe Supports Q.G. 69.30.4.1    M-4 Large Bore Piping Configuration Population M-4 Large Bore Piping Configuration Population List Q.G. 69.30.4.1    M-5 Piping System Bends Q.C. 69.30.4.1    M-6 Small Bore Piping Supports Q.G. 69.30.4.2    M-7 Large Bore Pipe Whip Restraints Q.C. 69.30.4.1    M-8 Small Bore Pipe Bolted Joints Q.G. 69.30.4.1    M-9 Small Bore & Instrument Pipe / Tube Welds Q.G. 69.30.4.2    M-10 small Bore Pipe Bends Q.C. 69.30.4.2    M-11 Large Bore Pipe Bolted Joints Q.G. 69.30.4.1    M-12 Large Bore Pipe Welds Q.G. 69.30.4.2    M-13 Inst. Pipe / Tube Bolted Joints Q.G. 69.30.4.1    M-15 Inst. Pipe / Tube Supports S-001, Concrete Placements S-002, Structural Steel
                    .S-003, Cored Holes S-004, Masonry Walls S-005, Liners S-006, cadwelds S-007, Post-Licensing i
327. Box containing miscellaneous files and working papers:
BCAP Reinspection Observation Status - Computer printout approx 15 pp long' 1 Black Binder labeled Malrix contains CSR-R-E-CND BCAP Summary of.
Observations 1 Brown Binder labeled "BCAP QA Equipmant Report HVAC Work H-02" PSM's Computer Printout list used as source for population items
                                                                                                          )
1 Brown Binder labeled "BCAP QA Duct Report HVAC Work CSR-H-01 69.30.7" 1 Black Binder labeled "ECAP Drawing Index" CSR BCAP Record of Review, Field Transmittal Forms, Document Review Sheets, all CSR-R-H-08 and CSR-I-H-07 Steering Group Meeting Notes / Comments, handwritten to Patterson CSR Supervisor from T.J. Lynch, CSR HVAC Support Engineer with Doc Review Sheets, and Checklists i
0550H/ December 12, 1985 i
                                                                                                          )
 
BCAP Field Transmittal Forms for CSR-I-S-001 with attached tabulation
  ,.                                  of samples of highly stressed concrete elements                                                                                                            l Speed letter from A.A. Patterson BCAP CSR Supv. re selection of "More Highly Stressed Items" with attached S&L transmittals on subject                                                                                          ;
Field transmittal forms re highly stressed small and large bore piping speed letters ce highly stressed items requesting lists Package of Field Transmittal Forms and attachments ce highly stressed
;                                    items from D.M. Fischer with attached tabulations.
Speed letter and attachments re more highly stressed Cable Pan Hangers to Fischer from Willoughby for sample i'
Package of Memos related to sample selection for safety related systems
+
I S&L Field Transmittal Forms re listing of highly stressed items 1-2 copies Transmittal to BCAP files sheet for CSR-5-001 Concrete Placement 9 Att, sample codes, reinspection list, list of HVAC Ducts Memo unidentified and undated re BCAP treament of Highly Stressed Items
,                                    S&L Highly stressed Areas / Items Schedule for submittal to CECO BC P dated 1/10/85 2
Handwritten note, 10/2/84, re CSR-I-5-001 S&L comments Typed notes re BCAP Treatment of more highly stressed items and sample selection has some handwritten notes of unidentified origin 4
.                                    3/22/85 BCAP note to Kaushal re Status of High Stress list and High 2
                                  ' stress Elements Flowpath Chart for BCAP drawing review, SI review, S-002 Structural t
                                  . Steel initialed CAB dated 3/8/85 6
S&L Interoffice Memo w/att, re BCAP Highly Stress Areas / Items discusses sample identification, transmittal guides, requirements, and schedules Handwritten notes dated 1/16 re additional info needed from S&L S&L transmittals w/att. re highly stressed elements, conduits, cable, 4
all dated 1/85 time frame I stack approx 4" high of manilla envelope flies - appear to be copies j                                    of file drawers. Package is labeled i
i 4
4 1
                                                                                        !                  0550H/ December 12, 1985 i              .
    - ,- -.    ..      . . . . _ _ - - _ - _ _ _ . . -      . _ _ , . _ _ _ _ _ , . .        - - _ ,,,,.,, n.                    , , , , . . - , _ _ . . - . - , _ - - - ._ .
 
t ATTACHMENT 2 PERSCNNE_ C=                          ,E 30u :cJE:-
03-;4-1985 AT 21:53                                                                                                            Page -
INI          NAME                                                                  JOB      YPE AM            A.      MORNICK                                                      Ss PORT ENG; A~            A.      TERGEVORKIAN                                      '
M/P SUPPORT ENGR A*    ^:
                .      A.      TANHA                                ,'                    'ELECTRICA_ INSPECTOR AAP            A.A.PATTERSON                                                          SUPV-CSR AGD            A.G.PA?ANIKOLAQU                                                      M/P SUPPCRT ENGR ANG            A.      NG                                                            M/P SUPPORT ENGR BJ            'W.F.JCSEY                        ,
MECH /WE D INSPECTCR DJF          'D.J. FLACK                          q                                  CIVIL / STRUCTURAL INSPECTOR BWG        ^B.W.GATu!N                                                              M/D SUPPORT ENGR CL            C.B.LARSEN                                                            NDE ENGR CAH          C.A. HALL.                                                            LEAD MATERIAL ENGR CAS            C.A. SWARD                    '-
                                                                                  -          C/S SUPPORT ENGR CEG            C.E. GOODMAN                                                          RPSR TECN ASST~
CET            C.E. THOMPSON ,                                                        CIVIL / STRUCTURAL INSPECTOR CJK          C.J.KIM                                                                C/S' SUPPORT ENGR CJP            C.J.PASSERI                                                            LEAD CIVIL / STRUCTURAL ENGR D0            D.H.GOSSETT                                                            CIV.IL/ STRUCTURAL INSPECTOR DM            D.      McAFEE                                                        SENIOR DANIELG REPRESENTATIVE                  *
  ,      DP            D.      PATEL        ^                  '
LEAD ELEC ENGR                              -
DE            D.      SHIH                        -
M/P SUPPO'RT ENGR DAH          D.A.HALEY                                                              S&L LIAGON REP / LEAD ELEC EVALUATOR lj        DCR            D.C.RICHARDS                                                          BCAP GA ELEC INSPECTOR
.j        DEA        .D.E.ARMSTRONG                                                          ELECTRICAL INSPECTOR DFB            D.F.BURLISON                                                          SUPPORT' SERVICES DJW          D.J.WILLC                                                              ASST SUPV-CSR
'.        DLO          D.L.CROLL                                                              BCAP 09 ELEC INSPECTOR
  ,      DwM          D.L.MCCAE .                                                            E EC INSPECTOR DLR          D.L.ROLLINS                                                            CIVIL / STRUCTURAL INSPECTOR DR            D.L.'RANSTROM                              ,
                                                                        ,                      BCAP GA ENGR / TECH ASST DLS          D.L. SMITH                                                            BCAP GA INSPECTION COORDINATOR DMF          D.M.FISCHER S&L LIASON-REPRESENTATIVE DRW          D.R. WALKER                                                            MECH / WELD' INSPECTOR DSG          D.S.GREWAL                                                            ELEC SUPPORT ENGR ED            E.      DOUCARELLIS                                                  TECHNICAL WRITER CH            E.      HORLBECK                                                      M/P SUPPORT ENGR EEF          E.E.FITZPATRICK                                                        ASST MANAGER GR EMS          E.M.SHEVLIN                                                            LEAD MECH / WELD INSP EP3        ~E.P.SMOLA                                                              ELECTRICAL INSPECTOR ERK        .E.R.KURTZ                                                              RSCAP TECn ASST FS            F.I.STARR                                                              MECH / WELD INSPECTOR
;          FU      '
F. ,ULU              .
HVAC SUPPORT ENGR l, .      FW            F.      WOZNIAK                                                    .RPSR SUPPORT ENGR
!'"        fad        .~F.A.KOVENSKY                                                          'C/S SUPPORT ENGR FJM      ... F.J.MILwER                                                            C/S SUPPORT ENGR FWM          F.W.MUSSELMAN                                                          INSPECTION COORDINATOR
  ,      GK            G.        KAN                                                          RPSR SUPPORT ENGR
  ,      GL            G.        LUTHER                                                      M/P SUPPORT ENGR GM            G.A.McCONAGHY                                                          DCC. REVIEW INSPECTOR GO            G.        PAN            ,'      ^
V/D SJPsO47 ENGR GD_          G.D..CNG.                                                            'C IV!L/ STR'JOTUR A- INSPECTCR 3EC            G. E. C CSSALCC.r.                                                    BCAP GA ENGR / TECH ASST GJS            G.J.SUTTON -                                                          MECH INSPECTCR GJ            G.L.JCDREY                                                            BCAP QA C/E-TEC-/wE_C INS ZCT::.
  +r-
                                                                          . . ~ .      --            . - ,  , , -          - , - - ,          , . ,
 
    .                                          PERSONNE        CF TnE BCPC CRCJECT 09-14-1985 AT 2I:53                                                                                  ;a;e E INI        NAME                                              JCB    YPE GLR          G.L.ROTH                                          CIVIL /STRUCTURAw INSPECTOR GMK        G.M.KERZNER                                        LEAD MECH / PIPING ENGR / MATERIAL SPEC CMO          G.M.ORLOV                                          ASST DIR GRR        G.R.RILEY                                          CIVIL / STRUCTURAL INSPECTOR HR          H.      RAMCHANDRA                                MECH / PIPING / MAT /RPSR SUPPORT ENGR HW          H.E. WILLIAMS                                      CSR-CLERICAL HLV          H.L.VENER                                          TECH ASST HMS        H.M.SIGREST                                        MECH INSPECTOR HWN          H.W.NORRIS                                        MECH / WELD INSPECTOR
        -J G          J.      GILDOR                                    HVAC SUPPORT ENGR JK          J.      KONOWAL                                  BCAP QA WELD /ELEC INSPECTOR JR          J.L.ROLLINS                                ^
CIVIL / STRUCTURAL INSPECTOR JS          J.      STACOM                                    SUPPORT ENGR JAA        J.A.ALBERGHINI                                    M/P SUPPORT ENGR JAP          J.A.PATTON                                        M/P SUPPORT ENGR JAU          J.A. ULLMAN                                        ELECTRICAL INSPECTOR
        'JAZ          J.A.~ZYCH                                        -BCAP QA SPECI AL PROJECTS ENGR                    ,
JCG          J.C.GILMAN                                        WELD INSPECTOR JCN          J.C. NELSON
                                                                                                              ~
ELEC SUPPORT ENGR JCT          J.C. THOMPSON                                      ASST SUPV-CSR JLE          J.L.EDMONDSON                                      ELECTRICAL INSPECTOR JMC          J.M.CUMISKEY                                      TECH ASST JPM          J.P.MATZ                                          ELEC SUPPORT ENGR JPM          J.P.MESSARD                                        BCAP QA SUPPORT STAFF JPS          J.P.STEVENS                                        ELEC SUPPORT ENGR
        -JRD        J.R.DESAI                                          M/P SUPPORT ENGR JRF          J.R. FLETCHER                                      QUALITY ENGR JRW          J.R.WOZNIAK                                        ELECTRICAL INSPECTOR JOS-        J.S. SEXTON                                        LEAD CIVIL / STRUCTURAL INSPECTOR JWH          J.W.HAMLER                                        BCAP QA PTL SUPV JWV          J.W.VANDELICHT                                    SUPPORT SERVICES LEAD KD.          K.W.DANIELS                                        WELD INSPECTOR KRN          K.R.NOVATNY                                        S&L LIASON REPRESENTATIVE KRR          K.R.RICHEY                                        ELECTRICAL INSPECTOR KTK          K.T.KOSTAL                                        S&L PROJECT ENGR
      -L R          L.D. RAPHAEL                                      M/P SUPPORT ENGR LAS          L.A.SHEA                                          LEAD ELECTRICAL INSPECTOR LDB          L.B. BROWN                                        WELD INSPECTOR LhS          L.H.STROPE                                        RSCAP LEAD MECH / PIPING ENGR LPn          L.P.HUME                                          ELECTRICAL INSPECTOR LRD          L.R.DUSS                                          M/P SUPPORT ENGR LSa        L.S. WEISS                                        DEPUTY SWEC MGR LSW          L.S.WIGLEY                                        RPSR TECH ASST LTR          L.T.ROUEN                                          RSCAP LEAD STRUCTURAL /HVAC ENGR MA          M.R.ANANTHARAMAN                                  ELEC SUPPORT ENGR MB        . M.      BOGLE                                    CERT /TRNG ADMIN
  ,      MG          M.      GANDHI                                    M/P SUPPORT ENGR
          .Y  K      M.      KLAYMAN                                  ADMIN ENGR /RECCRDS ADMIN MAC          F.. A .' C L I N T C N                            INSPECTICA SUPV MAK          M.A.KIRXAN-                                          /S/.-VAC SJP? ORT ENGR PAT          X.A.TERPENIN3                                    'SJPPORT SERVICES 72K          m.      ADPP                                      RSCAP LEAD'ELEC ENGR v,Jr.      M.J. MAJOR                                        MECn/wEuD INSPEC CR
 
,                                PERSONNE  CF THE BCAP PROJECT 09-14-1985 AT 21:53                                                        Page 3 INI      NAME    [                      JOB TYPE MJM        M.J.MURRAY                      BCAP GA MECH / WELD INSPECTOR MJM        M.J. WOODS                      BCAP GA C/S INSPECTOR MJS        M.J.SCHNEIDER                  MATERIAL SUPPORT ENGR MLW        M.L. WILLIAMS                  CERT /TRNG ADMIN MNS        M.N. SHAH                      HVAC SUPPORT ENGR MOM        M.O.McCRADY                                                                  l RSCAP SUPPORT ENGR                          I MOS        M.O. SMITH                      CIVIL / STRUCTURAL INSPECTOR MPM        M.P.MURSKYJ                      ELEC SUPPORT ENGR MRD        M.R.DOUGHERTY                    SUPV-RSCAP MRM        M.R.MODERSKI                    ASST SUPV-RPSR NB        N.      BANERJEE                RPSR LEAD STRUCTURAL /HVAC ENGR N5        N.      SZABAT                  PLANNING A SCHEDULING ENGR NW        N.      WADHIA                  HVAC SUPPORT ENGR NZC        N.B. COHEN                      HVAC SUPPORT ENGR NNK        N.N.KAUSHAL                    DIRECTOR NP2        N.P. SMITH                      GENERAL SUPERVISOR QA OAZ        O.A.ZDSULS                      SUPPORT ENGR                            f AA        P.      AMORUSO~                SUPV-RPSR                              y i
PAL        P.A.LAU                        BCAP GA ENGR / TECH ASST
                                                                ~
                                                                                            ~
l PJT        P.J. THOMPSON                  MECH / WELD INSPECTOR
                                                                                        ~
I PLC        P.L.CHUMBLEY                    ELEC SUPPORT ENGR PRM        P. R. MULE'                    LEAD HVAC ENGR PSJ        P.S. JONES                      MECH / WELD INSPECTOR PTG        P.T.GIANGRECO                  C/S SUPPORT ENGR RD        R.L.DURHAM                      M/P INSPECTOR RP        R.N.PLUMMER                    SUPPORT SERVICES RS        R. SWEET                    BCAP GA SUPPORT STAFF RAB        R.A.BECKFORD                    HVAC SUPPORT ENSR
  - RCC        R.C. CANNON                    BCAP QA O/O GRC.'JP SUPERVISOR RES        R.E. SPENCE                    BCAP GA RSCAP LEAD ENGR RFW        R.F. WILLIAMS                  BCAP GA CSR LEAD ENGR RGW        R.G. WILLIAMS                  BCAP GA MECH / WELD INSPECTOR RJA        R.J.AHO                        WELD INSGECTOR RJT        R.J.TRIESTE                    M/P SUPPORT ENGR RKR        R.K.RAMSGATE        r, -        BCAP GA ENGR / TECH ASST RLB        R.L.B          ;.      " -
ASST DIR    <
RLS        R.L.S          ERG            C/S FuPPORT ENGR RMB        R.M.B          EN              LEAD CIVIL /ETRUCTURAL ENGR              ^
RYC        RcY.C          e                M/P SUPPORT ENGR OD'        S. D ,_.4'                  HVAC SUPPORT ENGR SS          S. SIPPEL-                  ELEC SUPPORT ENGR CCW        S.C. WANG                      ELEC SUPPORT ENGR SDB        S.P.DiBIASO                    BCAP GA DOCUMENT COORDINATOR SLM        S.L. MANOR                      C/S SUPPORT ENGR SLM        S.L.McGRAW                      MECH / WELD INSPECTOR CRM        S.R. MODI                      HVAC SUPPORT ENGR              '
SWC        S.W.CROWE                      LEAD MECH / PIPING ENGR TA          T.J. ADAMS                      SUPPORT ENGR TF        .T. FLYNN                    ADMIN ENGR TAP        T.A. PARKER                    RSCAP SUPPORT / RECORDS ADMIN ENGR TCV        T.C.VOLKART                    CIVIL /STRUCTURAw INSPECTOR TES        T.E.STEPHENSON                  M/P SUPPORT ENGR TnA        T.H.ARMSTRONG                  SUPPORT SERVICE / MECH / WELD INSDEC C; i
 
O PERSONNE_ LF TnE BCAP PROJECT 09-14-1985 AT 21:53                                                                          Page a 8NI            NAME                                JOB 'YPE TJL              T.J. LYNCH                          hVAC SUPPORT ENGR TJR            T.J.RYAN                      -
TECH ASST                  .
TJV              T.J.VAUGmN JR.                      RPSR LEAD MECn/PIPI.N3 EN3R TwC            T.L.CHANEY                          MECH / WELD INSPECTOR
            .TRY              T.R. YOUNG                          MECH / WELD !.NSPECTOR VM              V. ~MEHTA                            C/S SUPPORT. ENGR VAH              V.A.HOFFMAN                          SWEC SITE ~MGR VJP            V.J.PATEL                            E EC SUPPORT ENGR VJT              V.J.' TURNER                        RPSR LEAD ELEC EN3R WW              W.          WILLOLGHBY              SUPV-CSR/ TECH ASST WCB              W.C.BRIMB ECOM                      ADMIN ENGR / RECORDS ADMIN WEE            W.E.EAMES                            MECH / WELD INSPECTOR                                '
WJM              W.J.MARCIS                          BCAP GA ENGR / TECH ASST WM3            W.M. SIDES                          BCAP QA RPSR LEAD ENGR WMY            .W.M.YEE                              M/P SUPPORT ENGR            .
TOTAL            -
                                                                                                              ~  ~
Printed 174 of the 174 records.
9 d
e I
        ,. . . . . ,  s,...        -.        .-                                        =  e                      .-_
 
ATTACHMENT 3 G: -
DESIGN CONTROL
 
==SUMMARY==
 
M&lE                                  DESIGN ELEMENT INDEX                      E e    orr--              PROJECT NO. 4683/84 UNIT NO. 1&2                3 PAGE 7  0F CALCULATIONS No. 19.3.1                REV. 6  DATE /2 f5-l TABLE OF CONTENTS Section              BCAP Population - Contents of Section              '
19.3.1.1.1          Concrete Placement - BCAP Observation Records 19.3.1.1.2          Concrete Placement - Calculations 19.3.1.2.1          Structural Steel - BCAP Observation Records 19.3.1.2.2          Structural Steel - Calculations 19.3.1.3            DELETED                                                      b 19.3.1.4.1          Masonry Walls - BCAP Observation Records 19.3.1.4.2          Masonry Walls - Calculations 19.3.1.5.1          Containment Liner - BCAP Observation Records 19.3.1.6            DELETED                                                      g 19.3.1.7            DELETED                                                        l 19.3.1.8.1          Conduit - BCAP Observation Records 19.3.1.8.2          Conduit - Calculation 19.3.1.9.1          Cat. I Conduit Hangers - BCAP Observation Records 19.3.1.9.2          Cat. I Conduit Hangers - Calculations 19.3.1.10.1          Cable Pans - BCAP Observation Records o  19.3.1.10.2          Cable Pans - Calculations
          $ 19.3.1.11.1          Cat. I Cable Pan Hangers - BCAP Observation
* Records 9  19.3.1.11.2          Cat. I Cable Pan Hangers - Calculations N  19.3.1.12.1          Electric Equipment Installation - BCAP
        $                      Observation Records un 19.3.1.12.2          Electric Equipment Installation - Calculations g
R  19.3.1.13.1          HVAC Duct - BCAP Observation Records a    19.3.1.13.2          HVAC Duct - Calculations (See also SAD Calc. 8.20.2-3.2    l 19.3.1.14.1          HVAC Equipment Installation - BCAP Observation Records 19.3.1.14.2          HVAC Equipment Installation - Calculations 19.3.1.15.1        HVAC Duct Hangers - BCAP Observation Records 19.3.1.15.2        HVAC Duct Hangers - Calculations 19.3.1.16.1        HVAC Housing and Plenums Fabrication - BCAP Observation Records 19.3.1.16.2        HVAC Housing and Plenums Fabrication -
Calculations
 
DESIGN CONTROL
 
==SUMMARY==
 
MOLE      --
DESIGN ELEMENT INDEX                        5
                                                                                            }
PROJECT NO. 4683/84 UNI'T NO.1& 2 PAGE 1 0F CALCULATIONS NO. 19.3.1              REV. 6    DATE /2 - / PS~
TABLE OF CONTENTS (con't)
Section              BCAP Population - Contents of Section 19.3.1.17          DELETED fo 19.3.1.18.1          Mechanical Equipment Installation - BCAP Observation Records 19.3.1.18.2        Mechanical Equipment Installation - Calculations 19.3.1.19.1        Touch Up Galvanizing HVAC Sheet Metal Duct Welds BCAP Observation Records
    ->  19.3.1.19.2        Touch Up Galvanizing HVAC Sheet Metal Duct Welds Calculatio'ns (See also SAD Calc. 8.20.2-3.2) 19.3.1.20.1        Large Bore Pipe Supports (Rigid) - BCAP Observation Records 19.3.1.20.2        Large Bore Pipe Supports (Rigid) - Calculations 19.3.1.21.1        Large Bore Pipe Supports (Non-Rigid) - BCAP Observation Records 19.3.1.21.2        Large Bore Pipe Supports (Non-Rigid) -
Calculations 19.3.1.22.1        Small Bore Pipe Supports - BCAP Observation Records C
19.3.1.22.2        Small Bore Pipe Supports - Calculations
      $ 19.3.1.23.1        Large Bore Pipe Configuration - BCAP Observation Records 6
9  19.3.1.23.2        Large Bore Pipe Configuration - Calculations 19.3.1.24.1        Instrument Pipe / Tube Supports - BCAP Observation Q
en Records g  19.3.1.24.2        Instrument Pipe / Tube Supports - Calculations 2  19.3.1.26.1        NSSS - BCAP Observations                                  6 i
i l
 
1
  ~
ATTACHMENT 4 SESD BCAP CALCULATIONS SECTION NO.              DESCRIPTION 4.5                  Braidwood Construction Assessment Program                    I (BCAP) 4.5.1                BCAP for Containment Wall
        -4.5.2.                Highly Stressed Containment Sections                        i
          ~
4.5.3-                Containment Liner Offsets and Bulges 4.5.                  RPV Support Analysis 4.5.5                NSSS Supports e
 
ATTACHMENT 5            (calculations for BcAP Trendi,c1 DESIGN CONTROL SDeMRY SARGENT&LUNDY                            DESIGN ELEMENT INDEX                  5
              = E NGIN8 8"* -
PROJECT NO. 4683/4 UNIT NO. 1g7
                                                                                        ]
PAGE ~2  0F CALCULATIONS NO. 19.4.1                REV.  () DATE t0 29 U TABLE OF CONTENTS Section              BCAP Population - Contents of Section 19.4.1.1.1          Concrete - Inspection Point Counts 19.4.1.1.2          Concrete - Discrepant Point Counts 19.4.1.1.3          Concrete - Surveys and Summaries 19.4.1.2.1          Structural Steel - Inspection Point Counts 19.4.1.2.2          Structural Steel - Discrepant Point Counts 19.4.1.2.3          Structural Steel - Surveys and Summaries 19.4.1.3            DELETED 19.4.1.4.1          Masonary Walls - Inspection Point Counts 19.4.1.4.2          Masonary Walls - Discrepant Point Counts 19.4.1.4.3          Masonary Walls - Surveys and Summaries 19.4.1.5.1          Containment Liner - Inspection Point Counts 19.4.1.5.2          Containment. Liner - Discrepant Point Counts 19.2.1.5.3          Containment Liner - Surveys and Summaries 19.4.1.6            DELETED 19.4.1.7            DELETED 19.4.1.8.1          Conduit - Inspection Point Counts 19.4.1.8.2          Conduit - Discrepant Point Counts j 19.4.1.8.3          Conduit - Surveys and Summaries 19.4.1.9.1          Cat. I Conduit Hangers - Inspection Point Counts d 19.4.1.9.2          Cat. I Conduit Hangers - Discrepant Point Counts 19.4.1.9.3          Cat. I Conduit Hangers - Surveys and Summaries z.
[ 19.4.1.10.1          Cable Pans - Inspection Point Counts 2
p 19.4.1.10.2          Cable Pans -- Discrepant Point Counts 19.4.1.10.3        Cable Pans - Surveys and Summaries 19.4.1.11.1        Cat. I Cable Pan Hangers - Inspection Point Counts 19.4.1.11.2        Cat. I Cable Pan Hangers - Discrepant-Point Counts 19.4.1.11.3        Cat. I Cable Pan Hangers - Surveys and Summaries 19.4.1.12.1        Electrical Equipment Installation - Inspection Point Counts 19.4.1.12.2        Electrical Equipment Installation - Discrepant Point Counts 19.4~l.12.3
          .              Electrical Equipment Installation - Surveys and Summaries
 
(Calculations for BCAP Trending)
DESIGN CONTROL
 
==SUMMARY==
 
SARGENT&LUNDY                          DESIGN ELEMENT INDEX                  o e NoiNe e'** -
PROJECT NO. _468 3/4 UNIT NO. 10          }
PACE  4  0F CALCULATIONS NO. 14_a 1                REV. O  DATE 10 7% 9I Section            BCAP Population - Content of Section 19.4.1.13.1        HVAC Duct - Inspection Point Counts                          !
l 19.4.1.13.2        HVAC Duct - Descrepant Point Counts                          j 19.4.1.13.3        HVAC Duct - Surveys and Summaries                            j 19.4.1.14.1        HVAC Equipment Installation - Inspection Point Counts        l 19.4.1.14.2        HVAC Equipment Installation - Discrepant Point Counts 19.4.1.14.3        HVAC Equipment Installation - Surveys and Summaries 19.4.1.15.1        HVAC-Duct Hangers - Inspection Point Counts 19.4.1.15.2        HVAC Duct Hangers - Discrepant Point Counts-19.4.1.15.3        HVAC Duct Hangers - Surveys and Summaries 19.4.1.16.1        HVAC Housing and Plenums Fabrication - Inspection
                      -Point Counts 19.4.1.16.2        HVAC Housing and Plenums Fabrication - Discrepant Point Counts 19.4.1.16.3        HVAC Housing and Plenums Fabrication - Surveys and Summaries 19.4.1.17          DELETED 19.4.1.18.1        Mechanical Equipment Installation - Inspection Point Counts
_ 19.4.1.18.2        Mechancial Equipment Installation - Discrepant Point
  ]                    Counts j 19.4.1.18.3        Mechanical Equipment Installation - Surveys and Summaries C 19.4.1.19.1        Touch-Up Galvanizing HVAC Sheet Metal Duct Welds -
U                    Inspection Point Counts
  $ 19.4.1.19.2        Touch-Up Galvanizing HVAC Sheet Metal Duct Welds -
[                    Discrepant Point Counts k
o 19.4.1.19.3        Touch-Up Galvanizina HVAC Sheet Metal Duct Welds -
Surveys and Summaries 19.4.1.20.1        Large Bore Pipe Supports (Rigid) - Inspection Point Counts 19.4.1.20.2        Large Bore Pipe Supports (Rigid) - Discrepant Point Counts 19.4.1.20.3        Large Bore Pipe Supports (Rigid) - Surveys and Summaries 19.4.1.21.1        Large Bore Pipe Supports (Non-Rigid) - Inspection Point Counts 19.4.1.21.2        Large Bore Pipe Supports (Non-Rigid) - Discrepant Point Counts
 
(Calculations for ECAP Trending)
DESIGN CONTROL
 
==SUMMARY==
 
SARGENT&LUNDY                                                              DESIGN ELEMENT INDEX                          5
                                                                  'ENeweens PROJECT NO. 4683/4 UNIT NO.                          1&2            3 FAGE f 0F CALCULAIIONS NO.-                    19.4.1                              REV. O          DATE 10 - 2c- Pr b l
Section                                          BCAP Population - Content of Section 19.4.1.21.3                                    Large Bore Pipe Supports (Non-Rigid) - Surveys and Summaries 19.4.1.22.1                                    Small Bore Pipe Supports - Inspection Point Counts 19.4.1.22.2                                    Small Bore Pipe Supports - Discrepant Point Counts 19.4.1.22.3                                    Small Boer Pipe Supports - Surveys and Summaries 19.4.1.23                                      DELETED 19.4.1.24.1                                    Instrument Pipe / Tube Supports - Inspection Point Counts l
I                            19.4.1.24.2                                    Instrument Pipe / Tube Supports - Discrepant Point I                                                                            Counts 19.4.1.24.3                                    Instrument Pipe / Tube Supports - Surveys and Summaries 19.4.1.25.1                                    Cable - Inspection Point Counts 19.4.1.25.2                                    Cable - Discrepant Point Counts 19.4.1.25.3                                    Cable - Surveys and Summaries 19.4.1.26.1                                    NSSS Supports - Inspection Point Counts 19.4.1.26.2                                    NSSS Supports - Discrepant Point Counts 19.4.1.26.3                                    NSSS Supports - Surveys and Summaries
                                            .. .                23          u s. c i a. - >- .O                  c,,)    .
O 7
N 1
Q m
I I          $
2 t
i l
 
r ATTACHMENT 6                          Braidwood Station
  -                                                                      *,      Units 1 & 2 BCAP FILE INDEX
* Commonwaalth Edison Co.
Projact No. 4683-38 7          File 40 - Braidwood Construction Assessment Program (BCAP)
: 1. Final Findings Report
: 2. BCAP Structural Calculation Index
: 3. Electrical Calculation Index
: 4. CSR-IE-COH Miscellaneous Correspondence, RE Checklist & Observations COH-4-1                            COH-58-2          C0H-121-4 COH-4-2                            COH-60-3          C0H-121-901 COH-4-3                            C0H-60-4          COH-121-902
                          'COH-5-1                            COH-62-)          C0H-121-903 s                          COH-5-2                            COH-62-901'      COH-122-1 COH-8-1                            COH-63-1          C0H-122              ]
C0H-8-2                            00H-65-2          C0H-123e1                l CCH-12-1                            COH-65-901        COH-126-1 C0H-12-2                            COH-66-2          C0H-126-3 COH-13-1                            COH-67-1          COH-127-1 COH-15-1                            COH-67-2        COH-128-l' C0H-15-2                            COH-67-3          C0H-130-1 C0H-15-3                          'C0H-69-1        COH-130-2 ~
C0H-24-1                            C0H-69-2          COH-132-L COH-26-1                            C0H-70-1        ~C0H-133-1 COH-26-2                            COH-72-1.        C0H-133-2
                          -C0H-27-1                            COH-72-2          COH-133-3
,.                        COH-30-1                            COH-76'-1        COH-133-9,01 1
COH-31-1                            COH-77-L        C0H-I34-1 C0H-31-049                          COH-77-2        COH-134-2 COH-32-1                            COH-77-3        C0H-134- 3 COH-32                          C0H-77-4.        C0H-136-1 C0H-34-1                            COH-102-1        COH-136-2 C0H-41-1                            COH-102-2        COH-13J-1 COH-44-1                            COH-105-1        COH-138-1 COH-47-l                            C0H-106      COH-139-1.
C0H 2                          COH-107-1        C0H-139-3 COH-47                        ' C0H-110-1;        C0H-139-4
                        -COH-49-1                            COH-110 2        C0H-143-901 COH-50-1                            COH-110-3        COH-144-2 COH-50-3~                          COH-11I-1        C0H-144-3 ~
C0H-52-1    .
C0H-112-1        COH-145-1 C0H-55-1                            COH-112-2        C0H-146-1 C0H-55-2                            COH-114-2        C0H-146-2 COH-55-3                          COH-ll4-3        COH-147-3 COH-55-4                          COH-115-1        COH-148-1
                        '_ COH-55-5 '                        C0H-ll7-1        COH-169-L COH-55-6                          C0H-ll7-2 .      . C0H-152- E COH-55-7                          COH-ll8-I        COH-152-2 COH-55-3                          -COH-119-2        COH-153-2 C0H-55-9                          C0H-120-1        C0H-154 -1 C0H-55-11                          C0H-120-2        C0H-154-3 COH-56-1                          C0H-121-1        C0H-155-1 C0H-58-1                          C0H-121-3        C0H-156-2
 
o
: 6.                        ,
: 4.            C0H-157-2
                      -COH-157-3.
COH-157-4=
: COH-158-1                                                              1 COH-158-2
                    'COH-160-1 C0H-160-2
: 5. CSR-IE-EIN Miscellaneous Correspondance. RE Checklist & Observations EIN-1-1      EIN-31-l~                      EIN-59-901  EIN-112-2  !
EIN-2-1      EIN-31-2                        EIN-62-1    EIN-112-3
                      'EIN-2-2        EIN-31-3                        EIN-62-2    EIN-113-2
                      -EIN-3-1        EIN-32-1                        EIN-63-1    EIN-ll3-3 EIN-3-2      EIN-32-2                        EIN-64-1    EIN-114-1 EIN-5-1      EIN-33-1                        EIN-64-3    EIN-114-2 EIN-6      EIN-34-1                        .EIN-66-1  EIN-115-1 EIN-8-1      EIN-36-1                        EIN-66-2    EIN-115-2 EIN-10-1      EIN-36-2                        EIN-68-l'  EIN-116-1 EIN-10-4      EIN-36-3                        EIN-68-2    EIN-116-2
:EIN-11-1        EIN-37-1                        EIN-70-2    EIN-117-1 EIN-11    EIN-38-2                        EIN-71-1    EIN-119-2
:EIN-11-901      EIN-38-3                        EIN-71-2    EIN-122-1 EIN-12-1      EIN-39-2                        EIN-72-1    EIN-122-2 EIN-13-1      EIN-42-1                        EIN-73-1    EIN-122-3 EIN-14-1      EIN-42-2                        EIN-73-2    EIN-125                          EIN-15-1. EIN-42-3                        EIN-73-3    EIN-125-2 EIN-16-2      EIN-43-2                      -EIN-75-1    EIN-126-1 iEIN-16-3        EIN-44-2                      - EIN-76-1  EIN-126-2 EIN-17    EIN-47-1                        EIN-76-2  EIN-126-3
                      'EIN-17-2      EIN-49-1                        EIN-78  EIN-127-1 EIN-17-3      EIN-49-2                      ~EIN-78-2    EIN-127-2 EIN-17-4    'EIN-50-1                        EIN-78-3  EIN-127-3 EIN-19-1      EIN-51-1                        EIN-78-901 EIN-128-2
!                      'EIN-19-2      EIN-52-1                        EIN-79-2  EIN-129                ^
                      <EIN-19-3      EIN-54-1                        EIN-80-2  EIN-129-2 i                      .EIN-19-4      EIN-55-1                        EIN-80-3  EIN-130-1 EIN-19-5      EIN-55-2                        EIN-101-1  EIN-131-1 EIN-20    EIN-55-3                        EIN-102-1  EIN-132-1 EIN-20-2      EIN-55-4                        EIN-104-1  EIN-132-2
                        .EIN-23-1      EIN-55-5                        EIN-104-2  EIN-133-1~
EIN-23-2    EIN-56-1                        -EIN-105-1  EIN-133-2 EIN-25-1    EIN-56-2                        EIN-105-2  EIN-134-1 EIN-25-2    EIN-56-901                      EIN-105-3  EIN-134-2 EIN-25-3'    EIN-56-902                      EIN-105-4  EIN-134-3 EIN-26-1    EIN-58-2                        EIN-107-1  EIN-134-356
                        'EIN-27-l'    EIN-58-3                        EIN-108-1  EIN-135-1 EIN-28-1    EIN-59-1                        EIN-111-1  EIN-135-2
                        -EIN-29-1      EIN-59-2                        EIN-111-2  EIN-136-1 A    _-__ - _ . _ _ _ ___
 
r;
        .-  L. ,
u, .                                                    .  .*
1,3
          '5.        EIN-137-1 EIN-138-1 i    EIN-138-2
                      .EIN-144-1 EIN-144-2 EIN=145-1 ~
EIN-145-2 EIN-146-2 EIN-146-3 EIN-146-4 EIN-146-5 EIN-147-2 EIN-147-3 EIN-147-4.
EIN-148-1.
: g.                    EIN-149-1 EIN-149-2 EIN-149-3 EIN-150-1 EIN-152-1 EIN-152                        EIN-153-1 EIN-154-1 EIN-154-2 EIN-155-1
                      -EIN-155-2 EIN-158-1 EIN-158-2 EIN-158-3 EIN-159-1 EIN-160-2
: 6. - CSR-IE-CBL Miscellaneous Correspondence, .RE Checklist 6 Observations 1CBL-2-2              CBL-17-3              C% "-                ~CBL-60-1 CBL-4-1              s'BL-18-1            .a.                  CBL-102-1 CBI-6-2              "FT-?l-1            GBL-40-2              CBL-102-2 CBL-8-1              CBL-21-278          CBL-46-2              CBL-102-3 CBL-9-1              CBL-22-1            CBL-49-112            CBL-103-1.
CBL-9-104.          CBL-22-116          CBL-50-1              CBL-103-3 CBL-10-1            CBL-22-901            .cL-50-2              CBL-104-1
                      .CBL-10-2            CBL-24-1            CBL-51-1              CBL-105-1 CBL-11            CBL-29-1            CBL-53-2              CBL-106 '
CBL-13-901          CBL-30-1            CBL-55-1              CBL-106-2 CBL-13-903          C3L-31-1            CBL-56-1              CBL-107-1 CB L-15-1            CEL-34-:            C3L-58-1              CBL-107-2 CBL-17-l'            CBL-34-3            .CBL-58-901            CBL-110-1 CBL-17-2            CBL-37-1            CBL-59-1              CBL-110-2
 
ry                                                                                                                          .
: 6.                                                    CBL-111-1                  7. . CSR-IE-CBP Miscellaneous Correspondence, RE checklist &
CBL-112-1                          Observations CBL-112-102
                                                                      .CBL-113-1                                  CBP-1-1 CBL-113-2                                                    CBP-44-2 CBP-1-901 CBL-114-1                                                    CBP-48-1.
CBP-3-1 l-                                                                      CBL-115-1                                                    CBP-51-1
'                                                                                                                  CBP-3-2 CBL-115-2.                                                    CBP-52-1 CBP-4-1 I
CBL-116-1.                                                1CBP-53-1 CBP-4-2 CBL-116-3                                                    CBP-59-2 CBP-5-1 I                                                                      'CBL-117-1                                                    CBP-60-1
      '                                                                                                            CBP-5-2
                                                                ' CBL-118-3                                                            CBP-101-1 CBP-6-1
!                                                                        CBL-119                                                    CBP-103-1
                                                                                                                  .CBP-6-2            CBP-104-1 CBL-119-2                                  CBP-6-3
!-                                                                      CBL-122-1                                                    CBP-104-2 CBP-7-1 CBL-122                                                -CBP-104-3 CBP-7-2 CBL-125-1                                                    CBP-105-1 CBP-8-2 CBL-126-1                                                    CBP-105-2 CBP-9-1 CBL-127-1 ~                                                  CBP-106-1 CBP-10-1~
:CBL-127                                                      CBP-106-2
                                                                                                                  -CBP-12-1 CBL-129-2                                                    CBP-106-3 CBP-12-2 CBL-129-3                                                    CBP-107-1 CBP-13-2~
                                                                      -CBL-129-4                                                      CBP-107-2 CBP-14-1                                    1 CBL-130-2                                                    CBP-108-1                I
                                                                                                                  'CBP-18-1 c                                                                      CBL-130-3                                                    CBP-108-2 CBP-19-2 CBL-130-4                                                    CBP-108-3 CBP-19-3            CBP-109-1
                                                                      -CBL-132-1                                  CBP-22-1 CBL-132-3                                                    CBP-110-1                1 CBP-24-1 CBL-133-2                                                    CBP-110-2 CBP-25-1 CBL-134-1                                                    CBP-112-1                i CBP-26-l'          CBP-113-1 CBL-134-2 .                              CBP-28-l'
                                                                      'CBL-137-1                                                      CBP-114-1 CBP-28-2 CBL-138-l'                                                    CBP-114-2 CBP-29-1
                                                                      .CBL-138-2                                                      CBP-115-1 CBP-29-2
                                                                      -CBL-139                                                    CBP-115-2 CBP-31-1 CBL-140-1                                                    CBP-115-3 CBP-33-1 CPL-143-1                                                -CBP-118-1 CBP-34-1 CBL-145-2                                                    CBP-118-3
)i-                                                                                                                CBP-34-2 CBL-145-901                                              .CBP-119-1 CBP-35-1 CBL-146-1                                                    CBP-120-1 CBP-35-3            CBP-122-1 CBL-146-2                                CBP-25-1
                                                                      'CBL-147-1                                                      CBP-122-2 CBP-37-1 R                                                                  'CBL-149-1.                                                    CBP-123-1
                                                                                                                'CBP-37-2            CBP-127-2 CBL-149-2                                CBP-38-1 CBL-153-1                                                    CBP-127-3 CBP-38-2 CBL-153-2                                                    CBP-128-1 CBP-38-3            CBP-128-2
                                                                      .CBL-154-1                                  CBP-38-4 CBL-155-1                                                    CBP-130-1 CBP-39-1 CBL-157-1                                                    CBP-130-3 CBP-39-2 CBL-158-1 ~                              CBP-41-1 CBL-159-1                                CBP-41-2 CBL-160-1.                                CBP-43-1
 
;p                                                    ,.                                            i l
        ~
: 8. CSR-IE-CND Miscellaneous Correspondence, RE checklist & Obeervations CND-1-1              .CND-57-5                  CND-95-2 CND-1-2                CND-58-1                  CND-95-3 CND-2-1                CND-58-2                  CND-96-1
~
CND-3-1                CND-59-1                  CND-97-1 CND-3-2                CND-59-2                  CND-98-1 CND-6-1                CND-60-1                  CND-98-2 CND-6-2                CND-61-2                  CND-101-1 CND-6-3                CND-62-2                  CND-110-1 CND-8-1                CND-63-2                  CND-110-2 CND-8-2                CND-64-1                  CND-113-1 CND-11-1              CND-64-2                  CND-114-1 CND-11-2              CND-64-3                  CND-115-1 CND-12-1              CND-67-2                  CND-Il7-1
                    'CND-12-2              CND-67-3                  CND-119-2 CND-13              CND-68-1                  CND-121-1 CND-13-2              CND-68-2                  CND-121-2 CND-14-1              CND-69-1                  CND-122-1 CND-15-1              CND-70-1                  CND-123-2 CND-16-2              CND-70-2 CND-18-1              CND-71-1      9. CSR-IE-CPH (in' Structural Department's CND-19-1              CND-71-2                    files)
CND-21-1              CND-73-2 CND-24-1              CND-73-3 10. CSR-IE-C0h-Details CND-24-3.              CND-73-4 CND-25-1              CND-73-5 11. CSR-IE-EIN-Details CND-29-2              CND-74-1 CND-29-3              CND-75-2 12. CSR-IE-CBL-Details CND-30-1              CND-77-1 CND-31-1              CND-79-1 13. CSR-IE-CBP-Details CND-31-2              CND-80                      CND-32-1              CND-80-2 14. CSR-IE-CND-Details CND-32-2              CND-81                      CND-33-1              CND-82-1 15. CSR-IE-CPH-Details (In Structural CND-37-1              CND-83-2                            Department's files)
CND-40-1              CND-83-3 CND-40-2              CND-84-901 CND-40-901            CND-85-2 CND-41-1              CND-86-1 CND-41-3              CND-86-2 CND-41-5.              CND-86-3 CND-42-1              CND-87-l '
CND-42-2              CND-88-1 CND-45-1              CND-88-2 CND-47-l'              CND-90-1 CND-48-1              CND-93-2 CND-49-1              CND-93-3
                    .CND-57-2              CND-95-1 a
 
  -i                                    ,,
TEO y                                                        CORREspgNC%4 08tEH F m wr~
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
                            .                '85 DEC 16 All :16 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD GFF!CE 0? SECRt lA; In the Matter of                      Y M hCH
                                                )
COMMONWEALTH EDISON COMPANY              )    Docket Nos. 50-456
                                                )                  50-457 (Braidwood Station Units 1 dnd 2)      )
CERTIFICATE OF CERVICE I,  Susan E. Babb, one of the attorneys for Common-wealth Edison Company, certify that copies of Applicant's
      . Fourth Partial Response to Rorem's Second Set of Quality Assurance Interrogatories and Request to Produce'have been served in the above-captioned matter on all persons listed on the attached Service List by United States nail, postage prepaid, this 13th day of December, 1985-except where service has been made as otherwise noted.
                                                                'h Susan E. Babb Isham, Lincoln & Beale
    .  .Three First National Plaza Chicago, Illinois 60602 (312)-558-7500 Dated: December 13, 1985
 
s                                        ..
9 SERVICE LIST Herbert Grossman, Esq.                      Mr. William L. Clements Chairman            .
Chief, Docketing and Services Administrative Law Judge                    United States Nuclear Regulatory Atomic Safety and Licensing                    Commission Board                                  Office of the Secretary United States Nuclear Regulatory            Washington, DC 20555 Commission Washington, DC    20555 Ms. Bridget Little Rorem 117 North Linden Street Dr.' Richard F. Cole                      P.O. Box 208 Administrative Law Judge                    Essex, IL  60935 Atomic Safety and Licensing Board
  . United States Nuclear Regulatory
* Robert Guild Commission                              Douglass W. Cassel, Jr.
Washington, DC  20555                    Timothy W. Wright, III BPI 109 North Dearborn Street Dr. A. Dixon Callihan                    -Suite 1300 Administrative Law Judge                  Chicago, IL 60602 102 Oak Lane Oak Ridge, TN  37830 Charles Jones, Director Illinois Emergency Services
  -Stuart Treby, Esq.                            and Disaster Agency Elaine I. Chan, Esq.                        110 East Adams Office of the. Executive Legal            Springfield, IL 62705 Director United States Nuclear. Regulatory Commission                            ' William Little, Director Washington, DC  20555                    Braidwood Project Region III United States Nuclear Regulatory Atomic Safety and Licensing                    Commission Board Panel                              799 Roosevelt Road United States Nuclear Regulatory            Glen Ellyn, IL  60137 Commission Washington, DC- 20555 Jan Stevens United States Nuclear Regulatory Atomic Safety and Licensing                    Commission Appeal Board Panel                      7920 Norfolk Avenue United States Nuclear Regulatory            Phillips Building Commission                              Bethesda, MD  20014 Washington, DC  20555
    *By Messenger Delivery on 12/13/85}}

Latest revision as of 08:53, 22 July 2020

Fourth Partial Response to Rorem Second Set of QA Interrogatories & Requests to Produce.W/Certificate of Svc.Related Correspondence
ML20138H938
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/13/1985
From:
COMMONWEALTH EDISON CO.
To:
ROREM, B.
References
CON-#485-500 OL, NUDOCS 8512170377
Download: ML20138H938 (25)


Text

,b 6

% ConggSPONDEN M

UNITED STATES OF AMERICA N

NUCLEARREGULATORYCOMR{E((D' BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

'85 DEC 16 A11 :16 In the Matter of )

t} p.t 0F 5!.CRti /A COMMONWEALTH EDISON COMPANY f)) M } k h Nos. 50-4560L-50-457 (Braidwood Station Units 1 and 2) )

APPLICANT'S FOURTH PARTIAL' RESPONSE TO ROREM'S SECOND SET OF QUALITY ASSURANCE INTERROGATORIES AND REQUESTS TO PRODUCE On October 21, 1985, Intervenors Rorem, et. al.

("Intervenors") filed their Second Set of Quality Assurance Interrogatories and Requests to Produce.

Applicant filed a first partial response on November 15, 1985 and responded to the remainder of the specific interrogatories in Intervenors' Second Set on November 22, 1985. On December 6, 1985, Applicant filed a third partial response which included indices to DCAP documents. This submission which is Applicant's Fourth i Partial Response supplements the indices in the Third Partial Response and provides indices to BCAP documents maintained by Sargent & Lundy.

BCAP DOCUMENTS

's indicated in Applicant's Third Pa.tial Response, therr < a massive volume of BCAP documentation created or taintained by the BCAP Task Force, BCAP QA, and Sargent &

Lundy. Applicant will make these documents available where Q

\303 ;

they are stored for Intervenors' inspection and copying.

Most of the BCAP Task Force and BCAP-QA documents are stored on the Braidwood site. Sargent & Lundy documents are maintained at either the Braidwood site or at Sargent &

Lundy's downtown offices located at 55 East Monroe Street, Chicago, Illinois 60603. Applicant needs at least one week's notice to arrange inspection of documents at the Braidwood site or at Sargent & Lundv's downtown offices.

Documents for which Applicant is asserting privi-lege have not been provided and are not available for inspection or copying. A privilege index will be provided indicating whether attorney client ("AC") or attorney work product ("WP") privilege is being asserted.

The first two attachments supplement the indices for the BCAP Task Force and BCAP QA provided in the Appli-cant's Third Partial Response. Attachment 1 supplements the Index Listing of BCAP Informal Files (Attachment 4 of Applicant's Third Partial Response). Attachment 2 is a listing of personnel associated with BCAP over the life of the program and their positions. Further investigation is proceeding to identify any other documents that concern BCAP. Supplements to indices will be provided as this process is completed.

Sargent & Lundy files which relate to BCAP are maintained by each of three departments within Sargent &

Lundy: Structural, Electrical and Mechanical. Files for J

0 6

the Structural and Electrical disciplines are located at Sargent & Lundy's downtown offices; files for the Mechanical discipline are located at the Braidwood site.

Sargent & Lunay_ files for the Mechanical discipline cover all piping populations (M-001 through M-015) and some HVAC/ Mechanical (H 002, H-005, H-006, and H-008). They consist of:

1) 4 Binders indexed by population number which typically contain for each population

- NCR signoff

- Copy of the inspection counting form

- Copy of the discrepancy counting form

- S&L write-up for that population

- Supplemental materials

2) 1 Calculation book organized by population number which contain copies of relevant calculations from Project Management Division (PMD)
3) 2 Boxes organized by population number which contain copies of observation records used for S&L evaluations related to that population.

The Structural Department calculations which relate to BCAP include calculations on the determination of the more highly stressed elements, inspection point counts and design significance of observations. Attach-ments 3 and 4 are indices for these calculations. Attach-ment 5 is an index of Structural Department's calculations for BCAP Trending.

Attachment 6 is a file index for the Electrical Department. The total volume of these files is approximately one file drawer and three binders. Calculations prepared by Structural Department to resolve discrepancies found by i

Electrical-Department have been integrated.with other calculations maintained by Structural Department.

Investigation continues for Sargent & Lundy documents which are not maintained in formal official filing systems.

i l

b i

l t

r l

1 I

i l

l i

l l

1.

1 ATTAC11 MENT 1' INDEX LISTING OF BCAP INFORMAL FILES ADDITIONS 325. Box of Observation Audit files - Load Forms RSCAP CSR-R.G. CEA CSR-R.G. CTG CSR-R.G. ELE.

CSR-R.C. 999 CSR-I.E. EIN CSR-I.E. CBP CSR-I.E. CND CSR-I.E. CBL < .

CSR-I.E. COH CSR-I.E.'CPH CSR-R.E. CBL CSR-R.E. CBP CSR-R.E. CND CSR-R.E. COH CSR-R.E. CPH CSR-R.E. EIN CSR-I.H. 001 CSR-I.H. 002 CSR-I.H. 003 CSR-I.H. 004 CSR-I.H. 005 CSR-I.H. 006 CSR-I.H. 007 CSR-I.H. 008 CSR-I.H. 010 CSR-R.H. 001 CSR-R.H. 002 CSR-R.H. 003 CSR-R.H. 004 CSR-R.H. 005 CSR-R.H. 006 CSR-R.H. 007 CSR-R.H. 008 CSR-R.H. 010 CSR-I.M. 001 CSR-I.M. 002 CSR-I.M. 003 CSR-I.M. 004 CSR-I.M. 005 CSR-I.M. 006 CSR-I.M. 007 CSR-I.M. 009 CSR-I.M. 011 CSR-I.M. 012 CSR-I.M. 015 0550H/ December 12, 1985

E CSR-R.M. 001 CSR-R.M. 002 CSR-R.M. 003 CSR-R.M. 004 CSR-R.M. 005 CSR-R.M. 006

.CSR-R.M.'007 CSR-R.M. 009 CSR-R.M. 011 CSR-R.M. 012 CSR-R.M. 015 CSR-R.S. 001 CSR-R.S. 002

-CSR-R.S. 003 CSR-R.S. 004 CSR-R.S. 005 CSR-R.S. 006 CSR-R.S. 007 326. Box of files containing documents under QG 69.30.4 thru 69.30.7 which d1d not go to QA Vault.

Q.C. 69.30.6.6 C-ELE AWS D1.1 Welds (Electrical Work)

Q.G. 69.30.6.6 G-ND1 Review of NDE Documentation Q.C. 69.30.6.6 ~G-NFS Visual Inspection of ASME Welds (NF)

Q.G. 60.30.6.6 CEA Assemblies Q.G. 69.30.6.6 G-ASM Visual Inspection of ASME Welds, NB, NC, ND Q.G. 69.30.6.6 C-CTC Visual Inspect 1on of Coatings

~Q.G. 69.30.6.6 G-D13 AWS D1.3 Visual Weld Inspection Q.G. 69.30.6.6 G-NEW AWS D1.1 Welds (Stiffeners for Electrical Work)

Q.G. 69.30.6.6 G-Dil AWS D1.1 Visual Inspection Q.C. 69.30.7.7 EIN Electrical Equipment Installatlon

-Q.C. 69.30.4.1 EIN Electrical Equipment Installatlon Q.G. 69.30.4.1 COM Category I Condult Hangers Q.G. 69.30.7.7 COM Category I Conduit Hangers Q.G. 69.30.7.9 CND Conduit Q.C. 69.30.4 CND Conduit Q.G. 69.30.4 CPN Category I Cable Pan Hangers Q.G. 69.30.7 CPH Category I Cable Pan Hangers Q.G. 69.30.4.1 CBL Cables Q.G. 69.30.7.7 CBL Cables Q.G. 69.30.4.1 CBP Cable Pars Q.C. 69.30.4.3 CBP Cable Panu Q.G. 69.30.7.7 CBP Cable Pant Q.G. 69.30.4.1 (H-10) NSSS F.qulpment Support Q.C. 69.30.4.1 (H-08) MSSS Equipment Installation Q.C. 69.30.4.1 (H-07) Touch Up Galvanizing for HVAC Sheet Metal Duct Welds Q.G. 69.30.4.1 (H-06) Mechanical Equipment Installation

  • Q.G. 69.30.4.1 (H-05) Mechanleal Equipment-Fleid Fabricated Tanks Q.G. 69.30.4.1 (H-04) HVAC Houslng & Plenums Fabrication Q.C. 69.30.4.1 (H-03) HVAC Hangers and Aux. Steel Q.G. 69.30.4.1 (H-02) HVAC Equlpment Installation 4

0550H/ December 12, 1985

.s Q.C. 69.30.7.7 (H-01) HVAC Duct HVAC-N-01 Q.C. 69.30.4.1 M-1 Small Bore Piping Configuration Q.G. 69.30.4.1 M-2 Large Bore Rigid Pipe Supports ITT Grinnell, ELECEN and Corner & LADA Catalogs CSR-I-M-2, CSR-I-N-3, CSR-I-M-6

, Q.G. 69.30.7.7 M-2 Large Bore Rigid Pipe Supports Q.C. 69.30.4.1 M-3 Large Bore Non-Rigid Pipe Supports Q.G. 69.30.4.1 M-4 Large Bore Piping Configuration Population M-4 Large Bore Piping Configuration Population List Q.G. 69.30.4.1 M-5 Piping System Bends Q.C. 69.30.4.1 M-6 Small Bore Piping Supports Q.G. 69.30.4.2 M-7 Large Bore Pipe Whip Restraints Q.C. 69.30.4.1 M-8 Small Bore Pipe Bolted Joints Q.G. 69.30.4.1 M-9 Small Bore & Instrument Pipe / Tube Welds Q.G. 69.30.4.2 M-10 small Bore Pipe Bends Q.C. 69.30.4.2 M-11 Large Bore Pipe Bolted Joints Q.G. 69.30.4.1 M-12 Large Bore Pipe Welds Q.G. 69.30.4.2 M-13 Inst. Pipe / Tube Bolted Joints Q.G. 69.30.4.1 M-15 Inst. Pipe / Tube Supports S-001, Concrete Placements S-002, Structural Steel

.S-003, Cored Holes S-004, Masonry Walls S-005, Liners S-006, cadwelds S-007, Post-Licensing i

327. Box containing miscellaneous files and working papers:

BCAP Reinspection Observation Status - Computer printout approx 15 pp long' 1 Black Binder labeled Malrix contains CSR-R-E-CND BCAP Summary of.

Observations 1 Brown Binder labeled "BCAP QA Equipmant Report HVAC Work H-02" PSM's Computer Printout list used as source for population items

)

1 Brown Binder labeled "BCAP QA Duct Report HVAC Work CSR-H-01 69.30.7" 1 Black Binder labeled "ECAP Drawing Index" CSR BCAP Record of Review, Field Transmittal Forms, Document Review Sheets, all CSR-R-H-08 and CSR-I-H-07 Steering Group Meeting Notes / Comments, handwritten to Patterson CSR Supervisor from T.J. Lynch, CSR HVAC Support Engineer with Doc Review Sheets, and Checklists i

0550H/ December 12, 1985 i

)

BCAP Field Transmittal Forms for CSR-I-S-001 with attached tabulation

,. of samples of highly stressed concrete elements l Speed letter from A.A. Patterson BCAP CSR Supv. re selection of "More Highly Stressed Items" with attached S&L transmittals on subject  ;

Field transmittal forms re highly stressed small and large bore piping speed letters ce highly stressed items requesting lists Package of Field Transmittal Forms and attachments ce highly stressed

items from D.M. Fischer with attached tabulations.

Speed letter and attachments re more highly stressed Cable Pan Hangers to Fischer from Willoughby for sample i'

Package of Memos related to sample selection for safety related systems

+

I S&L Field Transmittal Forms re listing of highly stressed items 1-2 copies Transmittal to BCAP files sheet for CSR-5-001 Concrete Placement 9 Att, sample codes, reinspection list, list of HVAC Ducts Memo unidentified and undated re BCAP treament of Highly Stressed Items

, S&L Highly stressed Areas / Items Schedule for submittal to CECO BC P dated 1/10/85 2

Handwritten note, 10/2/84, re CSR-I-5-001 S&L comments Typed notes re BCAP Treatment of more highly stressed items and sample selection has some handwritten notes of unidentified origin 4

. 3/22/85 BCAP note to Kaushal re Status of High Stress list and High 2

' stress Elements Flowpath Chart for BCAP drawing review, SI review, S-002 Structural t

. Steel initialed CAB dated 3/8/85 6

S&L Interoffice Memo w/att, re BCAP Highly Stress Areas / Items discusses sample identification, transmittal guides, requirements, and schedules Handwritten notes dated 1/16 re additional info needed from S&L S&L transmittals w/att. re highly stressed elements, conduits, cable, 4

all dated 1/85 time frame I stack approx 4" high of manilla envelope flies - appear to be copies j of file drawers. Package is labeled i

i 4

4 1

! 0550H/ December 12, 1985 i .

- ,- -. .. . . . . _ _ - - _ - _ _ _ . . - . _ _ , . _ _ _ _ _ , . . - - _ ,,,,.,, n. , , , , . . - , _ _ . . - . - , _ - - - ._ .

t ATTACHMENT 2 PERSCNNE_ C= ,E 30u :cJE:-

03-;4-1985 AT 21:53 Page -

INI NAME JOB YPE AM A. MORNICK Ss PORT ENG; A~ A. TERGEVORKIAN '

M/P SUPPORT ENGR A* ^:

. A. TANHA ,' 'ELECTRICA_ INSPECTOR AAP A.A.PATTERSON SUPV-CSR AGD A.G.PA?ANIKOLAQU M/P SUPPCRT ENGR ANG A. NG M/P SUPPORT ENGR BJ 'W.F.JCSEY ,

MECH /WE D INSPECTCR DJF 'D.J. FLACK q CIVIL / STRUCTURAL INSPECTOR BWG ^B.W.GATu!N M/D SUPPORT ENGR CL C.B.LARSEN NDE ENGR CAH C.A. HALL. LEAD MATERIAL ENGR CAS C.A. SWARD '-

- C/S SUPPORT ENGR CEG C.E. GOODMAN RPSR TECN ASST~

CET C.E. THOMPSON , CIVIL / STRUCTURAL INSPECTOR CJK C.J.KIM C/S' SUPPORT ENGR CJP C.J.PASSERI LEAD CIVIL / STRUCTURAL ENGR D0 D.H.GOSSETT CIV.IL/ STRUCTURAL INSPECTOR DM D. McAFEE SENIOR DANIELG REPRESENTATIVE *

, DP D. PATEL ^ '

LEAD ELEC ENGR -

DE D. SHIH -

M/P SUPPO'RT ENGR DAH D.A.HALEY S&L LIAGON REP / LEAD ELEC EVALUATOR lj DCR D.C.RICHARDS BCAP GA ELEC INSPECTOR

.j DEA .D.E.ARMSTRONG ELECTRICAL INSPECTOR DFB D.F.BURLISON SUPPORT' SERVICES DJW D.J.WILLC ASST SUPV-CSR

'. DLO D.L.CROLL BCAP 09 ELEC INSPECTOR

, DwM D.L.MCCAE . E EC INSPECTOR DLR D.L.ROLLINS CIVIL / STRUCTURAL INSPECTOR DR D.L.'RANSTROM ,

, BCAP GA ENGR / TECH ASST DLS D.L. SMITH BCAP GA INSPECTION COORDINATOR DMF D.M.FISCHER S&L LIASON-REPRESENTATIVE DRW D.R. WALKER MECH / WELD' INSPECTOR DSG D.S.GREWAL ELEC SUPPORT ENGR ED E. DOUCARELLIS TECHNICAL WRITER CH E. HORLBECK M/P SUPPORT ENGR EEF E.E.FITZPATRICK ASST MANAGER GR EMS E.M.SHEVLIN LEAD MECH / WELD INSP EP3 ~E.P.SMOLA ELECTRICAL INSPECTOR ERK .E.R.KURTZ RSCAP TECn ASST FS F.I.STARR MECH / WELD INSPECTOR

FU '

F. ,ULU .

HVAC SUPPORT ENGR l, . FW F. WOZNIAK .RPSR SUPPORT ENGR

!'" fad .~F.A.KOVENSKY 'C/S SUPPORT ENGR FJM ... F.J.MILwER C/S SUPPORT ENGR FWM F.W.MUSSELMAN INSPECTION COORDINATOR

, GK G. KAN RPSR SUPPORT ENGR

, GL G. LUTHER M/P SUPPORT ENGR GM G.A.McCONAGHY DCC. REVIEW INSPECTOR GO G. PAN ,' ^

V/D SJPsO47 ENGR GD_ G.D..CNG. 'C IV!L/ STR'JOTUR A- INSPECTCR 3EC G. E. C CSSALCC.r. BCAP GA ENGR / TECH ASST GJS G.J.SUTTON - MECH INSPECTCR GJ G.L.JCDREY BCAP QA C/E-TEC-/wE_C INS ZCT::.

+r-

. . ~ . -- . - , , , - - , - - , , . ,

. PERSONNE CF TnE BCPC CRCJECT 09-14-1985 AT 2I:53 ;a;e E INI NAME JCB YPE GLR G.L.ROTH CIVIL /STRUCTURAw INSPECTOR GMK G.M.KERZNER LEAD MECH / PIPING ENGR / MATERIAL SPEC CMO G.M.ORLOV ASST DIR GRR G.R.RILEY CIVIL / STRUCTURAL INSPECTOR HR H. RAMCHANDRA MECH / PIPING / MAT /RPSR SUPPORT ENGR HW H.E. WILLIAMS CSR-CLERICAL HLV H.L.VENER TECH ASST HMS H.M.SIGREST MECH INSPECTOR HWN H.W.NORRIS MECH / WELD INSPECTOR

-J G J. GILDOR HVAC SUPPORT ENGR JK J. KONOWAL BCAP QA WELD /ELEC INSPECTOR JR J.L.ROLLINS ^

CIVIL / STRUCTURAL INSPECTOR JS J. STACOM SUPPORT ENGR JAA J.A.ALBERGHINI M/P SUPPORT ENGR JAP J.A.PATTON M/P SUPPORT ENGR JAU J.A. ULLMAN ELECTRICAL INSPECTOR

'JAZ J.A.~ZYCH -BCAP QA SPECI AL PROJECTS ENGR ,

JCG J.C.GILMAN WELD INSPECTOR JCN J.C. NELSON

~

ELEC SUPPORT ENGR JCT J.C. THOMPSON ASST SUPV-CSR JLE J.L.EDMONDSON ELECTRICAL INSPECTOR JMC J.M.CUMISKEY TECH ASST JPM J.P.MATZ ELEC SUPPORT ENGR JPM J.P.MESSARD BCAP QA SUPPORT STAFF JPS J.P.STEVENS ELEC SUPPORT ENGR

-JRD J.R.DESAI M/P SUPPORT ENGR JRF J.R. FLETCHER QUALITY ENGR JRW J.R.WOZNIAK ELECTRICAL INSPECTOR JOS- J.S. SEXTON LEAD CIVIL / STRUCTURAL INSPECTOR JWH J.W.HAMLER BCAP QA PTL SUPV JWV J.W.VANDELICHT SUPPORT SERVICES LEAD KD. K.W.DANIELS WELD INSPECTOR KRN K.R.NOVATNY S&L LIASON REPRESENTATIVE KRR K.R.RICHEY ELECTRICAL INSPECTOR KTK K.T.KOSTAL S&L PROJECT ENGR

-L R L.D. RAPHAEL M/P SUPPORT ENGR LAS L.A.SHEA LEAD ELECTRICAL INSPECTOR LDB L.B. BROWN WELD INSPECTOR LhS L.H.STROPE RSCAP LEAD MECH / PIPING ENGR LPn L.P.HUME ELECTRICAL INSPECTOR LRD L.R.DUSS M/P SUPPORT ENGR LSa L.S. WEISS DEPUTY SWEC MGR LSW L.S.WIGLEY RPSR TECH ASST LTR L.T.ROUEN RSCAP LEAD STRUCTURAL /HVAC ENGR MA M.R.ANANTHARAMAN ELEC SUPPORT ENGR MB . M. BOGLE CERT /TRNG ADMIN

, MG M. GANDHI M/P SUPPORT ENGR

.Y K M. KLAYMAN ADMIN ENGR /RECCRDS ADMIN MAC F.. A .' C L I N T C N INSPECTICA SUPV MAK M.A.KIRXAN- /S/.-VAC SJP? ORT ENGR PAT X.A.TERPENIN3 'SJPPORT SERVICES 72K m. ADPP RSCAP LEAD'ELEC ENGR v,Jr. M.J. MAJOR MECn/wEuD INSPEC CR

, PERSONNE CF THE BCAP PROJECT 09-14-1985 AT 21:53 Page 3 INI NAME [ JOB TYPE MJM M.J.MURRAY BCAP GA MECH / WELD INSPECTOR MJM M.J. WOODS BCAP GA C/S INSPECTOR MJS M.J.SCHNEIDER MATERIAL SUPPORT ENGR MLW M.L. WILLIAMS CERT /TRNG ADMIN MNS M.N. SHAH HVAC SUPPORT ENGR MOM M.O.McCRADY l RSCAP SUPPORT ENGR I MOS M.O. SMITH CIVIL / STRUCTURAL INSPECTOR MPM M.P.MURSKYJ ELEC SUPPORT ENGR MRD M.R.DOUGHERTY SUPV-RSCAP MRM M.R.MODERSKI ASST SUPV-RPSR NB N. BANERJEE RPSR LEAD STRUCTURAL /HVAC ENGR N5 N. SZABAT PLANNING A SCHEDULING ENGR NW N. WADHIA HVAC SUPPORT ENGR NZC N.B. COHEN HVAC SUPPORT ENGR NNK N.N.KAUSHAL DIRECTOR NP2 N.P. SMITH GENERAL SUPERVISOR QA OAZ O.A.ZDSULS SUPPORT ENGR f AA P. AMORUSO~ SUPV-RPSR y i

PAL P.A.LAU BCAP GA ENGR / TECH ASST

~

~

l PJT P.J. THOMPSON MECH / WELD INSPECTOR

~

I PLC P.L.CHUMBLEY ELEC SUPPORT ENGR PRM P. R. MULE' LEAD HVAC ENGR PSJ P.S. JONES MECH / WELD INSPECTOR PTG P.T.GIANGRECO C/S SUPPORT ENGR RD R.L.DURHAM M/P INSPECTOR RP R.N.PLUMMER SUPPORT SERVICES RS R. SWEET BCAP GA SUPPORT STAFF RAB R.A.BECKFORD HVAC SUPPORT ENSR

- RCC R.C. CANNON BCAP QA O/O GRC.'JP SUPERVISOR RES R.E. SPENCE BCAP GA RSCAP LEAD ENGR RFW R.F. WILLIAMS BCAP GA CSR LEAD ENGR RGW R.G. WILLIAMS BCAP GA MECH / WELD INSPECTOR RJA R.J.AHO WELD INSGECTOR RJT R.J.TRIESTE M/P SUPPORT ENGR RKR R.K.RAMSGATE r, - BCAP GA ENGR / TECH ASST RLB R.L.B  ;. " -

ASST DIR <

RLS R.L.S ERG C/S FuPPORT ENGR RMB R.M.B EN LEAD CIVIL /ETRUCTURAL ENGR ^

RYC RcY.C e M/P SUPPORT ENGR OD' S. D ,_.4' HVAC SUPPORT ENGR SS S. SIPPEL- ELEC SUPPORT ENGR CCW S.C. WANG ELEC SUPPORT ENGR SDB S.P.DiBIASO BCAP GA DOCUMENT COORDINATOR SLM S.L. MANOR C/S SUPPORT ENGR SLM S.L.McGRAW MECH / WELD INSPECTOR CRM S.R. MODI HVAC SUPPORT ENGR '

SWC S.W.CROWE LEAD MECH / PIPING ENGR TA T.J. ADAMS SUPPORT ENGR TF .T. FLYNN ADMIN ENGR TAP T.A. PARKER RSCAP SUPPORT / RECORDS ADMIN ENGR TCV T.C.VOLKART CIVIL /STRUCTURAw INSPECTOR TES T.E.STEPHENSON M/P SUPPORT ENGR TnA T.H.ARMSTRONG SUPPORT SERVICE / MECH / WELD INSDEC C; i

O PERSONNE_ LF TnE BCAP PROJECT 09-14-1985 AT 21:53 Page a 8NI NAME JOB 'YPE TJL T.J. LYNCH hVAC SUPPORT ENGR TJR T.J.RYAN -

TECH ASST .

TJV T.J.VAUGmN JR. RPSR LEAD MECn/PIPI.N3 EN3R TwC T.L.CHANEY MECH / WELD INSPECTOR

.TRY T.R. YOUNG MECH / WELD !.NSPECTOR VM V. ~MEHTA C/S SUPPORT. ENGR VAH V.A.HOFFMAN SWEC SITE ~MGR VJP V.J.PATEL E EC SUPPORT ENGR VJT V.J.' TURNER RPSR LEAD ELEC EN3R WW W. WILLOLGHBY SUPV-CSR/ TECH ASST WCB W.C.BRIMB ECOM ADMIN ENGR / RECORDS ADMIN WEE W.E.EAMES MECH / WELD INSPECTOR '

WJM W.J.MARCIS BCAP GA ENGR / TECH ASST WM3 W.M. SIDES BCAP QA RPSR LEAD ENGR WMY .W.M.YEE M/P SUPPORT ENGR .

TOTAL -

~ ~

Printed 174 of the 174 records.

9 d

e I

,. . . . . , s,... -. .- = e .-_

ATTACHMENT 3 G: -

DESIGN CONTROL

SUMMARY

M&lE DESIGN ELEMENT INDEX E e orr-- PROJECT NO. 4683/84 UNIT NO. 1&2 3 PAGE 7 0F CALCULATIONS No. 19.3.1 REV. 6 DATE /2 f5-l TABLE OF CONTENTS Section BCAP Population - Contents of Section '

19.3.1.1.1 Concrete Placement - BCAP Observation Records 19.3.1.1.2 Concrete Placement - Calculations 19.3.1.2.1 Structural Steel - BCAP Observation Records 19.3.1.2.2 Structural Steel - Calculations 19.3.1.3 DELETED b 19.3.1.4.1 Masonry Walls - BCAP Observation Records 19.3.1.4.2 Masonry Walls - Calculations 19.3.1.5.1 Containment Liner - BCAP Observation Records 19.3.1.6 DELETED g 19.3.1.7 DELETED l 19.3.1.8.1 Conduit - BCAP Observation Records 19.3.1.8.2 Conduit - Calculation 19.3.1.9.1 Cat. I Conduit Hangers - BCAP Observation Records 19.3.1.9.2 Cat. I Conduit Hangers - Calculations 19.3.1.10.1 Cable Pans - BCAP Observation Records o 19.3.1.10.2 Cable Pans - Calculations

$ 19.3.1.11.1 Cat. I Cable Pan Hangers - BCAP Observation

  • Records 9 19.3.1.11.2 Cat. I Cable Pan Hangers - Calculations N 19.3.1.12.1 Electric Equipment Installation - BCAP

$ Observation Records un 19.3.1.12.2 Electric Equipment Installation - Calculations g

R 19.3.1.13.1 HVAC Duct - BCAP Observation Records a 19.3.1.13.2 HVAC Duct - Calculations (See also SAD Calc. 8.20.2-3.2 l 19.3.1.14.1 HVAC Equipment Installation - BCAP Observation Records 19.3.1.14.2 HVAC Equipment Installation - Calculations 19.3.1.15.1 HVAC Duct Hangers - BCAP Observation Records 19.3.1.15.2 HVAC Duct Hangers - Calculations 19.3.1.16.1 HVAC Housing and Plenums Fabrication - BCAP Observation Records 19.3.1.16.2 HVAC Housing and Plenums Fabrication -

Calculations

DESIGN CONTROL

SUMMARY

MOLE --

DESIGN ELEMENT INDEX 5

}

PROJECT NO. 4683/84 UNI'T NO.1& 2 PAGE 1 0F CALCULATIONS NO. 19.3.1 REV. 6 DATE /2 - / PS~

TABLE OF CONTENTS (con't)

Section BCAP Population - Contents of Section 19.3.1.17 DELETED fo 19.3.1.18.1 Mechanical Equipment Installation - BCAP Observation Records 19.3.1.18.2 Mechanical Equipment Installation - Calculations 19.3.1.19.1 Touch Up Galvanizing HVAC Sheet Metal Duct Welds BCAP Observation Records

-> 19.3.1.19.2 Touch Up Galvanizing HVAC Sheet Metal Duct Welds Calculatio'ns (See also SAD Calc. 8.20.2-3.2) 19.3.1.20.1 Large Bore Pipe Supports (Rigid) - BCAP Observation Records 19.3.1.20.2 Large Bore Pipe Supports (Rigid) - Calculations 19.3.1.21.1 Large Bore Pipe Supports (Non-Rigid) - BCAP Observation Records 19.3.1.21.2 Large Bore Pipe Supports (Non-Rigid) -

Calculations 19.3.1.22.1 Small Bore Pipe Supports - BCAP Observation Records C

19.3.1.22.2 Small Bore Pipe Supports - Calculations

$ 19.3.1.23.1 Large Bore Pipe Configuration - BCAP Observation Records 6

9 19.3.1.23.2 Large Bore Pipe Configuration - Calculations 19.3.1.24.1 Instrument Pipe / Tube Supports - BCAP Observation Q

en Records g 19.3.1.24.2 Instrument Pipe / Tube Supports - Calculations 2 19.3.1.26.1 NSSS - BCAP Observations 6 i

i l

1

~

ATTACHMENT 4 SESD BCAP CALCULATIONS SECTION NO. DESCRIPTION 4.5 Braidwood Construction Assessment Program I (BCAP) 4.5.1 BCAP for Containment Wall

-4.5.2. Highly Stressed Containment Sections i

~

4.5.3- Containment Liner Offsets and Bulges 4.5. RPV Support Analysis 4.5.5 NSSS Supports e

ATTACHMENT 5 (calculations for BcAP Trendi,c1 DESIGN CONTROL SDeMRY SARGENT&LUNDY DESIGN ELEMENT INDEX 5

= E NGIN8 8"* -

PROJECT NO. 4683/4 UNIT NO. 1g7

]

PAGE ~2 0F CALCULATIONS NO. 19.4.1 REV. () DATE t0 29 U TABLE OF CONTENTS Section BCAP Population - Contents of Section 19.4.1.1.1 Concrete - Inspection Point Counts 19.4.1.1.2 Concrete - Discrepant Point Counts 19.4.1.1.3 Concrete - Surveys and Summaries 19.4.1.2.1 Structural Steel - Inspection Point Counts 19.4.1.2.2 Structural Steel - Discrepant Point Counts 19.4.1.2.3 Structural Steel - Surveys and Summaries 19.4.1.3 DELETED 19.4.1.4.1 Masonary Walls - Inspection Point Counts 19.4.1.4.2 Masonary Walls - Discrepant Point Counts 19.4.1.4.3 Masonary Walls - Surveys and Summaries 19.4.1.5.1 Containment Liner - Inspection Point Counts 19.4.1.5.2 Containment. Liner - Discrepant Point Counts 19.2.1.5.3 Containment Liner - Surveys and Summaries 19.4.1.6 DELETED 19.4.1.7 DELETED 19.4.1.8.1 Conduit - Inspection Point Counts 19.4.1.8.2 Conduit - Discrepant Point Counts j 19.4.1.8.3 Conduit - Surveys and Summaries 19.4.1.9.1 Cat. I Conduit Hangers - Inspection Point Counts d 19.4.1.9.2 Cat. I Conduit Hangers - Discrepant Point Counts 19.4.1.9.3 Cat. I Conduit Hangers - Surveys and Summaries z.

[ 19.4.1.10.1 Cable Pans - Inspection Point Counts 2

p 19.4.1.10.2 Cable Pans -- Discrepant Point Counts 19.4.1.10.3 Cable Pans - Surveys and Summaries 19.4.1.11.1 Cat. I Cable Pan Hangers - Inspection Point Counts 19.4.1.11.2 Cat. I Cable Pan Hangers - Discrepant-Point Counts 19.4.1.11.3 Cat. I Cable Pan Hangers - Surveys and Summaries 19.4.1.12.1 Electrical Equipment Installation - Inspection Point Counts 19.4.1.12.2 Electrical Equipment Installation - Discrepant Point Counts 19.4~l.12.3

. Electrical Equipment Installation - Surveys and Summaries

(Calculations for BCAP Trending)

DESIGN CONTROL

SUMMARY

SARGENT&LUNDY DESIGN ELEMENT INDEX o e NoiNe e'** -

PROJECT NO. _468 3/4 UNIT NO. 10 }

PACE 4 0F CALCULATIONS NO. 14_a 1 REV. O DATE 10 7% 9I Section BCAP Population - Content of Section 19.4.1.13.1 HVAC Duct - Inspection Point Counts  !

l 19.4.1.13.2 HVAC Duct - Descrepant Point Counts j 19.4.1.13.3 HVAC Duct - Surveys and Summaries j 19.4.1.14.1 HVAC Equipment Installation - Inspection Point Counts l 19.4.1.14.2 HVAC Equipment Installation - Discrepant Point Counts 19.4.1.14.3 HVAC Equipment Installation - Surveys and Summaries 19.4.1.15.1 HVAC-Duct Hangers - Inspection Point Counts 19.4.1.15.2 HVAC Duct Hangers - Discrepant Point Counts-19.4.1.15.3 HVAC Duct Hangers - Surveys and Summaries 19.4.1.16.1 HVAC Housing and Plenums Fabrication - Inspection

-Point Counts 19.4.1.16.2 HVAC Housing and Plenums Fabrication - Discrepant Point Counts 19.4.1.16.3 HVAC Housing and Plenums Fabrication - Surveys and Summaries 19.4.1.17 DELETED 19.4.1.18.1 Mechanical Equipment Installation - Inspection Point Counts

_ 19.4.1.18.2 Mechancial Equipment Installation - Discrepant Point

] Counts j 19.4.1.18.3 Mechanical Equipment Installation - Surveys and Summaries C 19.4.1.19.1 Touch-Up Galvanizing HVAC Sheet Metal Duct Welds -

U Inspection Point Counts

$ 19.4.1.19.2 Touch-Up Galvanizing HVAC Sheet Metal Duct Welds -

[ Discrepant Point Counts k

o 19.4.1.19.3 Touch-Up Galvanizina HVAC Sheet Metal Duct Welds -

Surveys and Summaries 19.4.1.20.1 Large Bore Pipe Supports (Rigid) - Inspection Point Counts 19.4.1.20.2 Large Bore Pipe Supports (Rigid) - Discrepant Point Counts 19.4.1.20.3 Large Bore Pipe Supports (Rigid) - Surveys and Summaries 19.4.1.21.1 Large Bore Pipe Supports (Non-Rigid) - Inspection Point Counts 19.4.1.21.2 Large Bore Pipe Supports (Non-Rigid) - Discrepant Point Counts

(Calculations for ECAP Trending)

DESIGN CONTROL

SUMMARY

SARGENT&LUNDY DESIGN ELEMENT INDEX 5

'ENeweens PROJECT NO. 4683/4 UNIT NO. 1&2 3 FAGE f 0F CALCULAIIONS NO.- 19.4.1 REV. O DATE 10 - 2c- Pr b l

Section BCAP Population - Content of Section 19.4.1.21.3 Large Bore Pipe Supports (Non-Rigid) - Surveys and Summaries 19.4.1.22.1 Small Bore Pipe Supports - Inspection Point Counts 19.4.1.22.2 Small Bore Pipe Supports - Discrepant Point Counts 19.4.1.22.3 Small Boer Pipe Supports - Surveys and Summaries 19.4.1.23 DELETED 19.4.1.24.1 Instrument Pipe / Tube Supports - Inspection Point Counts l

I 19.4.1.24.2 Instrument Pipe / Tube Supports - Discrepant Point I Counts 19.4.1.24.3 Instrument Pipe / Tube Supports - Surveys and Summaries 19.4.1.25.1 Cable - Inspection Point Counts 19.4.1.25.2 Cable - Discrepant Point Counts 19.4.1.25.3 Cable - Surveys and Summaries 19.4.1.26.1 NSSS Supports - Inspection Point Counts 19.4.1.26.2 NSSS Supports - Discrepant Point Counts 19.4.1.26.3 NSSS Supports - Surveys and Summaries

.. . 23 u s. c i a. - >- .O c,,) .

O 7

N 1

Q m

I I $

2 t

i l

r ATTACHMENT 6 Braidwood Station

- *, Units 1 & 2 BCAP FILE INDEX

  • Commonwaalth Edison Co.

Projact No. 4683-38 7 File 40 - Braidwood Construction Assessment Program (BCAP)

1. Final Findings Report
2. BCAP Structural Calculation Index
3. Electrical Calculation Index
4. CSR-IE-COH Miscellaneous Correspondence, RE Checklist & Observations COH-4-1 COH-58-2 C0H-121-4 COH-4-2 COH-60-3 C0H-121-901 COH-4-3 C0H-60-4 COH-121-902

'COH-5-1 COH-62-) C0H-121-903 s COH-5-2 COH-62-901' COH-122-1 COH-8-1 COH-63-1 C0H-122 ]

C0H-8-2 00H-65-2 C0H-123e1 l CCH-12-1 COH-65-901 COH-126-1 C0H-12-2 COH-66-2 C0H-126-3 COH-13-1 COH-67-1 COH-127-1 COH-15-1 COH-67-2 COH-128-l' C0H-15-2 COH-67-3 C0H-130-1 C0H-15-3 'C0H-69-1 COH-130-2 ~

C0H-24-1 C0H-69-2 COH-132-L COH-26-1 C0H-70-1 ~C0H-133-1 COH-26-2 COH-72-1. C0H-133-2

-C0H-27-1 COH-72-2 COH-133-3

,. COH-30-1 COH-76'-1 COH-133-9,01 1

COH-31-1 COH-77-L C0H-I34-1 C0H-31-049 COH-77-2 COH-134-2 COH-32-1 COH-77-3 C0H-134- 3 COH-32 C0H-77-4. C0H-136-1 C0H-34-1 COH-102-1 COH-136-2 C0H-41-1 COH-102-2 COH-13J-1 COH-44-1 COH-105-1 COH-138-1 COH-47-l C0H-106 COH-139-1.

C0H 2 COH-107-1 C0H-139-3 COH-47 ' C0H-110-1; C0H-139-4

-COH-49-1 COH-110 2 C0H-143-901 COH-50-1 COH-110-3 COH-144-2 COH-50-3~ COH-11I-1 C0H-144-3 ~

C0H-52-1 .

C0H-112-1 COH-145-1 C0H-55-1 COH-112-2 C0H-146-1 C0H-55-2 COH-114-2 C0H-146-2 COH-55-3 COH-ll4-3 COH-147-3 COH-55-4 COH-115-1 COH-148-1

'_ COH-55-5 ' C0H-ll7-1 COH-169-L COH-55-6 C0H-ll7-2 . . C0H-152- E COH-55-7 COH-ll8-I COH-152-2 COH-55-3 -COH-119-2 COH-153-2 C0H-55-9 C0H-120-1 C0H-154 -1 C0H-55-11 C0H-120-2 C0H-154-3 COH-56-1 C0H-121-1 C0H-155-1 C0H-58-1 C0H-121-3 C0H-156-2

o

6. ,
4. C0H-157-2

-COH-157-3.

COH-157-4=

COH-158-1 1 COH-158-2

'COH-160-1 C0H-160-2

5. CSR-IE-EIN Miscellaneous Correspondance. RE Checklist & Observations EIN-1-1 EIN-31-l~ EIN-59-901 EIN-112-2  !

EIN-2-1 EIN-31-2 EIN-62-1 EIN-112-3

'EIN-2-2 EIN-31-3 EIN-62-2 EIN-113-2

-EIN-3-1 EIN-32-1 EIN-63-1 EIN-ll3-3 EIN-3-2 EIN-32-2 EIN-64-1 EIN-114-1 EIN-5-1 EIN-33-1 EIN-64-3 EIN-114-2 EIN-6 EIN-34-1 .EIN-66-1 EIN-115-1 EIN-8-1 EIN-36-1 EIN-66-2 EIN-115-2 EIN-10-1 EIN-36-2 EIN-68-l' EIN-116-1 EIN-10-4 EIN-36-3 EIN-68-2 EIN-116-2

EIN-11-1 EIN-37-1 EIN-70-2 EIN-117-1 EIN-11 EIN-38-2 EIN-71-1 EIN-119-2
EIN-11-901 EIN-38-3 EIN-71-2 EIN-122-1 EIN-12-1 EIN-39-2 EIN-72-1 EIN-122-2 EIN-13-1 EIN-42-1 EIN-73-1 EIN-122-3 EIN-14-1 EIN-42-2 EIN-73-2 EIN-125 EIN-15-1. EIN-42-3 EIN-73-3 EIN-125-2 EIN-16-2 EIN-43-2 -EIN-75-1 EIN-126-1 iEIN-16-3 EIN-44-2 - EIN-76-1 EIN-126-2 EIN-17 EIN-47-1 EIN-76-2 EIN-126-3

'EIN-17-2 EIN-49-1 EIN-78 EIN-127-1 EIN-17-3 EIN-49-2 ~EIN-78-2 EIN-127-2 EIN-17-4 'EIN-50-1 EIN-78-3 EIN-127-3 EIN-19-1 EIN-51-1 EIN-78-901 EIN-128-2

! 'EIN-19-2 EIN-52-1 EIN-79-2 EIN-129 ^

<EIN-19-3 EIN-54-1 EIN-80-2 EIN-129-2 i .EIN-19-4 EIN-55-1 EIN-80-3 EIN-130-1 EIN-19-5 EIN-55-2 EIN-101-1 EIN-131-1 EIN-20 EIN-55-3 EIN-102-1 EIN-132-1 EIN-20-2 EIN-55-4 EIN-104-1 EIN-132-2

.EIN-23-1 EIN-55-5 EIN-104-2 EIN-133-1~

EIN-23-2 EIN-56-1 -EIN-105-1 EIN-133-2 EIN-25-1 EIN-56-2 EIN-105-2 EIN-134-1 EIN-25-2 EIN-56-901 EIN-105-3 EIN-134-2 EIN-25-3' EIN-56-902 EIN-105-4 EIN-134-3 EIN-26-1 EIN-58-2 EIN-107-1 EIN-134-356

'EIN-27-l' EIN-58-3 EIN-108-1 EIN-135-1 EIN-28-1 EIN-59-1 EIN-111-1 EIN-135-2

-EIN-29-1 EIN-59-2 EIN-111-2 EIN-136-1 A _-__ - _ . _ _ _ ___

r;

.- L. ,

u, . . .*

1,3

'5. EIN-137-1 EIN-138-1 i EIN-138-2

.EIN-144-1 EIN-144-2 EIN=145-1 ~

EIN-145-2 EIN-146-2 EIN-146-3 EIN-146-4 EIN-146-5 EIN-147-2 EIN-147-3 EIN-147-4.

EIN-148-1.

g. EIN-149-1 EIN-149-2 EIN-149-3 EIN-150-1 EIN-152-1 EIN-152 EIN-153-1 EIN-154-1 EIN-154-2 EIN-155-1

-EIN-155-2 EIN-158-1 EIN-158-2 EIN-158-3 EIN-159-1 EIN-160-2

6. - CSR-IE-CBL Miscellaneous Correspondence, .RE Checklist 6 Observations 1CBL-2-2 CBL-17-3 C% "- ~CBL-60-1 CBL-4-1 s'BL-18-1 .a. CBL-102-1 CBI-6-2 "FT-?l-1 GBL-40-2 CBL-102-2 CBL-8-1 CBL-21-278 CBL-46-2 CBL-102-3 CBL-9-1 CBL-22-1 CBL-49-112 CBL-103-1.

CBL-9-104. CBL-22-116 CBL-50-1 CBL-103-3 CBL-10-1 CBL-22-901 .cL-50-2 CBL-104-1

.CBL-10-2 CBL-24-1 CBL-51-1 CBL-105-1 CBL-11 CBL-29-1 CBL-53-2 CBL-106 '

CBL-13-901 CBL-30-1 CBL-55-1 CBL-106-2 CBL-13-903 C3L-31-1 CBL-56-1 CBL-107-1 CB L-15-1 CEL-34-: C3L-58-1 CBL-107-2 CBL-17-l' CBL-34-3 .CBL-58-901 CBL-110-1 CBL-17-2 CBL-37-1 CBL-59-1 CBL-110-2

ry .

6. CBL-111-1 7. . CSR-IE-CBP Miscellaneous Correspondence, RE checklist &

CBL-112-1 Observations CBL-112-102

.CBL-113-1 CBP-1-1 CBL-113-2 CBP-44-2 CBP-1-901 CBL-114-1 CBP-48-1.

CBP-3-1 l- CBL-115-1 CBP-51-1

' CBP-3-2 CBL-115-2. CBP-52-1 CBP-4-1 I

CBL-116-1. 1CBP-53-1 CBP-4-2 CBL-116-3 CBP-59-2 CBP-5-1 I 'CBL-117-1 CBP-60-1

' CBP-5-2

' CBL-118-3 CBP-101-1 CBP-6-1

! CBL-119 CBP-103-1

.CBP-6-2 CBP-104-1 CBL-119-2 CBP-6-3

!- CBL-122-1 CBP-104-2 CBP-7-1 CBL-122 -CBP-104-3 CBP-7-2 CBL-125-1 CBP-105-1 CBP-8-2 CBL-126-1 CBP-105-2 CBP-9-1 CBL-127-1 ~ CBP-106-1 CBP-10-1~

CBL-127 CBP-106-2

-CBP-12-1 CBL-129-2 CBP-106-3 CBP-12-2 CBL-129-3 CBP-107-1 CBP-13-2~

-CBL-129-4 CBP-107-2 CBP-14-1 1 CBL-130-2 CBP-108-1 I

'CBP-18-1 c CBL-130-3 CBP-108-2 CBP-19-2 CBL-130-4 CBP-108-3 CBP-19-3 CBP-109-1

-CBL-132-1 CBP-22-1 CBL-132-3 CBP-110-1 1 CBP-24-1 CBL-133-2 CBP-110-2 CBP-25-1 CBL-134-1 CBP-112-1 i CBP-26-l' CBP-113-1 CBL-134-2 . CBP-28-l'

'CBL-137-1 CBP-114-1 CBP-28-2 CBL-138-l' CBP-114-2 CBP-29-1

.CBL-138-2 CBP-115-1 CBP-29-2

-CBL-139 CBP-115-2 CBP-31-1 CBL-140-1 CBP-115-3 CBP-33-1 CPL-143-1 -CBP-118-1 CBP-34-1 CBL-145-2 CBP-118-3

)i- CBP-34-2 CBL-145-901 .CBP-119-1 CBP-35-1 CBL-146-1 CBP-120-1 CBP-35-3 CBP-122-1 CBL-146-2 CBP-25-1

'CBL-147-1 CBP-122-2 CBP-37-1 R 'CBL-149-1. CBP-123-1

'CBP-37-2 CBP-127-2 CBL-149-2 CBP-38-1 CBL-153-1 CBP-127-3 CBP-38-2 CBL-153-2 CBP-128-1 CBP-38-3 CBP-128-2

.CBL-154-1 CBP-38-4 CBL-155-1 CBP-130-1 CBP-39-1 CBL-157-1 CBP-130-3 CBP-39-2 CBL-158-1 ~ CBP-41-1 CBL-159-1 CBP-41-2 CBL-160-1. CBP-43-1

p ,. i l

~

8. CSR-IE-CND Miscellaneous Correspondence, RE checklist & Obeervations CND-1-1 .CND-57-5 CND-95-2 CND-1-2 CND-58-1 CND-95-3 CND-2-1 CND-58-2 CND-96-1

~

CND-3-1 CND-59-1 CND-97-1 CND-3-2 CND-59-2 CND-98-1 CND-6-1 CND-60-1 CND-98-2 CND-6-2 CND-61-2 CND-101-1 CND-6-3 CND-62-2 CND-110-1 CND-8-1 CND-63-2 CND-110-2 CND-8-2 CND-64-1 CND-113-1 CND-11-1 CND-64-2 CND-114-1 CND-11-2 CND-64-3 CND-115-1 CND-12-1 CND-67-2 CND-Il7-1

'CND-12-2 CND-67-3 CND-119-2 CND-13 CND-68-1 CND-121-1 CND-13-2 CND-68-2 CND-121-2 CND-14-1 CND-69-1 CND-122-1 CND-15-1 CND-70-1 CND-123-2 CND-16-2 CND-70-2 CND-18-1 CND-71-1 9. CSR-IE-CPH (in' Structural Department's CND-19-1 CND-71-2 files)

CND-21-1 CND-73-2 CND-24-1 CND-73-3 10. CSR-IE-C0h-Details CND-24-3. CND-73-4 CND-25-1 CND-73-5 11. CSR-IE-EIN-Details CND-29-2 CND-74-1 CND-29-3 CND-75-2 12. CSR-IE-CBL-Details CND-30-1 CND-77-1 CND-31-1 CND-79-1 13. CSR-IE-CBP-Details CND-31-2 CND-80 CND-32-1 CND-80-2 14. CSR-IE-CND-Details CND-32-2 CND-81 CND-33-1 CND-82-1 15. CSR-IE-CPH-Details (In Structural CND-37-1 CND-83-2 Department's files)

CND-40-1 CND-83-3 CND-40-2 CND-84-901 CND-40-901 CND-85-2 CND-41-1 CND-86-1 CND-41-3 CND-86-2 CND-41-5. CND-86-3 CND-42-1 CND-87-l '

CND-42-2 CND-88-1 CND-45-1 CND-88-2 CND-47-l' CND-90-1 CND-48-1 CND-93-2 CND-49-1 CND-93-3

.CND-57-2 CND-95-1 a

-i ,,

TEO y CORREspgNC%4 08tEH F m wr~

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

. '85 DEC 16 All :16 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD GFF!CE 0? SECRt lA; In the Matter of Y M hCH

)

COMMONWEALTH EDISON COMPANY ) Docket Nos. 50-456

) 50-457 (Braidwood Station Units 1 dnd 2) )

CERTIFICATE OF CERVICE I, Susan E. Babb, one of the attorneys for Common-wealth Edison Company, certify that copies of Applicant's

. Fourth Partial Response to Rorem's Second Set of Quality Assurance Interrogatories and Request to Produce'have been served in the above-captioned matter on all persons listed on the attached Service List by United States nail, postage prepaid, this 13th day of December, 1985-except where service has been made as otherwise noted.

'h Susan E. Babb Isham, Lincoln & Beale

. .Three First National Plaza Chicago, Illinois 60602 (312)-558-7500 Dated: December 13, 1985

s ..

9 SERVICE LIST Herbert Grossman, Esq. Mr. William L. Clements Chairman .

Chief, Docketing and Services Administrative Law Judge United States Nuclear Regulatory Atomic Safety and Licensing Commission Board Office of the Secretary United States Nuclear Regulatory Washington, DC 20555 Commission Washington, DC 20555 Ms. Bridget Little Rorem 117 North Linden Street Dr.' Richard F. Cole P.O. Box 208 Administrative Law Judge Essex, IL 60935 Atomic Safety and Licensing Board

. United States Nuclear Regulatory

  • Robert Guild Commission Douglass W. Cassel, Jr.

Washington, DC 20555 Timothy W. Wright, III BPI 109 North Dearborn Street Dr. A. Dixon Callihan -Suite 1300 Administrative Law Judge Chicago, IL 60602 102 Oak Lane Oak Ridge, TN 37830 Charles Jones, Director Illinois Emergency Services

-Stuart Treby, Esq. and Disaster Agency Elaine I. Chan, Esq. 110 East Adams Office of the. Executive Legal Springfield, IL 62705 Director United States Nuclear. Regulatory Commission ' William Little, Director Washington, DC 20555 Braidwood Project Region III United States Nuclear Regulatory Atomic Safety and Licensing Commission Board Panel 799 Roosevelt Road United States Nuclear Regulatory Glen Ellyn, IL 60137 Commission Washington, DC- 20555 Jan Stevens United States Nuclear Regulatory Atomic Safety and Licensing Commission Appeal Board Panel 7920 Norfolk Avenue United States Nuclear Regulatory Phillips Building Commission Bethesda, MD 20014 Washington, DC 20555

  • By Messenger Delivery on 12/13/85