Text
_
r$
9 av.tmw ctmumumow October 9, 1985 L
' (' ',$ Y.IED UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
-9 P2:47 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD bbbfg7[SfjERVliT f0 c uRA,
N In the Matter of
)
COMMONWEALTH EDIS0N COMPANY Docket Nos. 50-456
)
50-457bb (Braidwood Station, Units 1 and 2 )
NRC STAFF RESPONSE TO BOARD'S MEMORANDUM AND ORDER COMPELLING DISCOVERY ON R0 REM INTERR0GATORIES 17 AND 57 FROM THE NRC STAFF I.
INTRODUCTION On September 4, 1985, Intervenors Bridget Little Rorem, et al.
filed a motion to compel answers to certain interrogatories from Applicant and NRC Staff.
Intervenors sought responses to Interroga-tories 17, 20 and 57 from the Staff.
Staff filed objections and a motion for a protecfive order. On September 27, 1985 the Board ordered Staff to file answefs to Interrogatories 17 and 57 by October 9,1985 and denied the protective order on these interrogatories (" Order"). M The Staff provides the following response to Interrogatories 17 and 57 as limited by the Board's discussion. Order at 9-10.
Respectfully submitted, Elaine I. Chan Counsel for NRC Staff Dated at Bethesda, Maryland this 9th day of October, 1985 8510110049 e51009 DS PDR ADOCK O 4y6 G
s
~.
Interrogatories 17 and 57 Please describe in detail the circumstances and procedures, if any, under which'Ouality Control inspection criteria may be waived.
In what respects are NRC requirements understood to be either minimum or maximum requirements with regard to the design and construc-tion of Braidwood? Please explain in detail and identify any documents which reflect this answer.
I.
NRC Staff's Response The Order limits the Staff's response to "the Braidwood facility and to particular circumstances pertaining to that facility under which quality control criteria or NRC requirements have not been fully applied to the design and construction of Braidwood within the subject areas of the contention." Order at 9.
It is the Board's and the Staff's under-standing that Intervenors wish to determine "whether any of the criteria or requirements that they assert have not been followed will be claimed by Staff not to be applicable to the construction of the facility." M.
The following response by the Staff is limited accordingly.
10C.F.R.Partf50.34requiresthattheApplicanthaveaQA/QCprogram, and Appendix B, to 10 C.F.R. Part 50 establishes the requirements for that program consisting of 18 criteria. The Applicant was required to describe in the Braidwood PSAR and FSAR their commitments to a QA program meeting the requirements of Appendix B.
10C.F.R.50.55(f)(1) requires the implementation of the commitments as described in the Safety Analysis Report (SAR). Once the QA program was accepted by the NRC, changes in the QA program were allowed in accordance with the requirements of 10 C.F.R. 50.55(f)(3). At no time have any changes been made to the Braidwood QA program that waive the requirements of the 18 criteria in Appendix B.
'l l'
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD l
In the Matter of
)
)
COMMONWEALTH EDISON COMPANY
)
Docket Nos. 50-456
)
50-457 l
(Braidwood Station, Units 1 and 2 )
l AFFIDAVIT OF WILLIAM S. LITTLE I, William S. Little, being first duly sworn do depose and state:
1.
I am employed as the Director, Braidwood Project, in the Division of Reactor Projects, U.S. Nuclear Regulatory Comission, Region III, 799 Roosevelt Road, Glen Ellyn, IL.,
60137.
2.
I have provided the answers to Interrogatories 17 and 57.
Those answers are true and correct to the best of my knowledge, information and belief.
William S. Little i
l Sworn to and subscribed before me this 8th day of October,1985 Q
f L Notary Public My Commission Expires I
2 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD <
In the Matter of
)
COMMONWEALTH EDIS0N COMPANY Docket Nos. 50-456
)
50-457 (Braidwood Nuclear Power Station,
)
Units 1 and 2)
)
CERTIFICATE OF SERVICE I hereby certify that copies of "NRC STAFF RESPONSE TO BOARD'S MEMORANDUM AND ORDER COMPELLING DISCOVERY ON ROREM INTERROGATORIES 17 AND 57 FROM THE NRC STAFF" in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class, by deposit in the Nuclear Reculatory Comission's internal mail system (*),
this 9th day of October, 1985:
Lawrence Brenner, Esq., Chairman
- Comonwealth Edison Company Administrative Judge ATTN: Cordell Reed Atomic Safety and Licensing Board Assistant Vice President U.S. Nuclear Regulatory Commission P.O. Box 767 Washington, DC 20555 Chicago, IL 60690 Herbert Grossman, Chairman
- Thomas J. Gordon, Esq.
Administrative Judge Waller, Evans & Gordon Atomic Safety and Licensing Board 2503 S. Neil U.S. Nuclear Regulatory Comission Champaign, IL 61820 Washington, DC 20555 Dr. A. Dixon Callihan~
Region III Administrative Judge U.S. Nuclear Regulatory Comission 102 Oak Lane Office of Inspection & Enforcement Oak Ridge, TN 37830 799 Roosevelt Road Glen Ellyn, IL 60137 Dr. Richard F. Cole
- Joseph Gallo, Esq.
Administrative Judge Isham, Lincoln & Beale Atomic Safety and Licensing Board Suite 840 U.S. Nuclear Regulatory Comission 1120 Connecticut Avenue, N.W.
Washington, DC 20555 Washington, DC 20036 Rebecca J. Lauer, Esq.
Isham, Lincoln & Beale-Three First National Plaza Suite 5200 Chicago, IL 60602
p_
q i
2-3 Ms. Bridget'Little Rorem C. Allen Bock, Esq.
117 North Linden Street P.O. Box 342 Essex, IL.60935 Urbana, Il 61801 Douglass W. Cassel, Jr., Esq.
Atomic Safety and Licensing Board Timothy Wright, Esq.
Panel
- 109 North Dearborn Street U.S. Nuclear Regulatory Commission Suite 1300 Washington, DC 20555 Chicago, IL 60602 Atomic Safety and Licensing Appeal Erie Jones, Director Board Panel
- Illinois Emergency Services U.S. Nuclear Regulatory Commission and Disaster Agency Washington, DC 20555 110 East Adams Springfield, IL 62705 Docketing and Service Section*
Office of the Secretary Lorraine Creek U.S. Nuclear Regulatory Commission Route 1, Box 182 Washington, DC 20555 Manteno, IL 60950 e: - _ _ -
Elaine I. Chan Counsel for NRC Staff I
m a
-