ML20086A565: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20086A565
| number = ML20086A565
| issue date = 11/05/1991
| issue date = 11/05/1991
| title = Forwards Beaver Valley Power Station Unit 1,Cycle 9 Startup Physics Test Rept.
| title = Forwards Beaver Valley Power Station Unit 1,Cycle 9 Startup Physics Test Rept
| author name = Sieber J
| author name = Sieber J
| author affiliation = DUQUESNE LIGHT CO.
| author affiliation = DUQUESNE LIGHT CO.

Latest revision as of 08:27, 16 April 2020

Forwards Beaver Valley Power Station Unit 1,Cycle 9 Startup Physics Test Rept
ML20086A565
Person / Time
Site: Beaver Valley
Issue date: 11/05/1991
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086A569 List:
References
NUDOCS 9111190238
Download: ML20086A565 (1)


Text

, . .. - _ - _.

Beaver Voitey Power Stabon Shippingport PA 15077-0004 (412) 393-5255 JOHN D SIEBER Vice Prescent . Nuclear Group November 5, 1991 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Cycle 9 Startup Test Report Enclosed is a copy of the Cycle 9 Startup Test Report provided in accordance with Technical Specification 6.9.1.3 Item (2). This report summarizes the applicable physics testing performed to verify the adequacy of the Cycle 9 reload core design. The results of each test performed indicated that the measured parameters either were within the specified acceptance criteria or were evaluated and determined to be within the available margin.

Sincerely,

/ ,

J&cg .Q(bwy ,k.

I. D'. Sieber Enclosure cc: Mr. J. Beall, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. A. W. DeAgazio, Project Manager 10' h

/ \\\

. ' s

/

'o 0111190238 #111DU

igja (4 DOCK 05000334

.p PDn

_. _ - _ - _ _ . . . _ . _ _. ~ . . - ~ . . _-