Line 2: |
Line 2: |
| | number = ML053490197 | | | number = ML053490197 |
| | issue date = 12/22/2005 | | | issue date = 12/22/2005 |
| | title = Request for Additional Information Regarding Steam Generator Tube Inspections (TAC Nos. MC8938 and MC8939) | | | title = Request for Additional Information Regarding Steam Generator Tube Inspections |
| | author name = Fields M | | | author name = Fields M |
| | author affiliation = NRC/NRR/ADRO/DORL | | | author affiliation = NRC/NRR/ADRO/DORL |
Letter Sequence RAI |
---|
|
|
MONTHYEARML0513003462005-04-27027 April 2005 Special Report 2-SR-2005-001 Project stage: Request ML0529805492005-10-18018 October 2005 Special Report 3-SR-2004-002-01 Re Results of the Steam Generator Tube Inservice Inspection Performed During the Unit 3 Eleventh Refueling Outage Project stage: Request ML0531301562005-10-24024 October 2005 Transmittal of Special Report 2-SR-2005-001-01 Project stage: Request ML0534901972005-12-22022 December 2005 Request for Additional Information Regarding Steam Generator Tube Inspections Project stage: RAI ML0608906572006-03-20020 March 2006 Response to NRC Request for Additional Information Regarding PVNGS Units 2 and 3 Steam Generator Tube Inspections Project stage: Response to RAI ML0620001942006-07-26026 July 2006 Review of Steam Generator Tube Inspection Summary Reports Project stage: Approval 2005-12-22
[Table View] |
|
---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24011A1002024-01-10010 January 2024 March 2024 Emergency Preparedness Program Inspection - Request for Information ML23334A1612023-11-30030 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - RAIs Associated with License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue ML23334A0072023-11-29029 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR That Revises TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating ML23298A1232023-10-25025 October 2023 NRR E-mail Capture - Palo Verde, Unit 1 - RAIs for Relief Request 70, Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle ML23031A3392023-01-31031 January 2023 In-service Inspection Request for Information ML23013A0632023-01-13013 January 2023 NRR E-mail Capture - Palo Verde Unit 1 -Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22348A1672022-12-14014 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22339A2372022-12-0505 December 2022 NRR E-mail Capture - Palo Verde Unit 1 Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22272A3252022-09-29029 September 2022 Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information ML22209A1752022-07-28028 July 2022 Inservice Inspection Request for Information ML22187A2632022-07-0606 July 2022 Notification of Inspection (NRC IR 05000528/2022004, 05000529/2022004 and 05000530/2022004) and Request for Information ML22067A2292022-03-0202 March 2022 Inservice Inspection Inspection PWR Request for Information ML22055A5842022-02-24024 February 2022 NRR E-mail Capture - Palo Verde, Unit 3 - Final RAIs for 22nd Refueling Outage (Spring 2021) Steam Generator Tube Inservice Inspection Report ML22035A3302022-02-10010 February 2022 Requests for Confirmation of Information for Exemption to Delete Diverse Auxiliary Feedwater Actuation System Based on Risk-Informed Process for Evaluations ML22025A4012022-01-0303 January 2022 March 2022 Emergency Preparedness Program Inspection - Request for Information ML21245A2222021-09-0101 September 2021 Request for Information ML21200A2392021-07-20020 July 2021 Docs Request AC - AA August 2021 ML21154A0082021-05-26026 May 2021 NRR E-mail Capture - Palo Verde 1, 2 and 3 - Official RAIs for LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) ML21064A2372021-03-0303 March 2021 ISI Request for Information Rls ML21042B9692021-02-18018 February 2021 Notification of NRC Design Bases Assurance Inspection and Initial Request for Information ML21043A1462021-02-11011 February 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAI for an Order Associated with Indirect License Transfer from Public Service Company of New Mexico to Avangrid, Inc ML21023A0212021-01-13013 January 2021 PVNGS PI&R Request for Information RA ML21011A1972021-01-12012 January 2021 Unit 2, and Unit 3 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000528/2021012, 05000529/2021012 and 05000530/2021012) and Request for Information ML20227A0992020-08-14014 August 2020 Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information ML20118D1362020-04-28028 April 2020 Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information ML20049A0992020-02-14014 February 2020 Notification of Cyber Security Inspection (NRC Inspection Report 05000528/2020401; 05000529/2020401; and 05000530/2020401) and Request for Information ML20049A0252020-02-12012 February 2020 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for License Amendment Request Associated with Changes to Emergency Plan Staffing Requirements ML20021A3172020-01-21021 January 2020 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for Relief Request 64, Impractical Examinations for the Third 10-Year ISI Interval ML19317D0782019-11-13013 November 2019 NRR E-mail Capture - Palo Verde 1 - Requests for Additional Information on Unit 1 21st Refueling Outage Steam Generator Tube Inspection Report ML19234A3202019-08-29029 August 2019 Redacted - Request for Additional Information for Amendment and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel (EPID L-2018-LLA-0194; EPID L-2018-LLE-0010) ML19155A1842019-05-30030 May 2019 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mvib Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval ML19095A6552019-04-0404 April 2019 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mphb Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval ML19044A7342019-02-13013 February 2019 NRR E-mail Capture - Palo Verde1, 2, and 3 - Official Requests for Additional Information for RR 62, Third and Fourth 10-Year ISI Intervals, Proposed Alternative - Pressurizer Heat Sleeve Repairs ML19008A3612019-01-0808 January 2019 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR Associated with Response Time Testing of Pressure Transmitters ML18341A0252018-12-0303 December 2018 Notification of NRC Design Bases Assurance Inspection (Teams)(05000528/2019011, 05000529/2019011, and 05000530/2019011) and Initial Request for Information ML18271A0392018-10-0202 October 2018 Non Proprietary - Supplemental Information Needed for Acceptance of Requested License Amendments and Exemptions Implementation of Framatome High Thermal Performance Fuel (Epids L-2018-LLA-0194 and L-2018-LLE-0010) ML18221A5102018-08-23023 August 2018 Request for Additional Information License Amendment Request to Adopt Risk-Informed Completion Times (CAC Nos. MF6576, MF6577, and MF6578; EPID: L-2015-LLA-0001) ML18229A3132018-08-17017 August 2018 NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2 - Second Se ML18227A8672018-08-15015 August 2018 NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2 ML18124A0112018-05-0303 May 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official Eeob RAIs for TSTF-505 (4b) LAR (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001) ML18099A0072018-04-0606 April 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for 10 CFR 50.69 LAR (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276) ML18094B1122018-04-0404 April 2018 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAIs for TSTF-505 (Initiative 4b) LAR (CAC Nos. MF6576, MF6577, and MF6578: EPID L-2015-LLA-0001) ML18066A7032018-03-0707 March 2018 Notification of Nrc Design Bases Assurance Inspection (Programs) 05000528/2018011, 05000529/2018011, and 05000530/2018011 Initial Request for Information ML17248A0162017-08-31031 August 2017 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAI for RRs PRR-03, PRR-04 and PRR-05, Pump Testing ML17107A0052017-04-14014 April 2017 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Ngf LAR and Exemption RAIs (CAC Nos. MF8076 to MF8081) ML17082A4462017-03-28028 March 2017 PVNGS Units 1, 2, and 3 Transition to CE 16x16 Ngf - Draft RAIs Rev 3 ML17003A0182017-01-0202 January 2017 NRR E-mail Capture - Palo Verde, Unit 3 - Draft RAIs for the Second Emergency LAR Associated with EDG 3B Failure ML16258A0312016-09-14014 September 2016 PVNGS Units 1-3 - Notif of NRC Insp of the Implementation of Mitigation Strategies and Spent Fuel Pool Instr. Orders and Emer. Prep. Comm./Staffing/Multi-Unit Dose Assessment Plns(05000528/ 2016009;05000529/2016009;and 05000530/2016009) and ML16111B3312016-04-20020 April 2016 Notification of NRC Component Design Bases Inspection (05000528/2016007; 05000529/2016007; 05000530/2016007) and Initial Request for Information ML16083A2502016-03-23023 March 2016 NRR E-mail Capture - Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Official RAIs for EAL LAR 2024-01-10
[Table view] |
Text
December 22, 2005 James M. Levine Executive Vice President, Generation Mail Station 7602 Arizona Public Service Company PO Box 52034 Phoenix, Arizona 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -
REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE INSPECTIONS (TAC NOS. MC8938 AND MC8939)
Dear Mr. Levine:
By letters dated November 9, 2004, April 27, October 18, and October 24, 2005, Arizona Public Service submitted the results of the steam generator tube inspections for the Spring 2005 and Fall 2004 refueling outages at the Palo Verde Nuclear Generating Station Units 2 and 3, respectively.
The Nuclear Regulatory Commission (NRC) staff has reviewed the information provided and determined that additional information is required in order to complete the evaluation. The additional information being requested is enclosed. As discussed with Tom Weber of your staff, the NRC staff is requesting a response within 90 days of this letter.
If you have any questions, please contact me at 301-415-3062.
Sincerely,
/RA/
Mel B. Fields, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-529 and STN 50-530
Enclosure:
Request for Additional Information
December 22, 2005 James M. Levine Executive Vice President, Generation Mail Station 7602 Arizona Public Service Company PO Box 52034 Phoenix, Arizona 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -
REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE INSPECTIONS (TAC NOS. MC8938 AND MC8939)
Dear Mr. Levine:
By letters dated November 9, 2004, April 27, October 18, and October 24, 2005, Arizona Public Service submitted the results of the steam generator tube inspections for the Spring 2005 and Fall 2004 refueling outages at the Palo Verde Nuclear Generating Station Units 2 and 3, respectively.
The Nuclear Regulatory Commission (NRC) staff has reviewed the information provided and determined that additional information is required in order to complete the evaluation. The additional information being requested is enclosed. As discussed with Tom Weber of your staff, the NRC staff is requesting a response within 90 days of this letter.
If you have any questions, please contact me at 301-415-3062.
Sincerely,
/RA/
Mel B. Fields, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-529 and STN 50-530
Enclosure:
Request for Additional Information DISTRIBUTION:
NONPUBLIC LPLIV Reading RidsNrrAdroDorl(CHaney/CHolden) YDíaz-Castillo RidsNrrAdroDorlLplIV (DTerao) RidsNrrLADJohnson RidsAcrsAcnwMailCenter AHiser RidsOgcRp RidsRgn4MailCenter (TPruett)
ADAMS ACCESSION NO: ML053490197 OFFICE LPLIV/PM LPLIV/LA LPLIV/BC NAME MFields DJohnson DTerao DATE 12/22/05 12/22/05 12/22/05 OFFICIAL RECORD COPY DOCUMENT NAME: E:\Filenet\ML053490197.wpd
REQUEST FOR ADDITIONAL INFORMATION ARIZONA PUBLIC SERVICE PALO VERDE UNITS 2 AND 3 STEAM GENERATOR TUBE INSPECTION REPORTS DOCKET NOS. 50-529 AND 50-530 By letters dated November 9, 2004 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML043210473), April 27, 2005 (ML051300346), October 18, 2005 (ML052980549), and October 24, 2005 (ML053130156), Arizona Public submitted the results of the steam generator tube inspections for the Spring 2005 and Fall 2004 outages at the Palo Verde Nuclear Generating Station Units 2 and 3, respectively.
The staff has reviewed the information provided and determined that the following additional information is required in order to complete the evaluation.
Questions for Palo Verde Unit 2
- 1. In Section 4.0 of your October 24, 2005 letter, you indicated that for steam generators 21 and 22, tubes were detected with abnormal dent indications. Were these indications present since the pre-service inspection? If so, please discuss whether they have changed since the pre-service inspection and the reasons for any change. If they were not present in the pre-service inspection, please discuss the cause of the dents. Please discuss whether these dents are considered abnormal since they are similar to the dent indication that was the cause of your 2004 primary-to-secondary leak.
- 2. In Section 4.0 of your October 24, 2005 letter, you indicated that a volumetric indication was detected and plugged. In addition, you detected several other volumetric indications. Please discuss the nature, cause, and severity of these indications.
- 3. Discuss whether a foreign object search and retrieval (FOSAR) was performed and whether the loose parts were removed from the steam generators. If any loose parts were not removed, please discuss whether you assessed the impact the loose part could have on tube integrity during the interval between inspections.
- 4. Appendices C and D of your October 24, 2005 letter, list several distorted support signals. Regarding these indications, please discuss whether these indications can be traced back to the baseline inspection? If so, have they shown any change? If change has been observed, please explain what has caused these indications to change.
- 5. In Section 3.0 of your October 24, 2005 letter, you indicated that an operational assessment will document your tube integrity assessment as required by NEI 97-06.
Please discuss the results of this assessment (i.e., did it confirm that the tube integrity will be maintained until the next steam generator tube inspections).
- 7. Several tubes were identified as being plugged (R141C102, R141C112, R154C91 and R106C117); however, the information in Appendices C and D contain no information concerning the nature of the indications in these tubes. Please discuss the reason for
plugging these tubes (e.g., abnormal dents).
- 8. It is the NRC staffs understanding that the Palo Verde Unit 2 replacement steam generators have an economizer with a similar set screw configuration as that in Unit 3 (which experienced degradation). As a result, please discuss whether any inspections were performed to confirm the integrity of these locations. In addition, please discuss whether any other secondary side inspections were performed during the outage.
- 9. Discuss the scope and results of your dent examinations including a discussion of whether all dents have been examined with a rotating coil since the fabrication of the steam generators. In addition, please discuss whether any dents have changed since the pre-service inspection.
- 10. Please clarify the scope and results of your U-bend and square bend examinations.
- 11. General information concerning the design of your replacement steam generators was provided in the submittal. In order for the staff to better understand the design of your replacement steam generators, please provide the following information: model #, heat transfer surface area, flow distribution baffle (FDB) design (e.g., circular holes) and thickness, tube support plate (TSP) thickness, batwing and vertical strap thickness, and the smallest U-bend radius.
Questions for Palo Verde Unit 3
- 1. In Section 3.0 of your October 18, 2005 letter, you indicated that an operational assessment will document your tube integrity assessment as required by NEI 97-06.
Please discuss the results of this assessment (i.e., did it confirm that the tube integrity will be maintained until the next steam generator tube inspections).
- 2. In Table 1 of your October 18, 2005 letter, you indicated that rotating coil examinations were performed on bobbin indications from the previous outage and from the current outage. Please clarify what types of indications (e.g., wear, manufacturing burnish marks, free span differentials, etc.) were included in this sample and whether the sample represented 100% of the bobbin indications Please confirm that rotating coil examination was performed on any distorted support indications (DSIs) or non-quantifiable indications identified by either the primary or secondary eddy current data analyst.
- 3. Regarding the volumetric indications detected during the 2004 (U1R11) inspections and reported in Table 2 of your October 18, 2005 letter, please clarify whether any of the indications are a result of corrosion (i.e., volumetric indications other than manufacturing burnish marks, pit-like indications (not corrosion related), tube-to-tube wear, wear at tube supports). If any volumetric indications attributed to corrosion (e.g., intergranular attack) were left in service, please discuss your basis for leaving them in service. With respect to the volumetric indications that were plugged, please clarify the reason for plugging these indications. Specifically address whether any of the flaws previously attributed to manufacturing related reasons (e.g., manufacturing burnish marks) have
changed with time. If they have changed, please discuss why and whether this has led to any changes in how you classify indications (since the change may imply an active degradation mechanism at this location).
- 4. In Table 2 of your October 18, 2005 letter, you indicated that various tubes were preventatively plugged due to dents. Please discuss whether there is active denting occurring or whether these tubes were plugged for dents whose characteristics (e.g.,
voltage) may not have changed but that might limit the effectiveness of the eddy current examination. If active denting is occurring, please discuss the cause.
- 5. Please discuss the results of the rotating coil examination of your dents/dings. Please include the voltage of the dents/dings and the nature of any indications in your response. If any flaw like indications were detected in your dents/dings, please discuss the nature of the indication and the voltage of the dent/ding.
- 6. Please discuss the results of the rotating coil examinations of the U-bend region in rows 1-18.
- 7. Regarding the set screw degradation found in steam generator 32, please discuss the results of your final analysis (e.g., was it consistent with your initial analysis summarized in the NRC letter dated February 23, 2005). In addition, please discuss your plans to address the potential for continuing degradation of these set screws (including inspections and integrity assessments).