ML061320542: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML061320542
| number = ML061320542
| issue date = 03/15/2006
| issue date = 03/15/2006
| title = E-mail from G. Bowman of Usnrc to S. Smith of Usnrc, Regarding Executive Summaries
| title = E-mail from G. Bowman of USNRC to S. Smith of USNRC, Regarding Executive Summaries
| author name = Bowman G
| author name = Bowman G
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name = Smith S M
| addressee name = Smith S
| addressee affiliation = NRC/FSME
| addressee affiliation = NRC/FSME
| docket = 05000003, 05000247, 05000286
| docket = 05000003, 05000247, 05000286
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Stacy Smith FW: 6 -guriA'a6e"i S a y S ih F :E e u i e S m a Ie --1..I-I~ -- ---- 1-,1- -~-,- -11 11 111,--I 1-- .- -X--=-1.1 Pag -11 From: "Bowman, Greg " <GBowm90@entergy.com>
{{#Wiki_filter:Stacy Smith FW:       6iv  6 -guriA'a6e"iS--1..I-I~
To: "'sms4@nrc.gov"'  
ay Sih F--:E----
<sms4@nrc.gov>
e ui eS 1-,1-maIe-~-,- -11 11 111,--I     1-- .-   -X--=-1.1 Pag -11 From:               "Bowman, Greg " <GBowm90@entergy.com>
Date: 3/15/06 8:28AM  
To:                 "'sms4@nrc.gov"' <sms4@nrc.gov>
Date:               3/15/06 8:28AM


==Subject:==
==Subject:==
FW: Executive Summaries From: Croulet, Donald Sent: Thursday, January 26, 2006 12:16 PM To: Janicki, John; 'James Noggle'; 'Timothy Rice'; PRICE, ERNEST JR; Robert Oliveira (boliveira@
FW: Executive Summaries From: Croulet, Donald Sent: Thursday, January 26, 2006 12:16 PM To: Janicki, John; 'James Noggle'; 'Timothy Rice'; PRICE, ERNEST JR; Robert Oliveira (boliveira@ amnucins.com) <mailto:boliveira@amnucins.com)>; Cox, Mark R; Bowman, Greg
amnucins.com)  
<mailto:boliveira@amnucins.com)>;
Cox, Mark R; Bowman, Greg  


==Subject:==
==Subject:==
FW: Executive Summaries fyi From: Lavera, Ron Sent: Thursday, January 26, 2006 11:15 AM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta;ERNEST PRICE; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Robert Oliveira; Ron Lavera; Ronald Sachatello; T. R. Jones; Thomas Burns  
FW: Executive Summaries fyi From: Lavera, Ron Sent: Thursday, January 26, 2006 11:15 AM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; ERNEST PRICE; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Robert Oliveira; Ron Lavera; Ronald Sachatello; T. R. Jones; Thomas Burns


==Subject:==
==Subject:==
Executive Summaries Please see the attached sample executive summaries.
Executive Summaries Please see the attached sample executive summaries.
Ron <<mwexecsummSort-byDateJan_26_2006.doc>>
Ron <<mwexecsummSort-byDateJan_26_2006.doc>>
<<mwexecsummSortby_WellJan_26_2006.doc>>
            <<mwexecsummSortby_WellJan_26_2006.doc>>
RLaVera entergy.com  
RLaVera entergy.com <mailto:RLaVera&#xa9;entergy.com>
<mailto:RLaVera&#xa9;entergy.com>
914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308 c!:\ternP\G}QO0TMP--I Page 1111----1-1111-Mail Envelope Properties (4418167A.027:
Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308
1: 57383)
 
c!:\ternP\G}QO0TMP--I                                             1111----1-1111- Page Mail Envelope Properties     (4418167A.027: 1: 57383)


==Subject:==
==Subject:==
Creation Date: From: Created By: FW: Executive Summaries 3/15/06 8:27AM"Bowman, Greg " <GBowm90@entergy.com>
FW: Executive Summaries Creation Date:        3/15/06 8:27AM From:                  "Bowman, Greg " <GBowm90@entergy.com>
GBowm90@entergy.com Recipients nrc.gov kpl-po.KPDO SMS4 (Stacy Smith)Post Office kpl-po.KP.DO Route nrc.gov]Files Size Date &MESSAGE 1348 03/15/0 TEXT.htm 3635 mwexecsummSort_byvDate Jan_26_2006.doc 142336 mwexecsumm__Sortby-WellJan_26_2006.doc 218624 Mime.822 501770 Time 5 08:27AM Options Expiration Date: Priority: Reply Requested:
Created By:            GBowm90@entergy.com Recipients nrc.gov kpl-po.KPDO SMS4 (Stacy Smith)
Return Notification:
Post Office                                     Route kpl-po.KP.DO                                   nrc.gov
Concealed  
            ]Files                         Size             Date & Time MESSAGE                       1348             03/15/0 5 08:27AM TEXT.htm                       3635 mwexecsummSort_byvDate Jan_26_2006.doc           142336 mwexecsumm__Sortby-WellJan_26_2006.doc           218624 Mime.822                       501770 Options Expiration Date:               None Priority:                     Standard Reply Requested:               No Return Notification:           None Concealed  


==Subject:==
==Subject:==
Security: None Standard No None No Standard I. __ I --1 -w IZ, , I , Z' --- ---- -I1-1-1 I -, 'Stacv Smith -mw execsumm Sort "qO--_q.doc Page 1 4 Stacy Smithr .....,= ->9 mw eesusSmmSo,__..r.....by,,...,.
No Security:                     Standard
_:at,,,,,___e
 
,_Ja_ .,,.,,26.  
I. --- __
= 006;.,o Pag 1,..................................v..,,,=.....
'Stacv  ' I--- mw Smith        1-11-execsumm- I1wIZ,
..On-Site Monitoring Wells Sorted by Date Executive Summary January 2 6 th Date ID Location Sample Results 9/28- MW-107 NEM ND/HTO 29/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO MW-111 Transformer Yard 212,000 pCi/l HTO 10/5/05 MW-111 Transformer Yard 188,000 pCi/l HTO 10/6/05 U3-1 U3 Discharge Canal 417 pCi/l HTO U3-2 U3 Discharge Canal 960 pCi/I HTO U3-3 U3 Discharge Canal 439 pCi/l HTO 10/7/05 U3-T1 U3 South Turbine 703 pCiIl HTO U3-T2 U3 North Turbine 1,590 pCi/I HTO MW-111 Transformer Yard 188,000 pCi/I HTO 10/14/05 MW-111 Transformer Yard 6,820 pCi/I HTO (rain)MW-111 Transformer Yard 6,320 pCi/I HTO (back-up)10/16/05 U3-4 U3 Condensate Polisher 406 pCi/A HTO 10/18/05 MH-B8 IP-3 Manhole IP-3 Disch Canal 959 pCi/I HTO East of IP-3 Monitor Tank MH-A4 ND/HTO 10/21/05 MW-111 Transformer Yard 284,000 pCill HTO 267,000 pCi/I HTO DEC 10/21/05 U3-1 U3 Discharge Canal ND/HTO U3-1 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal 512 pCi/I HTO DEC U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 399 pCi/I HTO U3-4 U3 Condensate Polisher 344 pCi/I HTO DEC U3-T1 U3 South Turbine ND/HTO U3-T1 U3 South Turbine ND/HTO DEC U3-T2 U3 North Turbine 1,470 pCi/l HTO U3-T2 U3 North Turbine 1,420 pCi/I HTO DEC mwexecsummSort-byDateJan_26_2006.doc 7 Page 1 of  
                                      - , ISort, Z'
,do--.111-11 ",V,-V -- -- --~ I --~ -~ _ -~ -- ~Y -- --~. , -~ -....Page 2,.1 Stacy Smith -mwexecsummSorLbyDateJan26_2006.doc Page 2 On-Site Monitoring Wells Sorted by Date Executive Sununary January 2 6 th 10/28/05 MW-l1l Transformer Yard 218,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal NDI/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-T1 U3 South Turbine NDIHTO U3-T2 U3 North Turbine 1,280 pCi/I HTO 11/4/05 MW-111 Transformer Yard 302,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal NDIHTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO Date ID Location Sample Results 11/3-4/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/05 MW-111 Transformer Yard 246,000 pCi/I HTO U3-1 U3 Discharge Canal NDIHTO U3-2 U3 Discharge Canal NDIHTO U3-3 U3 Discharge Canal 471 pCi/I HTO U3-4 U3 Condensate Polisher NDIHTO U3-T1 U3 South Turbine 563 pCi/I HTO U3-T2 U3 North Turbine 1,640 pCi/I HTO MH-6 Transformer Yard 51,300 pCi/I HTO 11/18/05 MW-111 Transformer Yard 171,000 pCi/I HTO U3-1 U3 Discharge Canal NDIHTO U3-2 U3 Discharge Canal ND/IHTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,130 pCiA HTO 11/22/05 MW-111 Transformer Yard 180,000 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc 7 Page 2 of 11,11-1  
                                                  - e'ypa
--- I,, I -, -__ , ''." ., --... ... ---1 11-111-111"",--, -iiiiffi__ , , "So-'r' ... C-6, --, b -a- t- 6 -J... an i",2",,6"""2"0"0-6,-.--do"c,', Page 31 Stac Smith ---~ ..... " _-- -wexcum~rb Dat_Ja_26_2006.doc Page_ _ __... _6......._
                                                      - --     - ---   - I1-1-1 I - ,
_,___,- 3 ----On-Site Monitoring Wells Sorted by Date Executive Summary January 2 6 th 12/02/05 MW-l1l Transformer Yard 125,000 pCiVI HTO MW-38 End of IP-3 Discharge Canal Concrete ND/HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine- 498 pCi/I HTO U3-T2 U3 North Turbine 1,130 pCi/I HTO 12/5/05 MW-38 End of IP-3 Discharge Canal Concrete ND/HTO 12/6/05 MW-38 End of IP-3 Discharge Canal Concrete ND/HTO 12/8/05 MW-101 U2 Warehouse ND/HTO MW-101 U2 Warehouse ND Sr-90 Teledyne MW-105 Maintenance Training ND/HTO MW-105 Maintenance Training ND Sr-90 Teledyne MW-107 NEM ND/HTO MW-107 NEM ND Sr-90 Teledyne MW-38 End of IP-3 Discharge Canal Concrete 985 pCi/I HTO MW-38 End of IP-3 Discharge Canal Concrete 701 pCi/I HTO DEC MW-38 End of IP-3 Discharge Canal Concrete ND Sr-90 Teledyne 12/08/05 MW-l1l Transformer Yard 270,000 pCi/I HTO MH-3 North of IP-2 Turb. 894 pCi/I HTO MH-5 Transformer Yard 2,020 pCill HTO MH-6 Transformer Yard 37,100 pCi/i HTO MW-38 End of IP-3 Discharge Canal Concrete 985 pCi/I HTO MW-101 EOF 701 pCi/I HTO DEC MW-101 EOF ND/HTO MW-105 Maint. Train. Facil ND/HTO DEC MW-105 Maint. Train. Facil ND/HTO MW-107 NEM Well 96 pCi/I HTO DEC MW-107 NEM Well ND/HTO 12113/05 MW-34 Transformer Yard 63,900 pCiAi HTO MW-35 Transformer Yard 42,300 pCi/I HTO 12/15/05 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 399 pCi/I HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,290 pCi/I HTO MW-33 Transformer Yard 142,000 pCi/I HTO MW-111 Transformer Yard 296,000 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc 7 Page 3 of  
                                                                        "qO     _q.doc                                         Page 1 4 Stacy Smithr .....
"' 6 _s, u, m, --S 6'r, _t b, y-, -, -D, -a" i _e, ....... .J, , "a' _n, , , , , 2-6 d , , d", o, c Page Stacy Smith ,-,rn-exesum o, yat_Jan X~_I- _26_20.....06.-doc  
                ->9mw eesusSmmSo,__..r.....by,,...,.
-~_ -----__--1-1,-1 I.. ..... ,,_ Pag 4 On-Site Monitoring Wells Sorted by Date Executive Summary January 261h 12/16/05 MH-19 Transformer Yard 1,800 pCi/Q HTO MH-18 Transformer Yard 854 pCi/l HTO MH-17 Transformer Yard 1,710 pCi/l HTO MH-10 Transformer Yard 2,940 pCi/l HTO MH-9 Transformer Yard 2,140 pCi/l HTO MH-8 Transformer Yard 4,510 pCi/I HTO MH-6 Transformner Yard 12,200 pCi/l HTO MH-4 Transformer Yard 4,320 pCi/l HTO MH-2 North of IP-2 Turb 651 pCi/l HTO 12/19/05 MW-33 Transformer Yard 199,000 pCi/l HTO MW-34 Transformer Yard 121,000 pCi/I HTO MW-35 Transformer Yard 76,000 pCi/A HTO MW-111 Transformer Yard 192,000 pCi/l HTO MH-3 North of IP-2 Turb. 2,330 pCi/l HTO MH-5 ABFP Bldg).. 6,920 pCi/l HTO MH-7 Transformer Yard 5,340 pCi/l HTO 12/19/05 Discharge Hudson River <MDA pCi/l HTO Canal 12/20/05 MH4-3 ',-Outside of Turbine Bldg. 2,330 pCill HTO MH-S Aux Feed Bldg. 6,920 pCi/l HTO 12/21/05 MH-4A Condensor Tube Pull Pit 2,730 pCi/I HTO MH-I River Front Dry -No Sample Taken 12/29/05 MW-l1l MOB 212,000 pCi/I HTO MW-33 Transformer Yard 220,000 pCi/l HTO MW-34 Transformer Yard 147,000 pCi/I HTO MW-35 Transformer Yard 80,500 pCi/I HTO 12/30/05 MW-31 MOB 4,060 pCi/l HTO U3-1 U3 Discharge Canal 651 pCi/l HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HrO U3-4 U3 Discharge Canal 442 pCi/l HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,690 pCi/I HTO MW-31 Outside MOB 4,060 pCi/l HTO MW-38 End of IP-3 Discharge Canal Concrete ND/HTO, mwexecsummSort-byDateJan_26_2006.doc 7 Page 4 of  
                            ,=                                              =006;.,o
----I,,--,',', 1-11 ----- ---'- .....-- ----,-_--, j, -_ __-'-"'_""'-"'__'
                                                                ,_Ja_ .,,.,,26.
I an-26-2006.doc Page 5 j Stacy~K Smith , mw_execsumm
_:at,,,,,___e                                                      Pag 1,.....
-- --or---b-- -ate I Ja_6_06.o Page 5 1--11111-  
On-Site Monitoring Wells Sorted by Date Executive Summary January    2 6 th Date                  ID                                Location            Sample Results 9/28-        MW-107                NEM                                        ND/HTO 29/05        MW-108                GT-1                                        ND/HTO MW-109                 GT-1                                       ND/HTO MW-111                 Transformer Yard                 212,000 pCi/l HTO 10/5/05       MW-111                 Transformer Yard                 188,000 pCi/l HTO 10/6/05       U3-1                   U3 Discharge Canal                     417 pCi/l HTO U3-2                   U3 Discharge Canal                     960 pCi/I HTO U3-3                   U3 Discharge Canal                     439 pCi/l HTO 10/7/05       U3-T1                 U3 South Turbine                       703 pCiIl HTO U3-T2                 U3 North Turbine                   1,590 pCi/I HTO MW-111                 Transformer Yard                 188,000 pCi/I HTO 10/14/05       MW-111                 Transformer Yard                     6,820 pCi/I HTO (rain)
-, On-Site Monitoring Wells Sorted by Date Executive Summary January 2 6 th 1/4/06 MH-2A CB-4 CB12 CB-24 MH-1 MH-2 MH-3 MH-4 MH-4A MH-5 MH-6 MH-7 MH-8 MH-12 MH-14'I I By IP-2 EDG By IP-2 RWST 3 South U1 Superheater
MW-111                 Transformer Yard                     6,320 pCi/I HTO (back-up) 10/16/05       U3-4                   U3 Condensate Polisher                 406 pCi/A HTO 10/18/05       MH-B8                 IP-3 Manhole IP-3 Disch Canal         959 pCi/I HTO East of IP-3 Monitor Tank MH-A4                                                             ND/HTO 10/21/05       MW-111                 Transformer Yard                 284,000 pCill HTO 267,000 pCi/I HTO DEC 10/21/05       U3-1                   U3 Discharge Canal                         ND/HTO U3-1                   U3 Discharge Canal                       ND/HTO DEC U3-2                   U3 Discharge Canal                       ND/HTO DEC U3-2                   U3 Discharge Canal                     512 pCi/I HTO DEC U3-3                   U3 Discharge Canal                         ND/HTO U3-4                   U3 Condensate Polisher                 399 pCi/I HTO U3-4                 U3 Condensate Polisher                 344 pCi/I HTO DEC U3-T1                 U3 South Turbine                             ND/HTO U3-T1                 U3 South Turbine                         ND/HTO DEC U3-T2                 U3 North Turbine                       1,470 pCi/l HTO U3-T2                 U3 North Turbine                       1,420 pCi/I HTO DEC mwexecsummSort-byDateJan_26_2006.doc                                               Page 1 of 7
,,By IP-2 Security Bldg.3 North of IP-2 Turb. Bldg.North of IP-2 Turb. Bldg.North of IP-2 Turb. Bldg 4Between Turb. & A B)P-2 Cond. Tub Pit JIP-2 ABFP Bldg'IP-2 Transformer Yard IP-2 Transformer Yard IP-2 Transformer Yard North End IP-2 Turb.North End IP-2 Turb.ND/HTO 1,010 pCi/l HTO ND/HTO 822 pCi/i HTO ND/HTO ND/HTO 3,450 pCi/l HTO 3,070 pCi/I HTO 3,380 pCi/l HTO 3,480 pCi/i HTO 13,100 pCi/I HTO 8,140 pCi/l HTO 5,740 pCi/l HTO ND/HTO ND/HTO A4 1/5/06 MW-31 MOB 3,050 pCi/l HTO 1/6/06 MW-l1l Transformer Yard 113,740 pCi/I HTO MW-33 Transformer Yard 189,000 pCi/i HTO MW-34 Transformer Yard 159,000 pCi/i HTO MW-35 Transformer Yard 95,400 pCi/i HTO MW-38 End of IP-3 Discharge Canal Concrete 1,018 pCi/l HTO U3-T2 U3 North Turbine 2,417 pCi/I HTO 1/10/06 MW-31 Outside MOB 4,030 pCi/l HTO 1-11-06 SD A2 East of IP-3 PAB ND/HTO SD A4 East of A2 South of A3 ND/HTO SD B 1 IP-3 Trans Yard 4,530 pCi/l HTO SD B3 IP-3 Trans Yard 6,280 pCi/i HTO SD B4 West U3 VC East Turb 3,180 pCi/I HTO SD B5 North IP-3 Turb IP-3 VC 5,200 pCi/lH TO SD B7 North IP-3 Turb Hall 2,510 pCi/l HTO SD Cl West of IP-3 Admin Bldg 997 pCi/l HTO SD D2 .South IP-3 Admin Bldg ND/HTO 1/12/06 MW-32 Between PAB & FSB 3,720 pCi/l HTO U3-1 U3 Discharge Canal 744 pCi/l HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 573 pCi/l HTO U3-T1 U3 South Turbine 787 pCi/l HTO U3-T2 U3 North Turbine 1,780 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc 7 Page 5 of y mith -mwexecsummSort by Date-Jan-26-2006.doc 1-1 ---1111-1-1-1  
 
-1 1-1--l" I,--- I', ----I,--- --1 I__ --- -11, ---__ ---,--K Pa9qAI Stacy Smith -mwexecsummSorLbyDateJan_26_2006.doc Page 6:j On-Site Monitoring Wells Sorted by Date Executive Summary January 2 6 th 1-13-06 MW-111 Transformer Yard 199,000 pCi/l HTO MW-33 Transformer Yard 232,000 pCi/l HTO MW-34 Transformer Yard 131,000 pCi/l HTO MW-35 Transformer Yard 97,800 pCi/I HTO 1-13-06 MH-13 IP-2 East of MH-12 ND/HTO MH-15 North east of MH-14 South IP-i Super ND/HTO CB-12 Heater 849 pCi/I HTO CB-13 South IP-1 Super Heater 856 pCi/I HTO CB-14 West of CB-13 734 pCi/I HTO CB-15 U2 North of MH-14 ND/HTO CB-19 South MH-14 ND/HTO 1/17/06 SD Bi Trans Yard IP-3 5,010 pCi/l HTO SD B3 Trans Yard IP-3 4,650 pCi/l HTO SD B4 North U3 Turb'& VC 3,430 pCi/l HTO SD B6 North IP-3 Turb. ND/HTO SD B7 North U3 Turb 2,690 pCi/I HTO SD Cl West U3 Admin 867 pCi/l HTO SD D2 South U3 Admin ND/HTO SD E4 South End Admin & road ND/HTO SD E4A SE End U3 Admin South of road ND/HTO SD E5 SW End Admin & South of Road ND/HTO SD E5A SE End U3 Admin South of road ND/HTO SD E6 SW U3 Admin South of Road ND/HTO SD E7 West U3 Admin by Disch Canal ND/HTO 1/19/06 CB-12 South IP-1 Super Heater 849 pCi/i HTO CB-15 South Ul Screen Structure 959 pCi/l SD A2 East of IP-3 PAB ND/HTO SD A6 West of U3 WH-U Tank Pad 686 pCi/l SD El South East Road way ND/HTO SD E2 South East Road way ND/HTO SD E2B South East Road way ND/HTO SD E3 South of Admin & north of road ND/HTO SD E3A South of Admin in road ND/HTO MH-2 River Front ND/HTO MH-3 North of IP-2 Turbine Building 2,240 pCi/I MH4 Transformer Yard 3,780 pCi/l MH-5 ux Feed Bldg3 3,570 pCi/l MH-6 aransformer Yard 18,600 pCi/I MH-7 Transformer Yard 3,840 pCi/i MH-12 West of IP-2 Turb. Bldg. by river ND/HTO MH-14 North End IP-2 Turb. 1,310 pCi/l mwexecsummSort-byDate_Jan_26_2006.doc 7 Page 6 of Ftac Smth-- mweesMm Sort_bv_Date_Jan_26_2006.doc Page 7 J.=. ,*<S .; ......> a>* .. K < As, .= ..z:EMuE.u<.  
                                                                              ~        ~
= .g< ................................................
                                                                      - - ",V,-VI---- -- - ~_-   ~-- ~Y -- -         ~ . ...
....,.m,.<= ..vvYe Stacy Smith -
                                                                                                                -~. , - -
Page 7  On-Site Monitoring Wells Sorted by Date Executive Summary January 26'Monitoring Wells I Locations Off-Site Date Location Results 10/18/05 Croton Reservoir ND/HTO -Gamma Camp Field Reservoir ND/HTO -Gamma 10/20/05 Gypsum Outfall ND/HTO -Gamma Algonquin NDIHTO -Gamma 5' Street Well ND/HTO -Gamma 10/25/05 Rock Quarry ND/HTO -Gamma 11/8/05 5' Street Well NDIHTO -Gamma 11/30/05 Gypsum Outfall
                                                ,do-              -. 111-11 Page 2,.1 Page 2 Stacy Smith mwexecsummSorLbyDateJan26_2006.doc On-Site Monitoring Wells Sorted by Date Executive Sununary January 26 th 10/28/05 MW-l1l     Transformer Yard                         218,000 pCi/I HTO U3-1       U3 Discharge Canal                                     ND/HTO U3-2       U3 Discharge Canal                                     NDI/HTO U3-3       U3 Discharge Canal                                     ND/HTO U3-4       U3 Condensate Polisher                             405 pCi/i HTO U3-T1     U3 South Turbine                                       NDIHTO U3-T2     U3 North Turbine                               1,280 pCi/I HTO 11/4/05 MW-111     Transformer Yard                           302,000 pCi/I HTO U3-1       U3 Discharge Canal                                     ND/HTO U3-2       U3 Discharge Canal                                     NDIHTO U3-3       U3 Discharge Canal                                     ND/HTO U3-4       U3 Condensate Polisher                                 ND/HTO U3-T1     U3 South Turbine                                       ND/HTO U3-T2     U3 North Turbine                               1,190 pCi/I HTO Date       ID                 Location                               Sample Results 11/3-4/05 MW-108     GT-1                                                   ND/HTO MW-109     GT-1                                                   ND/HTO 11/10/05 MW-111     Transformer Yard                         246,000 pCi/I HTO U3-1       U3 Discharge Canal                                     NDIHTO U3-2       U3 Discharge Canal                                     NDIHTO U3-3       U3 Discharge Canal                               471 pCi/I HTO U3-4       U3 Condensate Polisher                                 NDIHTO U3-T1     U3 South Turbine                                 563 pCi/I HTO U3-T2     U3 North Turbine                               1,640 pCi/I HTO MH-6       Transformer Yard                           51,300 pCi/I HTO 11/18/05 MW-111     Transformer Yard                         171,000 pCi/I HTO U3-1       U3 Discharge Canal                                     NDIHTO U3-2       U3 Discharge Canal                                     ND/IHTO U3-3       U3 Discharge Canal                                     ND/HTO U3-4       U3 Condensate Polisher                                 ND/HTO U3-T1     U3 South Turbine                                       ND/HTO U3-T2     U3 North Turbine                                 1,130 pCiA HTO 11/22/05 MW-111     Transformer Yard                         180,000 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc                                         Page 2 of 7
* NDJHTO 11/30/05 Algonquin
 
11,11-1
                                                                                                                ---I,, I-, - __, ''." . ,     -- ...... - - -111-111-111""
iiiiffi__  w_6x-6ecsumn , , "So-'r'...
C-6, --,b-a-t J...an i",2",,6"""2"0"0-6,-.--do"c,',                                                                   Page 31 Stac Smith     - wexcum~rb
                    --- ~ ....."     _--         Dat_Ja_26_2006.doc                                                       _ __... _6......._ _,___,-           Page_ 3 On-Site Monitoring Wells Sorted by Date Executive Summary January 26th 12/02/05   MW-l1l                 Transformer Yard                                 125,000 pCiVI HTO MW-38                   End of IP-3 Discharge Canal Concrete                             ND/HTO U3-1                   U3 Discharge Canal                                               ND/HTO U3-2                   U3 Discharge Canal                                               ND/HTO U3-3                   U3 Discharge Canal                                               ND/HTO U3-4                   U3 Condensate Polisher                                         ND/HTO U3-T1                   U3 South Turbine-                                       498 pCi/I HTO U3-T2                   U3 North Turbine                                     1,130 pCi/I HTO 12/5/05     MW-38                   End of IP-3 Discharge Canal Concrete                           ND/HTO 12/6/05     MW-38                   End of IP-3 Discharge Canal Concrete                           ND/HTO 12/8/05     MW-101                 U2 Warehouse                                                   ND/HTO MW-101                 U2 Warehouse                                           ND Sr-90 Teledyne MW-105                 Maintenance Training                                             ND/HTO MW-105                 Maintenance Training                                   ND Sr-90 Teledyne MW-107                 NEM                                                             ND/HTO MW-107                 NEM                                                     ND Sr-90 Teledyne MW-38                 End of IP-3 Discharge             Canal Concrete     985 pCi/I HTO MW-38                 End of IP-3 Discharge             Canal Concrete     701 pCi/I HTO DEC MW-38                 End of IP-3 Discharge             Canal Concrete       ND Sr-90 Teledyne 12/08/05     MW-l1l                 Transformer Yard                                 270,000 pCi/I HTO MH-3                   North of IP-2 Turb.                                   894 pCi/I HTO MH-5                   Transformer Yard                                     2,020 pCill HTO MH-6                   Transformer Yard                                   37,100 pCi/i HTO MW-38                 End of IP-3 Discharge             Canal Concrete     985 pCi/I HTO MW-101                 EOF                                                   701 pCi/I HTO DEC MW-101                 EOF                                                             ND/HTO MW-105                 Maint. Train. Facil                                         ND/HTO DEC MW-105               Maint. Train. Facil                                               ND/HTO MW-107                 NEM Well                                                   96 pCi/I HTO DEC MW-107               NEM Well                                                         ND/HTO 12113/05   MW-34                   Transformer Yard                                   63,900 pCiAi HTO MW-35                 Transformer Yard                                   42,300 pCi/I HTO 12/15/05   U3-1                   U3 Discharge Canal                                               ND/HTO U3-2                   U3 Discharge Canal                                               ND/HTO U3-3                   U3 Discharge Canal                                               ND/HTO U3-4                   U3 Discharge Canal                                     399 pCi/I HTO U3-T1                 U3 South Turbine                                                 ND/HTO U3-T2                 U3 North Turbine                                     1,290 pCi/I HTO MW-33                 Transformer Yard                                   142,000 pCi/I HTO MW-111                 Transformer Yard                                   296,000 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc                                                                 Page 3 of 7
 
Smith Stacy
        "' 6_s,u,m m,- -S6'r,_t b,y-,
o, yat_Jan
                ,-,rn-exesum
                                    -,-D,
                                        -a" i_e,.......
                                                .J,,"a'
_n,,,,2-6 d                                         X~_I-_26_20.....06.-doc 6,_
                                                                      ,,d",
o,c
                                                                                  - ~_ - ---- __--1-1,-1       I.. ..... ,,_ Page Pag 4 On-Site Monitoring Wells Sorted by Date Executive Summary January 261h 12/16/05       MH-19                     Transformer Yard                           1,800 pCi/QHTO MH-18                   Transformer Yard                                 854 pCi/l HTO MH-17                   Transformer Yard                             1,710 pCi/l HTO MH-10                   Transformer Yard                             2,940 pCi/l HTO MH-9                     Transformer Yard                             2,140 pCi/l HTO MH-8                     Transformer Yard                             4,510 pCi/I HTO MH-6                     Transformner Yard                           12,200 pCi/l HTO MH-4                     Transformer Yard                             4,320 pCi/l HTO MH-2                     North of IP-2 Turb                               651 pCi/l HTO 12/19/05       MW-33                   Transformer Yard                           199,000 pCi/l HTO MW-34                   Transformer Yard                           121,000 pCi/I HTO MW-35                   Transformer Yard                           76,000 pCi/AHTO MW-111                   Transformer Yard                           192,000 pCi/l HTO MH-3                     North of IP-2 Turb.                           2,330 pCi/l HTO MH-5                           ABFP Bldg)..                           6,920 pCi/l HTO MH-7                   Transformer Yard                               5,340 pCi/lHTO 12/19/05       Discharge               Hudson River                               <MDA pCi/l HTO Canal 12/20/05       MH4-3               ',-Outside of Turbine Bldg.                       2,330 pCill HTO MH-S                     Aux Feed Bldg.                               6,920 pCi/l HTO 12/21/05       MH-4A                   Condensor Tube Pull Pit                       2,730 pCi/I HTO MH-I                   River Front                                   Dry - No Sample Taken 12/29/05       MW-l1l                 MOB                                         212,000 pCi/I HTO MW-33                   Transformer Yard                             220,000 pCi/l HTO MW-34                   Transformer Yard                             147,000 pCi/I HTO MW-35                   Transformer Yard                               80,500 pCi/I HTO 12/30/05       MW-31                   MOB                                             4,060 pCi/l HTO U3-1                   U3 Discharge Canal                                 651 pCi/l HTO U3-2                   U3 Discharge Canal                                     ND/HTO U3-3                   U3 Discharge Canal                                     ND/HrO U3-4                   U3 Discharge Canal                                 442 pCi/l HTO U3-T1                   U3 South Turbine                                       ND/HTO U3-T2                   U3 North Turbine                               1,690 pCi/I HTO MW-31                   Outside MOB                                     4,060 pCi/l HTO MW-38                   End of IP-3 Discharge Canal Concrete                   ND/HTO, mwexecsummSort-byDateJan_26_2006.doc                                                         Page 4 of 7
 
                                                                        -         - - -I,,--,',', 1   - --- - -- '- ....-- - - -- ,
I Stacy~K Smith ,mw_execsumm
                      -- - -or---b--      j,
                                    -_--,-ate    I -___-'-"'_""'-"'__'
an-26-2006.doc Ja_6_06.o                          -,
Page 5 j Page 5 1--
On-Site Monitoring Wells Sorted by Date Executive Summary January       2 6th 1/4/06   MH-2A           By IP-2 EDG                                                  ND/HTO CB-4       'I By IP-2 RWST 3                                         1,010 pCi/l HTO CB12            South U1 Superheater                                         ND/HTO CB-24      I  ,,ByIP-2 Security Bldg.3                                 822 pCi/i HTO MH-1            North of IP-2 Turb. Bldg.                                   ND/HTO MH-2            North of IP-2 Turb. Bldg.                                   ND/HTO MH-3            North of IP-2 Turb. Bldg                             3,450 pCi/l HTO MH-4          4Between Turb. & A B                                   3,070 pCi/I HTO MH-4A          )P-2 Cond. Tub Pit                                   3,380 pCi/l HTO MH-5        A4 JIP-2 ABFP Bldg'                                       3,480 pCi/i HTO MH-6            IP-2 Transformer Yard                               13,100 pCi/I HTO MH-7            IP-2 Transformer Yard                               8,140 pCi/l HTO MH-8            IP-2 Transformer Yard                               5,740 pCi/l HTO MH-12          North End IP-2 Turb.                                         ND/HTO MH-14          North End IP-2 Turb.                                         ND/HTO 1/5/06  MW-31          MOB                                                  3,050 pCi/lHTO 1/6/06  MW-l1l          Transformer Yard                                113,740 pCi/I HTO MW-33            Transformer Yard                                189,000 pCi/i HTO MW-34          Transformer Yard                                159,000 pCi/i HTO MW-35          Transformer Yard                                    95,400 pCi/i HTO MW-38          End of IP-3 Discharge Canal Concrete                1,018 pCi/l HTO U3-T2            U3 North Turbine                                2,417 pCi/I HTO 1/10/06 MW-31           Outside MOB                                         4,030 pCi/l HTO 1-11-06  SD A2          East of IP-3 PAB                                              ND/HTO SD A4            East of A2 South of A3                                        ND/HTO SD B 1          IP-3 Trans Yard                                       4,530 pCi/lHTO SD B3            IP-3 Trans Yard                                       6,280 pCi/i HTO SD B4            West U3 VC East Turb                                  3,180 pCi/I HTO SD B5            North IP-3 Turb IP-3 VC                                5,200 pCi/lHTO SD B7            North IP-3 Turb Hall                                  2,510 pCi/lHTO SD Cl            West of IP-3 Admin Bldg                                  997 pCi/lHTO SD D2          .South IP-3 Admin Bldg                                          ND/HTO 1/12/06 MW-32            Between PAB & FSB                                      3,720 pCi/lHTO U3-1             U3 Discharge Canal                                      744 pCi/lHTO U3-2            U3 Discharge Canal                                            ND/HTO U3-3            U3 Discharge Canal                                            ND/HTO U3-4            U3 Discharge Canal                                        573 pCi/lHTO U3-T1            U3 South Turbine                                          787 pCi/l HTO U3-T2            U3 North Turbine                                      1,780 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc                                                    Page 5 of 7
 
                                                        --   --   -         1--l"I,--- I',-- ---I,--- - -1I__ - -- -11, - - - __-- - ,
1111-1-1-1 y mith - mwexecsummSort by Date-Jan-26-2006.doc 1-1                                                           --K__        Pa9qAI Stacy Smith mwexecsummSorLbyDateJan_26_2006.doc Page 6:j On-Site Monitoring Wells Sorted by Date Executive Summary January 26th 1-13-06 MW-111    Transformer  Yard                      199,000 pCi/l HTO MW-33      Transformer  Yard                      232,000 pCi/l HTO MW-34      Transformer  Yard                      131,000 pCi/l HTO MW-35      Transformer  Yard                      97,800 pCi/I HTO 1-13-06 MH-13      IP-2 East of MH-12                                    ND/HTO MH-15      North east of MH-14 South IP-i Super                  ND/HTO CB-12      Heater                                          849 pCi/I HTO CB-13      South IP-1 Super Heater                        856 pCi/I HTO CB-14      West of CB-13                                  734 pCi/I HTO CB-15      U2 North of MH-14                                      ND/HTO CB-19      South MH-14                                            ND/HTO 1/17/06 SD Bi      Trans Yard IP-3                              5,010 pCi/l HTO SD B3      Trans Yard IP-3                              4,650 pCi/l HTO SD B4      North U3 Turb'& VC                          3,430 pCi/l HTO SD B6      North IP-3 Turb.                                      ND/HTO SD B7      North U3 Turb                                2,690 pCi/I HTO SD Cl      West U3 Admin                                  867 pCi/l HTO SD D2      South U3 Admin                                        ND/HTO SD E4      South End Admin & road                                ND/HTO SD E4A    SE End U3 Admin South of road                          ND/HTO SD E5      SW End Admin & South of Road                          ND/HTO SD E5A    SE End U3 Admin South of road                          ND/HTO SD E6      SW U3 Admin South of Road                              ND/HTO SD E7      West U3 Admin by Disch Canal                          ND/HTO 1/19/06 CB-12      South IP-1 Super Heater                      849 pCi/i HTO CB-15      South Ul Screen Structure                    959 pCi/l SD A2      East of IP-3 PAB                                      ND/HTO SD A6      West of U3 WH-U Tank Pad                    686 pCi/l SD El      South East Road way                                    ND/HTO SD E2      South East Road way                                  ND/HTO SD E2B    South East Road way                                    ND/HTO SD E3      South of Admin & north of road                        ND/HTO SD E3A    South of Admin in road                                 ND/HTO MH-2      River Front                                            ND/HTO MH-3      North of IP-2 Turbine Building            2,240 pCi/I MH4        Transformer Yard                          3,780 pCi/l MH-5        ux Feed Bldg3                            3,570 pCi/l MH-6      aransformer Yard                        18,600 pCi/I MH-7      Transformer Yard                          3,840 pCi/i MH-12     West of IP-2 Turb. Bldg. by river                    ND/HTO MH-14      North End IP-2 Turb.                      1,310 pCi/l mwexecsummSort-byDate_Jan_26_2006.doc                                    Page 6 of 7
 
Ftac  Smth-- mweesMm      Sort_bv_Date_Jan_26_2006.doc                                                                                                                          Page 7 JI Page 7 Stacy Smith mwexecsummSorLbyDateJan_26_2006.doc
                                                                                                                      ................................................ .... ,.m,.<= .. vvYe
                                                          . =. ,*<S .; . ..... > a>* .. K< As, . = .. z:EMuE.u<. = .g<
On-Site Monitoring Wells Sorted by Date Executive Summary January 26' Monitoring Wells I Locations Off-Site Date                         Location                                                                             Results 10/18/05 Croton Reservoir                                                               ND/HTO                 - Gamma Camp Field Reservoir                                                           ND/HTO                 - Gamma 10/20/05 Gypsum Outfall                                                                 ND/HTO                 - Gamma Algonquin                                                                     NDIHTO                 - Gamma 5' Street Well                                                                 ND/HTO                 - Gamma 10/25/05 Rock Quarry                                                                   ND/HTO                 - Gamma 11/8/05 5' Street Well                                                                 NDIHTO                 - Gamma 11/30/05 Gypsum Outfall
* NDJHTO 11/30/05 Algonquin
* NDHITO 5' Street Well
* NDHITO 5' Street Well
* ND/HTO Rock Quarry
* ND/HTO Rock Quarry
* NDIHTO Croton Reservoir NDIHTO Camp Field Reservoir NDIHTO 12/6/05 Gypsum Plant Well #1 NDIHTO Gypsum Plant Well #2 NDJHTO 12/13/05 Algonquin Outfall ND/HTO Gypsum Outfall ND/ITO Rock Quarry ND/HTO* Environmental levels only of HTO & Sr-90 from 11/30/05 DEC Split samples mwexecsummSort-by-DateJan_26_2006.doc 7 Page 7 of 1 111 -111.11 I- I- I -11 I -11 I ----I -11, ... .... --11,11,11-I---
* NDIHTO Croton Reservoir                                                               NDIHTO Camp Field Reservoir                                                           NDIHTO 12/6/05 Gypsum Plant Well #1                                                           NDIHTO Gypsum Plant Well #2                                                           NDJHTO 12/13/05 Algonquin Outfall                                                             ND/HTO Gypsum Outfall                                                                 ND/ITO Rock Quarry                                                                   ND/HTO
b,_y'_"'_W_,_,"eIIJa'n"'  
* Environmental levels only of HTO & Sr-90 from 11/30/05   DEC Split samples mwexecsummSort-by-DateJan_26_2006.doc                                                                           Page 7 of 7
'2,,_6"_"_2,_0_0,6_.doc_, Page 1 g[Sac Smith----111 ,X-,-1"- ~, ~I-1 I m-x sm ~ orb~ I -- , I-_Ja---n_26_-2_006.doc'_"-  
 
.. .. " .- ._,___ _ Pag 1 .On-Site Monitoring Wells Sorted by Well Location ExecLItive Summary January 26 th Man-holes (Storm Drains)ID Date Location Sample Results MH-1 12/21/2005 North of IP-2 Turb. Bldg. by Too dry to sample 1/04/2006 Water ND/HTO MH-2 12/16/2005 River Front 651 pCi/I (IPEC)1/4/2006 ND/HTO 1/19/2006 ND/HTO MH-2A 1/4/2006 'By IP-2 EDG G ND/HTO MH-3 11/10/2005 North of IP-2 Turbine Building 1,950 pCi/i 12/8/2005 894 pCi/i 12/20/2005 2,330 pCi/i 1/4/2006 3,450 pCi/I 1/19/2006 2,240 pCi/I MH-4 12/16/2005 Transformer Yard 4,370 pCi/l 1/4/2006 3,070 pCi/i 1/19/2006 3,780 pCi/I MH-4A 12/21/2005 IP-2 Condenser Tube removal pit 2,730 pCi/i 1/4/2006 3,380 pCi/I MH-5 11/10/2005 Xux Feed Bldg 2,390 pCi/I 12/8/2005 2,020 pCi/I 12/20/2005 6,920 pCi/l 1/4/2006 3,480 pCi/i 1/19/2006 3,570 pCi/i MH-6 11/10/2005 Transformer Yard 51,300 pCi/i 12/8/2005 37,100 pCi/i 12/16/2005 12,200 pCi/I 1/4/2006 13,100 pCi/l 1/19/2006 18,600 pCi/I MH-7 12/19/2005 Transformer Yard 5,340 pCi/l 1/4/2006 8,140 pCi/i 1/19/2006 3,840 pCi/I MH-8 12/16/2005 Transformer Yard 4,510 pCi/l 1/4/2006 5,740 pCi/l 1/19/2006 3,210 pCi/I MH-9 12/16/2005 MOB Hill -80' 2,140 pCi/I MH-10 12/16/2005 MOB Hill -80' 2,940 pCi/i MH-12 1/4/2006 West of IP-2 Turb. Bldg. by river ND/HTO 1/13/2006 ND/HTO 1/19/2006 ND/HTO MH-14 1/4/2006 North End IP-2 Turb. ND/HTO 1/19/2006 1,310 pCi/l 5Q.a.CIM 11 f %&aVI Lt mwexecsummSort-byWellJan_26_2006.doc Page I of 8 m Sort by Welijan 26 I[--- I -6 Paqe 219 Stacy Smith -mwexecsummSorLbyWellJan_26_2006.doc Pa On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MH-15 1/13/2006 IP-2 North east of MH-14 ND/HTO MH-17 12/16/2005 Transformer Yard 1,710 pCi/I MH-18 12/16/2005 Transformer Yard 854 pCi/i MH-19 12/16/2005 Transformer Yard 1,800 pCi/i MH-A4 10/18/2005 IP-3 Manhole Located east of the ND/HTO IP-3 Monitor Tank MH-B8 10/18/2005 IP-3 Manhole located west of the 959 pCi/I north end of the IP-3 turbine hall over the discharge canal CB-4 1/4/2006 By IP-2 RWST _ 1,010 pCill CB-12 1/13/2006 South IP-1 Super Heater 849 pCi/I HTO CB-13 1/13/2006 South IP-1 Super Heater 856 pCi/l HTO CB-14 1/13/2006 West of CB-1 3 734 pCi/I HTO CB-15 1/13/2006 South U1 Screen Structure ND/HTO 1/19/2006 959 pCi/I CB-19 1/13/2006 South MH-14 ND/HTO CB-24 1/4/2006 jy IP-2 Sec. Bldg. 822 pCi/i SD A2 1/11/2006 East of IP-3 PAB ND/HTO 1/19/2006 ND/HTO SD A4 1/11/2006 East of A2 south A3 ND/HT 1/19/2006 1,190 pCi/I SD A6 1/19/2006 West of U3 WHU Tank Pad 686 pCi/I SD B 1 1/11/2006 Trans Yard 1P-3 4,530 pCi/i 1/17/2006 5,010 pCi/I SD B3 1/11/2006 Trans Yard IP-3 6,280 pCi/i 1/17/2006 4,650 pCi/I SD B4 1/11/2006 North U3 Turb & VC 3,180 pCi/i 1/17/2006 3,600 pCi/I SD B5 1/11/2006 North U3 Turb & VC 5,200 pCi/i 1/19/2006 3,320 pCi/l SD B6 1/17/2006 North 1P-3 Turb. ND/HTO SD B7 1/11/2006 North U3 Turb 2,510 pCi/i 1/17/2006 2,690 pCi/I SD B8 1/17/2006 North U3 Turb. By Disch Canal ND/HTO SD Cl 1/11/2006 West U3 Admin 997 pCi/l 1/17/2006 867 pCi/I F4 "I mwexecsummSort-byWellJan_26_2006.doc Page 2 of 8  
1               111 -       111.11 I-I- I-     11 I- 11                                 I- -- - I -11,
-----I- .-
                                                                                                    .......- - 11,11,11-I
-- -I..--,--  
              ---e--x-e--c-i6m""m"'---Sort- b,_y'_"'_W_,_,"eIIJa'n"' '2,,_6"_"_2,_0_0,6_.doc_,                                                           Page 1g
--I I I ---- =_ 111 ---I__, mw execsumm Sort bv Well Jan 26 2006.doc Paqe 3 4 I Stacy Smith -mw execsummSorLbyWellJan_26_2006.doc Page  On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th SD D2 1/11/2006 South U3 Admin ND/HTO 1/17/2006 ND/HTO SD El 1/19/2006 South East Road way ND/HTO SD E2 1/19/2006 South East Road way ND/HTO SD E2B 1/19/2006 South East Road way ND/HTO SD E3 1/19/2006 South of Admin & north of road ND/HTO SD E3A 1/19/2006 South of Admin in road ND/HTO SD E4 1/17/2006 South End Adrmin & road ND/HTO SD E4A 1/17/2006 SE End U3 Admin South of road ND/HTO SD E5 1/17/2006 SW End Admin & South of Road ND/HTO SD E5A 1/17/2006 SW U3 Admin in Road ND/HTO SD E6 1/17/2006 SW U3 Admin South of Road ND/HTO SD E7 1/17/2006 West U3 Admin by Disch Canal ND/HTO ID Date Location Sample Results MW-30 11/22/2005 SB Leakage Areaoote:
                                                                                                                                                            . 1 Pag m-x ~,
Well 464, 000 to 600, 000 pCi/l development NOT completed HTO MW-31 12/30/2005 Outside MOB 4,060 pCi/l HTO 1/5/2006 3,050 pCi/I HTO 1/10/2006
[Sac Smith----111
_ 4,030 pCi/l HTO MW-32 1/12/2006 Between FSB & PAB_ 3,720 pCiAI HTO -Raw Water MW-33 12/15/2005 Transformer Yard 142,000 pCi/l HTO 12/19/2005 199,000 pCi/l HTO 12/29/2005 220,000 pCi/l HTO 01/06/2006 189,000 pCi/i HTO 1/13/2006 232,000 pCi/I HTO MW-34 12/13/2005 Transformer Yard 63,900 pCi/l HTO 12/19/2005 121,000 pCi/l HTO 12/29/2005 147,000 pCi/I HTO 1/2006/2006 159,000 pCi/l HTO 1/13/2006 131,000 pCi/l HTO MW-35 12/13/2005 Transformer Yard 42,300 pCi/I HTO 12/19/2005 76,000 pCi/I HTO 12/29/2005 80,500 pCi/l HTO 1/6/2006 95,400 pCi/l HTO_ 1/13/2006 97,800 pCi/l HTO beffv&II!rT mwexecsummSort-byWellJan_26_2006.doc Page 3 of 8 ith -mw execsurnm Sort by Well Jan 26 2006.doc
        ,X-,-1"-         sm ~I-1 ~ orb~I I-- ,I-_Ja---n_26_-2_006.doc'_"-                                       .... "       .-         ._,___ _
__ -, --,", -__ " "-- --- ----Pag '4"J..'t1 I Stacy Smith -mwexecsummSorLbyWellJan_262006.doc Paae 4]On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th ID Date Location Sample Results MW-38 12/5/2005 End of IP-3 Discharge Canal ND/HTO 12/6/2005 Concrete ND/HTO 12/8/2005 985 pCi/l IPEC 12/8/2005 701 pCi/l NYSDEC 12/8/2005 ND SR-90 Teledyne 12/30/2006 ND/HTO 1/10/2006 1,008 pCi/l IPEC ID Date Location Sample Results MW- 11 9/28/2005 Transformer Yard 212,000 pCi/l HTO 10/5/2005 188,000 pCi/l HTO 10/7/2005 188,000 pCi/l HTO 10/14/2005 6820 pCi/l HTO(rain)10/14/2005 6320 pCi/l HTO (back-up)10/21/2005 284,000 pCi/l HTO 10/21/2005 267,000 pCi/l HTO DEC 10/28/2005 218,000 pCi/l HTO 11/4/2005 302,000 pCi/l HOT 11/10/2005 246,000 pCi/l HTO 11/18/2005 171,000 pCill HTO 11/22/2005 180,000 pCi/l HTO 12/02/2005 125,000 pCi/l HTO 12/08/2005 270,000 pCi/l HTO 12/15/2005 296,000 pCi/l HTO 12/19/2005 192,000 pC/I HTO 12/29/2005 212,000 pC/I HTO 1/6/2006 113,000 pC/I HTO 1/13/2006 199,000 pC/l HTO ID Date Location Sample Results MW-101 12/8/2005 U2 Warehouse ND/HTO 12/8/2005 ND/HTO DEC 12/8/2005 ND Sr-90 Teledyne mwexecsummSort-byWell_Jan_26_2006.doc Page 4 of 8 9_1-I-I--._-- , 1. ., , , .... ..X- __ r ---1 --_1,1--_ I--- I.,-rnw-execsymm-Sort by Well-Jan 26-2006.doc Page 51 Stacy Smith -mwexecsummSorLbyWellJan_26_2006.doc Page 5 I On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MW-105 12/8/2005 Mtce. Training ND/HTO 12/8/2005 96 pCi/I DEC 12/8/2005 ND Sr-90 Teledyne MW-107 9/28/2005 NEM ND/HTO 12/8/2005 ND/HTO 12/8/2005 ND/HTO DEC 12/8/2005 ND Sr-90 Teledyne MW-108 9/29/2005 GT-1 ND/HTO 11/3/2005 ND/HTO MW-109 9/28/2005 GT-1 ND/HTO 11/04/2005 ND/HTO ID Date Location Sample Results U3- 1 10/6/2005 U3 Discharge Canal 417 pCi/I HTO 10/21/2005 ND/HTO 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/2005 ND/HTO 12/15/2005 ND/HTO 12/30/2005 ND/HTO 1/12/2006 ND/HTO U3-2 10/6/2005 U3 Discharge Canal 960 pCi/l HTO 10/21/2005 ND/HTO 10/21/2005 512 pCi/l HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/2005 ND/HTO 12/15/2005 ND/HTO 12/30/2005 ND/HTO 1/11/2006 ND/HTO mwexecsummSort-by-WellJain_26_2006.doc Page 5 of 8 Stay',Sm,,h  
On-Site Monitoring Wells Sorted by Well Location ExecLItive Summary January 26 th Man-holes (Storm Drains)
,------ IIJ2 _ .P g 6 X~StcSmth -mw oexemmSok Well Jan 262006.doc Page 6,1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th U3-3 10/6/2005 U3 Discharge Canal 439 pCi/I HTO 10/21/2005 ND/HTO 10/21/2005 ND/HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 471 pCi/I HTO 11/18/2005 ND/HTO 12/2/2005 ND/HTO 12/15/2005 ND/HT 12-30-05 ND/HTO 1/11/2006 ND/H-T0 U3-4 10/16/2005 U3 Condensate Polisher 406 pCi/I HTO 10/21/2005 399 pCi/I HTO 10/21/2005 344 pCi/I HTO DEC 10/28/2005 405 pCi/I HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HT0 12/2/2005 ND/HTO 12/15/2005 399 pCi/I HTO 12-30-05 442 pCi/I HTO 1/12/2006 573 pCi/l HTO U3-T1 10/6/2005 U3 South Turbine 703 pCi/I HTO 10/21/2005 ND/HTO 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 563 pCi/i HTO 11/18/2005 ND/HTO 12/2/2005 498 pCi/i HTO 12/15/2005 ND/HT0 12-30-05 529 pCi/i HTO 1/12/2006
ID                 Date                                   Location                               Sample Results MH-1                   12/21/2005         North of IP-2 Turb. Bldg. by                           Too dry to sample 1/04/2006         Water                                                             ND/HTO MH-2                     12/16/2005         River Front                                               651 pCi/I (IPEC) 1/4/2006                                                                           ND/HTO 1/19/2006                                                                           ND/HTO CIM 11 f % Lt MH-2A                       1/4/2006       'By IP-2 EDG                         G                               ND/HTO             5Q.a.
__ _ _ _ _ _ _ _ _ _ _ _ _ 786 p Ci/I HTO mwexecsummSort-byWellJa.n_26_2006.doc Page 6 of 8 StacV Smith -mwexecsummSor(_bvWe11 Jan-26-2006.doc
MH-3                     11/10/2005         North of IP-2 Turbine Building                           1,950 pCi/i 12/8/2005                                                                   894 pCi/i 12/20/2005                                                                   2,330 pCi/i 1/4/2006                                                                 3,450 pCi/I 1/19/2006                                                                 2,240 pCi/I MH-4                     12/16/2005         Transformer Yard                                         4,370 pCi/l 1/4/2006                                                                 3,070 pCi/i 1/19/2006                                                                 3,780 pCi/I MH-4A                   12/21/2005         IP-2 Condenser Tube removal pit                         2,730 pCi/i 1/4/2006                                                                 3,380 pCi/I MH-5                     11/10/2005       Xux Feed Bldg                                               2,390 pCi/I 12/8/2005                                                                 2,020 pCi/I                   &aVI 12/20/2005                                                                   6,920 pCi/l 1/4/2006                                                                 3,480 pCi/i 1/19/2006                                                                 3,570 pCi/i MH-6                   11/10/2005         Transformer Yard                                       51,300 pCi/i 12/8/2005                                                               37,100 pCi/i 12/16/2005                                                                 12,200 pCi/I 1/4/2006                                                               13,100 pCi/l 1/19/2006                                                                 18,600 pCi/I MH-7                   12/19/2005         Transformer Yard                                         5,340 pCi/l 1/4/2006                                                                 8,140 pCi/i 1/19/2006                                                                   3,840 pCi/I MH-8                   12/16/2005         Transformer Yard                                         4,510 pCi/l 1/4/2006                                                                 5,740 pCi/l 1/19/2006                                                                   3,210 pCi/I MH-9                   12/16/2005         MOB Hill - 80'                                           2,140 pCi/I MH-10                   12/16/2005         MOB Hill - 80'                                           2,940 pCi/i MH-12                       1/4/2006       West of IP-2 Turb. Bldg. by river                                 ND/HTO 1/13/2006                                                                           ND/HTO 1/19/2006                                                                           ND/HTO MH-14                       1/4/2006       North End IP-2 Turb.                                               ND/HTO 1/19/2006                                                                           1,310 pCi/l mwexecsummSort-byWellJan_26_2006.doc                                                                         Page I of 8
...-___ __-- =111e-11111-  
 
-.- 11,1- , --1___.-11____
I[---                 m I Sort by Welijan 26 -     6                                                 Paqe 219 Pa Stacy Smith mwexecsummSorLbyWellJan_26_2006.doc On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MH-15       1/13/2006 IP-2 North east of MH-14                     ND/HTO MH-17     12/16/2005   Transformer Yard                     1,710 pCi/I MH-18     12/16/2005   Transformer Yard                       854 pCi/i MH-19     12/16/2005   Transformer Yard                     1,800 pCi/i MH-A4     10/18/2005   IP-3 Manhole Located east of the             ND/HTO IP-3 Monitor Tank MH-B8     10/18/2005   IP-3 Manhole located west of the     959 pCi/I north end of the IP-3 turbine hall over the discharge canal CB-4         1/4/2006 By IP-2 RWST _                     1,010 pCill CB-12     1/13/2006 South IP-1 Super Heater               849 pCi/I HTO         F4"I CB-13     1/13/2006   South IP-1 Super Heater             856 pCi/l HTO CB-14     1/13/2006   West of CB-1 3                       734 pCi/I HTO CB-15     1/13/2006   South U1 Screen Structure                   ND/HTO 1/19/2006                                       959 pCi/I CB-19     1/13/2006 South MH-14                                   ND/HTO CB-24       1/4/2006 jy IP-2 Sec. Bldg.                   822 pCi/i SD A2     1/11/2006 East of IP-3 PAB                               ND/HTO 1/19/2006                                               ND/HTO SD A4     1/11/2006   East of A2 south A3                           ND/HT 1/19/2006                                     1,190 pCi/I SD A6     1/19/2006   West of U3 WHU Tank Pad             686 pCi/I SD B 1     1/11/2006   Trans Yard 1P-3                   4,530 pCi/i 1/17/2006                                     5,010 pCi/I SD B3     1/11/2006 Trans Yard IP-3                     6,280 pCi/i 1/17/2006                                     4,650 pCi/I SD B4     1/11/2006 North U3 Turb & VC                   3,180 pCi/i 1/17/2006                                     3,600 pCi/I SD B5     1/11/2006 North U3 Turb & VC                   5,200 pCi/i 1/19/2006                                     3,320 pCi/l SD B6     1/17/2006 North 1P-3 Turb.                               ND/HTO SD B7     1/11/2006 North U3 Turb                       2,510 pCi/i 1/17/2006                                     2,690 pCi/I SD B8     1/17/2006 North U3 Turb. By Disch Canal                 ND/HTO SD Cl     1/11/2006 West U3 Admin                         997 pCi/l 1/17/2006                                       867 pCi/I mwexecsummSort-byWellJan_26_2006.doc                               Page 2 of 8
____ ___Stacy Smith -mwexecsummSorLbyWellJan_26_2006.doc Page 7:1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th U3-T2 10/7/2005 10/21/2005 10/21/2005 10/28/2005 11/4/2005 11/10/2005 11/18/2005 12/2/2005 12/15/2005 12/30/2005 1/06/2006 01/12/2006 U3 North Turbine 1,590 pCi/I HTO 1,470 pCi/i HTO 1,420 pCi/ HTO DEC 1,280 pCi/i HTO 1,190 pCi/i HTO 1,640 pCi/I HTO 1,130 pCi/I HTO 1,329 pCi/I HTO 1,290 pCi/I HTO 1,685 pCi/I HTO 2,417 pCi/I HTO 1,776 pCi/ lHTO ID Date Location Sample Results Well-I 12/06/2005 Lafarge Property.
 
North East ND/HTO 12/06/2005 Well -Farthest from river NDJHTO DEC 12/06/2005 ND SR-90 Teledyne Well-3 12/06/2005 Lafarge Property.
                                                        -     - - - -I- .- 111,1'.",-  --     -I..--,--     - - II    I - - -- =_ 111 - = - -I
North West ND/HTO 12/06/2005 Well -closest to river ND SR-90 Teledyne 12/06/2005 ND/HTO DEC mwexecsummSort-by-WellJan_26_2006.doc Page 7 of 8  
."S** __, mw     execsumm   Sort bv Well Jan 26 2006.doc                                                                                 Paqe 3 4 Page 3J IStacy Smith - mw execsummSorLbyWellJan_26_2006.doc On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th SD D2         1/11/2006 South U3 Admin                                                 ND/HTO 1/17/2006                                                                 ND/HTO SD El         1/19/2006 South East Road way                                           ND/HTO SD E2         1/19/2006 South East Road way                                             ND/HTO SD E2B       1/19/2006 South East Road way                                             ND/HTO SD E3         1/19/2006 South of Admin & north of road                                 ND/HTO SD E3A       1/19/2006 South of Admin in road                                         ND/HTO SD E4         1/17/2006 South End Adrmin & road                                         ND/HTO SD E4A       1/17/2006 SE End U3 Admin South of road                                   ND/HTO SD E5         1/17/2006 SW End Admin & South of Road                                   ND/HTO SD E5A       1/17/2006 SW U3 Admin in Road                                             ND/HTO SD E6         1/17/2006 SW U3 Admin South of Road                                       ND/HTO SD E7         1/17/2006 West U3 Admin by Disch Canal                                   ND/HTO ID         Date                   Location                                   Sample Results MW-30     11/22/2005   SB Leakage Areaoote: Well                   464, 000 to 600, 000 pCi/l development NOT completed                   HTO                                       beffv MW-31       12/30/2005 Outside MOB                                     4,060 pCi/l HTO 1/5/2006                                                 3,050 pCi/I HTO 1/10/2006       _                                         4,030 pCi/l HTO MW-32         1/12/2006 Between FSB & PAB_                               3,720 pCiAI HTO - Raw Water                                     &II!rT MW-33       12/15/2005 Transformer Yard                             142,000 pCi/l HTO 12/19/2005                                             199,000 pCi/l HTO 12/29/2005                                             220,000 pCi/l HTO 01/06/2006                                               189,000 pCi/i HTO 1/13/2006                                             232,000 pCi/I HTO MW-34       12/13/2005 Transformer Yard                             63,900 pCi/l HTO 12/19/2005                                             121,000 pCi/l HTO 12/29/2005                                             147,000 pCi/I HTO 1/2006/2006                                               159,000 pCi/l HTO 1/13/2006                                             131,000 pCi/l HTO MW-35       12/13/2005 Transformer Yard                             42,300 pCi/I HTO 12/19/2005                                               76,000 pCi/I HTO 12/29/2005                                               80,500 pCi/l HTO 1/6/2006                                               95,400 pCi/l HTO
; Stacy Smith -mw-execsumm=Sort-byWellJan_26_2006.doc
_    1/13/2006                                               97,800 pCi/l HTO mwexecsummSort-byWellJan_26_2006.doc                                                   Page 3 of 8
.Page 81 Stacy -- Smith mw execsu..mm  
 
-II 11-1 or -by1--1ell-_Ja--n_2I6_2006.d-oc Page 811--~ --- -- -- -On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MW-1l1, MW-33, MW-34 & MW-35 Tritium 350,000 300,000 250,000 R 8 200,000 E E 150,000 100,000 50,000 0-*- MW-lll pCi HTO rAW-33 pCVI HTO MW-34 pCO HTO-ir- MW-35 pCVI HTO L 0O8 010(0LO(0(0LO I LO I M (0 (0 0 ~0 0 0 0 C 0 Date mwexecsummSort_byWellJan_26_2006.doc Page 8 of 8}}
Fgfk-Shi  ith__- mw execsurnm
                    - ,--,",- __ Sort
                                    " by"--- Well
                                            ------Jan 26 2006.doc                                        Pag'4"J I Stacy Smith - mwexecsummSorLbyWellJan_262006.doc                                                     Paae 4]..'t1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th ID           Date                   Location               Sample Results MW-38           12/5/2005 End of IP-3 Discharge Canal             ND/HTO 12/6/2005 Concrete                                 ND/HTO 12/8/2005                                   985 pCi/l IPEC 12/8/2005                                   701 pCi/l NYSDEC 12/8/2005                                     ND SR-90 Teledyne 12/30/2006                                           ND/HTO 1/10/2006                                 1,008 pCi/l IPEC ID           Date                     Location               Sample Results MW- 11       9/28/2005               Transformer Yard   212,000 pCi/l HTO 10/5/2005                                   188,000 pCi/l HTO 10/7/2005                                   188,000 pCi/l HTO 10/14/2005                                     6820 pCi/l HTO(rain) 10/14/2005                                     6320 pCi/l HTO (back-up) 10/21/2005                                 284,000 pCi/l HTO 10/21/2005                                 267,000 pCi/l HTO DEC 10/28/2005                                 218,000 pCi/l HTO 11/4/2005                                 302,000 pCi/l HOT 11/10/2005                                 246,000 pCi/l HTO 11/18/2005                                 171,000 pCill HTO 11/22/2005                                 180,000 pCi/l HTO 12/02/2005                                 125,000 pCi/l HTO 12/08/2005                                 270,000 pCi/l HTO 12/15/2005                                 296,000 pCi/l HTO 12/19/2005                                 192,000 pC/I HTO 12/29/2005                                 212,000 pC/I HTO 1/6/2006                                 113,000 pC/I HTO 1/13/2006                                 199,000 pC/l HTO ID           Date                     Location               Sample Results MW-101       12/8/2005               U2 Warehouse               ND/HTO 12/8/2005                                         ND/HTO DEC 12/8/2005                                       ND Sr-90 Teledyne mwexecsummSort-byWell_Jan_26_2006.doc                               Page 4 of 8
 
9_1-I-I--._-- , 1.., -_,"","'-'-, , ,    . .....X- __r  -    - Well-Jan
                                                                  -1   - - _1,1--_ I---I.,
                        - rnw-execsymm-Sort                 by           26-2006.doc                                     Page 51 Page 5I Stacy Smith mwexecsummSorLbyWellJan_26_2006.doc On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MW-105             12/8/2005                 Mtce. Training             ND/HTO 12/8/2005                                         96 pCi/I DEC 12/8/2005                                       ND Sr-90 Teledyne MW-107             9/28/2005                     NEM                   ND/HTO 12/8/2005                                           ND/HTO 12/8/2005                                         ND/HTO DEC 12/8/2005                                       ND Sr-90 Teledyne MW-108             9/29/2005                     GT-1                   ND/HTO 11/3/2005                                           ND/HTO MW-109             9/28/2005                     GT-1                   ND/HTO 11/04/2005                                           ND/HTO ID                 Date                     Location             Sample Results U3- 1                 10/6/2005   U3 Discharge Canal             417 pCi/I HTO 10/21/2005                                             ND/HTO 10/28/2005                                             ND/HTO 11/4/2005                                           ND/HTO 11/10/2005                                             ND/HTO 11/18/2005                                             ND/HTO 12/2/2005                                           ND/HTO 12/15/2005                                             ND/HTO 12/30/2005                                             ND/HTO 1/12/2006                                           ND/HTO U3-2                 10/6/2005 U3 Discharge Canal                 960 pCi/l HTO 10/21/2005                                             ND/HTO 10/21/2005                                     512 pCi/l HTO DEC 10/28/2005                                             ND/HTO 11/4/2005                                           ND/HTO 11/10/2005                                             ND/HTO 11/18/2005                                             ND/HTO 12/2/2005                                             ND/HTO 12/15/2005                                             ND/HTO 12/30/2005                                             ND/HTO 1/11/2006                                             ND/HTO mwexecsummSort-by-WellJain_26_2006.doc                                   Page 5 of 8
 
Stay',Sm,,h     IIJ2       X        _ . P g 6
~StcSmth - mw oexemmSok         Well Jan 262006.doc                                                   Page 6,1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th U3-3       10/6/2005   U3 Discharge Canal                   439 pCi/I HTO 10/21/2005                                                   ND/HTO 10/21/2005                                                 ND/HTO DEC 10/28/2005                                                   ND/HTO 11/4/2005                                                   ND/HTO 11/10/2005                                           471 pCi/I HTO 11/18/2005                                                   ND/HTO 12/2/2005                                                   ND/HTO 12/15/2005                                                   ND/HT 12-30-05                                                   ND/HTO 1/11/2006                                                   ND/H-T0 U3-4     10/16/2005   U3 Condensate Polisher                 406 pCi/I HTO 10/21/2005                                           399 pCi/I HTO 10/21/2005                                           344 pCi/I HTO DEC 10/28/2005                                           405 pCi/I HTO 11/4/2005                                                     ND/HTO 11/10/2005                                                   ND/HTO 11/18/2005                                                   ND/HT0 12/2/2005                                                     ND/HTO 12/15/2005                                           399 pCi/I HTO 12-30-05                                             442 pCi/I HTO 1/12/2006                                             573 pCi/l HTO U3-T1     10/6/2005 U3 South Turbine                         703 pCi/I HTO 10/21/2005                                                   ND/HTO 10/28/2005                                                   ND/HTO 11/4/2005                                                     ND/HTO 11/10/2005                                           563 pCi/i HTO 11/18/2005                                                   ND/HTO 12/2/2005                                           498 pCi/i HTO 12/15/2005                                                   ND/HT0 12-30-05                                           529 pCi/i HTO 1/12/2006   __ _ _ _ _ _ _   _ _ _ _ _   _   786 p Ci/I HTO mwexecsummSort-byWellJa.n_26_2006.doc                                   Page 6 of 8
 
StacV Smith - mwexecsummSor(_bvWe11 Jan-26-2006.doc Stacy Smith mwexecsummSorLbyWellJan_26_2006.doc
                                                          -___ __-- =111e-11111-- .- 11,1- , - -
1___.-11____ ____ ___
Page 7:1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th U3-T2     10/7/2005 U3 North Turbine                                1,590 pCi/I HTO 10/21/2005                                                 1,470 pCi/i HTO 10/21/2005                                                  1,420 pCi/ HTO DEC 10/28/2005                                                 1,280 pCi/i HTO 11/4/2005                                                 1,190 pCi/i HTO 11/10/2005                                                 1,640 pCi/I HTO 11/18/2005                                                 1,130 pCi/I HTO 12/2/2005                                                 1,329 pCi/I HTO 12/15/2005                                                 1,290 pCi/I HTO 12/30/2005                                                 1,685 pCi/I HTO 1/06/2006                                                 2,417 pCi/I HTO 01/12/2006                                                 1,776 pCi/ lHTO ID      Date                Location                                    Sample Results Well-I   12/06/2005  Lafarge Property. North East              ND/HTO 12/06/2005  Well - Farthest from river                NDJHTO DEC 12/06/2005                                            ND SR-90 Teledyne Well-3    12/06/2005 Lafarge Property. North West              ND/HTO 12/06/2005 Well - closest to river                   ND SR-90 Teledyne 12/06/2005                                             ND/HTO DEC mwexecsummSort-by-WellJan_26_2006.doc                                           Page 7 of 8
 
; Stacy Smith - mw-execsumm=Sort-byWellJan_26_2006.doc                                                                         Page 81
                                                                                                                                -- 811--
Stacy--Smith mw execsu..mm or by1--1ell-_Ja--n_2I6_2006.d-oc
                                  - II11                                                                          - -- -- Page  -
On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MW-1l1, MW-33, MW-34 & MW-35 Tritium 350,000 300,000 250,000 R                                                                               -*- MW-lll pCi HTO 8 200,000 rAW-33 pCVI HTO E                                                                                    MW-34 pCO HTO E 150,000
                                                                                                  -ir- MW-35 pCVI HTO 100,000 50,000 0
L   0O8   010(0LO(0(0LO               I        I LO     M   (0 (0 0                                     ~0   0   0   0 C 0 Date mwexecsummSort_byWellJan_26_2006.doc                             Page 8 of 8}}

Latest revision as of 05:54, 23 March 2020

E-mail from G. Bowman of USNRC to S. Smith of USNRC, Regarding Executive Summaries
ML061320542
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/15/2006
From: Gregory Bowman
Entergy Nuclear Operations
To: Shawn Smith
NRC/FSME
References
FOIA/PA-2006-0140
Download: ML061320542 (17)


Text

Stacy Smith FW: 6iv 6 -guriA'a6e"iS--1..I-I~

ay Sih F--:E----

e ui eS 1-,1-maIe-~-,- -11 11 111,--I 1-- .- -X--=-1.1 Pag -11 From: "Bowman, Greg " <GBowm90@entergy.com>

To: "'sms4@nrc.gov"' <sms4@nrc.gov>

Date: 3/15/06 8:28AM

Subject:

FW: Executive Summaries From: Croulet, Donald Sent: Thursday, January 26, 2006 12:16 PM To: Janicki, John; 'James Noggle'; 'Timothy Rice'; PRICE, ERNEST JR; Robert Oliveira (boliveira@ amnucins.com) <mailto:boliveira@amnucins.com)>; Cox, Mark R; Bowman, Greg

Subject:

FW: Executive Summaries fyi From: Lavera, Ron Sent: Thursday, January 26, 2006 11:15 AM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; ERNEST PRICE; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Robert Oliveira; Ron Lavera; Ronald Sachatello; T. R. Jones; Thomas Burns

Subject:

Executive Summaries Please see the attached sample executive summaries.

Ron <<mwexecsummSort-byDateJan_26_2006.doc>>

<<mwexecsummSortby_WellJan_26_2006.doc>>

RLaVera entergy.com <mailto:RLaVera©entergy.com>

914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308

c!:\ternP\G}QO0TMP--I 1111----1-1111- Page Mail Envelope Properties (4418167A.027: 1: 57383)

Subject:

FW: Executive Summaries Creation Date: 3/15/06 8:27AM From: "Bowman, Greg " <GBowm90@entergy.com>

Created By: GBowm90@entergy.com Recipients nrc.gov kpl-po.KPDO SMS4 (Stacy Smith)

Post Office Route kpl-po.KP.DO nrc.gov

]Files Size Date & Time MESSAGE 1348 03/15/0 5 08:27AM TEXT.htm 3635 mwexecsummSort_byvDate Jan_26_2006.doc 142336 mwexecsumm__Sortby-WellJan_26_2006.doc 218624 Mime.822 501770 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard

I. --- __

'Stacv ' I--- mw Smith 1-11-execsumm- I1wIZ,

- , ISort, Z'

- e'ypa

- -- - --- - I1-1-1 I - ,

"qO _q.doc Page 1 4 Stacy Smithr .....

->9mw eesusSmmSo,__..r.....by,,...,.

,= =006;.,o

,_Ja_ .,,.,,26.

_:at,,,,,___e Pag 1,.....

On-Site Monitoring Wells Sorted by Date Executive Summary January 2 6 th Date ID Location Sample Results 9/28- MW-107 NEM ND/HTO 29/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO MW-111 Transformer Yard 212,000 pCi/l HTO 10/5/05 MW-111 Transformer Yard 188,000 pCi/l HTO 10/6/05 U3-1 U3 Discharge Canal 417 pCi/l HTO U3-2 U3 Discharge Canal 960 pCi/I HTO U3-3 U3 Discharge Canal 439 pCi/l HTO 10/7/05 U3-T1 U3 South Turbine 703 pCiIl HTO U3-T2 U3 North Turbine 1,590 pCi/I HTO MW-111 Transformer Yard 188,000 pCi/I HTO 10/14/05 MW-111 Transformer Yard 6,820 pCi/I HTO (rain)

MW-111 Transformer Yard 6,320 pCi/I HTO (back-up) 10/16/05 U3-4 U3 Condensate Polisher 406 pCi/A HTO 10/18/05 MH-B8 IP-3 Manhole IP-3 Disch Canal 959 pCi/I HTO East of IP-3 Monitor Tank MH-A4 ND/HTO 10/21/05 MW-111 Transformer Yard 284,000 pCill HTO 267,000 pCi/I HTO DEC 10/21/05 U3-1 U3 Discharge Canal ND/HTO U3-1 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal 512 pCi/I HTO DEC U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 399 pCi/I HTO U3-4 U3 Condensate Polisher 344 pCi/I HTO DEC U3-T1 U3 South Turbine ND/HTO U3-T1 U3 South Turbine ND/HTO DEC U3-T2 U3 North Turbine 1,470 pCi/l HTO U3-T2 U3 North Turbine 1,420 pCi/I HTO DEC mwexecsummSort-byDateJan_26_2006.doc Page 1 of 7

~ ~

- - ",V,-VI---- -- - ~_- ~-- ~Y -- - ~ . ...

-~. , - -

,do- -. 111-11 Page 2,.1 Page 2 Stacy Smith mwexecsummSorLbyDateJan26_2006.doc On-Site Monitoring Wells Sorted by Date Executive Sununary January 26 th 10/28/05 MW-l1l Transformer Yard 218,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal NDI/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-T1 U3 South Turbine NDIHTO U3-T2 U3 North Turbine 1,280 pCi/I HTO 11/4/05 MW-111 Transformer Yard 302,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal NDIHTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO Date ID Location Sample Results 11/3-4/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/05 MW-111 Transformer Yard 246,000 pCi/I HTO U3-1 U3 Discharge Canal NDIHTO U3-2 U3 Discharge Canal NDIHTO U3-3 U3 Discharge Canal 471 pCi/I HTO U3-4 U3 Condensate Polisher NDIHTO U3-T1 U3 South Turbine 563 pCi/I HTO U3-T2 U3 North Turbine 1,640 pCi/I HTO MH-6 Transformer Yard 51,300 pCi/I HTO 11/18/05 MW-111 Transformer Yard 171,000 pCi/I HTO U3-1 U3 Discharge Canal NDIHTO U3-2 U3 Discharge Canal ND/IHTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,130 pCiA HTO 11/22/05 MW-111 Transformer Yard 180,000 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc Page 2 of 7

11,11-1

---I,, I-, - __, ." . , -- ...... - - -111-111-111""

iiiiffi__ w_6x-6ecsumn , , "So-'r'...

C-6, --,b-a-t J...an i",2",,6"""2"0"0-6,-.--do"c,', Page 31 Stac Smith - wexcum~rb

--- ~ ....." _-- Dat_Ja_26_2006.doc _ __... _6......._ _,___,- Page_ 3 On-Site Monitoring Wells Sorted by Date Executive Summary January 26th 12/02/05 MW-l1l Transformer Yard 125,000 pCiVI HTO MW-38 End of IP-3 Discharge Canal Concrete ND/HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine- 498 pCi/I HTO U3-T2 U3 North Turbine 1,130 pCi/I HTO 12/5/05 MW-38 End of IP-3 Discharge Canal Concrete ND/HTO 12/6/05 MW-38 End of IP-3 Discharge Canal Concrete ND/HTO 12/8/05 MW-101 U2 Warehouse ND/HTO MW-101 U2 Warehouse ND Sr-90 Teledyne MW-105 Maintenance Training ND/HTO MW-105 Maintenance Training ND Sr-90 Teledyne MW-107 NEM ND/HTO MW-107 NEM ND Sr-90 Teledyne MW-38 End of IP-3 Discharge Canal Concrete 985 pCi/I HTO MW-38 End of IP-3 Discharge Canal Concrete 701 pCi/I HTO DEC MW-38 End of IP-3 Discharge Canal Concrete ND Sr-90 Teledyne 12/08/05 MW-l1l Transformer Yard 270,000 pCi/I HTO MH-3 North of IP-2 Turb. 894 pCi/I HTO MH-5 Transformer Yard 2,020 pCill HTO MH-6 Transformer Yard 37,100 pCi/i HTO MW-38 End of IP-3 Discharge Canal Concrete 985 pCi/I HTO MW-101 EOF 701 pCi/I HTO DEC MW-101 EOF ND/HTO MW-105 Maint. Train. Facil ND/HTO DEC MW-105 Maint. Train. Facil ND/HTO MW-107 NEM Well 96 pCi/I HTO DEC MW-107 NEM Well ND/HTO 12113/05 MW-34 Transformer Yard 63,900 pCiAi HTO MW-35 Transformer Yard 42,300 pCi/I HTO 12/15/05 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 399 pCi/I HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,290 pCi/I HTO MW-33 Transformer Yard 142,000 pCi/I HTO MW-111 Transformer Yard 296,000 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc Page 3 of 7

Smith Stacy

"' 6_s,u,m m,- -S6'r,_t b,y-,

o, yat_Jan

,-,rn-exesum

-,-D,

-a" i_e,.......

.J,,"a'

_n,,,,2-6 d X~_I-_26_20.....06.-doc 6,_

,,d",

o,c

- ~_ - ---- __--1-1,-1 I.. ..... ,,_ Page Pag 4 On-Site Monitoring Wells Sorted by Date Executive Summary January 261h 12/16/05 MH-19 Transformer Yard 1,800 pCi/QHTO MH-18 Transformer Yard 854 pCi/l HTO MH-17 Transformer Yard 1,710 pCi/l HTO MH-10 Transformer Yard 2,940 pCi/l HTO MH-9 Transformer Yard 2,140 pCi/l HTO MH-8 Transformer Yard 4,510 pCi/I HTO MH-6 Transformner Yard 12,200 pCi/l HTO MH-4 Transformer Yard 4,320 pCi/l HTO MH-2 North of IP-2 Turb 651 pCi/l HTO 12/19/05 MW-33 Transformer Yard 199,000 pCi/l HTO MW-34 Transformer Yard 121,000 pCi/I HTO MW-35 Transformer Yard 76,000 pCi/AHTO MW-111 Transformer Yard 192,000 pCi/l HTO MH-3 North of IP-2 Turb. 2,330 pCi/l HTO MH-5 ABFP Bldg).. 6,920 pCi/l HTO MH-7 Transformer Yard 5,340 pCi/lHTO 12/19/05 Discharge Hudson River <MDA pCi/l HTO Canal 12/20/05 MH4-3 ',-Outside of Turbine Bldg. 2,330 pCill HTO MH-S Aux Feed Bldg. 6,920 pCi/l HTO 12/21/05 MH-4A Condensor Tube Pull Pit 2,730 pCi/I HTO MH-I River Front Dry - No Sample Taken 12/29/05 MW-l1l MOB 212,000 pCi/I HTO MW-33 Transformer Yard 220,000 pCi/l HTO MW-34 Transformer Yard 147,000 pCi/I HTO MW-35 Transformer Yard 80,500 pCi/I HTO 12/30/05 MW-31 MOB 4,060 pCi/l HTO U3-1 U3 Discharge Canal 651 pCi/l HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HrO U3-4 U3 Discharge Canal 442 pCi/l HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,690 pCi/I HTO MW-31 Outside MOB 4,060 pCi/l HTO MW-38 End of IP-3 Discharge Canal Concrete ND/HTO, mwexecsummSort-byDateJan_26_2006.doc Page 4 of 7

- - - -I,,--,',', 1 - --- - -- '- ....-- - - -- ,

I Stacy~K Smith ,mw_execsumm

-- - -or---b-- j,

-_--,-ate I -___-'-"'_""'-"'__'

an-26-2006.doc Ja_6_06.o -,

Page 5 j Page 5 1--

On-Site Monitoring Wells Sorted by Date Executive Summary January 2 6th 1/4/06 MH-2A By IP-2 EDG ND/HTO CB-4 'I By IP-2 RWST 3 1,010 pCi/l HTO CB12 South U1 Superheater ND/HTO CB-24 I ,,ByIP-2 Security Bldg.3 822 pCi/i HTO MH-1 North of IP-2 Turb. Bldg. ND/HTO MH-2 North of IP-2 Turb. Bldg. ND/HTO MH-3 North of IP-2 Turb. Bldg 3,450 pCi/l HTO MH-4 4Between Turb. & A B 3,070 pCi/I HTO MH-4A )P-2 Cond. Tub Pit 3,380 pCi/l HTO MH-5 A4 JIP-2 ABFP Bldg' 3,480 pCi/i HTO MH-6 IP-2 Transformer Yard 13,100 pCi/I HTO MH-7 IP-2 Transformer Yard 8,140 pCi/l HTO MH-8 IP-2 Transformer Yard 5,740 pCi/l HTO MH-12 North End IP-2 Turb. ND/HTO MH-14 North End IP-2 Turb. ND/HTO 1/5/06 MW-31 MOB 3,050 pCi/lHTO 1/6/06 MW-l1l Transformer Yard 113,740 pCi/I HTO MW-33 Transformer Yard 189,000 pCi/i HTO MW-34 Transformer Yard 159,000 pCi/i HTO MW-35 Transformer Yard 95,400 pCi/i HTO MW-38 End of IP-3 Discharge Canal Concrete 1,018 pCi/l HTO U3-T2 U3 North Turbine 2,417 pCi/I HTO 1/10/06 MW-31 Outside MOB 4,030 pCi/l HTO 1-11-06 SD A2 East of IP-3 PAB ND/HTO SD A4 East of A2 South of A3 ND/HTO SD B 1 IP-3 Trans Yard 4,530 pCi/lHTO SD B3 IP-3 Trans Yard 6,280 pCi/i HTO SD B4 West U3 VC East Turb 3,180 pCi/I HTO SD B5 North IP-3 Turb IP-3 VC 5,200 pCi/lHTO SD B7 North IP-3 Turb Hall 2,510 pCi/lHTO SD Cl West of IP-3 Admin Bldg 997 pCi/lHTO SD D2 .South IP-3 Admin Bldg ND/HTO 1/12/06 MW-32 Between PAB & FSB 3,720 pCi/lHTO U3-1 U3 Discharge Canal 744 pCi/lHTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 573 pCi/lHTO U3-T1 U3 South Turbine 787 pCi/l HTO U3-T2 U3 North Turbine 1,780 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc Page 5 of 7

-- -- - 1--l"I,--- I',-- ---I,--- - -1I__ - -- -11, - - - __-- - ,

1111-1-1-1 y mith - mwexecsummSort by Date-Jan-26-2006.doc 1-1 --K__ Pa9qAI Stacy Smith mwexecsummSorLbyDateJan_26_2006.doc Page 6:j On-Site Monitoring Wells Sorted by Date Executive Summary January 26th 1-13-06 MW-111 Transformer Yard 199,000 pCi/l HTO MW-33 Transformer Yard 232,000 pCi/l HTO MW-34 Transformer Yard 131,000 pCi/l HTO MW-35 Transformer Yard 97,800 pCi/I HTO 1-13-06 MH-13 IP-2 East of MH-12 ND/HTO MH-15 North east of MH-14 South IP-i Super ND/HTO CB-12 Heater 849 pCi/I HTO CB-13 South IP-1 Super Heater 856 pCi/I HTO CB-14 West of CB-13 734 pCi/I HTO CB-15 U2 North of MH-14 ND/HTO CB-19 South MH-14 ND/HTO 1/17/06 SD Bi Trans Yard IP-3 5,010 pCi/l HTO SD B3 Trans Yard IP-3 4,650 pCi/l HTO SD B4 North U3 Turb'& VC 3,430 pCi/l HTO SD B6 North IP-3 Turb. ND/HTO SD B7 North U3 Turb 2,690 pCi/I HTO SD Cl West U3 Admin 867 pCi/l HTO SD D2 South U3 Admin ND/HTO SD E4 South End Admin & road ND/HTO SD E4A SE End U3 Admin South of road ND/HTO SD E5 SW End Admin & South of Road ND/HTO SD E5A SE End U3 Admin South of road ND/HTO SD E6 SW U3 Admin South of Road ND/HTO SD E7 West U3 Admin by Disch Canal ND/HTO 1/19/06 CB-12 South IP-1 Super Heater 849 pCi/i HTO CB-15 South Ul Screen Structure 959 pCi/l SD A2 East of IP-3 PAB ND/HTO SD A6 West of U3 WH-U Tank Pad 686 pCi/l SD El South East Road way ND/HTO SD E2 South East Road way ND/HTO SD E2B South East Road way ND/HTO SD E3 South of Admin & north of road ND/HTO SD E3A South of Admin in road ND/HTO MH-2 River Front ND/HTO MH-3 North of IP-2 Turbine Building 2,240 pCi/I MH4 Transformer Yard 3,780 pCi/l MH-5 ux Feed Bldg3 3,570 pCi/l MH-6 aransformer Yard 18,600 pCi/I MH-7 Transformer Yard 3,840 pCi/i MH-12 West of IP-2 Turb. Bldg. by river ND/HTO MH-14 North End IP-2 Turb. 1,310 pCi/l mwexecsummSort-byDate_Jan_26_2006.doc Page 6 of 7

Ftac Smth-- mweesMm Sort_bv_Date_Jan_26_2006.doc Page 7 JI Page 7 Stacy Smith mwexecsummSorLbyDateJan_26_2006.doc

................................................ .... ,.m,.<= .. vvYe

. =. ,* a>* .. K< As, . = .. z:EMuE.u<. = .g<

On-Site Monitoring Wells Sorted by Date Executive Summary January 26' Monitoring Wells I Locations Off-Site Date Location Results 10/18/05 Croton Reservoir ND/HTO - Gamma Camp Field Reservoir ND/HTO - Gamma 10/20/05 Gypsum Outfall ND/HTO - Gamma Algonquin NDIHTO - Gamma 5' Street Well ND/HTO - Gamma 10/25/05 Rock Quarry ND/HTO - Gamma 11/8/05 5' Street Well NDIHTO - Gamma 11/30/05 Gypsum Outfall

  • NDJHTO 11/30/05 Algonquin
  • NDHITO 5' Street Well
  • ND/HTO Rock Quarry
  • NDIHTO Croton Reservoir NDIHTO Camp Field Reservoir NDIHTO 12/6/05 Gypsum Plant Well #1 NDIHTO Gypsum Plant Well #2 NDJHTO 12/13/05 Algonquin Outfall ND/HTO Gypsum Outfall ND/ITO Rock Quarry ND/HTO
  • Environmental levels only of HTO & Sr-90 from 11/30/05 DEC Split samples mwexecsummSort-by-DateJan_26_2006.doc Page 7 of 7

1 111 - 111.11 I-I- I- 11 I- 11 I- -- - I -11,

.......- - 11,11,11-I

---e--x-e--c-i6m""m"'---Sort- b,_y'_"'_W_,_,"eIIJa'n"' '2,,_6"_"_2,_0_0,6_.doc_, Page 1g

. 1 Pag m-x ~,

[Sac Smith----111

,X-,-1"- sm ~I-1 ~ orb~I I-- ,I-_Ja---n_26_-2_006.doc'_"- .... " .- ._,___ _

On-Site Monitoring Wells Sorted by Well Location ExecLItive Summary January 26 th Man-holes (Storm Drains)

ID Date Location Sample Results MH-1 12/21/2005 North of IP-2 Turb. Bldg. by Too dry to sample 1/04/2006 Water ND/HTO MH-2 12/16/2005 River Front 651 pCi/I (IPEC) 1/4/2006 ND/HTO 1/19/2006 ND/HTO CIM 11 f % Lt MH-2A 1/4/2006 'By IP-2 EDG G ND/HTO 5Q.a.

MH-3 11/10/2005 North of IP-2 Turbine Building 1,950 pCi/i 12/8/2005 894 pCi/i 12/20/2005 2,330 pCi/i 1/4/2006 3,450 pCi/I 1/19/2006 2,240 pCi/I MH-4 12/16/2005 Transformer Yard 4,370 pCi/l 1/4/2006 3,070 pCi/i 1/19/2006 3,780 pCi/I MH-4A 12/21/2005 IP-2 Condenser Tube removal pit 2,730 pCi/i 1/4/2006 3,380 pCi/I MH-5 11/10/2005 Xux Feed Bldg 2,390 pCi/I 12/8/2005 2,020 pCi/I &aVI 12/20/2005 6,920 pCi/l 1/4/2006 3,480 pCi/i 1/19/2006 3,570 pCi/i MH-6 11/10/2005 Transformer Yard 51,300 pCi/i 12/8/2005 37,100 pCi/i 12/16/2005 12,200 pCi/I 1/4/2006 13,100 pCi/l 1/19/2006 18,600 pCi/I MH-7 12/19/2005 Transformer Yard 5,340 pCi/l 1/4/2006 8,140 pCi/i 1/19/2006 3,840 pCi/I MH-8 12/16/2005 Transformer Yard 4,510 pCi/l 1/4/2006 5,740 pCi/l 1/19/2006 3,210 pCi/I MH-9 12/16/2005 MOB Hill - 80' 2,140 pCi/I MH-10 12/16/2005 MOB Hill - 80' 2,940 pCi/i MH-12 1/4/2006 West of IP-2 Turb. Bldg. by river ND/HTO 1/13/2006 ND/HTO 1/19/2006 ND/HTO MH-14 1/4/2006 North End IP-2 Turb. ND/HTO 1/19/2006 1,310 pCi/l mwexecsummSort-byWellJan_26_2006.doc Page I of 8

I[--- m I Sort by Welijan 26 - 6 Paqe 219 Pa Stacy Smith mwexecsummSorLbyWellJan_26_2006.doc On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MH-15 1/13/2006 IP-2 North east of MH-14 ND/HTO MH-17 12/16/2005 Transformer Yard 1,710 pCi/I MH-18 12/16/2005 Transformer Yard 854 pCi/i MH-19 12/16/2005 Transformer Yard 1,800 pCi/i MH-A4 10/18/2005 IP-3 Manhole Located east of the ND/HTO IP-3 Monitor Tank MH-B8 10/18/2005 IP-3 Manhole located west of the 959 pCi/I north end of the IP-3 turbine hall over the discharge canal CB-4 1/4/2006 By IP-2 RWST _ 1,010 pCill CB-12 1/13/2006 South IP-1 Super Heater 849 pCi/I HTO F4"I CB-13 1/13/2006 South IP-1 Super Heater 856 pCi/l HTO CB-14 1/13/2006 West of CB-1 3 734 pCi/I HTO CB-15 1/13/2006 South U1 Screen Structure ND/HTO 1/19/2006 959 pCi/I CB-19 1/13/2006 South MH-14 ND/HTO CB-24 1/4/2006 jy IP-2 Sec. Bldg. 822 pCi/i SD A2 1/11/2006 East of IP-3 PAB ND/HTO 1/19/2006 ND/HTO SD A4 1/11/2006 East of A2 south A3 ND/HT 1/19/2006 1,190 pCi/I SD A6 1/19/2006 West of U3 WHU Tank Pad 686 pCi/I SD B 1 1/11/2006 Trans Yard 1P-3 4,530 pCi/i 1/17/2006 5,010 pCi/I SD B3 1/11/2006 Trans Yard IP-3 6,280 pCi/i 1/17/2006 4,650 pCi/I SD B4 1/11/2006 North U3 Turb & VC 3,180 pCi/i 1/17/2006 3,600 pCi/I SD B5 1/11/2006 North U3 Turb & VC 5,200 pCi/i 1/19/2006 3,320 pCi/l SD B6 1/17/2006 North 1P-3 Turb. ND/HTO SD B7 1/11/2006 North U3 Turb 2,510 pCi/i 1/17/2006 2,690 pCi/I SD B8 1/17/2006 North U3 Turb. By Disch Canal ND/HTO SD Cl 1/11/2006 West U3 Admin 997 pCi/l 1/17/2006 867 pCi/I mwexecsummSort-byWellJan_26_2006.doc Page 2 of 8

- - - - -I- .- 111,1'.",- -- -I..--,-- - - II I - - -- =_ 111 - = - -I

."S** __, mw execsumm Sort bv Well Jan 26 2006.doc Paqe 3 4 Page 3J IStacy Smith - mw execsummSorLbyWellJan_26_2006.doc On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th SD D2 1/11/2006 South U3 Admin ND/HTO 1/17/2006 ND/HTO SD El 1/19/2006 South East Road way ND/HTO SD E2 1/19/2006 South East Road way ND/HTO SD E2B 1/19/2006 South East Road way ND/HTO SD E3 1/19/2006 South of Admin & north of road ND/HTO SD E3A 1/19/2006 South of Admin in road ND/HTO SD E4 1/17/2006 South End Adrmin & road ND/HTO SD E4A 1/17/2006 SE End U3 Admin South of road ND/HTO SD E5 1/17/2006 SW End Admin & South of Road ND/HTO SD E5A 1/17/2006 SW U3 Admin in Road ND/HTO SD E6 1/17/2006 SW U3 Admin South of Road ND/HTO SD E7 1/17/2006 West U3 Admin by Disch Canal ND/HTO ID Date Location Sample Results MW-30 11/22/2005 SB Leakage Areaoote: Well 464, 000 to 600, 000 pCi/l development NOT completed HTO beffv MW-31 12/30/2005 Outside MOB 4,060 pCi/l HTO 1/5/2006 3,050 pCi/I HTO 1/10/2006 _ 4,030 pCi/l HTO MW-32 1/12/2006 Between FSB & PAB_ 3,720 pCiAI HTO - Raw Water &II!rT MW-33 12/15/2005 Transformer Yard 142,000 pCi/l HTO 12/19/2005 199,000 pCi/l HTO 12/29/2005 220,000 pCi/l HTO 01/06/2006 189,000 pCi/i HTO 1/13/2006 232,000 pCi/I HTO MW-34 12/13/2005 Transformer Yard 63,900 pCi/l HTO 12/19/2005 121,000 pCi/l HTO 12/29/2005 147,000 pCi/I HTO 1/2006/2006 159,000 pCi/l HTO 1/13/2006 131,000 pCi/l HTO MW-35 12/13/2005 Transformer Yard 42,300 pCi/I HTO 12/19/2005 76,000 pCi/I HTO 12/29/2005 80,500 pCi/l HTO 1/6/2006 95,400 pCi/l HTO

_ 1/13/2006 97,800 pCi/l HTO mwexecsummSort-byWellJan_26_2006.doc Page 3 of 8

Fgfk-Shi ith__- mw execsurnm

- ,--,",- __ Sort

" by"--- Well


Jan 26 2006.doc Pag'4"J I Stacy Smith - mwexecsummSorLbyWellJan_262006.doc Paae 4]..'t1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th ID Date Location Sample Results MW-38 12/5/2005 End of IP-3 Discharge Canal ND/HTO 12/6/2005 Concrete ND/HTO 12/8/2005 985 pCi/l IPEC 12/8/2005 701 pCi/l NYSDEC 12/8/2005 ND SR-90 Teledyne 12/30/2006 ND/HTO 1/10/2006 1,008 pCi/l IPEC ID Date Location Sample Results MW- 11 9/28/2005 Transformer Yard 212,000 pCi/l HTO 10/5/2005 188,000 pCi/l HTO 10/7/2005 188,000 pCi/l HTO 10/14/2005 6820 pCi/l HTO(rain) 10/14/2005 6320 pCi/l HTO (back-up) 10/21/2005 284,000 pCi/l HTO 10/21/2005 267,000 pCi/l HTO DEC 10/28/2005 218,000 pCi/l HTO 11/4/2005 302,000 pCi/l HOT 11/10/2005 246,000 pCi/l HTO 11/18/2005 171,000 pCill HTO 11/22/2005 180,000 pCi/l HTO 12/02/2005 125,000 pCi/l HTO 12/08/2005 270,000 pCi/l HTO 12/15/2005 296,000 pCi/l HTO 12/19/2005 192,000 pC/I HTO 12/29/2005 212,000 pC/I HTO 1/6/2006 113,000 pC/I HTO 1/13/2006 199,000 pC/l HTO ID Date Location Sample Results MW-101 12/8/2005 U2 Warehouse ND/HTO 12/8/2005 ND/HTO DEC 12/8/2005 ND Sr-90 Teledyne mwexecsummSort-byWell_Jan_26_2006.doc Page 4 of 8

9_1-I-I--._-- , 1.., -_,"","'-'-, , , . .....X- __r - - Well-Jan

-1 - - _1,1--_ _ I---I.,

- rnw-execsymm-Sort by 26-2006.doc Page 51 Page 5I Stacy Smith mwexecsummSorLbyWellJan_26_2006.doc On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MW-105 12/8/2005 Mtce. Training ND/HTO 12/8/2005 96 pCi/I DEC 12/8/2005 ND Sr-90 Teledyne MW-107 9/28/2005 NEM ND/HTO 12/8/2005 ND/HTO 12/8/2005 ND/HTO DEC 12/8/2005 ND Sr-90 Teledyne MW-108 9/29/2005 GT-1 ND/HTO 11/3/2005 ND/HTO MW-109 9/28/2005 GT-1 ND/HTO 11/04/2005 ND/HTO ID Date Location Sample Results U3- 1 10/6/2005 U3 Discharge Canal 417 pCi/I HTO 10/21/2005 ND/HTO 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/2005 ND/HTO 12/15/2005 ND/HTO 12/30/2005 ND/HTO 1/12/2006 ND/HTO U3-2 10/6/2005 U3 Discharge Canal 960 pCi/l HTO 10/21/2005 ND/HTO 10/21/2005 512 pCi/l HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/2005 ND/HTO 12/15/2005 ND/HTO 12/30/2005 ND/HTO 1/11/2006 ND/HTO mwexecsummSort-by-WellJain_26_2006.doc Page 5 of 8

Stay',Sm,,h IIJ2 X _ . P g 6

~StcSmth - mw oexemmSok Well Jan 262006.doc Page 6,1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th U3-3 10/6/2005 U3 Discharge Canal 439 pCi/I HTO 10/21/2005 ND/HTO 10/21/2005 ND/HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 471 pCi/I HTO 11/18/2005 ND/HTO 12/2/2005 ND/HTO 12/15/2005 ND/HT 12-30-05 ND/HTO 1/11/2006 ND/H-T0 U3-4 10/16/2005 U3 Condensate Polisher 406 pCi/I HTO 10/21/2005 399 pCi/I HTO 10/21/2005 344 pCi/I HTO DEC 10/28/2005 405 pCi/I HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HT0 12/2/2005 ND/HTO 12/15/2005 399 pCi/I HTO 12-30-05 442 pCi/I HTO 1/12/2006 573 pCi/l HTO U3-T1 10/6/2005 U3 South Turbine 703 pCi/I HTO 10/21/2005 ND/HTO 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 563 pCi/i HTO 11/18/2005 ND/HTO 12/2/2005 498 pCi/i HTO 12/15/2005 ND/HT0 12-30-05 529 pCi/i HTO 1/12/2006 __ _ _ _ _ _ _ _ _ _ _ _ _ 786 p Ci/I HTO mwexecsummSort-byWellJa.n_26_2006.doc Page 6 of 8

StacV Smith - mwexecsummSor(_bvWe11 Jan-26-2006.doc Stacy Smith mwexecsummSorLbyWellJan_26_2006.doc

-___ __-- =111e-11111-- .- 11,1- , - -

1___.-11____ ____ ___

Page 7:1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th U3-T2 10/7/2005 U3 North Turbine 1,590 pCi/I HTO 10/21/2005 1,470 pCi/i HTO 10/21/2005 1,420 pCi/ HTO DEC 10/28/2005 1,280 pCi/i HTO 11/4/2005 1,190 pCi/i HTO 11/10/2005 1,640 pCi/I HTO 11/18/2005 1,130 pCi/I HTO 12/2/2005 1,329 pCi/I HTO 12/15/2005 1,290 pCi/I HTO 12/30/2005 1,685 pCi/I HTO 1/06/2006 2,417 pCi/I HTO 01/12/2006 1,776 pCi/ lHTO ID Date Location Sample Results Well-I 12/06/2005 Lafarge Property. North East ND/HTO 12/06/2005 Well - Farthest from river NDJHTO DEC 12/06/2005 ND SR-90 Teledyne Well-3 12/06/2005 Lafarge Property. North West ND/HTO 12/06/2005 Well - closest to river ND SR-90 Teledyne 12/06/2005 ND/HTO DEC mwexecsummSort-by-WellJan_26_2006.doc Page 7 of 8

Stacy Smith - mw-execsumm=Sort-byWellJan_26_2006.doc Page 81

-- 811--

Stacy--Smith mw execsu..mm or by1--1ell-_Ja--n_2I6_2006.d-oc

- II11 - -- -- Page -

On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MW-1l1, MW-33, MW-34 & MW-35 Tritium 350,000 300,000 250,000 R -*- MW-lll pCi HTO 8 200,000 rAW-33 pCVI HTO E MW-34 pCO HTO E 150,000

-ir- MW-35 pCVI HTO 100,000 50,000 0

L 0O8 010(0LO(0(0LO I I LO M (0 (0 0 ~0 0 0 0 C 0 Date mwexecsummSort_byWellJan_26_2006.doc Page 8 of 8