ML15265A506: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15265A506
| number = ML15265A506
| issue date = 10/02/2015
| issue date = 10/02/2015
| title = Correction to Amendments Nos. 219 and 181 Regarding Change to Add New Limiting Conditions for Operation 3.0.5 and 3.0.6 (TAC Nos. MF5133 and MF5134)
| title = Correction to Amendments Nos. 219 and 181 Regarding Change to Add New Limiting Conditions for Operation 3.0.5 and 3.0.6
| author name = Ennis R
| author name = Ennis R
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 WASHINGTON, D.C. 20555-0001 October 2, 2015
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 2, 2015 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
LIMERICK GENERATING STATION, UNITS 1 AND 2 -CORRECTION TO AMENDMENTS NOS. 219 AND 181 REGARDING CHANGE TO ADD NEW LIMITING CONDITIONS FOR OPERATION 3.0.5 AND 3.0.6 {TAC NOS. MF5133 AND MF5134)  
LIMERICK GENERATING STATION, UNITS 1 AND 2 - CORRECTION TO AMENDMENTS NOS. 219 AND 181 REGARDING CHANGE TO ADD NEW LIMITING CONDITIONS FOR OPERATION 3.0.5 AND 3.0.6 {TAC NOS.
MF5133 AND MF5134)


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
By letter dated September 15, 2015 (Agencywide Documents Access and Management System Accession No. ML15218A501  
 
), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 219 and 181 to Renewed Facility Operating License (RFOL) Nos. NPF-39 and NPF-85 for Limerick Generating Station (Limerick), Units 1 and 2, respectively, in response to your application dated November 3, 2014, as supplemented by letter dated April 14, 2015. The amendments added new Limiting Conditions for Operation 3.0.5 and 3.0.6 to the Applicability section of the Technical Specifications.
By letter dated September 15, 2015 (Agencywide Documents Access and Management System Accession No. ML15218A501 ), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 219 and 181 to Renewed Facility Operating License (RFOL) Nos. NPF-39 and NPF-85 for Limerick Generating Station (Limerick), Units 1 and 2, respectively, in response to your application dated November 3, 2014, as supplemented by letter dated April 14, 2015.
The amendments added new Limiting Conditions for Operation 3.0.5 and 3.0.6 to the Applicability section of the Technical Specifications.
Subsequent to issuance of the amendments, the NRC staff identified that license page 3 for each of the units was is error. The error appears to be the result of the NRC staff using a version of the license pages that existed prior to issuance of the recent license renewal. The specific errors were as follows:
Subsequent to issuance of the amendments, the NRC staff identified that license page 3 for each of the units was is error. The error appears to be the result of the NRC staff using a version of the license pages that existed prior to issuance of the recent license renewal. The specific errors were as follows:
* Limerick, Unit 1, license page 3 issued by Amendment No. 219, was missing License Condition 2.B(2). Accordingly, please replace page 3 of RFOL No. NPF-39 with the enclosed page.
* Limerick, Unit 1, license page 3 issued by Amendment No. 219, was missing License Condition 2.B(2). Accordingly, please replace page 3 of RFOL No. NPF-39 with the enclosed page.
* Limerick, Unit 2, license page 3, issued by Amendment No. 181, was missing License Conditions 2.B(2) and 2.B(3). In addition, the page showed License Condition 2.C(3) which should be on license page 4. Accordingly, please replace page 3 of RFOL No. NPF-85 with the enclosed page. The NRC staff regrets any inconvenience this may have caused.
* Limerick, Unit 2, license page 3, issued by Amendment No. 181, was missing License Conditions 2.B(2) and 2.B(3). In addition, the page showed License Condition 2.C(3) which should be on license page 4. Accordingly, please replace page 3 of RFOL No. NPF-85 with the enclosed page.
B. Hanson If you have any questions regarding this matter, I may be reached at 301-415-1420 or Rick.Ennis@nrc.gov.
The NRC staff regrets any inconvenience this may have caused.
Docket Nos. 50-352 and 50-353  
 
B. Hanson                                 If you have any questions regarding this matter, I may be reached at 301-415-1420 or Rick.Ennis@nrc.gov.
Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353


==Enclosures:==
==Enclosures:==
: 1. Page 3 to Renewed License No. NPF-39 2. Page 3 to Renewed License No. NPF-85 cc w/enclosures:
: 1. Page 3 to Renewed License No. NPF-39
Distribution via Listserv Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ENCLOSURES Corrected page 3 for Amendment No. 219 to NPF-39 Corrected page 3 for Amendment No. 181 to NPF-85   (2) Pursuant to the Act and 1 O CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 1 O CFR Parts 30, 40, 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station. C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels not in excess of 3515 megawatts thermal (100% rated power) in accordance with the conditions specified herein and in Attachment 1 to this license. The items identified in Attachment 1 to this renewed license shall be completed as specified.
: 2. Page 3 to Renewed License No. NPF-85 cc w/enclosures: Distribution via Listserv
Attachment 1 is hereby incorporated into this renewed license. (2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 219, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. Renewed License No. NPF-39 Amendment No. 219   (2) Pursuant to the Act and 1 O CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3) Pursuant to the Act and 1 O CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 1 O CFR Parts 30, 40, 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station. C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 1 O CFR Chapter I (except as exempted from compliance in Section 2.D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels of 3515 megawatts thermal ( 100 percent rated power) in accordance with the conditions specified herein. (2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 181, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. Renewed License No. NPF-85 Amendment No. 181 B. Hanson If you have any questions regarding this matter, I may be reached at 301-415-1420 or Rick.Ennis@nrc.gov.
 
Docket Nos. 50-352 and 50-353
ENCLOSURES Corrected page 3 for Amendment No. 219 to NPF-39 Corrected page 3 for Amendment No. 181 to NPF-85
 
(2)     Pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)     Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)     Pursuant to the Act and 10 CFR Parts 30, 40, 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)     Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)     Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels not in excess of 3515 megawatts thermal (100% rated power) in accordance with the conditions specified herein and in Attachment 1 to this license. The items identified in Attachment 1 to this renewed license shall be completed as specified. Attachment 1 is hereby incorporated into this renewed license.
(2)     Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 219, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Renewed License No. NPF-39 Amendment No. 219


==Enclosures:==
(2)    Pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)    Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)    Pursuant to the Act and 10 CFR Parts 30, 40, 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)    Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station.
: 1. Page 3 to RFOL No. NPF-39 2. Page 3 to RFOL No. NPF-85 Sincerely, IRA/ Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc w/enclosures:
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
Distribution via Listserv DISTRIBUTION:
(1)    Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels of 3515 megawatts thermal ( 100 percent rated power) in accordance with the conditions specified herein.
PUBLIC LPL 1-2 R/F GHill,OIS RidsNrrDorlDpr Resource RidsNrrDorlLpl 1-2 Resource RidsACRS_MailCTR Resource RidsNrrLALRonewicz Resource RidsRgn1 MailCenter Resource Records Amend
(2)    Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 181, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
* RidsNrrPMLimerick Resource ADAMS Accession No.: ML15265A506 OFFICE DORL/LPL 1-2/PM DORL/LPL 1-2/LA DORL/LPL 1-2/BC NAME REnnis LRonewicz DBroaddus (JWhited for) DATE 9/23/15 9/23/15 10/02/15 OFFICIAL RECORD COPY DORL/LPL 1-2/PM REnnis 10/2/15}}
Renewed License No. NPF-85 Amendment No. 181
 
ML15265A506 OFFICE     DORL/LPL 1-2/PM     DORL/LPL 1-2/LA     DORL/LPL 1-2/BC   DORL/LPL 1-2/PM NAME       REnnis               LRonewicz           DBroaddus         REnnis (JWhited for)
DATE       9/23/15             9/23/15             10/02/15           10/2/15}}

Latest revision as of 09:14, 19 March 2020

Correction to Amendments Nos. 219 and 181 Regarding Change to Add New Limiting Conditions for Operation 3.0.5 and 3.0.6
ML15265A506
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/02/2015
From: Richard Ennis
Plant Licensing Branch 1
To: Bryan Hanson
Exelon Nuclear
Ennis R, NRR/DORL/LPLI-2, 415-1420
References
TAC MF5133, TAC MF5134
Download: ML15265A506 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 2, 2015 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 AND 2 - CORRECTION TO AMENDMENTS NOS. 219 AND 181 REGARDING CHANGE TO ADD NEW LIMITING CONDITIONS FOR OPERATION 3.0.5 AND 3.0.6 {TAC NOS.

MF5133 AND MF5134)

Dear Mr. Hanson:

By letter dated September 15, 2015 (Agencywide Documents Access and Management System Accession No. ML15218A501 ), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 219 and 181 to Renewed Facility Operating License (RFOL) Nos. NPF-39 and NPF-85 for Limerick Generating Station (Limerick), Units 1 and 2, respectively, in response to your application dated November 3, 2014, as supplemented by letter dated April 14, 2015.

The amendments added new Limiting Conditions for Operation 3.0.5 and 3.0.6 to the Applicability section of the Technical Specifications.

Subsequent to issuance of the amendments, the NRC staff identified that license page 3 for each of the units was is error. The error appears to be the result of the NRC staff using a version of the license pages that existed prior to issuance of the recent license renewal. The specific errors were as follows:

  • Limerick, Unit 1, license page 3 issued by Amendment No. 219, was missing License Condition 2.B(2). Accordingly, please replace page 3 of RFOL No. NPF-39 with the enclosed page.
  • Limerick, Unit 2, license page 3, issued by Amendment No. 181, was missing License Conditions 2.B(2) and 2.B(3). In addition, the page showed License Condition 2.C(3) which should be on license page 4. Accordingly, please replace page 3 of RFOL No. NPF-85 with the enclosed page.

The NRC staff regrets any inconvenience this may have caused.

B. Hanson If you have any questions regarding this matter, I may be reached at 301-415-1420 or Rick.Ennis@nrc.gov.

Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353

Enclosures:

1. Page 3 to Renewed License No. NPF-39
2. Page 3 to Renewed License No. NPF-85 cc w/enclosures: Distribution via Listserv

ENCLOSURES Corrected page 3 for Amendment No. 219 to NPF-39 Corrected page 3 for Amendment No. 181 to NPF-85

(2) Pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels not in excess of 3515 megawatts thermal (100% rated power) in accordance with the conditions specified herein and in Attachment 1 to this license. The items identified in Attachment 1 to this renewed license shall be completed as specified. Attachment 1 is hereby incorporated into this renewed license.

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 219, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Renewed License No. NPF-39 Amendment No. 219

(2) Pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels of 3515 megawatts thermal ( 100 percent rated power) in accordance with the conditions specified herein.

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 181, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Renewed License No. NPF-85 Amendment No. 181

ML15265A506 OFFICE DORL/LPL 1-2/PM DORL/LPL 1-2/LA DORL/LPL 1-2/BC DORL/LPL 1-2/PM NAME REnnis LRonewicz DBroaddus REnnis (JWhited for)

DATE 9/23/15 9/23/15 10/02/15 10/2/15