ML15267A387: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML15267A387 | | number = ML15267A387 | ||
| issue date = 09/24/2015 | | issue date = 09/24/2015 | ||
| title = | | title = NRR E-mail Capture - Diablo Canyon 1 and 2 - Acceptance Review of Relief Request (RR) NDE-FWNS-U1/U2, Feedwater Nozzle-to-Vessel Welds Examination | ||
| author name = Lingam S | | author name = Lingam S | ||
| author affiliation = NRC/NRR/DORL/LPLIV-1 | | author affiliation = NRC/NRR/DORL/LPLIV-1 | ||
| addressee name = Soenen P | | addressee name = Soenen P | ||
| addressee affiliation = Pacific Gas & Electric Co | | addressee affiliation = Pacific Gas & Electric Co | ||
| docket = 05000275, 05000323 | | docket = 05000275, 05000323 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:NRR-PMDAPEm Resource From: Lingam, Siva Sent: Thursday, September 24, 2015 10:14 AM To: Soenen, Philippe R (PNS3@pge.com) | ||
Cc: Markley, Michael; McHale, John; Stevens , Gary; Schrader, Kenneth (KJSe@pge.com); | Cc: Markley, Michael; McHale, John; Stevens, Gary; Schrader, Kenneth (KJSe@pge.com); | ||
'mjrm@pge.com' | 'mjrm@pge.com' | ||
==Subject:== | ==Subject:== | ||
Diablo Canyon 1 and 2 - Acceptance Review of Relief Request (RR) NDE-FWNS-U1/U2, Feedwater Nozzle-to-Vessel Welds | Diablo Canyon 1 and 2 - Acceptance Review of Relief Request (RR) NDE-FWNS-U1/U2, Feedwater Nozzle-to-Vessel Welds Examination (TAC Nos. MF6689 and MF6690) | ||
By letter dated September 3, 2015 (Agencywide Documents Access and Management System Accession No. ML15246A244), Pacific Gas and Electric Company (PG&E, the licensee) submitted a relief request (RR) NDE-FWNS-U1/U2 for Diablo Canyon Power Plant, Units 1 and 2 third inservice inspection interval. This relief is requested from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, for examination coverage of Class 2 feedwater nozzle-to-vessel welds. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this RR. | |||
The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | |||
The NRC staff has reviewed your application and requested for the following clarification: | The NRC staff has reviewed your application and requested for the following clarification: | ||
* The RR submittal requests relief under the provisions of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.55a(g)(5)(iii), "ISI program update: Notification of impractical ISI Code requirements." | * The RR submittal requests relief under the provisions of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.55a(g)(5)(iii), "ISI program update: Notification of impractical ISI Code requirements." However, the submittal also discusses and requests approval for proposed alternatives. Proposed alternatives are addressed under the provision of 10 CFR 50.55a(z), | ||
Alternatives to codes and standards requirements. Clarify whether or not an alternative pursuant to 10 CFR 50.55a(z) is also being requested in this RR. | |||
Therefore, we will review this submittal in accordance with the provisions of 10 CFR 50.55a(g)(6), | During a telephone call on September 23, 2015, the licensee clarified that the relief request is solely under the provisions of 10 CFR 50.55a(g)(5)(iii), and no proposed alternatives under 10 CFR 50.55a(z) are requested. | ||
Therefore, we will review this submittal in accordance with the provisions of 10 CFR 50.55a(g)(6), Actions by the Commission for evaluating impractical and augmented ISI [inservice inspection] Code requirements. We will also include this clarification in our final safety evaluation. | |||
Based on the above clarification, the NRC staff has | Based on the above clarification, the NRC staff has concluded that the relief request does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed RR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | ||
If you have any questions, please contact me. | |||
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1) | |||
Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 1 | |||
E-mail address: siva.lingam@nrc.gov 2 | |||
Hearing Identifier: NRR_PMDA Email Number: 2409 Mail Envelope Properties (Siva.Lingam@nrc.gov20150924101400) | |||
Hearing Identifier: | |||
==Subject:== | ==Subject:== | ||
Diablo Canyon 1 and 2 - Acceptance Review of Relief Request (RR) NDE-FWNS-U1/U2, Feedwater Nozzle-to-Vessel Welds Examination (TAC Nos. MF6689 and MF6690) | Diablo Canyon 1 and 2 - Acceptance Review of Relief Request (RR) | ||
Tracking Status: None | NDE-FWNS-U1/U2, Feedwater Nozzle-to-Vessel Welds Examination (TAC Nos. MF6689 and MF6690) | ||
"'mjrm@pge.com'" <mjrm@pge.com> | Sent Date: 9/24/2015 10:14:04 AM Received Date: 9/24/2015 10:14:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients: | ||
Tracking Status: None Post Office: | "Markley, Michael" <Michael.Markley@nrc.gov> | ||
Tracking Status: None "McHale, John" <John.McHale@nrc.gov> | |||
Options | Tracking Status: None "Stevens, Gary" <Gary.Stevens@nrc.gov> | ||
Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com> | |||
Tracking Status: None | |||
"'mjrm@pge.com'" <mjrm@pge.com> | |||
Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com> | |||
Tracking Status: None Post Office: | |||
Files Size Date & Time MESSAGE 3337 9/24/2015 10:14:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received:}} |
Latest revision as of 09:11, 19 March 2020
ML15267A387 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 09/24/2015 |
From: | Siva Lingam Plant Licensing Branch IV |
To: | Soenen P Pacific Gas & Electric Co |
References | |
TAC MF6689, TAC MF6690 | |
Download: ML15267A387 (3) | |
Text
NRR-PMDAPEm Resource From: Lingam, Siva Sent: Thursday, September 24, 2015 10:14 AM To: Soenen, Philippe R (PNS3@pge.com)
Cc: Markley, Michael; McHale, John; Stevens, Gary; Schrader, Kenneth (KJSe@pge.com);
'mjrm@pge.com'
Subject:
Diablo Canyon 1 and 2 - Acceptance Review of Relief Request (RR) NDE-FWNS-U1/U2, Feedwater Nozzle-to-Vessel Welds Examination (TAC Nos. MF6689 and MF6690)
By letter dated September 3, 2015 (Agencywide Documents Access and Management System Accession No. ML15246A244), Pacific Gas and Electric Company (PG&E, the licensee) submitted a relief request (RR) NDE-FWNS-U1/U2 for Diablo Canyon Power Plant, Units 1 and 2 third inservice inspection interval. This relief is requested from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, for examination coverage of Class 2 feedwater nozzle-to-vessel welds. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this RR.
The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and requested for the following clarification:
- The RR submittal requests relief under the provisions of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.55a(g)(5)(iii), "ISI program update: Notification of impractical ISI Code requirements." However, the submittal also discusses and requests approval for proposed alternatives. Proposed alternatives are addressed under the provision of 10 CFR 50.55a(z),
Alternatives to codes and standards requirements. Clarify whether or not an alternative pursuant to 10 CFR 50.55a(z) is also being requested in this RR.
During a telephone call on September 23, 2015, the licensee clarified that the relief request is solely under the provisions of 10 CFR 50.55a(g)(5)(iii), and no proposed alternatives under 10 CFR 50.55a(z) are requested.
Therefore, we will review this submittal in accordance with the provisions of 10 CFR 50.55a(g)(6), Actions by the Commission for evaluating impractical and augmented ISI [inservice inspection] Code requirements. We will also include this clarification in our final safety evaluation.
Based on the above clarification, the NRC staff has concluded that the relief request does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed RR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 1
E-mail address: siva.lingam@nrc.gov 2
Hearing Identifier: NRR_PMDA Email Number: 2409 Mail Envelope Properties (Siva.Lingam@nrc.gov20150924101400)
Subject:
Diablo Canyon 1 and 2 - Acceptance Review of Relief Request (RR)
NDE-FWNS-U1/U2, Feedwater Nozzle-to-Vessel Welds Examination (TAC Nos. MF6689 and MF6690)
Sent Date: 9/24/2015 10:14:04 AM Received Date: 9/24/2015 10:14:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:
"Markley, Michael" <Michael.Markley@nrc.gov>
Tracking Status: None "McHale, John" <John.McHale@nrc.gov>
Tracking Status: None "Stevens, Gary" <Gary.Stevens@nrc.gov>
Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>
Tracking Status: None
"'mjrm@pge.com'" <mjrm@pge.com>
Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 3337 9/24/2015 10:14:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: