ML060860172: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 22: Line 22:
y+
y+
(F/H) (1-5) Stem                                          #I Back- Q= SRO U/US                                      Explanation Focus                                        inits ward KIA Only v                                                                        Y    N  E    Wnot credible with given stem conditions. Stem dioes not specify any CEA position issues Charlge first part of stern to The plant was being shutdown per AOP-2575 Rapid Downpower when the CRS directed a Manual Trip. (GAJ)
(F/H) (1-5) Stem                                          #I Back- Q= SRO U/US                                      Explanation Focus                                        inits ward KIA Only v                                                                        Y    N  E    Wnot credible with given stem conditions. Stem dioes not specify any CEA position issues Charlge first part of stern to The plant was being shutdown per AOP-2575 Rapid Downpower when the CRS directed a Manual Trip. (GAJ)
                                                                                              -
                                                                                             . Ereplaced, other chanqes made as recommended Y*    N  S
                                                                                             . Ereplaced, other chanqes made as recommended Y*    N  S
* WA match considered acceptable since the question is related to flow out of PORV H                                                                  Y    N  S 4    H    3 5    H    3 6    H    2 7    F    2 Y I N I SI 8    H    2                                                                                  Need to validate correct answer against reference@)
* WA match considered acceptable since the question is related to flow out of PORV H                                                                  Y    N  S 4    H    3 5    H    3 6    H    2 7    F    2 Y I N I SI 8    H    2                                                                                  Need to validate correct answer against reference@)
Line 31: Line 30:
                                                                                     ~~              -
                                                                                     ~~              -
Y    N                            minor format DV-10 (GAJ)
Y    N                            minor format DV-10 (GAJ)
Fixed on final version
Fixed on final version N    N  U    WAmismatch. Question is about environmentalimpact, not battery
                                                    -
N    N  U    WAmismatch. Question is about environmentalimpact, not battery
                                                           >,j>.                    capacity(GAJ)
                                                           >,j>.                    capacity(GAJ)
                                                           , !:        Note: Very similar WA to question 50 WA match resolved
                                                           , !:        Note: Very similar WA to question 50 WA match resolved
Line 44: Line 41:
Validated with new reverences Y    N
Validated with new reverences Y    N


C
C c
    ._
0 m
c 0
r-: -
m r-: -
C m
C m
Cl 3
Cl 3
        >- >
N  N N L
N  N N L
n
n N  D N
        -
N  D N


I T
I T
0
0 c
    ._
m r-: 8 m
c m
r-: 8
    -
m
::
w i
w i
w      w    w z    z      Z
w      w    w z    z      Z t    i J
      -  -
t    i J
               +
               +
           +$
           +$
Line 95: Line 81:
: 6.        Based on the reviewers judgment, is the question as written (U)nacceptable(requiring repair or replacement),
: 6.        Based on the reviewers judgment, is the question as written (U)nacceptable(requiring repair or replacement),
                                                                                                                           .- in need of (E)ditorial enhancement, or (S)atisfactory?
                                                                                                                           .- in need of (E)ditorial enhancement, or (S)atisfactory?
                                                                                                                      --_-.
: 7.        At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).
: 7.        At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).
NUREG-1021, Revision 9}}
NUREG-1021, Revision 9}}

Latest revision as of 08:26, 14 March 2020

NRC Comments on Draft Licensee-Developed Written Exam (Folder 2)
ML060860172
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/24/2005
From: Jane Spence
Dominion Resources
To: Johnson G
Operations Branch I
Conte R
References
Download: ML060860172 (6)


Text

ES-401 Millstone Point Unit 2 Retake Written Examination Feb 06 Form ES-401-9 Written Examination Review Worksheet NOTE 1: All NRC examiner comments on the draft questions have been resolvedAncorporated.

Note 2: The following questions and/or correct answers were changed after NRC review of draft questions based on feedback from licensee validators: 8, 10,20,29,35,36, 48,49,50,51,58, 61, 63. These questions were graded E pending receipt of applicable references. These questions received a second technical review by the NRC examiner(s)

)# 1 26KI L:i v. - ~ ~-

Psychometric Flaws 4. Job Content Flaws I -5. Other 6.

I 7.

y+

(F/H) (1-5) Stem #I Back- Q= SRO U/US Explanation Focus inits ward KIA Only v Y N E Wnot credible with given stem conditions. Stem dioes not specify any CEA position issues Charlge first part of stern to The plant was being shutdown per AOP-2575 Rapid Downpower when the CRS directed a Manual Trip. (GAJ)

. Ereplaced, other chanqes made as recommended Y* N S

  • WA match considered acceptable since the question is related to flow out of PORV H Y N S 4 H 3 5 H 3 6 H 2 7 F 2 Y I N I SI 8 H 2 Need to validate correct answer against reference@)

Validated with new reverences

3. Psychometric Flaws 4. Job Content Flaws 5. Other 7.

Explanation Y N Y N E Need to validate correct answer against reference(s)

Validated with new reverences Y N S

~~ -

Y N minor format DV-10 (GAJ)

Fixed on final version N N U WAmismatch. Question is about environmentalimpact, not battery

>,j>. capacity(GAJ)

, !: Note: Very similar WA to question 50 WA match resolved

-.* r:

Y N E t :: Ensure reference supports correct answer (GAJ)

Validated with new reverences Y N S Y N S Y* N S *Note: Lack of radiation alarm is a needed cue for question (GAJ)

Y N E add femporaryin front of procedure change in B C and D to completely match WA (GAJ)

Changes made Need to validate correct answer against reference(s)

Validated with new reverences Y N S I Y N Need to validate correct answer against reference($)

Validated with new reverences Y N

C c

0 m

r-: -

C m

Cl 3

N N N L

n N D N

I T

0 c

m r-: 8 m

w i

w w w z z Z t i J

+

+$

0 (D (D

3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO U/US yz Explanation Focus Dist. Link units ward WA Only Y I N I EI Do not use should (RJC)

Changed should to Will Y N S Y N E Should be lower order LOK (RJC)

Changed to F; still >50% H

- F Y N S H

~ -~ ~-

Instructions 3efer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]

1. Enter the level of knowledge (LOK) of each question as either (F)undamentalor (H)igher cognitive level.
2. -

Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy difficult) rating scale (questions in the 2 - 4 range are acceptable).

3. Check the appropriate box if a psychometricflaw is identified:

The stem lacks sufficientfocus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).

The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).

The answer choices are a collection of unrelated true/false statements.

One or more tkEnteftedistractorsis not credible.

One or more distractors Is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).

4. Check the appropriate box if a job content error is identified:

The question is not linked to the job requirements (Le., the question has a valid WA but, as written, is not operational in content).

The question requires the recall of knowledge that IS too specific for the closed reference test mode (Le., it is not required to be known from memory).

The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).

The question requires reverse logic or applicationcompared to the job requirements.

5. Check questions that are sampled for conformancewith the approved WA and those that are desianated SRO-only (WA and license level mismatches are unacceptable).
6. Based on the reviewers judgment, is the question as written (U)nacceptable(requiring repair or replacement),

.- in need of (E)ditorial enhancement, or (S)atisfactory?

7. At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).

NUREG-1021, Revision 9