Person / Time
Site: Millstone, Kewaunee, Surry, North Anna  Dominion icon.png
Issue date: 07/28/2010
From: Hartz L
Dominion Energy Kewaunee, Dominion Resources Services, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
10-417, RIS 2010-08, FOIA/PA-2011-0115
Download: ML102230425 (8)


Text

Dominion Resources Services, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 omini Web Address: www.dom.com July 28, 2010 United States Nuclear Regulatory Commission Serial No.:

10-417 Attention: Document Control Desk NLOS/GLA Washington, DC 20555 Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DOMINION ENERGY KEWAUNEE, INC. (DEK)

DPR-65 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)

NPF-49 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion)

NPF-4/7 KEWAUNEE POWER STATION DPR-32/37 MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 & 2 NRC REGULATORY ISSUE

SUMMARY

2010-08 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2010-08, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. David Llewellyn at (804) 273-4314.

Very truly yours, L. N. Hartz Vice President - Nuclear Support Services Attachments cc:

U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415

~~D3

SN 10-417 Scheduling of Operator Licensing Examinations Page 2 of 3 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Dr. V. Sreenivas NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852 Ds. K. R. Cotton NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852 Ms. C. J. Sanders NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 08 B-3 11555 Rockville Pike Rockville, MD 20852 Mr. K. D. Feintuch NRC Project Manager United States Nuclear Regulatory Commission One White Flint North Mail Stop 08 H-4A 11555 Rockville Pike Rockville, MD 20852 NRC Senior Resident Inspector Kewaunee Power Station NRC Senior Resident Inspector Millstone Power Station

SN 10-417 Scheduling of Operator Licensing Examinations Page 3 of 3 NRC Senior Resident Inspector North Anna Power Station

,NRC Senior Resident Inspector Surry Power Station J

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 (10-2008) b IEstimated'

.urden !per response to comply with this voluntary information collection request! 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regardin burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch IT-5 F3),U.S.

Nuclear Regulatory Commission, Washington, DC 20555-000 or by Internet EXAMINATION DATA m-eto Ilnfocollects@nrc.gov, and to the Desk Officer. Office of Informaeton and Regulatory Affairs, NEOB-10202. (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.

FACILITY NRC REGION Kewaunee Power Station I11 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 Cy 2013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2 0 13 Cy 20 14 Cy 20 15 NUMBER OF REACTOR 0

5 0

5 OPERATORS NUMBER OF SENIOR REACTOR 0

5 0

5 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 02/18/2013 03102/2015 ALTERNATE DATE 02/25/2013 03/16/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES; 10131/2011 (10-2008)

Estimated burden per response to comply with this volunlary information collection request: A. hour. This information collection is used to plan budgets

p
  • 6nd resource.fd

ýbiratori:iiaminations. Send comments regarding burden estimate to'the'Rkords arid FOIA/Privacy Services Branch

_"-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001. or by internet EXAMINATION DATA inocollects@nrc.gov. and to the Desk Officer, Office of Information Aand RegulatorAffairs, NEOB-10202, (3150-0131). Office of Management and Budget, Washington. DC 20503.

If a means used to impose en Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, ond a person is not required to respond to, the information cofleclion.

FACILITY NRC REGION Millstone Unit 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2012 Cy 2013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 20 14 CY 2 015 NUMBER OF REACTOR 0

6 0

6 OPERATORS NUMBER OF SENIOR REACTOR 0

6 0

6 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR0 OPERATORS - UPGRADE 0

2 0

2 NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 05/12/2013 05/10/2015 ALTERNATE DATE 05/19/2013 05/17/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 C ANDIDATES NRC FORM W3 (10-2008)

PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: LN0. 3150-0"31 EXPIRES; t0/31/2011 (10-2008)

Estimated burden per response lo comply with this voluntary information Collection request: I hour.. This information collection is usede io plan budgets bnd resources. for~operator examinations. Send comments regardin bU~den Ostimate to the Rkcor&d and;FOlIAPrivacy Services Branch T-5 3), U..

& LNuar Re'ult DC 2055 orby inlemet E.meil to iMfOColla"ctsihn.

W*o*an-to the Desk Officer. Office of lnformnsion snd Rogulator Affairs, NE B-10202. (315O-Ol31)

Office of Management 'nd Budget, Washington, DC 20503.

If a means used to irposo an infomelaion colletion does not disptay a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to reipond to, the intormation collectlon.

FACILITY NRC REGION Millstone Unit 3 1

A. PROPOSED EXAMINATION PREPARATION' SCHEDULE PROPOSED NUMBER CY 2012 ey 20 13 Cy 2014 oy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy 2 0 13 Cy 2G4 Cy 2015 NUMBER OF REACTOR 6

0 6

OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0

0 2

NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 08/11/2013 08/09/2015 ALTERNATE DATE 08/18/2013 08/16/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NIRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10131i2011 (10-2008)

Estimated bijrden per response to comply with this voluntary information collection raquest:J -hour..This Information collection Is used to plan budgets O.nd resourijfoal*brnat&b'examinations. Send comments regd burden Ostim0el* toheRuc6rds and FOIA/Privacy Servce ranch (T-5F53), U.S.

OP RA O

LIE SN iqljclear Regulatory Commission, Washington, DC 20555-0001 or by Internet EOmAI to infocollects@nrc.gov, and to the Desk Officer, Office of infrmration EXAMINATION DATA and Regu;stcry Affairs, NEOB-1 0202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an Information coillction does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information colection.

FACILITY NRC REGION North Anna Power Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2 0 13 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2012 Cy 2013 CY 2014 Cy 2015 NUMBER OF REACTOR 10 0

10 0

OPERATORS NUMBER OF SENIOR REACTOR 5

0 6

0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3

0 3

0 NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 06/11/2012 06/16/2014 ALTERNATE DATE 06/18/2012 06/23/2014 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I

NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

J4, NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MS: NO. 3150-0131 EXPIRES: 10/31/2011 (10.2008)

Eslimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection Is used to plan budgets 3nd cesourcs for operator examinations. Send comments re arding burden OPERATOR CENSING estimate to the Records and FOIA/Privacy Services Branch 6 F531, U.S.

Nuclear Regulatory Commission, Washington, DC 20555-000, or by Internet e-rNai to infocoilects@nrc.gov, and to the Desk Officer. Otfia of Information EXAMINATION DATA and Reguatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington. DC 20503.

If a means used to impose an information collecton does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.

FACILITY NRC REGION Surry Power Station I!

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 Cy 2 0 13 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

0 0

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1

0 1

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy 2 013 CY 2014 CY 20 15 NUMBER OF REACTOR 12 0

12 0

OPERATORS NUMBER OF SENIOR REACTOR 0

6 0

OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2

0 2

01 NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 08/13/2012 081112014 ALTERNATE DATE 08/20/2012 08/18/2014 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 18 CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER