| {{#Wiki_filter:-- E~ntfgy Waterford 3 Emergency Diesel Generator Fuel Oil Storage Project NRC Overview April 5, 2006 Entorgy Objectives | | {{#Wiki_filter:-- E~ntfgy Waterford 3 Emergency Diesel Generator Fuel Oil Storage Project NRC Overview April 5, 2006 Entorgy Objectives |
| * Increase margin by using EDG "rated capacity" method to calculate fuel storage requirements | | * Increase margin by using EDG "rated capacity" method to calculate fuel storage requirements |
| * Increase margin by installing significantly more on site fuel oil storage capacity (40,000 gallons)* Fully comply with EPU commitment | | * Increase margin by installing significantly more on site fuel oil storage capacity (40,000 gallons) |
| * Use standard No. 2 diesel fuel oil* Slight reduction in FOST to reduce operator burden 2 1 | | * Fully comply with EPU commitment |
| -Entergy EPU Commitment To improve the fuel oil storage capability and provide a larger operational band, Waterford 3 commits to a design change to the onsite fuel oil storage system that will accommodate fuel oil storage volume equivalent to the fuel oil needed to run each DG for seven days based on calculational methods described in American National Standards Institute (ANSI) Standard N195-1976, "Fuel Oil Systems for Standby Diesel Generators." The modification will be completed by December 31, 2006. Supporting TS changes will be submitted as needed to support changes.3 Entergy License Amendment Request* Change to Technical Specification | | * Use standard No. 2 diesel fuel oil |
| -Relocate fuel oil requirements to new Technical Specification | | * Slight reduction in FOST to reduce operator burden 2 |
| -Increase the required capacity-Maintain allowed time for capacity < 7 days but> 6 days-Relocate FO Testing Program to Administrative TS* Supporting Bases Changes 4 2 | | 1 |
| -En/oeW New Required Capacity* Based on 7-day rated capacity of the Emergency Diesel Generator* Includes margin for testing* Provided in two tanks per train-Existing safety related tank-New non-safety related tank 5-Entfrgy Required Capacity Comparison Current Proposed 55,000 Volume 38,000 In safety related tank (gallons) 39,300 (5 days)17,000 in non-safety tank (2 days + margin for testing)Time dependent with exceptions Rated Capacity CaMculational -does not include 10% margin exeptity Method.Noecpin-does not include testing volume Duration 7 days 7 days 6 3 | | |
| -Enlergy Design Concept* Install two new 20,000 gallon non-safety storage tanks connected to existing FOST fill stations* Double walled tanks with dual submersible pumps powered by EDG's* Industrial grade tanks and equipment* Underground | | -Entergy EPU Commitment To improve the fuel oil storage capability and provide a larger operational band, Waterford 3 commits to a design change to the onsite fuel oil storage system that will accommodate fuel oil storage volume equivalent to the fuel oil needed to run each DG for seven days based on calculational methods described in American National Standards Institute (ANSI) Standard N195-1976, "Fuel Oil Systems for Standby Diesel Generators." The modification will be completed by December 31, 2006. Supporting TS changes will be submitted as needed to support changes. |
| / missile protected tank and pumps* Watertight | | 3 Entergy License Amendment Request |
| / flood protected | | * Change to Technical Specification |
| / hurricane proof e Z~Entcrg~y Design Concept 8 4 Entcrgy Defense In Depth* ANSI fuel oil storage calculational requirements fully met* Leak detection indication provided* Train separation maintained | | - Relocate fuel oil requirements to new Technical Specification |
| * Design will be hurricane | | - Increase the required capacity |
| / flood proof Enfergy Defense In Depth* DBA consumption | | - Maintain allowed time for capacity < 7 days but> 6 days |
| (-5 gpm) equates to:->5 days fuel supply in each SR tank->2 days in each NS tank* SR tanks cross-connected (active failure proof)* Replenishment fuel is available from multiple area sources following DBA 10 5 i , .-Enterfy Summary* Proposal fully meets EPU Commitment | | - Relocate FO Testing Program to Administrative TS |
| * Provides significant increase in fuel storage, controlled by TS* Provides increased defense in-depth* Reduces operator and chemistry burden..Entergy* Questions? | | * Supporting Bases Changes 4 |
| | 2 |
| | |
| | - En/oeW New Required Capacity |
| | * Based on 7-day rated capacity of the Emergency Diesel Generator |
| | * Includes margin for testing |
| | * Provided in two tanks per train |
| | - Existing safety related tank |
| | - New non-safety related tank 5 |
| | -Entfrgy Required Capacity Comparison Current Proposed 55,000 Volume 38,000 Insafety related tank (gallons) 39,300 (5days) 17,000 in non-safety tank (2days + margin for testing) |
| | Time dependent with exceptions Rated Capacity CaMculational -does not include 10% margin exeptity Method.Noecpin |
| | -does not include testing volume Duration 7 days 7 days 6 |
| | 3 |
| | |
| | -Enlergy Design Concept |
| | * Install two new 20,000 gallon non-safety storage tanks connected to existing FOST fill stations |
| | * Double walled tanks with dual submersible pumps powered by EDG's |
| | * Industrial grade tanks and equipment |
| | * Underground / missile protected tank and pumps |
| | * Watertight / flood protected / hurricane proof e |
| | Z~Entcrg~y Design Concept 8 |
| | 4 |
| | |
| | Entcrgy Defense In Depth |
| | * ANSI fuel oil storage calculational requirements fully met |
| | * Leak detection indication provided |
| | * Train separation maintained |
| | * Design will be hurricane / flood proof Enfergy Defense In Depth |
| | * DBA consumption (-5 gpm) equates to: |
| | - >5 days fuel supply in each SR tank |
| | - >2 days in each NS tank |
| | * SR tanks cross-connected (active failure proof) |
| | * Replenishment fuel is available from multiple area sources following DBA 10 5 |
| | |
| | i , . |
| | -Enterfy Summary |
| | * Proposal fully meets EPU Commitment |
| | * Provides significant increase in fuel storage, controlled by TS |
| | * Provides increased defense in-depth |
| | * Reduces operator and chemistry burden Entergy |
| | * Questions? |
| 12 6}} | | 12 6}} |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24248A2362024-09-0404 September 2024 2023 Annual Assessment Meeting Slides ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23296A1002023-10-24024 October 2023 Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR ML22271A7502022-09-29029 September 2022 Preapplication Meeting Slides: Technical Specification Change to Support Elimination of ESFAS Single Point Vulnerability ML22224A2462022-08-19019 August 2022 Entergy Slides for Regulatory Conference (Enc 3) ML22217A0082022-07-29029 July 2022 Regulatory Conference - NRC Slides (Enc 2) ML22076A1962022-03-17017 March 2022 Presentation March23, 2022 NRC Di_C Workshop ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21013A3372020-12-17017 December 2020 Risk-Informed Allowed Outage Time (Riaot) License Amendment Request -NRC Pre-Submittal Meeting, Licensee Slide Presentation, December 17, 2020 EPID L-2020-LRM-0110 ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20288A7292020-09-22022 September 2020 Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 W3F1-2020-0017, Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-03-12012 March 2020 Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0082, Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-12-0505 December 2019 Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0068, Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-09-12012 September 2019 Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18037B1102018-02-0808 February 2018 Presentation Slides for February 8 2018 Preapplication Meeting to Discuss Chapter 15 Fuel Misload ML17290A6552017-10-19019 October 2017 Public Meeting, Licensee Presentation Slides Regarding Waterford, Unit 3, Fluence Methodology ML16190A0842016-06-0808 June 2016 Public Meeting, June 8, 2016 (Pmc Comments1) ML15222A3472015-08-11011 August 2015 Presentation for 8-11-15 Public Meeting on Main Control Room Abandonment ML15196A4152015-07-15015 July 2015 Summary of Meeting with Entergy Corporation to Discuss Annual Performance Assessment ML15113A7872015-04-22022 April 2015 CEA Drop Time Technical Specification Change Request April 22, 2015 Revised Public Meeting Slides ML15110A0622015-04-22022 April 2015 CEA Drop Time T.S. Change Request April 22,2015 Public Meeting Slides ML14035A0942014-02-0404 February 2014 2/4/2014 Waterford Steam Electric Station, Unit 3 - Meeting Slides - NFPA 805 LAR Supplement ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12261A1962012-09-16016 September 2012 Summary of Meeting with Waterford Steam Electric Station to Discuss the Performance of the Waterford Steam Electric Station, Unit 3, for the Period of July 1, 2011 Through June 30, 2012 ML1129205202011-10-19019 October 2011 Regulatory Conference Summary ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 ML1031403752010-11-10010 November 2010 Handouts for the 11/10/10 Meeting Regarding Surge Line Leak-Before Break RCS Leakage Detection ML1014606312010-05-26026 May 2010 Summary of Public Meeting with Entergy Operations on Waterford Steam Electric Station Unit 3 2009 Performance ML1006903722010-03-0808 March 2010 Licensee Slides from 3/8/2010 Meeting Generic Letter 2004-02 Response to RAIs ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0821401432008-07-31031 July 2008 Summary of Public Meeting with Entergy on Waterford, Unit 3, 2007 Performance ML0805102512008-02-20020 February 2008 Summary of Meeting with Entergy Operations, Inc. Degraded Batwings Metal Support Structures for Tubes in Waterford 3's Steam Generators ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0729806702007-10-24024 October 2007 Meeting Presentation on GEH Chemical Effects Testing Update ML0726701082007-10-10010 October 2007 9/06/2007 Waterford Steam Electric Station, Unit No. 3 - Meeting Handouts ML0712005272007-04-30030 April 2007 Nrc/Entergy Operations, Inc. Management Meeting to Discuss the Performance of Arkansas Nuclear One, Cooper, Grand Gulf, River Bend and Waterford, Unit 3 ML0708706752007-03-22022 March 2007 Meeting Slides, Entergy Meeting with NRC, Topic: Waterford 3 Batwings ML0615000942006-05-30030 May 2006 Summary of Meeting with Entergy Operations Re Waterford Steam Electric Station, Unit 3, Annual Performance Assessment ML0610103332006-04-0505 April 2006 Slides Presented at April 6, 2006 Waterford 3 Meeting ML0427901372004-10-0404 October 2004 Meeting Summary for the September 29, 2004, Public Meeting to Discuss General Engineering Related Topics ML0323705292003-08-22022 August 2003 Summary of Nrc/Entergy Operations, Inc. Management Meeting ML0323201802003-08-14014 August 2003 8/14/03, EOI Will Discuss Its May 8, June 11, & July 1, 2003, Relaxation Requests from Nrc'S Vessel Head Inspection Order ML0310102992003-04-0101 April 2003 Enclosures to 04/01/2003 Waterford End-of-Cycle Meeting Summary. Includes Attendance List & Copy of Slides Presented 2024-09-04
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24248A2362024-09-0404 September 2024 2023 Annual Assessment Meeting Slides ML24096B4992024-04-0101 April 2024 Slides: Pre-Submittal Meeting for License Amendment Request to Modify Selected Surveillance Requirements in Support of the Surveillance Frequency Control Program ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23296A1002023-10-24024 October 2023 Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR ML23122A1012023-05-0202 May 2023 Assessment Presentation 2022 ML22271A7502022-09-29029 September 2022 Preapplication Meeting Slides: Technical Specification Change to Support Elimination of ESFAS Single Point Vulnerability ML22224A2462022-08-19019 August 2022 Entergy Slides for Regulatory Conference (Enc 3) ML22217A0082022-07-29029 July 2022 Regulatory Conference - NRC Slides (Enc 2) ML22164A8012022-06-13013 June 2022 Entergy Fleet (GGNS, RBS, and WF-3) - Code Case N-752 RR 6-14-22 Pre-Submittal Public Meeting Presentation Slides ML22076A1962022-03-17017 March 2022 Presentation March23, 2022 NRC Di_C Workshop ML21319A2452021-11-15015 November 2021 Natrium Energy Island Decoupling Strategy - 11-17-2021 ML21306A3162021-11-0909 November 2021 Digital IC Presentation 11/09/2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21012A1982021-01-15015 January 2021 Relocate Toxic Gas Monitoring Technical Specifications to Technical Requirements Manual License Amendment Request - NRC Pre-submittal Meeting ML21013A3372020-12-17017 December 2020 Risk-Informed Allowed Outage Time (Riaot) License Amendment Request -NRC Pre-Submittal Meeting, Licensee Slide Presentation, December 17, 2020 EPID L-2020-LRM-0110 ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20288A7292020-09-22022 September 2020 Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 W3F1-2020-0017, Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-03-12012 March 2020 Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2020-0002, Transmittal of Slides for Third Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-01-0808 January 2020 Transmittal of Slides for Third Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0082, Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-12-0505 December 2019 Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0068, Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-09-12012 September 2019 Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML18037B1102018-02-0808 February 2018 Presentation Slides for February 8 2018 Preapplication Meeting to Discuss Chapter 15 Fuel Misload ML17318A1232017-11-16016 November 2017 Licensee Presentation Slides for November 16, 2017, Category 1 Public Meeting Regarding Engineered Safety Features Actuation System ML17306A1652017-11-0202 November 2017 Updated Licensee Slide Presentation for October 19, 2017 Category 1 Meeting Regarding Raptor ML17290A6552017-10-19019 October 2017 Public Meeting, Licensee Presentation Slides Regarding Waterford, Unit 3, Fluence Methodology ML17158B1502017-06-0808 June 2017 Meeting Slides for High Pressure Safety Injection Pump AB Pre-submittal Public Meeting Relief Request Per 50.55a(Z)(2)for Waterford Steam Electric Station, Unit 3 ML17151A2952017-06-0101 June 2017 6/1/2017, Meeting Slide for Pre-Submittal Meeting Regarding Ultimate Heat Sink Technical Specification Change Request for Waterford 3 ML17101A6482017-04-11011 April 2017 Public Meeting Slides ML16190A0842016-06-0808 June 2016 Public Meeting, June 8, 2016 (Pmc Comments1) ML15222A3472015-08-11011 August 2015 Presentation for 8-11-15 Public Meeting on Main Control Room Abandonment ML15196A4152015-07-15015 July 2015 Summary of Meeting with Entergy Corporation to Discuss Annual Performance Assessment ML15113A7872015-04-22022 April 2015 CEA Drop Time Technical Specification Change Request April 22, 2015 Revised Public Meeting Slides ML15110A0622015-04-22022 April 2015 CEA Drop Time T.S. Change Request April 22,2015 Public Meeting Slides ML14035A0942014-02-0404 February 2014 2/4/2014 Waterford Steam Electric Station, Unit 3 - Meeting Slides - NFPA 805 LAR Supplement ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12261A1962012-09-16016 September 2012 Summary of Meeting with Waterford Steam Electric Station to Discuss the Performance of the Waterford Steam Electric Station, Unit 3, for the Period of July 1, 2011 Through June 30, 2012 ML11321A2912011-11-17017 November 2011 Final Significance Determination of White Finding, NRC Inspection ML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 ML1031403752010-11-10010 November 2010 Handouts for the 11/10/10 Meeting Regarding Surge Line Leak-Before Break RCS Leakage Detection ML1014606312010-05-26026 May 2010 Summary of Public Meeting with Entergy Operations on Waterford Steam Electric Station Unit 3 2009 Performance ML1006903722010-03-0808 March 2010 Licensee Slides from 3/8/2010 Meeting Generic Letter 2004-02 Response to RAIs ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0909603272009-04-0606 April 2009 Summary of Public Meeting with Entergy on Waterford Steam Electric Station Unit -3 2008 Performance 2024-09-04
[Table view] |
Text
-- E~ntfgy Waterford 3 Emergency Diesel Generator Fuel Oil Storage Project NRC Overview April 5, 2006 Entorgy Objectives
- Increase margin by using EDG "rated capacity" method to calculate fuel storage requirements
- Increase margin by installing significantly more on site fuel oil storage capacity (40,000 gallons)
- Fully comply with EPU commitment
- Use standard No. 2 diesel fuel oil
- Slight reduction in FOST to reduce operator burden 2
1
-Entergy EPU Commitment To improve the fuel oil storage capability and provide a larger operational band, Waterford 3 commits to a design change to the onsite fuel oil storage system that will accommodate fuel oil storage volume equivalent to the fuel oil needed to run each DG for seven days based on calculational methods described in American National Standards Institute (ANSI) Standard N195-1976, "Fuel Oil Systems for Standby Diesel Generators." The modification will be completed by December 31, 2006. Supporting TS changes will be submitted as needed to support changes.
3 Entergy License Amendment Request
- Change to Technical Specification
- Relocate fuel oil requirements to new Technical Specification
- Increase the required capacity
- Maintain allowed time for capacity < 7 days but> 6 days
- Relocate FO Testing Program to Administrative TS
- Supporting Bases Changes 4
2
- En/oeW New Required Capacity
- Includes margin for testing
- Provided in two tanks per train
- Existing safety related tank
- New non-safety related tank 5
-Entfrgy Required Capacity Comparison Current Proposed 55,000 Volume 38,000 Insafety related tank (gallons) 39,300 (5days) 17,000 in non-safety tank (2days + margin for testing)
Time dependent with exceptions Rated Capacity CaMculational -does not include 10% margin exeptity Method.Noecpin
-does not include testing volume Duration 7 days 7 days 6
3
-Enlergy Design Concept
- Install two new 20,000 gallon non-safety storage tanks connected to existing FOST fill stations
- Double walled tanks with dual submersible pumps powered by EDG's
- Industrial grade tanks and equipment
- Underground / missile protected tank and pumps
- Watertight / flood protected / hurricane proof e
Z~Entcrg~y Design Concept 8
4
Entcrgy Defense In Depth
- ANSI fuel oil storage calculational requirements fully met
- Leak detection indication provided
- Train separation maintained
- Design will be hurricane / flood proof Enfergy Defense In Depth
- DBA consumption (-5 gpm) equates to:
- >5 days fuel supply in each SR tank
- >2 days in each NS tank
- SR tanks cross-connected (active failure proof)
- Replenishment fuel is available from multiple area sources following DBA 10 5
i , .
-Enterfy Summary
- Proposal fully meets EPU Commitment
- Provides significant increase in fuel storage, controlled by TS
- Provides increased defense in-depth
- Reduces operator and chemistry burden Entergy
12 6