ML061220693: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML061220693
| number = ML061220693
| issue date = 05/30/2006
| issue date = 05/30/2006
| title = 11/07/2006 & 11/15/2006 Summary of Conference Calls with Florida Power Corporation. Progress Energy Presentation Slides
| title = & 11/15/2006 Summary of Conference Calls with Florida Power Corporation. Progress Energy Presentation Slides
| author name =  
| author name =  
| author affiliation = Progress Energy Co
| author affiliation = Progress Energy Co
Line 24: Line 24:
W) 0
W) 0
:  @  $        5?          00  Date                  00
:  @  $        5?          00  Date                  00
                                                                   '6
                                                                   '6 el Ab                                                                Progress Energy
                                                                            '
el Ab                                                                Progress Energy


Provide a description of the inspections performed including the areas examined and the probes used.
Provide a description of the inspections performed including the areas examined and the probes used.
Line 45: Line 43:


W smi              Q(uaet Ae) 5 -
W smi              Q(uaet Ae) 5 -
                                                                                  .                          ..              .............
                                                                        --------                ... :.....:................ .. ._..                            ...
                                                    ....                                                                    ...-
\  R 50 = I;                  ~~~~~~~~~~~.......................................................................                                                                              ViD,=Nefl,,,,,,N
\  R 50 = I;                  ~~~~~~~~~~~.......................................................................                                                                              ViD,=Nefl,,,,,,N
   \  SS15--              O R.............
   \  SS15--              O R.............
                                                                                   ....  .        ... tN~~...            .....
                                                                                   ....  .        ... tN~~...            .....
                                                                                                                                                   ..        ~~*---:
                                                                                                                                                   ..        ~~*---:
                                                                                                                                                                  ...............
                                                                                                                                                                          .
                        -                                                                ...............
30                                                                                    *              *                  *5.n
30                                                                                    *              *                  *5.n
                                                                                                                                                                                          ..........
               -      -                                                                ..........              I..        .....                .........
               -      -                                                                ..........              I..        .....                .........
U    -_
U    -_

Latest revision as of 05:52, 14 March 2020

& 11/15/2006 Summary of Conference Calls with Florida Power Corporation. Progress Energy Presentation Slides
ML061220693
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/30/2006
From:
Progress Energy Co
To:
Office of Nuclear Reactor Regulation
Mozafari B, NRR/ADRO/DORL, 415-2020
Shared Package
ML061350141 List:
References
TAC MC8535, TAC MC9562
Download: ML061220693 (6)


Text

http://nggweb/cr3environmentalradcontrol/chemist ry/out/podchem. pdf (2-year plot)

Primary to Secondary Leakrate / RM-A12 Method 3.5-3-

235- .kj t 05 -

W) 0

@ $ 5? 00 Date 00

'6 el Ab Progress Energy

Provide a description of the inspections performed including the areas examined and the probes used.

Scope A B 100% Full Length Bobbin Coil (UTS to LTS) 15,232 14,748 100% Upper and Lower Roll Transition Of The Non-Sleeved Tubes Inservice 15,232 14,748 Using MRPC 34% Bobbin Coil of the Inservice Sleeves Examined Full Length of the Sleeve 55 54 34% MRPC of the Rolled Joints in the UTS and 15S of the Inservice Sleeves (Plus 55 54 6" below the end of the sleeve) 34% MRPC exam UTS and 15S of Remainder Lane Region Un-sleeved tubes 13 10 34% MRPC @ 15S Exam Of One Tube Boundary Around Lane/Wedge Region 45 45 Sleeved and Un-Sleeved Tubes Visual Inspection of ALL Plugs 598 1566 100% MRPC of the I-600 Rolled Plugs 20 47 100% MRPC of the Dents Adjacent to Explosive Plugged Tubes 17 66 34% MRPC of all Dents LTS +4" to UTE 160 70 34% MRPC in the Lower Tube Sheet Crevice Area, +4" to -8" from the LTSF in 2054 1387 the Sludge Pile Region 100% MRPC of the Inservice Tubes with IGA in the First Span N/A 167 Mi Progres Energy

The scope of the inspection and the expansion criteria Scope 100% Full Length Bobbin Coil 100%/6 Inspection, no further expansion Is possible 100% Upper and Lower Roll Transition Of The Non-Sleeved Tubes Inservice 100% Inspection, no further expansion Is possible Using MRPC 34% Bobbin Coil of the Inservice Sleeves Examined Full Length of the Sleeve IF C-I: THEN NO EXPANSION REQUIRED IF C-2 or C-3:. THEN Inspect the remaining tubes inthe affected OTSG and 20% additional tubes inthe other OTSG.

34% MRPC of the Rolled Joints in the UTS and 15S of the Inservice Sleeves (Plus IEC-1: ITHE NO EXPANSION REQUIRED 6" below the end of the sleeve) jfC-2 or C-3:. THEN Inspect the remaining tubes Inthe affected OTSG and 20% additional tubes inthe other OTSG.

34% MRPC exam UTS and 15S of Remainder Lane Region Un-sleeved tubes IF C-1: THEN NO EXPANSION REQUIRED IF C-2 or C-3:. THEN Inspect the remaining tubes inthe affected OTSG and 20% additional tubes inthe other OTSG.

34% MRPC @ 15S Exam Of One Tube Boundary Around Lane/Wedge Region IEC-I: THEN NO EXPANSION REQUIRED Sleeved and Un-Sleeved Tubes LFC-2 or C-3:. IHEN Inspect the remaining tubes Inthe affected OTSG and 20% additional tubes Inthe other OTSG.

Visual Inspection of ALL Plugs 100% Inspection, no further expansion Is possible 100% MRPC of the I-600 Rolled Plugs 100% Inspection, no further expansion Is possible 100% MRPC of the Dents Adjacent to Explos Plugged Tubes 100% Inspection, no further expansion is possible 34% MRPC of all Dents LTS +4" to UTE IFC-1: TH3N NO EXPANSION REQUIRED IFC-2 or C-3:. THEN Inspect the remaining tubes inthe affected OTSG and 20% additional tubes Inthe other OTSG.

34% MRPC in the Lower Tube Sheet Crevice Area, +4" to -8" from the LTSF in IFC-1: THEN NO EXPANSION REQUIRED the Sludge Pile Region IEC-2 or C-3:. THEN Inspect the remaining tubes inthe affected OTSG and 20% additional tubes inthe other OTSG.

100% MRPC of the Inservice Tubes with IGA in the First Span (B OTSG) N/A doG Progress Energy

_ 24.00' IUIC (i0 38

-l 15S 149 C_ . UTS 38 139 37 12S 38 38 40 m 009S 39 48- _089 40 078 39 37 089 39 049 40 03S 39

, 02S 38 (upj k4II 01 S LTS LTE r

Ab Progress Energy

W smi Q(uaet Ae) 5 -

\ R 50 = I; ~~~~~~~~~~~....................................................................... ViD,=Nefl,,,,,,N

\ SS15-- O R.............

.... . ... tN~~... .....

.. ~~*---:

30 * * *5.n

- - .......... I.. ..... .........

U -_

40- _*

40 - ... ~..*.4 . ... .

N . .................

so5 . ............ . .. .. ... K

. . . . . . *.**** S.......................

,,_ se,  ; ....................... ::: .....................

.::-:. .... ..  :........... .. .. .z U ,.I.

I 0 - _:~*.

136

  • I 5 5
  • I4 V 135 - ....

............ 1

<8?G C Progress Energy

TYPICAL TUBE END CRACKING EC'T Indications 3/16" -1/2 "1 V'* Characteristics

  • Axial and Circumferential
  • Adjacent to TS Clad Region d% C2 Progress Energy