| title = 11/07/2006 & 11/15/2006 Summary of Conference Calls with Florida Power Corporation. Progress Energy Presentation Slides
| title = & 11/15/2006 Summary of Conference Calls with Florida Power Corporation. Progress Energy Presentation Slides
| author name =  
| author name =  
| author affiliation = Progress Energy Co
| author affiliation = Progress Energy Co
Line 9: Line 9:
| docket = 05000302
| docket = 05000302
| license number = DPR-072
| license number = DPR-072
| contact person = Mozafari B L, NRR/ADRO/DORL, 415-2020
| contact person = Mozafari B, NRR/ADRO/DORL, 415-2020
| case reference number = TAC MC8535, TAC MC9562
| case reference number = TAC MC8535, TAC MC9562
| package number = ML061350141
| package number = ML061350141
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:http://nggweb/cr3environmentalradcontrol/chemist ry/out/podchem. pdf (2-year plot)
Primary to Secondary Leakrate / RM-A12 Method 3.5-3-
235-  .kj                t 05      -
W) 0
:  @  $        5?          00  Date                  00
                                                                  '6 el Ab                                                                Progress Energy
 
Provide a description of the inspections performed including the areas examined and the probes used.
Scope                                                                              A          B 100% Full Length Bobbin Coil (UTS to LTS)                                      15,232      14,748 100% Upper and Lower Roll Transition Of The Non-Sleeved Tubes Inservice        15,232      14,748 Using MRPC 34% Bobbin Coil of the Inservice Sleeves Examined Full Length of the Sleeve        55        54 34% MRPC of the Rolled Joints in the UTS and 15S of the Inservice Sleeves (Plus    55        54 6" below the end of the sleeve) 34% MRPC exam UTS and 15S of Remainder Lane Region Un-sleeved tubes                13          10 34% MRPC @ 15S Exam Of One Tube Boundary Around Lane/Wedge Region                  45        45 Sleeved and Un-Sleeved Tubes Visual Inspection of ALL Plugs                                                    598        1566 100% MRPC of the I-600 Rolled Plugs                                                20        47 100% MRPC of the Dents Adjacent to Explosive Plugged Tubes                        17        66 34% MRPC of all Dents LTS +4" to UTE                                              160        70 34% MRPC in the Lower Tube Sheet Crevice Area, +4" to -8" from the LTSF in      2054        1387 the Sludge Pile Region 100% MRPC of the Inservice Tubes with IGA in the First Span                      N/A          167 Mi                                                                                    Progres Energy
 
The scope of the inspection and the expansion criteria Scope 100% Full Length Bobbin Coil                                                        100%/6 Inspection, no further expansion Is possible 100% Upper and Lower Roll Transition Of The Non-Sleeved Tubes Inservice              100% Inspection, no further expansion Is possible Using MRPC 34% Bobbin Coil of the Inservice Sleeves Examined Full Length of the Sleeve    IF C-I: THEN NO EXPANSION REQUIRED IF C-2 or C-3:. THEN Inspect the remaining tubes inthe affected OTSG and 20% additional tubes inthe other OTSG.
34% MRPC of the Rolled Joints in the UTS and 15S of the Inservice Sleeves (Plus IEC-1: ITHE NO EXPANSION REQUIRED 6" below the end of the sleeve)                                                jfC-2 or C-3:. THEN Inspect the remaining tubes Inthe affected OTSG and 20%  additional tubes inthe other OTSG.
34% MRPC exam UTS and 15S of Remainder Lane Region Un-sleeved tubes            IF C-1: THEN NO EXPANSION REQUIRED IF C-2 or C-3:. THEN Inspect the remaining tubes inthe affected OTSG and 20% additional tubes inthe other OTSG.
34% MRPC @ 15S Exam Of One Tube Boundary Around Lane/Wedge Region              IEC-I:  THEN NO EXPANSION REQUIRED Sleeved and Un-Sleeved Tubes                                                    LFC-2 or C-3:. IHEN Inspect the remaining tubes Inthe affected OTSG and 20% additional tubes Inthe other OTSG.
Visual Inspection of ALL Plugs                                                        100% Inspection, no further expansion Is possible 100%  MRPC of the I-600 Rolled Plugs                                                100% Inspection, no further expansion Is possible 100% MRPC of the Dents Adjacent to Explos Plugged Tubes                              100% Inspection,        no further expansion is possible 34% MRPC of all Dents LTS +4" to UTE                                            IFC-1: TH3N NO EXPANSION REQUIRED IFC-2 or C-3:. THEN Inspect the remaining tubes inthe affected OTSG and 20% additional tubes Inthe other OTSG.
34% MRPC in the Lower Tube Sheet Crevice Area, +4" to -8" from the LTSF in      IFC-1: THEN NO EXPANSION REQUIRED the Sludge Pile Region                                                          IEC-2 or C-3:. THEN Inspect the remaining tubes inthe affected OTSG and 20% additional tubes inthe other OTSG.
100% MRPC of the Inservice Tubes with IGA in the First Span (B OTSG)                                                N/A doG                                                                                                                                Progress Energy
 
_ 24.00' IUIC (i0 38
            -l  15S 149 C_ . UTS 38 139 37 12S 38 38 40 m  009S 39 48-  _089 40 078 39 37      089 39 049 40 03S 39
              , 02S 38 (upj k4II 01 S LTS LTE r
Ab                          Progress Energy
 
W smi              Q(uaet Ae) 5 -
\  R 50 = I;                  ~~~~~~~~~~~.......................................................................                                                                              ViD,=Nefl,,,,,,N
  \  SS15--              O R.............
                                                                                  ....  .        ... tN~~...            .....
                                                                                                                                                  ..        ~~*---:
30                                                                                    *              *                  *5.n
              -      -                                                                ..........              I..        .....                .........
U    -_
40-                                              _*
40 -                                                                                            ...                    ~..*.4                  . ...                  .
N  .                                                .................
so5  . ............                .                                                                                                              ..    .. ...                                        K
      .            .              .                  .                .              . *.****                            S.......................
                  ,,_ se,      ;    ....................... :::    .....................
                                                                    .::-:.                          ....      ..                :...........                                              .. ..          .z U    ,.I.
I 0 - _:~*.
136
* I 5      5
* I4            V 135 -          ....
                                                                                                        ............                                1
            <8?G                                                                                                                                                                                                C Progress Energy
 
TYPICAL TUBE END CRACKING EC'T Indications 3/16"        -1/2 "1 V'* Characteristics
* Axial and Circumferential
* Adjacent to TS Clad Region d%                                      C2 Progress Energy}}

Latest revision as of 05:52, 14 March 2020

& 11/15/2006 Summary of Conference Calls with Florida Power Corporation. Progress Energy Presentation Slides
ML061220693
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/30/2006
From:
Progress Energy Co
To:
Office of Nuclear Reactor Regulation
Mozafari B, NRR/ADRO/DORL, 415-2020
Shared Package
ML061350141 List:
References
TAC MC8535, TAC MC9562
Download: ML061220693 (6)


Text

http://nggweb/cr3environmentalradcontrol/chemist ry/out/podchem. pdf (2-year plot)

Primary to Secondary Leakrate / RM-A12 Method 3.5-3-

235- .kj t 05 -

W) 0

@ $ 5? 00 Date 00

'6 el Ab Progress Energy

Provide a description of the inspections performed including the areas examined and the probes used.

Scope A B 100% Full Length Bobbin Coil (UTS to LTS) 15,232 14,748 100% Upper and Lower Roll Transition Of The Non-Sleeved Tubes Inservice 15,232 14,748 Using MRPC 34% Bobbin Coil of the Inservice Sleeves Examined Full Length of the Sleeve 55 54 34% MRPC of the Rolled Joints in the UTS and 15S of the Inservice Sleeves (Plus 55 54 6" below the end of the sleeve) 34% MRPC exam UTS and 15S of Remainder Lane Region Un-sleeved tubes 13 10 34% MRPC @ 15S Exam Of One Tube Boundary Around Lane/Wedge Region 45 45 Sleeved and Un-Sleeved Tubes Visual Inspection of ALL Plugs 598 1566 100% MRPC of the I-600 Rolled Plugs 20 47 100% MRPC of the Dents Adjacent to Explosive Plugged Tubes 17 66 34% MRPC of all Dents LTS +4" to UTE 160 70 34% MRPC in the Lower Tube Sheet Crevice Area, +4" to -8" from the LTSF in 2054 1387 the Sludge Pile Region 100% MRPC of the Inservice Tubes with IGA in the First Span N/A 167 Mi Progres Energy

The scope of the inspection and the expansion criteria Scope 100% Full Length Bobbin Coil 100%/6 Inspection, no further expansion Is possible 100% Upper and Lower Roll Transition Of The Non-Sleeved Tubes Inservice 100% Inspection, no further expansion Is possible Using MRPC 34% Bobbin Coil of the Inservice Sleeves Examined Full Length of the Sleeve IF C-I: THEN NO EXPANSION REQUIRED IF C-2 or C-3:. THEN Inspect the remaining tubes inthe affected OTSG and 20% additional tubes inthe other OTSG.

34% MRPC of the Rolled Joints in the UTS and 15S of the Inservice Sleeves (Plus IEC-1: ITHE NO EXPANSION REQUIRED 6" below the end of the sleeve) jfC-2 or C-3:. THEN Inspect the remaining tubes Inthe affected OTSG and 20% additional tubes inthe other OTSG.

34% MRPC exam UTS and 15S of Remainder Lane Region Un-sleeved tubes IF C-1: THEN NO EXPANSION REQUIRED IF C-2 or C-3:. THEN Inspect the remaining tubes inthe affected OTSG and 20% additional tubes inthe other OTSG.

34% MRPC @ 15S Exam Of One Tube Boundary Around Lane/Wedge Region IEC-I: THEN NO EXPANSION REQUIRED Sleeved and Un-Sleeved Tubes LFC-2 or C-3:. IHEN Inspect the remaining tubes Inthe affected OTSG and 20% additional tubes Inthe other OTSG.

Visual Inspection of ALL Plugs 100% Inspection, no further expansion Is possible 100% MRPC of the I-600 Rolled Plugs 100% Inspection, no further expansion Is possible 100% MRPC of the Dents Adjacent to Explos Plugged Tubes 100% Inspection, no further expansion is possible 34% MRPC of all Dents LTS +4" to UTE IFC-1: TH3N NO EXPANSION REQUIRED IFC-2 or C-3:. THEN Inspect the remaining tubes inthe affected OTSG and 20% additional tubes Inthe other OTSG.

34% MRPC in the Lower Tube Sheet Crevice Area, +4" to -8" from the LTSF in IFC-1: THEN NO EXPANSION REQUIRED the Sludge Pile Region IEC-2 or C-3:. THEN Inspect the remaining tubes inthe affected OTSG and 20% additional tubes inthe other OTSG.

100% MRPC of the Inservice Tubes with IGA in the First Span (B OTSG) N/A doG Progress Energy

_ 24.00' IUIC (i0 38

-l 15S 149 C_ . UTS 38 139 37 12S 38 38 40 m 009S 39 48- _089 40 078 39 37 089 39 049 40 03S 39

, 02S 38 (upj k4II 01 S LTS LTE r

Ab Progress Energy

W smi Q(uaet Ae) 5 -

\ R 50 = I; ~~~~~~~~~~~....................................................................... ViD,=Nefl,,,,,,N

\ SS15-- O R.............

.... . ... tN~~... .....

.. ~~*---:

30 * * *5.n

- - .......... I.. ..... .........

U -_

40- _*

40 - ... ~..*.4 . ... .

N . .................

so5 . ............ . .. .. ... K

. . . . . . *.**** S.......................

,,_ se,  ; ....................... ::: .....................

.::-:. .... ..  :........... .. .. .z U ,.I.

I 0 - _:~*.

136

  • I 5 5
  • I4 V 135 - ....

............ 1

<8?G C Progress Energy

TYPICAL TUBE END CRACKING EC'T Indications 3/16" -1/2 "1 V'* Characteristics

  • Axial and Circumferential
  • Adjacent to TS Clad Region d% C2 Progress Energy