| | number = ML061510365 | | | number = ML061510365 |
| | issue date = 05/31/2006 | | | issue date = 05/31/2006 |
| | title = Surry Unit 1, Relief, Third 10-Year ISI Interval | | | title = Relief, Third 10-Year ISI Interval |
| | author name = Monarque S R | | | author name = Monarque S |
| | author affiliation = NRC/NRR/ADRO/DORL | | | author affiliation = NRC/NRR/ADRO/DORL |
| | addressee name = Christian D A | | | addressee name = Christian D |
| | addressee affiliation = Virginia Electric & Power Co (VEPCO) | | | addressee affiliation = Virginia Electric & Power Co (VEPCO) |
| | docket = 05000280 | | | docket = 05000280 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:May 31, 2006Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 | | {{#Wiki_filter:May 31, 2006 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SURRY POWER STATION, UNIT NO. 1 (SURRY 1 ) - CORRECTION TORELIEF REQUESTS PRT-07 AND PRT-08 (TAC NOS. MC6690 AND MC6707) | | SURRY POWER STATION, UNIT NO. 1 (SURRY 1 ) - CORRECTION TO RELIEF REQUESTS PRT-07 AND PRT-08 (TAC NOS. MC6690 AND MC6707) |
|
| |
|
| ==Dear Mr. Christian:== | | ==Dear Mr. Christian:== |
|
| |
|
| On March 28, 2006, the Nuclear Regulatory Commission (NRC) issued Relief RequestsPRT-07 and PRT-08 for Surry 1. These reliefs were in response to your application dated April 11, 2005. By letter dated April 27, 2006, you informed the NRC that the safety evaluations (SEs) for bothrelief requests contained a discrepancy. Your letter stated that these SEs provided the datesfor the third 10-year inservice inspection interval (ISI) at Surry 2, instead of the dates for the third 10-year ISI at Surry 1. The corrected pages for these SEs are enclosed with this letter. | | On March 28, 2006, the Nuclear Regulatory Commission (NRC) issued Relief Requests PRT-07 and PRT-08 for Surry 1. These reliefs were in response to your application dated April 11, 2005. |
| The revisions to the SEs are identified by lines in the margin.Sincerely,/RA/Stephen R. Monarque, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-280 | | By letter dated April 27, 2006, you informed the NRC that the safety evaluations (SEs) for both relief requests contained a discrepancy. Your letter stated that these SEs provided the dates for the third 10-year inservice inspection interval (ISI) at Surry 2, instead of the dates for the third 10-year ISI at Surry 1. The corrected pages for these SEs are enclosed with this letter. |
| | The revisions to the SEs are identified by lines in the margin. |
| | Sincerely, |
| | /RA/ |
| | Stephen R. Monarque, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-280 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Safety Evaluation cc w/encl: See next page | | Safety Evaluation cc w/encl: See next page |
|
| |
|
| ML061510365 NRR-028OFFICENRR/LPL2-1/PMNRR/LPL2-1/LANRR/LPL2-1/BCNAMESMonarque:srmMO'BrienEMarinos DATE5/17/065/18/065/26/06 listed therein. The ASME Code of record for the Surry 1 ISI program is the 1989 edition ofASME Code, Section XI. The licensee requested relief for the third 10-year ISI interval at Surry 1, which began on October 14, 1993, and ended on December 31, 2004. | | ML061510365 NRR-028 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME SMonarque:srm MOBrien EMarinos DATE 5/17/06 5/18/06 5/26/06 listed therein. The ASME Code of record for the Surry 1 ISI program is the 1989 edition of ASME Code, Section XI. The licensee requested relief for the third 10-year ISI interval at Surry 1, which began on October 14, 1993, and ended on December 31, 2004. l |
| l | |
|
| |
|
| ==3.0TECHNICAL EVALUATION== | | ==3.0 TECHNICAL EVALUATION== |
|
| |
|
| 3.1ASME Code, Section XI Requirement The 1989 edition of ASME Code, Section XI, Article IWB-2500 requires that components beexamined and tested as specified in Table IWB-2500-1. Table IWB-2500-1, examination category B-A, item number B1.11 requires a volumetric examination of the RV circumferential shell welds once each 10-year ISI interval with essentially 100-percent volumetric coverage of the examination volume cross section specified in Figure IWB-2500-1 of ASME Code, Section XI, for essentially 100-percent of the weld length.3.2Component for Which Relief is RequestedCategory Item Description B-A B1.11 RV Circumferential Shell WeldsThe licensee has specifically requested relief for Circumferential Shell Weld 1-04 at Surry 1. This weld adjoins the RV shell with the lower vessel head.3.3Licensee's Basis for Relief Request The ultrasonic examination of the reactor pressure vessel circumferential shellweld is conducted in accordance with techniques qualified by demonstration for Appendix VIII, Supplements 4 and 6 of the 1995-96 Addenda of ASME [Code],Section XI.There are four core support lugs located at 0 degree, 90 degree, 180 degree,and 270 degree [azimuth] positions [at] the vessel inside surface just above the | | 3.1 ASME Code, Section XI Requirement The 1989 edition of ASME Code, Section XI, Article IWB-2500 requires that components be examined and tested as specified in Table IWB-2500-1. Table IWB-2500-1, examination category B-A, item number B1.11 requires a volumetric examination of the RV circumferential shell welds once each 10-year ISI interval with essentially 100-percent volumetric coverage of the examination volume cross section specified in Figure IWB-2500-1 of ASME Code, Section XI, for essentially 100-percent of the weld length. |
| [circumferential shell] weld which restrict[s] complete coverage of the required examination volume. The ultrasonic examination of this weld was performed by scanning the accessible scan surfaces between the support lugs and below the support lugs. Figure 1 [in the licensee's submittal] shows the general configuration of the reactor vessel and location of weld 1-04. Figures 2 and 3 [in the licensee's submittal] show the ultrasonic scanning boundaries for this weld with the restrictions due to the core support lugs. The size of the ultrasonic manipulator end effector limits how close the individual transducers can be positioned to the support lugs while scanning. The proximity of the end effector to the support lugs limits the amount of coverage obtained with each of the qualified transducers. Table 1 [in the licensee's submittal] provides the breakdown of percent [of] coverage of the required examination volume by scan direction and transducer. The achieved coverage of the required examinationvolume applying the qualified techniques is 73.4 [percent]. Relief Request PRT-08 lMay 26, 2006 l subject to the limitations and modifications listed therein. The ASME Code of record for theSurry 1 ISI program is the 1989 edition of ASME Code, Section XI. The licensee requested relief for the third 10-year ISI interval at Surry 1, which began on October 14, 1993, and ended lon December 31, 2004. | | 3.2 Component for Which Relief is Requested Category Item Description B-A B1.11 RV Circumferential Shell Welds The licensee has specifically requested relief for Circumferential Shell Weld 1-04 at Surry 1. |
| l | | This weld adjoins the RV shell with the lower vessel head. |
| | 3.3 Licensees Basis for Relief Request The ultrasonic examination of the reactor pressure vessel circumferential shell weld is conducted in accordance with techniques qualified by demonstration for Appendix VIII, Supplements 4 and 6 of the 1995-96 Addenda of ASME [Code], |
| | Section XI. |
| | There are four core support lugs located at 0 degree, 90 degree, 180 degree, and 270 degree [azimuth] positions [at] the vessel inside surface just above the |
| | [circumferential shell] weld which restrict[s] complete coverage of the required examination volume. The ultrasonic examination of this weld was performed by scanning the accessible scan surfaces between the support lugs and below the support lugs. Figure 1 [in the licensees submittal] shows the general configuration of the reactor vessel and location of weld 1-04. Figures 2 and 3 [in the licensees submittal] show the ultrasonic scanning boundaries for this weld with the restrictions due to the core support lugs. The size of the ultrasonic manipulator end effector limits how close the individual transducers can be positioned to the support lugs while scanning. The proximity of the end effector to the support lugs limits the amount of coverage obtained with each of the qualified transducers. Table 1 [in the licensees submittal] provides the breakdown of percent [of] coverage of the required examination volume by scan direction and transducer. The achieved coverage of the required examination volume applying the qualified techniques is 73.4 [percent]. |
| | Relief Request PRT-08 l May 26, 2006 l |
|
| |
|
| ==3.0TECHNICAL EVALUATION==
| | subject to the limitations and modifications listed therein. The ASME Code of record for the Surry 1 ISI program is the 1989 edition of ASME Code, Section XI. The licensee requested relief for the third 10-year ISI interval at Surry 1, which began on October 14, 1993, and ended l on December 31, 2004. l |
|
| |
|
| 3.1ASME Code, Section XI Requirement The 1989 edition of ASME Code, Section XI, Article IWB-2500, requires that components beexamined and tested as specified in Table IWB-2500-1. Table IWB-2500-1, examination category B-A, Item Number B1.30, requires a volumetric examination of the RV shell-to-flange weld once each 10-year ISI interval, with essentially 100-percent volumetric coverage of the examination volume specified in Figure IWB-2500-4 of ASME Code, Section XI.3.2Component for Which Relief is Requested Category Item Description B-A B1.30 RV Shell-to-Flange Weld 3.3Licensee's Basis for Relief Request The ultrasonic examination of the reactor vessel shell-to-flange weld wasperformed using a combination of manual and remote automated ultrasonic examination techniques. The manual examination was applied from the flange surface with techniques in accordance with the requirements of ASME Section V, Article 4. The remote automated ultrasonic examinations were performed from the vessel shell inside surface using techniques qualified by demonstration for Appendix VIII, Supplements 4 and 6 of the 1995-1996 Addenda of ASME Section XI as allowed by approved relief request SR-030 (NRC letter datedOctober 16, 2004). These automated techniques are noted to produce more accurate, reliable and repeatable procedures of examinations than the standard | | ==3.0 TECHNICAL EVALUATION== |
| [ASME Code] Section V techniques previously used.Figure 1 [of the licensee's submittal] shows the reactor vessel and associatedwelds. Figures 2 and 3 [of the licensee's submittal] illustrate the weld profile andshow scan orientation and directions. Coverage of the examination volume is obtained by combining the manual examination performed from the flange surface with the automated coverage obtained from the vessel shell surface. The examination performed from the flange surface provides examination coverage with the ultrasonic sound beam directed essentially normal to the weld axis. Coverage from the flange provides coverage of the examination volume in one beam direction, perpendicular to the weld axis. The ASME Section XI, Appendix VIII, Supplements 4 and 6 techniques are applied from the vesselinside surface, scanning in four directions to the extent possible. Due to the surface geometry of the flange, the ability to scan the necessary areas to providecomplete coverage of the examination volume in four directions is limited. The examination tool end effector, which holds the ultrasonic transducers, is not able to maintain the necessary surface contact on the non-parallel surface of theRelief Request PRT-07 lMay 26, 2006 l | | |
| Surry Power Station, Units 1 & 2 cc:Ms. Lillian M. Cuoco, Esq.Senior Counsel Dominion Resources Services, Inc. | | 3.1 ASME Code, Section XI Requirement The 1989 edition of ASME Code, Section XI, Article IWB-2500, requires that components be examined and tested as specified in Table IWB-2500-1. Table IWB-2500-1, examination category B-A, Item Number B1.30, requires a volumetric examination of the RV shell-to-flange weld once each 10-year ISI interval, with essentially 100-percent volumetric coverage of the examination volume specified in Figure IWB-2500-4 of ASME Code, Section XI. |
| Building 475, 5th Floor Rope Ferry Road Waterford, Connecticut 06385Mr. Donald E. JerniganSite Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883-0315Senior Resident InspectorSurry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883ChairmanBoard of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683Dr. W. T. LoughVirginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218Dr. Robert B. Stroube, MD, MPHState Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia 23218Office of the Attorney GeneralCommonwealth of Virginia 900 East Main Street Richmond, Virginia 23219Mr. Chris L. Funderburk, DirectorNuclear Licensing & Operations Support Dominion Resources Services, Inc. | | 3.2 Component for Which Relief is Requested Category Item Description B-A B1.30 RV Shell-to-Flange Weld 3.3 Licensees Basis for Relief Request The ultrasonic examination of the reactor vessel shell-to-flange weld was performed using a combination of manual and remote automated ultrasonic examination techniques. The manual examination was applied from the flange surface with techniques in accordance with the requirements of ASME Section V, Article 4. The remote automated ultrasonic examinations were performed from the vessel shell inside surface using techniques qualified by demonstration for Appendix VIII, Supplements 4 and 6 of the 1995-1996 Addenda of ASME Section XI as allowed by approved relief request SR-030 (NRC letter dated October 16, 2004). These automated techniques are noted to produce more accurate, reliable and repeatable procedures of examinations than the standard |
| Innsbrook Technical Center 5000 Dominion Blvd.
| | [ASME Code] Section V techniques previously used. |
| Glen Allen, Virginia 23060-6711}}
| | Figure 1 [of the licensees submittal] shows the reactor vessel and associated welds. Figures 2 and 3 [of the licensees submittal] illustrate the weld profile and show scan orientation and directions. Coverage of the examination volume is obtained by combining the manual examination performed from the flange surface with the automated coverage obtained from the vessel shell surface. |
| | The examination performed from the flange surface provides examination coverage with the ultrasonic sound beam directed essentially normal to the weld axis. Coverage from the flange provides coverage of the examination volume in one beam direction, perpendicular to the weld axis. The ASME Section XI, Appendix VIII, Supplements 4 and 6 techniques are applied from the vessel inside surface, scanning in four directions to the extent possible. Due to the surface geometry of the flange, the ability to scan the necessary areas to provide complete coverage of the examination volume in four directions is limited. The examination tool end effector, which holds the ultrasonic transducers, is not able to maintain the necessary surface contact on the non-parallel surface of the Relief Request PRT-07 l May 26, 2006 l |
| | |
| | Surry Power Station, Units 1 & 2 cc: |
| | Ms. Lillian M. Cuoco, Esq. Office of the Attorney General Senior Counsel Commonwealth of Virginia Dominion Resources Services, Inc. 900 East Main Street Building 475, 5th Floor Richmond, Virginia 23219 Rope Ferry Road Waterford, Connecticut 06385 Mr. Chris L. Funderburk, Director Nuclear Licensing & Operations Support Mr. Donald E. Jernigan Dominion Resources Services, Inc. |
| | Site Vice President Innsbrook Technical Center Surry Power Station 5000 Dominion Blvd. |
| | Virginia Electric and Power Company Glen Allen, Virginia 23060-6711 5570 Hog Island Road Surry, Virginia 23883-0315 Senior Resident Inspector Surry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218 Dr. Robert B. Stroube, MD, MPH State Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia 23218}} |
Similar Documents at Surry |
---|
Category:Code Relief or Alternative
MONTHYEARML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23102A2832023-04-25025 April 2023 ASME OM Code Inservice Testing Program Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing ML23073A1912023-04-21021 April 2023 Alternative for Inservice Inspections of Pressurizer and Steam Generator Weld Examinations ML22342A1002022-12-0707 December 2022 Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles ML19043A8242019-03-15015 March 2019 Relief Requests Examination Coverage for Pressurizer Nozzle Inner Radius Sections and Certain Stainless Steel Piping Welds (S2-15-LMT-CO1 and S2-15-LMT-P01) ML18331A0602019-02-28028 February 2019 Relief Requests Regarding Examination Coverage for Pressurizer Nozzle Inner Radius Section and Certain Stainless Steel Piping Welds (S1-I5-LMT-C01 and S1-I5-LMT-P01) ML18236A2362018-09-26026 September 2018 Relief from the Requirements of the ASME Code - Proposed Alternatives S1-I5-ISI-04 and S2-I5-ISI-04 ML18068A0642018-03-26026 March 2018 Relief from the Requirements of the ASME Code Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) ML17303A0682017-12-20020 December 2017 Nonproprietary Relief from the Requirements of the ASME Code (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) ML16365A1182017-02-17017 February 2017 Requests for Relief LMT-R01, LMT-SS01, LMT-CS01, LMT-P01, LMT-C01, LMT-C02, LMT-C03, and LMT-C04 - for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML16208A0092016-08-24024 August 2016 Requests for Relief LMT-R01, LMT-R02, LMT-R03, LMT-P01, and LMT-C01, Alternatives to ASME Code Requirements for Limited Coverage from the Requirements of the ASME Code ML15023A4412015-03-16016 March 2015 Alternatives to the Requirements of the ASME Code and Use of a Subsequent Edition and Addenda of the ASME B&PV Code, Section XI ML15029A4242015-02-10010 February 2015 Fifth 10-Year Inservice Inspection Interval Request for Subsequent Edition/Addenda ML14309A6662014-11-25025 November 2014 Relief from the Requirements of the ASME Code ML14125A4712014-05-0909 May 2014 Relief from the Requirements of the ASME Code ML14115A1992014-04-30030 April 2014 Relief from the Requirements of the ASME OM Code ML14113A3462014-04-25025 April 2014 Relief from the Requirements of the ASME Code ML13204A2972013-08-0101 August 2013 Relief from the Requirements of the ASME Code (Tacs. MF0329 and MF0330) ML13106A1402013-04-30030 April 2013 Relief from the Requirements of the ASME Code Section XI for the Fourth Ten-Year Inservice Inspection Program Interval ML12348A0082012-11-0909 November 2012 ASME Section XI Inservice Inspection (Isl) Program Request for Alternative - Reactor Vessel Nozzle to Safe End Butt Welds Examination Relief Requests CMP-008 and CMP-010 ML12130A2172012-04-25025 April 2012 ASME Section XI Inservice Inspection (ISI) Program Request for Alternative - Implementation of Extended Reactor Vessel Inservice Inspection Interval Relief Requests CMP-007 and CMP-009 ML0930003522009-10-27027 October 2009 Submittal of Relief Request SPT-004, Revision 2, SPT-003, Revision 2 and Elimination of NRC Bulletin 2003-02 Commitment ML0714403422007-08-0303 August 2007 Relief Request to Use Portion of 2001 Edition of American Society of Mechanical Engineers Code ML0712700162007-06-0505 June 2007 Relief, Forth 10-Year Inservice Inspection Interval Relief Request CMP-001, Revision 1 ML0633402942006-11-29029 November 2006 Surrry, Unit No. 2, Reply to Fourth 10-Year Inservice Inspection Interval Relief Request CMP-007, TAC MD2673 ML0615103652006-05-31031 May 2006 Relief, Third 10-Year ISI Interval ML0611706232006-04-27027 April 2006 Relief, Section XI Inservice Inspection Program Relief Requests PRT-07 and PRT-08 NRC Safety Evaluation Report Discrepancy ML0608701372006-04-14014 April 2006 Third 10-Year Inservice Inspection Interval Relief Requests PRT-01 and PRT-02 ML0607304682006-03-28028 March 2006 Relief, Third 10-Year Inservice Inspection Interval PRT-07 ML0605402842006-03-28028 March 2006 Third 10-Year Inservice Inspection Interval Relief Request PRT-08 ML0604405462006-02-0202 February 2006 Relief, Containment Relief Request IWL1 ML0529300322005-11-0101 November 2005 Relief, Fourth 10-Year Inservice Inspection Program, MC5586, MC5587, MC5596, MC5597, MC5598, and MC5600 ML0530402032005-11-0101 November 2005 Relief Request, Fourth 10-Year Inservice Inspection SPT-008 ML0526903172005-09-28028 September 2005 Relief Request, ASME Section XI ISI on Partial Examination (Tac No. MC4633, MC4634, MC4635, MC4636, MC4637) ML0520800062005-08-0808 August 2005 Relief, Safety Significant Socket Weld Examinations, TAC MC3134 ML0514604312005-05-20020 May 2005 RR, Correction Letter for SR-36 ML0515302482005-05-20020 May 2005 ASME Section XI Inservice Inspection Relief Request Main Steam Line Branch Connection Weldolets ML0510101962005-04-11011 April 2005 ASME Section XI Relief Request Alternative Acceptance Criteria for Surface Examinations ML0510204862005-04-0808 April 2005 RR-8, ASME IST Requirements on Spray Pumps for Revised Relief P-8 (Tac No. MC6258) ML0504806682005-02-17017 February 2005 SE, Correction for ASME ISI (Tac No. MC3142, MC3143) ML0503406172005-02-0101 February 2005 Ltr, Authorization of RR SR-036 & SR-037 ML0501804952005-01-10010 January 2005 ASME Section XI Inservice Inspection Program, End of Intervals System Pressure Testing ML0500400542005-01-0404 January 2005 Relief, Interval Request for Relief SR-004, Rev. 2, TAC MC3693 ML0429504442004-10-16016 October 2004 Relief Request, American Society of Mechanical Engineers Inservice Inspection Program Third 10-Year Interval ML0429402892004-10-11011 October 2004 ASME Section Xl Inservice Inspection Program Partial Examination Relief Request ML0427304532004-09-28028 September 2004 American Society of Mechanical Engineers Inservice Testing Program, Revised Relief Requests P-2 ML0425900412004-09-13013 September 2004 Relief, Risk-Informed Inservice Inspection Relief Request R-1 2024-08-12
[Table view] Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 2024-09-03
[Table view] |
Text
May 31, 2006 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION, UNIT NO. 1 (SURRY 1 ) - CORRECTION TO RELIEF REQUESTS PRT-07 AND PRT-08 (TAC NOS. MC6690 AND MC6707)
Dear Mr. Christian:
On March 28, 2006, the Nuclear Regulatory Commission (NRC) issued Relief Requests PRT-07 and PRT-08 for Surry 1. These reliefs were in response to your application dated April 11, 2005.
By letter dated April 27, 2006, you informed the NRC that the safety evaluations (SEs) for both relief requests contained a discrepancy. Your letter stated that these SEs provided the dates for the third 10-year inservice inspection interval (ISI) at Surry 2, instead of the dates for the third 10-year ISI at Surry 1. The corrected pages for these SEs are enclosed with this letter.
The revisions to the SEs are identified by lines in the margin.
Sincerely,
/RA/
Stephen R. Monarque, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-280
Enclosure:
Safety Evaluation cc w/encl: See next page
ML061510365 NRR-028 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME SMonarque:srm MOBrien EMarinos DATE 5/17/06 5/18/06 5/26/06 listed therein. The ASME Code of record for the Surry 1 ISI program is the 1989 edition of ASME Code,Section XI. The licensee requested relief for the third 10-year ISI interval at Surry 1, which began on October 14, 1993, and ended on December 31, 2004. l
3.0 TECHNICAL EVALUATION
3.1 ASME Code,Section XI Requirement The 1989 edition of ASME Code,Section XI, Article IWB-2500 requires that components be examined and tested as specified in Table IWB-2500-1. Table IWB-2500-1, examination category B-A, item number B1.11 requires a volumetric examination of the RV circumferential shell welds once each 10-year ISI interval with essentially 100-percent volumetric coverage of the examination volume cross section specified in Figure IWB-2500-1 of ASME Code,Section XI, for essentially 100-percent of the weld length.
3.2 Component for Which Relief is Requested Category Item Description B-A B1.11 RV Circumferential Shell Welds The licensee has specifically requested relief for Circumferential Shell Weld 1-04 at Surry 1.
This weld adjoins the RV shell with the lower vessel head.
3.3 Licensees Basis for Relief Request The ultrasonic examination of the reactor pressure vessel circumferential shell weld is conducted in accordance with techniques qualified by demonstration for Appendix VIII, Supplements 4 and 6 of the 1995-96 Addenda of ASME [Code],
Section XI.
There are four core support lugs located at 0 degree, 90 degree, 180 degree, and 270 degree [azimuth] positions [at] the vessel inside surface just above the
[circumferential shell] weld which restrict[s] complete coverage of the required examination volume. The ultrasonic examination of this weld was performed by scanning the accessible scan surfaces between the support lugs and below the support lugs. Figure 1 [in the licensees submittal] shows the general configuration of the reactor vessel and location of weld 1-04. Figures 2 and 3 [in the licensees submittal] show the ultrasonic scanning boundaries for this weld with the restrictions due to the core support lugs. The size of the ultrasonic manipulator end effector limits how close the individual transducers can be positioned to the support lugs while scanning. The proximity of the end effector to the support lugs limits the amount of coverage obtained with each of the qualified transducers. Table 1 [in the licensees submittal] provides the breakdown of percent [of] coverage of the required examination volume by scan direction and transducer. The achieved coverage of the required examination volume applying the qualified techniques is 73.4 [percent].
Relief Request PRT-08 l May 26, 2006 l
subject to the limitations and modifications listed therein. The ASME Code of record for the Surry 1 ISI program is the 1989 edition of ASME Code,Section XI. The licensee requested relief for the third 10-year ISI interval at Surry 1, which began on October 14, 1993, and ended l on December 31, 2004. l
3.0 TECHNICAL EVALUATION
3.1 ASME Code,Section XI Requirement The 1989 edition of ASME Code,Section XI, Article IWB-2500, requires that components be examined and tested as specified in Table IWB-2500-1. Table IWB-2500-1, examination category B-A, Item Number B1.30, requires a volumetric examination of the RV shell-to-flange weld once each 10-year ISI interval, with essentially 100-percent volumetric coverage of the examination volume specified in Figure IWB-2500-4 of ASME Code,Section XI.
3.2 Component for Which Relief is Requested Category Item Description B-A B1.30 RV Shell-to-Flange Weld 3.3 Licensees Basis for Relief Request The ultrasonic examination of the reactor vessel shell-to-flange weld was performed using a combination of manual and remote automated ultrasonic examination techniques. The manual examination was applied from the flange surface with techniques in accordance with the requirements of ASME Section V, Article 4. The remote automated ultrasonic examinations were performed from the vessel shell inside surface using techniques qualified by demonstration for Appendix VIII, Supplements 4 and 6 of the 1995-1996 Addenda of ASME Section XI as allowed by approved relief request SR-030 (NRC letter dated October 16, 2004). These automated techniques are noted to produce more accurate, reliable and repeatable procedures of examinations than the standard
[ASME Code] Section V techniques previously used.
Figure 1 [of the licensees submittal] shows the reactor vessel and associated welds. Figures 2 and 3 [of the licensees submittal] illustrate the weld profile and show scan orientation and directions. Coverage of the examination volume is obtained by combining the manual examination performed from the flange surface with the automated coverage obtained from the vessel shell surface.
The examination performed from the flange surface provides examination coverage with the ultrasonic sound beam directed essentially normal to the weld axis. Coverage from the flange provides coverage of the examination volume in one beam direction, perpendicular to the weld axis. The ASME Section XI, Appendix VIII, Supplements 4 and 6 techniques are applied from the vessel inside surface, scanning in four directions to the extent possible. Due to the surface geometry of the flange, the ability to scan the necessary areas to provide complete coverage of the examination volume in four directions is limited. The examination tool end effector, which holds the ultrasonic transducers, is not able to maintain the necessary surface contact on the non-parallel surface of the Relief Request PRT-07 l May 26, 2006 l
Surry Power Station, Units 1 & 2 cc:
Ms. Lillian M. Cuoco, Esq. Office of the Attorney General Senior Counsel Commonwealth of Virginia Dominion Resources Services, Inc. 900 East Main Street Building 475, 5th Floor Richmond, Virginia 23219 Rope Ferry Road Waterford, Connecticut 06385 Mr. Chris L. Funderburk, Director Nuclear Licensing & Operations Support Mr. Donald E. Jernigan Dominion Resources Services, Inc.
Site Vice President Innsbrook Technical Center Surry Power Station 5000 Dominion Blvd.
Virginia Electric and Power Company Glen Allen, Virginia 23060-6711 5570 Hog Island Road Surry, Virginia 23883-0315 Senior Resident Inspector Surry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218 Dr. Robert B. Stroube, MD, MPH State Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia 23218