| number = ML063480055
| number = ML063480055
| issue date = 12/07/2006
| issue date = 12/07/2006
| title = 2006/12/07-Vermont Yankee - Letter from Steven C. Hamrick to Administrative Judges Providing Monthly Status Report and Hearing File Index
| title = Vermont Yankee - Letter from Steven C. Hamrick to Administrative Judges Providing Monthly Status Report and Hearing File Index
| author name = Hamrick S C
| author name = Hamrick S
| author affiliation = NRC/OGC
| author affiliation = NRC/OGC
| addressee name = Elleman T S, Karlin A S, Wardwell R E
| addressee name = Elleman T, Karlin A, Wardwell R
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05000271
| docket = 05000271
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:December 7, 2006Administrative JudgeAdministrative JudgeAlex S. Karlin, ChairmanDr. Thomas S. Elleman Atomic Safety and Licensing Board PanelAtomic Safety and Licensing Board Panel Mail Stop T-3 F235207 Creedmoor Road, #101 U.S. Nuclear Regulatory CommissionRaleigh, NC 27612 Washington, DC 20555-0001Washington, DC 20555-0001Administrative JudgeDr. Richard E. Wardwell Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001In the Matter ofENTERGY NUCLEAR OPERATIONS, INC.(Vermont Yankee Nuclear Power Station)Docket No. 50-271-LR; ASLBP No. 06-849-03-LR
{{#Wiki_filter:December 7, 2006 Administrative Judge                                    Administrative Judge Alex S. Karlin, Chairman                                Dr. Thomas S. Elleman Atomic Safety and Licensing Board Panel                Atomic Safety and Licensing Board Panel Mail Stop T-3 F23                                      5207 Creedmoor Road, #101 U.S. Nuclear Regulatory Commission                      Raleigh, NC 27612 Washington, DC 20555-0001                              Washington, DC 20555-0001 Administrative Judge Dr. Richard E. Wardwell Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.
(Vermont Yankee Nuclear Power Station)
Docket No. 50-271-LR; ASLBP No. 06-849-03-LR


==Dear Administrative Judges:==
==Dear Administrative Judges:==
The NRC Staff hereby provides its monthly status report and notice that it has updated thehearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff is also producing, as Attachment 2, updates to its privilege logs as required by 10 C.F.R. § 2.336(b)(5), and is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. Also attached are the Affidavit of Jonathan G. Rowley, as required by 10 C.F.R. § 2.336(c), and the Declaration of Pao-Tsin Kuo, Acting Director of the Division of License Renewal, formally invoking the deliberative process privilege.Please note that the first 46 documents included in the attached hearing file supplement aredrawings that were included as attachments to a January 25, 2006 letter from Entergy to the NRC. This letter was identified in the Staff's initial hearing file index (Document No. 00-088),
 
but the attached drawings were not individually identified. While the attachments were publicly available in an ADAMS package associated with the identified letter, the Staff has listed each of the attachments individually in this hearing file supplement. There have been no changes to the Staff's projected review schedule as submitted to theBoard on October 25, 2006. It is the Staff's understanding that the Plant License Renewal Subcommittee of the Advisory Committee on Reactor Safeguards (ACRS) has scheduled its meeting on Vermont Yankee's proposed license renewal for May 2, 2007, with the full ACRS meeting scheduled for the month of September 2007. The Staff is not aware of the schedule for the publication of any resulting ACRS report.Sincerely,/RA/Steven C. HamrickCounsel for NRC Staff
The NRC Staff hereby provides its monthly status report and notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff is also producing, as Attachment 2, updates to its privilege logs as required by 10 C.F.R. § 2.336(b)(5), and is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. Also attached are the Affidavit of Jonathan G. Rowley, as required by 10 C.F.R. § 2.336(c), and the Declaration of Pao-Tsin Kuo, Acting Director of the Division of License Renewal, formally invoking the deliberative process privilege.
Please note that the first 46 documents included in the attached hearing file supplement are drawings that were included as attachments to a January 25, 2006 letter from Entergy to the NRC. This letter was identified in the Staffs initial hearing file index (Document No. 00-088),
but the attached drawings were not individually identified. While the attachments were publicly available in an ADAMS package associated with the identified letter, the Staff has listed each of the attachments individually in this hearing file supplement.
 
There have been no changes to the Staffs projected review schedule as submitted to the Board on October 25, 2006. It is the Staffs understanding that the Plant License Renewal Subcommittee of the Advisory Committee on Reactor Safeguards (ACRS) has scheduled its meeting on Vermont Yankees proposed license renewal for May 2, 2007, with the full ACRS meeting scheduled for the month of September 2007. The Staff is not aware of the schedule for the publication of any resulting ACRS report.
Sincerely,
                                                          /RA/
Steven C. Hamrick Counsel for NRC Staff


==Enclosures:==
==Enclosures:==
Hearing File IndexPrivilege Log - Deliberative Process Affidavit of Jonathan G. Rowley Declaration of Pao-Tsin Kuocc:Service List Page 1 of 7ATTACHMENT 1 VERMONT YANKEE LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURESHEARING FILE INDEXSupplement 1 - December 7, 2006ID #AccessionNumberDocument DateTitle/Description:01-001ML0605303963/29/2005Drawing LRA-G-191155, "Piping and Instrument Symbols".01-002ML0605304183/29/2005Drawing LRA-G-191160-SH-04, "Flow Diagram Instrument Air System," Sheet 4.01-003ML0605304263/29/2005Drawing LRA-G-191160-SH-06, "Flow Diagram Service Air Service," Sheet 6.
Hearing File Index Privilege Log - Deliberative Process Affidavit of Jonathan G. Rowley Declaration of Pao-Tsin Kuo cc:     Service List
01-004ML0605306323/29/2005Drawing LRA-G-191162-SH-02, "Flow Diagram Miscellaneous Systems FuelOil," Sheet 2.01-005ML0605306363/29/2005Drawing LRA-G-191163-SH-01, "Flow Diagram Fire Protection System InnerLoop," Sheet 1.01-006ML0605306413/29/2005Drawing LRA-G-191163-SH-02, "Flow Diagram Fire Protection System OuterLoop," Sheet 2.01-007ML0605306473/29/2005Drawing LRA-G-191163-SH-04, "Control Room Bldg Cable Vault East & WestSwitchgear Rooms," Sheet 4.01-008ML0605306543/29/2005Drawing LRA-G-191165, "Flow Diagram Sampling System - Sheet 2".
 
01-009ML0605304283/29/2005Drawing LRA-G-191169-SH-01, "Flow Diagram High Pressure Coolant InjectionSystem".01-010ML0605304293/29/2005Drawing LRA-G-191169-SH-02, "Flow Diagram High Pressure Coolant InjectionSystem".01-011ML0605304683/29/2005Drawing LRA-G-191171, "Flow Diagram Standby Liquid Control System".
ATTACHMENT 1   VERMONT YANKEE LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplement 1 - December 7, 2006 ID #     Accession    Document Date                                Title/Description:
01-012ML0605306793/29/2005Drawing LRA-G-191178-SH-01, "Flow Diagram Reactor Water Clean-UpSystem," Sheet 1.
Number 01-001 ML060530396    3/29/2005          Drawing LRA-G-191155, Piping and Instrument Symbols.
ID #AccessionNumberDocument DateTitle/Description:Page 2 of 701-013ML0605306803/29/2005Drawing LRA-G-191237-SH-01, "HVAC - Flow Diagram Turbine, Service &Control Room Buildings," Sheet 1.01-014ML0605306843/29/2005Drawing LRA-G-191248, HVAC-Equipment Room Sheet No. 3".
01-002 ML060530418    3/29/2005          Drawing LRA-G-191160-SH-04, Flow Diagram Instrument Air System, Sheet 4.
01-015ML0605306853/29/2005Drawing LRA-G-191267-SH-01, "Flow Diagram Nuclear Boiler VesselInstrumentation," Sheet 1.01-016ML0605306873/29/2005Drawing LRA-G-191267-SH-02, "Flow Diagram Nuclear Boiler VesselInstrumentation," Sheet 2.01-017ML0605306464/1/2005Drawing LRA-G-191163-SH-03, "Flow Diagram Fire Protection System LowPressure Co2," Sheet 3.01-018ML0605304744/1/2005Drawing LRA-G-191173-SH-01, "Flow Diagram Fuel Pool Cooling & CleanupSystem," Sheet 1.01-019ML0605304104/4/2005Drawing LRA-G-191159-SH-03, "Flow Diagram RCW Cooling Water System,"Sheet 3.01-020ML0605304114/4/2005Drawing LRA-G-191159-SH-05, "Flow Diagram Recirculation Pump CoolingWater," Sheet 5.01-021ML0605306824/4/2005Drawing LRA-G-191237-SH-02, "HVAC - Flow Diagram Turbine, Service &Control Room Buildings," Sheet 2.01-022ML0605306834/4/2005Drawing LRA-G-191238, "HVAC-Flow Diagram Reactor Building".
01-003 ML060530426    3/29/2005          Drawing LRA-G-191160-SH-06, Flow Diagram Service Air Service, Sheet 6.
01-023ML0605304794/14/2005Drawing LRA-G-191174-SH-01, "Flow Diagram Reactor Core Isolation CoolingSystem," Sheet 1.01-024ML0605304824/14/2005Drawing LRA-G-191174-SH-02, "Flow Diagram Reactor Core Isolation CoolingSystem, " Sheet 2.01-025ML0605306774/14/2005Drawing LRA-G-191176-SH-01, "Flow Diagram Condensate & DemineralizedWater Transfer System," Sheet 1.
01-004 ML060530632    3/29/2005          Drawing LRA-G-191162-SH-02, Flow Diagram Miscellaneous Systems Fuel Oil, Sheet 2.
ID #AccessionNumberDocument DateTitle/Description:Page 3 of 701-026ML0605304654/29/2005Drawing LRA-G-191170, "Flow Diagram Control Rod Drive Hydraulic System".01-027ML0605303887/1/2005Drawing LRA-5920-4147, "Schematic Air/Jacket Coolant System".
01-005 ML060530636    3/29/2005          Drawing LRA-G-191163-SH-01, Flow Diagram Fire Protection System Inner Loop, Sheet 1.
01-028ML0605303937/1/2005Drawing LRA-5920-4150, "Schematic Lube Oil System".
01-006 ML060530641    3/29/2005          Drawing LRA-G-191163-SH-02, Flow Diagram Fire Protection System Outer Loop, Sheet 2.
01-029ML0605304277/1/2005Drawing LRA-G-191160-07, "Flow Diagram Diesel Generator Starting AirSystem," Sheet 7.01-030ML0605303808/15/2005Drawing LRA-33600-A-00217, "Engineering Flow Diagram Turbine Bldg AreaOff Gas Modification".01-031ML0605304018/15/2005Drawing LRA-G-191156, "Flow Diagram Main, Extraction & Auxiliary SteamSystems".01-032ML0605304148/15/2005Drawing LRA-G-191160-SH-03, "Flow Diagram Instrument Air System," Sheet 3.01-033ML0605304258/15/2005Drawing LRA-G-191160-SH-05, "Flow Diagram Service Air System," Sheet 5.
01-007 ML060530647    3/29/2005          Drawing LRA-G-191163-SH-04, Control Room Bldg Cable Vault East & West Switchgear Rooms, Sheet 4.
01-034ML0605304848/15/2005Drawing LRA-G-191175-SH-01, "Flow Diagram Primary Containment &Atmosphere Control System," Sheet 1.01-035ML0605304878/15/2005Drawing LRA-G-191175-SH-02, "Nitrogen Supply System Flow Diagram," Sheet 2.01-036ML0605306788/15/2005Drawing LRA-G-191177-SH-01, "Flow Diagram - Radwaste System," Sheet 1.
01-008 ML060530654    3/29/2005          Drawing LRA-G-191165, Flow Diagram Sampling System - Sheet 2".
01-037ML0605306888/15/2005Drawing LRA-VY-E-75-002, "Engineering Flow Diagram ContainmentAtmosphere Dilution System (CAD)".01-038ML06053040410/31/2005Drawing LRA-G-191159-SH-01, "Flow Diagram Service Water System," Sheet 1.01-039ML06053047110/31/2005Drawing LRA-G-191172, "Flow Diagram Residual Heat Removal System".
01-009 ML060530428    3/29/2005          Drawing LRA-G-191169-SH-01, Flow Diagram High Pressure Coolant Injection System.
ID #AccessionNumberDocument DateTitle/Description:Page 4 of 701-040ML06053047610/31/2005Drawing LRA-G-191173-SH-02, "Flow Diagram Fuel Pool & Clean Up System,"Sheet 2.01-041ML06053040611/1/2005Drawing LRA-G-191159-SH-02, "Flow Diagram Service Water System," Sheet 2.01-042ML06053038511/15/2005Drawing LRA-5920-00870, "HPCI Turbine Oil Piping Diagram".
01-010 ML060530429    3/29/2005          Drawing LRA-G-191169-SH-02, Flow Diagram High Pressure Coolant Injection System.
01-043ML06053062911/15/2005Drawing LRA-G-191160-SH-08, Flow Diagram Instrument Air System," Sheet 8.
01-011 ML060530468    3/29/2005          Drawing LRA-G-191171, Flow Diagram Standby Liquid Control System.
01-044ML06053065011/15/2005Drawing LRA-G-191164, "Flow Diagram Sampling System - Sheet 1".
01-012 ML060530679    3/29/2005          Drawing LRA-G-191178-SH-01, Flow Diagram Reactor Water Clean-Up System, Sheet 1.
01-045ML06053065711/15/2005Drawing LRA-G-191168, "Flow Diagram Core Spray System".
Page 1 of 7
01-046ML06053065611/21/2005Drawing LRA-G-191167, "Flow Diagram Nuclear Boiler".
 
01-047ML0629204349/27/2006EMAIL: (PA) Fwd: Request for Clarification on VY RAI Responses.
ID #     Accession  Document Date                              Title/Description:
01-048ML0629202709/30/2006EMAIL: (PA) VY 2006 DMR's to Date.
Number 01-013 ML060530680  3/29/2005      Drawing LRA-G-191237-SH-01, HVAC - Flow Diagram Turbine, Service &
01-049ML06292042310/3/2006(E-Mail) Cooling Tower Report for VY.
Control Room Buildings, Sheet 1.
01-050ML06292041710/3/2006(E-Mail) Current air cert and fishway temperature table from 2003 annual report.
01-014 ML060530684  3/29/2005      Drawing LRA-G-191248, HVAC-Equipment Room Sheet No. 3".
01-051ML06292035810/3/2006(E-Mail) Thermophillic 01-052ML06292035210/3/2006(E-Mail) Vermont Yankee License Renewal 01-053ML06292026510/3/2006EMAIL: (PA) FW Waste Minimization Plan.
01-015 ML060530685  3/29/2005      Drawing LRA-G-191267-SH-01, Flow Diagram Nuclear Boiler Vessel Instrumentation, Sheet 1.
01-054ML06292038510/5/2006(E-Mail) Current IDP permit.
01-016 ML060530687  3/29/2005      Drawing LRA-G-191267-SH-02, Flow Diagram Nuclear Boiler Vessel Instrumentation, Sheet 2.
01-055ML06292037210/5/2006(E-Mail) VY cooling tower operation.
01-017 ML060530646  4/1/2005        Drawing LRA-G-191163-SH-03, Flow Diagram Fire Protection System Low Pressure Co2, Sheet 3.
01-056ML06292037710/5/2006(E-Mail) VY Drift.
01-018 ML060530474  4/1/2005        Drawing LRA-G-191173-SH-01, Flow Diagram Fuel Pool Cooling & Cleanup System, Sheet 1.
01-057ML06284059510/10/2006Request for Additional Information for the Review of Vermont Yankee NuclearPower Station License Renewal Application.
01-019 ML060530410  4/4/2005        Drawing LRA-G-191159-SH-03, Flow Diagram RCW Cooling Water System, Sheet 3.
ID #AccessionNumberDocument DateTitle/Description:Page 5 of 701-058ML06292039110/11/2006(E-Mail) Additional temperature data request - VY.01-059ML06292032910/12/2006EMAIL: (PA) Ecological Report 31 [April 2002].
01-020 ML060530411  4/4/2005        Drawing LRA-G-191159-SH-05, Flow Diagram Recirculation Pump Cooling Water, Sheet 5.
01-060ML06292006910/12/2006Email: (PA) VY Annual Ecological Reports from the 1980's [1981]
01-021 ML060530682  4/4/2005        Drawing LRA-G-191237-SH-02, HVAC - Flow Diagram Turbine, Service &
01-061ML06298024910/12/2006EMAIL: (PA) VY Annual Ecological Reports from the 1980's [1983].
Control Room Buildings, Sheet 2.
01-062ML06279007110/12/2006Summary of a Telephone Conference Call Held on September 14, 2006,Between the U.S. NRC and Entergy Nuclear Operations, Inc, Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application.01-063ML06278012210/12/2006Summary of a Telephone Conference Call Held on September 19, 2006,between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc.01-064ML06292042810/17/2006Email: (PA) CD of VY ecology studies from 1980's.
01-022 ML060530683  4/4/2005        Drawing LRA-G-191238, HVAC-Flow Diagram Reactor Building.
01-065ML06296030110/17/2006Vermont Yankee - License Renewal Application, Amendment 16.
01-023 ML060530479  4/14/2005      Drawing LRA-G-191174-SH-01, Flow Diagram Reactor Core Isolation Cooling System, Sheet 1.
01-066ML06292007510/17/2006VY Annual Ecological Reports from the 1980's [1985]
01-024 ML060530482  4/14/2005      Drawing LRA-G-191174-SH-02, Flow Diagram Reactor Core Isolation Cooling System, Sheet 2.
01-067ML06312009510/18/2006E-mail: (PA-LR) FW: LRA Amendment 16.
01-025 ML060530677  4/14/2005      Drawing LRA-G-191176-SH-01, Flow Diagram Condensate & Demineralized Water Transfer System, Sheet 1.
01-068ML06312009310/20/2006E-mail: (PA-LR) Copy of SAMA Response.
Page 2 of 7
01-069ML06312010910/20/2006E-mail: (PA-LR) Copy of VHS RAI Response.
 
01-070ML06312009910/20/2006E-mail: (PA-LR) Re: Copy of SAMA Response.
ID #     Accession  Document Date                              Title/Description:
01-071ML06299014210/20/2006Vermont Yankee - License Renewal Application, Amendment No. 17.
Number 01-026 ML060530465  4/29/2005      Drawing LRA-G-191170, Flow Diagram Control Rod Drive Hydraulic System.
01-072ML06299015510/20/2006Vermont Yankee - License Renewal Application, Amendment No. 18, Responseto Request for Clarification of SAMA RAI Responses.
01-027 ML060530388  7/1/2005        Drawing LRA-5920-4147, Schematic Air/Jacket Coolant System.
ID #AccessionNumberDocument DateTitle/Description:Page 6 of 701-073ML06292003410/27/2006Summary of a Telephone Conference Call Held on September 25, 2006,Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application.01-074ML06296012510/27/2006Summary of Telephone Conference Call held on September 27, 2006, betweenthe U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc.,
01-028 ML060530393  7/1/2005        Drawing LRA-5920-4150, Schematic Lube Oil System.
Concerning Information Pertaining to the VY Nuclear Power Station LRA.01-075ML06303057610/30/2006Issuance of Environmental Scoping Summary Report Associated with the Staff'sReview of the Application by Entergy Nuclear Operations, Inc. For Renewal of the Operating License for Vermont Yankee Nuclear Power Station (TAC No.
01-029 ML060530427  7/1/2005        Drawing LRA-G-191160-07, Flow Diagram Diesel Generator Starting Air System, Sheet 7.
MC9670)01-076ML06297031810/30/2006Vermont Yankee Nuclear Power Station License Renewal Application Review.
01-030 ML060530380  8/15/2005      Drawing LRA-33600-A-00217, Engineering Flow Diagram Turbine Bldg Area Off Gas Modification.
01-077ML06312010610/31/2006E-mail: (PA-LR) VYNPS License Renewal Amendment 19.
01-031 ML060530401  8/15/2005      Drawing LRA-G-191156, Flow Diagram Main, Extraction & Auxiliary Steam Systems.
01-078ML06311007110/31/2006Vermont Yankee License Renewal Application, Amendment 19.
01-032 ML060530414  8/15/2005      Drawing LRA-G-191160-SH-03, Flow Diagram Instrument Air System, Sheet 3.
01-079ML06312010411/1/2006E-mail: (PR-LA) FW: Telecon Summary for review.
01-033 ML060530425  8/15/2005      Drawing LRA-G-191160-SH-05, Flow Diagram Service Air System, Sheet 5.
01-080ML06334022711/2/2006EMAIL: (PA-LR) Entergy Nuclear Cultural Resources Protection Plan.
01-034 ML060530484  8/15/2005      Drawing LRA-G-191175-SH-01, Flow Diagram Primary Containment &
01-081ML06313008211/2/2006Email: (NPA-PD-LR) Re: Clarification of Part 12, Subpart D Exemption.
Atmosphere Control System, Sheet 1.
01-082ML06305061911/6/2006Summary of a Telephone Conference Call Held on October 10, 2006, Betweenthe NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application.01-083ML06317008011/6/2006Vermont Yankee License Renewal Application, Amendment 21 Response toRequest for Clarification of SAMA RAIs.01-084ML06334022511/7/2006EMAIL: (PA-LR) Re: NRC Request for Meeting with VDH ID #AccessionNumberDocument DateTitle/Description:Page 7 of 701-085ML06324016311/9/2006Vermont Yankee License Renewal Application, Amendment 20.01-086ML06340045311/9/2006E-Mail: (NPA-PD-LR) VYNPS License Renewal Application Am. 20, VermontYankee.01-087ML06334022011/13/2006EMAIL: (PA-LR) Re: NRC Request for Meeting with VDH (W. Irwin Response).
01-035 ML060530487  8/15/2005      Drawing LRA-G-191175-SH-02, Nitrogen Supply System Flow Diagram, Sheet 2.
01-088ML06334022311/13/2006EMAIL: (PA-LR) Re: NRC Request for Meeting with VDH [R. Emch response].
01-036 ML060530678  8/15/2005      Drawing LRA-G-191177-SH-01, Flow Diagram - Radwaste System, Sheet 1.
01-089ML06312049611/21/2006Summary of Telephone Conference Call Held on October 12, 2006, Betweenthe U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc.,
01-037 ML060530688  8/15/2005      Drawing LRA-VY-E-75-002, Engineering Flow Diagram Containment Atmosphere Dilution System (CAD).
Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application Page 1 of 10ATTACHMENT 2VERMONT YANKEE LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURESPRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGESupplement 1 - December 7, 2006Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRCStaff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage Count DP-01-01ML062850564InformationSystemsLabs, Inc,NRC/NRR/ADRO/DLR/R LRCRevised Sections3.0 and 4.0 Inputfor the SafetyEvaluation for theVermont YankeeNuclear PowerStation LicenseRenewalApplication.10/11/2006SafetyEvaluationReportRowley J G,NRC/NRR/ADRO/DLR/RLRBMemorandumContaining ProposedSafety EvaluationSections 3.0 and 4.0 424 DP-01-02ML062840607Jung I C,NRC/NRR/ADES/DE/EE EBSafety EvaluationInput for VermontYankee LicenseRenewalApplication,Section 2.5 (TACNO. MC9668)10/11/2006Memoranda,SafetyEvaluationZimmerman J,NRC/NRR/ADRO/DLR/RLRBMemorandumContaining ProposedSafety EvaluationSection 2.5 6 DP-01-03ML063130089Flemming JL, NRCEMAIL: (NPA-PD-LR) RE: Report 31attached [from J.Flemming].10/13/2006E-MailPatton T L,ArgonneNational Lab(ANL)E-mail Discussion ofTextual Changes toEIS RegardingRenewed DischargePermit 2 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 2 of 10 DP-01-04ML063130094Patton T L,ArgonneNational Lab(ANL)EMAIL: (NPA-PD-LR) RE: Report 31attached.10/13/2006E-MailFlemming J L, NRC E-mail Discussion ofTextual Changes toEIS RegardingRenewed DischargePermit 2 DP-01-05ML062910428Emch R L, NRC(E-mail) TheScoping Comment
01-038 ML060530404  10/31/2005      Drawing LRA-G-191159-SH-01, Flow Diagram Service Water System, Sheet 1.
& Response under discussion10/16/2006E-MailLaGory K E,ArgonneNational Lab(ANL)Proposed Responseto Scoping Commenton Endangered Species 2 DP-01-06ML062910429LaGory K E,ArgonneNational Lab(ANL)The ScopingComment &Response under discussion toRichard Emch fromKirk LaGory10/16/2006E-MailEmch R L, NRCProposed Revision toResponse to ScopingComment onEndangered Species 3 DP-01-07ML063130324Huang J,Legin Group,IncE-MAIL: (NPA-PD-LR) Final Task 1Deliverable forVermont Yankee SER.10/18/2006E-Mail,SafetyEvaluationReportRowley J G,NRC/NRRPreliminary DraftVersion of SafetyEvaluation Report 1 DP-01-08ML063130081Emch R L, NRCEMAIL: (NPA-AC-LR) ScopingReport.10/18/2006E-Mail,Report,Miscellaneou sMiller D S,Moret E N,ArgonneNational Lab(ANL)Draft Version ofScoping SummaryReport 69 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 3 of 10 DP-01-09ML063130086Emch R L, NRCEMAIL: (NPA-PD-LR) draft letter toVELCO.10/23/2006E-MailDavis J,O'Rourke D,Wescott K,ArgonneNational Lab(ANL), NRCE-mail with AttachedDraft Version ofLetter to VermontDivision of HistoricPreservation 5 DP-01-10ML063130070Young R M, NRCEMAIL: (NPA-PD-LR) WP File forVermont Yankee DSER.10/23/2006E-Mail,SafetyEvaluationReport, DraftRowley J G, NRCE-mail With AttachedProposed SafetyEvaluation Section 2 42 DP-01-11ML062930015Weerakkody S D,NRC/NRR/ADRA/DRA/A FPBSafety EvaluationInput Regardingthe LicenseRenewalApplication -Vermont YankeeNuclear PowerStation - FireProtection (TACNo. MC9668).10/23/2006Memoranda,SafetyEvaluationReportZimmerman J I,NRC/NRR/ADRO/DLR/RLRBMemorandumContaining ProposedSafety EvaluationSections 2.3.3.8 and2.3.3.9 18 DP-01-12ML063130090Palla R L, NRCEMAIL: (NPA-PD-LR) Fwd: VYresponses.10/25/2006E-MailEmch R L, NRC Discussion ofAdequacy andCompleteness ofSAMA RAI Responses 4 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 4 of 10 DP-01-13ML063130078Nguyen D T, NRCEmail: (NPA-PD-LR) Re: VHSresponses from VY.10/25/2006E-MailMorgan M J,Rowley J G, NRC Discussion ofAdequacy andCompleteness of RAI ResponsesRegarding ElectricalCircuits and Vernon Dam 3 DP-01-14ML063130101Morgan M J, NRCEMAIL: (NPA-PD-LR) Fwd: Re:Questions ReQuad Cities.10/27/2006E-MailRowley J G, NRCDiscussion of How toApply LessonsLearned from QuadCities to VermontYankee re: SteamDryer 5 DP-01-15ML063130097Rubin M P, NRCEMAIL: (NPA-PD-LR) Re: Fwd: VYresponses.10/27/2006E-MailEmch R L,Palla R L, NRC Discussion ofAdequacy andCompleteness ofSAMA RAI Responses 4 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 5 of 10 DP-01-16ML063040144Hamzehee H G,NRC/NRR/ADES/DE/EQ VBDraft SafetyEvaluationRegarding theEntergy NuclearVermont Yankee,LLC, LicenseRenewalApplication for theVermont YankeeNuclear PowerStation, DatedJanuary 29, 200610/30/2006Draft SafetyEvaluationReport(DSER),MemorandaKuo P T,NRC/NRR/ADRO/DLRMemorandumContaining ProposedSafety EvaluationSections 2.0 and 3.1 40 DP-01-17ML063130068Nguyen D T, NRCEmail: (NPA-PD-LR) Re: Fwd:VYNPS RAI 3.6.2-2-N-08-1.10/30/2006E-MailHsu K R, NRCDiscussion ofAdequacy ofResponse to RAI3.6.2-2-N-08-1 andAttached DraftSection 3.6 of SER.
01-039 ML060530471  10/31/2005      Drawing LRA-G-191172, Flow Diagram Residual Heat Removal System.
33 DP-01-18ML063340235Palla B,NRC/NRREMAIL: (NPA-PD-LR) Fwd: UpdatedVY TER.10/31/2006E-Mail,Report,TechnicalEmch R L,NRC/NRRE-mail with AttachedDraft Version ofAppendix G (SAMAMitigationAlternatives) to theDSEIS 40 DP-01-19ML063130102Galletti G S, NRCEMAIL: (NPA-PD-LR) SE Input.10/31/2006E-Mail,MemorandaRowley J G, NRCE-mail ContainingProposed SafetyEvaluation Sections2.0 and 3.1 42 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 6 of 10 DP-01-20ML063100170Mitchell M A,NRC/NRR/ADES/DCI/CV IBVermont YankeeLicense RenewalApplication FinalSafety EvaluationReport SectionsOn The AgingManagementProgram For The Reactor Vessel(TAC NO.MC9668).11/2/2006Memoranda,SafetyEvaluationReportAuluck R C,NRC/NRR/ADRO/DLR/RLRBMemorandumContaining ProposedSafety EvaluationSection 3.0.3.2 6 DP-01-21ML063100042Mitchell M A,NRC/NRR/ADES/DCI/CV IBVermont YankeeLicense RenewalApplication FinalSafety EvaluationReport SectionsOn The AgingManagementReviews For The Reactor VesselAnd Its InternalComponents (TACNO. MC9668).11/2/2006Final SafetyEvaluationReport(FSER),MemorandaAuluck R,NRC/NRR/ADRO/DLR/RLRBMemorandumContaining ProposedSafety EvaluationSection 3.1.2.3 5 DP-01-22ML063410353CheruvenkiG S, NRCE-Mail: (NPA-PD-LR) Ses - VermontYankee - LRA,Vermont Yankee.11/2/2006E-MailRowley J G, NRCE-mail With AttachedSafety EvaluationSections 3.1.2-1 and3.1.2-2 14 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 7 of 10 DP-01-23ML063340229Palla B,NRC/NRREMAIL: (NPA-PD-LR) VY SAMAChapter 5.11/8/2006E-MailEmch R L, MuirJ M, NRC/NRRDraft DSEIS Section5.2 SAMA 8 DP-01-24ML063410351Morgan M J, NRCE-Mail: (NPA-PD-LR) Fwd: RE:Clarification of Part12, Subpart Dexemption,Vermont Yankee.11/13/2006E-MailRowley J G,NRC/NRR/ADRO/DLR/RLRBStaff Discussion ofScoping Impact ofInspectionExemption forVernon Dam 4 DP-01-25ML063410348Schoppy JG, NRCE-Mail: (NPA-PD-LR) that DamInspection,Vermont Yankee11/13/2006E-MailRowley J G, NRCStaff Discussion ofScoping Impact ofInspectionExemption forVernon Dam 2 DP-01-26ML063400516Emch R L, NRCE-Mail: (NPA-PD-LR) Fwd: Re:Chapters 2 & 4 ofVY attached,Vermont Yankee,From: RichardEmch, To: JessieMuir.11/16/2006E-MailMuir J M, NRCStaff ProposedRevision of DSEISLanguage 3 DP-01-27ML063400469Muir J M,NRC/NRRE-Mail: (NPA-PD-LR) Fwd: VY SER,Vermont Yankee.11/16/2006E-Mail,MemorandaEmch R L,NRC/NRRE-mail with AttachedDraft Version ofAppendix G (SAMAMitigationAlternatives) to theDSEIS 42 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 8 of 10 DP-01-28ML063400462Schaaf R G,NRC/NRR/A DROE-Mail: (NPA-PD-LR) Re: Chapters 2& 4 of VY attached,Vermont Yankee.11/16/2006E-MailEmch R L,NRC/NRR/ADR OStaff ProposedRevision of DSEISLanguage 3 DP-01-29ML063400460Palla R L, NRCE-Mail: (NPA-PD-LR) VYConcurrenceVersion, VermontYankee.11/16/2006E-MailEmch R L,NRC/NRR/ADR OE-mail with AttachedDraft Version ofAppendix G (SAMAMitigationAlternatives) to theDSEIS 40 DP-01-30ML063210401Rubin M P,NRC/NRR/ADRA/DRA/A PLAEvaluation ofSevere AccidentMitigationAlternatives forLicense Renewalof Vermont YankeeNuclear PowerStation.11/17/2006Memoranda,Report,Miscellaneou sFranovich R L,NRC/NRR/ADRO/DLR/REBBE-mail with AttachedDraft Version ofAppendix G (SAMAMitigationAlternatives) to theDSEIS 39 DP-01-31ML063400538Rodriguez V M,NRC/NRR/ADRO/DLRE-Mail: (NPA-PD-LR) Shell - Section2.1, VermontYankee.11/17/2006E-MailRowley J G,NRC/NRR/ADRO/DLRE-mail With AttachedShell Version ofSafety Evaluation 13 DP-01-32ML063400465Schaaf R,NRC/NRR/A DROE-Mail: (NPA-PD-LR) Fwd: Re:Chapters 2 & 4 ofVY attached,Vermont Yankee.11/20/2006E-MailMuir J M,NRC/NRR/ADR OStaff ProposedRevision of DSEISLanguage 3 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 9 of 10 DP-01-33ML063400505Moret E N,ArgonneNational Lab(ANL)E-Mail: (NPA-PD-LR) VT YankeeFigures, VermontYankee, 11/21/06,From: Ellen Moret,To: Jessie Muir,11:38am.11/21/2006E-Mail,Environmental ImpactStatement,MapMuir J M,NRC/NRR/ADR OE-mail With AttachedMap Proposed forInclusion as a Figurein DSEIS 5 DP-01-34ML063400508Moret E N,ArgonneNational Lab(ANL)E-Mail: (NPA-PD-LR) VT YankeeFigures, VermontYankee, 11/21/06,From: Ellen Moret,To: Jessie Muir,11:44am.11/21/2006E-Mail,Environmental ImpactStatement,Graphics inclCharts andTables, MapMuir J M,NRC/NRR/ADR OE-mail With AttachedMap Proposed forInclusion as a Figurein DSEIS 8 DP-01-35ML063400545Moret E N,ArgonneNational Lab(ANL)E-Mail: (NPA-PD-LR) VT YankeeFigures, VermontYankee, 11/21/06,From: Ellen Moret,To: Jessie Muir.11/21/2006E-Mail,Environmental ImpactStatement,Graphics inclCharts andTables, MapMuir J M, NRCE-mail With AttachedMap Proposed forInclusion as a Figurein DSEIS 12 DP-01-36ML063400454Moret E N,ArgonneNational Lab(ANL)E-Mail: (NPA-PD-LR) FW: Pg4-41,Vermont Yankee.11/22/2006E-MailMuir J M,NRC/NRR/ADRO/DLRE-mail With AttachedMap Proposed forInclusion as a Figurein DSEIS 4 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 10 of 10 DP-01-37ML063410170Morgan M J, NRCE-Mail: (NPA-PD-LR) Fwd: RE:Clarification of Part12, Subpart Dexemption,Vermont Yankee.11/22/2006E-MailRowley J G,NRC/NRR/ADRO/DLR/RLRB Discussion ofAcceptability ofLicense RenewalAmendment 19- RAI Response 4 DP-01-38ML063410166Hoang D V,NRC/NRR/ADRO/DLRE-Mail: (NPA-PD-LR) VYNPS: inputreport and SERinput, VermontYankee.11/22/2006E-MailHsu K R,Rowley J G,Tran L N,NRC/NRR/ADRO/DLRE-mail With AttachedDraft Version ofSafety EvaluationSection 3.0.3.3.6-Structures MonitoringVernon Dam 8
Page 3 of 7
December 7, 2006UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)
 
)ENTERGY NUCLEAR VERMONT YANKEE,)Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR)
ID #     Accession  Document Date                                  Title/Description:
OPERATIONS, INC.)ASLBP No. 06-849-03-LR
Number 01-040 ML060530476  10/31/2005      Drawing LRA-G-191173-SH-02, Flow Diagram Fuel Pool & Clean Up System, Sheet 2.
)(Vermont Yankee Nuclear Power Station))AFFIDAVIT OF JONATHAN G. ROWLEY CONCERNING MANDATORY DISCLOSURE                                      REQUIREMENT OF 10 C.F.R. § 2.336(c)                                   I, Jonathan G. Rowley, do hereby state as follows:1.I am employed as a Project Manager in the Division of License Renewal in theNuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Vermont Yankee Nuclear Power Station's license renewal application
01-041 ML060530406  11/1/2005      Drawing LRA-G-191159-SH-02, Flow Diagram Service Water System, Sheet 2.
("LRA"). 2.I hereby certify that all relevant materials required to be disclosed pursuant to10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that thedisclosures are accurate and complete as of the date of this certification.3.I declare under penalty of perjury that the foregoing is true and correct to the bestof my knowledge, information and belief.Original Signed By:
01-042 ML060530385  11/15/2005      Drawing LRA-5920-00870, HPCI Turbine Oil Piping Diagram.
_______________________Jonathan G. RowleyExecuted in Rockville, MDthis 7th day of December, 2006 December 7, 2006UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)
01-043 ML060530629  11/15/2005      Drawing LRA-G-191160-SH-08, Flow Diagram Instrument Air System, Sheet 8.
)ENTERGY NUCLEAR VERMONT YANKEE,)Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR)
01-044 ML060530650  11/15/2005      Drawing LRA-G-191164, Flow Diagram Sampling System - Sheet 1".
OPERATIONS, INC.)ASLBP No. 06-849-03-LR
01-045 ML060530657  11/15/2005      Drawing LRA-G-191168, Flow Diagram Core Spray System.
)(Vermont Yankee Nuclear Power Station))DECLARATION OF PAO-TSIN KUOI, Pao-Tsin Kuo, do hereby state as follows:1. I am employed as the Acting Director of the Division of Licensing Renewal("DLR") in the Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation
01-046 ML060530656  11/21/2005      Drawing LRA-G-191167, Flow Diagram Nuclear Boiler.
("NRR"). My supervisory responsibilities include oversight of the NRC Staff's review and evaluation of the Vermont Yankee Nuclear Power Station license renewal application.2. As part of their responsibilities in preparing the hearing file and mandatorydisclosures for these proceedings, NRC staff members under my supervision identified several documents as privileged because they contained information concerning the Staff's deliberative process. Those documents are listed in Attachment 2 to the December 7, 2006, submission of the Staff's Hearing File.3. I have personally reviewed the documents identified as privileged in Attachment2, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain predecisional information concerning the Staff's review of the license renewal application. All documents contain either the Staff's analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part of the deliberative  process necessary to the Staff's review of the pending license renewal application.4. Further, I have determined that disclosure of these documents could result inharm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill allfuture deliberations and would interfere with the Staff's ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.5. Accordingly, I formally invoke the deliberative process privilege with respect toeach of the documents listed in Attachment 2 to the December 7, 2006 submission of the Staff's Hearing File.6. I declare under penalty of perjury that the foregoing is true and correct to thebest of my knowledge, information and belief. Original Signed By:
01-047 ML062920434  9/27/2006      EMAIL: (PA) Fwd: Request for Clarification on VY RAI Responses.
01-048 ML062920270  9/30/2006      EMAIL: (PA) VY 2006 DMRs to Date.
01-049 ML062920423  10/3/2006       (E-Mail) Cooling Tower Report for VY.
01-050 ML062920417  10/3/2006       (E-Mail) Current air cert and fishway temperature table from 2003 annual report.
01-051 ML062920358  10/3/2006       (E-Mail) Thermophillic 01-052 ML062920352  10/3/2006       (E-Mail) Vermont Yankee License Renewal 01-053 ML062920265  10/3/2006      EMAIL: (PA) FW Waste Minimization Plan.
01-054 ML062920385  10/5/2006       (E-Mail) Current IDP permit.
01-055 ML062920372  10/5/2006       (E-Mail) VY cooling tower operation.
01-056 ML062920377  10/5/2006       (E-Mail) VY Drift.
01-057 ML062840595  10/10/2006      Request for Additional Information for the Review of Vermont Yankee Nuclear Power Station License Renewal Application.
Page 4 of 7
 
ID #     Accession  Document Date                                  Title/Description:
Number 01-058 ML062920391  10/11/2006     (E-Mail) Additional temperature data request - VY.
01-059 ML062920329  10/12/2006      EMAIL: (PA) Ecological Report 31 [April 2002].
01-060 ML062920069  10/12/2006      Email: (PA) VY Annual Ecological Reports from the 1980's [1981]
01-061 ML062980249  10/12/2006      EMAIL: (PA) VY Annual Ecological Reports from the 1980's [1983].
01-062 ML062790071  10/12/2006      Summary of a Telephone Conference Call Held on September 14, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc, Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application.
01-063 ML062780122  10/12/2006      Summary of a Telephone Conference Call Held on September 19, 2006, between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc.
01-064 ML062920428  10/17/2006      Email: (PA) CD of VY ecology studies from 1980's.
01-065 ML062960301  10/17/2006      Vermont Yankee - License Renewal Application, Amendment 16.
01-066 ML062920075  10/17/2006      VY Annual Ecological Reports from the 1980's [1985]
01-067 ML063120095  10/18/2006      E-mail: (PA-LR) FW: LRA Amendment 16.
01-068 ML063120093  10/20/2006      E-mail: (PA-LR) Copy of SAMA Response.
01-069 ML063120109  10/20/2006      E-mail: (PA-LR) Copy of VHS RAI Response.
01-070 ML063120099  10/20/2006      E-mail: (PA-LR) Re: Copy of SAMA Response.
01-071 ML062990142  10/20/2006      Vermont Yankee - License Renewal Application, Amendment No. 17.
01-072 ML062990155  10/20/2006      Vermont Yankee - License Renewal Application, Amendment No. 18, Response to Request for Clarification of SAMA RAI Responses.
Page 5 of 7
 
ID #     Accession  Document Date                                Title/Description:
Number 01-073 ML062920034  10/27/2006      Summary of a Telephone Conference Call Held on September 25, 2006, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application.
01-074 ML062960125  10/27/2006      Summary of Telephone Conference Call held on September 27, 2006, between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc.,
Concerning Information Pertaining to the VY Nuclear Power Station LRA.
01-075 ML063030576  10/30/2006      Issuance of Environmental Scoping Summary Report Associated with the Staffs Review of the Application by Entergy Nuclear Operations, Inc. For Renewal of the Operating License for Vermont Yankee Nuclear Power Station (TAC No.
MC9670) 01-076 ML062970318  10/30/2006      Vermont Yankee Nuclear Power Station License Renewal Application Review.
01-077 ML063120106  10/31/2006      E-mail: (PA-LR) VYNPS License Renewal Amendment 19.
01-078 ML063110071  10/31/2006      Vermont Yankee License Renewal Application, Amendment 19.
01-079 ML063120104  11/1/2006      E-mail: (PR-LA) FW: Telecon Summary for review.
01-080 ML063340227  11/2/2006      EMAIL: (PA-LR) Entergy Nuclear Cultural Resources Protection Plan.
01-081 ML063130082  11/2/2006      Email: (NPA-PD-LR) Re: Clarification of Part 12, Subpart D Exemption.
01-082 ML063050619  11/6/2006      Summary of a Telephone Conference Call Held on October 10, 2006, Between the NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application.
01-083 ML063170080  11/6/2006      Vermont Yankee License Renewal Application, Amendment 21 Response to Request for Clarification of SAMA RAIs.
01-084 ML063340225  11/7/2006      EMAIL: (PA-LR) Re: NRC Request for Meeting with VDH Page 6 of 7
 
ID #     Accession  Document Date                              Title/Description:
Number 01-085 ML063240163  11/9/2006      Vermont Yankee License Renewal Application, Amendment 20.
01-086 ML063400453  11/9/2006      E-Mail: (NPA-PD-LR) VYNPS License Renewal Application Am. 20, Vermont Yankee.
01-087 ML063340220  11/13/2006      EMAIL: (PA-LR) Re: NRC Request for Meeting with VDH (W. Irwin Response).
01-088 ML063340223  11/13/2006      EMAIL: (PA-LR) Re: NRC Request for Meeting with VDH [R. Emch response].
01-089 ML063120496  11/21/2006      Summary of Telephone Conference Call Held on October 12, 2006, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc.,
Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application Page 7 of 7
 
ATTACHMENT 2              VERMONT YANKEE LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGE Supplement 1 - December 7, 2006 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the deliberative process privilege.
Doc       Accession          Author        Title/Description:     Document    Document        Addressee /            Comment        Page No.        Number            Name/                                   Date        Type          Addressee                            Count Affiliation:                                                            Affiliation DP-     ML062850564        Information      Revised Sections      10/11/2006    Safety        Rowley J G,         Memorandum        424 01-01                          Systems        3.0 and 4.0 Input                    Evaluation    NRC/NRR/ADR        Containing Proposed Labs, Inc,        for the Safety                      Report        O/DLR/RLRB          Safety Evaluation NRC/NRR/A          Evaluation for the                                                    Sections 3.0 and 4.0 DRO/DLR/R          Vermont Yankee LRC            Nuclear Power Station License Renewal Application.
DP-     ML062840607          Jung I C,       Safety Evaluation      10/11/2006  Memoranda,    Zimmerman J,         Memorandum          6 01-02                      NRC/NRR/A          Input for Vermont                    Safety      NRC/NRR/ADR        Containing Proposed DES/DE/EE          Yankee License                      Evaluation    O/DLR/RLRB          Safety Evaluation EB                Renewal                                                              Section 2.5 Application, Section 2.5 (TAC NO. MC9668)
DP-    ML063130089        Flemming J        EMAIL: (NPA-PD-       10/13/2006    E-Mail        Patton T L,     E-mail Discussion of  2 01-03                          L, NRC         LR) RE: Report 31                                      Argonne        Textual Changes to attached [from J.                                    National Lab       EIS Regarding Flemming].                                          (ANL)         Renewed Discharge Permit Page 1 of 10
 
Doc  Accession    Author    Title/Description: Document      Document    Addressee /        Comment        Page No. Number      Name/                            Date          Type      Addressee                          Count Affiliation:                                                Affiliation DP- ML063130094  Patton T L, EMAIL: (NPA-PD-   10/13/2006      E-Mail   Flemming J L, E-mail Discussion of   2 01-04              Argonne    LR) RE: Report 31                                NRC      Textual Changes to National Lab      attached.                                                EIS Regarding (ANL)                                                                  Renewed Discharge Permit DP- ML062910428  Emch R L,       (E-mail) The    10/16/2006      E-Mail     LaGory K E,   Proposed Response      2 01-05                NRC      Scoping Comment                                Argonne    to Scoping Comment
                                & Response under                              National Lab   on Endangered discussion                                  (ANL)             Species DP- ML062910429 LaGory K E,      The Scoping    10/16/2006      E-Mail      Emch R L,   Proposed Revision to    3 01-06              Argonne        Comment &                                    NRC      Response to Scoping National Lab  Response under                                                Comment on (ANL)        discussion to                                          Endangered Species Richard Emch from Kirk LaGory DP-  ML063130324  Huang J,    E-MAIL: (NPA-PD-   10/18/2006      E-Mail,    Rowley J G,     Preliminary Draft    1 01-07            Legin Group,   LR) Final Task 1                  Safety      NRC/NRR      Version of Safety Inc      Deliverable for                Evaluation                  Evaluation Report Vermont Yankee                   Report SER.
DP-  ML063130081  Emch R L,    EMAIL: (NPA-AC-    10/18/2006      E-Mail,     Miller D S,   Draft Version of    69 01-08                NRC         LR) Scoping                    Report,     Moret E N,   Scoping Summary Report.                  Miscellaneou    Argonne            Report s      National Lab (ANL)
Page 2 of 10
 
Doc  Accession    Author    Title/Description:  Document      Document      Addressee /       Comment          Page No. Number      Name/                             Date        Type        Addressee                          Count Affiliation:                                                    Affiliation DP- ML063130086  Emch R L,   EMAIL: (NPA-PD-     10/23/2006      E-Mail        Davis J,   E-mail with Attached    5 01-09                NRC        LR) draft letter to                              ORourke D,   Draft Version of VELCO.                                       Wescott K,   Letter to Vermont Argonne    Division of Historic National Lab      Preservation (ANL), NRC DP- ML063130070 Young R M,   EMAIL: (NPA-PD-     10/23/2006    E-Mail,      Rowley J G, E-mail With Attached  42 01-10                NRC        LR) WP File for                  Safety            NRC        Proposed Safety Vermont Yankee                    Evaluation                  Evaluation Section 2 DSER.                     Report, Draft DP-  ML062930015 Weerakkody  Safety Evaluation    10/23/2006  Memoranda,    Zimmerman J I,    Memorandum          18 01-11                S D,       Input Regarding                    Safety      NRC/NRR/ADR    Containing Proposed NRC/NRR/A        the License                    Evaluation    O/DLR/RLRB    Safety Evaluation DRA/DRA/A          Renewal                      Report                    Sections 2.3.3.8 and FPB          Application -                                                      2.3.3.9 Vermont Yankee Nuclear Power Station - Fire Protection (TAC No. MC9668).
DP- ML063130090  Palla R L, EMAIL: (NPA-PD-     10/25/2006      E-Mail        Emch R L,      Discussion of        4 01-12                NRC          LR) Fwd: VY                                        NRC        Adequacy and responses.                                                  Completeness of SAMA RAI Responses Page 3 of 10
 
Doc  Accession    Author    Title/Description: Document    Document  Addressee /         Comment        Page No. Number      Name/                            Date        Type    Addressee                          Count Affiliation:                                            Affiliation DP- ML063130078 Nguyen D T,   Email: (NPA-PD-   10/25/2006    E-Mail Morgan M J,       Discussion of      3 01-13                NRC         LR) Re: VHS                            Rowley J G,     Adequacy and responses from                              NRC      Completeness of RAI VY.                                                  Responses Regarding Electrical Circuits and Vernon Dam DP-  ML063130101 Morgan M J,  EMAIL: (NPA-PD-   10/27/2006    E-Mail Rowley J G,   Discussion of How to  5 01-14                NRC          LR) Fwd: Re:                              NRC          Apply Lessons Questions Re                                          Learned from Quad Quad Cities.                                         Cities to Vermont Yankee re: Steam Dryer DP- ML063130097 Rubin M P,   EMAIL: (NPA-PD-    10/27/2006    E-Mail  Emch R L,        Discussion of      4 01-15                NRC        LR) Re: Fwd: VY                        Palla R L, NRC   Adequacy and responses.                                            Completeness of SAMA RAI Responses Page 4 of 10
 
Doc  Accession    Author      Title/Description:  Document    Document      Addressee /       Comment          Page No. Number      Name/                            Date        Type      Addressee                          Count Affiliation:                                                Affiliation DP- ML063040144 Hamzehee H        Draft Safety    10/30/2006  Draft Safety    Kuo P T,      Memorandum        40 01-16                  G,          Evaluation                  Evaluation  NRC/NRR/ADR  Containing Proposed NRC/NRR/A      Regarding the                    Report        O/DLR       Safety Evaluation DES/DE/EQ      Entergy Nuclear                  (DSER),                  Sections 2.0 and 3.1 VB      Vermont Yankee,                  Memoranda LLC, License Renewal Application for the Vermont Yankee Nuclear Power Station, Dated January 29, 2006 DP- ML063130068 Nguyen D T,   Email: (NPA-PD-   10/30/2006    E-Mail    Hsu K R, NRC      Discussion of      33 01-17                NRC          LR) Re: Fwd:                                                Adequacy of VYNPS RAI 3.6.2-                                              Response to RAI 2-N-08-1.                                               3.6.2-2-N-08-1 and Attached Draft Section 3.6 of SER.
DP- ML063340235  Palla B,   EMAIL: (NPA-PD-     10/31/2006    E-Mail,      Emch R L,   E-mail with Attached  40 01-18              NRC/NRR      LR) Fwd: Updated                  Report,     NRC/NRR        Draft Version of VY TER.                     Technical                Appendix G (SAMA Mitigation Alternatives) to the DSEIS DP- ML063130102 Galletti G S, EMAIL: (NPA-PD-     10/31/2006    E-Mail,    Rowley J G,   E-mail Containing    42 01-19                NRC          LR) SE Input.                Memoranda        NRC        Proposed Safety Evaluation Sections 2.0 and 3.1 Page 5 of 10
 
Doc  Accession    Author    Title/Description: Document    Document      Addressee /      Comment        Page No. Number      Name/                            Date          Type      Addressee                        Count Affiliation:                                                Affiliation DP-  ML063100170 Mitchell M A, Vermont Yankee    11/2/2006  Memoranda,   Auluck R C,     Memorandum          6 01-20            NRC/NRR/A      License Renewal                  Safety    NRC/NRR/ADR  Containing Proposed DES/DCI/CV    Application Final              Evaluation  O/DLR/RLRB    Safety Evaluation IB      Safety Evaluation                  Report                    Section 3.0.3.2 Report Sections On The Aging Management Program For The Reactor Vessel (TAC NO.
MC9668).
DP- ML063100042 Mitchell M A, Vermont Yankee     11/2/2006  Final Safety    Auluck R,     Memorandum          5 01-21            NRC/NRR/A      License Renewal                Evaluation  NRC/NRR/ADR   Containing Proposed DES/DCI/CV    Application Final                Report     O/DLR/RLRB    Safety Evaluation IB      Safety Evaluation                (FSER),                   Section 3.1.2.3 Report Sections                Memoranda On The Aging Management Reviews For The Reactor Vessel And Its Internal Components (TAC NO. MC9668).
DP-  ML063410353 Cheruvenki    E-Mail: (NPA-PD-   11/2/2006      E-Mail    Rowley J G, E-mail With Attached  14 01-22              G S, NRC     LR) Ses - Vermont                                 NRC      Safety Evaluation Yankee - LRA,                                           Sections 3.1.2-1 and Vermont Yankee.                                                  3.1.2-2 Page 6 of 10
 
Doc  Accession    Author    Title/Description:    Document    Document  Addressee /       Comment          Page No. Number      Name/                               Date        Type    Addressee                          Count Affiliation:                                                 Affiliation DP- ML063340229  Palla B,   EMAIL: (NPA-PD-       11/8/2006    E-Mail Emch R L, Muir Draft DSEIS Section    8 01-23              NRC/NRR      LR) VY SAMA                                J M, NRC/NRR         5.2 SAMA Chapter 5.
DP- ML063410351 Morgan M J, E-Mail: (NPA-PD-     11/13/2006    E-Mail   Rowley J G,   Staff Discussion of    4 01-24                NRC          LR) Fwd: RE:                              NRC/NRR/ADR     Scoping Impact of Clarification of Part                        O/DLR/RLRB          Inspection 12, Subpart D                                                Exemption for exemption,                                                  Vernon Dam Vermont Yankee.
DP- ML063410348  Schoppy J  E-Mail: (NPA-PD-     11/13/2006    E-Mail   Rowley J G,   Staff Discussion of    2 01-25              G, NRC        LR) that Dam                                    NRC      Scoping Impact of Inspection,                                                  Inspection Vermont Yankee                                                Exemption for Vernon Dam DP-  ML063400516  Emch R L,  E-Mail: (NPA-PD-     11/16/2006    E-Mail  Muir J M, NRC     Staff Proposed      3 01-26                NRC          LR) Fwd: Re:                                             Revision of DSEIS Chapters 2 & 4 of                                                 Language VY attached, Vermont Yankee, From: Richard Emch, To: Jessie Muir.
DP-  ML063400469  Muir J M,  E-Mail: (NPA-PD-      11/16/2006    E-Mail,  Emch R L,   E-mail with Attached  42 01-27              NRC/NRR     LR) Fwd: VY SER,                   Memoranda    NRC/NRR       Draft Version of Vermont Yankee.                                            Appendix G (SAMA Mitigation Alternatives) to the DSEIS Page 7 of 10
 
Doc  Accession    Author    Title/Description:  Document      Document    Addressee /        Comment          Page No. Number      Name/                             Date        Type        Addressee                          Count Affiliation:                                                Affiliation DP- ML063400462 Schaaf R G,   E-Mail: (NPA-PD-  11/16/2006      E-Mail      Emch R L,      Staff Proposed      3 01-28            NRC/NRR/A    LR) Re: Chapters 2                            NRC/NRR/ADR    Revision of DSEIS DRO      & 4 of VY attached,                                 O            Language Vermont Yankee.
DP- ML063400460  Palla R L,  E-Mail: (NPA-PD-  11/16/2006      E-Mail      Emch R L,   E-mail with Attached  40 01-29                NRC              LR) VY                                NRC/NRR/ADR      Draft Version of Concurrence                                      O        Appendix G (SAMA Version, Vermont                                                  Mitigation Yankee.                                                 Alternatives) to the DSEIS DP-  ML063210401 Rubin M P,       Evaluation of  11/17/2006  Memoranda,  Franovich R L, E-mail with Attached  39 01-30            NRC/NRR/A    Severe Accident                  Report,    NRC/NRR/ADR      Draft Version of DRA/DRA/A          Mitigation                Miscellaneou  O/DLR/REBB    Appendix G (SAMA PLA        Alternatives for                   s                            Mitigation License Renewal                                              Alternatives) to the of Vermont Yankee                                                   DSEIS Nuclear Power Station.
DP-  ML063400538 Rodriguez V  E-Mail: (NPA-PD-  11/17/2006      E-Mail    Rowley J G,  E-mail With Attached  13 01-31                  M,      LR) Shell - Section                          NRC/NRR/ADR      Shell Version of NRC/NRR/A        2.1, Vermont                                  O/DLR        Safety Evaluation DRO/DLR          Yankee.
DP-  ML063400465  Schaaf R,    E-Mail: (NPA-PD-  11/20/2006      E-Mail      Muir J M,      Staff Proposed      3 01-32            NRC/NRR/A      LR) Fwd: Re:                              NRC/NRR/ADR    Revision of DSEIS DRO        Chapters 2 & 4 of                                   O            Language VY attached, Vermont Yankee.
Page 8 of 10
 
Doc  Accession    Author    Title/Description: Document      Document      Addressee /      Comment          Page No. Number      Name/                          Date          Type      Addressee                          Count Affiliation:                                                 Affiliation DP-  ML063400505  Moret E N, E-Mail: (NPA-PD-  11/21/2006     E-Mail,     Muir J M,   E-mail With Attached    5 01-33              Argonne      LR) VT Yankee                Environment  NRC/NRR/ADR    Map Proposed for National Lab Figures, Vermont                  al Impact          O      Inclusion as a Figure (ANL)     Yankee, 11/21/06,               Statement,                      in DSEIS From: Ellen Moret,                  Map To: Jessie Muir, 11:38am.
DP-  ML063400508  Moret E N,  E-Mail: (NPA-PD-  11/21/2006      E-Mail,      Muir J M,  E-mail With Attached    8 01-34              Argonne      LR) VT Yankee                Environment  NRC/NRR/ADR    Map Proposed for National Lab Figures, Vermont                  al Impact          O      Inclusion as a Figure (ANL)     Yankee, 11/21/06,                Statement,                      in DSEIS From: Ellen Moret,              Graphics incl To: Jessie Muir,                Charts and 11:44am.                   Tables, Map DP-  ML063400545  Moret E N,  E-Mail: (NPA-PD-  11/21/2006      E-Mail,    Muir J M, NRC E-mail With Attached  12 01-35              Argonne      LR) VT Yankee                Environment                  Map Proposed for National Lab Figures, Vermont                  al Impact                Inclusion as a Figure (ANL)    Yankee, 11/21/06,               Statement,                       in DSEIS From: Ellen Moret,              Graphics incl To: Jessie Muir.               Charts and Tables, Map DP-  ML063400454  Moret E N, E-Mail: (NPA-PD-  11/22/2006      E-Mail      Muir J M,  E-mail With Attached    4 01-36              Argonne    LR) FW: Pg4-41,                             NRC/NRR/ADR    Map Proposed for National Lab Vermont Yankee.                                  O/DLR      Inclusion as a Figure (ANL)                                                                      in DSEIS Page 9 of 10
 
Doc  Accession    Author    Title/Description:    Document    Document  Addressee /      Comment          Page No. Number      Name/                                Date        Type    Addressee                        Count Affiliation:                                                Affiliation DP-  ML063410170 Morgan M J, E-Mail: (NPA-PD-      11/22/2006    E-Mail  Rowley J G,     Discussion of      4 01-37                NRC          LR) Fwd: RE:                              NRC/NRR/ADR      Acceptability of Clarification of Part                        O/DLR/RLRB    License Renewal 12, Subpart D                                          Amendment 19- RAI exemption,                                                  Response Vermont Yankee.
DP-  ML063410166 Hoang D V,   E-Mail: (NPA-PD-      11/22/2006    E-Mail    Hsu K R,   E-mail With Attached    8 01-38            NRC/NRR/A    LR) VYNPS: input                              Rowley J G,     Draft Version of DRO/DLR      report and SER                                Tran L N,    Safety Evaluation input, Vermont                            NRC/NRR/ADR    Section 3.0.3.3.6-Yankee.                                    O/DLR    Structures Monitoring Vernon Dam Page 10 of 10
 
December 7, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                 )
                                                  )
ENTERGY NUCLEAR VERMONT YANKEE,                   )            Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR                        )
OPERATIONS, INC.                                )            ASLBP No. 06-849-03-LR
                                                  )
(Vermont Yankee Nuclear Power Station)            )
AFFIDAVIT OF JONATHAN G. ROWLEY CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)
I, Jonathan G. Rowley, do hereby state as follows:
: 1.      I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Vermont Yankee Nuclear Power Stations license renewal application (LRA).
: 2.      I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
: 3.      I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
Original Signed By:
Jonathan G. Rowley Executed in Rockville, MD this 7th day of December, 2006
 
December 7, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )
                                                    )
ENTERGY NUCLEAR VERMONT YANKEE,                      )          Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR                          )
OPERATIONS, INC.                                  )          ASLBP No. 06-849-03-LR
                                                    )
(Vermont Yankee Nuclear Power Station)              )
DECLARATION OF PAO-TSIN KUO I, Pao-Tsin Kuo, do hereby state as follows:
: 1.      I am employed as the Acting Director of the Division of Licensing Renewal (DLR) in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). My supervisory responsibilities include oversight of the NRC Staffs review and evaluation of the Vermont Yankee Nuclear Power Station license renewal application.
: 2.      As part of their responsibilities in preparing the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified several documents as privileged because they contained information concerning the Staffs deliberative process. Those documents are listed in Attachment 2 to the December 7, 2006, submission of the Staffs Hearing File.
: 3.      I have personally reviewed the documents identified as privileged in Attachment 2, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain predecisional information concerning the Staffs review of the license renewal application. All documents contain either the Staffs analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part of the deliberative
 
process necessary to the Staffs review of the pending license renewal application.
: 4. Further, I have determined that disclosure of these documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staffs ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.
: 5. Accordingly, I formally invoke the deliberative process privilege with respect to each of the documents listed in Attachment 2 to the December 7, 2006 submission of the Staffs Hearing File.
: 6. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
Original Signed By:
Pao-Tsin Kuo Executed in Rockville, MD this 7th day of December, 2006
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                  )
                                                  )
ENTERGY NUCLEAR VERMONT YANKEE,                    )          Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR                        )
OPERATIONS, INC.                                )          ASLBP No. 06-849-03-LR
                                                  )
(Vermont Yankee Nuclear Power Station)            )
CERTIFICATE OF SERVICE I hereby certify that copies of the NRC Staff letter dated December 7, 2006, providing notice of the availability of the hearing file, with attachments, together with the affidavit of Jonathan G.
Rowley and the declaration of Pao-Tsin Kuo in the above-captioned proceeding have been served on the following by electronic mail with copies by deposit in the NRCs internal mail system or, as indicated by an asterisk, by electronic mail with copies by U.S. mail, first class, this 7th day of December 2006.
Administrative Judge                                  Administrative Judge Alex S. Karlin, Chair                                Richard E. Wardwell Atomic Safety and Licensing Board Panel              Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission                    U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                            Washington, DC 20555-0001 E-mail: ask2@nrc.gov                                  E-mail: rew@nrc.gov Administrative Judge                                  Office of the Secretary Thomas S. Elleman*                                    Attn: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel              Mail Stop: O-16C1 5207 Creedmoor Road, #101                            U.S. Nuclear Regulatory Commission Raleigh, NC 27612                                    Washington, DC 20555-0001 E-mail: elleman@eos.ncsu.edu                          E-mail: hearingdocket@nrc.gov Office of Commission Appellate                        Sarah Hofmann, Esq.*
Adjudication                                          Director of Public Advocacy Mail Stop: O-16C1                                    Department of Public Service U.S. Nuclear Regulatory Commission                    112 State Street - Drawer 20 Washington, DC 20555-0001                            Montpelier, VT 05620-2601 E-mail: OCAAmail@nrc.gov                              E-mail: sarah.hofmann@state.vt.us


_______________________Pao-Tsin KuoExecuted in Rockville, MDthis 7th day of December, 2006 UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)
Diane Curran, Esq.*                         Anthony Z. Roisman, Esq.*
)ENTERGY NUCLEAR VERMONT YANKEE,)Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR)
Harmon, Curran, Spielberg                   National Legal Scholars Law Firm
OPERATIONS, INC.)ASLBP No. 06-849-03-LR
  & Eisenberg, L.L.P.                        84 East Thetford Rd.
)(Vermont Yankee Nuclear Power Station))CERTIFICATE OF SERVICEI hereby certify that copies of the NRC Staff letter dated December 7, 2006, providing notice ofthe availability of the hearing file, with attachments, together with the affidavit of Jonathan G.
1726 M Street, NW., Suite 600               Lyme, NH 03768 Washington, DC 20036                       E-mail: aroisman@nationallegalscholars.com E-mail: dcurran@harmoncurran.com Matthew Brock, Esq.*
Rowley and the declaration of Pao-Tsin Kuo in the above-captioned proceeding have been served on the following by electronic mail with copies by deposit in the NRC's internal mail system or, as indicated by an asterisk, by electronic mail with copies by U.S. mail, first class, this 7th day of December 2006.Administrative JudgeAlex S. Karlin, Chair Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ask2@nrc.govAdministrative JudgeThomas S. Elleman*
Ronald A. Shems, Esq.*                     Assistant Attorney General Karen Tyler, Esq.                           Office of the Massachusetts Attorney Shems Dunkiel Kassel & Saunders, PLLC       General 91 College Street                           Environmental Protection Division Burlington, VT 05401                       One Ashburton Place, Room 1813 E-mail: rshems@sdkslaw.com                 Boston, MA 02108-1598 Ktyler@sdkslaw.com                  E-mail: matthew.brock@ago.state.ma.us Jennifer J. Patterson, Esq.*               David R. Lewis, Esq.*
Atomic Safety and Licensing Board Panel 5207 Creedmoor Road, #101 Raleigh, NC 27612 E-mail: elleman@eos.ncsu.eduOffice of Commission AppellateAdjudication Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: OCAAmail@nrc.govAdministrative JudgeRichard E. Wardwell Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: rew@nrc.govOffice of the SecretaryAttn: Rulemaking and Adjudications Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: hearingdocket@nrc.govSarah Hofmann, Esq.* Director of Public Advocacy Department of Public Service 112 State Street - Drawer 20 Montpelier, VT 05620-2601 E-mail: sarah.hofmann@state.vt.us  Diane Curran, Esq.*Harmon, Curran, Spielberg
Office of the New Hampshire                 Matias F. Travieso-Diaz Attorney General                           Pillsbury Winthrop Shaw Pittman LLP 33 Capitol Street                           2300 N Street, NW Concord, NH 03301                           Washington, DC 20037-1128 E-mail: jennifer.patterson@doj.nh.gov      E-mail: david.lewis@pillsburylaw.com matias.travieso-diaz@pillsburylaw.com Marcia Carpentier, Esq.
  & Eisenberg, L.L.P.
Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: mxc7@nrc.gov
1726 M Street, NW., Suite 600 Washington, DC 20036 E-mail: dcurran@harmoncurran.comRonald A. Shems, Esq.*Karen Tyler, Esq.
                                                    /RA/
Shems Dunkiel Kassel & Saunders, PLLC 91 College Street Burlington, VT 05401 E-mail: rshems@sdkslaw.com Ktyler@sdkslaw.comJennifer J. Patterson, Esq.*Office of the New Hampshire Attorney General 33 Capitol Street Concord, NH 03301 E-mail: jennifer.patterson@doj.nh.govMarcia Carpentier, Esq.Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: mxc7@nrc.govAnthony Z. Roisman, Esq.* National Legal Scholars Law Firm 84 East Thetford Rd.
Steven C. Hamrick Counsel for NRC Staff}}
Lyme, NH 03768 E-mail: aroisman@nationallegalscholars.comMatthew Brock, Esq.*Assistant Attorney General Office of the Massachusetts Attorney General Environmental Protection Division One Ashburton Place, Room 1813 Boston, MA 02108-1598 E-mail: matthew.brock@ago.state.ma.usDavid R. Lewis, Esq.*Matias F. Travieso-Diaz Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC 20037-1128 E-mail: david.lewis@pillsburylaw.com matias.travieso-diaz@pillsburylaw.com
    /RA/                                                                     Steven C. Hamrick Counsel for NRC Staff}}

Latest revision as of 22:29, 13 March 2020

Vermont Yankee - Letter from Steven C. Hamrick to Administrative Judges Providing Monthly Status Report and Hearing File Index
ML063480055
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/07/2006
From: Hamrick S
NRC/OGC
To: Elleman T, Karlin A, Richard Wardwell
Atomic Safety and Licensing Board Panel
Byrdsong A T
References
50-271-LR, ASLBP 06-849-03-LR, RAS 12653
Download: ML063480055 (24)


Text

December 7, 2006 Administrative Judge Administrative Judge Alex S. Karlin, Chairman Dr. Thomas S. Elleman Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 5207 Creedmoor Road, #101 U.S. Nuclear Regulatory Commission Raleigh, NC 27612 Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Dr. Richard E. Wardwell Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.

(Vermont Yankee Nuclear Power Station)

Docket No. 50-271-LR; ASLBP No. 06-849-03-LR

Dear Administrative Judges:

The NRC Staff hereby provides its monthly status report and notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff is also producing, as Attachment 2, updates to its privilege logs as required by 10 C.F.R. § 2.336(b)(5), and is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. Also attached are the Affidavit of Jonathan G. Rowley, as required by 10 C.F.R. § 2.336(c), and the Declaration of Pao-Tsin Kuo, Acting Director of the Division of License Renewal, formally invoking the deliberative process privilege.

Please note that the first 46 documents included in the attached hearing file supplement are drawings that were included as attachments to a January 25, 2006 letter from Entergy to the NRC. This letter was identified in the Staffs initial hearing file index (Document No.00-088),

but the attached drawings were not individually identified. While the attachments were publicly available in an ADAMS package associated with the identified letter, the Staff has listed each of the attachments individually in this hearing file supplement.

There have been no changes to the Staffs projected review schedule as submitted to the Board on October 25, 2006. It is the Staffs understanding that the Plant License Renewal Subcommittee of the Advisory Committee on Reactor Safeguards (ACRS) has scheduled its meeting on Vermont Yankees proposed license renewal for May 2, 2007, with the full ACRS meeting scheduled for the month of September 2007. The Staff is not aware of the schedule for the publication of any resulting ACRS report.

Sincerely,

/RA/

Steven C. Hamrick Counsel for NRC Staff

Enclosures:

Hearing File Index Privilege Log - Deliberative Process Affidavit of Jonathan G. Rowley Declaration of Pao-Tsin Kuo cc: Service List

ATTACHMENT 1 VERMONT YANKEE LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplement 1 - December 7, 2006 ID # Accession Document Date Title/Description:

Number 01-001 ML060530396 3/29/2005 Drawing LRA-G-191155, Piping and Instrument Symbols.01-002 ML060530418 3/29/2005 Drawing LRA-G-191160-SH-04, Flow Diagram Instrument Air System, Sheet 4.01-003 ML060530426 3/29/2005 Drawing LRA-G-191160-SH-06, Flow Diagram Service Air Service, Sheet 6.01-004 ML060530632 3/29/2005 Drawing LRA-G-191162-SH-02, Flow Diagram Miscellaneous Systems Fuel Oil, Sheet 2.01-005 ML060530636 3/29/2005 Drawing LRA-G-191163-SH-01, Flow Diagram Fire Protection System Inner Loop, Sheet 1.01-006 ML060530641 3/29/2005 Drawing LRA-G-191163-SH-02, Flow Diagram Fire Protection System Outer Loop, Sheet 2.01-007 ML060530647 3/29/2005 Drawing LRA-G-191163-SH-04, Control Room Bldg Cable Vault East & West Switchgear Rooms, Sheet 4.01-008 ML060530654 3/29/2005 Drawing LRA-G-191165, Flow Diagram Sampling System - Sheet 2".01-009 ML060530428 3/29/2005 Drawing LRA-G-191169-SH-01, Flow Diagram High Pressure Coolant Injection System.01-010 ML060530429 3/29/2005 Drawing LRA-G-191169-SH-02, Flow Diagram High Pressure Coolant Injection System.01-011 ML060530468 3/29/2005 Drawing LRA-G-191171, Flow Diagram Standby Liquid Control System.01-012 ML060530679 3/29/2005 Drawing LRA-G-191178-SH-01, Flow Diagram Reactor Water Clean-Up System, Sheet 1.

Page 1 of 7

ID # Accession Document Date Title/Description:

Number 01-013 ML060530680 3/29/2005 Drawing LRA-G-191237-SH-01, HVAC - Flow Diagram Turbine, Service &

Control Room Buildings, Sheet 1.01-014 ML060530684 3/29/2005 Drawing LRA-G-191248, HVAC-Equipment Room Sheet No. 3".01-015 ML060530685 3/29/2005 Drawing LRA-G-191267-SH-01, Flow Diagram Nuclear Boiler Vessel Instrumentation, Sheet 1.01-016 ML060530687 3/29/2005 Drawing LRA-G-191267-SH-02, Flow Diagram Nuclear Boiler Vessel Instrumentation, Sheet 2.01-017 ML060530646 4/1/2005 Drawing LRA-G-191163-SH-03, Flow Diagram Fire Protection System Low Pressure Co2, Sheet 3.01-018 ML060530474 4/1/2005 Drawing LRA-G-191173-SH-01, Flow Diagram Fuel Pool Cooling & Cleanup System, Sheet 1.01-019 ML060530410 4/4/2005 Drawing LRA-G-191159-SH-03, Flow Diagram RCW Cooling Water System, Sheet 3.01-020 ML060530411 4/4/2005 Drawing LRA-G-191159-SH-05, Flow Diagram Recirculation Pump Cooling Water, Sheet 5.01-021 ML060530682 4/4/2005 Drawing LRA-G-191237-SH-02, HVAC - Flow Diagram Turbine, Service &

Control Room Buildings, Sheet 2.01-022 ML060530683 4/4/2005 Drawing LRA-G-191238, HVAC-Flow Diagram Reactor Building.01-023 ML060530479 4/14/2005 Drawing LRA-G-191174-SH-01, Flow Diagram Reactor Core Isolation Cooling System, Sheet 1.01-024 ML060530482 4/14/2005 Drawing LRA-G-191174-SH-02, Flow Diagram Reactor Core Isolation Cooling System, Sheet 2.01-025 ML060530677 4/14/2005 Drawing LRA-G-191176-SH-01, Flow Diagram Condensate & Demineralized Water Transfer System, Sheet 1.

Page 2 of 7

ID # Accession Document Date Title/Description:

Number 01-026 ML060530465 4/29/2005 Drawing LRA-G-191170, Flow Diagram Control Rod Drive Hydraulic System.01-027 ML060530388 7/1/2005 Drawing LRA-5920-4147, Schematic Air/Jacket Coolant System.01-028 ML060530393 7/1/2005 Drawing LRA-5920-4150, Schematic Lube Oil System.01-029 ML060530427 7/1/2005 Drawing LRA-G-191160-07, Flow Diagram Diesel Generator Starting Air System, Sheet 7.01-030 ML060530380 8/15/2005 Drawing LRA-33600-A-00217, Engineering Flow Diagram Turbine Bldg Area Off Gas Modification.01-031 ML060530401 8/15/2005 Drawing LRA-G-191156, Flow Diagram Main, Extraction & Auxiliary Steam Systems.01-032 ML060530414 8/15/2005 Drawing LRA-G-191160-SH-03, Flow Diagram Instrument Air System, Sheet 3.01-033 ML060530425 8/15/2005 Drawing LRA-G-191160-SH-05, Flow Diagram Service Air System, Sheet 5.01-034 ML060530484 8/15/2005 Drawing LRA-G-191175-SH-01, Flow Diagram Primary Containment &

Atmosphere Control System, Sheet 1.01-035 ML060530487 8/15/2005 Drawing LRA-G-191175-SH-02, Nitrogen Supply System Flow Diagram, Sheet 2.01-036 ML060530678 8/15/2005 Drawing LRA-G-191177-SH-01, Flow Diagram - Radwaste System, Sheet 1.01-037 ML060530688 8/15/2005 Drawing LRA-VY-E-75-002, Engineering Flow Diagram Containment Atmosphere Dilution System (CAD).01-038 ML060530404 10/31/2005 Drawing LRA-G-191159-SH-01, Flow Diagram Service Water System, Sheet 1.01-039 ML060530471 10/31/2005 Drawing LRA-G-191172, Flow Diagram Residual Heat Removal System.

Page 3 of 7

ID # Accession Document Date Title/Description:

Number 01-040 ML060530476 10/31/2005 Drawing LRA-G-191173-SH-02, Flow Diagram Fuel Pool & Clean Up System, Sheet 2.01-041 ML060530406 11/1/2005 Drawing LRA-G-191159-SH-02, Flow Diagram Service Water System, Sheet 2.01-042 ML060530385 11/15/2005 Drawing LRA-5920-00870, HPCI Turbine Oil Piping Diagram.01-043 ML060530629 11/15/2005 Drawing LRA-G-191160-SH-08, Flow Diagram Instrument Air System, Sheet 8.01-044 ML060530650 11/15/2005 Drawing LRA-G-191164, Flow Diagram Sampling System - Sheet 1".01-045 ML060530657 11/15/2005 Drawing LRA-G-191168, Flow Diagram Core Spray System.01-046 ML060530656 11/21/2005 Drawing LRA-G-191167, Flow Diagram Nuclear Boiler.01-047 ML062920434 9/27/2006 EMAIL: (PA) Fwd: Request for Clarification on VY RAI Responses.01-048 ML062920270 9/30/2006 EMAIL: (PA) VY 2006 DMRs to Date.01-049 ML062920423 10/3/2006 (E-Mail) Cooling Tower Report for VY.01-050 ML062920417 10/3/2006 (E-Mail) Current air cert and fishway temperature table from 2003 annual report.01-051 ML062920358 10/3/2006 (E-Mail) Thermophillic 01-052 ML062920352 10/3/2006 (E-Mail) Vermont Yankee License Renewal 01-053 ML062920265 10/3/2006 EMAIL: (PA) FW Waste Minimization Plan.01-054 ML062920385 10/5/2006 (E-Mail) Current IDP permit.01-055 ML062920372 10/5/2006 (E-Mail) VY cooling tower operation.01-056 ML062920377 10/5/2006 (E-Mail) VY Drift.01-057 ML062840595 10/10/2006 Request for Additional Information for the Review of Vermont Yankee Nuclear Power Station License Renewal Application.

Page 4 of 7

ID # Accession Document Date Title/Description:

Number 01-058 ML062920391 10/11/2006 (E-Mail) Additional temperature data request - VY.01-059 ML062920329 10/12/2006 EMAIL: (PA) Ecological Report 31 [April 2002].01-060 ML062920069 10/12/2006 Email: (PA) VY Annual Ecological Reports from the 1980's [1981]

01-061 ML062980249 10/12/2006 EMAIL: (PA) VY Annual Ecological Reports from the 1980's [1983].01-062 ML062790071 10/12/2006 Summary of a Telephone Conference Call Held on September 14, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc, Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application.01-063 ML062780122 10/12/2006 Summary of a Telephone Conference Call Held on September 19, 2006, between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc.01-064 ML062920428 10/17/2006 Email: (PA) CD of VY ecology studies from 1980's.01-065 ML062960301 10/17/2006 Vermont Yankee - License Renewal Application, Amendment 16.01-066 ML062920075 10/17/2006 VY Annual Ecological Reports from the 1980's [1985]

01-067 ML063120095 10/18/2006 E-mail: (PA-LR) FW: LRA Amendment 16.01-068 ML063120093 10/20/2006 E-mail: (PA-LR) Copy of SAMA Response.01-069 ML063120109 10/20/2006 E-mail: (PA-LR) Copy of VHS RAI Response.01-070 ML063120099 10/20/2006 E-mail: (PA-LR) Re: Copy of SAMA Response.01-071 ML062990142 10/20/2006 Vermont Yankee - License Renewal Application, Amendment No. 17.01-072 ML062990155 10/20/2006 Vermont Yankee - License Renewal Application, Amendment No. 18, Response to Request for Clarification of SAMA RAI Responses.

Page 5 of 7

ID # Accession Document Date Title/Description:

Number 01-073 ML062920034 10/27/2006 Summary of a Telephone Conference Call Held on September 25, 2006, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application.01-074 ML062960125 10/27/2006 Summary of Telephone Conference Call held on September 27, 2006, between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc.,

Concerning Information Pertaining to the VY Nuclear Power Station LRA.01-075 ML063030576 10/30/2006 Issuance of Environmental Scoping Summary Report Associated with the Staffs Review of the Application by Entergy Nuclear Operations, Inc. For Renewal of the Operating License for Vermont Yankee Nuclear Power Station (TAC No.

MC9670)01-076 ML062970318 10/30/2006 Vermont Yankee Nuclear Power Station License Renewal Application Review.01-077 ML063120106 10/31/2006 E-mail: (PA-LR) VYNPS License Renewal Amendment 19.01-078 ML063110071 10/31/2006 Vermont Yankee License Renewal Application, Amendment 19.01-079 ML063120104 11/1/2006 E-mail: (PR-LA) FW: Telecon Summary for review.01-080 ML063340227 11/2/2006 EMAIL: (PA-LR) Entergy Nuclear Cultural Resources Protection Plan.01-081 ML063130082 11/2/2006 Email: (NPA-PD-LR) Re: Clarification of Part 12, Subpart D Exemption.01-082 ML063050619 11/6/2006 Summary of a Telephone Conference Call Held on October 10, 2006, Between the NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application.01-083 ML063170080 11/6/2006 Vermont Yankee License Renewal Application, Amendment 21 Response to Request for Clarification of SAMA RAIs.01-084 ML063340225 11/7/2006 EMAIL: (PA-LR) Re: NRC Request for Meeting with VDH Page 6 of 7

ID # Accession Document Date Title/Description:

Number 01-085 ML063240163 11/9/2006 Vermont Yankee License Renewal Application, Amendment 20.01-086 ML063400453 11/9/2006 E-Mail: (NPA-PD-LR) VYNPS License Renewal Application Am. 20, Vermont Yankee.01-087 ML063340220 11/13/2006 EMAIL: (PA-LR) Re: NRC Request for Meeting with VDH (W. Irwin Response).01-088 ML063340223 11/13/2006 EMAIL: (PA-LR) Re: NRC Request for Meeting with VDH [R. Emch response].01-089 ML063120496 11/21/2006 Summary of Telephone Conference Call Held on October 12, 2006, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc.,

Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application Page 7 of 7

ATTACHMENT 2 VERMONT YANKEE LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGE Supplement 1 - December 7, 2006 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.

§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the deliberative process privilege.

Doc Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML062850564 Information Revised Sections 10/11/2006 Safety Rowley J G, Memorandum 424 01-01 Systems 3.0 and 4.0 Input Evaluation NRC/NRR/ADR Containing Proposed Labs, Inc, for the Safety Report O/DLR/RLRB Safety Evaluation NRC/NRR/A Evaluation for the Sections 3.0 and 4.0 DRO/DLR/R Vermont Yankee LRC Nuclear Power Station License Renewal Application.

DP- ML062840607 Jung I C, Safety Evaluation 10/11/2006 Memoranda, Zimmerman J, Memorandum 6 01-02 NRC/NRR/A Input for Vermont Safety NRC/NRR/ADR Containing Proposed DES/DE/EE Yankee License Evaluation O/DLR/RLRB Safety Evaluation EB Renewal Section 2.5 Application, Section 2.5 (TAC NO. MC9668)

DP- ML063130089 Flemming J EMAIL: (NPA-PD- 10/13/2006 E-Mail Patton T L, E-mail Discussion of 2 01-03 L, NRC LR) RE: Report 31 Argonne Textual Changes to attached [from J. National Lab EIS Regarding Flemming]. (ANL) Renewed Discharge Permit Page 1 of 10

Doc Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML063130094 Patton T L, EMAIL: (NPA-PD- 10/13/2006 E-Mail Flemming J L, E-mail Discussion of 2 01-04 Argonne LR) RE: Report 31 NRC Textual Changes to National Lab attached. EIS Regarding (ANL) Renewed Discharge Permit DP- ML062910428 Emch R L, (E-mail) The 10/16/2006 E-Mail LaGory K E, Proposed Response 2 01-05 NRC Scoping Comment Argonne to Scoping Comment

& Response under National Lab on Endangered discussion (ANL) Species DP- ML062910429 LaGory K E, The Scoping 10/16/2006 E-Mail Emch R L, Proposed Revision to 3 01-06 Argonne Comment & NRC Response to Scoping National Lab Response under Comment on (ANL) discussion to Endangered Species Richard Emch from Kirk LaGory DP- ML063130324 Huang J, E-MAIL: (NPA-PD- 10/18/2006 E-Mail, Rowley J G, Preliminary Draft 1 01-07 Legin Group, LR) Final Task 1 Safety NRC/NRR Version of Safety Inc Deliverable for Evaluation Evaluation Report Vermont Yankee Report SER.

DP- ML063130081 Emch R L, EMAIL: (NPA-AC- 10/18/2006 E-Mail, Miller D S, Draft Version of 69 01-08 NRC LR) Scoping Report, Moret E N, Scoping Summary Report. Miscellaneou Argonne Report s National Lab (ANL)

Page 2 of 10

Doc Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML063130086 Emch R L, EMAIL: (NPA-PD- 10/23/2006 E-Mail Davis J, E-mail with Attached 5 01-09 NRC LR) draft letter to ORourke D, Draft Version of VELCO. Wescott K, Letter to Vermont Argonne Division of Historic National Lab Preservation (ANL), NRC DP- ML063130070 Young R M, EMAIL: (NPA-PD- 10/23/2006 E-Mail, Rowley J G, E-mail With Attached 42 01-10 NRC LR) WP File for Safety NRC Proposed Safety Vermont Yankee Evaluation Evaluation Section 2 DSER. Report, Draft DP- ML062930015 Weerakkody Safety Evaluation 10/23/2006 Memoranda, Zimmerman J I, Memorandum 18 01-11 S D, Input Regarding Safety NRC/NRR/ADR Containing Proposed NRC/NRR/A the License Evaluation O/DLR/RLRB Safety Evaluation DRA/DRA/A Renewal Report Sections 2.3.3.8 and FPB Application - 2.3.3.9 Vermont Yankee Nuclear Power Station - Fire Protection (TAC No. MC9668).

DP- ML063130090 Palla R L, EMAIL: (NPA-PD- 10/25/2006 E-Mail Emch R L, Discussion of 4 01-12 NRC LR) Fwd: VY NRC Adequacy and responses. Completeness of SAMA RAI Responses Page 3 of 10

Doc Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML063130078 Nguyen D T, Email: (NPA-PD- 10/25/2006 E-Mail Morgan M J, Discussion of 3 01-13 NRC LR) Re: VHS Rowley J G, Adequacy and responses from NRC Completeness of RAI VY. Responses Regarding Electrical Circuits and Vernon Dam DP- ML063130101 Morgan M J, EMAIL: (NPA-PD- 10/27/2006 E-Mail Rowley J G, Discussion of How to 5 01-14 NRC LR) Fwd: Re: NRC Apply Lessons Questions Re Learned from Quad Quad Cities. Cities to Vermont Yankee re: Steam Dryer DP- ML063130097 Rubin M P, EMAIL: (NPA-PD- 10/27/2006 E-Mail Emch R L, Discussion of 4 01-15 NRC LR) Re: Fwd: VY Palla R L, NRC Adequacy and responses. Completeness of SAMA RAI Responses Page 4 of 10

Doc Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML063040144 Hamzehee H Draft Safety 10/30/2006 Draft Safety Kuo P T, Memorandum 40 01-16 G, Evaluation Evaluation NRC/NRR/ADR Containing Proposed NRC/NRR/A Regarding the Report O/DLR Safety Evaluation DES/DE/EQ Entergy Nuclear (DSER), Sections 2.0 and 3.1 VB Vermont Yankee, Memoranda LLC, License Renewal Application for the Vermont Yankee Nuclear Power Station, Dated January 29, 2006 DP- ML063130068 Nguyen D T, Email: (NPA-PD- 10/30/2006 E-Mail Hsu K R, NRC Discussion of 33 01-17 NRC LR) Re: Fwd: Adequacy of VYNPS RAI 3.6.2- Response to RAI 2-N-08-1. 3.6.2-2-N-08-1 and Attached Draft Section 3.6 of SER.

DP- ML063340235 Palla B, EMAIL: (NPA-PD- 10/31/2006 E-Mail, Emch R L, E-mail with Attached 40 01-18 NRC/NRR LR) Fwd: Updated Report, NRC/NRR Draft Version of VY TER. Technical Appendix G (SAMA Mitigation Alternatives) to the DSEIS DP- ML063130102 Galletti G S, EMAIL: (NPA-PD- 10/31/2006 E-Mail, Rowley J G, E-mail Containing 42 01-19 NRC LR) SE Input. Memoranda NRC Proposed Safety Evaluation Sections 2.0 and 3.1 Page 5 of 10

Doc Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML063100170 Mitchell M A, Vermont Yankee 11/2/2006 Memoranda, Auluck R C, Memorandum 6 01-20 NRC/NRR/A License Renewal Safety NRC/NRR/ADR Containing Proposed DES/DCI/CV Application Final Evaluation O/DLR/RLRB Safety Evaluation IB Safety Evaluation Report Section 3.0.3.2 Report Sections On The Aging Management Program For The Reactor Vessel (TAC NO.

MC9668).

DP- ML063100042 Mitchell M A, Vermont Yankee 11/2/2006 Final Safety Auluck R, Memorandum 5 01-21 NRC/NRR/A License Renewal Evaluation NRC/NRR/ADR Containing Proposed DES/DCI/CV Application Final Report O/DLR/RLRB Safety Evaluation IB Safety Evaluation (FSER), Section 3.1.2.3 Report Sections Memoranda On The Aging Management Reviews For The Reactor Vessel And Its Internal Components (TAC NO. MC9668).

DP- ML063410353 Cheruvenki E-Mail: (NPA-PD- 11/2/2006 E-Mail Rowley J G, E-mail With Attached 14 01-22 G S, NRC LR) Ses - Vermont NRC Safety Evaluation Yankee - LRA, Sections 3.1.2-1 and Vermont Yankee. 3.1.2-2 Page 6 of 10

Doc Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML063340229 Palla B, EMAIL: (NPA-PD- 11/8/2006 E-Mail Emch R L, Muir Draft DSEIS Section 8 01-23 NRC/NRR LR) VY SAMA J M, NRC/NRR 5.2 SAMA Chapter 5.

DP- ML063410351 Morgan M J, E-Mail: (NPA-PD- 11/13/2006 E-Mail Rowley J G, Staff Discussion of 4 01-24 NRC LR) Fwd: RE: NRC/NRR/ADR Scoping Impact of Clarification of Part O/DLR/RLRB Inspection 12, Subpart D Exemption for exemption, Vernon Dam Vermont Yankee.

DP- ML063410348 Schoppy J E-Mail: (NPA-PD- 11/13/2006 E-Mail Rowley J G, Staff Discussion of 2 01-25 G, NRC LR) that Dam NRC Scoping Impact of Inspection, Inspection Vermont Yankee Exemption for Vernon Dam DP- ML063400516 Emch R L, E-Mail: (NPA-PD- 11/16/2006 E-Mail Muir J M, NRC Staff Proposed 3 01-26 NRC LR) Fwd: Re: Revision of DSEIS Chapters 2 & 4 of Language VY attached, Vermont Yankee, From: Richard Emch, To: Jessie Muir.

DP- ML063400469 Muir J M, E-Mail: (NPA-PD- 11/16/2006 E-Mail, Emch R L, E-mail with Attached 42 01-27 NRC/NRR LR) Fwd: VY SER, Memoranda NRC/NRR Draft Version of Vermont Yankee. Appendix G (SAMA Mitigation Alternatives) to the DSEIS Page 7 of 10

Doc Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML063400462 Schaaf R G, E-Mail: (NPA-PD- 11/16/2006 E-Mail Emch R L, Staff Proposed 3 01-28 NRC/NRR/A LR) Re: Chapters 2 NRC/NRR/ADR Revision of DSEIS DRO & 4 of VY attached, O Language Vermont Yankee.

DP- ML063400460 Palla R L, E-Mail: (NPA-PD- 11/16/2006 E-Mail Emch R L, E-mail with Attached 40 01-29 NRC LR) VY NRC/NRR/ADR Draft Version of Concurrence O Appendix G (SAMA Version, Vermont Mitigation Yankee. Alternatives) to the DSEIS DP- ML063210401 Rubin M P, Evaluation of 11/17/2006 Memoranda, Franovich R L, E-mail with Attached 39 01-30 NRC/NRR/A Severe Accident Report, NRC/NRR/ADR Draft Version of DRA/DRA/A Mitigation Miscellaneou O/DLR/REBB Appendix G (SAMA PLA Alternatives for s Mitigation License Renewal Alternatives) to the of Vermont Yankee DSEIS Nuclear Power Station.

DP- ML063400538 Rodriguez V E-Mail: (NPA-PD- 11/17/2006 E-Mail Rowley J G, E-mail With Attached 13 01-31 M, LR) Shell - Section NRC/NRR/ADR Shell Version of NRC/NRR/A 2.1, Vermont O/DLR Safety Evaluation DRO/DLR Yankee.

DP- ML063400465 Schaaf R, E-Mail: (NPA-PD- 11/20/2006 E-Mail Muir J M, Staff Proposed 3 01-32 NRC/NRR/A LR) Fwd: Re: NRC/NRR/ADR Revision of DSEIS DRO Chapters 2 & 4 of O Language VY attached, Vermont Yankee.

Page 8 of 10

Doc Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML063400505 Moret E N, E-Mail: (NPA-PD- 11/21/2006 E-Mail, Muir J M, E-mail With Attached 5 01-33 Argonne LR) VT Yankee Environment NRC/NRR/ADR Map Proposed for National Lab Figures, Vermont al Impact O Inclusion as a Figure (ANL) Yankee, 11/21/06, Statement, in DSEIS From: Ellen Moret, Map To: Jessie Muir, 11:38am.

DP- ML063400508 Moret E N, E-Mail: (NPA-PD- 11/21/2006 E-Mail, Muir J M, E-mail With Attached 8 01-34 Argonne LR) VT Yankee Environment NRC/NRR/ADR Map Proposed for National Lab Figures, Vermont al Impact O Inclusion as a Figure (ANL) Yankee, 11/21/06, Statement, in DSEIS From: Ellen Moret, Graphics incl To: Jessie Muir, Charts and 11:44am. Tables, Map DP- ML063400545 Moret E N, E-Mail: (NPA-PD- 11/21/2006 E-Mail, Muir J M, NRC E-mail With Attached 12 01-35 Argonne LR) VT Yankee Environment Map Proposed for National Lab Figures, Vermont al Impact Inclusion as a Figure (ANL) Yankee, 11/21/06, Statement, in DSEIS From: Ellen Moret, Graphics incl To: Jessie Muir. Charts and Tables, Map DP- ML063400454 Moret E N, E-Mail: (NPA-PD- 11/22/2006 E-Mail Muir J M, E-mail With Attached 4 01-36 Argonne LR) FW: Pg4-41, NRC/NRR/ADR Map Proposed for National Lab Vermont Yankee. O/DLR Inclusion as a Figure (ANL) in DSEIS Page 9 of 10

Doc Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML063410170 Morgan M J, E-Mail: (NPA-PD- 11/22/2006 E-Mail Rowley J G, Discussion of 4 01-37 NRC LR) Fwd: RE: NRC/NRR/ADR Acceptability of Clarification of Part O/DLR/RLRB License Renewal 12, Subpart D Amendment 19- RAI exemption, Response Vermont Yankee.

DP- ML063410166 Hoang D V, E-Mail: (NPA-PD- 11/22/2006 E-Mail Hsu K R, E-mail With Attached 8 01-38 NRC/NRR/A LR) VYNPS: input Rowley J G, Draft Version of DRO/DLR report and SER Tran L N, Safety Evaluation input, Vermont NRC/NRR/ADR Section 3.0.3.3.6-Yankee. O/DLR Structures Monitoring Vernon Dam Page 10 of 10

December 7, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR VERMONT YANKEE, ) Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-849-03-LR

)

(Vermont Yankee Nuclear Power Station) )

AFFIDAVIT OF JONATHAN G. ROWLEY CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)

I, Jonathan G. Rowley, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Vermont Yankee Nuclear Power Stations license renewal application (LRA).
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Original Signed By:

Jonathan G. Rowley Executed in Rockville, MD this 7th day of December, 2006

December 7, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR VERMONT YANKEE, ) Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-849-03-LR

)

(Vermont Yankee Nuclear Power Station) )

DECLARATION OF PAO-TSIN KUO I, Pao-Tsin Kuo, do hereby state as follows:

1. I am employed as the Acting Director of the Division of Licensing Renewal (DLR) in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). My supervisory responsibilities include oversight of the NRC Staffs review and evaluation of the Vermont Yankee Nuclear Power Station license renewal application.
2. As part of their responsibilities in preparing the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified several documents as privileged because they contained information concerning the Staffs deliberative process. Those documents are listed in Attachment 2 to the December 7, 2006, submission of the Staffs Hearing File.
3. I have personally reviewed the documents identified as privileged in Attachment 2, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain predecisional information concerning the Staffs review of the license renewal application. All documents contain either the Staffs analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part of the deliberative

process necessary to the Staffs review of the pending license renewal application.

4. Further, I have determined that disclosure of these documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staffs ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.
5. Accordingly, I formally invoke the deliberative process privilege with respect to each of the documents listed in Attachment 2 to the December 7, 2006 submission of the Staffs Hearing File.
6. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Original Signed By:

Pao-Tsin Kuo Executed in Rockville, MD this 7th day of December, 2006

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR VERMONT YANKEE, ) Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-849-03-LR

)

(Vermont Yankee Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of the NRC Staff letter dated December 7, 2006, providing notice of the availability of the hearing file, with attachments, together with the affidavit of Jonathan G.

Rowley and the declaration of Pao-Tsin Kuo in the above-captioned proceeding have been served on the following by electronic mail with copies by deposit in the NRCs internal mail system or, as indicated by an asterisk, by electronic mail with copies by U.S. mail, first class, this 7th day of December 2006.

Administrative Judge Administrative Judge Alex S. Karlin, Chair Richard E. Wardwell Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: ask2@nrc.gov E-mail: rew@nrc.gov Administrative Judge Office of the Secretary Thomas S. Elleman* Attn: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel Mail Stop: O-16C1 5207 Creedmoor Road, #101 U.S. Nuclear Regulatory Commission Raleigh, NC 27612 Washington, DC 20555-0001 E-mail: elleman@eos.ncsu.edu E-mail: hearingdocket@nrc.gov Office of Commission Appellate Sarah Hofmann, Esq.*

Adjudication Director of Public Advocacy Mail Stop: O-16C1 Department of Public Service U.S. Nuclear Regulatory Commission 112 State Street - Drawer 20 Washington, DC 20555-0001 Montpelier, VT 05620-2601 E-mail: OCAAmail@nrc.gov E-mail: sarah.hofmann@state.vt.us

Diane Curran, Esq.* Anthony Z. Roisman, Esq.*

Harmon, Curran, Spielberg National Legal Scholars Law Firm

& Eisenberg, L.L.P. 84 East Thetford Rd.

1726 M Street, NW., Suite 600 Lyme, NH 03768 Washington, DC 20036 E-mail: aroisman@nationallegalscholars.com E-mail: dcurran@harmoncurran.com Matthew Brock, Esq.*

Ronald A. Shems, Esq.* Assistant Attorney General Karen Tyler, Esq. Office of the Massachusetts Attorney Shems Dunkiel Kassel & Saunders, PLLC General 91 College Street Environmental Protection Division Burlington, VT 05401 One Ashburton Place, Room 1813 E-mail: rshems@sdkslaw.com Boston, MA 02108-1598 Ktyler@sdkslaw.com E-mail: matthew.brock@ago.state.ma.us Jennifer J. Patterson, Esq.* David R. Lewis, Esq.*

Office of the New Hampshire Matias F. Travieso-Diaz Attorney General Pillsbury Winthrop Shaw Pittman LLP 33 Capitol Street 2300 N Street, NW Concord, NH 03301 Washington, DC 20037-1128 E-mail: jennifer.patterson@doj.nh.gov E-mail: david.lewis@pillsburylaw.com matias.travieso-diaz@pillsburylaw.com Marcia Carpentier, Esq.

Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: mxc7@nrc.gov

/RA/