{{#Wiki_filter:To: DennisGirroir . 5/15/2001  
{{#Wiki_filter:.
-. From Ralph Connell Re: Report for TWE Inspections Performed for RF022 (Reference  
To: DennisGirroir                                                           5/15/2001 From Ralph Connell Re: Report for TWE Inspections Performed for RF022 (Reference Report for IWE Inspections Performed for WOZl dated 12/02/1999)
'Report for IWE Inspections Performed for WOZl" dated 12/02/1999)
XNTRODUCTIOIY:
XNTRODUCTIOIY: The objective in the current period for this new IWE inspection program was to gather as much information as we could for W021 and RF022. During RF021 the goal was to perform as many inspections as possible within the acceptable window without causing any interference with other outage work activities.
The objective in the current period for this new IWE inspection program was to gather as much information as we could for W021 and RF022. During RF021 the goal was to perform as many inspections as possible within the acceptable window without causing any interference with other outage work activities. The remahder of the required first period examinations was performed either before or during RF022.
The remahder of the required first period examinations was performed either before or during RF022. After the IWE examinations performed during RFO 21 the Program Procedure PP7024 was revised to incorporate lessons learned.
After the IWE examinations performed during RFO 21 the Program Procedure PP7024 was revised to incorporate lessons learned. Some revisions were made to the appendices regarding inspected components and inspection criteria. As a result some of the examinations originally listed for the 1 period were revised and are reflected in the completion schedule included in this report. All required VI-3 examinations were moved to the 3d period as required by the ASME Section XI[ Code 1992/92A.
Some revisions were made to the appendices regarding inspected components and inspection criteria.
As a result some of the examinations originally listed for the 1' period were revised and are reflected in the completion schedule included in this report. All required VI'-3 examinations were moved to the 3d period as required by the ASME Section XI[ Code 1992/92A.
DISCUSSION:
DISCUSSION:
The ASME Section XI Subsection  
The ASME Section XI Subsection ][WE Code requires an examination of the coated surfaces in order to determine the condition of the substrate. This examination of coated surfaces is for evidence of flaking, blistering, peeling, discoloration and other signs of distress of the underlying metal. The IWE examinations performed for W021 found only two areas of coating with signs of distress affecting the substrate. Those two areas were located at the drywefl interior moisture barrier and the other was on the drywell surface at the X-5G penetration. Both of these were evaluated by Mechanical Design Engineering and dispositions provided via the IDR process. IWE examinations during W 0 2 2 identified two more areas. These were areas of pitting and corrosion in the vent header and corrosion in the interior of penetrations X-207A-H. Both of these were also evaluated by Mechanical Design Engineering and dispositions provided via the LDR process. At many areas of the containment there is peeling or discoloration. Both of these issues have been previously identified and accepted via the OP5250 inspections.
][WE Code requires an examination of the coated surfaces in order to determine the condition of the substrate.
This examination of coated surfaces is for evidence of flaking, blistering, peeling, discoloration and other signs of distress of the underlying metal.
The IWE examinations performed for W021 found only two areas of coating with signs of distress affecting the substrate. Those two areas were located at the drywefl interior moisture barrier and the other was on the drywell surface at the X-5G penetration. Both of these were evaluated by Mechanical Design Engineering and dispositions provided via the IDR process. IWE examinations during W022 identified two more areas.
These were areas of pitting and corrosion in the vent header and corrosion in the interior of penetrations X-207A-H.
Both of these were also evaluated by Mechanical Design Engineering and dispositions provided via the LDR process. At many areas of the containment there is peeling or discoloration. Both of these issues have been previously identified and accepted via the OP5250 inspections.
The Maintenance Department has been perfiiming containment inspections for several years via OP5250 to evaluate the condition of the coatings on containment surfaces.
The Maintenance Department has been perfiiming containment inspections for several years via OP5250 to evaluate the condition of the coatings on containment surfaces.
These inspections have compiled an excellent source of data documenting the conditions of the coatings and how these coatings are maintaining over time. The information provided fkom these reports provides the basis for disposition of issues identified on the IWE reports such as coating peeling and blistering.  
These inspections have compiled an excellent source of data documenting the conditions of the coatings and how these coatings are maintaining over time. The information provided fkom these reports provides the basis for disposition of issues identified on the IWEreports such as coating peeling and blistering.
..
 
* Several areas were identified as inaccessible during the RF021 and RF022 IWE examination process. Those inaccessible areas are generally defined in PP7024. More specific information is included with the data supplied in this report. DETAILS: TORUS SURFACE The dace ffom just below the catwalk on the exterior surface to the horizontal mid point of the toms was inspected prior to IZF022 The remaining torus penetrations were examined prior to W022 and during RF022. Penetrations X-207A-H were identified as having corrosion exceeding the provided acceptance criteria.
Several areas were identified as inaccessible during the RF021 and RF022 IWE examination process. Those inaccessible areas are generally defined in PP7024. More specific information is included with the data supplied in this report.
IDR 01-08 was written on this item. This was addressed by Design Engineering and a design wall thickness for these penetrations was provided.
DETAILS:
The X- 207A-H penetrations are acceptable for continued use and the corrosion identified does not exceed the required design wall thickness.
TORUS SURFACE The d a c e ffom just below the catwalk on the exterior surface to the horizontal mid point of the toms was inspected prior to IZF022 The remaining torus penetrations were examined prior to W022 and during RF022.
Torus penetration (includes penetrations in the vent system) examinations were completed for the first period. The interior surface of the vent header examination was completed during RF022. There were areas of pitting and corrosion identified in the vent header that exceeded the provided acceptance criteria.
Penetrations X-207A-H were identified as having corrosion exceeding the provided acceptance criteria. IDR 01-08 was written on this item. This was addressed by Design Engineering and a design wall thickness for these penetrations was provided. The X-207A-H penetrations are acceptable for continued use and the corrosion identified does not exceed the required design wall thickness.
IDR 01-07 was written to address the areas of pitting and corrosion Design Engineering addressed this IDR and provided new acceptance criteria for the vent header corrosion identified.
Torus penetration (includes penetrations in the vent system) examinations were completed for the first period.
All areas ae within the required design wall thickness provided by the Design Engineering resolution and are acceptable for Continued operation. After review of the data gathered during W021, a portion of the containment surface at the joint seal area was declared as augmented.
The interior surface of the vent header examination was completed during RF022. There were areas of pitting and corrosion identified in the vent header that exceeded the provided acceptance criteria. IDR 01-07 was written to address the areas of pitting and corrosion Design Engineering addressed this IDR and provided new acceptance criteria for the vent header corrosion identified. All areas a e within the required design wall thickness provided by the Design Engineering resolution and are acceptable for Continued operation.
This area was examined and documented during RF022. No change was identified in the as inspected condition between RF021 and RF022 in the augmented area. Since the area of the augmented sdce was being prepared for seal installation and painting the opportunity to exmine this region with white metal exposed and all corrosion removed presented itself The entire circumference in the moisture barrier area was examined and the areas of pitting and pit depths were identified.
After review of the data gathered during W021, a portion of the containment surface at the joint seal area was declared as augmented. This area was examined and documented during RF022. No change was identified in the as inspected condition between RF021 and RF022 in the augmented area.
All pitting identified by this examination were bounded by the 1999 evaluation, VYM 99/139, and are acceptable for continued operation of the drywell. Forty-three (43) percent of the required first period drywell penetration examinations were completed during RF021 the remainder was examined either prior to or during RF022. Many of these penetrations depicted debris and peeling paint. The diddebris is not considered to be detrimental to the containment structure.
Since the area of the augmented s d c e was being prepared for seal installation and painting the opportunity to exmine this region with white metal exposed and all corrosion removed presented itself The entire circumference in the moisture barrier area was examined and the areas of pitting and pit depths were identified. All pitting
All penetration cavities were dry with no visible indication of moisture.
 
The peeling paint was similar to that identified in the maintenance reports and is not unumal for the age and environmental conditions experienced by the coating. The dirt/debris identified in the drywell penetration cavities is a housekeeping issue only, not a containment integrity concern.
identified by this examination were bounded by the 1999 evaluation, VYM 99/139, and are acceptable for continued operation of the drywell.
All large debris located in the penetrations examined has been removed. The remaining debris consists ofthe accumulation of dirt, dust and paint chips over the Iife of the plant. The quantity of debris in the penetrations identified is not a containment integrity concern.
Forty-three (43) percent of the required first period drywell penetration examinations were completed during RF021 the remainder was examined either prior to or during RF022. Many of these penetrations depicted debris and peeling paint. The diddebris is not considered to be detrimental to the containment structure. All penetration cavities were dry with no visible indication of moisture. The peeling paint was similar to that identified in the maintenance reports and is not unumal for the age and environmental conditions experienced by the coating.
Most dddebris was lying in the concrete sleeve and not in contact with the penetration.
The dirt/debris identified in the drywell penetration cavities is a housekeeping issue only, not a containment integrity concern. All large debris located in the penetrations examined has been removed. The remaining debris consists ofthe accumulation of dirt, dust and paint chips over the Iife of the plant. The quantity of debris in the penetrations identified is not a containment integrity concern. Most dddebris was lying in the concrete sleeve and not in contact with the penetration. All penetrations examined (except for X-207A-H) were dry with no indication of water. The penetrations typically have a small access and pose difficulty cleaning. The dilemma fiom inside the drywell is the accessibility to the penetrations and the ALARA cqncerns.
All penetrations examined (except for X-207A-H) were dry with no indication of water. The penetrations typically have a small access and pose difficulty cleaning.
The drywell moisture barrier at the concrete floor to steel interface on the 238 level was identified as failed during RF021 examination. During RFO 22 this seal was replaced.
The dilemma fiom inside the drywell is the accessibility to the penetrations and the ALARA cqncerns.
To deal with the paint chipping and corrosion in the seal area and to accommodate the seal installation a six-inch wide band of paint was removed in the seal area for the 111 circumference of the drywell at the 238 level. The seal was reinstalled per minor mod
The drywell moisture barrier at the concrete floor to steel interface on the 238' level was identified as failed during RF021 examination.
#2000-010.The six-inch band was re-coated with non-qualified coating. The area ofthe seal and coating was examined after installation to document the as installed condition.
During RFO 22 this seal was replaced.
This seal acts as a gasket at the concrete to steel interface to prevent moisture from penetrating under the concrete and to prevent it fkom setting in the interface setting up localized corrosion. This area is an area that regularly gets flooded with water due to the activities that take place during outages in the dry well. This area also is an area that experiences wear and tear at a much higher rate than the rest of the containment due to its location. As a result of the location and outage activities this is an area that requires regular maintenance to keep the moisture barrier seal and the paint in the moisture barrier area intact and properly protecting the steel containment. The logistics of trying to place qualified coating at this location and then set up to regularly maintain it can be difficult as was seen during RF022 not to mention very costly. X recommend that this moisture barrier area and the six-inch band of paint be declared a high maintenance area and designed as an area where unqualified coatings are approved and utilized. This will make the routine maintenance of this area much easier to perform resulting in better
To deal with the paint chipping and corrosion in the seal area and to accommodate the seal installation a six-inch wide band of paint was removed in the seal area for the 111 circumference of the drywell at the 238' level. The seal was reinstalled per minor mod #2000-010.
 
The six-inch band was re-coated with non-qualified coating. The area ofthe seal and coating was examined after installation to document the as installed condition.
maintenance of this area in the fitlare. If this approach were approved, repahting with qualified coating would not be required only maintenance activity to maintain the integrity of the non-qualified paint and moisture barrier seal. This maintenance should become a routine PM.
This seal acts as a gasket at the concrete to steel interface to prevent moisture from penetrating under the concrete and to prevent it fkom setting in the interface setting up localized corrosion.
PRESSURERETkMNG BOLllNG Bolting examinations for X-200A & B and V16-19-5G& H were completed during W022 in the removed condition. Bolting examinations for V16-19-SA-F was examined in place. This completes the required first period IWEbolting examinations.
This area is an area that regularly gets flooded with water due to the activities that take place during outages in the dry well. This area also is an area that experiences wear and tear at a much higher rate than the rest of the containment due to its location.
As a result of the location and outage activities this is an area that requires regular maintenance to keep the moisture barrier seal and the paint in the moisture barrier area intact and properly protecting the steel containment.
The logistics of trying to place qualified coating at this location and then set up to regularly maintain it can be difficult as was seen during RF022 not to mention very costly. X recommend that this moisture barrier area and the six-inch band of paint be declared a high maintenance area and designed as an area where unqualified coatings are approved and utilized. This will make the routine maintenance of this area much easier to perform resulting in better
* maintenance of this area in the fitlare. If this approach were approved, repahting with qualified coating would not be required only maintenance activity to maintain the integrity of the non-qualified paint and moisture barrier seal. This maintenance should become a routine PM. PRESSURERETkMNG BOLllNG Bolting examinations for X-200A & B and V16-19-5G  
& H were completed during W022 in the removed condition. Bolting examinations for V16-19-SA-F was examined in place. This completes the required first period IWE bolting examinations.
An estimated 80% of IWE examinations are completed prior to or during RFO21. The remaining 20% were completed prior to or during RF022 to complete the first period examination requirements.
An estimated 80% of IWE examinations are completed prior to or during RFO21. The remaining 20% were completed prior to or during RF022 to complete the first period examination requirements.
There were two new IDR's generated, per DP4027, *or contahment issues during RF022. All of these issues were addressed by Mechanical Design Engineering prior to RF022 startup. Please find attached to this report for reference the Summary of First Period IWE Examinations.
There were two new IDRs generated, per DP4027, or contahment issues during RF022. All of these issues were addressed by Mechanical Design Engineering prior to RF022 startup.
This repod provides details for the first period examinations.
Please find attached to this report for reference the Summary of First Period     IWE Examinations. This repod provides details for the first period examinations.
1/23/1999  
 
1/23/1999    


==SUMMARY==
==SUMMARY==
OF FIRST PERIOD WE TORUS BAY 2 TORUS BAY 3 TORUS BAY 4 CONTAmhE ASME SECTION XI ITEM NO. GV 100 % GV 100 % GV 100 Yo EL11 TORUS BAY 5 TORUS BAY 6 TORUS BAY 7 E1.11 GV 100 % GV 100 % GV 100 Yo El.11 TORUS BAY 9 TORUS BAY 10 TORUS BAY 11 TORUS BAY 12 EL11 GV 1w Yo GV 100 % GV 100 % GV 100 Yo El.11 El.ll EL11 EL11 EL1 1 EL11 El.1 I EL11 E1.11 EL11 T SURFACES (TORUS BAYS) I COMPLETE TO DATE IS1 UDENTIFICATION
OF FIRST PERIOD WE XAMINATiONS CONTAmhE T SURFACES (TORUS BAYS)            ASME SECTION XI EXAM. CATEGORY E-A I
ASME      IS1                              REMARKS SECTION XI UDENTIFICATION          COMPLETE ITEM NO. NO./DESCRIPTION        TO DATE I I Intmal surfam above wata line completed RFO 21 EL11      TORUS BAY 1                      E x t m l s u r f a excqt
                                                                ~        area &om catwalk down to belt h e completed Remaking area to be inspeded after S/U RFMl(complaed pre RFO 22)
Gv    looV    Note: VT-1 completedbelow water line RF020 IrttmnaI surface above water line completed RFO 21 E1.11      TORUS BAY 2      GV    100 %    External surface except area from catwalk down to belt limecompleted.
Remainingarea to be inspected after S/U RFMl (completed pre RFO
: 22) Note: VT-1 completed below water ImeRF020 Internal SUI%= above watpr line completed RFO 21 TORUS BAY 3      GV    100 %    Extanal surface except area &om catwalk down to belt line compl+xl R e m a i n i n g i a e


==SUMMARY==
==SUMMARY==
: Although we did not complete all IWE first period examinations during RFO21, we did meet our original objective.
Although we did not complete all IWE first period examinations during RFO21, we did meet our original objective. That objective was to gather information regarding primary containment issues relating to the IWE program and to complete as many examinations as possible without impacting other outage work activities. An estimated 80% of IWE examinations are completed for the first period. The remaining 20% shall be rescheduled for RF022 for examination or reexamination. Some of the areas to be examined will require additional coordination due to cleaning requirements or accessibility requirements to complete the examinations.
That objective was to gather information regarding primary containment issues relating to the IWE program and to complete as many examinations as possible without impacting other outage work activities.
There were four new IDRs generated, per DP4027, for containment issues during RF021. All of these issues were addressed by Mechanical Design Engineering prior to RF021 startup.
An estimated 80% of IWE examinations are completed for the first period. The remaining 20% shall be rescheduled for RF022 for examination or reexamination.
Please find attached to this report for reference the Summary of First Period IWE Examinations for RF021 and the maintenance 1999 Drywell Inspection Record. These reports provide detail for examinations completed and those required to be rescheduled for RF022 and a summary of the OW250 coating examinations.
Some of the areas to be examined will require additional coordination due to cleaning requirements or accessibility requirements to complete the examinations.
 
There were four new IDRs generated, per DP4027, for containment issues during RF021. All of these issues were addressed by Mechanical Design Engineering prior to RF021 startup. Please find attached to this report for reference the Summary of First Period IWE Examinations for RF021 and the maintenance 1999 Drywell Inspection Record. These reports provide detail for examinations completed and those required to be rescheduled for RF022 and a summary of the OW250 coating examinations.  
1/23/1999    
..
ASME SECTiON XI ITEM NO. El.11 E1.11 IS1 IDENTIFICATION NOlDESCRIPTION TORUS BAY I TORUS BAY 2 EL11 TORUS BAY 4 El.ll TORUS BAY 5 GV GV GV GV GV 94 Yo 94 % 94 % 94 % 94 vb 1/23/1999  


==SUMMARY==
==SUMMARY==
OF FIRST PERIOD IWI XAMlNATIONS FOR RFO21 ASME SECTION XI EXAM. CATEGORY E-A REMARKS BAYS) TO DATE 94 % Irbenal dace above water line compleed RFO 21 External surface except area fIom catwalk down to be& line compIeted Remaining area to be deaned and inspected afia S/U RF021 Irbbemal surface above water line complded BFO 21 Exieand surface except area from catwalk down to belt lie completed.
OF FIRST PERIOD IWI XAMlNATIONSFOR RFO21 BAYS)            ASME SECTION XI EXAM.CATEGORY E-A ASME        IS1                            REMARKS SECTiONXI  IDENTIFICATION ITEM NO. NOlDESCRIPTION        TO DATE Irbenal d a c e above water line compleed RFO 21 El.11      TORUS BAY I            94 %    External surface except area fIom catwalk down to be& line compIeted Remaining area to be deaned and inspected afia S/U RF021 Nose: VT-I. completed below w a t a line RFW Irbbemal surface above water line complded BFO 21 E1.11      TORUS BAY 2    GV    94 Yo  Exieand surface except area from catwalk down to belt lie completed.
Remaining areato be dead and inspeded after SKI RFo21 NCQe: VT-1 completed Mow wata lme RF020 lntaoal surface above water he completed RFO 21 External surface except area &om catwalk down to belt line compleled Remaining area to be cleaned and inspected after SlIJ IC021 Nose: VT-I. completed below wata line RFW GV 94 Yo E1.11 TORUS BAY 3 GV ~ 94 Yo Ncte: VT-1 completed below water line RFO20 Intimal surfice above water line completed RFO 21 GV 94 vo External sud5ce except area fiom catwalk down to belt line completed.
Remaining areato be d e a d and inspeded after SKI RFo21
Ranaiaing areato be deanedandinspeded afterS/URFO21 Note: VT-1 completed below water line RF-0 Intanal dace above water line coroplded RFO 21 Extwal &ace except am Grom catwalk down to belt line complete&
                                    ~
Remaihgareato bedeaned andinspededafbSltTRF021 hitanal surface above water he complded RFO 21 External surface except area hm adwafk down to belt line compkkd. Remaining area to be cleaned and mspefted aftex S/U RFOZl NW VT-1 completed below water he WOZO Intanal surface above wata line completed RFO 21 Extemd surfaaz except area from catwalk down to belt line completed.
NCQe:VT-1 completed M o w wata lme RF020 lntaoalsurface above water h e completed RFO 21 E1.11      TORUS BAY 3    GV      94 Yo    External surface except area &om catwalk down to belt line compleled Remaining area to be cleaned and inspected after SlIJ IC021 Ncte: VT-1 completed below water line RFO20 Intimal surfice above water line completed RFO 21 EL11        TORUS BAY 4    GV     94 vo   External sud5ce except area fiom catwalk down to belt line completed.
Remainingareat0 be cleaned and inspectedaftar S/U RFO21 Nate: VT-1 completed Mow water line RF020 IosanaI surface above water line completed RFO 21. ExtemaI surfsce except area &om catwalk down to belt line completed Remaining-to bedd and inspected afb S/U RF021 Note: VT-1 wmpleted below water lme -0 Inteanal surface above water line completed RFO 21 mal srnface ex+ area from catwalk down to belt line completed Remammg area to be deaned and inspected after SlU RF021 Note: VT-1 com&ted below water line RF020 Intanal surface above water line complezed RPO 21 External surface except area &om catwalk down to belt line completed.
Ranaiaing areato be deanedandinspeded afterS/URFO21 Note: VT-1 completedbelow water line RF-0 1
Remaining area to be cleaned and inspected after Snr RFO21 Note VT-1 completed below water line W020 Memat smfsce above water line completed EO 21 External snrface except area from catwalk down to belt line compIeted 1 completed below wak line RF020 Mema1 surke above water line completed RFO 21 Ea6 slafa~ except area from catwalk down to bek Line completed.
Intanal d a c e above water line coroplded RFO 21 El.ll      TORUS BAY 5            94 Yo  Extwal &ace except a m Grom catwalk down to belt line complete&
Remaiaing area to be cleaned and inspected after SAJ RM21 NcQe: VT-1 completed below wster line RFO20 hternal surfirce above water he complaed RFO 21 External surfkce except area &om catwalk down to beIt line wmpleted Remainiig arm to be cleaned and inspected der S/U RFO21 Nota VT-1 completed bdow water lime WOZO brtenal surface above water lme completed RFO 21 ExtemaJ. srtrface except area fiom catwalk down to belt line compl&ed.
Gv              Remaihgareato bedeaned andinspededafbSltTRF021 Note: VT-1 completedbelow wata line RF020 hitanal surface above water h e compldedRFO 21 TORUS BAY 6    GV    194%      External surface except area h m adwafkdownto belt line compkkd.
Remaining area to be deaned and inspected after SIU RFO2l Nde: VT-I completed below water line RF020 Intam1 surface above water line completed RFO 21 J2xtemal suri3ce exapt area from catwalk down to belt line completd Remaining area to be cleaned and inspected after S/U RF021 Nute: m-1 completed bdow wata line RFOZO Note: VT-1 completed below wata line RF020 Rhhg atea to be dmed and inspected
EL11                                      Remaining area to be cleaned and mspeftedaftex S/U RFOZl N W VT-1 completed below water h e WOZO Intanal surface above wata line completed RFO 21 EI.11      TORUS BAY 7    GV      94 %    Extemd surfaaz except area from catwalk down to belt line completed.
&e S/U RFOZI Note. VT- 94 Yo Gv 1 GV 194% TORUS BAY 6 EL11 EI.11 TORUS BAY 7 GV 94 % _I GV TORUS BAY 8 94 Oh El.ll TORUS BAY 9 94 Yo GV EL11 TORUS BAY 10 EL11 TORUS BAY 11 ELI1 1 TORUS iAY 12 TORUS BAY 13 El.11 El.ll EL11 TORUS BAY 14 TORUS BAY 15 El.ll I .. . __ __ . . . . . .. .. . .. . _.. -. .. . . . .. ... . - . .. ._ - . ._ . . . .
Remainingareat0 be cleaned and inspectedaftar S/U RFO21
1 El.11 1 TORUSBAY 16 GV btanal dace above water line completed RFO 21 Extd dace except area Eom catwalk down to belt bine completed Remaining mea to be cleaned and inm after S/W -021 Note: VT-1 completed below water line RF020 94 % ASME SECTI EL11 El .20 ELI1 EL20 J XI EXAM. CATEGC VENT SYSTEM BAY 2 (VENTLINE ASSEMBLY, VACUUM BEAKER LNS, ANDVENT HEADER M BAY 2 AM) BAY 3) VENT SYSTEM BAY 4 (VENT= ASSEMBLY, VACUUM BREAKERLINES, ANDVENT HEADER IN BAY 4 AND BAY 5) VENT SYSTEM BAY 6 CVENTLN ASSEMBLY.
_  I Nate: VT-1 completed Mow water line RF020 IosanaIsurface above water line completed RFO 21.
VACUUM BREAKER LINES, AM, VENT HEADER IN BAY 6 AND BAY 7) Y: E-A CrV vT3 GV YT3 GV 75% 100% 75% 100% 75% SURFACERFMl.
TORUS BAY 8    GV      94 Oh  ExtemaI surfsce except area &om catwalk downto belt line completed El.ll                                      Remaining- to b e d d and inspected a f b S/U RF021 Note: VT-1 wmpleted below water lme -0 Inteanal surfaceabove water line completed RFO 21 TORUS BAY 9    GV      94 Yo  m a l srnface ex+ area from catwalk down to belt line completed EL11                                      Remammg area to be deaned and inspected after S l U RF021 Note: VT-1 com&ted below water line RF020 Intanalsurface above water line complezedRPO 21 TORUS BAY 10  GV      94 Yo  External surface except area &om catwalk downto belt line completed.
THEVACUUMBREAKERXANESWERE COMPLETED FROM THE EXTERNAL SURFACE TO THE PENETRATION 203 ELBOW THEN FROM THE INSlDE FROM THE 203 PFlyETRATION TO THE ELBOW VERTICAL WELD. TEIE EXTERNAL SURFACE OFT HE VENT HEADER AND^^
EL11                                      Remaining area to be cleaned and inspected after Snr RFO21 Note VT-1 completed below water line W 0 2 0 Memat smfsce above water line completed E O 21 TORUS BAY 11  GV      94 %    External snrface except area from catwalk down to belt line compIeted ELI1                                      R h h g atea to be dmed and inspected &e S/U RFOZI Note. VT-1 completedbelow w a k line RF020 El.11 1 TORUS i A Y 12 GV      94 %
AND EXTERNAL SURFACES OF THE DOWNCOMERS WHERE COMPLETED RFO20. THE VENT HEADER TNTEHOR, VENT LINE EXTERIOR, AND THE REMAINDER OF THE VACUUM LINE WILL BE SCHEDULED FOR RFO22. THE VENT LINE WAS COMPLETED FROM THE INl73WAL SURFACE RF021. THE VACUUM BREAKER LINES !WERE COMPLETED FROM THE EXTERNAL SURFACE TO THE PEhElXATIONZO3 ELBOW THEN FROM THE INSIDE FROM THE 203 PENMTRATION TO THE ELBOW VERTICAL WELD. THE lExTERNAcSURFAcEOFTHEVENTHEAIlERANDINTERNAL AM) EXTEN& DOWN COMER SURFACES WHERE COMPLETED RFCYZO. THE VEMT LINE WAS COMPLE~ FROMTRE INlZRN& SURFACE -021. TRE VACUUM BEAKER LIN3 WERE COMPLETED FROMTHEEXTERNAL SURFACETOTHE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATION TO THE ELBOW VERTICAL WELD. THE EXTERNALSURFACEOFTHEVENTHEADERANDINTERNAL AND EXTERNAL SURFACES OF THE DOWNCOIWRS WHERE corn- RFOZO. THE VENT HEADER INTERIOR, VENT LINE EXTERIOR, AND THEREMAII\IDEROFTHEVAC~LINEwILLBESCHEDULED FOR RFO22. THEVENTLINEWASCOh4PLETEDFEOMTHEINTERNAL SURFACE RF021. THE VACUUM BREAKERLINES WERE COMPLETED FROMTHE EXTERNAL SURFACE TOTHE PENETRATION203 ELBOW THEN FROM TIE INSIDE FROM THE 203 PENf5TRATION TO THE ELBOW VERTICAL WELD. THE EXTERNAL.
Mema1s u r k e abovewater line completed RFO 21 E a 6slafa~         except area from catwalk down to bek Line completed.
SURFACE OF THE VENT HEADER AND INTERNAt AND EX'ERNAL SURFACES OF THE DOWNCOMERS WHERE COMPLETED RFOU). THEVENTLINEWASCOMPLETEDFROMTHEINTERNAL SURFACE RYO21. THE VACUUM BREAKER LINES WERE COMPLETED FROM THE EXTEFWAL SURFACE TO "HE RENETRAnoN 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATION TO THE ELBOW VERTICAL WELD. THE EXTERNALSURFACEOFTHEVENTHEADERANDINTERNAL AND EXTERNAL SURFACES OF THE DOWNCOMERS WHERE corn- RF020. THE VENT HEADER INJXRIOR, VENT LXNE EXTERKOR, AND THE REMAIMlElz OF THE VACUUM LINE WILL BE SCREDULED FOR RFO22.
Remaiaing areato be cleaned and inspected after SAJ RM21 NcQe: VT-1 completed below wster lineRFO20 hternal surfirce above water h e complaed RFO 21 TORUS BAY 13  GV      94 %    External surfkce except area &om catwalk down to beIt line wmpleted El.ll                                      Remainiig arm to be cleaned and inspectedd e r S/U RFO21 Nota VT-1completed bdow water lime WOZO brtenal surface above water lme completed RFO 21 EL11        TORUS BAY 14  GV      94 v b    ExtemaJ. srtrface except area fiom catwalk down to belt line compl&ed.
El.11 El.ll )NS) El.11 EI.11 ASME SECTIONXI EXAU CATEGORY:
Remaining area to be deaned and inspected after SIU RFO2l Nde: VT-I completedbelow water line RF020 Intam1 surface abovewater line completed RFO 21 TORUS BAY 15                  J2xtemal suri3ce exapt area from catwalk down to belt line completd El.ll                                      Remaining area to be cleaned and inspected after S/U RF021 I                                Nute: m-1completed bdow wata line RFOZO
EA El.11 100% 100% 50% 100% VENT SYSTEM BAY 8 (VENTLINE ASSEMBLY, VACUUM BREAKERLINES, ANDVENT HEADER IN BAY 8 AND BAY 9) VENT SYSTEM BAY 10 CVENTLN ASSEMBLY, VACUUM BREAKERLINES, ANDVENT HEADER IN BAY 10 ANDBAY 11) COMPLETElNTERNALANDEXTERNAL COMPLETE FROM EXTERNAL RF021 COMPLETl?,FROMLNTERNALRIO21 EXTERNAL.
 
TO BE SCHEDULED BEFORE OR DURING RFO22 COMPLETE FROMINTERNU AND EXTERNAL RFO21 VENT SYS'IEM BAY 12 ASSEMBLY, VACUUM BREAKERLINES7 ANDVENT HEADER XN BAY 12 AND BAY 13) (VENTLINE VENT SYSTEM BAY 14 mLm ASSEMBLY, VACWM BREAKERLINES, ANDVENT HEADER IN BAY 14 AM) BAY 15) Toms Pendration X-200A & B TorusPenetratiOn X-201A THRU H To~usPpnehation X-202A THRU F VENT SYSTEM BAY 16 ASSEMBLY, VACUUM BREAKERLINES, AND VENT KEADER IN BAY 16ANDBAY 1) CiENTm GV VT-3 GV GV GV GV GV ~ GV GV 75% 75% 75% THE VENT LINE WAS COMPUTED FROMTHE ETERNAL SURFACERFO21.
1 El.11    1 TORUSBAY 16      GV     94 %
THEVACUUMBREAKERLINES WEE COMPUTED FROM THE EXTERNAL SURFACE TO THE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATION TO THE ELBOW VERTICAL WELD. TRE EXTERNAL.
btanald a c e above water line completed RFO 21 E x t d d a c e except area Eom catwalk down to belt b Remaining mea to be cleaned and i n m after S/W -021 Note: VT-1 completed below water line RF020 ie completed n
SURFACE OF THE VENT HEADER AM) INTERNAL AND ExTEIENAI, SURFACES OF THE DOWNCOMERS WHERE. COMPLETED RIFOZO. THE VENT HEADER INTEIUOR, VENT LINE EXTERIOR, AM3 THE REMAINDER OF THE VACWM LINE WIU BE SCHEDULED FOR RF022. THEVENTLXNEWASCOMPLETEDFROMTHEINTERNAL SURFACE R302I. THE VACUUM BREAKER LZNES WERE COMPUTED FROM THE EXTERNAL SURFACE TO THE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATION TO THE ELBOW VERTICAL WELD. THE EXTERNAL SURFACE OF THE VENT HEADER AND INTERNAL ANDEXTERNAL SURFACES OFTHEDOwNcoMmcS WHERE COMPLETED RFu20. THE VENT HEADER INTERIOR, VENT WNE EXTERIOR, AND THE REMAlNDER OF THE VACUUM LINE WILL BE SCHEDULED FOR RFO22. THE VENT LINE WAS COMPLETED FROM THE INTERNAL SURFACE RFO21. THE; VACUUM BREAKER LINES MRE COMPLETED FROM THE EXIEIUVAL SURFACE TO THE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRAnON TO THE ELBOW VERTICAL WELD. THE EXTERNAL, SURFACE OFTHE VENT HEADER AND INTERNAL AND EXTERNAL SURFACES OF THE DOWNCOMERS WRERE COMPLETED RFOZO. THE VENT HEADER INTEFUOR, VENT LINE EXTERIOR.
ASME SECTI J XI EXAM. CATEGC Y: E-A EL11        VENT SYSTEM      CrV      75%  SURFACERFMl. THEVACUUMBREAKERXANESWERE BAY 2                          COMPLETED FROM THE EXTERNAL SURFACE TO THE (VENTLINE                      PENETRATION 203 ELBOW THEN FROM THE INSlDE FROM THE ASSEMBLY,                      203 PFlyETRATION TO THEELBOW VERTICAL WELD. TEIE VACUUM                          EXTERNAL SURFACE OFT HE VENT HEADER AND^^
AND THE RE-= OF THE VACWM LINE WILL BE SCHEDULED FOR RF022. THEVENTLINEWASCOMPLETEDFROMTHEINTERNAL SURFACE RFo21. TEE VACUUM BREAKER LMES WERE C0MPL.ETEDFROMTHEEXTERNALSURFACETOTHE PEMETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETR4TION TO THE ELBO W VERTICAL WELD. THE ExTERNAtSURFACEOFTHEVENTHE;ADERANDINTERNAI, AND JXEWAL. SURFACES OF THE DOWN~~RS WERE COMPLETED RFOZO. THE VENT HEADER INTERIOR, VENT LINE EX'ERlOR, AND THE REMAIMlER OF THE VACUUM LINE WILL BE SCHEDULED FOR RF022. THEVENTLINEWASCOMPLETEDFROMTIAEINTERNAL SURFACE FSO2l. T*E VACWMBREAKERLINES WERE COh4PLETJW FROMTHE EXTERNAL SURFACE TO THE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATiON TO THE ELBOW VERTICAL.
BEAKER L N S ,                  AND EXTERNAL SURFACES OF THE DOWNCOMERS WHERE ANDVENT                        COMPLETED RFO20.
WELD. TRE EXTERNAL SURFACE OF THE VENT HEADER AND IN"ERNAL AND EXTERNAL SURFACES OF THE DOWNCOMERS WHERE COMPLETED RF020. THEVJ%NTHEADERINTERIOR,VENTL.INEEXIERIO~AND THERE~EROFTNEVACUUNIL~WILLBESCHEDULED FOR W022. CONTAINME EL11 El. 12 EL11 El.11  
HEADER M BAY 2                  THE VENT HEADER TNTEHOR, VENT LINE EXTERIOR, AND AM)BAY 3)                      THE REMAINDER OF THE VACUUM LINE WILL BE SCHEDULED FOR RFO22.
.. EL11 Torus Ppletration GV
El .20                      vT3            THE VENT LINE WAS COMPLETED FROM THE INl73WAL 100% SURFACE RF021. THE VACUUM BREAKER LINES !WERE COMPLETED FROM THE EXTERNAL SURFACE TO THE PEhElXATIONZO3 ELBOW THEN FROM THE INSIDEFROM THE 203 PENMTRATION TO THE ELBOW VERTICAL WELD. THE lExTERNAcSURFAcEOFTHEVENTHEAIlERANDINTERNAL AM)EXTEN&        DOWN COMER SURFACES WHERE COMPLETEDRFCYZO.
* 100% COMPLETE FROM INTERNAL AM) EXTERNAL RFOZl X-202G THRU K f El.11 Tow Pendration GV 50% X-203A TIlRU F EL11 TorusPenerration GV 50% COMPLETE FROM INTERNALRFozl EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22 COMPLEI'E FROM INTERNAL RFO21 B1.11 EL11 EL12 EL11 E1.12 ELI1 EL11 El.ll El.ll EI.11 El.ll El.ll E1.12 E1.11 El.ll El.ll El.ll EL11 EL11 E1.ll X-203G THRU H TorusPeaetratim GV 100% COMPLE"EFROMlNTERNALANDEXTERNALRF021 FX'ERNAL TO BE SCHEDULED BEFORE OR DURING RF022 X-205 A & D COMPLETED FROM lNW%!i?AL RFMI (s&C ARE BELOW 3 & C COMPLETED FROM EXTERNAL RFO21 A & D EXTERNAL RESCHlEDuLE FOR RFOZ2 B & C COMPLETED FROM EXTERNAL RFO21 TorusPeneet;ldion GV 75% WATER LINE FOR IN"ERN.4.L)
THE VEMT LINE WAS C O M P L E FROMTRE ~          INlZRN&
X-206A THRU D VT-3 50% A & D RESCHEDULE FOR W022 Torus Penetration GV 100% OOMPLETE FROMEXTERNAL RF02l (UNDERWATER)
ELI1        VENT SYSTEM      GV        75%  SURFACE -021. TRE VACUUM BEAKER LIN3 WERE BAY 4                          COMPLETEDFROMTHEEXTERNAL SURFACETOTHE (VENT=                          PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY,                      203 PENETRATION TO THE ELBOW VERTICAL WELD. THE VACUUM                          EXTERNALSURFACEOFTHEVENTHEADERANDINTERNAL BREAKERLINES,                  AND EXTERNAL SURFACES OF THE DOWNCOIWRS WHERE ANDVENT                        corn-        RFOZO.
X-206E THRU F 1 VT-3 100% COMPLETE FROMEXTERNAL RF021 TarusPene&atim GV 50% COMPLETEFROMEXTERNALRFOZX X-207A THRU H Torus Paetrrdioa GV 100% COMPUTEFROMINTERN4.LANDEXTERNALRFO21 X-208A THRU D INERNAL TO BE RESCHEDuL;EI)
HEADER INBAY 4                  THE VENT HEADER INTERIOR,VENT LINE EXTERIOR, AND AND BAY 5 )                    THEREMAII\IDEROFTHEVAC~LINEwILLBESCHEDULED FOR RFO22.
FOR RFO22 A&DCOMPLETEDFROMATERNALRF021 (ggtcAREBELoW B & C COMPLE"E,D FROM EXTERNAL.
THEVENTLINEWASCOh4PLETEDFEOMTHEINTERNAL EL20                        YT3      100% SURFACE RF021. THE VACUUM BREAKERLINESWERE COMPLETEDFROMTHE EXTERNAL SURFACE TOTHE PENETRATION203 ELBOW THEN FROM TIE INSIDE FROM THE 203 PENf5TRATIONTO THE ELBOW VERTICAL WELD. THE EXTERNAL. SURFACE OF THE VENT HEADER AND INTERNAt AND EX'ERNAL SURFACES OF THE DOWNCOMERS WHERE COMPLETED RFOU).
W021 A&D RESCHEDULE FORRFO22 TorusPenetration GV 75% WATERLINEFORINTERNAL)
THEVENTLINEWASCOMPLETEDFROMTHEINTERNAL VENT SYSTEM     GV        75%  SURFACE RYO21. THE VACUUM BREAKER LINES WERE BAY 6                           COMPLETED FROM THE EXTEFWAL SURFACE TO "HE CVENTLN                        RENETRAnoN203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY.                      203 PENETRATIONTO THE ELBOW VERTICAL WELD. THE VACUUM                          EXTERNALSURFACEOFTHEVENTHEADERANDINTERNAL BREAKER LINES,                  AND EXTERNAL SURFACES OF THE DOWNCOMERS WHERE AM, VENT                        corn-        RF020.
X-209A THRU D Toms Pendm GV 100?40 COMPLETE FROM INTERNAL AND EXTERNAL RFO21 X-21OA& B Torus Penetrrdion GV 100% COMPLETEFROMMTERNALANDExTERNAtRFO21 X-211A & I3 Torus Penetration GV 100% COMPLETE FROMlNTERNAL ANDExTERNAt RFo21 x-212 TausPen&at.ion GV 100% COMPLETE FROMEXERNALRFO21 (UNDER WATER)
HEADER IN BAY 6                THE VENT HEADER INJXRIOR, VENT LXNE EXTERKOR, AND AND BAY 7)                      THEREMAIMlElz OF THE VACUUM LINE WILL BE SCREDULED FOR RFO22.
X-213A & B VT-3 1 ow0 COMPLEIE FROMEXTERNALRFO21 (UNDER WATER) Tarus Penetration GV 100% COMPLETE FROM R4IZRNAL AND EXTEXNAL RFO21 X-214 TwusPendm GV 100% COMPLETE FROM INTl3RNAL AND EXTERNAL RF0221 X-215 TorusPenetration GV 100% COMPLETE FROM INTERNAL ANI) EXTERNAL RlW2l X-216 TorusPenetratiOn GV 100% COMPLETEFROMINTERNALANDEXTE~ALRFo21 X-2 1 7 TorusPenebatim GV 100% COMPI.ETEFROMINTERNALANDEXTERNALRFOZ1 X-218 Torus Pendratim GV 1 ooY0 COMPlEF!ZFROMINTERNALANDEXTERNALRF021 X-219 Twus Penetraiion GV 100% COMPLETE FROM INTERNAL AM) EXTERNAC RFO21 x-220
 
* El.ll El.ll El.ll El. 11 Torus PenetratiOn x-221 Torus Penemtion x-222 Tarus Penetration X-223 TorusPenWon GV GV 1Wh COMPLETE FROM INTERNAL AND Ernma RFOzl 1 00% COMPLETEFROMrNTERNALANDEXTERNALRF021 GV I 100% COMPETE FROMINTERNAL AND EXTERNAL SO21 El.11 Drywdlevatiw 238to eldon 251 quadrant 0 to 90 EL12 GV VT-3 Drywell elevation 238 to eldm 251 quadrant90to 180 EL12 100% COMPLETE FROMEXTERNGtRFO21 0% INSULAATION PREVEWTIIW INSPECTION FROM EXTEIuIJAt, INTERNAL UNDER WATER. NOT COMPLETE AT THIS TIME. TOBERESCHEDULED.
THE VENT LINE WAS COMPUTED FROMTHE ETERNAL El.11    VENT SYSTEM      GV  75%  SURFACERFO21. THEVACUUMBREAKERLINES W E E BAY 8                        COMPUTEDFROM THE EXTERNAL SURFACE TO THE (VENTLINE                    PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY,                    203 PENETRATIONTO THE ELBOW VERTICAL WELD. TRE VACUUM                      EXTERNAL.SURFACE OF THE VENT HEADER AM) INTERNAL BREAKERLINES,                AND ExTEIENAI,SURFACES OF THE DOWNCOMERS WHERE.
THIS WIUBERESCHEDULEDWHEN I I GV ' 1000? El.ll DryweU devation 238to elevation 251 180 to 270 B1.12 DlvERS ARE IN TORUS ALONG WITH THE UNDERWATER SURFACES. RESCHEDULE THIS ACTIVITY.
ANDVENT                      COMPLETED RIFOZO.
COMPLETE FROMEX"ERNAJ-.RFOZl (UNDER WATER) ' E1.12 El.11 E1.12 El.ll , EL12 EL1 1 EL12 EL11 El.ll EL11 EL11 EL11 X-224A & B TorusPenetrsrtion X-225 TorusPen&ration X-226A & B Tons Pen&ation X-227 Torus Pen&atiw X-228 Torus Penetratioa x-229 Torus Penetration x-230 Tow Pen&&ion X-231 A-H Drywen elevation 238toelevation251 quadrant 270 to 360 dw- VT-3 GV VT-3 GV VT-3 GV OV GV QV 100% COMPLJTTE FROMEXTERNaRFO21 (UNDER WATER) 100% COMPLETE FROMEXTERNALRF021 (UNDER WATER) 100% COMPLETE FROMEXTERNAI.WO21 (UNDER WATER) 1 Oooh COMPLETE FROMEXTERNAL RFO21 (UNDER WATER) 100% COMPLE'E FROMEXl73RNAL~OZI (UNDER WATER) 100% COMPLETED FROMEXERIOR RFO21 (NOT ACCESSIBLE FROM INTIERXOR)
HEADER INBAY 8              THE VENT HEADER INTEIUOR, VENT LINE EXTERIOR, AM3 AND BAY 9)                  THE REMAINDEROF THE VACWM LINE WIUBE SCHEDULED FOR RF022.
COMPLETED FROMEXTERIORRFOZl (NOT ACCESSIBLE FROM INTERIOR) 100% 100% COMPLETED FROMEXTERIOR RF021 A,C,E, &G COMPLETED FROM INTERIOR -1 (B,D,F &H ARE 80% UNDER WATERFROMIIWEIWAL)
THEVENTLXNEWASCOMPLETEDFROMTHEINTERNAL El.ll    VENT SYSTEM      GV  75%  SURFACE R302I. THE VACUUM BREAKER LZNES WERE BAY 10                      COMPUTEDFROM THE EXTERNAL SURFACE TO THE CVENTLN                      PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY,                    203 PENETRATION TO THE ELBOW VERTICAL WELD. THE VACUUM                      EXTERNALSURFACE OF THE VENT HEADER AND INTERNAL BREAKERLINES,                ANDEXTERNAL SURFACES OFTHEDOwNcoMmcS WHERE ANDVENT                      COMPLETED RFu20.
B,D,F,G & H COMPLETED FROMEXlEF?NAL RFO21 RESCHESDULE A,C, 8t E FOR RF022 II d SURFACES)
HEADER IN BAY                THEVENT HEADER INTERIOR,VENT WNE EXTERIOR, AND 10 ANDBAY 11)                THE REMAlNDER OF THE VACUUM LINE WILL BE SCHEDULED FOR RFO22.
GV 100% VT-3 100% GV 100% VT-3 1W/o GV lW? VT-3 1QO% GV 100% . .... . .._.. . ___ . . .._. . . . . . . .. ._ ASME SECTION XI EXAM. CATEGORY:
THE VENT LINE WAS COMPLETED FROM THE INTERNAL El.11    VENT SYS'IEM      GV  75%  SURFACE RFO21. THE;VACUUM BREAKER LINES MRE BAY 12                      COMPLETED FROM THE EXIEIUVAL SURFACE TO THE (VENTLINE                    PENETRATION203 ELBOW THEN FROM THE INSIDEFROM THE ASSEMBLY,                    203 PENETRAnONTO THE ELBOW VERTICAL WELD. THE VACUUM                      EXTERNAL, SURFACE OFTHE VENT HEADER AND INTERNAL BREAKERLINES7                AND EXTERNAL SURFACES OF THE DOWNCOMERS WRERE ANDVENT                      COMPLETED RFOZO.
E-A CO-D FROMlNIERNALRFOZl EXTERNAL INACCESSIBLE BY DESIGN COMP~DFROMlNTERNALRFO21 E;(cTERNAL INACCESSIBLE BY DESIGN COMPLETED FROM INTE,RNALlZFOZl EXTERNAL INACCFSSIBLE BY DESIGN COMPWTED FROMINTEFWAL RF021 EXTERNAL INACCESSIBLE BY DESIGN COh4PL.ETED FROM INTERNAL RF02 1 EXTERNAI, INACCESSIBLE BY DESIGN COMPLEXED FROMIN'ERNNALRFOZl EXERNAL INACCESSIBLE BY DESIGN COMPLETED FROMINTERNALRFOZ1 EXTERNAL INACCESSIBLE BY DESIGN EL12 1ooo/a 100% lW? El.11 COh4PLETED FROM INTERNAL RFO2l EXTERNAL INACCESSIBLE BY DESIGN COMPWED FROM INTERNAL -021 EXTEKNAL INACCESSIBLE BY DESIGN COMPLETED FROM INTERNAL RF021 EXTERNfi INACCESSIBLE BY DESIGN El.12 1ooOh El.11 COMPLETED@TERNALANDEXTERNALRIF021 PORTIONS OF THE EXTERNAL AREA ARE INACCESSIBLE FROM DIRECT VISUALEXAMINATION BY DESIGN EL11 E1.11 EI.11 E1.11 DrywellPenetraticm GV 100% COMPLETED INTERNAL AND EXlWX4.L RF021 x-2 PORTIONS OF THE EXTERNAL AREA ARE INACCESS-FROM DIRECT VISUAL EXAMMATION BY DESIGN DrywellPenetratim GV 100% COMPLGTED INTERNAL AND EXTERNAL RF021 El.ll EL11 EL11 El.ll El.ll El.ll I x-4 ----t-- I I ~ryweue~evation 1 251 to elevation 269 quadrant 0 to 90 degrees 1 25 1 to elevation 269 1M)% COMPLElEDFROMINTERNALRFO21 EXTERNAL INACCESSIBLE BY DESIGN loOO? COMPLETEL)
HEADER X N BAY              THE VENT HEADER INTEFUOR, VENT LINE EXTERIOR.AND 12 AND BAY 13)              THE RE-=      OF THE VACWM LINE WILL BE SCHEDULED
FROM INTERNAL RFO2l EXlXRNAL.
                            ~
INACCESSIBLE BY DESIGN COMPLETED FROM INTERNAL RFO21 JXIERNAT., INACCESSIBLE BY DESIGN I COMPLETED PROMINTERNAL W02L EXIXRNAL INACCESSIBLE BY DESIGN COMPLETED FROMINTERNAL RF021 EXTERNAL INACCESSIBE BY DESIGN lao% COMPLETED FROMINTERNAL RFo2i mRNAL DIACCESSIBLIE BY DESIGN COMPLETED WOZl COh4PLEIED NO21 I CONTAINMENT SURFACES (DRY WELL PENETRAnrONS)
FOR RF022.
I I 1 I x-i EL11 I Drywenpenetration I GV I500/0 I WMPL&'IED INTERNAL RF021 X-SATHRU X-5H EXTERNAL TO BE COMPLETED BEFORE OR DURING PO22 I E1.12 E1.11 EL12 El.11 VT-3 DrywellPenetration GV Xd VT-3 DrywellPenetrrdion GV X-7A ELI2 EL11 x-7c 50% 0% 50% COMPUTED FROMINTERIOR RFO21 RESCHEDULE EXTERiOR BEFORE OR DURING RF022 RESCHEDULE BEFORE OR DURING RFO22 COMP~TEDFROMINTERNALRF021 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 El.11 E1.12 EL11 DrywellPcnetratioO GV x-m VT-3 DxywellPenehation GV X-8 E1.ll X-13A EL11 X-13B 50% 0% SO% COMPLa?TED FROM INTERNAL RFOZl EXTERNAC TO BE SCHEDULED BEFOIU? OR DUIUNG RFo22 RESCHEDULE FOR RF022 COMPLETED FROMIN"ERNALRF021 100%
THEVENTLINEWASCOMPLETEDFROMTHEINTERNAL EI.11    VENT SYSTEM      GV        SURFACE RFo21. TEE VACUUM BREAKER LMES WERE BAY 14                      C0MPL.ETEDFROMTHEEXTERNALSURFACETOTHE m L m                        PEMETRATION203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY,                    203 PENETR4TIONTO THE ELBOW VERTICAL WELD. THE VACWM                        ExTERNAtSURFACEOFTHEVENTHE;ADERANDINTERNAI, BREAKERLINES,                AND JXEWAL.SURFACES OF THE D O W N ~ ~ W    R ES R E ANDVENT                      COMPLETED RFOZO.
* COh4PIETED FROM THE JNERNAL. SURFACE RFO21 COMPLETED FROM INTERNAL RFO2l E1.12 RESCHEDULE FORSO22 50% COMPtETED FROM INTERNAL RFO21 EXTERNAL TO BE SCWEDULED BEFORE OR DURING RF022 RESCHEDLkE FOR RF022 VT-3 50% 0% 500/0 0% 0% I COMPLETED FROM INTERNAL RF021 EXTJ5RNAL TO BE SCHEDULED BEFORE OR D-G RF022 RESCHEDULE FOR RFO22 COMPETED FROM INTERNAL.
HEADER INBAY                THE VENT HEADER INTERIOR,VENT LINE EX'ERlOR, AND 14 AM)BAY 15)              THEREMAIMlER OF THE VACUUM LINE WILL BE SCHEDULED FOR RF022.
RFMl EXTERNAL TO BE SCFEDULED BEFORE OR DURING R.FOZ2 RESCHEDULE FOR RF022 RESCHEDULE FOR RFO22 EL11 E1.12 El.11 E1.12 El.ll 0% DrywellPeoetration GV X-9A VT-3 DryweItPenetrzticm GV X-9B VT-3 DryweUPene&ation GV x-10 THIS PENETRATION IS NOT ACCESSIBLE WITHOUT SIGNEXCANT EFFORT TO ACCESS. STAGING WOULD HAVE TO BE BUILT. I AM LOOKING AT CLASSIFYING T*lIS AS INACCESSIBLE FROM INSIDE. THE EXTERIOR INSPECTION WILL DETERMIBE HOW WE HAVE; TO DEAL WITH THIS PEN. REVIEW FORRFOZ2 El.ll DrywdlP+x~dion x-11 El.ll DrywellPenetnrtion x-12 GV GV ._ ... .... . . ... .-. . .... . - .. .... .._ .,. ... .. 50% 50% 50% COMPW'IZD FROMINTERNALRF021 (INACCESSIBLE AREA mw1FIED) EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 COMPLETED FROM INTERNAL RFOZl EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 COMPLETED FROMINTERNALRF021 ElLTERNAt To BE SCHEDULED BEFORE OR DURING RF022 EL11 DqwellPdon GV X-14 EL11 DrywellPen&ation GV X-15 0% RESCHEDULE FOR RF022 El.ll 0% El.11 THIS PENETRATXON IS NOT ACCESSIBLE WITHOUT SIGNIFICANT EFFORT TO ACCESS. STAGING WOULD HAVE TO BE BUILT. THE PEN ALSO HAS INSULATION CONFIGURATION El.ll 0% 50°% 50% 0% E1.11 EL12 EL11 EL12 EL11 RESTRlCTIONS AND DESIGN RESTRICTIONS.
THEVENTLINEWASCOMPLETEDFROMTIAEINTERNAL El.11     VENT SYSTEM      GV        SURFACE FSO2l. TE VACWMBREAKERLINES WERE BAY 16                      COh4PLETJW FROMTHE EXTERNAL SURFACE TO THE CiENTm                      PENETRATION 203 ELBOW THEN FROM THEINSIDE FROM THE ASSEMBLY,                   203 PENETRATiON TO THE ELBOW VERTICAL. WELD. TRE VACUUM                      EXTERNALSURFACE OF THE VENT HEADER AND IN"ERNAL BREAKERLINES,               AND EXTERNAL SURFACES OF THE DOWNCOMERS WHERE AND VENT                     COMPLETEDRF020.
I AM LOOKING AT CLASSIFYING THIS AS WACCESSIBLE FROM INSIDE. TEE EXEMOR INSPECTION WILL DETE- HOW WE HAVE TO DEAL WITH THIS PEN. REVIEW FOR RF022 THIS PENETRATION IS NOT ACCESSIBLE WITHOUT SIGMFICANT EFFORT TO ACCESS. STAGING WOULD HAVE TO BE BUILT. THlS PEN ALSO HAS INSULATION CONFIGURATION RESTRICTIONS AND DESIGN RESTRICTIONS.
KEADER IN BAY               THEVJ%NTHEADERINTERIOR,VENTL.INEEXIERIO~AND 16ANDBAY 1)                 THERE~EROFTNEVACUUNIL~WILLBESCHEDULED FOR W022.
I AM LOOKING AT CLASSIFYING THIS AS INACCESSIBLE FROM INSIDE. THE EXTERIOR INSPECTION WIW, DETERMINE HOW WE HAVE TO DEAL WlTH THIS PEN. REVEWFORRFO22 COMPLETED FROM INTERNAL RF021 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 COMPLETED FROMXNTERNALRFCnl EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 RESCHEDULE FOR RFO22 ELI2 EL11 50% E1.12 El.11 E1.12 El.ll E1.12 EL11 ELI2 EL11 El.ll COh4PLETEDFROM~ALRFO21 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 El.12 EL11 50% o?? 50% 0% OYO 0% Do? 0% 5076 50% 1oOoh 50?? 0% E1.12 COWLETED FROMINTERNALRFOZI EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 RESCHEDULE FORRFO22 COMPLETED FROM DJTJ5RNA.L RFml EXIERNAL TO BE SCHJ3DULED BEFORE OR DURING RFW RESC-W FOR RF022 REscfxEDuLE FOR RF022 RESCHEDm FOR a022 RESCHEDULE FOR RF022 RESCHEDULE FOR W022 COMPLETED FROMINTERNAL RFOZl EXTERNAL TO BE SCHEDULED BEFOE OR DURING RFO22 COMPLETED FROM INTERNAL RFOZl EM-. TO BE SCHEDULED BEFORE OR DURING RF022 COMPI.liXED FROMINTERNALRF021 COh4PLETEDFROMINTERNALRFOZl EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFm2 RESCHEDULE FOR W022 Drywell Pmetratiw X-16A Drywell Penetration X-16B Dryweu Pcnetretion x-19 Drywell Penetration x-20 Drywell Pm*iratiOn x-2 1 Drywell Penekatim x-22 Drywell Pen*iratim X-23 DrywelIPeaetration X-24 Pmetrsdigl X-25 Drywell Penetration X-26 DlyWellPeaehation X-27 GV GV GV GV VT-3 GV VT-3 GV VT-3 GV VT-3 GV VT-3 GV VT-3 GV VT-3 GV GV VT-3 GV VT-3 I REscHlEDuLE FORM022 50% COMPLETED FROM WTIERNAz.
CONTAINME                        )NS)    ASME SECTIONXI E X A U CATEGORY: E A EL11      Toms Pendration  GV    100% COMPLETElNTERNALANDEXTERNAL X-200A & B El. 12                     VT-3  100% COMPLETEFROM EXTERNALRF021 EL11      TorusPenetratiOn GV    50%  COMPLETl?,FROMLNTERNALRIO21 X-201ATHRU H                 EXTERNAL. TO BE SCHEDULEDBEFORE OR DURING RFO22 El.11      To~usPpnehation GV    100% COMPLETE FROMINTERNU AND EXTERNAL RFO21 X-202ATHRU F
RFOZI EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 I 1 I I EL11 El.11 El.ll E1.12 ByweUPen&rat.im GV 50% COMPLETED FROMINTERNALRF021 X-28 DrywellPenetmtion GV 0% liEsCHEDuLE FORRFOZ! x-29 DrywellPenetration GV SOYO COMPLETED F'ROMINTERNALRFOZl X-30 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 EXTERNAL To BE SCmDULED BEFORE OR DURING RFO22 VT-3 100% COMPLETEDFROMINTERNAIRFO21 El.ll 1~e.llPenetdon GV 50% COMPLETED FROMINTERNAtRFOZl EXTERNAL 'IQ BE SCHEDULED BEFORE OR DURING RF022 EL12 EL11 EL12 EL11 El.ll EL12 El.ll E1.12 VT-3 100% COMPLETED FROM INTERNAL RFO2l DrywellPeatkation GV 50% COMPLETED FROMXNTEXNaRF021 X-32 EXTERNAL TOBE SCNEDuI;EI>
 
BEFORE OR DURING RMn2 VT-3 100% COMP@TED FROMINTERh'ALRF021 DrywellPenettatiOn GV 50% COMPmD FROMXhTERNALRFO!Zl x-33 D~~~ollPenetraaioa GV ovo RESCFIEDULE FOR RFO22 x-34 VT-3 Ooh RESCHEDULE FOR RFOZZ ~~AL TO BE SCHEDULED BEFORE OR DURING E022 hywdPeaetratiar GV 50% COMPLETED FROM INTERNAL RF021 X-35A EXTERNAL TO BE SCHEDULED BEFORE OR DURMO RRXZ VT-3 100% COMPL;ETEDFROMINTEWALRFOZl EL11 DrywdPenetratioo X-35B E1.12 GV 50% COMF'LETED FROMINTERNALRFOZl EXTERNAL TO BE SCHEDULEI)
EL11  Torus Ppletration GV     100%   COMPLETE FROM INTERNAL AM)EXTERNAL RFOZl X-202G THRU K          f El.11 T o w Pendration  GV    50%   COMPLETE FROM INTERNALRFozl X-203A TIlRU F                  EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22 EL11  TorusPenerration  GV    50%    COMPLEI'E FROM INTERNALRFO21 X-203G THRU H                  FX'ERNAL TO BE SCHEDULED BEFORE OR DURING RF022 B1.11 TorusPeaetratim  GV    100%  COMPLE"EFROMlNTERNALANDEXTERNALRF021 X-205 A & D COMPLETED FROM lNW%!i?AL RFMI (s&C ARE BELOW EL11  TorusPeneet;ldion GV    75%    WATER LINE FOR IN"ERN.4.L)
BEFORE OR DURING WO22 VT-3 1 OO?! COMPLEED FROM INTERNAL RFO21 ELI1 DryweuPaetmtion GV x-35c E1.12 VT-3 El.ll DryWellPenetrati~n GV X-35D 5Ooh COM?L.!ZTEDFROMINTERNALRFO!Zl EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22 100% COMPLETED FROM INTERNAL RF021 500A COMPUETED FROM INTERNAL RFO21 EXTERNAL TO BE SCHEDULED BEFOF33 OR DURING RFOZP 1 E1.12 El.11 E1.12 EL11 El.11 EL11 El.ll El.11 VT-3 100% COMPLETED FROM TNTERNALRFMl DryweItPenWon GV 50?h COMP~FROM~RNALRF021 X-3 5E EXTERNALTO BE SCHEDULED BEFORE ORDURINGRFO22 VT-3 100% COMF'LE~DFROMINTERNALWO21 DrywellPeaetration GV ' 50% MIMPEEDFROMINTERNAtRM3al X-36 DrywellPenetration GV 50% COMPLETED FROM lNTERNALRFO21 X-37A IhyweUPenetratiOn GV 50% CQMPGTED FROMPJTERNALRF021 x-3% IxywdPm&ation GV 50% coMpLEl33D FFtOMrmTERNALRFo21 x-37c DrywellPenetmtion GV 50% WMPW FROM INTERNAL RFO21 x-37D EXTERNAL TO BE SCHEDULED BEFORE OR DURING E022 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 EXTERNAL.
X-206A THRU D                  3 & C COMPLETED FROM EXTERNAL RFO21 A & D EXTERNAL RESCHlEDuLE FOR RFOZ2 B & C COMPLETED FROM EXTERNAL RFO21 EL12                    VT-3  50%    A & D RESCHEDULE FOR W 0 2 2 EL11  Torus Penetration GV    100%  OOMPLETE FROMEXTERNALRF02l (UNDERWATER)
TO BE SCHEDULEI)
X-206ETHRU F          1 E1.12                  VT-3  100%  COMPLETE FROMEXTERNALRF021 ELI1  TarusPene&atim    GV    50%    COMPLETEFROMEXTERNALRFOZX X-207A THRU H                  INERNAL TO BE RESCHEDuL;EI) FOR RFO22 EL11  Torus Paetrrdioa  GV    100%  COMPUTEFROMINTERN4.LANDEXTERNALRFO21 X-208A THRU D A&DCOMPLETEDFROMATERNALRF021(ggtcAREBELoW El.ll TorusPenetration  GV    75%    WATERLINEFORINTERNAL)
BEPORE OR DURING RFOZ2 EXERNAL TO BE SCHEDUWED BEFORE OR DURING RFO22 GV 50% DrywellPealetration Drywell P~etrati~m X-38A X-38B Drywell Pendm X-38C Drywell PeaQration Drywell Penetratian Drywell Penaetration x-39B DIyWdl Penetratioo X-40A Drywell Pepetrrdion X-4OB Drywell Penetratioa x4c Drywell Penemtion DrvFpell Pulc3mtim X-41 Drywell Penehtioa X42 X-38D X-39A X4D Drywell Penetration x-43 DrywellPenetratiOo X-44 coMpLElEDFROMINTE~ALRFOZ1 EXTERNAL TO BE SCHEDULED BEFORE OR DURING W022 COMPLETED FROMImERN~RF021 EXI'ERNAL TO BE SCHEDULED BEFORE OR Dm RF022 GV 50% 50% El.11 GV COMPLETED FROM INTERNAL RFozl EXTERNAL TO BE SCHEDULED BEFORE OR DURING RED22 COMPLETED FROM TNTERNAL W021 EXERNAL TO BE SCHEDULED BEFORE OR IlURING RF022 COMpum FROM INTERNAL RFOn EXTERNAL TO BE SCHEDULED BEFORE OR DURING E022 COMPLETED FROMINTERNALRF021 FXERNAL TO BE SCHEDULED BEFOE OR DURING RFO22 COMPLJXED FROMEVERNAL EO21 EXTERNAL TO BE SCHliDULED BEFOW OR DURING RF022 COMPLETED FROM INTERNAL RF021 EXTERNAL TO BE SCHEDULED BEFORE OR DURING WO22 COMPLETED FROMTNTERNALRFotl EXTERNAL TO BE SCHEDULED BEFORE OR DURING -2 COMPLETED FROMINTERNALRF021 EXTERNAL TO BE SCHEDW BEFORE OR DURIh'G RFO2Z RESCHEDULE FOR -022 EL11 GV 50% 50% E1.11 GV EL11 GV GV GV GV GV 50% 50% 50% 50% 50% ELI1 El.11 El.ll El.11 EL11 GV 0% 50% 50% 50% El.ll GV COA4PLETED FROMIh'TERNALRFOZl 33XIERNAL TO BE SCHEDUIXD BEFORE OR DURING RFo22 COMPLETEDFROMW~ALRF021 EXTERNAL TO BE SC-W BEFORE OR DuIuNGRF022 COMPETED FROM INTBRNAL RF021 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFOZZ COMPLETEDFROM~AJ..RFOZ1 EXl'EFWAL TO BE SCHEDULED BEFORe OR DURING WOZ2 COMPLETED FROMINTERNAL.
X-209A THRU D                  B & C COMPLE"E,D FROM EXTERNAL.W021 A&D RESCHEDULE FORRFO22 El.ll Toms P e n d m    GV    100?40 COMPLETE FROM INTERNAL AND EXTERNALRFO21 X-21OA& B EI.11 Torus Penetrrdion GV    100%  COMPLETEFROMMTERNALANDExTERNAtRFO21 X-211A & I3 El.ll Torus Penetration GV    100%  COMPLETE FROMlNTERNAL ANDExTERNAt RFo21 x-212 El.ll TausPen&at.ion    GV    100%  COMPLETE FROMEXERNALRFO21 (UNDER WATER)
RFo21 E)tTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 RESCHEDULE FOR RF022 EL11 GV El.11 ELI1 GV GV 50% Dqweu Peoerratian x45 El.11 GV 500h 0% ELI1 GV Drywen Penettasion x47 El.ll E1.12 El.11 Drywell Palwon X48 GV VT-3 GV 50% 0% 50% COMPLETEDFROMKNTERNALRFo21 FXTERNALTO BE SCHEDULED BEFORE OR DURING RFo22 RESCHEDULE FOR RF022 COMPLETED FROM INTERNAL.
X-213A& B E1.12                  VT-3  1o w 0 COMPLEIE FROMEXTERNALRFO21(UNDER WATER)
W021 EXTERNAL TO BE SCHEDUIXD BEFORE OR DURING RF-2 COMPLETEDFROM~RNALRF02I EXTERNAL TO BE SCHEDULED BEFOIZE OR DURING WO22 COMP~TED FROMINTERNALRF021 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFOZ2 COMPLETED FROM INTERNAt RFm1 EXTERNAL TO BE SCHEDULED
E1.11 Tarus Penetration GV    100%  COMPLETE FROM R4IZRNAL AND EXTEXNALRFO21 X-214 El.ll TwusPendm        GV    100%  COMPLETE FROM INTl3RNAL AND EXTERNAL RF0221 X-215 El.ll  TorusPenetration GV    100%  COMPLETE FROM INTERNAL ANI)EXTERNAL RlW2l X-216 El.ll  TorusPenetratiOn GV      100% COMPLETEFROMINTERNALANDEXTE~ALRFo21 X-2 17 EL11   TorusPenebatim  GV      100%  COMPI.ETEFROMINTERNALANDEXTERNALRFOZ1 X-218 EL11  Torus Pendratim  GV      1ooY0 COMPlEF!ZFROMINTERNALANDEXTERNALRF021 X-219 E1.ll  Twus Penetraiion GV     100%   COMPLETE FROM INTERNAL A M )EXTERNAC RFO21 x-220
=FORE OR DURJNG RF022 Drywell Penetdcn x49 Drywell Penetratim X-50 DryWellPenetration X-51 Drywell Pmetrrdirm X-52 EL11 CrV 50% 50% 50% EL11 El.ll GV GV 9 COMPLETED FROMINTERNAL RFO21 (INACCESSIBLE AREA EXERNAL TO BE SCHEDUL;ED BEFORE OR DURING RF022 COMPLETED FROM INTERNAL RF021 (INACCESSIBLE AREA IDENTIFID')
 
IDENTIFED)
El.ll    Torus PenetratiOn      GV       1Wh          COMPLETEFROM INTERNAL AND Ernma RFOzl x-221 El.ll   Torus Penemtion        GV        100%        COMPLETEFROMrNTERNALANDEXTERNALRF021 x-222 El.ll   Tarus Penetration      GV        100%        COMPETE FROMINTERNAL AND EXTERNAL S O 2 1 X-223 El. 11   TorusPenWon            GV        100%        COMPLETE FROMEXTERNGtRFO21 X-224A & B                                    INSULAATIONPREVEWTIIW INSPECTION FROM EXTEIuIJAt, E1.12                           VT-3      0%          INTERNALUNDER WATER. NOT COMPLETE AT THIS TIME.
DrywelI Panetration X-1 DOA GV El.11 50% GV El.11 EL11 Drywelt Penetration X-1 DOB iorywell Penetratioa X-ZOOC 50% 50% EXTERNAL i.0 BE SCHEDULED BEFORE OR DURING RF~Z COMPLETED FROMINTERNALRFo21 (INACCEWLBI3 AREA IDENTIFIED)
TOBERESCHEDULED. THIS WIUBERESCHEDULEDWHEN DlvERS ARE IN TORUS ALONG WITH THEUNDERWATER SURFACES. RESCHEDULET H I S ACTIVITY.
EXTERNAL TO BE SCHEDULGD BEFORE OR DURING SO22 COMPLETED FR0MINTERhM.L RF02X (INACCESSIBLE AREA IDEN'IIFIED)
I El.11    TorusPenetrsrtion      GV      ' 1000?        COMPLETE FROMEX"ERNAJ-.RFOZl(UNDER WATER)
EXTERNAL TO BE SCHEDULED BEFORE OR DURlNG RFO22 COMPLETED FROM INTJZNa RFOZl WACCESSIBLE AREA EXTERNAL To BE SCHEDULED BEFORE OR DURMG RFO22 COMPIEIED FlROMINTERNALRF021 (INACCESSIBLE AREA EX'IERNm TO BE SCHEDULED BEFORE OR DURING RFO22 COMPLETED F!LOM INTERNAL RF022 (lNACCESSIBLE AREA EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 COMPLETED FROM INTERNAL.
X-225 E1.12                          VT-3      100%        COMPLJTTE FROMEXTERNaRFO21 (UNDERWATER)
RFO21 (INACCESSIBLE AREA IDENTIFIED)
El.ll  , TorusPen&ration        GV       100%         COMPLETE FROMEXTERNALRF021(UNDERWATER)
EXTERNAL TO BE SCIEDUJ3D BEFORE OR DURING Sa2 COMPLETED FROMINTERNALRF021 (INACCESSII3LE AREA 1D-D) F,XTERNAL, TO BE SCHEDULED BEFORE OR DURING RFo22 COMPLETED FROMINTERNAL W021 (DIACCCESSIBLE AREA IDENTIFIED)
X-226A & B EL12                            VT-3      100%         COMPLETEFROMEXTERNAI.WO21(UNDER WATER)
IDENTIFIED) m-1 GV GV El.ll 50% ~ GV El.ll EL11 EL11 Drywell Penetration X-101A DIywell PenetdGn X-lO1B Drywell Pgleaatim x-101c 50% 50% 50% GV GV El.ll GV 5OQh GV EL11 El.ll EL11 El.ll Dryweu Pmdration x-102 Drywen Pmehtiul X-103 DrywellPenetratian X-104A 50% 50% 500h GV IDENTXFED)
EL1 1    Tons Pen&ation        GV        1Oooh        COMPLETEFROMEXTERNALRFO21 (UNDER WATER)
EXTERNALTOBESCHEDUKED BEFORE ORDURINGRFOZ2 GV COMPLETED FROM ENTERNAL.
X-227 EL12                            VT-3     100%        COMPLE'E FROMEXl73RNAL~OZI(UNDER WATER)
RFOZl (INACCESSIBLE AREA EXTERNAL TO BE SCHEDULED BEFORE OR DWG RFOZ2 CONlpLETED FROM INTERNAL RXO21 (INACCESSIBLE AREA EXTERNAJ.,TOBE SCHEDUJXD BEFORE OR DURINGWOZZ COMPUTED FROM WRNAL RFozl (XNACCESmW AREA IDENTIFIED)
EL11    Torus Pen&atiw        GV        100%        COMPLETED FROMEXERIOR RFO21 (NOT ACCESSIBLE FROM X-228                                        INTIERXOR)
EXTERNAL TO BE SCHEDULED BEFORE OR DURJNG W022 COMPUXED FROMm'"ERNALRFO21 (INACCESSIBLE AREA IDENTIFED)
El.ll    Torus Penetratioa      OV        100%        COMPLETED FROMEXTERIORRFOZl(NOT ACCESSIBLE FROM x-229                                        INTERIOR)
EXTERNALTO BE SCHEDULED BEFORE ORDURING RFO22 COMPLETED FROM INTERNAL RF(n1 (INACCESSBLE AREA D-1 IDrnD) Drywell Penetratim X-1 WB GV 90% El.ll 50% GV GV GV EL11 Drywell Penetration X-105A mall Pm&Lation X-105B EL11 m-1 EXTERNAL TO BE SCHEDULED BEFORE OR DUEUNG W022 EL11 Drywen Penetration X-10.5'2 GV COMPLETED FROM INTERNAL WO21 (INACCESSIBLE AREA EXTERNALTOBESCHEDULEDBEFORE ORDURINGGRFo22 COMPLETED FROMTNTERNAt RFO21 (INACCESSlBLE AREA DDENTIFIED)
EL11    Torus Penetration     GV       100%         COMPLETED FROMEXTERIORRF021 x-230 A,C,E, &G COMPLETED FROM INTERIOR -1  (B,D,F &H ARE EL11    T o w Pen&&ion        QV        80%         UNDER WATERFROMIIWEIWAL)
EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 IDENTIFED)
X-231 A-H B,D,F,G & H COMPLETED FROMEXlEF?NALRFO21 RESCHESDULE A,C, 8t E FOR RF022 I
El.ll Drywell Parean X-105D GV El.11 EL11 ASME SECTION XI lTEM NO. E530 DrywelIPenetrrdjoo GV 50% COh@mFRoMmRNAL,RFo21 X-106 DrywellPenetmtion GV 504? COMPLETED FROM INTERNAL RFOZI X-107 EXTERNAL TO 3E SCHEDULED BEFORE OR DURING RFM2 EX'ERNG ID BE SCHEDULED BEFORE OR DURING RFO22 ISI IDENTIFICATION NOJDESCRKPTKON DRY WELL INTERIOR MOISTURE BARRIER Exam VT-3 % REMARKS mMPLBTE TO DATE 1OOoh INSPECTION COMPLETED RFOZ1 DISCREPANCIES WERE IDENTIFIED AND DISPOSITION FOR THIS ITEM IS WlTH MECHANICAL DESIGN ENGmRING CONTAINMEWT PRESSURE RETAINING BOLTING ~ ASME SECTION XI IEM NO. E8.10 E8.10 E8.10 E8.10 E8.10 B.10 E8.10 Is1 IDENTIFICATION NOJDES~ON TORUS WAY FLANGfi BOLTING PENETRATION 200A TORUS MAMVAY FLm~BOLTMo PENETRATION 200B NEUTRON MO~ORING SYSTEM PEMETRAnoN 35A NEUTRON MONITORKNG SYSTEM PENETRATION 35B NEUTRON MONITORING SYSIXM PENETRATION 35c NEUTRON MONITORING SYSTEM PENETRATION (SPARE) 35D NEUTRON MONITORING SYSTEM PENETRATION 35E o?? o?? 0% 0% 0% ASME SECTION XI EXAM. CATEGORY E-G RESCHEDULE FOR RFO22 RESCHEDULJ3 FORWO22 lU3SCREDUL.E FOR RFO22 RESCHEDULE FOR RFo22 RESCI-EDULE FOR RF022 Vermont Yankee Work Order No.: on -5037 Visual Examination Report Form VT-1, Containment Surfaces (m) Page. / of Date: e5-/-CJ/ Component Method Photo Sketch Intermediate
d SURFACES)            ASME SECTION XI EXAM. CATEGORY: E-A El.11    Drywdlevatiw          GV       100%         CO-D         FROMlNIERNALRFOZl 238to e l d o n 251                          EXTERNAL INACCESSIBLEBY DESIGN quadrant 0 to 90 EL12                            VT-3      100%         COMP~DFROMlNTERNALRFO21 E;(cTERNAL INACCESSIBLEBY DESIGN Drywell elevation      GV       100%         COMPLETED FROM INTE,RNALlZFOZl 238 to e l d m 251                            EXTERNALINACCFSSIBLE BY DESIGN quadrant90to 180 EL12                            VT-3      1W/o        COMPWTED FROMINTEFWAL RF021 I                                              EXTERNALINACCESSIBLE BY DESIGN El.ll    DryweU devation        GV       lW?          COh4PL.ETED FROM INTERNAL RF02 1 238to elevation251                            EXTERNAI,INACCESSIBLE BY DESIGN B1.12 EL11 180to 270 Drywen elevation 238toelevation251 quadrant 270 to 360 VT-3 GV 1QO%
&/# &/A / .--- I Direct None None Intermediate e# .u/A , EvaIuation Required?
100%
~~es fio VYNEP 8045.02 NE 8045 Rev. 1 Page 1 of 1 Instrument Instrument Make: ?G fi7n ~m r?+r.iL5 Instrument Model:
COMPLEXED FROMIN'ERNNALRFOZl EXERNAL INACCESSIBLEBY DESIGN COMPLETED FROMINTERNALRFOZ1 EXTERNALINACCESSIBLEBY DESIGN dw-I            I
2 6 DL Ph3 ' Instrument SIN: .9,3 2 9 '3a7 Instrument Dfsplay: CRT ( ) Digital (d Horitonta!
 
Linearity Performed?:
EL12 El.11 El.12
Yes ( ) No (/ Calibration Block -2 Callbration Block Materiak c/c Serial Number: >/c / - f . Block Temperature:
          ----t--
73- OF Thicknesses:
          ~ryweue~evation 251 to elevation 269 quadrant 0to 90 degrees 1     1ooo/a 100%
,360 - 5.001 M&TE Used?: Yes ( } No (4 M&TE Description
lW?
[SIN: h!/h Product Form: Wrn ,,,$+ , Calibration Times Initial Calibration:
COh4PLETED FROM INTERNALRFO2l EXTERNAL INACCESSIBLEBY DESIGN COMPWED FROM INTERNAL-021 EXTEKNALINACCESSIBLEBY DESIGN COMPLETED FROM INTERNAL RF021 EXTERNfi INACCESSIBLEBY DESIGN El.11 1
O%UO Check: 1 3 OQ Check <@ Check: N//# Check: /?h Final: 16 3O I Sketch and Examination Results: 
25 1 to elevation 269 EL11                                    1M)%     COMPLElEDFROMINTERNALRFO21 EXTERNALINACCESSIBLE BY DESIGN E1.11                                   loOO?    COMPLETEL) FROM INTERNALRFO2l EXlXRNAL. INACCESSIBLEBY DESIGN El.ll                                            COMPLETED FROM INTERNALRFO21 JXIERNAT., INACCESSIBLEBY DESIGN I
EL11                                            COMPLETED PROMINTERNALW02L EXIXRNAL INACCESSIBLEBY DESIGN EL11                                            COMPLETED FROMINTERNAL RF021 EXTERNAL INACCESSIBE BY DESIGN El.ll                                   lao%    COMPLETEDFROMINTERNALRFo2i m R N A L DIACCESSIBLIEBY DESIGN El.ll                                            COMPLETED WOZl El.ll                                            COh4PLEIED NO21 I
CONTAINMENTSURFACES (DRYWELL PENETRAnrONS)     I I    1        I 1ooOh    COMPLETED@TERNALANDEXTERNALRIF021 x-i                                  PORTIONS OF THEEXTERNAL AREA ARE INACCESSIBLE FROM DIRECT VISUALEXAMINATION BY DESIGN E1.11     DrywellPenetraticm      GV  100%    COMPLETED INTERNAL AND EXlWX4.L RF021 x-2                                  PORTIONS OF THE EXTERNAL AREA ARE INACCESS-FROM DIRECT VISUALEXAMMATION BY DESIGN EI.11      DrywellPenetratim      GV  100%    COMPLGTED INTERNAL AND EXTERNAL RF021 I x-4                        I        I EL11    I  Drywenpenetration X-SATHRU X-5H I GV I500/0  I WMPL&'IEDINTERNAL RF021 EXTERNAL TO BE COMPLETED BEFORE OR DURING PO22
 
I E1.12                      VT-3         COh4PIETEDFROM THE JNERNAL. SURFACE RFO21 E1.11 DrywellPenetration  GV   50%    COMPUTED FROMINTERIOR RFO21 Xd                                RESCHEDULEEXTERiOR BEFORE OR DURING RF022 EL12                      VT-3 0%      RESCHEDULE BEFORE OR DURING RFO22 El.11 DrywellPenetrrdion  GV   50%     COMP~TEDFROMINTERNALRF021 X-7A                              EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 RESCHEDULEFORSO22 50%     COMPtETED FROM INTERNALRFO21 EXTERNAL TO BE SCWEDULEDBEFORE OR DURING RF022 ELI2                                    RESCHEDLkE FOR RF022 EL11 x-7c El.11 DrywellPcnetratioO  GV  50%     COMPLa?TEDFROM INTERNAL RFOZl x-m                              EXTERNAC TO BE SCHEDULEDBEFOIU?OR DUIUNG RFo22 E1.12                      VT-3 0%      RESCHEDULE FOR RF022 EL11  DxywellPenehation    GV  SO%    COMPLETEDFROMINERNALRF021 X-8 E1.12                      VT-3 100%   COMPLETED FROM INTERNAL RFO2l EL11  DrywellPeoetration  GV  50%     COMPLETED FROM INTERNALRF021 X-9A                              EXTJ5RNALTO BE SCHEDULED BEFORE OR DG          -     RF022 E1.12                      VT-3 0%     RESCHEDULE FOR RFO22 El.11 DryweItPenetrzticm  GV   500/0  COMPETED FROM INTERNAL.RFMl X-9B                              EXTERNALTO BE SCFEDULED BEFORE OR DURING R.FOZ2 E1.12                      VT-3 0%     RESCHEDULE FOR RF022 El.ll DryweUPene&ation    GV   0%     RESCHEDULE FOR RFO22 x-10 El.ll DrywdlP+x~dion      GV x-11                            I El.ll DrywellPenetnrtion  GV  50%    COMPWIZD FROMINTERNALRF021 (INACCESSIBLE AREA x-12                              mw1FIED)
EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 E1.ll                          50%    COMPLETED FROM INTERNAL RFOZl X-13A                            EXTERNALTO BE SCHEDULEDBEFORE OR DURING RFO22 EL11                            50%    COMPLETED FROMINTERNALRF021 X-13B                            ElLTERNAtToBE SCHEDULED BEFORE OR DURING RF022 EL11  DqwellPdon          GV  0%      THISPENETRATION IS NOT ACCESSIBLE WITHOUT X-14                              SIGNEXCANT EFFORT TO ACCESS. STAGING WOULD HAVE TO BE BUILT. I AM LOOKING AT CLASSIFYING TlIS AS INACCESSIBLE FROM INSIDE. THE EXTERIOR INSPECTION WILL DETERMIBE HOW WE HAVE; TO DEAL WITH THIS PEN.
REVIEW FORRFOZ2 EL11  DrywellPen&ation    GV  0%      RESCHEDULE FOR RF022 X-15
 
I El.ll Drywell Pmetratiw  GV  0%      THIS PENETRATXONISNOT ACCESSIBLE WITHOUT X-16A                            SIGNIFICANTEFFORT TO ACCESS. STAGING WOULD HAVE TO BE BUILT. THE PEN ALSO HAS INSULATION CONFIGURATION RESTRlCTIONS AND DESIGN RESTRICTIONS. I AM LOOKING AT CLASSIFYING THIS AS WACCESSIBLE FROM INSIDE. TEE EXEMOR INSPECTION WILL DETE-        HOW WE HAVE TO DEAL WITH THIS PEN.
REVIEW FOR RF022 El.11 Drywell Penetration GV   0%     THIS PENETRATION IS NOT ACCESSIBLE WITHOUT X-16B                            SIGMFICANTEFFORT TO ACCESS. STAGING WOULD HAVE TO BE BUILT. THlS PEN ALSO HAS INSULATIONCONFIGURATION RESTRICTIONS AND DESIGN RESTRICTIONS. I AM LOOKING AT CLASSIFYINGTHIS AS INACCESSIBLE FROM INSIDE.THE EXTERIOR INSPECTION WIW, DETERMINE HOW WE HAVE TO DEAL WlTH THIS PEN.
REVEWFORRFO22 El.ll                     GV  50&deg;%    COMPLETEDFROM INTERNAL RF021 EXTERNAL TO BE SCHEDULEDBEFORE OR DURING RF022 E1.11                    GV  50%    COMPLETED FROMXNTERNALRFCnl EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 EL12                      VT-3 0%     RESCHEDULE FOR RFO22 EL11  Dryweu Pcnetretion  GV  50%    COh4PLETEDFROM~ALRFO21 x-19                            EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 EL12                      VT-3        REscHlEDuLEFORM022 EL11  Drywell Penetration GV  50%    COMPLETED FROM WTIERNAz.RFOZI x-20                            EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 ELI2                      VT-3 EL11  Drywell PmiratiOn  GV  50%     COWLETED FROMINTERNALRFOZI x-2 1                            EXTERNALTO BE SCHEDULEDBEFORE OR DURING RFO22 E1.12                     VT-3 o??    RESCHEDULE FORRFO22 El.11 Drywell Penekatim  GV  50%    COMPLETED FROM DJTJ5RNA.L RFml x-22                            EXIERNAL TO BE SCHJ3DULED BEFORE OR DURING RFW E1.12                    VT-3 0%      RESC-W      FOR RF022 El.ll Drywell Peniratim  GV  OYO    REscfxEDuLE FOR RF022 X-23 E1.12                    VT-3 0%     RESCHEDm FOR a 0 2 2 EL11  DrywelIPeaetration  GV  Do?    RESCHEDULE FOR RF022 X-24 ELI2                      VT-3 0%      RESCHEDULE FOR W022 EL11          Pmetrsdigl  GV  5076    COMPLETED FROMINTERNAL RFOZl X-25                            EXTERNAL TO BE SCHEDULEDBEFOE OR DURING RFO22 El.ll Drywell Penetration GV   50%    COMPLETED FROM INTERNAL RFOZl X-26                            E M - . TO BE SCHEDULEDBEFORE OR DURING RF022 El.12                    VT-3 1oOoh  COMPI.liXED FROMINTERNALRF021 EL11  DlyWellPeaehation  GV   50??    COh4PLETEDFROMINTERNALRFOZl X-27                            EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFm2 E1.12                    VT-3 0%      RESCHEDULE FOR W 0 2 2
 
I                          1      I      I EL11    ByweUPen&rat.im            GV    50%    COMPLETED FROMINTERNALRF021 X-28                                      EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22 El.11  DrywellPenetmtion          GV    0%     liEsCHEDuLE FORRFOZ!
x-29 El.ll  DrywellPenetration        GV    SOYO    COMPLETED F'ROMINTERNALRFOZl X-30                                      EXTERNAL To BE SCmDULED BEFORE OR DURING RFO22 E1.12                              VT-3   100%    COMPLETEDFROMINTERNAIRFO21 El.ll 1 ~ e . l l P e n e t d o n GV      50%     COMPLETED FROMINTERNAtRFOZl EXTERNAL'IQ BE SCHEDULEDBEFORE OR DURING RF022 EL12                              VT-3  100%    COMPLETED FROM INTERNAL RFO2l EL11    DrywellPeatkation          GV    50%    COMPLETED FROMXNTEXNaRF021 X-32                                      EXTERNALTOBE SCNEDuI;EI> BEFORE OR DURING RMn2 EL12                              VT-3  100%    COMP@TED FROMINTERh'ALRF021 EL11   DrywellPenettatiOn        GV    50%    C O M P m D FROMXhTERNALRFO!Zl x-33                                      ~                A    L BEFORE OR DURING E 0 2 2
                                                          ~ TO BE SCHEDULED El.ll   D~~~ollPenetraaioa G V            ovo    RESCFIEDULEFOR RFO22 x-34 EL12                              VT-3   Ooh    RESCHEDULEFOR RFOZZ El.ll  hywdPeaetratiar            GV     50%    COMPLETED FROM INTERNALRF021 X-35A                                    EXTERNAL TO BE SCHEDULED BEFORE OR DURMO R R X Z E1.12                              VT-3   100%    COMPL;ETEDFROMINTEWALRFOZl EL11    DrywdPenetratioo          GV     50%    COMF'LETED FROMINTERNALRFOZl X-35B                                    EXTERNALTO BE SCHEDULEI) BEFORE OR DURING WO22 E1.12                              VT-3  1OO?!  COMPLEED FROM INTERNAL RFO21 ELI1    DryweuPaetmtion            GV    5Ooh    COM?L.!ZTEDFROMINTERNALRFO!Zl x-35c                                    EXTERNALTOBE SCHEDULEDBEFORE OR DURING RFO22 E1.12                              VT-3  100%    COMPLETED FROM INTERNALRF021 El.ll   DryWellPenetrati~n        GV    500A    COMPUETED FROM INTERNALRFO21 X-35D                                    EXTERNAL TO BE SCHEDULEDBEFOF33 OR DURING RFOZP 1
E1.12                             VT-3  100%    COMPLETEDFROM TNTERNALRFMl El.11  DryweItPenWon              GV    50?h    COMP~FROM~RNALRF021 X-3 5E                                    EXTERNALTO BE SCHEDULED BEFORE ORDURINGRFO22 E1.12                              VT-3  100%    COMF'LE~DFROMINTERNALWO21 EL11    DrywellPeaetration        GV  ' 50%     MIMPEEDFROMINTERNAtRM3al X-36                                      EXTERNALTO BE SCHEDULED BEFORE OR DURING E 0 2 2 El.11  DrywellPenetration        GV    50%     COMPLETEDFROM lNTERNALRFO21 X-37A                                    EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 EL11    IhyweUPenetratiOn          GV    50%    CQMPGTED FROMPJTERNALRF021 x-3%                                      EXTERNALTO BE SCHEDULED BEFORE OR DURING RF022 El.ll  IxywdPm&ation             GV     50%    coMpLEl33D FFtOMrmTERNALRFo21 x-37c                                    EXTERNAL. TO BE SCHEDULEI)BEPORE OR DURING RFOZ2 El.11  DrywellPenetmtion          GV    50%     W M P W FROM INTERNAL RFO21 x-37D                                    EXERNAL TO BE SCHEDUWED BEFORE OR DURING RFO22
 
DrywellPealetration        GV  50%  coMpLElEDFROMINTE~ALRFOZ1 X-38A                                EXTERNAL TO BE SCHEDULED BEFORE OR DURING W022 Drywell P ~ e t r a t i ~ m GV  50%  COMPLETED F R O M I m E R N ~ R F 0 2 1 X-38B                                EXI'ERNAL TO BE SCHEDULED BEFORE OR D        m RF022 El.11 Drywell P e n d m          GV  50%  COMPLETED FROM INTERNALRFozl X-38C                                EXTERNAL TO BE SCHEDULEDBEFORE OR DURING RED22 EL11  Drywell PeaQration          GV  50% COMPLETED FROM TNTERNAL W 0 2 1 X-38D                                EXERNAL TO BE SCHEDULED BEFORE OR IlURINGRF022 E1.11 Drywell Penetratian        GV  50% C O M  p um FROM INTERNALRFOn X-39A                                EXTERNAL TO BE SCHEDULED BEFORE OR DURING E 0 2 2 EL11  Drywell Penaetration        GV  50%  COMPLETED FROMINTERNALRF021 x-39B                                FXERNAL TO BE SCHEDULED BEFOE OR DURING RFO22 ELI1  DIyWdl Penetratioo          GV  50%  COMPLJXEDFROMEVERNAL E O 2 1 X-40A                                EXTERNALTO BE SCHliDULED BEFOW OR DURING RF022 El.11 Drywell Pepetrrdion        GV  50%  COMPLETED FROM INTERNAL RF021 X-4OB                                EXTERNALTO BE SCHEDULED BEFORE OR DURING WO22 El.ll Drywell Penetratioa        GV  50%  COMPLETED FROMTNTERNALRFotl x4c                                  EXTERNAL TO BE SCHEDULEDBEFORE OR DURING -2 El.11 Drywell Penemtion          GV  50%  COMPLETED FROMINTERNALRF021 X4D                                  EXTERNAL TO BE S C H E D W BEFORE OR DURIh'G RFO2Z EL11  DrvFpell Pulc3mtim          GV  0%  RESCHEDULE FOR -022 X-41 El.ll Drywell Penehtioa          GV  50%  COA4PLETED FROMIh'TERNALRFOZl X42                                  33XIERNAL TO BE SCHEDUIXD BEFORE OR DURING RFo22 EL11  Drywell Penetration        GV  50%  COMPLETEDFROMW~ALRF021 x-43                                  EXTERNAL TO BE S C - W        BEFORE OR DuIuNGRF022 El.11 DrywellPenetratiOo          GV   50% COMPETED FROM INTBRNALRF021 X-44                                  EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFOZZ ELI1  Dqweu Peoerratian          GV  50%  COMPLETEDFROM~AJ..RFOZ1 x45                                  EXl'EFWAL TO BE SCHEDULED BEFORe OR DURING WOZ2 El.11                             GV   500h COMPLETED FROMINTERNAL. RFo21 E)tTERNALTO BE SCHEDULED BEFORE OR DURING RF022 ELI1  Drywen Penettasion          GV   0%   RESCHEDULEFOR RF022 x47 El.ll Drywell P a l w o n        GV   50%  COMPLETEDFROMKNTERNALRFo21 X48                                  FXTERNALTO BE SCHEDULED BEFORE OR DURING RFo22 E1.12                            VT-3 0%   RESCHEDULE FOR RF022 El.11 Drywell Penetdcn            GV   50% COMPLETEDFROM INTERNAL. W021 x49                                  EXTERNAL TO BE SCHEDUIXD BEFOREOR DURING RF-2 EL11 Drywell Penetratim          CrV  50% COMPLETEDFROM~RNALRF02I X-50                                  EXTERNAL TO BE SCHEDULED BEFOIZE OR DURING WO22 EL11  DryWellPenetration          GV   50% COMP~TED  FROMINTERNALRF021 X-51                                  EXTERNAL TO BE SCHEDULEDBEFORE OR DURING RFOZ2 El.ll Drywell Pmetrrdirm          GV   50% COMPLETED FROM INTERNAtRFm1 X-52                                  EXTERNAL TO BE SCHEDULED =FORE OR DURJNG RF022
 
9 El.11 DrywelI Panetration    GV 50% COMPLETED FROMINTERNALRFO21 (INACCESSIBLE AREA X-1 DOA                        IDENTIFED)
EXERNAL TO BE SCHEDUL;ED BEFORE OR DURING RF022 El.11 Drywelt Penetration    GV 50%  COMPLETED FROM INTERNAL RF021 (INACCESSIBLE AREA X-1 DOB                        IDENTIFID')
EXTERNALi.0 BE SCHEDULED BEFOREOR DURING R F ~ Z EL11  iorywell Penetratioa  GV 50%  COMPLETED FROMINTERNALRFo21 (INACCEWLBI3 AREA X-ZOOC                        IDENTIFIED)
EXTERNAL TO BE SCHEDULGD BEFORE OR DURING S O 2 2 El.ll                        GV 50% COMPLETED FR0MINTERhM.L RF02X (INACCESSIBLEAREA IDEN'IIFIED)
                          ~
EXTERNALTO BE SCHEDULED BEFORE OR DURlNG RFO22 El.ll Drywell Penetration    GV 50% COMPLETED FROM INTJZNa RFOZl WACCESSIBLE AREA X-101A                        IDENTIFIED)
EXTERNAL To BE SCHEDULED BEFORE OR DURMG RFO22 EL11  DIywell PenetdGn      GV 50% COMPIEIED FlROMINTERNALRF021 (INACCESSIBLEAREA X-lO1B                        IDENTIFIED)
EX'IERNm TO BE SCHEDULED BEFORE OR DURING RFO22 EL11  Drywell Pgleaatim      GV 50% COMPLETED F!LOM INTERNALRF022 (lNACCESSIBLE AREA x-101c                        m1-EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22 El.ll                      GV  5OQh COMPLETED FROM INTERNAL.RFO21 (INACCESSIBLE AREA IDENTIFIED)
EXTERNALTO BE SCIEDUJ3D BEFORE OR DURING S a 2 EL11  Dryweu Pmdration      GV 50% COMPLETED FROMINTERNALRF021 (INACCESSII3LEAREA x-102                          1D-D)
F,XTERNAL, TO BE SCHEDULED BEFORE OR DURING RFo22 El.ll Drywen Pmehtiul        GV 50%  COMPLETED FROMINTERNALW021 (DIACCCESSIBLE AREA X-103                          IDENTXFED)
EXTERNALTOBESCHEDUKED BEFORE ORDURINGRFOZ2 EL11  DrywellPenetratian    GV 500h COMPLETED FROM ENTERNAL.RFOZl (INACCESSIBLEAREA X-104A                        D 1 EXTERNALTO BE SCHEDULED BEFORE OR D W G RFOZ2 El.ll Drywell Penetratim    GV 90%  CONlpLETED FROM INTERNAL RXO21 (INACCESSIBLE AREA X-1 W B                        I D r n D )
EXTERNAJ.,TOBE SCHEDUJXDBEFORE OR DURINGWOZZ El.ll                        GV 50% COMPUTED FROM W R N A L RFozl (XNACCESmW AREA IDENTIFIED)
EXTERNAL TO BE SCHEDULED BEFORE OR DURJNG W 0 2 2 EL11  Drywell Penetration    GV      COMPUXED FROMm'"ERNALRFO21 (INACCESSIBLEAREA X-105A                        IDENTIFED)
EXTERNALTO BE SCHEDULED BEFORE ORDURING RFO22 EL11  m  a ll Pm&Lation    GV      COMPLETED FROM INTERNAL RF(n1 (INACCESSBLE AREA X-105B                        m1-EXTERNAL TO BE SCHEDULED BEFORE OR DUEUNG W022 EL11  Drywen Penetration    GV      COMPLETED FROM INTERNAL WO21 (INACCESSIBLEAREA X-10.5'2                      IDENTIFED)
EXTERNALTOBESCHEDULEDBEFOREORDURINGGRFo22 El.ll Drywell P a r e a n    GV      COMPLETED FROMTNTERNAt RFO21 (INACCESSlBLE AREA X-105D                        DDENTIFIED)
EXTERNALTO BE SCHEDULED BEFORE OR DURING RF022
 
El.11      DrywelIPenetrrdjoo GV      50%    COh@mFRoMmRNAL,RFo21 X-106                              EXTERNALTO 3E SCHEDULED BEFORE OR DURING RFM2 EL11        DrywellPenetmtion  GV      504?    COMPLETED FROM INTERNALRFOZI X-107                              EX'ERNG I  DBE SCHEDULEDBEFORE OR DURING RFO22 ASME        ISI                Exam %           REMARKS SECTIONXI  IDENTIFICATION          m  MP LBTE lTEM NO. NOJDESCRKPTKON          TO DATE DRY WELL E530        INTERIOR          VT-3  1OOoh      INSPECTION COMPLETED RFOZ1 MOISTURE                            DISCREPANCIES WERE IDENTIFIED AND DISPOSITION FOR BARRIER                            THIS ITEM IS WlTH MECHANICAL DESIGN E N G m R I N G CONTAINMEWTPRESSURE RETAINING BOLTING          ASME SECTIONXI EXAM. CATEGORY E-G
          ~
ASME        Is1 SECTION XI  IDENTIFICATION I E M NO. NOJDES~ON E8.10      TORUS W A Y            o??
FLANGfi BOLTING PENETRATION 200A E8.10      TORUS MAMVAY            o??        RESCHEDULE FOR RFO22 FLm~BOLTMo PENETRATION 200B E8.10      NEUTRON                            RESCHEDULJ3FORWO22 MO~ORING SYSTEM PEMETRAnoN 35A E8.10      NEUTRON                0%
MONITORKNG SYSTEM PENETRATION 35B E8.10      NEUTRON                0%          lU3SCREDUL.EFOR RFO22 MONITORING SYSIXM PENETRATION 35c B.10        NEUTRON                0%          RESCHEDULE FOR RFo22 MONITORING SYSTEM PENETRATION (SPARE) 35D E8.10      NEUTRON                            RESCI-EDULEFOR RF022 MONITORING SYSTEM PENETRATION 35E
 
Vermont Yankee Visual Examination Report Form Work Order No.: on -5037 VT-1, Containment Surfaces (m)
Page.   /    of Date: e5-/-CJ/
Component Method          Photo      Sketch  Intermediate          &/#
                                                                /          .---
                                                                            &/A IDirect              None        None    Intermediate        e#            .,
u/A EvaIuation Required?
                                                                          ~     ~ f i oe  s VYNEP 8045.02 NE 8045 Rev. 1 Page 1 of 1
 
Instrument Instrument Make: ?G    fi7n ~mr?+r.iL5          Instrument Model:    26 DL      Ph3        Instrument SIN: .9,3  293a7 Instrument Dfsplay: CRT ( )        Digital (d                  Horitonta! Linearity Performed?: Yes ( )     No  (/
Calibration Block Serial Number:    >/c / - .       -2  Callbration Block Materiak    c/c                    Product Form: Wrn      ,,,$+
Block Temperature: 73-       OF          Thicknesses:            -
                                                          ,360 5.001                                        ,
M&TE Used?:        Yes ( }    No  (4    M&TE Description [SIN:    h!/h Calibration Times Initial Calibration: O%UO      Check:  13 OQ      Check    <@
I Check:  N//#        Check:  /?h        Final:  16 3O Sketch and Examination Results:
 
Data Sheet No.:    $US3 -0/-06$/
Procedure No/Rev. N E ~ 0 5 . 3REV +PC *A Page I          of .A o a t e :
* 5 @ 1 Workorder Number.     ~-0654,?7-000 Thickness Calibration Data Sheet Drawing NumberlRev.:      6 2 02-2      EEv 0                        Plant Location: DfZY UELL 2 3 2 ' e l . d Material:        6ON S T E E L            Product Form:      trl E O U6 F( 7                    Nominal Thickness:      1.O " # 2 , s "
                                                                                                                      ~~
Instrument Instrument Make: PANA M R1<1L's              Instrument Model: 2 6 0 L P L            5          Instrument S/N: 9 3 1 2        9387 Instrument Display: CRT ( )    Digitat (4                      Horizontal Linearity Performed?:    Yes ( }        No (v E/C i - F                        Calibration Block Serial Number:      E/C  1-2          Calibration Blodc Material: CAR 8pA S?EC I                Product Form: W            U 6ti7 Block Temperature:      75    OF      mim~sss:      o ~ u d 'oI099",
                                                                    ,          ima'',    z.oool~,z s a z ' n ,      3,601 M & E Used?:        Yes ( )    No (4 M&TEDescription /S/N:
Calibration Times Initial Calibration: 0000      Check: d/A      Check:      NIA        Check:                Check:                  Final:  1OS4 Sketch and Examination Results:        E      A E                  ;
Evaluation Required:
Examiner..       Y                    MdfK E h?dLJA            Level:              Date: S- 9-01 t                              Level:    EL        Date:$/!/U/            Yes  (4            No { )
Reviewer:                                                                          Date:    s'.i~*  0I t        Form Number:
I Page t of 1 ANII: .                                                                             Date: K-fY-!                  NE 8053 Original LPC#I          -
Experience Hours Credit:
 
c 3
 
Visual Examination Report Form Work Order No.: 00 .e    37 VT-1, Containment Surfaces @WE)
Procedure No/Rev.: /vE 80 y 5 ,&Ev-1
                                          . Page  / of 6        Date: 5 0 /
Cornnonent
:racks/L,inears
'hysical Damage
:orrosion irosion 3ouges Near Evaluation Required?
VYNEF 8045.02 NE 8045 Rev. I c                                                                      Page 1 of 1
 
Vermont Yankee VYNEF. 8045.04 NE 8045 Original Page 1 of 1 LPC # I
 
Vermont Yankee uaminer:                  Level:  ~4 Date:  4
:viewer:                              Date:
Y
:viewer:    Nh                        Date:  dh NII: A  #                              Date: e-//-@/
VYNEF 8045.04 NE 8045 Original Page 'I of 1 LPC #I
 
clu
                            .d


Data Sheet No.: $US3 -0/-06$/ Procedure No/Rev. N E ~05.3 REV +PC *A Page I of .A oate:*5-9-@1 Workorder Number. ~-0654,?7-000 Thickness Calibration Data Sheet Examiner..
9 EVALUA?3ON 0.F DATA PROWED BY VT-1, CONTATNMENT SURFACES (rwE)
Y MdfK E h?dLJA Level: Date: S- 9-01 t Level: EL Date:$/!/U/
DATA SHEET No: 804541-019 During RFO 21 TWE examitTatioflsit was discovered that the Joint SeaI at the concrete to steel interfice on the 238 level ofthe containment had failed and there was evidence of corrosion in areas of the seal. As a resalt a portion of the circnmferenceof the seal interface area was declared as augmented. ?he joht seal itself was also scheduled for replacement duringRFO-22.
Drawing NumberlRev.:
At the start ofW0-22 the examinersperformed;he reqniredVT-1 examinations of the augmented area at thejoint Seat to detemine ifany changes bad o c c u ~ r e dduring the last operating cycle. The results afthat examinationreveal no changes identifiedin the augmented a n a After the VT-1 examinatomwere cornprete the ptocess began for the joint seal replacement. A band of paint was removed h m the concrete floor up the steel contabment approximately6 wide for the full circumference. The recessed area for the joint seaI was aIs0 cleanedin preparation for the new seal installation. At this point a VT-3 examinationswas performed which identifieda band of pitting that covered much ofthe 3600-Begree circumference. A more detailed VT-1 was ordered by the Responsiie Engineer to detail this area prior to pamt/seaI instdlation.
62 02-2 EEv 0 Plant Location:
Thisjoint seal area was identSed as an issue inthe early 1990s. (ER-99-1594deals with the issues from the 1990s resolution). In 1993 the joint seal area was cleaned and painted so as to form a paint joint seal at the mncfete to seal interface. The 2t~easidentifiedduring the RFO-21 examinations were areas that were experiencing evidence of corrosion and paint loss in this pdinteajointarea Some of the paint was still intad and providing adequate protection for the steel it was covering.
DfZY UELL 232'el.d Material:
The new areas of pitting in the area of the joint seal are as a result of the coating removal to white metal in this area. This atea was not previously identified during RFU-21 because it was an old area of pitting that hadbeencoveredbythe1993 ~ g a n d h a d n o t e ~ ~ c e d a n y ~ e r d Asaresultofthe      e~tim coatings being completely removed h m thisjoint area, this VT-1 examination was able to map this region without the impedance of any obmructioa The areas of pitting are isolated to the general area of the joint seal &&ace between the concrete and the steel. The pitting subsides as it move up or down out of thejointseal area. This was evident when a portion ofthe steel smfitce was exposed as a result of the removal of a concrete chip. The under slnface area exposed was approximately 9 wide and 3 deep in a crescent shape. The worst case pitting is isolated to a band in the joint seal areafromapproximately % wick to approximately 1 wide and is clescrii in the report as areas with general wastage and connected pitting All corrosion identifiedwithin this report is bounded by evaluation VYM 99/139.Based on this evaluation all aeas are well within the requmd design base metal t h i c a e s aed are acceptable for continued operation as is.
6ON STEEL Product Form: trl EO U 6 F( 7 Nominal Thickness:
e  phcmell Rewmiblle Engineer May 11,2001
1 .O " # 2,s " Evaluation Required:
Yes (4 No { ) ~~ Instrument Instrument Make: PANA M R1<1L's Instrument Model: 2 6 0 L PL 5 Instrument S/N: 9 3 1 2 9387 Instrument Display: CRT ( ) Digitat (4 Horizontal Linearity Performed?:
Yes ( } No (v I ANII: . Date: K-fY-! E/C i-F Calibration Block Serial Number: E/C 1- 2 Calibration Blodc Material:
CAR 8pA S?EC I Product Form: W U 6 ti7 Block Temperature:
7 5 OF mim~sss: o~ud', oI099", ima'', z.oool~, zsaz 'n, 3,601 M&E Used?: Yes ( ) No (4 M&TE Description
/S/N: Page t of 1 NE 8053 Original LPC#I - Calibration Times Initial Calibration:
0000 Check: d/A Check: NIA Check: Check: Final: 1OS4
* Sketch and Examination Results: E A E ; Reviewer:
Date: s'.i~* 0 It Form Number: Experience Hours Credit: 
.. ... ., .. ' c 3 Work Order No.: 00 .e 3 7 Visual Examination Report Form VT-1, Containment Surfaces @WE) Procedure No/Rev.: /vE 80 y5 ,&E v- 1 . Page / of 6 Date: 5-9-0/ Cornnonent
:racks/L,inears
'hysical Damage :orrosion irosion 3ouges Near Evaluation Required?
c VYNEF 8045.02 NE 8045 Rev. I Page 1 of 1 Vermont Yankee VYNEF. 8045.04 NE 8045 Original Page 1 of 1 LPC #I 
- Vermont Yankee uaminer: Level: ~4 Date: 4 :viewer: Y Date: :viewer: Nh Date: dh NII: A# Date: e-//-@/ VYNEF 8045.04 NE 8045 Original Page 'I of 1 LPC #I 
.. , . :' c lu .d . . - ._ . - .. . .


9 EVALUA?3ON 0.F DATA PROWED BY VT-1, CONTATNMENT SURFACES (rwE) DATA SHEET No: 804541-019 During RFO 21 TWE examitTatiofls it was discovered that the Joint SeaI at the concrete to steel interfice on the 238' level ofthe containment had failed and there was evidence of corrosion in areas of the seal. As a resalt a portion of the circnmference of the seal interface area was declared as augmented.
Work Order  NO.:^ 00.5037-004 w
?'he joht seal itself was also scheduled for replacement during RFO-22. At the start ofW0-22 the examiners performed
Vermont Yankee                                                    IPC Procedure NolRev.:&'FS??P7       4b. R Visual Examination Report Form for VT-3 Moisture Barriers, Gaskets and Seals (!WE)             Page   1   of   1     Date: ~ - l ~ -
;he reqnired VT-1 examinations of the augmented area at the joint Seat to detemine if any changes bad occu~red during the last operating cycle. The results afthat examination reveal no changes identified in the augmented ana After the VT-1 examinatom were cornprete the ptocess began for the joint seal replacement.
1
A band of paint was removed hm the concrete floor up the steel contabment approximately 6" wide for the full circumference.
                                                                                          ~~
The recessed area for the joint seaI was aIs0 cleaned in preparation for the new seal installation.
Vituat Aids         Illumination Level Check                 Photo/Sketch Other (Describe]:
At this point a VT-3 examinations was performed which identified a band of pitting that covered much ofthe 3600-Begree circumference.
A more detailed VT-1 was ordered by the Responsiie Engineer to detail this area prior to pamt/seaI instdlation.
This joint seal area was identSed as an issue in the early 1990's. (ER-99-1594 deals with the issues from the 1990's resolution).
In 1993 the joint seal area was cleaned and painted so as to form a paint joint seal at the mncfete to seal interface.
The 2t~eas identified during the RFO-21 examinations were areas that were experiencing evidence of corrosion and paint loss in this pdinteajoint area Some of the paint was still intad and providing adequate protection for the steel it was covering.
The new areas of pitting in the area of the joint seal are as a result of the coating removal to white metal in this area. This atea was not previously identified during RFU-21 because it was an old area of pitting that hadbeencoveredbythe 1993 ~gandhadnote~~cedany~erde~tim Asaresultofthe coatings being completely removed hm this joint area, this VT-1 examination was able to map this region without the impedance of any obmructioa The areas of pitting are isolated to the general area of the joint seal &&ace between the concrete and the steel. The pitting subsides as it move up or down out of the joint seal area. This was evident when a portion ofthe steel smfitce was exposed as a result of the removal of a concrete chip. The under slnface area exposed was approximately 9'' wide and 3" deep in a crescent shape. The worst case pitting is isolated to a band in the joint seal area from approximately
%" wick to approximately 1'' wide and is clescrii in the report as areas with general wastage and connected pitting All corrosion identified within this report is bounded by evaluation VYM 99/139. Based on this evaluation all aeas are well within the requmd design base metal thicaes aed are acceptable for continued operation as is. phcmell May 11,2001 e Rewmiblle Engineer Work Order  NO.:^ w 00.5 037-004 IPC Procedure NolRev.:&'FS??P7 4 b. R Vermont Yankee Visual Examination Report Form for VT-3 Moisture Barriers, Gaskets and Seals (!WE) Page 1 of 1 Date: ~-l~-~/ Vituat Aids ~~ - Illumination Level Check 1 Photo/Sketch Other (Describe]:
Evaluation Required?
Evaluation Required?
Yes I No WNEF 8047.08 NE 8047 Original Page 1 of 1 Data Sheet No: 2?H Work Order No.: 60 -0Os037- Procedure NolRev.: AEpdy7&. 0 Vermont Yankee Visual Examination Report Form for VT-3 Other (Describe):  
Yes   I No W N E F 8047.08 NE 8047 Original Page 1 of 1
.&**5-%0/
 
Level Date -.fey-#/ Level rJh Date Date 3yt4b/ Reviewer:
Data Sheet No: 2?H Work Order No.: 60 -0Os037-Vermont Yankee Visual Examination Report Form for VT-3             Procedure NolRev.: AEpdy7&. 0 Other (Describe):
Nh Date 4~ Date Evaluation Required?
                                            .&*5-%0/
ayes @NO SLC -&: S WNEF 8047.07 NE 8047 Original Page 1 of 'I Visual Examination Report Form for General Visual (IWE) page / of 1 Date: /?//6./00 Component Date Y Level Examiner:
Evaluation Level         Date -.fey-#/               Required?
VYNEF 8047.06 NE 8047 Original Page 1 of 1 VYNEF 8047.06 NE 8047 Original Page 1 of 1 ....... - -
ayes Level   rJh   Date
I Work Order No.: 00 0 50 35 Visual Aids 0 Binoculars Vermont Yankee Procedure NolRev.: dE 90 7/0&:9+&..
                                                                                  @NO Date 3yt4b/                             SLC Reviewer:         Nh             Date   4~
Visual Examination Report Form for General Visual (IWE) Page I cf Date: /S//l;./OQ 9 Photo Sketch Method "bne IZHJone 6ect t Component Q Mirror &ght Source 0 6" Scale 0 Attached 10 Attached 1 u Remote Examination location 0escriptj.on~Remarks  
Date
&&id&d IS fi~ Gitaj~Ik - Remote Examination ConditionslEquipment Remarks f .. Examiner:
                                                                        -&:S W N E F 8047.07 NE 8047 Original Page 1 of 'I
Level Date I Reviewer:
 
Date Reviewer:
Visual Examination Report Form for General Visual (IWE)             page   / of 1 Date: /?//6./00 Component Y
Date /uh?/ZL ANII: Date to-t?d - i VYNEF 8047.b6 NE 8047 Originat Page 1 of 7 ----
Examiner:                     Level          Date VYNEF 8047.06 N E 8047 Original Page 1 of 1
t Data Sheet No: m6- 3 Binoculars 3 Mirror kght Source 0 6" Scale Vermont Yankee Visual Examination Report Form for General Visual (IWE) @%one mane dect D Attached 0 Attached Remote Examination Location OescriptionlRemarks k%W;dqS;d is E&M Clfr3~lk Remote Examination Conditions/Equipmcnt Remarks do& f~ lsCt+X;d,~
 
04 &/A Work Order No.: . 00 - 0 SO 3 5 Procedure NoiRev.: go 7/on;9..'pc Page / of 1 Date: /#//6/00 Component 3rawing NolRev.: a&
VYNEF 8047.06 NE 8047 Original Page 1 of 1
* 4z 473 Location:
 
Visuat Aids 1 Photo I Sketch I Method Examiner:
I                                                                    Work Order No.00       0 50         35 Vermont Yankee                                   Procedure NolRev.: d E 90     7/0&:9+&..
Level Date Review e r : . Date VYNEF 8047.06 NE 8047 Original Page 1 of 1 -- .. - - -
Visual Examination Report Form for General Visual (IWE)                               Page   I   cf       Date: / S / / l ; . / O Q    9 t                                                    Component Visual Aids                  Photo                     Sketch                       Method 0 Binoculars          "bne                             IZHJone             6 e c t Q Mirror
r Data Sheet No: Td6- & - 3 <7 Visual Aids 3 Binoculars Vermont Yankee Visual Examination Report Form for Genera! Visual (IWE) v Photo Skerch Method d&I* &ne Bz6jrect Examination Location Description/Remarks  
                          -0 Attached                       10 Attached         1 u Remote
&jr+ut+w -%Z4L 0 c tl Mirror dght Source 0 6" Scale Remote Exbmination ConditionslEquipment Remarks N /A Examination Results, Details and Comments:
    &ght    Source        Examination location 0escriptj.on~Remarks Remote Examination ConditionslEquipment Remarks 0 6" Scale            &&id&d         IS f  i Gitaj~Ik
Examiner:
                                                      ~
Level Date Reviewer:
f                                                               ..
Date Date /$?/& Date i 0 -pd I VYNEF 8047.06 NE 8047 Oilginat Page 1 of 7 Vermont Yankee Procedure NolRev.: 8b f7/6&''i~kd Visual Examination Report Form for General Visual {!WE) Page f of / Date: /O/J&/dO .I Visual Aids Photo Sketch El Binoculars UiTone GYIGne 0 Mirror 0 Attached 0 Attached U Method drect 0 Remote Examiner:
Examiner:
Level Date Reviewer:
Reviewer:
Date Date /i&/a Date /D-("?d V dght Source Ci 6" Scale 0 Other . MNEF 8047 .Q 6 NE 8047 Original Page 1 of 1 Examination Location DescriptionlRemarks
Level Date Date Reviewer:
&#%L,\LIT dun?% 8 4 Remote Exemination ConditionslEquiprnenr Remarks vi, PLACk6&J x 231 A&, +E j . - - - . . - . . . . . .
              -                                  Date     /uh?/ZL ANII:                                         Date   to-t?d i
t Data Sheet No: sdc- 35? Work Order No.: 00 - 0 SObS D Mirror dght Source 0 6" Scale Vermont Yankee Visual Examination Report Form for General Visual (IWE) a Attached 10 Attached D Remote Examination Location DescriptionlRemarks Remote Examination CanditionslEquiprnent Remarks SjhdL,'''  
VYNEF 8047.b6 NE 8047 Originat Page 1 of 7
'%Zl;*c, 8 4 mJ.4 Procedure NolRev.: -l Page I of f Date: /O//G/BQ ./ Visual Aids 1 Photo I Sketch I -~ -~ - v Method Examiner:
 
Level Date VYNEF 8047.06 NE 8047 Original Page 1 of 1 Work Order No.: ProcedureNoRev.:
t Data Sheet No:     m6-Vermont Yankee Work Order No.:  . 00 -  0 SO  35 Procedure NoiRev.:      go 7/on;9..'pc Visual Examination Report Form for General Visual (IWE)                               Page      /  of    1  Date: /#//6/00        -1 Component 3rawing NolRev.:  a&4z
NE @q5 00 - 00 5b 35%0 Visual Examination Report Form VT-1, Bolting (IWE) Page I of 1 Date: q./?*oI Examiner: - Level:= Date: 1 ' 0 Examiner:
* 473                      Location:
Level: +Date: rJ I& Yes Reviewer:
Visuat Aids    1              Photo              I      Sketch      I              Method 3 Binoculars          @%one                              mane                  d e c t 3 Mirror              D Attached                        0 Attached              Remote k g h t Source        Examination Location OescriptionlRemarks Remote Examination Conditions/Equipmcnt Remarks 0 6" Scale            k%W;dqS;d is        E&MClfr3~lk do&         f~ lsCt+X;d,~04                    &/A Examiner:                                     Level               Date Reviewe r :                                 .Date VYNEF 8047.06 NE 8047 Original Page 1 of 1
Date: 4/(h/ Reviewer:
 
VYNEF 8045.03 NE 8045 Original Page 1 of 1 d I II -. e. - Vermont Yankee DataSheetNo:
r Data Sheet No: T d 6 - &   - 3 <7 Vermont Yankee Visual Examination Report Form for Genera! Visual (IWE) v Visual Aids                    Photo                         Skerch                   Method 3 Binoculars            d & I *                             &ne                 Bz6jrect tl Mirror d g h t Source          Examination Location Description/Remarks Remote Exbmination ConditionslEquipment Remarks 0 6" Scale              &jr+ut+w   -% Z4L     0 c                         N/ A Examination Results, Details and Comments:
Bj693 01 oz Work Order No.: ProcedureNoRev.:
Examiner:                                       Level                 Date Reviewer:                                       Date Date   $/?&
NE wc15 Page 1 of f Date: r/*/9*0t Ob - 00 56 35-00 Visual Examination Report Form VT-1, Bolting o[wlE) 11 Component
                                                          /
/DrawingNoRev.:
Date     i 0 -pd I
4 -19 If 75 . t g163 BoltingLength:
VYNEF 8047.06 NE 8047 Oilginat Page 1 of 7
H/A " Bolting Diameter:
 
EJ/A " I [ I t II --pDp. ~ PhotolSketch Method Examination f Bolting Components Examined Illumination Level Check done 4 direct 6 Place 1 dolting 0 Washers Date 0 Attached 1 0 Remote 10 Removed Bushings 0 Flange Surface Initial 12:to 44cia Visual Aids Intermediate d/A ~~ IJ/p CI Magnifying Glass dunination car~o.: J q-5 Intermediate  
Vermont Yankee                                     Procedure NolRev.:     8b f7/6&''i~kd Visual Examination Report Form for General Visual {!WE)                               Page   f   of   /     Date: /O/J&/dO         .I U
&/A NA n*ICilrror Final r3:45 344-or LightmeterS/N:  
Visual Aids                   Photo                       Sketch                       Method El Binoculars               UiTone                           GYIGne               d r e c t 0 Mirror                   0 Attached                       0 Attached           0 Remote d g h t Source            Examination Location DescriptionlRemarks  Remote Exemination ConditionslEquiprnenr Remarks 4
~5% SO^ Cracks/Linears Corrosion Erosion \ Evidence of Leakage Other(Exdain) 13 /A @/A 4 .. , Examiner:
Ci 6" Scale 0 Other                 .
Level:= Date: q* 19 0 ( Examiner: Level:
                              &#%L,\LIT P LA C  k 6&
rJh - nata. Reviewer:
dun?%
Date: #/&A/ # 0 Yes VYNEF 8045.03 NE 8045 Original Page 1 of 1 .
J   x 8
Vermont Yankee Visual Examination Report Form VT-1, Bolting (rwE) Data Sheet No: (-' J 16- I 4- 5 r,) @%r- o/- a3 Work Order No.: ProcedureNoflRev.:
231 A&, +E           j vi, Examiner:                                          Level                Date Reviewer:                                          Date Date /i&/a Date    /D-("?d V
AJ& mu5 Page f of I Date: 4 19 *d I Ob - 00 56 35-00 Visual Aids Magnifying Glass Mumination carmo.: J + 5 dror -n CondiGonsLimihtions:
M N E F 8047 .Q 6 NE 8047 Original Page 1 of 1
I ldight Source (Describe):
 
PEUm 0 &I- RemarkslObservations LoosefMissing 4 &/A Thread Engagement  
t Data Sheet No: sdc-           35?
/ Thread Damage J \ Galling J \ Coating Degradation r/ I Benflwisted J t I I Physicai Damage r/ I I I Fractured Parts / I J I 'Gouges J Cracksninean J I / I Corrosion  
Work Order No.: 00 0 SObS Vermont Yankee                                   Procedure NolRev.: -l Visual Examination Report Form for General Visual (IWE)                               Page    I    of  f    Date:  /O//G/BQ          ./
/ 1 t 1 Erosion / I lwear < \ n I IEvidence of Leakage 4 4 Examiner:
-~ -~ -                                                                                  v Visual Aids  1              Photo                I    Sketch        I              Method D Mirror              a Attached                        10 Attached           D Remote d g h t Source        Examination Location DescriptionlRemarks   Remote Examination CanditionslEquiprnent Remarks 0 6" Scale            SjhdL,'''   '%Zl;*c,   8 4                         mJ.4 Examiner:                                    Level                Date VYNEF 8047.06 NE 8047 Original Page 1 of 1
Level: E Date: 'f rq ' 0 \ ". Examiner:
 
Level!'& Date: JfA Reviewer:  
Visual Examination Report Form Work Order No.:  00  - 005 b 35%0 ProcedureNoRev.: NE @ q 5 VT-1, Bolting (IWE)            Page     I        of   1     Date:   q./?*oI Examiner:                   -   Level:=     Date:     1   0 Yes Examiner:                       Level: +Date:         rJ I&
/&&& Date: +h$h/ Reviewer:
Reviewer:                                   Date: 4/(h/
Date: Date: /*v4/ 4 0 Yes VYNEF 8045.03 NE 8045 Original Page 1 of 1 - . . - . . . - . . - ...
Reviewer:
1 II Vermont Yankee Data Sheet No: &qaP-@l - a J Work Order No.: ProcedureNoRev.:
VYNEF 8045.03 NE 8045 Original Page 1 of 1
NE 80q5 00 - 00 56 35-00 I Page i of I Date: L/./?*di - Visual Examination Report Form VT-1, Bolting @WE) I Component , I Corrosion 4 f Erosion / W&X d \ I I 1 I L Evidence of Leakaee Other (Explain)  
 
@/A /- I Examiner:
                                                                                                  -- 0. 1 I
Level: *Date: 3
d Vermont Yankee                             I            DataSheetNo:
* 14 0 t Examiner:
Work Order No.:
Level: + Date: SI* Reviewer.
Bj693 Ob  - 0056 35-00 e
Date: 'Il/t~[d~
oz.
I[ Reviewer:
Visual Examination Report Form                                      ProcedureNoRev.: NE       wc  1  5 VT-1, Bolting o[wlE)
Date: Y a Yes VYNEF 8045.03 NE 8045 Original Page 1 of 7 __ .... . ..
Page     1         of     f               Date: r/*/9*0t 11 Component I
r, Data Sheet No: Work Order No.: ProcedureNoRev.:
/DrawingNoRev.:      4 -19 If7 5
8645 8 @r/*/L 01- QLT Vermont Yankee Visual Examination Report Form VT-1, Bolting @WE) 00 - 00 5035-00 Page of f Date: +/%O I Corn pon en t Component m: J Ib c SE System: PCAC It PhotolSketch I Method I Examination I BoIting CornDonenis Examined 11 Illumination Level Check 1) tJ Attached 0 Remote 0 Removed Bushings Flange Surface Visual Aids 'Intermediate d/A d/A 0 Magnifying Glass dunination card/~o.:
[         I
J-S Intermediate d/! db 6m0r dight Source (Describe}:
                                              .t
PEuw u 6# Final 13:6 a*CCt*O( Remote Examination ConditlonCimitations:
                                          --pDp.
LightmeterSM A593 SOJ CaLDueDate:
g163 t
: 4. f3 Coating Degradation I Corrosion I Erosion *f I Wear J: \ \ Evidence of Leakage e a Yes WNEF 8045.03 NE 8045 Original Page 1 of 1 . .. 
BoltingLength: H/A II
- Data SheetNo: W- Ob ... . .. . _- Vermont Yankee Drawing No/Rev.: 4 -19 It?< a .I e163 BoltingLength H/fi " Bolting Diameter:
                                                                                                            " Bolting Diameter: EJ/A     "
I' PhotolSketch Method Examination BoIting Components Examined I Illumination Level Check . ." rp* "9r-B.' n -c -; 3*?;*-*&&
~       PhotolSketch       Method     Examination f               Bolting Components Examined                 Illumination Level Check d o n e              4 direct     6 Place                 1 dolting           0 Washers                                             Date 0 Attached           1 0 Remote 1 0 Removed                   Bushings       0 Flange Surface       Initial           12:to 44cia Visual Aids                                                     Intermediate       d/A   ~~ IJ/p CI Magnifying Glass               d u n i n a t i o n c a r ~ o . :J q   -5                           Intermediate       &/A       NA n*ICilrror                                                                                             Final             r3:45 344-or LightmeterS/N: ~ 5 %       SO^
done drect dplace dolting CI Washers '$$$@&&E&:
Cracks/Linears Corrosion Erosion
Time Date 0 Attached Q Remote Removed Bushings 0 Flange Surface Initial Visual Aids 0 Magnifying Glass mumination carno.: \I J-5 Intermediate I NA I &m*r dight Source (Describe):
                                                                        \
Pcuw u &T Final Remote Examhation Conditiodimitations:  
Evidence of Leakage Other(Exdain)             13/A             @/A                       4                                       #
-. ~. Lightmeterm:  
Examiner:                                               Level:=       Date: q*19     0(
~593 a~q - Rema rkslObservations LooseiMissing rl @/A dA Thread Engagement  
0 Yes Examiner:                                               Level: r-Jh  nata.
/ Thread Damage J Galling J \ Coatipg Degradation r, I BentKwisted J I I Physical Damage c, I I 1 Fractured Parts / I / 1 Gouges .J Cmkfiinears J / Erosion I/ I I Wear J \ n I I Corrosion I f Evidence of Leakage + Yes VYNEF 8045.03 NE 8045 Original Page 1 of 1 . - . .. . . .. .
Reviewer:                                                               Date: #/&A/
Vermont Yankee Data Sheet No: I Work Order No.: 40 - uu +.,/or- 0 0 u Procedure No/Rev.: A/& '?5 / Page / of / Date: 5- 7-c3/ Visual Examination Report Form VT-1, Bolting (IWE) I Bgg&??e; " Bolting Diameter:
VYNEF 8045.03 NE 8045 Original Page 1 of 1
1 Drawing NoRev.: %d20A I I I U PhotoolSketch Method Examination Bolting Components Examined I Illumination Level Check None E Direct II In PIace Rl Bolting 17 Washers Date I I Attached I Remote 11 Removed 10 Bushings Visual Aids Intermediate x - Illumination CardNo.. [ydiat~~~t~~~, Final&g7 Lightmeter SFN: ~/2/53 Cal. Due Date: &#/y4d 0 Magnifying Glass $I Mirror Remote Examination Conditionfimitations:
 
E Light Source (Describe):
Vermont Yankee                                       Data Sheet No: (-' J 16- I 4- 5 r,)   @%r-o/-a3 Visual Examination Report Form Work Order No.:     Ob    - 00 56 35-00 ProcedureNoflRev.: AJ&       mu5 VT-1, Bolting (rwE)
F39s&/9&f L . t OYes PNo VYNEF 8045.03 NE 8045 Original Page 1 of 1 Vermont Yankee VT-1, Bolting OWE) Work Order No.: BO - 0 0 y/@?-o 0 0 Visual Examination Report Form Procedm NoRev.: ?5 &. / Page / of / Date: ,$-q-o/ _c Component Component ID: ,&lie vz -/P - 54 System: s;pa*s Reviewer:
Page        f        of    I        Date:   4 19 *dI Visual Aids Magnifying Glass                   Mumination carmo.: J         +5 d r o r                              l d i g h t Source (Describe): P E U m        0&I-n-                    CondiGonsLimihtions:
I Reviewer:
I RemarkslObservations LoosefMissing               4                                                                             &/A Thread Engagement           /
4 Date: ANII: wp2f&g&d Date: &- J-- e! WNEF 8045.03 NE 8045 Original Page 1 of 1 I - 390 Data Sheet No: 6J Work Order No.: Procedure No1Rev.Z PP 7b s .//c> . 00- 00 56 3 5 Vermont ~inkee Visual Examination Re~ort Form for General Visual-(IWE)
Thread Damage               J                                                                                     \
Page I of Date: '//L/aI / Component Zomponent ID:- System: Tonu c, Irawing No/Rev.: & L. 0 Location:_Fule c :ur Sur.Cpee,<
Galling                     J                                               \
Visual Aids Photo Sketch Method 1 p Binoculars B None lj3 None &) Direct &&a+& 7 Mirror 0 Attached 0 Attached a Remote El Light Source Examination Location Description/Remarks Remote Examination ConditionslEquipment Remarks 3 6" Scale ixamination Results, Details and Comments:
Coating Degradation         r/                                                                                     I I
VYNEF 8047.06 NE 8047 Original Page '1 of 1 i i Data Sheet NO: 4?-ar - 031 Work Order No.: 00 - 3'7 Procedure NolRev,: bOJ7 40 . Vermont Yankee Visual Examination Report Form for General Visual (!WE) Page of 9 Date: <If b/ I I Visual Aids Photo Sketch 0 Binoculars None None 8pcrg.s 3 Mirror 0 Attached fl Attached Method @ Direct &&4 0 Remote Reviewer: - /vfl Date $ light Source 6" Scale Other VYNEF 8047.06 NE 8047 OAginal Page 1 of 1 i - Examination Location Descriptionmemarks Remote Examjnation ConditianslEguipment Remarks z*+rPlOr bJ p Ffie cc c, 4 V&* CCladler EJ/p 
Benflwisted                 J                       t                       I                                   I Physicai Damage             r/                     I                       I                                   I Fractured Parts             /                     I                       J                                   I
'Gouges                       J Cracksninean               J                 I                       /
I Corrosion                   /               1                       t 1 Erosion                     /                                       I lwear                         <               \                       n IEvidence of Leakage                           4                     4 4
Examiner:                                                 Level: E Date:     'f r q ' 0\
0 Yes Examiner:                                                 Level!&
                                                                    '   Date:         JfA Reviewer:                 &
                              /&   &                                   Date:     +h$h/
Reviewer:                                                             Date:
Date:   /*v4/
VYNEF 8045.03 NE 8045 Original Page 1 of 1
 
1                 Vermont Yankee         I          Data Sheet No:   &qaP-@l
                                                                                  - aJ I                                        I            Work Order No.: 00    00 56 35-00 Visual Examination Report Form ProcedureNoRev.: NE 80q5 VT-1, Bolting @WE)
Page     i       of   I     Date: L/./?*di     -
Component
                                          ,           I Corrosion             4         f I          I                              1 Erosion               /       I L
W&X                   d                           \
Evidence of Leakaee Other (Explain)                   @/A             /-             I             Y Examiner:                             Level: *Date:       3
* 14   0t Examiner:                             Level: +     Date:     SI*
a Yes Reviewer.                                           Date: 'Il/t~[d~
I[ Reviewer:                                           Date:
VYNEF 8045.03 NE 8045 Original Page 1 of 7
 
r, Vermont Yankee                                          Data Sheet No:   8@r/*/L 01-     QLT Visual Examination Report Form Work Order No.:  00   - 00 5035-00 ProcedureNoRev.:          8645 VT-1, Bolting @WE)                                        Page                 of     f           Date: +/%O       I Cornpon ent Component m:       J Ib       c SE                                                     System:     PCAC It     PhotolSketch     I   Method     I   Examination         I   BoIting CornDonenis Examined     1      Illumination Level Check 1)tJ Attached             0 Remote       0 Removed                 Bushings         Flange Surface Visual Aids                                             'Intermediate       d/A       d/A 0 Magnifying Glass                     d u n i n a t i o n card/~o.:   J-S                             Intermediate     d/! d b 6 m 0 r                                d i g h t Source (Describe}:   P E u w u 6#                   Final           13:6     a*CCt*O(
Remote Examination ConditlonCimitations:
LightmeterSM A 5 9 3    SOJ CaLDueDate:   4.f3 Coating Degradation I Corrosion                                   I Erosion                     *f                                                                               I Wear                       J:               \                       \
Evidence of Leakage e
a Yes WNEF 8045.03 NE 8045 Original Page 1 of 1
 
Vermont Yankee                                Data SheetNo:     -5        -W-           Ob Drawing No/Rev.:       4 -19 It?<     a. I           e163                 BoltingLength H/fi           Bolting Diameter:               I PhotolSketch     Method     Examination           BoIting Components Examined       I. .-Illumination rp*
                                                                                                        &&*-*;?*3;9r-B. n Level Check    -c d o n e                  drect     dplace               dolting           CI Washers         $$$@&&E&:                   Time       Date 0 Attached               Q Remote     Removed             Bushings       0 Flange Surface       Initial Visual Aids 0 Magnifying Glass                 mumination carno.:         \IJ-5                             Intermediate           I NA I
  &m*r                               d i g h t Source (Describe): P c u w u &T           -. ~.
Final Remote Examhation Conditiodimitations:
Lightmeterm:           ~ 5 9 a3    ~ q RemarkslObservations LooseiMissing               rl                                     @/A                                       d A Thread Engagement           /
Thread Damage               J Galling                   J                                           \
Coatipg Degradation         r,                                                                                             I BentKwisted                 J                                             I                                                 I Physical Damage             c,                   I                       I                                               1 Fractured Parts             /                 I                       /                                             1 Gouges                     .J Cmkfiinears                 J Corrosion                    /             I I                                          f Erosion                     I/                                   I                                         I J             \
                                                                    +
Wear                                                                n                                           I Evidence of Leakage Yes VYNEF 8045.03 NE 8045 Original Page 1 of 1
 
I                Vermont Yankee                                           Data Sheet No:
I Work Order No.: 40 uu +.,/or-00 u Visual Examination Report Form Procedure No/Rev.: A/&         '?5             /
VT-1, Bolting (IWE)
Page        /      of  /            Date: 5-7-c3/
1 Drawing NoRev.:
PhotoolSketch
                    %d20A I
Method I
Examination I
B g g & ? ? e ;
Bolting ComponentsExamined U
I
                                                                                                        "  Bolting Diameter:
Illumination Level Check None                 E Direct       II In PIace         Rl Bolting         17 Washers                                       Date I                                                                 I I
[ydiat~~~t~~~,
Attached                Remote      1 1Removed          1 0 Bushings Visual Aids                                          Intermediate x      -
0 Magnifying Glass                          Illumination CardNo..
  $I Mirror L  .
E Light Source (Describe):   F39s&/9&f                     Final&g7 Remote Examination Conditionfimitations:                                          t Lightmeter SFN: ~/2/53 Cal. Due Date: &#/y4d OYes     PNo VYNEF 8045.03 NE 8045 Original Page 1 of 1
 
Vermont Yankee Work Order No.: B O  - 0 0 y/@?-o0 0 Visual Examination Report Form VT-1, Bolting OWE)
Procedm NoRev.:           ?5 &. /
Page     /         of   /     Date: ,$-q-o/
_c Component Component ID:,&lie   vz -/P - 54                   System:s ; pa *s IReviewer:
Reviewer:       4                   Date:
ANII: w    p 2 f &   g &   d         Date: &-J-- e !
WNEF 8045.03 NE 8045 Original Page 1 of 1
 
I Data Sheet No:           6J     - 390 Work Order No.:     0 0 - 00 5 6    35 Vermont ~ i n k e e                                  Procedure No1Rev.Z   PP 7bs .//c> .
Visual Examination R e ~ o r tForm for General Visual-(IWE)                                   Page     I of           Date:   '//L/aI       /
Component Zomponent   ID:-                                                         System:   T o n u c, Irawing No/Rev.:     &     L. 0                                 Location:_Fule c :ur   Sur.Cpee,<
Visual Aids                     Photo                       Sketch       1                Method p Binoculars           B None                             lj3 None               &) Direct   &&a+&
7 Mirror                 0 Attached                         0 Attached             a Remote El Light Source         Examination Location Description/Remarks     Remote Examination ConditionslEquipment Remarks 3 6" Scale ixamination Results, Details and Comments:
VYNEF 8047.06 NE 8047 Original Page '1 of 1     i


-   
i Data Sheet NO:      4?-ar  - 031 Work Order No.:    00 -      3'7 Vermont Yankee                                  Procedure NolRev,: bOJ7    40        .
*  
Visual Examination Report Form for General Visual (!WE)                                Page        of 9    Date: <Ifb /      I Visual Aids                  Photo I        Sketch
.. - . ._ . . . - 
                                                                            @ Direct Method
                                                                                        &&4 0 Binoculars            None                              None 8pcrg.s 3 Mirror              0 Attached                        fl Attached          0 Remote
$ light Source        Examination Location Descriptionmemarks Remote Examjnation ConditianslEguipment Remarks 6" Scale            z*+rPlOr      bJp Ffie cc c, 4 Other              V&*    CCladler                          EJ/p Reviewer: -     /vfl                        Date VYNEF 8047.06 NE 8047 OAginal Page 1 of 1    i


. .- . .. .
rs
rs


INSERVICE DISCREPANCY REPORT (IDR) IDR #: Jm Date: 5/2/ZOOl, Location:
INSERVICE DISCREPANCY REPORT (IDR)
Dwell
IDR #: Jm Date:   5/2/ZOOl, Component:.-Y                                   Location: D w e l l Performed By:                                       Date :
* Component:
Disposition/Repair:
Y-. Performed By: Date : Disposition/Repair:
ISI Program Coordinator:                             Date:
ISI Program Coordinator:
Repair Ef f o r t ;
Date: Repair Ef fort ; Reference Document:
Reference Document:
Repair Completion Date:
Repair Completion Date:
Service Induced: YES - NO BY: Date: ~- Sample Pxpansion Required:
Service Induced:                         YES - NO           BY:       Date: ~-
YES .- NO BY: - Date: -, Sample Expansion:
Sample Pxpansion Required:               YES -. NO     BY: - Date:     ,-
IS1 Program Coordinator:
Sample Expansion:
Date : Reinspection Required:
IS1 Program Coordinator:                             Date :
YES NO - BY : Subsequent Inspection Required:
Reinspection Required:                       YES       NO -BY :
YES - NO - BY : IS1 Supervisor Notified:
Subsequent Inspection Required: YES                 -   NO -BY :
IS1 Program Coordinator:
IS1 Supervisor Notified:
Date : . Reinspection Completed Satisfactorily:
IS1 Program Coordinator:                             Date:
IS1 Supervisor
. Reinspection Completed Satisfactorily:
: Date : IS1 Program Coordinator:
IS1 Supervisor :                                     Date:
Date : IDR Closed: VYAPF 4027.01 AP 4027 Rev. 4
IDR Closed:
* Page 1 of 1 . . - . . . . . . . . . -
I S 1 Program Coordinator:                           Date :
I Datasheet No: -6v- 360 Work Order No.: 00 - 00 56 5s Vermont Yankee Visual Examination Report Form for ~~ Procedure NolRav.: @ 702 4 /O Page i of / Date: !/l&,/O) t General Visual {IWE) 3 Mirror C tight Swrce D 6* Scale 0 Attached 0 Attached 0 Remote Examhation Location Desm*ption/Remarks Remote Examination ConditianslEquipm ent Remarks Reuiewer:. , Date #/A WNEF 8047.06 NE 8047 Originat Page 1 of 1 : 
VYAPF 4027.01 AP 4027 Rev. 4
* Page 1 of 1


Procedure NolRev.: 0 Vermont Yankee Visual Examination Report Form for I General Visual (IWE) Page / of Date: f/3o/i / Component Component ID: -X- 7 4 1 +eL, / e75 systm: Qw d iocation:, &+y 7Q%w 1 39tb- v/ Drawing NotRev.: Visual Aids photo Sketch Method p None p!$ None f!!f Direct 644 a Binoculars U Mirror 0 Attached 0 6" Scale &+t,-,(k~IIda~
I Datasheet  No:        -6v-    360 Work Order No.: 0 0 -  00 56 5s ~~
gKkrwYI 0 Attached U Remote tight Source &amination LWatian Description/Rema&s Remote Examination CooditionslEquipment Remarks 44 Level Level Date Date Examiner:
Vermont Yankee Procedure NolRav.:  @ 7024 /O Visual Examination Report Form for General Visual {IWE)                            Page    i  of  /    Date: !/l&,/O)        t 3 Mirror          0 Attached                      0 Attached          0 Remote C tight Swrce      Examhation Location Desm*ption/Remarks Remote Examination ConditianslEquipment Remarks D 6* Scale Reuiewer:.      ,                        Date  #/A WNEF 8047.06 NE 8047 Originat Page 1 of 1      :
 
Vermont Yankee                                    Procedure NolRev.:              0 I
Visual Examination General Visual       (IWE)Form for Report                              Page     / of           Date: f/3o/i   /
Component Component ID:     -X- 7 4 +eL, 1        /   e75                         systm:       Q wd Drawing NotRev.:    3 9 t b - v/                                iocation:, &+y       7Q%w   1 photo                     Sketch                       Method Visual Aids p None                           $!p None             f!!f Direct 6    4    4 a Binoculars U Mirror               0 Attached                        0 Attached         U Remote tight Source          &amination LWatian Description/Rema&s Remote Examination CooditionslEquipment Remarks 0 6" Scale             &+t,-,(k~IIda~     gKkrwYI 4 4 Examiner:                                    Level Examiner:                                    Level Reviewer:                                    Date Y                                          4.h Reviewer:                                    Date VYNEF 8047.06 NE 8047 Original Page 1 of 1
 
Vermont Yankee                                    Procedure NolRev.:  PP 7QJ-9/0              .
Visual Examination Report Form for General Visual (IWE)                                  Page    /  of        Date:    f / J C /df    I Component Component ID:        x- 8                                              System:    bhv      cM Visual Aids                    Phbto                        Sketch                        Method El Binoculars            @ None                              B None              @ Direct      &rJ        +a+&
0 Mirror                0 Attached                          0 Attached           U Remote
/2U Light Source         Examination Location DescriptionlRemarks    Remote Examination ConditionslEquipment Remarks L7 6 Scale              aaad, U.            U t a -              NtR 0 Other
          ~-              ~-
x - f3                                    ~
Examination Results, Details and Comments:
Examiner:      &/A                              Level      .I/A      Date    d.4 Reviewer:      d3/A                            Date      d/A Reviewer:      #!A                            Date      A)/A VYNEF 8097.06 NE 8047 Original Page 1 of 1
 
Data Sheet No:            -
                                                          %0q7 - o( 043 Wark Order No.:    00 - 5 0 3&
Vermont Yankee                Procedure NolRev.:  86 d7    40 Visual Examination Report Form for General Visual (IWE)            Page    I  of. 1 Date: "/3&/OI Examiner:    dl4              Level >I!  Date  Al/P.
Reviewer:                      Date Y
Reviewer:    /v/A              Date N/A W N E F 8047.46 NE 8047 Original Page 1 of 1
 
Vermont Yankee                            Procedure Nomev.:  bo f? RO Visual Examination Report Form for General Visual (IWE)                          Page    /  of  1    Date: &&/
-~
Component Component ID:      x- lo                                      System:    3 ~c3r  4 L4 Drawing NolRev.:    s i30    ci//                        Location: A~J            4&/ L Visual Aids                  Photo                Sketch                      Method 0 Binoculars            None                    Bp None              # Direct  &d 0 Mirror              Q Attached                0 Attached          13 Remote Examiner:
Examiner:
Examiner:
Level Level a*4 Date Date V~&I
                                                                    .r/A  .
Reviewer:4 Y
D      D      a      t    e fioA/
Reviewer:          MfA                    Date  v2 VYNEF 8047.06 NE 8047 Original Page 1 of 1
Work Order No.:- QO  503b Vermont Yankee              Procedure NolRev.: go47 R 0 Visual Examination Report Form for General Visual (IWE)            Page    /    of  1  Date: %?k?/C3[
Component x- I (
I Component ID:                                  System:-
I  Light Source W N S 8047.0.6 NE 8047 Original Page 1 of 1
I                  Vermont Yankee Work Order No.: Q O - @      50 3's Procedure NolRev.:  PP 7 6 24 g/D Visual Examination Report Form for General Visual (IWE)                                Page        of  1    Date:  !h~ci/4j Component Visual Aids                    Photo                    Sketch                      Method Cl BinocuIars          9 None                            $9 None              @ Direct  0~~~      Q.
0 Mirror Light Source          Examination Location Description/Remarks Remote' Examination ConditionslEquipment Remarks I
I 0 6' Scale                                                          aI.4
' 0 Other                1      x-  l')c                          I 1 Examination Results, Details and Comments:
Examiner:  d/la Reviewer:  r//A                                Date    41 Reviewer: - 44                                  Date    Nh ANI!:                                          Date    //?!*(
1' VYNEF 8047.06 NE 8047 On'giflal Page 1 of 1      \
Data Sheet No:      6-  GU- f g t Vermont Yankee                Procedure NolRev.: f?y76 2 y / o Visual xamination Report Form for                                        8 General Visual (IWE)            Page        of  /    Date:  :/l-c/ot    J Component Component ID:  -
X 13 A    4-13                  System:    bA A        d  *rJC Xe&4,i>
                                                                              &L-L 0 Mirror VYNEF 8067.06 NE 8047 Original Page 1 of 1
e        Data Sheet No:  go L/7 - 0 I -Dfco Work Order No.:    00      50 37 Vermont Yankee                                    Procedure Nomev.:      047 R o Visual Examination Report Form for General Visual (IWE)                                Page    i  of  (    Date:  j///d/
Component
:omponent ID:    -x* / 4                                            System:
3rawing NolRev.:
Photo                      Sketch                      Method 7 Binoculars          W None                              None              p00irect  &&-&
3 Mirror              f 3 Attached                        0 Attached          f3 Remote p Light Source        Examination Locetion Description/Remarks 1 Remote Examination ConditiondEquipment Remarks 7 6" Scale I] Other 0
Saminer:                                      Level                Dats M N E F 8047.Q6 NE 8047 Originat Page 1 of 1
Vermont Yankee                                        Procedure NolRev.: gOV7        k o Visual Examination Report Form for General Visual (IWE)                                      Page        of  I    Date: ~/</oJ        I Component
:omponent 10:        -x- /5                                                System:  3rc4 d c t x Irawing NolRev.:    P            4/                                  Location:
I                        U Visual Aids                        Photo                        Sketch                      Method 3 Binoculars                  None                                None                  Direct  6 - 4 3 Mirror                  U Attached                          I3 Attached          Cl Remote 81 Light Source            Examination Location DescriptionlRemarks    Remote Examination ConditionslEquipment Remarks J  6" Scale                ak~~6"QCM 3 Other                  btqwclL            YhJe Examiner:                                          Level    9.'
J%
Date  d7l.t Examiner:                                            Level    r//A        Date  uh-Reviewer:
U Date    Qfb, Reviewer:                                            Date    #b ANII:                                                Date        s-@/
VYNEF 8047.06 NE 8047 Originaf Page 1 of 1      1
I
* Data Sheet No:  m e - 6J-            38 f I                  Vermont Yankee Work Order No.:  00- 04    50 3s Visual Examination Report Form for Procedure NolRev.:  Pp    7&3-c(/c,'
General Visual (IWE)                                Page      f  of        Date: ! / / 6 , / 6 j  t Component Component ID:      X 1b A                                            System:
k Drawing NolRev,:        -
                      .<?h, q/                                      Location:  ~sL.A!          s ~ A    ts4-U Visual Aids                Photo                        Sketch                      Method 5 Binoculars          @ None                            C@ None                Direct    6 6~ 4 *C 0 Mirror              0 Attached                        El Attached          D Remote I$ Light Source      Examination Location DescriptionlRemarks    Remote Examination ConditionslEquipment Remarks U 6" Scale            BFpuY            & J & & I h                q4 D Other                x -/&A t
5p*&tq Examiner:  LE U                                Level              Rate !/lb /Q /
Examiner:    MA                              Level    e/!        Date    $/A Reviewer:    &/A                              Date    41~
Reviewer: - d/A                                Date  d A VY NEF 8047 .U6 NE 8047 Original Page 1 of 1      i
Vermont Yankee                  Procedure NolRev.: 930 L/7 RO Visual Examination Report Form for General Visual (IWE)              Page    1  of      Date: 5///0/
Component VYNEF 8047.06 NE 8047 Original Page 1 of 1
Work Order No.:
Vermont Yankee                                  Procedure NolRev.:  /?p70 ; t V 10.
Visual Examination Report Form for General Visual (IWE)                                Page    /  of    I  Date:  1/16 / o /
Component Visual Aids                  Phbto                      Sketch                        Method 0 Binoculars          I$, None                              Nons              4~ Direct    t r 4 ~ * ~ o . ~
0 Mirror              0 Attached                        0 Attached          D Remota
$ Light Source        ExaminationLocation Oescription/Remarks  Remota' Examination ConditionsiEquipment Remarks 0 6" Scale                          &&Mi d            Ad        "/A
[3 Other            t    x-r7 Examiner:    d//3                            Levet                Date  d/A Reviewer:    Hh                              Date    E.1/A Date    .z/A Date    /-3P/
VYNEF 8047.06 NE 8047 Originaf Page 1 of 1
6- 6 V - 377 I                                                  8 Data Sheet N c x 3 - 2 )
Work Order No.:      Don 0 0 50'35 Visual Aids              Photo                        Sketch                        Method 0 Binoculars    @None  .                          IjZ None                  Direct  &ea a r o-L 0 Mirror        D Attached                        13 Attached            0 Remote Light Source  Examination Location Description/Remarks Remote' Examination ConditionslEquipment Remarks D 6" Scale fhyrrcb AI@.6 8
Examiner:                                LeveI&T.rJu*L Date          1/l&./O      1 Examiner:  Ah%                          Level      A#          Date  IJ/A Reviewer:    &A                          Date    &/A Reviewer:                                Date    dh VYNEF 8047.06 NE 8047 Original Page 1 of 1      I
I Data Sheet NO:    ZW- b d - 378 Vermont Yankee Work Order No.: 00 90 5 0        fs Procedure NolRev.:,  P?p7 02(//0        ,
Visual Examination Report Form for General Visual (IWE)                              Page -  I  of -,  I    Date: !/'/b/~/    t Component Visual Aids                  Photo                      Sketch        I                Method Binoculars          LX? None                          03 None            I    Direct  6*3&  r*L 0 Mirror              0 Attached                        0 Attached            I3 Remote Light Source        Examination Location Description/Rernarks Remote Examination CanditionslEquiprnentRemarks 0 6" Scale            bq      Jrt(  P*dcMr*                    %
0 Other                    k- 19 Examiner:    dh                              Level    ~2          Date  NA Reviewer:                                    Date    A/A Reviewer: -                                  Date ANII:                                        Date    /43/4/
I' VYNEF 8047.05 NE 8047 Original Page 1 of 1 i
Vermont Yankee                                            Procedure NolRev.:_dO  $7 Ro Visual Examination Report Form for General Visual (IWE)                                        ?age    /  oi i      Date:qA,/o/
I Component ID:              x- r9 Component system:  3& k )\c/cI Drawing No/Rev.: 5 2 0 -        //
I
                                            ~~
Visual Aids                            Photo                    Sketch                    Method c1 Binoculars                  ga None                          pb: None            FDirect    6*4LIc.vQ 0 Mirror                      C3 Attached                      Cl Attached          0 Remote Light Source                Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks 0 6' Scate                      si+JzR&d            5tllLcp-              n//p 0 Other                      7 %I*)LN              I 4W&
Examination ~ e s u l t s ,Details andcomments:
    &*/f-s        #f k            s ci;Ad/r& nyu                          3444&4r,              U b.*      be co+cp;ficd.
b 5 f haminer:                                                L e v a l e          Date  chh 1 Examiner:                                              Level  &/A          Date  &h Reviewer:%.e a
            *t Reviewer:                                              Date W N E F 8047.M NE 8047 Original Page 1 of 1
Vermont Yankee                                  Procedure NofAev.: pp 7oA4 /o Visual Examination Report Form for General Visual {IWEI                                page    f  of  /  Date: !//~/uI        I Component Component ID:    x                                                  System:
Visual Aids      I            Photo                      Sketch                      Method 0 Binocutars            FjtNone                        @ None              PDirect  6
* c ~
* p b ~
0 Mirror f&fLight Source          Examhation Location Descriptim/Remarks Remote-Examination ConditionsEquipment Remarks 0 6 Scafe                bq      4      PcAcht*+. aL\          q4 0 Other                IXJZO                                  I Examination Results, Details and Comments:
Examiner:  ~h                                Level  &/A        Date  Ab!h l  Reviewer:  /J/A                              Datenl/A.,
VYNEF 8097.06 NE 8047 Original Page 1 of 1 i
I Data Sheet No: E M 6 -    gdm3 7 b Work Order No.:    BO- 00      S O 4s Vermont Yankee                                      Procedure No/Rev.:  *#?P7o*f/u Visual Examination Report Form for General Visual (IWE)                                    Page      1 _of 1        Date:  //I610 /    t Visual Aids                    Photo                      Sketch                          Method
@Binoculars              *None                            Q None                  p) Direct  &A  c(    L 0 Mirror                D Attached                        0 Attached            I 0 Remote
                                      ~.
I ExaminationLocation DescriDtionlRernarks 1 kernote. Examination ConditionslEquipment Remarks
                                        ~ ~~
%Light Source 0 6" Scale 0 Other                1 X-                                      I
                                      ~. -    __
Examination Results, Details and Comments:
Reviewer:    ~ I A                              Date    e/#
VYNEF 80.47.06 NE 8047 Original Page 1 of 1
Data Sheet NO:  2        -6      37Y Work Order NO.:  oo*oo 5 0 33 Vermont ~itnicee                        Procedure N o I R e v . : y p 7d 2  f/b Visual Examination Report Form for General Visual (IWE)                        Page    /    of          Date:  !//6hL      r Component Component ID:    X -# LL,                                  System:    Bfi? d          4 Visual Aids                  Photo                Sketch                        Method sf3inocutar.s            None                  poria                    Direct      64+4*L El Mirror              0 Attached              fl Attached Examiner:    d/A                        Level  dh          Date  ry/A Reviewer:    &/A                        Date  A//A Reviewer:- $/A                          Date  ni/A VYNEF 8047.06 NE 8047 Original Page 1 of 1      t
C Data Sheet  NO:  SOy7- O / 037      1 Work Order No.:    Po - 5 0 3 7 Vermont Yankee                                  ROCedW8  NoiRev.:  g047 L o Visual Examination Report Form for General Visual (IWE)                              Page      /  of  /    Date:  5//0/
Component Component    ID:  x* A 3                                            system:    -&.I    d  c &i Drawing NolRev.:
Visual Aids s!!&w@    d/ Photo                          Location:
Sketch 3/z..d  t    4 Method c1 Binoculars        @ None                                None                  Direct  br,~u*rzc(l 0 Mirror              0 Attached                          0 Attached          El Remote Examination Location Description/&marks    Remote Examination ConditionsEquipment  Remarks Other          -
f Reviewer:                                    Date ANII:                                          Date  & o /
WNEF 8047.06 NE 8047 Original Page 1 of 1
Vermont Yankee Visual Examination Report Form for General Visual (IWE)
Component Procedure NdHev.:
Pa98        Of    1 PP 7 0 2 ' f / 0 Date: ?//&Id t
I Component ID:        x-A3                                            System:    ~  H  L3W e a Visual Aids                  mota                        Sketch                      Method p Binocu!ars            b None                            $B None            E, I Direct    &a&*  cQIC.
0 Mirror                CJ Attached                        0 Attached        10 Remote pS Liiltt Source        Examination Location DescriptionlRemarks 1 Remote ExaminationCanditionslEquipment Remarks 0 6" Scale              3ftSLJ-a      a.J*u;Or\
Reviewer:  - '14                                Date  @/u
            /
I/
bate                                                              I 4
VYNEF 8047.06 NE 8047 original Page 1 of 1 i.
C Data Sheet No:  8047 @D/-O3 b Work Order No.:    00          3'7 Vermont Yankee                                      Procedure NoJRev.: yo $7 L o Visual Examination Report Form for General Visual (IWE)                                    Page    / of        Date:<A/o      I Component Component 10:        K-29                                                system:  3 4 L3C.u Drawing NolRev.:      5- $41                                        Location:  -44    I pluu Visual Aids                    Photo                        Sketch                      Method I3 Binoculars            p None                              Pp None            @ Direct 61~.++4~4 0 Mirror                0 Attached                          D Attached          0 Remote 9fUght Source            Examination Location DesctiptionlRernarks Remote Examination ConditionsEquipment Remarks 0 6" Scale                2=*.3.(Fd 0 Other                Ab,
                                            &IL*&
4c. bL ye@&'
N/A.
Examination Results, Details and Comments:
H' Examiner:
Y Level  9      s        Date  s"/,,h  /
IIReviewer:
Reviewer: -      .'/A Date Date f///. f VYNEF 8047.06 NE 8047 Original Page 1 of 1
fi r
Data sheet No:          6Jn      37%
Work Order No.:    00-00    SO35 Vermont Y b k e e                                Proceciwe N~IEW.:,  PP 7 b A c j / D    '
Visual Examination Report Form for General Visual (IWE)                              Page -      1 of  -I    Date: !//C/O            I Component Component IO:      X%+                                              System:      /t~)cs 4 5 9 a-0  - Yf                                            E~-L,,A Drawing NoMev.:                                                  tacatim:
Visual Aids                  Photo                      Sketch                      Method ino oculars          W None                            @ None              PDitect    LS&d**L t
CI Mirrar              0 Attached                        0 Attached          a Remote Light Source        Examination Lacation DescriptionlRemarks  Remote Examination ConditionsEquiprnent Remarks I3 6* Scale D q w 4      PLW4-n 1
H W N & 00d7.06 NE 8047 Original Page 1 of t I
VYN$8047.06 NE 8047 Original Page 1 of 1      i
c I
                                                                    ~ a t meet a    NO:  Zwe    -t    ~ 37/
1 work order NO.:    00 - 00 SO35 Vermont Yankee                                    prOCeChU8 NOmeV.:  /?  7d  d. / O    .
Visual Examination Report Form for General Visual (IWE)                                  Page    /  of  1    Date: ! / J L A      t Component Component tD:      X - Ab                                            System:    .3  t ~ rA 6 4 Visual Aids                      Photo                      Sketch                      Method 0 Binoculars            mNme                              SNanr,              ~ aDirect
                                                                                      ,      6
* r- , ~L-Mirror                0 Attached                        D Attached          0 Remote p Light source          Examination Location DescriptiodRemarks Remote Examination CanditionslEqrripmentRemarks U 6" Scale            ' B f i p d P~c&#&                          VA 0 Other                1.
Examination Results, Oeta3s and Comments:
WNEF 804'7.06 NE 8047 Original Page 1 of 1 i
Vermont Yankee                                Procedure NdRev.:    8d d7 k!O        .
Visual Examination Report Form for General Visual (IWE)                              Page    /  of  I    Date: $ff&            t t                                                  Component 1 Component ID:                                                      System:    h-    L3 *4 Visual Aids                Photo                      Sketch                      Method  @
c1 Binoculars        $ None                            @! None              /Z Direct L      a    d 0 Mirror            0 Attached                        0 Attached            0 Remote
  @ Light Source      Examination Location DescriptionlRematks Remote' Examination ConditionslEquipment Remarks 0 6- Scale            # w d 4Y&.CA&k.
0 Utherphq                d 4 &&e.
1 Reviewer:        44                        Date    5%
VYNEF 8047.06 NE 8047 Original Page 1 of 'I    i
Data %et  No:        6 bf*            evv  1 work Order NO.: 0 0 .. 4 0 5 0 35 Vermont Yankee                                    Procedure NolRev.: pp 761!//0.
Visual Examination Report Form for General Visual (IWE)                                  page    I  of  /    Date: ! / 1 6 / a L  I D Mirror                c1 Attached                        Attached
$I Light Source          Examination Location DescriptionlRemarks Remote Examination CondifionsEquipmentRemarks I7 6" Scale El Other              I x-LS                                    I Examination Results, Details and Comments:
Examiner:  rJ/n                                Level  Ah            Dale 'h Reviewer:- ' h                                  Date    44 ate  J!!
ANII:                                            Date  P                                                          I Y
VYNG 8047.06 NE 8047 Original Page 1 of 1 t
Vermont Yankee                  PfoC8dUr0 NO/RW.: /f Visual Examination Report Form for General Visual (IWE)                Page        of i  Date: !//b,Ld      1 Commnent                                            1 Component ID:
II Visual Aids                              Sketch                  Method U Binoculars              $ti None              None c7 Mirror Light Source Cl 6" Scaie 0 Other                                            I Examination Results, Details and Comments:
WNEF 8047.06 NE 8047 Original Page I of 1      1
Work Order No.: 6 0 -00      $035 Vermont Yankee                                      Procedure Nomev.:    Pfl 702 l//o.
Visual Examination Report Form for General Visual (IWE)                                  Page    I  of  1    Date:  '//&/b[      I Component                                                          il Component    ID:  X - 3~                                                System:    'Dm    L3 4 I
Drawing NoiRev.:    ,<?to  + qf    .                                Location:  GK                  -.5Y/t&Gc Visual Aids                  Photo                        Sketch                        Method 0 Binoculars            $4None                            ,j5t None                )%#Direct    6 r ~ ~ p - L El Mirror              0 Attached                        0 Attached            I D Remote Light Source        Examination Location DescrbtionlRernarks  I Remote' Examination ConditionsiEquiprnentRemarks 0 6" Scale Examiner:    d A                              Level    d / ~          Date  htlA Reviewer:  d A                                D    a  t    e  . L  ~
Reviewer:'  rflA                              o a t e . L ,
ANII:                                          Date    i. 3r-0(
1                                                                                                                      A VYNEF 8047.06 NE 8047 Original Page 1 of 1
I Data Sheet No: Z a E -          3rfs            I Work Ordsr No.:    00 - 03  503s" I
Vermont Yankee                                      procedure Nmev.:. PP 7 6 .t/o ~
Visual Examination Report Form for General Visual (IW)                                  Page  ,-Lof I - ,      Date:  $/b/d        r Component Component ID:      c                                                  system:      3rz.r CJCY Drawing Nomev.:  - '59'z  tc(                                  Location:.                  -ju&i        4 Visual Aids U Binoculars          crp None Photo If  None Sketch II@Direct    6 Method d
a Mirror              D Attached                        1 5 Attached        1 IO Remote
@ Light Source        Examination Location DescriptionJRernarks Remote' Examination ConditionslEquuipment Remarks 0 6" Scale            b y p d P&A&b,4,.h WN& 6047.06 NE 8047 Orighd Page 1 of 1
                                                                                                                    \
Vermont Yankee Visual Examination Report form for procedure Nomev.:      pfl76    ?-. (//o.        I General Visual (IWE)                              page      1 of    I  Date:
Component 0 Mirror            0 Attached                        0 Attached          U Remote I$ Light Source      Examination Location DescriptionlRemarks  Remote' Examination ConditianslEquipment Remarks 0 6" Scale t
0 Other            I I
V Y N E 8047.06 NE 8047 Original Page 1 of 1    i
Vermont Yankee                                      Procedure Na/Rev,:  pp 7 0 4
* Visual Examination Report Form for General Visual {IWE)                                    Page    /  of  1 Date: !//fh/              I Visual Aids                      Photo                        Sketch                      Method 0 Binoculars            pB None                          /I$None            ?Direct    w d 0 Mirror                U Attached                          Attached        I  Remote p Light Source          Examination Location DescriptionlRernarks 1 Remote Examination ConditionslEquiprnent Remarks D 6" Scale 0 Other                I x- 3 3                                    I
                      *:\
Examination Results, Details and Comments:
    ?sArvlJn/A4                  t9-U 45 VYNEF 8047.06 NE 8047 Original Page 1 of t      i
Visual Aids                    Photo                        Sketch                    Method 3 Bioocu!ars              None                          p31 None            PDirect  &
* A    d 3 Mirror                tl Attached                      13 Attached        1 D Remote Light Source          Examination Location DescrjptionlRemarks Remote Examination ConditionslEquipment Remarks 3 6 Scale                an-)C J 4 Pdd4                sh,        Y4
                                                &*Sa 3 Other
~
k - 3 v j-
                              - ~~-                        --      ~-
kamination Results, Details and Comments:
                              #                                                                  I/
4+sf2lms.b4 Examiner:  R4 to L &LJ    u ?    ~            Level & r c r i 4 u ~ Date
                                                                          -4W.QJ-Examiner:  uI/R                                Level  &              Date ?A seviewer: N/R                                  Date  ?$
3eviewer: -                                      Date  Nh VYNEF 8047.06 NE 8047 Original Page 1 of 1 i
work Order  NO.:  40  5 6  33 Vermont Yankee Visual Examination General Visual (IWE)Form for Report                  Page      of Procedure NolRev.:  80q7 40 Date: T f i / O /
Component VYNEF 8047.06 NE 8047 Original Page 1 of 1
Data Sheet N o : X& E -        3C3 Work Order No.:  0 0 0 00 50  $5 Vermont Yankee                                    Procedure NolRev.:  f p 7b & / D        .
Visual Examination Report Form for                                                            0 General Visual (IWE)                              Page        of        Date: !//6/0/      t Component Visual Aids                  Photo                      Sketch                      Method J Binoculars        Q None                              b None              /%Direct    kC,&
3 Mirror            0 Attached                          0 Attached          0 Remote PLight Source        Examination Location Description/Remarks Remote' Examination ConditionslEquipment Remarks 7 6" Scale          b A l L s e M &!&du-&-,d'      6  O b 5    N/4 3 Other                x- 3 7 j    4 e j Examiner:  #/A                              -~evel    rJk          Date &/A Reviewer: U/h                                Date  Iv/A VYNEF 8047.06 NE 8647 Original Page 1 of 1 i
C Data Sheet No: 8w3 -o/ #    -  3 Vermont Yankee Visual Examination Report Form for General Visual (IWE)
Drawing Nomev.:
I                                  I Location:
I R!S&L & -Id,*d    uI Visual Aids    I              Piioto              t      Sketch      I              Method 0 Binoculars 0 Minor              0 Attached                        a Attached        1o Remote
@ Light Source        Examination Location Description/Remarks ' Remote barnination ConditionslEqtlipmentRemarks 6' Scale            &&+4f#&            3dlLCAC.c Examiner:    MA                                                  Date  #/A WNEF 8047.06 NE 8047 Original Page 1 of 1
Visual Examination Report Form for General Visual (IWE)            Page -. 1 of -1 Date: !//-
c Component I
Level &/&      Daet-.
Examiner: 'h Reviewer: #I%                  Date  &h, WNEF 8047.06 NE 8047 Original Page 1 of 1 i
I Vermont Yankee Work Order No.:
Procedure NolRev.:
00 - 93b 8097 A3      .
VYNEF 8047.06 N E 8047 qriginal Page 1 of 1 1
Data Sheet No:        - 6 v - 361 Work Order No.: 6 6 - Do  $0  5r Vermont Yankee                                      Procedure Nomev.:  pp 70L ' f ( / D Visual Examination Report Form for Visual Aids                      Photo                      Sketch                      Method 0 Binoculars            $F None                          $None              $[ Direct  6ae~lrlr~L 0 Mirror                D  Attached                      10 Attached        1 o Remote Light Source                                                  I Examination Location DescfiDtionlRematks Remote Exemination CanditionslEquiprnent Remarks 0 6" Scale Examination Results, Detans and Comments:
VYNEF 8047.06 NE 8647 Original Page 1 of 1      f
Vermont Yankee                                  Procedure NolRev.:  26 #7      R U Visual Examination Report Form for General Visual (IWE)                              Page      !of i      Date:  <I<h    1 Component Component ID:      x47          .:                                System:  >rz$    ulca Drawing NoiRev.:  X?h #(                                      Location:
d Visual Aids                Photo                      Sketch                    Method 5 Binoculars        $ None                            $Zl None            9 Direct  &A&
Q Mirror            0 Attached                        n Attached          0 Remote I$ Light Source      Examination Location DescriptionlRemarks Remote Examination ConditianslEquipment Remark:
0 6 Scale G+4PAJ44        SdrL-crPrcrr                */A VYNEF 8047.06 NE 8047 Original Page 1 of 1
Work Order No.:  Do  - 00 $0    35 Vermont Yankee                                  Procedure NofRev.:    pp  76&</h.
Visual Examination Report Form for General Visual (IWE)                                Page c  !
_  of  1      Date: !/fG/o  I    I Component hmponent ID:      x- 4 8                                            System:  & k, &(A Visual Aids                    Photo                      Sketch                      Method 3 Binoculars              None                              None                Direct          4f aL 3 Mirror                  Attached                        D Attached          0 Remote Light Source        Examination Location Description/Remarks Remote Examination ConditionslEquipmentRemarks 3 6"Scale                b yd      d  kL-,k.oz);JL\            BauQtZu          &
I3 Other            -L    g-  LJ$                              v:c34      4-      mcu3 Examiner:    f!/R                                Level              Date  4 Reviewer:    ph                                  Date  ~h Reviewer: - dh                                  Date    4 Date  /-3/& /
V VYNEF 8047.06 NE 8047 Original Page 1 of 1      I
t Data Sheet No:  ZQe- v- 38 7 Work Order No.:    0 0 - on    s a 35 Vermont Yankee                                      Procedure NofRev.:, &?      7a 2.4 / O Visual xarnination Report Form for General Visual (iWE)                                    Page      / of i      Date: !/l</f.l!
t                                                    Component I Component ID:      c                                                  System:
3~7      LI i
Visual Aids                    Photo                        Sketch                        Method t! Binoculars          $b None                            /Z! None                Direct      6m ~          t    a    ~
El Mirror                0 Attached                          0 Attached          D Remote Light Source          Examination Location OascFiption[Remarks    Remota' Examination ConditionslEquipment Remarks Q 6" Scale              'bQc3uUP.WA)bd.m                              A'f4 0 Other                    x- L(4 1 Reviewer: -  A 4                                Date.&-
W N E F 8047.06 NE 8047 Original Page 1 of 1      t
Visual Examination Report Form for I!
Visual Examination          Report General Visual    Form for
{IWE)              Page -    of / Date: !//$h Component I
. Examiner: 15(/A    V                  Level did      Date Revi ANlI:
i I
W N E F 8047.06 NE 8047 Original Page 1 of 1 i
      ....-.-. .    .  ~.
Work Order No.: g0- O b      543s Vermont Yankee                                                            p p 7 0 2f  / D  .
Procedure NofRev.:
Visual Examination Report Form for General Visual (IWE)                                  Page    I    of  I    Date:  ?/ir/ol      z Component
:omponent ID:    x-SL            :                                  System: art9      d 4 -
Visual Aids                  Photo                        Sketch                      Method J Binoculars        IJ None                              eQ None              jZ Direct    L a 4 4r  d-3 Mirror            0 Attached                            0 Attached            D Remote
$ Light Source        Examination Location DescriptionlRernarks Remote Examination CooditionslEquipment Remarks J 6" Scale            -p4 &&+A                    6 ctd 3 Other            i    x- 5 %
Examiner:                                    Level      rulR        Date    $/A Reviewer:  &                                Date      J/A Reviewer:                                    Date      IJh Date    l-S{+f Y
VYNEF 8047.06 NE 8047 Original Page 1 of 1 1
8        Data Sheet No: z d          t&
Work Order No.:    00 - 0 0 s o 3 5 Vermont Yankee Procedure NdRev.:    //70;~1//6        .
Visuat Examination Report Form for General Visual ([WE)                                  Page      /  of    /    Date:  ebyA 1      1 Component ZompDnent ID:    x404      A,&,
r  .
                                      .k,v
                                            .) b                        System: ' b a y ~        3  6  ~
Drawing Nomev.:  5 5 s-    Vt                                    Location:        ~~~L Visual Aids                    Photo                      Sketch        t                Method c3 Binoculars          1 @ None                            pb None                  Direct  64l~*1.&L Ip Mirror                0 Attached                        0 Attached            El Remote
!I Light Source          Examination Location Description/Rernark Remote'Examination ConditionsEquipment Remarks 0 6" Scale Examindon Results, Details and Comments:
haminer:          dI.4                          Level    J!A        Date+.
Reviewer:        JfA                            Date      $!A Reviewer:,        r/(A                          Date      (/A VYNV 8047.06 NE 8047 brTginal Page 1 of 1      t
I                                                                Work Order No.:, 0 0 - 60503 5 Vermont Yankee Procedure NO~RW.:  PP 7b P f / O Visual Examination Report Form for General Visual (IWE)                              Page    / of          ~ater_r/r(/o/      I I                                                Component t      Visuaf Aids                photo                I        Sketch      I            Method
  @ Mirror            10 Attached
                            ~
1 CI Attached I cl Remote tight Source      Examination Location DescriptionlRsmarks Remote-Examination ConditicnslEquipment Remarks 0 6 SCd8            hrty&Y      fidC4?&W5 WNEF 8047.06 NE 8047 original Page 1 of 1      t
Vermont Yankee Visual Examination Report Form for General Visual {IWE)
Component
:ompooent ID:          -
X /a%                                              System:    bn+    k    ~    c    ~
Visual Aids                      Photo                      Sketch                      Method 3 Binoculars                pl None                          $4 None              p Direct  G*rr,r~Qe~
1 Mirror kl Light Source            Examination Location Descr$tion/Remarks  Remote Examination ConditionslEquipment Remarks 3 6" Scale                  h q d 4 4-c          L&*4*.&            rJ/A.
3 Other                  1    X-l13%                              I Examination Results, Details and Comments:
Examiner:      #/A                                Level  IJ/R        Date  '"/A Reviewer:      &/A                                  Date    N/A Reviewer:
* Date    Nh VYNEF 8047.06 NE 8047 Origina!
Page 1 of 1      i
i Work Order No.:    00-00    5035 Vermont Yankee Procedure NolRev.:  8 p 70 %$
Visual Examination Report Form for Visual Aids                  Photo                      Sketch                      Method 3 Binoculars        C% None                            0 None              0 Direct N u t p*6G-d?,
3 Mirror            0 Attached                          !JAttached          0 Remote % A C t L G - d 5 b g! Light Source        Examination location DescriptionjRemarks Remote' Examination ConditionslEquipment Remarks 0 6" Scale            'I>r y rJcLI  pl&C.Cru=JiOrr,
                                                                  &r'A 0 Other                  x-  lo3 VYNEF 6047.06 NE 3047 Original Page 1 of 1      L
I                                                        e Data Sheet No:  [-
Work Order No.:.. 190-OD  $0  3c Vermont Yankee Praedure Nomev.:    /p    70A Visual Examination Report Form for General Visual (!WE)                                  Page        of    4  Date: @d,/h/      t c                                                                                                                -
Component I
Minor                0 Attached                        0 Attached            0 Remote
  ~ g h Source t                Examination Location Desuiptionmernarb Remote Examination ConditionsfEquipment Remarks D 6' Scale Examination Results, Details and Comments:                                                                        I!
W N E F 8047.06 NE 8047 briginal Page 1 af t        i
Vermont Yankee Visual Examination Report Form for General Visual (IWE)                    Page 1 of I  Date: :hx/b/      t Component 0 Other                                            I Fvnmination Re&,  Details and Comments:
W N E F 8047.06 NE 8047 Original Page 1 of 1
1 Data Sheet N o : - z a c -    -
btf 387 .
I Work Order No.:    00 00 503      5 verrnbnt Yankee                                  Procedure NolRev.:    #p 70 As/ / o Visual Examination Report Form for General Visual flWE)
Visua[ Aids                  Photo                        Sketch                        Method 3 Binoculars              None                            )B None            FDirect        6.1~~)a P*L
%Mirror                0 Attached 0 Attached          a Remote I ExaminationLocation Descriotionlffemarks1 Remote Examination ConditionsIEquipment Remarks
                                                            ~ ~
3 tight Source Examiner:                                      Level    lu/A        Date Reviewer:      N/A                            Date    Nh Reviewer:    EJh                              Date    A/A ANII:        I f Qate    Id?/*f f
VYNEF 8047.06 NE 8047 Origina!
Page 1 of 1      !
C Data Sheet NO: Z w 6-G J -    38 8 Work Order NO.: 00-00 S O      is Vermont Yankee                                    Procedure Nomev.:    @P  7 b LI/  /a Visual Examination Report Form for General Visual (JWE)                                  Page      1 of        Date: t . l a      i Component component ID:
Drawing NolRev.:
Visual Aids y-107 s??-d    - s//
Photo 1
System:
Location:
Sketch b . 9  ~ - L u -
gx.cc,,4 S Q ~ &
Method 0 Binoculars                None                              None            E
                                                                                  , l Direct    60,*
f$L Mirror              U Attached                        0 Attached          CI Remote
  $&Light Source          Examination Location OescriptionlRemarks Remote Examination ConditionslEquipment Remarks 0 6 Scale                aqb3A.q P u , k d ; o            &)      4 4 D Other                      A-  107 Examination Results, Details and Comments:
RI -LJ-  d2  AbLlG            %      b
* L 4              Cr+-ccA c**A ,A.-
L
      &f?un    e&*d*b D C          di\ p-LA3      I,                  PLSUikS      r n l  AI&
,    L s u k      * .*.c4sfLc VYNEF 8047.06 NE 8047 Original Page 1 of 1
Vermont Yankee Visual Examination Report Form Work Order No.:  t?d* 80ild/ 7 dbd VT-1, Containment Surfaces (IWE)
ProcedureNoRev.:    &b fb    /      1 Drawing Nomev.: 4-/9 /I67  !a.0 Other (Explain) 1 Examiner:                              Level:  4 Date:        , ,
Evaluation Required?
Examiner:                              Level:  &/A      Date:
Reviewer:                                              Date:  </<kt            yes    d  o VYNEF 8045.02 NE 8045 Rev. 1 Page 1 of 1
Vermont Yankee                                      BorCs-a/ -s//
Reference Data Sheet No:
Visual Examination      Page  2 of        Date:  s/I-//o /
Supplemental Report Form Component
:omponent ID: )-ZOO4                                    System:    %LV3 Raminer                                                  Level:,  ..fA Date:    4 Zeviewer:                                                              Date:  sydk/
ieviewer:          4 4                                                Date:  4 M I  :.&w                                                              Date: S- %/
VYNEE 8045.04 NE 8045 Original Page 1 of 1 t f c #I
Vermont Yankee                I        Work Order No.: 00 -0046)7~,060 Visual Examination Report Form VT-1, Bolting @WE)
Procedure NoRev.:    h!k"goi/-T    /      RmG /
page      I        of    /        Date:  5-3-o/
                    ~
II                                                  Comuonent Drawing NoRev.:    L - ~ W We/v:
                                ~ a                          Bolting Length: Y ;/8 'I' Bolting Diameter:
0 Magnifying Glass            umination carmo.:    y Yg
'Examiner:                                  Level: &-Date: 4+
Reviewer:
Reviewer:
Reviewer:
ANII:  #F&                                          Date:     9-O /
Y 4.h VYNEF 8047.06 NE 8047 Original Page 1 of 1 Vermont Yankee Procedure NolRev.: PP 7QJ-9/0 . Visual Examination Report Form for General Visual (IWE) Page / of Date: f/JC /df I Component Component ID: x- 8 System: bhv cM Visual Aids Phbto Sketch El Binoculars
W N E F 8045.03 NE 8045 Original Page 1 of 1
@ None B None 0 Mirror 0 Attached 0 Attached Method @ Direct &rJ +a+& U Remote ~- ~- ~ Examination Results, Details and Comments:  
 
/2U Light Source L7 6" Scale 0 Other Examiner:  
WorkOrderNo.:   00 - 00 94 / f . - C ' d 0 Visual Examination Report Form Procedure No/Rev.: /YE 86 95  Me*.. 0 VT-1, Bolting (IWE)
&/A Level .I/A Date d.4 Reviewer:
Page       /       of /      Date: s - = s - ~ /
d3/A Date d/A Examination Location DescriptionlRemarks Remote' Examination ConditionslEquipment Remarks aaad, U. Uta- NtR x- f3 Reviewer:'
Evaluation Required?
#!A Date A)/A VYNEF 8097.06 NE 8047 Original Page 1 of 1 - --
Leve1:xDate:   fi g0@
Data Sheet No: %0q7 - o( - 043 Wark Order No.: 00 - 50 3 & Vermont Yankee Procedure NolRev.: 86 d7 40 General Visual (IWE) Page I of. 1 Date: "/3&/OI Visual Examination Report Form for Examiner:
UYes    VNo Examiner:                        Level: &Date:
dl4 Level >I! Date Al/P. Reviewer:
Reviewer:                                Date:             1 I
Date Y Reviewer:  
Reviewer:      h'h                      Date:    IJ/A Date: 6-s-o!
/v/A Date N/A WNEF 8047.46 NE 8047 Original Page 1 of 1 Procedure Nomev.: bo f? RO Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page / of 1 Date: &&/ -~ Component Component ID: x- lo System: 3~4 c3r L4 Drawing NolRev.: si30 ci// Location:
VYNEF 8045.03 NE 8045 Original Page 1 of 1
A~JL 4& / Visual Aids Photo Sketch Method 0 Binoculars None Bp None # Direct &d 0 Mirror Q Attached 0 Attached 13 Remote Level a* Date V~&I Examiner:
 
Examiner:
Vermont Yankee Visual Examination Report Form VT-1, Bolting (IWE)
Level 4 Date .r/A . Reviewer:
CA/3S86d          //'
4DDate fioA/ Reviewer:
Drawing Nomev.:   7- 6 2 O ; L 4euoo
MfA Date v2 Y VYNEF 8047.06 NE 8047 Original Page 1 of 1 Vermont Yankee
* Bolting Length: ya"  'I Bolting Diameter:
* Work Order No.:- QO 50 3b Procedure NolRev.: go47 R 0 Visual Examination Report Form for General Visual (IWE) Page / of 1 Date: %?k?/C3[ Component Component ID: x- I( System:- I I Light Source WNS 8047.0.6 NE 8047 Original Page 1 of 1 I Work Order No.: QO-@ 50 3's Visual Aids Cl BinocuIars Procedure NolRev.: PP 76 24 g/D Page of 1 Date: !h~ci/4 j Vermont Yankee Visual Examination Report Form for General Visual (IWE) Photo Sketch Method 9 None $9 None @ Direct 0~~~ Q. Component Examination Location Description/Remarks Remote' Examination ConditionslEquipment Remarks aI.4 0 Mirror Light Source I I 0 6' Scale 1 x- l')c ' 0 Other 1 Examination Results, Details and Comments:
II 0 Magnifying Glass OYes      MNo VYNEF 8045.03 NE 8045 Original Page 7 of 1
I Examiner:
 
d/la Reviewer:
Visual Examination Report Form for General Visual (IWE)             page I of 1 Date: !//G/oI      t Component WNEF 8047.06 NE 8047 Original Page 1 of 1 i
r//A Date 41 Reviewer: - 44 Date Nh ANI!: Date //?!*( : 1' VYNEF 8047.06 NE 8047 On'giflal Page 1 of 1 \
 
Data Sheet No: 6- GU- fgt Vermont Yankee Visual *xamination Report Form for General Visual (IWE) Procedure NolRev.: f?y 7 6 2y/o 8 Page of / Date: :/l-c/ot J Component - 13 A 4-13' System: bA Ad *rJC Xe&4,i'> Component ID: X &L-L 0 Mirror VYNEF 8067.06 Page 1 of 1 NE 8047 Original e Data Sheet No: go L/7 - 0 I -Dfco Work Order No.: 00 50 37 Vermont Yankee Procedure Nomev.: 047 Ro General Visual (IWE) Page i of ( Date: j///d/ Visual Examination Report Form for Component
t        Data Sheet No: Z  h J 6- 6Q-396 Vermont Yankee Work Order  No.:   DO- 90
:omponent ID: * /4 System: -x 3rawing NolRev.: 7 Binoculars 3 Mirror p Light Source 7 6" Scale I] Other Photo Sketch Method W None None p00irect &&-& f3 Attached 0 Attached f3 Remote Examination Locetion Description/Remarks 1 Remote Examination ConditiondEquipment Remarks 0 Saminer: Level Dats MNEF 8047.Q6 NE 8047 Originat Page 1 of 1 Vermont Yankee Visual Examination Report Form for General Visual (IWE) Visual Aids 3 Binoculars 3 Mirror 81 Light Source J 6" Scale 3 Other Procedure NolRev.: gOV7 ko Page of I Date: ~/</oJ I Sketch Method Photo None None Direct 6-4 U Attached I3 Attached Cl Remote Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks ak~~6"QCM btqwclL YhJe Component
* 5 Procedure NolRev.: pp    70 aq/b        .
:omponent 10: -x - /5 System: 3 rc4 dctx Irawing NolRev.: P 4/ Location:
Visual Examination Report Form for General Visual (IWE)                                  Page     1 of   I    Date: j l ~ ~ l o ti Component Zomponent ID:    X - AQ 3 A        +im      Ir                          System:   7-04 u.<
I U J% Examiner:
hawing NoRev.:     6%                                                                                  6 dc Visual Aids                      Photo                      Sketch                      Method 3 Binoculars            IEl None                          @  I None                  Direct    6edr~oc 3 Mirror                D Attached                        0 Attached          0 Remote
Level 9.' Date d7l.t Examiner:
                              ~. ~
Level r//A Date uh- Reviewer:
8 Light Source            Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks 7 6" Scale              TSR.*S    PeucccC~:gcu~                  -14 Examination Results, Details and Comments:
Date Qfb, U Reviewer:
c VYNEF 8047.06 NE 8047 Original Page 1 of 1
Date #b ANII: Date s-@/ -. - - -. -- -- VYNEF 8047.06 NE 8047 Originaf Page 1 of 1 1 I
 
* Data Sheet No: me- 6J- 38 f Component Component ID: X 1 b A System: Drawing NolRev,: .<? h, - q/ Location:
r 8
~sL.A! s~A ts4-U k I Work Order No.: 00- 04 50 3s Visual Aids Photo Sketch 5 Binoculars
Data Sheet NO:        6Jw    39s Work Order No.: 9 0
@ None C@ None 0 Mirror 0 Attached El Attached Vermont Yankee Visual Examination Report Form for General Visual (IWE) Procedure NolRev.: Pp 7&3-c(/c,'
* 00 5 0 35 VYNEF 8047.06 NE 8047 Original Page 1 of 1
Page f of Date: !//6,/6 j t Method Direct 6 6~ 4 *C D Remote I$ Light Source U 6" Scale D Other Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks BFpuY &J&&Ih q4 x -/&A VY NEF 8 047 .U6 NE 8047 Original Page 1 of 1 i t 5p*& t q Examiner:
 
LE U Level Rate !/lb /Q / Examiner:
Vermont ~ i n k e e WNEF 8047.06 NE8047 Original Page 1 of 1
MA Level e/! Date $/A Reviewer:
 
&/A Date 41~ Reviewer: - d/A Date dA Vermont Yankee Procedure NolRev.: 930 L/7 RO Date: 5///0/ Visual Examination Report Form for 1 General Visual (IWE) Page of Component VYNEF 8047.06 NE 8047 Original Page 1 of 1 Vermont Yankee Visual Examination Report Form for General Visual (IWE) 0 Binoculars 0 Mirror $ Light Source 0 6" Scale [3 Other Work Order No.: Procedure NolRev.: /?p 7 0;tV 10. Page / of I Date: 1/16 /o/ I$, None Nons 4~ Direct tr4~*~o.~
INSERVICE DISCREPANCY REPORT ( I D R )
0 Attached 0 Attached D Remota Examination Location Oescription/Remarks Remota' Examination ConditionsiEquipment Remarks &&M id Ad "/A t x-r7 Component Visual Aids Phbto Sketch Method Examiner:
IDR #: lL!dL&
d//3 Levet Date d/A Reviewer:
Date : 5 /2/2001
Hh Date E.1/A Date .z/A Date /-3P/ VYNEF 8047.06 NE 8047 Originaf Page 1 of 1 I 8 6- 6V- 377 Data Sheet Ncx3-2) Work Order No.: Don 00 50'35 Visual Aids Photo Sketch 0 Binoculars
* Component:            X-207A -. H          Location: Drvweld, Mechanical D e s i g n Engineering Evaluation:
@None . IjZ None Method Direct &ea a r o-L 0 Mirror Light Source D 6" Scale 13 Attached 0 Remote D Attached Examination Location Description/Remarks Remote' Examination ConditionslEquipment Remarks fhyrrcb 8 Examiner:
Performed By:                                    Date :
AI@. 6 Examiner:
Disposition/Repair:
Ah% Level A# Date IJ/A Reviewer:
                  ~~    ~
&A Date &/A Reviewer:
ISI Program Coordinator:                        Date :
Date dh LeveI&T.rJu*L Date 1/l&./O 1 -. . VYNEF 8047.06 NE 8047 Original Page 1 of 1 I I Data Sheet NO: ZW- bd- 3 78 Work Order No.: 00 - 90 50 fs Visual Aids Binoculars Procedure NolRev.:, P?p 7 02(//0 , Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page - I of ,- I Date: !/'/b/~/ t Photo Sketch Method I LX? None 03 None I Direct 6*3& r*L Component 0 Mirror Light Source 0 6" Scale 0 Other 0 Attached 0 Attached I3 Remote Examination Location Description/Rernarks Remote Examination CanditionslEquiprnent Remarks bq Jrt( P*dcMr* % k- 19 Examiner:
Repair Effort:
dh Level ~2 Date NA Reviewer:
Reference Document:
Date A/A Reviewer: - Date ANII: Date /43/4/ I' VYNEF 8047.05 NE 8047 Original Page 1 of 1 i Procedure NolRev.:_dO
Repair Completion Date:
$7 Ro Vermont Yankee Visual Examination Report Form for General Visual (IWE) ?age / oi i Date:qA,/o/
Service Induced:                      =s  - NO        BY :        Date :
I Component Component ID: x- r9 system: 3& k) \c/cI Drawing No/Rev.: 520- // I ~~ - Visual Aids Photo Sketch Method c1 Binoculars ga None pb: None FDirect 6*4LIc.vQ 0 Mirror C3 Attached Cl Attached 0 Remote Light Source Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks 0 6' Scate si+JzR&d 5tllLcp- n//p 0 Other 7 %I*)LN 4W& Examination
7 Sample Expansion Required:                     NO -BY:              Date: -.
~esults, Details andcomments:
Sample Expansion:
&*/f-s #f ks ci;Ad/r& nyu 3444&4r, Ub.* be co+cp;ficd.
IS1 Program Coordinator:                         Date :
I b5f haminer: Levale Date chh 1 Examiner:
Reinspection Required:                   YES      NO -BY:
Level &/A Date &h Reviewer:
Subsequent Inspection Required: YES          -       -BY :
.%*ate Reviewer:
IS1 Supervisor Notified:
Date WNEF 8047.M NE 8047 Original Page 1 of 1 Procedure NofAev.: pp 7oA4 /o ' Vermont Yankee Visual Examination Report Form for General Visual {IWEI page f of / Date: !//~/uI I Visual Aids Photo I 0 Binocutars FjtNone Component Component ID: x System: Sketch Method @ None PDirect 6*c~*pb~ Examhation Location Descriptim/Remarks bq 4 PcAcht*+.
IS1 Program Coordinator:                         Date :
aL\ 0 Mirror f&f Light Source 0 6" Scafe Remote- Examination ConditionsEquipment Remarks q4 0 Other I XJZO I Examination Results, Details and Comments:
Reinspection Completed Satisfactorily:
Examiner:
IS1 Supervisor:                                   Date :
~h Level &/A Date Ab!h l Reviewer:
IDR Closed:
/J /A Datenl/A., , VYNEF 8097.06 NE 8047 Original Page 1 of 1 i I Data Sheet No: EM6- gdm 3 7 b Work Order No.: BO- 00 SO 4s Procedure No/Rev.: *#?P7o*f/u Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page 1 _of 1 Date: //I610 / t Visual Aids Photo Sketch @Binoculars
IS1 Program Coordinator:                         Date :
*None Q None 0 Mirror D Attached 0 Attached Method p) Direct &A c( L I 0 Remote %Light Source 0 6" Scale ~. ~ ~~ I Examination Location DescriDtionlRernarks 1 kernote. Examination ConditionslEquipment Remarks I 0 Other 1 X- ~. - __ Examination Results, Details and Comments:
WAPF 4027.01 AP 4027 R e v . 4
Reviewer:
* Page 1 of 1
~IA Date e/# VYNEF 80.47.06 NE 8047 Original Page 1 of 1 
 
> Data Sheet NO: 2 - 6 37Y Work Order NO.: oo*oo 50 33 Procedure NoIRev.:yp 7d 2 f/b Page / of Date: !//6hL r Vermont ~itnicee Visual Examination Report Form for General Visual (IWE) Component Component ID: X -# LL, System: Bfi? d4 Visual Aids sf3inocutar.s El Mirror Photo Sketch Method None poria Direct 64+4*L 0 Attached fl Attached Examiner:
INSERVICE DISCREPANCY REPORT ( I D R )
d/A Level dh Date ry/A Reviewer:
IDR # :   01-07 Date:      5/2/2001        ,
&/A Date A//A Reviewer:-
Component:     Vent He-  r            Location: Drvwell, Mechanical Design Engineering Evaluation:
$/A Date ni/A VYNEF 8047.06 NE 8047 Original Page 1 of 1 t C Data Sheet NO: SOy7- O/ 037 1 Work Order No.: Po -5037 Vermont Yankee Visual Examination Report Form for General Visual (IWE) ROCedW8 NoiRev.: g 047 Lo Page / of / Date: 5//0/ Component Component ID: x* A3 system: -&.I d c &i Drawing NolRev.: s!!&w@ d/ Location:
                                          * % de            -/ewe9      + cd-&$
3/z..t d4 Visual Aids Photo Sketch Method c1 Binoculars
@ None None Direct br,~u*rzc(l 0 Mirror 0 Attached 0 Attached El Remote Examination Location Description/&marks Remote Examination Conditions'Equipment Remarks Other - f Date Reviewer:
ANII: Date & o/ WNEF 8047.06 NE 8047 Original Page 1 of 1 I Procedure NdHev.: PP 702'f/0 . Pa98 Of 1 Date: ?//&Id t Vermont Yankee Visual Examination Report Form for General Visual (IWE) Component Component ID: x- A3 System: ~HW L3 ea Visual Aids mota Sketch Method $B None ,EI Direct &a&* cQIC. p Binocu!ars b None 0 Mirror pS Liiltt Source 0 6" Scale CJ Attached 0 Attached 10 Remote Examination Location DescriptionlRemarks 1 Remote Examination CanditionslEquipment Remarks 3ftSLJ-a a.J*u;Or\
Reviewer: - '14 Date @/u bate I/ 4 I / VYNEF 8047.06 NE 8047 original Page 1 of 1 i.
C Data Sheet No: 8047 @D/-O 3b Work Order No.: 00 3'7 Procedure NoJRev.: yo $7 Lo Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page / of Date:<A/o I Component Component 10: K-29 system: 34 L3C.u Drawing NolRev.: 5 - $41 Location:
-44 pluu I Visual Aids Photo Sketch Method I3 Binoculars p None Pp None @ Direct 61~.++4~4 0 Mirror 0 Attached D Attached 0 Remote Examination Location DesctiptionlRernarks 9fUght Source 0 6" Scale 2=*.3.(Fd
&IL*& 0 Other Examination Results, Details and Comments:
Remote Examination ConditionsEquipment Remarks ' N/A. Ab, 4 c. bL ye@&' H' Examiner:
Level 9s Date s"/,,h / Y Reviewer:
Date f///. f I I Reviewer: - .'/A Date VYNEF 8047.06 NE 8047 Original Page 1 of 1 fi r Data sheet No: 6Jn 37% Work Order No.: 00-00 SO35 Vermont Ybkee Proceciwe N~IEW.:, PP 7b Acj/D ' Visual Examination Report Form for General Visual (IWE) Page -1 of - I Date: !//C/O I Component Component IO: X%+ System: /t~) cs 4 Drawing NoMev.: 59 a Yf tacatim: E~-L,,A Visual Aids Photo Sketch Method  ino oculars W None @ None PDitect LS&d**L CI Mirrar Light Source I3 6* Scale t 0 Attached 0 Attached a Remote Examination Lacation DescriptionlRemarks Remote Examination ConditionsEquiprnent Remarks , Dqw4 PLW4-n 1 H WN& 00d7.06 NE 8047 Original Page 1 of t I VYN$8047.06 NE 8047 Original Page 1 of 1 _. . . . -. - - . . - . i c I ~ata meet NO: Zwe - t~- 37/ work order NO.: 00 - 00 SO 35 1 Vermont Yankee prOCeChU8 NOmeV.: /? 7 dd/O . . Visual Examination Report Form for General Visual (IWE) Page / of 1 Date: !/JLA t Component Component tD: X- Ab System: .3 t~6 rA 4 Visual Aids Photo Sketch Method 0 Binoculars mNme SNanr, ~a, Direct 6*,~ r- L- Mirror 0 Attached p Light source Examination Location DescriptiodRemarks Remote Examination CanditionslEqrripment Remarks D Attached 0 Remote U 6" Scale 'Bfipd P~c&#& VA 0 Other 1. Examination Results, Oeta3s and Comments:
WNEF 804'7.06 NE 8047 Original Page 1 of 1 i - - - . . . . .
Vermont Yankee Procedure NdRev.: 8d d7 k!O . General Visual (IWE) Page / of I Date: $ff& t Visual Examination Report Form for c1 Binoculars
$ None @! None 0 Mirror 0 Attached 0 Attached t Component
/Z Direct Lad 0 Remote Component ID: System: h- L3 *4 1 Visual Aids @ Light Source 0 6- Scale 0 Utherphq Photo Sketch Method @ Examination Location DescriptionlRematks Remote' Examination ConditionslEquipment Remarks - *#wd 4 Y&.CA&k. d4 &&e. 1 Reviewer:
44 Date 5% VYNEF 8047.06 NE 8047 Original Page 1 of 'I i Data %et No: 6 bf* evv 1 Procedure NolRev.: pp 761!//0. work Order NO.: 0 0 .. 4 050 3 5 Vermont Yankee Visual Examination Report Form for General Visual (IWE) page I of / Date: !/16/aL I D Mirror $I Light Source I7 6" Scale c1 Attached Attached Examination Location DescriptionlRemarks Remote Examination CondifionsEquipment Remarks El Other I x-LS I Examination Results, Details and Comments:
Examiner:
rJ/n Level Ah Dale 'h Reviewer:-
'h Date 44  ate J!! ANII: Date P I Y VYNG 8047.06 NE 8047 Original Page 1 of 1 t Vermont Yankee PfoC8dUr0 NO/RW.: /f Visual Examination Report Form for General Visual (IWE) Page of i Date: !//b,Ld 1 Commnent 1 Component ID: I Sketch Method Visual Aids U Binoculars
$ti None I None c7 Mirror Light Source Cl 6" Scaie 0 Other Examination Results, Details and Comments:
I WNEF 8047.06 NE 8047 Original Page I of 1 1 - - . . . .. . . . -. .-. . .
Vermont Yankee Visual Examination Report Form for General Visual (IWE) Visual Aids 0 Binoculars
-00 $035
* Work Order No.: 60 Procedure Nomev.: Pfl 70 2 l//o. Page I of 1 Date: '//&/b[ I Photo Sketch Method $4 None ,j5t None )%#Direct 6r~~p-L Component il Component ID: X- 3~ System: 'Dm L3 4 I Examiner:
dA Level d/~ Date htlA Reviewer:
dA Date.L~ Reviewer:'
rflA oate.L, ANII: Date i. 3r-0( 1 A Drawing NoiRev.: ,<?to + qf . Location:
GK -.5Y/t&Gc El Mirror Light Source 0 6" Scale 0 Attached 0 Attached I D Remote Examination Location DescrbtionlRernarks I Remote' Examination ConditionsiEquiprnent Remarks VYNEF 8047.06 NE 8047 Original Page 1 of 1 I Data Sheet No: ZaE- 3rfs I Work Ordsr No.: 00 - 03 503s" procedure Nmev.:. PP 76~ .t/o Vermont Yankee Visual Examination Report Form for I General Visual (IW*) Page ,-L of ,- I Date: $/b/d r Component Component ID: c system: 3rz.r CJCY Drawing Nomev.: - '59 'z tc( Location:. -ju&i 4 Visual Aids Photo Sketch Method I I U Binoculars crp None f None I @ Direct 6 d 1 a Mirror @ Light Source 0 6" Scale D Attached 1 5 Attached IO Remote Examination Location DescriptionJRernarks Remote' Examination ConditionslEquuipment Remarks bypd P&A&b,4,.h WN& 6047.06 NE 8047 Orighd Page 1 of 1 \ .- __
procedure Nomev.: pfl76 ?-. (//o. page 1 of I Date: Vermont Yankee Visual Examination Report form for General Visual (IWE) I Component 0 Mirror I$ Light Source 0 6" Scale 0 Attached 0 Attached U Remote Examination Location DescriptionlRemarks Remote' Examination ConditianslEquipment Remarks I 0 Other t I VYNE 8047.06 NE 8047 Original Page 1 of 1 i Procedure Na/Rev,: pp 704* Vermont Yankee Visual Examination Report Form for General Visual {IWE) Page / of 1 Date: !//fh/ I Visual Aids 0 Binoculars Photo Sketch Method pB None /I$None ?Direct wd 0 Mirror p Light Source D 6" Scale U Attached Attached I Remote Examination Location DescriptionlRernarks 1 Remote Examination ConditionslEquiprnent Remarks I x- 33 0 Other Examination Results, Details and Comments:
I ?sArvlJn/A4
*:\ t9-U 45 - VYNEF 8047.06 NE 8047 Original Page 1 of t i Visual Aids 3 Bioocu!ars 3 Mirror Light Source 3 6' Scale 3 Other Photo Sketch Method None p31 None PDirect &*Ad - ~ - ~~- - -- ~- kamination Results, Details and Comments:
tl Attached 13 Attached 1 D Remote Examination Location DescrjptionlRemarks Remote' Examination ConditionslEquipment Remarks an-) CJ4 Pdd4 &*Sa sh, Y4 k-3vj # I/ 4+sf2lms.b4 Level &rcri4u~ Date -4W.QJ- Examiner:
R4 to L &LJ u?~ Examiner:
uI/R Level & Date '?A seviewer:
N/R Date ?$ 3eviewer: - Date Nh VYNEF 8047.06 NE 8047 Original Page 1 of 1 i work Order NO.: 40 56 3 3 Procedure NolRev.: 80q7 40 Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page 'of ' Date: Tfi/O / Component VYNEF 8047.06 NE 8047 Original Page 1 of 1 
# Data Sheet No:X &E- 3C3 Visual Aids Photo Sketch J Binoculars Q None b None Work Order No.: 000 00 50 $5 Method /%Direct kC, & Procedure NolRev.: fp 7 b&/D . Vermont Yankee Visual Examination Report Form for General Visual (IWE) 0 Page of Date: !//6/0/ t 3 Mirror PLight Source 7 6" Scale 3 Other Component 0 Attached 0 Attached 0 Remote Examination Location Description/Remarks Remote' Examination ConditionslEquipment Remarks bAlLseM &!&du-&-,d' 6 Ob5 N/4 x- 37 j4ej Examiner:
#/A -~evel rJk Date &/A Reviewer:
U/h Date Iv/A VYNEF 8047.06 NE 8647 Original Page 1 of 1 i C Data Sheet No: 8w3 -o/ - # 3 Vermont Yankee Visual Examination Report Form for General Visual (IWE) Drawing Nomev.: Location:
R!S&L & uI - Id,*d I I I
* Visual Aids I Piioto t Sketch I Method 0 Binoculars 0 Minor 0 Attached a Attached 1 o Remote @ Light Source Examination Location Description/Remarks
' Remote barnination ConditionslEqtlipment Remarks 6' Scale &&+4f#& 3dlLCAC.c Examiner:
MA Date #/A WNEF 8047.06 NE 8047 Original Page 1 of 1 Visual Examination Report Form for 1 Date: !//- 1 Page .- of -- General Visual (IWE) c Component I Level &/& Date.- Examiner:
'h Reviewer:
#I% Date &h , WNEF 8047.06 NE 8047 Original Page 1 of 1 i .
I Vermont Yankee Work Order No.: Procedure NolRev.: 8097 A3 . 00 - 9 3 b VYNEF 8047.06 NE 8047 qriginal Page 1 of 1 1 Data Sheet No: - 6 v- 361 Visual Aids 0 Binoculars Vermont Yankee Visual Examination Report Form for Photo Sketch Method
$F None $ None $[ Direct 6ae~lrlr~L Work Order No.: 66- Do $0 5r Procedure Nomev.: pp 70 L'f(/D 0 Mirror Light Source 0 6" Scale D Attached 10 Attached 1 o Remote Examination Location DescfiDtionlRematks I Remote Exemination CanditionslEquiprnent Remarks -- - Examination Results, Detans and Comments:
VYNEF 8047.06 Page 1 of 1 f NE 8647 Original Procedure NolRev.: 26 #7 RU Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page ! of i Date: <I<h 1 Component Component ID: x47 .: System: >rz$ ulca Drawing NoiRev.: X?h d #( Location:
Visual Aids Photo Sketch Method . 5 Binoculars
$ None $Zl None 9 Direct &A& Q Mirror I$ Light Source 0 6" Scale 0 Attached n Attached 0 Remote Examination Location DescriptionlRemarks Remote Examination ConditianslEquipment Remark: G+4PAJ44 SdrL-crPrcrr
*/A VYNEF 8047.06 NE 8047 Original Page 1 of 1 Work Order No.: Do - 00 $0 35 Visual Aids Photo Sketch 3 Binoculars None None 3 Mirror Attached D Attached Vermont Yankee Procedure NofRev.: pp 76&</h. Page c_ ! of 1 Date: !/fG/o I I Visual Examination Report Form for General Visual (IWE) Method Direct 4 f aL 0 Remote Component Light Source 3 6" Scale I3 Other -L hmponent ID: x- 48 System: & k, &(A Examination Location Description/Remarks Remote Examination ConditionslEquipment Remarks by dd kL-,k.oz);JL\
BauQtZu & g- LJ$ v:c34 4- mcu3 Examiner:
f!/R Level Date 4 Reviewer:
ph Date ~h Reviewer: - dh Date 4 Date /-3/& / V VYNEF 8047.06 NE 8047 Original Page 1 of 1 I t Data Sheet No: ZQe- v- 3 87 Work Order No.: 00- on sa 35 # i Visual Aids Photo Sketch t! Binoculars
$b None /Z! None El Mirror 0 Attached 0 Attached Vermont Yankee Procedure NofRev.:, &? 7a 2.4 /O Visual *xarnination Report Form for General Visual (iWE) Page / of i Date: !/l</f.l!
Method Direct 6m ~ta~ D Remote t Component Light Source Q 6" Scale 0 Other Component ID: c System: 3 ~7 LI I - Examination Location OascFiption[Remarks Remota' Examination ConditionslEquipment Remarks 'bQc3uU P.WA)bd.m A'f4 x- L(4 1 Reviewer: - A4 Date.&- WNEF 8047.06 NE 8047 Original Page 1 of 1 t Visual Examination Report Form for I! __ . . - . . - .
Page of / Date: !//$h Visual Examination Report Form for General Visual {IWE) - Component V . I Examiner:
15(/A Level did Date Revi ANlI: i I WNEF 8047.06 NE 8047 Original Page 1 of 1 i . . . . -. -. . . ~.
Vermont Yankee Visual Examination Report Form for General Visual (IWE) Visual Aids Photo Sketch J Binoculars IJ None eQ None 3 Mirror 0 Attached 0 Attached Work Order No.: Procedure NofRev.: Page I of I Date: ?/ir/ol z g0 -Ob 543s pp 702 f /D . Method jZ Direct La44 rd- D Remote Component
$ Light Source J 6" Scale 3 Other :omponent ID: x-SL : System: art9 d4- Examination Location DescriptionlRernarks Remote Examination CooditionslEquipment Remarks -p4 &&+A 6 ctd i x- 5% Examiner:
Level rulR Date $/A Reviewer:
& Date J/A Reviewer:
Date IJh Date l-S{+f Y VYNEF 8047.06 NE 8047 Original Page 1 of 1 1 8 Data Sheet No: zd t& Work Order No.: Procedure NdRev.: //70;~1//6 . 00 -00 so35 Vermont Yankee Visuat Examination Report Form for General Visual ([WE) Page / of / Date: ebyA 1 1 Component ZompDnent ID: x404 A,&, .k, .) b System: 'bay ~36~ r. v Visual Aids Drawing Nomev.: 55 s- Vt Location:
~~~L Photo Sketch t Method c3 Binoculars 1 @ None Ip Mirror I!& Light Source 0 6" Scale pb None Direct 64l~*1.&L 0 Attached 0 Attached El Remote Examination Location Description/Rernark Remote' Examination ConditionsEquipment Remarks Examindon Results, Details and Comments:
haminer: dI.4 Level J!A Date+. Reviewer:
JfA Date $!A Reviewer:, r/(A Date (/A VYNV 8047.06 NE 8047 brTginal Page 1 of 1 t 
.- t Visuaf Aids I photo Sketch Method I I Vermont Yankee Visual Examination Report Form for General Visual (IWE)
* Work Order No.:, 00 - 6050 35 Procedure NO~RW.: PP 7 bPf/O Page / of ~ater_r/r(/o/
I I . - Component
@ Mirror tight Source 0 6" SCd8 10 Attached 1 CI Attached I cl Remote ~ - Examination Location DescriptionlRsmarks Remote- Examination ConditicnslEquipment Remarks - hrty&Y fidC4?&W5 WNEF 8047.06 NE 8047 original Page 1 of 1 t Vermont Yankee Visual Examination Report Form for General Visual {IWE) Visual Aids Photo Sketch 3 Binoculars pl None $4 None Component
:ompooent ID: X - /a% System: bn+ k~c~ Method p Direct G*rr,r~Qe~
Examination Location Descr$tion/Remarks hqd4 4-c L&*4*.& 1 Mirror kl Light Source 3 6" Scale Remote Examination ConditionslEquipment Remarks rJ/A. 3 Other 1 X-l13% I Examination Results, Details and Comments:
Examiner:
#/A Level IJ/R Date '"/A Reviewer:
&/A Date N/A Reviewer:
* Date Nh VYNEF 8047.06 NE 8047 Origina! Page 1 of 1 i . -. - . . . . . __ .
i Work Order No.: 00-00 5035 Visual Aids Photo Sketch 3 Binoculars C% None 0 None 3 Mirror 0 Attached !J Attached Vermont Yankee Visual Examination Report Form for Method 0 Direct Nut p*6G-d?, 0 Remote % ACtLG-d5b Procedure NolRev.: 8p 70 %$ g! Light Source 0 6" Scale 0 Other Examination location DescriptionjRemarks Remote' Examination ConditionslEquipment Remarks 'I>r y rJc LI pl&C.Cru=JiOrr, &r'A x- lo3 VYNEF 6047.06 NE 3047 Original Page 1 of 1 L -. ..
I e Data Sheet No: -[ Work Order No.:.. Praedure Nomev.: /p 70 A 190 -OD $0 3c Vermont Yankee Visual Examination Report Form for General Visual (!WE) Page of 4 Date: @d,/h/ t c - Component Minor ~ght Source D 6' Scale 0 Attached 0 Attached 0 Remote Examination Location Desuiptionmernarb I Remote Examination Conditionsf Equipment Remarks Examination Results, Details and Comments:
I! WNEF 8047.06 NE 8047 briginal Page 1 af t i - --- - -
Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page 1 of I Date: :hx/b/ t Component 0 Other Fvnmination Re&, Details and Comments:
I . WNEF 8047.06 NE 8047 Original Page 1 of 1 1 Data Sheet No:-zac- btf - 387 Work Order No.: 00 00 50 35 Procedure NolRev.: #p 70 As/ /o . I verrnbnt Yankee Visual Examination Report Form for Visua[ Aids Photo Sketch 3 Binoculars None )B None %Mirror 0 Attached 0 Attached General Visual flWE) Method FDirect 6.1~~) a P*L a Remote - __ ~ ~ 3 tight Source I Examination Location Descriotionlff emarks1 Remote Examination ConditionsIEquipment Remarks Examiner:
Level lu/A Date Reviewer:
N/A Date Nh Reviewer:'
EJh Date A'/A ANII: Qate Id?/*f If f VYNEF 8047.06 NE 8047 Origina! Page 1 of 1 !
* C Data Sheet NO: Zw 6- GJ- 3 8 8 Work Order NO.: 00- 00 SO is Procedure Nomev.: Page 1 of Date: t.la i @P 7b LI/ /a Vermont Yankee Visual Examination Report Form for General Visual (JWE) Component component ID: y-107 System: b.9 ~-Lu- Drawing NolRev.: s??-d - s// Location:
gx.cc,", 4 SQ~& - Visual Aids Photo Sketch Method 1 - 0 Binoculars None None ,El Direct 60,* U Attached 0 Attached CI Remote f$L Mirror $&Light Source Examination Location OescriptionlRemarks Remote Examination ConditionslEquipment Remarks 0 6" Scale aqb3A.q Pu,kd;o &) 44 D Other A- 107 Examination Results, Details and Comments:
RI -LJ- d2 AbLlG % b*L 4 Cr+-ccA L &f?un e&*d*b DC di\ p -LA3 I, PLSUikS rnl AI& c **A ,A .- , Lsuk * .*.c4sfLc VYNEF 8047.06 NE 8047 Original Page 1 of 1 Vermont Yankee Work Order No.: t?d* 80 ild / 7 dbd Procedure NoRev.: &b fb / 1 Visual Examination Report Form VT-1, Containment Surfaces (IWE) Drawing Nomev.:
4- /9 /I67 !a. 0 Other (Explain)
Level: 4' Date: , , Examiner:
1 Examiner: Level:
&/A Date: Reviewer:
Date: </<kt Evaluation Required?
yes do VYNEF 8045.02 NE 8045 Rev. 1 Page 1 of 1 BorCs-a/ -s// Vermont Yankee Reference Data Sheet No: Visual Examination Page 2 of Date: s/I-//o / Supplemental Report Form Component
:omponent ID: )-ZOO4 System: %LV3 Raminer Level:, ..fA Date: 4 Zeviewer:
Date: sydk/ ieviewer:
44 Date: 4 MI: .&w Date: S- %/ VYNEE 8045.04 NE 8045 Original Page 1 of 1 tfc #I Vermont Yankee II Work Order No.: 00 -0046)7~,060 page I of / Date: 5 o/ Procedure NoRev.: h!k "goi/-T / RmG / Visual Examination Report Form VT-1, Bolting @WE) ~ II Comuonent Drawing NoRev.: L-~WW~ e /v: a Bolting Length: Y ;/8 ' I' Bolting Diameter:
0 Magnifying Glass umination carmo.: y Yg 'Examiner:
Level: &- Date: 4+ Reviewer:
ANII: #F& Date: 9- O/ WNEF 8045.03 NE 8045 Original Page 1 of 1 WorkOrderNo.:
00 - 00 94 /f.-C'd 0 Procedure No/Rev.: /YE 86 95 Me*.. 0 Page / of / Date: s-=s-~/ Visual Examination Report Form VT-1, Bolting (IWE) Evaluation Required?
UYes VNo Leve1:xDate:
fi g0 @ Examiner:
Level: & Date: Reviewer:
Date: 1 Reviewer:
h'h Date: IJ/A I Date: 6-s-o! VYNEF 8045.03 NE 8045 Original Page 1 of 1 Vermont Yankee Visual Examination Report Form VT-1, Bolting (IWE) CA/3S86d //' Drawing Nomev.: 7 -62O;L 4euo o
* Bolting Length: ya" 'I Bolting Diameter:
II 0 Magnifying Glass OYes MNo VYNEF 8045.03 NE 8045 Original Page 7 of 1 Visual Examination Report Form for General Visual (IWE) page I of 1 Date: !//G/oI t Component WNEF 8047.06 NE 8047 Original Page 1 of 1 i t Data Sheet No: ZhJ 6- 6Q- 396 Visual Aids 3 Binoculars 3 Mirror Work Order No.: DO- 90
* 5 Procedure NolRev.: pp 70 aq/b . Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page 1 of I Date: jl~~loi t Component Zomponent ID: X- AQ 3 A +im Ir System: 7-04 u.< Photo Sketch Method IEl None @I None Direct 6edr~oc D Attached 0 Attached 0 Remote hawing NoRev.: 6% 6d c 8 Light Source 7 6" Scale ~. ~ Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks TSR.*S PeucccC~:gcu~
-14 Examination Results, Details and Comments:
c VYNEF 8047.06 NE 8047 Original Page 1 of 1 r 8 Data Sheet NO: 6Jw 39s Work Order No.: 90
* 00 50 35 VYNEF 8047.06 NE 8047 Original Page 1 of 1 Vermont ~inkee WNEF 8047.06 NE 8047 Original Page 1 of 1 INSERVICE DISCREPANCY REPORT (IDR) IDR #: lL!dL& Date : 5 /2 /2 001 Location:
Drvweld, Component:
X-207A -. H
* Mechanical Design Engineering Evaluation:
Performed By: Date : Disposition/Repair: ~~ ~ ISI Program Coordinator: Date
: Repair Effort: Reference Document:
Repair Completion Date: BY : Date : Service Induced: =s - NO 7 Sample Expansion Required: - NO - BY: Date: .- Sample Expansion:
IS1 Program Coordinator:
Date : BY: BY : Reinspection Required:
YES NO - Subsequent Inspection Required:
YES - - IS1 Supervisor Notified:
IS1 Program Coordinator:
Date : Reinspection Completed Satisfactorily:
IS1 Supervisor:
Date : IS1 Program Coordinator:
Date : IDR Closed: WAPF 4027.01 AP 4027 Rev. 4
* Page 1 of 1 . . . . . . - -
INSERVICE DISCREPANCY REPORT (IDR) IDR #: 01-07 Date: 5/2/2001 , Component:
Vent He- r Location:
Drvwell, *% de -/ewe9 + cd-+ &$ Mechanical Design Engineering Evaluation:
Disposition/Regair:
Disposition/Regair:
IS1 Program Coordinator:  
IS1 Program Coordinator:       +&e&?&           Date:     ?f+@
+&e&?& Date: ?f+@ Repair Effort: Reference Document:
Repair Effort:
PA Repair Completion Date: Nd Service Induced : YES &- NO - BY: Date: ~&i[ Sample Expansion Required:
Reference Document:         PA Repair Completion Date: Nd Service Induced :               YES &- NO     -BY:               Date: ~ & i [
YES - NO )G BY: ate: Sample Expansion:
Sample Expansion Required:       YES -     NO   )G   BY:       ate:
Reinspection Required:
Sample Expansion:
YES - NO L BY: @ Subsequent Inspection Required:
Reinspection Required:               YES - NO L BY:             @
Yes - NO &BY:
Subsequent Inspection Required:     Yes - NO       &BY:
* IS1 Supervisor Notified:
* IS1 Supervisor Notified:
IS1 Program Coordinator:  
I S 1 Program Coordinator:   &                   D a t e : 5-/7/./
& Date : 5-/7/./ Reinspection Completed Satisfactorily:
Reinspection Completed Satisfactorily:
IS1 Supervisor:  
IS1 Supervisor:                 &A               Date:   /4 5 5 - 1 IDR Closed:
&A Date: /4 55- 1 IDR Closed: IS1 Program Coordinator:
IS1 Program Coordinator:       i?i&%rw2         Date:
i?i&%rw2 Date: VYAPF 4027.01 AP 4027 Rev. 4 Page 1 of 1 r Data Sheet No: 80 Y7 " 0 3 Work Order No.: 00' 5037 Vermont Yankee Procedure NolRev.: Rdq? 4 0 . Visual Examination Report Form for General Visual (IWE) Page I of 9 Date: </l/b/ Reviewer: - /v/3 Date /i4 VYNEF 8047.06 NE $047 Original Page t of 1 i 
VYAPF 4027.01 AP 4027 Rev. 4 Page 1 of 1


,
r Data Sheet No:  80 Y 7     " 03 Work Order No.:   00'  5037 Vermont Yankee                Procedure NolRev.: Rdq?    40        .
x b &
Visual Examination Report Form for General Visual (IWE)           Page   I  of 9   Date: < / l / b /
Vermont Yankee Visual Examination Report Form for General Visual {IWE) 7 Component
Reviewer: -   /v/3             Date  /i4 VYNEF 8047.06 NE $047 Original Page t of 1 i
__ Visual Aids 3 Binoculars 3 Mirror !6 Light Source 3 6' Scale 7 Other Photo Sketch Method qYNone @ None @ Direct &&& 0 Attached r) Attached 0 Remote Examination Location Description/Remarks I Remote Examination CondifionslEquipment Remarks ~ 3xamination Results, Details and Comments:
Date 4Nk 0 ate VYNEF 8047,06 NE 8047 Original Page I of 1 VERMONT YANKEE TECHNICAL EVALUATION DOCUMEWATLON Technical Evaluation No. 2001 625 Tile: EVALUATION OF ASME SECTION XI - IWE FINDINGS FOR IDR 01-07 & IDR 0198 El QA (Safety CIass, OQA. or Vital Fire) 0 Non QA (Non-Safety) (Check One} Backsround This T.E. evaluates findinas from the IWE inspections of the vent header and vent Pipe bowls in the VY primaw containment.
Specificaliv addressed are Inservice Discrepancv R~Do~~s ft DRl Nos. 01-07 and 01-08, design inputs (D1) I & 2. Visual Inspections are performed on the VY primary containment in accordance with the American Society of Mechanical Engineers (ASME) Code Section Xi, Subsection IWE. The purpose of the inspections is to identify degradation of coatings and metal waJl loss to insure the continued structural integrity of the primary containment.
The inspectors use a pre-evaluated acceptance criteria, 01 (31, to screen inspection results. The pre-evaluated criteria is based on VY calculation VYC-1032, Rev.1, DI (4), it serves as a threshold for further evaluation of the results by Design Engineering.
IDR 01-07 identifies areas of general pitting and general corrosion in the vent header and the vent pipe bowls. DI (3) requires any indications adjacent to the vent header mitre joints, downcomer intersections, and vent pipe/header intersections be forwarded to Design Engineering for evaluation.
IDR 01-08 identifies corrosion on the internal surfaces of all (8) of the X-207 penetrations.
These penetrations were the !ow point drain in the bottom of each vent pipe bowl. Dl's (3) & (4) do not specifically address corrosion in the X-207 penetrations.
The findings were forwarded to Design Engineering for evaluation.
Discussion I DR 01 -07 1DR 01-07 identifies areas of general pitting and general corrosion in the vent header and the vent pipe bowls. A summary of the findings from IDR 01-07 is attached to this TE as Table 1 I As indicated on page 1 of 9 of Data Sheet No. 8047-01-031, the pitting areas identified have a minimum separation of (3) pit diameters.
Areas identified with local pitting in the vent pipe bowls and in the vent header within 4 inches of the vent pipeheader intersections require an evaluation by Design Engineering.
This TE will evaluate the findings shown in Table 1 against the acceptance criteria contained in DI(4). As shown in Table 1, localized pitting was found in the lower portions of all (8) vent pipe bowis. The areas of pitting correspond to zones 1 and 3 as shown in Figure 27 in Attachment A of VYC- 1032, Rev. 1, Di (4). Permissible size indications for these zones are given in Figures 28 and 30 from D1(4> for zones 1 and 3 respectively.
The limiting zone is zone 1. All pitting in the vent pipe bowls will be evahted using an enveloping comparison for zone I. From DI (3), a pit is , WAPF 6045.02 Ap604S.02 Qriginal Page 1 of 6 W Technical evaluation No. TE 2001 -0025 defined as a small area of surface corrosion less than 0.5 inch in diameter. , To envelop pitting found in the vent pipe bowls, the allowable depth of a 1 inch diameter surface indication wiil be compared against the largest measured pit depth from Table 1, Note that the areas of localized pitting shown in Table 1 only define the areas of pitting, not a zone of wall loss. From Figure 28, for a 1 inch diameter indication an allowable depth is greater than 0.1 0 inch. From Table 1 the maximum pit depth for the vent pipe bowls is 0.042 inches in X-5F. Therefore all observed pitting in the vent pipe bowls is acceptable.
To envelop pitting found in the vent header, the same approach as for the vent pipe bowls will be used. Since the pitting is adjacent to the vent pipe intersection, Figure 30 for zone 3 will be used, From Figure 30; for a 1 inch diameter indication, an allowable depth is greater than 0.12 inch. From Table 1 the maximum pit depth for the vent header is 0.042 inches adjacent to X-5F. Therefore all observed pitting in the vent header is acceptable.
The standing water found in the in the bottom of the bowl at X-5H along with any other standing water accumulated in the other bowls during this refueling outage will be removed prior to drywell closeout per 5/4/01 telecon with B.Tietze, VY Facilities Supervisor.
1DR 01-08 IDR 01-08 identifies corrosion on the internal surfaces of all (8) of the X-207 penetrations, X-207 A to X-207H. Dl's (3) & (4) do not specifically address corrosion in the X-207 penetrations.
The results were fowarded to Design Engineering for evaluation.
Each of these penetrations was the low point drain in the bottom of each vent pipe bowl. The original design of the X-207 penetration was a 1 inch nominal pipe which extended from the bottom of the vent pipe bowl down to an elevation below the Torus water level. These lines were removed and the pipe stubs were capped during the Torus Mark I Program Modifications under EDCR 80-1 1, Details are shown on VY drawings No. 6202-213 and 5920-9152, Dl's (6) & (7). Specific calculations for required wall thickness for the X-207 penetration are not contained in the original design analysis report, Dt (5). Due to the small size of the penetration (less than 2 inch nominal) no additional reinforcement was required by the ASME Code. Drawing No. 6202- 213 shows the construction details for the penetration.
The penetration is a 1 inch diameter schedule 80 pipe attached to the vent pipe head using a full penetration weld and a reinforcing fillet weld. The thinnest section is the wail of the 1 inch diameter pipe stub. Using the sizing requirements from the original design code, the required thickness for pressure and applied loads wiII be determined.
This will be compared against the piping wall thickness with the estimated waIl loss from IDR 01 -08 as shown on Data Sheet No. 8047-01-32.
From Dl (6), the pipe is 7 inch Sch. 80 seamless pipe A333 Gr. 1, with an outside diameter of 1.315 inches, and a nominal thickness of 0.179 inch. The material ultimate strength is 55 KSi. and the code allowable stress is 13.7 Ksi. The minimum installed thickness of the pipe including the +/- 12.5% manufacturing tolerance is 0.157 inch. The effective throat of the 3/16 fillet weld on the cap is .707{3/16)
= 0.133 inch. WAPF 6045.02- Ap6045.02 original Page 2 of 6 VY Technical evafmtiun No. TE 2001-0025 . From ASME 111 & Vllt, DI (8), the required thickness for the 56 Psi design pressure (conservative considering this is an internal component) is taken from UG-27 of ASME VJII. With P=56. Psi., R= 1.315 /2 = .658 inch, & SE 43,700. Psi.: , 't = 56'(0*658)
= 0.0027 inch. PR Circumferential Stress: t = SE - 0.6P 13700. -0.6(56) Longitudinal Stress: t= , t= 56'(0'658)
=Z 0.001 3 inch. PR 2SE -F 0.4P 2(13700.)
f 0.4(56) Given the cantilever configuration and the small size of the stub, there are minimal loads on the stub, Using a 1.0% increase to account for rnisc. loads etc., the required wall thickness for the pipe will be taken as 0.003 inch. The minimum wall thickness including the 0.025 inch estimated wall ioss from Data Sheet No. 8047-01-32, is (0.157-.025)
= 0.132 inch. This is significantly greater than the 0.003 inch required wall thickness.
AssurnDtionsfOpen items NONE Material Reauirementsflrnptementation Instructions NONE Conclusions 1DR 01-07: The localized shallow pitting found in the bottom interior surfaces of the vent header and vent pipe bowls has been evaluated against the D1 (4) acceptance criteria and found acceptable.
The preparer of this T.E. accompanied the !WE examiners on this inspection.
The interior condition of the vent header appears essentially the same as observed on a pre-IW E walkdown performed on 9/23/93. During the 1993 refueling outage the vent header was cleaned and a protective coating was applied to the bottom of each bowl and at stiffener plate locations at the downcomers.
These coatings are still intact. The extent of light surface corrosion and local pitting appears about the same as was observed in 1993. This indicates that most of the pitting occurred prior to 1993, and that the mechanism is not currently aggressive.
Based on this, no augmented inspections would be recommended.
IDR 01-08 The estimated wall joss in each of the X-207 penetrations has been conservatbely evaluated WAPF 6045XQ * ~~6045.02 Original Page 3 of 6 W Technical evaluation No. TE 2001-0025 against code requirements and the reamining wall is significantly greater than the code required wall thickness.
The significant margin to code minimum wall thickness and the low expected rate of gakanic corrosion in the inerted containment during operation,'
would support that no augmented inspections would be recommended at this time. Recommendations
: 1. The ZOO1 refueling outage Data Sheet 8047-01-031 should be used as a baseline for the next scheduled
!WE inspection of the vent header interior.
: 2. The next scheduled IWE visual inspection of the exterior of the vent pipe should include a specific note to check the exterior condition of the X-207 stubs. Approval s/Ciosea ut e and provide signature/date.,l CE Independent Reviewer Department Manager Closeout (AN actions that were recommended by the TE and accepted by management have been initiated and any identified open ifems have been dispositioned.)
/ CE (signature)
{date) Aftachments A. Table I: Summary of Vent Header IWE Findings (1 Page} 6. VY Insetvice Discrepancy Report (IDR) No. 01-07 for Vent Header, dated 5/2/01. -1WE Data Sheet No. 8047-01-031. ( 10 Pages } C. VY Inservice Discrepancy Report (IDR) No, 01-08 for X 207 A-H , dated 5/2/01. - IWE Data Sheet No. 8047-01-032. ( 2 Pages) WAPF 6045.02 Ap6045.02 Original Page 4 of 6 TECHNICAL EVALUATION DATABASE lNPUT #I 1 2 3 4 5 6 7 8 Document Title (including Rev. No. and Date, if appkable) 1 W Inservice Discrepancy Report (IOR) No. 01 -07 for Vent Header, dated 32/01. (!WE Data Sheet No. W Inservice Discrepancy Report (IDR) No. 01 -08 for X 207 A-H , dated 5/2/01. (IW E Data Sheet No. W Design Engineering Memo: J.C.Fitzpatrick to J.H.Callaghan, subject: Pre-Evaluated Acceptance Criteria for Primary Containment ASME XI IWE Inspections, VYM 99/112, dated December 7,1999. VY Calculation No. WG-1032, Rev.l "Torus Shell & Vent System Thickness Requirements.
Certified Stress Report, , Vernon - II, Vermont Yankee Project Containment Vessel, No. 9-6202-11, October 29,7968, by Chicago 8ridge & Iron - Oak Brook Engineering.
VY Drawing No. 6202-213, Rev 0. C8&I Drawing for Vent tine - Header Intersection.
VY Drawing No. 5920-91 52, Rev. 0, CB&! drawing for Modifications to Vent Header Drain Line ASME Section 111 Nuclear Vessels, ?965 (with Winter 1965 Addenda) and ASME Section Vlll Unfired Pressure Vessefs ,1965. 8047-01-031 ) 8047-01 -032) TE 2001-025 Page 5 of 6 I NONE 1 TE NO. 2001-025 r# 9 TE Title: EVALUATION OF ASME SECTION XI - IW E FINDINGS FOR IDR 01-07 & IDR 01 -08 Keywords:
Torus, ASME Section XI, IWE, Vent Pipe. Vent Header Reference Title (including Rev. No. and Date, if applicable}
ANSI 836.10 -1979 Welded and Seamless Wrought Steel Pipe. Data Entered inlo Database 1 Entry Verified I Signature Date Signature Date VYAPF 6045.03 . Page 1 of 1 AP 6045 origw  
- - -- TECHNlCAL EVALUATION REVIEW TE NO. 2001-025 Pg 6 Of 6 TE#: 700 1-025 Required Date: Y / Reviewer Assigned:
h/- Titte: EVALUAT ION OF ASME SEC'IWN XI - !WE FINDINGS FOR 1DR 01 -07 & IDR 01-08 Cornmen ts: n/ahlE
* I /Oat$ to your area of expertise.
2, 3. 4. 5. 6. 7. 8. Verify Depattment Procedures, Program Inpuk. and output documents are appropriately addressed, Meetings of discussions lo resolve questions and mmmenls are encouraged.
Resolution by telecon is acceptable and should be noted as such. Make comments spaclllc, and avoid generalizations and queslions.
Lf no comments indicalo 'None" Request Management asslstance if resolution can not be achieved.
Roturn all comments to Ihe CE by raquired date or request an edenslon.
Resolution:
VYAPF 6045.04 AP 6045 Orighal Page 1 of 1 TABLE 1 Summary of Vent Header IWE Findings Vent Pipe Findings D.I. (4) Bowl 63 Figure 27 X-5A Zone{s) I & 3 Light scattered pitting at bottom of interior surface adjacent to vent header A-6 intersection, depfh - 0.01 5" metal loss. X-56 General surface corrosion, no significant 3 x-5c General surface corrosion, no significant 3 metal loss with light scattered pitting at botlom of interior surface adjacent to vent header B-C intersectlon, depth - 0.016". X-5D General surface corrosion, no significant 1 metal loss with light scattered pitting at bottom of interior surface adjacent to vent header C-D intersection, depth - 0.009" X-5E Light general surface corrosion, no significant 3 metal loss. X-5F Scattered pitting at bottom of interior surface 3 adjacent to vent header intersections:
E-F, depth - 0.042", and at F-G, depth - 0.025, X-5G General corrosion and scattered pitting at 1,3 bottom of interior surface adjacent to vent Vent Header Findings between X-5A ti X-55 Scattered pitting bottom interior surface adjacent to X-5A vent pipe intersection, ma. depth - 0.035" General surface corrosion, no significant metal loss. Scattered pitting bottom interior surface adjacent to X-5B vent pipe intersection, depth - 0.026" General surface corrosion 1x1 bottom interior surface, no significant metal loss. Scattered pitting bottom interior surface adjacent to X- 5D vent pipe intersection, max. depth - 0.025" light general surface corrosion, no significant metal loss. Light pitting bottom interior surface adjacent to vent pipe intersections.
At X-5D max. depth - 0.009", at X-5E ma. depth - 0.010'. General surface corrosion, no significant metal loss. Scattered pittjng at X-5E vent pipe intersection, ma. depth - 0.031" over area size 2" by 3". Scattered pitting bottom interior surface adjacent to vent pipe X-5F, depth - 0.042" . General surface corrosion.
no significant metal loss. Scattered pitting at X-5G vent pipe intersection, Max. depth 0.025". General surface corrosion, no significant metal loss. Scattered X-56 & X-5C X-5C & X-5D X-5D & X-5E X-5E & X-5F X-5F & X-5G X-5G & X-5H pitting at X-5G vent pips intersection, ma. depth 0.010*. Scattered pitting at X-5H vent pipe intersection, ma. depth 0.035* approximate area 9" bv 9". X-5H 0.01 0" Scattered pitting at bottom of interior surface adjacent to G-H vent header Intersection, ma depth - 0.025" area size 9" x 14". significant amount of water in bottom of bowl. 3 XSM & X-5A General surface corrosion on bottom interior surface, no significant metat loss. ATACHMENT A to T.E. NO. 2001-025 Page 1 of 1 Performed By: Date: Disposition/Repair:
__ -. IS1 Program Coordinator:
Date:. Repair Effort: Reference Document:
Repair Completion Date: Service Induced: YES - NO - BY: ___ Date:. sample Expansion Required:
YES _u NO - BY: Date: .- sample Expansion
: ,-__ ~~- ~ ~~ IS1 Program Coordinator:
Date : Reinspection Required:
YES NO 7 BY : Subsequent Inspection Required:
YES NO _c BY:. rsI: Supervisor Notified:
IS1 Program Coordinator:
Date : Reinspection Completed Satisfactorily:
IS1 Supervisor:
Date: IDR Closed: Is1 Program Coordinator:
Date: VYAPF 4027.01 AP 4027 Rev. 4- Page 1 of 1 I- # Data Sheet No: BO J? Work Order NO.: Procedure NolRev.:.
8OJ7 40 . I - 0 3f 00 - 50 37 b Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page 1 of 9 -Date: ?/?/dl I f < Component CQmponent 10: f~*+ H~Q~A> System: -br+ 4 Drawing NolRev.: 62-02. 2-0'6 Location:
t Qtv ~3 cU Method Visual Aids Photo Sketch IZf Direct (5*rrJ4 8 p3'5 rJh 0 Binoculars None a None 13 Attached @ Attached 0 Remote Examinatian Location Oescription/Remarks Rem& Examination ConditionslEqulpmeot Remark 0 Mirror Light Source $+irp.ior S,I P f6e a F 0 6" Scale 0 Other V.Acct' #dar ination Results, Details and Comments:
t


.
x b
-.
 
\ x 
Vermont Yankee Visual Examination Report Form for General Visual {IWE) 7            Component Visual Aids                    Photo                      Sketch                    Method 3 Binoculars            qYNone                            @ None            @ Direct    &&&
.- XNSERVICE DISCREPANCY REPORT (IDR) IDR #: QT-OS. Date: 5La/20Q1 Component
3 Mirror                0 Attached                        r) Attached      0 Remote
: X-207A - y Location:
!6 Light Source                                                  I Examination Location Description/Remarks Remote Examination CondifionslEquipment Remarks 3 6' Scale 7 Other
Dm I < XSI Supervisor:
~
D-4 Date: System Operability Affected:
3xamination Results, Details and Comments:
YES NO BY: BN Date: Shift Supervisor Notified:
Date 4Nk                                              0 ate VYNEF 8047,06 NE 8047 Original Page I of 1
YES NO LBY: Date: d4/ Event Report Initiated:
 
Mechanical Design Engineering Evah.IatiOn:, YES - NO LBY: .H Date: flab/ c Performed By: . Date: *. Disposition/Repair:, IS1 Program Coordinator:, Date : Repair Effort : Reference Document:
VERMONT YANKEE TECHNICAL EVALUATION DOCUMEWATLON Technical Evaluation No. 20016 2 5 Tile: EVALUATION OF ASME SECTION XI          - IWE FINDINGS FOR IDR 01-07 & IDR 0198 El QA (SafetyCIass, OQA. or Vital Fire) 0 Non QA (Non-Safety) (Check One}
Repair Completion Date:. Semice Induced: YES __ NO 7 BY: Date: .- Sample Expansion Required:
Backsround This T.E. evaluates findinas from the IWE inspections of the vent header and vent Pipe bowls in the VY primaw containment. Specificalivaddressed are Inservice Discrepancv R ~ D o ft~ DRl      ~s Nos. 01-07 and 01-08, design inputs (D1)I& 2.
YES __. NO - BY: Date:, Sample Expansion:
Visual Inspections are performed on the VY primary containment in accordance with the American Society of Mechanical Engineers (ASME) Code Section Xi,Subsection IWE. The purpose of the inspections is to identify degradation of coatings and metal waJl loss to insure the continued structural integrity of the primary containment. The inspectors use a pre-evaluated acceptance criteria, 01 (31,to screen inspection results. The pre-evaluated criteria is based on VY calculation VYC-1032, Rev.1, DI (4), it serves as a threshold for further evaluation of the results by Design Engineering.
IS1 Program Coordinator:
IDR 01-07 identifiesareas of general pitting and general corrosion in the vent header and the vent pipe bowls. DI (3) requires any indications adjacent to the vent header mitre joints, downcomer intersections, and vent pipe/header intersections be forwarded to Design Engineering for evaluation.
Date : Reinspection Required:
IDR 01-08 identifies corrosion on the internal surfaces of all (8) ofthe X-207 penetrations.
YES - NO - BY: SubsecpenL Inspection Required:
These penetrations were the !ow point drain in the bottom of each vent pipe bowl. Dl's (3)& (4) do not specifically address corrosion in the X-207 penetrations. The findings were forwarded to Design Engineering for evaluation.
YES - NO - BY: XSI Supervisor Notified:
Discussion I DR 01-07 1DR 01-07 identifies areas of general pitting and general corrosion in the vent header and the vent pipe bowls. A summary of the findings from IDR 01-07 is attached to this TE as Table 1        I As indicated on page 1 of 9 of Data Sheet No. 8047-01-031, the pitting areas identified have a minimum separation of (3) pit diameters. Areas identified with local pitting in the vent pipe bowls and in the vent header within 4 inches of the vent pipeheader intersections require an evaluation by Design Engineering. This TE will evaluate the findings shown in Table 1 against the acceptance criteria contained in DI(4).
As shown in Table 1, localized pitting was found in the lower portions of all (8)vent pipe bowis.
The areas of pitting correspond to zones 1 and 3 as shown in Figure 27 in Attachment A of VYC-1032,Rev. 1, Di (4). Permissible size indications for these zones are given in Figures 28 and 30 from D1(4>for zones 1 and 3 respectively. The limiting zone is zone 1. All pitting in the vent pipe bowls will be evahted using an enveloping comparison for zone I.From DI (3), a pit is
                                                                              , WAPF 6045.02 Ap604S.02 Qriginal Page 1 of 6
 
W Technical evaluation No. TE 2001-0025 defined as a small area of surface corrosion less than 0.5 inch in diameter.
To envelop pitting found in the vent pipe bowls, the allowable depth of a 1 inch diameter surface indication wiil be compared against the largest measured pit depth from Table 1, Note that the areas of localized pitting shown in Table 1 only define the areas of pitting, not a zone of wall loss. From Figure 28, for a 1 inch diameter indication an allowable depth is greater than 0.10 inch. From Table 1 the maximum pit depth for the vent pipe bowls is 0.042 inches in X-5F.
Therefore all observed pitting in the vent pipe bowls is acceptable.
To envelop pitting found in the vent header, the same approach as for the vent pipe bowls will be used. Since the pitting is adjacent to the vent pipe intersection, Figure 30 for zone 3 will be used, From Figure 30; for a 1 inch diameter indication, an allowable depth is greater than 0.12 inch. From Table 1 the maximum pit depth for the vent header is 0.042 inches adjacent to X-5F.
Therefore all observed pitting in the vent header is acceptable.
The standing water found in the in the bottom of the bowl at X-5Halong with any other standing water accumulated in the other bowls during this refueling outage will be removed prior to drywell closeout per 5/4/01 telecon with B.Tietze, VY Facilities Supervisor.
1DR 01-08 IDR 01-08 identifies corrosion on the internal surfaces of all (8) of the X-207 penetrations, X-207 A to X-207H. Dl's (3) & (4) do not specifically address corrosion in the X-207 penetrations. The results were fowarded to Design Engineering for evaluation.
Each of these penetrations was the low point drain in the bottom of each vent pipe bowl. The original design of the X-207 penetration was a 1 inch nominal pipe which extended from the bottom ofthe vent pipe bowl down to an elevation below the Torus water level. These lines were removed and the pipe stubs were capped during the Torus Mark I Program Modifications under EDCR 80-11, Details a r e shown on VY drawings No. 6202-213 and 5920-9152,Dl's (6) &
(7).
Specific calculations for required wall thickness for the X-207 penetration are not contained in the original design analysis report, Dt (5). Due to the small size of the penetration (less than 2 inch nominal) no additional reinforcement was required by the ASME Code. Drawing No. 6202-213 shows the construction details for the penetration. The penetration is a 1 inch diameter schedule 80 pipe attached to the vent pipe head using a full penetration weld and a reinforcing fillet weld. The thinnest section is the wail of the 1 inch diameter pipe stub. Using the sizing requirements from the original design code, the required thickness for pressure and applied loads wiII be determined. This will be compared against the piping wall thickness with the estimated waIl loss from IDR 01-08 as shown on Data Sheet No. 8047-01-32.
From Dl (6),the pipe is 7 inch Sch. 80 seamless pipe A333 Gr.1, with a n outside diameter of 1.315inches, and a nominal thickness of 0.179 inch. The material ultimate strength is 55 KSi.
and the code allowable stress is 13.7Ksi. The minimum installed thickness of the pipe including the +/- 12.5%manufacturing tolerance is 0.157 inch. The effective throat of the 3/16fillet weld on the cap is .707{3/16) = 0.133 inch.
WAPF 6045.02-Ap6045.02 original Page 2 of 6
 
VY Technical evafmtiun No. TE 2001-0025 From ASME 111 & Vllt, DI (8),the required thickness for the 56 Psi design pressure (conservative considering this is an internal component) is taken from UG-27 of ASME VJII.
With P=56. Psi., R= 1.315/2= .658inch, & SE 43,700.Psi.:
PR    , 't =    56'(0*658) = 0.0027 inch.
Circumferential Stress:    t=
SE- 0.6P        13700.-0.6(56)
Longitudinal Stress:     t=    PR      , t=        56'(0'658)      =Z 0.001 3 inch.
2SE -F 0.4P        2(13700.)f 0.4(56)
Given the cantilever configuration and the small size of the stub, there are minimal loads on the stub, Using a 1.0% increase to account for rnisc. loads etc., the required wall thickness for the pipe will be taken as 0.003inch.
The minimum wall thickness including the 0.025 inch estimated wall ioss from Data Sheet No.
8047-01-32,    is (0.157-.025)= 0.132 inch. This is significantly greater than the 0.003 inch required wall thickness.
AssurnDtionsfOpen items            NONE Material Reauirementsflrnptementation Instructions              NONE Conclusions 1DR 01-07:
The localized shallow pitting found in the bottom interior surfaces of the vent header and vent pipe bowls has been evaluated against the D1 (4) acceptance criteria and found acceptable.
The preparer of this T.E.accompanied the !WE examiners on this inspection. The interior condition of the vent header appears essentially the same as observed on a pre-IW E walkdown performed on 9/23/93. During the 1993 refueling outage the vent header was cleaned and a protective coating was applied to the bottom of each bowl and at stiffener plate locations at the downcomers. These coatings are still intact. The extent of light surface corrosion and local pitting appears about the same as was observed in 1993. This indicates that most of the pitting occurred prior to 1993, and that the mechanism is not currently aggressive. Based on this, no augmented inspections would be recommended.
IDR 01-08 The estimated wall joss in each of the X-207 penetrations has been conservatbely evaluated WAPF 6045XQ *
                                                                                ~ ~ 6 0 4 5 . 0Original 2
Page 3 of 6
 
W Technical evaluation No. TE 2001-0025 against code requirements and the reamining wall is significantly greater than the code required wall thickness.
The significant margin to code minimum wall thickness and the low expected rate of gakanic corrosion in the inerted containment during operation,would support that no augmented inspections would be recommended at this time.
Recommendations
: 1. The ZOO1 refueling outage Data Sheet 8047-01-031should be used as a baseline for the next scheduled !WE inspection of the vent header interior.
: 2. The next scheduled IWE visual inspection of the exterior of the vent pipe should include a specific note to check the exterior condition of the X-207 stubs.
Approvals/Ciosea ut              e and provide signature/date.,l CE Independent Reviewer Department Manager Closeout (AN actions that were recommended by the TE and accepted by management have been initiated and any identified open ifems have been dispositioned.)
                            /              CE (signature)                {date)
Aftachments A. Table I: Summary of Vent Header IWE Findings (1 Page}
: 6. VY Insetvice Discrepancy Report (IDR) No. 01-07 for Vent Header, dated 5/2/01. -1WE Data Sheet No. 8047-01-031.    ( 10 Pages }
C. VY Inservice Discrepancy Report (IDR) No, 01-08 for X 207 A-H , dated 5/2/01. - IWE Data Sheet No. 8047-01-032.( 2 Pages)
WAPF 6045.02 Ap6045.02 Original Page 4 of 6
 
TECHNICAL EVALUATION DATABASE lNPUT                        TE 2001-025 Page 5 of 6 TE NO. 2001-025 TE
 
==Title:==
EVALUATION OF ASME SECTION XI                - IW E FINDINGS FOR IDR 01-07& IDR 01-08 Keywords: Torus, ASME Section XI, IWE, Vent Pipe. Vent Header 1
    #      I                        DocumentTitle (including Rev. No. and Date, if appkable) 1        W Inservice Discrepancy Report (IOR) No. 01-07 for Vent Header, dated 32/01. (!WE Data Sheet No.
8047-01-031) 2        W Inservice Discrepancy Report (IDR) No.01-08for X 207 A-H ,dated 5/2/01. (IW E Data Sheet No.
8047-01-032) 3        W Design Engineering Memo: J.C.Fitzpatrick to J.H.Callaghan, subject: Pre-EvaluatedAcceptance Criteria for Primary ContainmentASME XI IWE Inspections, VYM 99/112, dated December 7,1999.
4        VY Calculation No. WG-1032, Rev.l Torus Shell & Vent System Thickness Requirements.
5        Certified Stress Report, ,Vernon - II, Vermont Yankee Project Containment Vessel, No. 9-6202-11, October 29,7968,by Chicago 8ridge & Iron- Oak Brook Engineering.
6                                                                        -
VY Drawing No. 6202-213, Rev 0.C8&I Drawing for Vent tine Header Intersection.
7        VY Drawing No. 5920-9152, Rev. 0,CB&! drawing for Modifications to Vent Header Drain Line 8      ASME Section 111 Nuclear Vessels, ?965 (with Winter 1965 Addenda) and ASME Section Vlll Unfired Pressure Vessefs ,1965.
I NONE 1
r  #                                Reference Title (including Rev. No. and Date, if applicable}
9        ANSI 836.10-1979 Welded and Seamless Wrought Steel Pipe.
Data Entered inlo Database                                  1        Entry Verified                    I Signature                  Date                    Signature              Date VYAPF 6045.03 .
AP 6045 origw Page 1of 1
 
                                                                                  --  1---                                -
TECHNlCAL EVALUATION REVIEW                        TE NO. 2001-025Pg 6 Of 6 TE#: 7001-025                                        Required Date:         Y    /      Reviewer Assigned: h/-
Titte: EVALUATION OF ASME SEC'IWN XI                        - !WEFINDINGS FOR 1DR 01-07& IDR 01-08 Cornments:                                                                         Resolution:
n/ahlE
* I
                                                          /Oat$
to your area of expertise.
2,  Verify Depattment Procedures, Program Inpuk. and output documents are appropriately addressed,
: 3. Meetings of discussions lo resolve questions and mmmenls are encouraged.
: 4. Resolution by telecon is acceptable and should be noted as such.
: 5. Make comments spaclllc, and avoid generalizations and queslions.
: 6. Lf no comments indicalo 'None"
: 7. Request Management asslstance if resolution can not be achieved.
: 8. Roturn all comments to Ihe CE by raquired date or request an edenslon.
VYAPF 6045.04 AP 6045 Orighal Page 1 of 1
 
TABLE 1 Summary of Vent Header IWE Findings Vent Pipe Findings                                        D.I. (4)  Vent Header  Findings Bowl 63                                                  Figure 27 between Zone{s)
X-5A      Light scattered pitting at bottom of interior      I& 3  X-5A ti X-55 Scattered pitting bottom interior surface adjacent to X-5A vent pipe surface adjacent to vent header A-6 intersection, depfh 0.015 intersection, ma. depth 0.035 X-56      General surface corrosion, no significant            3  X-56 & X-5C  General surface corrosion, no significant metal loss. Scattered metal loss.                                                            pitting bottom interior surface adjacent to X-5B vent pipe intersection, depth 0.026 x-5c      General surface corrosion, no significant            3  X-5C & X-5D  General surface corrosion 1x1bottom interior surface, no significant metal loss with light scattered pitting at                            metal loss. Scattered pitting bottom interior surface adjacent to X-botlom of interior surface adjacent to vent header B-C intersectlon, depth 0.016.
5D vent pipe intersection,max. depth 0.025 X-5D      General surface corrosion, no significant            1  X-5D & X-5E  light general surface corrosion, no significant metal loss. Light metal loss with light scattered pitting at                            pitting bottom interior surface adjacent to vent pipe intersections.At bottom of interior surface adjacent to vent header C-D intersection, depth - 0.009 X-5D max. depth 0.009,at X-5E ma.depth 0.010.  -
X-5E      Light general surface corrosion, no significant      3  X-5E & X-5F  General surface corrosion, no significant metal loss. Scattered metal loss.                                                                                                                -
pittjng at X-5E vent pipe intersection, m a . depth 0.031over area size 2 by 3. Scattered pitting bottom interior surface adjacent to vent pipe X-5F, depth 0.042.
X-5F      Scattered pitting at bottom of interior surface      3  X-5F & X-5G  General surface corrosion. no significant metal loss. Scattered adjacent to vent header intersections:E-F,                            pitting at X-5G vent pipe intersection, Max. depth 0.025.
X-5G depth 0.042, and at F-G, depth 0.025, General corrosion and scattered pitting at          1,3  X-5G & X-5H  General surface corrosion, no significant metal loss. Scattered bottom of interior surface adjacent to vent                            pitting at X-5G vent pips intersection, m a . depth 0.010*. Scattered pitting at X-5H vent pipe intersection,m a . depth 0.035*
approximate area 9bv 9.
0.010 X-5H      Scattered pitting at bottom of interior surface      3  XSM & X-5A  General surface corrosion on bottom interior surface, no significant adjacent to G-H vent header Intersection,                              metat loss.
m a depth - 0.025 area size 9x 14.
significantamount of water in bottom of bowl.
ATACHMENT A to    T.E. NO. 2001-025 Page 1 of 1
 
Performed By:                                 Date:
Disposition/Repair:
IS1 Program Coordinator:                     Date:.
Repair Effort:
Reference Document:
Repair Completion D a t e :
Service Induced:                   YES     - NO BY: ___ Date:.
sample Expansion Required:         YES     _u NO -   BY:       Date: .-
sample Expansion :
,-__            ~~-  ~ ~~
IS1 Program Coordinator:                     Date :
Reinspection Required:                   YES     NO BY :
Subsequent Inspection Required: YES               NO _c  BY:.
rsI:  Supervisor Notified:
I S 1 Program Coordinator:                    D a t e:
Reinspection Completed Satisfactorily:
Reinspection Completed Satisfactorily:
IS1 Program Coordinator:
IS1 Supervisor:                              Date:
Date :
IDR Closed:
* ISI Supemisax:
Is1 Program Coordinator:                     Date:
Date: Date: IDR Closed: VYAFF 4027.01 AP 4027 Rev. 4. Page 3. of 1 Work Order No.: 00
VYAPF 4027.01 AP 4027 Rev. 4-Page 1 of 1
* 50 37 . 0 Procedure NolRev.: %f'? 4 Vermont Yankee Visual Examination Report Form for General Visual (fWE) Page I of / Date: 51/& -~ Cornaonent Drawing Nomev.: 5920- 4~' Visual Aids Photo Sketch Method 0 Binocdars yffone ' &None Direct +&d 0 Mirror I I3 Attached 0 Attached D Remote Light Source barnination Location Descciptian/Rernarks Remote Examination ConditionslEquipment Remarks I3 6' Scale 2...t.rw&4-&w 6s- Examination Results, Details and Comments:
 
I Pcs Examiner:
I-                                                            #
Level44 Dale fll/d I Examiner:
Data Sheet No: BO J?          I  - 0 3f Work Order NO.:      00  -  50 3    7  b Vermont Yankee                                      Procedure NolRev.:. 8OJ7      40      .
Lev el A?!&, Date Reviewer:  
Visual Examination General Visual    Report (IWE)  Form for                Page    1    of  9    -Date:   ?/?/dl      I f                                        <            Component CQmponent 10:      f ~ *H+~ Q ~ A >                                    System:    -br+ 4 Drawing NolRev.:      62-02. 2-06                                  Location:  tQtv    ~3 c U Visual Aids                      Photo                      Sketch Method 0 Binoculars                  None                            a None                IZf Direct  ( 5
*A Date Lf/./o/ Reviewer:
* r r J 4 13 Attached                                8 p35
pH Date @ AMI: Date IJSERVICE DISCREPAXCY  
                                                                @ Attached            0 Remote 0 Mirror Light Source            Examinatian Location Oescription/Remarks Rem& Examination ConditionslEqulpmeot Remark 0 6 Scale                  $+irp.ior    S,IP f6e      aF 0 Other                    V.Acct # d a r                          rJh ination Results, Details and Comments:
=PORT (IDR) IDR #: !&dB Date: 5/2/2001 I Component: - d Location:
t
DrYwell L IS1 Supervisor:
 
D*d Date : System Operability Affected:
\
YES - NO jcBY: BOcy Date: dh Shift Supervisor Notified:
x
YES - NO - )C BY: LMZ Date: dJ- Event Report Initiated:
 
YES - NO ABY: Date: Q++& Mechanical Design Engineering Evaluation:
.-                    XNSERVICE DISCREPANCY REPORT (IDR)
Performed By: Disposition/Repair:
IDR #: QT-OS.
IS1 Program Coordinator:
Date:  5La/20Q1 Component :      X-207A    -  y          Location: D    m          I D-4 XSI Supervisor:                                    Date:
Date: <I5/& Repair Effort: Reference Document:
System Operability Affected: YES              NO      BY: BN    Date:
MFJ Repair Completion Date: A/!! Service Induced: YES -E..,. NO BY: w Date: d& Sample Expansion Required:
Shift Supervisor Notified:          YES      NO  L B Y :Date:            d4/
YES - NO )r BY: - e Date: Sample Expansion:
Event Report Initiated:            YES    - NO  L B Y :  . H Date: flab/
w 2Iw.d d+fz+-L . &e Hh 2- d ,e *, /.mz J&Z# .a&?b rn /-%72& # 1 &*&a&A Date : </d/ IS1 Program Coordinator:
Mechanical Design Engineering Evah.IatiOn:,
Reinspection Required:
c Performed By:
YES - NO &BY: Subsequent Inspection Required:
                              .                          Date:
YES - NO LBY: m IS1 Supervisor Notified:
Disposition/Repair:,
IS1 Program Coordinator:  
IS1 Program Coordinator:,                        Date :
*& Date: r?%k Reinspection Completed Satisfactorily:
Repair E f f o r t :
IsI Supervisor:
Reference Document:
BW - w Date: s'/s/l/ IDR Closed: IS1 Program Coordinator:
Repair Completion D a t e : .
mu& Date: VYAPF 4027.01 AP 4027 Rev. 4 - Page 1 of 1 I Data Sheet No: Work Order No.: 00
Semice Induced:                    YES __ NO    7    BY:      Date:  .-
* 5037 ' 47 3%- ProcduraNomev.:
Sample Expansion Required:          YES __. NO    -BY:          Date:,
8bf7 4 0 Vermont Yankee Visual Examination Report Form for General Visual (IWEI Page / of 1 Date: 5/it/u Component Compooent 10: X-AQ? A, 4. C,*h.G*fi 6, LLLd Visual Aids photo Sketch Method I 0 Binoculars Vffone None I I Direct ' o mimar )!f Light Source 0 6" Scale I Remote Examination Location Description/Remarks  
Sample Expansion:
>?&PA& kkhm fidm Mote Examination CanditionsEquiprnent Remarks i f. Date @ MNEF 8047.06 NE 8047 Original Page 1 of 1 VERMONT YANKEE TECHNICAL EVALUATLON DOCUMENTATION Technical Evaluation No. 2001 -025 I Title: EVALUATION OF ASME SECTION XI - IWE FlNDfNGS FOR IDR 01-07 & IDR 01-08 El QA (Safety Class, MIA, or Vital Fire) El Non QA (Non-Safety} (Check One) Backaround This T.E. evaluates findinas from the IWEjnspections of the vent header and vent pipe bowls in the VY priman/ containment. Specifically addressed are Inservice Discrepancv Reoorts (IDR) Nos. 01 -07 and 01 -08, desiqn inouts (Dl) I & 2. Visual Inspections are performed on the VY primary containment in accordance with the American Society of Mechanical Engineers (ASME) Code Section XI, Subsection IWE. The purpose of the inspections is to identify degradation of coatings and metal wall loss to- insure fhe continued structural integrity of the primary containment.
IS1 Program Coordinator:                          Date:
The inspectors use a pre-evaluated acceptance criteria, D1 (3)' to screen inspection results. The pre-evaluated criteria is based on VY calculation VYC-1032, Rev.1 , Df (4)' it serves as a threshold for further evaluation of the results by Design Engineering.
Reinspection Required:                  YES - NO -BY:
SubsecpenL Inspection Required: YES        - NO -BY:
XSI Supervisor Notified:
I S 1 Program Coordinator:                      Date:
Reinspection Completed Satisfactorily:
ISI S u p e m i s a x :                          Date:
IDR Closed:
Date:
VYAFF 4 0 2 7 . 0 1 AP 4027 Rev. 4 .
Page 3. of 1
 
37 Vermont Yankee Work Order No.:
Procedure NolRev.:
00
* 5 0
                                                                                            %f'? 4 0 Visual Examination Report Form for General
            -~
Visual (fWE)                                 Page   I   of     /   Date:   51/&
Cornaonent Drawing Nomev.:   5920- 4 ~ '
Visual Aids 0 Binocdars             yffone Photo I &NoneSketch            Direct   +&d Method 0 Mirror                 I3 Attached                         0 Attached           D Remote Light Source           barnination Location Descciptian/Rernarks Remote Examination ConditionslEquipment Remarks I3 6' Scale               2...t.rw&4-&w               6s-I Examination Results, Details and Comments:
Pcs Examiner:                                       L e v e l 4 4        Dale f l l / d   I Examiner:                                       Lev el A?!&,         Date Reviewer:     *A                                 Date     Lf/./o/
Reviewer:     pH                               Date         @
AMI:                                             Date
 
IJSERVICE DISCREPAXCY =PORT         (IDR)
IDR #:   !&dB Date:     5/2/2001       I Component:     -     d               Location: DrYwell L
IS1 Supervisor:       D*d                         Date :
System Operability Affected: YES     - NO     j c B Y : BOcyD a t e : dh Shift Supervisor Notified:       YES - NO -BY:  )C       LMZ D a t e : dJ-Event Report Initiated:         YES - NO     A B Y :           Date:   Q++&
Mechanical Design Engineering Evaluation:
Performed By:
Disposition/Repair:
IS1 Program Coordinator:                         Date:   <I5/&
Repair Effort:
Reference Document:           MFJ Repair Completion Date:         A/!!
Service Induced:                 YES -E..,. NO         BY: w Date: d     &
Sample Expansion Required:       YES -                    -
NO )r BY: e D a t e :
Sample Expansion:
                        ,  e w 2Iw.d d+fz+-L     . &e   H h2  -       d
            /.mz J&Z# .a&?b r n -/%72&                       #
1 IS1 Program Coordinator:
                                    &&a&A             Date:   </d/
Reinspection Required:               YES   - NO     &BY:
Subsequent Inspection Required: YES         - NO     L B Y :   m IS1 Supervisor Notified:
IS1 Program Coordinator:       *&                 Date:   r?%k Reinspection Completed Satisfactorily:
IsI Supervisor:                 BW - w           Date:   s'/s/l/
IDR Closed:
I S 1 Program Coordinator:       mu&             Date:
VYAPF 4027.01 AP 4027 R e v . 4 -
Page 1 of 1
 
I Data Sheet No:       47-01 3%- -
Work Order No.:   00
* 5037 Vermont Yankee                                ProcduraNomev.:     8bf7       40 Visual Examination Report Form for General Visual (IWEI                             Page     /   of   1   Date:   5/it/u Component Compooent 10:   X-AQ? A , 4. C ,
* h . G
* f i6        ,                                           L L L d Visual Aids                 photo                     Sketch     I                Method 0 Binoculars         Vffone                             None           IIDirect o   mimar                                                                 I    Remote
)!f Light Source       Examination Location Description/Remarks M o t e Examination CanditionsEquiprnent Remarks 0 6 Scale            >?&PA&         kkhm       f i d m i                                                   f.
Date       @
M N E F 8047.06 NE 8047 Original Page 1 of 1
 
VERMONT YANKEE TECHNICAL EVALUATLON DOCUMENTATION Technical Evaluation No. 2001-025                 I
 
==Title:==
EVALUATION OF ASME SECTION XI               - IWE FlNDfNGSFOR IDR 01-07 & IDR 01-08 El QA (Safety Class, M I A , or Vital Fire) El Non QA (Non-Safety} (Check One)
Backaround This T.E. evaluates findinas from the IWEjnspections of the vent header and vent pipe bowls in the VY priman/ containment. Specifically addressed are Inservice Discrepancv Reoorts (IDR)
Nos. 01-07 and 01-08, desiqn inouts (Dl) I& 2.
Visual Inspections are performed on the VY primary containment in accordance with the American Society of Mechanical Engineers (ASME) Code Section XI, Subsection IWE. The purpose of the inspections is to identify degradation of coatings and metal wall loss to- insure fhe continued structural integrity of the primary containment. The inspectors use a pre-evaluated acceptance criteria, D1 (3)to screen inspection results. The pre-evaluatedcriteria is based on VY calculation VYC-1032,Rev.1 , Df (4) it serves as a threshold for further evaluation of the results by Design Engineering.
IDR 01-07 identifies areas of general pitting and general corrosion in the vent header and the vent pipe bowls. Dt (3) requires any indications adjacent to the vent header mitre joints, downcomer intersections, and vent pipdheader intersections be forwarded to Design Engineering for evaluation.
IDR 01-07 identifies areas of general pitting and general corrosion in the vent header and the vent pipe bowls. Dt (3) requires any indications adjacent to the vent header mitre joints, downcomer intersections, and vent pipdheader intersections be forwarded to Design Engineering for evaluation.
IDR 01 -08 identjfies corrosion on the internal surfaces of all (8) of the X-207 penetrations.
IDR 01-08 identjfies corrosion on the internal surfaces of all (8) of the X-207 penetrations.
These penetrations were the low point drain in the bottom of each vent pipe bowl. Dl's (3) & (4) do not specifically address corrosion in the X-207 penetrations.
These penetrations were the low point drain in the bottom of each vent pipe bowl. Dls (3)& (4) do not specifically address corrosion in the X-207 penetrations. The findings were forwarded to Design Engineeringfor evaluation.
The findings were forwarded to Design Engineering for evaluation.
Discussion IDR 01-07 IDR 01-07 identifies areas of general pitting and general corrosion in the vent header and the vent pipe bowls. A summary of the findings from IDR 01-07 is attached to this TE as Table 1.
Discussion IDR 01 -07 IDR 01-07 identifies areas of general pitting and general corrosion in the vent header and the vent pipe bowls. A summary of the findings from IDR 01-07 is attached to this TE as Table 1. As indicated on page 1 of 9 of Data Sheet No. 8047-01 -031, the pitting areas identified have a minimum separation of 13) pit diameters.
As indicated on page 1 of 9 of Data Sheet No. 8047-01-031, the pitting areas identified have a minimum separation of 13) pit diameters. Areas identified with local pitting in the vent pipe bowls and in the vent header within 4 inches of the vent pipdheader intersections require an evaluation by Design Engineering. This TE will evaluate the findings shown in Table 1 against the acceptance criteria contained in DI (4).
Areas identified with local pitting in the vent pipe bowls and in the vent header within 4 inches of the vent pipdheader intersections require an evaluation by Design Engineering.
As shown in Table I , localized pitting was found in the lower portions of all (8) vent pipe bowls.
This TE will evaluate the findings shown in Table 1 against the acceptance criteria contained in DI (4). As shown in Table I, localized pitting was found in the lower portions of all (8) vent pipe bowls. The areas of pitting correspond to zmes 1 and 3 as shown in Figure 27 in Attachment A of Vyc- 1032, Rev. 1, DI (4). Permissible size indications for these zones are given in Figures 28 and 30 from DI (4) for zones 1 and 3 respectively.
The areas of pitting correspond to zmes 1 and 3 as shown in Figure 27 in Attachment A of Vyc-1032, Rev. 1, DI (4). Permissible size indications for these zones are given in Figures 28 and 30 from DI (4) for zones 1 and 3 respectively. The limiting zone is zone I. AI[ pitting in the vent pipe bowls will be evahated using an enveloping comparison for zone I.From DI (31,a pit is VYAPF 6045.02 Ap6045.02 Original-Page I o f 6
The limiting zone is zone I. AI[ pitting in the vent pipe bowls will be evahated using an enveloping comparison for zone I. From DI (31, a pit is VYAPF 6045.02 Ap6045.02 Original-Page I of6 VY Technical evaluation No. TE 2001-0025 defined as a small area of surface corrosion less than 0.5 inch in diameter.
 
To envelop pitting found in the vent pipe bowls, the allowable depth of a I inch diameter surface indication will be compared against the largest measured pit depth from Table 1. Note that the areas of localized pitting shown in Table 1 only define the areas of pitting, not a zone of wall loss. From Figure 28, for a 1 inch diameter indication an allowable depth is greater than 0.10 inch. From Table 1 the maximum pit depth for the vent pipe bowls is 0.042 inches in X-5F. Therefore all observed pitting in the vent pipe bowls is acceptabte.
VY Technical evaluation No. TE 2001-0025 defined as a small area of surface corrosion less than 0.5 inch in diameter.
To envelop pitting found in the vent header, the same approach as for the vent pipe bowls will be used. Since the pitting is adjacent to the ventpipe intersection, Figure 30 for zone 3 will be used. From Figure 30; for a 1 inch diameter indication, an allowable depth is greater than 0.12 inch. From Table 1 the maximum pit depth for the vent header is 0.042 inches adjacent to X-5F. Therefore all observed pitting in the vent header Is acceptable.
To envelop pitting found in the vent pipe bowls, the allowable depth of a I inch diameter surface indication will be compared against the largest measured pit depth from Table 1. Note that the areas of localized pitting shown in Table 1 only define the areas of pitting, not a zone of wall loss. From Figure 28,for a 1 inch diameter indication an allowable depth is greater than 0.10 inch. From Table 1 the maximum pit depth for the vent pipe bowls is 0.042 inches in X-5F.
Therefore all observed pitting in the vent pipe bowls is acceptabte.
To envelop pitting found in the vent header, the same approach as forthe vent pipe bowls will be used. Since the pitting is adjacent to the ventpipe intersection, Figure 30 for zone 3 will b e used. From Figure 30; for a 1 inch diameter indication, an allowable depth is greater than 0.12 inch. From Table 1 the maximum pit depth for the vent header is 0.042 inches adjacent to X-5F.
Therefore all observed pitting in the vent header Is acceptable.
The standing water found in the in the bottom of the bowl at X-5H dong with any other standing water accumulated in the other bowls during this refueling outage will be removed prior to drywell closeout per 5/4/01 telecon with 8.Tietze, VY Facilities Supervisor.
The standing water found in the in the bottom of the bowl at X-5H dong with any other standing water accumulated in the other bowls during this refueling outage will be removed prior to drywell closeout per 5/4/01 telecon with 8.Tietze, VY Facilities Supervisor.
IDR 01-08 IDR 01-08 identifies corrosion on the internal surfaces of all (8) of the X-207 penetrations, X-207 A to X-207H. Dl's (3) & (4) do not specifically address corrosion in the X-207 penetrations.
IDR 01-08 IDR 01-08identifies corrosion on the internal surfaces of all (8) of the X-207 penetrations, X-207 A to X-207H. Dl's (3) & (4) do not specifically address corrosion in the X-207 penetrations. The results were forwarded to Design Engineering for evaluation.
The results were forwarded to Design Engineering for evaluation.
Each of these penetrations was the low point drain in the bottom of each vent pipe bowl. The original design of the X-207penetration was a Iinch nominal pipe which extended from the bottom of the vent pipe bowl down to an elevation below the Torus water level. These lines were removed and the pipe stubs were capped during the Torus Mark I Program Modifications under EDCR 80-1I . Details are shown on VY drawings No. 6202-213 and 5920-9152, Dl's (6)&
Each of these penetrations was the low point drain in the bottom of each vent pipe bowl. The original design of the X-207 penetration was a I inch nominal pipe which extended from the bottom of the vent pipe bowl down to an elevation below the Torus water level. These lines were removed and the pipe stubs were capped during the Torus Mark I Program Modifications under EDCR 80-1 I. Details are shown on VY drawings No. 6202-21 3 and 5920-9152, Dl's (6) & (7)
(7)*
* Specific calculations for required wall thickness for the X-207 penetration are not contained in the original design analysis report, D1 (5). Due to the small size of the penetration (less than 2 inch nominal) no additional reinforcement was required by the ASME Code. Drawing No. 6202- 213 shows the construction details for the penetration.
Specific calculationsfor required wall thickness for the X-207 penetration are not contained in the original design analysis report, D1 (5).Due to the small size of the penetration (less than 2 inch nominal) no additional reinforcement was required by the ASME Code. Drawing No. 6202-213 shows the construction details for the penetration. The penetration is a 1 inch diameter schedule 80 pipe attached to the vent pipe head using a full penetration weld and a reinforcing fillet weld. The thhinnesf section is .the wall of the 1 inch diameter pipe stub. Using the sizing requirements from the original design code, the required thickness for pressure and applied loads will be determined. This will be compared against the piping wall thickness with the estimated wall loss from IDR 01-08 as shown on Data Sheet No. 8047-01-32.
The penetration is a 1 inch diameter schedule 80 pipe attached to the vent pipe head using a full penetration weld and a reinforcing fillet weld. The thhinnesf section is .the wall of the 1 inch diameter pipe stub. Using the sizing requirements from the original design code, the required thickness for pressure and applied loads will be determined.
From DI (6),the pipe is 1 inch Sch. 80 seamless pipe A333 Gr. I,       with an outside diameter of I .315inches, and a nominal thickness of 0.1 79 inch. The material ultimate strength is 55 Ksi.
This will be compared against the piping wall thickness with the estimated wall loss from IDR 01-08 as shown on Data Sheet No. 8047-01-32.
and the code allowable stress is 13.7 Ksi. The minimum installed thickness of the pipe including the 4- 12.5% manufacturingtolerance is 0.157 inch. The effective throat of the 3/16 fillet weld on the cap is .707(3/16)= 0.133inch.
From DI (6), the pipe is 1 inch Sch. 80 seamless pipe A333 Gr. I, with an outside diameter of I .315 inches, and a nominal thickness of 0.1 79 inch. The material ultimate strength is 55 Ksi. and the code allowable stress is 13.7 Ksi. The minimum installed thickness of the pipe including the 4- 12.5% manufacturing tolerance is 0.1 57 inch. The effective throat of the 3/16 fillet weld on the cap is .707(3/16)  
VYAPF 6045.02
= 0.133 inch. VYAPF 6045.02
* Ap6045.02 Origlnaf Page 2 of 6
* Ap6045.02 Origlnaf Page 2 of 6 W Technical evaluation No. TE 2001-0025 From ASME 111 & Vill, Dl (*31, the required thickness for the 56 Psi design pressure {consewative considering this is an internal component) is taken from UG-27 of ASM* Vlll. With P=56. Psi., R= 1.315 / 2 = ,658 inch, & SE =13,700. Psi.: , t= 56'(0'658)  
 
= 0.0027 inch. PR Circumferential Stress: t = SE - 0.6P 13700. - 0.6(56) = 0.001 3 inch. 56.(0.658) 2(137OO.)
W Technical evaluation No. TE 2001-0025 From ASME 111 & Vill, Dl (31,the required thickness forthe 56 Psi design pressure {consewative considering this is an internal component) is taken from UG-27 of ASM Vlll.
f 0.4(56) , t= PR 2SE + 0.4P t= Longitudinal Stress: Given the cantilever configuration and the small size of the stub, there are minimal loads on the stub. Using a 10% increase to account for misc. Ioads etc., the required wall thickness for the pipe will be taken as 0.003 inch. The minimum wall thickness including the 0.025 inch estimated wall loss from Data Sheet No. 8047-01-32, is (0.157-.025)  
With P=56. Psi., R= 1.315 / 2 = ,658 inch, & SE =13,700.Psi.:
= 0.132 inch. This is significantly greater than the 0.003 inch required wall thickness, AssumDtionslODen Items NONE Materia! ReauirernentsflmPlementation Instructions NONE Conclusions IDR 01-07: The localized shallow pitting found in the bottom interior surfaces of the vent header and vent pipe bowls has been evaluated against the D1 (4) acceptance criteria and found acceptable.
PR    , t=     56'(0'658) = 0.0027 inch.
The preparer of this T.E. accompanied the IWE examiners on this inspection.
Circumferential Stress:     t=
The interior condition of the vent header appears essentially the same as observed on a pre-IWE walkdown performed on 9/23/93. During the 1993 refueling outage the vent header was cleaned and a protective coating was applied to the bottom of each bowl and at stiffener plate locations at the downcomers.
SE - 0.6P       13700.- 0.6(56)
These coatings are still intact. The extent of light surface corrosion and local pitting appears about the same as was observed in 1993. This indicates that most of the pitling occurred prior to 1993, and that the mechanism is not currently aggressive.
PR                  56.(0.658)
Based on this, no augmented inspections would be recommended.
Longitudinal Stress:      t=              ,  t=                        = 0.001 3 inch.
2SE + 0.4P          2(137OO.)f 0.4(56)
Given the cantilever configuration and the small size of the stub, there are minimal loads on the stub. Using a 10%increase to account for misc. Ioads etc., the required wall thickness for the pipe will be taken as 0.003 inch.
The minimum wall thickness including the 0.025 inch estimated wall loss from Data Sheet No.
8047-01-32,   is (0.157-.025) = 0.132 inch. This is significantly greater than the 0.003 inch required wall thickness, AssumDtionslODen Items             NONE Materia! ReauirernentsflmPlementationInstructions                NONE Conclusions IDR 01-07:
The localized shallow pitting found in the bottom interior surfaces of the vent header and vent pipe bowls has been evaluated against the D1 (4) acceptance criteria and found acceptable.
The preparer of this T.E. accompanied the IWE examiners on this inspection. The interior condition of the vent header appears essentially the same as observed on a pre-IWE walkdown performed on 9/23/93. During the 1993 refueling outage the vent header was cleaned and a protective coating was applied to the bottom of each bowl and at stiffener plate locations at the downcomers. These coatings are still intact. The extent of light surface corrosion a n d local pitting appears about the same as was observed in 1993. This indicates that most of the pitling occurred prior to 1993, and that the mechanism is not currently aggressive. Based on this, no augmented inspections would be recommended.
IDR 01-08 The estimated wall toss in each of the X-207 penetrations has been conservatively evaluated WAPF 6045.02
IDR 01-08 The estimated wall toss in each of the X-207 penetrations has been conservatively evaluated WAPF 6045.02
* Ap6045.02 Original Page 3 of 6
* Ap6045.02 Original Page 3 of 6
.. VY Technical evaluation No. TE 2001-0025 against code requirements and the reamining wall is significantly greater than the code required wall thickness.
 
The slgnificant margin to code minimum wall thickness and the low expected rate of galvanic corrosion in the inerted containment during operation,'
VY Technical evaluation No. TE 2001-0025 against code requirements and the reamining wall is significantly greater than the code required wall thickness.
would support that no augmented inspections would be recommended at this time. recommendations 1, The 2001 refueling outage Data Sheet 8047-01-031 should be used as a baseline for the next scheduled fWE inspection of the vent header interior.
The slgnificant margin to code minimum wall thickness and the low expected rate of galvanic corrosion in the inerted containment during operation,'would support that no augmented inspections would be recommended at this time.
: 2. The next scheduled IWE visual inspection of the exterior of ihe vent pipe should include a specific note to check the exterior condition of the X-207 stubs. Ap provaldCloseout arne and provide signaturddafe.)
recommendations 1, The 2001 refueling outage Data Sheet 8047-01-031 should be used as a baseline forthe next scheduled fWE inspection of the vent header interior.
CE Independent Reviewer Department Manager . Closeout (All actions that were recommended by the TE and accepted by management have been initiated and any identified open iferns have been disposifioned.)
: 2. The next scheduled IWE visual inspection of the exterior of ihe vent pipe should include a specific note to check the exterior condition of the X-207 stubs.
I CE (signature) (date) Attachments A. Table 1: Summary of Vent Header IWE Findings (1 Page) B. VY Inservice Discrepancy Report (IDR) No. 01 -07 for Vent Header, dated 5/2/01. -IWE Data Sheet No. 8047-01 -031. ( 10 Pages } C. VY Inservice Discrepancy Report (IDR) No. 01 -08 for X 207 A-H , dated 5/2/01. - IWE Data Sheet No. 8047-01-032. ( 2 Pages} VYAPF66045.02 . ~p6045.02 original Page 4 of 6 TECHNICAL EVALUATION DATABASE lNPUT # 1 TE 2001-025 Page 5 of 6 Document Title (including Rev. No. and Date, if applicable)
Ap provaldCloseout             arne and provide signaturddafe.)
W Inservice Discrepancy Report (!OR) No. 01 -07 for Vent Header, dated 5/2/07. ([WE Data Sheet No. TE NO. 2001-025 TE Title: EVALUATION OF ASME SECTION XI - IWE FiNDlNGS FOR iDR 01 -07 & IDR 01 -08 Keywords:
CE Independent Reviewer Department Manager     .
Torus, ASME Section Xi. IWE, Vent Pioe. Vent Header 3 4 5 6 8047-01 -032) W Design Engineering Memo: J.C.F&patrick to J.H.Callaghan, subject: Pre-Evaluated Acceptance Criteria for Primary Containment ASME XI IWE Inspections, VYM 99/112, dated December 7,1999. W Calculation No. WC-I 032, Rev.1 I' Torus SheH & Vent System Thickness Requirements.
Closeout (All actions that were recommended by the TE and accepted by management have been initiated and any identified open iferns have been disposifioned.)
Certified Stress Report, , Vernon - It, Vermont Yankee Project Containment Vessel, No. 9-6202-11, October 29,1968, by Chicago Bridge & Iron - Oak Brook Engineering.
I               CE (signature)                 (date)
W Drawing No. 6202-213, Rev 0. CB&! Drawing for Vent Line - Header Intersection.
Attachments A. Table 1: Summary of Vent Header IWE Findings (1 Page)
1 8047-01-031) 2 I W Inservice Discrepancy Report (IDR) No. 01 -08 for X 207 A-H , dated 5/2/01. (!WE Data Sheet No. 7 8 VY Drawing No. 5920-9152, Rev. 0, CB&l drawing for Modifications to Vent Header Drain Line ASME Section Ill Nuclear Vessels, 1965 (with Winter 1965 Addenda) and ASME Section VHI Unfired Pressure Vessels ,1965. I- I I Desiqn Output Documents -The folIowing documents are impacted by this TE. I#] Document Title 1 General References 1 I Data Entered into Database t Signature Date Entry Verified I Signature Date WAPF 6045.Q3 AP 6045 Original Page 1 of 1 TECHNICAL EVALUATION REVIEW TE NO. 2001-025 Pg -025 Required Date: Md 'J 5. { Reviewer Assigned:
B. VY Inservice Discrepancy Report (IDR) No. 01-07for Vent Header, dated 5/2/01. -IWE Data Sheet No.8047-01-031.( 10 Pages }
hf- J, DdFFY TE#: 2001 Title: *VALUPTI0 N OF AS ME SECTION XI - IWE FINDINGS FOR IDR 07-07 h IDR 01-08 6 of 6 - Comments:
C. VY Inservice Discrepancy Report (IDR) No. 01-08for X 207 A-H , dated 5/2/01. - IWE Data Sheet No. 8047-01-032.( 2 Pages}
dohlE 6. 7. Request Management assistance if resolutlon can not be achieved.
VYAPF66045.02 .
                                                                                ~p6045.02original Page 4 of 6
 
TECHNICAL EVALUATION DATABASE lNPUT                       TE 2001-025 Page 5 of 6 TE NO. 2001-025 TE
 
==Title:==
EVALUATION OF ASME SECTION XI - IWE FiNDlNGS FOR iDR 01-07& IDR 01-08 Keywords: Torus, ASME Section Xi. IWE, Vent Pioe. Vent Header
    #                              Document Title (including Rev. No. and Date, if applicable) 1      W Inservice Discrepancy Report (!OR)No.01-07for Vent Header, dated 5/2/07.       ([WEData Sheet No.
1 8047-01-031) 2    I W Inservice Discrepancy Report (IDR) No. 01-08for X 207 A-H ,dated 5/2/01. (!WE Data Sheet No.
8047-01-032) 3      W Design Engineering Memo:J.C.F&patrick to J.H.Callaghan,subject: Pre-Evaluated Acceptance Criteria for Primary Containment ASME XI IWE Inspections, VYM 99/112, dated December 7,1999.
4      W Calculation No. WC-I 032,Rev.1 I' Torus SheH & Vent System Thickness Requirements.
5                                        -
Certified Stress Report, ,Vernon It, Vermont Yankee Project Containment Vessel, No. 9-6202-11, October 29,1968, by Chicago Bridge & Iron Oak Brook Engineering.
6                                                                      -
W Drawing No. 6202-213,Rev 0. CB&! Drawing for Vent Line Header Intersection.
7       VY Drawing No. 5920-9152,Rev. 0, CB&l drawing for Modifications to Vent Header Drain Line 8      ASME Section Ill Nuclear Vessels, 1965 (with Winter 1965 Addenda) and ASME Section VHI Unfired Pressure Vessels ,1965.
I-       I                                                                                                         I Desiqn Output Documents -ThefolIowing documents are impacted by this TE.
I # ]                                                   Document Title                                             1 1
General References I
Data Entered into Database                                 t       Entry Verified                     I Signature                 Date                    Signature                Date WAPF 6045.Q3 AP 6045 Original Page 1 of 1
 
TECHNICAL EVALUATION REVIEW                       TE NO. 2001-025 Pg 6 of 6
                -025                               Required Date: M    d 'J5.   {     Reviewer Assigned: hf-J, DdFFY TE#: 2 0 0 1
 
==Title:==
VALUPTI0N OF ASM E SECTION XI                   - IWE FINDINGS FOR IDR 07-07 h IDR 01-08 Resolutlon:
Comments:
dohlE
: 6. Ifno comments Indicate "None"
: 7. Request Management assistance if resolutlon can not be achieved.
: 8. Return all comments to heCE by requlred date or request an eaenslon.
: 8. Return all comments to heCE by requlred date or request an eaenslon.
If no comments Indicate "None" Resolutlon
VYAPF 6045.04 AP 6045 Original Page 1 of 1
: VYAPF 6045.04 AP 6045 Original Page 1 of 1 TABLE 1 Summary of Vent Header IWE Findings Findings Light scattered pitting at bottom of interior surface adjacent to vent header A-6 intersection, depth - 0.015" General surface corrosion, no significant metal loss. General surface corrosion, no significant melal loss with light scattered pitting at bottom of interior surface adjacent to vent header 8-C intersection, depth - 0.05 6". metai loss wrth light scattered pitting at bottom of interior surface adjacent to vent General surlace corrosion, no significant Vent Pipe Bowl 0 X-584 X-50 D.I. (4) Figure 27 Zona(s) I& 3 3 3 1 x-5c Vent Keader between X-5A & X X-58 ti X-S X-5C & X-5D X-5D & X-5E X-5E & X-5F X-5F 8 X-5G XSG & X-5M X-5H & X-5A x-50 Findings I Scattered pitting bottom interior surface adjacent to X-5A vent pipe intersection, max. depth - 0.035" General surface corrosion, no Significant metal loss. Scattered pitting bottom interior surface adjacent to X-58 vent pipe intersection, depth - 0.026" General surface corrosion on bottom interior surface, no significant metal loss. Scattered pitting bottom interior surface adjacent to X- 50 vent pipe intersection, ma. depth - 0.025" Light general surface corrosion, no significant metal loss. Light pitting bottom interior surface adjacent to vent pipe Intersections.
 
At X-50 max. depth - 0.009", at X-5E rnax:depth - 0.01 0". General surface corrosion, no significant metal loss. Scattered pitting at X-5E vent pipe Intersection, max. depth - 0.031" over area size 2" by 3'. Scattered pitting bottom interior surface adlacent to vent pipe X-5F, depfh - 0.042" . General surface corrosion, no significant metal loss. Scattered pitting at X-5G vent pipe intersection, ma. depth 0.025". General surface corrosion, no significant metal loss. Scattered pitting at X-5G vent pipe intersection, max. depth 0.010". Scattered , pitting at X-5H vent pipe intersection, max. depth 0.035" approximate area 9" by 9". General surface corrosion on bottom interior surface, no significant metal loss. I header C-D intersection.
TABLE 1 Summary of Vent Header IWE Findings Vent Pipe   Findings                                        D.I. (4)   Vent Keader  Findings Bowl 0                                                      Figure 27 between Zona(s)                                                                                         I X-584      Light scattered pitting at bottom of interior      I& 3   X-5A & X-56  Scattered pitting bottom interior surface adjacent to X-5A vent pipe surface adjacent to vent header A-6                                                                  -
depth - 0.009" X-5E 1 Light general surface corrosion, no significant 3 metal loss. I X-5F X-5G Scattered pitting at bottom of interior surface 3 adjacent to vent header intersections:
intersection, max. depth 0.035" intersection, depth 0.015"                                -X-58 ti X - S General surface corrosion, no Significant metal loss. Scattered X-50        General surface corrosion, no significant            3 metal loss.                                                              pitting bottom interior surface adjacent to X-58 vent pipe intersection, depth 0.026" x-5c        General surface corrosion, no significant            3    X-5C & X-5D  General surface corrosion on bottom interior surface, no significant melal loss with light scattered pitting at                                metal loss. Scattered pitting bottom interior surface adjacent to X-bottom of interior surface adjacent to vent header 8-C intersection, depth 0.056".
E-F, depth - 0.042", and at F-GI depth 0.025 General corrosion and scattered pitting at 1,3 bottom of interior surface adjacent to vent header intersections:
50 vent pipe intersection, m a . depth 0.025" x-50        General surlace corrosion, no significant              1    X-5D & X-5E  Light general surfacecorrosion, no significant metal loss. Light metai loss wrth light scattered pitting at                                pitting bottom interior surface adjacent to vent pipe Intersections.At bottom of interior surface adjacent to vent I header C-Dintersection. depth - 0.009" X-50 max. depth 0.009",at X-5E rnax:depth         - 0.010".
F-G, rnax depth - 0.025" area size 9" x 1 BI and at G-ti, depth - 0.010" adjacent to G-M vent header intersection, max depth - 0.025" area size 9" x 14"; Significant amount of water in bottom of bowl. X-5H Scattered pitting at bottom of interior surface ATACHMENT A to T.E. No. 2001-025 Page 1 of 1 3 Dispositian/Repair:
1 Light general surface corrosion, no significant            X-5E & X-5F  General surface corrosion, no significant metal loss. Scattered X-5E                                                              3 X-5F I metal loss.
IS1 Program Coordinator:
Scattered pitting at bottom of interior surface      3    X-5F 8 X-5G pitting at X-5E vent pipe Intersection, max. depth 0.031"over area size 2" by 3'. Scattered pittingbottom interior surface adlacent to vent pipe X-5F, depfh 0.042"     .
Date : c_ Repair Effort: Reference Document:
General surfacecorrosion, no significant metal loss. Scattered adjacent to vent header intersections: E-F,                              pitting at X-5G vent pipe intersection, m a . depth 0.025".
Repair Completion Date: Service Induced: YES NO ___ BY: _e Date : Sample Expansion Required:
depth 0.042",and at F-GI depth 0.025 X-5G        General corrosion and scattered pitting at          1,3    XSG & X-5M    General surface corrosion, no significant metal loss. Scattered bottom of interior surface adjacent to vent                              pitting at X-5G vent pipe intersection, max. depth 0.010". Scattered   ,
YES .___ NO -, BY : Date: Sample Expansion:
header intersections: F-G, rnax depth    -                                pitting at X-5H vent pipe intersection, max. depth 0.035" 0.025" area size 9" x 1B I and at G-ti, depth  -                          approximate area 9" by 9".
IS1 Program Coordinator:
0.010" X-5H        Scattered pitting at bottom of interior surface       3     X-5H & X-5A  General surface corrosion on bottom interior surface, no significant adjacent to G-M vent header intersection,                                 metal loss.
Date : Reinspection Required:
max depth 0.025"area size 9"x 14";
YES - NO ,- BY: Subsequent Inspection Required:
Significant amount of water in bottom of bowl.
YES NO .- BY : IS1 Supervisor Notified:
ATACHMENT A to T.E. No. 2001-025 Page 1 of1
IS1 Program Coordinator:
 
Date : Reinspection Completed Satisfactorily:
Dispositian/Repair:
IS1 Supervisor:
IS1 Program Coordinator:                         Date :   c _
Date: IDR Closed: IS1 Program Coordinator:
Repair Effort:
Date : ___L1 VYAPF 4027.01 AP 4027 Rev. 4 - Page 1 of 1
Reference Document:
, Visual Aids 3 Binoculars Photo Sketch Method CY None g A , 0 Direct &,44 D Remote p9= @ None : Reviewer: .w@ Date A ANN: Date AUACHMENT 
Repair Completion DYES Service Induced:                 ate:    NO ___ BY:       _e   Date :
.- 
Sample Expansion Required:       YES .___ NO ,-       BY :       Date:
Sample Expansion:
IS1 Program Coordinator:                         Date :
Reinspection Required:
Subsequent Inspection Required:
YES YES
                                        - NO     - ,     BY:
NO -.     BY :
IS1 Supervisor Notified:
I S 1 Program Coordinator:                       Date:
Reinspection Completed Satisfactorily:
IS1 Supervisor:                                 Date:
IDR Closed:
I S 1 Program Coordinator:                       D a t e :___L1 VYAPF 4027.01 AP 4027 Rev. 4 -
Page 1 of 1


'3 a 0 og 
Photo              Sketch              Method Visual Aids 3 Binoculars        @ None              CY None g pA9 ,= 0 Direct D Remote
                                                                  & , 4 4 Reviewer:      .w@              Date    A              :
ANN:                            Date AUACHMENT


\ x ,
  '3 a
INSERVICE DISCmPANCY REPORT (IDR) .- IDR #: 01-08 Date: 3/2/2001 Component: )I-207A - a Location:
0 og
BYKAJ , Mechanical Design Engineering Evaluation:  
 
*. Performed  
\
-, By: Date: Disposition/Repair:
x
IS1 Program Coordinator:
 
Date : Repair Effort: Reference Document:
.-                    INSERVICE DISCmPANCY REPORT (IDR)
Repair Completion Date: Service Induced: YES - NO - BY : Date: ,-, Sample Expansion Required:
IDR #:   01-08 Component:     )I-207A -a               Date:
YES - NO - BY : Date: ,- Sample Expansion:
Location: 3/2/2001 BYKAJ Mechanical Design Engineering Evaluation:                     *.
ISI Program Coordinator:
Performed
Date: Reinspection Required:
        -,           By:                               Date:
YES NO - BY : Subsequent Inspection Required:
Disposition/Repair:
YES - NO - BY z IS1 Supervisor Notified:
IS1 Program Coordinator:                       Date :
Repair Effort:
Reference Document:
Repair Completion Date:
Service Induced:                   YES - - NO       BY :       D a t e : ,-,
Sample Expansion Required:         YES -NO -BY         :       Date:     -,
Sample Expansion:
ISI Program Coordinator:                       Date:
Reinspection Required:                 YES       NO -BY     :
Subsequent Inspection Required: YES       - -BY NO          z IS1 Supervisor Notified:
fSI Program Coordinator:                      Date:
Reinspection Completed Satisfactorily:
Reinspection Completed Satisfactorily:
fSI Program Coordinator:
IS1 Supervisor:                               Date :
Date : IS1 Supervisor:
I D R Closed:
Date : Date : IDR Closed: VYAPF 4027.01 AP 4027 Rev. 4 . Page I of 1 Work Order No+ 00 5037 . 0 Procedure Nomev.: %t/7 & Vermont Yankee Visual Exam!nation Report Form for General Visual (IWE) Page I of /  ate: s/i,/$ Component Reviewer: - /yp Qate 0 ANk Date VYNEF 8047.06 NE 8047 Originaf Page 1 of 1 INSERVICE DISCREPANCY REPORT (IDR) Component
Date:
: Discrepancy:
VYAPF 4027.01 AP 4027 Rev. 4 .
IDR #: 01-09 Date: 05/07/01 I P-18-lA Recirc. pump Location : Drvwell. 238 boltins. (OIA-N/W-lGA-m Durincs VT-I. examination the followins was found: 1. The chrome rdate on the threads indicated on Dws. VYEM 5920- 738 & 739 R/1 amears to be,missfncr due to corrosion.
Page I of 1
: 2. Evidence of leakase is indeterminate due to water lvins on t IS1 Supervisor:
 
Date: -.-/.l/o/
5037 Vermont Yankee Work Order No+ 00 Procedure Nomev.: %t/7   & 0 Visual Exam!nation Report Form for General Visual (IWE)             Page   I   of   /  ate: s/i,/$
System Operability Affected:
Component Reviewer: - /yp                 Qate   0 ANk                             Date VYNEF 8047.06 NE8047 Originaf Page 1 of 1
YES - NO x- BY: Date: <h? Shift Supervisor Notified:
 
YES - NO BY: W Date: 5h!( Event Report Initiated:
INSERVICE DISCREPANCY REPORT ( I D R )
YES - NO - x BY: -Date: </& Mechanical Design Engineering Evaluation:--[ -t%& Performed By: Disposition/Repair:
IDR # : 01-09 Date:     05/07/01         I Component :      P-18-lA R e c i r c . pump       Location : Drvwell. 238 boltins. (OIA-N/W-lGA-m Discrepancy: Durincs VT-I. examination the followins was found: 1. The chrome rdate on the threads indicated on D w s . VYEM 5920-738 & 739 R / 1 amears to be,missfncr due to corrosion.
IS1 Program Coordinator:
: 2. Evidence of leakase is indeterminate due to water l v i n s on t IS1 Supervisor:                                             Date:     -.-/.l/o/
Bm?cd Date: 47573/ Repair Effort: Reference Document:  
System Operability Affected: Y E S - NO                   x-   BY:         Date:   <h?
/A Repair Completion Date: d/A n ;r'W( r, Service Induced: YES NO BY: Date: gba-Oi NO BY: e Date: - ~W~l Sample Expansion Required:
Shift Supervisor Notified:                 Y E S - NO         BY: W Date:         5h!(
YES - Sample Expansion:  
Event Report I n i t i a t e d :           YES - NO       -
%* TE 2001- 633 [Rme> m IS1 Program Coordinator:  
x   BY: -Date:           </&
*dd Date: ,d/ ../J Reinspection Required:
Mechanical Design Engineering Evaluation:--[                             -t%&
YES - NO J BY:(=$@ Subsequent Inspection Required:
Performed By:
YES - NO f BY:* IS1 Supervisor Notified:
Disposition/Repair:
IS1 Program Coordinator:
I S 1 Program C o o r d i n a t o r :     Bm?cd           Date:   47573/
Date: -.r./.7?/
Repair E f f o r t :
Reference Document:                       /A Repair Completion Date:                       d/A     n       ;
r ,r W (
Service Induced:                           YES       NO       BY:         Date: gba-Oi Sample Expansion Required:                  YES - NO           BY: e Date: -       ~   W ~ l Sample Expansion:           % T E 2001- 633 [ R m e >             m IS1 Program Coordinator:                   *dd             Date:     ,d/   ../J Reinspection Required:                           YES - NO       J BY:(=$@
Subsequent Inspection Required:                 YES - NO       f   BY:*
IS1 Supervisor Notified:
IS1 Program Coordinator:                                   Date:     -.r./.7?/
Reinspection Completed Satisfactorily:
Reinspection Completed Satisfactorily:
Is1 Supervisor:
Is1 Supervisor:                               I.i/A       Date:
I.i/A Date: IDR Closed: IS1 Program Coordinator:
IDR Closed:
Date: s//7k/ VYAPF 4027.01 . AP 4027 Rev. 4 Page 1 of 1 Vermont Yankee Visual Examination Report Form VT-1, Bolting (Non-!WE)
IS1 Program Coordinator:                                   Date:   s//7k/
Work Order No.: O/ --/997-O 00 Procedure NdRev.: &&-BO 9.5 ,4?&9 a/ Date 5- /7-0/ I I Experience Hours Credit: VYNEF 8645.01 NE 8045 Rev. 1 Page 1 of 1 VERMONT YANKEE TECHNICAL EVALUATION DOCUMENTATION Technical Evaluation No. 2001 434 Title: EVALUATION OF IS1 PROGRAM IDR NO. 01-09, P-18-1A REACTOR REClRC PUMP BOLTING El QA (Safety Class, OQA, or VW Fire) Backaround This T.E. evaluates findings from the ASME Section XI inspection of the Reactor Recirculation Pump, P- 18-1A, cover to case cap screws as documented on Inservice Discrepancy Report. (IDR) No. 01-09 (Attachment A). The cap screws are 2-1/2 diameter 16" long, (Part No. 2-6) with washers (Part No. 2-5 ) as shown on W drawings 5920-738 & 5920-739, design inputs (D!) Nos. 2 & 3. The 1st visual inspection of the pump cover to case bolting is documented on Data Sheet No. 804501- 016, dated 5/5/01 which is attached to the IDR. Recodable findings noted on the Data Sheet are: Non QA (Non-Safety) (Check One) 1. Coating is missing. 2. Corrosion exists on portion of threads where they screw into the pump casing. 3. Water standing in scattered areas on top of casing. {could be from small bore piping above). To assess the degree of corrosion at the bolt locations a walkdown of the bolts on both pumps was performed by Design Engineering MIS (J.FitzpaWck  
VYAPF 4027.01       .
& KBeardsley) on 5/9/01. Access to both pumps was facilitated by scaffolding erected for modifications to the attached RBCCW cooling lines. The areas surrounding the bolt heads and washers on both pumps exhibit 8 light surface corrosion.
AP 4027 Rev. 4 Page 1 of 1
The insulation on ihe attached RBCCW cooling lines was removed for the piping modification, this permitted easy access to the cap screw heads and the surrounding areas. See the photos in attachment
 
: 6. The general surface corrosion may be the result of condensation from the exterior of the R3CCW tines or from water draining into this area during past replacements of the pump seals. As shown in the photos in Attachment 6, corrosion by-products were observed on painted surfaces above the location of the cap screw heads. Other than the general surface corrosion there is no significant amount of additional corrosion evident at the cap screw head and washer interface.
Vermont Yankee       Work Order No.: O/--/997-O 00 Visual Examination Report Form Procedure NdRev.: &&-BO 9.5 ,4?&9a /
The exposed threads on the cap screw at the pump casing coverbody interface are identified as having the chrome plating degraded and as exhibiting some surface corrosion on the ewsed threads. There appears to be minimal metal loss on the exposed threads. From DI 4, the ASME stress report for the pumps, there is margin in the supplied bolt area over the required bolt area. This supplied margin ensures that the cap screws will perfom their design function and still meet ASME code requirements for allowable stress. The following quantifies this margin. 2-1/2" diameter cap screws , A193 Gr. 67 2-1/2"-8N-2A, (DI 4) From Table 8.2.10 in Marks Handbook (reference 5). Minor diameter = 2.343 inch From page 7 of the design stress report for the pump (DI 4), the totai bolt area required, Am, = 62.31 inches2 WAPF6045.02 Ap6045.02 Original Page 1 of 4 W Technical evaluation No. TE 2001-0034 The bok root diameter required to supply the total bolt area required, considering all bolts degraded is: MinDiameter  
VT-1, Bolting (Non-!WE)
= J4xAreq =J4x62*31  
Date 5-/ 7 - 0 /                       I I Experience Hours Credit:
= 2.27inch.
VYNEF 8645.01 NE 8045 Rev. 1 Page 1 of 1
nl Gbolts nl Gbolts The allowable corroded thickness (lost metal) on each bolt is M( 2.343-2.27)  
 
= 0.0365", (approx 1/32"). Given that no significant metal loss was noted on the threads and the inert atmosphere in the containment during operation, corrosion is not expected to occur at a significant rate during future operation.
VERMONT YANKEE TECHNICAL EVALUATION DOCUMENTATION Technical Evaluation No. 2001434
AssumDtionsJOoen Item2 NONE ~ le entationt structions NONE Conclusions The pumps casing cover/body bolting will perform its design function with the as-noted surface conditions.
 
Margin exists in the 2/12" diameter cap screws for future corrosion.
==Title:==
No additional and/or augmented inspections other than planned IS1 are required.
EVALUATIONOF IS1 PROGRAM IDR NO. 01-09, P-18-1A REACTOR REClRC PUMP BOLTING El QA (Safety Class, OQA, or VW Fire)           Non QA (Non-Safety) (Check One)
Recommendations NONE ApprovalS(Close0ut (qrint nfind provide slgnature/date.)
Backaround This T.E. evaluates findings from the ASME Section XI inspection of the Reactor Recirculation Pump,P-18-1A, cover to case cap screws as documented on Inservice Discrepancy Report. (IDR) No. 01-09 (Attachment A). The cap screws are 2-1/2 diameter 16" long, (Part No. 2-6) with washers (Part No. 2-5 )
Independent Reviewer Department Manager (signature) (date} were recommended by the TE and accepted by rnaMgemen!
as shown on W drawings 5920-738 & 5920-739, design inputs (D!) Nos. 2 & 3.
have been initiated and any Mentified open items NONE REQUIRED / qdh! CE (tiate) Attacbments A. IDR No. 01 -09, for P-18-1 A, Recirc. Pump Bolting. (01A-NNV-I 6A-W), dated 5/7/01 (2 pages total) 8. Photographs of Recirc. Pump Casing Cover/Body Cap Screws (2 pages total) VYAPF 6045.02 Ap6045.02 Original Page 2 of 4 TECHNICAL EVALUATION DATABASE INPUT TE 2003;034 Page 3 of 4 -. NONE TE No. 2001-034 TE Titfe: Evaluation of IS1 Proaram IDR No. 01-09, P-18-fA Reactor Recirc. PumD Boitinq ## 5 Reference Tie (including Rev. No. and Date, if applicable)
The 1st visual inspection of the pump cover to case bolting is documented on Data Sheet No. 804501-016, dated 5/5/01which is attached to the IDR. Recodable findings noted on the Data Sheet are:
Marks Standard Handbook for Mechanlcal Engineers Ninth Edition, Q 1978, McGraw-Hill lnc. Keywords:
: 1. Coating is missing.
Purn~. Sottina. ASME Section XI, In-senrice Insrnkn, P-18-1A Design Output Doeuments - The following documents are impacted by this TE. [#I Document Tile 1 Data Entered into Database / Enfry Verified / Signature Date SQnature Date WAPF 6045.m AP 6045 W@nd Page I of 1 I TECHNICAL EVALUATION REVIEW TE NO. 2001-034 Pg 4 Of 4 TE #: .ZOO1 434 Required Date: Reviewer Assigned:
: 2. Corrosion exists on portion of threads where they screw into the pump casing.
Comments:
: 3. Water standing in scattered areas on top of casing. {could be from small bore piping above).
Resolution:
To assess the degree of corrosion at the bolt locations a walkdown of the bolts on both pumps was performedby Design EngineeringMIS (J.FitzpaWck & KBeardsley) on 5/9/01. Access to both pumps was facilitated by scaffolding erected for modifications to the attached RBCCW cooling lines.
I s/%, Date Notes and Requirements:
The areas surrounding the bolt heads and washers on both pumps exhibit 8 light surface corrosion. The insulation on ihe attached RBCCW cooling lines was removedfor the piping modification, this permitted easy access to the cap screw heads and the surrounding areas. See the photos in attachment 6.The general surface corrosion may be the result of condensation from the exterior of the R3CCW tines or from water draining into this area during past replacementsof the pump seals. As shown in the photos in , corrosion by-products were observed on painted surfaces above the location of the cap screw heads. Other than the general surface corrosion there is no significant amount of additional corrosion evident at the cap screw head and washer interface.
The exposed threads on the cap screw at the pump casing coverbody interface are identified as having the chrome plating degraded and as exhibitingsome surface corrosion on the e w s e d threads. There appears to be minimal metal loss on the exposed threads. From DI 4, the ASME stress report forthe pumps, there is margin in the supplied bolt area over the required bolt area. This supplied margin ensures that the cap screws will perfom their design function and still meet ASME code requirementsfor allowable stress. The following quantifies this margin.
2-1/2" diameter cap screws , A193 Gr.67 2-1/2"-8N-2A, (DI 4)
From Table 8.2.10 in Marks Handbook (reference 5). Minor diameter = 2.343 inch From page 7 of the design stress report for the pump (DI 4), the totai bolt area required, Am,= 62.31 inches2 WAPF6045.02 Ap6045.02 Original Page 1 of 4
 
W Technical evaluation No. TE 2001-0034 The bok root diameter required to supply the total bolt area required, considering all bolts degraded is:
MinDiameter = J4xAreq =J4x62*31 = 2.27inch.
nl Gbolts         nl Gbolts The allowable corroded thickness (lost metal) on each bolt is M( 2.343-2.27)                 = 0.0365,     (approx 1/32).
Given that no significant metal loss was noted on the threads and the inert atmosphere in the containment during operation, corrosion is not expected to occur at a significant rate during future operation.
AssumDtionsJOoen Item2               NONE
~                               le entationt structions               NONE Conclusions The pumps casing cover/body bolting will perform its design function with the as-noted surface conditions.
Margin exists in the 2/12 diameter cap screws for future corrosion. No additional and/or augmented inspections other than planned IS1 are required.
Recommendations           NONE ApprovalS(Close0ut(qrint nfind           provide slgnature/date.)
Independent Reviewer Department Manager (signature)                         (date}
were recommended by the TE and accepted by rnaMgemen! have been initiated and any Mentified open items NONE REQUIRED
                                /   qdh!(tiate)
CE Attacbments A. IDR No. 01-09, for P-18-1A, Recirc. Pump Bolting. (01A-NNV-I 6 A - W ) , dated 5/7/01 (2 pages total)
: 8. Photographs of Recirc. Pump Casing Cover/Body Cap Screws (2 pages total)
VYAPF 6045.02 Ap6045.02 Original Page 2 of 4
 
TECHNICAL EVALUATION DATABASE INPUT                       TE 2003;034 Page 3 of4 TE No. 2001-034 TE Titfe: Evaluation of IS1 Proaram IDR No. 01-09,P-18-fA Reactor Recirc. PumD Boitinq Keywords: Purn~.Sottina. ASME Section XI, In-senrice I n s r n k n , P-18-1A
[ # I Design Output Doeuments The following documents are impacted by this TE.
Document Tile                                           1
-.        NONE
    ##                          Reference T i e (including Rev. No.and Date, if applicable) 5      Marks Standard Handbook for Mechanlcal Engineers Ninth Edition, Q 1978, McGraw-Hill lnc.
Data Entered into Database                               /         Enfry Verified                 /
Signature                   Date                   SQnature               Date WAPF 6045.m AP 6045 W@nd Page I of 1
 
I TECHNICAL EVALUATION REVIEW                     TE NO. 2001-034 Pg 4 Of 4 TE #:       .ZOO14 3 4                                    Required Date:                     Reviewer Assigned:
Comments:                                                                           Resolution:
I   s/%,
Date Notes and Requirements:                                                                           DGE Signature              &at6 '
: 1. Validate design Input appropriateness relative to your area of expertise.
: 1. Validate design Input appropriateness relative to your area of expertise.
: 2. Verify Department Procedures, Program inputs, and output documents are 3. Meetings or discussions to resolve questions and comments are encouraged.
: 2. Verify Department Procedures, Program inputs, and output documents are
: 4. 'Resolution by telecon Is acceptable and should be noted as such. 5, Make comments specific, and avoid gbneralizations and questlans.
    . appropriately addressed.
: 6. If no comments indicate "None" 7. Request Management assistance if resolution can not be achieved.
: 3. Meetings or discussions to resolve questions and comments are encouraged.
: 8. . Return all comments to the CE by requlred date or request an extenston. . appropriately addressed.  
: 4.   'Resolution by telecon Is acceptable and should be noted as such.
&at6 ' DGE Signature VYAPF 8045.04 AP 6045 Original Page 1 of 1
5,     Make comments specific,and avoid gbneralizations and questlans.
: Data Sheet No: zde'- 6r/- 35? Work Order No.: DO - 0 SQ3s Visual Aids Photo Sketch 0 Binoculars done &ne 0 Mirror 0 Attached U Attached Procedure NolRev.: 46 $0 1/7/M<'c~d Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page I of / Date: h//&/bO' ./ U Method E6rect 0 Remote 7- 04 lght Source 0 6" Scale 0 Other Component Examination Location DescriptianlRemarks Remote Examination ConditionslEquipment Remarks %+ &flu:& duaCAcI, e .I: Pl*.k&J:&J x> ObA 3.b Level Date VYNEF 8047.06 NE 8047 Original Page 1 of 1 Vermont Yankee Procedure Nomev.: pp 70A \r/o . General Visual (1WE) Page I of I ~ate:I//L/cll t Visual Examination Report Form for Visual Aids Photo Sketch 0 Binocufars 1 @ None 8 None Methad @Direct bed& 13 Mirror Light Source 0 6" Scale ~~ ~ Examination Location DesctiptionlRemarks 3qJd Pw*(r&;- 1 CI Attached 10 Attached 10 Remote Remote Examination ConditionslEquipment Remarks !!/A 4 Y-3j 0 Other Examination Results, Details and Comments:
: 6. If no comments indicate "None"
1 Examiner:
: 7. Request Management assistance if resolution can not be achieved.
p'/A -~evel rc'/A Date , Reviewer:
: 8.   . Return all comments to the CE by requlred date or request an extenston.
dh Date % WNEF 8047.06 NE 8047 Original Page 1 of I 8 Data Sheet No: rdd - 6 v- 36 0 Work Order No.: 00 - 00 50 35 Procedure NolRev.:  
VYAPF 8045.04 AP 6045 Original Page 1 of 1
@p 702 (t /O Page 1 of / Date: i//b,/o) I f Vermont Yankee Visual Examination Report Form for General Visual (IWE) Component Component ID: X-SA 721 ru &H System: 3- dcl/i Drawing NoFiev.: <?m - 4/ Location:
 
c-2 h&lj,& -Sd&.4caa/
Data Sheet No: zde'-6r/-35?
I I Visual Aids @ Binoculars 0 Attached 0 Attached 10 Remote Examhation hation Description/Remarks Remote' Examination ConditionslEquipment Remarks 3q-M Pede trcA1-tJks 1 &/+A Photo Sketch Method eP None None p Direct 6&4 (3 Mirror Light Source 0 6" Scale 0 Other Examination Results, Details and Comments:
Work Order No.:   DO - 0 SQ3s Vermont Yankee                                  Procedure NolRev.: 46 $0 1/7/M<'c~d Visual Examination Report Form for General Visual (IWE)                             Page   I   of   /   Date: h//&/bO'       ./
1 WNEF 8047.06 NE 8047 Original Page 1 of 1 Vermont Yankee Procedure Nomev.: !?fly Q 2, f./O, Visual Examination Report Form for General Visual (IWE) Page 1 of 1 Date: l/fb ./Q, I r-- ~ Component Component ID: x-3 2, System: bfi, 4 Drawing No/Rev.: 5? Lo - q/ Location:
7-                                            Component U
3,- 4.q Visual Aids Photo Sketch Method 1 0 Binocutars Qbhsone ()B None 9 Direct 644-t 0 Mirror I$ Light Source 113 6" Scale 0 Attached 0 Attached U Remote Examination Location DescriptionlRemarks Remote Examination CanditionslEquiprnent Remarks - maminer: Level nc/R Date *'/R Reviewer:  
Visual Aids                Photo                      Sketch                    Method 0 Binoculars        d o n e                            &ne                E6rect 0 Mirror            0 Attached                        U Attached          0 Remote 04lght Source      Examination Location DescriptianlRemarks Remote Examination ConditionslEquipmentRemarks 0 6" Scale          &flu:&     duaCAcI, e .I:
'/fl Date 'h Reviewer:-
                                                                        %+
Nh Date .J/A VYNEF 8047.06 . NE 8047 Original Page 1 of 1 'i e Data Sheet No: zwd .. &v' 37/ Wofk Older No.: 0 0 4 00 50 35 Procedure Noiflev.:  
0 Other              Pl*.k&J:&Jx >         O b A 3.b Level               Date VYNEF 8047.06 NE 8047 Original Page 1 of 1
#?/ 7d t? Page / of i Date:& 1 . Vermont Yankee Visual Examination Report Form for General Visual (!WE) Component Component ID: x- Ab System: Lcjd Drawing NolRev.: S92-d Location:  
 
~~f~~~ucvC
Vermont Yankee                                       Procedure Nomev.:   pp   70A \r/o .
&A- 4. u 1 ~~ -~ ~. ~ __ Visual Aids Photo Sketch Method I 0 Binoculars WNone qP None ij3 Direct F* L- 0 Mirror 0 Attached U Attached 0 Remote ~- I)d tight Source Examination Location OescriptionlRemarks Remote Examination ConditionsfEquipment Remarks 0 6" Scale &yocs. 44 Level .&$*'U&i Date f/l L,/dL Examiner:  
Visual Examination Report Form for General Visual (1WE)                                   Page     I of   I   ~ate:I//L/cll         t Visual Aids                     Photo                       Sketch                       Methad 0 Binocufars           1@ None                               8 None               @Direct   bed&
'14 Level d/A Date IJ/A Reviewer:  
13 Mirror             1CI Attached            ~~       ~
'h .Date '! Reviewer:
10 Attached          10 Remote Light Source          Examination Location DesctiptionlRemarks     Remote Examination ConditionslEquipmentRemarks 0 6Scale              3 q J d        Pw*(r&;-                     !!/A 0 Other              4Y-3j                                       1 Examination Results, Details and Comments:
_. #/!A Date .'lp VYNff 8047.06 NE 8047 Original Page 1 of 1 i Vermont Yankee Procedure NolRev.:
Examiner: p/A                               -~evel   rc/A             Date
Pfl 70 29 10 . Visual Examination Report Form for General Visual (!WE) Page 1 of I Date: !/[S/ol t Component Reviewer:
,Reviewer:   dh                                     Date %
44 Reviewer: - #I4 ANII: Dates- Date i v VYNEF 8047.06 Page 1 of 1 NE 8047 Original i El.11 GV 1000/0 Drywell Paletration x-5 1 Drywen Penetration x-52 COMPLETED FROM INTERNAL RFO21 EX'FERNAL TO BE SCHEDULET, BEFORE OR DURING RMn2 (completed pre RFO 22) COMPLETED FROM NIXRNALRF021 EXTJ33AL.
WNEF 8047.06 NE 8047 Original Page 1 of I
TO BE SCHEDULED BEFORE OR DURING RF022 (complded pre RFO 22) m-1 COMPLETED FROM XNTERNAL RFO2 1 (INACCESSIBLE AREA EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 (completed pre RFO 22) COMPLETED FROMINTERNAL RF02X (JNACCESSJBLE AREA IDENTIFIED)
 
EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFOn @mpl"d pre RFO 22) COMPLETED FROM INTERNAL RFO21 (INACCESSIBLE AREA IDENTIFIED)
8 Data Sheet No: rdd     - 6 v- 36 0         f Work Order No.: 0 0  - 0 0 5 0 35 Vermont Yankee                                        Procedure NolRev.:   @p702(t / O Visual Examination Report Form for General Visual (IWE)                                      Page     1 of   /     Date: i//b,/o)     I Component Component ID:     X - S A 721r u &H                                       System:   3- dcl/i Drawing NoFiev.:     <?m- 4/                                         Location:   c-2h&lj,&       -Sd&.4caa/
EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFOU (ccmpletedpre RFO 22) COMPLETED FROM INTERN& RFO21 (INACCESSIBLE AREA IDENTIFED)
I                                                         I Visual Aids                     Photo                          Sketch                        Method
EXTERNAZ, TO BE SCHEDDULED BEFORE OR DURING W022 @mpletCd pre RFO 22) COMPLETED FROMINERNAL RFO2I (INACCESSIBLE AREA EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 @ompl&ed pre RFO 22) COMPLETED FROM INTERNAL RF021 (INACCESSIBLE AREA EXTERNAL TO BE SCHEDULED BEFORE OR DURING -022 foompleted pre RFO 22) COWSlZD FROM INTERNAL RFO21 (INACCESSIBLE AREA -Dl EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 fcompleted pre RFO 22) COMPLETED FROM INTERNAL RFO21 (INACCESSIBLE AREA lDENlIFED)
@ Binoculars             eP None                                None                p Direct  6&4 (3 Mirror                0 Attached                           0 Attached         10 Remote Light Source          Examhation h a t i o n Description/Remarks Remote' Examination ConditionslEquipment Remarks 0 6" Scale                3 q - M       Pede trcA1-tJks             1 &/+A 0 Other                                                              1 Examination Results, Details and Comments:
EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFm ~oompleted pre RFO 22) IDENTIFIED)
WNEF 8047.06 NE8047 Original Page 1 of 1
IDENTIFIED)
 
DENlTED) COMPLETED FROM INTERNAL RF021 (INACCESSIBLE AREA EXTERNAL TO BE SCHEDULED BEFORE OR DURING -022 (compl~~eci pre RFO 22) COMPLETED FROMINTERNAL RF021 QNACCESSIBLE AREA WENTIFED)
Vermont Yankee                                       Procedure Nomev.:     !?fly Q 2, f./O, Visual Examination Report Form for General Visual (IWE)                                     Page       1 of   1   Date:   l / f b ./Q,   I r--
EXlXRNAL.
                                                              ~
TO BE SCHEDULED BEFORE OR DURINO RFO22 (completed pre RFO 22) EXTERNAL SURFACE OF TIiIS PENETRATION IS NOT ACCESSIBLE FOR EXAMINATION DUE TO DESIGN COMPLETED FROMINTEIWAL RF021 (INACCESSIBLE AREA IDENTIFIED)
Component Component ID:         x - 3 2,                                             System:     bfi,     4 Drawing No/Rev.:     5?Lo - q/                                         Location:                 3,- 4q  .
EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 &ompleted pre RFO 22) E1.11 EL11 Drywell Peamaticil X-lOOA El.ll Drywell Penetration X-100B EL11 Drywell faretmtiar x-10oc E1.11 DryweU Padration X-100D EL11 DIywellP&m X-lO1A El.11 Drywell Penetration X-1O1B EL11 Drywell Pmetratiaa x-IOIC 1 my0 Gv I EL1I Drywell Penshation X-IOID Drywen Penetration x-102 El.ll El.11 DryweU Penetration X-I03 1OOYO 1 Drywell Penebatim X-104A EL11 - . . - - .. . . . . . . . -.. -. . . . . . . . . . . . . . .. .. . . . . . . . .. . . . . . . . . -. . . . . . . . .
Visual Aids 0 Binocutars             Qbhsone Photo 1        Sketch
To: DennisGirroir 5/1 Y200 1 From: Ralph Connell Re: Report for TWE Inspections Performed for RF022 (Reference
()B None Method 9 Direct 644-t 0 Mirror                   0 Attached                           0 Attached           U Remote I$  Light Source          Examination Location DescriptionlRemarks     Remote ExaminationCanditionslEquiprnent Remarks 113 6 Scale maminer:                                         Level   nc/R           Date */R Reviewer:   /fl                                 Date   h Reviewer:-   Nh                                   Date   .J/A VYNEF 8047.06     .
'Xeport for IWE Inspections Performed for RF021" dated 12/02/1999)
NE 8047 Original Page 1 of 1 i
INTRODUCTION: The objective in the current period for this new ][WE inspection program was to gather as much information as we could for RF021 and RF022. During RF021 the goal was to perform as many inspections as possible within the acceptable window without causing any interference with other outage work activities.
 
The remainder of the required first period examinations was performed either before or during RFOZZ. After the ZWE examinations performed during RFO 21 the Program Procedure PP7024 was revised to incorporate lessons learned. Some revisions were made to the appendices regarding inspected components and inspection criteria.
e Data Sheet No: z w d        ..&v' 37/
As a result some of the examinations originally listed for the 1' period were revised and are reflected in the completion schedule included in this report. All required VT-3 examinations were moved to the 3d period as required by the ASME Section M Code 1992/92A.
Wofk Older No.:     00  4 00 50   35 Vermont Yankee                                        Procedure Noiflev.:   #?/   7 d t?         .
Visual Examination Report Form for General Visual (!WE)                                     Page      /  of    i      Date:&              1 Component Component ID:       x - Ab                                                 System:                 L c j d Drawing NolRev.:   S92-d                                               Location:     ~ ~ f ~ ~ &A-       ~ u4 c. v u   C
            -~                   ~.      __
I
                                                            ~~
1
                                      ~
Visual Aids                 Photo                           Sketch                           Method 0 Binoculars             WNone                                 qP None               ij3 Direct           F* L-0 Mirror                 0 Attached                             U Attached             0 Remote
                                              ~-
I)d tight Source         Examination Location OescriptionlRemarks Remote Examination ConditionsfEquipment Remarks 0 6" Scale
                                                      &yocs.         44 Level .&$*'U&i           Date   f/l L,/dL Examiner:   '14                                 Level d/A               Date IJ/A Reviewer:     'h                               .Date   '!
Reviewer: _#/!A
              .                                Date   .'lp VYNff 8047.06 NE 8047 Original Page 1 of 1 i
 
Vermont Yankee                 Procedure NolRev.: Pfl 70 29 10   .
Visual Examination Report Form for General Visual (!WE)             Page   1   of I Date: !/[S/ol     t Component Reviewer:   44 Reviewer: - #I4                 Date ANII:                           D  a t e  s  -
i v
VYNEF 8047.06 NE 8047 Original i Page 1 of 1
 
El.11 Drywell Paletration GV   1000/0 COMPLETED FROM INTERNAL RFO21 x-51                            EX'FERNAL TO BE SCHEDULET, BEFORE OR DURING RMn2 (completed pre RFO 22)
E1.11 Drywen Penetration              COMPLETED FROM NIXRNALRF021 x-52                            EXTJ33AL. TO BE SCHEDULED BEFORE OR DURING RF022 (complded pre RFO 22)
EL11  Drywell Peamaticil              COMPLETED FROM XNTERNAL RFO2 1 (INACCESSIBLE AREA X-lOOA                          m1-EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 (completed pre RFO 22)
El.ll Drywell Penetration            COMPLETED FROMINTERNAL RF02X (JNACCESSJBLEAREA X-100B                          IDENTIFIED)
EXTERNAL TO BE SCHEDULED BEFORE OR DURING R F O n
                                      @mpl"d pre RFO 22)
EL11  Drywell faretmtiar              COMPLETED FROM INTERNALRFO21 (INACCESSIBLE AREA x-10oc                          IDENTIFIED)
EXTERNALTO BE SCHEDULEDBEFORE OR DURING RFOU (ccmpletedpre RFO 22)
E1.11 DryweU Padration                COMPLETED FROM INTERN& RFO21 (INACCESSIBLE AREA X-100D                          IDENTIFED)
EXTERNAZ,TO BE SCHEDDULEDBEFORE OR DURING W022
                                      @mpletCd pre RFO 22)
EL11  DIywellP&m                      COMPLETED FROMINERNAL RFO2I (INACCESSIBLE AREA X-lO1A                          IDENTIFIED)
EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22
                                      @ompl&edpre RFO 22)
El.11 Drywell Penetration            COMPLETED FROM INTERNAL RF021 (INACCESSIBLEAREA X-1O1B                          DENlTED)
EXTERNAL TO BE SCHEDULED BEFORE OR DURING -022 foompletedpre RFO 22)
EL11  Drywell Pmetratiaa x-IOIC Gv I 1my0    C O W S l Z D FROM INTERNALRFO21 (INACCESSIBLEAREA
                                      -Dl EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 fcompletedpre RFO 22)
EL1I  Drywell Penshation              COMPLETED FROM INTERNALRFO21 (INACCESSIBLE AREA X-IOID                          lDENlIFED)
EXTERNAL TO BE SCHEDULED BEFORE OR DURING R                                              F m
                                      ~oompleted     pre RFO 22)
El.ll Drywen Penetration              COMPLETED FROM INTERNALRF021 (INACCESSIBLE AREA x-102                            IDENTIFIED)
EXTERNALTO BE SCHEDULED BEFORE OR DURING -022 (compl~~eci     pre RFO 22)
El.11 DryweU Penetration              COMPLETED FROMINTERNAL RF021 QNACCESSIBLE AREA X-I03                          WENTIFED)
EXlXRNAL. TO BE SCHEDULED BEFORE OR DURINO RFO22 (completed pre RFO 22) EXTERNAL SURFACE OF TIiIS PENETRATION IS NOT ACCESSIBLE FOR EXAMINATION DUE TO DESIGN EL11  Drywell Penebatim X-104A 1    1OOYO  COMPLETED FROMINTEIWAL RF021 (INACCESSIBLEAREA IDENTIFIED)
EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22
                                      &ompleted pre RFO 22)
 
To: DennisGirroir                                                          5/1Y200 1 From: Ralph Connell Re: Report for TWE Inspections Performed for RF022 (Reference Xeport for IWE Inspections Performed for RF021 dated 12/02/1999)
INTRODUCTION:
The objective in the current period for this new ][WE inspection program was to gather as much information as we could for RF021 and RF022. During RF021 the goal was to perform as many inspections as possible within the acceptable window without causing any interference with other outage work activities. The remainder of the required first period examinations was performed either before or during RFOZZ.
After the ZWE examinations performed during RFO 21 the Program Procedure PP7024 was revised to incorporate lessons learned. Some revisions were made to the appendices regarding inspected components and inspection criteria. As a result some of the examinations originally listed for the 1 period were revised and are reflected in the completion schedule included in this report. All required VT-3 examinations were moved to the 3d period as required by the ASME Section M Code 1992/92A.
DISCUSSION:
DISCUSSION:
The ASME Section XI Subsection IWE Code requires an examination of tbe coated Surfaces in order to determine the condition of the substrate.
The ASME Section XI Subsection IWE Code requires an examination of tbe coated Surfaces in order to determine the condition of the substrate. This examination of coated surfaces is for evidence of flaking, blistering, peeling, discoloration and other signs of distress of the underlying metal. The IWE examinations performed for RFO21 found only two areas of coating with signs of distress affecting the substrate. Those two areas were located at the drywell interior moisture barrier and the other was on the drywell surface at the X-5Gpenetration. Both of these were evaluated by Mechanical Design Engineering and dispositions provided via the IDR process. IWE examinations during RF022 identified two more areas. These were areas of pitting and corrosion in the vent header and corrosion in the interior of penetrations X-207A-H. Both of these were also evaluated by Mechanical Design Engineering and dispositions provided via the IDR process. At many areas of the containment there is peeling or discoloration. Both of these issues have been previously identified and accepted via the OP5250 inspections.
This examination of coated surfaces is for evidence of flaking, blistering, peeling, discoloration and other signs of distress of the underlying metal. The IWE examinations performed for RFO21 found only two areas of coating with signs of distress affecting the substrate. Those two areas were located at the drywell interior moisture barrier and the other was on the drywell surface at the X-5G penetration.
Both of these were evaluated by Mechanical Design Engineering and dispositions provided via the IDR process. IWE examinations during RF022 identified two more areas. These were areas of pitting and corrosion in the vent header and corrosion in the interior of penetrations X-207A-H.
Both of these were also evaluated by Mechanical Design Engineering and dispositions provided via the IDR process. At many areas of the containment there is peeling or discoloration.
Both of these issues have been previously identified and accepted via the OP5250 inspections.
The Maintenance Department has been performing containment inspections for several years via OP5250 to evaluate the condition of the coatings on containment surfaces.
The Maintenance Department has been performing containment inspections for several years via OP5250 to evaluate the condition of the coatings on containment surfaces.
These inspections have compiled an excellent source of data documenting the conditions of the coatings and how these coatings are maintaining over time. The information provided &om these reports provides the basis for disposition of issues identified on the IWE reports such as coating peeling and blistering.
These inspections have compiled an excellent source of data documenting the conditions of the coatings and how these coatings are maintaining over time. The information provided &om these reports provides the basis for disposition of issues identified on the IWE reports such as coating peeling and blistering.
9 Several areas were identified as inaccessible during the RF021 and W022 IWE examination process. Those inaccessible areas are generally defined in PW024. More specific information is included with the data supplied in this report. DETAILS: TORUSSURFACE The surface fkom just below the catwalk on the exterior surface to the horizontal mid point of the torus was inspected prior to W022 The remaining torus penetrations were examined prior to RF022 and during RF022. Penetrations X-207A-H were identified as having corrosion exceeding the provided acceptance criteria.
 
IDR 01-08 was written on this item. This was addressed by Design Engineering and a design wall thickness for these penetrations was provided.
9 Several areas were identified as inaccessible during the RF021 and W022 IWE examination process. Those inaccessible areas are generally defined in PW024. More specific information is included with the data supplied in this report.
The X- 207A-H penetrations are acceptable for continued use and the corrosion identified does not exceed the required design wall thickness.
DETAILS:
Torus penetration (includes penetrations in the vent system) examinations were completed for the first period. The interior surface of the vent header examination was completed during RlF022. There were areas of pitting and corrosion identified in the vent header that exceeded the provided acceptance criteria.
TORUSSURFACE The surface fkom just below the catwalk on the exterior surface to the horizontal mid point of the torus was inspected prior to W 0 2 2 The remaining torus penetrations were examined prior to RF022 and during RF022.
IDR 01-07 was written to address the areas of pitting and corrosion. Design Engineering addressed this IDR and provided new acceptance criteria for the vent header corrosion identified.
Penetrations X-207A-H were identified as having corrosion exceeding the provided acceptance criteria. IDR 01-08 was written on this item. This was addressed by Design Engineering and a design wall thickness for these penetrations was provided. The X-207A-H penetrations are acceptable for continued use and the corrosion identified does not exceed the required design wall thickness.
All areas are within the required design wall thickness provided by the Design Engineering resolution and are acceptable fur continued operation.
Torus penetration (includes penetrations in the vent system) examinations were completed for the first period.
AUGmNmDmL SURFACES After review of the data gathered during RF021, a portion of the containment surface at the joint seal area was declared as augmented. This area was examined and documented during RFO22. No change was identified in the as inspected condition between RFO21 and RF022 in the augmented area. Since the area of the augmented sdace was being prepared for seal installation and painting the opportunity to examine this region with white metal exposed and all corrosion removed presented itself The entire circumference in the moisture barrier area was examined and the areas of pitting and pit depths were identified.
The interior surface of the vent header examination was completed during RlF022. There were areas of pitting and corrosion identified in the vent header that exceeded the provided acceptance criteria. IDR 01-07 was written to address the areas of pitting and corrosion. Design Engineering addressed this IDR and provided new acceptance criteria for the vent header corrosion identified. All areas are within the required design wall thickness provided by the Design Engineering resolution and are acceptable fur continued operation.
All pitting identified by this examination were bounded by the 1999 evaluation, VYM 99/139, and are acceptable for continued operation of the drywell. Forty-three (43) percent of the required first period drywell penetration examinations were completed during NO21 the remainder was examined either prior to or during RF022. Many of these penetrations depicted debris and peeling paint. The dddebris is not considered to be detrimental to the containment structure.
A U G m N m D m L SURFACES After review of the data gathered during RF021, a portion of the containment surface at the joint seal area was declared as augmented. This area was examined and documented during RFO22. No change was identified in the as inspected condition between RFO21 and RF022 in the augmented area.
All penetration cavities were dry with no visible indication of moisture.
Since the area of the augmented s d a c e was being prepared for seal installation and painting the opportunity to examine this region with white metal exposed and all corrosion removed presented itself The entire circumference in the moisture barrier area was examined and the areas of pitting and pit depths were identified. All pitting
The peeling paint was similar to that identified in the maintenance reports and is not unusual for the age and environmental conditions experienced by the coating. The diddebris identified in the drywell penetration cavities is a housekeeping issue only, not a containment integrity concern.
 
All large debris located in the penetrations examined has been removed. The remaining debris consists of the accumulation of dirt, dust and paint chips over the life of the plant. The quantity of debris in the penetrations identified is not a containment integrity concern. Most diddebris was lying in the concrete sleeve and not in contact with the penetration.
identified by this examination were bounded by the 1999 evaluation, VYM 99/139, and are acceptable for continued operation of the drywell.
All penetrations examined (except for X-207A-H) were dry with no indication of water. The penetrations typically have a small access and pose difficulty cleaning.
Forty-three (43) percent of the required first period drywell penetration examinations were completed during NO21 the remainder was examined either prior to or during RF022. Many of these penetrations depicted debris and peeling paint. The dddebris is not considered to be detrimental to the containment structure. All penetration cavities were dry with no visible indication of moisture. The peeling paint was similar to that identified in the maintenance reports and is not unusual for the age and environmental conditions experienced by the coating.
The dilemma from inside the drywell is the accessibility to the penetrations and the ALATU concerns. The drywell moisture barrier at the concrete floor to steel interface on the 238' level was identified as failed during RF021 examination.
The diddebris identified in the drywell penetration cavities is a housekeeping issue only, not a containment integrity concern. All large debris located in the penetrations examined has been removed. The remaining debris consists of the accumulation of dirt, dust and paint chips over the life of the plant. The quantity of debris in the penetrations identified is not a containment integrity concern. Most diddebris was lying in the concrete sleeve and not in contact with the penetration. All penetrations examined (except for X-207A-H) were dry with no indication of water. The penetrations typically have a small access and pose difficulty cleaning. The dilemma from inside the drywell is the accessibility to the penetrations and the ALATU concerns.
During RFO 22 this seal was replaced.
The drywell moisture barrier at the concrete floor to steel interface on the 238 level was identified as failed during RF021 examination. During RFO 22 this seal was replaced.
To deal With the paint chipping and corrosion in the seal area and to accommodate the seal installation a six-inch wide band of paint was removed in the seal area for the full circumference of the drywell at the 238' level. The seal was reinstalled per minor mod #2000-010. The six-inch band was re-coated with non-qualified coating. The area of the seal and coating was examined after installation to document the as installed condition.
To deal With the paint chipping and corrosion in the seal area and to accommodate the seal installation a six-inch wide band of paint was removed in the seal area for the full circumference of the drywell at the 238 level. The seal was reinstalled per minor mod
This seal acts as a gasket at the concrete to steel interface to prevent moisture from penetrating under the concrete and to prevent it fiom setting in the interface setting up localized corrosion.
#2000-010.The six-inch band was re-coated with non-qualified coating. The area of the seal and coating was examined after installation to document the as installed condition.
This area is an area that regularly gets flooded with water due to the activities that take place during outages in the dry well. This area also is an area that experiences wear and tear at a much higher rate than the rest of the containment due to its location.
This seal acts as a gasket at the concrete to steel interface to prevent moisture from penetrating under the concrete and to prevent it fiom setting in the interface setting up localized corrosion. This area is an area that regularly gets flooded with water due to the activities that take place during outages in the dry well. This area also is an area that experiences wear and tear at a much higher rate than the rest of the containment due to its location. As a result of the location and outage activities this is an area that requires regular maintenance to keep the moisture barrier seal and the paint in the moisture barrier area intact and properly protecting the steel containment. The logistics of trying to place qualified coating at this location and then set up to regularly maintain it can be difficult as was seen during RFO22 not to mention very costly. I recommend that this moisture barrier area and the six-inch band of paint be declared a high maintenance area and designed as an area where unqualified coatings are approved and utilized. This will make the routine maintenance of this area much easier to perform resulting in better
As a result of the location and outage activities this is an area that requires regular maintenance to keep the moisture barrier seal and the paint in the moisture barrier area intact and properly protecting the steel containment.
 
The logistics of trying to place qualified coating at this location and then set up to regularly maintain it can be difficult as was seen during RFO22 not to mention very costly.
maintenance of this area in the fbture. If this approach were approved, repainting with qualified coating would not be required only maintenance activity to maintain the integrity of the nonqualified paint and moisture barrier seal. This maintenance should become a routine PM.
I recommend that this moisture barrier area and the six-inch band of paint be declared a high maintenance area and designed as an area where unqualified coatings are approved and utilized.
PRESSURERETAlN1.G BOLllNG Bolting examinations for X-200A & B and V16-19-5G& H were completed during RF022 in the removed condition. Bolting examinations or Vl6-19-5A-F was examined in place. This completes the required first period IWE bolting examinations.
This will make the routine maintenance of this area much easier to perform resulting in better
* maintenance of this area in the fbture. If this approach were approved, repainting with qualified coating would not be required only maintenance activity to maintain the integrity of the nonqualified paint and moisture barrier seal. This maintenance should become a routine PM. PRESSURERETAlN1.G BOLllNG Bolting examinations for X-200A & B and V16-19-5G  
& H were completed during RF022 in the removed condition. Bolting examinations  
*or Vl6-19-5A-F was examined in place. This completes the required first period IWE bolting examinations.  


==SUMMARY==
==SUMMARY==
: An estimated 80% of MrE examinations are completed prior to or during RFO21. The remaining 20% were completed prior to or during RF022 to complete the first period examination requirements.
An estimated 80% of MrE examinations are completed prior to or during RFO21. The remaining 20% were completed prior to or during RF022 to complete the first period examination requirements.
There were two new IDR's generated, per DP4027, for containment issues Gng W022. All of these issues were addressed by Mechanical Design Engineering prior to RF022 startup. Please find attached to this report for reference the Summary of First Period TWE Examinations.
There were two new IDRs generated, per DP4027, for containment issues G n g W022. All of these issues were addressed by Mechanical Design Engineering prior to RF022 startup.
This repod provides details for the fir& period examinations.  
Please find attached to this report for reference the Summary of First Period TWE Examinations. This repod provides details for the fir&period examinations.
..
 
1/23/1999  
1/23/1999    


==SUMMARY==
==SUMMARY==
OF FIRST PERIOD Twl XAMINATIONS ASME SECTION XI EXAhL CATEGORY.
OF FIRST PERIOD Twl XAMINATIONS CONTAINME
E-A REMARKS BAYS) EXAM CONTAINME ASME SECTlON XI ITEM NO.
* SURFACES (TORU! BAYS)          ASME SECTION XI EXAhL CATEGORY. E-A ASME        IS1                EXAM %        REMARKS SECTlON X I IDENTIFICATION          COMPLETE ITEM NO. NO.IDESCRIPTION         TO DATE h e m a l surface above water line completedRFO 21 El.ll      TORUS BAY 1        GV  100 yo  Exi.emal surface except area ffm catwalk down to belt Line completed.
* SURFACES (TORU! IS1 IDENTIFICATION NO.IDESCRIPTION  
Remaining m to be mspeded after S/URFO2l(oompl&edpre RFO 22)
% COMPLETE TO DATE hemal surface above water line completed RFO 21 Exi.emal surface except area ffm catwalk down to belt Line completed.
Nate: VT-1 completed below water line RFCUO m a l surface above water line completedRFO 21 EI.11      TORUS BAY 2        GV  IW %    Eldeanel surface except area 5om catwalk down to belt line completed.
Remaining m to be mspeded after S/U RFO2l(oompl&ed pre RFO 22) Nate: VT-1 completed below water line RFCUO mal surface above water line completed RFO 21 Eldeanel surface except area 5om catwalk down to belt line completed.
Remaiming area to be inspected after SN RMnl (complaedpre RFO
Remaiming area to be inspected after SN RMnl (complaed pre RFO 22) Note: VT-1 completed below water line RF020 Internal &ce above water line completed RFO 21 Elagnal surface except area &om catwalk down to beIt line complefed Rmnaiairig arca to be inspected afts SN RF(nl(c0mpletedp RFO 22) banal dace above wata line completed RFO 21 Extemal surface except area fiom catwalk down to belt line compfeted Remaining area to be inspected after SKJ RF02l(completed pre RFO 22) Ncte: VT-1 completed below water line RF-0 Internal surface above water line compIeted RFO 21 F&temal surfaw ex- area from catwak down to belt line completed Remaining area to be inspected after S/W RF02l(completed pre RM) 22) Internal dace above water line complded RFO 21 Extad dace except area fiom catwalk down to belt line compIeted.
                    ~~    ~          ~
Remaining area to be inspecid a%er SN RF02l(compleLed pre RFO 22) Nate: VT-1 completed below water line RF020 Mmal surface above water line complded FSO 21 mal dce except area ikom catwalk dawn to belt line completed.
: 22) Note: VT-1 completed below water line RF020 Internal &ce         above water line completed RFO 21 ELI1        TORUS BAY 3        GV  100 Yo  Elagnal surface except area &omcatwalk down to beIt line complefed Rmnaiairig arca to be inspected a f t s S N RF(nl(c0mpletedp RFO 22)
Remaining area to be mspeded der SN RFO2l(compllBed pre RFO 22) Nde: VT-1 complUed bdow water line RFOZO baemal dace above water Line completed RFO 21 Edema1 slpface except area fiom catwalk down to belt line completed-mining area to be inspected after SN WO22(compldedpre RFO 22) Note: VT-1 completed below water line RFOZO krtanal sllrface above water line mnpleted RFO 21 Extemd daw except area from catwalk down to bdt line completed.
                                            $late: VT-I ~0mleted              below water line RF020 banal d a c e above wata line completedRFO 21 El.ll      TORUS BAY 4        GV  100 Yo  Extemal surface except area fiom catwalk down to belt line compfeted Remaining area to be inspected after SKJ RF02l(completed pre RFO 22)
Remaining area to be inspe&ed aAa SN RF02l(complaed pre RFO 22) Note: VT-1 completes below water line RF020 Internal dace above water rine completed RFO 21 Extanal sorface except area eom catwalk down to belt line oomplaed Remaining area to be inspected aftex S/U RF02l(completedpre RFO 22) Note: VT-1 completed below water line W020 fntemal surfaoe above water Line canplaed RFO 21 External surface excqt area fiom catwalk down to belt line mmplered Remaming area to be inspected after SN ~l(0ompleted pre RFO 22) Note: VT-I completed below water line RF020 Intanal dace above water line complded RFO 21 External surface except area 6.om catwalk down to belt line completed Remaining afes to be inspected ah SllJ RFoZl(c0mpleted pre RFO 22) Note: VT-1 completed below water line RF020 bitema1 surfh above water line compleced RFO 21 External surf$= except area fiom catwalk down to be& he completed Remaining area to be inspected a%= SN RFOZl(comp1eted pre RFO 22) Note: VT-1 coqkted below water line RF020 Intemal surface above water lime completed RFO 21 External SllrfaQ except area fiom catwalk &wm to belt line completed Remabing area to be inspected a&er SN RFO2l(complBed pre RM, 22) Note VT-1 completed below water line W020 haernal surface above water tine complaed RFO 21 External SUrfaQ exqt are *om catwalk down to belt line completed Izcmaining area to be inspected after S/u RFCnl(c0mpleted pre rZF0 22) Note: V7'-I completed below water line RF020 $late: VT-I ~0mleted below water line RF020 Note: VT-1 ~mpkkd below .water IhK RF020 El.ll TORUS BAY 1 GV 100 yo EI.11 TORUS BAY 2 GV IW % ~~ ~ TORUS BAY 3 GV ~ 100 Yo 100 Yo ELI1 GV El.ll TORUS BAY 4 ELI1 TORUS BAY 5 GV TORUS BAY 6 I00 Yo 100 % 100 Yo 100 Oh GV GV El.ll El.ll TORUS BAY 7 GV TORUS BAY 8 EL11 TORUS BAY 9 GV El.ll ~~ TORUS BAY 10 GV 100 Yo ELI1 TORUS BAY 11 GV loo % 100 Yo 100 % 100 % 100 % EL11 GV TORUS BAY 12 E1.11 TORUS BAY 13 GV EL11 TORUS BAY 14 OV GV El.ll EL11 ~~ TORUS BAY 1 5 _. -. . - . . - .. . .. . .. - . .. . ... .. . . -. . . ... -. . . . ._ __ . .- __
Ncte: VT-1 completed below water line RF-0 Internal surface above water line compIeted RFO 21 ELI1        TORUS BAY 5      GV            F&temalsurfaw ex-                 area from catwak downto belt line completed Remainingarea to be inspected after S/WRF02l(completed pre RM)22)
a El.11 Intend surface above water line coloplaed RFO 21 Exkznal sllrliice exqt area hm catwalk down to belt Iinc completed Remakingareato bemspeded~erS/URF(nl(aomplBedpre~O
Note: VT-1 ~ m p k k below        d        .water IhK RF020 Internal d a c e above water line complded RFO 21 TORUS BAY 6        GV  I00 Yo  E x t a d d a c e except area fiom catwalk downto belt line compIeted.
: 22) TORUS BAY 16 GV 100 % Nde: VT-I c~mpleted below water line RF020 ASME SECTIt J XI EXAM. CATEOC VENT SYSTEM BAY 2 mum ASSEMBLY, VACUUM BREAKER JXNES, ANDm HEAVJB IN BAY 2 AND BAY 3) VENT SYSTEM BAY 4 (VENTLINE ASSEMBLY, VACUUM BREAJERLDJES, AND VENT HEADER M BAY 4 AM) BAY 5) VENT SYSTEM BAY 6 ASSEMBLY, VACUUM BREAKERLINES, ANDVENT HEADER IN BAY 6 AND BAY 7) (VENTLINE THE VENT LINE WAS COMPLETEa FROM THE TNTERNAt SURFACE FS021. THE VACUUM BREAKER LXNES WERE COMPLETEDFROMTHEEXTERNALSURFACETOfltfE PENZTRATLON 203 ELBOW THEN FROM THE INSIDE FROM THE 203 Pl%ETlL4nON TO THE ELBOW VERTICAL WELD. THE FXEWAL. SURFACE OF THE VENT HEADER AND INTERNAL AM) EXTERNAL SURFACES OF THE DOWNCOMERS COMPLETED RFWO. THE VENT HEADER INTERIOR, VENT LINE -OR, AND THE REMAINDER OF THE VACUUM LINE WIU BE SCHEDULED FOR RFO22. (completed pre RFO 22) TIiE VENT LINE WAS COMPLETED FROM THE INTERNAL SURFACE RF021. THE VACUUMBREAKER LINES WERE CONIPLETEDFROMTHEEmWALSURFACETOTHE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATON TO THE ELBOW VERTICAL WELD. THE EXTERNAL SURFACE OF THE VENT HEADER AND INTERNAL AM) EXTERNAL DOWN COMER SURFACES WHERE COMPLETED RF020. THEVENTLINE WASCOMPLETEDFROMTHEINT'ERNAL.
El.ll                                        Remaining area to be inspecid a%er SN RF02l(compleLed pre RFO 22)
SURFACE W0.21. THE VACUUM BRWU<ER LINES COMl'LETJ3,DFROMTHEEXTERh'ALSuRFAcE TOTHE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM TF5 203 PENETRATION TO THE ELBOW VERTICAL WJZD. THE EXTERNAL SURFACE OF THE VENT HEADER AND INTERNAL.
Nate: VT-1 completed below water line RF020 Mmalsurface abovewater line complded FSO 21 El.ll      TORUS BAY 7        GV  100 %    m a l d c e except area ikom catwalk dawn to belt line completed.
AND EXTERNAL SURFACES OF THE DOWNCOMERS  
Remainingarea to be mspeded d e r S N RFO2l(compllBed pre RFO 22)
%'*ERE COhApLETED RFW. THE VENTHEADER JNTERIoR, VENT LINE mNOR, AND THERJ3MNDEBOFTHEVACWUMLINEWIUBESCHEDULED FOR RFO22. (compl&ed pre RFO 22) THEVENTLINEWASCOh4PLETEDFROMTIIEINTERNAL SURFACE RF021. THE VACUUMBREAKERLINES WERE cOMpIE% FROM THE EXTERNAL SURFACE TO THE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATIONTO THE ELBOW VERTICAL WELD. THE ExIlERNAt SURFACE OF TNE AND EXTERNAL SURFACES OF THE DowNcOMERs WMERE HEADER AND INTE'FWAL COMPLETED RFo20. THE VEhT LIME WAS OOMPLETEX)
Nde: VT-1 complUed bdow water line RFOZO baemal d a c e above water Line completed RFO 21 TORUS BAY 8        GV  100 Yo  Edema1 slpface except area fiom catwalk down to belt line completed-EL11                                        m i n i n g area to be inspected after SN WO22(compldedpre RFO 22)
FROM THE INTERNAL SURFACE RFO21. THE VACuuhiI BREAKER LINES COIvlPL.E~FROMTHEEXTERNALSURFACETOTHE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATION TO THE ELBOW VERTICAL WELD. THE EXTERNAL SURFACE OF THE VENT HEADER AND INTERNAL AND EXTERNAL SURFACES OF THE DOWNCOMERS GoMPrnD RFmo. THE VENT HEADER INTERIOR, VENT LINE EXTERIOR, AND TIE REMAINDER OF THE VACUUM LINE WILL BE SCHEDULED FOR RF022. (completed pre RFO 22)
Note: VT-1 completed below water line RFOZO krtanal sllrface above water line mnpleted RFO 21 TORUS BAY 9        GV  100 Oh  Extemd d a w except area from catwalk down to bdt line completed.
El.ll EL11 100% E1.11 SURFACE -1. THE VACUUM BREASRLINES WERE COMPLETEDFROMTHEEXTERNALSURFACE TOTHE PENETRAnoN 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATION TO THE ELBOW VERTICAL W. THE EXlXRNAL SURFACE OFTHE VENT HEADER AM) INTERNAL AND EXTERNAL SURFACES OF THE DOWNCOMERS WAERE COMPLETED RFmo. THE VENT HEADER INTERIOR, VENT LXNE EXTERIOR, AND THEREMAINIlEROFTHE VACWMLINEWIUBESCHEDUm VENT SYSTEM BAY 8 CVENTm ASSEMBLY, VACUUM BREAKER LINES, AND VENT *LEADER IN BAY 8 AND BAY 9) VENT SYSTEM BAY 10 {VENTLME ASSEMBLY, VACUUM BREAKERLINES, ANDVENT HEADER IN BAY 10ANDBAY 11) 100% 100% VENT SYSTEM BAY 12 (VENTLN ASSEMBLY, VACUUM BREAELERLINES, AND VENT HEADER IN BAY 12 AND BAY 13) I TfIEVENTLLNEWASC0MPLE"EDFROMTHEINXERNAL SURFACE RF021. THE VACUUM BREAKER LINES WERE COMPld3TEDFROMTHEEXTERNALSURE.'ACETOTRE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 fENETRATIQN TO THE ELBOW VERTICAL WELD. THE EXTERNAL SURFACE OFTHE VENTHEADERAND INTERNAL ANDEXTERNAtSURFACESOFTHEWWNCOMERs WHERE COMPLETED RF020. THE~HEAJlER~O~~Y3NEEXTERIOR,AND THE REMAINDER OF THE VACUUM LINE WILL BE SCXEDUUD FOR RFO22 (completed pre RFO 22) THEVENTLINEWASCOMPLETEDFROMTHEINTERNAL VENT SYSTEM BAY 14 (VENTLINE ASSEMBLY, VACUUM BREAKERLINES, ANDVENT HEADER IN BAY 14 AND BAY 15) EL11 E1.12 EL11 VENT SYSTEM BAY 16 (VENTLINE ASsErnLY, VACUUM BREAKERLINES, ANDVENT HEADER IN BAY 16 AND BAY 1) TorusPgletratiOn GV 100% X-2OOA & B VT-3 100% Torus Penetration GV 100% X-201A THRU A GV GV GV GV GV 100% 100% SGACE W&1. THE VACUUMBREAKER LINES WERE COMPLJ3ZD FROM THE EXTERNa SURFACE TO THE PENETRATION 203 ELBOW ITEN FROM THE INSIDE FROM THE 203 PENXRATION TO THE ELBOW VERTICAL WELD. THE EXTERNAL SURFACE OF THE VENT HEADER AM) INTERNAL ANDEXERNAL SURFACES OF THE DOWNCOMERS mRE COmLETED RFmo. THE VENT HEADER INFERIOR, VENT LINE EXTERIOR, AND SURFACE RFO21. THE VACUUM BEAKER LMES WERE C0MPETF.D FROM THE EXl33FWAL SURFACE To THE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATION TO THE ELBOW VERTICAL WELD. THE EXTERNAL SURFACE OF THE VENT HEADER AND INTERNAL AND EXIZRNAL SURFACES OF THE DOWNCOMERS COMPLETED wmo. THE VENTHEADER INTERIOR, VENT LINJ? EXTERIOR, ANI) THE REMAINDER OF THE VACUUM LINE WILL BE SCHEDULED FOR xFO22. (completed pre RFO 22) ASME SECTION XI EXAM. CATEGORY E-A COMPLEmINTERNALANDEXTERNAL
El.ll                                        Remaining area to be inspe&ed aAa S N RF02l(complaed pre RFO 22)
-~ COMPLETE FROM EXTERNAL -021 COMPLETE FROM INTERNAL RFO21 EX"ZRNAL TO BE SCHEDULED BEFORE OR DURING RFOZXcompleted pre RFO 22)
                      ~~
El.11 EL11 EL11 I TarusPendration X-202A THRU F Torus Penekation X-202G THRU K Torus Penetration X-203A THRU F El.11 EL12 El.ll To~usPen&itioa X-203G THRU H TmPen~m X-207A THRU H I EL11 Torus Pmetnrtion Torus Penetration X-208A THRU D El.ll El.ll EL11 EL11 EL11 Tarus Pgletration X-206A THRU D TonrsPenetmtion X-2 1OA & EL Toms Penetration X-ZlIA&B Taus Pen&itim x-212 Torus Penetration X-213A &. B I ioo% 100% 100% 100% 100% 100% 100% 100% 100% El.12 COMPLXTE FROM INTERNAL AND EXTERNAL SO21 COMPLETEFROMINTEKNALANDEXTERNALW021 COMPLEE FROMEXTERNAL RFCnl (UNDER WATER) COMPLETE FROME;rlTERNALRFO21 WER WATER) COMPLETEFROMINTERN&AlWEXTERNAtRF021 COMPLETE FROMKNTERNAL AND EXTERNAL RF021 COMPLETE FROMWRNAL AND EXTERNAL RFO21 COMPLETE FROM lNl'ERN& AM) EXEIRNAL RFOZ1 COMPLETE FROM INTERNAL AND EXTERNAL RFO21 Toms Penplr;aion X-206E THRU F El.ll EL11 EL11 EL11 EL11 Torus Penetration X-2 I4 TorusPenWw X-2 1 5 Torus Pen&at.ion X-2 16 Toms Pondration X-217 ' Taus Penetration X-2 1 8 El.ll Taus Penetration X-209A THRU D I EL12 I GV GV GV GV GV GV VT-3 GV VT-3 GV GV GV GV GV GV GV VT-3 GV GV GV GV GV 100% I COMPUTE FROM INTERNAL AND EXI'ERNAL WO21 100% 1 COMPLETE FROMINTERNAL ANL) EXTERNAL E3021 D BEFORE ORDWRING COMPLETE FROM INTERNAL W021 RNAL TO BE SCHEDULED BEFORE OR DURING W022 COMPLETE FROM xNTEIu\JAL AND EXTERNAL W02I ED FOR RF02z(completed RFO 22 COMPLETEFROMINT'ERNALANDEXTERNALRF021 ,
Note: VT-1 completes below water line RF020 Internal d a c e above water rine completedRFO 21 TORUS BAY 10      GV  100 Yo  Extanal sorface except area eom catwalk downto belt line oomplaed ELI1                                        Remaining area to be inspected aftex S/U RF02l(completedpre RFO 22)
El.ll Torus Peaetnnion X-219 Torus Penetration EL11 GV 100% COMPLETE FROM mAL AND EXTERN& RFO21 GV 100% COMPLETE FROM INTERNAL AND EXTERNAL RFO21 EI.11 x-221 TorusPenetration x-222 El.ll GV 100% COMPLETE F'ROMINTERNAL AND EXTERNALRFOZl El.ll X-223 El.ll t *1.11 EL12 El.ll E1.12 EL11 E1.12 EL11 Torus Pendmtion X-224A & B TolusPenetrsdion X-225 Torus Peaetration X-226A & B EL11 EL11 GV 1 00Yo I COMPLETE FROMIZXTERNALRFOZl INSULATION PREVENTING INSPECTION FROM EXTERNAL, INTERNAL,UNDER WATER THIS WIU BE RESCHEDULED WHEN DIVERS ARE IN TORUS OR TORUS HAS BEEN DRAMED ALONG WITlI THE UNDERWATER SURFACES.
Note: VT-1 completed below water line W020 fntemalsurfaoe above water Line canplaedRFO 21 TORUS BAY 11      GV  loo %    External surface excqt area fiom catwalk downto belt line mmplered EL11                                        Remaming area to be inspectedafter S N ~ l ( 0 o m p l e t e pre     d RFO 22)
GV 100% COMPLETE FROMEXTERNAL W021 (UNIIER WATER) VT-3 100% COMPLETE FROMEXTERNALRFCBl (UNDER WATER) GV 100% COMPLETE FROMEXTERNALRFOZI (UNDER WATER) VT-3 100% COMPLETE FROMEXTERNALRFOZI (UNDERWATER)
Note: VT-I completed below water line RF020 Intanald a c e above water line complded RFO 21 TORUS BAY 12      GV  100 Yo  External surface except area 6.omcatwalk down to belt line completed E1.11                                        Remaining afes to be inspected a h SllJ RFoZl(c0mpleted pre RFO 22)
EL11 Torus Penetmtion GV X-227 100% COMPLETE FROMEXTERNALRFo21 (UNDER WATER) TorusPenQtation X-228 Torus Pen&ation X-229 Toms Pendon X-230 TorusPenetraton X-231 A-H GV 100% COMPETED FROM EXTERIOR RFOZ1 (NOT ACCESSIBLE FROM INTERIOR)
Note: VT-1 completed below water line RF020 bitema1 s u r f h abovewater line compleced RFO 21 TORUS BAY 13      GV  100 %    External surf$= except area fiom catwalk down to be& h e completed EL11                                        Remaining area to be inspected a%= S N RFOZl(comp1eted pre RFO 22)
GV 100% COMPLETED FROMEXTERIOR RFO21 (NOT ACCESSIBLE FROM INTERIOR)
Note: VT-1 coqkted below water line RF020 Intemal surfaceabove water lime completed RFO 21 El.ll      TORUS BAY 14      OV  100 %    External SllrfaQ except area fiom catwalk &wm to belt line completed Remabing area to be inspected a&er S N RFO2l(complBed pre RM, 22)
GV 100% COMPLEED FROMEXTERIORRF021
                ~~
&G COMFTZTED FROM DITEPJOR RFOZ1 (B,D,F &H ARE GV 100YO UNDER WATER FROM INTERNAL)
Note VT-1 completed below water line W 0 2 0 haernal surface above water tine complaedRFO 21 TORUS BAY 15      GV  100 %    External SUrfaQ e x q t a r e *om catwalk down to belt line completed EL11                                        Izcmainingarea to be inspected after S / u RFCnl(c0mpleted pre rZF0 22)
B,D,F,G & H COMPLETED FROM EXTERNAL RFCB 1 RESCHEDULE A,C, & E FOR RFO22(wmpleced pre RFO 22) Drywellelevation dew 238 to elevation 25 1 quadrant 180 to 270 1 VT-3 I 100% I COMPLETE FROMEXTERNAL RFml (UNDER WATER) I I I GV lODO/o 100% 238 to elevation 251 quadrant a to 90 100% I I I I I I EL11 I Dnwellelevation I GV I 100% 26 to elevation 251 quadrant 90 to I80 EL11 ASME SECTION M EXAM. CATEGORY:
Note: V7'-I completed below water line RF020
E-A COMPLETEDFROMINTERNALRF021 EXTERNAL INACCESSIBLE BY DESIGN COMPLETED FROMIh'TEN'JAL.
 
RFo21 EXTERNAL INACCESSIBLE BY DESIGN COMPLETED FROMINTERNAZ, RF021 EXTERNAL INACCESSIBLE BY DESIGN COMPLETEDFROMl[NTERNALRFO21 EXTERNAL lNACCESSIBLE BY DESIGN COMPLETED FROM INTERNAL RFOZ1 EXTERNAL INACCESSIBLE BY DESIGN E1.12 loo?? EL11 E1.12 . COMPLETED FROM INTERNAL RF021 8 ExTERNAt INACCESsI8LE BY DESIGN EL11 E1.12 100% 100% 100?4 100% 100% El.ll COMPLETED FROM NEFCNAL RFO2l EXTIERNAL INACCESSIBLE BY DESIGN OOMPLETEDFROMINTERNALRF021 EXTERNAL INACCESSIBLE BY DESIGN COMPLETED FROMEVIERNAL.
a Intend surface above water line coloplaed RFO 21 TORUS BAY 16      GV 100 % Exkznal sllrliice e x q t area h m catwalk downto belt Iinc completed El.11                                 Remakingareato bemspeded~erS/URF(nl(aomplBedpre~O22)
RFO21 EXTERNAL INACCESSIBLE BY DESIGN COMPUTED FROM INTEF3VA.L RFO21 EXTERN& INACCESSIBLE BY DESIGN COMPLETED FROMINTERNALRF021 EXTERNAL INACCESSIBLE BY DESIGN El. I1 10% EL11 COMPLETED FROMIlvTmNAL RFo21 EXTERNAL INACCESSIBLE BY DESIGN EL11 100% E1.11 E1.11 COMPLETED FROMINTERNALRF021 EXTERNAL INACCESSIBLE BY DESIGN ELI1 1 OO?! El.11 El.ll COh4PLETED FROM INTERNAL RF021 ECIERNAL.
Nde: VT-I c~mpletedbelow water line RF020 ASME SECTIt J XI EXAM. CATEOC THE VENT LINE WAS COMPLETEa FROM THE TNTERNAt VENT SYSTEM                SURFACE FS021. THE VACUUM BREAKER LXNES WERE BAY 2                      COMPLETEDFROMTHEEXTERNALSURFACETOfltfE mum                        PENZTRATLON203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY,                  203 Pl%ETlL4nON TO THE ELBOW VERTICAL WELD. THE VACUUM                    FXEWAL. SURFACE OF THE VENT HEADER AND INTERNAL BREAKER JXNES,            A M )EXTERNAL SURFACES OF THE DOWNCOMERS A N D m                    COMPLETED RFWO.
INACCESSIBLE BY DESIGN Drywell elevatim 238to eIevation 251 quadrant 270 to 360 degFees 100% Drywellelevation 251 to elevation 269 qu.adtimt 0 to 90 degrees COMPLETED IXOMrmTERNAL FSOZ1 EXERNAL INACCBSIBLE BY DESIGN Drywell elevation 251 to elevation 269 quadnmt90to180 degreg Drywell elevation 251 to elevation 269 quadrant 3.80 to 2'70 degrees DryweU elevation 251 to elevation 269 quadrant 270 to 360 aegrees Drywell elevation 269 to elevation 321 quaoh.antoto90 degrees Drywell dwation 269 to elevation 321 quabt 90 to 180 degrees DrywelI elevation 269 to elevation 321 quadrant 180 to 270 kees Drywell elevation 269 to ekv&cro 321 quadrant 270 to 360 degrees Drywen Head Drywen flanges interior surfacesand Drywell Head ~orsurfsces 100% 100% 100% VT-3 ~ COMPIETED FROM INTERNAL RFO21 EXTERNAL INACCESSIBLE BY DESIGN COMPLETED M021 COMPLETED RFOZ1 GV VT-3 r SURFACES (DRYWELL PENETRATIONS)
HEAVJB IN BAY 2            THE VENT HEADER INTERIOR,VENT LINE -OR,                      AND AND BAY 3)                THE REMAINDER OF THE VACUUM LINE WIU BE SCHEDULED FOR RFO22. (completed pre RFO 22)
DryweUPenetratim GV 100% x-1 DrywellPeoetration GV 100% x-2 GV COMPLETED INTERNAL AND EXTERNAL RF021 PORTIONS OF THE EXTERNAL AREA ARE INACCESSIBLE FROM DIRECT vzSUAJ+ EXAMINATION BY DESIGN COMPLETED INTERNAL AND EXTERNAL FS021 PORTIQNS OF THE EXTERNAL AREA AKE INACCESSIBLE FROM DIRECT VISUAL EXAMINATiON BY DESIGN VT-3 GV GV GV GV GV GV GV GV GV t I I COMF'LETEDFROMINTERNALR.F021 ECI'EXWAL INACCESSIBLE BY DESIGN CONTAINME EL11 EL1 I El.ll Drywell Penetration El.ll Drywell Penetrativn X-SA THRU X-5H 100% 100% 100% 1 OPh I COMPLETEDINTERNALANDEXTERNALRF021 COMPETED INTERNALRFO21 EXTERNAL TO BE COMPLETED BEFORE OR DURING RF022(completedpre RFO 22) COMPIETED FROM THE INTERNAL SURFACE RFO21 WMF'LETED FROMINTERIOR RFO21 RESCHEDULE EXIERIOR BEFORE OR DURING RF022(oompleted pre RFO 22) COMPLETED FROM INTERNAL RFO21 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22(completed RFO 22) E1.12 I E1.12 EL11 El.ll Drywell Penetration X-9A DrywellPenetratiGil X-7A 100% El.ll Drywell Penetr;aica 1 x-7c COMPLETED FROMMTERNAZ.RF021 EXTERNAL TO 3E SCHISDULED BEFORE OR DURING RFOn(camp1eted RFO 22) El.ll Dryweu Penetration El.ll DryWellPmetration 1 X-9B I El .11 DrywelI Penetration 1 x-10 I El.ll Drywen PenetTation El.ll Drywdl Penetration x-12 GV GV VT-3 GV GV GV GV GV GV VT-3 GV GV GV GV GV COMPLETED FROM LNTERN MCI'ERNAL TO BE SCHEDULED BEFORE OR DURING RE3CSDUL.E FOR W022 (completed RFO 22) External surface insulated restriding access for GV Exam. Nd internal surface has RESCHEDULE FOR RFm (completed RFO 22) External dace FROM INTERNAL RF021 (INACCESSIBLE AREA 8 . . ___ . . -. ._ . - . . -. - - - . . . . . - - . . . . . . - - . . . . . . . . . . . . . . - - . . . . . . . .. . . ... . . . .. . . - __ -. . . . - .__ ._ . . . . . . . . . . .. -. .
TIiE VENT LINE WAS COMPLETED FROM THE INTERNAL SURFACE RF021. THE VACUUMBREAKER LINES WERE CONIPLETEDFROMTHEEmWALSURFACETOTHE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATONTO THE ELBOW VERTICAL WELD. THE EXTERNAL SURFACE OF THE VENT HEADER AND INTERNAL AM)EXTERNALDOWN COMER SURFACES WHERE COMPLETEDRF020.
8 COMPLETEDF'ROMINTE~ALRF021 RNAL TO BE SCHEDULED BEFORE OR DURING RF022 COMPLETED FROM INTEIZNAL RF021 RNAL TO BE SCHEDULED BEFORG OR DURING RFO22 GV 100% THIS FZNETRATION IS NOT ACCESSIBLE FOR GV EXAM OF INTERNAL SURFACE. (completed RFO 22) GV GV GV 100% TRIS PENETRATIONIS NOT ACCESSIBLE FOR GVEXAM OF INTERNAL SURFACE. (completed RFO 22) 100% COMPLETED FROMINTERNALRFO21 EXERNALTO BE SC*KEDUI.ED BEFORE OR DURING W022 (compleled pre RFO 22) 1004/0 COMPLETED lXOMINTERNAL W021 EXTERNAL TO BE SCHEDULED BEFORE OR DURING W022 (completed pre RFO 22) GV 100% COMPLETED FROMMTERNALRFO21 EXTERNAL TO BE SCHEDULED BEFORE OR DUfUNG -022 (completed RM) 22) GV 100?%3 WWIETED FROM INTERNAL RFO21 EXTERNAL M BE SCHEDULED BEFORE OR DURING RFcn2(completcd pre RFO 22) I lOOo! COMPLETED FROM lNTJ5RNAL RF021 EXIXRNAL TO BE SCHEDULED BEFORE, OR DURING RFO22(comp leted pre RFO 22) 100% COMPLETED FROM INTERNALRFOZl EXIZRNM. TO BE SCHEDULED BEFORE OR DURING RF022(completed pre RFO 22) 100% INSuLATlON PREVENTS ACCESS FOR GV EXAM FROM INTERNAL SURFACE. (completed RFO 22) 100% LNSULATION PREVENTS ACCESS FOR GV EXAM FROM INTERNAL SURFACE (completed RFO 22) 100% 100% COMPLETED FROM INTERNAL RFozl EXTERNAL TO BE SCHEDULED BEFORE OR DURING I(Foz2(compIeted pre RFO 22) COMPLETED FROMTNTERNAL RFcnl EXTERNAL TO BE SCHEDULED BEFORE OR DURING Eo22 (compld pre RFO 22) El.11 Drywell Penetration X-13A El.ll Drywell Penetralicm X-13B El.ll DrywellPenetration DrywellPenecration x-15 Drywell Peneb.ation DrywellPtnetraticm x-16B Drywell Pmctratian X-14 X-16A X-17 El.11 EL11 El.11 El.ll El.ll Drywell Penetration X-18 I I I Drywell Penetration x-19 El.11 I I I Drywell Penetration x-20 EL11 EL21 Drywen PmeEratia x-2 1 GV GV t Dryweu Pennetration x-22 Drywell Penetraticn X-23 ELI1 av Drywell Penetratiar X-24 GV EL11 I El.11 GV Drywell Pentztration X-25 Drywell Penetration X-26 EL11 GV E1.12 EL11 DrywdlPenebatioo X-30 DrywetlPenetratim El.ll EL11 GV VT-3 GV El.ll EL12 El.ll EL12 El.ll El. 12 El.ll EL11 EL11 X-3 1 DrywellPemtration X-32 EL12 El.11 VT-3 GV EL12 El.ll DrywellPeneCration X-35A E1.12 EL11 GV VT-3 I Drywell Penetration X-27 GV DryWeUPeretratica GV X-28 I------
THEVENTLINE WASCOMPLETEDFROMTHEINT'ERNAL.
* Drywell Peoctratian x-34 EEzq-? X-35B hyweIi Pme?ratioa x-35c GV VT-3 I X-35D Drywdppenetratim I- f VT-3 100% loo?? ~ 100% 100% 100% 100% looOm 100% 100% 100% 100% 100% ~~ 100% 100% 100% 100% 100% 100% 100% 100% + COMPLETED FROM INTERNAL RFm1 COMPLETED FROM WIXWAL RFO21 EXTERNAL.
VENT SYSTEM                SURFACE W0.21.THE VACUUM BRWU<ER LINES BAY 4                    COMl'LETJ3,DFROMTHEEXTERh'ALSuRFAcE TOTHE (VENTLINE                  PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM TF5 ASSEMBLY,                  203 PENETRATIONTO THE ELBOW VERTICAL WJZD. THE VACUUM                    EXTERNALSURFACE OF THE VENT HEADER AND INTERNAL.
TO BE SCHEDULED BEFORE OR DURING RF022 (completed RFO 22) ~ COMPLETED FROM INTERNAL RF021 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 ~compleled RFO 22) RESCHEDULE FOR RF022 INTERNAL SURFACE NOT SAFELY ACCESSIBLE FOR GV EXAMINATION (completed RFO 22) COMPLETED FROM INTERNALRFOZl EXTERNAL TO BE SCBDWD BEFORE OR DUIUNG RF022 (completed pre RFO 22) COMPLETED FROM INTERNAL RFOZl COMPLETED FROMINTERNALRF021 EXTEFWAL TO BE SCHEDULED BEFORE OR DURING RFo22 (completed pre RFO 22) COMPLETED FROM INTERNAL RF021 COhPLETI3DFROMMTERNALRF021 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFOZ2 ~complaedpre RFO 22) COMPUTED FROMINTERNALRF021 COMPLETED FROMINTERNALRF021 EXTERNAL TO BE SCHJ3DULED BEFORE OR DURING RW22 (completed pre RFO 22) RESCHEDULE FOR RF022 (completed pre RFO 22) COMPIETEDFROMINTERi'JALANDE2CIXRNALRFOZl THIS PENETRATION IS PARTIALLY ACCESSIBLE FORGV Wh4PUTED FROM INTERNfi RFO21 COMPLETED FROM INTERNAL AND EXTEWAL W021 THIS PENETRATION IS PARTIALLY ACC?3SIBLE FOR GV EXAM COh4FTEIBD FROM rmTERNAL RF021 COMPLETED FROM INTERNAL AND EXIERNAL RF021 THIS PENETRATION IS PARTIALLY ACCESSIBLE FOR GV EXAM COMPLETED FROM INTERNAL.
BREAJERLDJES,            AND EXTERNAL SURFACES OF THE DOWNCOMERS %'ERE AND VENT                  COhApLETED RFW.
RF021 COMPLETED FROM XNTERNAL AND EXTERNAL RFO21 THIS PIPJETRATION IS PARTIALLY ACCESSIBLE FOR GV EXAM COWLETED FROM INTERNAL.
HEADER M BAY 4            THE VENTHEADER JNTERIoR, VENT LINE m N O R , AND AM) BAY 5)                THERJ3MNDEBOFTHEVACWUMLINEWIUBESCHEDULED FOR RFO22.(compl&edpre RFO 22)
RF021 COMPLETED FROM INTERNAL AND EXXERNALRFO21 THiS PENETRATION IS PARTIALLY ACCESSIBLE FOR OV EXAM - - - - - . . - . ... . . . - . . . . . . . . . . . . . . . ___ .
THEVENTLINEWASCOh4PLETEDFROMTIIEINTERNAL SURFACE RF021. THE VACUUMBREAKERLINESWERE cOMpIE% FROM THE EXTERNAL SURFACE TO THE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATIONTO THE ELBOW VERTICAL WELD. THE ExIlERNAtSURFACE OF TNE                  HEADER AND INTE'FWAL AND EXTERNAL SURFACES OF THE DowNcOMERs WMERE COMPLETED RFo20.
E1.12 ELXI El.11 VT-3 GV GV GV 100% 100% 100% 100% COMPLETED FROMINTERNALRFOZl COMPLETED FROM IMERNAL W02I EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22) THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GVEXAU COMPLETEDFROMINTERNALRFOZX EXTERNAL TO BE SCHEDUUD BEFORE OR DURING RFO22 (oompl&edpre RFO 22) THIS PENETRATION IS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXIMITY OF PIPES M EACH OTHER AND THE MINIMAL CLEARANCES BETWEEN THE CRD PPING AND THE mmmm SLEEVES. COMPLETED FROM INTERNAL.
THE V E h T LIME WAS OOMPLETEX) FROM THE INTERNAL VENT SYSTEM              SURFACE RFO21. THE VACuuhiI BREAKER LINES BAY 6                    COIvlPL.E~FROMTHEEXTERNALSURFACETOTHE (VENTLINE                PENETRATION203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY,                 203 PENETRATION TO THE ELBOW VERTICAL WELD. THE VACUUM                    EXTERNAL SURFACE OF THE VENT HEADER AND INTERNAL BREAKERLINES,             AND EXTERNAL SURFACES OF THEDOWNCOMERS ANDVENT                  G o M P r n D RFmo.
RF07.1 EXTERNAL TO BE SCHEDULED BEFORE OR DURINGRFOZZ (completed pre RFO 22) THIS Pl3EXIU'MON IS NOT ACCESSBLE FOR GV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AND THE MINIMAL CLEARANCES BETWEEN THE CIU) PIPING AND THE CONCRETE SLEEVES. COMPLETED FROM INTERNAL RFOZI EXTERNAL TO BE SCHEDULED BEFORE OR DURING -022 (aomplaed pre RFO 22) THIS PENETRATION IS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXWKY OF PIPES TO EACH OTHER AND THE MINIMAL CLEARANCES BETWEZN THE CRD PIPING AM) THE CONCRETE SLEEVES. Drywen Penetration X-36 Drywell Penetration X-37A Drywen Penetration x-3% EL11 El.11 Drywell PenetIatiOn x-37c GV 100% 100% El.ll GV Drywell Penetration x-37D COMPETED FROMINTEWAL RFOZl EXTEF?XAL TO BE SCHENJIED BEFORE OR DURING RFO22 (compieted pre RFO 22) THIS PENETRATION IS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AM) THEMINIMALCLEARANCES BETWEENTHE CRD PIPING AND THECONCRETE S?XEVES. EL11 Drywell Penetraticn X-38A COMPtETEDFROMINTEWALRF021 EXTERNAL.
HEADER IN BAY 6          THE VENT HEADER INTERIOR, VENT LINE EXTERIOR, AND AND BAY 7)               TIE REMAINDER OF THE VACUUM LINE WILL BE SCHEDULED FOR RF022.(completed pre RFO 22)
TO BE SCHEDULED BEFORE OR DURING RFo22 (completed pre RFO 22) THIS PENETRATION IS NOT ACCESSIBG FOR GV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AND THE MINIMAL CLEARANCES BETWEEN THE CIiD PIPING AND THE CONCRETE SWVES. COMPLETED FROM INTERNAL RFOZl EXTERNALTOBESCHEDULED BEFOREORDURINGRFO22
 
*(completed pre RFO 22) THIS PENJXRATKON IS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXIMITY OF PEES TO EACH OTHEfz AND THE MlNLMAL CLEARANCES BETWEEN THE CRD PIPING AND THE CONCRETE SLEEVES. COM.PLETED FROM INTERNAL RF021 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22) THIS PENETRATION IS NOT ACCESSIBE FOR GV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AND THE MIMMAL CLEARANCES BETWEEN THE CRD PIPINO AND THECONCRETE SLEEVES. COMPLETED FROM INTERNAL RFO21 EXTERNAL TO BE SCHEDULED BEFORE OR DWG RF-2 (completed pre RFO 22) THIS PENETRATION IS NOT ACCXLSSIBa FOR GV EXAM DUE TO PROXIh4IlY OF PIPES TO EACH OTHER AND THE CLEARANCES BETWEEN THE CRD PIPING AND THE CONCRETE SLEEVES. GV GV 100% 100% 100% EL11 Drywell Penetration X-3833 EL11 GV Drywell Peaetration X-38C El.ll Drywen Penetration X-38D GV 10o?h EL11 Drywell Penetration X-39A GV 100% ~~LEIEDFROMINTERNALRFO21 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22) THIS PENETRATION IS INACCESSIBLE FOR GV EXAM OF EXTERNAL SURFACES RUE TO INSULATION DrpdlPenetrrdion X-39B GV 1 DrYwellPcmiration X-44 GV DryweITPeaetraticu x-45 GV r)rywenPenetration x-47 GV ~dPe.nebatim x-49 GV I EI.ll COMPLETED FROMINTE~ALRFOZI EXTERNAL TO BE SCIXEDUWD BEFORE OR DURING WO22 (completed pre RFO 22) COMPLETED FROM iN'I'ERNAL RFO21 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFOn (compIeted pre RFO 22) THIS PENETRATION IS NOT SAFELY ACCESSlBLE FOR GVEXAM OF EXTERNAL SURFACE COMPLETED FROM INTERNAL, RF021 EXTERNALTO BE SCHEDULED BEFORE ORDURING RF022 (cnnpletedpre RFO 22) THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV EXAM OF EXTERNAL SURFACE COMPIJXED FROMrmTERNAL W021 EXTERNAT.
VENT SYSTEM       GV  100%
TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22)THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV EXAM OF EXIERNJ~L SURFACE COMPLETED FROMINTERIVALRFO21 EXTERNAL TO 3E SCHEDULED BEFORE OR DURING RFO22 (completed pre RM, 22) THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV EXAM OF EXIXFtNAL SURFACE RE23mDUT-E FOR RFOn (oompl&ed RFO 22) THE, INTEWAL SURFACE OF THlS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV EXAh4 COMPLETED FROM INTERNAL RF021 EXTERNAL TO BE SCHEDULED BEFORE OR DWUNG RF022 (completedpre RFO 22) COMPLETED FROM INTERNAL RFO21 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 (completed RFO 22) THE EXTERNAL SURFACE OF THIS PENETRATION IS NOT SAFELY ACCESSIBZ FOR GV EXAM COMPLETED FROM INTERNfi RFO21 EXTERNAL TO BE SCHJDUJJD BEFORE OR DURING RF022 (complaed RFO 22) THE EXTERNAL SURFACE OF THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV EXAM COMPLETED FROM INTERNAL RFO2I EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22) COMPLETED FROM INTERNAL RFO21 EXTERNAL TO BE SCHEDULED BEFORIE OR DURING RF022 (completed RFO 22) THE EXTERNAL SURFACE OF THIS PENETIUTION IS NOT SAFELY ACCESSIBLE FOR GVEXAM RESCHEDULE FOR WO22(comptBed RFO 22) TJX INTERNAL, SURFACE OF THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV EXAM COMPLETED FROMINTERNALEGO21 EXTERNAL TO BE SCzfEDUlLED BEFORE OR DmG EGO22 (completed pre RFO 22) 100% 1W/o El.ll Di3w811 Penetratim X4OA GV El.11 GV 1W/o ELI 1 100?? DrYc9.4 P0l&ion x4oc GV EL11 ~ 100% GV I EI.11 El.ll E1.11 El.ll 100% 101)0/0 100% DrywellPeneh-dtion GV x-42 I Drywell Penetration x-43 GV 100% 100% 1OWh 100% El.ll El.ll EL11 Drywell Peuehticm X-46 GV EL11 EL11 1 00YO 100% loo?/. COMPLETED FROM INTERNAL, RFO21 EXrEF3W.L TO BE SCHEDULED WORE OR DURPJG E022 (completed pm RFO 22) COMPLETED FROMINTERNALRFOzl EXTEWAL TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22) El.ll DrywedlPenetration GV x-so El.11 1 51.11 1 DrywellPenetrdon 1 GV 1 100% X-105A DryWellPenetration GV 100% X-104B I E1.ll 100% TURE BWRS EI.11 Drywell Penetration 100% X-107 ASME SECTION XI EXAM. CATEGORY E-D + COMl'uETEf)
BAY 8 CV EN  Tm ASSEMBLY, VACUUM BREAKER LINES, AND VENT LEADER IN BAY 8 AND BAY 9)
FROM INTERNAL RFO21 (INACCESSIBLE AREA IDENTIFIED)
VENT SYSTEM       GV  100%  SURFACE -1.     THE VACUUM BREASRLINES WERE BAY 10                        COMPLETEDFROMTHEEXTERNALSURFACETOTHE
EXTERNALTO BE SCHEDULED BEFORE OR DURINGRFOZO (completed pre RFO 22) CQMPLETEI)
{VENTLME                      PENETRAnoN 203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY,                    203 PENETRATION TO THE ELBOW VERTICAL W.THE VACUUM                        EXlXRNAL SURFACE OFTHE VENT HEADER AM) INTERNAL BREAKERLINES,                AND EXTERNAL SURFACES OF THE DOWNCOMERS WAERE ANDVENT                      COMPLETED RFmo.
FROMINTERNAL RFO21 (INACCESSIBLE AREA IDrnED} EXTERNAL, TO BE SCHEDULED BEFORE OR DURING RMn2 (cOmplBedpreRFO22)
HEADER IN BAY                THE VENT HEADER INTERIOR, VENT LXNE EXTERIOR,AND 10ANDBAY 11)                  THEREMAINIlEROFTHE VACWMLINEWIUBESCHEDUm I TfIEVENTLLNEWASC0MPLE"EDFROMTHEINXERNAL El.ll VENT SYSTEM      GV  100%  SURFACE RF021. THE VACUUM BREAKER LINES WERE BAY 12                        COMPld3TEDFROMTHEEXTERNALSURE.'ACETOTRE (VENTLN                      PENETRATION203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY,                    203 fENETRATIQNTO THE ELBOW VERTICAL WELD. THE VACUUM                        EXTERNAL SURFACE OFTHE VENTHEADERAND INTERNAL BREAELERLINES,                ANDEXTERNAtSURFACESOFTHEWWNCOMERs WHERE AND VENT                      COMPLETED RF020.
IDENTIFED)
HEADER IN BAY                THE~HEAJlER~O~~Y3NEEXTERIOR,AND 12 AND BAY 13)                THE REMAINDER OF THE VACUUM LINE WILL BE SCXEDUUD FOR RFO22 (completedpre RFO 22)
COMPLEJXDFROMINTERNALRFO2I (INACCESSIBLE AREA EXTERNAL TO BE SCHEDULED BEFORE OR DURING W22 (completed pie RFO 22) COWLIZTEI)
THEVENTLINEWASCOMPLETEDFROMTHEINTERNAL EL11  VENT SYSTEM      GV  100%  S G A C E W&1. THE VACUUMBREAKER LINES WERE BAY 14                        COMPLJ3ZD FROM THE EXTERNa SURFACE TO THE (VENTLINE                    PENETRATION 203 ELBOW ITEN FROM THE INSIDE FROM THE ASSEMBLY,                    203 PENXRATIONTO THE ELBOW VERTICAL WELD. THE VACUUM                        EXTERNAL SURFACE OF THE VENT HEADER AM)INTERNAL BREAKERLINES,                ANDEXERNAL SURFACES OF THE DOWNCOMERS m      RE ANDVENT                      COmLETEDRFmo.
FROM INTERNAL RFO21 (INACCESSIBLE AREA EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 ID*ZTl-EED) (oompleted pre RFO 22) ID-) (COmplBed prc RFO 22) IDENTIFIED) (oomplBedpreRFO22)
HEADER IN BAY                THE VENT HEADER INFERIOR, VENT LINEEXTERIOR, AND 14 AND BAY 15)
COMPLETED FROM INl'XRNALRFo511 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 (comgleted pre RFO 22) COMPLETEDFROM~~&RF~l EXERNAL. TO BE SCHEDULED BEFORE OR DURING RFOn (completedpreRFOZ2)
E1.11 VENT SYSTEM      GV  100%  SURFACE RFO21. THE VACUUM BEAKER LMES WERE BAY 16                        C0MPETF.D FROM THE EXl33FWAL SURFACE ToTHE (VENTLINE                    PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE ASsErnLY,                    203 PENETRATION TO THE ELBOW VERTICAL WELD. THE VACUUM                        EXTERNAL SURFACE OF THE VENT HEADER AND INTERNAL BREAKERLINES,                AND EXIZRNAL SURFACES OF THE DOWNCOMERS ANDVENT                      COMPLETEDwmo.
COMPLETED FROM INTERNAL W021 (3NACCESSLl3LIE AREA I.3LTERNAL TO BE SCHEDULED BEFORE OR DURING RFm2 COh4PLETJ5D FROM INTEIUUL RFO21 (INACCESSIBLE AREA ~RNALTOBESCEIEDULEDBEFOREORDURINOIRF022 .UGMENTED ASME CLASS MC t ASME SECTION XI EM CATEGORY:
HEADER IN BAY                THE VENTHEADER INTERIOR,VENT LINJ?EXTERIOR, ANI) 16 AND BAY 1)                 THE REMAINDER OF THE VACUUM LINE WILL BE SCHEDULED FOR xFO22. (completedpre RFO 22)
E-C SECTION XI ITEM NO. ASME m IDENTIFICATlON COMPLET SECTIONXI IS1 EXam YO NUMBER NO./DESCRIPTION E TO E5.30 I REhRARKs F SEALS, GASKETS, E4.11 IS1 IDENTIFICATION DATE Drywell Interior Surfaceatthe VT-I 100% Tbe area identified for augrtlented exam of the Drywell surface at the Moishue Bank rno- barrier interface shall be &om containment plate weld joint Interface l~OfX-5Btothecoatainmentplateweldjoirdrigbt OfpenetratiOnX-5E and emthe concrete metal indce up 1 foot. Complete RF022 iNTERIOR MOISTURE BARRIER JDMO EXam VT-3 jLRlNG N YO COMPLETE TO DATE 100% REMARKS INSPECTION COMPLETED RFO21 DTSCREPANCES WERE IDENTIFIED AND DISPOSIITON FOR THIS ITEM IS WITH MECHANICAL DESIGN ENGINEERING
ASME SECTION XI EXAM. CATEGORY E-A EL11  TorusPgletratiOn  GV  100%  COMPLEmINTERNALANDEXTERNAL X-2OOA & B                  -~
.. .. - . . . . -. ... . . . . . . . - , . . . . . . .. . . . . . . . . . . . . . . . . . - . . . . . . . . . . . . __ . . _. -. . . - . -. - - - . . . - __ - . .. _.
E1.12                  VT-3 100%  COMPLETE FROM EXTERNAL -021 EL11  Torus Penetration GV  100%  COMPLETE FROM INTERNALRFO21 X-201A THRU A                EX"ZRNAL TO BE SCHEDULED BEFORE OR DURING RFOZXcompleted pre RFO 22)
E4.12 Volumetlic 100% T Drywell rntexior Slnfsce at the Moisture Barrier Intdace CONTAINMENT PRESSURE RETAINMGBOLTING Asm SECTION XI ITEM NO. E8.10 ES.10 E8.10 E8.10 Is1 IDENTEICATION NO./DESCRTPTION TORUS MANWAY FLANGE BOLTING PENETRATION 200A TORUS MANWAY FLANGE BOLTING PJiMXRATION 200B V16-19-5A-F - Exam - VT VT-I VT-1 VT-x. % COMPLETE TO DATE 1 OW? 100% 100% 100% TheareaidmtSedforaugmeuted examoftheDrywd1 surfaceatthe moisture barrier intdce shall be from Containment plate weld joint left ofX-5Bt~thecoatainmentplateweldjoiatrigfRofpm~onX-5E and ~IXI the concrete metal interfsce up 1 foot. Complete RFO22 ASME SECTION XI EXAM. CATEGORY:
 
E-G RESCHEDULE FOKW022 (completed RFO 22) RESCHEDULE FOR RF022 (completed WO 22) W022 INSTALLEB RF022 REMOVED Vermont Yankee DataSheetNo:
El.11  TarusPendration X-202A THRU F GV  100% I COMPUTE FROM INTERNALAND EXI'ERNAL WO21 EL11    Torus Penekation X-202G THRU K GV  100% 1 COMPLETE FROMINTERNAL ANL) EXTERNAL E 3 0 2 1 EL11    Torus Penetration GV X-203A THRU F                                          D BEFORE ORDWRING I
g'?k-O -. Q!o Work Order No.: ou-YO37 Visual Examination Report Form VT-1, Containment Surfaces (IWE) ProcedureNoRev.:
El.11  To~usPen&itioa    GV          COMPLETE FROM INTERNAL W021 X-203G THRU H                    RNAL TO BE SCHEDULED BEFORE OR DURING W 0 2 2 I
j?&= 80 p.5 /r? EL4 1 Visual Aids -#/ Illumination Level Check Method Photo I Sketch I Xntermediate a/# &/A I I I / c I Direct I None B None htermediare A,& .u/& OJ-7 c 1 Remote Attached Attached Final "1 7f j% 9: 15 A/y 5-/-0/ iemote Examination Conditionfiquipment Remarks df qef'" .4"eJ cue* r/2'53' &'e 993-0 P Evaluation Required?
Torus Pmetnrtion  GV          COMPLETE FROM xNTEIu\JAL AND EXTERNAL W02I El.ll  Tarus Pgletration GV X-206A THRU D I
~~es $NO VWF 8045.02 NE 8045 Rev. 1 Page 1 of I Work Order Number: 0 0 -0O'sb~7 - 000 Thickness Calibration Data Sheet . Instrument Instrument Make: ?&a q P&L< instrument Model: 2 6 DL Ph3 Instrument SM: '9.3 2 9 '3 s7 Instrument Display: CRT { ) Digital (/ Horizontal Linearity Performed?:
El.12                    VT-3 Toms Penplr;aion  GV X-206E THRU F EL12                      VT-3 El.ll  T m P e n ~ m    GV X-207A THRU H                                        E D FOR RF02z(completed RFO 22 EL11    Torus Penetration GV          COMPLETEFROMINT'ERNALANDEXTERNALRF021 X-208ATHRU D El.ll  Taus Penetration  GV X-209A THRU D I
Yes ( ) No (\d Calibration Block Serial Number: Ek / - 1 , 64 /-2 Calibration Block Material:
El.ll  TonrsPenetmtion  GV X-2 1OA & EL EL11    Toms Penetration  GV  ioo%  COMPLXTEFROM INTERNAL AND EXTERNAL S O 2 1 X-ZlIA&B EL11    Taus Pen&itim    GV  100%  COMPLETEFROMINTEKNALANDEXTERNALW021 x-212 EL11    Torus Penetration GV  100%  COMPLEE FROMEXTERNAL RFCnl (UNDERWATER)
Block Temperature:
X-213A &. B EL12  I                  VT-3 100%   COMPLETE FROME;rlTERNALRFO21W E R WATER)
75 OF Thicknesses:
El.ll  Torus Penetration GV   100%   COMPLETEFROMINTERN&AlWEXTERNAtRF021 X-2 I4 EL11    TorusPenWw        GV   100%   COMPLETE FROMKNTERNAL AND EXTERNAL RF021 X-21 5 EL11    Torus Pen&at.ion  GV  100%   COMPLETE FROMWRNAL AND EXTERNAL RFO21 X-216 EL11    Toms Pondration  GV  100%  COMPLETE FROM lNl'ERN& A M )EXEIRNAL RFOZ1 X-217        '
,860 - T. 001 M&TE Used?: Yes ( } No (4 M&TE Description I WN: k. Calibration Times $k Product Form: wrykf Check: N/A Check ~h Final: 1630 / initial Calibration:
EL11    Taus Penetration  GV  100%  COMPLETE FROM INTERNALAND EXTERNAL RFO21 X-2 18
OgOO Check: ./ 3 oc Check 14 Sketch and Examination Results: fee pfiy Examiner:
 
El.ll  Torus Peaetnnion        GV    100%    COMPLETE FROM m    A  L AND EXTERN& RFO21 X-219 EL11    Torus Penetration      GV    100%    COMPLETE FROM INTERNAL AND EXTERNAL RFO21 EI.11 x-221 El.ll  TorusPenetration        GV    100%    COMPLETE F'ROMINTERNAL AND EXTERNALRFOZl x-222 El.ll X-223                        t El.ll  Torus Pendmtion        GV    100Yo  I COMPLETE FROMIZXTERNALRFOZl X-224A & B                              INSULATION PREVENTING INSPECTIONFROM EXTERNAL, INTERNAL,UNDER WATER THIS WIU BE RESCHEDULED WHEN DIVERS ARE IN TORUS OR TORUS HAS BEEN DRAMED ALONG WITlI THE UNDERWATER SURFACES.
1.11  TolusPenetrsdion        GV    100%    COMPLETE FROMEXTERNAL W 0 2 1 (UNIIER WATER)
X-225 EL12                            VT-3  100%    COMPLETE FROMEXTERNALRFCBl(UNDER WATER)
El.ll  Torus Peaetration      GV    100%    COMPLETE FROMEXTERNALRFOZI (UNDER WATER)
X-226A & B E1.12                          VT-3  100%    COMPLETE FROMEXTERNALRFOZI (UNDERWATER)
EL11    Torus Penetmtion        GV    100%    COMPLETE FROMEXTERNALRFo21 (UNDER WATER)
X-227 E1.12                        1I VT-3 I 100%  I COMPLETE FROMEXTERNAL RFml (UNDER WATER)
I        I EL11   TorusPenQtation        GV    100%    COMPETED FROM EXTERIOR RFOZ1 (NOTACCESSIBLE FROM X-228                                  INTERIOR)
EL11   Torus Pen&ation        GV    100%    COMPLETED FROMEXTERIOR RFO21 (NOT ACCESSIBLE FROM X-229                                  INTERIOR)
EL11    Toms P e n d o n        GV    100%    COMPLEED FROMEXTERIORRF021 X-230
                                                      &G COMFTZTED FROM DITEPJOR RFOZ1 (B,D,F &H ARE EL11    TorusPenetraton        GV    100YO    UNDER WATER FROM INTERNAL)
X-231A-H B,D,F,G& H COMPLETED FROM EXTERNAL RFCB 1 RESCHEDULE A,C, & E FOR RFO22(wmpleced pre RFO 22)
ASME SECTION M EXAM.CATEGORY: E-A 100%     COMPLETEDFROMINTERNALRF021 238 to elevation 251                    EXTERNAL INACCESSIBLE BY DESIGN quadrant ato 90 100%     COMPLETED FROMIh'TEN'JAL. RFo21 I                      I      I          EXTERNAL INACCESSIBLE BY DESIGN I                      I      I EL11  I Dnwellelevation      I GV  I 100%    COMPLETED FROMINTERNAZ, RF021 2 6 to elevation 251                    EXTERNAL INACCESSIBLE BY DESIGN quadrant 90to I80 COMPLETEDFROMl[NTERNALRFO21 EXTERNAL lNACCESSIBLE BY DESIGN EL11    Drywellelevation        GV    lODO/o  COMPLETED FROM INTERNALRFOZ1 238to elevation 251                    EXTERNAL INACCESSIBLE BY DESIGN quadrant 180to 270 d e w
 
t I
E1.12                          VT-3  loo??  . COMPLETED FROM INTERNAL RF021 8 ExTERNAtINACCESsI8LEBY DESIGN EL11       Drywell elevatim    GV    100%    COMPLETED FROM NEFCNAL RFO2l 238to eIevation 251                EXTIERNALINACCESSIBLEBY DESIGN quadrant 270 to 360 E1.12    degFees              VT-3  100%    OOMPLETEDFROMINTERNALRF021 EXTERNAL INACCESSIBLEBY DESIGN EL11      Drywellelevation    GV    100?4    COMPLETED FROMEVIERNAL. RFO21 251 to elevation 269                EXTERNAL INACCESSIBLEBY DESIGN qu.adtimt 0 to 90 E1.12    degrees              VT-3 100%    COMPUTED FROM INTEF3VA.L RFO21 EXTERN& INACCESSIBLEBY DESIGN El.ll    Drywell elevation    GV   100%     COMPLETED FROMINTERNALRF021 251 to elevation269                EXTERNALINACCESSIBLEBY DESIGN quadnmt90to180 degreg I
El. I1    Drywell elevation    GV    10%     COMPLETED FROMIlvTmNAL RFo21 251 to elevation269                EXTERNAL INACCESSIBLEBY DESIGN quadrant 3.80to 2'70 degrees EL11      DryweU elevation    GV    100%    COMPLETED FROMINTERNALRF021 251 to elevation 269                EXTERNALINACCESSIBLEBY DESIGN quadrant 270 to 360 aegrees EL11      Drywell elevation    GV    1OO?!    COh4PLETED FROM INTERNAL RF021 269 to elevation321                ECIERNAL. INACCESSIBLE BY DESIGN quaoh.antoto90 degrees E1.11    Drywell dwation      GV            COMF'LETEDFROMINTERNALR.F021 269 to elevation 321                ECI'EXWAL INACCESSIBLEBY DESIGN q u a b t 90 to 180 degrees E1.11    DrywelI elevation    GV    100%    COMPLETEDIXOMrmTERNALFSOZ1 269 to elevation 321                EXERNAL INACCBSIBLEBY DESIGN quadrant 180 to 270 kees                                                                            ~
ELI1      Drywell elevation    GV   100%     COMPIETED FROM INTERNAL RFO21 269 to ekv&cro 321                  EXTERNALINACCESSIBLE BY DESIGN quadrant 270 to 360 degrees El.11      Drywen Head        GV   100%     COMPLETED M021 interior surfacesand Drywen flanges El.ll     Drywell Head        GV   100%     COMPLETED RFOZ1
          ~orsurfsces CONTAINME r SURFACES (DRYWELL PENETRATIONS)
EL11      DryweUPenetratim    GV    100%    COMPLETED INTERNAL AND EXTERNAL RF021 x-1                                 PORTIONS OF THEEXTERNAL AREA ARE INACCESSIBLE FROM DIRECT vzSUAJ+EXAMINATION BY DESIGN EL1 I      DrywellPeoetration  GV   100%    COMPLETED INTERNAL AND EXTERNAL F S 0 2 1 x-2                                PORTIQNS OF THE EXTERNAL AREA AKE INACCESSIBLE FROM DIRECT VISUAL EXAMINATiON BY DESIGN
 
El.ll      Drywell Penetration    GV     100%         COMPLETEDINTERNALANDEXTERNALRF021 El.ll      Drywell Penetrativn    GV    100%        COMPETED INTERNALRFO21 X-SA THRU X-5H                              EXTERNAL TO BE COMPLETED BEFORE OR DURING RF022(completedpreRFO 22)
I E1.12                              VT-3               COMPIETED FROM THE INTERNAL SURFACE RFO21 I
GV    100%         WMF'LETED FROMINTERIORRFO21 RESCHEDULEEXIERIOR BEFORE OR DURING RF022(oompleted pre RFO 22)
El.ll      DrywellPenetratiGil    GV     1OPh        COMPLETED FROM INTERNAL RFO21 X-7A                                        EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22(completed RFO 22)
GV El.ll 1  Drywell Penetr;aica x-7c GV El.ll    Dryweu Penetration      GV                  COMPLETED FROM LNTERN MCI'ERNAL TO BE SCHEDULED BEFORE OR DURING GV E1.12                            VT-3 EL11      Drywell Penetration    GV X-9A El.ll 1  DryWellPmetration X-9B GV     100%         COMPLETED FROMMTERNAZ.RF021 EXTERNALTO 3E SCHISDULED BEFORE OR DURING RFOn(camp1eted RFO 22)
I El .11 1  DrywelI Penetration x-10 GV                 RE3CSDUL.E FOR W022 (completed RFO 22) External surface insulated restridingaccess for GV Exam. N d internal surface has I
El.ll    Drywen PenetTation      GV                  RESCHEDULE FOR R                  Fm (completed RFO 22) External d                    a c e El.ll    Drywdl Penetration      GV                                      FROM INTERNAL RF021 (INACCESSIBLEAREA x-12
                            .. . . . .. . ....-. . 8 . . ___ ..-. ._. - . . -.- - - . . . . . - - ... ... - - . ... . ... ... . .. - - .... . .... .. ...
 
8 El.11 Drywell Penetration                COMPLETEDF'ROMINTE~ALRF021 X-13A                                    RNAL TO BE SCHEDULEDBEFORE OR DURING RF022 El.ll Drywell Penetralicm                COMPLETED FROM INTEIZNAL RF021 X-13B                                    RNAL TO BE SCHEDULEDBEFORG OR DURING RFO22 El.ll DrywellPenetration X-14 El.11 DrywellPenecration x-15 EL11  Drywell Peneb.ation  GV  100%     THIS FZNETRATION IS NOT ACCESSIBLEFOR GV EXAM OF X-16A                              INTERNALSURFACE. (completed RFO 22)
El.11 DrywellPtnetraticm  GV   100%     TRIS PENETRATIONIS NOT ACCESSIBLE FOR GVEXAM OF x-16B                              INTERNAL SURFACE.(completedRFO 22)
El.ll Drywell Pmctratian  GV   100%     COMPLETED FROMINTERNALRFO21 X-17                              EXERNALTO BE SCKEDUI.ED BEFORE OR DURING W 0 2 2 (compleled pre RFO 22)
El.ll Drywell Penetration  GV   1004/0  COMPLETED lXOMINTERNAL W021 X-18                              EXTERNAL TO BE SCHEDULED BEFORE OR DURING W 0 2 2 (completed pre RFO 22)
I        I El.11 Drywell Penetration  GV  100%    COMPLETED FROMMTERNALRFO21 x-19                              EXTERNAL TO BE SCHEDULEDBEFORE OR DUfUNG -022 (completedRM)22)
I        I I
EL11 Drywell Penetration GV  100?%3  WWIETED FROM INTERNAL RFO21 x-20                              EXTERNALM BE SCHEDULEDBEFORE OR DURING RFcn2(completcd pre RFO 22)
I EL21  Drywen PmeEratia    GV  lOOo!    COMPLETEDFROM lNTJ5RNAL RF021 x-21                              EXIXRNAL TO BE SCHEDULEDBEFORE, OR DURING RFO22(completed pre RFO 22) t Dryweu Pennetration  GV  100%    COMPLETED FROM INTERNALRFOZl x-22                              EXIZRNM. TO BE SCHEDULED BEFORE OR DURING RF022(completedpre RFO 22)
ELI1  Drywell Penetraticn  av  100%    INSuLATlON PREVENTS ACCESS FOR GV EXAM FROM X-23                              INTERNAL SURFACE. (completed RFO 22)
EL11 Drywell Penetratiar  GV  100%    LNSULATIONPREVENTS ACCESS FOR GV EXAM FROM X-24                              INTERNAL SURFACE(completed RFO 22)
I El.11 Drywell Pentztration GV  100%    COMPLETED FROM INTERNAL RFozl X-25                              EXTERNALTO BE SCHEDULED BEFORE OR DURING I(Foz2(compIeted pre RFO 22)
EL11  Drywell Penetration GV  100%    COMPLETED FROMTNTERNALRFcnl X-26                              EXTERNAL TO BE SCHEDULEDBEFORE OR DURING Eo22
( c o m p l d pre RFO 22)
 
                                                                                                  +
E1.12                        VT-3  100%      COMPLETED FROM INTERNAL RFm1 I
EL11  Drywell Penetration  GV    loo??    COMPLETED FROM WIXWAL RFO21 X-27                                EXTERNAL. TO BE SCHEDULED BEFORE OR DURING RF022 (completed RFO 22)
                                          ~  ~
El.ll DryWeUPeretratica    GV   100%    COMPLETED FROM INTERNALRF021 X-28                                EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022
                                            ~compleledRFO 22)
EL11                                        RESCHEDULE FOR RF022 INTERNAL SURFACE NOT SAFELY ACCESSIBLE FOR GV EXAMINATION (completed RFO 22)
El.ll  DrywdlPenebatioo      GV   100%    COMPLETEDFROM INTERNALRFOZl X-30                                EXTERNALTO BE S C B D W D BEFORE OR DUIUNG RF022 (completed pre RFO 22)
EL12                        VT-3  100%    COMPLETED FROM INTERNAL RFOZl El.ll  DrywetlPenetratim    GV    100%    COMPLETED FROMINTERNALRF021 X-31                                EXTEFWAL TO BE SCHEDULED BEFORE OR DURING RFo22 (completedpre RFO 22)
EL12                        VT-3  looOm    COMPLETED FROM INTERNAL RF021 El.ll  DrywellPemtration    GV    100%    COhPLETI3DFROMMTERNALRF021 X-32                                EXTERNAL TO BE SCHEDULEDBEFORE OR DURING RFOZ2
                                            ~complaedpre    RFO 22)
I------
El. 12                            100%    COMPUTED FROMINTERNALRF021 El.ll                              100%    COMPLETED FROMINTERNALRF021 EXTERNAL TO BE SCHJ3DULED BEFORE OR DURING R W 2 2 (completed pre RFO 22)
EL11  Drywell Peoctratian        100%    RESCHEDULEFOR RF022 (completedpre RFO 22) x-34 EL11  DrywellPeneCration    GV    100%    COMPIETEDFROMINTERi'JALANDE2CIXRNALRFOZl X-35A                                THIS PENETRATIONIS PARTIALLY ACCESSIBLE FORGV
                                      ~~
EL12 El.11  EEzq-?
X-35B 100%
100%
Wh4PUTED FROM INTERNfi RFO21 COMPLETEDFROM INTERNAL AND EXTEWAL W021 THIS PENETRATION IS PARTIALLY ACC?3SIBLEFOR GV EXAM EL12                              100%    COh4FTEIBD FROM rmTERNALRF021 El.ll  hyweIi Pme?ratioa    GV    100%    COMPLETED FROM INTERNALAND EXIERNAL RF021 x-35c                                THISPENETRATION IS PARTIALLY ACCESSIBLE FOR GV EXAM E1.12                        VT-3  100%    COMPLETED FROM INTERNAL.RF021 I
I-EL11                              100%     COMPLETED FROM XNTERNAL AND EXTERNAL RFO21 X-35D                                THIS PIPJETRATION IS PARTIALLY ACCESSIBLE FOR G V EXAM Drywdppenetratim f VT-3  100%    COWLETED FROM INTERNAL. RF021 100%     COMPLETED FROM INTERNAL AND EXXERNALRFO21 THiS PENETRATIONIS PARTIALLY ACCESSIBLE FOR OV EXAM
 
E1.12                    VT-3 100%  COMPLETED FROMINTERNALRFOZl ELXI  Drywen Penetration  GV  100% COMPLETED FROM IMERNAL W02I X-36                          EXTERNALTO BE SCHEDULED BEFORE OR DURING RF022 (completedpre RFO 22)THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GVEXAU El.11 Drywell Penetration GV   100% COMPLETEDFROMINTERNALRFOZX X-37A                          EXTERNAL TO BE SCHEDUUD BEFORE OR DURING RFO22 (oompl&edpreRFO 22) THIS PENETRATION IS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXIMITY OF PIPES M EACH OTHER AND THE MINIMAL CLEARANCES BETWEEN THE CRD PPING AND THE mmmm SLEEVES.
EL11  Drywen Penetration  GV  100% COMPLETED FROM INTERNAL. RF07.1 x-3%                          EXTERNAL TO BE SCHEDULED BEFORE OR DURINGRFOZZ (completed pre RFO 22) THIS Pl3EXIU'MON IS NOT ACCESSBLE FOR GV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AND THE MINIMAL CLEARANCES BETWEEN THE CIU) PIPING AND THE CONCRETE SLEEVES.
El.11 Drywell PenetIatiOn GV  100%  COMPLETED FROM INTERNAL RFOZI x-37c                          EXTERNAL TO BE SCHEDULED BEFORE OR DURING -022 (aomplaed pre RFO 22) THIS PENETRATION IS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXWKY OF PIPES TO EACH OTHER AND THE MINIMALCLEARANCES BETWEZN THE CRD PIPING AM)THE CONCRETE SLEEVES.
El.ll Drywell Penetration GV  100% COMPETED FROMINTEWAL RFOZl x-37D                          EXTEF?XALTO BE SCHENJIED BEFORE OR DURING RFO22 (compietedpre RFO 22)THIS PENETRATION IS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AM) THEMINIMALCLEARANCESBETWEENTHE CRD PIPING AND THECONCRETE S?XEVES.
EL11  Drywell Penetraticn GV  100% COMPtETEDFROMINTEWALRF021 X-38A                          EXTERNAL.TO BE SCHEDULED BEFORE OR DURING RFo22 (completed pre RFO 22) THISPENETRATION IS NOT ACCESSIBG FOR GV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AND THEMINIMAL CLEARANCES BETWEENTHE CIiD PIPING AND THE CONCRETE S W V E S .
EL11  Drywell Penetration GV  100%  COMPLETED FROM INTERNALRFOZl X-3833                        EXTERNALTOBESCHEDULEDBEFOREORDURINGRFO22
                                    *(completedpre RFO 22) THIS PENJXRATKONIS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXIMITY OF PEES TO EACH OTHEfz AND THE MlNLMAL CLEARANCESBETWEEN THE CRD PIPING AND THE CONCRETE SLEEVES.
EL11  Drywell Peaetration GV  100%  COM.PLETED FROM INTERNAL RF021 X-38C                          EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22)THIS PENETRATION IS NOT ACCESSIBE FOR GV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AND THE MIMMAL CLEARANCES BETWEEN THE CRD PIPINO AND THECONCRETE SLEEVES.
El.ll Drywen Penetration  GV  10o?h COMPLETED FROM INTERNALRFO21 X-38D                          EXTERNAL TO BE SCHEDULED BEFORE OR D W G RF-2 (completed pre RFO 22) THIS PENETRATION IS NOT ACCXLSSIBa FOR GV EXAM DUE TO PROXIh4IlY OF PIPES TO EACH OTHER AND THE              CLEARANCES BETWEEN THE CRD PIPING AND THE CONCRETE SLEEVES.
EL11  Drywell Penetration GV  100%  ~~LEIEDFROMINTERNALRFO21 X-39A                          EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22) THIS PENETRATION IS INACCESSIBLE FOR GV EXAM OF EXTERNAL SURFACES RUE TO INSULATION
 
I EI.ll DrpdlPenetrrdion      GV 100%    COMPLETED FROMINTE~ALRFOZI X-39B                            EXTERNAL TO BE SCIXEDUWD BEFORE OR DURING WO22 (completed pre RFO 22)
El.ll Di3w811Penetratim    GV 1W/o    COMPLETED FROM iN'I'ERNAL RFO21 X4OA                            EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFOn (compIetedpre RFO 22) THIS PENETRATION IS NOT SAFELY ACCESSlBLE FOR GVEXAM OF EXTERNAL SURFACE El.11                      GV 1W/o    COMPLETED FROM INTERNAL, RF021 EXTERNALTO BE SCHEDULED BEFORE ORDURING RF022 (cnnpletedpreRFO 22) THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV EXAM OF EXTERNAL SURFACE ELI 1 1
DrYc9.4 P0l&ion      GV 100??  COMPIJXED FROMrmTERNAL W021 x4oc                            EXTERNAT.TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22)THIS PENETRATION IS NOT SAFELY
                                    ~
ACCESSIBLE FOR GV EXAM OF EXIERNJ~LSURFACE EL11                       GV 100%    COMPLETED FROMINTERIVALRFO21 EXTERNALTO 3 E SCHEDULED BEFORE OR DURING RFO22 (completedpre RM, 22) THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV E X A M OF EXIXFtNAL SURFACE I
EI.11                          100%    RE23mDUT-E FOR RFOn (oompl&ed RFO 22) THE, INTEWAL SURFACE OF THlS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV EXAh4 El.ll DrywellPeneh-dtion x-42 I GV 101)0/0 COMPLETED FROM INTERNALRF021 EXTERNALTO BE SCHEDULED BEFORE OR DWUNG RF022 (completedpre RFO 22)
E1.11 Drywell Penetration  GV 100%   COMPLETED FROM INTERNAL RFO21 x-43                            EXTERNAL TO BE SCHEDULEDBEFORE OR DURING RF022 (completed RFO 22) THE EXTERNAL SURFACE OF THIS PENETRATION IS NOT SAFELY ACCESSIBZ FOR GV EXAM El.ll DrYwellPcmiration    GV 100%    COMPLETED FROM INTERNfi RFO21 X-44                            EXTERNAL TO BE SCHJDUJJDBEFORE OR DURING RF022 (complaed RFO 22) THE EXTERNAL SURFACE OF THIS PENETRATIONIS NOT SAFELY ACCESSIBLE FOR GV EXAM El.ll DryweITPeaetraticu    GV 100%    COMPLETED FROM INTERNALRFO2I x-45                            EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22)
El.ll Drywell Peuehticm    GV 1OWh    COMPLETED FROM INTERNALRFO21 X-46                            EXTERNALTO BE SCHEDULED BEFORIE OR DURING RF022 (completed RFO 22) THE EXTERNAL SURFACE OF THIS PENETIUTION IS NOT SAFELY ACCESSIBLE FOR GVEXAM EL11  r)rywenPenetration    GV 100%    RESCHEDULE FOR WO22(comptBed RFO 22) TJX INTERNAL, x-47                            SURFACE OF THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV EXAM EL11                          100YO  COMPLETED FROMINTERNALEGO21 EXTERNAL TO BE SCzfEDUlLED BEFORE OR D m G EGO22 (completed pre RFO 22)
EL11  ~dPe.nebatim          GV 100%    COMPLETED FROM INTERNAL,RFO21 x-49                            EXrEF3W.LTO BE SCHEDULED W O R E OR DURPJG E 0 2 2 (completed pm RFO 22)
El.ll DrywedlPenetration    GV loo?/. COMPLETED FROMINTERNALRFOzl x-so                            EXTEWAL TO BE SCHEDULED BEFORE OR DURING RF022 (completedpre RFO 22)
 
                                                                                                                        +
El.11       DryWellPenetration    GV         100%       COMl'uETEf) FROM INTERNAL RFO21 (INACCESSIBLE AREA X-104B                                        IDENTIFIED)
EXTERNALTO BE SCHEDULED BEFORE OR DURINGRFOZO (completedpre RFO 22)
CQMPLETEI) FROMINTERNAL RFO21 (INACCESSIBLEAREA IDrnED}
1            1                      1 1 EXTERNAL, TO BE SCHEDULED BEFORE OR DURING RMn2 (cOmplBedpreRFO22) 51.11        DrywellPenetrdon      GV         100%      COMPLEJXDFROMINTERNALRFO2I (INACCESSIBLE AREA X-105A                                        IDENTIFED)
EXTERNAL TO BE SCHEDULED BEFORE OR DURING W22 (completed pie RFO 22)
COWLIZTEI)FROM INTERNAL RFO21 (INACCESSIBLEAREA IDZTl-EED)
EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22 (oompleted pre RFO 22)
I E1.ll                                          100%      COMPLETED FROM INTERNAL W021 (3NACCESSLl3LIEAREA
                                                            )
D I
I.3LTERNAL TO BE SCHEDULED BEFORE OR DURING RFm2 (COmplBed prc RFO 22)
COh4PLETJ5D FROM INTEIUUL RFO21 (INACCESSIBLEAREA IDENTIFIED)
                                                            ~RNALTOBESCEIEDULEDBEFOREORDURINOIRF022 (oomplBedpreRFO22)
COMPLETEDFROM INl'XRNALRFo511 EXTERNALTO BE SCHEDULED BEFORE OR DURING RF022 (comgleted pre RFO 22)
EI.11        Drywell Penetration               100%      COMPLETEDFROM~~&RF~l X-107                                        EXERNAL. TO BE SCHEDULED BEFORE OR DURING RFOn (completedpreRFOZ2) t              F SEALS, GASKETS,      JDMO  TURE B W R S          ASME SECTIONXI EXAM. CATEGORY E-D IS1                    EXam    YO            REMARKS SECTION XI  IDENTIFICATION                COMPLETE ITEM NO.                                   TO DATE E5.30        iNTERIOR              VT-3    100%          INSPECTIONCOMPLETED RFO21 MOISTURE                                    DTSCREPANCES WERE IDENTIFIED AND DISPOSIITON FOR BARRIER                                      THIS ITEM IS WITH MECHANICAL DESIGN ENGINEERING jLRlNG .UGMENTED                    ASME CLASS MC                            ASME SECTION XI E              M N                                                                                    CATEGORY: E-C I
ASME SECTIONXI    IS1                  EXam        YO          REhRARKs m        IDENTIFICATlON                    COMPLET NUMBER      NO./DESCRIPTION                    E TO DATE Drywell Interior E4.11        Surfaceatthe          VT-I        100%        Tbe area identified for augrtlentedexam of the Drywell surface at the Moishue B a n k                                rno-          barrier interfaceshall be &om containmentplate weld joint Interface                                      l~OfX-5BtothecoatainmentplateweldjoirdrigbtOfpenetratiOnX-5E and emthe concrete metal i n d c e up 1 foot. Complete RF022
 
T E4.12      Drywell rntexior Volumetlic  100%  TheareaidmtSedforaugmeutedexamoftheDrywd1surfaceatthe Slnfsce at the                      moisture barrier i n t d c e shall be from Containment plate weld joint Moisture Barrier                    left ofX-5Bt~thecoatainmentplateweldjoiatrigfRofpm~onX-Intdace                              5E and ~ I X I the concrete metal interfsceup 1 foot. Complete RFO22 CONTAINMENTPRESSURE RETAINMGBOLTING          ASME SECTIONXI EXAM. CATEGORY: E-G Asm        Is1              Exam    %
SECTION XI IDENTEICATION            COMPLETE ITEM NO. NO./DESCRTPTION          TO DATE E8.10      TORUS MANWAY    VT-1    1OW?      RESCHEDULE FOKW022 (completedRFO 22)
FLANGE BOLTING PENETRATION 200A            -
ES.10      TORUS MANWAY    VT-I    100%     RESCHEDULE FOR RF022 (completed W O 22)
FLANGE BOLTING PJiMXRATION 200B E8.10      V16-19-5A-F      VT-1    100%      W022 INSTALLEB E8.10                      VT-x. 100%      RF022 REMOVED
 
Vermont Yankee                            DataSheetNo:    g'?k-O        -.Q!o Visual Examination Report Form Work Order No.:    ou-YO37 VT-1, Containment Surfaces (IWE)
ProcedureNoRev.:  j?&=  80 p.5 /r?EL4 1
                                                                                                -  #  /
Visual Aids                                          Illumination Level Check Method I
Photo      I I
Sketch  I Xntermediate I
a/#
                                                                                        /
                                                                                                            &/A c
IDirect                      I None            B None      htermediare OJ-7 A,
                                                                                        &                    .u c
                                                                                                                /&
1Remote                        Attached          Attached  Final "1 7f j % 9    : 15 A/y          5-/-0/
df qef'" .4"eJ cue* r/2'53' &'e                993-0 iemote Examination Conditionfiquipment Remarks P
Evaluation Required?
                                                                                                          ~      ~ $NO e  s V W F 8045.02 NE 8045 Rev. 1 Page 1 of I
 
Work Order Number:      0 0 -0O'sb~7- 000 Thickness Calibration Data Sheet .
Instrument Instrument Make: ?    &
a    q P&L<            instrument Model:  2 6 DL      Ph3          Instrument SM:  '9.329'3s7 Instrument Display: CRT { )    Digital (/                  Horizontal Linearity Performed?:  Yes ( ) No (\d Calibration Block Serial Number:    E k / - 1 , 64 /-2 Calibration Block Material:      $k                      Product Form:  wrykf Block Temperature: 7 5 OF               Thicknesses: ,860      - T . 001 M&TE Used?:        Yes ( }    No (4    M&TE Description I WN:  k.
Calibration Times initial Calibration: O g O O Check: ./ 3 oc      Check    14      Check:   N/A          Check    ~h/
Final: 1630 Sketch and Examination Results:
fee     pfiy Examiner:
Reviewer:
Reviewer:
5A56d PA 6- Level: 21= Date: Sl8fo~ I Yes (Jy , No ( ) Date: 5$ Io 6 0 Form Number: &?$&d 4 Date: ~/~~/b~ WNEF8053.0'l U Page 1 of 1 Cog. Engineer.
5A56d   PA -6         Level: 21=
Date: &WW' NE 8053 Original *NI[:HX3%4425 LPC#l . Experience Hours Credit:
Date:   5$ Io 6 0 I
Date: S l 8 f o ~ Yes ( J y          ,
Form Number:
No ( )
Cog. Engineer.                                  &?$&d       4                 Date: ~ / ~ ~ / b WNEF8053.0'l~
U                                                                                     Page 1 of 1 Date:&WW'                   NE 8053 Original
*NI[:HX3%4425                                                                                               LPC#l .
Experience Hours Credit:


Work Order Number: m-oaSo37-oao Thickness Calibration Data Sheet lnstrument Instrument Make: PAlvA M -#ICs Instrument Model: 2 6 0 C PL k 5 Instrument SM: 9 3 1 2 9'307 Instrument Display: CRT ( ) Digitat (4 Horizontal Linearity Performed?:
Work Order Number:       m-oaSo37-oao Thickness Calibration Data Sheet lnstrument Instrument Make:   PAlvA M-#ICs               Instrument Model: 2 6     0 C PL k 5             Instrument SM:       9 3 1 2 9'307 Instrument Display: CRT ( )     Digitat (4                     Horizontal Linearity Performed?: Yes ( )
Yes ( ) No (# ~ ~~ *IC 1-1. Calibration Mock SeriaINumber:
                                                                                                    ~  ~~
E/C 1-2 Calibration Block Material:
No (#
CAR SPEE C Product Form: W e6 U 6 )17 Block Temperature:
IC   1-1.                         Calibration Mock SeriaINumber:       E/C   1-2           Calibration Block Material: CAR         SPEE C           Product Form: W e6 U 6 )       17 Block Temperature:     75  OF         Thicknesses: 0.f506",   u I ~ W ' , ~ ~ s o o " Z, . O O ~ ~ zI ,s n i  '1,   3,ea$
7 5 OF M&T* Used?: Yes ( ) No (4 M&TE Description/W:
M&T Used?:        Yes ( )    No  (4 M&TE Description/W:
Thicknesses:
                                          . .       .' Calibration Times InitialCalibration: 0 0 0 0    Check:   hf/A     Check:       NIA     Ch-:       &/A         Check         dIi4     Final: 1osn Sketch and Examination Results:       s EE Q A E                     ;
0.f506", uI~W', ~~soo", Z.OO~~I, zsni '1, 3, ea$ .. .. .. .' Calibration Times .. InitialCalibration:
Reviewer:                                                                          Date: s"d0.0 f                   Form Number:
0000 Check: hf/A Check: NIA Ch-: &/A Check dIi4 Final: 1osn Sketch and Examination Results: s E E Q A E ; Date: s"d0.0 f Form Number: Date: 5/41 /o t WNEF8053.01  
Cog. Engineer.                                                                    Date:   5/41 /o t               WNEF8053.01 I                       &y#**k           6+wt                                                   Page 1of 1 ANII: . /W    /
' Reviewer:
              &                                                                     Date: fl-KH*/                     NE 8053 Original LPC#l    -
Cog. Engineer.
Experience Hours Credit:
ANII: . /W/& Date: fl-KH*/ NE 8053 Original Experience Hours Credit: I &y#**k 6+wt Page 1 of 1 LPC#l - 
! F B [ a .. c Q .. (3 c cn 3 3 w 
- Vermont Yankee Work Order No.: 00- 3 7 Visual Examination Report Form VT-1, Containment Surfaces @WE) Procedure No/Rev.: /vE 80 y5 ,&E VI / , Page 1 of 6 Date: .5-9-0/ Component 3Remote Attached I =Attached I Final f6/%. I ?,'dU,4?42 iemote Examination ConditionsEquipment Remarks 1/53 uc/E: 943-82 Recordable NIA RemarkslObservations I Evaluation Required?
VYNEk 8045.02 NE 8045 Rev. 1 Page 1 of 1 Vermont Yankee Visual Examination Reference Data Sheet No: 8o'j?c - O/ 2 O/ 9 Level: z Date: H-y-O/ Level: .J/A Date: 4h >miner: c'/R hviewer: Date: 4-c Lviewer: f/ )I /b Date: Lh A" WNEF-8045.04 NE 8045 Original Page 1 of 1 Lpc #I Level: &- Date: miner: viewer: viewer: Date: w- Date: J/c6 Date: 5-//--4/ VYNEE 8045.04 NE 8045 Original Page I of 1 LPC #
.. .. .. .. *' 


EVALUATION OF DATA PROWED BY VT-1, CONTAINMENT SURFACES (IWE) DATA SHEETNO: 8045-01-019 During RFO 2 1 IWE examinations it was discovered that the Joint Seal at tbe concrete to steel interface on the 238' level of the containment had failed and there was evidence of corrosion in areas of the seal. As a malt a portion of the circamference of the seal interface area was declared as augmented.
FB c
The joint seal itself was also scwed for replacement during RFO-22. At the start of RFO-22 the examiners performed the required VT-1 examinations of the augmented area at the joint seal to determine if any changes had occurred chning the last operating cycle. The results ofthat examination meal no changes identified in the augmented area After the VT-1 exminations were complete the process began for the joint seal replacement.
Q. .
A band of paint was removed from the concrete *loor up the steel containt approximately 6" wide for the fizll ciKnU33ference.
(3
The recessed area for the joint seal was also cleaned m preparation for the new seat installation.
[
At this point a VT-3 examinations was performed which identified a band of pitting that Covered much of the 360-degree circumference.
c cn a ..
A more detailed VT-1 was ordered by the Responsrwe Engineer to detail this area prior to paidseal hstiUion.
3 3w
This joint seal area was identified as an issue in the early 1990's. (ER-99-1594 deals with the issues fiom the 1990's resolution).
 
lo 1993 the joint seal area was cleaoed and painted so as to form a paint joint seal at the concrete to seal interface.
Vermont Yankee Visual Examination Report Form                        Work Order No.:   00-       37 VT-1, Containment Surfaces @WE)
The areas identified during the EO-21 examinations were areas that were experiencing evidence of Oormsion and paint loss in tbis painteajoint area. Some of the paint was still intact and providhg protection for the steel it was covering.
Procedure No/Rev.: /vE 80 y 5 ,&EVI /
The new areas of pitting in the area of the joint seal are as a result of the coating removal to white metal in this area. This area was not previously identified during RFO-21 because it was an old area of pitting that had been covered by the 1993 coating and had not experienced any further degradation.
                                                        , Page  1 of     6    Date: .5-9-0/
As a result ofthe coatings being completely removed from this joint area, this VT-1 examhation was able to map this region without the impedance of any obstruction.
Component 3Remote                        Attached      I =Attached I Final      f6/%. I ?,dU,4?42 1                                   / Remarks iemote Examination ConditionsEquipment                              5                                3 uc/E: 943-82 Recordable        NIA                    RemarkslObservations I
The areas of pitthg are isolated to the general area of the joint seal interface between the concrete and the stel. The pitting subsides as it move up or down out of the joint seal area. This was evident when a portion of the steel surface was exposed as a result of the removal ofa concrete chip.
The imcler dace area exposed was approximately
!3" wide. and 3" &ep in a crescent shape. The worst case pitting is isolated to aband in the joint seal area from approximately
%" wide to approximately 1" wide and is described in the report as areas wi6 general wastage and connected pining AU corrosion identified within this report is bounded by evaluation VYM 99/139, Based on this evaluation ail areas are well within the required design base metal thicknesses and are for continued operation as is. /tA-!bKonnell IWE Responsible Engineer May 11,2001 Work Order No.:C)O - ms 037-0cll Vermont Yankee Visual Examination Report Form for VT-3 __ LkJC +u d. 1 Procedure No/Rev.:rYifBd 97 f Date: 5-f ./-a/ Moisture Barriers, Gaskets and Seals (1.WE) Page I .of Visual Aids t 0 Magnifier I Light Source (Describe]
F/dS&AW7-NO. e/2rs3 &We +i3-ez Mirror Other:,&W?&iST E4 ' W Illumination Cardmumber.
v)'% -- ~~ Intermediate
~~ Illumination Level Check Photo/Sketch Date $/+o/ =None 4!/@ &+ 0 Attached 5-/9*/ Remarks Evaluation Required?
OYes I No qeviewer:
Date r//do/ 3evie wer: Date Y Date FA/$@./ I WNEF 8047.08 NE 8047 Original Page 1 of 1 
/3/ Data Sheet No: 2?M Work Order No,: 00 -LsOs~37-c80 Procedure NoiRev.: &~8Uf?7&0.
0 Vermont Yankee Visual Examination Report Form for VT-3 Level Date 5-9-01 Examiner:
Level d(k Date % ?M Reviewer:
Evaluation Required?
Evaluation Required?
OYes @No $u. &/hJ WNEF 8047.07 NE 8047 Original Page 1 of 1 Procedure Nomev.: A!& 8.~7/.b~dd Vermont Yankee Visual Examination Report Form for -I General Visual (IWE) Page I of 1 Date: &/6& Component Examiner:
VYNEk 8045.02 NE 8045 Rev. 1 Page 1 of 1
Level Date Reviewer:
 
Date Reviewer:
Vermont Yankee Visual Examination Reference Data Sheet No:   8o'j?c- O/2 O / 9 Level:   z      Date: H-y-O/
Date /e!&& ANII: Wd Date &fd 60 11 v VYNEF 8047.06 NE 8047 Original Page 3 of 1 Data Sheet No: ZW - CLQ- 3$4/ work Order NO.: 00 - o SO 35 Procedure NolRev.: go 9 ?/&9dd. Vermont Yankee Visual Examination Report Form fur General Visual (IWE) Page- / of 1 Date: /4//6./09
>miner:  c'/R Level:   .J/A Date:   4h f/) I / b hviewer:                                                     Date: 4       -     c Lviewer:
./ Component .c Component ID: %R~A BAVb
A "                                         Date: L  h WNEF-8045.04 NE 8045 Original Page 1 of 1 Lpc # I
* s -B s**tem:&+a*nl AlCAnc Visual Aids 0 Binoculars Drawing NolRev.: sf& - 42 ' 4% Location:
 
b 1 I Photo Sketch Method mane mane dect U Mirror dght Source D Attached U Attached 0 Remote Examination Location Description/Remarks 1 Remote Examination ConditionslEquipment Remarks i Ex amin er: Level Date Date Dale /&4/& Date (of?@' VYNEF 8047.06 NE 8047 Original Page 1 of 1 Vermont Yankee Procedure NolRev.: AIE 20 v ~AA.P.JPC Visual Examination Report Form for 9 General Visual (IWE) Page 1 of 1 Date:Je//6/0Q Component fi5pC.J- Examiner:
miner:
Level&yjdhW Date ffh,h& Examiner:
Level: &- Date:
Level Date Reviewer:
viewer:
Date Date /./.</&7 Date to-[?+ VYNEF 8047.b6 NE 8047 Original Page f of 1 e 6- 6tJ Data Sheet No: 3 6" Scale 3 Other Vermont Yankee Visual Examination Report Form for General Visual (IWE) &&;dRs;d is hM Gidkrk.. t4oM AJ a/+x;AO,c
Date: w-viewer:
# 4u*q %I Work Order No.: 00 - 0 SO 35 Procedure NolRev.: 90 7/o/l;BNdd..
Date: J/c6 Date: 5-//--4/
Page / of I ~ate:J0./6/0~
VYNEE 8045.04 NE 8045 Original Page I of 1 LPC #I
.- dght Source Examination Location Description/Rernarks .Y System:_Cl4u?La#J MCr J+ lrawing No/Rev.: sf& .. 4.2- ' & /3 3 Binoculars
@%one -one 6ect Location:
RK &I.! Visual Aids Photo Sketch Method 7 Mirror 0 Attached 0 Attached 0 Remote Remote Examination ConditionslEquipment Remarks -~- %mination Results, Details and Comments:
Examiner:
~ Level Date Reviewer:
Date VYNEF 8047.06 NE 8047 Original Page 1 of I  
-- -- --
Vermont Yankee Visual Examination Report Form for Genera! Visual (IWE) Drawing NoIRev,: &20 - * ' Ad 620;~w~b Location:
4 &kd*.+~ Visual Aids Photo Sketch I VMethod 0 Binoculars G6L-Ie @&ne direct 0 Mirror dght Source 0 Attached . 0 Attached 0 Remote Examination Location DescriptionEiemarks Remote Examination ConditionslEquipment Remarks 'Uh D 6" Scale &&L;$P '&Z cpc*, 8 8 D Other PLAtk&&.&J x 231 A,c, +E II Examination Results, DetaiIs and Comments:
1 Work Order No.: 00 - 0 503s Procedure NolRev.: fd ~7/$&'9dd Page I of / Date: /o//G/~o 3 il Component Examiner:
Level Date Reviewer:
Date VYNEF 8047.06 NE 8047 Original Page 1 of 1 - -
e Data Sheet No: zde- Ad- 3 5? Work Order No.: 00 - 0%?3.$ Visual Aids J Binoculars 3 Mirror id ight Source 7 6" Scale 3 Other Procedure NolRev.: & 84 ~7/&!;94&~
Vermont Yankee Visual Examination Report Form fur / of 1 Date: /0//6/00 ./ General Visual (IWE) Page - W Photo Sketch Method 6one &ne hrect D Attached CJ Attached 0 Remote Examination Location Oescription/Remarks Remote Examination ConditionslEquipment Remarks 94 Ejafar*uP cs,nXoc*, bC P*dcd;&J x> Ob A 3.1) Component 3rawing NolRev.: 32a e ' Location:
A ~ du# Examiner:
Level Date Date Date /?&/oa Date !04?* I VYNEF 8047.06 NE 8047 Original Page 1 of 1 Data Sheet No: Work Order No.: Ob - 00 56 35'00 ProcedureNoiRev.:
wq5 &/o Page I of f Date: q'/q*or Visual Examination Report Form VT-1, Bolting (WE) Ii II _. 1 Component Component ID: V tb-14-5;4 System: Pc AC Photo/Sketch Method 8 Examination Bolting Components Examined done direct &Place dolting 0 Washers Attached 0 Remote Removed 17 Bushings 17 Flange Surface - I1 Visual Aids 11 Magnifying Glass &ilTor Remote Examination ConditionsLimitations:
l5dight Source (Describe):
pt%JcRf3 u &df Examiner:
+ Level:= Date: 4' 1 ' 0 Examiner:
Level: *Date: Q IA Reviewer: Date:
g/fh/ Reviewer:
Date: ANII: Date: 9-a u'-o/ 0 Yes VYNEF 8045.03 NE 8045 Original Page 1 of 1 I I -. c. c Vermont Yankee DataSheetNo:
6OQ3 Oz Work Order No.: 00 - 00 5& 35-00 ProcedureNoiRev.:
NE 8ac(5r r(-b Page 1 of I Date: 4. /9 -0 r Visual Examination Report Form VT-1, Bolting @WE) Component Component ID: J lb-19-5B system: Pc AC r DrawingNoRev.:
6 -19 117's .I GI63 Boltinghgth
@/A " Bolting Diameter:
dA I' I II Phato/S ketch Method Examination Illumination Level Check direct 6 Place dolting 0 Washers Date 0 Attached 1 Remote 10 Removed El Bushings 0 Flange Surface Initial 12=w 444d' - ~ Visual Aids Intermediate d/A dh% ~ Erosion /- I I Wear Jc Evidence of Leakage Other (Explain) c I 4A I 44 I / Examiner: . Level:= Date: q* 49 0 ( Examiner:
44 Level: & Date: EJ /& Reviewer:
Date: #/&A/ 11 Reviewer:
Date: + 0 Yes VYNEF 8045.03 NE 8045 Original Page 1 of 1 .
1 Vermont Yankee I DataSheetNo:
(' Jib- (4-S 6) @%r- &/- a3 Work Order No.: F'rocedureNoRev.:
mq5 Page I of f Date: d*/?*Ol Ob - 00 56 35-00 Visual Examination Report Form VT-1, BoIting (rwE) Component Component ID: VIb-fq-SC System: PCAC I RemarkdObservations LooseNissing cl 44 4A Thread Engagement 4 Thread Damage J Galling J \ ~ ~ I BenVTwisted J I I Physical Damage
/ I I Fractured Parts / I f Gouges .J Crack.s/I,inears J Corrosion
/ Erosion / f Other (Emlaid WA @/A / ~~ Coating Degradation J I I / J 1 \ Evidence of Leakage 4 .. , .I Examiner:
eve^: E Date: 3 (9 0 \ ,- Examiner:
Level4A Date: 44 Reviewer:
Date: {&$/$I Reviewer:
Date: ANII: Date: v-@/ + Yes VYNEF 8045.03 NE 8045 Original Page 1 of 1 Vermont Yankee Data Sheet No: &qs-oj- oq Work Order No.: 60 .. 00 56 35-00 ProcedureNo/Rev.:
At* e/. Page I of f Date: 4' /4 .d 1 Visual Examination Report Form VT-1, Bolting (WE) .I 463 Bolting Length: c3/A " Bolting Diameter: "CIA r 1 , Other (Explain)
I I Examiner:
Level: =Date: 3
* f 9 0 Examiner:
Level: a& Date: Jlh Reviewer:
Date: Vh~ldi Reviewer:
Date: ANII: Date: +2 Wd/ Yes VYNEF 8045.03 NE 8045 Original Page 1 of 1 -..- ....... ......
Vermont Yankee Visual Examination Report Form v-1, Bolting ow]E) Corn ponen t Component ID: J lb cf 5-E System: WAC Drawing No/Rev.: 4 -14 I I 75 .I C!63 Bolting Length: @/& " Bolting Diameter:
dA 11 r PhotolSketch Method Examination BoIting Components Examined Illumination Level Check &One direct dn Place rrB0lting Et Washers 0 Attached 0 Remote 0 Removed 0 Bushings 0 Flange Surface Initial Erosion WKW Evidence of Leakage Other Exthin) a Yes WNEF 8045.03 NE 8045 Original Page 7 of 1 ...
Vermont Yankee Data Sheet No: 01- Ob Work Order No.: 00 - 00 50 35-00 ProcedureNolRev.:
NE Wq5 e/o Page 4 of I Date: 4 (4 *b I Visual Examination Report Form VT-I, Bolting @WE) Component System: Pc At umination Card/No.:
e D Yes VYNEF 8045.03 NE 3045 Original Page f of 1 . . . . . .. . . . . . .
Data Sheet No: !. Vermont Yankee II Work Order No.: 4. - do L//Ur- 0 0 C7 ProcedureNoRev.:
#&- 95 &U- / Page Visual Examination Report Form VT-1, Bolting @WE) / of / Date: 5- /I Commnent I None Direct 0 In PIace iB Bolting Washers 0 Attached Remote H Removed Bushings = Flange Surface / Intermediate
&?+ a/ # Find? $j$&,+~~p?&.&7-0/
0 Magnifying Glass Illumination Card/No.:
CI Mirror Remote Examination ConditionsiLimitation:
8 Light Source (Describe):
/%?Sxby& OYes INo Date: d"- 8-O/ VYNEF 8045.03 NE 8045 Original Page 1 of 7 Work Order No.: Procedure No/Rev.: Page / of / Visual Examination Report Form VT-1, Bolting @WE) Component
-/9 - 59 System: ZGWS J7ZWS Bolting Length* d Bolting Diameter:
7'50 " II PhotoISketch Method Examination BoIting Components Examined Illumination Level Check Bl None H Direct In Place Bolting LI Washers 0 Attached 0 Remote Removed Initial Visual Aids 0 Magnifying Glass Illumination CardMo.: Vy8 Mirror Remote Examination ConditionsKimitations:
Light Source (Describe):
/%+s&&>& - c U Lightmeter Sht 15 3 Level: ZDate: yd@/ Level: & Date: EI/A Date: S7dd / f Reviewer:
../A Date: ANII; m Date: s- &-# o! H Evaluation Required?
UYes #No WNEF 8045.03 NE 8045 Original Page 1 of 1
* Data Sheet No: zdg- 6J - 398 Visual Aids Photo Sketch @I Binoculars B None @ None Vermont Yankee Visual Examination Report Form for Genera! Visual (IWE) Method si] Direct &AH& Work Order No.: Procedure NolRev.: /?? 7b 2 d,/O . Page I of / Date: '//L/af I 00- 00 56 3 5 -~ ~ Component 0 Mirror @ Light Source [7 6" Scale D Attached 17 Attached Remote Examination Location DescriptionIRemarks Remote Examination ConditionslEquipment Remarks Examiner:
d/A Level I.'/A Date 4& Reviewer:
d/. Date (/A 1 Reviewer:
dlA Date 1"/! I /-3/-o/ , ANII: Date VYNEF 8047.06 NE 8047 Original Page 1 of 1 i -.
c Data Sheet NO: Work Order No.: Procedure NolRev.: 8OJ7 40 . Page, 1 of 9 Date:af 8 Li7 -01 .. 0 31 00 - 50 3'7 Vermont Yankee Visual Examination Report Form for General Visual (1WE) __ --- ~ ~ Component Drawing NolRev.: 62 02 00 Location:
W~CL Visual Aids Photo Sketch Method 0 Binoculars PQ None 0 Mirror 0 Attached 0 6" Scale %+4eter ~4 r CFC e C Light Source Examination Location Descrjption/Remasks Remote Examination ConditionsEquipmsnt Remarks Reviewer: - Pfi 5ate ANII: Date &-Z-O/ WNEF 8047.06 NE 8047 Original Page 1 of 1 I


b C 
EVALUATION OF DATA PROWED BY VT-1, CONTAINMENT SURFACES (IWE)
. ..
DATA SHEETNO: 8045-01-019 During RFO 21 IWEexaminationsit was discoveredthat the Joint Seal at tbe concrete to steel interface on the 238' level of the containmenthad failed and there was evidence of corrosion in areas of the seal. As a malt a portion of the circamferenceof the seal interface area was declared as augmented. The joint seal itselfwas also s c w e d for replacement during RFO-22.
At the start of RFO-22 the examinersperformed the requiredVT-1examinationsof the augmented area at thejoint seal to determine if any changes had occurred chningthe last operating cycle. The results ofthat examination meal no changes identified in the augmented area After the VT-1 exminationswere complete the processbegan for the joint seal replacement. A band of paint was removed from the concrete loor up the steel c o n t a i n t approximately 6" wide for the fizll ciKnU33ference. The recessed area for the joint seal was also cleaned m preparationfor the new seat installation. At this point a VT-3 examinationswas performedwhich identified a band of pitting that Covered much of the 360-degreecircumference. A more detailed VT-1was ordered by the Responsrwe Engineer to detail this area prior to paidseal hstiUion.
Thisjoint seal area was identified as an issue in the early 1990's. (ER-99-1594deals with the issues fiom the 1990's resolution). lo 1993 the joint seal area was cleaoed and painted so as to form a paintjoint seal at the concrete to seal interface. The areas identified during the EO-21 examinations were areas thatwere experiencing evidence of Oormsion and paint loss in tbis painteajoint area. Some of the paint was still intact and providhg            protection for the steel it was covering.
The new areas of pitting inthe area of the joint seal are as a result of the coatingremovalto white metal in this area. This area was not previously identified during RFO-21 because it was an old area of pitting that had been coveredby the 1993 coating and had not experienced any further degradation. As a result ofthe coatings being completely removed from thisjoint area,this VT-1 examhation was able to map this region without the impedance of any obstruction.
The areas of pitthg are isolated to the general area of the joint seal interface between the concrete and the stel. The pitting subsides as it move up or down out of the joint seal area. This was evident when a portion of the steel surface was exposed as a result of the removal ofa concrete chip. The imcler d a c e area exposed was approximately !3" wide.and 3" &ep in a crescent shape. The worst case pitting is isolated to aband in the joint seal area from approximately %" wide to approximately 1" wide and is described in the report as areas w i 6 general wastage and connected pining AU corrosionidentified within this report is bounded by evaluation VYM 99/139, Based on this evaluation ail areas are well withinthe required design base metal thicknesses and are              for continued operation as is.
/tA-!bKonnell IWE Responsible Engineer May 11,2001


INSERVICE DISCREPANCY REPORT (IDR) IDR #: Q2-07 Date : 5/2/2001, Location:
Vermont Yankee Work Order No.:C)O  -ms037-0cll      _ _
prvwe 11 Component:
LkJC Procedure No/Rev.:rYifBd 97      +ud. 1 Visual Examination Report Form for VT-3 Moisture Barriers, Gaskets and Seals (1.WE)                                  Page    I  .of  f    Date:  5-f./-a/
Performed By: Date : Disposition/Repair: - IS1 Program Coordinator:
                                                                                                      ~~
Date : Repair Effort: Reference Document:
Visual Aids                t                Illumination Level Check                Photo/Sketch 0 Magnifier      I Light Source (Describe]                                              Date F/dS&AW7-
Repair Completion Date: BY : Dale : Service Induced: YES - NO - Sample Expansion Required:
                                                                                    $/+o/          =None Mirror            Other:,&W?&iST      E4 4!/@
YES -. NO BY: - Date: Sample Expansion:
NO. e/2rs3                          ~~              --
IS1 Program Coordinator:
                  &We +i3-ez                  Intermediate                            & +          0 Attached W Illumination Cardmumber. v)%                                                    5-/9*/
Date : Reinspection Required:
Remarks Evaluation Required?
YES NO - BY : Subsequent Inspection Required:
OYes      I No qeviewer:                                      Date  r / / d o /
Y 3eviewer:                                      Date Date FA/$@./
I WNEF 8047.08 NE 8047 Original Page 1 of 1
 
                                                                    /3/
Data Sheet No: 2?M Work Order No,:  00 -LsOs~37-c80 Vermont Yankee Visual Examination Report Form for VT-3      Procedure NoiRev.: &~8Uf?7&0.      0 Evaluation Level    Date 5-9-01                  Required?
OYes    @No Examiner:                    Level d(k Date    %
  ?M                                                              $u. &/hJ Reviewer:
WNEF 8047.07 NE 8047 Original Page 1 of 1
 
Vermont Yankee                  Procedure Nomev.: A!& 8 . ~ 7 / . b ~ d d Visual Examination Report Form for General Visual (IWE)            Page    I  of  1    Date: &/6&          -I Component Examiner:                      Level          Date Reviewer:                      Date Reviewer:                      Date  /e!&&
ANII:
1 1 W  d        Date  &fd 60 v
VYNEF 8047.06 NE 8047 Original Page 3 of 1
 
Data Sheet No: Z W      -  CLQ- 3$4/
Vermont Yankee work Order NO.:    00  - o SO35 Procedure NolRev.:      go9 ?/&9dd.
Visual Examination Report Form fur General Visual (IWE)                                Page- /      of  1    Date:  /4//6./09      ./
Component Component ID: % R ~ A      BAVb
* s- B                          s**tem:&+a*nl
                                                                                          . c AlCAnc Drawing NolRev.:  sf& - 42          4%                          Location:
b                                  1                    I Visual Aids                  Photo                      Sketch                        Method 0 Binoculars          mane                              mane                  d e c t U Mirror              D Attached                        U Attached            0 Remote d g h t Source                                                  1 Examination Location Description/Remarks Remote Examination ConditionslEquipment Remarks i
Ex amin er:                                    Level                Date Date Dale  /&4/&
Date    (of?@
VYNEF 8047.06 NE 8047 Original Page 1 of 1
 
Vermont Yankee                            Procedure NolRev.: AIE 20  v ~AA.P.JPC Visual Examination Report Form for General Visual (IWE)                        Page    1  of  1    Date:Je//6/0Q          9 Component f i 5 p C . J -
Examiner:                      L e v e l & y j d h W Date      ffh,h&
Examiner:                      Level                    Date Reviewer:                      Date Date <.& /.7
                                          /
Date      to-[?+
VYNEF 8047.b6 NE 8047 Original Page f of 1
 
e Data Sheet No:
6- 6 t J                                                                  Work Order No.:    00 -  0 SO    35 Vermont Yankee                                    Procedure NolRev.:      90    7/o/l;BNdd..
Visual Examination Report Form for General Visual (IWE)                                Page    /  of  I    ~ate:J0./6/0~          .-
                                                                                      . Y System:_Cl4u?La#J MCr J+
lrawing No/Rev.: sf& ..4.2-      '  &/ 3                      Location:  RK      &I.!
Visual Aids                    Photo                      Sketch                      Method 3 Binoculars          @%one                              -one                6 e c t 7 Mirror              0 Attached                        0 Attached          0 Remote d g h t Source        Examination Location Description/Rernarks Remote Examination ConditionslEquipment Remarks 3 6" Scale            &&;dRs;d        is h M    Gidkrk..
3 Other t4oM    AJ  a/+x;AO,c #        4u*q            %I
          - ~ -
%mination Results, Details and Comments:
Examiner:                                    ~ Level                Date Reviewer:                                      Date VYNEF 8047.06 NE 8047 Original Page 1 of I
 
Work Order No.: 00    - 0 503s Vermont Yankee                                      Procedure NolRev.:    fd ~7/$&'9dd Visual Examination Report Form for Genera! Visual (IWE)                                  Page    I  of  /    Date: / o / / G / ~ o    3 Component il Drawing NoIRev,: &20        - *    '        Ad 620;~w~b          Location:  4 &kd*.+~
Visual Aids                        Photo                    Sketch      I            VMethod 0 Binoculars            G6L-Ie                            @&ne                  direct 0 Mirror                0 Attached .                      0 Attached            0 Remote d g h t Source          Examination Location DescriptionEiemarks  Remote Examination ConditionslEquipment Remarks D 6" Scale              &&L;$P      &'Z  cpc*, 8 8
                                                                                'Uh D Other                  PLAtk&&.&J        x 2 3 1 A,c, +E 1
Examination Results, DetaiIs and Comments:
II Examiner:                                        Level                Date Reviewer:                                        Date VYNEF 8047.06 NE 8047 Original Page 1 of 1
 
e Data Sheet No:  z d e - Ad- 3 5?
Work Order No.: 00    - 0%?3.$
Vermont Yankee                                    Procedure NolRev.: &84~ 7 / & ! ; 9 4 & ~
Visual Examination Report Form fur General Visual (IWE)                                Page  -  / of    1    Date: /0//6/00        ./
Component 3rawing NolRev.: 3 2 a  e      '                              Location:  A  ~  du#
W Visual Aids                  Photo                        Sketch                      Method                I J Binoculars        6 o n e                            &ne                  h r e c t 3 Mirror            D Attached                          CJ Attached          0 Remote idight Source        Examination Location Oescription/Remarks Remote Examination ConditionslEquipment Remarks 7 6" Scale          Ejafar*uPcs,nXoc*,      bC 9 4 3 Other              P*dcd;&J          x>  Ob    A 3.1)
Examiner:                                    Level                Date Date Date  /?&/oa Date    !04?*
VYNEF 8047.06 NE 8047 Original Page 1 of 1
 
Data Sheet No:
Visual Examination Report Form Work Order No.:    Ob    - 0056 3500 VT-1, Bolting (WE)
ProcedureNoiRev.:          wq5        &/o Page      I          of    f      Date: q/q*or II _ .
Ii                                                                                                                              1 Component Component ID:      V tb-14-5;4                                                        System:    Pc A C Photo/Sketch          Method      8  Examination            Bolting Components Examined done                    direct          &Place              dolting          0 Washers 1I Attached              0 Remote
                                            - Removed Visual Aids 17 Bushings      17 Flange Surface 1    Magnifying Glass
  &ilTor                                  l5dight Source (Describe):  pt%JcRf3 u &df Remote Examination ConditionsLimitations:
Examiner:                                  +              Level:=      Date:    41    0 0 Yes Examiner:                                                Level: *Date:            Q  IA Reviewer:                                                              Date: g/fh/
Reviewer:                                                              Date:
ANII:                                                                  Date: 9-a u-o/
VYNEF 8045.03 NE 8045 Original Page 1 of 1
 
I                Vermont Yankee                      I          DataSheetNo:      6OQ3    c
                                                                                            -.        c Oz.
Visual Examination Report Form Work Order No.: 00 00 5&35-00 ProcedureNoiRev.: NE 8ac(5r                      r(-b VT-1, Bolting @WE)
Page    1          of    I                Date:  4./9-0r Component Component ID:      J lb-19-5B                                                  system:      Pc A C r
DrawingNoRev.:      6 -19 117  s
                                  '        .I      GI63 I
Boltinghgth      @/A II
                                                                                                      "  Bolting Diameter:  dA      I' Phato/Sketch        Method      Examination                                                        Illumination Level Check direct      6 Place          dolting          0 Washers                                                Date
-0 Attached      ~
1  Remote  1 0Removed        El Bushings      0 Flange Surface      ~
Initial          12=w 444d' Visual Aids                                                Intermediate      d/A        dh%
Erosion                    /-          I                      I Wear                      Jc Evidence of Leakage Other (Explain)    c I  4 A      I    44        I        /                                        +
Examiner:                            .            Level:=      Date:  q*49 0 (
0 Yes Examiner:                        44                Level: &Date:            EJ /&
Reviewer:                                                      Date:  #/&A/
1 Reviewer:                                                      Date:
VYNEF 8045.03 NE 8045 Original Page 1 of 1
 
1                Vermont Yankee            I          DataSheetNo: (Jib-(4-S Work Order No.: Ob 00 56 35-00
: 6) @%r-&/- a3 Visual Examination Report Form VT-1, BoIting (rwE)
FrocedureNoRev.:          mq5 Page    I          of      f        Date:    d*/?*Ol I
Component Component ID:          VIb-fq-SC                                      System:        PCAC RemarkdObservations LooseNissing              cl      4 4                                                    4 A Thread Engagement          4 Thread Damage            J Galling                  J                    ~
                                                              \          ~            ~~
Coating Degradation      J                                                                          I BenVTwisted              J            I                                                            I Physical Damage          /            I                                                          I Fractured Parts          /          I                                                        f Gouges                    .J Crack.s/I,inears          J Corrosion                /      I                    I                                  /
Erosion                  /      f J    1                      \
Evidence o f Leakage                4 Other (Emlaid        . I W A        @/A              /                                    +
Examiner:                                eve^:  EDate: 3          (9 0\
                                                                                ,-                Yes Examiner:                                L e v e l 4 A Date:      4 4 Reviewer:                                              Date: {&$/$I Reviewer:                                              Date:
ANII:                                                  Date:      v-@/
VYNEF 8045.03 NE 8045 Original Page 1 of 1
 
Vermont Yankee                  Data Sheet No:      &qs-oj- oq Work Order No.:    60  . 00 56 35-00 Visual Examination Report Form VT-1, Bolting (WE)
ProcedureNo/Rev.: At                  e/.
Page      I          of    f      Date:  4'/4 .d 1 r                      1
                                    .I 463 Bolting Length:  c3/A " Bolting Diameter: "CIA Other (Explain)                      I                          I Examiner:                            Level: =Date:        3* f 9    0 Yes Examiner:                            Level: a
                                              & Date:          Jlh Reviewer:                                        Date:    Vh~ldi Reviewer:                                        Date:
ANII:                                            Date: +2 Wd/
VYNEF 8045.03 NE 8045 Original Page 1 of 1
 
Vermont Yankee Visual Examination Report Form v-1Bolting
                      ,        ow]E)
Cornponent Component ID:      J lb cf 5-E                                        System:  WAC r
Drawing No/Rev.:    4 -14 I I 7 5      . I    C!63            Bolting Length: @/&  "  Bolting Diameter:  dA      11 PhotolSketch        Method    Examination    BoIting Components Examined            Illumination Level Check
&One                  direct    d n Place    rrB0lting      E t Washers 0 Attached            0 Remote  0 Removed    0 Bushings      0 Flange Surface  Initial Erosion WKW Evidence of Leakage Other Exthin) a Yes WNEF 8045.03 NE 8045 Original Page 7 of 1
 
Vermont Yankee                        Data Sheet No:  -5      O b Visual Examination Report Form Work Order No.:  00    - 00 50 35-00 ProcedureNolRev.: N E W q 5          e/o VT-I, Bolting @WE)
Page      4        of    I      Date: 4  (4 *bI Component System:    Pc A t umination Card/No.:
e D Yes VYNEF 8045.03 NE 3045 Original Page f of 1
 
Vermont Yankee                              I          Data Sheet No:
Work Order No.:        -
4 . do L / / U r - 00C7 Visual Examination Report Form ProcedureNoRev.: #&-          95 &U- /
VT-1, Bolting @WE)
Page        /      of    /        Date: 5-
/I                                                                Commnent I  None                    Direct      0 In PIace          iB Bolting            Washers 0 Attached                Remote      H Removed              Bushings        = Flange Surface
                                                                                                                              /
0 Magnifying Glass                        Illumination Card/No.:                                  Intermediate    &?+        a/  #
CI Mirror                                Light Source (Describe):  /%?Sxby&                      Find? $j$&,+~~p?&.&7-0/
Remote Examination ConditionsiLimitation:                                      8 OYes      INo Date: d" O /
VYNEF 8045.03 NE 8045 Original Page 1 of 7
 
Work Order No.:
Visual Examination Report Form                                  Procedure No/Rev.:
VT-1, Bolting @WE)                                      Page      /        of  /
Component
                                        -/9 -5 9                                      System: ZGWS J7ZWS Bolting Length*    dII Bolting Diameter:  7'50    "
PhotoISketch          Method        Examination          BoIting Components Examined                Illumination Level Check Bl None                H Direct          In Place          Bolting        LI Washers 0 Attached              0 Remote          Removed                                                  Initial Visual Aids 0 Magnifying Glass                        Illumination CardMo.:  Vy8
- Mirror                                  Light Source (Describe): /%+s&&>&
c Remote Examination ConditionsKimitations:
Lightmeter Sht        15 3 U
Evaluation Required?
Level: Z D a t e :      yd@/
UYes      #No Level: &Date:        EI/A f
Date: S7dd /
Reviewer:            ../A                                            Date:
H ANII; m                                                          Date: s-&-#    o !
WNEF 8045.03 NE 8045 Original Page 1 of 1
 
Data Sheet No:  zdg-    6 J- 398 Work Order No.:    00- 00 5 6    35 Vermont Yankee                                      Procedure NolRev.:  /??  7 b 2 d,/O    .
Visual Examination Report Form for Genera! Visual (IWE)                                  Page    I  of    /    Date:  '//L/af      I
                                                    -~  ~
Component Visual Aids                  Photo                          Sketch                      Method
  @I Binoculars        B None                                @ None              si] Direct  &AH&
0 Mirror              D Attached                            17 Attached              Remote
  @ Light Source        Examination Location DescriptionIRemarks Remote Examination ConditionslEquipment Remarks
[7 6" Scale Examiner:        d/A                        Level        I.'/A      Date    4&
Reviewer:      d/.                          Date        (/A 1 Reviewer:        dlA                          Date        1"/!
I
, ANII:                                          Date
                                                              /-3/-o/
VYNEF 8047.06 NE 8047 Original Page 1 of 1      i
 
c Data Sheet NO:      Li7 -01  . 0 31 Work Order No.:    00  -  50  3'7 Vermont Yankee Procedure NolRev.:  8OJ7      40        .
Visual Examination Report Form for General Visual (1WE)                                Page,  1    of 9      Date:af              8
---            ~                      ~
Component Drawing NolRev.:    620  2 00                                Location:          W ~ C L Visual Aids                  Photo                      Sketch                      Method 0 Binoculars          PQ None 0 Mirror              0 Attached Light Source        Examination Location Descrjption/Remasks  Remote Examination ConditionsEquipmsnt Remarks 0 6" Scale              %+4eter      ~4  r CFC      eC Reviewer: -      Pfi                          5ate ANII:                                          Date  &-Z-O/
W N E F 8047.06 NE 8047 Original Page 1 of 1
 
I
 
INSERVICE DISCREPANCY REPORT (IDR)
IDR #: Q2-07 Date : 5/2/2001, Component:                                            Location: prvwe11 Performed By:                                           Date :
Disposition/Repair:
IS1 Program Coordinator:                                 Date :
R e p a i r Effort:
Reference Document:
Repair Completion D a t e :
Service Induced:                           YES     - NO -BY :              Dale :
Sample Expansion Required:                 YES     -. NO     BY: -Date:
Sample Expansion:
IS1 Program Coordinator:                                 Date :
Reinspection Required:                           YES       NO -BY :
Subsequent Inspection Required: YES                    - NO    -BY :
IS1 Supervisor Notified:
IS1 Supervisor Notified:
YES - NO - BY : IS1 Program Coordinator:
IS1 Program Coordinator:                                 Date:
Date: . Reinspection Completed Satisfactorily:
. Reinspection Completed Satisfactorily:
Date : IS1 Supervisor:
IS1 Supervisor:                                          Date :
IDR Closed: ISI Program coordinator:
IDR Closed:
Date : VYAPF 4027.01 AP 4027 Rev. 4 + Page 1 of 1 - . . . . . . . . . .
ISI Program coordinator:                                 Date:
r 1 Data Sheet No: - 6 36 0 Work Order Na.:& Vermont Yankee Procedure NofRev.: pp 702 d'/U page I of 1 Date: !//&,/oI r Visual Examination Report Form for General Visual (IWE) r Component I Component ID: X- 54 fir% $'I4 system: 312-(1 ~3c~/t Drawing NolRev.: 59m - +f tocation:
VYAPF 4027.01 AP 4027 Rev. 4 +
4.r +4&d& --sUk.4AU Visual Aids @ Binoculars 0 Mirror Light Source 0 6" Scale 0 Other Examination Results, Details and Comments:
Page 1 of 1
Photo Sketch Method I I None p Direct 6444 -6 0 Attached I3 Attached 0 Remote Examination Location Descriptionmemarks Remote' Exammation ConditionsEquipment Remarks Bny W*M pede bC&+l.tP-4 yb -a)4,C1 O,&,F, 6- -t ci WNEF 8047.06 NE 8047 Orighnal Page 1 of 1 f Examiner:  
 
& i e DataSheetNo:
r 1         Data Sheet No:         - 6       360 Work Order Na.:&
soq7- o/-Ogq Work Order No.: Odfl.55 3 6
Vermont Yankee                                         Procedure NofRev.: pp 702d'/U Visual Examination Report Form for General Visual (IWE)                                      page      I  of 1   Date: !//&,/oI       r r                                                     Component I Component ID:   X- 5 4 fir% $'I4                                         system:     31 2  ~
* Vermont Yankee Procedure  
                                                                                              - 3( c1
~o/~ev.: 96 (/7 Ro Visual Examination Report Form for General Visual (IWE) Page / of / Date:&/* / Component Component ID: X- 7 A I +e', / 675 Drawing NolRev.: xf&b - Location:
                                                                                                    ~/t Drawing NolRev.:     5 9 m - +f                                       tocation:   4.r+4&d&     --sUk.4AU Visual Aids                     Photo I        Sketch                     Method
A- TL& I system: 44 c M Photo Sketch Method Visual Aids I3 Binoculars fl None None @Direct IJ Remote U Mirror 0 Attached 0 Attached tight Source Examination Location Description/Remarks Remote Examination ConditionslEquipment Remarks Jl-4 0 6" Scale . E*:dkdrJ gj&r.vd IJ Other . bE$dJcLk 4 Pwet 5 A.s"/h 6C &..s e)o)+cl.;&c-J ebh wc .TAJ 43 &dm. Glc 'st,
  @ Binoculars                                                I   None             p Direct 6444   -6 0 Mirror                0 Attached                           I3 Attached           0 Remote Light Source          Examination Location Descriptionmemarks Remote' Exammation ConditionsEquipment Remarks 0 6" Scale              B n y W
* a&#. Examination Results, Details and Comments:
* M pede b C & + l . t P - 4         yb 0 Other                  -a)4,C1O,&,F, 6--t ci Examination Results, Details and Comments:
Examiner:
WNEF 8047.06 NE 8047 Orighnal Page 1 of 1     f
Level Examiner:
 
Level Date Reviewer:
Examiner: &
Y Reviewer:
i
Date w% .. VYNEF 8047.06 NE 8047 Original Page 1 of 1 Visual Aids Photo Sketch 7 Binoculars p None E? None 3 Mirror 8 Light Source 7 6" Scale Method Direct &A L ro,t 0 Attached 0 Attached 0 Remote Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks b&pc u P4J.G uta- Examiner:
 
E~/A Level nl/~ Date &/A Reviewer:  
e DataSheetNo:       soq7- o / - O g q Work Order No.:     Odfl.55 3 6 Vermont Yankee                                                           96 (/7 R o Procedure ~ o / ~ e v . :
/3/A Date *rA Reviewer:.  
Visual Examination Report Form for General Visual (IWE)                                 Page     /   of   /       Date:&/*         /
#/A Date d1A ANII: !/-by& Date /-2(&f CII VYNEF S0$7.06 NE 8047 Original Page 'I of 1 i Data Sheet NO: 8047 - 01 Work Order No.: B 43 00- 50 3 6 Procedure Nomev.: 84q7 40 Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page / of 1 Date:d3lb/D J I---- Component Component ID: X -9 &A .: System: 34~ dcLc Drawing Nomev.: SFLO .. Location:
Component Component ID:     X- 7 A         +e',675
7u~dcL. Viual Aids Photo Sketch Method Binoculars None @ None JO Direct 6~0~4 I Minor 0 Attached 0 Attached 0 Remote Examiner:
                                      /                                system:              4 4 cM I
Level .I Y I Reviewer:
Drawing NolRev.:     xf&b                                         Location:   A- TL&I Visual Aids Photo                       Sketch                           Method I3 Binoculars           f l None                             None             @Direct U Mirror                 0 Attached                         0 Attached         IJ Remote tight Source         Examination Location Description/Remarks Remote Examination ConditionslEquipment Remarks 0 6" Scale             . E*:dkdrJ         gj&r.vd IJ Other               . bE$dJcLk 4       Pwet 5 Jl-4 Examination Results, Details and Comments:
N/A Date N/A VYNEF 8047.0.6 NE 8047 Original Page 1 of 1 - - -. --
A.s"/h6C &..s                   e)o)+cl.;&c- Je  b  h  wc       .TAJ4    3  &dm.                 G l c'st,
* a&#.
Examiner:                                       Level Examiner:                                       Level Reviewer:                                       Date Y
Reviewer:                                       Date       w%
VYNEF 8047.06 NE 8047 Original Page 1 of 1
 
Visual Aids                 Photo                     Sketch                     Method 7 Binoculars         p None                           E?None               Direct     &A   Lr o , t 3 Mirror              0 Attached                       0 Attached         0 Remote 8 Light Source        Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks 7 6 Scale            b&pcu P4J.G u t a -
Examiner:       E~/A                         Level     nl/~     Date &/A Reviewer:       /3/A                         Date     *rA Reviewer:.       #/A                         Date     d1A ANII:   !/-by&                               Date   /-2(&f CII VYNEF S0$7.06 NE 8047 Original Page I of 1     i
 
Data Sheet NO: 8047 - 01 B 43 Work Order No.:     00-   503 6 Vermont Yankee                        Procedure Nomev.:       84q7   40 Visual Examination Report Form for General Visual (IWE)                     Page     / of   1   Date:d3lb/D J I----                                       Component I Component ID:
Drawing Nomev.:
X -9 & A SFLO    .
                                  .:                       System:
Location:
3 4dcLc  ~
7 u ~ d c L .
Viual Aids                 Photo             Sketch                     Method Binoculars           None                   @ None             JO Direct 6 ~ 0 ~ 4 Minor             0 Attached               0 Attached           0 Remote
.IExaminer:                               Level IReviewer:
Y N/A                   Date N/A VYNEF 8047.0.6 NE 8047 Original Page 1 of 1
 
Work Order No.:  n0  c      b S S ~?
Vermont Yankee                  Procedure NolRev.: b0 f? k b Visual Examination Report Form for General Visual (IWE)              Page    1  of  /  Date: #&/
                                                                                  ~~
Component I
kaminer:                        Level          Date ixarniner:                      Level    4      Date  .l//p .
kviewet:                        Date  %c&
leviewer:                      Date  .//A VY NEF 8047.09 NE8047 Original Page 1 of I
 
Vermont Yankee                      Procedure No/Rev.: Po47 R 0 Visual Examination Report Form for General Visual (IWE)                  Page    /  of  I  Date: +!,+IO{
Component Examiner:
3eviewer:
Y Level Date 7,
                                      ./ 36 C r /
Date  Nh Reviewer:    4 4              Date ANII:                          Date  r-#W VYNEF 8047.0.6 NE 8047 Original Page 1 of 1
 
Work Order No.: 60 00 -     50 3 5 Vermont Yankee                                    Procedure NoIRev.:  PP 7 6 aY%
Visual Examination Report Form for General Visual (IWE)                                Page    ! of /        DaTe:  @fd          t Visual Aids                    Photo                        Sketch                      Method 3 Binoculars                None                            $9None              @ Direct    b a d0    QC C 3 Mirror                U Attached                        D Attached          0 Remote
                                        ~
$ Light Source          Examination Location Descriptjon/Remarks  Remote Examination ConditionsEquipment Remarks 3 6" Scale                Oq    hku, P.wLrlydc'M                    "/A 3 Other                        X-1>
Examination Results, Details and Comments:
Examiner:  rl/d                                Level                Date  @4 Reviewer:  .'/A                                Date    /J/A Reviewer:
* 1J/R                                Date    Nh ANN:                                            Date VYNEF 8047.06 NE 8047 Original Page 1 of 1      i
 
Vermont Yankee                                Procedure NolRev.: f/  76 2    f h    ;
Visual Examination Reoort Form for General Visual '[IWE)                            Page        of  /  Date:  !/lr/bf      I Component Visual Aids                Photo                I      Sketch      I              Method 0 Binoculars        9 Nene 13 Mirror            D Attached                        0 Attached          [J Remote
$t  Light Source      Examination Location Description/Remarks Remati Examination ConditionsiEquipment Remarks c3 6" Scale 0 Other WNEF 8041.06 NE 8047 Original Page 1 of I      i.
 
Work Order No.:    00          ST Vermont Yankee Visual Examination Report Form for General Visual (IWE)
Component Drawing NolRev.:                                                  Location:&    &/A&    &I Visual Aids      I              Photo              I      Sketch      I                Method 0 Binoculars 0 Mirror Light Source II W  None El Attached                    I ab None 0 Attached Examination Location Descrip&n/Remarks I@ Direct 0 Remote
                                                                                            &EJY&
1 Remote. Examination ConditionsAquipment Remarks 0 6' Scale Examination Results, Details and'Comments:
Examiner:                                        Level Examiner:                                                            Date    dh VYNEF 8047.06 NE 8047 Original Page I of 1
 
Data Sheet No:      C J - 38 Work Order No.:    00- Od  so hs Vermont Yankee                                  Procedure NofRev.:  Pf 9 b 4 ,
Visual Examination Report Form for General Visual (IWE)                              Page    I  of  I    Date:_kICL?6    1    I Visual Aids                  Photo                      Sketch                      Method 0 Binoculars          l,R None                          @ None              @ Direct    6-    ZY aC 0 Mirror              U  Attached                      U Attached          5 Remote Pp Light Source        Examination Location Description/Remarks Remote Examination Conditionskquipment Remarks 0 6 Scale              BFpuY          fid&u46h                VA 0 Other X-IbA VYNEF 8047.06 NE 8047 Original Page 1 of 1      i
 
Vermont Yankee                                Procedure NolRev.:  90 q7    Ro Visual Examination Report Form for Generat Visual (IWEI                            Page -    1 of -  I  Date:  5///0/
Component
:omponent IO:    Y-IGB          -;                              System:            ~&/Lc Xawing No/Rev.:  59-        q/                              Location:  RX Visual Aids                Phot0                    Sketch I              Method 7 Binoculars        a None                          @ None                $Direct  trd+t&
3 Mirror            CI Attached                      0 Attached          0 Remote 8 Light Source      Examination Location Descrbtionmemarks I Remote Examination ConditionsKquipment Remarks J 6" Scale Examiner:                                  Levei    Ni&        Date    IJ/A Reviewer: -                                  Date    1 s7r/d I                                            ,
VYNEF 8047.06 NE 8047 Original Page I of 1
 
e Data Sheet No:          -        380 Work Order No.:      -
06 ob 503s Vermont Yankee                                    Procedure NolRev.:  P L7ol,t'/o.
Visual Examination Report Form for General Visual (1WE)                                Page    /  of    f    Date: f//G    /O/    t
                                                  ~
Component Zornponent ID:    X-17                                                System:  D r ~ rkJ4 fl 3rawing NoJRev.:  5?W      - t//                                  Location:  K ~ - f ; a r N ~5- lu: z        .
Visuai Aids 0 Binoculars I
                                  ~
Photo              r        Sketch      I              Method 3 Mirror              0 Attached                          0 Attached          0 Remote 9 tight Source        Examination Location OescriptionlRemarks Remote Examination Cooditions/Equipment Remarks 3 6" Scate                                          c'd rt        VA Examiner:    d/h                              Level                Date  p//n Reviewer:    N/A                              Date      /?/A Reviewer:'  dA                                Date      </A ANII:              /  -                        Date    I-?/*(
VYNEF 8047.06 NE 8047 Original Page 1 of 1
                                                                                                                      \
 
r        Data Sheet No:  06 - 4 v - 3W Work Order No.: 0 0 - 0 0    50'35 Vermont Yankee                                  Procedure NoiRev.:    @ 7 d 3. /o        .
Visual Examination Report Form for General Visual (IWE)                              Page. t!  of  I      Date;  :/16b/      i Visual Aids                Photo                        Sketch                        Method 3 Binoculars        @None  *                          !@None              ,$$ Direct  k d a P u-&
7 Mirror            0 Attached                          0 Attached        ICI Remote 8 Light Source      Examination Location DescriptionlRemarks    Remote ExaminationConditionslEquipment Remarks 7 6"Scale Examiner:  AI/A                            Levef      /?/R      Date    Nhd Reviewer:    N/!!                          Date    hr/p Reviewer: '                                Date    dh VYNEF 8047.06 NE 8047 Original Page 1 of 1      i
 
e Data Sheet NO: Z W - 6J- 378 Work Order No.: 60 40 s    o 3s Vermont Yankee                                  Procedure NolRev.:  pfl 7O  A V h      ,
Visual Examination Report Form for General Visual (IWE)                              Page    i  of    1  Date: !11&!0/      /
Visual Aids                Photo                      Sketch                      Method 13 Binoculars        @ None                            D3 None              @ Direct          r-L D Mirror            0 Attached                        0 Attached          0 Remote Light Source      Examination Location Oescription/Remarks Remote Examination ConditionsiEquiprnent Remarks El 6 Scale          b q w 4 fi&Cd,&                            &/A 0 Other                  x- i 4 V
Examiner:  d1.k                            Level    &/A          Date  M Reviewer:    */A                            Date    n11~
Reviewer:  &/A                              Date If Date  /-sI-of P
VYNEF 8047.06 NE 8047 Original Page Iof 1,    t
 
Vermont Yankee                                  Procedure NolFtev.:JC)    $7 Ro Visual Examination Report Form for General Visual (I WE)                              Page    /  of 1      Date:<A,/O/
Component Component    ID:      x- 19                                          System:    3 / t L t k )et54
                                                                                        /
Drawing NolRev.:                                                                      L Visual Aids                  photo                        Sketch                        Method Q Binoculars          P N m                            pb None              PDirect      6.tc~4 0 Mirror              0 Attached                        t3 Attached          D Remote pLight Source        Examination Location Descriptionmemarks Remote Examination ConditbnslEquipment Remarks U 6 n Scale c
b5;P Examiner:                                    Level a*              Date  s///o1 Examiner:                                    Level    &/A        Date  *I//A Reviewer:A          D      a          t          e Reviewer: -      +/A                        Date    131~
Date    &-d- "',2/
VYNEF 6047.M NE BO47 Original Page I of 1
 
Visual Examination Report Form for General Visual (!WE)              page [ of 1 Date: {//&/O/        I Component VYNEF 8047.06 NE 8047 Original Page 1 of 1 I
 
I        Data Sheet No:  zMo'            37 b Work Order No.: 40- 00 S O 3        s Vermont Yankee                                      Procedure NolRev.:  PP704o Visual Examination Report Form for General Visual (IWE)                                  Page      I  of  f    Date: / / / 6 / 0 /  I Component Component ID:            x - a1                                            System:    D / ~~  z 3  4 Drawing NdRev.:          <9 20 4/                                    Location: AX-&    PA/&      S"&*.
r VisuaI Aids                    Photo                        Sketch                      Method
@Binoculars                  @Nons                              4 None                  Direct  t * & e ~
* L 0 Mirror                    El Attached                        0 Attached          0 Remote p l i g h t Source          Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks 6" Scale                -yuC.CQ        &u*M*.-                    qb Other                  -  x-At Examination Results, Details and Comments:
25.F4-m.r H . c 62      4:s        PLdPJ.Ih. 4            -            X & S L    iLL45.t A 3 ,      j0U (6        ry    t a n  8 1 U h V S- ,        5  h , w e , f ? d:C_      lQz"df&;L w              #%
hlo        4*4?,-)Uto /u                *&-e&& 5 y &                  &e
                                                                        .      5*#,t      &h, Examiner:      &/A                                  Level  &/A          Date  #/A Reviewer:        N/A                                Date  3h Reviewer:        MIA                                Date  $/A Date    /-3td/
i M N E F 8047.06 NE 8047 Original Page 1 of 1      t
 
Vermont Yankee Visual Examination Report Form for General Visual (IWE)                        Page ! of- Date: !//6h/      I Component esults, Details and Comments:
Reviewer:  A/A Reviewer: - d//3                          Date&
Date  /- 5 w U
WNEF 8047.06      .
NE 8047 Original Page 1 of 1 I
 
e Data Sheet NO:        - - 037 SO#? O /
Work Order No.:  00  - 5037
* Vermont Yankee                    Procedure Nomev.:  804'7 LQ Visual Examination Report Form for General Visual (IWE)                Page    /  of      Date: 5//6/
I                                    Component Examiner:                        Level            Date  </~/OI Examiner:    d/A)
Reviewer:                        Date      /d 1
,Reviewer:
W N E F 8047.06 NE 8047 Original Page 1 a i 1
 
Work Order No.:    00- 0 0  fi 3 Vermont ~ i n i t e e                Pcocdwa Nomev.:      PP 702 9 /z,      '
'  Visual Examination Report Form for General Visual (1WE)                    Page      of  /    ~ a    t e :  a  / t Component Component IO:      x-A?,                                System:    -isnu d
* l / i Drswing NolRev.:    5 7 2-3 -41                      Location:  &1;-kn NlLp & L i c e 0 Visual Aids              Photo              Sketch                    Method Binocdars          E?None                    None                Direct            e&L 0 Mirror Cip tight Source D 6" Scale I
Reviewer:    E3!A                      Date! Ni Reviewer:  - '/A                        ate  ?/A WNG SDls"l.06 NE 8047 original Page 1 of 1      i
 
r Data Sheet  No:
Work Order  No.:  00 *5a 3'7 Vermont Yankee                                    Procedure NolRev.:  %q?      44%
Visual Examination Report Form for General Visual (IWEI Component
:ornponeot ID:    j(++                                                system:  3qd          d Irawing NolRev.:    -#a        - #/                              Location:
Visual Aids                    Photo                      Sketch                    Method 3 Binoculars            p None                                None              $ Direct  6wyroCe 3 Mirror                0 Attacbed                        D Attached          D Remote YLight Source            Examination Location Description/Remarks Remote Examination ConditionsEquipment Remarks 3 6" Scale 3 Other Z    G  h  P  d SJP-fPL NIA
:xamination Results, Details and Comments:
Ixaminer:      -4 4                            Level                Date  &/A    '
W N E F 8047.06 NE 8047 Original Page 1 of 1
 
I                                                          e Data Sheet No:    D e - 6i/- 37%
Work Order No.:          -
0 0 00  SO 3s I
f Vermont Yankee Visual Examination Report Form for General Visual ([WE)
Component Procedure ~ o m v . :
Page    4  of.-  l PP 7 d Aq/Q Date:-j//e/o  I Component IO:        X-A4                                            System:                -4 Drawing NofRev.:    5 9 P-D-CfI                                  tocation:  ~      X    -  L  r 5tu    ~ A~  d P
Visual Aids                  Photo                      Sketch                        Method Sinoculars          pB None                          @ None              @Direct      6~ It&
0 Mirrar                0 Attached                        0 Attached          0 Remote
  )?f tight Source        Examination Location DescriptiodRemarks Remote Examination ConditionslEquipment Remarks ci 6" Scale Examiner;    '/A                                Level  .'/R        Date A h Reviewer:    flh                                Date  'h Reviewer:
Date  d/!
II I
WNEF 8047.06 NE 8047 Original Page 1 of I i
 
Data Sheet NO: ZM    6 q w 39 8          7 Work Order No.: ba- 00  50 3s Vermont Yankee                Procedure Nomev.: Pf 7o  W / O Visual Examination Report Form for Generat Visual ( I WE]          Page    /    of^-.
f  Date:  Vf6-hf      I j
Component Component fD:      L                          System:    D/t~t -4 MNEF 8047.06 NE 8047 Original Page 1 of 1
 
Vermont Yankee                                    Procedure NolRev.:  #?? 742.9 /fl        .
Visual Examination Report Form for General Visual (IWEj Component Component ID:    -  X - ~b                                            System:      3 r~
Drawing NolRev.:    .$?a>      r q/                                Location:    4 d ~ d d . -d. S A &6cd Visual Aids                    Photo                        Sketch        i            Method D Binoculars            WNone                            l%r None Mirror                a Attached                        D Attached            n Remote Light Source                                                    1 Examination Location DescfiptionlRemarks Remote Examination CondltionslEquiprnent Remarks 0 6" Scale 0 Other                                                          I Examination Results. Details and Comments:
c Examiner:  '/A                                  Level  4b            Date  IJ/A Reviewer:  "/A                                  Date  'h Reviewer:r. N/A                                  Date  4~
VYNEF 8047.06 NE 8047 original Page 1 of 1 i
 
t Data Sheet No: goq 7-@/ -    8s Work Order No.: 80    - 503.6 Vermont Yankee                                  Procedure No/Rev.:  Rd g7 kb          .
Visual Examination Report Form for General Visual (IWE)                              Page    /  of  I    Date:  SfYb        t r-
                                            ~    ~~~
Component Visual Aids                Photo                        Sketch 0 Binoculars          None                              @ None                Direct L    e j d 0 Mirror            0 Attached                          0 Attached          0 Remote Light Source      Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks Q 6 Scale          EfwcbQ 6&4hccL 0 Other            b434 &.e-Level
                                                      /.rp 67            Date  //A/
Examiner:                                    Level                Date  %%
Date    d<h/
Reviewer:                                    Date    4 4 Date J=5--+
I VYNEF 8047.06 N E 8047 Original Page 1 of 1      i
 
Vermont Yankee                                      Procedure NclXev.:  pp 7 d 2 d O .
Visual Examination Report Form for General Visual (IWE)                                  Page    I  of  1 Date: !/'b,/nL          4 Component
:mponeot ID:        x- aS 1
Visual Aids                    Photo                      Sketch                      Method 8, Direct 6 4 + 4 Y
* L 3 Binoculars          pNm8                                P o n e 9 Mirror              0 Attached                          0 Attached          0 Remote a Light source          Examination Location DesuiptionlRemarks    Remote Examination ConditionslEquipment Remarks 3 6" Scale                39-4 P&cJru..c;h                        */A 3 Other                    x-  2-93 3amination Results, Details and Comments:
Examiner:                                      Levat  rJh            Date A'lA qeviewer: 'h                                  Date  44 VYN& 8047.06 NE 8047 Ofi&@l Page 1 of 1 i
 
Vermont Yankee                                      procedure Nomev.:  // 7&2Lf./o .
Visual Examination Report Farm for General Visual (IWE)
__    ~~
Component Zornponent tD:        -
  >rawing Nomev.:    .<q to L(/fl Visual Aids    I            Photo                I        Skttch I            Method 3 Binoculars            @ None                                None              p Direct  45*~u*L 3 Mirror                0 Attached                          0 Attached          Cl Remote 8 Light Source          Examination Location Oescriptionjflernarkg Remote' Examinah CunditionslEquipment Remarks 3 6" Scale c1 Other                x- ac9
  &amination Results, Detals and Comments:
M N E f 8047,OS NE 8047 Orighal Page 1 of 1
 
t Data Sheet No: m g
* Gc/-37r 9
Work Order No.: 0 0 -00se35 Vermont Yankee Procedure NolRev.:  f?p762 c/./o.
Visual Examination ReDort Form for Visual Aids                Photo                      Sketch                    Method 0 Binoculars        p None                            )X None                Direct  &J*P      a-L D Mirror            U Attached                          0 Attached        10 Remote Light Source      Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks 0 6" Scale
                                    \
VYNEF 8067.06 NE 8047 Original Page 1 of 1 I
 
Vermont Yankee                                  Procedure NolRev.:  pp 26A$/0          '
Visuat Examination Report Form for General Visual (IWE)                              p a g e ~ o f      I  Date:  :I/&/.
Component Component IO:          c                                                System:    3rt~LJCY Drawing NdRev.:      -5733 -  5v                                  Location:            ba 3 u n . & t u    c, Visual Aids                Photo                        Sketch                      Method 0 Binoculars            Q None                            8 None              @ Direct  6e h clbvc Mirror              0 Attached                        0 Attached          D Remota
  @ light Swrce            Examination Location Descriptionlftemarks Remote Examination CondifionslEquipment Remarks 0 6* Scale              3yjd.lrCQ P    4wC-cd;~                  #/A I
WNEk 8047.06 NE 8047 Ofigind Page 7 of 1    ;
 
VYNS 804'7.06 NE 8047 Original Page 1 of 1 i
 
Work Order No.: ob    DO  5035 Vermont Yankee                                  Procedure NolRev.:  pp 70 Wli7 .
Visua! Examination Report Form for General Visual (IWE)I                              Page    /  of    / Date: !//.fh/            J Component Visual Aids                Photo                        Sketch                      Method 3 Binoculars        p None                            RNone              FDirect            6 3 Mirror            0 Attached                          0 Attached          0 Remote id Light Source      Examination Location DescriptionfRemarks    Remotd Examina?ian ConditionsiEquipment Remarks 3 6 ScaIe            0%Y u/ Y 94 N e f Pa-4 ;3      b J        &/A 3 Other                x-  33 VYNEk 8047.06 NE 8047 Original Page 1 of 1      I
 
I            Vermont Yankee                Procedure NolRev.: -@
Visual Examination Report Form for        Page f
                                                .      of-. /  Date: !/.L,/o/      r General Visual (IWE)
Component                                            1 Reviewer: Nh                  Date Iv/p VYNEF 8047.06 NE 8047 original Page 1 of 1 i
 
I          Vermont Yankee Visual Examination General Visual (IWE)Form for Report Work Order No.:
Procedure NolRev.:
Page      'of 40  5 6 8oq? Ro 33 Date: s f i / U (      1 Component I      Sketch ID Attached        I  Remote VYNEF 8047.06 NE8047 Original Page 1 of 1
 
Vermont Yankee                                      Procedure NolRev.: f P 7b R + / D      .
Visual Examination Report Form for General Visual (IWE)                                    Page        of  /    Date:  I//c./D/    I r---    ~
                ~              ~-                          ~
Component
                                                                ~~
1 Component ID:
Drawing NolRev.:
X - 39 A + E 0-  + I System:
Location:
3-        CU, G ~ + ~sdA4EP.d AA                a Visual Aids                    Photo                        Sketch                    Method 0 Binoculars            Q None                            @ None                  Direct  6~
I3 Mirror                U Attached                          0 Attached          0 Remote Light Source          Examination Location Descript;on,JRernarks Remote Examination ConditionslEquipment Remarks 0 6" Scale                hhlueu P&AJ&+f& : b L s                    N]4 0 Other                I    X-39tAcB                                I, Examination Results, Details and Comments:
Examiner: #/A                                    Level N h              Date  %
Reviewer: #/A                                    Date  4 Reviewer:
* Date '%
VYNEF 0047.06 NE 8047 Original Page 1 of 1      i
 
Work Order No.:    B d rr 5 0  3b Vermont Yankee                                    Procedure NolRev.:    db  q? & a Visual Examination Report Form for General Visual (IWE)                                  Page      /of    l      Date: .C/<lo Component Component ID:        &Y/            .:                                System:    39d          d Drawing No/Rev.:
Visual Aids 593-0 -vi Photo I
Location:
Sketch I
a & L      & u1 Method
                                                                                                      -Id8*d -
0 Binoculars            @ None                            B Norie              $&.Direct 60~s-po~
0 Minor                  U Attached                        0 Attached          0 Remote Light Source          Examination Location Description/Remarks  Remote Examination ConditiondEquiprnent Remarks 6 Scale                G*+ef #d &*LCk&
0 osm                    b F > k ) c N      psh)4, Examination Results, Details andcomrnents:
Examiner:    IcI/A                              Level    wr/A        Date  #/A Reviewer:
Y Date    ri1Io1 Reviewer: *  */A                                Date    &!A ANI1:                                            Date  xg-o/
W N E F 8047.06 NE BO47 Original Page 1 of 1
 
Data Sheet No:  z'c-      6Y-  3tz Work Order No.:    06  - 00 50  &
Vermont Yankee                                  Procedure NolRev.:  pp 7b > ~ / O Visual Examination Report Form for General Visual ~ I W E )                            page      I  of  1      Date:  )*//</&I P
Component Component ID:      y-4L                                            System:  %A+    A*  ~4 Drawing NolRev.:    5 7 Lc3  - L/I                              Location:  ~ x . f - u d3 " 4 / R t E 5 Visual Aids                  Photo                      Sketch                        Method D Binoculars                None                          None              $' Direct  b a d 4
' 0 Mirror                0 Attached                      0 Attached          I3 Remote fl Light Source                    Location Descriptionmemarks Remote' Examination ConditionslEquipmentRemarks E%eminsr?~an 0 6" Scale 1
Other                    )c- 5%.                            1 Examination Results, Details and Comments:
I          -,
Reviewer: "'/A                                  Date  Nh VYNEF 8047.06 NE 8047 drighal Page 1 of 1    i
 
Vermont Yankee I  Visual Examination Report Foirm for Page .
f      of f General Visual (1WE)
Component K- q.3                              System: 3fp4 Component ID:
Drawing NolRev.:        5Tzo      -                    Location:  /ai%&&-AJ:I$++  (r          -
Visual Aids                  Photo            Sketch                Method 0 Binoculars                  None              @ None              a Direct &
0 Attached          D Remote 0 Attached W N E F 0047.06 N E a047 qriginal Page 1 of 1 i
 
Work Order No.: 0 0 - 0 4 5 0    3c Vermont Yankee Visual Examination Report Form for Procedure NotRev.: PP 70A${/O General Visual (IWE)                                Page    I  of  I    ~atet-1 Visuai Aids                Phbto                        Sketch      I                  Method D Binoculars FN-                                    None            $5 Direct 0 Mirror            0 Attached                        0 Attached            0 Remote
                                            -~        ~~
Light Source      Examination Location DescriptionlRernarks Remote Examination ConditionslEquipment Remarks 0 S* Scale          3fi~""Lc      P<&- (cw;0n/
V WNEF 8047.06 NE 8047 Original Page 1 of 1      i
 
I                                                                Work Order No.:    00 "      3  6' Vermont Yankee                                Procedure No/Rev.:  86 f 7 RO Visual Examination Report Form for General Visual (IWE)                              Page        of  I    ate:  c/.j.
Component Component ID:        x47          .:                                system:  >AS    d 4 Drawing No/Rev.:    sqw    d  f(                                Location:                    ut /de Visual Aids                Photo                      Sketch                    Method 0 Binoculars          f$ None                              None            9 Direct  &A+&
0 Mirror              0 Attached                        C3 Attached          D Remote
$ Light Source        Examination Location DasctiptionlRemarks Remote Examination ConditionslEquiprnent Remark:
0 6" Scale            GfW#uaQ &&&.ch                            "ish Examiner:                                    Level  */A.        Date  ~h Reviewer:
Reviewer:                                    Date    &h
-&ANII:        g e                            Date X-A-Qf WNEF 8047.06 NE 8047 Original Page 1 of 1
 
Vermont Yankee Visual Examination Report Form for General Visual (IWE)
Procedure No/Rev.:
Page __  1 of    I
* Date: !//&l'~      I
              -~ -      ~
Component Visual Aids                  Photo                      Sketch                      Method Binoculars          Pp None                            p None                  Rirect    6*~  P c **
L 3 Mirror              0 Attached                        17 Attached          C l Remote R Light Source        Examination Location Desctiption/Remarks Remote Examination ConditionslEquipment Remarks 7 6" Scale              acc) 3& k*efr&&q                          l?ac*gcu I      d
* A:J L h Examiner:    @/A Reviewer:  Nh                                Date    ~h4 Reviewer:-  dJA I                              Date    IJ/A ANI!:      1 J Date    /-5/d V
WNEF 8047.06 NE 8047 Qn'gina1 Page 1 of 1      I
 
Data Sheet No:  xu6-            386 Work Order No.: 00      %t  SU  35 Vermont Yankee                                    Procedure NolRev.:  pp 7 Visual Examination Report Form for General Visual (]WE)                                Page    I  of  I    Date: !ii.?iil Component
;omponent ID:      x- 5-0 Visual Aids                Photo                        Sketch                      Method 7 Binoculars          !)  I None                              None              )gl Direct    6.- a PaL 3 Mirror              0 Attached                        0 Anached                Remote rb Liaht Source      Examination Location DescriDtion/Rernarks I Remote Examination CondkionslEquipment Remarks Reviewer:    J/A                            Date VYNEF 8047.06 NE 8047 Original Page 1 of 1      i
 
I Data Sheet .N
                                                      .O work Order No.:  00 -00 5 0 3 5 Vermont Yankee Visual Examination Report Form for procedure NofRev.:  PP 7azSI /A General Visual (IWE)              Page        of /  -Date:  !//s/o[
Component W N E F 8047.06 NE 8047 Original Page 1 of 1
 
Vermont Yankee                                  Procedure NoIRev.:      @p 7 0 t f  10  .
Visual Examination Report Form for General Visual (IWE)                              Page      I    of  I    Date: ?/iS-/o!      I
                                                  ~~
Component hmponent ID:          x-SL            .*                              System: 3 i ~ h yd    4 -
Srawing No/Rev.:      59 xb - 4[    '                              Location:    & f-      ARL    5A&-P Visual Aids                Photo                      Sketch                          Method Binoculars          03 None                            @ None                ,L3 Direct          p0-C 0 Mirror                0 Attached                        D Attached          10 Remote
$ t i g h t Source      Examination Location DescriptionlRemarks Remote. Examination ConditionsIEquipment Remarks D 6" Scale                                            # oh)        WA Examiner:        tW                              Level    44        Date    di!A Reviewer:                                        Date    dh Reviewer:    -  al4                            Date    '/A VYNEF 8047.06 NE 8047 Original Page 1 of 1      1
 
Vermont Yankee Visual Examination Report Form for General Visual (IWE)
Vermont Yankee Visual Examination Report Form for General Visual (IWE)
* Work Order No.: Procedure NolRev.: b0 f? kb Page 1 of / Date: #&/ n0 c SS ~? b ~~ Component I kaminer: Level Date ixarniner:
Component
Level 4 Date .l//p . kviewet: Date %%c& leviewer:
:omponent ID:   k-/o/     A,&r
Date .//A VY N EF 8047.09 NE 8047 Original Page 1 of I Procedure No/Rev.: Po47 R 0 Page / of I Date: +!,+IO{ Vermont Yankee Visual Examination Report Form for General Visual (IWE) Component Examiner:
                                  .k,3 b                   System:          CJCC LL Visual Aids                  Photo                Sketch                      Method ql None                    Qb None 3 Binocufars                                                            Direct  ~*AJI+*L 8 Minor              113 Attached              10 Attached        10 Remote 9 Light Source                                            Remote Examination ConditionsEquiprnent Remarks 3 6" Scale f Other                                                I '
Level 7, Date Nh 3eview er: Date ./ 36 Cr/ Y Reviewer:
Examiner;        d!A                    Level  J!h        Date,&.
44 Date ANII: Date r-#W VYNEF 8047.0.6 NE 8047 Original Page 1 of 1 Vermont Yankee Visual Examination Report Form for General Visual (IWE) Visual Aids Photo Sketch 3 Binoculars None $9 None 3 Mirror U Attached D Attached Work Order No.: 60 - 00 50 35 Procedure NoIRev.: PP 76 aY% Page ! of / DaTe: @fd t Method bad 0 QC C @ Direct 0 Remote $ Light Source 3 6" Scale 3 Other ~ Examination Location Descriptjon/Remarks Remote Examination ConditionsEquipment Remarks Oq hku, P.wLrlydc'M
Reviewer:        &!A                      Date    d!A Reviewer:                                Date 4/,,
"/A X-1> Examination Results, Details and Comments:
Bate  !/?la/                                                    f, WNEF 8047.06 NE 8047 brlginal Page 1 of 1
Examiner:
 
rl/d Level Date @4 Reviewer:  
a Data Sheet No: Z d E -          .
.'/A Date /J/A Reviewer:
3?9 r'
* 1J/R Date Nh ANN: Date VYNEF 8047.06 NE 8047 Original Page 1 of 1 i Vermont Yankee Visual Examination Reoort Form for Procedure NolRev.: f/ 76 2fh ; General Visual '[IWE) Page of / Date: !/lr/bf I Component Visual Aids 0 Binoculars 13 Mirror t$ Light Source c3 6" Scale 0 Other Photo I Sketch I Method 9 Nene 0 Attached [J Remote D Attached Examination Location Description/Remarks Remati Examination ConditionsiEquipment Remarks WNEF 8041.06 NE 8047 Original Page 1 of I i.
Work Order  No.:       c 9056      35 Vermont Yankee Procedure NO/REV.:    PPI 4 & / 0 Visual Examination Report Form for General Visual (!WE)               Page        ot    1  Date: ?//c/o/         t 1 t
Work Order No.: 00 ST Vermont Yankee Visual Examination Report Form for General Visual (IWE) -- Component Drawing NolRev.: Location:&
I Component iD:   x- /QO A! 6,c Component System:    'zs hL1 d    4 4
&/A& &I Visual Aids I Photo I Sketch I Method 0 Binoculars 0 Mirror W None I El Attached ab None I 0 Attached @ Direct &EJY& I 0 Remote Light Source 0 6' Scale I Examination Location Descrip&n/Remarks 1 Remote. Examination Conditions Aquipment Remarks Examination Results, Details and'Comments:
A Drawing NolRev.:  <9 w  - qi                    Location: EK+L/w~/G        S u /r- Cfi c d Visual Aids             Photo   I      Sketch                       Method 1 fa                      Direct  &,A~P+      I 0 Remote marks  Remote Examination ConditionslEquipment Remarks W N E F 8047.06 NE 8047 briginal .
Examiner:
Page 1 of 1 i
Level Examiner:
 
Date dh VYNEF 8047.06 NE 8047 Original Page I of 1 
n Data Sheet No:          - &Uc  391 I
- .... . . -- ._
Work Order No.:   00-00     5035 Vermont Yankee                                    Procedure NolRev.:     pp 702-$
: Data Sheet No: CJ- 38 Work Order No.: 00- Od so hs Visual Aids Photo Sketch 0 Binoculars l,R None @ None 0 Mirror U Attached U Attached Vermont Yankee Visual Examination Report Form for General Visual (IWE) Method @ Direct 6- ZY aC 5 Remote Procedure NofRev.: Pf 9b4, Page I of I Date:_kICL?6 1 I Pp Light Source 0 6" Scale 0 Other ' Examination Location Description/Remarks Remote Examination Conditionskquipment Remarks BFpuY fid&u46h VA X-IbA VYNEF 8047.06 NE 8047 Original Page 1 of 1 i Vermont Yankee Visual Examination Report Form for Procedure NolRev.: 90 q7 Ro Generat Visual (IWEI Page - 1 of - I Date: 5///0/ Component
Visual Examination Report Form for General Visual (IWE)                                Page   f  of 1      Date: ? j l ~ i / u i I Component hmponent ID:       %-lo?,                                            System:              Jc 1/1 I\
:omponent IO: Y-IGB -; System: ~&/Lc Xawing No/Rev.: 59- q/ RX Location:
Visual Aids                    Photo                      Sketch                      Method 3 Binoculars            &None                            8 None              0 Direct N u t    p**GsQ, 3 Mirror                0 Attached                        CI Attached        1o  Remote 91 Light Source         Examination location DescriptionlRemarks  Remote-Examination ConditionslEquipment Remarks 7 6" Scale
Visual Aids 7 Binoculars 3 Mirror 8 Light Source J 6" Scale Phot0 Sketch Method I a None @ None $Direct trd+t& CI Attached 0 Attached 0 Remote Examination Location Descrbtionmemarks I Remote Examination ConditionsKquipment Remarks Examiner:
                                                                    "//t
Levei Ni& Date IJ/A Reviewer:
-~                          _ _
-1, Date s7r/d I VYNEF 8047.06 NE 8047 Original Page I of 1 e Data Sheet No: - 380 Work Order No.: 06 - ob 503s Vermont Yankee Visual Examination Report Form for General Visual (1WE) Procedure NolRev.: PL 7 ol,t'/o. Page / of f Date: f//G /O/ t ~ Component Zornponent ID: X-17 System: Dr~r kJ4 fl 3rawing NoJRev.: 5?W - t// Location:
%amination Results, Details and Comments:
K~-f;arN~-l:
VVNEF 8047.06 NE 8047 Original Page 1 of 1
5uz . Visuai Aids I ~ Photo r Sketch I Method 0 Binoculars 3 Mirror 9 tight Source 3 6" Scate 0 Attached 0 Attached 0 Remote Examination Location OescriptionlRemarks Remote Examination Cooditions/Equipment Remarks c'd rt VA Examiner:
 
d/h Level Date p//n Reviewer:
a Data Sheet No:
N/A Date /?/A Reviewer:'
Vermont Yankee Visual Examination Report Form for General Visual (IWE)              page    1  of t ate: !hdrh/
dA Date </A ANII: /- Date I-?/*( VYNEF 8047.06 NE 8047 Original Page 1 of 1 \
Component P
r Data Sheet No: 0 6- 4v- 3W Work Order No.: 00- 00 50'35 Visual Aids Photo Sketch 3 Binoculars
WNEF 0047.06 NE 8047 brigha!
@None * !@None Vermont Yankee Procedure NoiRev.: @ 7d 3. /o . General Visual (IWE) Page. t! of I Date; :/16b/ i Visual Examination Report Form for Method ,$$ Direct kd a P u-& 7 Mirror 8 Light Source 7 6" Scale 0 Attached 0 Attached I CI Remote Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks Examiner:
Page 1 of f
AI/A Levef /?/R Date Nhd Reviewer:
 
N/!! Date hr/p Reviewer:
r Data Sheet No: z u c o GLJ-387 Work Order No.: O U - ~ S ' O ~ S Vermont Yankee                                    Procedure NolRev.: @p 76 ;?"? 1      0  .
' Date dh VYNEF 8047.06 NE 8047 Original Page 1 of 1 i e Data Sheet NO: ZW- 6J- 378 Work Order No.: 60 40 so 3s Visual Aids Photo Sketch 13 Binoculars
Visual Examination Report Form for General Visual [IWE)                                   Page   t  of   I  Date: i / i i / d /   t Component
@ None D3 None D Mirror 0 Attached 0 Attached Procedure NolRev.: pfl 7 OAVh , Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page i of 1 Date: !11&!0/ / Method @ Direct r'-L 0 Remote Light Source El 6" Scale 0 Other V Examination Location Oescription/Remarks Remote Examination ConditionsiEquiprnent Remarks bqw4 fi&Cd,& &/A x- i4 Examiner:
:omponent io:        X- J o(P                                          System:  3 1 0 ~w LI
d1.k Level &/A Date M Reviewer:
(  .
*/A Date n11~ Reviewer:
Visual Aids                  Photo                       Sketch                       Method 3 Binoculars            9 None                            PpNone              FDirect      GWa t-*b
&/A Date Date /-sI-of If P VYNEF 8047.06 NE 8047 Original Page 'I of 1, t Procedure NolFtev.:JC)
%.Mirror                0 Attached                        0 Attached           U Remote Light Source          Examination Location Description/Remarks ' Remote Examination Conditions/EquipmentRemarks 0 6" Scale                afip4.z P*,,*~rJQ;ord                      N/A Examiner:    ~h                                Level    NA            Date  *h Reviewer:.       */A                            Date    #/A Reviewer:     @/A                               Date    iJ/A ANII:    I   If Date    ldT/*/
$7 Ro Vermont Yankee Visual Examination Report Form for General Visual (I WE) Page / of 1 Date:<A,/O/
il WNEF 8047.06 NE 8047 Original Page 1 of I     !
Component Component ID: x- 19 System: 3/tLtk) et54 / Drawing NolRev.: L Visual Aids photo Sketch Method Q Binoculars PNm pb None PDirect 6.tc~4 0 Mirror p Light Source U 6n Scale 0 Attached t3 Attached D Remote Examination Location Descriptionmemarks Remote Examination ConditbnslEquipment Remarks c b5;P Examiner:
 
Level *a Date s///o 1 Examiner:
I                                                             Work Order No.: 00-00 5 0       3s Vermont Yankee                                Procedure NolRev.:    flP  70  3-q /a      '
Level &/A Date *I//A Reviewer:
Visual Examination Report Farm for General Visual (IWE)                            p a g e l o f          Date:    1/ic,,&
ADate Reviewer: - +/A Date 131~ Date &-d- "',2/ VYNEF 6047.M NE BO47 Original Page I of 1 Visual Examination Report Form for General Visual (!WE) page [ of 1 Date: {//&/O/ I Component VYNEF 8047.06 NE 8047 Original Page 1 of 1 I I Data Sheet No: zMo' 3 7 b Vermont Yankee Visual Examination Report Form for General Visual (IWE) Work Order No.: 40- 00 SO 3s Procedure NolRev.: PP704o Page I of f Date: ///6/0/ I Component Component ID: x- a1 System: D/~z ~34 Drawing NdRev.: <9 20 4/ Location:
1                                                Component Visual Aids                Photo                      Sketch                        Method 0 Binoculars          None                            fFNone              9 Direct      &*a    ~  fCi U Attached                        0 Attached            Remote Examinatian Location Oescr$tion/Remarks  Remote' Examination ConditionslEquiprnent Remarks 0 6" Scale                                                    4 4 D Other                x-   107 L                                          .
AX-& PA/& S"&*. r VisuaI Aids Photo Sketch Method @Binoculars
VYNEF 8047.06 NE 8047 Original Page 1 of 1
@Nons 4 None Direct t*&e~*L 0 Mirror El Attached 0 Attached 0 Remote plight Source Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks 6" Scale -yuC.CQ &u*M*.- qb Other - x-At Examination Results, Details and Comments:
 
rH.c 4:s PLdPJ.Ih.
Vermont Yankee I        Visual Examination Report Form VT-1, Containment Surfaces (IWE) work Order NO.:   bU*      iL4 /7 DO ProcedureNoRev.:    d&  fb6    /k h1
4- X&SL iLL45.t A j0U 3, (6 ry tan 8 1 UhVS - , *5*h,we,f?
                                                . Page  1    of    2    Date:  534/
d:C_ lQz"df&;L w #% 25.F4-m. 62 hlo 4*4?,-)Uto
Remote Examination ConditiondEquiprnent Remarks Other (Explain)
/u *&-e& &5y& &..e 5*#,t &h , Examiner:
Exminer:                                        Level:   4        Date:                 EvaIuation Required?
&/A Level &/A Date #/A Reviewer:
Examiner:            4                          Level: dh        Date:
N/A Date 3h Reviewer:
MIA Date $/A Date /-3td/ i MNEF 8047.06 NE 8047 Original Page 1 of 1 t Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page ! of- Date: !//6h/ I - Component esults, Details and Comments: - Reviewer:
A/A Reviewer: - d//3 Date& Date /- 5w U WNEF 8047.06 . NE 8047 Original Page 1 of 1 I e Data Sheet NO: SO#? - O/ - 037 Work Order No.:
* 00 - 5037 Procedure Nomev.: 804'7 LQ Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page / of Date: 5//6/ I Component Examiner:
Level Date </~/OI Examiner:
d/A) Reviewer:
Date /d 1 Reviewer: , * ' WNEF 8047.06 NE 8047 Original Page 1 ai 1 Work Order No.: Pcocdwa Nomev.: PP 702 9 /z, ' 00- 00 fi 3 Vermont ~initee ' Visual Examination Report Form for General Visual (1WE) Page of / ~ate:a/ t Component Component IO: x-A?, System: -isnu d *l/i Drswing NolRev.: 57 2-3 -41 Location:
&1;-kn NlLp &Lice0 Method Visual Aids Photo Sketch Binocdars E? None None Direct e&L 0 Mirror Cip tight Source D 6" Scale I Reviewer:
E3!A Date! Ni Reviewer: - '/A  ate ?/A WNG SDls"l.06 NE 8047 original Page 1 of 1 i r Data Sheet No: Work Order No.: 00 *5a 3'7 Procedure NolRev.: % q? 44% Vermont Yankee Visual Examination Report Form for General Visual (IWEI - Component
:ornponeot ID: j(++ system: 3q dd Irawing NolRev.: -#a - #/ Location:
Visual Aids Photo Sketch Method 3 Binoculars p None None $ Direct 6wyroCe 3 Mirror 0 Attacbed D Attached D Remote YLight Source Examination Location Description/Remarks Remote Examination ConditionsEquipment Remarks NIA 3 6" Scale ZGhPd SJP-fPL 3 Other :xamination Results, Details and Comments:
Date &/A ' Ixaminer: - 44 Level WNEF 8047.06 NE 8047 Original Page 1 of 1 I e Data Sheet No: De- 6i/- 37% Work Order No.: 00 - 00 SO 3s Vermont Yankee Procedure
~omv.: PP 7d Aq/Q Page 4 of.- l Date:-j//e/o I Visual Examination Report Form for I General Visual ([WE) f Component IO: X-A4 System: -4 Drawing NofRev.: 59 P-D-CfI tocation:
~X-Lrt~~ 5 uAd Component P Visual Aids Photo Sketch Method Sinoculars pB None @ None @Direct 6~ It& 0 Mirrar 0 Attached 0 Attached 0 Remote )?f tight Source Examination Location DescriptiodRemarks Remote Examination ConditionslEquipment Remarks ci 6" Scale .. . Examiner;
'/A Level .'/R Date Ah Reviewer:
flh Date 'h Reviewer:
Date d/!
* II I WNEF 8047.06 NE 8047 Original Page 1 of I i Data Sheet NO: ZM Work Order No.: ba- 00 50 3s 6qw 39 8 MNEF 8047.06 NE 8047 Original Page 1 of 1 7 Vermont Yankee Visual Examination Report Form for Procedure Nomev.: Pf 7 oW/O Page /  of^-. f Date: Vf6-h f I Generat Visual (I WE] j Component Component fD: L System: D/t~t -4 Procedure NolRev.: #?? 742.9 /fl . Vermont Yankee Visual Examination Report Form for General Visual (IWEj Component Component ID: - X- ~b System: 3 r~ Drawing NolRev.: .$?a> q/ Location:
4d~dd.d -.SA & Visual Aids Photo Sketch Method D Binoculars WNone l%r None 6cd r i Mirror Light Source 0 6" Scale a Attached D Attached n Remote Examination Location DescfiptionlRemarks 1 Remote Examination CondltionslEquiprnent Remarks 0 Other I Examination Results. Details and Comments:
c Examiner:
'/A Level 4b Date IJ/A Reviewer:
"/A Date 'h Reviewer:
: r. N/A Date 4~ VYNEF 8047.06 NE 8047 original Page 1 of 1 i - . . ..
t Data Sheet No: goq 7- @/ -8s' Work Order No.: 80 - 503.6 Vermont Yankee Procedure No/Rev.: Rd g7 kb . General Visual (IWE) Page / of I Date: SfYb t Visual Examination Report Form for Visual Aids 0 Binoculars 0 Mirror r- Photo Sketch None @ None Direct Lejd 0 Attached 0 Attached 0 Remote ~ ~~~ Component Light Source Examination Location DescriptionlRemarks Q 6" Scale EfwcbQ 6 "&4hccL 0 Other b434 &.e- Remote Examination ConditionslEquipment Remarks /."rp Level 67 Date //A/ Date d<h/ Examiner:
Level Date '%% Reviewer:
Date 44 Date J=5--+' I VYNEF 8047.06 NE 8047 Original Page 1 of 1 i Vermont Yankee Visual Examination Report Form for Procedure NclXev.: pp 7d2dO. General Visual (IWE) Page I of 1 Date: !/'b,/nL 4 Component
:mponeot ID: x- aS 1 Visual Aids Photo Sketch Method 8, Direct 64+4Y*L 3 Binoculars pNm8 Pone 9 Mirror 0 Attached 0 Attached 0 Remote a Light source Examination Location DesuiptionlRemarks Remote Examination ConditionslEquipment Remarks 3 6" Scale 39-4 P&cJru..c;h
*/A 3 Other x- 2-93 3amination Results, Details and Comments:
Examiner:
Levat rJh Date A'lA qeviewer:
'h Date 44 VYN& 8047.06 NE 8047 Ofi&@l Page 1 of 1 i procedure Nomev.: // 7&2Lf./o . Vermont Yankee Visual Examination Report Farm for General Visual (IWE) __ ~~ Component - Zornponent tD: >rawing Nomev.: .<q to fl L(/ Visual Aids Photo Skttch Method 3 Binoculars
@ None None p Direct 45*~u*L 3 Mirror 0 Attached 0 Attached Cl Remote 8 Light Source Examination Location Oescriptionjflernarkg Remote' Examinah CunditionslEquipment Remarks I I I 3 6" Scale c1 Other x- ac9 &amination Results, Detals and Comments:
MNEf 8047,OS NE 8047 Orighal Page 1 of 1 .-. - -- ...._.._____
t Data Sheet No: mg* Gc/- 37r 9 Work Order No.: 00 -00 se35 Visual Aids Photo Sketch 0 Binoculars p None )X None Vermont Yankee Visual Examination ReDort Form for Method Direct &J*P a-L Procedure NolRev.: f?p 76 2 c/./o. D Mirror Light Source 0 6" Scale U Attached 0 Attached 10 Remote Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks \ VYNEF 8067.06 NE 8047 Original Page 1 of 1 I Procedure NolRev.: pp 26A$/0 ' page~of I Date: :I/&/. Vermont Yankee Visuat Examination Report Form for General Visual (IWE) Component Component IO: c System: 3rt~ LJCY Drawing NdRev.: -57 3 3- 5v Location:
ba 3un.&tu c, Visual Aids Photo Sketch Method 0 Binoculars Q None 8 None @ Direct 6 eh clbvc Mirror @ light Swrce 0 6* Scale 0 Attached 0 Attached D Remota Examination Location Descriptionlftemarks Remote Examination CondifionslEquipment Remarks 3yjd.lrCQ P4wC-cd;~
#/A I WNEk 8047.06 NE 8047 Ofigind Page 7 of 1 ; -- . . . . . . . - .
VYNS 804'7.06 NE 8047 Original Page 1 of 1 i Work Order No.: ob DO 5035 Visual Aids Photo Sketch 3 Binoculars p None RNone 3 Mirror 0 Attached 0 Attached Vermont Yankee Visua! Examination Report Form for Method FDirect 6 0 Remote Procedure NolRev.: pp 70 Wli7 . id Light Source 3 6" ScaIe 3 Other General Visual (IWE) Examination Location DescriptionfRemarks Remotd Examina?ian ConditionsiEquipment Remarks 0% Y u/ Y 94 N e f Pa-4 ; 3 bJ &/A x- 33 Page / of / Date: !//.fh/ J I Component VYNEk 8047.06 NE 8047 Original Page 1 of 1 I Procedure NolRev.:
-@ ' I Vermont Yankee Visual Examination Report Form for Page .f of .- / Date: !/.L,/o/ r General Visual (IWE) Component 1 Reviewer:
Nh Date Iv/p VYNEF 8047.06 NE 8047 original Page 1 of 1 i I Vermont Yankee Work Order No.: 40 56 3 3 Procedure NolRev.: 8oq? Ro Visual Examination Report Form for General Visual (IWE) Page 'of ' Date: sfi/U( 1 Component I Sketch I D Attached I Remote VYNEF 8047.06 NE 8047 Original Page 1 of 1 Procedure NolRev.: f P 7 bR+/D . Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page of / Date: I//c./D/ I ~ ~ ~~ ~- r--- ~ Component Component ID: X - 39 A +E System: 3- CU, 1 Drawing NolRev.: 0- +I Location:
G~+~AA sdA4EP.d a Visual Aids Photo Sketch Method 0 Binoculars Q None @ None Direct 6~ I3 Mirror U Attached 0 Attached 0 Remote Light Source Examination Location Descript;on,JRernarks Remote Examination ConditionslEquipment Remarks 0 6" Scale hhlueu P&AJ&+f& :bLs N]4 0 Other I X-39tAcB I, Examination Results, Details and Comments:
Examiner:
#/A Level Nh Date % Reviewer:
#/A Date 4 Reviewer:
* Date '% VYNEF 0047.06 NE 8047 Original Page 1 of 1 i Work Order No.: Bd rr 50 3 b Procedure NolRev.: db q? & a General Visual (IWE) Page /of l Date: .C/<lo Vermont Yankee Visual Examination Report Form for Component Component ID: &Y/ .: System: '39 dd Drawing No/Rev.: 593-0 -vi Location:
a&L & u1 - Id8*d I I - Visual Aids Photo Sketch Method 0 Binoculars
@ None B Norie $&. Direct 60~s-po~ 0 Minor U Attached 0 Attached 0 Remote Light Source Examination Location Description/Remarks Remote Examination ConditiondEquiprnent Remarks 6" Scale G*+ef #d &*LCk& 0 osm bF>k)cN psh)4, Examination Results, Details and'comrnents:
Examiner:
IcI/A Level wr/A Date #/A Reviewer:
Date ri1Io1 Y Reviewer:
* */A Date &!A ANI1: Date xg-o/ WNEF 8047.06 NE BO47 Original Page 1 of 1 Data Sheet No: z'c- 6Y- 3tz Work Order No.: 06 - 00 50 & Procedure NolRev.: pp 7 b>~/O Vermont Yankee Visual Examination Report Form for General Visual ~IWE) page I of 1 Date: )*//</&I P Component Component ID: y-4L System: %A+ A* ~4 Drawing NolRev.: 57 Lc3 - L/I Location:
~x.f-ud 3 "4/RtE5 Visual Aids Photo Sketch Method D Binoculars None None $' Direct bad4 ' 0 Mirror fl Light Source 0 6" Scale 1 0 Attached 0 Attached I3 Remote E%eminsr?~an Location Descriptionmemarks Remote' Examination ConditionslEquipment Remarks )c- 5%. 1 Other Examination Results, Details and Comments:
I Reviewer:
-, "'/A Date Nh VYNEF 8047.06 NE 8047 drighal Page 1 of 1 i Vermont Yankee I Visual Examination Report Fo irm for General Visual (1WE) Page .f. of f Component K- q.3 System: 3fp4 /ai%&&- AJ:I$++ Component ID: Drawing NolRev.: 5Tzo - Location:
0 Binoculars None @ None a Direct & (r - Sketch Method Visual Aids Photo 0 Attached D Remote 0 Attached WNEF 0047.06 NE a047 qriginal Page 1 of 1 i . . .... - . - - -. -- ----
Work Order No.: 00- 04 50 3c Procedure NotRev.: PP 70 A${/O Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page I of I ~atet-1 Visuai Aids Phbto Sketch Method I None $5 Direct 0 Mirror 0 Attached 0 Attached 0 Remote D Binoculars FN- Light Source 0 S* Scale ~~ -~ Examination Location DescriptionlRernarks Remote Examination ConditionslEquipment Remarks 3fi~""Lc P<&- (cw;0n/ V WNEF 8047.06 NE 8047 Original Page 1 of 1 i I Work Order No.: 00 " 3 6' Procedure No/Rev.: 86 f7 RO General Visual (IWE) Page of I  ate: c/.j. Vermont Yankee Visual Examination Report Form for Component Component ID: x47 .: system: >AS d4 Drawing No/Rev.: sqw d f( Location:
ut /de Visual Aids Photo Sketch Method 0 Binoculars f$ None None 9 Direct &A+& 0 Mirror 0 Attached C3 Attached D Remote $ Light Source Examination Location DasctiptionlRemarks Remote Examination ConditionslEquiprnent Remark: 0 6" Scale GfW#uaQ &&&.ch "ish Examiner:
Level */A. Date ~h Reviewer:
Reviewer:
Reviewer:
Date &h ANII: &ge Date X-A-Qf - WNEF 8047.06 NE 8047 Original Page 1 of 1 Procedure No/Rev.:
Date:  c/~L/            ayes d    o Reviewer:            /.I&                                         me:    aI/A ANII: H                                                          Date: s-Y-01 VYNEF 8045.02 NE 8045 Rev. 1 Page 1 of 1
* Vermont Yankee Visual Examination Report Form for 1 of I Date: !//&l'~ I General Visual (IWE) Page __ Visual Aids Photo Sketch Binoculars Pp None p None 3 Mirror 0 Attached 17 Attached -~ - ~ Component Method Rirect 6*~* Pc*L Cl Remote R Light Source 7 6" Scale Examiner:  
 
@/A Reviewer:
Vermont Yankee Reference Data Sheet No:
Nh Date ~h4 Examination Location Desctiption/Remarks Remote Examination ConditionslEquipment Remarks acc) 3& k*efr&&q l?ac*gcu Id
Visual Examination      Page  2 of        Date: fA_/dl/o  1 r  r Supplemental Report Form Component Zomponent ZD: )'2064                                  System:    %w.3 f'
* A:J Lh Reviewer:-
baminer:            ."/R                                Level:  ..fR  Date:  4 ieviewer: 4                                                            Date: sydk/
dJIA Date IJ/A ANI!: Date /-5/d 1J V WNEF 8047.06 NE 8047 Qn'gina1 Page 1 of 1 I ... 
teviewer:          4 4                                                Date: 4k Date:  %/
VYNEF. 8045.04 NE 8045 Original Page 1 of 1 tpc #I
 
Vermont Yankee                                           Data Sheet No:  gocds- 6    01  3 Work Order No.:  00 -a0 46 1 7 4 0 0 Visual Examination Report Form Procedure NoRev.: Nk"g)oi/F -/ REV0 /
VT-1, Bolting OWE)
Page        I        of   1          Date: S- 3-o/
Bolting Length: 4 % ,' " Bolting Diameter:
PhotolSketch          Method          Examination            Bolting Components Examined            Ihmiaation Level Check dNone                  EfDirect        I3 In Place          dolting          0 Washers Visual Aids                                           Intermediate                  c
_ _ _ _ _ ~ ~
0 Magnifying GIass                      Milmination c a r c ~ ~ o . : Y Y8                          Intermediate    /vA.
0 Mirror                                d i g h t Source (Describe):
Remote Examination ConditionslLimitations:
                                                                        && r  c c  /
w                Final 223      /-./e    5h/$
NA                                                      Lightmeter SM:  8/2/53 Evaluation Required?
ayes      0%0 1Examiner:                                                  Level: .lkDate:      &/A              l WNEF 8045.03 N E 8045 Original Page 1 of 1
 
Vermont Yankee        Data Sheet No:    go fLs4c3 1 o/s" Visual Examination Report Form Work Order No.: U U  - OU 96 s*.-0 4 0 Procedure NoRev.: 46 86 95 /e@.      0 VT-1, Bolting (rwE) page        /    of    /    Date: S - s n o /
VYNEF 8045.03 NE 8045 Original Page 1 of 1


Data Sheet No: xu6- Work Order No.: 00 t% SU 35 38 6
Vermont Yankee                              gDataShmNo.zz Work Order No.: d d -dd      94/P-*         CJ00 Visual Examination Report Form ProcedureNo/Rev.:   N E ~ 9.5      o /pF& /
* Visual Aids Vermont Yankee Procedure NolRev.: pp 7 Page I of I Date: !ii.?iil Visual Examination Report Form for General Visual (]WE) Photo Sketch Method Component
VT-1, Bolting (WE)
;omponent ID: x- 5-0 7 Binoculars
Page         /      of     /            Date: 5-3-a1 II Component CH/JC&-~                /'
!)I None None )gl Direct 6.- a PaL 3 Mirror rb Liaht Source 0 Anached Remote 0 Attached Examination Location DescriDtion/Rernarks I Remote Examination CondkionslEquipment Remarks Reviewer:
Drawing NoRev.:     9 -62.o.L                    Meuuo
J/A Date VYNEF 8047.06 NE 8047 Original Page 1 of 1 i I Data Sheet NO:.. work Order No.: 00 -00 50 35
* Bolting Length:   ya"      "  Bolting Diameter:
* Vermont Yankee procedure NofRev.:
I                  I                                        I1 Ph otolSketch        Method         Examination            BoltingComponents Examined                ntumination Level Check II None                   Direct       0 In Place          M Bolting        0 Washers Attached             0 Remote           Removed            0 Bushings          Flange Surface
PP 7azSI /A Page of / -Date: !//s/o[ Visual Examination Report Form for General Visual (IWE) Component WNEF 8047.06 NE 8047 Original Page 1 of 1 Vermont Yankee Visual Examination Report Form for General Visual (IWE) Procedure NoIRev.: Page I of I Date: ?/iS-/o! I @p 70tf 10 . ~~ Component hmponent ID: x-SL .* System: 3i~hy d4- Srawing No/Rev.: 59 xb - 4[ ' Location:  
__F I
& f- ARL 5A&-P Method Visual Aids Photo Sketch Binoculars 03 None @ None ,L3 Direct p0-C 0 Mirror $tight Source D 6" Scale 0 Attached D Attached 10 Remote Examination Location DescriptionlRemarks Remote. Examination ConditionsIEquipment Remarks # oh) WA Examiner:
Visual Aids Magnifying Glass                      w Illumination carmo.:         @
tW Level 44 Date di!A Reviewer:
0 Mirror                                1Light Source (Describe): ,/=)%dL+~ f Remote Examination Conditionskimitations:                                       #
Date dh Reviewer: - al4 Date '/A VYNEF 8047.06 NE 8047 Original Page 1 of 1 1 Vermont Yankee Visual Examination Report Form for General Visual (IWE) 3 Binocufars Component Qb None Direct ~*AJI+*L ql None r :omponent ID: k-/o/ A,& .k, 3 b System: CJCC LL Visual Aids Photo Sketch Method 8 Minor 9 Light Source 3 6" Scale Examiner; d!A Level J!h Date,&. Reviewer:  
                                            /v/A-                                                       Lightmeter W. r/z/53 Evaluation Required?
&!A Date d!A Reviewer:
OYes      EN0 WNEF 8045.03 NE 8045 Original Page 1 of 1
Date 4/,, Bate !/?la/ f, 113 Attached 10 Attached 10 Remote Remote Examination ConditionsEquiprnent Remarks , f Other I' WNEF 8047.06 NE 8047 brlginal Page 1 of 1 r' a Data Sheet No: ZdE- Work Order No.: 3?9 . c 9056 35 Vermont Yankee Procedure NO/REV.: PPI 4&/0 Visual Examination Report Form for General Visual (!WE) Page ot 1 Date: ?//c/o/ t 1 I 4 t Component A ' System: 'zs hL1 d4 Component iD: x- /QO A! 6, c:, $. Drawing NolRev.: <9 w - qi Location:
EK+L/w~/G Su /r- Cfi cd Visual Aids Photo I Sketch Method 1 fa Direct &,A~P+ I 0 Remote marks Remote Examination ConditionslEquipment Remarks WNEF 8047.06 NE 8047 briginal . Page 1 of 1 i n
Data Sheet No: - &Uc 391 I Visual Aids Photo Sketch 3 Binoculars
&None 8 None Vermont Yankee Visual Examination Report Form for General Visual (IWE) Method 0 Direct Nut p**GsQ, Work Order No.: 00-00 5035 Procedure NolRev.: pp 70 2-$ Page f of 1 Date: ?jl~i/ui I Component hmponent ID: %-lo?, System: J c 1/1 \I 3 Mirror 91 Light Source 7 6" Scale 0 Attached CI Attached 1 o Remote Examination location DescriptionlRemarks Remote- Examination ConditionslEquipment Remarks "//t -~ __ %amination Results, Details and Comments:
VVNEF 8047.06 NE 8047 Original Page 1 of 1 a Data Sheet No: Vermont Yankee Visual Examination Report Form for General Visual (IWE) page 1 of t  ate: !hdrh/ Component P WNEF 0047.06 NE 8047 brigha! Page 1 of f 


r Data Sheet No: zuco GLJ- 387 Work Order No.: OU-~S'O~S Visual Aids 3 Binoculars
WNEF 8047.06 NE 8047 Original Page Iof 1 i
%.Mirror Vermont Yankee Procedure NolRev.: @p 76 ;?"? 10 . Page t of I Date: i/ii/d/ t Visual Examination Report Form for General Visual [IWE) Method Photo Sketch 9 None Pp None FDirect GW a t-*b 0 Attached 0 Attached U Remote Component
 
:omponent io: X- J o(P System: 310~ w (. LI Examination Location Description/Remarks afip4.z P*,,*~rJQ;ord
Vermont Yankee                                   Procedure NolRev.: /f    7oaq/b Visual Examination Report Form for General Visual (IWE)                               Page    t  of  I    Date: ~//tLol      r Component Visual Aids                 Photo                       Sketch                       Method Binoculars         ITP None                          @? None             9, Direct   b*&*raC a Mirror            D Attached                        [7 Attached         0 Remote
' Remote Examination Conditions/Equipment Remarks N/A Light Source 0 6" Scale Examiner:
@ LightISource        Examination Location DescriptionlRemarks 1 Remote Examination ConditionsEquipment Remarks VYNEF 8047.06 NE 8047 Original Page 1 of 1
~h Level NA Date *h Reviewer:.
 
*/A Date #/A Reviewer:
Work Order No.: 0 0 - 00 5 0 35 Vermont Yankee                                       Procedure NolRev.: PP  70 a'// O    .
@/A Date iJ/A ANII: Date ldT/*/ I If il WNEF 8047.06 NE 8047 Original Page 1 of I !
Visual Examination Report Form for General Visual (IWE)                                   Page         of   / Date:   I/IG/O /     I I
Work Order No.: 00- 00 50 3s I 0 6" Scale D Other Vermont Yankee Procedure NolRev.: flP 70 3-q /a ' Visual Examination Report Farm for General Visual (IWE) pagelof Date: 1/ic,,& 44 x- 107 1 Component Visual Aids Photo Sketch Method 0 Binoculars None fFNone 9 Direct &*a ~fi C U Attached 0 Attached Remote Examinatian Location Oescr$tion/Remarks Remote' Examination ConditionslEquiprnent Remarks L . VYNEF 8047.06 NE 8047 Original Page 1 of 1 Vermont Yankee I work Order NO.: bU* iL4 /7  DO Visual Examination Report Form VT-1, Containment Surfaces (IWE) ProcedureNoRev.:
Component System:     Tu/Lv  Q Visual Aids     1I              Photo               II      Sketch       I            Method 0 Binoculars               None                             @ None             I@
d& fb6 / kh 1 . Page 1 of 2 Date: 534/ Remote Examination ConditiondEquiprnent Remarks Other (Explain)
1 Direct   &IrFo-C 0 Mirror d)f Light Source           Examination Location DescriptionlRemarks Remote Examination ConditionslEquiprnentRemarks
Exminer: Level: 4 Date: Examiner:
, 0 6" Scale               7'4 A W ' P*wa..hA:6&S                      v4
4 Level: dh Date: Reviewer:
'   5 Other                 k-3         G+kk j Examination Results, Details and Comments:
Date: c/~L/ Reviewer:
VYNEF 8047.06 NE 8047 Original Page 1 of 1
/.I& me: aI/A ANII: H Date: s- Y-01 ': EvaIuation Required?
 
ayes do VYNEF 8045.02 NE 8045 Rev. 1 Page 1 of 1 Vermont Yankee Visual Examination Reference Data Sheet No: Page 2 of Date: fA_/dl/o 1 rr Supplemental Report Form Component Zomponent ZD: )'2064 System: %w.3 f' baminer: ."/R Level: ..fR Date: 4 teviewer:
Data Sheet No: b70 47       I e
44 Date: sydk/ Date: 4k Date: %/ ieviewer:
0     32-Work Order No.:   06 - S O3  7 Vermont Yankee                                      procedure Nomev.:   %f7       40 Visual Examination Report Form for General Visual ([WE)                                   Page - /   of   1   Date: 5/..t/0[
4 VYNEF. 8045.04 NE 8045 Original Page 1 of 1 tpc #I Vermont Yankee Data Sheet No: gocds- 6 0 13 Work Order No.: 00 -a0 46 17400 Procedure NoRev.: Nk "g)oi/F -/ REV0 / Visual Examination Report Form VT-1, Bolting OWE) Page I of 1 Date: S o/ , Bolting Length: 4 % ' " Bolting Diameter: PhotolSketch Method Examination Bolting Components Examined Ihmiaation Level Check dNone EfDirect I3 In Place dolting 0 Washers Visual Aids Intermediate c _____~ ~ - 0 Magnifying GIass Milmination carc~~o.:
t                                                     ComDonent Drawing NOlReV.:   59%-
Y Y8 Intermediate
Visual Aids                     Photo                     Sketch                     Method 0 Binoculars             YNone                               @ None             09 Direct GJ-&
/vA. - 0 Mirror dight Source (Describe):
Mirror                 0 Attached                       10 Attached         10 Remote
&& rcc/w Final 223 /-./e 5h/$ Remote Examination ConditionslLimitations:
                          ~           ~
NA Lightmeter SM: 8/2/53 Evaluation Required?
Light Source                                                  1 Examination Location DescriptioniRemarks Remote Examination ConditionslEquipment Remarks 0 6" Scale Cl Other Examination Results, Details and Comments:
ayes 0%0 1 Examiner:
I Examiner:
Level: .lk Date: &/A ll WNEF 8045.03 NE 8045 Original Page 1 of 1 Vermont Yankee Work Order No.: UU - OU 96 s*.- 0 4 0 Procedure NoRev.: 46 86 95 /e@. 0 / of / Date: S-sno/ page Visual Examination Report Form VT-1, Bolting (rwE) Data Sheet No: go fLs4 c3 1 o/ s" VYNEF 8045.03 NE 8045 Original Page 1 of 1 Vermont Yankee gDataShmNo.zz Work Order No.: dd -dd 94 /P-* CJ 00 ProcedureNo/Rev.:
Examiner:             &&
NE~o 9.5 /pF &/ Visual Examination Report Form VT-1, Bolting (WE) Page / of / Date: 5-3-a 1 II Component CH/JC&-~ /' Drawing NoRev.: 9 -62.o.L Meuu o
Level@,
* Bolting Length: ya" " Bolting Diameter:
Level  A+    3 Date Date 5r/t/o A.&
I I I1 Ph otolSketch Method Examination Bolting Components Examined ntumination Level Check II None Direct 0 In Place M Bolting 0 Washers Attached 0 Remote Removed 0 Bushings Flange Surface __F I Visual Aids Magnifying Glass w Illumination carmo.: @ 0 Mirror Remote Examination Conditionskimitations:
                                                                                        /
1 Light Source (Describe):
Reviewer:                                        Date    <h&
,/=)%dL+~
Reviewer: -                                      Date      @
f # /v/A- Lightmeter W. r/z /53 Evaluation Required?
I ANII:  &gH&                                      Date  d=t?&.
OYes EN0 WNEF 8045.03 NE 8045 Original Page 1 of 1 WNEF 8047.06 NE 8047 Original Page I of 1 i Vermont Yankee Procedure NolRev.: /f 7oaq/b Visual Examination Report Form for General Visual (IWE) Page t of I Date: ~//tLol r Component Visual Aids Photo Sketch Binoculars ITP None @? None a Mirror D Attached [7 Attached Method 9, Direct b*&*raC 0 Remote VYNEF 8047.06 NE 8047 Original Page 1 of 1 : @I Light Source Examination Location DescriptionlRemarks 1 Remote Examination ConditionsEquipment Remarks Work Order No.: 00- 00 50 35 0 Mirror f)d Light Source , 0 6" Scale Procedure NolRev.: PP 70 a'/ /O Page of / Date: I/IG/O / I . Vermont Yankee Visual Examination Report Form for General Visual (IWE) ' 5 Other k-3 G+kk j Examination Results, Details and Comments:
VYNEF 8047.06 NE 8047 Original Page 1 of 1
I Component System: T u/Lv Q Examination Location DescriptionlRemarks 7'4 AW' P*wa..hA:6&S Visual Aids 1 Photo I Sketch I Method Remote Examination ConditionslEquiprnent Remarks v4 I I 1 0 Binoculars None @ None I @ Direct &IrFo-C VYNEF 8047.06 NE 8047 Original Page 1 of 1 e Data Sheet No: b70 47 0 I 32- Work Order No.:
 
* 06 - SO 3 7 A+ Examiner:
INSERVICE DISCREPANCY REPORT (IDR)
&& Level 3 Date .A& Reviewer:
IDR #: lL!,AB Date : 5/2/2002 X-207A -
Date <h& Reviewer: - Date @ ANII: &gH& Date d=t?&. I procedure Nomev.: %f7 40 Vermont Yankee Visual Examination Report Form for General Visual ([WE) Page - / of 1 Date: 5/..t/0[ t ComDonent Drawing NOlReV.: 59%- Visual Aids Photo Sketch Method 0 Binoculars YNone @ None 09 Direct GJ-& Mirror Light Source 0 6" Scale Cl Other 0 Attached 10 Attached 10 Remote ~ ~ Examination Location DescriptioniRemarks 1 Remote Examination ConditionslEquipment Remarks Examination Results, Details and Comments:
I Component:                                Location: Drvwell Performed By:                                     Date:
Examiner:
Disposition/Repair:
Level@, Date 5r/t/o / I VYNEF 8047.06 NE 8047 Original Page 1 of 1 INSERVICE DISCREPANCY REPORT (IDR) IDR #: lL!,AB Date : 5/2/2002 Component:
IS1 Program Coordinator:                         Date :
X-207A - Location:
Repair Effort:
Drvwell I Performed By: Date: Disposition/Repair:
Reference Document:
IS1 Program Coordinator:
Repair Completion D a t e :
Date : Repair Effort: Reference Document:
Service Induced:                   YES  - NO -BY:               Date:
Repair Completion Date: BY: Date: Sample Ekpansion Required:
Sample Ekpansion Required:         YES - NO         BY:       Date:
YES - NO BY: Date: Sample Expansion:
Sample Expansion:
Service Induced: YES - NO - IS1 Program Coordinator:
IS1 Program Coordinator:                         Date :
Date : Reinspection Required:
Reinspection Required:                 YES - NO         BY:
YES - NO BY: Subsequent Inspection Required:
Subsequent Inspection R e q u i r e d : YES - NO         BY:
YES - NO BY: IS1 Supervisor Notified:
IS1 Supervisor Notified:
IS1 Program Coordinator:
IS1 Program Coordinator:                         Date:
Date : Reinspection Completed Satisfactorily:
Reinspection Completed Satisfactorily:
IS1 Supervisor:
IS1 Supervisor:                                   Date:
Date : IDR Closed: ISI Program coordinator:
IDR Closed:
Date : WAPF 4027.01 AP 4027 Rev. 4
ISI Program coordinator:                         Date :
WAPF 4027.01 AP 4027 Rev. 4
* Page I of 1}}
* Page I of 1}}

Latest revision as of 19:10, 13 March 2020

Report for IWE Inspections Performed for RF022, 05/15/2001
ML070680259
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 05/15/2001
From: Connell R
Vermont Yankee
To: Girroir D
- No Known Affiliation, Office of Nuclear Reactor Regulation
References
Download: ML070680259 (324)


Text

.

To: DennisGirroir 5/15/2001 From Ralph Connell Re: Report for TWE Inspections Performed for RF022 (Reference Report for IWE Inspections Performed for WOZl dated 12/02/1999)

XNTRODUCTIOIY:

The objective in the current period for this new IWE inspection program was to gather as much information as we could for W021 and RF022. During RF021 the goal was to perform as many inspections as possible within the acceptable window without causing any interference with other outage work activities. The remahder of the required first period examinations was performed either before or during RF022.

After the IWE examinations performed during RFO 21 the Program Procedure PP7024 was revised to incorporate lessons learned. Some revisions were made to the appendices regarding inspected components and inspection criteria. As a result some of the examinations originally listed for the 1 period were revised and are reflected in the completion schedule included in this report. All required VI-3 examinations were moved to the 3d period as required by the ASME Section XI[ Code 1992/92A.

DISCUSSION:

The ASME Section XI Subsection ][WE Code requires an examination of the coated surfaces in order to determine the condition of the substrate. This examination of coated surfaces is for evidence of flaking, blistering, peeling, discoloration and other signs of distress of the underlying metal. The IWE examinations performed for W021 found only two areas of coating with signs of distress affecting the substrate. Those two areas were located at the drywefl interior moisture barrier and the other was on the drywell surface at the X-5G penetration. Both of these were evaluated by Mechanical Design Engineering and dispositions provided via the IDR process. IWE examinations during W 0 2 2 identified two more areas. These were areas of pitting and corrosion in the vent header and corrosion in the interior of penetrations X-207A-H. Both of these were also evaluated by Mechanical Design Engineering and dispositions provided via the LDR process. At many areas of the containment there is peeling or discoloration. Both of these issues have been previously identified and accepted via the OP5250 inspections.

The Maintenance Department has been perfiiming containment inspections for several years via OP5250 to evaluate the condition of the coatings on containment surfaces.

These inspections have compiled an excellent source of data documenting the conditions of the coatings and how these coatings are maintaining over time. The information provided fkom these reports provides the basis for disposition of issues identified on the IWEreports such as coating peeling and blistering.

Several areas were identified as inaccessible during the RF021 and RF022 IWE examination process. Those inaccessible areas are generally defined in PP7024. More specific information is included with the data supplied in this report.

DETAILS:

TORUS SURFACE The d a c e ffom just below the catwalk on the exterior surface to the horizontal mid point of the toms was inspected prior to IZF022 The remaining torus penetrations were examined prior to W022 and during RF022.

Penetrations X-207A-H were identified as having corrosion exceeding the provided acceptance criteria. IDR 01-08 was written on this item. This was addressed by Design Engineering and a design wall thickness for these penetrations was provided. The X-207A-H penetrations are acceptable for continued use and the corrosion identified does not exceed the required design wall thickness.

Torus penetration (includes penetrations in the vent system) examinations were completed for the first period.

The interior surface of the vent header examination was completed during RF022. There were areas of pitting and corrosion identified in the vent header that exceeded the provided acceptance criteria. IDR 01-07 was written to address the areas of pitting and corrosion Design Engineering addressed this IDR and provided new acceptance criteria for the vent header corrosion identified. All areas a e within the required design wall thickness provided by the Design Engineering resolution and are acceptable for Continued operation.

After review of the data gathered during W021, a portion of the containment surface at the joint seal area was declared as augmented. This area was examined and documented during RF022. No change was identified in the as inspected condition between RF021 and RF022 in the augmented area.

Since the area of the augmented s d c e was being prepared for seal installation and painting the opportunity to exmine this region with white metal exposed and all corrosion removed presented itself The entire circumference in the moisture barrier area was examined and the areas of pitting and pit depths were identified. All pitting

identified by this examination were bounded by the 1999 evaluation, VYM 99/139, and are acceptable for continued operation of the drywell.

Forty-three (43) percent of the required first period drywell penetration examinations were completed during RF021 the remainder was examined either prior to or during RF022. Many of these penetrations depicted debris and peeling paint. The diddebris is not considered to be detrimental to the containment structure. All penetration cavities were dry with no visible indication of moisture. The peeling paint was similar to that identified in the maintenance reports and is not unumal for the age and environmental conditions experienced by the coating.

The dirt/debris identified in the drywell penetration cavities is a housekeeping issue only, not a containment integrity concern. All large debris located in the penetrations examined has been removed. The remaining debris consists ofthe accumulation of dirt, dust and paint chips over the Iife of the plant. The quantity of debris in the penetrations identified is not a containment integrity concern. Most dddebris was lying in the concrete sleeve and not in contact with the penetration. All penetrations examined (except for X-207A-H) were dry with no indication of water. The penetrations typically have a small access and pose difficulty cleaning. The dilemma fiom inside the drywell is the accessibility to the penetrations and the ALARA cqncerns.

The drywell moisture barrier at the concrete floor to steel interface on the 238 level was identified as failed during RF021 examination. During RFO 22 this seal was replaced.

To deal with the paint chipping and corrosion in the seal area and to accommodate the seal installation a six-inch wide band of paint was removed in the seal area for the 111 circumference of the drywell at the 238 level. The seal was reinstalled per minor mod

  1. 2000-010.The six-inch band was re-coated with non-qualified coating. The area ofthe seal and coating was examined after installation to document the as installed condition.

This seal acts as a gasket at the concrete to steel interface to prevent moisture from penetrating under the concrete and to prevent it fkom setting in the interface setting up localized corrosion. This area is an area that regularly gets flooded with water due to the activities that take place during outages in the dry well. This area also is an area that experiences wear and tear at a much higher rate than the rest of the containment due to its location. As a result of the location and outage activities this is an area that requires regular maintenance to keep the moisture barrier seal and the paint in the moisture barrier area intact and properly protecting the steel containment. The logistics of trying to place qualified coating at this location and then set up to regularly maintain it can be difficult as was seen during RF022 not to mention very costly. X recommend that this moisture barrier area and the six-inch band of paint be declared a high maintenance area and designed as an area where unqualified coatings are approved and utilized. This will make the routine maintenance of this area much easier to perform resulting in better

maintenance of this area in the fitlare. If this approach were approved, repahting with qualified coating would not be required only maintenance activity to maintain the integrity of the non-qualified paint and moisture barrier seal. This maintenance should become a routine PM.

PRESSURERETkMNG BOLllNG Bolting examinations for X-200A & B and V16-19-5G& H were completed during W022 in the removed condition. Bolting examinations for V16-19-SA-F was examined in place. This completes the required first period IWEbolting examinations.

An estimated 80% of IWE examinations are completed prior to or during RFO21. The remaining 20% were completed prior to or during RF022 to complete the first period examination requirements.

There were two new IDRs generated, per DP4027, or contahment issues during RF022. All of these issues were addressed by Mechanical Design Engineering prior to RF022 startup.

Please find attached to this report for reference the Summary of First Period IWE Examinations. This repod provides details for the first period examinations.

1/23/1999

SUMMARY

OF FIRST PERIOD WE XAMINATiONS CONTAmhE T SURFACES (TORUS BAYS) ASME SECTION XI EXAM. CATEGORY E-A I

ASME IS1 REMARKS SECTION XI UDENTIFICATION COMPLETE ITEM NO. NO./DESCRIPTION TO DATE I I Intmal surfam above wata line completed RFO 21 EL11 TORUS BAY 1 E x t m l s u r f a excqt

~ area &om catwalk down to belt h e completed Remaking area to be inspeded after S/U RFMl(complaed pre RFO 22)

Gv looV Note: VT-1 completedbelow water line RF020 IrttmnaI surface above water line completed RFO 21 E1.11 TORUS BAY 2 GV 100 % External surface except area from catwalk down to belt limecompleted.

Remainingarea to be inspected after S/U RFMl (completed pre RFO

22) Note: VT-1 completed below water ImeRF020 Internal SUI%= above watpr line completed RFO 21 TORUS BAY 3 GV 100 % Extanal surface except area &om catwalk down to belt line compl+xl R e m a i n i n g i a e a t o b e ~ e d a f t e h S / U ~ l .( c o.m p I ~ p r e R F O 2 2 )

NOQCVT~Icompleted below wata lins RFOZO Internal d a c e above water line completed RFO 21 El.11 TORUS BAY 4 GV 100 Yo E x t a a l surface except area liom &ak down to belt line oonpleted.

Remaking area to be inspected after S/U RFOZl(0ompleted pre RFO 22)

Nate: VT-1 completed below water h e RFOZO Memat surface above water line compl&ed RFO 21 EL11 TORUS BAY 5 GV 100 % External surface except area eom catwalk down to belt b e completed Remaining area to be inspected after s/LT RF02l(completedpie RFO 22)

N&-. VT-1 c o ~ l e t e d below pat= line RF020 h a n a l surface above water line completedRFO 21 TORUS BAY 6 GV 100 % External d a c e except area fiom catwalk down t o belt line completed El.11 Remaining area to be inspeded afla S/U RF<ytl(completed pre RFO 22)

Nde: VT-I wmplezedbelow water lie RFO20 Intimal surface above water line completed RFO 21 El.ll TORUS BAY 7 GV 100 Yo Extmal surface except area fiom catwalk down to belt line completed Remaining area to be inspected S/U RF02l(completedpre RFO 22)

Note:VT-1 complezcd below watcr line RF020 EL11 TORUSBAY8 1 GV 1 100%

haanal M a c e above water line oompl&edRFO 21 External d c e excqqt area fiom catwalk down to belt line complehd RemainingaeatobeinspaiedaftaSIURFO2f(compl&uipreRFO 22)

Note: VT-1 completed below water h e EO20 Intemal sllrface abovewatex line completed RFO 21 TORUS BAY 9 GV 1w Yo Extemal surface except area *om catwalk down to belt line completed EL11 Remaining area to be inspected &er S/U RFO[Zl(oomplBedpre RFO 22)

Note: VT-1 completed below water line FCFO!20 Intimal surface above water line completed RFO 21 TORUS BAY 10 GV 100% Extemal sorface except area &om calk down to belt line completed EL1 1 Reznaining area to be inspeczed ater SiU RFO2l~completedpre RFO 22)

VT-1 c o ~ l e t e dbelow water line RF020 fnternalsurface abovewater line completed RFO 27 TORUS BAY 11 GV 100 % &mal smfilce e x q t area from catwalk down to belt line completed EL11 Remaining areato be inspectedafter S/U RFO2l(oompletedpre WO 22)

Notc VT-I completedbelow water line RF020 Internal surfkce above water line complered RFO 21 TORUS BAY 12 GV 100 Yo Exkana1 &ace except area from catwalk down to belt line completed.

El.1 I Remaining area to be inspected after S/URF(nl(completed pre RFO 22)

EL11 TORUS BAY 13 I I GV 100%

Note: VT-1 completed below water line RF020 htand slafiice above water h e conrpletedRFO 21 External slnface e x q t area fiom catwalk downto belt fine completed Remaining area to be inspected after SIU RFOZl(c0mpleted pre RFO 22)

Not= VT-1 completed below water line RF020 h t d surface above water line completed RFo 21 E1.11 TORUS BAY 14 100 % External surface except area from catwalk down to beltline completed.

Remabiag area to be inspeded aeer S N RFO2l(compleLed pre RFO 2)

Note: VT-1 completedbelow water Ime RF020 Wernal surface above water line completedRFO 21 TORUS BAY 15 100 Yo External except area &om catwalk down to belt line completed EL11 Remaining arcs to be mspccted after S/U RF~l(c0mpletedpre RFO 22)

Note: VT-I compldedbelow water lme RF020

8 Internal surface above water line compld RFO 21 TORUS BAY 16 GV 100 % Memal surfitce except area &om catwalk down to belt line rompleted-Remaining area to be inspeded after SN RFOZl(compl&edpie RFO 22)

Note: VT-1 completedbelow water line RF020 ASME SECTION XI EXAM. CATECX I THE VENT LJNE WAS COMPLJXEDFROM THE INTERNAL El.11 VENT SYSTEM SURFACEFSOZl. TIIEVACUUhIBREAKERLXNESWERE BAY2 COMPLETEDFROMTHEEXTERNALSURFACETOTEfE m m PENETRATION203ELBOW THEN FROM THE WSIDE FROM THE ASSEMBLY, 203 PEhEFRA270N TO THE EJ2OW VERTICAL WELD. THE VACUUM EXTERNAL SURFACE OF THE VENT HEADER AND INTERNAL BREAKERIKNES, AM)EXTERNAL SURFACES OF THE DOWNCOMERS WHERE ANDVENT COMPUTED WOZO.

I-EADER IN BAY 2 THEVENTHEADERINTERIOR,VENTLDEEXi'ERIO%AND AND BAY 3) THE REMAINDER OF THE VACUUM LINE WlLL BE S O U L E D FOR RF022. (completed pre RFO 22)

E1.20 THE VENT LINE WAS COMPLETED FROM THE INTERNAL SURFACE RFOZI. THE VACUUM BREAKER LENES WERE COWLETEDFROMTHEEX'l?5FWALSURFACETOTHE PENETRATION 203 ELBOW THEN FROM THE INSDE FROM THE 203 PENETRATIONTO THE ELBOW VERTICAL WELD. THE EXTERNAL SURFACEOFTHEVENTHEADER ANDINTERNAL AND EXTERNAL DOWNCOMER SURFACES WHERE COMPLETED RFOZO.

THEVENTUNEWAScoMpLETEDJ?ROMTHEt~3ERNAL.

EL1 1 VENT SYSTEM SURFACE RFO21. THE VACUWMBRIEAICERLINESWERE BAY 4 COMPETED FROMTHE EXTERNAL SURFACE TO THE (VENTLINE PENETRATION203 ELBOW THEN FRUM THE INSIDE FROM TIE ASSEMBLY, 203 PEEIETRATlON TO THE ELBOW VERTICAL WELD. THE VACWM EXTERNAL SURFACE OFTIXE VENT HEADER AND IhTERNAL BREAKERLINES, AM, EXTERNAL SURFACES OF THE DOWNCOMERS"RERE ANDVENT COIHPLETEDRFO20.

HEADER INBAY 4 TWE VENT HEADER INTERIOR, VENT LINE EXIERIOR, AND AM)BAY 5 ) THE REEdAINDER OF THE VACUUM LINE WLUBE SCHEDULED FOR RF022.(completed pre RFO 22)

THEVENTLINEWASCOMpI-,ETEDFROMTHJiINTERNAL I 1 SURFACE RF021. THE VACUUMBREAKERLJNES WERE COMPLETEDFROM THE EXTERNAL. SURFACE TO THE PENJXFtATION203 ELBOW THEN =OM THE INSIDE FROM THE 203 PENETRAnoNTO THE ELBOW VERTICAL WELD. THE EXTERNALSURFACE OF THE VENT HEADER AM> INTE,RNAL AM)EXTERNAL SURFACES OF THE DOWNCOMERS WHERE EL11 VENT SYSTEM SURFACE RF02I. THE VACUUM BREAKER tINES WERE BAY 6 COMPLETEDFROMTHEEXTERNAZ,SURFACETOTHE CVENTLINfi PENETRAnoN 203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY, 203 PENETRATION TO THE ELBOW VERTICAL WELD. THE VACUUM EXTERNAL SURFACE OF THE VENTHEADER AND INlZRNAL BREAKER LINES, AND EX7ERNAL SURFACES OF THEDOWNCOMERS WHERE ANDVENT COMF'LETED RFW.

KEADER IN BAY 6 THJSVENT HEADER BTERIOR, VENT LINE EXERIOR, ANI)

AND BAY 7) THE REMAINDER OF THE VACUUMLINE WILL BE SCHEDULED L I FOR RFO22. (completed pre RFO 22)

THEvEESrLINE WASCOMPLETEDFROMTHENIERNAL VENT SYSTEM GV 100% SWACERFOZl. THE VACUU~JIBREAKERLINES WERE BAY 8 COMPLETEDFROMTHEEXTERNALSURFACETOTHE m- PENETRATION 203 ELBOW THEN FROM THEINSIDE FROM THE ASSEMBLY, 203 PENETRATION TO THE ELBOW VERTICAL WELD. THE VACUUM EXTERN'& SURFACE OF THE VENT HEADER AM) INTERNAL BREAKERLMES, ANDExTETwAI,SuRFAcEsOFTHEDoWNcoMERswHERE A M )

m COMPLETED RF020.

HEADER IN BAY 8 THE VENT HEADER INTERIOR,VENT LINE EXTERIOR, AND AM) BAY 9 ) THE REMGIMlER OF THE VACUUM LINE W a L BE SCREDULED FOR RF022.(compldpre WO 22)

THE VENT LINE WAS COMPLETED FROMTHE INIERNAL VENT SYSTEM GV 100% SURFACE RFOZI. THE VACUUM BREAKER LINBS WERE BAY 10 COWLETEDFROM THE EXI'ERNAL SURFACE TO THE (VENTLINE PENETRAnoN 203 ELBOW THEN FRUM TNE INSIDE FRUM THE ASSEMBLY, 203 PESETRATIONTOTHE ELBOW VERTICAL WEU). THE VACUUM EXTERNALSURFACE OF THE VENT HEADER AND INTERNAL BEAKERLDES, AND ExTERNAz,SURFACES OF THE DOWNCOMERS WRERE A M ) VENT coMPLE,mRF020.

HEADER IN BAY THE VENT H E A D E R ~ R I O RVENTLINE ExTFmoxt,AND 10AM)BAY 11) THE REMAfMlER OF THE VACUUM LINE WIU BE SCHEDULED FOR RF022.(copnpleted pre RFO 22)

TlEVENTLINEWASCOMP~TlEDFROMTHE~~~

EI.11 VENT SYSTEM GV 100% SUREACERFO21. THE VACWMBREAKERWNES WERE BAY 12 COMPLETEDFROMTHEEXTERNALSURFACETOTHE m=

ASSEMBLY, PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATIONTO THEELBOW VERTICAL Wms. THE VACUUM EXl'ERN~SURFACEOFTFE'vENTIlEADERANDINTElwAL BREAKERMNES, ANDE~ALSuRFAcEsOFTHEDOWNcoMERSWHERE ANDVENT COMPLETED wmo.

HEADER IN BAY TEVENTHEADERlNTERIORVENT~EXTERIOR,AND 12AND BAY 13) THE FSMAIhDER OF THE VACUUN LINE WELL BE SCHEJXUD FOR RFOZZ (completedpre RFO 22)

THE VENT LINE WAS COMPLJXED FROM TfIE MTERNAL El.ll VENT SYSTEM GV 100% SURFACERFo21. TliE VACUUMBREAKERLINES WERE BAY 14 c0MPL;ETED FROM THE EXERNAL SURFACE TO TRE (VENT- PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMLY, 203 PENFzaAnoN TO THE ELBOW VERTICAL WELD. THE VACWM EXTERNAL SURFACE OF THE VENT HEADER ANI) INTERNAL BREAKER-, AND EXTERNAL SURFACES OF THE DOWNCOMERS WHERE ANDVENT COMPLETED RFOZO.

HEADER IN BAY THE VENT HEADER INTERIOR,VENT LINE EXTERIOR AM) 14 AND BAY 15) THE REMAINDER OF THE VACUUM LINE Wac BE SCHEDULED FOR RFO22(completed pre RFO 22)

THEVENTL.DE WASCOhPLETBDFR0EiATHE:INIWWfi E1.11 VENT SYSTEM GV 100% SURFACE RFO2l. THE VACUUMBREAKERLINESWERE BAY 16 COMPLETED FROM THE EXTERNAL SURFACE TO THE mm- PENETRATION 203 ELBOW TIEN FROM THE INSIDE FROM TIJE ASSEMBLY, 203 PENETRATION TO THE ELBOW VER'MCAL WLD. THE VACUUM EXTERNALSURFACE0FTfIEVENTHEADERAM)INTERNAL BREAKERLJNES, AND EXTERNAL. SURFACES OF "HE DOWNCOMERS WHERE ANDVENT COMFLEm T(F020.

HEADER IN BAY THE VENT HEADER INTEXUOR, VENT LINE EXTERIOR, ANI) 16 AND BAY 1) THE REMAINDER OF THE VACUUM LME WILL BE SCHEDULED FOR RFO22. (completed pre RFO 22) r SURFACES (TORUSPENETRATIONS) ASME SECTION XI EXAM CATEGORY: E-A I I TausPco&ation GV 100% COMPLETEINTERNALANDEXTERNAL X-2OOA & B -

VT-3 100% COMPLETE FROM EXI'EWAL RF021 To~usPmettzdi~n GV 100% COMPETE FROMINTERNALRF02I X-20lA THRU H ExTERNAtTO BE SCHEDULED BEFORE OR DURING RFOZZ(comple4edpre RFO 22)

E1.11 El.ll i

El.ll EL11 I--

EL11 EL11 El.ll El.ll x-212 1

kEL1 1 Torus Peneiration GV 100% COMPETE FROMEXTERNALRFOtl (UMIERWATER)

X-213A & B E1.12 VT-3 1000/0 COMPUTE FROM EXTERNAL FS021 (UNDER WATER)

El.ll Torus P e n d o n GV 1ooO/o COMPL.ETlZFROMINTERNALAM3EXTERNALRF021 X-214 El.ll TorusPenetration GV 100% COMPLETE FROM INTERNAL AND EXTERNALRF021 X-215 El.ll TorusPenetration GV 100% COMPLFXE FROMINTERNAL AND EXERNAT- W021 X-216 1 i Et.11 Torus Penetration GV 100% COMPLETE FROM INTERNAL AND EXTERNAL RFO21 X-217 '

TonrsPene4ration GV 100% COMP~TE FROMINTEFWAL AND EXl'ERNALRFO21 I X-218

Torus Penetrasion GV 100% COUPLETE FROM INTERNAL AND EXTERNAL RF021 X-219 El.11 TorusPenetation GV 100% COMPLETE FROM INTERNAL AND EXTERNAL RFO21 x-220 El.ll TONSPenetration GV 100?/0 COMPLETE FROMINTERNAL AND EXIEKNAL RF021 x-221 E1.II Torus Penetration GV 1W?? COMPUTE FROMINTERNU AND EXIERNALRFO21 X-222 El.ll Tom Penetration GV 100% COWLEXE FROM INTERNAL AM)EXIZKNAL RFO21

~ ~ ~

E1.11 Torus Pen&ation GV 100?/0 COMPLETE FROMEXTE,RNALRF021 X-224A & B II INSULATIONPREVENTING INSPECTION FROM E X ' J X ~ A L ,

INTERNALUNDER WATER. THIS WILL BE RESCHEDULED WHEN DIVERS ARE IN TORUS OR TORUS HAS BEEN DRluNED

' Azx>NG WITH TKEUNDERWATERWAER SURFACES.

El.ll TorusPmetration GV 100% COMPLETE FROMEX'lERNAL RFOZ1 (UNDER WATER)

X-225 EL12 VT-3 100% COMPLETE FROMEXTERNAL.RFO21 o E R WATER)

EL11 Tarus Penetration X-226A & B 100% 1 COMPLETE FROMEXTERNALRFOZl (UNDERWATER)

EL12 VT-3 100% COMPLETE FROMEXTERNALRFO21 (UNDER WATER)

EI.11 TansPendmtion GV 100% COMPLETE FROMEXERNALRF021 (UNDER WATER)

X-227 E1.12 VT-3 100% CQWLETEFROMEXTERNAL.WO2f (UNDER WATER)

E1.ll 100% COMPLETED FROM EXTERIOR RFOX (NOT ACCESSIBLE FROM

~~

INTERIOR)

E1.11 TorusPenarstion GV 1W! COMPUTED FROM EXTERIOR RFO22 (NOTACCESSIBLE FROM X-229 INTERIOR)

ELI1 TorusP~ndration 100VO COMPLETED FROMEXTERIORRFCnl EL11 Torus Pm&ation GV UNDER WATER FROM INTERNAL)

X-231 A-H B,D,F,G & H COMPLETEDFROM EXERNAL. RFOZl CONTAINME JS) ASME SECTION XI EXAh4. CATEGORY: E-A EL11 IOOYO CUMPLETEI)FROMINTERNALRF021 238 to elevath 251 EXTERNALINACCESSIBLEBY DESIGN quadraut 0 to 90 EL22 degrees 100% COMPLETED FROM INTERNALRFO21 EXTERNAL INACCESSIBLEBY DESIGN EL11 ~ryw-~e~evatian 100% COMPLETED FROM INTERN& RFO21 238 to eIevdan 251 EXTERNAL INACCESSIBLEBY DESIGN quadrant 90 to 180 E1.12 &pees 100% COMPLETEDFROMINTERNALRFO21 EXTERNALINACCESSIBLEBY DESIGN El.ll n y W d elwation low?? COMPLETED FROM INTERNAL RF021 238 to elevation251 EXTERNAL INACCESSIBLE BY DESIGN quadrant 180 to 270 degrees

El. 12 VT-3 100% COhdPLETEDFROMINTERNALRFOZl EXTERNAL INACCESSXBLEBY DESIGN El.ll Drywell elevation COMPLETEDFROM INTERNAL RFOZl 238 to elevation 251 EXTERNAL INACCESSIBLEBY DESIGN quadrant 270 to 360 E1.12 CQMPLETEDFROMIN"ERNALRF021 EXTERNALINACCESSIBLEBY DESIGN EI.11 COMPLETED FROMINTERNALRF021 EXTERNALINACCXSSIBLE BY DESIGN E1.12 COMPLETEDFROM INTERNAL WOZl EXTERNAL JNACCESSIBLE BY DESIGN EL11 COMPLETED FROM INTERNAL RF021 EXTERNALINACCESSIBLE BY DESIGN El.ll COMPLETED FROMINTERNALRFOZl EXTERNALINACCESSIBLEBY DESIGN EL11 COMPLETED FROMIN'IENALRFO21 EXTERNALINACCWIJ3L.E BY DESIGN EL11 COh4HZTED FiROMINTERNaRFOZl EXXERNAL. INACCESSIBLEBY DWIGN E1.11 COMPLETED FROMINTERNALRF021 EXTERN& INACCESSIBLEBY DESIGN El.11 COMPLETEDFROM INTERNALRFOZ1 EXTERNALINACCESSIBLEBY DESIGN qua&& 180to 270 EL11 COMPLETED FROM INTERNAL RFOZl EXTERNALINACCESSIBLE BY DESIGN El.11 COMPLETED RFO21 El.11 CONTAINNE! T SURFACES (DRYWELLPENETRATIONS)

El.ll DrywellPemtzitiion GV low? COMPLETED IN"ER5Jfi AND EXTERNAL RF021 x-1 PORTIONS OF THE EXIZRNAL =A ARE INACCESSIBLE FROM DIRECT VISUALEXAMINATIONBY DESIGN EL11 DrywellPenemion GV 100% COMPLETEDINTERNALANDEXTEIWAZ,RF~I x-2 PORTIQNS OF THJ3 EXTERNAL AREA ARE INACCESSIBLE FROM DIRECT VISUAL EXAMINATIONBY DESIGN

EL11 Drywell Penetdon X-4 GV 1 I

1 100% I I

I COMPLETED~RNfiANDEXTERNALRF021 I

I El.ll Drywell PeneIration GV 100% COMPLETEDTNTERNALRFO21 X-5A THRUX-5H EXJTRNAL TO BE COMPLETED BEFORE OR DURING WO22(colnple&ed pre RFO 22)

E1.12 VT-3 COMPLETED FXOMTHEINTEFWAL SURFACE W021 ELI1 GV low0 COMPLETED FROM INTERIOR RFO21 RESCHEDULE EXIERIOR BEFORE OR DURING RFO22(c0mpl&d pre RFO 22)

I I

I I I El.11 GV 100% COMPLETED FROM INTERNAL RF021 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFo22(coqleted RFO 22)

El.11 Drywedl Penetration GV 100% COMPLETED FROM INTERNALRF021 X-7B EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFo22fcompleted RFO 22)

El.ll Drywell Pffletratm GV 100% COMPLETED FROMINTERNAL W 0 2 1 x-7c EXTERNAL TO BE SCHEX)ULED BEFORE OR DURING RFo22(completed RFO 22)

I El.ll Drywell Pendration GV 100% COMPLETED FROMINTERXAL RFO21 X-7D EXTERNAL. TO BE SCHEDULED BEFORE OR DURING RFO22(comp leted RFO 22)

I El.ll Drywell Pen&ation GV 100% COMPLETED FROMXNIERNALRF021 x-8 EXTJ5RNAL TO BE SCHEDUED BEFORE OR DURING RFo2xCompleted pre RFO 22)

E1.12 w-3 100% COMPIETEDFROM~NALRF021 EL11 Drywell Penetration GV 100% COMPLETEDFROM DJTElWAL RFO2l X-9A EL11 DryWeuPenetratim GV 100% COMPLETED FROMINTERNAC RFO2l X-9B EXEFWAL TO BE SCHEDULED BEFORE OR DURING RFo22(completed RFO 22)

El.11 Drywell Penetration GV 100% RESCHEDULE FOR W 0 2 2 (oompleted RFO 22) Extarnal surface x-TO insulated restrictingaaess for GV Exam. N d internal srnfacehas limitedviewfromBdstingvanta~poirrts El.11 Drywell Penetration GV 100% RESCHEDULE FOR RF022 (complaed RFO 22) External d a c e x-11 insulatedrestrictingacceff for GV Exam Normal internal d c e h m limited view fiom &g vantage points El.ll Drywen Penetration GV 100% COMPLETED FROM INTERNAL RF021 (TNACCESSIBBLE AREA x-12 IDENTIFIED)

EXTERNALTO BE SCHEDULED BEFORE OR DURING RFOZ2(completed pre RFO 22)

El.ll Drywell Penei~atioa GV COMPLETEDFROMINTERNALRF021 X-13A RNAt TO BE SCHEDULEDBEFORE OR DURING W 0 2 2 EL11 Drywell Pen&mlion GV COMPLETED FROM INTERNAL RF021 X-13B TOBE SCHEDULEDBEFORE OR DURING RFOZZ Ell1 Drywell Penetration GV x-14 El.ll Drywen ILeoetration GV X-15 EL11 hyweu Pezle.tration GV X-16A El.ll DiywellPenetration GV X-16B El.11 Dlywdl Penetration GV COMPLETED FROMINTEWALRFOZl X-17 RNAL TO BE SCHEDULEDBEFORE OR DURING RF02f E1.11 Drywcn Penetration GV COMPLETED mOM INTERNAL RF021 X-18 AL TO BE SCHEDULEDBEFORE OR DURING W022 El.11 GV 100% COMPLETED FROMlNTERNALRFOZl EXTERNAL TO BE SCHEDULED BEFORE OR DURING W022 (completed RFO 22)

EL11 Drywell Pen&ation GV 1WA COMPLETEDFROMINTERNAL RFo21 x-20 EXTERN& TO BE SCHEDUUD BEFORE OR DURING RFo22(completed pre RFO 22)

EI.ll DryweU Penehatim GV 100% COMPLETED FROM INTERNAL RFO21 x-21 JXTl3RNA.L TO BE SCHEDULEDBEFORE OR DURING RFmz(C0mplekd pre RM 22)

I El.ll Drywell Penetration GV 100% COMPLETED FROMNI'ERNALRRlFOZl x-22 EXTERNACT0 BE SCHEDULEDBEFORE OR DURING RFo22(oompleted pre RM 22)

El. 11 Drywell Pen&itim GV 100% INSULATION PREVENTS ACCESS FOR GVEXAM FROM X-23 lNTERNAL SURFACE.(complded RFO 22)

El.ll DryweU Penetration GV lOoO/o INSULATIONPREVENTS ACCESS FOR GV E X A M FROM X-24 INTERNAL, SURFACE(oompletd RFO 22)

I I

El.ll GV 100% COWLETZD FROM INTERNALRF02 1 EXTERNALTO BE SCHEDULED BEFORE OR DURING RFot2(completed pre RFO 22)

El.ll Drywell Penetration GV 100% COMPLETEDFROkfINTERNALRF021 X-26 EXTERNALTO BE SCIfEDZILEDBEFORE OR DURING RFO22 (complaedpreRFO22)

I E1.12 100% COMPWTED FROM INTERN4.L -021 EI.11 Drjwell Penetration 100% COMPLETED FROM INTERNALRFO21 X-27 EXTERNAL TO BE SCHEIlULeDBEFORE OR DURING RFO22 (cmplered RFO 22)

El.11 Drywell Paletration X-28 I Gv 100% COMPLETED FROM INTERNALRF021 EXTERNALTO BE SCHEDULED BEFORE ORDUIUNGW022 (compleled RFO 22)

E1.11 100% REScIEDULE FOR RFO22 INTERNAL SURFACENOT SAFELY ACCESSIBLX FOR GV EXAMINATTON (completed RFO 22)

El.ll 100% COMPLETED FROM INTERNALRFoILl EXTERNAL TO BE S C E D W D BEFORE OR DURMG R.FO22 pmplaed pre RFO 22)

E1.12 VT-3 100% COMPLETEDFROM MTERNAL RFO21 EL11 DryweUPenetration GV 100% COMPLETEDFROMTNTEPNALRFOZl X-3 1 EXTERNALTO BE SCHEDULEDBEFOF33 OR DURING W022

{cOmpl&ed pre RFO 22)

E1.12 VT-3 lOoO/o COMPLETED FROM INTERNAL RF021 I

E1.11 DrywellPenelratim GV 1000/0 COMPLETED FROM INTERNAL RF021 x-32 EXTERNAL TO BE SCmDULED BEFORE OR DURING RFO22 (compldpre RIO 22)

EL12 100% COMPUTZD FROM INTERNALRF021 El.ll 100% COMPLETED FROMINTERNfiRFO21 J3TERNA.LTO BE SCHEDULED BEFORE OR DURING RF022 (completedpre RFO 22)

I EL11 100% RESCHEDULE FOR RFOZZ (complet& pre RFO 22)

EL11 DryweIlPene(rati0n X-35A I GV 100% COMPLETEDFROMINTERNALANDEXTERNALRmtl THISPENETRATION IS PARTIALLY ACCESSIBLEFOR GV EXAM ELI2 100% COMPLETED FROM INTERNALRFOZI El.ll LLzq-?-

X-35B 100% COMPLETED F?AOMINTERNALAND EXTERNAL RF021 THIS PENETRATIONIS PARTIALLY ACCESSIBLE FOR GV EXAM EL12 100% COMPKEIZD FROM W W A L R F 0 2 1 EL11 100% COMPLETED FROM INTERNAL AND EXTERNAL It3021 x-35c THISPENETRATlON IS P A R ~ ACCESSlBLE ~ Y FOR GV EXAM EL12 I VT-3 100% COMPLETED FROM INTERNALRF021 I

El.11 DryweliPeuetration GV 100% COWU3TED FROM INTERNAL AND EXTERNAZ.W 0 2 1 X-35D THIS PENETRATION IS PARTIALLY ACCESSIBLEFOR GV EXAM I-----

E1.12 / VT-3 100% COMFLETEDFROM~~ALRJ?O21 El.ll 1000/0 COMPLETED FROM INTERNALAND ?LXTERNALRFO21 THIS PEMETRATIONIS PARTIALLY ACCESSIBLE FOR GV EXAM

E1.12 VT 100% COMPLZEDFROMINTERNALRF021 EL11 Drywen Penetratim GV 100% COMPLETED FROM INTERNAL RFOZ1 X-36 EXTERNALTO BE SCHEDULED BEFORE OR DURING RF022 (compIptedpreRFO22)THLS PEmTRATIONIS NOT SAF'ELY ACCESSDBUFOR GV EXAM.

El.ll Drywell Penebatim GV 100% COMI)LETEDFROMINTERNALRFO21 X37A -NAL TO BE SCHEDULED BEFORE OR DURING UO22 (completedpre RFO 22) THIS PENE'IXATIONIS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXIMITY OF PIPESTO EACH OTHER AND THEMINIMAL CLEARANCES BETWEEN THECRD PIPING ANDTHEcowm~s~vEs.

ELI1 GV 100% COMPLETED FROMINTERNALRFOZI EXTERNALTO BE SCHEDULED BEFORE OR DURXNGRF022 (compldpre RFO 22) THIS PENETRATION IS NOT ACCESSIBLE FOR G V EXAM DUE TO PRO'XIMITYOF PIPES TO EACH OTHER AND THE MINIMAL CLEARANCES BETWEEN THE CRD PIPING AM3 THE CONCREIX SLEEVES.

EL11 DIywellPenehation GV 100% COMPLETEDFROM JNEFSAL RFW1 x-37c EXTERNALTO BE SCHEDULED BEFORE OR DURING -022 (complplaedpre RFO 22) THls PENETRATIONIS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXIh4lTY OF PIPES TO EACH OTfIER AND THE MINIMAL CLEARANCES BETWEEN THE CRD PIPING AND THECONCRETE SLEEVES.

EL11 GV 100% COMPLETED FROMINTERNALRFo21 MTERNALTO BE S C m U L E D BEFORE OR DURING RFO22 (coqlBed pre RFO 22) THlS PENETRATION IS NOT ACCESSBIB FOR CrV EXAM DUE TO PROxIMIn OF PIPES TO EACH OTHER AM3 THE MINIMAL CLEARANCES BETWEEN THE CRD PIPING AND THE CONCRETE SLEEVES.

EL11 Drywell Pen&atim GV 100% COMfLETEDFROMINTJBNURF021 X-38A EXTERNAL TO BE SCHEDULED BEFORE OK DURING RF022 (oompl&ed pre RFO 22)THIS PENETRATIONIS NOT ACCESSIBLE FOR QV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AM3 THE MZNIMAL CLEARANCES BETWEEN THE CkUl PIPING ANDTHE CONCRETE SLEEVES.

El.11 Drywell Pelle&tim GV 100% COMF'LETED FROM INTERNAL RFO21 X-38B EXlBFtNAL To BE SCHEDULED BEFORE OR DURING RF022

  • (aornpleted pre RFO 22) THIS PENJXRATXON IS NOT ACWSIBLE FOR GVEXAM DUE TO PROXIMITYOF PIPES TO EACH OTHER AND THE MINIMAC CLEARANCESBETWEEN THE CRD PPlNC3 AND THE CONCRETE SLEEVES.

El.ll Drywell Pen&ation GV 100% COMPLETED FROM MTERNAL RF021 X-38C EXTERNAL TO BE SCHEDULED BEFORE OR DURJNQ W022 (completed pRFO 22) THIS PENETRA~ONIS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER ANDTHEMINIMALCLEARANCESBETWEENTHECRDPIPLNG AND THE CONCRETE SLEEVES E1.11 Dryweu Penetration GV 100% COMPLETED FROM INTERNAL RFO21 X38D EXTERNALTO BE SCHEDULEDBEFORE OKDURING RFOZ2 (completed pre RFO 22) TMS 'PENETRATIONIS NOT ACCESSIBLE FOR G V EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AND THE MINlMAL CLEARANCESBETWEEN THE CRD PIPING AND THE CONCRETE SLEEVES.

El.ll GV 100% COMPLETEDFROM INTERNAL RFO21 EX'ERN,M, TO BE SCKEDUUD BEFORE OK DURING R.F-2 (completed pre RFO 22) THIS PENETRATION'ISINACCESSIBLE FOR GV EXAM OF EXTERNAL,S W A C E S DUE TO INSIXATION

1 1 b

EI .11 DrywellPenctraticn GV 100% COMPETED FROM INTERNALWO21 X-39B EXTERNAL TO BE SCHEDULED BEFORE OR DURING W 0 2 2 (oompletedpre RFO 22)

El.ll COh4PLE7ED FROM INTERN& RF021 EXTERNALTO BE SCHEDULEDBEFORE OR DURING S O 2 2 (completedpre RFO 22) THIS PENETRATIONIS NOT SAFELY ACCESSIBLEFOR GVEXAM OF EXYERNm SURFACE El.11 COMPLETED FROM INTERNAL RFOZI EXERNAL TO BE SCHEDULED BEFORE OR DURING -022 (completedpre RFO 22) THIS PENETRATIONIS NOT SAFELY ACCESSIBLE FOR GV EXAM OF EXEWAL SURFACE E1.11 COMPLETED FROMINTERNAL RFO21 EXTERNAL TO BE SCHEDULEDBEFORE OR DURING W022 (completed pre RFO 22)THIS PENETRATIONIS NOT SAFELY ACCESSIBLE FOR GV EXAM OF EXTE;RNAZ.SURFACE El.11 COMPLETED FROMINIXRNALRFOZl EXTERNALTO 3 E SCHEDULED BEFORE OR DURING RF-2 (coql&edpre RFO 22) T H I S PENETRATIONIS NOT SAFELY ACCESSIBLE FOR GV EXAM OF EXTERNAL SURFACE EL11 DrywellPeneCraticn x-41 1 GV I 100% RESCHEDULE FOR RFO22 (completed RFO 22) THE INTERNAL SURFACEOF T H I S PENETRATIONISNOT S A F n Y ACCESSIBLE FOR GV EXAM EL11 COMPLETED FROMWIERNALRF021 EXTERNAL TO BE SCHEDULED BEFORE OR DURXNG BO22 (completed pre RFO 22)

El.11 DryWelIPenelxation GV 100% COMPLETED FROMINTERNALW 0 2 I x43 EXTERNAL TO BE SCHEDULED BEFORE OR DKJRING RF022 (completed RFO 22) THE EXTERNAL SURFACE OF TAIS PENETRATION IS NOT SAFELY ACCESSIBLEFOR GV EXAM El.ll DrywellPmdration GV 100% COMPLETEDFROM INTERNAcRFO21 X-44 EXTERNAL TO BE SCHEDULED BEFORE OR DURING W O 2 2 (completedRFO 22) THE EX'ERNAL SURFACEOF THIS PENETRATIONIS NOT SAFELY ACCESSIBLEFOR G V EXAM El.ll COMPLETED FROM INTERNAL RFO21 EXTEFWAL. TO BE SCHEDULED BEFOm OR DURING RF022 (completedpreRFO22)

EL11 DrywdlPndraticn GV 1MY0 COmLETED FROMINTERNALRFOZl X-46 EXTERNAL.TO BE S C m U L E D BEFORE OR DURING S o 2 2 (complded RFO 22) THF,EXTERNAL SURFACE OF THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GVEXAM EL11 RESCHEDULE FOR RFO2ltfcompkted RFO 22) TIE INTERNAL SURFACE OF THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV EXAM El.ll COMPLETEDFROMINTEFWALRFO21 EXTERNALTO BE SCHEDULED BEFORE OR DURING RF022 L

(completedpre RFO 22)

EL11 DrywellPendon GV 100% COMPLETEDFROMINTERNALRFO21 x-49 EXTERNAL TO BE SCHEDlJLFD BEFORE OR DURING -022 (completed pre RFO 22)

EL11 COMPLETED FROM mTTERNAL RFO2I EXTERNALTO BE SCHEDULED BEFORE OR DURING RF022 (Completedpre W O 22)

COMPLETEDFROMMTERNALRF021 EXTERNAL TO BE SCIEDLJLl3lBEFORE OR DURING W022 (completed pre RFO 22)

COMPLETED FROM MTERNALRF021 EXlERNAI., TO BE SCHEDULED BEFORE OR DURING RF022 (completedpre RFO 22)

El.ll DryweuPenetratica GV 1MY0 COMPLETED FROM INTERNAL RFO21 (INACCESSIBLE AREA X-100A IDENTIFED)

EXTERNAL TO BE SCHEDULED BEFORE OR D W G RF022 (completedpre RFO 22)

COMPLETED FROM INTERNAL WON (INACCESSIBLE AREA IDENTIFIED)

EXTERNAL TO BE SCHEDULED BEFORE OR DURlNG RFO22 (completedpreRFO 22)

COMPLEETEI, FROM INTERNALWOZ1 (INACCESSIBLE AREA IDENTIFIED)

EXTERNALTO BE SCHEDULED BEFORE OR D U G RFO22

[completed pre RFO 22)

EL11 DryweUPmetration GV 100% COMPLJ373D FROM INTERNAL RFO21 (INACCESSIBLEAREA X-100D D-D)

EXTERNALTO BE SCHEDULED BEFORE OR DURING -022 (oompleted pre RFO 22) -

El.ll DryvpeUPeaetmtion GV 100?? COMPETED FROMWTERNALRF021 (rNACCESSIBLE AREA X-lO1A IDENTIFIED)

EXTJ3RNAL TO 3E SCHEDULED BEFORE OR DURING RFO22 (completed pre RFO 22)

COMPLETEDFROMINTERNAtRF021 (INACCESSIBLEAREA IDENTIFIED)

EXTERNAL TO BE SCHEDULED BEFORE OR DURING -022 (complaed pie RFO 22)

COMPLETED FROMINTERNALRF021 (l.NACCESSIBLEAREA IDENTIFIED)

EXTERNAZ,TO BE SCHEDULED BEFORE OR DURING W022 (completed pre RFO 22)

COMPLETEDFROM INTERNAL WOZ1 (INACCESSIBLE AREA m-D) 1 I 1 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RRXZ (COmpTetedpreRFO 22)

I I I El.ll DrywellPenetration GV 100% COMPLETEDFROM INTERNAL RFO21 (INACCESSIBLE AREA x-102 ID-D)

EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 (completedpre RFO 22)

CO?dPIE'ED FROM INTERNALRFO21 (INACCESSIBLE AREA IDENTIFIED)

EXI'ER.NAL TO BE SCHEDULED BEFORE OR DuRINci RF022 (completedpre RFO 22) EXTERNAL SURFACE OF TIflS PENETRATIONIS NOT ACCESSIBLE FOR EXAMINATIONDUE TO DESIGN COMPLETED FROM INTEKNAL RF021 (INACCESSIBLE AREA IDENTIFIED)

EXTERNALTO BE SCEDULED BEFORE OR DURING RFO22 0

~

El.11 DrywellPenetmiion GV 100% COMpLJ3TED FROM INTERNALRFO21 (INACCESSIBLE AREA X-104B IDENTIFED)

EXTERNALTOBE SCHEDULEDBEFOREORDURINGRFO22 (completed pre RFO 22)

ELI1 DtywellPenetrrdim GV 100% COMPETED FXOMINTEWAL RFO21 (ILNACCESSIBLEAREA X-104c IDrnrn)

EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 (oampleted pre RFO 22)

EL11 DrywellPenetration GV 100% COMPLETED FR0MLN"ERNALRFO;ZI (INACCESSIBLE AREA X-1O5A IDENTIFIED)

EX"ERNAL TO BE SCHEDULED BEFORE OR DURING I(Fo22 (completedpre RFO 22)

El .I 1 Drywen Penataticn GV 1OOVO COMPUTED FROM INTERNAL RF021 (TNACCESSDBLEAREA X-1OSB IDENTIFIED)

FxfERNALTO BE SCHEDULED BEFORE OR DURING W022 (COmplBed prs RFO 22)

EL11 COMPLETED FROM INTERNGLRF021 (INACCESSJELJ?AREA EL11 COh4PETED FROM INTERNAL RFO21 (INACCESSIBLEAREA EL11 El.11 CONTAINMENT SEALS. GASKETS, AND MOISTURE BARRIERS ASME SECTION XI EXAM. CATEGORY: E D I I I E ~ a m Vo REMARKS mmLETE TO DATE DRY WELL I 1 IhSPECTIONCOMftETED RF021 MOIsruRE DISCREPANCIESWERE IDENTIFIED AND DISPOSITION FOR BARRlER THIS lTEM IS WlTH MECHANICALDESIGNENGMERlNG vT-3 loo%

CONTNMENT SURFACESREQUIRING AUGMENTED ASME CLASS MC ASME SECTION XI EXAM:

JXAMINATION CATEGORY- E-C ASME SECTIONXI IS1 Exam  % REMARKS ITEM IDENTIFICATION COMPLET NUMBER NO./DESCRIPTION E TO DATE Drywell I[nterior E4.11 Surfaceatthe VT-1 100% The area jdenrifiedfor augmented exam of the Drywell surface at the Moisture Barrier moishuebarrier interface shaLl be from ccmtainmat plate weldjomt Intdace leiofX-5B to the containmentplate weld joint right ofpenetrrrtionX-I 5E and *om the m a d e metal intRfHce up 1 foot. Complete RFO22

.. .. . . . - . ..._..... ..... . .. . . . .. ... .__ . .... ...... .... .... ..... -. ~.

E4.12 Drywell Interior Volumetric 100% ?heareaidentiiedforaugmented examoftheDrywellsurfaceattbe Su&ce at the moisturebarrier i n t d c e shall be from contp' t plate wdd joint MohBarrier left of X-5B tothe c m t a h e n t plate weldjoiot right ofpenatation X-Interface 5E and fromthe concrete metal interfaceup 1 foot. ConpleteE O2 2 I t I I ASME Is1 Exam  % REMARKS SECTION XI IDENTIFICATION COMPLETE ITEM NO. NO.IDESCRIPTI0N TO DATE 1 IRESCHEDULE FOR RF022 (completedRFO 22)

E8.10 TORUS MANWAY Vl-1 1W/o FLANGE BOLTING PENETRATION 200A - ~

E8.10 TQRUS MANWAY VT-I 100% RESCHEDULE FOR RF022 (complaed RFO 22)

FLANGE BOLTING PENETRATIQN 200B -

E8.10 V16-19-5A-F VT-1 100?/0 E8.10 VT-I 100?40

To: DennisGirroir 12/02/1999 From: Ralph Connell Re: Report for IWE Inspections Performed for W021 INTRODUCTION:

The objective in the current period for this new NVE inspection program was to gather as much information as we could for RF021 and RF022. During RF021 the goal was to perform as many inspections as possible within the acceptable window without causing any interference with other outage work activities. The remainder of the required first period examinations will be scheduled for RFO22. An estimated 80% of the required first period examinations have been completed at the cbmpletion of RF02 1.

DISCUSSION:

The ASlwE Section XI Subsection MTE Code requires an examination of the coated sUTfaCes in order to determine the condition of the substrate. This examination of coated surf'aces is for evidence of flaking, blistering, peeling, discoloration and other signs of distress. The TWE examinations performed for W021 found only two areas of coating with signs of distress affecting the substrate. Those two areas were located at the drywell interior moisture barrier and the other was on the drywell surface at the X-5G penetration. Both of these were evaluated by Mechanical Design Engineering and dispositions provided via the IDR process. At m y iireas of the drywell there is peeling or discoloration. Both of these issues have been previously identified and accepted via the OP5250 inspections.

The Maintenance Department has been peri?o&g containment inspections for several years via OF5250 to evaluate the condition of the coatings on containment surfaces.

These inspections have compiled an excellent source of data documenting the conditions of the coatings and how these coatings are maintaining over time. The information provided from these reports provides the basis for disposition of issues identified on the IWEreports such as coating peeling and blistering. In all cases, except for the two areas specifically identified at the joint seal and the SG-penetration area, the peeling and blistering coating is a condition that applies to the outer epoxy coating. The primer coat remains intact providing acceptable protection of the metal surfaces.

Several areas were identified as inaccessible during the RF021 IWE examhation process. These inspection reports shall be reviewed for detail and validity. After the review the program procedure wilI be revised to recognize the inaccessible areas in the program, PP7024.

There were fiReen examhation reports rejected due to housekeeping concern. One report was a VT-3 for X-206A external surface, eigh for X-207A through H internal

t surface, two for X-9A & B external surface, and four for X-7A through D external surface. All of these examinations shall be rescheduled for inspection before or during RF022 after cleaning. There are also housekeeping issues on a portion of the external torus surface below the catwalk, which also require cleaning and reinspection.

DETAXLS:

TORUS SURFACE The torus inspections covered approximately 94% of the accessible Surface for general visual examination. Underwater locations are considered inaccessible for general visual examination. The Surface %om just below the catwalk on the exterior surface to the horizontal mid point of the torus was not inspected. This surface requires cleaning before it can be properly examined. A work order request has been submitted to perform this cleaning. The remaining 6% of this Surface can be inspected with the plant on line and should be completed prior to W 0 2 2 if cleaning is performed.

The underwater surface areas were completed in RF020 using VT-1 criteria. These inspections were performed prior to the formal development of the IWE program. In order to be conservative, VT-1 examinations were specified in anticipation of this area being classified as Category E-C augmented examination. The review of the torus inspection data generated fiom 1998 revealed that during the twenty-five plus years of operation there were no significant areas of general corrosiodmetal loss identified.

Therefore it may be concluded that the interior surface of the torus is not subject to accelerated corrosion and no augmented examination are required at this time. The IWE program as written reflects this philosophy. This is not to say that the torus will never be classified as Category E-C, but that classification, if necessary, will be the result of finding areas that are subject to accelerated corrosion. The scheduled TWE examinations will provide regular examinations of the torus and that data will be evaluated for applicability to Category E-C. The result of performing VT-1 and UT examinations was that it provided excellent baseline data. The VT-1 examinations performed during RF020 exceed the required IWEVT-3 examinations of the applicable surfaces.

IDR 99-07 provides the disposition for an area on torus bay 4 where metal was removed.

This area on bay 4 appears to be &om original construction and does not violate the minimum required thickness in this area OT the code referenced 10%. This area is acceptable as is. Reference VYM 99/147 for the complete details of this evaluation.

The examinations required for the first period have completions of 80% for the general visual inspections and 100% for the scheduled VT-3 exams. The vent header external surface, downcorners internal and downcomers external surfaces were completed during RF020 inspections using VT-1 examinations. The vent lines were completed during RF021. The exterior of the vent lines outside the torus, the remainder of the vacuum breaker lines external surfaces and the vent header interior surface will be rescheduled for

general visual examination before or during RF022. Tbe remaining 20% of the required first period examinations will be rescheduled for RF022.

IDR 99-06 was generated against nine rejected examination reports for cracks in the attachment clip tack welds that holds the vacuum breaker line bellows cover in place. The cracked welds for the vacuum breaker expansion joint cover attachment clips appeared to be a configuration issue as the cause. Tbe short-term evaluation was basically use as is.

An ER was also written for the issues addressed here, ER 99-1321, and will address the long-term corrective actions for the items identified 'within IDR 99-06. VYM 991145 provides the details of this evaluation.

Torus penetration (includes penetrations in the vent system) examinations completed 90% of the requirements for the first period, The areas remaining 10% of the penetrations to be examined were in the area of the torus requiring cleaning. These penetrations will be cleaned along with the torus surface and inspections should be completed prior to RF022.

RFO21 examinations completed 100% of the accessible drywell surface. The outer surface of the drywell is inaccessible by design except for the drywe11 head, which is accessible from both sides. Except for paint issues which have been previously identified by OP5250 and found acceptable, the only other issues dealing with the containment surfkce is the corrosion identified on the containment surface at the 5G penetration and the corrosion of the containment surface in areas along the joint seal. The joint seal area corrosion is described in more detail under heading Containment Seals, Gaskets, and Moisture Barriers. Tn these two cases the paint was ciacked and peeled. Investigation of these areas identified the corrosion in these areas.

In general, the paint peeling and flaking are the results of loss of paint film adhesion of the outercoat to the primer coat. Typically the primer coating under this peeling and flaking paint is in good condition and is tightly adhered to the base metal. The discoloration are the result of leakage and work activities from past events and work activities except those noted on IDR's for m h e r engineering evaluations. The blistering identified in the coating is most likely the result of gases or liquids within or underneath the paint, which exert pressure greater than the adhesion or cohesion of the paint at the area under stress. If the rate of diffision of the solvent vapor through the paint film is slower than the rate of formation of the vapor, blistering will occur. This would have occurred during the drymg process shortly after the paint was originally applied. It is not unusual to find some ofthis type of condition in this paint system. This condition is a paint issue only and does not affect the base metal.

IDR 99-018 is for corrosion identified on the containment (drywell) surface in the area of the X-5Gpenetration. No signrfcant wall loss is identified for this area. And no further

action is required, Reference VYM 99/139 for the complete details of this evaluation.

This area shall be scheduled for cleanup and repainting during RF022.

DRYFU3.LP.ENTRAnONS Forty-three (43) percent of the required first period drywell penetration examinations were completed during RF021. Many of these penetrations depicted debris and peeling paint in the examination reports. Follow up examinations of these penetrations pefformed by the Project Engineer Responsible Engineer revealed that the debris remaining in the penetrations consisted of an accumulation of dirt and peeled paint fiom approximately twenty-six years of operation. This debris is not considered to be detrimental to the containment structure. All penetration cavities were dry with no visible indication of moisture. The peeling paint was similar to that identified in the maintenance reports and is not unusual for the age and environmental conditions experienced by the coating. The remaining 57% of these penetrations shall be inspected prior to or during RF022.

The debris identified in the drywell penetration cavities is a housekeeping issue only, not a containment integrity concern. Ali large debris located in the penetrations examined have been removed, The remaining debris consists of the accumulation of dirt, dust and paint chips over the life of the plant. The quantity of debris in the penetrations identified is not a containment integrity concern. All penetrations examined were dry with no indication of water. The penetrations typically have a small access and pose difficulty cleaning. The dilemma fiom inside the drywell is the accessibility to the penetrations and the ALARA concerns. A work order request has been originated to dean the external sleeves of the drywell penetrations. During this time we will attempt to develop an acceptable process to perform this task. If an acceptable process can be developed for the extern1 sleeves we will investigate the possibility of cleaning the drywell internal sleeves on a case by case basis.

COhTUiWENT SEALS, GASKETS, AND MOISTURE BARRlElzs The entire drywell interior moisture barrier was inspected to the VT-3 criteria. This examination revealed cracked and peeling paint with arms.of corrosion on the base metal in the seal area. The paint was cracked in the bottom of this area for 360 degrees. This area has an ER and IDR written against it.

There was one rejected report for the drywell interior moisture barrier. This report was the original VT-3 examination of this area. IDR 99-012 was generated against this report for the engineering evaluation. This IDR was evaluated by MechanicaI Design Engineering and found to be adequate as is for structurd concerns. Paint coating and seal repairs should be pedomed at the earliest opportunity. Event Report 99-1594 was Written against this area, The disposition of this ER shall provide the details required to implement the repair. VYM 99/139 provides the details of this evaluation. It is the opinion of this author that the necessary repairs for this area should take place: during

RF022. The responsible department should be identified as early as possible as well as providing the necessary scope of work. The Project Engineering Responsible Engineer shall monitor the progress of this issue and provide regular reports to the Project Engineering Program Supervisor. This area shall be. evaluated for the applicability of Category E-C augmented examination prior to the revision of procedure PP7024.

No bolting was inspected for lWE for RF021. All bolting originally scheduled for RF021 will be review for the possibility of rescheduling to RF022.

SUMMARY

Although we did not complete all IWE first period examinations during RFO21, we did meet our original objective. That objective was to gather information regarding primary containment issues relating to the IWE program and to complete as many examinations as possible without impacting other outage work activities. An estimated 80% of IWE examinations are completed for the first period. The remaining 20% shall be rescheduled for RF022 for examination or reexamination. Some of the areas to be examined will require additional coordination due to cleaning requirements or accessibility requirements to complete the examinations.

There were four new IDRs generated, per DP4027, for containment issues during RF021. All of these issues were addressed by Mechanical Design Engineering prior to RF021 startup.

Please find attached to this report for reference the Summary of First Period IWE Examinations for RF021 and the maintenance 1999 Drywell Inspection Record. These reports provide detail for examinations completed and those required to be rescheduled for RF022 and a summary of the OW250 coating examinations.

1/23/1999

SUMMARY

OF FIRST PERIOD IWI XAMlNATIONSFOR RFO21 BAYS) ASME SECTION XI EXAM.CATEGORY E-A ASME IS1 REMARKS SECTiONXI IDENTIFICATION ITEM NO. NOlDESCRIPTION TO DATE Irbenal d a c e above water line compleed RFO 21 El.11 TORUS BAY I 94 % External surface except area fIom catwalk down to be& line compIeted Remaining area to be deaned and inspected afia S/U RF021 Nose: VT-I. completed below w a t a line RFW Irbbemal surface above water line complded BFO 21 E1.11 TORUS BAY 2 GV 94 Yo Exieand surface except area from catwalk down to belt lie completed.

Remaining areato be d e a d and inspeded after SKI RFo21

~

NCQe:VT-1 completed M o w wata lme RF020 lntaoalsurface above water h e completed RFO 21 E1.11 TORUS BAY 3 GV 94 Yo External surface except area &om catwalk down to belt line compleled Remaining area to be cleaned and inspected after SlIJ IC021 Ncte: VT-1 completed below water line RFO20 Intimal surfice above water line completed RFO 21 EL11 TORUS BAY 4 GV 94 vo External sud5ce except area fiom catwalk down to belt line completed.

Ranaiaing areato be deanedandinspeded afterS/URFO21 Note: VT-1 completedbelow water line RF-0 1

Intanal d a c e above water line coroplded RFO 21 El.ll TORUS BAY 5 94 Yo Extwal &ace except a m Grom catwalk down to belt line complete&

Gv Remaihgareato bedeaned andinspededafbSltTRF021 Note: VT-1 completedbelow wata line RF020 hitanal surface above water h e compldedRFO 21 TORUS BAY 6 GV 194% External surface except area h m adwafkdownto belt line compkkd.

EL11 Remaining area to be cleaned and mspeftedaftex S/U RFOZl N W VT-1 completed below water h e WOZO Intanal surface above wata line completed RFO 21 EI.11 TORUS BAY 7 GV 94 % Extemd surfaaz except area from catwalk down to belt line completed.

Remainingareat0 be cleaned and inspectedaftar S/U RFO21

_ I Nate: VT-1 completed Mow water line RF020 IosanaIsurface above water line completed RFO 21.

TORUS BAY 8 GV 94 Oh ExtemaI surfsce except area &om catwalk downto belt line completed El.ll Remaining- to b e d d and inspected a f b S/U RF021 Note: VT-1 wmpleted below water lme -0 Inteanal surfaceabove water line completed RFO 21 TORUS BAY 9 GV 94 Yo m a l srnface ex+ area from catwalk down to belt line completed EL11 Remammg area to be deaned and inspected after S l U RF021 Note: VT-1 com&ted below water line RF020 Intanalsurface above water line complezedRPO 21 TORUS BAY 10 GV 94 Yo External surface except area &om catwalk downto belt line completed.

EL11 Remaining area to be cleaned and inspected after Snr RFO21 Note VT-1 completed below water line W 0 2 0 Memat smfsce above water line completed E O 21 TORUS BAY 11 GV 94 % External snrface except area from catwalk down to belt line compIeted ELI1 R h h g atea to be dmed and inspected &e S/U RFOZI Note. VT-1 completedbelow w a k line RF020 El.11 1 TORUS i A Y 12 GV 94 %

Mema1s u r k e abovewater line completed RFO 21 E a 6slafa~ except area from catwalk down to bek Line completed.

Remaiaing areato be cleaned and inspected after SAJ RM21 NcQe: VT-1 completed below wster lineRFO20 hternal surfirce above water h e complaed RFO 21 TORUS BAY 13 GV 94 % External surfkce except area &om catwalk down to beIt line wmpleted El.ll Remainiig arm to be cleaned and inspectedd e r S/U RFO21 Nota VT-1completed bdow water lime WOZO brtenal surface above water lme completed RFO 21 EL11 TORUS BAY 14 GV 94 v b ExtemaJ. srtrface except area fiom catwalk down to belt line compl&ed.

Remaining area to be deaned and inspected after SIU RFO2l Nde: VT-I completedbelow water line RF020 Intam1 surface abovewater line completed RFO 21 TORUS BAY 15 J2xtemal suri3ce exapt area from catwalk down to belt line completd El.ll Remaining area to be cleaned and inspected after S/U RF021 I Nute: m-1completed bdow wata line RFOZO

1 El.11 1 TORUSBAY 16 GV 94 %

btanald a c e above water line completed RFO 21 E x t d d a c e except area Eom catwalk down to belt b Remaining mea to be cleaned and i n m after S/W -021 Note: VT-1 completed below water line RF020 ie completed n

ASME SECTI J XI EXAM. CATEGC Y: E-A EL11 VENT SYSTEM CrV 75% SURFACERFMl. THEVACUUMBREAKERXANESWERE BAY 2 COMPLETED FROM THE EXTERNAL SURFACE TO THE (VENTLINE PENETRATION 203 ELBOW THEN FROM THE INSlDE FROM THE ASSEMBLY, 203 PFlyETRATION TO THEELBOW VERTICAL WELD. TEIE VACUUM EXTERNAL SURFACE OFT HE VENT HEADER AND^^

BEAKER L N S , AND EXTERNAL SURFACES OF THE DOWNCOMERS WHERE ANDVENT COMPLETED RFO20.

HEADER M BAY 2 THE VENT HEADER TNTEHOR, VENT LINE EXTERIOR, AND AM)BAY 3) THE REMAINDER OF THE VACUUM LINE WILL BE SCHEDULED FOR RFO22.

El .20 vT3 THE VENT LINE WAS COMPLETED FROM THE INl73WAL 100% SURFACE RF021. THE VACUUM BREAKER LINES !WERE COMPLETED FROM THE EXTERNAL SURFACE TO THE PEhElXATIONZO3 ELBOW THEN FROM THE INSIDEFROM THE 203 PENMTRATION TO THE ELBOW VERTICAL WELD. THE lExTERNAcSURFAcEOFTHEVENTHEAIlERANDINTERNAL AM)EXTEN& DOWN COMER SURFACES WHERE COMPLETEDRFCYZO.

THE VEMT LINE WAS C O M P L E FROMTRE ~ INlZRN&

ELI1 VENT SYSTEM GV 75% SURFACE -021. TRE VACUUM BEAKER LIN3 WERE BAY 4 COMPLETEDFROMTHEEXTERNAL SURFACETOTHE (VENT= PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY, 203 PENETRATION TO THE ELBOW VERTICAL WELD. THE VACUUM EXTERNALSURFACEOFTHEVENTHEADERANDINTERNAL BREAKERLINES, AND EXTERNAL SURFACES OF THE DOWNCOIWRS WHERE ANDVENT corn- RFOZO.

HEADER INBAY 4 THE VENT HEADER INTERIOR,VENT LINE EXTERIOR, AND AND BAY 5 ) THEREMAII\IDEROFTHEVAC~LINEwILLBESCHEDULED FOR RFO22.

THEVENTLINEWASCOh4PLETEDFEOMTHEINTERNAL EL20 YT3 100% SURFACE RF021. THE VACUUM BREAKERLINESWERE COMPLETEDFROMTHE EXTERNAL SURFACE TOTHE PENETRATION203 ELBOW THEN FROM TIE INSIDE FROM THE 203 PENf5TRATIONTO THE ELBOW VERTICAL WELD. THE EXTERNAL. SURFACE OF THE VENT HEADER AND INTERNAt AND EX'ERNAL SURFACES OF THE DOWNCOMERS WHERE COMPLETED RFOU).

THEVENTLINEWASCOMPLETEDFROMTHEINTERNAL VENT SYSTEM GV 75% SURFACE RYO21. THE VACUUM BREAKER LINES WERE BAY 6 COMPLETED FROM THE EXTEFWAL SURFACE TO "HE CVENTLN RENETRAnoN203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY. 203 PENETRATIONTO THE ELBOW VERTICAL WELD. THE VACUUM EXTERNALSURFACEOFTHEVENTHEADERANDINTERNAL BREAKER LINES, AND EXTERNAL SURFACES OF THE DOWNCOMERS WHERE AM, VENT corn- RF020.

HEADER IN BAY 6 THE VENT HEADER INJXRIOR, VENT LXNE EXTERKOR, AND AND BAY 7) THEREMAIMlElz OF THE VACUUM LINE WILL BE SCREDULED FOR RFO22.

THE VENT LINE WAS COMPUTED FROMTHE ETERNAL El.11 VENT SYSTEM GV 75% SURFACERFO21. THEVACUUMBREAKERLINES W E E BAY 8 COMPUTEDFROM THE EXTERNAL SURFACE TO THE (VENTLINE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY, 203 PENETRATIONTO THE ELBOW VERTICAL WELD. TRE VACUUM EXTERNAL.SURFACE OF THE VENT HEADER AM) INTERNAL BREAKERLINES, AND ExTEIENAI,SURFACES OF THE DOWNCOMERS WHERE.

ANDVENT COMPLETED RIFOZO.

HEADER INBAY 8 THE VENT HEADER INTEIUOR, VENT LINE EXTERIOR, AM3 AND BAY 9) THE REMAINDEROF THE VACWM LINE WIUBE SCHEDULED FOR RF022.

THEVENTLXNEWASCOMPLETEDFROMTHEINTERNAL El.ll VENT SYSTEM GV 75% SURFACE R302I. THE VACUUM BREAKER LZNES WERE BAY 10 COMPUTEDFROM THE EXTERNAL SURFACE TO THE CVENTLN PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY, 203 PENETRATION TO THE ELBOW VERTICAL WELD. THE VACUUM EXTERNALSURFACE OF THE VENT HEADER AND INTERNAL BREAKERLINES, ANDEXTERNAL SURFACES OFTHEDOwNcoMmcS WHERE ANDVENT COMPLETED RFu20.

HEADER IN BAY THEVENT HEADER INTERIOR,VENT WNE EXTERIOR, AND 10 ANDBAY 11) THE REMAlNDER OF THE VACUUM LINE WILL BE SCHEDULED FOR RFO22.

THE VENT LINE WAS COMPLETED FROM THE INTERNAL El.11 VENT SYS'IEM GV 75% SURFACE RFO21. THE;VACUUM BREAKER LINES MRE BAY 12 COMPLETED FROM THE EXIEIUVAL SURFACE TO THE (VENTLINE PENETRATION203 ELBOW THEN FROM THE INSIDEFROM THE ASSEMBLY, 203 PENETRAnONTO THE ELBOW VERTICAL WELD. THE VACUUM EXTERNAL, SURFACE OFTHE VENT HEADER AND INTERNAL BREAKERLINES7 AND EXTERNAL SURFACES OF THE DOWNCOMERS WRERE ANDVENT COMPLETED RFOZO.

HEADER X N BAY THE VENT HEADER INTEFUOR, VENT LINE EXTERIOR.AND 12 AND BAY 13) THE RE-= OF THE VACWM LINE WILL BE SCHEDULED

~

FOR RF022.

THEVENTLINEWASCOMPLETEDFROMTHEINTERNAL EI.11 VENT SYSTEM GV SURFACE RFo21. TEE VACUUM BREAKER LMES WERE BAY 14 C0MPL.ETEDFROMTHEEXTERNALSURFACETOTHE m L m PEMETRATION203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY, 203 PENETR4TIONTO THE ELBOW VERTICAL WELD. THE VACWM ExTERNAtSURFACEOFTHEVENTHE;ADERANDINTERNAI, BREAKERLINES, AND JXEWAL.SURFACES OF THE D O W N ~ ~ W R ES R E ANDVENT COMPLETED RFOZO.

HEADER INBAY THE VENT HEADER INTERIOR,VENT LINE EX'ERlOR, AND 14 AM)BAY 15) THEREMAIMlER OF THE VACUUM LINE WILL BE SCHEDULED FOR RF022.

THEVENTLINEWASCOMPLETEDFROMTIAEINTERNAL El.11 VENT SYSTEM GV SURFACE FSO2l. TE VACWMBREAKERLINES WERE BAY 16 COh4PLETJW FROMTHE EXTERNAL SURFACE TO THE CiENTm PENETRATION 203 ELBOW THEN FROM THEINSIDE FROM THE ASSEMBLY, 203 PENETRATiON TO THE ELBOW VERTICAL. WELD. TRE VACUUM EXTERNALSURFACE OF THE VENT HEADER AND IN"ERNAL BREAKERLINES, AND EXTERNAL SURFACES OF THE DOWNCOMERS WHERE AND VENT COMPLETEDRF020.

KEADER IN BAY THEVJ%NTHEADERINTERIOR,VENTL.INEEXIERIO~AND 16ANDBAY 1) THERE~EROFTNEVACUUNIL~WILLBESCHEDULED FOR W022.

CONTAINME )NS) ASME SECTIONXI E X A U CATEGORY: E A EL11 Toms Pendration GV 100% COMPLETElNTERNALANDEXTERNAL X-200A & B El. 12 VT-3 100% COMPLETEFROM EXTERNALRF021 EL11 TorusPenetratiOn GV 50% COMPLETl?,FROMLNTERNALRIO21 X-201ATHRU H EXTERNAL. TO BE SCHEDULEDBEFORE OR DURING RFO22 El.11 To~usPpnehation GV 100% COMPLETE FROMINTERNU AND EXTERNAL RFO21 X-202ATHRU F

EL11 Torus Ppletration GV 100% COMPLETE FROM INTERNAL AM)EXTERNAL RFOZl X-202G THRU K f El.11 T o w Pendration GV 50% COMPLETE FROM INTERNALRFozl X-203A TIlRU F EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22 EL11 TorusPenerration GV 50% COMPLEI'E FROM INTERNALRFO21 X-203G THRU H FX'ERNAL TO BE SCHEDULED BEFORE OR DURING RF022 B1.11 TorusPeaetratim GV 100% COMPLE"EFROMlNTERNALANDEXTERNALRF021 X-205 A & D COMPLETED FROM lNW%!i?AL RFMI (s&C ARE BELOW EL11 TorusPeneet;ldion GV 75% WATER LINE FOR IN"ERN.4.L)

X-206A THRU D 3 & C COMPLETED FROM EXTERNAL RFO21 A & D EXTERNAL RESCHlEDuLE FOR RFOZ2 B & C COMPLETED FROM EXTERNAL RFO21 EL12 VT-3 50% A & D RESCHEDULE FOR W 0 2 2 EL11 Torus Penetration GV 100% OOMPLETE FROMEXTERNALRF02l (UNDERWATER)

X-206ETHRU F 1 E1.12 VT-3 100% COMPLETE FROMEXTERNALRF021 ELI1 TarusPene&atim GV 50% COMPLETEFROMEXTERNALRFOZX X-207A THRU H INERNAL TO BE RESCHEDuL;EI) FOR RFO22 EL11 Torus Paetrrdioa GV 100% COMPUTEFROMINTERN4.LANDEXTERNALRFO21 X-208A THRU D A&DCOMPLETEDFROMATERNALRF021(ggtcAREBELoW El.ll TorusPenetration GV 75% WATERLINEFORINTERNAL)

X-209A THRU D B & C COMPLE"E,D FROM EXTERNAL.W021 A&D RESCHEDULE FORRFO22 El.ll Toms P e n d m GV 100?40 COMPLETE FROM INTERNAL AND EXTERNALRFO21 X-21OA& B EI.11 Torus Penetrrdion GV 100% COMPLETEFROMMTERNALANDExTERNAtRFO21 X-211A & I3 El.ll Torus Penetration GV 100% COMPLETE FROMlNTERNAL ANDExTERNAt RFo21 x-212 El.ll TausPen&at.ion GV 100% COMPLETE FROMEXERNALRFO21 (UNDER WATER)

X-213A& B E1.12 VT-3 1o w 0 COMPLEIE FROMEXTERNALRFO21(UNDER WATER)

E1.11 Tarus Penetration GV 100% COMPLETE FROM R4IZRNAL AND EXTEXNALRFO21 X-214 El.ll TwusPendm GV 100% COMPLETE FROM INTl3RNAL AND EXTERNAL RF0221 X-215 El.ll TorusPenetration GV 100% COMPLETE FROM INTERNAL ANI)EXTERNAL RlW2l X-216 El.ll TorusPenetratiOn GV 100% COMPLETEFROMINTERNALANDEXTE~ALRFo21 X-2 17 EL11 TorusPenebatim GV 100% COMPI.ETEFROMINTERNALANDEXTERNALRFOZ1 X-218 EL11 Torus Pendratim GV 1ooY0 COMPlEF!ZFROMINTERNALANDEXTERNALRF021 X-219 E1.ll Twus Penetraiion GV 100% COMPLETE FROM INTERNAL A M )EXTERNAC RFO21 x-220

El.ll Torus PenetratiOn GV 1Wh COMPLETEFROM INTERNAL AND Ernma RFOzl x-221 El.ll Torus Penemtion GV 100% COMPLETEFROMrNTERNALANDEXTERNALRF021 x-222 El.ll Tarus Penetration GV 100% COMPETE FROMINTERNAL AND EXTERNAL S O 2 1 X-223 El. 11 TorusPenWon GV 100% COMPLETE FROMEXTERNGtRFO21 X-224A & B INSULAATIONPREVEWTIIW INSPECTION FROM EXTEIuIJAt, E1.12 VT-3 0% INTERNALUNDER WATER. NOT COMPLETE AT THIS TIME.

TOBERESCHEDULED. THIS WIUBERESCHEDULEDWHEN DlvERS ARE IN TORUS ALONG WITH THEUNDERWATER SURFACES. RESCHEDULET H I S ACTIVITY.

I El.11 TorusPenetrsrtion GV ' 1000? COMPLETE FROMEX"ERNAJ-.RFOZl(UNDER WATER)

X-225 E1.12 VT-3 100% COMPLJTTE FROMEXTERNaRFO21 (UNDERWATER)

El.ll , TorusPen&ration GV 100% COMPLETE FROMEXTERNALRF021(UNDERWATER)

X-226A & B EL12 VT-3 100% COMPLETEFROMEXTERNAI.WO21(UNDER WATER)

EL1 1 Tons Pen&ation GV 1Oooh COMPLETEFROMEXTERNALRFO21 (UNDER WATER)

X-227 EL12 VT-3 100% COMPLE'E FROMEXl73RNAL~OZI(UNDER WATER)

EL11 Torus Pen&atiw GV 100% COMPLETED FROMEXERIOR RFO21 (NOT ACCESSIBLE FROM X-228 INTIERXOR)

El.ll Torus Penetratioa OV 100% COMPLETED FROMEXTERIORRFOZl(NOT ACCESSIBLE FROM x-229 INTERIOR)

EL11 Torus Penetration GV 100% COMPLETED FROMEXTERIORRF021 x-230 A,C,E, &G COMPLETED FROM INTERIOR -1 (B,D,F &H ARE EL11 T o w Pen&&ion QV 80% UNDER WATERFROMIIWEIWAL)

X-231 A-H B,D,F,G & H COMPLETED FROMEXlEF?NALRFO21 RESCHESDULE A,C, 8t E FOR RF022 I

d SURFACES) ASME SECTION XI EXAM. CATEGORY: E-A El.11 Drywdlevatiw GV 100% CO-D FROMlNIERNALRFOZl 238to e l d o n 251 EXTERNAL INACCESSIBLEBY DESIGN quadrant 0 to 90 EL12 VT-3 100% COMP~DFROMlNTERNALRFO21 E;(cTERNAL INACCESSIBLEBY DESIGN Drywell elevation GV 100% COMPLETED FROM INTE,RNALlZFOZl 238 to e l d m 251 EXTERNALINACCFSSIBLE BY DESIGN quadrant90to 180 EL12 VT-3 1W/o COMPWTED FROMINTEFWAL RF021 I EXTERNALINACCESSIBLE BY DESIGN El.ll DryweU devation GV lW? COh4PL.ETED FROM INTERNAL RF02 1 238to elevation251 EXTERNAI,INACCESSIBLE BY DESIGN B1.12 EL11 180to 270 Drywen elevation 238toelevation251 quadrant 270 to 360 VT-3 GV 1QO%

100%

COMPLEXED FROMIN'ERNNALRFOZl EXERNAL INACCESSIBLEBY DESIGN COMPLETED FROMINTERNALRFOZ1 EXTERNALINACCESSIBLEBY DESIGN dw-I I

EL12 El.11 El.12


t--

~ryweue~evation 251 to elevation 269 quadrant 0to 90 degrees 1 1ooo/a 100%

lW?

COh4PLETED FROM INTERNALRFO2l EXTERNAL INACCESSIBLEBY DESIGN COMPWED FROM INTERNAL-021 EXTEKNALINACCESSIBLEBY DESIGN COMPLETED FROM INTERNAL RF021 EXTERNfi INACCESSIBLEBY DESIGN El.11 1

25 1 to elevation 269 EL11 1M)% COMPLElEDFROMINTERNALRFO21 EXTERNALINACCESSIBLE BY DESIGN E1.11 loOO? COMPLETEL) FROM INTERNALRFO2l EXlXRNAL. INACCESSIBLEBY DESIGN El.ll COMPLETED FROM INTERNALRFO21 JXIERNAT., INACCESSIBLEBY DESIGN I

EL11 COMPLETED PROMINTERNALW02L EXIXRNAL INACCESSIBLEBY DESIGN EL11 COMPLETED FROMINTERNAL RF021 EXTERNAL INACCESSIBE BY DESIGN El.ll lao% COMPLETEDFROMINTERNALRFo2i m R N A L DIACCESSIBLIEBY DESIGN El.ll COMPLETED WOZl El.ll COh4PLEIED NO21 I

CONTAINMENTSURFACES (DRYWELL PENETRAnrONS) I I 1 I 1ooOh COMPLETED@TERNALANDEXTERNALRIF021 x-i PORTIONS OF THEEXTERNAL AREA ARE INACCESSIBLE FROM DIRECT VISUALEXAMINATION BY DESIGN E1.11 DrywellPenetraticm GV 100% COMPLETED INTERNAL AND EXlWX4.L RF021 x-2 PORTIONS OF THE EXTERNAL AREA ARE INACCESS-FROM DIRECT VISUALEXAMMATION BY DESIGN EI.11 DrywellPenetratim GV 100% COMPLGTED INTERNAL AND EXTERNAL RF021 I x-4 I I EL11 I Drywenpenetration X-SATHRU X-5H I GV I500/0 I WMPL&'IEDINTERNAL RF021 EXTERNAL TO BE COMPLETED BEFORE OR DURING PO22

I E1.12 VT-3 COh4PIETEDFROM THE JNERNAL. SURFACE RFO21 E1.11 DrywellPenetration GV 50% COMPUTED FROMINTERIOR RFO21 Xd RESCHEDULEEXTERiOR BEFORE OR DURING RF022 EL12 VT-3 0% RESCHEDULE BEFORE OR DURING RFO22 El.11 DrywellPenetrrdion GV 50% COMP~TEDFROMINTERNALRF021 X-7A EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 RESCHEDULEFORSO22 50% COMPtETED FROM INTERNALRFO21 EXTERNAL TO BE SCWEDULEDBEFORE OR DURING RF022 ELI2 RESCHEDLkE FOR RF022 EL11 x-7c El.11 DrywellPcnetratioO GV 50% COMPLa?TEDFROM INTERNAL RFOZl x-m EXTERNAC TO BE SCHEDULEDBEFOIU?OR DUIUNG RFo22 E1.12 VT-3 0% RESCHEDULE FOR RF022 EL11 DxywellPenehation GV SO% COMPLETEDFROMINERNALRF021 X-8 E1.12 VT-3 100% COMPLETED FROM INTERNAL RFO2l EL11 DrywellPeoetration GV 50% COMPLETED FROM INTERNALRF021 X-9A EXTJ5RNALTO BE SCHEDULED BEFORE OR DG - RF022 E1.12 VT-3 0% RESCHEDULE FOR RFO22 El.11 DryweItPenetrzticm GV 500/0 COMPETED FROM INTERNAL.RFMl X-9B EXTERNALTO BE SCFEDULED BEFORE OR DURING R.FOZ2 E1.12 VT-3 0% RESCHEDULE FOR RF022 El.ll DryweUPene&ation GV 0% RESCHEDULE FOR RFO22 x-10 El.ll DrywdlP+x~dion GV x-11 I El.ll DrywellPenetnrtion GV 50% COMPWIZD FROMINTERNALRF021 (INACCESSIBLE AREA x-12 mw1FIED)

EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 E1.ll 50% COMPLETED FROM INTERNAL RFOZl X-13A EXTERNALTO BE SCHEDULEDBEFORE OR DURING RFO22 EL11 50% COMPLETED FROMINTERNALRF021 X-13B ElLTERNAtToBE SCHEDULED BEFORE OR DURING RF022 EL11 DqwellPdon GV 0% THISPENETRATION IS NOT ACCESSIBLE WITHOUT X-14 SIGNEXCANT EFFORT TO ACCESS. STAGING WOULD HAVE TO BE BUILT. I AM LOOKING AT CLASSIFYING TlIS AS INACCESSIBLE FROM INSIDE. THE EXTERIOR INSPECTION WILL DETERMIBE HOW WE HAVE; TO DEAL WITH THIS PEN.

REVIEW FORRFOZ2 EL11 DrywellPen&ation GV 0% RESCHEDULE FOR RF022 X-15

I El.ll Drywell Pmetratiw GV 0% THIS PENETRATXONISNOT ACCESSIBLE WITHOUT X-16A SIGNIFICANTEFFORT TO ACCESS. STAGING WOULD HAVE TO BE BUILT. THE PEN ALSO HAS INSULATION CONFIGURATION RESTRlCTIONS AND DESIGN RESTRICTIONS. I AM LOOKING AT CLASSIFYING THIS AS WACCESSIBLE FROM INSIDE. TEE EXEMOR INSPECTION WILL DETE- HOW WE HAVE TO DEAL WITH THIS PEN.

REVIEW FOR RF022 El.11 Drywell Penetration GV 0% THIS PENETRATION IS NOT ACCESSIBLE WITHOUT X-16B SIGMFICANTEFFORT TO ACCESS. STAGING WOULD HAVE TO BE BUILT. THlS PEN ALSO HAS INSULATIONCONFIGURATION RESTRICTIONS AND DESIGN RESTRICTIONS. I AM LOOKING AT CLASSIFYINGTHIS AS INACCESSIBLE FROM INSIDE.THE EXTERIOR INSPECTION WIW, DETERMINE HOW WE HAVE TO DEAL WlTH THIS PEN.

REVEWFORRFO22 El.ll GV 50°% COMPLETEDFROM INTERNAL RF021 EXTERNAL TO BE SCHEDULEDBEFORE OR DURING RF022 E1.11 GV 50% COMPLETED FROMXNTERNALRFCnl EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 EL12 VT-3 0% RESCHEDULE FOR RFO22 EL11 Dryweu Pcnetretion GV 50% COh4PLETEDFROM~ALRFO21 x-19 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 EL12 VT-3 REscHlEDuLEFORM022 EL11 Drywell Penetration GV 50% COMPLETED FROM WTIERNAz.RFOZI x-20 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 ELI2 VT-3 EL11 Drywell PmiratiOn GV 50% COWLETED FROMINTERNALRFOZI x-2 1 EXTERNALTO BE SCHEDULEDBEFORE OR DURING RFO22 E1.12 VT-3 o?? RESCHEDULE FORRFO22 El.11 Drywell Penekatim GV 50% COMPLETED FROM DJTJ5RNA.L RFml x-22 EXIERNAL TO BE SCHJ3DULED BEFORE OR DURING RFW E1.12 VT-3 0% RESC-W FOR RF022 El.ll Drywell Peniratim GV OYO REscfxEDuLE FOR RF022 X-23 E1.12 VT-3 0% RESCHEDm FOR a 0 2 2 EL11 DrywelIPeaetration GV Do? RESCHEDULE FOR RF022 X-24 ELI2 VT-3 0% RESCHEDULE FOR W022 EL11 Pmetrsdigl GV 5076 COMPLETED FROMINTERNAL RFOZl X-25 EXTERNAL TO BE SCHEDULEDBEFOE OR DURING RFO22 El.ll Drywell Penetration GV 50% COMPLETED FROM INTERNAL RFOZl X-26 E M - . TO BE SCHEDULEDBEFORE OR DURING RF022 El.12 VT-3 1oOoh COMPI.liXED FROMINTERNALRF021 EL11 DlyWellPeaehation GV 50?? COh4PLETEDFROMINTERNALRFOZl X-27 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFm2 E1.12 VT-3 0% RESCHEDULE FOR W 0 2 2

I 1 I I EL11 ByweUPen&rat.im GV 50% COMPLETED FROMINTERNALRF021 X-28 EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22 El.11 DrywellPenetmtion GV 0% liEsCHEDuLE FORRFOZ!

x-29 El.ll DrywellPenetration GV SOYO COMPLETED F'ROMINTERNALRFOZl X-30 EXTERNAL To BE SCmDULED BEFORE OR DURING RFO22 E1.12 VT-3 100% COMPLETEDFROMINTERNAIRFO21 El.ll 1 ~ e . l l P e n e t d o n GV 50% COMPLETED FROMINTERNAtRFOZl EXTERNAL'IQ BE SCHEDULEDBEFORE OR DURING RF022 EL12 VT-3 100% COMPLETED FROM INTERNAL RFO2l EL11 DrywellPeatkation GV 50% COMPLETED FROMXNTEXNaRF021 X-32 EXTERNALTOBE SCNEDuI;EI> BEFORE OR DURING RMn2 EL12 VT-3 100% COMP@TED FROMINTERh'ALRF021 EL11 DrywellPenettatiOn GV 50% C O M P m D FROMXhTERNALRFO!Zl x-33 ~ A L BEFORE OR DURING E 0 2 2

~ TO BE SCHEDULED El.ll D~~~ollPenetraaioa G V ovo RESCFIEDULEFOR RFO22 x-34 EL12 VT-3 Ooh RESCHEDULEFOR RFOZZ El.ll hywdPeaetratiar GV 50% COMPLETED FROM INTERNALRF021 X-35A EXTERNAL TO BE SCHEDULED BEFORE OR DURMO R R X Z E1.12 VT-3 100% COMPL;ETEDFROMINTEWALRFOZl EL11 DrywdPenetratioo GV 50% COMF'LETED FROMINTERNALRFOZl X-35B EXTERNALTO BE SCHEDULEI) BEFORE OR DURING WO22 E1.12 VT-3 1OO?! COMPLEED FROM INTERNAL RFO21 ELI1 DryweuPaetmtion GV 5Ooh COM?L.!ZTEDFROMINTERNALRFO!Zl x-35c EXTERNALTOBE SCHEDULEDBEFORE OR DURING RFO22 E1.12 VT-3 100% COMPLETED FROM INTERNALRF021 El.ll DryWellPenetrati~n GV 500A COMPUETED FROM INTERNALRFO21 X-35D EXTERNAL TO BE SCHEDULEDBEFOF33 OR DURING RFOZP 1

E1.12 VT-3 100% COMPLETEDFROM TNTERNALRFMl El.11 DryweItPenWon GV 50?h COMP~FROM~RNALRF021 X-3 5E EXTERNALTO BE SCHEDULED BEFORE ORDURINGRFO22 E1.12 VT-3 100% COMF'LE~DFROMINTERNALWO21 EL11 DrywellPeaetration GV ' 50% MIMPEEDFROMINTERNAtRM3al X-36 EXTERNALTO BE SCHEDULED BEFORE OR DURING E 0 2 2 El.11 DrywellPenetration GV 50% COMPLETEDFROM lNTERNALRFO21 X-37A EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 EL11 IhyweUPenetratiOn GV 50% CQMPGTED FROMPJTERNALRF021 x-3% EXTERNALTO BE SCHEDULED BEFORE OR DURING RF022 El.ll IxywdPm&ation GV 50% coMpLEl33D FFtOMrmTERNALRFo21 x-37c EXTERNAL. TO BE SCHEDULEI)BEPORE OR DURING RFOZ2 El.11 DrywellPenetmtion GV 50% W M P W FROM INTERNAL RFO21 x-37D EXERNAL TO BE SCHEDUWED BEFORE OR DURING RFO22

DrywellPealetration GV 50% coMpLElEDFROMINTE~ALRFOZ1 X-38A EXTERNAL TO BE SCHEDULED BEFORE OR DURING W022 Drywell P ~ e t r a t i ~ m GV 50% COMPLETED F R O M I m E R N ~ R F 0 2 1 X-38B EXI'ERNAL TO BE SCHEDULED BEFORE OR D m RF022 El.11 Drywell P e n d m GV 50% COMPLETED FROM INTERNALRFozl X-38C EXTERNAL TO BE SCHEDULEDBEFORE OR DURING RED22 EL11 Drywell PeaQration GV 50% COMPLETED FROM TNTERNAL W 0 2 1 X-38D EXERNAL TO BE SCHEDULED BEFORE OR IlURINGRF022 E1.11 Drywell Penetratian GV 50% C O M p um FROM INTERNALRFOn X-39A EXTERNAL TO BE SCHEDULED BEFORE OR DURING E 0 2 2 EL11 Drywell Penaetration GV 50% COMPLETED FROMINTERNALRF021 x-39B FXERNAL TO BE SCHEDULED BEFOE OR DURING RFO22 ELI1 DIyWdl Penetratioo GV 50% COMPLJXEDFROMEVERNAL E O 2 1 X-40A EXTERNALTO BE SCHliDULED BEFOW OR DURING RF022 El.11 Drywell Pepetrrdion GV 50% COMPLETED FROM INTERNAL RF021 X-4OB EXTERNALTO BE SCHEDULED BEFORE OR DURING WO22 El.ll Drywell Penetratioa GV 50% COMPLETED FROMTNTERNALRFotl x4c EXTERNAL TO BE SCHEDULEDBEFORE OR DURING -2 El.11 Drywell Penemtion GV 50% COMPLETED FROMINTERNALRF021 X4D EXTERNAL TO BE S C H E D W BEFORE OR DURIh'G RFO2Z EL11 DrvFpell Pulc3mtim GV 0% RESCHEDULE FOR -022 X-41 El.ll Drywell Penehtioa GV 50% COA4PLETED FROMIh'TERNALRFOZl X42 33XIERNAL TO BE SCHEDUIXD BEFORE OR DURING RFo22 EL11 Drywell Penetration GV 50% COMPLETEDFROMW~ALRF021 x-43 EXTERNAL TO BE S C - W BEFORE OR DuIuNGRF022 El.11 DrywellPenetratiOo GV 50% COMPETED FROM INTBRNALRF021 X-44 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFOZZ ELI1 Dqweu Peoerratian GV 50% COMPLETEDFROM~AJ..RFOZ1 x45 EXl'EFWAL TO BE SCHEDULED BEFORe OR DURING WOZ2 El.11 GV 500h COMPLETED FROMINTERNAL. RFo21 E)tTERNALTO BE SCHEDULED BEFORE OR DURING RF022 ELI1 Drywen Penettasion GV 0% RESCHEDULEFOR RF022 x47 El.ll Drywell P a l w o n GV 50% COMPLETEDFROMKNTERNALRFo21 X48 FXTERNALTO BE SCHEDULED BEFORE OR DURING RFo22 E1.12 VT-3 0% RESCHEDULE FOR RF022 El.11 Drywell Penetdcn GV 50% COMPLETEDFROM INTERNAL. W021 x49 EXTERNAL TO BE SCHEDUIXD BEFOREOR DURING RF-2 EL11 Drywell Penetratim CrV 50% COMPLETEDFROM~RNALRF02I X-50 EXTERNAL TO BE SCHEDULED BEFOIZE OR DURING WO22 EL11 DryWellPenetration GV 50% COMP~TED FROMINTERNALRF021 X-51 EXTERNAL TO BE SCHEDULEDBEFORE OR DURING RFOZ2 El.ll Drywell Pmetrrdirm GV 50% COMPLETED FROM INTERNAtRFm1 X-52 EXTERNAL TO BE SCHEDULED =FORE OR DURJNG RF022

9 El.11 DrywelI Panetration GV 50% COMPLETED FROMINTERNALRFO21 (INACCESSIBLE AREA X-1 DOA IDENTIFED)

EXERNAL TO BE SCHEDUL;ED BEFORE OR DURING RF022 El.11 Drywelt Penetration GV 50% COMPLETED FROM INTERNAL RF021 (INACCESSIBLE AREA X-1 DOB IDENTIFID')

EXTERNALi.0 BE SCHEDULED BEFOREOR DURING R F ~ Z EL11 iorywell Penetratioa GV 50% COMPLETED FROMINTERNALRFo21 (INACCEWLBI3 AREA X-ZOOC IDENTIFIED)

EXTERNAL TO BE SCHEDULGD BEFORE OR DURING S O 2 2 El.ll GV 50% COMPLETED FR0MINTERhM.L RF02X (INACCESSIBLEAREA IDEN'IIFIED)

~

EXTERNALTO BE SCHEDULED BEFORE OR DURlNG RFO22 El.ll Drywell Penetration GV 50% COMPLETED FROM INTJZNa RFOZl WACCESSIBLE AREA X-101A IDENTIFIED)

EXTERNAL To BE SCHEDULED BEFORE OR DURMG RFO22 EL11 DIywell PenetdGn GV 50% COMPIEIED FlROMINTERNALRF021 (INACCESSIBLEAREA X-lO1B IDENTIFIED)

EX'IERNm TO BE SCHEDULED BEFORE OR DURING RFO22 EL11 Drywell Pgleaatim GV 50% COMPLETED F!LOM INTERNALRF022 (lNACCESSIBLE AREA x-101c m1-EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22 El.ll GV 5OQh COMPLETED FROM INTERNAL.RFO21 (INACCESSIBLE AREA IDENTIFIED)

EXTERNALTO BE SCIEDUJ3D BEFORE OR DURING S a 2 EL11 Dryweu Pmdration GV 50% COMPLETED FROMINTERNALRF021 (INACCESSII3LEAREA x-102 1D-D)

F,XTERNAL, TO BE SCHEDULED BEFORE OR DURING RFo22 El.ll Drywen Pmehtiul GV 50% COMPLETED FROMINTERNALW021 (DIACCCESSIBLE AREA X-103 IDENTXFED)

EXTERNALTOBESCHEDUKED BEFORE ORDURINGRFOZ2 EL11 DrywellPenetratian GV 500h COMPLETED FROM ENTERNAL.RFOZl (INACCESSIBLEAREA X-104A D 1 EXTERNALTO BE SCHEDULED BEFORE OR D W G RFOZ2 El.ll Drywell Penetratim GV 90% CONlpLETED FROM INTERNAL RXO21 (INACCESSIBLE AREA X-1 W B I D r n D )

EXTERNAJ.,TOBE SCHEDUJXDBEFORE OR DURINGWOZZ El.ll GV 50% COMPUTED FROM W R N A L RFozl (XNACCESmW AREA IDENTIFIED)

EXTERNAL TO BE SCHEDULED BEFORE OR DURJNG W 0 2 2 EL11 Drywell Penetration GV COMPUXED FROMm'"ERNALRFO21 (INACCESSIBLEAREA X-105A IDENTIFED)

EXTERNALTO BE SCHEDULED BEFORE ORDURING RFO22 EL11 m a ll Pm&Lation GV COMPLETED FROM INTERNAL RF(n1 (INACCESSBLE AREA X-105B m1-EXTERNAL TO BE SCHEDULED BEFORE OR DUEUNG W022 EL11 Drywen Penetration GV COMPLETED FROM INTERNAL WO21 (INACCESSIBLEAREA X-10.5'2 IDENTIFED)

EXTERNALTOBESCHEDULEDBEFOREORDURINGGRFo22 El.ll Drywell P a r e a n GV COMPLETED FROMTNTERNAt RFO21 (INACCESSlBLE AREA X-105D DDENTIFIED)

EXTERNALTO BE SCHEDULED BEFORE OR DURING RF022

El.11 DrywelIPenetrrdjoo GV 50% COh@mFRoMmRNAL,RFo21 X-106 EXTERNALTO 3E SCHEDULED BEFORE OR DURING RFM2 EL11 DrywellPenetmtion GV 504? COMPLETED FROM INTERNALRFOZI X-107 EX'ERNG I DBE SCHEDULEDBEFORE OR DURING RFO22 ASME ISI Exam % REMARKS SECTIONXI IDENTIFICATION m MP LBTE lTEM NO. NOJDESCRKPTKON TO DATE DRY WELL E530 INTERIOR VT-3 1OOoh INSPECTION COMPLETED RFOZ1 MOISTURE DISCREPANCIES WERE IDENTIFIED AND DISPOSITION FOR BARRIER THIS ITEM IS WlTH MECHANICAL DESIGN E N G m R I N G CONTAINMEWTPRESSURE RETAINING BOLTING ASME SECTIONXI EXAM. CATEGORY E-G

~

ASME Is1 SECTION XI IDENTIFICATION I E M NO. NOJDES~ON E8.10 TORUS W A Y o??

FLANGfi BOLTING PENETRATION 200A E8.10 TORUS MAMVAY o?? RESCHEDULE FOR RFO22 FLm~BOLTMo PENETRATION 200B E8.10 NEUTRON RESCHEDULJ3FORWO22 MO~ORING SYSTEM PEMETRAnoN 35A E8.10 NEUTRON 0%

MONITORKNG SYSTEM PENETRATION 35B E8.10 NEUTRON 0% lU3SCREDUL.EFOR RFO22 MONITORING SYSIXM PENETRATION 35c B.10 NEUTRON 0% RESCHEDULE FOR RFo22 MONITORING SYSTEM PENETRATION (SPARE) 35D E8.10 NEUTRON RESCI-EDULEFOR RF022 MONITORING SYSTEM PENETRATION 35E

Vermont Yankee Visual Examination Report Form Work Order No.: on -5037 VT-1, Containment Surfaces (m)

Page. / of Date: e5-/-CJ/

Component Method Photo Sketch Intermediate &/#

/ .---

&/A IDirect None None Intermediate e# .,

u/A EvaIuation Required?

~ ~ f i oe s VYNEP 8045.02 NE 8045 Rev. 1 Page 1 of 1

Instrument Instrument Make: ?G fi7n ~mr?+r.iL5 Instrument Model: 26 DL Ph3 Instrument SIN: .9,3 293a7 Instrument Dfsplay: CRT ( ) Digital (d Horitonta! Linearity Performed?: Yes ( ) No (/

Calibration Block Serial Number: >/c / - f . -2 Callbration Block Materiak c/c Product Form: Wrn ,,,$+

Block Temperature: 73- OF Thicknesses: -

,360 5.001 ,

M&TE Used?: Yes ( } No (4 M&TE Description [SIN: h!/h Calibration Times Initial Calibration: O%UO Check: 13 OQ Check <@

I Check: N//# Check: /?h Final: 16 3O Sketch and Examination Results:

Data Sheet No.: $US3 -0/-06$/

Procedure No/Rev. N E ~ 0 5 . 3REV +PC *A Page I of .A o a t e :

  • 5 @ 1 Workorder Number. ~-0654,?7-000 Thickness Calibration Data Sheet Drawing NumberlRev.: 6 2 02-2 EEv 0 Plant Location: DfZY UELL 2 3 2 ' e l . d Material: 6ON S T E E L Product Form: trl E O U6 F( 7 Nominal Thickness: 1.O " # 2 , s "

~~

Instrument Instrument Make: PANA M R1<1L's Instrument Model: 2 6 0 L P L 5 Instrument S/N: 9 3 1 2 9387 Instrument Display: CRT ( ) Digitat (4 Horizontal Linearity Performed?: Yes ( } No (v E/C i - F Calibration Block Serial Number: E/C 1-2 Calibration Blodc Material: CAR 8pA S?EC I Product Form: W U 6ti7 Block Temperature: 75 OF mim~sss: o ~ u d 'oI099",

, ima, z.oool~,z s a z ' n , 3,601 M & E Used?: Yes ( ) No (4 M&TEDescription /S/N:

Calibration Times Initial Calibration: 0000 Check: d/A Check: NIA Check: Check: Final: 1OS4 Sketch and Examination Results: E A E  ;

Evaluation Required:

Examiner.. Y MdfK E h?dLJA Level: Date: S- 9-01 t Level: EL Date:$/!/U/ Yes (4 No { )

Reviewer: Date: s'.i~* 0I t Form Number:

I Page t of 1 ANII: . Date: K-fY-! NE 8053 Original LPC#I -

Experience Hours Credit:

c 3

Visual Examination Report Form Work Order No.: 00 .e 37 VT-1, Containment Surfaces @WE)

Procedure No/Rev.: /vE 80 y 5 ,&Ev-1

. Page / of 6 Date: 5 0 /

Cornnonent

racks/L,inears

'hysical Damage

orrosion irosion 3ouges Near Evaluation Required?

VYNEF 8045.02 NE 8045 Rev. I c Page 1 of 1

Vermont Yankee VYNEF. 8045.04 NE 8045 Original Page 1 of 1 LPC # I

Vermont Yankee uaminer: Level: ~4 Date: 4

viewer: Date:

Y

viewer: Nh Date: dh NII: A # Date: e-//-@/

VYNEF 8045.04 NE 8045 Original Page 'I of 1 LPC #I

clu

.d

9 EVALUA?3ON 0.F DATA PROWED BY VT-1, CONTATNMENT SURFACES (rwE)

DATA SHEET No: 804541-019 During RFO 21 TWE examitTatioflsit was discovered that the Joint SeaI at the concrete to steel interfice on the 238 level ofthe containment had failed and there was evidence of corrosion in areas of the seal. As a resalt a portion of the circnmferenceof the seal interface area was declared as augmented. ?he joht seal itself was also scheduled for replacement duringRFO-22.

At the start ofW0-22 the examinersperformed;he reqniredVT-1 examinations of the augmented area at thejoint Seat to detemine ifany changes bad o c c u ~ r e dduring the last operating cycle. The results afthat examinationreveal no changes identifiedin the augmented a n a After the VT-1 examinatomwere cornprete the ptocess began for the joint seal replacement. A band of paint was removed h m the concrete floor up the steel contabment approximately6 wide for the full circumference. The recessed area for the joint seaI was aIs0 cleanedin preparation for the new seal installation. At this point a VT-3 examinationswas performed which identifieda band of pitting that covered much ofthe 3600-Begree circumference. A more detailed VT-1 was ordered by the Responsiie Engineer to detail this area prior to pamt/seaI instdlation.

Thisjoint seal area was identSed as an issue inthe early 1990s. (ER-99-1594deals with the issues from the 1990s resolution). In 1993 the joint seal area was cleaned and painted so as to form a paint joint seal at the mncfete to seal interface. The 2t~easidentifiedduring the RFO-21 examinations were areas that were experiencing evidence of corrosion and paint loss in this pdinteajointarea Some of the paint was still intad and providing adequate protection for the steel it was covering.

The new areas of pitting in the area of the joint seal are as a result of the coating removal to white metal in this area. This atea was not previously identified during RFU-21 because it was an old area of pitting that hadbeencoveredbythe1993 ~ g a n d h a d n o t e ~ ~ c e d a n y ~ e r d Asaresultofthe e~tim coatings being completely removed h m thisjoint area, this VT-1 examination was able to map this region without the impedance of any obmructioa The areas of pitting are isolated to the general area of the joint seal &&ace between the concrete and the steel. The pitting subsides as it move up or down out of thejointseal area. This was evident when a portion ofthe steel smfitce was exposed as a result of the removal of a concrete chip. The under slnface area exposed was approximately 9 wide and 3 deep in a crescent shape. The worst case pitting is isolated to a band in the joint seal areafromapproximately % wick to approximately 1 wide and is clescrii in the report as areas with general wastage and connected pitting All corrosion identifiedwithin this report is bounded by evaluation VYM 99/139.Based on this evaluation all aeas are well within the requmd design base metal t h i c a e s aed are acceptable for continued operation as is.

e phcmell Rewmiblle Engineer May 11,2001

Work Order NO.:^ 00.5037-004 w

Vermont Yankee IPC Procedure NolRev.:&'FS??P7 4b. R Visual Examination Report Form for VT-3 Moisture Barriers, Gaskets and Seals (!WE) Page 1 of 1 Date: ~ - l ~ -

1

~~

Vituat Aids Illumination Level Check Photo/Sketch Other (Describe]:

Evaluation Required?

Yes I No W N E F 8047.08 NE 8047 Original Page 1 of 1

Data Sheet No: 2?H Work Order No.: 60 -0Os037-Vermont Yankee Visual Examination Report Form for VT-3 Procedure NolRev.: AEpdy7&. 0 Other (Describe):

.&*5-%0/

Evaluation Level Date -.fey-#/ Required?

ayes Level rJh Date

@NO Date 3yt4b/ SLC Reviewer: Nh Date 4~

Date

-&:S W N E F 8047.07 NE 8047 Original Page 1 of 'I

Visual Examination Report Form for General Visual (IWE) page / of 1 Date: /?//6./00 Component Y

Examiner: Level Date VYNEF 8047.06 N E 8047 Original Page 1 of 1

VYNEF 8047.06 NE 8047 Original Page 1 of 1

I Work Order No.: 00 0 50 35 Vermont Yankee Procedure NolRev.: d E 90 7/0&:9+&..

Visual Examination Report Form for General Visual (IWE) Page I cf Date: / S / / l ; . / O Q 9 t Component Visual Aids Photo Sketch Method 0 Binoculars "bne IZHJone 6 e c t Q Mirror

-0 Attached 10 Attached 1 u Remote

&ght Source Examination location 0escriptj.on~Remarks Remote Examination ConditionslEquipment Remarks 0 6" Scale &&id&d IS f i Gitaj~Ik

~

f ..

I Examiner:

Reviewer:

Level Date Date Reviewer:

- Date /uh?/ZL ANII: Date to-t?d i

VYNEF 8047.b6 NE 8047 Originat Page 1 of 7

t Data Sheet No: m6-Vermont Yankee Work Order No.: . 00 - 0 SO 35 Procedure NoiRev.: go 7/on;9..'pc Visual Examination Report Form for General Visual (IWE) Page / of 1 Date: /#//6/00 -1 Component 3rawing NolRev.: a&4z

  • 473 Location:

Visuat Aids 1 Photo I Sketch I Method 3 Binoculars @%one mane d e c t 3 Mirror D Attached 0 Attached Remote k g h t Source Examination Location OescriptionlRemarks Remote Examination Conditions/Equipmcnt Remarks 0 6" Scale k%W;dqS;d is E&MClfr3~lk do& f~ lsCt+X;d,~04 &/A Examiner: Level Date Reviewe r : .Date VYNEF 8047.06 NE 8047 Original Page 1 of 1

r Data Sheet No: T d 6 - & - 3 <7 Vermont Yankee Visual Examination Report Form for Genera! Visual (IWE) v Visual Aids Photo Skerch Method 3 Binoculars d & I * &ne Bz6jrect tl Mirror d g h t Source Examination Location Description/Remarks Remote Exbmination ConditionslEquipment Remarks 0 6" Scale &jr+ut+w -% Z4L 0 c N/ A Examination Results, Details and Comments:

Examiner: Level Date Reviewer: Date Date $/?&

/

Date i 0 -pd I

VYNEF 8047.06 NE 8047 Oilginat Page 1 of 7

Vermont Yankee Procedure NolRev.: 8b f7/6&i~kd Visual Examination Report Form for General Visual {!WE) Page f of / Date: /O/J&/dO .I U

Visual Aids Photo Sketch Method El Binoculars UiTone GYIGne d r e c t 0 Mirror 0 Attached 0 Attached 0 Remote d g h t Source Examination Location DescriptionlRemarks Remote Exemination ConditionslEquiprnenr Remarks 4

Ci 6" Scale 0 Other .

&#%L,\LIT P LA C k 6&

dun?%

J x 8

231 A&, +E j vi, Examiner: Level Date Reviewer: Date Date /i&/a Date /D-("?d V

M N E F 8047 .Q 6 NE 8047 Original Page 1 of 1

t Data Sheet No: sdc- 35?

Work Order No.: 00 0 SObS Vermont Yankee Procedure NolRev.: -l Visual Examination Report Form for General Visual (IWE) Page I of f Date: /O//G/BQ ./

-~ -~ - v Visual Aids 1 Photo I Sketch I Method D Mirror a Attached 10 Attached D Remote d g h t Source Examination Location DescriptionlRemarks Remote Examination CanditionslEquiprnent Remarks 0 6" Scale SjhdL, '%Zl;*c, 8 4 mJ.4 Examiner: Level Date VYNEF 8047.06 NE 8047 Original Page 1 of 1

Visual Examination Report Form Work Order No.: 00 - 005 b 35%0 ProcedureNoRev.: NE @ q 5 VT-1, Bolting (IWE) Page I of 1 Date: q./?*oI Examiner: - Level:= Date: 1 0 Yes Examiner: Level: +Date: rJ I&

Reviewer: Date: 4/(h/

Reviewer:

VYNEF 8045.03 NE 8045 Original Page 1 of 1

-- 0. 1 I

d Vermont Yankee I DataSheetNo:

Work Order No.:

Bj693 Ob - 0056 35-00 e

oz.

Visual Examination Report Form ProcedureNoRev.: NE wc 1 5 VT-1, Bolting o[wlE)

Page 1 of f Date: r/*/9*0t 11 Component I

/DrawingNoRev.: 4 -19 If7 5

[ I

.t

--pDp.

g163 t

BoltingLength: H/A II

" Bolting Diameter: EJ/A "

~ PhotolSketch Method Examination f Bolting Components Examined Illumination Level Check d o n e 4 direct 6 Place 1 dolting 0 Washers Date 0 Attached 1 0 Remote 1 0 Removed Bushings 0 Flange Surface Initial 12:to 44cia Visual Aids Intermediate d/A ~~ IJ/p CI Magnifying Glass d u n i n a t i o n c a r ~ o . :J q -5 Intermediate &/A NA n*ICilrror Final r3:45 344-or LightmeterS/N: ~ 5 % SO^

Cracks/Linears Corrosion Erosion

\

Evidence of Leakage Other(Exdain) 13/A @/A 4 #

Examiner: Level:= Date: q*19 0(

0 Yes Examiner: Level: r-Jh nata.

Reviewer: Date: #/&A/

VYNEF 8045.03 NE 8045 Original Page 1 of 1

Vermont Yankee Data Sheet No: (-' J 16- I 4- 5 r,) @%r-o/-a3 Visual Examination Report Form Work Order No.: Ob - 00 56 35-00 ProcedureNoflRev.: AJ& mu5 VT-1, Bolting (rwE)

Page f of I Date: 4 19 *dI Visual Aids Magnifying Glass Mumination carmo.: J +5 d r o r l d i g h t Source (Describe): P E U m 0&I-n- CondiGonsLimihtions:

I RemarkslObservations LoosefMissing 4 &/A Thread Engagement /

Thread Damage J \

Galling J \

Coating Degradation r/ I I

Benflwisted J t I I Physicai Damage r/ I I I Fractured Parts / I J I

'Gouges J Cracksninean J I /

I Corrosion / 1 t 1 Erosion / I lwear < \ n IEvidence of Leakage 4 4 4

Examiner: Level: E Date: 'f r q ' 0\

0 Yes Examiner: Level!&

' Date: JfA Reviewer: &

/& & Date: +h$h/

Reviewer: Date:

Date: /*v4/

VYNEF 8045.03 NE 8045 Original Page 1 of 1

1 Vermont Yankee I Data Sheet No: &qaP-@l

- aJ I I Work Order No.: 00 00 56 35-00 Visual Examination Report Form ProcedureNoRev.: NE 80q5 VT-1, Bolting @WE)

Page i of I Date: L/./?*di -

Component

, I Corrosion 4 f I I 1 Erosion / I L

W&X d \

Evidence of Leakaee Other (Explain) @/A /- I Y Examiner: Level: *Date: 3

  • 14 0t Examiner: Level: + Date: SI*

a Yes Reviewer. Date: 'Il/t~[d~

I[ Reviewer: Date:

VYNEF 8045.03 NE 8045 Original Page 1 of 7

r, Vermont Yankee Data Sheet No: 8@r/*/L 01- QLT Visual Examination Report Form Work Order No.: 00 - 00 5035-00 ProcedureNoRev.: 8645 VT-1, Bolting @WE) Page of f Date: +/%O I Cornpon ent Component m: J Ib c SE System: PCAC It PhotolSketch I Method I Examination I BoIting CornDonenis Examined 1 Illumination Level Check 1)tJ Attached 0 Remote 0 Removed Bushings Flange Surface Visual Aids 'Intermediate d/A d/A 0 Magnifying Glass d u n i n a t i o n card/~o.: J-S Intermediate d/! d b 6 m 0 r d i g h t Source (Describe}: P E u w u 6# Final 13:6 a*CCt*O(

Remote Examination ConditlonCimitations:

LightmeterSM A 5 9 3 SOJ CaLDueDate: 4.f3 Coating Degradation I Corrosion I Erosion *f I Wear J: \ \

Evidence of Leakage e

a Yes WNEF 8045.03 NE 8045 Original Page 1 of 1

Vermont Yankee Data SheetNo: -5 -W- Ob Drawing No/Rev.: 4 -19 It?< a. I e163 BoltingLength H/fi Bolting Diameter: I PhotolSketch Method Examination BoIting Components Examined I. .-Illumination rp*

&&*-*;?*3;9r-B. n Level Check -c d o n e drect dplace dolting CI Washers $$$@&&E&: Time Date 0 Attached Q Remote Removed Bushings 0 Flange Surface Initial Visual Aids 0 Magnifying Glass mumination carno.: \IJ-5 Intermediate I NA I

&m*r d i g h t Source (Describe): P c u w u &T -. ~.

Final Remote Examhation Conditiodimitations:

Lightmeterm: ~ 5 9 a3 ~ q RemarkslObservations LooseiMissing rl @/A d A Thread Engagement /

Thread Damage J Galling J \

Coatipg Degradation r, I BentKwisted J I I Physical Damage c, I I 1 Fractured Parts / I / 1 Gouges .J Cmkfiinears J Corrosion / I I f Erosion I/ I I J \

+

Wear n I Evidence of Leakage Yes VYNEF 8045.03 NE 8045 Original Page 1 of 1

I Vermont Yankee Data Sheet No:

I Work Order No.: 40 uu +.,/or-00 u Visual Examination Report Form Procedure No/Rev.: A/& '?5 /

VT-1, Bolting (IWE)

Page / of / Date: 5-7-c3/

1 Drawing NoRev.:

PhotoolSketch

%d20A I

Method I

Examination I

B g g & ? ? e ;

Bolting ComponentsExamined U

I

" Bolting Diameter:

Illumination Level Check None E Direct II In PIace Rl Bolting 17 Washers Date I I I

[ydiat~~~t~~~,

Attached Remote 1 1Removed 1 0 Bushings Visual Aids Intermediate x -

0 Magnifying Glass Illumination CardNo..

$I Mirror L .

E Light Source (Describe): F39s&/9&f Final&g7 Remote Examination Conditionfimitations: t Lightmeter SFN: ~/2/53 Cal. Due Date: &#/y4d OYes PNo VYNEF 8045.03 NE 8045 Original Page 1 of 1

Vermont Yankee Work Order No.: B O - 0 0 y/@?-o0 0 Visual Examination Report Form VT-1, Bolting OWE)

Procedm NoRev.: ?5 &. /

Page / of / Date: ,$-q-o/

_c Component Component ID:,&lie vz -/P - 54 System:s ; pa *s IReviewer:

Reviewer: 4 Date:

ANII: w p 2 f & g & d Date: &-J-- e !

WNEF 8045.03 NE 8045 Original Page 1 of 1

I Data Sheet No: 6J - 390 Work Order No.: 0 0 - 00 5 6 35 Vermont ~ i n k e e Procedure No1Rev.Z PP 7bs .//c> .

Visual Examination R e ~ o r tForm for General Visual-(IWE) Page I of Date: '//L/aI /

Component Zomponent ID:- System: T o n u c, Irawing No/Rev.: & L. 0 Location:_Fule c :ur Sur.Cpee,<

Visual Aids Photo Sketch 1 Method p Binoculars B None lj3 None &) Direct &&a+&

7 Mirror 0 Attached 0 Attached a Remote El Light Source Examination Location Description/Remarks Remote Examination ConditionslEquipment Remarks 3 6" Scale ixamination Results, Details and Comments:

VYNEF 8047.06 NE 8047 Original Page '1 of 1 i

i Data Sheet NO: 4?-ar - 031 Work Order No.: 00 - 3'7 Vermont Yankee Procedure NolRev,: bOJ7 40 .

Visual Examination Report Form for General Visual (!WE) Page of 9 Date: <Ifb / I Visual Aids Photo I Sketch

@ Direct Method

&&4 0 Binoculars None None 8pcrg.s 3 Mirror 0 Attached fl Attached 0 Remote

$ light Source Examination Location Descriptionmemarks Remote Examjnation ConditianslEguipment Remarks 6" Scale z*+rPlOr bJp Ffie cc c, 4 Other V&* CCladler EJ/p Reviewer: - /vfl Date VYNEF 8047.06 NE 8047 OAginal Page 1 of 1 i

rs

INSERVICE DISCREPANCY REPORT (IDR)

IDR #: Jm Date: 5/2/ZOOl, Component:.-Y Location: D w e l l Performed By: Date :

Disposition/Repair:

ISI Program Coordinator: Date:

Repair Ef f o r t ;

Reference Document:

Repair Completion Date:

Service Induced: YES - NO BY: Date: ~-

Sample Pxpansion Required: YES -. NO BY: - Date: ,-

Sample Expansion:

IS1 Program Coordinator: Date :

Reinspection Required: YES NO -BY :

Subsequent Inspection Required: YES - NO -BY :

IS1 Supervisor Notified:

IS1 Program Coordinator: Date:

. Reinspection Completed Satisfactorily:

IS1 Supervisor : Date:

IDR Closed:

I S 1 Program Coordinator: Date :

VYAPF 4027.01 AP 4027 Rev. 4

  • Page 1 of 1

I Datasheet No: -6v- 360 Work Order No.: 0 0 - 00 56 5s ~~

Vermont Yankee Procedure NolRav.: @ 7024 /O Visual Examination Report Form for General Visual {IWE) Page i of / Date: !/l&,/O) t 3 Mirror 0 Attached 0 Attached 0 Remote C tight Swrce Examhation Location Desm*ption/Remarks Remote Examination ConditianslEquipment Remarks D 6* Scale Reuiewer:. , Date #/A WNEF 8047.06 NE 8047 Originat Page 1 of 1  :

Vermont Yankee Procedure NolRev.: 0 I

Visual Examination General Visual (IWE)Form for Report Page / of Date: f/3o/i /

Component Component ID: -X- 7 4 +eL, 1 / e75 systm: Q wd Drawing NotRev.: 3 9 t b - v/ iocation:, &+y 7Q%w 1 photo Sketch Method Visual Aids p None $!p None f!!f Direct 6 4 4 a Binoculars U Mirror 0 Attached 0 Attached U Remote tight Source &amination LWatian Description/Rema&s Remote Examination CooditionslEquipment Remarks 0 6" Scale &+t,-,(k~IIda~ gKkrwYI 4 4 Examiner: Level Examiner: Level Reviewer: Date Y 4.h Reviewer: Date VYNEF 8047.06 NE 8047 Original Page 1 of 1

Vermont Yankee Procedure NolRev.: PP 7QJ-9/0 .

Visual Examination Report Form for General Visual (IWE) Page / of Date: f / J C /df I Component Component ID: x- 8 System: bhv cM Visual Aids Phbto Sketch Method El Binoculars @ None B None @ Direct &rJ +a+&

0 Mirror 0 Attached 0 Attached U Remote

/2U Light Source Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks L7 6 Scale aaad, U. U t a - NtR 0 Other

~- ~-

x - f3 ~

Examination Results, Details and Comments:

Examiner: &/A Level .I/A Date d.4 Reviewer: d3/A Date d/A Reviewer: #!A Date A)/A VYNEF 8097.06 NE 8047 Original Page 1 of 1

Data Sheet No: -

%0q7 - o( 043 Wark Order No.: 00 - 5 0 3&

Vermont Yankee Procedure NolRev.: 86 d7 40 Visual Examination Report Form for General Visual (IWE) Page I of. 1 Date: "/3&/OI Examiner: dl4 Level >I! Date Al/P.

Reviewer: Date Y

Reviewer: /v/A Date N/A W N E F 8047.46 NE 8047 Original Page 1 of 1

Vermont Yankee Procedure Nomev.: bo f? RO Visual Examination Report Form for General Visual (IWE) Page / of 1 Date: &&/

-~

Component Component ID: x- lo System: 3 ~c3r 4 L4 Drawing NolRev.: s i30 ci// Location: A~J 4&/ L Visual Aids Photo Sketch Method 0 Binoculars None Bp None # Direct &d 0 Mirror Q Attached 0 Attached 13 Remote Examiner:

Examiner:

Level Level a*4 Date Date V~&I

.r/A .

Reviewer:4 Y

D D a t e fioA/

Reviewer: MfA Date v2 VYNEF 8047.06 NE 8047 Original Page 1 of 1

Work Order No.:- QO 503b Vermont Yankee Procedure NolRev.: go47 R 0 Visual Examination Report Form for General Visual (IWE) Page / of 1 Date: %?k?/C3[

Component x- I (

I Component ID: System:-

I Light Source W N S 8047.0.6 NE 8047 Original Page 1 of 1

I Vermont Yankee Work Order No.: Q O - @ 50 3's Procedure NolRev.: PP 7 6 24 g/D Visual Examination Report Form for General Visual (IWE) Page of 1 Date: !h~ci/4j Component Visual Aids Photo Sketch Method Cl BinocuIars 9 None $9 None @ Direct 0~~~ Q.

0 Mirror Light Source Examination Location Description/Remarks Remote' Examination ConditionslEquipment Remarks I

I 0 6' Scale aI.4

' 0 Other 1 x- l')c I 1 Examination Results, Details and Comments:

Examiner: d/la Reviewer: r//A Date 41 Reviewer: - 44 Date Nh ANI!: Date //?!*(

1' VYNEF 8047.06 NE 8047 On'giflal Page 1 of 1 \

Data Sheet No: 6- GU- f g t Vermont Yankee Procedure NolRev.: f?y76 2 y / o Visual xamination Report Form for 8 General Visual (IWE) Page of / Date:  :/l-c/ot J Component Component ID: -

X 13 A 4-13 System: bA A d *rJC Xe&4,i>

&L-L 0 Mirror VYNEF 8067.06 NE 8047 Original Page 1 of 1

e Data Sheet No: go L/7 - 0 I -Dfco Work Order No.: 00 50 37 Vermont Yankee Procedure Nomev.: 047 R o Visual Examination Report Form for General Visual (IWE) Page i of ( Date: j///d/

Component

omponent ID: -x* / 4 System:

3rawing NolRev.:

Photo Sketch Method 7 Binoculars W None None p00irect &&-&

3 Mirror f 3 Attached 0 Attached f3 Remote p Light Source Examination Locetion Description/Remarks 1 Remote Examination ConditiondEquipment Remarks 7 6" Scale I] Other 0

Saminer: Level Dats M N E F 8047.Q6 NE 8047 Originat Page 1 of 1

Vermont Yankee Procedure NolRev.: gOV7 k o Visual Examination Report Form for General Visual (IWE) Page of I Date: ~/</oJ I Component

omponent 10: -x- /5 System: 3rc4 d c t x Irawing NolRev.: P 4/ Location:

I U Visual Aids Photo Sketch Method 3 Binoculars None None Direct 6 - 4 3 Mirror U Attached I3 Attached Cl Remote 81 Light Source Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks J 6" Scale ak~~6"QCM 3 Other btqwclL YhJe Examiner: Level 9.'

J%

Date d7l.t Examiner: Level r//A Date uh-Reviewer:

U Date Qfb, Reviewer: Date #b ANII: Date s-@/

VYNEF 8047.06 NE 8047 Originaf Page 1 of 1 1

I

  • Data Sheet No: m e - 6J- 38 f I Vermont Yankee Work Order No.: 00- 04 50 3s Visual Examination Report Form for Procedure NolRev.: Pp 7&3-c(/c,'

General Visual (IWE) Page f of Date: ! / / 6 , / 6 j t Component Component ID: X 1b A System:

k Drawing NolRev,: -

.<?h, q/ Location: ~sL.A! s ~ A ts4-U Visual Aids Photo Sketch Method 5 Binoculars @ None C@ None Direct 6 6~ 4 *C 0 Mirror 0 Attached El Attached D Remote I$ Light Source Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks U 6" Scale BFpuY & J & & I h q4 D Other x -/&A t

5p*&tq Examiner: LE U Level Rate !/lb /Q /

Examiner: MA Level e/! Date $/A Reviewer: &/A Date 41~

Reviewer: - d/A Date d A VY NEF 8047 .U6 NE 8047 Original Page 1 of 1 i

Vermont Yankee Procedure NolRev.: 930 L/7 RO Visual Examination Report Form for General Visual (IWE) Page 1 of Date: 5///0/

Component VYNEF 8047.06 NE 8047 Original Page 1 of 1

Work Order No.:

Vermont Yankee Procedure NolRev.: /?p70 ; t V 10.

Visual Examination Report Form for General Visual (IWE) Page / of I Date: 1/16 / o /

Component Visual Aids Phbto Sketch Method 0 Binoculars I$, None Nons 4~ Direct t r 4 ~ * ~ o . ~

0 Mirror 0 Attached 0 Attached D Remota

$ Light Source ExaminationLocation Oescription/Remarks Remota' Examination ConditionsiEquipment Remarks 0 6" Scale &&Mi d Ad "/A

[3 Other t x-r7 Examiner: d//3 Levet Date d/A Reviewer: Hh Date E.1/A Date .z/A Date /-3P/

VYNEF 8047.06 NE 8047 Originaf Page 1 of 1

6- 6 V - 377 I 8 Data Sheet N c x 3 - 2 )

Work Order No.: Don 0 0 50'35 Visual Aids Photo Sketch Method 0 Binoculars @None . IjZ None Direct &ea a r o-L 0 Mirror D Attached 13 Attached 0 Remote Light Source Examination Location Description/Remarks Remote' Examination ConditionslEquipment Remarks D 6" Scale fhyrrcb AI@.6 8

Examiner: LeveI&T.rJu*L Date 1/l&./O 1 Examiner: Ah% Level A# Date IJ/A Reviewer: &A Date &/A Reviewer: Date dh VYNEF 8047.06 NE 8047 Original Page 1 of 1 I

I Data Sheet NO: ZW- b d - 378 Vermont Yankee Work Order No.: 00 90 5 0 fs Procedure NolRev.:, P?p7 02(//0 ,

Visual Examination Report Form for General Visual (IWE) Page - I of -, I Date: !/'/b/~/ t Component Visual Aids Photo Sketch I Method Binoculars LX? None 03 None I Direct 6*3& r*L 0 Mirror 0 Attached 0 Attached I3 Remote Light Source Examination Location Description/Rernarks Remote Examination CanditionslEquiprnentRemarks 0 6" Scale bq Jrt( P*dcMr*  %

0 Other k- 19 Examiner: dh Level ~2 Date NA Reviewer: Date A/A Reviewer: - Date ANII: Date /43/4/

I' VYNEF 8047.05 NE 8047 Original Page 1 of 1 i

Vermont Yankee Procedure NolRev.:_dO $7 Ro Visual Examination Report Form for General Visual (IWE) ?age / oi i Date:qA,/o/

I Component ID: x- r9 Component system: 3& k )\c/cI Drawing No/Rev.: 5 2 0 - //

I

~~

Visual Aids Photo Sketch Method c1 Binoculars ga None pb: None FDirect 6*4LIc.vQ 0 Mirror C3 Attached Cl Attached 0 Remote Light Source Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks 0 6' Scate si+JzR&d 5tllLcp- n//p 0 Other 7 %I*)LN I 4W&

Examination ~ e s u l t s ,Details andcomments:

&*/f-s #f k s ci;Ad/r& nyu 3444&4r, U b.* be co+cp;ficd.

b 5 f haminer: L e v a l e Date chh 1 Examiner: Level &/A Date &h Reviewer:%.e a

  • t Reviewer: Date W N E F 8047.M NE 8047 Original Page 1 of 1

Vermont Yankee Procedure NofAev.: pp 7oA4 /o Visual Examination Report Form for General Visual {IWEI page f of / Date: !//~/uI I Component Component ID: x System:

Visual Aids I Photo Sketch Method 0 Binocutars FjtNone @ None PDirect 6

  • c ~
  • p b ~

0 Mirror f&fLight Source Examhation Location Descriptim/Remarks Remote-Examination ConditionsEquipment Remarks 0 6 Scafe bq 4 PcAcht*+. aL\ q4 0 Other IXJZO I Examination Results, Details and Comments:

Examiner: ~h Level &/A Date Ab!h l Reviewer: /J/A Datenl/A.,

VYNEF 8097.06 NE 8047 Original Page 1 of 1 i

I Data Sheet No: E M 6 - gdm3 7 b Work Order No.: BO- 00 S O 4s Vermont Yankee Procedure No/Rev.: *#?P7o*f/u Visual Examination Report Form for General Visual (IWE) Page 1 _of 1 Date: //I610 / t Visual Aids Photo Sketch Method

@Binoculars *None Q None p) Direct &A c( L 0 Mirror D Attached 0 Attached I 0 Remote

~.

I ExaminationLocation DescriDtionlRernarks 1 kernote. Examination ConditionslEquipment Remarks

~ ~~

%Light Source 0 6" Scale 0 Other 1 X- I

~. - __

Examination Results, Details and Comments:

Reviewer: ~ I A Date e/#

VYNEF 80.47.06 NE 8047 Original Page 1 of 1

Data Sheet NO: 2 -6 37Y Work Order NO.: oo*oo 5 0 33 Vermont ~itnicee Procedure N o I R e v . : y p 7d 2 f/b Visual Examination Report Form for General Visual (IWE) Page / of Date:  !//6hL r Component Component ID: X -# LL, System: Bfi? d 4 Visual Aids Photo Sketch Method sf3inocutar.s None poria Direct 64+4*L El Mirror 0 Attached fl Attached Examiner: d/A Level dh Date ry/A Reviewer: &/A Date A//A Reviewer:- $/A Date ni/A VYNEF 8047.06 NE 8047 Original Page 1 of 1 t

C Data Sheet NO: SOy7- O / 037 1 Work Order No.: Po - 5 0 3 7 Vermont Yankee ROCedW8 NoiRev.: g047 L o Visual Examination Report Form for General Visual (IWE) Page / of / Date: 5//0/

Component Component ID: x* A 3 system: -&.I d c &i Drawing NolRev.:

Visual Aids s!!&w@ d/ Photo Location:

Sketch 3/z..d t 4 Method c1 Binoculars @ None None Direct br,~u*rzc(l 0 Mirror 0 Attached 0 Attached El Remote Examination Location Description/&marks Remote Examination ConditionsEquipment Remarks Other -

f Reviewer: Date ANII: Date & o /

WNEF 8047.06 NE 8047 Original Page 1 of 1

Vermont Yankee Visual Examination Report Form for General Visual (IWE)

Component Procedure NdHev.:

Pa98 Of 1 PP 7 0 2 ' f / 0 Date: ?//&Id t

I Component ID: x-A3 System: ~ H L3W e a Visual Aids mota Sketch Method p Binocu!ars b None $B None E, I Direct &a&* cQIC.

0 Mirror CJ Attached 0 Attached 10 Remote pS Liiltt Source Examination Location DescriptionlRemarks 1 Remote ExaminationCanditionslEquipment Remarks 0 6" Scale 3ftSLJ-a a.J*u;Or\

Reviewer: - '14 Date @/u

/

I/

bate I 4

VYNEF 8047.06 NE 8047 original Page 1 of 1 i.

C Data Sheet No: 8047 @D/-O3 b Work Order No.: 00 3'7 Vermont Yankee Procedure NoJRev.: yo $7 L o Visual Examination Report Form for General Visual (IWE) Page / of Date:<A/o I Component Component 10: K-29 system: 3 4 L3C.u Drawing NolRev.: 5- $41 Location: -44 I pluu Visual Aids Photo Sketch Method I3 Binoculars p None Pp None @ Direct 61~.++4~4 0 Mirror 0 Attached D Attached 0 Remote 9fUght Source Examination Location DesctiptionlRernarks Remote Examination ConditionsEquipment Remarks 0 6" Scale 2=*.3.(Fd 0 Other Ab,

&IL*&

4c. bL ye@&'

N/A.

Examination Results, Details and Comments:

H' Examiner:

Y Level 9 s Date s"/,,h /

IIReviewer:

Reviewer: - .'/A Date Date f///. f VYNEF 8047.06 NE 8047 Original Page 1 of 1

fi r

Data sheet No: 6Jn 37%

Work Order No.: 00-00 SO35 Vermont Y b k e e Proceciwe N~IEW.:, PP 7 b A c j / D '

Visual Examination Report Form for General Visual (IWE) Page - 1 of -I Date: !//C/O I Component Component IO: X%+ System: /t~)cs 4 5 9 a-0 - Yf E~-L,,A Drawing NoMev.: tacatim:

Visual Aids Photo Sketch Method ino oculars W None @ None PDitect LS&d**L t

CI Mirrar 0 Attached 0 Attached a Remote Light Source Examination Lacation DescriptionlRemarks Remote Examination ConditionsEquiprnent Remarks I3 6* Scale D q w 4 PLW4-n 1

H W N & 00d7.06 NE 8047 Original Page 1 of t I

VYN$8047.06 NE 8047 Original Page 1 of 1 i

c I

~ a t meet a NO: Zwe -t ~ 37/

1 work order NO.: 00 - 00 SO35 Vermont Yankee prOCeChU8 NOmeV.: /? 7d d. / O .

Visual Examination Report Form for General Visual (IWE) Page / of 1 Date: ! / J L A t Component Component tD: X - Ab System: .3 t ~ rA 6 4 Visual Aids Photo Sketch Method 0 Binoculars mNme SNanr, ~ aDirect

, 6

  • r- , ~L-Mirror 0 Attached D Attached 0 Remote p Light source Examination Location DescriptiodRemarks Remote Examination CanditionslEqrripmentRemarks U 6" Scale ' B f i p d P~c&#& VA 0 Other 1.

Examination Results, Oeta3s and Comments:

WNEF 804'7.06 NE 8047 Original Page 1 of 1 i

Vermont Yankee Procedure NdRev.: 8d d7 k!O .

Visual Examination Report Form for General Visual (IWE) Page / of I Date: $ff& t t Component 1 Component ID: System: h- L3 *4 Visual Aids Photo Sketch Method @

c1 Binoculars $ None @! None /Z Direct L a d 0 Mirror 0 Attached 0 Attached 0 Remote

@ Light Source Examination Location DescriptionlRematks Remote' Examination ConditionslEquipment Remarks 0 6- Scale # w d 4Y&.CA&k.

0 Utherphq d 4 &&e.

1 Reviewer: 44 Date 5%

VYNEF 8047.06 NE 8047 Original Page 1 of 'I i

Data %et No: 6 bf* evv 1 work Order NO.: 0 0 .. 4 0 5 0 35 Vermont Yankee Procedure NolRev.: pp 761!//0.

Visual Examination Report Form for General Visual (IWE) page I of / Date: ! / 1 6 / a L I D Mirror c1 Attached Attached

$I Light Source Examination Location DescriptionlRemarks Remote Examination CondifionsEquipmentRemarks I7 6" Scale El Other I x-LS I Examination Results, Details and Comments:

Examiner: rJ/n Level Ah Dale 'h Reviewer:- ' h Date 44 ate J!!

ANII: Date P I Y

VYNG 8047.06 NE 8047 Original Page 1 of 1 t

Vermont Yankee PfoC8dUr0 NO/RW.: /f Visual Examination Report Form for General Visual (IWE) Page of i Date: !//b,Ld 1 Commnent 1 Component ID:

II Visual Aids Sketch Method U Binoculars $ti None None c7 Mirror Light Source Cl 6" Scaie 0 Other I Examination Results, Details and Comments:

WNEF 8047.06 NE 8047 Original Page I of 1 1

Work Order No.: 6 0 -00 $035 Vermont Yankee Procedure Nomev.: Pfl 702 l//o.

Visual Examination Report Form for General Visual (IWE) Page I of 1 Date: '//&/b[ I Component il Component ID: X - 3~ System: 'Dm L3 4 I

Drawing NoiRev.: ,<?to + qf . Location: GK -.5Y/t&Gc Visual Aids Photo Sketch Method 0 Binoculars $4None ,j5t None )%#Direct 6 r ~ ~ p - L El Mirror 0 Attached 0 Attached I D Remote Light Source Examination Location DescrbtionlRernarks I Remote' Examination ConditionsiEquiprnentRemarks 0 6" Scale Examiner: d A Level d / ~ Date htlA Reviewer: d A D a t e . L ~

Reviewer:' rflA o a t e . L ,

ANII: Date i. 3r-0(

1 A VYNEF 8047.06 NE 8047 Original Page 1 of 1

I Data Sheet No: Z a E - 3rfs I Work Ordsr No.: 00 - 03 503s" I

Vermont Yankee procedure Nmev.:. PP 7 6 .t/o ~

Visual Examination Report Form for General Visual (IW) Page ,-Lof I - , Date: $/b/d r Component Component ID: c system: 3rz.r CJCY Drawing Nomev.: - '59'z tc( Location:. -ju&i 4 Visual Aids U Binoculars crp None Photo If None Sketch II@Direct 6 Method d

a Mirror D Attached 1 5 Attached 1 IO Remote

@ Light Source Examination Location DescriptionJRernarks Remote' Examination ConditionslEquuipment Remarks 0 6" Scale b y p d P&A&b,4,.h WN& 6047.06 NE 8047 Orighd Page 1 of 1

\

Vermont Yankee Visual Examination Report form for procedure Nomev.: pfl76  ?-. (//o. I General Visual (IWE) page 1 of I Date:

Component 0 Mirror 0 Attached 0 Attached U Remote I$ Light Source Examination Location DescriptionlRemarks Remote' Examination ConditianslEquipment Remarks 0 6" Scale t

0 Other I I

V Y N E 8047.06 NE 8047 Original Page 1 of 1 i

Vermont Yankee Procedure Na/Rev,: pp 7 0 4

  • Visual Examination Report Form for General Visual {IWE) Page / of 1 Date: !//fh/ I Visual Aids Photo Sketch Method 0 Binoculars pB None /I$None ?Direct w d 0 Mirror U Attached Attached I Remote p Light Source Examination Location DescriptionlRernarks 1 Remote Examination ConditionslEquiprnent Remarks D 6" Scale 0 Other I x- 3 3 I
  • \

Examination Results, Details and Comments:

?sArvlJn/A4 t9-U 45 VYNEF 8047.06 NE 8047 Original Page 1 of t i

Visual Aids Photo Sketch Method 3 Bioocu!ars None p31 None PDirect &

  • A d 3 Mirror tl Attached 13 Attached 1 D Remote Light Source Examination Location DescrjptionlRemarks Remote Examination ConditionslEquipment Remarks 3 6 Scale an-)C J 4 Pdd4 sh, Y4

&*Sa 3 Other

~

k - 3 v j-

- ~~- -- ~-

kamination Results, Details and Comments:

  1. I/

4+sf2lms.b4 Examiner: R4 to L &LJ u ? ~ Level & r c r i 4 u ~ Date

-4W.QJ-Examiner: uI/R Level & Date ?A seviewer: N/R Date  ?$

3eviewer: - Date Nh VYNEF 8047.06 NE 8047 Original Page 1 of 1 i

work Order NO.: 40 5 6 33 Vermont Yankee Visual Examination General Visual (IWE)Form for Report Page of Procedure NolRev.: 80q7 40 Date: T f i / O /

Component VYNEF 8047.06 NE 8047 Original Page 1 of 1

Data Sheet N o : X& E - 3C3 Work Order No.: 0 0 0 00 50 $5 Vermont Yankee Procedure NolRev.: f p 7b & / D .

Visual Examination Report Form for 0 General Visual (IWE) Page of Date: !//6/0/ t Component Visual Aids Photo Sketch Method J Binoculars Q None b None /%Direct kC,&

3 Mirror 0 Attached 0 Attached 0 Remote PLight Source Examination Location Description/Remarks Remote' Examination ConditionslEquipment Remarks 7 6" Scale b A l L s e M &!&du-&-,d' 6 O b 5 N/4 3 Other x- 3 7 j 4 e j Examiner: #/A -~evel rJk Date &/A Reviewer: U/h Date Iv/A VYNEF 8047.06 NE 8647 Original Page 1 of 1 i

C Data Sheet No: 8w3 -o/ # - 3 Vermont Yankee Visual Examination Report Form for General Visual (IWE)

Drawing Nomev.:

I I Location:

I R!S&L & -Id,*d uI Visual Aids I Piioto t Sketch I Method 0 Binoculars 0 Minor 0 Attached a Attached 1o Remote

@ Light Source Examination Location Description/Remarks ' Remote barnination ConditionslEqtlipmentRemarks 6' Scale &&+4f#& 3dlLCAC.c Examiner: MA Date #/A WNEF 8047.06 NE 8047 Original Page 1 of 1

Visual Examination Report Form for General Visual (IWE) Page -. 1 of -1 Date: !//-

c Component I

Level &/& Daet-.

Examiner: 'h Reviewer: #I% Date &h, WNEF 8047.06 NE 8047 Original Page 1 of 1 i

I Vermont Yankee Work Order No.:

Procedure NolRev.:

00 - 93b 8097 A3 .

VYNEF 8047.06 N E 8047 qriginal Page 1 of 1 1

Data Sheet No: - 6 v - 361 Work Order No.: 6 6 - Do $0 5r Vermont Yankee Procedure Nomev.: pp 70L ' f ( / D Visual Examination Report Form for Visual Aids Photo Sketch Method 0 Binoculars $F None $None $[ Direct 6ae~lrlr~L 0 Mirror D Attached 10 Attached 1 o Remote Light Source I Examination Location DescfiDtionlRematks Remote Exemination CanditionslEquiprnent Remarks 0 6" Scale Examination Results, Detans and Comments:

VYNEF 8047.06 NE 8647 Original Page 1 of 1 f

Vermont Yankee Procedure NolRev.: 26 #7 R U Visual Examination Report Form for General Visual (IWE) Page !of i Date: <I<h 1 Component Component ID: x47 .: System: >rz$ ulca Drawing NoiRev.: X?h #( Location:

d Visual Aids Photo Sketch Method 5 Binoculars $ None $Zl None 9 Direct &A&

Q Mirror 0 Attached n Attached 0 Remote I$ Light Source Examination Location DescriptionlRemarks Remote Examination ConditianslEquipment Remark:

0 6 Scale G+4PAJ44 SdrL-crPrcrr */A VYNEF 8047.06 NE 8047 Original Page 1 of 1

Work Order No.: Do - 00 $0 35 Vermont Yankee Procedure NofRev.: pp 76&</h.

Visual Examination Report Form for General Visual (IWE) Page c  !

_ of 1 Date: !/fG/o I I Component hmponent ID: x- 4 8 System: & k, &(A Visual Aids Photo Sketch Method 3 Binoculars None None Direct 4f aL 3 Mirror Attached D Attached 0 Remote Light Source Examination Location Description/Remarks Remote Examination ConditionslEquipmentRemarks 3 6"Scale b yd d kL-,k.oz);JL\ BauQtZu &

I3 Other -L g- LJ$ v:c34 4- mcu3 Examiner: f!/R Level Date 4 Reviewer: ph Date ~h Reviewer: - dh Date 4 Date /-3/& /

V VYNEF 8047.06 NE 8047 Original Page 1 of 1 I

t Data Sheet No: ZQe- v- 38 7 Work Order No.: 0 0 - on s a 35 Vermont Yankee Procedure NofRev.:, &? 7a 2.4 / O Visual xarnination Report Form for General Visual (iWE) Page / of i Date: !/l</f.l!

t Component I Component ID: c System:

3~7 LI i

Visual Aids Photo Sketch Method t! Binoculars $b None /Z! None Direct 6m ~ t a ~

El Mirror 0 Attached 0 Attached D Remote Light Source Examination Location OascFiption[Remarks Remota' Examination ConditionslEquipment Remarks Q 6" Scale 'bQc3uUP.WA)bd.m A'f4 0 Other x- L(4 1 Reviewer: - A 4 Date.&-

W N E F 8047.06 NE 8047 Original Page 1 of 1 t

Visual Examination Report Form for I!

Visual Examination Report General Visual Form for

{IWE) Page - of / Date: !//$h Component I

. Examiner: 15(/A V Level did Date Revi ANlI:

i I

W N E F 8047.06 NE 8047 Original Page 1 of 1 i

....-.-. . . ~.

Work Order No.: g0- O b 543s Vermont Yankee p p 7 0 2f / D .

Procedure NofRev.:

Visual Examination Report Form for General Visual (IWE) Page I of I Date:  ?/ir/ol z Component

omponent ID: x-SL  : System: art9 d 4 -

Visual Aids Photo Sketch Method J Binoculars IJ None eQ None jZ Direct L a 4 4r d-3 Mirror 0 Attached 0 Attached D Remote

$ Light Source Examination Location DescriptionlRernarks Remote Examination CooditionslEquipment Remarks J 6" Scale -p4 &&+A 6 ctd 3 Other i x- 5 %

Examiner: Level rulR Date $/A Reviewer: & Date J/A Reviewer: Date IJh Date l-S{+f Y

VYNEF 8047.06 NE 8047 Original Page 1 of 1 1

8 Data Sheet No: z d t&

Work Order No.: 00 - 0 0 s o 3 5 Vermont Yankee Procedure NdRev.: //70;~1//6 .

Visuat Examination Report Form for General Visual ([WE) Page / of / Date: ebyA 1 1 Component ZompDnent ID: x404 A,&,

r .

.k,v

.) b System: ' b a y ~ 3 6 ~

Drawing Nomev.: 5 5 s- Vt Location: ~~~L Visual Aids Photo Sketch t Method c3 Binoculars 1 @ None pb None Direct 64l~*1.&L Ip Mirror 0 Attached 0 Attached El Remote

!I Light Source Examination Location Description/Rernark Remote'Examination ConditionsEquipment Remarks 0 6" Scale Examindon Results, Details and Comments:

haminer: dI.4 Level J!A Date+.

Reviewer: JfA Date $!A Reviewer:, r/(A Date (/A VYNV 8047.06 NE 8047 brTginal Page 1 of 1 t

I Work Order No.:, 0 0 - 60503 5 Vermont Yankee Procedure NO~RW.: PP 7b P f / O Visual Examination Report Form for General Visual (IWE) Page / of ~ater_r/r(/o/ I I Component t Visuaf Aids photo I Sketch I Method

@ Mirror 10 Attached

~

1 CI Attached I cl Remote tight Source Examination Location DescriptionlRsmarks Remote-Examination ConditicnslEquipment Remarks 0 6 SCd8 hrty&Y fidC4?&W5 WNEF 8047.06 NE 8047 original Page 1 of 1 t

Vermont Yankee Visual Examination Report Form for General Visual {IWE)

Component

ompooent ID: -

X /a% System: bn+ k ~ c ~

Visual Aids Photo Sketch Method 3 Binoculars pl None $4 None p Direct G*rr,r~Qe~

1 Mirror kl Light Source Examination Location Descr$tion/Remarks Remote Examination ConditionslEquipment Remarks 3 6" Scale h q d 4 4-c L&*4*.& rJ/A.

3 Other 1 X-l13% I Examination Results, Details and Comments:

Examiner: #/A Level IJ/R Date '"/A Reviewer: &/A Date N/A Reviewer:

  • Date Nh VYNEF 8047.06 NE 8047 Origina!

Page 1 of 1 i

i Work Order No.: 00-00 5035 Vermont Yankee Procedure NolRev.: 8 p 70 %$

Visual Examination Report Form for Visual Aids Photo Sketch Method 3 Binoculars C% None 0 None 0 Direct N u t p*6G-d?,

3 Mirror 0 Attached !JAttached 0 Remote % A C t L G - d 5 b g! Light Source Examination location DescriptionjRemarks Remote' Examination ConditionslEquipment Remarks 0 6" Scale 'I>r y rJcLI pl&C.Cru=JiOrr,

&r'A 0 Other x- lo3 VYNEF 6047.06 NE 3047 Original Page 1 of 1 L

I e Data Sheet No: [-

Work Order No.:.. 190-OD $0 3c Vermont Yankee Praedure Nomev.: /p 70A Visual Examination Report Form for General Visual (!WE) Page of 4 Date: @d,/h/ t c -

Component I

Minor 0 Attached 0 Attached 0 Remote

~ g h Source t Examination Location Desuiptionmernarb Remote Examination ConditionsfEquipment Remarks D 6' Scale Examination Results, Details and Comments: I!

W N E F 8047.06 NE 8047 briginal Page 1 af t i

Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page 1 of I Date: :hx/b/ t Component 0 Other I Fvnmination Re&, Details and Comments:

W N E F 8047.06 NE 8047 Original Page 1 of 1

1 Data Sheet N o : - z a c - -

btf 387 .

I Work Order No.: 00 00 503 5 verrnbnt Yankee Procedure NolRev.: #p 70 As/ / o Visual Examination Report Form for General Visual flWE)

Visua[ Aids Photo Sketch Method 3 Binoculars None )B None FDirect 6.1~~)a P*L

%Mirror 0 Attached 0 Attached a Remote I ExaminationLocation Descriotionlffemarks1 Remote Examination ConditionsIEquipment Remarks

~ ~

3 tight Source Examiner: Level lu/A Date Reviewer: N/A Date Nh Reviewer: EJh Date A/A ANII: I f Qate Id?/*f f

VYNEF 8047.06 NE 8047 Origina!

Page 1 of 1  !

C Data Sheet NO: Z w 6-G J - 38 8 Work Order NO.: 00-00 S O is Vermont Yankee Procedure Nomev.: @P 7 b LI/ /a Visual Examination Report Form for General Visual (JWE) Page 1 of Date: t . l a i Component component ID:

Drawing NolRev.:

Visual Aids y-107 s??-d - s//

Photo 1

System:

Location:

Sketch b . 9 ~ - L u -

gx.cc,,4 S Q ~ &

Method 0 Binoculars None None E

, l Direct 60,*

f$L Mirror U Attached 0 Attached CI Remote

$&Light Source Examination Location OescriptionlRemarks Remote Examination ConditionslEquipment Remarks 0 6 Scale aqb3A.q P u , k d ; o &) 4 4 D Other A- 107 Examination Results, Details and Comments:

RI -LJ- d2 AbLlG  % b

  • L 4 Cr+-ccA c**A ,A.-

L

&f?un e&*d*b D C di\ p-LA3 I, PLSUikS r n l AI&

, L s u k * .*.c4sfLc VYNEF 8047.06 NE 8047 Original Page 1 of 1

Vermont Yankee Visual Examination Report Form Work Order No.: t?d* 80ild/ 7 dbd VT-1, Containment Surfaces (IWE)

ProcedureNoRev.: &b fb / 1 Drawing Nomev.: 4-/9 /I67 !a.0 Other (Explain) 1 Examiner: Level: 4 Date: , ,

Evaluation Required?

Examiner: Level: &/A Date:

Reviewer: Date: </<kt yes d o VYNEF 8045.02 NE 8045 Rev. 1 Page 1 of 1

Vermont Yankee BorCs-a/ -s//

Reference Data Sheet No:

Visual Examination Page 2 of Date: s/I-//o /

Supplemental Report Form Component

omponent ID: )-ZOO4 System: %LV3 Raminer Level:, ..fA Date: 4 Zeviewer: Date: sydk/

ieviewer: 4 4 Date: 4 M I  :.&w Date: S- %/

VYNEE 8045.04 NE 8045 Original Page 1 of 1 t f c #I

Vermont Yankee I Work Order No.: 00 -0046)7~,060 Visual Examination Report Form VT-1, Bolting @WE)

Procedure NoRev.: h!k"goi/-T / RmG /

page I of / Date: 5-3-o/

~

II Comuonent Drawing NoRev.: L - ~ W We/v:

~ a Bolting Length: Y ;/8 'I' Bolting Diameter:

0 Magnifying Glass umination carmo.: y Yg

'Examiner: Level: &-Date: 4+

Reviewer:

ANII: #F& Date: 9-O /

W N E F 8045.03 NE 8045 Original Page 1 of 1

WorkOrderNo.: 00 - 00 94 / f . - C ' d 0 Visual Examination Report Form Procedure No/Rev.: /YE 86 95 Me*.. 0 VT-1, Bolting (IWE)

Page / of / Date: s - = s - ~ /

Evaluation Required?

Leve1:xDate: fi g0@

UYes VNo Examiner: Level: &Date:

Reviewer: Date: 1 I

Reviewer: h'h Date: IJ/A Date: 6-s-o!

VYNEF 8045.03 NE 8045 Original Page 1 of 1

Vermont Yankee Visual Examination Report Form VT-1, Bolting (IWE)

CA/3S86d //'

Drawing Nomev.: 7- 6 2 O ; L 4euoo

  • Bolting Length: ya" 'I Bolting Diameter:

II 0 Magnifying Glass OYes MNo VYNEF 8045.03 NE 8045 Original Page 7 of 1

Visual Examination Report Form for General Visual (IWE) page I of 1 Date: !//G/oI t Component WNEF 8047.06 NE 8047 Original Page 1 of 1 i

t Data Sheet No: Z h J 6- 6Q-396 Vermont Yankee Work Order No.: DO- 90

  • 5 Procedure NolRev.: pp 70 aq/b .

Visual Examination Report Form for General Visual (IWE) Page 1 of I Date: j l ~ ~ l o ti Component Zomponent ID: X - AQ 3 A +im Ir System: 7-04 u.<

hawing NoRev.: 6% 6 dc Visual Aids Photo Sketch Method 3 Binoculars IEl None @ I None Direct 6edr~oc 3 Mirror D Attached 0 Attached 0 Remote

~. ~

8 Light Source Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks 7 6" Scale TSR.*S PeucccC~:gcu~ -14 Examination Results, Details and Comments:

c VYNEF 8047.06 NE 8047 Original Page 1 of 1

r 8

Data Sheet NO: 6Jw 39s Work Order No.: 9 0

  • 00 5 0 35 VYNEF 8047.06 NE 8047 Original Page 1 of 1

Vermont ~ i n k e e WNEF 8047.06 NE8047 Original Page 1 of 1

INSERVICE DISCREPANCY REPORT ( I D R )

IDR #: lL!dL&

Date : 5 /2/2001

  • Component: X-207A -. H Location: Drvweld, Mechanical D e s i g n Engineering Evaluation:

Performed By: Date :

Disposition/Repair:

~~ ~

ISI Program Coordinator: Date :

Repair Effort:

Reference Document:

Repair Completion Date:

Service Induced: =s - NO BY : Date :

7 Sample Expansion Required: NO -BY: Date: -.

Sample Expansion:

IS1 Program Coordinator: Date :

Reinspection Required: YES NO -BY:

Subsequent Inspection Required: YES - -BY :

IS1 Supervisor Notified:

IS1 Program Coordinator: Date :

Reinspection Completed Satisfactorily:

IS1 Supervisor: Date :

IDR Closed:

IS1 Program Coordinator: Date :

WAPF 4027.01 AP 4027 R e v . 4

  • Page 1 of 1

INSERVICE DISCREPANCY REPORT ( I D R )

IDR # : 01-07 Date: 5/2/2001 ,

Component: Vent He- r Location: Drvwell, Mechanical Design Engineering Evaluation:

  • % de -/ewe9 + cd-+ &$

Disposition/Regair:

IS1 Program Coordinator: +&e&?& Date: ?f+@

Repair Effort:

Reference Document: PA Repair Completion Date: Nd Service Induced : YES &- NO -BY: Date: ~ & i [

Sample Expansion Required: YES - NO )G BY: ate:

Sample Expansion:

Reinspection Required: YES - NO L BY: @

Subsequent Inspection Required: Yes - NO &BY:

  • IS1 Supervisor Notified:

I S 1 Program Coordinator: & D a t e : 5-/7/./

Reinspection Completed Satisfactorily:

IS1 Supervisor: &A Date: /4 5 5 - 1 IDR Closed:

IS1 Program Coordinator: i?i&%rw2 Date:

VYAPF 4027.01 AP 4027 Rev. 4 Page 1 of 1

r Data Sheet No: 80 Y 7 " 03 Work Order No.: 00' 5037 Vermont Yankee Procedure NolRev.: Rdq? 40 .

Visual Examination Report Form for General Visual (IWE) Page I of 9 Date: < / l / b /

Reviewer: - /v/3 Date /i4 VYNEF 8047.06 NE $047 Original Page t of 1 i

x b

Vermont Yankee Visual Examination Report Form for General Visual {IWE) 7 Component Visual Aids Photo Sketch Method 3 Binoculars qYNone @ None @ Direct &&&

3 Mirror 0 Attached r) Attached 0 Remote

!6 Light Source I Examination Location Description/Remarks Remote Examination CondifionslEquipment Remarks 3 6' Scale 7 Other

~

3xamination Results, Details and Comments:

Date 4Nk 0 ate VYNEF 8047,06 NE 8047 Original Page I of 1

VERMONT YANKEE TECHNICAL EVALUATION DOCUMEWATLON Technical Evaluation No. 20016 2 5 Tile: EVALUATION OF ASME SECTION XI - IWE FINDINGS FOR IDR 01-07 & IDR 0198 El QA (SafetyCIass, OQA. or Vital Fire) 0 Non QA (Non-Safety) (Check One}

Backsround This T.E. evaluates findinas from the IWE inspections of the vent header and vent Pipe bowls in the VY primaw containment. Specificalivaddressed are Inservice Discrepancv R ~ D o ft~ DRl ~s Nos. 01-07 and 01-08, design inputs (D1)I& 2.

Visual Inspections are performed on the VY primary containment in accordance with the American Society of Mechanical Engineers (ASME) Code Section Xi,Subsection IWE. The purpose of the inspections is to identify degradation of coatings and metal waJl loss to insure the continued structural integrity of the primary containment. The inspectors use a pre-evaluated acceptance criteria, 01 (31,to screen inspection results. The pre-evaluated criteria is based on VY calculation VYC-1032, Rev.1, DI (4), it serves as a threshold for further evaluation of the results by Design Engineering.

IDR 01-07 identifiesareas of general pitting and general corrosion in the vent header and the vent pipe bowls. DI (3) requires any indications adjacent to the vent header mitre joints, downcomer intersections, and vent pipe/header intersections be forwarded to Design Engineering for evaluation.

IDR 01-08 identifies corrosion on the internal surfaces of all (8) ofthe X-207 penetrations.

These penetrations were the !ow point drain in the bottom of each vent pipe bowl. Dl's (3)& (4) do not specifically address corrosion in the X-207 penetrations. The findings were forwarded to Design Engineering for evaluation.

Discussion I DR 01-07 1DR 01-07 identifies areas of general pitting and general corrosion in the vent header and the vent pipe bowls. A summary of the findings from IDR 01-07 is attached to this TE as Table 1 I As indicated on page 1 of 9 of Data Sheet No. 8047-01-031, the pitting areas identified have a minimum separation of (3) pit diameters. Areas identified with local pitting in the vent pipe bowls and in the vent header within 4 inches of the vent pipeheader intersections require an evaluation by Design Engineering. This TE will evaluate the findings shown in Table 1 against the acceptance criteria contained in DI(4).

As shown in Table 1, localized pitting was found in the lower portions of all (8)vent pipe bowis.

The areas of pitting correspond to zones 1 and 3 as shown in Figure 27 in Attachment A of VYC-1032,Rev. 1, Di (4). Permissible size indications for these zones are given in Figures 28 and 30 from D1(4>for zones 1 and 3 respectively. The limiting zone is zone 1. All pitting in the vent pipe bowls will be evahted using an enveloping comparison for zone I.From DI (3), a pit is

, WAPF 6045.02 Ap604S.02 Qriginal Page 1 of 6

W Technical evaluation No. TE 2001-0025 defined as a small area of surface corrosion less than 0.5 inch in diameter.

To envelop pitting found in the vent pipe bowls, the allowable depth of a 1 inch diameter surface indication wiil be compared against the largest measured pit depth from Table 1, Note that the areas of localized pitting shown in Table 1 only define the areas of pitting, not a zone of wall loss. From Figure 28, for a 1 inch diameter indication an allowable depth is greater than 0.10 inch. From Table 1 the maximum pit depth for the vent pipe bowls is 0.042 inches in X-5F.

Therefore all observed pitting in the vent pipe bowls is acceptable.

To envelop pitting found in the vent header, the same approach as for the vent pipe bowls will be used. Since the pitting is adjacent to the vent pipe intersection, Figure 30 for zone 3 will be used, From Figure 30; for a 1 inch diameter indication, an allowable depth is greater than 0.12 inch. From Table 1 the maximum pit depth for the vent header is 0.042 inches adjacent to X-5F.

Therefore all observed pitting in the vent header is acceptable.

The standing water found in the in the bottom of the bowl at X-5Halong with any other standing water accumulated in the other bowls during this refueling outage will be removed prior to drywell closeout per 5/4/01 telecon with B.Tietze, VY Facilities Supervisor.

1DR 01-08 IDR 01-08 identifies corrosion on the internal surfaces of all (8) of the X-207 penetrations, X-207 A to X-207H. Dl's (3) & (4) do not specifically address corrosion in the X-207 penetrations. The results were fowarded to Design Engineering for evaluation.

Each of these penetrations was the low point drain in the bottom of each vent pipe bowl. The original design of the X-207 penetration was a 1 inch nominal pipe which extended from the bottom ofthe vent pipe bowl down to an elevation below the Torus water level. These lines were removed and the pipe stubs were capped during the Torus Mark I Program Modifications under EDCR 80-11, Details a r e shown on VY drawings No. 6202-213 and 5920-9152,Dl's (6) &

(7).

Specific calculations for required wall thickness for the X-207 penetration are not contained in the original design analysis report, Dt (5). Due to the small size of the penetration (less than 2 inch nominal) no additional reinforcement was required by the ASME Code. Drawing No. 6202-213 shows the construction details for the penetration. The penetration is a 1 inch diameter schedule 80 pipe attached to the vent pipe head using a full penetration weld and a reinforcing fillet weld. The thinnest section is the wail of the 1 inch diameter pipe stub. Using the sizing requirements from the original design code, the required thickness for pressure and applied loads wiII be determined. This will be compared against the piping wall thickness with the estimated waIl loss from IDR 01-08 as shown on Data Sheet No. 8047-01-32.

From Dl (6),the pipe is 7 inch Sch. 80 seamless pipe A333 Gr.1, with a n outside diameter of 1.315inches, and a nominal thickness of 0.179 inch. The material ultimate strength is 55 KSi.

and the code allowable stress is 13.7Ksi. The minimum installed thickness of the pipe including the +/- 12.5%manufacturing tolerance is 0.157 inch. The effective throat of the 3/16fillet weld on the cap is .707{3/16) = 0.133 inch.

WAPF 6045.02-Ap6045.02 original Page 2 of 6

VY Technical evafmtiun No. TE 2001-0025 From ASME 111 & Vllt, DI (8),the required thickness for the 56 Psi design pressure (conservative considering this is an internal component) is taken from UG-27 of ASME VJII.

With P=56. Psi., R= 1.315/2= .658inch, & SE 43,700.Psi.:

PR , 't = 56'(0*658) = 0.0027 inch.

Circumferential Stress: t=

SE- 0.6P 13700.-0.6(56)

Longitudinal Stress: t= PR , t= 56'(0'658) =Z 0.001 3 inch.

2SE -F 0.4P 2(13700.)f 0.4(56)

Given the cantilever configuration and the small size of the stub, there are minimal loads on the stub, Using a 1.0% increase to account for rnisc. loads etc., the required wall thickness for the pipe will be taken as 0.003inch.

The minimum wall thickness including the 0.025 inch estimated wall ioss from Data Sheet No.

8047-01-32, is (0.157-.025)= 0.132 inch. This is significantly greater than the 0.003 inch required wall thickness.

AssurnDtionsfOpen items NONE Material Reauirementsflrnptementation Instructions NONE Conclusions 1DR 01-07:

The localized shallow pitting found in the bottom interior surfaces of the vent header and vent pipe bowls has been evaluated against the D1 (4) acceptance criteria and found acceptable.

The preparer of this T.E.accompanied the !WE examiners on this inspection. The interior condition of the vent header appears essentially the same as observed on a pre-IW E walkdown performed on 9/23/93. During the 1993 refueling outage the vent header was cleaned and a protective coating was applied to the bottom of each bowl and at stiffener plate locations at the downcomers. These coatings are still intact. The extent of light surface corrosion and local pitting appears about the same as was observed in 1993. This indicates that most of the pitting occurred prior to 1993, and that the mechanism is not currently aggressive. Based on this, no augmented inspections would be recommended.

IDR 01-08 The estimated wall joss in each of the X-207 penetrations has been conservatbely evaluated WAPF 6045XQ *

~ ~ 6 0 4 5 . 0Original 2

Page 3 of 6

W Technical evaluation No. TE 2001-0025 against code requirements and the reamining wall is significantly greater than the code required wall thickness.

The significant margin to code minimum wall thickness and the low expected rate of gakanic corrosion in the inerted containment during operation,would support that no augmented inspections would be recommended at this time.

Recommendations

1. The ZOO1 refueling outage Data Sheet 8047-01-031should be used as a baseline for the next scheduled !WE inspection of the vent header interior.
2. The next scheduled IWE visual inspection of the exterior of the vent pipe should include a specific note to check the exterior condition of the X-207 stubs.

Approvals/Ciosea ut e and provide signature/date.,l CE Independent Reviewer Department Manager Closeout (AN actions that were recommended by the TE and accepted by management have been initiated and any identified open ifems have been dispositioned.)

/ CE (signature) {date)

Aftachments A. Table I: Summary of Vent Header IWE Findings (1 Page}

6. VY Insetvice Discrepancy Report (IDR) No. 01-07 for Vent Header, dated 5/2/01. -1WE Data Sheet No. 8047-01-031. ( 10 Pages }

C. VY Inservice Discrepancy Report (IDR) No, 01-08 for X 207 A-H , dated 5/2/01. - IWE Data Sheet No. 8047-01-032.( 2 Pages)

WAPF 6045.02 Ap6045.02 Original Page 4 of 6

TECHNICAL EVALUATION DATABASE lNPUT TE 2001-025 Page 5 of 6 TE NO. 2001-025 TE

Title:

EVALUATION OF ASME SECTION XI - IW E FINDINGS FOR IDR 01-07& IDR 01-08 Keywords: Torus, ASME Section XI, IWE, Vent Pipe. Vent Header 1

  1. I DocumentTitle (including Rev. No. and Date, if appkable) 1 W Inservice Discrepancy Report (IOR) No. 01-07 for Vent Header, dated 32/01. (!WE Data Sheet No.

8047-01-031) 2 W Inservice Discrepancy Report (IDR) No.01-08for X 207 A-H ,dated 5/2/01. (IW E Data Sheet No.

8047-01-032) 3 W Design Engineering Memo: J.C.Fitzpatrick to J.H.Callaghan, subject: Pre-EvaluatedAcceptance Criteria for Primary ContainmentASME XI IWE Inspections, VYM 99/112, dated December 7,1999.

4 VY Calculation No. WG-1032, Rev.l Torus Shell & Vent System Thickness Requirements.

5 Certified Stress Report, ,Vernon - II, Vermont Yankee Project Containment Vessel, No. 9-6202-11, October 29,7968,by Chicago 8ridge & Iron- Oak Brook Engineering.

6 -

VY Drawing No. 6202-213, Rev 0.C8&I Drawing for Vent tine Header Intersection.

7 VY Drawing No. 5920-9152, Rev. 0,CB&! drawing for Modifications to Vent Header Drain Line 8 ASME Section 111 Nuclear Vessels, ?965 (with Winter 1965 Addenda) and ASME Section Vlll Unfired Pressure Vessefs ,1965.

I NONE 1

r # Reference Title (including Rev. No. and Date, if applicable}

9 ANSI 836.10-1979 Welded and Seamless Wrought Steel Pipe.

Data Entered inlo Database 1 Entry Verified I Signature Date Signature Date VYAPF 6045.03 .

AP 6045 origw Page 1of 1

-- 1--- -

TECHNlCAL EVALUATION REVIEW TE NO. 2001-025Pg 6 Of 6 TE#: 7001-025 Required Date: Y / Reviewer Assigned: h/-

Titte: EVALUATION OF ASME SEC'IWN XI - !WEFINDINGS FOR 1DR 01-07& IDR 01-08 Cornments: Resolution:

n/ahlE

  • I

/Oat$

to your area of expertise.

2, Verify Depattment Procedures, Program Inpuk. and output documents are appropriately addressed,

3. Meetings of discussions lo resolve questions and mmmenls are encouraged.
4. Resolution by telecon is acceptable and should be noted as such.
5. Make comments spaclllc, and avoid generalizations and queslions.
6. Lf no comments indicalo 'None"
7. Request Management asslstance if resolution can not be achieved.
8. Roturn all comments to Ihe CE by raquired date or request an edenslon.

VYAPF 6045.04 AP 6045 Orighal Page 1 of 1

TABLE 1 Summary of Vent Header IWE Findings Vent Pipe Findings D.I. (4) Vent Header Findings Bowl 63 Figure 27 between Zone{s)

X-5A Light scattered pitting at bottom of interior I& 3 X-5A ti X-55 Scattered pitting bottom interior surface adjacent to X-5A vent pipe surface adjacent to vent header A-6 intersection, depfh 0.015 intersection, ma. depth 0.035 X-56 General surface corrosion, no significant 3 X-56 & X-5C General surface corrosion, no significant metal loss. Scattered metal loss. pitting bottom interior surface adjacent to X-5B vent pipe intersection, depth 0.026 x-5c General surface corrosion, no significant 3 X-5C & X-5D General surface corrosion 1x1bottom interior surface, no significant metal loss with light scattered pitting at metal loss. Scattered pitting bottom interior surface adjacent to X-botlom of interior surface adjacent to vent header B-C intersectlon, depth 0.016.

5D vent pipe intersection,max. depth 0.025 X-5D General surface corrosion, no significant 1 X-5D & X-5E light general surface corrosion, no significant metal loss. Light metal loss with light scattered pitting at pitting bottom interior surface adjacent to vent pipe intersections.At bottom of interior surface adjacent to vent header C-D intersection, depth - 0.009 X-5D max. depth 0.009,at X-5E ma.depth 0.010. -

X-5E Light general surface corrosion, no significant 3 X-5E & X-5F General surface corrosion, no significant metal loss. Scattered metal loss. -

pittjng at X-5E vent pipe intersection, m a . depth 0.031over area size 2 by 3. Scattered pitting bottom interior surface adjacent to vent pipe X-5F, depth 0.042.

X-5F Scattered pitting at bottom of interior surface 3 X-5F & X-5G General surface corrosion. no significant metal loss. Scattered adjacent to vent header intersections:E-F, pitting at X-5G vent pipe intersection, Max. depth 0.025.

X-5G depth 0.042, and at F-G, depth 0.025, General corrosion and scattered pitting at 1,3 X-5G & X-5H General surface corrosion, no significant metal loss. Scattered bottom of interior surface adjacent to vent pitting at X-5G vent pips intersection, m a . depth 0.010*. Scattered pitting at X-5H vent pipe intersection,m a . depth 0.035*

approximate area 9bv 9.

0.010 X-5H Scattered pitting at bottom of interior surface 3 XSM & X-5A General surface corrosion on bottom interior surface, no significant adjacent to G-H vent header Intersection, metat loss.

m a depth - 0.025 area size 9x 14.

significantamount of water in bottom of bowl.

ATACHMENT A to T.E. NO. 2001-025 Page 1 of 1

Performed By: Date:

Disposition/Repair:

IS1 Program Coordinator: Date:.

Repair Effort:

Reference Document:

Repair Completion D a t e :

Service Induced: YES - NO - BY: ___ Date:.

sample Expansion Required: YES _u NO - BY: Date: .-

sample Expansion :

,-__ ~~- ~ ~~

IS1 Program Coordinator: Date :

Reinspection Required: YES NO 7 BY :

Subsequent Inspection Required: YES NO _c BY:.

rsI: Supervisor Notified:

I S 1 Program Coordinator: D a t e:

Reinspection Completed Satisfactorily:

IS1 Supervisor: Date:

IDR Closed:

Is1 Program Coordinator: Date:

VYAPF 4027.01 AP 4027 Rev. 4-Page 1 of 1

I- #

Data Sheet No: BO J? I - 0 3f Work Order NO.: 00 - 50 3 7 b Vermont Yankee Procedure NolRev.:. 8OJ7 40 .

Visual Examination General Visual Report (IWE) Form for Page 1 of 9 -Date:  ?/?/dl I f < Component CQmponent 10: f ~ *H+~ Q ~ A > System: -br+ 4 Drawing NolRev.: 62-02. 2-06 Location: tQtv ~3 c U Visual Aids Photo Sketch Method 0 Binoculars None a None IZf Direct ( 5

  • r r J 4 13 Attached 8 p35

@ Attached 0 Remote 0 Mirror Light Source Examinatian Location Oescription/Remarks Rem& Examination ConditionslEqulpmeot Remark 0 6 Scale $+irp.ior S,IP f6e aF 0 Other V.Acct # d a r rJh ination Results, Details and Comments:

t

\

x

.- XNSERVICE DISCREPANCY REPORT (IDR)

IDR #: QT-OS.

Date: 5La/20Q1 Component : X-207A - y Location: D m I D-4 XSI Supervisor: Date:

System Operability Affected: YES NO BY: BN Date:

Shift Supervisor Notified: YES NO L B Y :Date: d4/

Event Report Initiated: YES - NO L B Y : . H Date: flab/

Mechanical Design Engineering Evah.IatiOn:,

c Performed By:

. Date:

Disposition/Repair:,

IS1 Program Coordinator:, Date :

Repair E f f o r t :

Reference Document:

Repair Completion D a t e : .

Semice Induced: YES __ NO 7 BY: Date: .-

Sample Expansion Required: YES __. NO -BY: Date:,

Sample Expansion:

IS1 Program Coordinator: Date:

Reinspection Required: YES - NO -BY:

SubsecpenL Inspection Required: YES - NO -BY:

XSI Supervisor Notified:

I S 1 Program Coordinator: Date:

Reinspection Completed Satisfactorily:

ISI S u p e m i s a x : Date:

IDR Closed:

Date:

VYAFF 4 0 2 7 . 0 1 AP 4027 Rev. 4 .

Page 3. of 1

37 Vermont Yankee Work Order No.:

Procedure NolRev.:

00

  • 5 0

%f'? 4 0 Visual Examination Report Form for General

-~

Visual (fWE) Page I of / Date: 51/&

Cornaonent Drawing Nomev.: 5920- 4 ~ '

Visual Aids 0 Binocdars yffone Photo I &NoneSketch Direct +&d Method 0 Mirror I3 Attached 0 Attached D Remote Light Source barnination Location Descciptian/Rernarks Remote Examination ConditionslEquipment Remarks I3 6' Scale 2...t.rw&4-&w 6s-I Examination Results, Details and Comments:

Pcs Examiner: L e v e l 4 4 Dale f l l / d I Examiner: Lev el A?!&, Date Reviewer: *A Date Lf/./o/

Reviewer: pH Date @

AMI: Date

IJSERVICE DISCREPAXCY =PORT (IDR)

IDR #:  !&dB Date: 5/2/2001 I Component: - d Location: DrYwell L

IS1 Supervisor: D*d Date :

System Operability Affected: YES - NO j c B Y : BOcyD a t e : dh Shift Supervisor Notified: YES - NO -BY: )C LMZ D a t e : dJ-Event Report Initiated: YES - NO A B Y : Date: Q++&

Mechanical Design Engineering Evaluation:

Performed By:

Disposition/Repair:

IS1 Program Coordinator: Date: <I5/&

Repair Effort:

Reference Document: MFJ Repair Completion Date: A/!!

Service Induced: YES -E..,. NO BY: w Date: d &

Sample Expansion Required: YES - -

NO )r BY: e D a t e :

Sample Expansion:

, e w 2Iw.d d+fz+-L . &e H h2 - d

/.mz J&Z# .a&?b r n -/%72& #

1 IS1 Program Coordinator:

&&a&A Date: </d/

Reinspection Required: YES - NO &BY:

Subsequent Inspection Required: YES - NO L B Y : m IS1 Supervisor Notified:

IS1 Program Coordinator: *& Date: r?%k Reinspection Completed Satisfactorily:

IsI Supervisor: BW - w Date: s'/s/l/

IDR Closed:

I S 1 Program Coordinator: mu& Date:

VYAPF 4027.01 AP 4027 R e v . 4 -

Page 1 of 1

I Data Sheet No: 47-01 3%- -

Work Order No.: 00

  • 5037 Vermont Yankee ProcduraNomev.: 8bf7 40 Visual Examination Report Form for General Visual (IWEI Page / of 1 Date: 5/it/u Component Compooent 10: X-AQ? A , 4. C ,
  • h . G
  • f i6 , L L L d Visual Aids photo Sketch I Method 0 Binoculars Vffone None IIDirect o mimar I Remote

)!f Light Source Examination Location Description/Remarks M o t e Examination CanditionsEquiprnent Remarks 0 6 Scale >?&PA& kkhm f i d m i f.

Date @

M N E F 8047.06 NE 8047 Original Page 1 of 1

VERMONT YANKEE TECHNICAL EVALUATLON DOCUMENTATION Technical Evaluation No. 2001-025 I

Title:

EVALUATION OF ASME SECTION XI - IWE FlNDfNGSFOR IDR 01-07 & IDR 01-08 El QA (Safety Class, M I A , or Vital Fire) El Non QA (Non-Safety} (Check One)

Backaround This T.E. evaluates findinas from the IWEjnspections of the vent header and vent pipe bowls in the VY priman/ containment. Specifically addressed are Inservice Discrepancv Reoorts (IDR)

Nos. 01-07 and 01-08, desiqn inouts (Dl) I& 2.

Visual Inspections are performed on the VY primary containment in accordance with the American Society of Mechanical Engineers (ASME) Code Section XI, Subsection IWE. The purpose of the inspections is to identify degradation of coatings and metal wall loss to- insure fhe continued structural integrity of the primary containment. The inspectors use a pre-evaluated acceptance criteria, D1 (3)to screen inspection results. The pre-evaluatedcriteria is based on VY calculation VYC-1032,Rev.1 , Df (4) it serves as a threshold for further evaluation of the results by Design Engineering.

IDR 01-07 identifies areas of general pitting and general corrosion in the vent header and the vent pipe bowls. Dt (3) requires any indications adjacent to the vent header mitre joints, downcomer intersections, and vent pipdheader intersections be forwarded to Design Engineering for evaluation.

IDR 01-08 identjfies corrosion on the internal surfaces of all (8) of the X-207 penetrations.

These penetrations were the low point drain in the bottom of each vent pipe bowl. Dls (3)& (4) do not specifically address corrosion in the X-207 penetrations. The findings were forwarded to Design Engineeringfor evaluation.

Discussion IDR 01-07 IDR 01-07 identifies areas of general pitting and general corrosion in the vent header and the vent pipe bowls. A summary of the findings from IDR 01-07 is attached to this TE as Table 1.

As indicated on page 1 of 9 of Data Sheet No. 8047-01-031, the pitting areas identified have a minimum separation of 13) pit diameters. Areas identified with local pitting in the vent pipe bowls and in the vent header within 4 inches of the vent pipdheader intersections require an evaluation by Design Engineering. This TE will evaluate the findings shown in Table 1 against the acceptance criteria contained in DI (4).

As shown in Table I , localized pitting was found in the lower portions of all (8) vent pipe bowls.

The areas of pitting correspond to zmes 1 and 3 as shown in Figure 27 in Attachment A of Vyc-1032, Rev. 1, DI (4). Permissible size indications for these zones are given in Figures 28 and 30 from DI (4) for zones 1 and 3 respectively. The limiting zone is zone I. AI[ pitting in the vent pipe bowls will be evahated using an enveloping comparison for zone I.From DI (31,a pit is VYAPF 6045.02 Ap6045.02 Original-Page I o f 6

VY Technical evaluation No. TE 2001-0025 defined as a small area of surface corrosion less than 0.5 inch in diameter.

To envelop pitting found in the vent pipe bowls, the allowable depth of a I inch diameter surface indication will be compared against the largest measured pit depth from Table 1. Note that the areas of localized pitting shown in Table 1 only define the areas of pitting, not a zone of wall loss. From Figure 28,for a 1 inch diameter indication an allowable depth is greater than 0.10 inch. From Table 1 the maximum pit depth for the vent pipe bowls is 0.042 inches in X-5F.

Therefore all observed pitting in the vent pipe bowls is acceptabte.

To envelop pitting found in the vent header, the same approach as forthe vent pipe bowls will be used. Since the pitting is adjacent to the ventpipe intersection, Figure 30 for zone 3 will b e used. From Figure 30; for a 1 inch diameter indication, an allowable depth is greater than 0.12 inch. From Table 1 the maximum pit depth for the vent header is 0.042 inches adjacent to X-5F.

Therefore all observed pitting in the vent header Is acceptable.

The standing water found in the in the bottom of the bowl at X-5H dong with any other standing water accumulated in the other bowls during this refueling outage will be removed prior to drywell closeout per 5/4/01 telecon with 8.Tietze, VY Facilities Supervisor.

IDR 01-08 IDR 01-08identifies corrosion on the internal surfaces of all (8) of the X-207 penetrations, X-207 A to X-207H. Dl's (3) & (4) do not specifically address corrosion in the X-207 penetrations. The results were forwarded to Design Engineering for evaluation.

Each of these penetrations was the low point drain in the bottom of each vent pipe bowl. The original design of the X-207penetration was a Iinch nominal pipe which extended from the bottom of the vent pipe bowl down to an elevation below the Torus water level. These lines were removed and the pipe stubs were capped during the Torus Mark I Program Modifications under EDCR 80-1I . Details are shown on VY drawings No. 6202-213 and 5920-9152, Dl's (6)&

(7)*

Specific calculationsfor required wall thickness for the X-207 penetration are not contained in the original design analysis report, D1 (5).Due to the small size of the penetration (less than 2 inch nominal) no additional reinforcement was required by the ASME Code. Drawing No. 6202-213 shows the construction details for the penetration. The penetration is a 1 inch diameter schedule 80 pipe attached to the vent pipe head using a full penetration weld and a reinforcing fillet weld. The thhinnesf section is .the wall of the 1 inch diameter pipe stub. Using the sizing requirements from the original design code, the required thickness for pressure and applied loads will be determined. This will be compared against the piping wall thickness with the estimated wall loss from IDR 01-08 as shown on Data Sheet No. 8047-01-32.

From DI (6),the pipe is 1 inch Sch. 80 seamless pipe A333 Gr. I, with an outside diameter of I .315inches, and a nominal thickness of 0.1 79 inch. The material ultimate strength is 55 Ksi.

and the code allowable stress is 13.7 Ksi. The minimum installed thickness of the pipe including the 4- 12.5% manufacturingtolerance is 0.157 inch. The effective throat of the 3/16 fillet weld on the cap is .707(3/16)= 0.133inch.

VYAPF 6045.02

  • Ap6045.02 Origlnaf Page 2 of 6

W Technical evaluation No. TE 2001-0025 From ASME 111 & Vill, Dl (31,the required thickness forthe 56 Psi design pressure {consewative considering this is an internal component) is taken from UG-27 of ASM Vlll.

With P=56. Psi., R= 1.315 / 2 = ,658 inch, & SE =13,700.Psi.:

PR , t= 56'(0'658) = 0.0027 inch.

Circumferential Stress: t=

SE - 0.6P 13700.- 0.6(56)

PR 56.(0.658)

Longitudinal Stress: t= , t= = 0.001 3 inch.

2SE + 0.4P 2(137OO.)f 0.4(56)

Given the cantilever configuration and the small size of the stub, there are minimal loads on the stub. Using a 10%increase to account for misc. Ioads etc., the required wall thickness for the pipe will be taken as 0.003 inch.

The minimum wall thickness including the 0.025 inch estimated wall loss from Data Sheet No.

8047-01-32, is (0.157-.025) = 0.132 inch. This is significantly greater than the 0.003 inch required wall thickness, AssumDtionslODen Items NONE Materia! ReauirernentsflmPlementationInstructions NONE Conclusions IDR 01-07:

The localized shallow pitting found in the bottom interior surfaces of the vent header and vent pipe bowls has been evaluated against the D1 (4) acceptance criteria and found acceptable.

The preparer of this T.E. accompanied the IWE examiners on this inspection. The interior condition of the vent header appears essentially the same as observed on a pre-IWE walkdown performed on 9/23/93. During the 1993 refueling outage the vent header was cleaned and a protective coating was applied to the bottom of each bowl and at stiffener plate locations at the downcomers. These coatings are still intact. The extent of light surface corrosion a n d local pitting appears about the same as was observed in 1993. This indicates that most of the pitling occurred prior to 1993, and that the mechanism is not currently aggressive. Based on this, no augmented inspections would be recommended.

IDR 01-08 The estimated wall toss in each of the X-207 penetrations has been conservatively evaluated WAPF 6045.02

  • Ap6045.02 Original Page 3 of 6

VY Technical evaluation No. TE 2001-0025 against code requirements and the reamining wall is significantly greater than the code required wall thickness.

The slgnificant margin to code minimum wall thickness and the low expected rate of galvanic corrosion in the inerted containment during operation,'would support that no augmented inspections would be recommended at this time.

recommendations 1, The 2001 refueling outage Data Sheet 8047-01-031 should be used as a baseline forthe next scheduled fWE inspection of the vent header interior.

2. The next scheduled IWE visual inspection of the exterior of ihe vent pipe should include a specific note to check the exterior condition of the X-207 stubs.

Ap provaldCloseout arne and provide signaturddafe.)

CE Independent Reviewer Department Manager .

Closeout (All actions that were recommended by the TE and accepted by management have been initiated and any identified open iferns have been disposifioned.)

I CE (signature) (date)

Attachments A. Table 1: Summary of Vent Header IWE Findings (1 Page)

B. VY Inservice Discrepancy Report (IDR) No. 01-07for Vent Header, dated 5/2/01. -IWE Data Sheet No.8047-01-031.( 10 Pages }

C. VY Inservice Discrepancy Report (IDR) No. 01-08for X 207 A-H , dated 5/2/01. - IWE Data Sheet No. 8047-01-032.( 2 Pages}

VYAPF66045.02 .

~p6045.02original Page 4 of 6

TECHNICAL EVALUATION DATABASE lNPUT TE 2001-025 Page 5 of 6 TE NO. 2001-025 TE

Title:

EVALUATION OF ASME SECTION XI - IWE FiNDlNGS FOR iDR 01-07& IDR 01-08 Keywords: Torus, ASME Section Xi. IWE, Vent Pioe. Vent Header

  1. Document Title (including Rev. No. and Date, if applicable) 1 W Inservice Discrepancy Report (!OR)No.01-07for Vent Header, dated 5/2/07. ([WEData Sheet No.

1 8047-01-031) 2 I W Inservice Discrepancy Report (IDR) No. 01-08for X 207 A-H ,dated 5/2/01. (!WE Data Sheet No.

8047-01-032) 3 W Design Engineering Memo:J.C.F&patrick to J.H.Callaghan,subject: Pre-Evaluated Acceptance Criteria for Primary Containment ASME XI IWE Inspections, VYM 99/112, dated December 7,1999.

4 W Calculation No. WC-I 032,Rev.1 I' Torus SheH & Vent System Thickness Requirements.

5 -

Certified Stress Report, ,Vernon It, Vermont Yankee Project Containment Vessel, No. 9-6202-11, October 29,1968, by Chicago Bridge & Iron Oak Brook Engineering.

6 -

W Drawing No. 6202-213,Rev 0. CB&! Drawing for Vent Line Header Intersection.

7 VY Drawing No. 5920-9152,Rev. 0, CB&l drawing for Modifications to Vent Header Drain Line 8 ASME Section Ill Nuclear Vessels, 1965 (with Winter 1965 Addenda) and ASME Section VHI Unfired Pressure Vessels ,1965.

I- I I Desiqn Output Documents -ThefolIowing documents are impacted by this TE.

I # ] Document Title 1 1

General References I

Data Entered into Database t Entry Verified I Signature Date Signature Date WAPF 6045.Q3 AP 6045 Original Page 1 of 1

TECHNICAL EVALUATION REVIEW TE NO. 2001-025 Pg 6 of 6

-025 Required Date: M d 'J5. { Reviewer Assigned: hf-J, DdFFY TE#: 2 0 0 1

Title:

VALUPTI0N OF ASM E SECTION XI - IWE FINDINGS FOR IDR 07-07 h IDR 01-08 Resolutlon:

Comments:

dohlE

6. Ifno comments Indicate "None"
7. Request Management assistance if resolutlon can not be achieved.
8. Return all comments to heCE by requlred date or request an eaenslon.

VYAPF 6045.04 AP 6045 Original Page 1 of 1

TABLE 1 Summary of Vent Header IWE Findings Vent Pipe Findings D.I. (4) Vent Keader Findings Bowl 0 Figure 27 between Zona(s) I X-584 Light scattered pitting at bottom of interior I& 3 X-5A & X-56 Scattered pitting bottom interior surface adjacent to X-5A vent pipe surface adjacent to vent header A-6 -

intersection, max. depth 0.035" intersection, depth 0.015" -X-58 ti X - S General surface corrosion, no Significant metal loss. Scattered X-50 General surface corrosion, no significant 3 metal loss. pitting bottom interior surface adjacent to X-58 vent pipe intersection, depth 0.026" x-5c General surface corrosion, no significant 3 X-5C & X-5D General surface corrosion on bottom interior surface, no significant melal loss with light scattered pitting at metal loss. Scattered pitting bottom interior surface adjacent to X-bottom of interior surface adjacent to vent header 8-C intersection, depth 0.056".

50 vent pipe intersection, m a . depth 0.025" x-50 General surlace corrosion, no significant 1 X-5D & X-5E Light general surfacecorrosion, no significant metal loss. Light metai loss wrth light scattered pitting at pitting bottom interior surface adjacent to vent pipe Intersections.At bottom of interior surface adjacent to vent I header C-Dintersection. depth - 0.009" X-50 max. depth 0.009",at X-5E rnax:depth - 0.010".

1 Light general surface corrosion, no significant X-5E & X-5F General surface corrosion, no significant metal loss. Scattered X-5E 3 X-5F I metal loss.

Scattered pitting at bottom of interior surface 3 X-5F 8 X-5G pitting at X-5E vent pipe Intersection, max. depth 0.031"over area size 2" by 3'. Scattered pittingbottom interior surface adlacent to vent pipe X-5F, depfh 0.042" .

General surfacecorrosion, no significant metal loss. Scattered adjacent to vent header intersections: E-F, pitting at X-5G vent pipe intersection, m a . depth 0.025".

depth 0.042",and at F-GI depth 0.025 X-5G General corrosion and scattered pitting at 1,3 XSG & X-5M General surface corrosion, no significant metal loss. Scattered bottom of interior surface adjacent to vent pitting at X-5G vent pipe intersection, max. depth 0.010". Scattered ,

header intersections: F-G, rnax depth - pitting at X-5H vent pipe intersection, max. depth 0.035" 0.025" area size 9" x 1B I and at G-ti, depth - approximate area 9" by 9".

0.010" X-5H Scattered pitting at bottom of interior surface 3 X-5H & X-5A General surface corrosion on bottom interior surface, no significant adjacent to G-M vent header intersection, metal loss.

max depth 0.025"area size 9"x 14";

Significant amount of water in bottom of bowl.

ATACHMENT A to T.E. No. 2001-025 Page 1 of1

Dispositian/Repair:

IS1 Program Coordinator: Date : c _

Repair Effort:

Reference Document:

Repair Completion DYES Service Induced: ate: NO ___ BY: _e Date :

Sample Expansion Required: YES .___ NO ,- BY : Date:

Sample Expansion:

IS1 Program Coordinator: Date :

Reinspection Required:

Subsequent Inspection Required:

YES YES

- NO - , BY:

NO -. BY :

IS1 Supervisor Notified:

I S 1 Program Coordinator: Date:

Reinspection Completed Satisfactorily:

IS1 Supervisor: Date:

IDR Closed:

I S 1 Program Coordinator: D a t e :___L1 VYAPF 4027.01 AP 4027 Rev. 4 -

Page 1 of 1

Photo Sketch Method Visual Aids 3 Binoculars @ None CY None g pA9 ,= 0 Direct D Remote

& , 4 4 Reviewer: .w@ Date A  :

ANN: Date AUACHMENT

'3 a

0 og

\

x

.- INSERVICE DISCmPANCY REPORT (IDR)

IDR #: 01-08 Component: )I-207A -a Date:

Location: 3/2/2001 BYKAJ Mechanical Design Engineering Evaluation: *.

Performed

-, By: Date:

Disposition/Repair:

IS1 Program Coordinator: Date :

Repair Effort:

Reference Document:

Repair Completion Date:

Service Induced: YES - - NO BY : D a t e : ,-,

Sample Expansion Required: YES -NO -BY  : Date: -,

Sample Expansion:

ISI Program Coordinator: Date:

Reinspection Required: YES NO -BY  :

Subsequent Inspection Required: YES - -BY NO z IS1 Supervisor Notified:

fSI Program Coordinator: Date:

Reinspection Completed Satisfactorily:

IS1 Supervisor: Date :

I D R Closed:

Date:

VYAPF 4027.01 AP 4027 Rev. 4 .

Page I of 1

5037 Vermont Yankee Work Order No+ 00 Procedure Nomev.: %t/7 & 0 Visual Exam!nation Report Form for General Visual (IWE) Page I of / ate: s/i,/$

Component Reviewer: - /yp Qate 0 ANk Date VYNEF 8047.06 NE8047 Originaf Page 1 of 1

INSERVICE DISCREPANCY REPORT ( I D R )

IDR # : 01-09 Date: 05/07/01 I Component : P-18-lA R e c i r c . pump Location : Drvwell. 238 boltins. (OIA-N/W-lGA-m Discrepancy: Durincs VT-I. examination the followins was found: 1. The chrome rdate on the threads indicated on D w s . VYEM 5920-738 & 739 R / 1 amears to be,missfncr due to corrosion.

2. Evidence of leakase is indeterminate due to water l v i n s on t IS1 Supervisor: Date: -.-/.l/o/

System Operability Affected: Y E S - NO x- BY: Date: <h?

Shift Supervisor Notified: Y E S - NO BY: W Date: 5h!(

Event Report I n i t i a t e d : YES - NO -

x BY: -Date: </&

Mechanical Design Engineering Evaluation:--[ -t%&

Performed By:

Disposition/Repair:

I S 1 Program C o o r d i n a t o r : Bm?cd Date: 47573/

Repair E f f o r t :

Reference Document: /A Repair Completion Date: d/A n  ;

r ,r W (

Service Induced: YES NO BY: Date: gba-Oi Sample Expansion Required: YES - NO BY: e Date: - ~ W ~ l Sample Expansion:  % T E 2001- 633 [ R m e > m IS1 Program Coordinator: *dd Date: ,d/ ../J Reinspection Required: YES - NO J BY:(=$@

Subsequent Inspection Required: YES - NO f BY:*

IS1 Supervisor Notified:

IS1 Program Coordinator: Date: -.r./.7?/

Reinspection Completed Satisfactorily:

Is1 Supervisor: I.i/A Date:

IDR Closed:

IS1 Program Coordinator: Date: s//7k/

VYAPF 4027.01 .

AP 4027 Rev. 4 Page 1 of 1

Vermont Yankee Work Order No.: O/--/997-O 00 Visual Examination Report Form Procedure NdRev.: &&-BO 9.5 ,4?&9a /

VT-1, Bolting (Non-!WE)

Date 5-/ 7 - 0 / I I Experience Hours Credit:

VYNEF 8645.01 NE 8045 Rev. 1 Page 1 of 1

VERMONT YANKEE TECHNICAL EVALUATION DOCUMENTATION Technical Evaluation No. 2001434

Title:

EVALUATIONOF IS1 PROGRAM IDR NO. 01-09, P-18-1A REACTOR REClRC PUMP BOLTING El QA (Safety Class, OQA, or VW Fire) Non QA (Non-Safety) (Check One)

Backaround This T.E. evaluates findings from the ASME Section XI inspection of the Reactor Recirculation Pump,P-18-1A, cover to case cap screws as documented on Inservice Discrepancy Report. (IDR) No. 01-09 (Attachment A). The cap screws are 2-1/2 diameter 16" long, (Part No. 2-6) with washers (Part No. 2-5 )

as shown on W drawings 5920-738 & 5920-739, design inputs (D!) Nos. 2 & 3.

The 1st visual inspection of the pump cover to case bolting is documented on Data Sheet No. 804501-016, dated 5/5/01which is attached to the IDR. Recodable findings noted on the Data Sheet are:

1. Coating is missing.
2. Corrosion exists on portion of threads where they screw into the pump casing.
3. Water standing in scattered areas on top of casing. {could be from small bore piping above).

To assess the degree of corrosion at the bolt locations a walkdown of the bolts on both pumps was performedby Design EngineeringMIS (J.FitzpaWck & KBeardsley) on 5/9/01. Access to both pumps was facilitated by scaffolding erected for modifications to the attached RBCCW cooling lines.

The areas surrounding the bolt heads and washers on both pumps exhibit 8 light surface corrosion. The insulation on ihe attached RBCCW cooling lines was removedfor the piping modification, this permitted easy access to the cap screw heads and the surrounding areas. See the photos in attachment 6.The general surface corrosion may be the result of condensation from the exterior of the R3CCW tines or from water draining into this area during past replacementsof the pump seals. As shown in the photos in , corrosion by-products were observed on painted surfaces above the location of the cap screw heads. Other than the general surface corrosion there is no significant amount of additional corrosion evident at the cap screw head and washer interface.

The exposed threads on the cap screw at the pump casing coverbody interface are identified as having the chrome plating degraded and as exhibitingsome surface corrosion on the e w s e d threads. There appears to be minimal metal loss on the exposed threads. From DI 4, the ASME stress report forthe pumps, there is margin in the supplied bolt area over the required bolt area. This supplied margin ensures that the cap screws will perfom their design function and still meet ASME code requirementsfor allowable stress. The following quantifies this margin.

2-1/2" diameter cap screws , A193 Gr.67 2-1/2"-8N-2A, (DI 4)

From Table 8.2.10 in Marks Handbook (reference 5). Minor diameter = 2.343 inch From page 7 of the design stress report for the pump (DI 4), the totai bolt area required, Am,= 62.31 inches2 WAPF6045.02 Ap6045.02 Original Page 1 of 4

W Technical evaluation No. TE 2001-0034 The bok root diameter required to supply the total bolt area required, considering all bolts degraded is:

MinDiameter = J4xAreq =J4x62*31 = 2.27inch.

nl Gbolts nl Gbolts The allowable corroded thickness (lost metal) on each bolt is M( 2.343-2.27) = 0.0365, (approx 1/32).

Given that no significant metal loss was noted on the threads and the inert atmosphere in the containment during operation, corrosion is not expected to occur at a significant rate during future operation.

AssumDtionsJOoen Item2 NONE

~ le entationt structions NONE Conclusions The pumps casing cover/body bolting will perform its design function with the as-noted surface conditions.

Margin exists in the 2/12 diameter cap screws for future corrosion. No additional and/or augmented inspections other than planned IS1 are required.

Recommendations NONE ApprovalS(Close0ut(qrint nfind provide slgnature/date.)

Independent Reviewer Department Manager (signature) (date}

were recommended by the TE and accepted by rnaMgemen! have been initiated and any Mentified open items NONE REQUIRED

/ qdh!(tiate)

CE Attacbments A. IDR No. 01-09, for P-18-1A, Recirc. Pump Bolting. (01A-NNV-I 6 A - W ) , dated 5/7/01 (2 pages total)

8. Photographs of Recirc. Pump Casing Cover/Body Cap Screws (2 pages total)

VYAPF 6045.02 Ap6045.02 Original Page 2 of 4

TECHNICAL EVALUATION DATABASE INPUT TE 2003;034 Page 3 of4 TE No. 2001-034 TE Titfe: Evaluation of IS1 Proaram IDR No. 01-09,P-18-fA Reactor Recirc. PumD Boitinq Keywords: Purn~.Sottina. ASME Section XI, In-senrice I n s r n k n , P-18-1A

[ # I Design Output Doeuments The following documents are impacted by this TE.

Document Tile 1

-. NONE

    1. Reference T i e (including Rev. No.and Date, if applicable) 5 Marks Standard Handbook for Mechanlcal Engineers Ninth Edition, Q 1978, McGraw-Hill lnc.

Data Entered into Database / Enfry Verified /

Signature Date SQnature Date WAPF 6045.m AP 6045 W@nd Page I of 1

I TECHNICAL EVALUATION REVIEW TE NO. 2001-034 Pg 4 Of 4 TE #: .ZOO14 3 4 Required Date: Reviewer Assigned:

Comments: Resolution:

I s/%,

Date Notes and Requirements: DGE Signature &at6 '

1. Validate design Input appropriateness relative to your area of expertise.
2. Verify Department Procedures, Program inputs, and output documents are

. appropriately addressed.

3. Meetings or discussions to resolve questions and comments are encouraged.
4. 'Resolution by telecon Is acceptable and should be noted as such.

5, Make comments specific,and avoid gbneralizations and questlans.

6. If no comments indicate "None"
7. Request Management assistance if resolution can not be achieved.
8. . Return all comments to the CE by requlred date or request an extenston.

VYAPF 8045.04 AP 6045 Original Page 1 of 1

Data Sheet No: zde'-6r/-35?

Work Order No.: DO - 0 SQ3s Vermont Yankee Procedure NolRev.: 46 $0 1/7/M<'c~d Visual Examination Report Form for General Visual (IWE) Page I of / Date: h//&/bO' ./

7- Component U

Visual Aids Photo Sketch Method 0 Binoculars d o n e &ne E6rect 0 Mirror 0 Attached U Attached 0 Remote 04lght Source Examination Location DescriptianlRemarks Remote Examination ConditionslEquipmentRemarks 0 6" Scale &flu:& duaCAcI, e .I:

%+

0 Other Pl*.k&J:&Jx > O b A 3.b Level Date VYNEF 8047.06 NE 8047 Original Page 1 of 1

Vermont Yankee Procedure Nomev.: pp 70A \r/o .

Visual Examination Report Form for General Visual (1WE) Page I of I ~ate:I//L/cll t Visual Aids Photo Sketch Methad 0 Binocufars 1@ None 8 None @Direct bed&

13 Mirror 1CI Attached ~~ ~

10 Attached 10 Remote Light Source Examination Location DesctiptionlRemarks Remote Examination ConditionslEquipmentRemarks 0 6Scale 3 q J d Pw*(r&;-  !!/A 0 Other 4Y-3j 1 Examination Results, Details and Comments:

Examiner: p/A -~evel rc/A Date

,Reviewer: dh Date %

WNEF 8047.06 NE 8047 Original Page 1 of I

8 Data Sheet No: rdd - 6 v- 36 0 f Work Order No.: 0 0 - 0 0 5 0 35 Vermont Yankee Procedure NolRev.: @p702(t / O Visual Examination Report Form for General Visual (IWE) Page 1 of / Date: i//b,/o) I Component Component ID: X - S A 721r u &H System: 3- dcl/i Drawing NoFiev.: <?m- 4/ Location: c-2h&lj,& -Sd&.4caa/

I I Visual Aids Photo Sketch Method

@ Binoculars eP None None p Direct 6&4 (3 Mirror 0 Attached 0 Attached 10 Remote Light Source Examhation h a t i o n Description/Remarks Remote' Examination ConditionslEquipment Remarks 0 6" Scale 3 q - M Pede trcA1-tJks 1 &/+A 0 Other 1 Examination Results, Details and Comments:

WNEF 8047.06 NE8047 Original Page 1 of 1

Vermont Yankee Procedure Nomev.:  !?fly Q 2, f./O, Visual Examination Report Form for General Visual (IWE) Page 1 of 1 Date: l / f b ./Q, I r--

~

Component Component ID: x - 3 2, System: bfi, 4 Drawing No/Rev.: 5?Lo - q/ Location: 3,- 4q .

Visual Aids 0 Binocutars Qbhsone Photo 1 Sketch

()B None Method 9 Direct 644-t 0 Mirror 0 Attached 0 Attached U Remote I$ Light Source Examination Location DescriptionlRemarks Remote ExaminationCanditionslEquiprnent Remarks 113 6 Scale maminer: Level nc/R Date */R Reviewer: /fl Date h Reviewer:- Nh Date .J/A VYNEF 8047.06 .

NE 8047 Original Page 1 of 1 i

e Data Sheet No: z w d ..&v' 37/

Wofk Older No.: 00 4 00 50 35 Vermont Yankee Procedure Noiflev.: #?/ 7 d t? .

Visual Examination Report Form for General Visual (!WE) Page / of i Date:& 1 Component Component ID: x - Ab System: L c j d Drawing NolRev.: S92-d Location: ~ ~ f ~ ~ &A- ~ u4 c. v u C

-~ ~. __

I

~~

1

~

Visual Aids Photo Sketch Method 0 Binoculars WNone qP None ij3 Direct F* L-0 Mirror 0 Attached U Attached 0 Remote

~-

I)d tight Source Examination Location OescriptionlRemarks Remote Examination ConditionsfEquipment Remarks 0 6" Scale

&yocs. 44 Level .&$*'U&i Date f/l L,/dL Examiner: '14 Level d/A Date IJ/A Reviewer: 'h .Date '!

Reviewer: _#/!A

. Date .'lp VYNff 8047.06 NE 8047 Original Page 1 of 1 i

Vermont Yankee Procedure NolRev.: Pfl 70 29 10 .

Visual Examination Report Form for General Visual (!WE) Page 1 of I Date: !/[S/ol t Component Reviewer: 44 Reviewer: - #I4 Date ANII: D a t e s -

i v

VYNEF 8047.06 NE 8047 Original i Page 1 of 1

El.11 Drywell Paletration GV 1000/0 COMPLETED FROM INTERNAL RFO21 x-51 EX'FERNAL TO BE SCHEDULET, BEFORE OR DURING RMn2 (completed pre RFO 22)

E1.11 Drywen Penetration COMPLETED FROM NIXRNALRF021 x-52 EXTJ33AL. TO BE SCHEDULED BEFORE OR DURING RF022 (complded pre RFO 22)

EL11 Drywell Peamaticil COMPLETED FROM XNTERNAL RFO2 1 (INACCESSIBLE AREA X-lOOA m1-EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22 (completed pre RFO 22)

El.ll Drywell Penetration COMPLETED FROMINTERNAL RF02X (JNACCESSJBLEAREA X-100B IDENTIFIED)

EXTERNAL TO BE SCHEDULED BEFORE OR DURING R F O n

@mpl"d pre RFO 22)

EL11 Drywell faretmtiar COMPLETED FROM INTERNALRFO21 (INACCESSIBLE AREA x-10oc IDENTIFIED)

EXTERNALTO BE SCHEDULEDBEFORE OR DURING RFOU (ccmpletedpre RFO 22)

E1.11 DryweU Padration COMPLETED FROM INTERN& RFO21 (INACCESSIBLE AREA X-100D IDENTIFED)

EXTERNAZ,TO BE SCHEDDULEDBEFORE OR DURING W022

@mpletCd pre RFO 22)

EL11 DIywellP&m COMPLETED FROMINERNAL RFO2I (INACCESSIBLE AREA X-lO1A IDENTIFIED)

EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22

@ompl&edpre RFO 22)

El.11 Drywell Penetration COMPLETED FROM INTERNAL RF021 (INACCESSIBLEAREA X-1O1B DENlTED)

EXTERNAL TO BE SCHEDULED BEFORE OR DURING -022 foompletedpre RFO 22)

EL11 Drywell Pmetratiaa x-IOIC Gv I 1my0 C O W S l Z D FROM INTERNALRFO21 (INACCESSIBLEAREA

-Dl EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 fcompletedpre RFO 22)

EL1I Drywell Penshation COMPLETED FROM INTERNALRFO21 (INACCESSIBLE AREA X-IOID lDENlIFED)

EXTERNAL TO BE SCHEDULED BEFORE OR DURING R F m

~oompleted pre RFO 22)

El.ll Drywen Penetration COMPLETED FROM INTERNALRF021 (INACCESSIBLE AREA x-102 IDENTIFIED)

EXTERNALTO BE SCHEDULED BEFORE OR DURING -022 (compl~~eci pre RFO 22)

El.11 DryweU Penetration COMPLETED FROMINTERNAL RF021 QNACCESSIBLE AREA X-I03 WENTIFED)

EXlXRNAL. TO BE SCHEDULED BEFORE OR DURINO RFO22 (completed pre RFO 22) EXTERNAL SURFACE OF TIiIS PENETRATION IS NOT ACCESSIBLE FOR EXAMINATION DUE TO DESIGN EL11 Drywell Penebatim X-104A 1 1OOYO COMPLETED FROMINTEIWAL RF021 (INACCESSIBLEAREA IDENTIFIED)

EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFO22

&ompleted pre RFO 22)

To: DennisGirroir 5/1Y200 1 From: Ralph Connell Re: Report for TWE Inspections Performed for RF022 (Reference Xeport for IWE Inspections Performed for RF021 dated 12/02/1999)

INTRODUCTION:

The objective in the current period for this new ][WE inspection program was to gather as much information as we could for RF021 and RF022. During RF021 the goal was to perform as many inspections as possible within the acceptable window without causing any interference with other outage work activities. The remainder of the required first period examinations was performed either before or during RFOZZ.

After the ZWE examinations performed during RFO 21 the Program Procedure PP7024 was revised to incorporate lessons learned. Some revisions were made to the appendices regarding inspected components and inspection criteria. As a result some of the examinations originally listed for the 1 period were revised and are reflected in the completion schedule included in this report. All required VT-3 examinations were moved to the 3d period as required by the ASME Section M Code 1992/92A.

DISCUSSION:

The ASME Section XI Subsection IWE Code requires an examination of tbe coated Surfaces in order to determine the condition of the substrate. This examination of coated surfaces is for evidence of flaking, blistering, peeling, discoloration and other signs of distress of the underlying metal. The IWE examinations performed for RFO21 found only two areas of coating with signs of distress affecting the substrate. Those two areas were located at the drywell interior moisture barrier and the other was on the drywell surface at the X-5Gpenetration. Both of these were evaluated by Mechanical Design Engineering and dispositions provided via the IDR process. IWE examinations during RF022 identified two more areas. These were areas of pitting and corrosion in the vent header and corrosion in the interior of penetrations X-207A-H. Both of these were also evaluated by Mechanical Design Engineering and dispositions provided via the IDR process. At many areas of the containment there is peeling or discoloration. Both of these issues have been previously identified and accepted via the OP5250 inspections.

The Maintenance Department has been performing containment inspections for several years via OP5250 to evaluate the condition of the coatings on containment surfaces.

These inspections have compiled an excellent source of data documenting the conditions of the coatings and how these coatings are maintaining over time. The information provided &om these reports provides the basis for disposition of issues identified on the IWE reports such as coating peeling and blistering.

9 Several areas were identified as inaccessible during the RF021 and W022 IWE examination process. Those inaccessible areas are generally defined in PW024. More specific information is included with the data supplied in this report.

DETAILS:

TORUSSURFACE The surface fkom just below the catwalk on the exterior surface to the horizontal mid point of the torus was inspected prior to W 0 2 2 The remaining torus penetrations were examined prior to RF022 and during RF022.

Penetrations X-207A-H were identified as having corrosion exceeding the provided acceptance criteria. IDR 01-08 was written on this item. This was addressed by Design Engineering and a design wall thickness for these penetrations was provided. The X-207A-H penetrations are acceptable for continued use and the corrosion identified does not exceed the required design wall thickness.

Torus penetration (includes penetrations in the vent system) examinations were completed for the first period.

The interior surface of the vent header examination was completed during RlF022. There were areas of pitting and corrosion identified in the vent header that exceeded the provided acceptance criteria. IDR 01-07 was written to address the areas of pitting and corrosion. Design Engineering addressed this IDR and provided new acceptance criteria for the vent header corrosion identified. All areas are within the required design wall thickness provided by the Design Engineering resolution and are acceptable fur continued operation.

A U G m N m D m L SURFACES After review of the data gathered during RF021, a portion of the containment surface at the joint seal area was declared as augmented. This area was examined and documented during RFO22. No change was identified in the as inspected condition between RFO21 and RF022 in the augmented area.

Since the area of the augmented s d a c e was being prepared for seal installation and painting the opportunity to examine this region with white metal exposed and all corrosion removed presented itself The entire circumference in the moisture barrier area was examined and the areas of pitting and pit depths were identified. All pitting

identified by this examination were bounded by the 1999 evaluation, VYM 99/139, and are acceptable for continued operation of the drywell.

Forty-three (43) percent of the required first period drywell penetration examinations were completed during NO21 the remainder was examined either prior to or during RF022. Many of these penetrations depicted debris and peeling paint. The dddebris is not considered to be detrimental to the containment structure. All penetration cavities were dry with no visible indication of moisture. The peeling paint was similar to that identified in the maintenance reports and is not unusual for the age and environmental conditions experienced by the coating.

The diddebris identified in the drywell penetration cavities is a housekeeping issue only, not a containment integrity concern. All large debris located in the penetrations examined has been removed. The remaining debris consists of the accumulation of dirt, dust and paint chips over the life of the plant. The quantity of debris in the penetrations identified is not a containment integrity concern. Most diddebris was lying in the concrete sleeve and not in contact with the penetration. All penetrations examined (except for X-207A-H) were dry with no indication of water. The penetrations typically have a small access and pose difficulty cleaning. The dilemma from inside the drywell is the accessibility to the penetrations and the ALATU concerns.

The drywell moisture barrier at the concrete floor to steel interface on the 238 level was identified as failed during RF021 examination. During RFO 22 this seal was replaced.

To deal With the paint chipping and corrosion in the seal area and to accommodate the seal installation a six-inch wide band of paint was removed in the seal area for the full circumference of the drywell at the 238 level. The seal was reinstalled per minor mod

  1. 2000-010.The six-inch band was re-coated with non-qualified coating. The area of the seal and coating was examined after installation to document the as installed condition.

This seal acts as a gasket at the concrete to steel interface to prevent moisture from penetrating under the concrete and to prevent it fiom setting in the interface setting up localized corrosion. This area is an area that regularly gets flooded with water due to the activities that take place during outages in the dry well. This area also is an area that experiences wear and tear at a much higher rate than the rest of the containment due to its location. As a result of the location and outage activities this is an area that requires regular maintenance to keep the moisture barrier seal and the paint in the moisture barrier area intact and properly protecting the steel containment. The logistics of trying to place qualified coating at this location and then set up to regularly maintain it can be difficult as was seen during RFO22 not to mention very costly. I recommend that this moisture barrier area and the six-inch band of paint be declared a high maintenance area and designed as an area where unqualified coatings are approved and utilized. This will make the routine maintenance of this area much easier to perform resulting in better

maintenance of this area in the fbture. If this approach were approved, repainting with qualified coating would not be required only maintenance activity to maintain the integrity of the nonqualified paint and moisture barrier seal. This maintenance should become a routine PM.

PRESSURERETAlN1.G BOLllNG Bolting examinations for X-200A & B and V16-19-5G& H were completed during RF022 in the removed condition. Bolting examinations or Vl6-19-5A-F was examined in place. This completes the required first period IWE bolting examinations.

SUMMARY

An estimated 80% of MrE examinations are completed prior to or during RFO21. The remaining 20% were completed prior to or during RF022 to complete the first period examination requirements.

There were two new IDRs generated, per DP4027, for containment issues G n g W022. All of these issues were addressed by Mechanical Design Engineering prior to RF022 startup.

Please find attached to this report for reference the Summary of First Period TWE Examinations. This repod provides details for the fir&period examinations.

1/23/1999

SUMMARY

OF FIRST PERIOD Twl XAMINATIONS CONTAINME

  • SURFACES (TORU! BAYS) ASME SECTION XI EXAhL CATEGORY. E-A ASME IS1 EXAM % REMARKS SECTlON X I IDENTIFICATION COMPLETE ITEM NO. NO.IDESCRIPTION TO DATE h e m a l surface above water line completedRFO 21 El.ll TORUS BAY 1 GV 100 yo Exi.emal surface except area ffm catwalk down to belt Line completed.

Remaining m to be mspeded after S/URFO2l(oompl&edpre RFO 22)

Nate: VT-1 completed below water line RFCUO m a l surface above water line completedRFO 21 EI.11 TORUS BAY 2 GV IW % Eldeanel surface except area 5om catwalk down to belt line completed.

Remaiming area to be inspected after SN RMnl (complaedpre RFO

~~ ~ ~

22) Note: VT-1 completed below water line RF020 Internal &ce above water line completed RFO 21 ELI1 TORUS BAY 3 GV 100 Yo Elagnal surface except area &omcatwalk down to beIt line complefed Rmnaiairig arca to be inspected a f t s S N RF(nl(c0mpletedp RFO 22)

$late: VT-I ~0mleted below water line RF020 banal d a c e above wata line completedRFO 21 El.ll TORUS BAY 4 GV 100 Yo Extemal surface except area fiom catwalk down to belt line compfeted Remaining area to be inspected after SKJ RF02l(completed pre RFO 22)

Ncte: VT-1 completed below water line RF-0 Internal surface above water line compIeted RFO 21 ELI1 TORUS BAY 5 GV F&temalsurfaw ex- area from catwak downto belt line completed Remainingarea to be inspected after S/WRF02l(completed pre RM)22)

Note: VT-1 ~ m p k k below d .water IhK RF020 Internal d a c e above water line complded RFO 21 TORUS BAY 6 GV I00 Yo E x t a d d a c e except area fiom catwalk downto belt line compIeted.

El.ll Remaining area to be inspecid a%er SN RF02l(compleLed pre RFO 22)

Nate: VT-1 completed below water line RF020 Mmalsurface abovewater line complded FSO 21 El.ll TORUS BAY 7 GV 100 % m a l d c e except area ikom catwalk dawn to belt line completed.

Remainingarea to be mspeded d e r S N RFO2l(compllBed pre RFO 22)

Nde: VT-1 complUed bdow water line RFOZO baemal d a c e above water Line completed RFO 21 TORUS BAY 8 GV 100 Yo Edema1 slpface except area fiom catwalk down to belt line completed-EL11 m i n i n g area to be inspected after SN WO22(compldedpre RFO 22)

Note: VT-1 completed below water line RFOZO krtanal sllrface above water line mnpleted RFO 21 TORUS BAY 9 GV 100 Oh Extemd d a w except area from catwalk down to bdt line completed.

El.ll Remaining area to be inspe&ed aAa S N RF02l(complaed pre RFO 22)

~~

Note: VT-1 completes below water line RF020 Internal d a c e above water rine completedRFO 21 TORUS BAY 10 GV 100 Yo Extanal sorface except area eom catwalk downto belt line oomplaed ELI1 Remaining area to be inspected aftex S/U RF02l(completedpre RFO 22)

Note: VT-1 completed below water line W020 fntemalsurfaoe above water Line canplaedRFO 21 TORUS BAY 11 GV loo % External surface excqt area fiom catwalk downto belt line mmplered EL11 Remaming area to be inspectedafter S N ~ l ( 0 o m p l e t e pre d RFO 22)

Note: VT-I completed below water line RF020 Intanald a c e above water line complded RFO 21 TORUS BAY 12 GV 100 Yo External surface except area 6.omcatwalk down to belt line completed E1.11 Remaining afes to be inspected a h SllJ RFoZl(c0mpleted pre RFO 22)

Note: VT-1 completed below water line RF020 bitema1 s u r f h abovewater line compleced RFO 21 TORUS BAY 13 GV 100 % External surf$= except area fiom catwalk down to be& h e completed EL11 Remaining area to be inspected a%= S N RFOZl(comp1eted pre RFO 22)

Note: VT-1 coqkted below water line RF020 Intemal surfaceabove water lime completed RFO 21 El.ll TORUS BAY 14 OV 100 % External SllrfaQ except area fiom catwalk &wm to belt line completed Remabing area to be inspected a&er S N RFO2l(complBed pre RM, 22)

~~

Note VT-1 completed below water line W 0 2 0 haernal surface above water tine complaedRFO 21 TORUS BAY 15 GV 100 % External SUrfaQ e x q t a r e *om catwalk down to belt line completed EL11 Izcmainingarea to be inspected after S / u RFCnl(c0mpleted pre rZF0 22)

Note: V7'-I completed below water line RF020

a Intend surface above water line coloplaed RFO 21 TORUS BAY 16 GV 100 % Exkznal sllrliice e x q t area h m catwalk downto belt Iinc completed El.11 Remakingareato bemspeded~erS/URF(nl(aomplBedpre~O22)

Nde: VT-I c~mpletedbelow water line RF020 ASME SECTIt J XI EXAM. CATEOC THE VENT LINE WAS COMPLETEa FROM THE TNTERNAt VENT SYSTEM SURFACE FS021. THE VACUUM BREAKER LXNES WERE BAY 2 COMPLETEDFROMTHEEXTERNALSURFACETOfltfE mum PENZTRATLON203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY, 203 Pl%ETlL4nON TO THE ELBOW VERTICAL WELD. THE VACUUM FXEWAL. SURFACE OF THE VENT HEADER AND INTERNAL BREAKER JXNES, A M )EXTERNAL SURFACES OF THE DOWNCOMERS A N D m COMPLETED RFWO.

HEAVJB IN BAY 2 THE VENT HEADER INTERIOR,VENT LINE -OR, AND AND BAY 3) THE REMAINDER OF THE VACUUM LINE WIU BE SCHEDULED FOR RFO22. (completed pre RFO 22)

TIiE VENT LINE WAS COMPLETED FROM THE INTERNAL SURFACE RF021. THE VACUUMBREAKER LINES WERE CONIPLETEDFROMTHEEmWALSURFACETOTHE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATONTO THE ELBOW VERTICAL WELD. THE EXTERNAL SURFACE OF THE VENT HEADER AND INTERNAL AM)EXTERNALDOWN COMER SURFACES WHERE COMPLETEDRF020.

THEVENTLINE WASCOMPLETEDFROMTHEINT'ERNAL.

VENT SYSTEM SURFACE W0.21.THE VACUUM BRWU<ER LINES BAY 4 COMl'LETJ3,DFROMTHEEXTERh'ALSuRFAcE TOTHE (VENTLINE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM TF5 ASSEMBLY, 203 PENETRATIONTO THE ELBOW VERTICAL WJZD. THE VACUUM EXTERNALSURFACE OF THE VENT HEADER AND INTERNAL.

BREAJERLDJES, AND EXTERNAL SURFACES OF THE DOWNCOMERS %'ERE AND VENT COhApLETED RFW.

HEADER M BAY 4 THE VENTHEADER JNTERIoR, VENT LINE m N O R , AND AM) BAY 5) THERJ3MNDEBOFTHEVACWUMLINEWIUBESCHEDULED FOR RFO22.(compl&edpre RFO 22)

THEVENTLINEWASCOh4PLETEDFROMTIIEINTERNAL SURFACE RF021. THE VACUUMBREAKERLINESWERE cOMpIE% FROM THE EXTERNAL SURFACE TO THE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE 203 PENETRATIONTO THE ELBOW VERTICAL WELD. THE ExIlERNAtSURFACE OF TNE HEADER AND INTE'FWAL AND EXTERNAL SURFACES OF THE DowNcOMERs WMERE COMPLETED RFo20.

THE V E h T LIME WAS OOMPLETEX) FROM THE INTERNAL VENT SYSTEM SURFACE RFO21. THE VACuuhiI BREAKER LINES BAY 6 COIvlPL.E~FROMTHEEXTERNALSURFACETOTHE (VENTLINE PENETRATION203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY, 203 PENETRATION TO THE ELBOW VERTICAL WELD. THE VACUUM EXTERNAL SURFACE OF THE VENT HEADER AND INTERNAL BREAKERLINES, AND EXTERNAL SURFACES OF THEDOWNCOMERS ANDVENT G o M P r n D RFmo.

HEADER IN BAY 6 THE VENT HEADER INTERIOR, VENT LINE EXTERIOR, AND AND BAY 7) TIE REMAINDER OF THE VACUUM LINE WILL BE SCHEDULED FOR RF022.(completed pre RFO 22)

VENT SYSTEM GV 100%

BAY 8 CV EN Tm ASSEMBLY, VACUUM BREAKER LINES, AND VENT LEADER IN BAY 8 AND BAY 9)

VENT SYSTEM GV 100% SURFACE -1. THE VACUUM BREASRLINES WERE BAY 10 COMPLETEDFROMTHEEXTERNALSURFACETOTHE

{VENTLME PENETRAnoN 203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY, 203 PENETRATION TO THE ELBOW VERTICAL W.THE VACUUM EXlXRNAL SURFACE OFTHE VENT HEADER AM) INTERNAL BREAKERLINES, AND EXTERNAL SURFACES OF THE DOWNCOMERS WAERE ANDVENT COMPLETED RFmo.

HEADER IN BAY THE VENT HEADER INTERIOR, VENT LXNE EXTERIOR,AND 10ANDBAY 11) THEREMAINIlEROFTHE VACWMLINEWIUBESCHEDUm I TfIEVENTLLNEWASC0MPLE"EDFROMTHEINXERNAL El.ll VENT SYSTEM GV 100% SURFACE RF021. THE VACUUM BREAKER LINES WERE BAY 12 COMPld3TEDFROMTHEEXTERNALSURE.'ACETOTRE (VENTLN PENETRATION203 ELBOW THEN FROM THE INSIDE FROM THE ASSEMBLY, 203 fENETRATIQNTO THE ELBOW VERTICAL WELD. THE VACUUM EXTERNAL SURFACE OFTHE VENTHEADERAND INTERNAL BREAELERLINES, ANDEXTERNAtSURFACESOFTHEWWNCOMERs WHERE AND VENT COMPLETED RF020.

HEADER IN BAY THE~HEAJlER~O~~Y3NEEXTERIOR,AND 12 AND BAY 13) THE REMAINDER OF THE VACUUM LINE WILL BE SCXEDUUD FOR RFO22 (completedpre RFO 22)

THEVENTLINEWASCOMPLETEDFROMTHEINTERNAL EL11 VENT SYSTEM GV 100% S G A C E W&1. THE VACUUMBREAKER LINES WERE BAY 14 COMPLJ3ZD FROM THE EXTERNa SURFACE TO THE (VENTLINE PENETRATION 203 ELBOW ITEN FROM THE INSIDE FROM THE ASSEMBLY, 203 PENXRATIONTO THE ELBOW VERTICAL WELD. THE VACUUM EXTERNAL SURFACE OF THE VENT HEADER AM)INTERNAL BREAKERLINES, ANDEXERNAL SURFACES OF THE DOWNCOMERS m RE ANDVENT COmLETEDRFmo.

HEADER IN BAY THE VENT HEADER INFERIOR, VENT LINEEXTERIOR, AND 14 AND BAY 15)

E1.11 VENT SYSTEM GV 100% SURFACE RFO21. THE VACUUM BEAKER LMES WERE BAY 16 C0MPETF.D FROM THE EXl33FWAL SURFACE ToTHE (VENTLINE PENETRATION 203 ELBOW THEN FROM THE INSIDE FROM THE ASsErnLY, 203 PENETRATION TO THE ELBOW VERTICAL WELD. THE VACUUM EXTERNAL SURFACE OF THE VENT HEADER AND INTERNAL BREAKERLINES, AND EXIZRNAL SURFACES OF THE DOWNCOMERS ANDVENT COMPLETEDwmo.

HEADER IN BAY THE VENTHEADER INTERIOR,VENT LINJ?EXTERIOR, ANI) 16 AND BAY 1) THE REMAINDER OF THE VACUUM LINE WILL BE SCHEDULED FOR xFO22. (completedpre RFO 22)

ASME SECTION XI EXAM. CATEGORY E-A EL11 TorusPgletratiOn GV 100% COMPLEmINTERNALANDEXTERNAL X-2OOA & B -~

E1.12 VT-3 100% COMPLETE FROM EXTERNAL -021 EL11 Torus Penetration GV 100% COMPLETE FROM INTERNALRFO21 X-201A THRU A EX"ZRNAL TO BE SCHEDULED BEFORE OR DURING RFOZXcompleted pre RFO 22)

El.11 TarusPendration X-202A THRU F GV 100% I COMPUTE FROM INTERNALAND EXI'ERNAL WO21 EL11 Torus Penekation X-202G THRU K GV 100% 1 COMPLETE FROMINTERNAL ANL) EXTERNAL E 3 0 2 1 EL11 Torus Penetration GV X-203A THRU F D BEFORE ORDWRING I

El.11 To~usPen&itioa GV COMPLETE FROM INTERNAL W021 X-203G THRU H RNAL TO BE SCHEDULED BEFORE OR DURING W 0 2 2 I

Torus Pmetnrtion GV COMPLETE FROM xNTEIu\JAL AND EXTERNAL W02I El.ll Tarus Pgletration GV X-206A THRU D I

El.12 VT-3 Toms Penplr;aion GV X-206E THRU F EL12 VT-3 El.ll T m P e n ~ m GV X-207A THRU H E D FOR RF02z(completed RFO 22 EL11 Torus Penetration GV COMPLETEFROMINT'ERNALANDEXTERNALRF021 X-208ATHRU D El.ll Taus Penetration GV X-209A THRU D I

El.ll TonrsPenetmtion GV X-2 1OA & EL EL11 Toms Penetration GV ioo% COMPLXTEFROM INTERNAL AND EXTERNAL S O 2 1 X-ZlIA&B EL11 Taus Pen&itim GV 100% COMPLETEFROMINTEKNALANDEXTERNALW021 x-212 EL11 Torus Penetration GV 100% COMPLEE FROMEXTERNAL RFCnl (UNDERWATER)

X-213A &. B EL12 I VT-3 100% COMPLETE FROME;rlTERNALRFO21W E R WATER)

El.ll Torus Penetration GV 100% COMPLETEFROMINTERN&AlWEXTERNAtRF021 X-2 I4 EL11 TorusPenWw GV 100% COMPLETE FROMKNTERNAL AND EXTERNAL RF021 X-21 5 EL11 Torus Pen&at.ion GV 100% COMPLETE FROMWRNAL AND EXTERNAL RFO21 X-216 EL11 Toms Pondration GV 100% COMPLETE FROM lNl'ERN& A M )EXEIRNAL RFOZ1 X-217 '

EL11 Taus Penetration GV 100% COMPLETE FROM INTERNALAND EXTERNAL RFO21 X-2 18

El.ll Torus Peaetnnion GV 100% COMPLETE FROM m A L AND EXTERN& RFO21 X-219 EL11 Torus Penetration GV 100% COMPLETE FROM INTERNAL AND EXTERNAL RFO21 EI.11 x-221 El.ll TorusPenetration GV 100% COMPLETE F'ROMINTERNAL AND EXTERNALRFOZl x-222 El.ll X-223 t El.ll Torus Pendmtion GV 100Yo I COMPLETE FROMIZXTERNALRFOZl X-224A & B INSULATION PREVENTING INSPECTIONFROM EXTERNAL, INTERNAL,UNDER WATER THIS WIU BE RESCHEDULED WHEN DIVERS ARE IN TORUS OR TORUS HAS BEEN DRAMED ALONG WITlI THE UNDERWATER SURFACES.

1.11 TolusPenetrsdion GV 100% COMPLETE FROMEXTERNAL W 0 2 1 (UNIIER WATER)

X-225 EL12 VT-3 100% COMPLETE FROMEXTERNALRFCBl(UNDER WATER)

El.ll Torus Peaetration GV 100% COMPLETE FROMEXTERNALRFOZI (UNDER WATER)

X-226A & B E1.12 VT-3 100% COMPLETE FROMEXTERNALRFOZI (UNDERWATER)

EL11 Torus Penetmtion GV 100% COMPLETE FROMEXTERNALRFo21 (UNDER WATER)

X-227 E1.12 1I VT-3 I 100% I COMPLETE FROMEXTERNAL RFml (UNDER WATER)

I I EL11 TorusPenQtation GV 100% COMPETED FROM EXTERIOR RFOZ1 (NOTACCESSIBLE FROM X-228 INTERIOR)

EL11 Torus Pen&ation GV 100% COMPLETED FROMEXTERIOR RFO21 (NOT ACCESSIBLE FROM X-229 INTERIOR)

EL11 Toms P e n d o n GV 100% COMPLEED FROMEXTERIORRF021 X-230

&G COMFTZTED FROM DITEPJOR RFOZ1 (B,D,F &H ARE EL11 TorusPenetraton GV 100YO UNDER WATER FROM INTERNAL)

X-231A-H B,D,F,G& H COMPLETED FROM EXTERNAL RFCB 1 RESCHEDULE A,C, & E FOR RFO22(wmpleced pre RFO 22)

ASME SECTION M EXAM.CATEGORY: E-A 100% COMPLETEDFROMINTERNALRF021 238 to elevation 251 EXTERNAL INACCESSIBLE BY DESIGN quadrant ato 90 100% COMPLETED FROMIh'TEN'JAL. RFo21 I I I EXTERNAL INACCESSIBLE BY DESIGN I I I EL11 I Dnwellelevation I GV I 100% COMPLETED FROMINTERNAZ, RF021 2 6 to elevation 251 EXTERNAL INACCESSIBLE BY DESIGN quadrant 90to I80 COMPLETEDFROMl[NTERNALRFO21 EXTERNAL lNACCESSIBLE BY DESIGN EL11 Drywellelevation GV lODO/o COMPLETED FROM INTERNALRFOZ1 238to elevation 251 EXTERNAL INACCESSIBLE BY DESIGN quadrant 180to 270 d e w

t I

E1.12 VT-3 loo?? . COMPLETED FROM INTERNAL RF021 8 ExTERNAtINACCESsI8LEBY DESIGN EL11 Drywell elevatim GV 100% COMPLETED FROM NEFCNAL RFO2l 238to eIevation 251 EXTIERNALINACCESSIBLEBY DESIGN quadrant 270 to 360 E1.12 degFees VT-3 100% OOMPLETEDFROMINTERNALRF021 EXTERNAL INACCESSIBLEBY DESIGN EL11 Drywellelevation GV 100?4 COMPLETED FROMEVIERNAL. RFO21 251 to elevation 269 EXTERNAL INACCESSIBLEBY DESIGN qu.adtimt 0 to 90 E1.12 degrees VT-3 100% COMPUTED FROM INTEF3VA.L RFO21 EXTERN& INACCESSIBLEBY DESIGN El.ll Drywell elevation GV 100% COMPLETED FROMINTERNALRF021 251 to elevation269 EXTERNALINACCESSIBLEBY DESIGN quadnmt90to180 degreg I

El. I1 Drywell elevation GV 10% COMPLETED FROMIlvTmNAL RFo21 251 to elevation269 EXTERNAL INACCESSIBLEBY DESIGN quadrant 3.80to 2'70 degrees EL11 DryweU elevation GV 100% COMPLETED FROMINTERNALRF021 251 to elevation 269 EXTERNALINACCESSIBLEBY DESIGN quadrant 270 to 360 aegrees EL11 Drywell elevation GV 1OO?! COh4PLETED FROM INTERNAL RF021 269 to elevation321 ECIERNAL. INACCESSIBLE BY DESIGN quaoh.antoto90 degrees E1.11 Drywell dwation GV COMF'LETEDFROMINTERNALR.F021 269 to elevation 321 ECI'EXWAL INACCESSIBLEBY DESIGN q u a b t 90 to 180 degrees E1.11 DrywelI elevation GV 100% COMPLETEDIXOMrmTERNALFSOZ1 269 to elevation 321 EXERNAL INACCBSIBLEBY DESIGN quadrant 180 to 270 kees ~

ELI1 Drywell elevation GV 100% COMPIETED FROM INTERNAL RFO21 269 to ekv&cro 321 EXTERNALINACCESSIBLE BY DESIGN quadrant 270 to 360 degrees El.11 Drywen Head GV 100% COMPLETED M021 interior surfacesand Drywen flanges El.ll Drywell Head GV 100% COMPLETED RFOZ1

~orsurfsces CONTAINME r SURFACES (DRYWELL PENETRATIONS)

EL11 DryweUPenetratim GV 100% COMPLETED INTERNAL AND EXTERNAL RF021 x-1 PORTIONS OF THEEXTERNAL AREA ARE INACCESSIBLE FROM DIRECT vzSUAJ+EXAMINATION BY DESIGN EL1 I DrywellPeoetration GV 100% COMPLETED INTERNAL AND EXTERNAL F S 0 2 1 x-2 PORTIQNS OF THE EXTERNAL AREA AKE INACCESSIBLE FROM DIRECT VISUAL EXAMINATiON BY DESIGN

El.ll Drywell Penetration GV 100% COMPLETEDINTERNALANDEXTERNALRF021 El.ll Drywell Penetrativn GV 100% COMPETED INTERNALRFO21 X-SA THRU X-5H EXTERNAL TO BE COMPLETED BEFORE OR DURING RF022(completedpreRFO 22)

I E1.12 VT-3 COMPIETED FROM THE INTERNAL SURFACE RFO21 I

GV 100% WMF'LETED FROMINTERIORRFO21 RESCHEDULEEXIERIOR BEFORE OR DURING RF022(oompleted pre RFO 22)

El.ll DrywellPenetratiGil GV 1OPh COMPLETED FROM INTERNAL RFO21 X-7A EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22(completed RFO 22)

GV El.ll 1 Drywell Penetr;aica x-7c GV El.ll Dryweu Penetration GV COMPLETED FROM LNTERN MCI'ERNAL TO BE SCHEDULED BEFORE OR DURING GV E1.12 VT-3 EL11 Drywell Penetration GV X-9A El.ll 1 DryWellPmetration X-9B GV 100% COMPLETED FROMMTERNAZ.RF021 EXTERNALTO 3E SCHISDULED BEFORE OR DURING RFOn(camp1eted RFO 22)

I El .11 1 DrywelI Penetration x-10 GV RE3CSDUL.E FOR W022 (completed RFO 22) External surface insulated restridingaccess for GV Exam. N d internal surface has I

El.ll Drywen PenetTation GV RESCHEDULE FOR R Fm (completed RFO 22) External d a c e El.ll Drywdl Penetration GV FROM INTERNAL RF021 (INACCESSIBLEAREA x-12

.. . . . .. . ....-. . 8 . . ___ ..-. ._. - . . -.- - - . . . . . - - ... ... - - . ... . ... ... . .. - - .... . .... .. ...

8 El.11 Drywell Penetration COMPLETEDF'ROMINTE~ALRF021 X-13A RNAL TO BE SCHEDULEDBEFORE OR DURING RF022 El.ll Drywell Penetralicm COMPLETED FROM INTEIZNAL RF021 X-13B RNAL TO BE SCHEDULEDBEFORG OR DURING RFO22 El.ll DrywellPenetration X-14 El.11 DrywellPenecration x-15 EL11 Drywell Peneb.ation GV 100% THIS FZNETRATION IS NOT ACCESSIBLEFOR GV EXAM OF X-16A INTERNALSURFACE. (completed RFO 22)

El.11 DrywellPtnetraticm GV 100% TRIS PENETRATIONIS NOT ACCESSIBLE FOR GVEXAM OF x-16B INTERNAL SURFACE.(completedRFO 22)

El.ll Drywell Pmctratian GV 100% COMPLETED FROMINTERNALRFO21 X-17 EXERNALTO BE SCKEDUI.ED BEFORE OR DURING W 0 2 2 (compleled pre RFO 22)

El.ll Drywell Penetration GV 1004/0 COMPLETED lXOMINTERNAL W021 X-18 EXTERNAL TO BE SCHEDULED BEFORE OR DURING W 0 2 2 (completed pre RFO 22)

I I El.11 Drywell Penetration GV 100% COMPLETED FROMMTERNALRFO21 x-19 EXTERNAL TO BE SCHEDULEDBEFORE OR DUfUNG -022 (completedRM)22)

I I I

EL11 Drywell Penetration GV 100?%3 WWIETED FROM INTERNAL RFO21 x-20 EXTERNALM BE SCHEDULEDBEFORE OR DURING RFcn2(completcd pre RFO 22)

I EL21 Drywen PmeEratia GV lOOo! COMPLETEDFROM lNTJ5RNAL RF021 x-21 EXIXRNAL TO BE SCHEDULEDBEFORE, OR DURING RFO22(completed pre RFO 22) t Dryweu Pennetration GV 100% COMPLETED FROM INTERNALRFOZl x-22 EXIZRNM. TO BE SCHEDULED BEFORE OR DURING RF022(completedpre RFO 22)

ELI1 Drywell Penetraticn av 100% INSuLATlON PREVENTS ACCESS FOR GV EXAM FROM X-23 INTERNAL SURFACE. (completed RFO 22)

EL11 Drywell Penetratiar GV 100% LNSULATIONPREVENTS ACCESS FOR GV EXAM FROM X-24 INTERNAL SURFACE(completed RFO 22)

I El.11 Drywell Pentztration GV 100% COMPLETED FROM INTERNAL RFozl X-25 EXTERNALTO BE SCHEDULED BEFORE OR DURING I(Foz2(compIeted pre RFO 22)

EL11 Drywell Penetration GV 100% COMPLETED FROMTNTERNALRFcnl X-26 EXTERNAL TO BE SCHEDULEDBEFORE OR DURING Eo22

( c o m p l d pre RFO 22)

+

E1.12 VT-3 100% COMPLETED FROM INTERNAL RFm1 I

EL11 Drywell Penetration GV loo?? COMPLETED FROM WIXWAL RFO21 X-27 EXTERNAL. TO BE SCHEDULED BEFORE OR DURING RF022 (completed RFO 22)

~ ~

El.ll DryWeUPeretratica GV 100% COMPLETED FROM INTERNALRF021 X-28 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022

~compleledRFO 22)

EL11 RESCHEDULE FOR RF022 INTERNAL SURFACE NOT SAFELY ACCESSIBLE FOR GV EXAMINATION (completed RFO 22)

El.ll DrywdlPenebatioo GV 100% COMPLETEDFROM INTERNALRFOZl X-30 EXTERNALTO BE S C B D W D BEFORE OR DUIUNG RF022 (completed pre RFO 22)

EL12 VT-3 100% COMPLETED FROM INTERNAL RFOZl El.ll DrywetlPenetratim GV 100% COMPLETED FROMINTERNALRF021 X-31 EXTEFWAL TO BE SCHEDULED BEFORE OR DURING RFo22 (completedpre RFO 22)

EL12 VT-3 looOm COMPLETED FROM INTERNAL RF021 El.ll DrywellPemtration GV 100% COhPLETI3DFROMMTERNALRF021 X-32 EXTERNAL TO BE SCHEDULEDBEFORE OR DURING RFOZ2

~complaedpre RFO 22)

I------

El. 12 100% COMPUTED FROMINTERNALRF021 El.ll 100% COMPLETED FROMINTERNALRF021 EXTERNAL TO BE SCHJ3DULED BEFORE OR DURING R W 2 2 (completed pre RFO 22)

EL11 Drywell Peoctratian 100% RESCHEDULEFOR RF022 (completedpre RFO 22) x-34 EL11 DrywellPeneCration GV 100% COMPIETEDFROMINTERi'JALANDE2CIXRNALRFOZl X-35A THIS PENETRATIONIS PARTIALLY ACCESSIBLE FORGV

~~

EL12 El.11 EEzq-?

X-35B 100%

100%

Wh4PUTED FROM INTERNfi RFO21 COMPLETEDFROM INTERNAL AND EXTEWAL W021 THIS PENETRATION IS PARTIALLY ACC?3SIBLEFOR GV EXAM EL12 100% COh4FTEIBD FROM rmTERNALRF021 El.ll hyweIi Pme?ratioa GV 100% COMPLETED FROM INTERNALAND EXIERNAL RF021 x-35c THISPENETRATION IS PARTIALLY ACCESSIBLE FOR GV EXAM E1.12 VT-3 100% COMPLETED FROM INTERNAL.RF021 I

I-EL11 100% COMPLETED FROM XNTERNAL AND EXTERNAL RFO21 X-35D THIS PIPJETRATION IS PARTIALLY ACCESSIBLE FOR G V EXAM Drywdppenetratim f VT-3 100% COWLETED FROM INTERNAL. RF021 100% COMPLETED FROM INTERNAL AND EXXERNALRFO21 THiS PENETRATIONIS PARTIALLY ACCESSIBLE FOR OV EXAM

E1.12 VT-3 100% COMPLETED FROMINTERNALRFOZl ELXI Drywen Penetration GV 100% COMPLETED FROM IMERNAL W02I X-36 EXTERNALTO BE SCHEDULED BEFORE OR DURING RF022 (completedpre RFO 22)THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GVEXAU El.11 Drywell Penetration GV 100% COMPLETEDFROMINTERNALRFOZX X-37A EXTERNAL TO BE SCHEDUUD BEFORE OR DURING RFO22 (oompl&edpreRFO 22) THIS PENETRATION IS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXIMITY OF PIPES M EACH OTHER AND THE MINIMAL CLEARANCES BETWEEN THE CRD PPING AND THE mmmm SLEEVES.

EL11 Drywen Penetration GV 100% COMPLETED FROM INTERNAL. RF07.1 x-3% EXTERNAL TO BE SCHEDULED BEFORE OR DURINGRFOZZ (completed pre RFO 22) THIS Pl3EXIU'MON IS NOT ACCESSBLE FOR GV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AND THE MINIMAL CLEARANCES BETWEEN THE CIU) PIPING AND THE CONCRETE SLEEVES.

El.11 Drywell PenetIatiOn GV 100% COMPLETED FROM INTERNAL RFOZI x-37c EXTERNAL TO BE SCHEDULED BEFORE OR DURING -022 (aomplaed pre RFO 22) THIS PENETRATION IS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXWKY OF PIPES TO EACH OTHER AND THE MINIMALCLEARANCES BETWEZN THE CRD PIPING AM)THE CONCRETE SLEEVES.

El.ll Drywell Penetration GV 100% COMPETED FROMINTEWAL RFOZl x-37D EXTEF?XALTO BE SCHENJIED BEFORE OR DURING RFO22 (compietedpre RFO 22)THIS PENETRATION IS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AM) THEMINIMALCLEARANCESBETWEENTHE CRD PIPING AND THECONCRETE S?XEVES.

EL11 Drywell Penetraticn GV 100% COMPtETEDFROMINTEWALRF021 X-38A EXTERNAL.TO BE SCHEDULED BEFORE OR DURING RFo22 (completed pre RFO 22) THISPENETRATION IS NOT ACCESSIBG FOR GV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AND THEMINIMAL CLEARANCES BETWEENTHE CIiD PIPING AND THE CONCRETE S W V E S .

EL11 Drywell Penetration GV 100% COMPLETED FROM INTERNALRFOZl X-3833 EXTERNALTOBESCHEDULEDBEFOREORDURINGRFO22

  • (completedpre RFO 22) THIS PENJXRATKONIS NOT ACCESSIBLE FOR GV EXAM DUE TO PROXIMITY OF PEES TO EACH OTHEfz AND THE MlNLMAL CLEARANCESBETWEEN THE CRD PIPING AND THE CONCRETE SLEEVES.

EL11 Drywell Peaetration GV 100% COM.PLETED FROM INTERNAL RF021 X-38C EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22)THIS PENETRATION IS NOT ACCESSIBE FOR GV EXAM DUE TO PROXIMITY OF PIPES TO EACH OTHER AND THE MIMMAL CLEARANCES BETWEEN THE CRD PIPINO AND THECONCRETE SLEEVES.

El.ll Drywen Penetration GV 10o?h COMPLETED FROM INTERNALRFO21 X-38D EXTERNAL TO BE SCHEDULED BEFORE OR D W G RF-2 (completed pre RFO 22) THIS PENETRATION IS NOT ACCXLSSIBa FOR GV EXAM DUE TO PROXIh4IlY OF PIPES TO EACH OTHER AND THE CLEARANCES BETWEEN THE CRD PIPING AND THE CONCRETE SLEEVES.

EL11 Drywell Penetration GV 100% ~~LEIEDFROMINTERNALRFO21 X-39A EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22) THIS PENETRATION IS INACCESSIBLE FOR GV EXAM OF EXTERNAL SURFACES RUE TO INSULATION

I EI.ll DrpdlPenetrrdion GV 100% COMPLETED FROMINTE~ALRFOZI X-39B EXTERNAL TO BE SCIXEDUWD BEFORE OR DURING WO22 (completed pre RFO 22)

El.ll Di3w811Penetratim GV 1W/o COMPLETED FROM iN'I'ERNAL RFO21 X4OA EXTERNAL TO BE SCHEDULED BEFORE OR DURING RFOn (compIetedpre RFO 22) THIS PENETRATION IS NOT SAFELY ACCESSlBLE FOR GVEXAM OF EXTERNAL SURFACE El.11 GV 1W/o COMPLETED FROM INTERNAL, RF021 EXTERNALTO BE SCHEDULED BEFORE ORDURING RF022 (cnnpletedpreRFO 22) THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV EXAM OF EXTERNAL SURFACE ELI 1 1

DrYc9.4 P0l&ion GV 100?? COMPIJXED FROMrmTERNAL W021 x4oc EXTERNAT.TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22)THIS PENETRATION IS NOT SAFELY

~

ACCESSIBLE FOR GV EXAM OF EXIERNJ~LSURFACE EL11 GV 100% COMPLETED FROMINTERIVALRFO21 EXTERNALTO 3 E SCHEDULED BEFORE OR DURING RFO22 (completedpre RM, 22) THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV E X A M OF EXIXFtNAL SURFACE I

EI.11 100% RE23mDUT-E FOR RFOn (oompl&ed RFO 22) THE, INTEWAL SURFACE OF THlS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV EXAh4 El.ll DrywellPeneh-dtion x-42 I GV 101)0/0 COMPLETED FROM INTERNALRF021 EXTERNALTO BE SCHEDULED BEFORE OR DWUNG RF022 (completedpre RFO 22)

E1.11 Drywell Penetration GV 100% COMPLETED FROM INTERNAL RFO21 x-43 EXTERNAL TO BE SCHEDULEDBEFORE OR DURING RF022 (completed RFO 22) THE EXTERNAL SURFACE OF THIS PENETRATION IS NOT SAFELY ACCESSIBZ FOR GV EXAM El.ll DrYwellPcmiration GV 100% COMPLETED FROM INTERNfi RFO21 X-44 EXTERNAL TO BE SCHJDUJJDBEFORE OR DURING RF022 (complaed RFO 22) THE EXTERNAL SURFACE OF THIS PENETRATIONIS NOT SAFELY ACCESSIBLE FOR GV EXAM El.ll DryweITPeaetraticu GV 100% COMPLETED FROM INTERNALRFO2I x-45 EXTERNAL TO BE SCHEDULED BEFORE OR DURING RF022 (completed pre RFO 22)

El.ll Drywell Peuehticm GV 1OWh COMPLETED FROM INTERNALRFO21 X-46 EXTERNALTO BE SCHEDULED BEFORIE OR DURING RF022 (completed RFO 22) THE EXTERNAL SURFACE OF THIS PENETIUTION IS NOT SAFELY ACCESSIBLE FOR GVEXAM EL11 r)rywenPenetration GV 100% RESCHEDULE FOR WO22(comptBed RFO 22) TJX INTERNAL, x-47 SURFACE OF THIS PENETRATION IS NOT SAFELY ACCESSIBLE FOR GV EXAM EL11 100YO COMPLETED FROMINTERNALEGO21 EXTERNAL TO BE SCzfEDUlLED BEFORE OR D m G EGO22 (completed pre RFO 22)

EL11 ~dPe.nebatim GV 100% COMPLETED FROM INTERNAL,RFO21 x-49 EXrEF3W.LTO BE SCHEDULED W O R E OR DURPJG E 0 2 2 (completed pm RFO 22)

El.ll DrywedlPenetration GV loo?/. COMPLETED FROMINTERNALRFOzl x-so EXTEWAL TO BE SCHEDULED BEFORE OR DURING RF022 (completedpre RFO 22)

+

El.11 DryWellPenetration GV 100% COMl'uETEf) FROM INTERNAL RFO21 (INACCESSIBLE AREA X-104B IDENTIFIED)

EXTERNALTO BE SCHEDULED BEFORE OR DURINGRFOZO (completedpre RFO 22)

CQMPLETEI) FROMINTERNAL RFO21 (INACCESSIBLEAREA IDrnED}

1 1 1 1 EXTERNAL, TO BE SCHEDULED BEFORE OR DURING RMn2 (cOmplBedpreRFO22) 51.11 DrywellPenetrdon GV 100% COMPLEJXDFROMINTERNALRFO2I (INACCESSIBLE AREA X-105A IDENTIFED)

EXTERNAL TO BE SCHEDULED BEFORE OR DURING W22 (completed pie RFO 22)

COWLIZTEI)FROM INTERNAL RFO21 (INACCESSIBLEAREA IDZTl-EED)

EXTERNALTO BE SCHEDULED BEFORE OR DURING RFO22 (oompleted pre RFO 22)

I E1.ll 100% COMPLETED FROM INTERNAL W021 (3NACCESSLl3LIEAREA

)

D I

I.3LTERNAL TO BE SCHEDULED BEFORE OR DURING RFm2 (COmplBed prc RFO 22)

COh4PLETJ5D FROM INTEIUUL RFO21 (INACCESSIBLEAREA IDENTIFIED)

~RNALTOBESCEIEDULEDBEFOREORDURINOIRF022 (oomplBedpreRFO22)

COMPLETEDFROM INl'XRNALRFo511 EXTERNALTO BE SCHEDULED BEFORE OR DURING RF022 (comgleted pre RFO 22)

EI.11 Drywell Penetration 100% COMPLETEDFROM~~&RF~l X-107 EXERNAL. TO BE SCHEDULED BEFORE OR DURING RFOn (completedpreRFOZ2) t F SEALS, GASKETS, JDMO TURE B W R S ASME SECTIONXI EXAM. CATEGORY E-D IS1 EXam YO REMARKS SECTION XI IDENTIFICATION COMPLETE ITEM NO. TO DATE E5.30 iNTERIOR VT-3 100% INSPECTIONCOMPLETED RFO21 MOISTURE DTSCREPANCES WERE IDENTIFIED AND DISPOSIITON FOR BARRIER THIS ITEM IS WITH MECHANICAL DESIGN ENGINEERING jLRlNG .UGMENTED ASME CLASS MC ASME SECTION XI E M N CATEGORY: E-C I

ASME SECTIONXI IS1 EXam YO REhRARKs m IDENTIFICATlON COMPLET NUMBER NO./DESCRIPTION E TO DATE Drywell Interior E4.11 Surfaceatthe VT-I 100% Tbe area identified for augrtlentedexam of the Drywell surface at the Moishue B a n k rno- barrier interfaceshall be &om containmentplate weld joint Interface l~OfX-5BtothecoatainmentplateweldjoirdrigbtOfpenetratiOnX-5E and emthe concrete metal i n d c e up 1 foot. Complete RF022

T E4.12 Drywell rntexior Volumetlic 100% TheareaidmtSedforaugmeutedexamoftheDrywd1surfaceatthe Slnfsce at the moisture barrier i n t d c e shall be from Containment plate weld joint Moisture Barrier left ofX-5Bt~thecoatainmentplateweldjoiatrigfRofpm~onX-Intdace 5E and ~ I X I the concrete metal interfsceup 1 foot. Complete RFO22 CONTAINMENTPRESSURE RETAINMGBOLTING ASME SECTIONXI EXAM. CATEGORY: E-G Asm Is1 Exam  %

SECTION XI IDENTEICATION COMPLETE ITEM NO. NO./DESCRTPTION TO DATE E8.10 TORUS MANWAY VT-1 1OW? RESCHEDULE FOKW022 (completedRFO 22)

FLANGE BOLTING PENETRATION 200A -

ES.10 TORUS MANWAY VT-I 100% RESCHEDULE FOR RF022 (completed W O 22)

FLANGE BOLTING PJiMXRATION 200B E8.10 V16-19-5A-F VT-1 100% W022 INSTALLEB E8.10 VT-x. 100% RF022 REMOVED

Vermont Yankee DataSheetNo: g'?k-O -.Q!o Visual Examination Report Form Work Order No.: ou-YO37 VT-1, Containment Surfaces (IWE)

ProcedureNoRev.: j?&= 80 p.5 /r?EL4 1

- # /

Visual Aids Illumination Level Check Method I

Photo I I

Sketch I Xntermediate I

a/#

/

&/A c

IDirect I None B None htermediare OJ-7 A,

& .u c

/&

1Remote Attached Attached Final "1 7f j % 9  : 15 A/y 5-/-0/

df qef'" .4"eJ cue* r/2'53' &'e 993-0 iemote Examination Conditionfiquipment Remarks P

Evaluation Required?

~ ~ $NO e s V W F 8045.02 NE 8045 Rev. 1 Page 1 of I

Work Order Number: 0 0 -0O'sb~7- 000 Thickness Calibration Data Sheet .

Instrument Instrument Make: ? &

a q P&L< instrument Model: 2 6 DL Ph3 Instrument SM: '9.329'3s7 Instrument Display: CRT { ) Digital (/ Horizontal Linearity Performed?: Yes ( ) No (\d Calibration Block Serial Number: E k / - 1 , 64 /-2 Calibration Block Material: $k Product Form: wrykf Block Temperature: 7 5 OF Thicknesses: ,860 - T . 001 M&TE Used?: Yes ( } No (4 M&TE Description I WN: k.

Calibration Times initial Calibration: O g O O Check: ./ 3 oc Check 14 Check: N/A Check ~h/

Final: 1630 Sketch and Examination Results:

fee pfiy Examiner:

Reviewer:

5A56d PA -6 Level: 21=

Date: 5$ Io 6 0 I

Date: S l 8 f o ~ Yes ( J y ,

Form Number:

No ( )

Cog. Engineer. &?$&d 4 Date: ~ / ~ ~ / b WNEF8053.0'l~

U Page 1 of 1 Date:&WW' NE 8053 Original

  • NI[:HX3%4425 LPC#l .

Experience Hours Credit:

Work Order Number: m-oaSo37-oao Thickness Calibration Data Sheet lnstrument Instrument Make: PAlvA M-#ICs Instrument Model: 2 6 0 C PL k 5 Instrument SM: 9 3 1 2 9'307 Instrument Display: CRT ( ) Digitat (4 Horizontal Linearity Performed?: Yes ( )

~ ~~

No (#

IC 1-1. Calibration Mock SeriaINumber: E/C 1-2 Calibration Block Material: CAR SPEE C Product Form: W e6 U 6 ) 17 Block Temperature: 75 OF Thicknesses: 0.f506", u I ~ W ' , ~ ~ s o o " Z, . O O ~ ~ zI ,s n i '1, 3,ea$

M&T Used?: Yes ( ) No (4 M&TE Description/W:

. . .' Calibration Times InitialCalibration: 0 0 0 0 Check: hf/A Check: NIA Ch-: &/A Check dIi4 Final: 1osn Sketch and Examination Results: s EE Q A E  ;

Reviewer: Date: s"d0.0 f Form Number:

Cog. Engineer. Date: 5/41 /o t WNEF8053.01 I &y#**k 6+wt Page 1of 1 ANII: . /W /

& Date: fl-KH*/ NE 8053 Original LPC#l -

Experience Hours Credit:

FB c

Q. .

(3

[

c cn a ..

3 3w

Vermont Yankee Visual Examination Report Form Work Order No.: 00- 37 VT-1, Containment Surfaces @WE)

Procedure No/Rev.: /vE 80 y 5 ,&EVI /

, Page 1 of 6 Date: .5-9-0/

Component 3Remote Attached I =Attached I Final f6/%. I ?,dU,4?42 1 / Remarks iemote Examination ConditionsEquipment 5 3 uc/E: 943-82 Recordable NIA RemarkslObservations I

Evaluation Required?

VYNEk 8045.02 NE 8045 Rev. 1 Page 1 of 1

Vermont Yankee Visual Examination Reference Data Sheet No: 8o'j?c- O/2 O / 9 Level: z Date: H-y-O/

>miner: c'/R Level: .J/A Date: 4h f/) I / b hviewer: Date: 4 - c Lviewer:

A " Date: L h WNEF-8045.04 NE 8045 Original Page 1 of 1 Lpc # I

miner:

Level: &- Date:

viewer:

Date: w-viewer:

Date: J/c6 Date: 5-//--4/

VYNEE 8045.04 NE 8045 Original Page I of 1 LPC #I

EVALUATION OF DATA PROWED BY VT-1, CONTAINMENT SURFACES (IWE)

DATA SHEETNO: 8045-01-019 During RFO 21 IWEexaminationsit was discoveredthat the Joint Seal at tbe concrete to steel interface on the 238' level of the containmenthad failed and there was evidence of corrosion in areas of the seal. As a malt a portion of the circamferenceof the seal interface area was declared as augmented. The joint seal itselfwas also s c w e d for replacement during RFO-22.

At the start of RFO-22 the examinersperformed the requiredVT-1examinationsof the augmented area at thejoint seal to determine if any changes had occurred chningthe last operating cycle. The results ofthat examination meal no changes identified in the augmented area After the VT-1 exminationswere complete the processbegan for the joint seal replacement. A band of paint was removed from the concrete loor up the steel c o n t a i n t approximately 6" wide for the fizll ciKnU33ference. The recessed area for the joint seal was also cleaned m preparationfor the new seat installation. At this point a VT-3 examinationswas performedwhich identified a band of pitting that Covered much of the 360-degreecircumference. A more detailed VT-1was ordered by the Responsrwe Engineer to detail this area prior to paidseal hstiUion.

Thisjoint seal area was identified as an issue in the early 1990's. (ER-99-1594deals with the issues fiom the 1990's resolution). lo 1993 the joint seal area was cleaoed and painted so as to form a paintjoint seal at the concrete to seal interface. The areas identified during the EO-21 examinations were areas thatwere experiencing evidence of Oormsion and paint loss in tbis painteajoint area. Some of the paint was still intact and providhg protection for the steel it was covering.

The new areas of pitting inthe area of the joint seal are as a result of the coatingremovalto white metal in this area. This area was not previously identified during RFO-21 because it was an old area of pitting that had been coveredby the 1993 coating and had not experienced any further degradation. As a result ofthe coatings being completely removed from thisjoint area,this VT-1 examhation was able to map this region without the impedance of any obstruction.

The areas of pitthg are isolated to the general area of the joint seal interface between the concrete and the stel. The pitting subsides as it move up or down out of the joint seal area. This was evident when a portion of the steel surface was exposed as a result of the removal ofa concrete chip. The imcler d a c e area exposed was approximately !3" wide.and 3" &ep in a crescent shape. The worst case pitting is isolated to aband in the joint seal area from approximately %" wide to approximately 1" wide and is described in the report as areas w i 6 general wastage and connected pining AU corrosionidentified within this report is bounded by evaluation VYM 99/139, Based on this evaluation ail areas are well withinthe required design base metal thicknesses and are for continued operation as is.

/tA-!bKonnell IWE Responsible Engineer May 11,2001

Vermont Yankee Work Order No.:C)O -ms037-0cll _ _

LkJC Procedure No/Rev.:rYifBd 97 +ud. 1 Visual Examination Report Form for VT-3 Moisture Barriers, Gaskets and Seals (1.WE) Page I .of f Date: 5-f./-a/

~~

Visual Aids t Illumination Level Check Photo/Sketch 0 Magnifier I Light Source (Describe] Date F/dS&AW7-

$/+o/ =None Mirror Other:,&W?&iST E4 4!/@

NO. e/2rs3 ~~ --

&We +i3-ez Intermediate & + 0 Attached W Illumination Cardmumber. v)% 5-/9*/

Remarks Evaluation Required?

OYes I No qeviewer: Date r / / d o /

Y 3eviewer: Date Date FA/$@./

I WNEF 8047.08 NE 8047 Original Page 1 of 1

/3/

Data Sheet No: 2?M Work Order No,: 00 -LsOs~37-c80 Vermont Yankee Visual Examination Report Form for VT-3 Procedure NoiRev.: &~8Uf?7&0. 0 Evaluation Level Date 5-9-01 Required?

OYes @No Examiner: Level d(k Date  %

?M $u. &/hJ Reviewer:

WNEF 8047.07 NE 8047 Original Page 1 of 1

Vermont Yankee Procedure Nomev.: A!& 8 . ~ 7 / . b ~ d d Visual Examination Report Form for General Visual (IWE) Page I of 1 Date: &/6& -I Component Examiner: Level Date Reviewer: Date Reviewer: Date /e!&&

ANII:

1 1 W d Date &fd 60 v

VYNEF 8047.06 NE 8047 Original Page 3 of 1

Data Sheet No: Z W - CLQ- 3$4/

Vermont Yankee work Order NO.: 00 - o SO35 Procedure NolRev.: go9 ?/&9dd.

Visual Examination Report Form fur General Visual (IWE) Page- / of 1 Date: /4//6./09 ./

Component Component ID: % R ~ A BAVb

  • s- B s**tem:&+a*nl

. c AlCAnc Drawing NolRev.: sf& - 42 4% Location:

b 1 I Visual Aids Photo Sketch Method 0 Binoculars mane mane d e c t U Mirror D Attached U Attached 0 Remote d g h t Source 1 Examination Location Description/Remarks Remote Examination ConditionslEquipment Remarks i

Ex amin er: Level Date Date Dale /&4/&

Date (of?@

VYNEF 8047.06 NE 8047 Original Page 1 of 1

Vermont Yankee Procedure NolRev.: AIE 20 v ~AA.P.JPC Visual Examination Report Form for General Visual (IWE) Page 1 of 1 Date:Je//6/0Q 9 Component f i 5 p C . J -

Examiner: L e v e l & y j d h W Date ffh,h&

Examiner: Level Date Reviewer: Date Date <.& /.7

/

Date to-[?+

VYNEF 8047.b6 NE 8047 Original Page f of 1

e Data Sheet No:

6- 6 t J Work Order No.: 00 - 0 SO 35 Vermont Yankee Procedure NolRev.: 90 7/o/l;BNdd..

Visual Examination Report Form for General Visual (IWE) Page / of I ~ate:J0./6/0~ .-

. Y System:_Cl4u?La#J MCr J+

lrawing No/Rev.: sf& ..4.2- ' &/ 3 Location: RK &I.!

Visual Aids Photo Sketch Method 3 Binoculars @%one -one 6 e c t 7 Mirror 0 Attached 0 Attached 0 Remote d g h t Source Examination Location Description/Rernarks Remote Examination ConditionslEquipment Remarks 3 6" Scale &&;dRs;d is h M Gidkrk..

3 Other t4oM AJ a/+x;AO,c # 4u*q %I

- ~ -

%mination Results, Details and Comments:

Examiner: ~ Level Date Reviewer: Date VYNEF 8047.06 NE 8047 Original Page 1 of I

Work Order No.: 00 - 0 503s Vermont Yankee Procedure NolRev.: fd ~7/$&'9dd Visual Examination Report Form for Genera! Visual (IWE) Page I of / Date: / o / / G / ~ o 3 Component il Drawing NoIRev,: &20 - * ' Ad 620;~w~b Location: 4 &kd*.+~

Visual Aids Photo Sketch I VMethod 0 Binoculars G6L-Ie @&ne direct 0 Mirror 0 Attached . 0 Attached 0 Remote d g h t Source Examination Location DescriptionEiemarks Remote Examination ConditionslEquipment Remarks D 6" Scale &&L;$P &'Z cpc*, 8 8

'Uh D Other PLAtk&&.&J x 2 3 1 A,c, +E 1

Examination Results, DetaiIs and Comments:

II Examiner: Level Date Reviewer: Date VYNEF 8047.06 NE 8047 Original Page 1 of 1

e Data Sheet No: z d e - Ad- 3 5?

Work Order No.: 00 - 0%?3.$

Vermont Yankee Procedure NolRev.: &84~ 7 / & ! ; 9 4 & ~

Visual Examination Report Form fur General Visual (IWE) Page - / of 1 Date: /0//6/00 ./

Component 3rawing NolRev.: 3 2 a e ' Location: A ~ du#

W Visual Aids Photo Sketch Method I J Binoculars 6 o n e &ne h r e c t 3 Mirror D Attached CJ Attached 0 Remote idight Source Examination Location Oescription/Remarks Remote Examination ConditionslEquipment Remarks 7 6" Scale Ejafar*uPcs,nXoc*, bC 9 4 3 Other P*dcd;&J x> Ob A 3.1)

Examiner: Level Date Date Date /?&/oa Date !04?*

VYNEF 8047.06 NE 8047 Original Page 1 of 1

Data Sheet No:

Visual Examination Report Form Work Order No.: Ob - 0056 3500 VT-1, Bolting (WE)

ProcedureNoiRev.: wq5 &/o Page I of f Date: q/q*or II _ .

Ii 1 Component Component ID: V tb-14-5;4 System: Pc A C Photo/Sketch Method 8 Examination Bolting Components Examined done direct &Place dolting 0 Washers 1I Attached 0 Remote

- Removed Visual Aids 17 Bushings 17 Flange Surface 1 Magnifying Glass

&ilTor l5dight Source (Describe): pt%JcRf3 u &df Remote Examination ConditionsLimitations:

Examiner: + Level:= Date: 41 0 0 Yes Examiner: Level: *Date: Q IA Reviewer: Date: g/fh/

Reviewer: Date:

ANII: Date: 9-a u-o/

VYNEF 8045.03 NE 8045 Original Page 1 of 1

I Vermont Yankee I DataSheetNo: 6OQ3 c

-. c Oz.

Visual Examination Report Form Work Order No.: 00 00 5&35-00 ProcedureNoiRev.: NE 8ac(5r r(-b VT-1, Bolting @WE)

Page 1 of I Date: 4./9-0r Component Component ID: J lb-19-5B system: Pc A C r

DrawingNoRev.: 6 -19 117 s

' .I GI63 I

Boltinghgth @/A II

" Bolting Diameter: dA I' Phato/Sketch Method Examination Illumination Level Check direct 6 Place dolting 0 Washers Date

-0 Attached ~

1 Remote 1 0Removed El Bushings 0 Flange Surface ~

Initial 12=w 444d' Visual Aids Intermediate d/A dh%

Erosion /- I I Wear Jc Evidence of Leakage Other (Explain) c I 4 A I 44 I / +

Examiner: . Level:= Date: q*49 0 (

0 Yes Examiner: 44 Level: &Date: EJ /&

Reviewer: Date: #/&A/

1 Reviewer: Date:

VYNEF 8045.03 NE 8045 Original Page 1 of 1

1 Vermont Yankee I DataSheetNo: (Jib-(4-S Work Order No.: Ob 00 56 35-00

6) @%r-&/- a3 Visual Examination Report Form VT-1, BoIting (rwE)

FrocedureNoRev.: mq5 Page I of f Date: d*/?*Ol I

Component Component ID: VIb-fq-SC System: PCAC RemarkdObservations LooseNissing cl 4 4 4 A Thread Engagement 4 Thread Damage J Galling J ~

\ ~ ~~

Coating Degradation J I BenVTwisted J I I Physical Damage / I I Fractured Parts / I f Gouges .J Crack.s/I,inears J Corrosion / I I /

Erosion / f J 1 \

Evidence o f Leakage 4 Other (Emlaid . I W A @/A / +

Examiner: eve^: EDate: 3 (9 0\

,- Yes Examiner: L e v e l 4 A Date: 4 4 Reviewer: Date: {&$/$I Reviewer: Date:

ANII: Date: v-@/

VYNEF 8045.03 NE 8045 Original Page 1 of 1

Vermont Yankee Data Sheet No: &qs-oj- oq Work Order No.: 60 . 00 56 35-00 Visual Examination Report Form VT-1, Bolting (WE)

ProcedureNo/Rev.: At e/.

Page I of f Date: 4'/4 .d 1 r 1

.I 463 Bolting Length: c3/A " Bolting Diameter: "CIA Other (Explain) I I Examiner: Level: =Date: 3* f 9 0 Yes Examiner: Level: a

& Date: Jlh Reviewer: Date: Vh~ldi Reviewer: Date:

ANII: Date: +2 Wd/

VYNEF 8045.03 NE 8045 Original Page 1 of 1

Vermont Yankee Visual Examination Report Form v-1Bolting

, ow]E)

Cornponent Component ID: J lb cf 5-E System: WAC r

Drawing No/Rev.: 4 -14 I I 7 5 . I C!63 Bolting Length: @/& " Bolting Diameter: dA 11 PhotolSketch Method Examination BoIting Components Examined Illumination Level Check

&One direct d n Place rrB0lting E t Washers 0 Attached 0 Remote 0 Removed 0 Bushings 0 Flange Surface Initial Erosion WKW Evidence of Leakage Other Exthin) a Yes WNEF 8045.03 NE 8045 Original Page 7 of 1

Vermont Yankee Data Sheet No: -5 O b Visual Examination Report Form Work Order No.: 00 - 00 50 35-00 ProcedureNolRev.: N E W q 5 e/o VT-I, Bolting @WE)

Page 4 of I Date: 4 (4 *bI Component System: Pc A t umination Card/No.:

e D Yes VYNEF 8045.03 NE 3045 Original Page f of 1

Vermont Yankee I Data Sheet No:

Work Order No.: -

4 . do L / / U r - 00C7 Visual Examination Report Form ProcedureNoRev.: #&- 95 &U- /

VT-1, Bolting @WE)

Page / of / Date: 5-

/I Commnent I None Direct 0 In PIace iB Bolting Washers 0 Attached Remote H Removed Bushings = Flange Surface

/

0 Magnifying Glass Illumination Card/No.: Intermediate &?+ a/ #

CI Mirror Light Source (Describe): /%?Sxby& Find? $j$&,+~~p?&.&7-0/

Remote Examination ConditionsiLimitation: 8 OYes INo Date: d" O /

VYNEF 8045.03 NE 8045 Original Page 1 of 7

Work Order No.:

Visual Examination Report Form Procedure No/Rev.:

VT-1, Bolting @WE) Page / of /

Component

-/9 -5 9 System: ZGWS J7ZWS Bolting Length* dII Bolting Diameter: 7'50 "

PhotoISketch Method Examination BoIting Components Examined Illumination Level Check Bl None H Direct In Place Bolting LI Washers 0 Attached 0 Remote Removed Initial Visual Aids 0 Magnifying Glass Illumination CardMo.: Vy8

- Mirror Light Source (Describe): /%+s&&>&

c Remote Examination ConditionsKimitations:

Lightmeter Sht 15 3 U

Evaluation Required?

Level: Z D a t e : yd@/

UYes #No Level: &Date: EI/A f

Date: S7dd /

Reviewer: ../A Date:

H ANII; m Date: s-&-# o !

WNEF 8045.03 NE 8045 Original Page 1 of 1

Data Sheet No: zdg- 6 J- 398 Work Order No.: 00- 00 5 6 35 Vermont Yankee Procedure NolRev.: /?? 7 b 2 d,/O .

Visual Examination Report Form for Genera! Visual (IWE) Page I of / Date: '//L/af I

-~ ~

Component Visual Aids Photo Sketch Method

@I Binoculars B None @ None si] Direct &AH&

0 Mirror D Attached 17 Attached Remote

@ Light Source Examination Location DescriptionIRemarks Remote Examination ConditionslEquipment Remarks

[7 6" Scale Examiner: d/A Level I.'/A Date 4&

Reviewer: d/. Date (/A 1 Reviewer: dlA Date 1"/!

I

, ANII: Date

/-3/-o/

VYNEF 8047.06 NE 8047 Original Page 1 of 1 i

c Data Sheet NO: Li7 -01 . 0 31 Work Order No.: 00 - 50 3'7 Vermont Yankee Procedure NolRev.: 8OJ7 40 .

Visual Examination Report Form for General Visual (1WE) Page, 1 of 9 Date:af 8

--- ~ ~

Component Drawing NolRev.: 620 2 00 Location: W ~ C L Visual Aids Photo Sketch Method 0 Binoculars PQ None 0 Mirror 0 Attached Light Source Examination Location Descrjption/Remasks Remote Examination ConditionsEquipmsnt Remarks 0 6" Scale  %+4eter ~4 r CFC eC Reviewer: - Pfi 5ate ANII: Date &-Z-O/

W N E F 8047.06 NE 8047 Original Page 1 of 1

I

INSERVICE DISCREPANCY REPORT (IDR)

IDR #: Q2-07 Date : 5/2/2001, Component: Location: prvwe11 Performed By: Date :

Disposition/Repair:

IS1 Program Coordinator: Date :

R e p a i r Effort:

Reference Document:

Repair Completion D a t e :

Service Induced: YES - NO -BY : Dale :

Sample Expansion Required: YES -. NO BY: -Date:

Sample Expansion:

IS1 Program Coordinator: Date :

Reinspection Required: YES NO -BY :

Subsequent Inspection Required: YES - NO -BY :

IS1 Supervisor Notified:

IS1 Program Coordinator: Date:

. Reinspection Completed Satisfactorily:

IS1 Supervisor: Date :

IDR Closed:

ISI Program coordinator: Date:

VYAPF 4027.01 AP 4027 Rev. 4 +

Page 1 of 1

r 1 Data Sheet No: - 6 360 Work Order Na.:&

Vermont Yankee Procedure NofRev.: pp 702d'/U Visual Examination Report Form for General Visual (IWE) page I of 1 Date: !//&,/oI r r Component I Component ID: X- 5 4 fir% $'I4 system: 31 2 ~

- 3( c1

~/t Drawing NolRev.: 5 9 m - +f tocation: 4.r+4&d& --sUk.4AU Visual Aids Photo I Sketch Method

@ Binoculars I None p Direct 6444 -6 0 Mirror 0 Attached I3 Attached 0 Remote Light Source Examination Location Descriptionmemarks Remote' Exammation ConditionsEquipment Remarks 0 6" Scale B n y W

  • M pede b C & + l . t P - 4 yb 0 Other -a)4,C1O,&,F, 6--t ci Examination Results, Details and Comments:

WNEF 8047.06 NE 8047 Orighnal Page 1 of 1 f

Examiner: &

i

e DataSheetNo: soq7- o / - O g q Work Order No.: Odfl.55 3 6 Vermont Yankee 96 (/7 R o Procedure ~ o / ~ e v . :

Visual Examination Report Form for General Visual (IWE) Page / of / Date:&/* /

Component Component ID: X- 7 A +e',675

/ system: 4 4 cM I

Drawing NolRev.: xf&b Location: A- TL&I Visual Aids Photo Sketch Method I3 Binoculars f l None None @Direct U Mirror 0 Attached 0 Attached IJ Remote tight Source Examination Location Description/Remarks Remote Examination ConditionslEquipment Remarks 0 6" Scale . E*:dkdrJ gj&r.vd IJ Other . bE$dJcLk 4 Pwet 5 Jl-4 Examination Results, Details and Comments:

A.s"/h6C &..s e)o)+cl.;&c- Je b h wc .TAJ4 3 &dm. G l c'st,

  • a&#.

Examiner: Level Examiner: Level Reviewer: Date Y

Reviewer: Date w%

VYNEF 8047.06 NE 8047 Original Page 1 of 1

Visual Aids Photo Sketch Method 7 Binoculars p None E?None Direct &A Lr o , t 3 Mirror 0 Attached 0 Attached 0 Remote 8 Light Source Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks 7 6 Scale b&pcu P4J.G u t a -

Examiner: E~/A Level nl/~ Date &/A Reviewer: /3/A Date *rA Reviewer:. #/A Date d1A ANII:  !/-by& Date /-2(&f CII VYNEF S0$7.06 NE 8047 Original Page I of 1 i

Data Sheet NO: 8047 - 01 B 43 Work Order No.: 00- 503 6 Vermont Yankee Procedure Nomev.: 84q7 40 Visual Examination Report Form for General Visual (IWE) Page / of 1 Date:d3lb/D J I---- Component I Component ID:

Drawing Nomev.:

X -9 & A SFLO .

.: System:

Location:

3 4dcLc ~

7 u ~ d c L .

Viual Aids Photo Sketch Method Binoculars None @ None JO Direct 6 ~ 0 ~ 4 Minor 0 Attached 0 Attached 0 Remote

.IExaminer: Level IReviewer:

Y N/A Date N/A VYNEF 8047.0.6 NE 8047 Original Page 1 of 1

Work Order No.: n0 c b S S ~?

Vermont Yankee Procedure NolRev.: b0 f? k b Visual Examination Report Form for General Visual (IWE) Page 1 of / Date: #&/

~~

Component I

kaminer: Level Date ixarniner: Level 4 Date .l//p .

kviewet: Date %c&

leviewer: Date .//A VY NEF 8047.09 NE8047 Original Page 1 of I

Vermont Yankee Procedure No/Rev.: Po47 R 0 Visual Examination Report Form for General Visual (IWE) Page / of I Date: +!,+IO{

Component Examiner:

3eviewer:

Y Level Date 7,

./ 36 C r /

Date Nh Reviewer: 4 4 Date ANII: Date r-#W VYNEF 8047.0.6 NE 8047 Original Page 1 of 1

Work Order No.: 60 00 - 50 3 5 Vermont Yankee Procedure NoIRev.: PP 7 6 aY%

Visual Examination Report Form for General Visual (IWE) Page  ! of / DaTe: @fd t Visual Aids Photo Sketch Method 3 Binoculars None $9None @ Direct b a d0 QC C 3 Mirror U Attached D Attached 0 Remote

~

$ Light Source Examination Location Descriptjon/Remarks Remote Examination ConditionsEquipment Remarks 3 6" Scale Oq hku, P.wLrlydc'M "/A 3 Other X-1>

Examination Results, Details and Comments:

Examiner: rl/d Level Date @4 Reviewer: .'/A Date /J/A Reviewer:

  • 1J/R Date Nh ANN: Date VYNEF 8047.06 NE 8047 Original Page 1 of 1 i

Vermont Yankee Procedure NolRev.: f/ 76 2 f h  ;

Visual Examination Reoort Form for General Visual '[IWE) Page of / Date:  !/lr/bf I Component Visual Aids Photo I Sketch I Method 0 Binoculars 9 Nene 13 Mirror D Attached 0 Attached [J Remote

$t Light Source Examination Location Description/Remarks Remati Examination ConditionsiEquipment Remarks c3 6" Scale 0 Other WNEF 8041.06 NE 8047 Original Page 1 of I i.

Work Order No.: 00 ST Vermont Yankee Visual Examination Report Form for General Visual (IWE)

Component Drawing NolRev.: Location:& &/A& &I Visual Aids I Photo I Sketch I Method 0 Binoculars 0 Mirror Light Source II W None El Attached I ab None 0 Attached Examination Location Descrip&n/Remarks I@ Direct 0 Remote

&EJY&

1 Remote. Examination ConditionsAquipment Remarks 0 6' Scale Examination Results, Details and'Comments:

Examiner: Level Examiner: Date dh VYNEF 8047.06 NE 8047 Original Page I of 1

Data Sheet No: C J - 38 Work Order No.: 00- Od so hs Vermont Yankee Procedure NofRev.: Pf 9 b 4 ,

Visual Examination Report Form for General Visual (IWE) Page I of I Date:_kICL?6 1 I Visual Aids Photo Sketch Method 0 Binoculars l,R None @ None @ Direct 6- ZY aC 0 Mirror U Attached U Attached 5 Remote Pp Light Source Examination Location Description/Remarks Remote Examination Conditionskquipment Remarks 0 6 Scale BFpuY fid&u46h VA 0 Other X-IbA VYNEF 8047.06 NE 8047 Original Page 1 of 1 i

Vermont Yankee Procedure NolRev.: 90 q7 Ro Visual Examination Report Form for Generat Visual (IWEI Page - 1 of - I Date: 5///0/

Component

omponent IO: Y-IGB -; System: ~&/Lc Xawing No/Rev.: 59- q/ Location: RX Visual Aids Phot0 Sketch I Method 7 Binoculars a None @ None $Direct trd+t&

3 Mirror CI Attached 0 Attached 0 Remote 8 Light Source Examination Location Descrbtionmemarks I Remote Examination ConditionsKquipment Remarks J 6" Scale Examiner: Levei Ni& Date IJ/A Reviewer: - Date 1 s7r/d I ,

VYNEF 8047.06 NE 8047 Original Page I of 1

e Data Sheet No: - 380 Work Order No.: -

06 ob 503s Vermont Yankee Procedure NolRev.: P L7ol,t'/o.

Visual Examination Report Form for General Visual (1WE) Page / of f Date: f//G /O/ t

~

Component Zornponent ID: X-17 System: D r ~ rkJ4 fl 3rawing NoJRev.: 5?W - t// Location: K ~ - f ; a r N ~5- lu: z .

Visuai Aids 0 Binoculars I

~

Photo r Sketch I Method 3 Mirror 0 Attached 0 Attached 0 Remote 9 tight Source Examination Location OescriptionlRemarks Remote Examination Cooditions/Equipment Remarks 3 6" Scate c'd rt VA Examiner: d/h Level Date p//n Reviewer: N/A Date /?/A Reviewer:' dA Date </A ANII: / - Date I-?/*(

VYNEF 8047.06 NE 8047 Original Page 1 of 1

\

r Data Sheet No: 06 - 4 v - 3W Work Order No.: 0 0 - 0 0 50'35 Vermont Yankee Procedure NoiRev.: @ 7 d 3. /o .

Visual Examination Report Form for General Visual (IWE) Page. t! of I Date;  :/16b/ i Visual Aids Photo Sketch Method 3 Binoculars @None *  !@None ,$$ Direct k d a P u-&

7 Mirror 0 Attached 0 Attached ICI Remote 8 Light Source Examination Location DescriptionlRemarks Remote ExaminationConditionslEquipment Remarks 7 6"Scale Examiner: AI/A Levef /?/R Date Nhd Reviewer: N/!! Date hr/p Reviewer: ' Date dh VYNEF 8047.06 NE 8047 Original Page 1 of 1 i

e Data Sheet NO: Z W - 6J- 378 Work Order No.: 60 40 s o 3s Vermont Yankee Procedure NolRev.: pfl 7O A V h ,

Visual Examination Report Form for General Visual (IWE) Page i of 1 Date: !11&!0/ /

Visual Aids Photo Sketch Method 13 Binoculars @ None D3 None @ Direct r-L D Mirror 0 Attached 0 Attached 0 Remote Light Source Examination Location Oescription/Remarks Remote Examination ConditionsiEquiprnent Remarks El 6 Scale b q w 4 fi&Cd,& &/A 0 Other x- i 4 V

Examiner: d1.k Level &/A Date M Reviewer: */A Date n11~

Reviewer: &/A Date If Date /-sI-of P

VYNEF 8047.06 NE 8047 Original Page Iof 1, t

Vermont Yankee Procedure NolFtev.:JC) $7 Ro Visual Examination Report Form for General Visual (I WE) Page / of 1 Date:<A,/O/

Component Component ID: x- 19 System: 3 / t L t k )et54

/

Drawing NolRev.: L Visual Aids photo Sketch Method Q Binoculars P N m pb None PDirect 6.tc~4 0 Mirror 0 Attached t3 Attached D Remote pLight Source Examination Location Descriptionmemarks Remote Examination ConditbnslEquipment Remarks U 6 n Scale c

b5;P Examiner: Level a* Date s///o1 Examiner: Level &/A Date *I//A Reviewer:A D a t e Reviewer: - +/A Date 131~

Date &-d- "',2/

VYNEF 6047.M NE BO47 Original Page I of 1

Visual Examination Report Form for General Visual (!WE) page [ of 1 Date: {//&/O/ I Component VYNEF 8047.06 NE 8047 Original Page 1 of 1 I

I Data Sheet No: zMo' 37 b Work Order No.: 40- 00 S O 3 s Vermont Yankee Procedure NolRev.: PP704o Visual Examination Report Form for General Visual (IWE) Page I of f Date: / / / 6 / 0 / I Component Component ID: x - a1 System: D / ~~ z 3 4 Drawing NdRev.: <9 20 4/ Location: AX-& PA/& S"&*.

r VisuaI Aids Photo Sketch Method

@Binoculars @Nons 4 None Direct t * & e ~

  • L 0 Mirror El Attached 0 Attached 0 Remote p l i g h t Source Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks 6" Scale -yuC.CQ &u*M*.- qb Other - x-At Examination Results, Details and Comments:

25.F4-m.r H . c 62 4:s PLdPJ.Ih. 4 - X & S L iLL45.t A 3 , j0U (6 ry t a n 8 1 U h V S- , 5 h , w e , f ? d:C_ lQz"df&;L w #%

hlo 4*4?,-)Uto /u *&-e&& 5 y & &e

. 5*#,t &h, Examiner: &/A Level &/A Date #/A Reviewer: N/A Date 3h Reviewer: MIA Date $/A Date /-3td/

i M N E F 8047.06 NE 8047 Original Page 1 of 1 t

Vermont Yankee Visual Examination Report Form for General Visual (IWE) Page ! of- Date: !//6h/ I Component esults, Details and Comments:

Reviewer: A/A Reviewer: - d//3 Date&

Date /- 5 w U

WNEF 8047.06 .

NE 8047 Original Page 1 of 1 I

e Data Sheet NO: - - 037 SO#? O /

Work Order No.: 00 - 5037

  • Vermont Yankee Procedure Nomev.: 804'7 LQ Visual Examination Report Form for General Visual (IWE) Page / of Date: 5//6/

I Component Examiner: Level Date </~/OI Examiner: d/A)

Reviewer: Date /d 1

,Reviewer:

W N E F 8047.06 NE 8047 Original Page 1 a i 1

Work Order No.: 00- 0 0 fi 3 Vermont ~ i n i t e e Pcocdwa Nomev.: PP 702 9 /z, '

' Visual Examination Report Form for General Visual (1WE) Page of / ~ a t e : a / t Component Component IO: x-A?, System: -isnu d

  • l / i Drswing NolRev.: 5 7 2-3 -41 Location: &1;-kn NlLp & L i c e 0 Visual Aids Photo Sketch Method Binocdars E?None None Direct e&L 0 Mirror Cip tight Source D 6" Scale I

Reviewer: E3!A Date! Ni Reviewer: - '/A ate  ?/A WNG SDls"l.06 NE 8047 original Page 1 of 1 i

r Data Sheet No:

Work Order No.: 00 *5a 3'7 Vermont Yankee Procedure NolRev.: %q? 44%

Visual Examination Report Form for General Visual (IWEI Component

ornponeot ID: j(++ system: 3qd d Irawing NolRev.: -#a - #/ Location:

Visual Aids Photo Sketch Method 3 Binoculars p None None $ Direct 6wyroCe 3 Mirror 0 Attacbed D Attached D Remote YLight Source Examination Location Description/Remarks Remote Examination ConditionsEquipment Remarks 3 6" Scale 3 Other Z G h P d SJP-fPL NIA

xamination Results, Details and Comments:

Ixaminer: -4 4 Level Date &/A '

W N E F 8047.06 NE 8047 Original Page 1 of 1

I e Data Sheet No: D e - 6i/- 37%

Work Order No.: -

0 0 00 SO 3s I

f Vermont Yankee Visual Examination Report Form for General Visual ([WE)

Component Procedure ~ o m v . :

Page 4 of.- l PP 7 d Aq/Q Date:-j//e/o I Component IO: X-A4 System: -4 Drawing NofRev.: 5 9 P-D-CfI tocation: ~ X - L r 5tu ~ A~ d P

Visual Aids Photo Sketch Method Sinoculars pB None @ None @Direct 6~ It&

0 Mirrar 0 Attached 0 Attached 0 Remote

)?f tight Source Examination Location DescriptiodRemarks Remote Examination ConditionslEquipment Remarks ci 6" Scale Examiner; '/A Level .'/R Date A h Reviewer: flh Date 'h Reviewer:

Date d/!

II I

WNEF 8047.06 NE 8047 Original Page 1 of I i

Data Sheet NO: ZM 6 q w 39 8 7 Work Order No.: ba- 00 50 3s Vermont Yankee Procedure Nomev.: Pf 7o W / O Visual Examination Report Form for Generat Visual ( I WE] Page / of^-.

f Date: Vf6-hf I j

Component Component fD: L System: D/t~t -4 MNEF 8047.06 NE 8047 Original Page 1 of 1

Vermont Yankee Procedure NolRev.: #?? 742.9 /fl .

Visual Examination Report Form for General Visual (IWEj Component Component ID: - X - ~b System: 3 r~

Drawing NolRev.: .$?a> r q/ Location: 4 d ~ d d . -d. S A &6cd Visual Aids Photo Sketch i Method D Binoculars WNone l%r None Mirror a Attached D Attached n Remote Light Source 1 Examination Location DescfiptionlRemarks Remote Examination CondltionslEquiprnent Remarks 0 6" Scale 0 Other I Examination Results. Details and Comments:

c Examiner: '/A Level 4b Date IJ/A Reviewer: "/A Date 'h Reviewer:r. N/A Date 4~

VYNEF 8047.06 NE 8047 original Page 1 of 1 i

t Data Sheet No: goq 7-@/ - 8s Work Order No.: 80 - 503.6 Vermont Yankee Procedure No/Rev.: Rd g7 kb .

Visual Examination Report Form for General Visual (IWE) Page / of I Date: SfYb t r-

~ ~~~

Component Visual Aids Photo Sketch 0 Binoculars None @ None Direct L e j d 0 Mirror 0 Attached 0 Attached 0 Remote Light Source Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks Q 6 Scale EfwcbQ 6&4hccL 0 Other b434 &.e-Level

/.rp 67 Date //A/

Examiner: Level Date  %%

Date d<h/

Reviewer: Date 4 4 Date J=5--+

I VYNEF 8047.06 N E 8047 Original Page 1 of 1 i

Vermont Yankee Procedure NclXev.: pp 7 d 2 d O .

Visual Examination Report Form for General Visual (IWE) Page I of 1 Date: !/'b,/nL 4 Component

mponeot ID: x- aS 1

Visual Aids Photo Sketch Method 8, Direct 6 4 + 4 Y

  • L 3 Binoculars pNm8 P o n e 9 Mirror 0 Attached 0 Attached 0 Remote a Light source Examination Location DesuiptionlRemarks Remote Examination ConditionslEquipment Remarks 3 6" Scale 39-4 P&cJru..c;h */A 3 Other x- 2-93 3amination Results, Details and Comments:

Examiner: Levat rJh Date A'lA qeviewer: 'h Date 44 VYN& 8047.06 NE 8047 Ofi&@l Page 1 of 1 i

Vermont Yankee procedure Nomev.: // 7&2Lf./o .

Visual Examination Report Farm for General Visual (IWE)

__ ~~

Component Zornponent tD: -

>rawing Nomev.: .<q to L(/fl Visual Aids I Photo I Skttch I Method 3 Binoculars @ None None p Direct 45*~u*L 3 Mirror 0 Attached 0 Attached Cl Remote 8 Light Source Examination Location Oescriptionjflernarkg Remote' Examinah CunditionslEquipment Remarks 3 6" Scale c1 Other x- ac9

&amination Results, Detals and Comments:

M N E f 8047,OS NE 8047 Orighal Page 1 of 1

t Data Sheet No: m g

  • Gc/-37r 9

Work Order No.: 0 0 -00se35 Vermont Yankee Procedure NolRev.: f?p762 c/./o.

Visual Examination ReDort Form for Visual Aids Photo Sketch Method 0 Binoculars p None )X None Direct &J*P a-L D Mirror U Attached 0 Attached 10 Remote Light Source Examination Location DescriptionlRemarks Remote Examination ConditionslEquipment Remarks 0 6" Scale

\

VYNEF 8067.06 NE 8047 Original Page 1 of 1 I

Vermont Yankee Procedure NolRev.: pp 26A$/0 '

Visuat Examination Report Form for General Visual (IWE) p a g e ~ o f I Date: :I/&/.

Component Component IO: c System: 3rt~LJCY Drawing NdRev.: -5733 - 5v Location: ba 3 u n . & t u c, Visual Aids Photo Sketch Method 0 Binoculars Q None 8 None @ Direct 6e h clbvc Mirror 0 Attached 0 Attached D Remota

@ light Swrce Examination Location Descriptionlftemarks Remote Examination CondifionslEquipment Remarks 0 6* Scale 3yjd.lrCQ P 4wC-cd;~ #/A I

WNEk 8047.06 NE 8047 Ofigind Page 7 of 1  ;

VYNS 804'7.06 NE 8047 Original Page 1 of 1 i

Work Order No.: ob DO 5035 Vermont Yankee Procedure NolRev.: pp 70 Wli7 .

Visua! Examination Report Form for General Visual (IWE)I Page / of / Date: !//.fh/ J Component Visual Aids Photo Sketch Method 3 Binoculars p None RNone FDirect 6 3 Mirror 0 Attached 0 Attached 0 Remote id Light Source Examination Location DescriptionfRemarks Remotd Examina?ian ConditionsiEquipment Remarks 3 6 ScaIe 0%Y u/ Y 94 N e f Pa-4 ;3 b J &/A 3 Other x- 33 VYNEk 8047.06 NE 8047 Original Page 1 of 1 I

I Vermont Yankee Procedure NolRev.: -@

Visual Examination Report Form for Page f

. of-. / Date: !/.L,/o/ r General Visual (IWE)

Component 1 Reviewer: Nh Date Iv/p VYNEF 8047.06 NE 8047 original Page 1 of 1 i

I Vermont Yankee Visual Examination General Visual (IWE)Form for Report Work Order No.:

Procedure NolRev.:

Page 'of 40 5 6 8oq? Ro 33 Date: s f i / U ( 1 Component I Sketch ID Attached I Remote VYNEF 8047.06 NE8047 Original Page 1 of 1

Vermont Yankee Procedure NolRev.: f P 7b R + / D .

Visual Examination Report Form for General Visual (IWE) Page of / Date: I//c./D/ I r--- ~

~ ~- ~

Component

~~

1 Component ID:

Drawing NolRev.:

X - 39 A + E 0- + I System:

Location:

3- CU, G ~ + ~sdA4EP.d AA a Visual Aids Photo Sketch Method 0 Binoculars Q None @ None Direct 6~

I3 Mirror U Attached 0 Attached 0 Remote Light Source Examination Location Descript;on,JRernarks Remote Examination ConditionslEquipment Remarks 0 6" Scale hhlueu P&AJ&+f& : b L s N]4 0 Other I X-39tAcB I, Examination Results, Details and Comments:

Examiner: #/A Level N h Date  %

Reviewer: #/A Date 4 Reviewer:

  • Date '%

VYNEF 0047.06 NE 8047 Original Page 1 of 1 i

Work Order No.: B d rr 5 0 3b Vermont Yankee Procedure NolRev.: db q? & a Visual Examination Report Form for General Visual (IWE) Page /of l Date: .C/<lo Component Component ID: &Y/ .: System: 39d d Drawing No/Rev.:

Visual Aids 593-0 -vi Photo I

Location:

Sketch I

a & L & u1 Method

-Id8*d -

0 Binoculars @ None B Norie $&.Direct 60~s-po~

0 Minor U Attached 0 Attached 0 Remote Light Source Examination Location Description/Remarks Remote Examination ConditiondEquiprnent Remarks 6 Scale G*+ef #d &*LCk&

0 osm b F > k ) c N psh)4, Examination Results, Details andcomrnents:

Examiner: IcI/A Level wr/A Date #/A Reviewer:

Y Date ri1Io1 Reviewer: * */A Date &!A ANI1: Date xg-o/

W N E F 8047.06 NE BO47 Original Page 1 of 1

Data Sheet No: z'c- 6Y- 3tz Work Order No.: 06 - 00 50 &

Vermont Yankee Procedure NolRev.: pp 7b > ~ / O Visual Examination Report Form for General Visual ~ I W E ) page I of 1 Date: )*//</&I P

Component Component ID: y-4L System: %A+ A* ~4 Drawing NolRev.: 5 7 Lc3 - L/I Location: ~ x . f - u d3 " 4 / R t E 5 Visual Aids Photo Sketch Method D Binoculars None None $' Direct b a d 4

' 0 Mirror 0 Attached 0 Attached I3 Remote fl Light Source Location Descriptionmemarks Remote' Examination ConditionslEquipmentRemarks E%eminsr?~an 0 6" Scale 1

Other )c- 5%. 1 Examination Results, Details and Comments:

I -,

Reviewer: "'/A Date Nh VYNEF 8047.06 NE 8047 drighal Page 1 of 1 i

Vermont Yankee I Visual Examination Report Foirm for Page .

f of f General Visual (1WE)

Component K- q.3 System: 3fp4 Component ID:

Drawing NolRev.: 5Tzo - Location: /ai%&&-AJ:I$++ (r -

Visual Aids Photo Sketch Method 0 Binoculars None @ None a Direct &

0 Attached D Remote 0 Attached W N E F 0047.06 N E a047 qriginal Page 1 of 1 i

Work Order No.: 0 0 - 0 4 5 0 3c Vermont Yankee Visual Examination Report Form for Procedure NotRev.: PP 70A${/O General Visual (IWE) Page I of I ~atet-1 Visuai Aids Phbto Sketch I Method D Binoculars FN- None $5 Direct 0 Mirror 0 Attached 0 Attached 0 Remote

-~ ~~

Light Source Examination Location DescriptionlRernarks Remote Examination ConditionslEquipment Remarks 0 S* Scale 3fi~""Lc P<&- (cw;0n/

V WNEF 8047.06 NE 8047 Original Page 1 of 1 i

I Work Order No.: 00 " 3 6' Vermont Yankee Procedure No/Rev.: 86 f 7 RO Visual Examination Report Form for General Visual (IWE) Page of I ate: c/.j.

Component Component ID: x47 .: system: >AS d 4 Drawing No/Rev.: sqw d f( Location: ut /de Visual Aids Photo Sketch Method 0 Binoculars f$ None None 9 Direct &A+&

0 Mirror 0 Attached C3 Attached D Remote

$ Light Source Examination Location DasctiptionlRemarks Remote Examination ConditionslEquiprnent Remark:

0 6" Scale GfW#uaQ &&&.ch "ish Examiner: Level */A. Date ~h Reviewer:

Reviewer: Date &h

-&ANII: g e Date X-A-Qf WNEF 8047.06 NE 8047 Original Page 1 of 1

Vermont Yankee Visual Examination Report Form for General Visual (IWE)

Procedure No/Rev.:

Page __ 1 of I

  • Date: !//&l'~ I

-~ - ~

Component Visual Aids Photo Sketch Method Binoculars Pp None p None Rirect 6*~ P c **

L 3 Mirror 0 Attached 17 Attached C l Remote R Light Source Examination Location Desctiption/Remarks Remote Examination ConditionslEquipment Remarks 7 6" Scale acc) 3& k*efr&&q l?ac*gcu I d

  • A:J L h Examiner: @/A Reviewer: Nh Date ~h4 Reviewer:- dJA I Date IJ/A ANI!: 1 J Date /-5/d V

WNEF 8047.06 NE 8047 Qn'gina1 Page 1 of 1 I

Data Sheet No: xu6- 386 Work Order No.: 00 %t SU 35 Vermont Yankee Procedure NolRev.: pp 7 Visual Examination Report Form for General Visual (]WE) Page I of I Date: !ii.?iil Component

omponent ID
x- 5-0 Visual Aids Photo Sketch Method 7 Binoculars  !) I None None )gl Direct 6.- a PaL 3 Mirror 0 Attached 0 Anached Remote rb Liaht Source Examination Location DescriDtion/Rernarks I Remote Examination CondkionslEquipment Remarks Reviewer: J/A Date VYNEF 8047.06 NE 8047 Original Page 1 of 1 i

I Data Sheet .N

.O work Order No.: 00 -00 5 0 3 5 Vermont Yankee Visual Examination Report Form for procedure NofRev.: PP 7azSI /A General Visual (IWE) Page of / -Date:  !//s/o[

Component W N E F 8047.06 NE 8047 Original Page 1 of 1

Vermont Yankee Procedure NoIRev.: @p 7 0 t f 10 .

Visual Examination Report Form for General Visual (IWE) Page I of I Date: ?/iS-/o! I

~~

Component hmponent ID: x-SL .* System: 3 i ~ h yd 4 -

Srawing No/Rev.: 59 xb - 4[ ' Location: & f- ARL 5A&-P Visual Aids Photo Sketch Method Binoculars 03 None @ None ,L3 Direct p0-C 0 Mirror 0 Attached D Attached 10 Remote

$ t i g h t Source Examination Location DescriptionlRemarks Remote. Examination ConditionsIEquipment Remarks D 6" Scale # oh) WA Examiner: tW Level 44 Date di!A Reviewer: Date dh Reviewer: - al4 Date '/A VYNEF 8047.06 NE 8047 Original Page 1 of 1 1

Vermont Yankee Visual Examination Report Form for General Visual (IWE)

Component

omponent ID: k-/o/ A,&r

.k,3 b System: CJCC LL Visual Aids Photo Sketch Method ql None Qb None 3 Binocufars Direct ~*AJI+*L 8 Minor 113 Attached 10 Attached 10 Remote 9 Light Source Remote Examination ConditionsEquiprnent Remarks 3 6" Scale f Other I '

Examiner; d!A Level J!h Date,&.

Reviewer: &!A Date d!A Reviewer: Date 4/,,

Bate  !/?la/ f, WNEF 8047.06 NE 8047 brlginal Page 1 of 1

a Data Sheet No: Z d E - .

3?9 r'

Work Order No.: c 9056 35 Vermont Yankee Procedure NO/REV.: PPI 4 & / 0 Visual Examination Report Form for General Visual (!WE) Page ot 1 Date:  ?//c/o/ t 1 t

I Component iD: x- /QO A! 6,c Component System: 'zs hL1 d 4 4

A Drawing NolRev.: <9 w - qi Location: EK+L/w~/G S u /r- Cfi c d Visual Aids Photo I Sketch Method 1 fa Direct &,A~P+ I 0 Remote marks Remote Examination ConditionslEquipment Remarks W N E F 8047.06 NE 8047 briginal .

Page 1 of 1 i

n Data Sheet No: - &Uc 391 I

Work Order No.: 00-00 5035 Vermont Yankee Procedure NolRev.: pp 702-$

Visual Examination Report Form for General Visual (IWE) Page f of 1 Date: ? j l ~ i / u i I Component hmponent ID:  %-lo?, System: Jc 1/1 I\

Visual Aids Photo Sketch Method 3 Binoculars &None 8 None 0 Direct N u t p**GsQ, 3 Mirror 0 Attached CI Attached 1o Remote 91 Light Source Examination location DescriptionlRemarks Remote-Examination ConditionslEquipment Remarks 7 6" Scale

"//t

-~ _ _

%amination Results, Details and Comments:

VVNEF 8047.06 NE 8047 Original Page 1 of 1

a Data Sheet No:

Vermont Yankee Visual Examination Report Form for General Visual (IWE) page 1 of t ate: !hdrh/

Component P

WNEF 0047.06 NE 8047 brigha!

Page 1 of f

r Data Sheet No: z u c o GLJ-387 Work Order No.: O U - ~ S ' O ~ S Vermont Yankee Procedure NolRev.: @p 76 ;?"? 1 0 .

Visual Examination Report Form for General Visual [IWE) Page t of I Date: i / i i / d / t Component

omponent io: X- J o(P System: 3 1 0 ~w LI

( .

Visual Aids Photo Sketch Method 3 Binoculars 9 None PpNone FDirect GWa t-*b

%.Mirror 0 Attached 0 Attached U Remote Light Source Examination Location Description/Remarks ' Remote Examination Conditions/EquipmentRemarks 0 6" Scale afip4.z P*,,*~rJQ;ord N/A Examiner: ~h Level NA Date *h Reviewer:. */A Date #/A Reviewer: @/A Date iJ/A ANII: I If Date ldT/*/

il WNEF 8047.06 NE 8047 Original Page 1 of I  !

I Work Order No.: 00-00 5 0 3s Vermont Yankee Procedure NolRev.: flP 70 3-q /a '

Visual Examination Report Farm for General Visual (IWE) p a g e l o f Date: 1/ic,,&

1 Component Visual Aids Photo Sketch Method 0 Binoculars None fFNone 9 Direct &*a ~ fCi U Attached 0 Attached Remote Examinatian Location Oescr$tion/Remarks Remote' Examination ConditionslEquiprnent Remarks 0 6" Scale 4 4 D Other x- 107 L .

VYNEF 8047.06 NE 8047 Original Page 1 of 1

Vermont Yankee I Visual Examination Report Form VT-1, Containment Surfaces (IWE) work Order NO.: bU* iL4 /7 DO ProcedureNoRev.: d& fb6 /k h1

. Page 1 of 2 Date: 534/

Remote Examination ConditiondEquiprnent Remarks Other (Explain)

Exminer: Level: 4 Date: EvaIuation Required?

Examiner: 4 Level: dh Date:

Reviewer:

Date: c/~L/ ayes d o Reviewer: /.I& me: aI/A ANII: H Date: s-Y-01 VYNEF 8045.02 NE 8045 Rev. 1 Page 1 of 1

Vermont Yankee Reference Data Sheet No:

Visual Examination Page 2 of Date: fA_/dl/o 1 r r Supplemental Report Form Component Zomponent ZD: )'2064 System: %w.3 f'

baminer: ."/R Level: ..fR Date: 4 ieviewer: 4 Date: sydk/

teviewer: 4 4 Date: 4k Date:  %/

VYNEF. 8045.04 NE 8045 Original Page 1 of 1 tpc #I

Vermont Yankee Data Sheet No: gocds- 6 01 3 Work Order No.: 00 -a0 46 1 7 4 0 0 Visual Examination Report Form Procedure NoRev.: Nk"g)oi/F -/ REV0 /

VT-1, Bolting OWE)

Page I of 1 Date: S- 3-o/

Bolting Length: 4 % ,' " Bolting Diameter:

PhotolSketch Method Examination Bolting Components Examined Ihmiaation Level Check dNone EfDirect I3 In Place dolting 0 Washers Visual Aids Intermediate c

_ _ _ _ _ ~ ~

0 Magnifying GIass Milmination c a r c ~ ~ o . : Y Y8 Intermediate /vA.

0 Mirror d i g h t Source (Describe):

Remote Examination ConditionslLimitations:

&& r c c /

w Final 223 /-./e 5h/$

NA Lightmeter SM: 8/2/53 Evaluation Required?

ayes 0%0 1Examiner: Level: .lkDate: &/A l WNEF 8045.03 N E 8045 Original Page 1 of 1

Vermont Yankee Data Sheet No: go fLs4c3 1 o/s" Visual Examination Report Form Work Order No.: U U - OU 96 s*.-0 4 0 Procedure NoRev.: 46 86 95 /e@. 0 VT-1, Bolting (rwE) page / of / Date: S - s n o /

VYNEF 8045.03 NE 8045 Original Page 1 of 1

Vermont Yankee gDataShmNo.zz Work Order No.: d d -dd 94/P-* CJ00 Visual Examination Report Form ProcedureNo/Rev.: N E ~ 9.5 o /pF& /

VT-1, Bolting (WE)

Page / of / Date: 5-3-a1 II Component CH/JC&-~ /'

Drawing NoRev.: 9 -62.o.L Meuuo

  • Bolting Length: ya" " Bolting Diameter:

I I I1 Ph otolSketch Method Examination BoltingComponents Examined ntumination Level Check II None Direct 0 In Place M Bolting 0 Washers Attached 0 Remote Removed 0 Bushings Flange Surface

__F I

Visual Aids Magnifying Glass w Illumination carmo.: @

0 Mirror 1Light Source (Describe): ,/=)%dL+~ f Remote Examination Conditionskimitations: #

/v/A- Lightmeter W. r/z/53 Evaluation Required?

OYes EN0 WNEF 8045.03 NE 8045 Original Page 1 of 1

WNEF 8047.06 NE 8047 Original Page Iof 1 i

Vermont Yankee Procedure NolRev.: /f 7oaq/b Visual Examination Report Form for General Visual (IWE) Page t of I Date: ~//tLol r Component Visual Aids Photo Sketch Method Binoculars ITP None @? None 9, Direct b*&*raC a Mirror D Attached [7 Attached 0 Remote

@ LightISource Examination Location DescriptionlRemarks 1 Remote Examination ConditionsEquipment Remarks VYNEF 8047.06 NE 8047 Original Page 1 of 1

Work Order No.: 0 0 - 00 5 0 35 Vermont Yankee Procedure NolRev.: PP 70 a'// O .

Visual Examination Report Form for General Visual (IWE) Page of / Date: I/IG/O / I I

Component System: Tu/Lv Q Visual Aids 1I Photo II Sketch I Method 0 Binoculars None @ None I@

1 Direct &IrFo-C 0 Mirror d)f Light Source Examination Location DescriptionlRemarks Remote Examination ConditionslEquiprnentRemarks

, 0 6" Scale 7'4 A W ' P*wa..hA:6&S v4

' 5 Other k-3 G+kk j Examination Results, Details and Comments:

VYNEF 8047.06 NE 8047 Original Page 1 of 1

Data Sheet No: b70 47 I e

0 32-Work Order No.: 06 - S O3 7 Vermont Yankee procedure Nomev.: %f7 40 Visual Examination Report Form for General Visual ([WE) Page - / of 1 Date: 5/..t/0[

t ComDonent Drawing NOlReV.: 59%-

Visual Aids Photo Sketch Method 0 Binoculars YNone @ None 09 Direct GJ-&

Mirror 0 Attached 10 Attached 10 Remote

~ ~

Light Source 1 Examination Location DescriptioniRemarks Remote Examination ConditionslEquipment Remarks 0 6" Scale Cl Other Examination Results, Details and Comments:

I Examiner:

Examiner: &&

Level@,

Level A+ 3 Date Date 5r/t/o A.&

/

Reviewer: Date <h&

Reviewer: - Date @

I ANII: &gH& Date d=t?&.

VYNEF 8047.06 NE 8047 Original Page 1 of 1

INSERVICE DISCREPANCY REPORT (IDR)

IDR #: lL!,AB Date : 5/2/2002 X-207A -

I Component: Location: Drvwell Performed By: Date:

Disposition/Repair:

IS1 Program Coordinator: Date :

Repair Effort:

Reference Document:

Repair Completion D a t e :

Service Induced: YES - NO -BY: Date:

Sample Ekpansion Required: YES - NO BY: Date:

Sample Expansion:

IS1 Program Coordinator: Date :

Reinspection Required: YES - NO BY:

Subsequent Inspection R e q u i r e d : YES - NO BY:

IS1 Supervisor Notified:

IS1 Program Coordinator: Date:

Reinspection Completed Satisfactorily:

IS1 Supervisor: Date:

IDR Closed:

ISI Program coordinator: Date :

WAPF 4027.01 AP 4027 Rev. 4