ML071230748: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 19: Line 19:
{{#Wiki_filter:LIST OF REFERENCE HANDOUTS PROVIDED TO CANDIDATES FOR THE MONTICELLO INITIAL EXAMINATION FEBRUARY 2007
{{#Wiki_filter:LIST OF REFERENCE HANDOUTS PROVIDED TO CANDIDATES FOR THE MONTICELLO INITIAL EXAMINATION FEBRUARY 2007


MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED Related          REFERENCE HANDOUTS PROVIDED                  REVISION Question                                                        NUMBER
MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED Related          REFERENCE HANDOUTS PROVIDED                  REVISION Question                                                        NUMBER 5    Technical Specification 3.1.7                          Amendment 146 Technical Specification 3.1.7 Bases                    Revision 0 Alarm Response Procedure C.6-005-B-15                  Revision 3 7, 8  Electrical Prints:
  #
5    Technical Specification 3.1.7                          Amendment 146 Technical Specification 3.1.7 Bases                    Revision 0 Alarm Response Procedure C.6-005-B-15                  Revision 3 7, 8  Electrical Prints:
NX-7834-67-9                                          Revision G NX-7834-67-10                                          Revision H NX-7834-67-11                                              NIA NX-7834-67-13                                              NIA 9    Attached Pictures of IRM Channel #11                      NIA 11    Attached Picture of APRM Channel 4                  1    NIA 13    Technical Specification 3.5.1                          Amendment Technical Specification 3.5.2                              146 Technical Specification 3.5.2 Technical Specification 3.5.1 Bases                    Revision 2 Technical Specification 3.5.2 Bases                    Revision 0 Technical Specification 3.5.3 Bases                    Revision 0 18    Attached Picture of SBGT Controller FIC 2943              NIA 22    4512-CM, Trouble Shooting For 250 VDC Battery System    Revision 9 Grounds - Battery No. 13 Page 1 of 3
NX-7834-67-9                                          Revision G NX-7834-67-10                                          Revision H NX-7834-67-11                                              NIA NX-7834-67-13                                              NIA 9    Attached Pictures of IRM Channel #11                      NIA 11    Attached Picture of APRM Channel 4                  1    NIA 13    Technical Specification 3.5.1                          Amendment Technical Specification 3.5.2                              146 Technical Specification 3.5.2 Technical Specification 3.5.1 Bases                    Revision 2 Technical Specification 3.5.2 Bases                    Revision 0 Technical Specification 3.5.3 Bases                    Revision 0 18    Attached Picture of SBGT Controller FIC 2943              NIA 22    4512-CM, Trouble Shooting For 250 VDC Battery System    Revision 9 Grounds - Battery No. 13 Page 1 of 3



Latest revision as of 16:42, 13 March 2020

List of Reference Handouts Provided to Candidates for the Monticello Initial Examination - February 2007
ML071230748
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/03/2007
From: Valos N
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML070660508 List:
References
50-263/07-301
Download: ML071230748 (4)


Text

LIST OF REFERENCE HANDOUTS PROVIDED TO CANDIDATES FOR THE MONTICELLO INITIAL EXAMINATION FEBRUARY 2007

MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED Related REFERENCE HANDOUTS PROVIDED REVISION Question NUMBER 5 Technical Specification 3.1.7 Amendment 146 Technical Specification 3.1.7 Bases Revision 0 Alarm Response Procedure C.6-005-B-15 Revision 3 7, 8 Electrical Prints:

NX-7834-67-9 Revision G NX-7834-67-10 Revision H NX-7834-67-11 NIA NX-7834-67-13 NIA 9 Attached Pictures of IRM Channel #11 NIA 11 Attached Picture of APRM Channel 4 1 NIA 13 Technical Specification 3.5.1 Amendment Technical Specification 3.5.2 146 Technical Specification 3.5.2 Technical Specification 3.5.1 Bases Revision 2 Technical Specification 3.5.2 Bases Revision 0 Technical Specification 3.5.3 Bases Revision 0 18 Attached Picture of SBGT Controller FIC 2943 NIA 22 4512-CM, Trouble Shooting For 250 VDC Battery System Revision 9 Grounds - Battery No. 13 Page 1 of 3

MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED I

I 26 Attached Picture of RBCCW Pump Switches N/A 31 Drywell Spray Limit curve [ Figure N from C.5-1200, Revision 16 PRIMARY CONTAINMENT CONTROL1 39 Attached Picture of Reactor Recirculation System Control N/A Board Meters Ops Man C.4-B.05.01.02.A, Figure 1, Monticello Nuclear Revision 12 Generating Plant Power-Flow Operating Map ~~

44 Ops Man C.4-C, Figure 2, Reactor Depressurization Rate Revision 29 50 Ops Man C.5.1-1000, Figure 21, Heat Capacity Temperature Revision 19 Limit Attached Picture of No. 1 Main Transformer Deluge System N/A I 59 Ops Man C.4-6.06.03.A, Figure 1, Turbine Exhaust Pressure Limits Revision 10 I 68 Ops Man B.9.2-06, Figure 2, Reactive Capability vs. Megawatt Load - Turbine Generator Revision 1 1 N/A Steam Tables N/A I-r NOTE: The following reference handouts are for the SRO-only examination.

Various All of the EOP Flow Charts (with the Entry Conditions blanked Various out)

Emergency Action Level Matrix Revision 1 A.2-101, Classification of Emergencies Revision 37 I

83 4 A w l 04.01.05, Reactivity Management Program Revision 8 FP-OP-RM-01 FP-OP-RM-01, Reactivity Management Program I Revision 0 Page 2 of 3

MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED ~

88 Technical Specification 3.0 Amendment Technical Specification 3.4.7 146 Technical Specification 3.7.2 Technical Specification 3.0 Bases Revision 0 Technical Specification 3.4.7 Bases Technical Specification 3.7.2 Bases ~

89 Technical Specification 3.4.3 Amendment 146 Technical Specification 3.4.3 Bases Revision 0 4 AWI-04.08.02, 10CFR50.72 and 10CFR73.71 Immediate Revision 14 Notification NUREG-1022, Event Reporting Guidelines 10 CFR 50.72 and Revision 2 50.73 93 0289-A, Service Water Effluent Monitor Functional Test Revision 14 FP-G-DOC-04, Procedure Processing Revision 3 QF-0013, Temporary Change Request Revision 4 4 AW 1-02.02.02, Procedure Reviews and Approval Revision 23 Page 3 of 3