{{#Wiki_filter:Final Submittal(BluePaper)
{{#Wiki_filter:Final Submittal (Blue Paper)
Final Submittal(BluePaper)
 
Ifl£e:LsaoB{50
Final Submittal (Blue Paper)
/"Te5{"Sllo FINAL JPMS ADMINISTRATIVE JPMs AppendixC Job Performance Measure WorksheetFormES-C-1 Facility: HARRISTaskNo.:301144H601TaskTitle:DeterminetheCold, Xenon-free Boron Concentration RequirementforaNaturalCirculationCooldownJPMNo.:2008.NRCJPMRO/SROA1-1KIA
Ifl£e:LsaoB{50 /
Ope(ClT'f'l~ "Te5{   ~J.1I~ "Sllo ~3)3JUU?
FINAL JPMS ADMINISTRATIVE JPMs
 
Appendix C                                Job Performance Measure                       Form ES-C-1 Worksheet Facility:               HARRIS                                  Task No.:     301144H601 Task
 
==Title:==
Determine the Cold, Xenon-free           JPM No.:     2008. NRC JPM Boron Concentration Requirement                        RO/SRO A1-1 for a Natural Circulation Cooldown KIA


==Reference:==
==Reference:==
2.1.25(2.8/3.1)
2.1.25 (2.8/3.1)
Examinee:NRCExaminer:FacilityEvaluator:
Examinee:                                                     NRC Examiner:
Date:Methodoftesting:
Facility Evaluator:                                           Date:
Simulated Performance:
Method of testing:
ClassroomREADTOTHE EXAMINEE X SimulatorActualPerformance:
Simulated Performance:                                       Actual Performance:        X Classroom          X     Simulator    - - - Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Plant---XIwillexplaintheinitialconditions,whichstepstosimulateordiscuss,andprovideinitiatingcues.Whenyou completethetasksuccessfully,theobjectiveforthisJobPerformanceMeasurewillbesatisfied.
INITIAL
INITIAL*Theunittrippedduetoalossofoff-sitepower.Allcontrolrods CONDITIONS:haveinserted.*Theoperatingcrewis performingEPP-005,NATURAL CIRCULATION COOLDOWN.*TheunitwillbetakentoColdShutdown.*PowerTraxisnotavailable.*CurrentRCSBoron concentrationis1125ppm.*CoreBurnupis130EFPD.*RCSB-10AtomPercentis19.36
* The unit tripped due to a loss of off-site power. All control rods CONDITIONS:                         have inserted.
*Temperatureis140°F.TaskStandard:
* The operating crew is performing EPP-005, NATURAL CIRCULATION COOLDOWN.
Calculationswithinspecifiedrange.RequiredMaterials:
* The unit will be taken to Cold Shutdown.
CalculatorGeneral
* PowerTrax is not available.
* Current RCS Boron concentration is 1125 ppm.
* Core Burnup is 130 EFPD.
* RCS B-10 Atom Percent is 19.36
* Temperature is 140°F.
Task Standard:             Calculations within specified range.
Required Materials:         Calculator General


==References:==
==References:==
*EPP-005, NATURAL CIRCULATION COOLDOWN*OST-1036,SDM CALCULATIONMODES1-5*CurveBook Handouts:*EPP-005,Step7
* EPP-005, NATURAL CIRCULATION COOLDOWN
*OST-1036*CurveBook (EnsureCurveA-X-22is available and unmarked)2008HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9 Appendix C Job Performance Measure WorksheetFormES-C-1InitiatingCue:TimeCriticalTask:
* OST-1036, SDM CALCULATION MODES 1-5
Validation Time:USCGhas directedyoutoperformstep7.aofEPP-005, determine the corrected Xe-freecoldshutdownboron concentrationusingOST-1036.Recordvaluesonthiscuesheetonceitis determinedifSDM requirementsaremetbythecurrentboron concentration.
* Curve Book Handouts:
CRODS_CCURVE_CREQ ,_CRCS ,_CSDM_MET/NOTMET(Circleone)
* EPP-005, Step 7
NO15minutes2008HARRISNRCRO-SRO At-1Rev2NUREG1021,Revision9 Appendix C (DenoteCriticalStepswithaStartTime:_Page3of8 PERFORMANCE INFORMATIONFormES-C-1 Performance Step: 1 Standard: Evaluator Cue: Comment: Performance Step: 2 Standard: Evaluator Cue: Comment: Performance Step: 3 Standard:;.Comment:ReviewsEPP-005,Step7.
* OST-1036
Determines OST-1036 applies.Provide EPP-005, Step 7.Locates/reviewsOST-1036.Determines OST-1036,Section7.2applies.
* Curve Book (Ensure Curve A-X-22 is available and unmarked) 2008 HARRIS NRC RO-SRO A1-1 Rev 2                                              NUREG 1021, Revision 9
Provide OST-1036.Recordthefollowing:*CoreburnupfromMCRStatusboard.
 
*TemperatureforwhichthisSDM calculationistaking credit.*Latest availableRCSboronsample.FromInitial Conditions, records:*130EFPD*200°F,orless*1125ppm 2008 HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9 Appendix CPage4of8 PERFORMANCE INFORMATIONFormES-C-1 Performance Step: 4 Standard: Evaluator Cue: Comment: Performance Step: 5 Standard: Comment: Performance Step: 6 Standard: Comment:Recordthefollowing:*RCSB-10ATOM percentfromMCRStatusBoardORRWSTB-10Atompercent, IF followingCoreReload.Records19.36 RCS 8-10 ATOM percent from cue sheet Checkrodstatusasfollows:*Ifallrodsareinserted,record CRODS=0inStep7.2.2.aandN/AStep7.2.2.b.Records0in7.2.2.aandN/A's7.2.2.b.
Appendix C                           Job Performance Measure                   Form ES-C-1 Worksheet Initiating Cue:     USCG has directed you to perform step 7.a of EPP-005, determine the corrected Xe-free cold shutdown boron concentration using OST-1036.
DetermineXenonfreeSDMboron concentration,CSDM,as follows:a.Recordthefollowing information:*Boronadditionto compensateforstuckrodsfrom Attachment1orStep7.2.2.a.
Record values on this cue sheet once it is determined if SDM requirements are met by the current boron concentration.
Enters O.2008HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9 Appendix CPage5of8 PERFORMANCE INFORMATIONFormES-C-1 PerformanceStep:7 Standard: Evaluator Cue: Comment: PerformanceStep:8 Standard: Comment:PerformanceStep:9 Standard: Comment: DetermineXenonfreeSOMboron concentration,CSOM,as follows:a.Recordthe following information:
C RODS        _
*UncorrectedrequiredSOMboron concentration fromcurveA-X-22(Useactionlevellineoncurve.)Reads2020to2040ppm DeterminerequiredXenonfreeSOM uncorrected boron concentration CREQ: CREQCROOS+CCURVE CREQ=_CREQ=2020to2040ppm DetermineXenonfreeSOM corrected boron concentration, CSOM: 19.9/ArcsxCREQDivides19.9by19.36and multipliesbyCREQ: 19.9/19.36(2020to2040ppm)=Records2076to2097ppm 2008 HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9 AppendixCPage6of8 PERFORMANCE INFORMATIONFormES-C-1Performance Step: 10 Standard: Comment: Terminating Cue: Determine whetherSDMrequirementscanbemetbyXenonfreeSOMcalculation:CompareRCSboron concentration,CRCS,andXenonfreeSOMcorrectedboron concentration, CSDM:*CRCSRCSboronsamplefromStep7.2.1.*CSOMXenonfreeSDMcorrectedboron concentrationfromStep7.2.3.c.IfCRCSislessthanorequaltoCSDM,thencontinuewithStep7.2.5totakecreditforXenoneffects.
CCURVE          _
DeterminescurrentRCSboron concentrationis<CSDMboron concentration.Whenthe candidate proceeds toStep7.2.5:
C REQ,         _
ThisJPMis complete.StopTime:_2008HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9 Appendix CPage7of8 VERIFICATION QF COMPLETIONFormES-C-1 Job PerformanceMeasureNo.:2008NRCJPMRO/SROA1-1 Examinee's Name:DatePerformed:FacilityEvaluator:
C RCS,         _
NumberofAttempts:TimetoComplete:.
CSDM          _
MET / NOT MET (Circle one)
Time Critical Task: NO Validation Time:    15 minutes 2008 HARRIS NRC RO-SRO At-1 Rev 2                                NUREG 1021, Revision 9
 
Appendix C                                     Page 3 of 8                    Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a ~)
Start Time:          _
Performance Step: 1         Reviews EPP-005, Step 7.
Standard:                  Determines OST-1036 applies.
Evaluator Cue:              Provide EPP-005, Step 7.
Comment:
Performance Step: 2        Locates/reviews OST -1036.
Standard:                  Determines OST-1036, Section 7.2 applies.
Evaluator Cue:              Provide OST-1036.
Comment:
Performance Step: 3        Record the following:
* Core burn up from MCR Status board.
* Temperature for which this SDM calculation is taking credit.
* Latest available RCS boron sample.
Standard :;.                 From Initial Conditions, records:
* 130 EFPD
* 200&deg;F, or less
* 1125 ppm Comment:
2008 HARRIS NRC RO-SRO A1-1 Rev 2                                  NUREG 1021, Revision 9
 
Appendix C                              Page 4 of 8                        Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Record the following:
* RCS B-10 ATOM percent from MCR Status Board OR RWST B-10 Atom percent, IF following Core Reload.
Standard:          Records 19.36 Evaluator Cue:      RCS 8-10 ATOM percent from cue sheet Comment:
Performance Step: 5 Check rod status as follows:
* If all rods are inserted, record CRODS = 0 in Step 7.2.2.a and N/A Step 7.2.2.b.
Standard:          Records 0 in 7.2.2.a and N/A's 7.2.2.b.
Comment:
Performance Step: 6 Determine Xenon free SDM boron concentration, CSDM, as follows:
: a. Record the following information:
* Boron addition to compensate for stuck rods from Attachment 1 or Step 7.2.2.a.
Standard:          Enters O.
Comment:
2008 HARRIS NRC RO-SRO A1-1 Rev 2                              NUREG 1021, Revision 9
 
Appendix C                              Page 5 of 8                        Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 Determine Xenon free SOM boron concentration, CSOM, as follows:
: a. Record the following information:
* Uncorrected required SOM boron concentration from curve A-X-22 (Use action level line on curve.)
Standard:          Reads 2020 to 2040 ppm Evaluator Cue:
Comment:
Performance Step: 8 Determine required Xenon free SOM uncorrected boron concentration CREQ:
CREQ ~ CROOS + CCURVE CREQ=               _
Standard:          CREQ = 2020 to 2040 ppm Comment:
~  Performance Step: 9 Determine Xenon free SOM corrected boron concentration, CSOM:
19.9/Arcs x CREQ Standard:          Divides 19.9 by 19.36 and multiplies by CREQ:
19.9/19.36 (2020 to 2040 ppm) =
Records 2076 to 2097 ppm Comment:
2008 HARRIS NRC RO-SRO A1-1 Rev 2                                NUREG 1021, Revision 9
 
Appendix C                              Page 6 of 8                        Form ES-C-1 PERFORMANCE INFORMATION
~  Performance Step: 10 Determine whether SDM requirements can be met by Xenon free SOM calculation:
Compare RCS boron concentration, CRCS, and Xenon free SOM corrected boron concentration, CSDM:
* CRCS              RCS boron sample from Step 7.2.1.
* CSOM              Xenon free SDM corrected boron concentration from Step 7.2.3.c.
If CRCS is less than or equal to CSDM, then continue with Step 7.2.5 to take credit for Xenon effects.
Standard:            Determines current RCS boron concentration is <CSDM boron concentration.
Comment:
Terminating Cue:        When the candidate proceeds to Step 7.2.5: This JPM is complete.
Stop Time:             _
2008 HARRIS NRC RO-SRO A1-1 Rev 2                                NUREG 1021, Revision 9
 
Appendix C                            Page 7 of 8                  Form ES-C-1 VERIFICATION QF COMPLETION Job Performance Measure No.: 2008 NRC JPM RO/SRO A1-1 Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete: .
Question Documentation:
Question Documentation:
Question: Response: Result: Examiner's Signature:
Question:
SAT UNSAT Date:2008HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9 Appendix CPage8of8JPMCUE SHEETFormES-C-1 INITIAL CONDITIONS:
 
INITIATING CUE:*Theunit trippedduetoalossofoff-sitepower.Allcontrolrodshaveinserted.*The operatingcrewis performing EPP-005, NATURALCIRCULATIONCOOLDOWN.*TheunitwillbetakentoColdShutdown.
===Response===
*PowerTraxisnotavailable.
Result:                     SAT            UNSAT Examiner's Signature:                                 Date:
*CurrentRCSBoron concentrationis1125ppm.*CoreBurnupis130EFPD.*RCSB-10AtomPercentis19.36
2008 HARRIS NRC RO-SRO A1-1 Rev 2                          NUREG 1021, Revision 9
*Temperatureis140&deg;F.USCOhas directedyoutoperformstep7.aofEPP-005, determine the corrected Xe-freecoldshutdownboron concentrationusingOST-1036.Recordvaluesonthiscuesheetonceitis determinedifSDM requirementsaremetbythe current boron concentration.
 
CRODS_CCURVE_CREQ_CRCS_CSDM_MET/NOTMET(Circleone)2008HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9 Appendix C Page 8 of 8JPMCUE SHEET INITIAL CONDITIONS:
Appendix C                                Page 8 of 8                        Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
INITIATING CUE:*The unit tripped duetoa toss of off-site power.All control rods have inserted.*The operating crew is performing EPP-005 7 NATURAL CIRCULATION COOLDOWN.*Theunitwillbe takentoCold Shutdown.*PowerTraxisnot available.
* The unit tripped due to a loss of off-site power. All control rods have inserted.
*Current ReS Boron concentration is 1125 ppm.*Core Burnupis130 EFPD.*ReS B-10 Atom Percent is 19.36*Temperature is 140&deg;F.usee has directedyouto perform step 7.aof determine the corrected Xe-free cold shutdown boron concentration using OST-1036.Record values on this cue sheet onceitis determined if 8DM requirements are met by the current boron concentration.
* The operating crew is performing EPP-005, NATURAL CIRCULATION COOLDOWN.
CRODS C"'}..,./("')()...,/r"j.r;ICCURVE l/7(j(;2o Bo<.fq)CREQ
* The unit will be taken to Cold Shutdown.
(
* PowerTrax is not available.
(9c.)((())
* Current RCS Boron concentration is 1125 ppm.
eRCS\lCSDM f)bt (c, (90'7&deft 7)MET(Circleone) 2008 HARRIS NRC RO-SROA1-1Rev2 NUREG 1021, Revision 9 Appendix C Job Performance Measure WorksheetFormES-C-1 Facility: HARRISTaskNo.:005016H101TaskTitle:KIA
* Core Burnup is 130 EFPD.
* RCS B-10 Atom Percent is 19.36
* Temperature is 140&deg;F.
INITIATING CUE:        USCO has directed you to perform step 7.a of EPP-005, determine the corrected Xe-free cold shutdown boron concentration using OST-1036.
Record values on this cue sheet once it is determined if SDM requirements are met by the current boron concentration.
C RODS            _
CCURVE        _
CREQ            _
CRCS            _
C SDM            _
MET / NOT MET (Circle one) 2008 HARRIS NRC RO-SRO A1-1 Rev 2                                NUREG 1021, Revision 9
 
Appendix C                                         Page 8 of 8 JPM CUE SHEET INITIAL CONDITIONS:
* The unit tripped due to a toss of off-site power. All control rods have inserted.
* The operating crew is performing EPP-005 NATURAL  7 CIRCULATION COOLDOWN.
* The unit will be taken to Cold Shutdown.
* PowerTrax is not available.
* Current ReS Boron concentration is 1125 ppm.
* Core Burnup is 130 EFPD.
* ReS B-10 Atom Percent is 19.36
* Temperature is 140&deg;F.
INITIATING CUE:          usee has directed you to perform step 7.aof EPP-005~
determine the corrected Xe-free cold shutdown boron concentration using OST-1036.
Record values on this cue sheet once it is determined if 8DM requirements are met by the current boron concentration.
:~:.
CRODS       C"'}
                                        ..,./
("' ) () ...,   /r"j . r; I    ...~
CCURVE (1.(),~.}O        l/7(j(;2o I~O Bo<.fq)
C REQ  ~c\:3t)          ( 9t)(~o,,\nc} (9c.)((())
eRCS   \ l L.~)
CS DM f) b  '7(~    t (c, (90'7&     +~ deft 7)
MET   I~~~V (Circle one) 2008 HARRIS NRC RO-SRO A1-1 Rev 2                                            NUREG 1021, Revision 9
 
Appendix C                                 Job Performance Measure                   Form ES-C-1 Worksheet Facility:               HARRIS                                    Task No.:   005016H101 Task
 
==Title:==
Estimate Primary to Secondary            JPM No.:    2008 NRC RO ADM Leak Rate                                            JPM A1-2 KIA  


==Reference:==
==Reference:==
2.1.31 (4.2)
Examinee:                                                      NRC Examiner:
Facility Evaluator:                                            Date:
Method of testing: This JPM should be performed on a frozen simulator.
Simulated Performance:                                          Actual Performance:    X Classroom                Simulator        X      Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.                                                                .
Initial Conditions:
* The plant is at 100% power.
* A steam generator tube leak is in progress.
* AOP-016 has been entered and actions are in progress.
* OSI-PI is not available.
* Chemistry sampling has not commenced.
* Motivating air is isolated.
Task Standard:              Determines leak rate to be --25 gpd using Method 1 of AOP-016, Att. 1.
Required Materials:        None General
==References:==
AOP-016, Excessive Primary Plant Leakage, Rev 37 Curve Book Handouts:                  AOP-016, Attachment 1 Initiating Cue:            The USCG has directed you to perform AOP-016, Excessive Primary Plant Leakage, Attachment 1 step 3 to estimate primary to secondary leakage.
Time Critical Task:        No Validation Time:            10 minutes HARRIS 2008 NRC RO A1-2 REVISION 2                                            NUREG 1021, Revision 9
Appendix C                        Job Performance Measure        Form ES-C-1 Worksheet SIMULATOR SETUP IC-19 imf RMS079 (REM-1TV-3534 CVPETS) to 6.00 E-7 uCi/ml.
NOTE: Must go to RUN for the malfunction to show.
Leave simulator in FREEZE once malfunction has appeared.
HARRIS 2008 NRC RO A1-2 REVISION 2                        NUREG 1021, Revision 9


Examinee:EstimatePrimaryto SecondaryLeakRate2.1.31(4.2)JPMNo.:2008NRCROADMJPMA1-2NRCExaminer:FacilityEvaluator:
Appendix C                                    Page 3'of 6                      Form ES-C-1 '
Date:Methodoftesting:ThisJPM should be performedona frozen simulator.SimulatedPerformance:
PERFORMANCE INFORMATION (Denote Critical Steps with a ~)
ClassroomREADTOTHE EXAMINEE SimulatorActualPerformance:XPlant XIwillexplaintheinitialconditions,whichstepstosimulateordiscuss,andprovideinitiatingcues.Whenyoucompletethetask successfully,theobjectiveforthisJob PerformanceMeasurewillbesatisfied.
Start Time:          _
.Initial Conditions:*Theplantisat100
Performance Step: 1         Obtain procedure.
%power.*Asteam generatortubeleakisinprogress.
Standard:                  Locates and reviews procedures.
*AOP-016hasbeenenteredandactionsareinprogress.*OSI-PIisnotavailable.
Evaluator Cue:             Provide Curve Book and AOP-016, Att. 1, step 3 after the procedure is located.
*Chemistrysamplinghasnotcommenced.*Motivatingairisisolated.TaskStandard:Determinesleakratetobe
Comment:
--25gpdusingMethod1ofAOP-016,Att.1.RequiredMaterials:NoneGeneral
~  Performance Step: 2        ESTIMATE Primary-To-Secondary leak rate using ONE of the methods listed (no preferred method):
Method 1: Use Condenser Vacuum Pump Rad Monitor REM-3534 (Grid 2), Curve H-X-15A, Curve H-X-15B, or H-X-15C (Depending on status of motivating air)
Standard:                  Determines that Method 1 is required.
Comment:
~  Performance Step: 3        Operates RM-11 to obtain reading for REM-1TV-3534 (Grid 2).
Standard:                    Reads REM-1TV-3534 as 6.00 E-7    ~Ci/ml.
Comment:
HARRIS 2008 NRC RO A1-2 REVISION 2                                    NUREG 1021, Revision 9


==References:==
Appendix C                             Page 4 of 6                         Form ES-C-1 PERFORMANCE INFORMATION
AOP-016,ExcessivePrimaryPlantLeakage,Rev37CurveBook Handouts:InitiatingCue:TimeCriticalTask:ValidationTime:
~  Performance Step: 4  Determines which curve from Curve Book to use.
AOP-016, Attachment 1TheUSCGhas directedyoutoperformAOP-016,ExcessivePrimaryPlantLeakage, Attachment1step3toestimateprimaryto secondary leakage.No10minutesHARRIS2008NRCROA1-2REVISION2NUREG1021,Revision9 Appendix C Job Performance Measure Worksheet SIMULATOR SETUPFormES-C-1 IC-19imfRMS079 (REM-1TV-3534 CVPETS)to6.00E-7uCi/ml.NOTE:MustgotoRUNforthe malfunctiontoshow.Leave simulator in FREEZE once malfunction has appeared.HARRIS2008NRCROA1-2 REVISION 2NUREG1021,Revision9 Appendix C (DenoteCriticalStepswithaStartTime:_
Standard:           Uses Curve H-X-15C since motivating air is isolated.
Page 3'of 6 PERFORMANCE INFORMATIONFormES-C-1' PerformanceStep:1 Standard: Evaluator Cue: Comment:PerformanceStep:2 Standard: Comment:PerformanceStep:3 Standard: Comment: Obtain procedure.Locatesandreviews procedures.
Comment:
Provide Curve BookandAOP-016,Att.1, step 3 after the procedure is located.ESTIMATE Primary-To-SecondaryleakrateusingONEofthe methodslisted(no preferred method):Method1:Use CondenserVacuumPumpRad Monitor3534(Grid2),CurveH-X-15A,CurveH-X-15B,or H-X-15C (Dependingonstatusof motivating air)DeterminesthatMethod1isrequired.
Performance Step: 5 Calculates Primary to Secondary leak rate.
OperatesRM-11toobtainreadingfor REM-1TV-3534(Grid2).Reads REM-1TV-3534as6.00E-7 HARRIS2008NRCROA1-2 REVISION 2NUREG1021,Revision9 Appendix CPerformance Step: 4Page4of6 PERFORMANCE INFORMATION DetermineswhichcurvefromCurveBooktouse.FormES-C-1 Standard: Comment:Performance Step: 5 Standard: Comment: Terminating Cue: StopTime:_UsesCurve H-X-15Csincemotivatingairisisolated.
Standard:            Determines Primary to Secondary leak rate is between 22 gpd to 27 gpd).
Calculates Primary to Secondaryleakrate.Determines Primary to Secondaryleakrateisbetween22gpdto27gpd).+/-2.5 gpd is margin of errorbasedon reading data from graphWhenthe primary to secondaryleakratehasbeen determined and reported totheUSCO: Evaluation on thisJPMis complete.HARRIS2008NRCROA1-2REVISION2NUREG1021,Revision9 AppendixCPage5of6 VERIFICATION OF COMPLETIONFormES-C-1JobPerformanceMeasureNo.:2008NRCROADMJPMA1-2 Examinee's Name:DatePerformed:FacilityEvaluator:NumberofAttempts:TimetoComplete:
Comment:            +/- 2.5 gpd is margin of error based on reading data from graph Terminating Cue:        When the primary to secondary leak rate has been determined and reported to the USCO: Evaluation on this JPM is complete.
Stop Time:        _
HARRIS 2008 NRC RO A1-2 REVISION 2                            NUREG 1021, Revision 9
 
Appendix C                            Page 5 of 6                  Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC RO ADM JPM A1-2 Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question Documentation:
Question: Response: Result: Examiner's Signature:
Question:
SAT UNSAT Date:HARRIS2008NRCROA1-2REVISION2NUREG1021,Revision9 Appendix CPage6of6JPMCUE SHEETFormES-C-1 INITIAL CONDITIONS:
 
INITIATING CUE:*Theplantisat100
===Response===
%power.*Asteam generatortubeleakisinprogress.
Result:                     SAT            UNSAT Examiner's Signature:                                 Date:
*AOP-016hasbeenenteredandactionsareinprogress.*OSI-PIisnotavailable.
HARRIS 2008 NRC RO A1-2 REVISION 2                          NUREG 1021, Revision 9
*Chemistry samplinghasnot commenced.
 
*Motivatingairisisolated.TheUSCOhas directedyoutoperformAOP-016,Excessive PrimaryPlantLeakage, Attachment1step3to estimate primary to secondary leakage.HARRIS2008NRCROA1-2 REVISION 2NUREG1021,Revision9 Appendix CJobPerformanceMeasure WorksheetFormES-C-1 Facility: HARRISTaskNo.: 341010H302TaskTitle:PerformReviewofDaily SurveillanceRequirementsLogJPMNo.:2008NRCSROA1-2 KJA
Appendix C                              Page 6 of 6                        Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
* The plant is at 100 % power.
* A steam generator tube leak is in progress.
* AOP-016 has been entered and actions are in progress.
* OSI-PI is not available.
* Chemistry sampling has not commenced.
* Motivating air is isolated.
INITIATING CUE:        The USCO has directed you to perform AOP-016, Excessive Primary Plant Leakage, Attachment 1 step 3 to estimate primary to secondary leakage.
HARRIS 2008 NRC RO A1-2 REVISION 2                            NUREG 1021, Revision 9
 
Appendix C                                  Job Performance Measure                    Form ES-C-1 Worksheet Facility:               HARRIS                                  Task No.:   341010H302 Task
 
==Title:==
Perform Review of Daily                  JPM No.:   2008 NRC SRO A1-2 Surveillance Requirements Log KJA  


==Reference:==
==Reference:==
2.1.18 (3.0)
Examinee:                                                    NRC Examiner:
Facility Evaluator:                                          Date:
Method of testing:
Simulated Performance:                                        Actual Performance:      x Classroom            X    Simulator  - - - Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
* The plant is in Mode 2, waiting for management approval to proceed to Mode 1.
* EDG "8" is synchronized to the grid for a post-maintenance test.
* The Daily Surveillance Logs (OST-1021 , Attachment 4) for 2100 have been completed.
* ERFIS Pressurizer Pressures are unavailable.
Task Standard:              All errors and TS actions identified Required Materials:        Perform in a location with TS or electronic access to TS available.
General
==References:==
* OST-1021 , DAILY SURVEILLANCE REQUIREMENTS, DAILY INTERVAL, MODE 1 AND 2
* Technical Specifications HARRIS 2008 NRC SRO A1-2 Rev 2                                              NUREG 1021, Revision 9
Appendix C                          Job Performance Measure                  Form ES-C-1 Worksheet Handouts:
* Copy of a completed OST-1021 , Attachment 4.
* Delete all notes.
* Substitute the following incorrect data:
* Modify log readings on p.19 of OST-1021 so that the 1500 reading of 457 and 456 are low and together average < 2205.
* Include 455 approximately 60 psig high so that the channel check is unsat.
* Condensate Storage Tank Level (both channels) progressively lowering from 85% to 60% throughout the day (TS).
* RCS Loop Flow Channel FI-424 progressively lowering from 100.21 to 98.13 throughout the day (TS).
* EDG Room Temperature channel TDG6903B @ 121&deg;F (should be circled)
Initiating Cue:    You are the USCG and have just completed an emergency watch relief due to illness of the scheduled person. Review the OST-1021 ,
Attachment 4 logs. At the conclusion of your review, discuss any findings with me.
Time Critical Task: No Validation Time:    20 minutes HARRIS 2008 NRC SRO A1-2 Rev 2                                    NUREG 1021, Revision 9
Appendix C                                      Page 3 of 7                      Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a ~)
Start Time:          _
Performance Step: 1          Obtain completed log.
Standard:                    Reviews handout.
Evaluator Cue:
* Provide handout for NRC SRO A1-2 after the Initial Conditions are reviewed and the Initiating Cue is provided.
* If necessary, after the applicant discusses each finding:
What action, if any, is required relative to this reading?
Evaluator Note:              Only the incorrect items in the logs are identified in the JPM Steps.
Comment:
-v Performance Step: 2          Review OST -1021, Attachment 4 for approval.
Standard:
* Identifies that Pressurizer Pressure Channel 455. fails it's channel check.
Comment:
HARRIS 2008 NRC SRO A1-2 Rev 2                                          NUREG 1021, Revision 9
Appendix C                                  Page 4 of 7                        Form ES-C-1 PERFORMANCE INFORMATION
'./  Performance Step: 3  Review OST-1021, Attachment 4 for approval.
Standard:
* Identifies that the Pressurizer Pressures should have the calculations completed.
* Pressurizer pressure should be identified low out of spec based on performing calculation with only Channels 456 and 457.
Evaluator Cue:      SRO may send paperwork back to RO to do the calculations.
If so cue the SRO to perform the calculations.
Comment:
'./  Performance Step: 4  Review OST-1021, Attachment 4 for approval.
Standard:
* Identifies one RCS Loop "B" Flow Channel (Sheet 5) is below Acceptance Criteria.
* Reading should be circled. TS does not apply in Mode 2.
Comment:
'./ Performance Step: 5  Review OST-1021 , Attachment 4 for approval.
Standard:
* Condensate Storage Tank Level (Sheet 7) is below Acceptance Criteria.
* Reading should be circled and entry into TS 3.7.1.3 Action a -
restore to operable or be in HSB within 6 hours, is required.
Comment:
HARRIS 2008 NRC SRO A1-2 Rev 2                                    NUREG 1021, Revision 9


2.1.18 (3.0)Examinee:NRCExaminer:FacilityEvaluator:
Appendix C                              Page 5 of 7                        Form ES-C-1 PERFORMANCE INFORMATION
Date:Methodoftesting:SimulatedPerformance:
-Y Performance Step: 6  Review OST-1021, Attachment 4 for approval.
ClassroomREADTOTHE EXAMINEE X SimulatorActualPerformance:
Standard:
Plant---xIwillexplaintheinitialconditions,whichstepstosimulateordiscuss,andprovideinitiatingcues.Whenyou completethetasksuccessfully,theobjectiveforthisJob PerformanceMeasurewillbesatisfied.InitialConditions:*TheplantisinMode2,waitingfor managementapprovaltoproceedtoMode1.*EDG"8" is synchronizedtothegridfora post-maintenance test.*TheDailySurveillanceLogs(OST-1021, Attachment4)for2100havebeencompleted.*ERFIS PressurizerPressuresareunavailable.TaskStandard:AllerrorsandTSactionsidentifiedRequiredMaterials:PerforminalocationwithTSor electronicaccesstoTSavailable.General
* Identifies Diesel Generator Room 261 temperature TDG6903B (Sheet 10) exceeds Acceptance Criteria.
* Reading should be circled and investigative/corrective actions implemented.
Evaluator Cue:        If requested: EDG "B" has been running for 30 minutes.
Evaluator Note:      Reading does not meet criteria for declaring equipment in the room inoperable.        '
Comment:
Terminating Cue:        After all findings have been reviewed: Evaluation on this JPM is complete.
Stop Time:        _
HARRIS 2008 NRC SRO A1-2 Rev 2                                NUREG 1021, Revision 9


==References:==
Appendix C                             Page 6 of 7                Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SRO A1-2 Examinee's Name:
*OST-1021,DAILY SURVEILLANCE REQUIREMENTS, DAILYINTERVAL,MODE1AND2*Technical SpecificationsHARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9 Appendix C Job Performance Measure WorksheetFormES-C-1 Handouts:InitiatingCue:TimeCriticalTask:ValidationTime:*Copyofa completedOST-1021, Attachment 4.*Deleteallnotes.
Date Performed:
*Substitute the following incorrect data:*Modifylogreadingsonp.19ofOST-1021sothatthe1500readingof457and456arelowand together average<2205.*Include455 approximately60psighighsothatthechannelcheckisunsat.
Facility Evaluator:
*Condensate StorageTankLevel(both channels)progressivelyloweringfrom 85%to 60%throughouttheday(TS).*RCSLoopFlowChannelFI-424 progressivelyloweringfrom100.21to98.13 throughouttheday(TS).*EDGRoom Temperature channel TDG6903B@121&deg;F(shouldbecircled)YouaretheUSCGandhave just completed an emergencywatchreliefduetoillnessofthe scheduledperson.ReviewtheOST-1021, Attachment4logs.Atthe conclusionofyourreview,discussanyfindingswithme.
Number of Attempts:
No20minutes HARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9 Appendix C(DenoteCriticalStepswithaStartTime:_Page3of7 PERFORMANCE INFORMATIONFormES-C-1 PerformanceStep:1 Standard: Evaluator Cue: Evaluator Note: Comment:-v Performance Step: 2 Standard: Comment: Obtain completed log.Reviewshandout.
Time to Complete:
*Provide handout forNRCSROA1-2 after the Initial Conditions are reviewedandthe InitiatingCueis provided.*If necessary, after the applicant discusses each finding: What action,ifany,is required relative to this reading?Only the incorrect itemsinthe logs are identifiedintheJPM Steps.ReviewOST-1021, Attachment4forapproval.
*Identifies that PressurizerPressureChannel 455.failsit'schannelcheck.HARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9 Appendix C'./PerformanceStep:3Page4of7 PERFORMANCE INFORMATION Review OST-1021, Attachment4forapproval.FormES-C-1 Standard: Evaluator Cue: Comment: './PerformanceStep:4 Standard: Comment: './PerformanceStep:5 Standard: Comment:*Identifiesthatthe Pressurizer Pressuresshouldhavethe calculations completed.
*Pressurizerpressureshouldbeidentifiedlowoutofspecbasedon performing calculationwithonly Channels456and 457.SROmay send paperwork back toROtodothe calculations.IfsocuetheSROto perform the calculations.
Review OST-1021, Attachment4forapproval.
*IdentifiesoneRCSLoop"B"FlowChannel(Sheet5)isbelow Acceptance Criteria.*Readingshouldbecircled.TSdoesnotapplyinMode2.
ReviewOST-1021, Attachment4forapproval.
*Condensate Storage TankLevel(Sheet7)isbelow Acceptance Criteria.*ReadingshouldbecircledandentryintoTS 3.7.1.3Actionarestoreto operableorbeinHSBwithin6hours,isrequired.HARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9 Appendix C-Y PerformanceStep:6Page5of7 PERFORMANCE INFORMATION Review OST-1021, Attachment4forapproval.FormES-C-1 Standard: Evaluator Cue: Evaluator Note: Comment: Terminating Cue: StopTime:_*Identifies Diesel GeneratorRoom261 temperature TDG6903B(Sheet10)exceeds Acceptance Criteria.*Readingshouldbecircledand investigative/corrective actions implemented.
If requested:
EDG"B"hasbeen running for 30 minutes.Reading does not meet criteria for declaring equipment in the room inoperable.
'After all findingshavebeen reviewed: Evaluation on thisJPMis complete.HARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9 AppendixCPage6of7 VERIFICATION OF COMPLETIONFormES-C-1JobPerformanceMeasureNo.:2008NRCSROA1-2Examinee'sName:DatePerformed:FacilityEvaluator:NumberofAttempts:TimetoComplete:
Question Documentation:
Question Documentation:
Question: Response: Result: Examiner's Signature:
Question:
SAT UNSAT Date:HARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9 Appendix CPage7of7JPMCUESHEETFormES-C-1 INITIAL CONDITIONS:
 
INITIATING CUE:*TheplantisinMode2,waitingfor managementapprovalto proceedtoMode1.*EDG"8" is synchronizedtothegridtor.a post-maintenance test.*TheDaily SurveillanceLogs(OST-1021, Attachment4)for2100havebeencompleted.*ERFIS PressurizerPressuresare unavailable.YouaretheUSCGandhavejust completed an emergency watchreliefduetoillnessofthe scheduledperson.Reviewthe1021, Attachment4logs.Atthe conclusionofyourreview, discuss any findingswithme.HARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9 4.5.1 , 1.a.1 1 a.zTECHSPEC Attachment 4...Daily Surveillance Requirements LogSheet1of15 etA A PRESSURECLAB PRESSURECLAC PRESSURE Between 585 and 665 psig OPEN Eees ACCUMULATORS PI..927 Pl-929 PI...931 PI-925 PI-923 PI-921 PARAMETER INSTRUMENT ACCEPTANCE CRITER!A MODE 12AND 3 WITH ReS PRESSUREABOVE1000 PSIG 0300 0900 1500 210q TECH SPEC a.s.1.1,8.1 14.5.1.1, b (partial)PARAMETER ECCS A.CCUMULATORSCLAALEVEL CLABLEVELCLACLEVEL INSTRUMENT SampUng Not Sampling Not SampUng Not LI..920 Lt..922 Required per LI924 Ll-926*Required per Ll..928 U930 Required per AU 6 Att 6Aft6 ACCEPTANCE CRiTERIA MODE between 66 and 96 ok Indicated level viith less 9(}k cumulative level increase (excludfngmakeupfrom operable RWST) last satisfact()
===Response===
sample 1 1 2 AND 3 WITHReSPRESSUREABOVE 1000 PSIG Previous Days Level 0300 0900 1500 2100 TECH SPEC 4A.6,2,1.b 4.3.2.1.10 1 2c , Sa3 14c 1 5c, Bd, 6g;4,3.3.6.1a; 4J3.1.4 PARAMETER CNMTSUMP FLOW MONITORiNG SUMP LEAK RATECNMTSUMPLEVEL CONTAINMENT PRESSURE PROGRAM ACCEPTANCE NO CHECKS CRITERIA ALARM PEROP..163 iNSTRUMENTALB1 ERF1S URE URE 9001 9002 N/A LeT LeT 7161A 7161B NfA PI 950 LESS THAN 1.6 PSfG PI 953 N/A CHAN.CHECK MODE 0300 0900 1500 2100[6ST-1021 Rev.66 Page 17 I Attachment4-Daily Surveillance Requirements Log Sheet2of15 TECH SPEC 4.1.2.6.a.2; 4.5.4.a.1; 4.3.2.1.7b, se: 4.3.3.6.9 a.3 PARAMETER RWST LEVELBORICACIDTANK INSTRUMENTL!..990 Ll...991 LI-992LI..993 N/A LI-106 L1..161.158 TCS7240 ACCEPTANCECHANNELGREATER THAN OR GREATER THAN GREATER THAN OR EQUAL TO 92&deg;k>OR EQUAL TO CRITERJA CHECKEQUALTO 74%>65 QF MODE 1.2 13)and.4 1.2,3and4 0300 C,iP C1C-, (il.l 9,5 2?I gc:).::,0900.: ,..../:.::'.....::-.1500 2100;h(')V TECH SPEC 4.5,2.a 4.4.9.3 PARAMETERECCSVALVEALIGNMENT PRZ SPRAY INSTRUMENT181..340 181-341 181-359 I 181-86 I 1$1-52 I 181-107 TJ-123 TI-454.1 ACCEPTANCE OPEN ANDPULLEDTO SHUT AND PULLED TO LOCK WITHLESSTHAN CRITERIA LOCK WiTH CONTROL CONTROL POWER OFF OR EQUAL POWER OFF TO 625&deg;F MODE 1 r2,and3 DURINGAUX SPRAY OPS 0300 Ai)(\41 rtJ r\OtJ(;", 0900''':bth*f.J1500If,JIA;:.2100"k)
Result:                     SAT            UNSAT Examiner's Signature:                               Date:
{h0 itO ihQ"if (-))llJ V V V TECH SPEC 4.4.3,1: 4.3.1.1.11:
HARRIS 2008 NRC SRO A1-2 Rev 2                          NUREG 1021, Revision 9
4.3.3.6.5 PARAMETER PRESSURIZER LEVEL INSTRUMENT LI-460 LI-461.1 LI-459A.1 N/A ACCEPTANCELESSTHANOR CHANNEL CRITERIA EQUALTO90%CHECK MODE1}2.and3 1 0300-(0\&;c!r<J 0900 lor (t;;;C>00,,-1500 CbiJ (0(\(0[)(';A j 2100 (),rQ\.(0 (') v I 08T-1021Rev.66Page18of40 I
 
Attachment 4-Daily Surveillance Requirements LogSheet3 of 15 TECH SPEC PARAMETER.4.2.5.1;4.3,1.1.9, 10; 3a3}3c3, 5c t6d PRESSURIZER PRESSURE tNDEPENDENT CALCULATION VERIFICATION ACCEPTANCE COMPLETED COMPLETED CRITERIA MET ACCEPTANCE C-RtTERIASEEBELOW N/A N/A NiA N/A CHANNEL CHECK MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE: NOTE:Calculationsmust bedonewitheithertheMCBIndicatorsORERFIS lndlcsuons, NOTacombination.
Appendix C                                Page 7 of 7                      Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
If all operable channelsgreaterthanor equal to theacceptancecriteria, calculations are not required.CALCULATIONS FOR PRESSURIZER PRESSURE PRESSURE (#Operable Channels used Normally 3)PRC0455
* The plant is in Mode 2, waiting for management approval to proceed to Mode 1.
++=
* EDG "8" is synchronized to the grid tor.a post-maintenance test.
PI--457 P\-456 0300: 0900:+PRC0457 PRC0456 PI..456 1500:
* The Daily Surveillance Logs (OST-1021 , Attachment 4) for 2100 have been completed.
.+Wy PRC0457 PRC0456 PI..457 PI-456+::: PRC0455 PI-455+=PRC0455 Pl...455 (#Operable Channels used Normally 3)Q-(#Operable Channels used Normally 3)PRESSURIZER PRESSURE=
* ERFIS Pressurizer Pressures are unavailable.
*"***P"RESSURIZER PRESSURE PRC0456 PRC0455-PI-457 PI-456 2100:++(#Operable Channels used Normally 3):=PRESSURIZER PRESSURE ACCEPT ANCEGRITER1A FOR PRESSURIZER PRESSURE (must meetoneof the following):
INITIATING CUE:        You are the USCG and have just completed an emergency watch relief due to illness of the scheduled person. Review the OST-1021, Attachment 4 logs. At the conclusion of your review, discuss any findings with me.
1.Average of operable Mea indicator channels greater thanorequalto 2205 psig.2,Averageof operable ERF1S points greaterthanor equal to 2202 psig.3, If three MeB indicators are not available,thenthe lowest channelshouldbegreaterthanorequalto2220 psig+4.If three ERFISpointsare not available, thenthelowest channel should be greaterthanor equalto2211 pSlg, IRev.66 Page19of40 I TECH$PEC PARAMETER Attachment 4..Daily Surveillance Requirements Log Sheet 4 of 15 4,2.5.1 ResLOOPTAVG INSTRUMENT(MeBOR ERFlS)ACCEPTANCE CRtTERIA TRC0412D TRC04220 TRC0432D CALCULATION TI-422D TI..432D COMPLETED SEE BELOW NIA INDEPENDENT VERIFICATION COMPLETED NfA ACCEPTANCE CRITERIA MET N/A MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE:Calculatlonsmustbe done with either the Mea IndicatorsORERFIS lndicatlons, NOT a combination.
HARRIS 2008 NRC SRO A1-2 Rev 2                                    NUREG 1021, Revision 9
IfaU operable channels are lessthanor equal to the acceptance critena, calculations are not required..CALCULATIONSF.OR ReS LOOP TAVG 0300: TRC0412D
 
++=
Attachment 4 ... Daily Surveillance Requirements Log Sheet 1 of 15 TECH SPEC                                                              4.5.1,1.a.1 1 a.z Eees ACCUMULATORS PARAMETER etA A PRESSURE               CLA B PRESSURE              CLA C PRESSURE INSTRUMENT      PI- 921          PI- 923      PI-925      PI ..927       Pl-929       PI ... 931 ACCEPTANCE                                Between 585 and 665 psig                                                        OPEN CRITER!A MODE                                         1~ 2 AND 3 WITH ReS PRESSURE ABOVE 1000 PSIG 0300 0900 1500 210q TECH SPEC                                                     a.s. 1.1,8.1 14.5.1.1, b (partial)
(#Operable Channels usedNormally3)
ECCS A.CCUMULATORS PARAMETER CLA A LEVEL                                  CLA B LEVEL                                  CLA C LEVEL SampUng Not                                   Sampling Not                                 SampUng Not INSTRUMENT    LI ..920       Lt ..922   Required per       LI ~ 924      Ll- 926*     Required per       Ll ..928     U ~. 930      Required per AU6                                          Att 6                                        Aft 6 ACCEPTANCE                                               between 66 and 96 ok Indicated level viith CRiTERIA          less tha.~ 9(}k cumulative level increase(excludfng makeup from operable RWST) ~inye last satisfact() sample MODE                                          1 2 AND 3 WITH ReS PRESSUREABOVE 1000 PSIG 1
=Res LOOP TAVG 0900:++=:TRC0412.DTRC0422DTRC0432D TI...412D Tt-422D TI...432D+(#Operable::::Channels used ReS LOOP Normally 3)TAVG 1500: TRC0412D Tt-412D+TRC0422D Ti-422D+
Previous Days Level 0300 0900 1500 2100 4.3.2.1.10 2c, Sa3 3b3~ 3c3~ 4c 1        1            1 TECH SPEC                                        4A.6,2,1.b 5c, Bd,6g; 4,3.3.6.1a; 4J3.1.4 CNMTSUMP                      SUMP PARAMETER                                                           CNMT SUMP LEVEL                        CONTAINMENT PRESSURE FLOW MONITORiNG               LEAK RATE ALB 1                          URE       URE           LeT              LeT            PI                          PI iNSTRUMENT                    ERF1S                                                                                                          N/A 9001      9002        7161A             7161B         950                         953 PROGRAM ACCEPTANCE      NO            CHECKS                                                                                                        CHAN.
:: (#Operable Channels used Normally 3)=RCSLOOP TAVG 2100:++=TRC0412D TRC0432D11-412D Tt w422D TI-432D (#Operable::_Channels used ReS LOOP Normally 3)TAVG ACCI;PT ANCE CRITERIA FOR ReS LOOpTAVG.(must meetoneof the following):
N/A                         NfA                        LESSTHAN 1.6 PSfG CRITERIA    ALARM              PER                                                                                                      CHECK OP..163 MODE 0300 0900 1500 2100
1, Average of operable Mea indicator channels mustbe lessthanor equal to 592.5 QF.2.Averageof operable ERF1S points less than or equal to 593.1"F.3.If three Meaindicatorsare notavallable, then the highest channel shouldbeless than or equal to 591 ,3>:>F.4.Ifthree ERFISpointsarenot available, then the highest channel should be lessthanor equalto592,3 OF.IRev.66Page20of40 I
[6ST-1021                                                       Rev. 66                                                       Page 17 of~O      I
Attachment 4,.Daily Surveillance Requirements Log Sheet 50f 15TECHSPEC 4,3.2.1 ,.4.4.6.2.1.e PARAMETER Res PRESSURE FLANGE LEAKOFF TEMP OTliT OPllT PROTECTIONllT iNSTRUMENT PI-403.1 P1402,1 TI401 Tt w412C}TI422C 2 TI..432C Tl..-412B)
 
TI..
Attachment 4 - Daily Surveillance Requirements Log Sheet 2 of 15 TECH SPEC             4.1.2.6.a.2; 4.5.4.a.1; 4.3.2.1. 7b,             se: 4.3.3.6.9                                     4.1.2.6.a.2~ a.3 PARAMETER                                 RWST LEVEL                                                                  BORIC ACID TANK INSTRUMENT    L!..990         Ll...991         LI-992        LI..993             N/A                   LI-106         L1..161.158             TCS7240 GREATER THAN ACCEPTANCE      GREATER THAN OR EQUAL TO 92&deg;k>
TI-4328 TJ....412A*TJ..422A t Tl-432A ACCEPTANCE CRITERIA MODE 0300 0900 1500 2100 CHANNEL CHECK N/ACHANNELCHECK INSTRUCTIONIfReS flow acceptance criteria is not met, perform EST-70B, RCSFlowDetermination.
CHANNEL                    GREATER THAN OR OR EQUAL TO CRITERJA                                                                     CHECK                          EQUAL TO 74%>                         QF 65 MODE                                       1.2   13) and.4                                                               1.2,3 and 4 0300         C,iP C1C-,                       (il.l       9,5               IC)-(~)                    2? I           gc:)               Ci~?
INSTRUMENT FRC0414 FI..41498.30/0 FRC0434 4.4.6.2.1.d or 2100 1500 0900 Tf?CH SPEC PARAMETER PARAMETER INSTRUMENT TeCH SPEC ACCEPTANCE ACCEPTANCE CRITER1A COMPLETED COMPLETED (Typically on Night Shift)MODE 1 above 15%Powerand 4 0300 r OST-1021Rev.56 I Page 210f 40 I Attachment 4 M Daily Surveillance Requirements LogSheet6of15TECHSPEC 4.4.1.t 4.3.1.1.12 PARAMETER*
                                                                                    ~
ResLOOPFLOWS FRC0414 FRC0415 FRC0416 RCPA N/A FRC0424FRC0425FRC0426 Reps N/A INSTRUMENT FI-414 FI-415 F1..416 FI-424 Fl-425 FI-426 ACCEPTANCE POSITIVE INDICAT10NOFFLOWWITHCHANNEL POSITIVEINDICATIONOFFLOWWITH CHANNEL CR1TERIA RepRUNNINGINDICATION CHECK Rep RUNNING lNDICATION CHECK MODE 1 12 1 1.2 1 0300 k)A'O AD AtO MJ (uD rIO{....(:ti JiJ.y........r:J)0900...\-\:.1500("1.r,l\-(&(11 (j...lo to t\1()rf()r&#xa5;-J At&#xa3;)2100 (J\J\1"J, V....V v vTECHSPEC 4.4.1.1: 4.3.1.1.12 4.3.1.1.2a.2b.
0900                                                   .:
5.6 PARAMETER ResLOOPFLOWSPOWERINTERMEDIATE SOURCE RANGE RANGE RANGE INSTRUMENT FRC0434 FRC0435 FRC0436 RCPC N/A Nt-41, Nl-42 Nl..35 Nl-31 FI-434 FJ*435 FI-436 N143, NI-44 NI-36 NI-32ACCEPTANCEPOSITIVEINDICATIONOFFLOWWITH CHANNELCHANNELCHECK CRITERIA RepRUNNINGiNDICATION CHECK MODE 1,2 1 1}2 1<<P-10).22<<P..6), 3.4.5 0300A6"')r\&#xa3;)
                                                                                    '~
,'\1//)rJ/A 0900'1/'1 Nf\l fJ 1500....\J)f\l if-\j\J fA J+.\.2100r-b rK) 1-10)toIfi t J 114-'v v\J V V vTECHSPEC PARAMETER INSTRUMENT ACCEPTANCE CRITERIA MODE 0300 0900 1500 2100 I4.3.2.1.1e.3a3.
                                              , ....                   /:
3c3 1 4d, sc, 6d, 69 4.3.3.6.6STEAMLINEPRESSURE Pl..474.1.PI-484.1Pi-494Pl..475.PI-476PI..
1500 2100                                                                       ;h(')
485.PI486 PI-495.PI-496.1 CHANNEL CHECK t,2.3and4Rev.66 4.3.1.1.14 CHANNEL CHECK 1,2 Page22of40 I Attachment 4-Daily Surveillance Requirements LogSheet7of15 TECH SPEC PARAMETER 4,3,1.1,13;4.3.1>
V TECH SPEC                                                       4.5,2.a                                                                 4.4.9.3 PRZ PARAMETER                                          ECCS VALVE ALIGNMENT SPRAY ~T INSTRUMENT      181..340             181-341             181-359         I   181-86     I 1$1-52           I   181-107 TJ-123 TI-454.1 OPEN AND PULLEDTO                                                                                                        LESS THAN ACCEPTANCE                                                       SHUT AND PULLED TO LOCK WITH LOCK WiTH CONTROL                                                                                                       OR EQUAL CRITERIA                                                                CONTROL POWER OFF POWER OFF                                                                                                     TO 625&deg;F DURINGAUX MODE                                                       1 r 2, and 3 SPRAY OPS 0300         Ai)                   (\41           rtJ               r\O              (;~~J
114;4.3.2.1.se.ec, 4.3.3.6,7SGLEVEL 4,7,1,3,1CSTLEVEL 081 S8GREATERTHANOR EQUAL-.TO 62%LI-9010A.1 SA LI..484 LI..493 l LI-494 L148*j Lj...496 CHANNEL CHECK 2100 1500 0900 0300 MOPE INSTRUMENT ACCEPTANCE CRITERIA TECH SPEC 4.7.1.3.2 PARAMETER.
                                                                                                  ",                 dl~)                  tJ /;~
ESWTOAFW INSTRUMENT 1SW..121 1SW++'124 18W..127 1SW...130 1SW-123 1SW+M126 1SW-129 1SW-132 ACCEPTANCE OPEN (only when supplying CRITERIA AFW pumps)MODE 1 t 2,-and 3 0300
0900          ''':b                .~                th*
.....*...............
                                                              ,~f~            .:~            ~~.                    ~                    f.J If~
"'W.<<.>>;.;-;.,;.;,.;.X/Vo."",.,..NNA*I'.";.
r~;U                                ~1:)
0900 r J If\"
1500          r-~\)
':;;:>1500 tJltPr***)0 2100.,..,;.;.""-",,,.,,___K_
                      ;:.                                   ~                                  ~                    ~                      If,JIA 2100           "k)                 ~O                'A-~O              {h0             itO                   ihQ
;;::>IOST-1021 Rev.66 23 of 40 I Attachment 4..Daily Surveillance Requirements Log Sheet8of15 INSTRUCTIONS 1.ERFIS is the preferred source for verifying CNTMT AVG TEMP.2.VerIfy TCV97540 computer point quality code is acceptable.
                                                                                                                      ) l                    "if (-)
If acceptable,recordthe ERFlS value for CNTMT AVG TEMP and verify Jess than or equal to 120&deg;F.3.If computer point TCV97540 is not available, verify both MeB indicators for CNTMT AVG TEMP lessthanorequalto120 0 F.TECHSPEC PARAMETER INSTRUMENT ACCEPTANCE CRITERiA MODE PLP-114AEDGELECBEDGELECROOM261ROOM 261 ALB27/1..3 NO ALARM116 0F)LOCALTEMPIS NEEDED IF ALARM IS PRESENT WHENEVERTHEEQUIPMENTINAN AFFECTED AREA IS R'EQU1REDTOBE OPERABLE 4.6.1.5 N/ACNMTAVGTEMP TCV97540 TJ-7542 TI-7541SASBLESSTHANOR EQUAL TO 120&deg;F 1.2.3.and4 4.6.1.4 CONTAINMENT PRESSURE PDl*7680 PDI-7680 A SA B 58 GREATER THAN-1.0 JNWG PLP-114 CONTROL ROOM ENVELOPE 305 TI-7837 TI-7837 A1SA B188 LESS THAN OREQUALTO85 QF WHENEVER THE EQUtPMENT IN ANAFFECTEDAREA IS REQUlRED TO BE OPERABLE 0300 0900 1500 2100 (\UJ\/'l f TECH SPECPLp..114 ROD STEAMSAELECT 5B ELECT 1A35SA.PARAMETERFHBEMEREXHAREA CNTRL CAB PENET PENETAREA305 TUNNELAREA261AREA2611B35SB 261 INSTRUMENT Tl..6537A1SA TI..65378158ALB23/3-5 ALB 23J2-11 ALB 2312-8 ALB23/2..5 ACCEPTANCE LESS THAN OR EQUALTONO ALARM NO ALARM NO ALARM CRITERIA 104&deg;F<<104&deg;F)<<122&deg;F)(LESS THAN OR EQUAL TO 104&deg;F)WHENEVERTHE EQUIPMENTINAN WHENEVER THE EQUIPMENT ,IN AN AFFECTED AREA IS REQUIREDTOBE MODE AFFECTED AREA IS REQUIREDTOBE OPERABLE (LOCAL TEMP MUST BE TAKENIFALARM IS PRESENT)OPERABLE 0300 tv c(ro kC)A-o rro rJp:)./:.)0900{j-/dI(&\tJ9.cL"-1500&'-1 rv t A."",)2100 (0"7 Cv cl(ro
                          ~              lJ                V                                 V                   V TECH SPEC                                                               4.4.3,1: 4.3.1.1.11: 4.3.3.6.5 PARAMETER                                                                   PRESSURIZER LEVEL INSTRUMENT                 LI-460                                 LI-461.1                               LI-459A.1                           N/A ACCEPTANCE                                                  LESS THAN OR                                                                  CHANNEL CRITERIA                                                 EQUAL TO 90%                                                                   CHECK MODE                                                        1} 2. and 3                                                                      1 0300                 -(0 \                                 (~/O                                      &; c                         !r<J
\J'J V\t'J I OST-1021Rev.66 Page24of40 I TECH SPEC Attachment4-Daily Surveillance Requirements LogSheet9of15 PLp...114 PARAMETER CHILLER IAFWCCWPUMPS PIPE&VALVE&HX AFWAREA261PUMPS236A..SAB-S81C-SAB CSIP ROOM CSI?ROOM C$1iP ROOM 236 236 236 SW BSTRB-SBPUMP 236 MECH&ELECPENETAREA 236 INSTRUMENT ALB 23/2-6 ALB 23/1*6 ALB 23/2...7 ALB 23/1-7 ALB 23/1..5 ALB 23/1-4ALB23/1-11 ALB 23/2..9 ALB 23/2-10 ACCEPTANCE CRITERIA MODE 0300 0900 1500 2100 NO ALARM (LESS THAN OR EQUAL TO 104&#xa2;F)WHENEVERTHE EQUiPMENTINANAFFECTEDAREAIS REQU1RED TO BE OPERABLE LOCAL TEMP MUST BE TAKEN IF ALARM lS PRESENT TECH SPEC IPLP..114 4.9.1*1 COMMITMENT CSAT&WPB A*SA BwSBFUELPOOLS PARAMETER HVAC HVACRHR 1 CS,EQUIP RM EQUIPRM HVAC HVAC SPENT FP NEWFP SFPCSFPD 216 236 190 190 INSTRUMENT ALB 23/1-8 ALB 23/1 w9 ALB23/1..10 ALB 23/4-17 ALB 23/5-17 ALB 23/4*18 ALB23/5..18 ACCEPTANCENOALARM(LESSTHANOREQUALTO104 OF)NO ALARM (GREATER THAN23FT)CRITERIA WHENEVER THE EQUIPMENT IN AN AFFECTED MODEAREA18 REQUIREDTOBE OPERABLE WHEN IRRADIATED FUEL IS INTHEPOOL (LOCAL TEMP MUST BE TAKEN IF ALARM IS (LOCAL LEVEL MUST BE TAKEN IF ALARM rs PRESENT)PRESENT)0300 d<)({O,.))0900<.-.V}'...,;:.1500b.......2100 (kJ r!P)tto ko\/v'tJ I OST-1021Rev.56Page25of40 I
                                                                                                                                            ~l{~
Attachment 4...Daily Surveillance Requirements LogSheet10of15TECHSPEC I COMMiTMENT PARAMETER INSTRUMENT ACCEPTANCE CRiTERIA MODE 0300 0900 1500 2100TECHSPECESR97..00272SPENTFUELPOOL HIGH TEMPERATURE ALARM ALB 23/4..16NOALARM ESR SPENTFUELPOOL HIGH TEMPERATURE ALARM ALB 23/4...15 ALB NO ALARM PLP-114 ESR 97-00272 NEW FUEL POOL HIGH ALB 23/5...16 NO ALARM PARAMETER INSTRUMENT ACCEPTANCE CRITERIA 0900 1500 2100 IOST-1021 ESWELECEQUJPROOM261ESWPUMPROOM261 EDG ROOM: 261 TEV6588A TEV6592ATEV6592BTDG6903A TDG6903f.3
0900                   lor                                   (t;;; C>                                 00                             ,,-
...LESSTHANOREQUAL LESS THAN OR EQUALTOLESSTHANOR EQUAL TO TO WHENEVER THE EQUIPfv1ENT IN AN AFFECTED AREA IS RE.QUIRED TO BE OPERABl.E Rev.66 Page26of40 I Attachment 4..Daily Surveillance Requirements Log Sheet11of15NOTE1:Ifa reservoir level computerpointis bad, manual reservoir level determinationcanbe performed per OP w163.NOTE2:Ifa reservoir temperature computerpointis bad, manual reservoir temperature readingscanbe performedperOP-163.
1500                   CbiJ                                 (0(\   j                                    (0 [)                       (';A 2100                     (),rQ\.                             (0 (')                                     &(~)                    {~~7 v
INSTRUCTION 1.Duetoa 3&deg;F instrument inaccuracy associatedwiththe permanently installed reservoir TSWs, if TSW9114ITSW9115
I 08T-1021                                                                    Rev. 66                                                          Page 18 of 40 I
'indicate 291&deg;F Jobtainlocal temperature readings per OP-163.4.1.2.6b TECH SPEC 4.5.4.b 4.7.5 RWSTAUXRSVR PARAMETER TEMPAUXRSVRLEVEL TEMP MAINRSVRLEVELMAINRSVR TEMP lNSTRUMENT TCT7110 LSC8752A LSC87528 TSW9114LSC8750ALSC8750B TSW9115GREATERTHANOR GREATER THAN OR EQUAL ACCEPTANCE AND EQUALTO250FT::;94&deg;FTO215 FT s 94&deg;F CRITERlA<125&deg;FNOTE1NOTE2NOTE1NOTE2 MODE 12)3and4 0300&.'(9-5Jl i: Ll{()t o.;.:;
 
;)17" (0 I 4&v6:"-', 0900 1500
Attachment 4 -Daily Surveillance Requirements Log Sheet 3 of 15
, 5j 5<1 l)r9.Sec, J,j l 15 J<7 LJS..,.....,W-:l....{........':':.2100 INSTRUCTION1.TheECCSleakageoutsideRABEESreadingis onlyrequiredevery72hours.Perform on Sunday,WednesdaYtandFriday(markas N/A on other days).2.If any ECCS leakageoutsideRABEES is measured,recordthe cumulative leakrate on Attachment 7 talongwiththe locations leaking.TECH SPEC PLP-114 PARAMETER ECCS leakage outside RABEES INSTRUMENT N/A ACCEPTANCELESSTHAN2GPH(125 cc/min)cumulative CRITERIA MODE 1,2,3and4 0300 0900 1500 VJ/t\2100 I OST-1021Rev.66Page27of40 I
                                                                                          ~ .
Attachment4-Daily Surveillance Requirements LogSheet12 of15 NOTE 1: Meteorological Channel check includes: (1)Initialingfora acceptable qualitycodeif using ERFISorverifyingdataqualityisconsistentwith actual weather conditions ifusinga Personal Computer(PC) to access the meteorologicaltower,and(2)Recordingpresentvaluesandverifyingtrendappearsnormal.NOTE1:Duringcalm wind conditions (approximately2mphorless) itisnormaltosee disagreement between the upper and lower wind direction indicators.
TECH SPEC                                       4.2.5.1; 4.3,1.1.9, 10; 4.32.1,1d~ 3a3} 3c3, 5c t 6 d PARAMETER                                                    PRESSURIZER PRESSURE tNDEPENDENT CALCULATION         VERIFICATION         ACCEPTANCE             N/A COMPLETED           COMPLETED           CRITERIA MET ACCEPTANCE                                                                             N/A CHANNEL SEE BELOW                            N/A                                   NiA C-RtTERIA                                                                                                                CHECK MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE:         Calculations must be done with either the MCB Indicators OR ERFIS lndlcsuons, NOT a combination.
At times the vanesmayactually rotate in opposite directions.NOTE1:The followingshallbeusedfor performing the daily channel checkofthe meteorological instrumentation channels:*OnERFISobservethepointsfor wind speed, wind direction, and differential temperature.*.UsingaPC
NOTE:          If all operable channels ~re greater than or equal to the acceptance criteria, calculations are not required.
,accessthe meteoroloqicaltowerandobserveupper and lowerwindspeed, upperandlowerwind directlon.
CALCULATIONS FOR PRESSURIZER PRESSURE 0300:
and differential temperature (or stability class).The meteorological instrumentation shouldonlybe considered inoperableifbothof the above methods are unavailable.
PRC0457"~'
NOTE2:MIMS Channel check should include,asa minimum,botha Self TestandanAudio Monitoring Testofall operable channels.Op wo182 contains guidance for resetting the CPU FAILED lightiflit.(Reference 2.6.4)TECHSPEC PLP-114 PLP-114 METEOROLOGICAL MIMS PARAMETER LOWER WIND UPPER WIND LOWER WIND UPPER WIND A1R SPEED SPEED DIRECTION D1RECTION llT INSTRUMENT MMT1008 MMT1010 MMT1014MMT1013MMT1004 MMT1Q05 ALL CHANNELS ACCEPTANCE CHANNEL CHECKNOTE1 CHANNEL CRITERIA Value Init Value Init Value Init Value Init Value Init Value Init CHECKNOTE2 MODEATALLTlMES 1,2 0300 C\t/&'f)7 1)
                            +
Z-3 li J f1/31 rh-J\
                              ~~P-RC~O-4-5                                              +
1.(0 11..55" j,.-I,()A f)J.i"0"..'-s: 'J'0900
                                                ._.........,.....-~~
'"11 jlL3<6l2.(,<1/l3
                                                                    =                   ~      (# Operable PRC0455                                    Channels used              PRESSURTzEFf>>~
'J)-l,'7J15002100 I OST-1021 IPage28of 40'1 Attachment4-Daily Surveillance Requirements LogSheet13of15 LOCAL TEMPERATURESTECHSPEC PLp..114 PARAMETERSFPPUMP&TANKAREAE-6ROOMS261HXROOM 236 A-SA B-SB lNSTRUMENT LOCAL THERMOMETER ACCEPTANCELESSTHAN OR EQUAL TOLESSTHANOREQUAL TO 104.oF VERIFIED CRlTERIA 115.5 ofWHENEVERTHE EQUIPMENT iN AN AFECTED:.:, MODE ATALLTIMES t*:,':.:,-.:.::
PI--457         P\-456             PI~455                                    Normally 3)                PRESSURE 0900:                     +                 +                      :::                        (# Operable PRC0457           PRC0456           PRC0455                                    Channels used            PRESSURIZER PI~457          PI..456           PI-455                                    Normally 3)                PRESSURE Q-1500:     .~,.,,~:Q:;too .+ Wy :;l~05      +                     =                         (# Operable         = ~6~.5 PRC0457          PRC0456          PRC0455                                    Channels used           *"***P"RESSURIZER PI..457         PI-456             Pl...455                                  Normally 3)                PRESSURE 2100:                    +                 +                                                (#Operable         :=
AREA IS REQUIRED TO BE*OPERABLE
PRC04~            PRC0456          PRC0455-                                    Channels used             PRESSURIZER PI-457          PI-456            Pl~455                                      Normally 3)                 PRESSURE ACCEPTANCEGRITER1A FOR PRESSURIZER PRESSURE (must meet one of the following):
:::.:;.;.;:
: 1. Average of operable   Mea indicator channels greater than          or equal to 2205 psig.
'::-.:,:.: 0100-0400 1.--7 S 0:?G7 t L{&v-1.:)7)D ,)I1300..1600 la it,Lf t9??(p" c.(C: i&,.-l'/C!..-/TECHSPEC PLP-114EDGHVACROOM280EDGHVACROOM292 DFOST BLDG PARAMETER A-SA B-58 A-SA B-SB 242 lNSTRUMENT LOCAL THERMOMETER ACCEPTANCELESSTHANOR EQUAL TOLESSTHANOREQUAL TOLESSTHAN OR EQUAL VERIFIED CRITERIA 118&deg;F 122&deg;F TO 122 QF MODE WHEN THE EQUIPMENT iNTHEAFFECTEDAREA18 REQUlREDTOBE OPERABLE 0100..0400GI g::)D*'7t;5t'*'7 if If>3<>>.<./....
2,     Average of operable ERF1S points greater than or equal to 2202 psig.
71 L{td''")"j C:Ol , L( 1300-1600I OST-1021Rev.66Page29of40 I
3,     If three MeB indicators are not available, then the lowest channel should be greater than or equal to 2220 psig+
Attachment 4..Daily Surveillance Requirements Log Sheet14of15 LOCAL TEMPERATURES INSTRUCTION1.If battery room temperatureislessthan71 of, performStep7.0.5.
: 4.     If three ERFIS points are not available, then the lowest channel should be greater than or equal to 2211 pSlg, IOST~1021                                                      Rev. 66                                                 Page 19 of 40  I
TECH SPEC PLp..114 ELECT SW1TCHGEAR PARAMETER PENETRAT'ONROOM286 SA TIERYROOM286ACP286 AREA 286 A..SA BwSB A-SA B-S8 A..SA I B...SB INSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR LESS THAN OR71&deg;F AND85&deg;FLESSTHANOR VERIF1ED CRITERIA EQUAL TO 104&deg;FEQUALTO gO&deg;FEQUALTO gO&deg;F WHENEVER THE EQUIPMENTINAN AFFECTED AREA IS REQUIREDTOBE'.....:.:..:.>..:/':.':",::, MODE
 
':',::'.':': OPERABLE y\, C:j c1"7ipi?l 0900-1200 G.'(to.'--7 2100-2400 Q ci-7 L( ,t:tC}"7'7 G:1;)(0:--.\<:1 TECH SPEC PLp w114 AUX TRANSFER PANEL ROOM PIC ROOMS PARAMETER 286 286 A-SAB..SB 17 t 19 18 INSTRUMENT LOCAL THERMOMETER ACCEPTANCELESSTHANOR EQUAL TOLESSTHANOR EQUAL TO CRITERJA 104&deg;F 85&deg;F MODE WHENEVER THE EQUIPMENT iN AN AFFEOTED AREA IS REQUIRED TO BE OPERABLE 0900...1200 c.
Attachment 4 .. Daily Surveillance Requirements Log Sheet 4 of 15 TECH $PEC                                                      4,2.5.1 PARAMETER                                                  Res LOOP TAVG INDEPENDENT INSTRUMENT         TRC0412D     TRC04220       TRC0432D     CALCULATION VERIFICATION ACCEPTANCE (MeB OR ERFlS)        TI~412D      TI-422D         TI..432D     COMPLETED                            CRITERIA MET COMPLETED ACCEPTANCE                      SEE BELOW                         NIA             NfA                   N/A CRtTERIA MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE:       Calculatlons must be done with either the Mea Indicators OR ERFIS lndicatlons, NOT a combination.
C)(...2100...2400"'7 2..--'-'7 2'<2-.&#xa3;2 Lo(t'(>,'J VERiFIED TECH SPEC PLP-114 ARPROOM AH-15 VENTILATION PARAMETER PICROOM305 305 ROOM INSTRUMENT LOCAL THERMOMETER ACCEPTANCELESSTHANOREQUALTOLESSTHANOR VERIF1ED CRITERIA 85&deg;F EQUAL TO 104&deg;F WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS':.'.:-:/.:-:::.,:.,'
IfaU operable channels are less than or equal to the acceptance critena, calculations are not required..
.......'....: MODE REQUIREDTOBE OPERABLEt.0{(i{a ,4,0\(0900-1200 r0 2100-2400&01 OST-1021Rev.66Page30of40 I
CALCULATIONSF.OR ReS LOOP TAVG 0300:                   +                 +                 =                   (# Operable     =
Attachment4-Daily Surveillance Requirements Log Sheet15of15 NOTE 1: These readings are only required on Sundays.These readings may be marked N/A on other days.TECH SPEC 4.1.2.2.a VCTVALVE BAT BORJCACIDEMERBORATION BORIC ACID PARAMETER GALLERY ROOM XFER PUMPVALVERMXFERPUMP VALVE GALLERY ROOM INSTRUMENT LOCAL THERMOMETER ACCEPTANCE GREATER THAN OR EQUAL TO 65&deg;F CR1TERIA MODE 1,2and3 1300-1600 rrJ lA-(NOTE 1)....__..-......---...------Y'O"+i'---.M........-.-
TRC0412D            -~..--        H~'TRC0432D                        Channels used            Res LOOP TI~412D                            TI~432D                          Normally 3)                TAVG 0900:                   +                 +                 =:             +    (# Operable      ::::
..................
                                                                    ~--
..,.-..........----------
TRC0412.D        TRC0422D          TRC0432D                          Channels used            ReS LOOP TI...412D         Tt-422D           TI...432D                         Normally 3)               TAVG 1500:                   +                 +                 ::                 (# Operable     =
TECH SPEC 4.1.2.2.aBATTO CSt?SUCTION HEADER PfPE TEMPERATURE (IF ANY OF THESE INSTRUMENTS FAIL.INITIATE CORRECTIVE ACTION AND NOTE IN COMMENTS PARAMETER SECTION.USE SECONDARY INSTRUMENTS TO SATISFY THE SURVEILLANCE REQUfREMENT)
TRC0412D          TRC0422D        W""'r"R"C043W-                    Channels used             RCSLOOP Tt-412D          Ti-422D          TI~432D                            Normally 3)               TAVG 2100:                   +                 +                 =                   (# Operable      :: ~              _
HT-18753C I HT-18753C I HT-18753B I I HT..18753B IHT..18753B INSTRUMENT C2-1 C2-2 C1-9 C1-13 C2..3 C2-5 ACCEPTANCE CRiTERIA GREATER THAN OR EQUAL TO 65&deg;F MODE 1,2and31300..1600
TRC0412D         TRC04226""~        TRC0432D          --~-            Channels used            ReS LOOP 11-412D           Tt w422D TI-432D                           Normally 3)               TAVG ACCI;PT ANCE CRITERIA FOR ReS LOOpTAVG. (must meet one of the following):
\_*..*---------1-------
1,     Average of operable   Mea indicator channels mustbe less than or equal to 592.5 QF.
tJ 1
: 2.     Average of operable ERF1S points less than or equal to 593.1 "F.
.I r.(NOTE 1)NI I I TECH SPEC 4.1.2.2.8BATTOCSIPSUCTIONHEADER PlPE TEMPERATURE (THESE ARE SECONDARY INSTRUMENTS.
: 3.     If three Mea indicators are notavallable, then the highest channel should be less than or equal to 591,3>:>F.
THESE SHOULD BE USED WHEN PRIMARY INSTRUMENTS PARAMETER FAll.(N/AIFNOT BE1NG USED.)HT-18753CC IHT..18753CC I HT-18753BB I HT-18753BB 1HT..187538B I HT-18753BB INSTRUMENT C2-1 C2...2 C1v9 C1-13 C2...3 C2-5 ACCEPTANCE CRITERIAGREATERTHANOREQUALTO65&deg;F MODE 1,2and3 1300-1600 f)1---*-----.1-I i.1 (NOTE 1)I I OST-1021 Rev,66Page31of40 I
: 4.     If three ERFIS points are not available, then the highest channel should be less than or equal to 592,3 OF.
Appendix C Job Performance Measure WorksheetFormES-C-1 Facility: HARRIS Task No.: 015004H201 Task Title: Perform the Quadrant Power Tilt Ratio SurveillanceJPMNo.: 2008NRCROA2 KIA  
IOST~1021                                                  Rev. 66                                      Page 20 of 40 I
 
Attachment4,. DailySurveillance Requirements Log Sheet 50f 15 TECH SPEC          4,3.2.1         4.4.6.2.1.e FLANGE PARAMETER     Res PRESSURE LEAKOFF TEMP OTliT       OPllT       PROTECTIONllT Ttw412C}
Tl..-412B)
TJ... 412A* TJ..422At iNSTRUMENT   PI-403.1     P1402,1     TI401               TI422C   2   TI..422B~
Tl-432A TI..432C    TI-4328 ACCEPTANCE CHANNEL CHECK              N/A                          CHANNELCHECK CRITERIA MODE 0300 0900 1500 2100 INSTRUCTION If ReS flow acceptance criteria is not met, perform EST-70B, RCSFlowDetermination.
TeCH SPEC PARAMETER INSTRUMENT   FRC0414                                                         FRC0434 FI..414                                                          F(~434 ACCEPTANCE                                                                            ~ 98.30/0 CRITER~A 0900 1500 2100 Tf?CH SPEC                                4.4.6.2.1.d PARAMETER OST~1004    or INSTRUMENT OST~1204 COMPLETED ACCEPTANCE   COMPLETED             (Typically on Night Shift)
CRITER1A 1 above 15%
MODE                                1~ 2~3~  and 4 Power 0300 rOST-1021                                            Rev. 56 I                   Page 210f 40     I
 
Attachment 4 Daily Surveillance Requirements Log M
Sheet 6 of 15 TECH SPEC                                                                      4.4.1.t 4.3.1.1.12 PARAMETER*                                                                     Res LOOP FLOWS FRC0414 FRC0415                         FRC0416                                 FRC0424 FRC0425 FRC0426 INSTRUMENT                                                      RCPA               N/A                                                 Reps           N/A FI-414         FI-415                 F1..4 16                                FI-424           Fl-425             FI-426 ACCEPTANCE     POSITIVE INDICAT10N OF FLOW WITH                              CHANNEL        POSITIVE INDICATION OF FLOW WITH                    CHANNEL CR1TERIA               Rep RUNNING INDICATION                                  CHECK                    Rep RUNNING lNDICATION                   CHECK MODE                                       1 12                                   1                                 1.2                             1 0300         ~()            { ,\(~)
                                      ....            k)           A'O           AD         AtO y.. . . .
MJ               (~0    (uD         rIO 0900        ~b              ~
                                  ~
                                                      ~
                                                        ~.
                                                        ...         (:ti         JiJ.       ~:D              ~                r:J)
                                                                                                                                  \:. y~          ~
(&
                                                                                  \-
1500    (~\               ~~                    ~            ~ll            ~~          f~~              ("1.             r,l\-     (j.      ~
(11
              ..~.:~.
2100          ( J
                    \J
                                ~6J
                                \1
                                                      ~.()
                                                      "J lo
                                                                  ~
to
                                                                                  ,            t\1()
V
(~
rf()
V r&#xa5;-J v
At&#xa3;)
v TECH SPEC                                  4.4.1.1: 4.3.1.1.12                                                       4.3.1.1.2a.2b. 5.6 POWER                  INTERMEDIATE            SOURCE PARAMETER                                 Res LOOP FLOWS RANGE                       RANGE             RANGE FRC0434 FRC0435 FRC0436                                                         Nt-41, Nl-42                       Nl..35           Nl-31 INSTRUMENT                                                      RCPC              N/A FI-434         FJ*435               FI-436                                   N143, NI-44                         NI-36             NI-32 ACCEPTANCE      POSITIVE INDICATION OF FLOW WITH                              CHANNEL CHANNEL CHECK CRITERIA               Rep RUNNING iNDICATION                                  CHECK MODE                                       1,2                                   1                   1} 2               1 <<P-10). 2      2 <<P..6), 3.4.5 0300      (~()            A6"')                 ~          ~iC)          r\&#xa3;)                     (~kL)            ,'\1 //)               rJ/A 0900     ~~              ~14                  ~~          ~              ~~.                    ~                  ' 1/'1 f\lfJ             N li~
                ~~            (~)                                              r~
(~....
1500                                            ~.           J+.           ;~~            \J)
                                                                                                \.                      f\l if-\             j\J fA 2100        (~)            r-b                 rK)       ~/r\()          1-10             )to                      l~ Ifi              t J 114-
                  'v           v                   \J         V               V               v 4.3.2.1.1e. 3a3. 3c3 1 4d, sc, 6d, 69 TECH SPEC                                                                                                              4.3.1.1.14 4.3.3.6.6 PARAMETER                    STEAM LINE PRESSURE Pl..474.1.                 PI-484.1                Pi-494 INSTRUMENT Pl..475. PI-476              PI..485. PI486     PI-495. PI-496.1 ACCEPTANCE CHANNEL CHECK                                                                  CHANNEL CHECK CRITERIA MODE                                    t, 2. 3 and 4                                                                     1,2 0300 0900 1500 2100 I OST~1021                                                                  Rev. 66                                                          Page 22 of 40    I
 
Attachment 4 - Daily Surveillance Requirements Log Sheet 7 of 15 TECH SPEC   4,3,1.1,13;4.3.1> 1~ 14; 4.3.2.1                                                           .se. ec, 10~t 4.3.3.6,7                        4,7,1,3,1 PARAMETER                                                    SG LEVEL                                                                                CST LEVEL Ll~483f LI..484                                               LI..493 LI-494 LI~901 081 l
INSTRUMENT                                                                                                                                  LI-9010A.1 SA                  S8 LI~485~ L148j                                                Lt:.,,495~ Lj...496 ACCEPTANCE                                                                                                                                        GREATER THAN OR CHANNEL CHECK CRITERIA                                                                                                                                           EQUAL-.TO 62%
MOPE 0300 0900 1500 2100 TECH SPEC                                                                         4.7.1.3.2 PARAMETER.                                                       ESWTOAFW 1SW..121             1SW++'124                                                           18W..127             1SW...130 INSTRUMENT 1SW-123               1SW+M126                                                             1SW-129             1SW-132 ACCEPTANCE                     OPEN (only when supplying CRITERIA                                                           AFW pumps)
MODE                                                                       1 2,- and3 t
0300     ~)rpr'                .....*..............."'W.<<.>>;.;-;.,;.;,.;.X/Vo."",.,..NNA*I'.";.
0900     rJ If\"               ~X>>m-:-:->Jo>>>;'>>>
1500   tJltPr
                                                                                                                      *** )0
                                                                                                                                        ~~~/
                            ., ;. " -", .,___K_
                        -<<-~
                                ;N>>>:':~;MYN>>~>>Y>>'
2100    ~0/A                                                                                      ~:-:<<~<N.~                  ;;::>
IOST-1021                                                                                                              Rev. 66                                                ~age 23 of 40 I
 
Attachment 4 .. Daily Surveillance Requirements Log Sheet 8 of 15 INSTRUCTIONS
: 1.       ERFIS is the preferred source for verifying CNTMT AVG TEMP.
: 2.       VerIfy TCV97540 computer point quality code is acceptable. If acceptable, record the ERFlS value for CNTMT AVG TEMP and verify Jess than or equal to 120&deg;F.
: 3.       If computer point TCV97540 is not available, verify both MeB indicators for CNTMT AVG TEMP less than or equal to 120 0 F.
TECH SPEC                    PLP-114              4.6.1.5              N/A                    4.6.1.4                PLP-114 A EDG ELEC          B EDG ELEC                                              CONTAINMENT          CONTROL ROOM PARAMETER                                                CNMT AVG TEMP ROOM 261              ROOM 261                                                PRESSURE            ENVELOPE 305 TCV97540     TJ-7542     TI-7541    PDl*7680    PDI-7680  TI-7837 TI-7837 INSTRUMENT                    ALB 27/1..3 SA          SB        A SA         B 58     A1SA        B188 NO ALARM ~ 116 0 F) LOCAL ACCEPTANCE                                            LESS THAN OR EQUAL TO                GREATER THAN -1.0         LESS THAN OR TEMP IS NEEDED IF ALARM IS CRITERiA                                                      120&deg;F                            JNWG              EQUAL TO 85  QF PRESENT WHENEVER THE WHENEVER THE EQUIPMENT                                                                            EQUtPMENT IN AN IN AN AFFECTED AREA IS                   1. 2. 3. and 4                                        AFFECTED AREA MODE R'EQU1RED TO BE OPERABLE                                                                            IS REQUlRED TO BE OPERABLE 0300           (\UJ                                                                                           'l f 0900 1500 2100
                          \/
TECH SPEC                                                            PLp ..114 ROD                             SA ELECT            5B ELECT STEAM                                                  1A35SA.
PARAMETER            FHB EMER EXH AREA          CNTRL CAB                             PENET              PENET TUNNEL                                                1B35SB 261 AREA 305                            AREA 261          AREA 261 INSTRUMENT     Tl ..6 537A1SA    TI..6 5378158  ALB 23/3-5     ALB 23J2-11                   ALB 2312-8                 ALB 23/2..5 ACCEPTANCE       LESS THAN OR EQUAL TO            NO ALARM       NO ALARM                               NO ALARM CRITERIA                   104&deg;F               << 104&deg;F)       << 122&deg;F)                 (LESS THAN OR EQUAL TO 104&deg;F)
WHENEVER THE EQUIPMENT IN AN WHENEVER THE EQUIPMENT ,IN AN AFFECTED AREA IS REQUIRED TO BE MODE               AFFECTED AREA IS OPERABLE (LOCAL TEMP MUST BE TAKEN IF ALARM IS PRESENT)
REQUIRED TO BE OPERABLE 0300             tv c(         ro     ~'?
:.)    ~6J            kC)               A-o               rro               rJp:)
(&
                                        ./
0900           {j-/d            (~()      I      ~                                ~                \tJ9.
cL "-         (~
1500             &'-1           rv     ~l      '~.            <~~,
t A              '~J)            ~~
(ro
                                            . "",)
2100             (0"7           Cv cl         (~O              k~:)            ~:>                                )}-6~)
                                                      \J               'J               V                   \t
                                                                                                                            'J IOST-1021                                                    Rev. 66                                               Page 24 of 40      I
 
Attachment 4 - Daily Surveillance Requirements Log Sheet 9 of 15 TECH SPEC                                                          PLp ...114 CHILLER AFW I        CCW PUMPS            A..SA            B-S8        1C-SAB        SW BSTR              MECH & ELEC PARAMETER   PIPE & VALVE         & HX AFW        CSIP ROOM     CSI? ROOM       C$1iP ROOM     B-SB PUMP            PENETAREA AREA 261          PUMPS 236           236               236           236                236                 236 ALB 23/2-6       ALB 23/1*6                                                                               ALB 23/2..9 INSTRUMENT                                                ALB 23/1 ..5           ALB 23/1-4    ALB 23/1-11 ALB 23/2...7      ALB 23/1-7                                                                              ALB 23/2-10 ACCEPTANCE NO ALARM (LESS THAN OR EQUAL TO 104&#xa2;F)
CRITERIA WHENEVERTHE EQUiPMENT IN AN AFFECTED AREA IS REQU1RED TO BE OPERABLE MODE LOCAL TEMP MUST BE TAKEN IF ALARM lS PRESENT 0300 0900 1500 2100 TECH SPEC I PLP ..114                                                     4.9.1*1 COMMITMENT CSAT&           WPB           A*SA         BwSB                              FUEL POOLS HVAC          HVAC         CS~ RHR 1   CS, RHR~
PARAMETER EQUIP RM       EQUIPRM         HVAC         HVAC           SPENT FP       NEWFP                 SFPC          SFP D 216           236           190           190 INSTRUMENT ALB 23/1-8     ALB 23/1 w9 ALB 23/1..10           ALB 23/4-17   ALB 23/5-17     ALB 23/4*18         ALB 23/5..18 ACCEPTANCE NO ALARM (LESS THAN OR EQUAL TO 104 OF)                              NO ALARM (GREATER THAN 23 FT)
CRITERIA WHENEVER THE EQUIPMENT IN AN AFFECTED AREA 18REQUIRED TO BE OPERABLE                               WHEN IRRADIATED FUEL IS IN THE POOL MODE (LOCAL TEMP MUST BE TAKEN IF ALARM IS                     (LOCAL LEVEL MUST BE TAKEN IF ALARM             rs PRESENT)
PRESENT) 0300       d<)           {~)            ({O         ~                                                ,.))
0900     '-~~          '~~
                              <.-.         ')~          ~dJ-            "-~J)~
                                                                                        ~~                                V~'} I/~
l~
                                                                                                          ' ...,;:. ~
                                                        .~
1500    .~
b            .~-                                                            ..
2100     (kJ           r!P           )tto ko
              ~.J            \/           v           'tJ I OST-1021                                                  Rev. 56                                                    Page 25 of 40    I
 
Attachment 4 ... Daily Surveillance Requirements Log Sheet 10 of 15 TECH SPEC I ESR 97..00272                ESR 95~00425                    ESR 97-00272 COMMiTMENT SPENT FUEL POOL HIGH         SPENTFUEL POOLHIGH                NEW FUEL POOLHIGH PARAMETER    TEMPERATURE ALARM           TEMPERATURE ALARM                TEMPERATUR~ALARM INSTRUMENT        ALB 23/4..16      ALB 23/4...15     ALB 2315~15            ALB 23/5.. 16 ACCEPTANCE          NO ALARM                      NO ALARM                        NO ALARM CRiTERIA MODE 0300 0900 1500 2100 TECH SPEC                                  PLP-114 ESWELECEQUJP ROOM 261          ESW PUMP ROOM 261              EDG ROOM: 261 PARAMETER INSTRUMENT  TEV6588A TEV658~~ TEV6592A        TEV6592B    TDG6903A      TDG6903f.3 . .
ACCEPTANCE  LESS THAN OR EQUAL LESS THAN OR EQUAL TO        LESS THAN OR EQUAL TO CRITERIA        TO 116$;)F122~F WHENEVER THE EQUIPfv1ENT IN AN AFFECTED AREA IS RE.QUIRED TO BE OPERABl.E 0900 1500 2100 IOST-1021                                      Rev. 66                                   Page 26 of 40 I
 
Attachment 4 .. Daily Surveillance Requirements Log Sheet 11 of 15 NOTE 1:     If a reservoir level computer point is bad, manual reservoir level determination can be performed per OP             w163.
NOTE 2:     If a reservoir temperature computer point is bad, manual reservoir temperature readings can be performed per OP-163.
INSTRUCTION
: 1.     Due to a 3&deg;F instrument inaccuracy associated with the permanently installed reservoir TSWs, if TSW9114ITSW9115 'indicate 291 &deg;F obtain local temperature       J readings per OP-163.
4.1.2.6b TECH SPEC         4.5.4.b                                                             4.7.5 RWST                                          AUX RSVR PARAMETER         TEMP              AUX RSVR LEVEL                TEMP               MAIN RSVR LEVEL      MAIN RSVR TEMP lNSTRUMENT       TCT7110           LSC8752A LSC87528             TSW9114            LSC8750A      LSC8750B      TSW9115
                    ~40&deg;F            GREATER THAN OR                              GREATER THAN OR EQUAL ACCEPTANCE         AND               EQUAL TO 250 FT              ::; 94&deg;F                TO 215 FT             s 94&deg;F CRITERlA       < 125&deg;F                  NOTE 1                  NOTE 2                    NOTE 1              NOTE 2 MODE                                                                   1 ~ 2) 3 and 4 0300         5~7. &.'         (9-5Jl i:     r?~S L ~S(}    l{() t o.;.:;     9Jt\~;S      ;)17" (0 I       4&v6 0900 1500       t~~-7  ,5          ~SI\5        /)5~ j    5<1   L(~t3~          l)r9. Sec, J,j 15 ~ W l
J <7
                                                                                                          -:l LJS... ...,....,{
                        .....               ~...
                                                ~
2100 INSTRUCTION
: 1.     The ECCS leakage outside RABEES reading is only required every 72 hours. Perform on Sunday, WednesdaYt and Friday (mark as N/A on other days).
: 2.     If any ECCS leakage outside RABEES is measured, record the cumulative leakrate on Attachment 7 along with the locations leaking.
t TECH SPEC                                   PLP-114 PARAMETER                       ECCS leakage outside RABEES INSTRUMENT                                       N/A ACCEPTANCE                LESS THAN 2 GPH (125 cc/min) cumulative CRITERIA MODE                                   1,2,3 and 4 0300 0900 1500                                 VJ/t\
2100 IOST-1021                                                          Rev. 66                                        Page 27 of 40      I
 
Attachment 4 - Daily Surveillance Requirements Log Sheet 12 of15 NOTE 1:     Meteorological Channel check includes: (1) Initialing for a acceptable quality code if using ERFIS or verifying data quality is consistent with actual weather conditions if using a Personal Computer(PC) to access the meteorological tower, and (2)
Recording present values and verifying trend appears normal.
NOTE 1:     During calm wind conditions (approximately 2 mph or less) it is normal to see disagreement between the upper and lower wind direction indicators. At times the vanes may actually rotate in opposite directions.
NOTE 1:     The following shall be used for performing the daily channel check of the meteorological instrumentation channels:
* On ERFIS observe the points for wind speed, wind direction, and differential temperature.
                  * . Using a PC , access the meteoroloqical tower and observe upper and lower wind speed, upper and lower wind directlon. and differential temperature (or stability class).
The meteorological instrumentation should only be considered inoperable if both of the above methods are unavailable.
NOTE 2:     MIMS Channel check should include, as a minimum, both a Self Test and an Audio Monitoring Test of all operable channels. Op 182 contains guidance for resetting the wo CPU FAILED light if lit.
(Reference 2.6.4)
TECH SPEC                                                    PLP-114                                                   PLP-114 METEOROLOGICAL MIMS PARAMETER   LOWER WIND           UPPER WIND       LOWER WIND           UPPER WIND               A1R SPEED                 SPEED         DIRECTION           D1RECTION                 llT ALL INSTRUMENT     MMT1008               MMT1010           MMT1014            MMT1013    MMT1004          MMT1Q05 CHANNELS CHANNEL CHECK NOTE 1                                                CHANNEL ACCEPTANCE CHECK CRITERIA     Value     Init     Value     Init Value       Init   Value   Init Value   Init     Value Init NOTE 2 MODE                                                    AT ALL TlMES                                                  1,2 0300     C\t/&       M;~)      'f) 7 1)
J. '.7~  S~f)  3~:;*21 Z-3 li J   f1/31   rh-J \ L.~,,~ 1.(0 11..55"   j,.-I,()     A"0"f) i
                          ~.'.. '
                                              -s :                                                                         'J' 0900
                                                                                                                          .~
1500    ~'},J~    '~ll "11     jlL3<6    ~      ~{Z~ l2. l~
(,<1/l3 ~~    *-~Lgti  'J) -l,'7J '~J2
                                                                                                ~'
2100 IOST-1021                                                                             I                          Page 28 of      40'1
 
Attachment 4 - Daily Surveillance Requirements Log Sheet 13 of 15 LOCAL TEMPERATURES TECH SPEC                                      PLp..114 SFP PUMP &       TANK AREA                          E-6 ROOMS 261 PARAMETER HX ROOM                  236                   A-SA             B-SB lNSTRUMENT                             LOCAL THERMOMETER LESS THAN ACCEPTANCE OR EQUAL TO                  LESS THAN OR EQUAL TO 104.oF                                   VERIFIED CRlTERIA 115.5 of WHENEVER THE EQUIPMENT iN AN AFECTED                         t*:,':.:,-.:.: *::.*\.:;>~~}~t~.: (;/}~:::::~:r.:::~*:**
MODE      AT ALL TIMES AREA IS REQUIRED TO BE*OPERABLE                        :::.:;.;.;: '::-:,:.:
0100-0400     1.--7 S
                ,)  I              0:?G7 L{
t              & v-1 ~ .:)       &L/~    7                               )D la it, ~ Lf                              " c.(    C:i                            r7~
1300..1600     ~51\"3                                    t9?? (p       &, .- l '/                                 C!..-/
TECH SPEC                                            PLP-114 EDG HVAC ROOM 280                    EDG HVAC ROOM 292 DFOST BLDG PARAMETER 242 A-SA           B-58                   A-SA             B-SB lNSTRUMENT                                 LOCAL THERMOMETER LESS THAN ACCEPTANCE    LESS THAN OR EQUAL TO              LESS THAN OR EQUAL TO OR EQUAL                                  VERIFIED CRITERIA             118&deg;F                                   122&deg;F                         QF TO 122 WHEN THE EQUIPMENT iN THE AFFECTEDAREA 18 REQUlRED TO BE MODE OPERABLE 0100..0400  ~-?&(  GI      g::)
                                ....  ~
D       *'7t;5t     '*'7     if If>3         <>>.     <./                                       (~QJ 1300-1600    ~~7? \,~5'  71 L{td             ' ") ~1 ~ "j         7l0~fo          C:Ol , L(                                       ~~Q ~.;}
I OST-1021                                                        Rev. 66                                                                                Page 29 of 40 I
 
Attachment 4 .. Daily Surveillance Requirements Log Sheet 14 of 15 LOCAL TEMPERATURES INSTRUCTION
: 1.           If battery room temperature is less than 71 of, perform Step 7.0.5.
TECH SPEC                                                               PLp..114 ELECT SW1TCHGEAR PENETRAT'ON                                                SATIERY ROOM286                  ACP 286 PARAMETER                                              ROOM 286 AREA 286 A..SA         BwSB         A-SA           B-S8               A..SA     I B...SB INSTRUMENT                                                     LOCAL THERMOMETER ACCEPTANCE             LESS THAN OR                LESS THAN OR                                             LESS THAN OR
                                                                                    ~ 71&deg;F AND ~ 85&deg;F                                                            VERIF1ED CRITERIA         EQUAL TO 104&deg;F                EQUAL TO gO&deg;F                                            EQUAL TO gO&deg;F
                                                                                                                                                            '.. . :.:.:..>..:         /':.':",::,
WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS REQUIRED TO BE                                                                    O:':':':::::::',\,~:  ':',::'       .':':
MODE OPERABLE 0900-1200        &~;;)\ G.'    '~7[{ (to    y\, C:j       '7~~1~  c1       ~*-?0. ~      "7ip ~  i?   .-~] ~7 ~ '--7                                                   l l"~J 2100-2400         (0:--Q ~ ci   -7 L(J~.    ~t\t _~3        ~7<l,    ,      ':-7~S ~ t:t  "7~J ~  C}   "7'7. \ G           <:1                                    :1;)
TECH SPEC                                                   PLp w114 AUX TRANSFER PANEL ROOM                                         PIC ROOMS PARAMETER                             286                                               286 A-SA                  B..SB                   17 19 t                   18 INSTRUMENT                                       LOCAL THERMOMETER ACCEPTANCE                LESS THAN OR EQUAL TO                           LESS THAN OR EQUAL TO CRITERJA                            104&deg;F                                             85&deg;F WHENEVER THE EQUIPMENT iN AN AFFEOTED AREA IS                                           VERiFIED MODE REQUIRED TO BE OPERABLE 0900...1200         --7~:) ~ ~~-'1        '~'7 ~1.
(...   ~),
(-~        "'}~,      c.            "'7:5~ C) 2100 ...2400       "'7 2..-- ~ '~7      '-'7 2 '<2-               ~~7
                                                                          '(>,. ~ &#xa3;2'J        ~7 Lo( t ~l TECH SPEC                                                     PLP-114 ARPROOM                   AH-15 VENTILATION PARAMETER               PIC ROOM 305                          305                   ROOM INSTRUMENT                                         LOCAL THERMOMETER ACCEPTANCE                      LESS THAN OR EQUAL TO                                    LESS THAN OR VERIF1ED CRITERIA                                     85&deg;F                                     EQUAL TO 104&deg;F
                                                                                                                    ':.'. :-:/. :-:::.,:.,'. ......' ....:
WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS MODE REQUIRED TO BE OPERABLE 0900-1200            ~7 t . 0                         {(i{a , ~                          4,0 \ (                                 r0
                                                                                                                                        ~
2100-2400               ~7C) ~ ~6                        (&~~ ~ '~7                      &0 ~ (~)                              ~
1 OST-1021                                                                      Rev. 66                                                                                          Page 30 of 40      I
 
Attachment 4 - Daily Surveillance Requirements Log Sheet 15 of 15 NOTE 1:       These readings are only required on Sundays. These readings may be marked N/A on other days.
TECH SPEC                                                                                                                   4.1.2.2.a BORJCACID                                BORIC ACID VCTVALVE                                         BAT                                                                     EMER BORATION PARAMETER                                                                                                                 XFER PUMP                                XFER PUMP GALLERY                                     ROOM                                                                           VALVE RM VALVE GALLERY                                ROOM INSTRUMENT                                                                                                             LOCAL THERMOMETER ACCEPTANCE                                                                                           GREATER THAN OR EQUAL TO 65&deg;F CR1TERIA MODE                                                                                                                     1,2 and 3 1300-1600 (NOTE 1)         rrJ lA-            ....__..-......---...------Y'O"+i'---.M........-.-....................,.-.. ........----------                               ---._~
TECH SPEC                                                                                                                   4.1.2.2.a BAT TO CSt? SUCTION HEADER PfPE TEMPERATURE (IF ANY OF THESE INSTRUMENTS FAIL. INITIATE CORRECTIVE ACTION AND NOTE IN COMMENTS PARAMETER             SECTION. USE SECONDARY INSTRUMENTS TO SATISFY THE SURVEILLANCE REQUfREMENT)
HT-18753C                 HT-18753C                                                             HT-18753B         HT~18753B      HT..18753B     HT..18753B INSTRUMENT ACCEPTANCE C2-1     I                        C2-2                                 I                    C1-9       I    C1-13     I      C2..3   I      C2-5 CRiTERIA                                                                                           GREATER THAN OR EQUAL TO 65&deg;F MODE                                                                                                                     1,2 and 3 1300..1600 (NOTE 1)    N. I r. r~
                          ;.~.     \_*. *---------1-------                                                                       tI              ~J I
1 I
                                                                                                                                                                          --~~.-_"'-~
TECH SPEC                                                                                                                   4.1.2.2.8 BAT TO CSIP SUCTION HEADER PlPE TEMPERATURE (THESE ARE SECONDARY INSTRUMENTS. THESE SHOULD BE USED WHEN PRIMARY INSTRUMENTS PARAMETER INSTRUMENT HT-18753CC C2-1 I      HT..18753CC C2...2                                I FAll. (N/A IF NOT BE1NG USED.)
HT-18753BB C1v9      I HT-18753BB C1-13      1 HT..187538B C2 ...3 I HT-18753BB C2-5 ACCEPTANCE CRITERIA                                                                                            GREATER THAN OR EQUAL TO 65&deg;F MODE                                                                                                                     1,2 and 3 1300-1600 (NOTE 1)        f~1 f)         1---*-----.1-                                                                                   I               i.             1I      -.~----;.""i IOST-1021                                                                                                               Rev,66                                    Page 31 of 40        I
 
Appendix C                                   Job Performance Measure                   Form ES-C-1 Worksheet Facility:               HARRIS                                 Task No.:     015004H201 Task
 
==Title:==
Perform the Quadrant Power Tilt         JPM No.:     2008 NRC RO A2 Ratio Surveillance KIA  


==Reference:==
==Reference:==
2.2.12 (3.4)
Examinee:                                                    NRC Examiner:
Facility Evaluator:                                          Date:
Method oftesting:
Simulated Performance:                                      Actual Performance:      x Classroom            X    Simulator    - - - Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
* The plant has been stabilized at 100 % power following a dropped rod in Control Bank "B" (M-6).
* The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND" INDICATION SYSTEM.
* No deficiency tags on PRNls.
Task Standard:              Calculations within required band.
Required Materials:        Calculator General
==References:==
OST-1039, CALCULATION OF QPTR, Revision 13 Handouts:
* OST-1039
* Curve Book (Ensure F-X-8 included and unmarked)
Initiating Cue:            The USCO has directed you to perform a manual QPTR lAW OST-1039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.
For the purposes of the examination, there will be no independent verification of your work.
Time Critical Task:        NO Validation Time:            12 minutes HARRIS 2008 NRC RO A2 Revision 2                                            NUREG 1021, Revision 9
Appendix C                                      Page 2 of 10                          Form ES-C-1 VERIFICATION OF COMPLETION (Denote Critical Steps with a ~)
Start Time:          _
Performance Step: 1        Obtain procedure.
Standard:                  Reviews procedure.
Evaluator Cue:              Provide OST-1039.
Evaluator Note:            A KEY is provided for your use on JPM Page 7.
Comment:
Performance Step: 2        Completes Prerequisites section:
* Instrumentation needed for the performance of this test is free of deficiency tags that affect instrument indication.
* Verify the most recent Curve F-X-8 is used in the performance of this procedure.
* Verify all prerequisites are met, then obtain Unit SCO permission to perform this OST.
Standard:
* Logs F-X-8 revision number (NRC Exam)
* Initials/signs all blocks Evaluator Cue:
Comment:
HARRIS 2008 NRC RO A2 Revision 2                                        NUREG 1021, Revision 9
Appendix C                              Page 30f 10                          Form ES-C-1 VERIFICATION OF COMPLETION Performance Step: 3
* If Quadrant Power Tilt Ratio Calculation Computer Program is used, perform Section 7.1, and N/A section 7.2.
* If manual calculation of the Quadrant Power Tilt Ratio is used, perform Section 7.2, and N/A section 7.1.
Standard:
* Marks Section 7.1 N/A
* Proceeds to Section 7.2 Comment:
Performance Step: 4  Prior to reading the value of detector current, ensure the meter range/rate switch is in the 400 J,lAlSLOW position.
Standard:            Verifies meter range/rate switches were in the 400 J,lAlSLOW position when the readings were taken.
Evaluator Cue:
Comment:
Performance Step: 5  Record on Attachment 2, in Column A, the upper and lower detector currents from all operable power range channels as read on the Nuclear Instrumentation Cabinet.
Standard:            Transposes readings from PRNIS Readings Table onto Attachment 2.
Comment:
HARRIS 2008 NRC RO A2 Revision 2                                NUREG 1021, Revision 9
Appendix C                            Page 4 of 10                        Form ES-C-1 VERIFICATION OF COMPLETION Performance Step: 6  Record on Attachment 2, in Column B, the 100% power normalized current for each channel. (Refer to Curve F-X-8)
Standard:            Transposes TOP and BOTTOM 100 % current values from the Curve Book provided.
Evaluator Cue:
Comment:
Performance Step: 7  Divide values in Column A by the respective normalized current in Column B and record the result in Column C as the Normalized Fraction.
Standard:            Divides each Upper and Lower reading by the respective 100%
normalized current value and records in Column C.
Comment:
Performance Step: 8  Calculate the average value for the upper and the lower Normalized Fractions by adding the Normalized Fraction in each section of Column C and divide by the number of operable NI channels. Record in Column D of Attachment 2.
Standard:            Adds all Normalized Fractions for the same plane, divides by four and records result in Column D.
Evaluator Note:      On the KEY, this value is shown at the bottom of Column C.
Comment:
HARRIS 2008 NRC RO A2 Revision 2                              NUREG 1021, Revision 9


2.2.12 (3.4)Examinee: NRC Examiner: Facility Evaluator:
Appendix C                              Page 5 of 10                        Form ES-C-1 VERIFICATION OF COMPLETION
Date: Method of testing: Simulated Performance:
~  Performance Step: 9  Using the formula and values from Attachment 2 calculate the Upper and Lower Ratios.
ClassroomREADTOTHE EXAMINEE X Simulator Actual Performance:
Standard:
Plant---xIwill explaintheinitial conditions, which steps to simulate or discuss, and provide initiating cues.When you complete the task successfully, the objectiveforthisJob Performance Measurewillbe satisfied.
* Divides the Maximum Normalized Fraction by the Average Normalized Fraction on each plane.
Initial Conditions:*The planthasbeen stabilizedat100%power following a droppedrodin Control Bank"B"(M-6).*The crew is performing AOP-001, MALFUNCTIONOFROD CONTROL AND" INDICATION SYSTEM.*No deficiencytagson PRNls.Task Standard: Calculations within required band.Required Materials:
* Determines both UPPER and LOWER ~ 1.029.
Calculator General
Evaluator Note:     The applicant may inform the USCO as soon as any calculation is > 1.02. If so, acknowledge and direct applicant to complete.
Comment:
Performance Step: 10 Perform independent verification of all calculations made on Attachment 2.
Standard:           Requests Independent Verifier.
Evaluator Cue:      If necessary, repeat Initiating Cue: For the purpose of this examination, there will be no independent verification of your work.
Comment:            Candidate may choose to check calculations.
~  Performance Step: 11 The upper ratio or the lower ratio, whichever is greater, is the quadrant power tilt ratio (QPTR). Record QPTR and verify QPTR is less than or equal to 1.02.
Standard:           Records Maximum QPTR value 1.026 to 1.036 (N44 UPPER)
Comment:            Acceptable band is +/- 50/0 (rounded to .005) around 1.031.
HARRIS 2008 NRC RO A2 Revision 2                                NUREG 1021, Revision 9


==References:==
Appendix C                                Page 6 of 10                    Form ES-C-1 VERIFICATION OF COMPLETION
-v Performance Step: 12  Complete applicable sections of Attachment 3, Certifications and Reviews and inform the Unit SCO when this test is completed.
Standard:
* Check marks Periodic Surveillance or notes AOP-001 in Comments section
* Plant Condition: 100% Power (may note dropped rod)
* Mode 1
* Today's Date
* Current Time
* OST Completed By: Applicant's name
* Initials/Name
* Indicate in General Comments Section and/or informs USCG that the limit is exceeded (-V)
Evaluator Cue:        Acknowledge any report.
Comment:
Terminating Cue:        After the USCO has been notified: Evaluation on this JPM is complete.
HARRIS 2008 NRC RO A2 Revision 2                              NUREG 1021, Revision 9
 
Appendix C                                Page 7 of 10                        Form ES-C-1 VERIFICATION OF COMPLETION KEY A                B                C UPPER            UPPER UPPER        100% POWER      NORMALIZED UPPER              DETECTOR        NORMALIZED        FRACTION DETECTOR            CURRENT          CURRENT          (NOTE 1)
N-41                149.7            155.2            .965 N-42                177.9            175.6            1.013 N-43                202.0              200.0            1..010 N-44                165.5            159.5            1.038 SUM          4.026/4 =
1.0065 A                  B                  C LOWER              LOWER LOWER          100% POWER        NORMALIZED LOWER              DETECTOR          NORMALIZED          FRACTION DETECTOR            CURRENT            CURRENT            (NOTE 1)
N-41                169.2              176.1              .961 N-42                202.6              202.2              1.002 N-43                221.1              221.2              .9995 N-44                197.5              192.3              1.027 SUM              3.99/4 =
                                                                          .9975 Highest Upper (N-44) 1.038/1.0065 = 1.031 Highest Lower (N-44) 1.027/.9975 = 1.0296 (1.03)
HARRIS 2008 NRC RO A2 Revision 2                                NUREG 1021, Revision 9


OST-1039, CALCULATION OF QPTR,Revision13 Handouts: Initiating Cue: Time Critical Task: Validation Time:*OST-1039*Curve Book (Ensure F-X-8 included and unmarked)The USCO has directedyouto perform a manual QPTR lAW OST-1039, CALCULATION OF QPTR.The PowerRangeNIS readings are providedinthe table below.Forthe purposesofthe examination, therewillbeno independent verification of your work.NO 12 minutes HARRIS 2008NRCROA2 Revision 2NUREG1021,Revision9 Appendix C (DenoteCriticalStepswithaStartTime:_Page2of10 VERIFICATION OF COMPLETIONFormES-C-1 PerformanceStep:1 Standard: Evaluator Cue: Evaluator Note: Comment: PerformanceStep:2 Standard: Evaluator Cue: Comment:Obtainprocedure.
Appendix C                             Page 8 of 10               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC RO A2 Examinee's Name:
Reviews procedure.
Date Performed:
Provide OST-1039.AKEYis provided for youruseonJPMPage7.
Facility Evaluator:
Completes Prerequisites section:*Instrumentationneededforthe performanceofthistestisfreeof deficiencytagsthataffect instrument indication.*VerifythemostrecentCurveF-X-8isusedinthe performanceofthis procedure.*Verifyall prerequisitesaremet,thenobtainUnitSCO permissiontoperformthisOST.*LogsF-X-8revision number(NRCExam)*Initials/signsallblocks HARRIS2008NRCROA2Revision2NUREG1021,Revision9 Appendix C Page 30f 10 VERIFICATION OF COMPLETIONFormES-C-1 PerformanceStep:3 Standard: Comment: PerformanceStep:4 Standard: Evaluator Cue: Comment: PerformanceStep:5 Standard: Comment:*If QuadrantPowerTiltRatio Calculation Computer Programisused,performSection7.1,andN/Asection7.2.*Ifmanual calculationofthe QuadrantPowerTiltRatioisused,performSection7.2,andN/Asection7.1.*MarksSection7.1N/A*ProceedstoSection7.2Priortoreadingthevalueof detectorcurrent,ensurethemeter range/rateswitchisinthe400 J,lAlSLOW position.Verifiesmeter range/rateswitcheswereinthe400 J,lAlSLOWpositionwhenthereadingsweretaken.Recordon Attachment2,inColumnA,theupperandlower detector currentsfromall operablepowerrange channels asreadonthe Nuclear Instrumentation Cabinet.Transposes readingsfromPRNISReadingsTableonto Attachment 2.HARRIS2008NRCROA2Revision2NUREG1021,Revision9 Appendix CPage4of10 VERIFICATION OF COMPLETIONFormES-C-1 Performance Step: 6 Standard: Evaluator Cue: Comment: Performance Step: 7 Standard: Comment: Performance Step: 8 Standard: Evaluator Note: Comment:Recordon Attachment2,inColumnB,the100
Number of Attempts:
%power normalized currentforeachchannel.(RefertoCurveF-X-8)
Time to Complete:
TransposesTOPandBOTTOM100
%currentvaluesfromtheCurveBookprovided.DividevaluesinColumnAbytherespective normalized currentinColumnBandrecordtheresultinColumnCasthe Normalized Fraction.DivideseachUpperandLowerreadingbytherespective100
%normalized currentvalueandrecordsinColumnC.
Calculatetheaveragevaluefortheupperandthelower Normalized Fractionsbyaddingthe NormalizedFractionineachsectionofColumnCanddividebythe numberofoperableNIchannels.RecordinColumnDof Attachment 2.Addsall Normalized Fractionsforthesameplane,dividesbyfourandrecordsresultinColumnD.
On the KEY, this value is shown at the bottom of Column C.HARRIS2008NRCROA2Revision2NUREG1021,Revision9 Appendix CPage5of10 VERIFICATION OF COMPLETIONFormES-C-1PerformanceStep:9 Standard: Evaluator Note: Comment: PerformanceStep:10 Standard: Evaluator Cue: Comment:PerformanceStep:11 Standard: Comment:Usingthe formula and values from Attachment 2 calculate the Upper and Lower Ratios.*Divides the Maximum Normalized Fractionbythe Average Normalized Fractiononeachplane.
*Determines both UPPER and LOWER1.029.The applicant may informtheUSCOas soonasany calculation is>1.02.Ifso, acknowledge and direct applicant to complete.Perform independent verificationofall calculationsmadeon Attachment 2.Requests Independent Verifier.If necessary, repeat InitiatingCue:Forthe purpose of this examination, there willbeno independent verification of your work.Candidate may choose to check calculations.
The upperratioorthe lower ratio, whichever is greater,isthe quadrant powertiltratio (QPTR).Record QPTR and verify QPTRislessthanorequalto1.02.
Records Maximum QPTR value 1.026 to 1.036 (N44 UPPER)Acceptablebandis+/-50/0 (rounded to.005)around 1.031.HARRIS 2008NRCROA2 Revision 2 NUREG1021,Revision9 Appendix CPage6of10 VERIFICATION OF COMPLETIONFormES-C-1-v PerformanceStep:12 Standard: Evaluator Cue: Comment: Terminating Cue: Complete applicable sections of Attachment 3, Certifications andReviewsandinformtheUnitSCOwhenthistestis completed.
*CheckmarksPeriodic SurveillanceornotesAOP-001in Comments section*PlantCondition:100
%Power(maynote dropped rod)*Mode1*Today's Date*Current Time*OST Completed By: Applicant's name*Initials/Name
*IndicateinGeneral Comments Section and/orinformsUSCGthatthelimitis exceeded (-V)Acknowledge any report.After theUSCOhasbeen notified: Evaluation on thisJPMis complete.HARRIS2008NRCROA2Revision2NUREG1021,Revision9 Appendix CPage7of10 VERIFICATION OF COMPLETION KEYFormES-C-1 A B C UPPER UPPERUPPER100%POWER NORMALIZED UPPER DETECTOR NORMALIZED FRACTION DETECTORCURRENTCURRENT(NOTE1)N-41 149.7 155.2.965 N-42 177.9 175.6 1.013 N-43 202.0 200.0 1..010 N-44 165.5 159.5 1.038 SUM 4.026/4=1.0065 A B C LOWER LOWER LOWER 100%POWER NORMALIZED LOWER DETECTOR NORMALIZED FRACTION DETECTORCURRENTCURRENT(NOTE1)N-41 169.2 176.1.961 N-42 202.6 202.2 1.002 N-43 221.1 221.2.9995 N-44 197.5 192.3 1.027 SUM 3.99/4=.9975 Highest Upper (N-44)1.038/1.0065
=1.031 HighestLower(N-44) 1.027/.9975
=1.0296 (1.03)HARRIS2008NRCROA2Revision2NUREG1021,Revision9 AppendixCPage8of10 VERIFICATION OF COMPLETIONFormES-C-1 Job PerformanceMeasureNo.:2008NRCROA2 Examinee's Name:DatePerformed:FacilityEvaluator:NumberofAttempts:TimetoComplete:
Question Documentation:
Question Documentation:
Question: Response: Result: Examiner's Signature:
Question:
SAT UNSAT Date:HARRIS2008NRCROA2Revision2NUREG1021,Revision9 Appendix CPage9 of 10 VERIFICATION OF COMPLETIONHARRIS2008NRCROJPM A2CurveF-X-8 HANDOUTRevisionNumber:NRCExamNISCurrentSetpoint TableuA,100%powerFormES-C-1 N41 N42 N43 N44 155.2 175.6 200.0 159.5 176.1 202.2 221.2 192.3HARRIS2008NRCROA2Revision2NUREG1021,Revision9 Appendix CPage10of10JPMCUE SHEETFormES-C-1 INITIAL CONDITIONS:
 
INITIATING CUE:*Theplanthasbeenstabilizedat100
===Response===
%powerfollowinga droppedrodinControlBank"B"(M-6).*Thecrewis performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.*No deficiencytagsonPRNls.TheUSCOhasdirectedyoutoperformamanualQPTRlAW OST-1039, CALCULATIONOFQPTR.ThePowerRangeNIS readingsareprovidedinthetablebelow.Forthe purposesofthe examination,therewillbeno independent verificationofyourwork.
Result:                     SAT            UNSAT Examiner's Signature:                               Date:
PRNIS Readings N41 N42 N43 N44 149.7 177.9 202.0 165.5 169.2 202.6 221.1 197.5*Allvaluesweretaken,withthe Range/Rateswitchin400 IJAiSlow position.HARRIS2008NRCROA2Revision2NUREG1021,Revision9 AppendixC Facility: HARRIS Job Performance Measure WorksheetTaskNo.:FormES-C-1TaskTitle:Reviewthe CompletedOSTfor Auxiliary FeedwaterPump1A-SAJPMNo.:2008NRCSROA2KIA
HARRIS 2008 NRC RO A2 Revision 2                          NUREG 1021, Revision 9
 
Appendix C                            Page 9 of 10             Form ES-C-1 VERIFICATION OF COMPLETION HARRIS 2008 NRC RO JPM A2 Curve F-X-8 HANDOUT Revision Number: NRC Exam NIS Current Setpoint Table uA, 100 % power N41                       155.2                 176.1 N42                        175.6                 202.2 N43                        200.0                 221.2 N44                        159.5                 192.3 HARRIS 2008 NRC RO A2 Revision 2                       NUREG 1021, Revision 9
 
Appendix C                                      Page 10 of 10                      Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
* The plant has been stabilized at 100% power following a dropped rod in Control Bank "B" (M-6).
* The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.
* No deficiency tags on PRNls.
INITIATING CUE:                The USCO has directed you to perform a manual QPTR lAW OST-1039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.
For the purposes of the examination, there will be no independent verification of your work.
PRNIS Readings N41                               149.7                           169.2 N42                                177.9                         202.6 N43                              202.0                          221.1 N44                                165.5                          197.5
* All values were taken, with the Range/Rate switch in 400 IJAiSlow position.
HARRIS 2008 NRC RO A2 Revision 2                                        NUREG 1021, Revision 9
 
Appendix C                                  Job Performance Measure                   Form ES-C-1 Worksheet Facility:                HARRIS                                  Task No.:
Task
 
==Title:==
Review the Completed OST for            JPM No.:   2008 NRC SRO A2 Auxiliary Feedwater Pump 1A-SA KIA


==Reference:==
==Reference:==
2.2.12(3.4)
2.2.12 (3.4)
Examinee:NRCExaminer:FacilityEvaluator:
Examinee:                                                     NRC Examiner:
Date:Methodoftesting:
Facility Evaluator:                                           Date:
Simulated Performance:
Method of testing:
ClassroomREADTOTHE EXAMINEE X SimulatorActualPerformance:
Simulated Performance:                                         Actual Performance:      x Classroom            X   Simulator    ---
Plant---xIwillexplaintheinitialconditions,whichstepstosimulateordiscuss,andprovideinitiatingcues.Whenyou completethetasksuccessfully,theobjectiveforthisJob PerformanceMeasurewillbesatisfied.InitialConditions:*TheunitisinMode1at100
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
%power*AllmajorcontrollersareinAUTO*NoTSAction Statementsareineffect*OST-1211, AUXILIARY FEEDWATERPUMP1A-SA OPERABILITY TEST QUARTERLY INTERVALMODES1-4,hasjustbeen completedTaskStandard:Allerrors(4)identifiedRequiredMaterials:NoneGeneral
Initial Conditions:
* The unit is in Mode 1 at 100% power
* All major controllers are in AUTO
* No TS Action Statements are in effect
* OST-1211, AUXILIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4, has just been completed Task Standard:             All errors (4) identified Required Materials:         None General


==References:==
==References:==
OST-1211, AUXILIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4 Handout:                    Completed OST-1211 with the errors incorporated.
Initiating Cue:            You are the USCO. Completely review the procedure and note any problems in the
==GENERAL COMMENT==
S section of Attachment 6 -
Certification and Review. Discuss your review with me at the conclusion.
HARRIS 2008 NRC SRO A2 Revision 2                                            NUREG 1021, Revision 9


OST-1211, AUXILIARY FEEDWATERPUMP1A-SA OPERABILITY TEST QUARTERLY INTERVALMODES1-4 Handout:InitiatingCue:
Appendix C                    Job Performance Measure        Form ES-C-1 Worksheet Time Critical Task: No Validation Time:    12 minutes HARRIS 2008 NRC SRO A2 Revision 2                      NUREG 1021, Revision 9
CompletedOST-1211withtheerrorsincorporated.YouaretheUSCO.
 
Completelyreviewtheprocedureandnoteany problemsinthe
Appendix C                      Job Performance Measure          Form ES-C-1 Worksheet SIMULATOR SETUP N/A HARRIS 2008 NRC SRO A2 Revision 2                      NUREG 1021, Revision 9
 
Appendix C                                  Page 4 of 8                        Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
START TIME:
Performance Step: 1      Review procedure Standard:                Ensures proper conditions, signatures/initials, and may verify the current revision of the procedure Evaluator Cue:
* Provide the completed OST-1211.
Comment:
~  Performance Step: 2      Review the completed OST Standard:                Attachment 1 (Page 16) - Identifies stopwatch is past calibration date Evaluator Note:          This makes the OST invalid and/or any timed elements would have to be repeated.
Comment:
HARRIS 2008 NRC SRO A2 Revision 2                                  NUREG 1021, Revision 9
 
Appendix C                                Page 5 of 8                        Form ES-C-1 PERFORMANCE INFORMATION
-v Performance Step: 3  Review the completed OST Standard:
* Attachment 2, Sheet 1 (Page 17) - wrong Specific Volume used to determine ilPcorr.
Evaluator Note:      l\Pcorr still exceeds minimum requirement but is incorrect.
Comment:
-v Performance Step: 4   Review the completed OST Standard:
* Attachment 3 (Page 20) - Outboard Horizontal Vibration reading is in the ALERT range but there is no documentation in accordance with Instructions 1.a and 1.b.
Evaluator Note:      The pump would still be operable but this could prevent corrective action or the required increase in surveillance frequency.
Comment:
-v Performance Step: 5    Review the completed OST Standard:            Attachment 4 (Page 21) - 1AF-74 SHUT time exceeds CODE CRITERIA and, in accordance with Step 7.0.1, should have been retested immediately.
Comment:
HARRIS 2008 NRC SRO A2 Revision 2                                NUREG 1021, Revision 9
 
Appendix C                              Page 6 of 8                      Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 6  Review the completed OST Standard:            Returns the procedure unsigned or, if signed, with EXCEPTIONS circled and all errors identified in the


==GENERAL COMMENT==
==GENERAL COMMENT==
Ssectionof Attachment6 CertificationandReview.Discussyourreviewwithmeatthe conclusion.HARRIS2008NRCSROA2Revision2NUREG1021,Revision9 Appendix CTimeCriticalTask:ValidationTime:
S section.
No12minutes Job Performance Measure WorksheetFormES-C-1HARRIS2008NRCSROA2Revision2NUREG1021,Revision9 Appendix C Job Performance Measure Worksheet SIMULATOR SETUP N/AFormES-C-1 HARRIS2008NRCSROA2Revision2NUREG1021,Revision9 Appendix CPage4of8 PERFORMANCE INFORMATIONFormES-C-1 (Denote Critical Steps with a check mark)STARTTIME:
Comment:
PerformanceStep:1 Standard: Evaluator Cue: Comment:PerformanceStep:2 Standard: Evaluator Note: Comment: Review procedure Ensures proper conditions, signatures/initials,andmayverifythe currentrevisionofthe procedure*Provide the completed OST-1211.Reviewthe completed OST Attachment1(Page16)-
Terminating Cue:       When the procedure is returned: Evaluation on this JPM is complete.
Identifiesstopwatchispastcalibration date This makestheOST invalid and/or any timed elements wouldhavetobe repeated.HARRIS2008NRCSROA2Revision2NUREG1021,Revision9 Appendix C-v PerformanceStep:3Page5of8 PERFORMANCE INFORMATIONReviewthe completed OSTFormES-C-1 Standard: Evaluator Note: Comment:-v PerformanceStep:4 Standard: Evaluator Note: Comment:-v PerformanceStep:5 Standard: Comment:*Attachment2,Sheet1(Page17)-wrongSpecificVolumeusedto determine ilPcorr.l\Pcorr still exceeds minimum requirementbutisincorrect.Reviewthe completed OST*Attachment3(Page20)-
STOP TIME:
Outboard Horizontal VibrationreadingisintheALERTrangebutthereisno documentation in accordance with Instructions1.aand1.b.Thepumpwouldstillbe operablebutthiscouldprevent correctiveactionortherequired increase in surveillance frequency.Reviewthe completed OST Attachment4(Page21)-
HARRIS 2008 NRC SRO A2 Revision 2                                  NUREG 1021, Revision 9
1AF-74SHUTtime exceeds CODE CRITERIAand,in accordancewithStep7.0.1,shouldhavebeen retested immediately.
HARRIS2008NRCSROA2 Revision 2NUREG1021,Revision9 Appendix C Performance Step: 6Page6of8 PERFORMANCE INFORMATIONReviewthe completed OSTFormES-C-1 Standard: Comment: Terminating Cue:STOPTIME:Returnsthe procedureunsignedor,ifsigned,with EXCEPTIONScircledandallerrorsidentifiedinthe


==GENERAL COMMENT==
Appendix C                            Page 7 of 8                Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SRO A2 Examinee's Name:
S section.Whenthe procedure is returned: Evaluation on thisJPMis complete.HARRIS2008NRCSROA2Revision2NUREG1021,Revision9 Appendix CPage7of8 VERIFICATION OF COMPLETIONFormES-C-1 Job PerformanceMeasureNo.:2008NRCSROA2 Examinee's Name:DatePerformed:FacilityEvaluator:NumberofAttempts:TimetoComplete:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question Documentation:
Question: Response: Result: Examiner's Signature:
Question:
SAT UNSAT Date:HARRIS2008NRCSROA2Revision2NUREG1021,Revision9 Appendix CPage8of8JPMCUE SHEETFormES-C-1 INITIAL CONDITIONS:
 
INITIATING CUE:*TheunitisinMode1at100
===Response===
%power*All major controllersareinAUTO*NoTSAction Statementsareineffect*OST-1211,AUXILIARY FEEDWATERPUMP1 A-SA OPERABI LITY TEST QUARTERLY I NTERVAL MODES 1-4,'has just been completedYouaretheUSCO.
Result:                     SAT            UNSAT Examiner's Signature:                               Date:
Completelyreviewthe procedureandnote any problemsinthe
HARRIS 2008 NRC SRO A2 Revision 2                        NUREG 1021, Revision 9
 
Appendix C                                Page 8 of 8                    Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
* The unit is in Mode 1 at 100 % power
* All major controllers are in AUTO
* No TS Action Statements are in effect
* OST -1211, AUXI LIARY FEEDWATER PUMP 1A-SA OPERABI LITY TEST QUARTERLY INTERVAL MODES 1-4,'
has just been completed INITIATING CUE:        You are the USCO. Completely review the procedure and note any problems in the


==GENERAL COMMENT==
==GENERAL COMMENT==
S section of Attachment6-CertificationandReview.Discussyourreviewwithmeatthe conclusion.
S section of Attachment 6 - Certification and Review. Discuss your review with me at the conclusion.
HARRIS2008NRCSROA2Revision2NUREG1021,Revision9 NUMBER: C CO*NTINUOUS USE HARRIS NUCLEAR PLANT PLANT OPERATING MAN UAl VOLUME 3PART9 QPERAT10NS SU*RVEllLANCE TEST OST-1211 TITLE: NOTE: A*U:XILIARY FEEDWATER PUMP 1A.-SA OPERABILITY TEST QUARTERLYI*NTERVAL MOD:ES 1-4 Thlsprccedure has been screened perPLP-1 00 Criteria and determined to be CASE Iii,:additionalmanagementinvolveme*nt is required.I OST-1211......*1 Rev, 16 Page1of 261 Attachment 1-Calibration Data Sheet Sheet 1 of 1 Cal Due Date-97-I o N.A QT'0 (JT" c:: Rev.16 Page 18 of 261 A'ttaehm.ent 2Performance DataSheet1 of*3 Auxiliary Peecwater Pump 1A..SA NOTE1:Caiculate DifferentiaiPressure as foltows: lb{)()Step 7'.1.21<(iSIS Step1.18= psid Step 7.1.23*L!==========:,======
HARRIS 2008 NRC SRO A2 Revision 2                              NUREG 1021, Revision 9
=..::=.:..
 
NOTE*2: Satisfactory Acceptance Criteria is.determlnedby u.sing the following and verifying the correcteodlfterenttatpressure ts\tifit.hinthe
C CO*NTINUOUS USE HARRIS NUCLEAR PLANT PLANT OPERATING MAN UAl VOLUME 3 PART 9 QPERAT10NS SU*RVEllLANCE TEST NUMBER:
.-:_-
OST-1211 TITLE:     A*U:XILIARY FEEDWATER PUMP 1A.-SA OPERABILITY TEST QUARTERLYI*NTERVAL MOD:ES 1 -4 NOTE:  Thlsprccedure has been screened perPLP-1 00 Criteria and determined to be CASE Iii,       :additionalmanagementinvolveme*nt is required.
la: tlPcorr:::;APind:=Uf=: 7.1.24 Corrected DifferentIal Pressure Discharge Pressure minus Indicated sucuon Pressure SpeCific Volume (ftslfbm)for saturated Iiquidwater (u,)for suction temperature recorded inStep7..*1.22.This number can be determined from Sheet3 of this Attachment or Standard Steam I 0$1-1211 r w Rev.16 Page 11 of26, Attachm.ent 2Performance Data Sheet 2of3 INSTRUC*TIONS 1.If pump hydrauHcdatEfdoes not meet acceptance criteria:Declare the pump iNOPERABLE., bInlti:ate a:CR.ST*Ep***NO.7.1.3 7.1.18 7.1.20 7.1.22 7.1 Suction Temperature OifferentlalPressure Differenual Pressure Test Gauqe
                    .... . *1 I OST-1211                                Rev, 16                             Page 1 of 261
...V*2 Test G:8uge at1AF-11*HV.2 ERFISPoint TCE901..*::or Test Gauqe at 1AF-7 Calculated per NOTE 1 Calculated perNOTE2 (C:orrected (liP corr)psig{Cod D psig 2: 15 psig N/A N/A***Circle instrument used.50 to54inches water column is equivalent to 50 to52gpm IRev.16 Page 18 of 261 Attachm.ent 2*Performance Data Sheet 3 of 3 Specific Volume (ft 3/Ibm)For Saturated Liquid Water{ud Temperature Specific Volume Temperature l:s...peciflc 59 60 61 62 63 64 66 67 6*8 69 70 11 7*2 73 74 75 76 77 78 79 0:.016034 0..=016035 0.016036 0.0160:38 0.01603:9 (t016044 CL016046 0.01.60:48 0.016052 0.016056'0.01605$0.016060 0.016062 0.016064 0.016061 0.Ot6069 0.016011 I 80 I 81 82 83 84 as 81 88 89 95 96 98 tOO 0.016074 0.016076 0.016079 0.016081 0..0=16097 12 OJJ*16.115 0.016125 0.016131Rev.16 103 105 109 111 11:2 113 1 116 117 1 119 120 0.0'16110 0.016174 0.016177 0.016189 0.016201 0.016209 Page 19 of 26 I Attachment 3Vibration Data Sheet1of1 IN'STRUCTIONS:
 
1.If pump vibration data is greater than the Acceptable Range but within the Alert Range: a.Prepare enE-man orMenlOtothe Surveillance Testing Scheduling Coordinator directing the testfrequencyofthe pumptobedoubled,b.Attachacopy of the E-mailorMemoto the test package.2.If pump vibration data meets the Required Action Criteria: B.b.Declare the pump INOPERABLE.
Attachment 1 -Calibration Data Sheet Sheet 1 of 1 Cal Due Date     I o~    o c                    QT'   0 (JT" N.A
Initiate a Condition Report (CR)v F s\, Vibration ACCEPTANCE
::     Rev. 16                     Page 18 of 261
:CRITERIA.location IN/SEC Acceptable Range Alert Range Required Action Axial*J.1Q:s.0.285:>
 
to0.68.4>
A'ttaehm.ent 2 ~ Performance Data Sheet 1 of*3 Auxiliary Peecwater Pump 1A..SA NOTE1:Caiculate DifferentiaiPressure as foltows:
Outboard0.2325>0.232'5 to.s:O.558>
lb{)()                           <  (iSIS                =  J514~d,    psid Step 7'. 1.21                         Step 7~ 1.18             Step 7.1.23*
)Horizontal Outboard*.....*..s
L!==========:,=======                                           . ::=.:..   .=====;======~
>ON2775 tos 0.666>0,666 Vertical/'0.............Inboard I s
NOTE* 2:   Satisfactory Acceptance Criteria is .determlnedby u.sing the following
*>O.2.i5Sto*s
                  ~.rH l~-HO and verifying the correcteodlfterenttatpressure ts \tifit.hinthe
:>0:.636 Hortzontat
                  .-   :_-   ~t;:t;. \i.~ Iltj'~: la:
{DC(J Inboard Vertica': s
tlP corr :::; Corrected DifferentIal Pressure APind   :=   tndlq.~ted Discharge               Pressure minus Indicated sucuon Pressure Uf      =:  SpeCific Volume (ftslfbm) for saturated Iiquidwater (u,) for suction temperature recorded inStep7.. *1.22. This number can be determined from Sheet3 of this Attachment or Standard Steam Tabtes~
>0.315 to s 0.70>0.'70'*../;1:0...".__....*..L__
7.1.24 I0$1-1211                                 r w
Attachment 4 M*.Valve Test Data Sheet 1of1_um""'''''''''''''''h
Rev. 16                           Page 11 of 26 ,
-".",.:,u......*.._..,.
 
____.h_PRETESTFAILSAFE rosrrssr ALIGNMENT FULL STROKE TEST TEST ALIGNMENT ACCEPTANCE y",,131TERIA (SEC)........-..........
Attachm.ent 2 ~ Performance Data Sheet 2 of 3 INSTRUC*TIONS
".."........-.............
: 1.     If pump hydrauHcdatEfdoes not meet acceptance criteria:
CODE CR.tTERI.A VerificationStrokeTime LIMlT1NGVALUE ofT"ravel by (SEC)I OPEN SHUT'Valve Pretest Ind Lights:Fail Safe Position Pusttes!Number Position I:Htt (lNIT)OPEN SHUT: Positlon Verified*Pos.iUonPoslnit Vert loit Low High Low High OPEN SHUT 1AF-55 Open ffO!fJ 1&.1" NIA NtA Open}6=>.:u 14.25 14,34 19;40 23.00 1AF...74 Open Aio Aw NlA NIA Open:i) 20.94 14,84 20.07 27.31 23.00-e,:0'Comments:.,..".,.....,.,.....-
a~      Declare the pump iNOPERABLE.,
.<<ovm<_'<<"=_
b~      Inlti:ate a :CR.
.*"*****.*._.vwm.*
ST*Ep***
.....wm"hwu....**.*.**.VII'*...,...__*..a**b*.*.**.'.*'"A<<.:...:A.:.:
NO.
..,_O'<<".:*.*: '.....:.b*:**v*.i(**..*************
7.1.3 7.1.18                                   Test Gauqe              psig 2: 15 psig CE~42 . .V*2 7.1.20                                    Test G:8uge at1AF-11*HV.2       {CodD psig    N/A ERFISPoint 7.1.22                                  TCE901 . *::or Suction Temperature                                          N/A Har~dheld Porom~t~(*
.......;.;.;;;.: ,.;<N._N.-"...;N..__J'.I'_.+-.-.
Test Gauqe at 1AF-7 OifferentlalPressure      Calculated per NOTE 1 Calculated per 7.1 ~26      Differenual Pressure          NOTE 2 (C:orrected (liPcorr)
__*_,.v.*.*..I'>..................................
* Circle instrument used.
.....................
**       50 to 54 inches water column is equivalent to 50 to 52 gpm IOST~1211                                      Rev. 16                       Page 18 of 261
..........-._..-.-'w.....-vvY.y.,..w.
 
..
Attachm.ent 2* Performance Data Sheet 3 of 3 Specific Volume (ft 3/Ibm) For Saturated Liquid Water {ud Temperature Specific Volume   Temperature   l:s.. peciflc VO~.unne 59         0:.016034          80        I      0.016074 60         0.. =016035         81                0.016076 61        0.016036             82                0.016079      103 62        0.0160:38           83                0.016081 63        0.01603:9           84                                105 64                            as 66        (t016044           81 67        CL016046           88                                109 6*8        0.01.60:48           89                0..0=16097 69        O~01'6050                                            111      0.0'16110 70        0.016052                                              11:2      0.016174 11                                                              113      0.016177 7*2        0.016056' 73        0.01605$                                      12    1 74        0.016060            95                OJJ*16.115    116      0.016189 75        0.016062            96                              117 76        0.016064                                              1 77        0.016061            98                0.016125      119      0.016201 78        0.Ot6069                                              120 79        0.016011            tOO                0.016131                0.016209 I                Rev. 16                       Page 19 of 26 I
__.cccccccee<.;..OC;"':O:':<_........-_<hV<hV<hV<hV NN
 
<<<<'i.<<-;-;
Attachment 3 ~ Vibration Data Sheet 1 of 1 IN'STRUCTIONS:
;.;;*;..:*:.:*;.:.:-:<<.>>:
: 1. If pump vibration data is greater than the Acceptable Range but within the Alert Range:
:<<::-'-<N****NU*""""""......:..."j/vu'**u.*u.*.*.*.*
: a.                           Prepare enE-man or MenlO to the Surveillance Testing Scheduling Coordinator directing the test frequency of the pump to be doubled,
I Rev.16 I Page 21 0126 1 Attachment 5-Valve Retest Data S'heet Sheet 1 of 2 NOTE: This entire Attachment is N/A if no valve is retested due to exceeding the CodeCrttena.
: b.                         Attach a copy of the E-mail or Memo to the test package.
Determine if the.stroke time exceeds the Limiting Value,1.Ifthe stroke time exceeds the limlting Value, declare the valve inoperable and initiat.e*(NIAifstroke time is less than the LirnltlnqValue) 2..lfthe stroke time is.less than the Limiting Value.but outsidetheCodeOnteria limits, perform the foUovving:Steps: 8.Ifthe cause is knowntobe mechanical if a retest cannot be performed expeditiously, declarethevalve inoperable and inJUate a CR(Except PMTRs).b.If retestlng the valve is desired$perform the following:
: 2. If pump vibration data meets the Required Action Criteria:
N:OTE:.If necessary separate markedup sheets of this CST maybe used to document necessary manlpulatlons.
B.                           Declare the pump INOPERABLE.
sheets would this procedure and noted in the comments SectionofAttachment 7.(1)Determine wbich Ste:psneedto beperfcrrned up conditionstor testing the valve.Unit SeQ concurrence must be obtained and documented in the Comments section of Attachment 7>(2)Perform the Steps determlned in the previous Ste'p anddocument stroke times/valve positioning on Sheet2.(3) retest results are still outside the Code the valve inoperable and initiate aCR (except Prv1T), (4)1f retest results-are Within the Code Criteria y perform the.following: (a) the valve operable.(b)
: b.                          Initiate a Condition Report (CR)v F                                                               s Vibration                                                                                                     ACCEPTANCE :CRITERIA
CR.identify1ng test findings for the first and second tests.(c)Send test results to Responsible Engineer (1ST)for evaluation and docurnentanonon the CR.IOST-1211 Page 22 of 26 I Attachment 5V,alveRetest Data Sheet Sheet 2.of 2 (1)FUI out PRETEST ALIGNMENT t POSTT;EST ALIGNMENT, and ACCEPTANCE CRITERIA valuesforthe velvets)being tested using the valuesinthe initIal test Attachment,
  .location                 IN/SEC                                                 Acceptable Range                   Alert Range     Required Action Axial             ~ *J.1Q                                                         :s.0.285                   :> O~285 to ~ 0.68.4   > O~68*4 Outboard                                                                              ~. 0.2325                 > 0.232'5 to .s:O.558   > O~558 Horizontal    l~Gt~3 )                     *.. .,.".,.,:;">>,,.,~~, .*,.".~;-.,..
.':..->>...:***..:.........,-J PRETEST POSTIEST ALIGNMENT ALIGNMENT ACCEPTANCECRJTERIA (SEC)(1)
Outboard                                                                              s O~2775                  >ON2775 tos 0.666        > 0,666
STROKE Tt=$T (1)".<<-=<<-x-tt}I CO.9.E CRITERIA I Time(SE:C)OPf:N$HVT...LIMITfNG VALUE Pretest Posttest I*\l'a'dve i!''''l:\JlnUf
                  /'0
..:n Posmon tntt: OPEN SHUT Position Pes lnit Verflnif Low High Low High OPEN i.StrUTIi'.<'.-
                                ............. ~
,,_.........:MW
Vertical Inboard                                                                               s O~265                  *>O.2.i5Sto*s O~63.6    :> 0:.636 Hortzontat   I Vertica' :
.........,_=t Rev.16 I Page 23 of AttachmentCertification and Review Sheet 1 of 2 Periodic Surveillance Requirement:__Postmalrrtenance OperabHity Test:_Redundant SUbsystem Test: Mode: PlantConottlons:
{DC( J s O~315                    > 0.315 to s 0.70       >0.'70 Inboard
T:hiS CST was performed as a: OST Compl.etedBy:
                    ... ". '* . I~G  /;1:0
-..-..-<Date: ToDAt Time:
                \,
OS.1..
L~~::!~~.*                                  ,_~_~~,_"_"__~~~ . .* .                                         L _ _2~e ~o ~!~
Bv: Initials Name (Print)Initials Name (Print)General Comments/Recomm:endation/Corrective ActionslExceptions:
 
I ()$T-1211*L Rev.16 m mJ Page 24 of 26 I Attachment 6Certifications and Reviews Sheet2of 2-Step 7,1.11 Step Step 7.2.1.c Step 1A..SA AF\'V Pump Inoperable1A-SAAFWPump Operable-1A-SA and 1 B-S-B AFWPump Inoperable 1A-SA-and1B..SBAFW Pump Operable Time: fJ10 t::.Date: 'Tc)J:r-ti.*.
Attachment 4 Valve Test Data                                          M*.
..... o
Sheet 1 of 1
........
_um""'''''''''''''''h                                 -"                                                                                                                                                                                                                                                                                                                                 .",.:,u......*.._.
__=l-L Date:
                                                                                                                                                                                                                                                                                                                                                                                                    ~                  .,.                                                                                 <_,,~.                ____.       ~.      h_
Time:tot5__Date:
PRETEST                                                                                                                                            FAIL SAFE                                                                      rosrrssr ALIGNMENT                                                   FULL
Time:...-Date: Pa.ges Used: A CST Completed with NO EXCEPT10NS1EXCEPTIONS:
                                                                              ........ -.......... STROKE TEST
Reviewed By: Unit SeQ ResponsibieEngin"eer (1ST)Reviewed By: ANn Date:----Date:----After receiving the final review signature, this OS:T becomes a a-A RECORD and should be submitted to Document Servloes..IOST-1211 Revy16
                                                                                                                        .............                                                   TEST                                                              ALIGNMENT                                                                                                                                                  ACCEPTANCE y",,131TERIA (SEC)
CODE CR.tTERI.A Verification                      Stroke Time                                                                                                                                                                                                                                                                                                                                                                            LIMlT1NGVALUE ofT"ravel by                                     (SEC)                               I                                                                                                                                                                                                           OPEN                                                                         SHUT
  'Valve                 Pretest                                         Ind Lights                                                                           : Fail Safe Position Pusttes!
Number                 Position                         I:Htt             (lNIT)                   OPEN SHUT: Positlon Verified *Pos.iUon Pos lnit Vert loit                                                                                                                                                                                               Low                               High                                   Low                   High                             OPEN                               SHUT 1AF-55                 Open ffO !fJ                                     l/Pt~fo                      1&.1" NIA                                     NtA                     Open                     }6=>.                                 :u                                                 14.25                             19~28                                14,34                   19;40                               25~15                              23.00 1AF...74               Open Aio Aw                                               bb61~~;P~    -e,                                          :0' NlA                                     NIA                     Open
                                                                                                                                                                                                                                                                    ~ :i)                                                                                   f5~48                          20.94                                   14,84                   20.07                               27.31                             23.00 Comments:                         .,..".,.....,.,.....-           .<<ovm<_'<<"=_ .*                                                                                                                                                                                                                                                                                                                     " *****.*._.vwm.*..... wm"hwu.
                                                                                                                                                                                                                                                                                                                                                                                    ...* *.*.*     *.VII'           * ...,..._ _*..a*     *b*.*.* *.'.* ' "A <<.:...:A.:.:..,_O'<< ".:*.*:   '           .....:. b *:**v*.i( * *..**** * * *** **   **
                                                                                                                                                                              ....... ~                ;.;.; ; ;.: ,.; <N._  N          .-"...; N .. ~_ _        J'.I'_.+-.-. _ _*_,.v.*.*..I'>............................................................                                                                                                                                 .     . . - ._..-.-'w       ~        .....-vvY.y.,..w. ~
~                ..
  ...-;~-...x<<<<o: -:<;;Xo<<~~ __. _~                      cccccccee                                                                   <.;..OC;"':O:':<_........-_<hV<hV<hV<hV     h~AQ;y,;<<o;.y;;oc;.,.;                 .~.--"..No'N:N       NN    N~........:<<  <<<<'i.<<-;-; ;.; ;*;..:*:.:*;.:.:-:<<.>>: :<< : :    -'-    <N                               ~" :.:.-.~.w.r.*.*.* * ***  NU *""""""        ......:.   ~~.; .."j    /vu'**u.* u.*.*.*.*
L?ST~1211                                                                                      I                                                  Rev. 16                                                                                      I                                                                                            Page 21 0126 1
 
Attachment 5- Valve Retest Data S'heet Sheet 1 of 2 NOTE:      This entire Attachment is N/A if no valve is retested due to exceeding the CodeCrttena.
Determine if the. stroke time exceeds the Limiting Value,
: 1.      If the stroke time exceeds the limlting Value, declare the valve inoperable and initiat.e* aCR~ (NIAifstroke time is less than the LirnltlnqValue) 2..      lfthe stroke time is. less than the Limiting Value.but outside the Code Onteria limits, perform the foUovving :Steps:
: 8.        If the cause is known to be mechanical failure~or if a retest cannot be performed expeditiously, declare the valve inoperable and inJUate a CR(Except PMTRs).
: b.        If retestlng the valve is desired perform the following:
N:OTE:. If necessary separate markedup sheets of this CST maybe used to document necessary manlpulatlons.                     sheets would                    this procedure and noted in the comments Section of Attachment 7.
(1)     Determine wbich Ste:ps need to beperfcrrned                up conditionstor testing the valve. Unit SeQ concurrence must be obtained and documented in the Comments section of Attachment 7>
(2)     Perform the Steps determlned in the previous Ste'p anddocument stroke times/valve positioning on Sheet2.
(3)      ~f retest results are still outside the Code Crlteria~declare the valve inoperable and initiate aCR (except Prv1T),
(4)     1f retest results-are Within the Code Criteria perform the .following:
y (a)     Dec~are  the valve operable.
(b)    Inltl~.tea CR. identify1ng test findings for the first and second tests.
(c)     Send test results to Responsible Engineer (1ST) for evaluation and docurnentanonon the CR.
IOST-1211                                                                                            Page 22 of 26 I
 
Attachment 5 ~ V,alveRetest Data Sheet Sheet 2. of 2 (1)          FUI out PRETEST ALIGNMENT POSTT;EST ALIGNMENT, and ACCEPTANCE CRITERIA values for the velvets) being t
tested using the values in the initIal test Attachment,
                                                                                                                              ~~
                                                                                                                                        ~~::....;;..;.:.:y:w .':..->>...:***..:.           ........  ,-
PRETEST ALIGNMENT (1)                                  F.]J.~l. STROKETt=$T POSTIEST ALIGNMENT (1) ".     <<-=<<-x-CO.9.E CRITERIA ACCEPTANCECRJTERIA (SEC) tt}
I I
J Time                                                                                                                ~
(SE:C)                                                   OPf:N                                          $HVT...             LIMITfNG VALUE Pretest
*\l'a'dve i!''''l:\JlnUf.:n
                        . Posmon                        tntt:   OPEN          SHUT Posttest Position    Pes lnit    Verflnif      Low                High                        Low      High        OPEN      I i  .StrUT
                                                                                                                              ~
                                                                                                                                                                                                    ~
I            i
                                                                                                                                                                                                    ~
                                                                                                                ~
~~11*.                           ,,_.........:MW  ~
                                              ... . .... . , _=t                    Rev. 16                    I                Page 23 of ~61


General Revision16updates the procedurereferenceto the new 1ST Program Plan, Des9ription o.fChanges
Attachment 6*~ Certification and Review Sheet 1 of 2 T:hiS CST was performed as a:                      Periodic Surveillance Requirement:  _~ __
*Page.Section Ghange Description Ail 3 3 5 8 8 8 9 11 17 All 1
Postmalrrtenance OperabHity Test:            _
)
Redundant SUbsystem Test:
6.Q.1.c 7.1.5 7+1.24 Attachment 2 Updated revision level.Adde.d check valves 1AF-23 1 54 1 92, 11 73.Deleted, HNP-*lST-003, HNP 1ST Program Plan-3rd tntervat, Changedacceptancecriterla per calc, (Also cbanqed on Atta'chme*nt2
PlantConottlons:                                                                Mode:
)Deleted"Parnat'strcke Added check valves 1AF-23, 54$92 1and 73.Added check valves and 73.Added check va'hte1AF-23$110 Added checkvalves 92, 110 , andRev.16 Page26of 26 1 Appendix C Facility: HARRIS Job Performance Measure Worksheet Task No.:FormES-C-1 Task Title:Givena Declared Emergency,JPMNo.: 2008NRCRO-SROA3 DeterminetheDoseRate,DoseLimit,andthe NumberofPeopletoPerformaTask.
                    --~~~~~----------_.............--
KJ A
OST Compl.etedBy:                    -                              ..-..-< Date:  ToDAt Time:    tq~3(~)
OS.1 . P~.rfofrf1ed Bv:
Initials          Name (Print)                    Initials      Name (Print)
General Comments/Recomm:endation/Corrective ActionslExceptions:
I()$T-1211*                      L            Rev. 16        m    mJ Page 24 of 26 I
 
Attachment 6 ~ Certifications and Reviews Sheet 2 of 2-Step 7,1.11      1A..SA AF\'V Pump Inoperable                  Time:  fJ10 t::.
                                                                      ~-~'~"oXA ~v;o;,o ;o;.~
                                                                                                        'Tc)J:r-ti Date: :~"X'.xo;:<<    ;~_"_~-o;,"XX..;-
Step  7~1.32      1A-SA AFW Pump Operable-                      Time:_~__=l-L Date:                    ~:IJ:fDfft=_
Step 7.2.1.c      1A-SA and 1 B-S-B AFWPump Inoperable          Time:tot5 __~ Date: ~Jilt Step  7~2~1,p    1A-SA-and 1B.. SBAFW Pump Operable            Time: 1,~;~.,5"" . .-        Date: ~JcJtfl~t,~,
Pa.ges Used:      Atl~_~~_
CST Completed with NO EXCEPT10NS1EXCEPTIONS:
Reviewed By:                                                                          Date:
Unit SeQ ResponsibieEngin"eer (1ST)
Reviewed By:                                                                          Date:
ANn                                                    ----
After receiving the final review signature, this OS:T becomes a a-A RECORD and should be submitted to Document Servloes.                                                                                  .
IOST-1211                                        Revy16
 
R~.vtsion S~Jmmary General Revision 16 updates the procedure reference to the new 1ST Program Plan, Des9ription o.fChanges
*Page.             Section     Ghange Description Ail                   All       Updated revision level.
3                    1~O+2     Adde.d check valves 1AF-231 54 92, 11 O~and 73.
1 3                    t~O.4      Deleted, 5                    2~7.4      HNP-*lST-003, HNP 1ST Program Plan - 3rd tntervat, 8                6+0~1.e~(1 )  Changedacceptancecriterla per calc, (Also cbanqed on Atta'chme*nt2) 8                  6~O.1.b      Deleted "Parnat'strcke 8                  6.Q.1.c      Added check valves 1AF-23, 54$ 92 1 110~ and 73.
9                    7.1.5      Added check valves   1AF~54,92~  and 73.
11                  7+1.24      Added check va'hte1AF-23$110 17              Attachment 2    Added checkvalves 1AF*-23*~541 92, 110 , and 73~
Rev. 16                             Page 26 of 26 1
 
Appendix C                                   Job Performance Measure                     Form ES-C-1 Worksheet Facility:                HARRIS                                    Task No.:
Task
 
==Title:==
Given a Declared Emergency,               JPM No.:   2008 NRC RO-SRO A3 Determine the Dose Rate, Dose Limit, and the Number of People to Perform a Task.
KJA


==Reference:==
==Reference:==
2.3.4 (2.5/3.1)
Examinee:                                                    NRC Examiner:
Facility Evaluator:                                          Date:
Method of testing:
Simulated Performance:                                        Actual Performance:        X Classroom          X      Simulator            Plant Perform in a location with the general references available or with electronic access to the references.
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
* A large break LOCA has occurred.
* The ECCS is in cold leg recirculation.
* RHR Pump "8" is running. RHR Pump "A" showed evidence of gas binding and was stopped.
* A Site Area Emergency (SAE) is in effect.
* The Emergency Engineering Organization has determined that the RHR Pump "A" should be vented to ensure that a backup is available.
* The general radiation level in the area is 16 R/hour
* The OSC estimates that the total task will take. 75 man-hours.
* The Site Emergency Coordinator has specified that he/she will not authorize an extension to the site emergency workers dose limit for performance of this task.
Task Standard:              Number of people and stay times calculated within specified limits.
Required Materials:        Calculator HARRIS08 NRC RO-SRO A3 Revision 2                                            NUREG 1021, Revision 9


2.3.4 (2.5/3.1)Examinee: NRC Examiner: Facility Evaluator:
Appendix C                          Job Performance Measure                    Form ES-C-1 Worksheet General
Date:Methodoftesting:
Simulated Performance:
Actual Performance:
X Classroom X Simulator Plant Perform in a location with the general references available or with electronic access to the references.
READTOTHE EXAMINEEIwillexplaintheinitial conditions,whichstepsto simulateordiscuss,andprovide initiatingcues.Whenyou completethetask successfully, the objectiveforthisJob Performance Measurewillbe satisfied.
Initial Conditions:*AlargebreakLOCAhas occurred.*TheECCSisincoldleg recirculation.*RHRPump"8"isrunning.RHRPump"A"showed evidence ofgasbindingandwas stopped.*ASiteArea Emergency(SAE)isineffect.*The Emergency Engineering Organization has determined thattheRHRPump"A" shouldbeventedtoensurethata backup is available.*The general radiationlevelintheareais16R/hour*TheOSC estimatesthatthetotaltaskwill take.75 man-hours.*TheSite Emergency Coordinator has specifiedthathe/shewill not authorize an extensiontothesite emergency workers doselimitfor performanceofthistask.
Task Standard: Numberofpeopleandstay times calculated within specified limits.RequiredMaterials:
Calculator HARRIS08 NRC RO-SROA3Revision2NUREG1021,Revision9 AppendixCJobPerformanceMeasure WorksheetFormES-C-1General


==References:==
==References:==
*PEP-330, RADIOLOGICAL CONSEQUENCES
* PEP-330, RADIOLOGICAL CONSEQUENCES
*NGGM-PM-0002, RADIATION CONTROLANDPROTECTION MANUALInitiatingCue:Thesite emergencyworkerslistedinthetablebelowareavailable.Theywillbeutilizedfromlowesttohighest accumulatedTEDEdose.Usingtheminimumnumberofworkerspossible,DETERMINE:*thetotalnumberofworkersrequiredtoperformthetaskand*themaximumstaytimeforeachindividualwhowillbeutilized.Assumenodoseintransitandroundofftothenearestminutebelowthe limit.TimeCriticalTask:NOValidationTime:
* NGGM-PM-0002, RADIATION CONTROL AND PROTECTION MANUAL Initiating Cue:     The site emergency workers listed in the table below are available.
HARRIS08NRCRO-SROA3Revision2NUREG1021,Revision9 Appendix C Job Performance Measure Worksheet SIMULATOR SETUP N/AFormES-C-1 HARRIS08 NRC RO-SROA3Revision2NUREG1021,Revision9 Appendix CPage4of7 PERFORMANCE INFORMATIONFormES-C-1 (Denote Critical Steps with a check mark)START TIME: Performance Step: 1 Standard: Comment: PerformanceStep:2 Standard: Comment:PerformanceStep:3 Standard: Comment: Determine total estimateddoseforthetask.
They will be utilized from lowest to highest accumulated TEDE dose.
16 R/hourx.75hours=12Rem Determinethedoselimitforsite emergency workers Per PEP-330-Attachment1:5Rem Determine the number of people required WorkersA,B,andCwouldhavetobeusedtoreachthe12Remtotal estimateddose(4700+4450+4300=13.45)
Using the minimum number of workers possible, DETERMINE:
HARRIS08 NRC RO-SRO A3 Revision 2 NUREG1021,Revision9 Appendix CPerformanceStep:4 Standard: Comment:Page5of7 PERFORMANCE INFORMATIONStayTimefor Workers A: 4.7/16x60minutes
* the total number of workers required to perform the task and
=17minutes B: 4.55/16x60minutes
* the maximum stay time for each individual who will be utilized.
=17minutes C: 4.30/16x60minutes
Assume no dose in transit and round off to the nearest minute below the limit.
=16minutesFormES-C-1 Terminating Cue:STOPTIME: After the maximum stay time for the workerstobeusedis calculated:
Time Critical Task: NO Validation Time:
Evaluation on thisJPMis complete.HARRIS08 NRC RO-SROA3Revision2NUREG1021,Revision9 AppendixCPage6of 7 VERIFICATION OF COMPLETIONFormES-C-1 Job PerformanceMeasureNo.:2008NRCRO-SROA3 Examinee's Name:DatePerformed:FacilityEvaluator:NumberofAttempts:TimetoComplete:
HARRIS08 NRC RO-SRO A3 Revision 2                                  NUREG 1021, Revision 9
 
Appendix C                   Job Performance Measure         Form ES-C-1 Worksheet SIMULATOR SETUP N/A HARRIS08 NRC RO-SRO A3 Revision 2                    NUREG 1021, Revision 9
 
Appendix C                                  Page 4 of 7                      Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
START TIME:
Performance Step: 1       Determine total estimated dose for the task.
Standard:                16 R/hour x .75 hours = 12 Rem Comment:
Performance Step: 2      Determine the dose limit for site emergency workers Standard:                Per PEP-330 - Attachment 1: 5 Rem Comment:
~  Performance Step: 3      Determine the number of people required Standard:                Workers A, B, and C would have to be used (~) to reach the 12 Rem total estimated dose (4700 + 4450 + 4300 = 13.45)
Comment:
HARRIS08 NRC RO-SRO A3 Revision 2                                   NUREG 1021, Revision 9
 
Appendix C                            Page 5 of 7                      Form ES-C-1 PERFORMANCE INFORMATION
~  Performance Step: 4 Stay Time for Workers Standard:           A: 4.7/16 x 60 minutes = 17 minutes B: 4.55/16 x 60 minutes = 17 minutes C: 4.30/16 x 60 minutes = 16 minutes Comment:
Terminating Cue:       After the maximum stay time for the workers to be used is calculated: Evaluation on this JPM is complete.
STOP TIME:
HARRIS08 NRC RO-SRO A3 Revision 2                          NUREG 1021, Revision 9
 
Appendix C                            Page 6 of 7               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC RO-SRO A3 Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question Documentation:
Question: Response: Result:Examiner'sSignature:
Question:
SAT UNSAT Date:HARRIS08NRCRO-SROA3Revision2NUREG1021,Revision9 Appendix CPage7of7JPMCUE SHEETFormES-C-1 INITIAL CONDITIONS:
 
INITIATING CUE:*AlargebreakLOCAhas occurred.*TheECCSisincoldleg recirculation.*RHRPump"B"isrunning.RHRPump"A"showed evidenceofgasbindingandwasstopped.*ASiteArea Emergency(SAE)isineffect.*The Emergency Engineering Organization has determinedthattheRHRPump"A"shouldbeventedtoensurethatabackupisavailable.*Thegeneralradiationlevelintheareais16R/hour*TheOSC estimatesthatthetotaltaskwill take.75 hours.*TheSite Emergency Coordinator has specifiedthathe/shewillnot authorizeanextensiontothesite emergency workersdoselimitfor performanceofthistask.Thesite emergencyworkerslistedinthetablebeloware available.Theywillbeutilizedfromlowesttohighest accumulatedTEDEdose.Usingtheminimumnumberof workers possible, DETERMINE:*thetotal number of workersrequiredtoperformthetask and*the maximumstaytimeforeachindividualwhowillbe utilized.Assumenodoseintransitandroundofftothenearestminute belowthelimit.Site Emergency Worker AccumulatedTEDEDoseThisYear A300mr B450mr C700mr D800mr E850mr F1000mr G1050mr H1150mr I1200mr J1300mr K1500mr L1650mr HARRIS08NRCRO-SROA3Revision2NUREG1021,Revision9 Appendix C Facility:TaskTitle:KIA
===Response===
Result:                     SAT            UNSAT Examiner's Signature:                               Date:
HARRIS08 NRC RO-SRO A3 Revision 2                        NUREG 1021, Revision 9
 
Appendix C                                    Page 7 of 7                        Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
* A large break LOCA has occurred.
* The ECCS is in cold leg recirculation.
* RHR Pump "B" is running. RHR Pump "A" showed evidence of gas binding and was stopped.
* A Site Area Emergency (SAE) is in effect.
* The Emergency Engineering Organization has determined that the RHR Pump "A" should be vented to ensure that a backup is available.
* The general radiation level in the area is 16 R/hour
* The OSC estimates that the total task will take. 75 man-hours.
* The Site Emergency Coordinator has specified that he/she will not authorize an extension to the site emergency workers dose limit for performance of this task.
INITIATING CUE:            The site emergency workers listed in the table below are available. They will be utilized from lowest to highest accumulated TEDE dose.
Using the minimum number of workers possible, DETERMINE:
* the total number of workers required to perform the task and
* the maximum stay time for each individual who will be utilized.
Assume no dose in transit and round off to the nearest minute below the limit.
Site Emergency Worker                     Accumulated TEDE Dose This Year A                                              300 mr B                                              450 mr C                                              700 mr D                                              800 mr E                                              850 mr F                                              1000 mr G                                              1050 mr H                                              1150 mr I                                              1200 mr J                                              1300 mr K                                              1500 mr L                                              1650 mr HARRIS08 NRC RO-SRO A3 Revision 2                                    NUREG 1021, Revision 9
 
Appendix C                                 Job Performance Measure                      Form ES-C-1 Worksheet Facility:               HARRIS                                  Task No.:  345001H602 Task
 
==Title:==
Evaluate a Change in Conditions on      JPM No.:   2008 NRC JPM SRO an Existing EAL                                      A4 KIA  


==Reference:==
==Reference:==
2.4.41 (4.1)
Examinee:                                                    NRC Examiner:
Facility Evaluator:                                          Date:
Method of testing: This JPM can be performed in any setting with the required references available.
Simulated Performance:                                      Actual Performance:        x Classroom            X  Simulator              Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:        See Plant Conditions handout.
Task Standard:              Upgrade EAL to GE and correct PAR within required time.
Required Materials:        None General
==References:==
* PEP-110, EMERGENCY CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS, Rev. 16
* PEP-230, CONTROL ROOM OPERATIONS, Rev.14
* PEP-310, NOTIFICATIONS AND COMMUNICATIONS, Rev. 21 Handouts:
* Attached Initial Conditions
* EAL Flowcharts
* PEP-110
* PEP-310
* EP/EAL Guidelines
* PEP-230, Attachment 1 - SITE EMERGENCY COORDINATOR Initiating Cue:            You are the Site Emergency Coordinator. Review the plant conditions handout sheet and determine the current Emergency Action Level (EAL). This is a time critical JPM. The clock starts after you have reviewed the Plant Conditions sheet.
Time Critical Task:        YES - 15 minutes to classify then 15 more minutes to make the PAR.
HARRIS 2008 NRC SRO A4 Revision 2                                          NUREG 1021, Revision
Appendix C                      Job Performance Measure                  Form ES-C-1 Worksheet Validation Time:  10 minutes to classify, 12 minutes for PAR/Emergency Notification Form.
HARRIS 2008 NRC SRO A4 Revision 2                                NUREG 1021, Revision
Appendix C                                    Page 3 of 7                        Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a ~)
Start Time:          _
Performance Step: 1        Evaluate changing conditions.
Standard:                  Compares conditions against EAL Flowchart criteria.
Evaluator Cue:
* Provide Initial Conditions sheet (last page of JPM).
* Provide reference materials if not available in the JPM performance location.
  . Comment:                  Classification Start Time          _
-Y  Performance Step: 2        Determine EAL.
Standard:                  Upgrade to GE (2-1-4) required:
* RCS Breached
* Fuel Breached - DEI sample> 300 uCi/cc
* CNMT Jeopardized - Pressure> 3 PSIG Evaluator Note:
* It may be necessary to cue the PAR performance. The facility normally splits the EAL and the PAR into two JPM's.
* If the applicant incorrectly classifies then skip to the Evaluator Cue in Performance Step 3.
Comment:                  Classification End Time/PAR Start Time              _
HARRIS 2008 NRC SRO A4 Revision 2                                      NUREG 1021, Revision


Examinee: Job Performance Measure Worksheet HARRISTaskNo.:EvaluateaChangeinConditionsonJPMNo.:anExistingEAL2.4.41(4.1)NRCExaminer:FormES-C-1 345001H6022008NRCJPMSRO A4FacilityEvaluator:
Appendix C                              Page 4 of 7                          Form ES-C-1 PERFORMANCE INFORMATION
Date:Methodoftesting:ThisJPMcanbe performed in any settingwiththe required references available.SimulatedPerformance:
Performance Step: 3  Determine PAR (PEP-230, Attachment 1, Step 10).
ClassroomREADTOTHE EXAMINEE X SimulatorActualPerformance:
Standard:           Refers to PEP-110, Attachment 3:
Plant xIwillexplaintheinitialconditions,whichstepstosimulateordiscuss,andprovideinitiatingcues.Whenyoucompletethetasksuccessfully,theobjectiveforthisJob PerformanceMeasurewillbesatisfied.InitialConditions:SeePlant Conditions handout.TaskStandard:UpgradeEALtoGEand correctPARwithinrequiredtime.RequiredMaterials:NoneGeneral
PROTECTIVE ACTION RECOMMENDATION:
* EVACUATE: 2 mile radius
* EVACUATE: Subzones A, B, L
* SHELTER: Subzones C, D, E, F, G, H, I, J, K, M, N Evaluator Cue:      The computer program is not available. Hand write a paper copy of the Manual Notification Form in accordance with PEP-230, Attachment 1, Step 11.b.
Comment:
~  Performance Step: 4  Complete the ENF.
Standard:           Critical Elements:
* Block 4: GE
* Block 4 EAL: 2-1-4
* Block 5 PAR: Evacuate 2 mile radius and Subzones A, B, L; Shelter Subzones C, D, E, F, G, H, I, J, K,M,N
* Block 6 Emergency Release: Is Occurring 0
* Block 9 Wind Direction from: 126
* Block 10: DECLARATION; Current TIME; Current DATE
* Block 17: Applicant signature/Title/Current Time/ Current Date
* Provide form to Communicator Evaluator Note:      An ENF KEY is attached, Comment:            PAR Notification End Time                _
Terminating Cue:       After the ENF is handed to the communicator: Evaluation on this JPM is complete.
HARRIS 2008 NRC SRO A4 Revision 2                                    NUREG 1021, Revision


==References:==
Appendix C                             Page 5 of 7                Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC JPM SRO A4 Examinee's Name:
*PEP-110, EMERGENCY CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS,Rev.16*PEP-230, CONTROL ROOM OPERATIONS, Rev.14*PEP-310, NOTIFICATIONS AND COMMUNICATIONS,Rev.21 Handouts:InitiatingCue:TimeCriticalTask:*AttachedInitial Conditions*EALFlowcharts*PEP-110*PEP-310*EP/EAL Guidelines*PEP-230, Attachment1-SITE EMERGENCY COORDINATORYouaretheSite Emergency Coordinator.Reviewtheplantconditionshandoutsheetand determinethecurrentEmergencyActionLevel(EAL).ThisisatimecriticalJPM.TheclockstartsafteryouhavereviewedthePlant Conditions sheet.YES-15minutesto classifythen15moreminutestomakethePAR.HARRIS2008NRCSROA4Revision2NUREG1021,Revision Appendix C Job Performance Measure WorksheetFormES-C-1ValidationTime:10minutestoclassify,12minutesfor PAR/Emergency Notification Form.HARRIS2008NRCSROA4Revision2NUREG1021,Revision Appendix C(DenoteCriticalStepswithaStartTime:_Page3of7 PERFORMANCE INFORMATIONFormES-C-1 PerformanceStep:1 Standard: Evaluator Cue:.Comment:-Y PerformanceStep:2 Standard: Evaluator Note: Comment:Evaluatechangingconditions.
Date Performed:
Compares conditionsagainstEAL Flowchart criteria.*Provide Initial Conditions sheet (lastpageofJPM).
Facility Evaluator:
*Provide reference materials if not availableintheJPM performance location.Classification StartTime_Determine EAL.UpgradetoGE(2-1-4)required:*RCSBreached*FuelBreached-DEI sample>300uCi/cc*CNMT Jeopardized
Number of Attempts:
-Pressure>3PSIG*Itmaybe necessarytocue the PAR performance.
Time to Complete:
The facility normally splitstheEALandthePAR into two JPM's.*If the applicant incorrectly classifies then skiptothe EvaluatorCuein Performance Step 3.ClassificationEndTime/PAR StartTime_HARRIS2008NRCSROA4Revision2NUREG1021,Revision Appendix CPerformance Step: 3Page4of7 PERFORMANCE INFORMATION DeterminePAR(PEP-230, Attachment1,Step10).FormES-C-1 Standard: Evaluator Cue: Comment:Performance Step: 4 Standard: Evaluator Note: Comment: Terminating Cue:ReferstoPEP-110, Attachment 3: PROTECTIVE ACTION RECOMMENDATION:*EVACUATE:2mileradius
*EVACUATE: SubzonesA,B,L*SHELTER: SubzonesC,D,E,F,G,H,I, J,K,M,N The computer program is not available.
Hand write a paper copy of the Manual Notification Form in accordance with PEP-230, Attachment 1, Step 11.b.CompletetheENF.CriticalElements:*Block4:GE*Block4EAL:2-1-4*Block 5 PAR: Evacuate2mileradiusand SubzonesA,B, L;Shelter SubzonesC,D,E,F,G,H,I,J, K,M,N*Block6 EmergencyRelease:IsOccurring*Block9WindDirectionfrom:126 0*Block10: DECLARATION; Current TIME;Current DATE*Block17: Applicant signature/Title/Current Time/Current Date*Provideformto CommunicatorAnENFKEYis attached, PAR Notification End Time_After theENFis handed to the communicator:
Evaluation on thisJPMis complete.HARRIS2008NRCSROA4Revision2NUREG1021,Revision Appendix CPage5of7 VERIFICATION OF COMPLETIONFormES-C-1 Job PerformanceMeasureNo.:2008NRCJPMSROA4 Examinee's Name:DatePerformed:FacilityEvaluator:
NumberofAttempts:TimetoComplete:
Question Documentation:
Question Documentation:
Question: Response: Result: Examiner's Signature:
Question:
SAT UNSAT Date:HARRIS2008NRCSROA4Revision2NUREG1021,Revision AppendixC INITIAL CONDITIONS:Page6of7JPMCUESHEETSeePlantConditionshandout.FormES-C-1INITIATINGCUE:YouaretheSite EmergencyCoordinator.Reviewtheplant conditionshandoutsheetanddeterminethecurrent EmergencyActionLevel(EAL).ThisisatimecriticalJPM.TheclockstartsafteryouhavereviewedthePlantConditionssheet.HARRIS2008NRCSROA4Revision2NUREG1021,Revision Appendix CPage7of7JPMCUESHEET2008NRCJPMSROA4Plant ConditionsFormES-C-1
 
*IncreasingRCSleakagerequireda MANUALReactorTripandSafetyInjection*The TDAFWPumpisclearedandtagged*TheRCSleak escalatedtoa large-breakLOCAwhilethecrewwas performing PATH-1*Containment Spray actuated*ThereisaREDCSFon INTEGRITY*TheEAL NetworkwasenteredatPointX*ASiteArea Emergency(SAE)isineffectwiththeRCS breached(EAL2-1-3)and Containment jeopardized*Outside temperatureis62 of*Thunderstormsaremovingintothearea*Thewindisblowingat12MPHfrom126 degrees*SincetheSAE declaration, the followinghasoccurred:*Plant computersaredownwhichwillrequireany additional notificationstobedoneusingamanual notification form*Off-sitepowerwaslostandEDG1Bfailedwhile starting*ECCScoldleg recirculation alignmentonTrain"A"wasjust completed*Containment Pressureis3.8PSIG,lowering slowly*ContainmentAreaRadiation MonitorsareinHIGHalarm,risingslowly
===Response===
*ContalnrnentHighRange Monitorsarerisingbutnotinalarm*PlantVentStack#1 Monitorisrisingslowlybutnotinalarm
Result:                     SAT            UNSAT Examiner's Signature:                               Date:
*ChargingPump"A"Room MonitorwentintoHIGHalarmaftercoldleg recirculationwasinitiated
HARRIS 2008 NRC SRO A4 Revision 2                          NUREG 1021, Revision
*Chemistry has analyzed a sampleandreportsanIodineDose Equivalent RCS concentrationof410 uCilccHARRIS2008NRCSROA4Revision2NUREG1021,Revision Attachment3-PROTECTIVE ACTION RECOMMENDATION PROCESS Sheet 1 of 2 No No Fuel Breach)No (Yes/due to Res Breach)2 MliileRadius
 
:5 Miles Downwind IPEP-110 Wiind IEvacuaie Shelter Direction Subzones:Subzooes
Appendix C                             Page 6 of 7                          Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:     See Plant Conditions handout.
-"-010'AB,C,O;H,U<.L 01 1&deg;-
INITIATING CUE:        You are the Site Emergency Coordinator. Review the plant conditions handout sheet and determine the current Emergency Action Level (EAL). This is a time critical JPM. The clock starts after you have reviewed the Plant Conditions sheet.
E"F"G,J,M.N cse--DIg-::
HARRIS 2008 NRC SRO A4 Revision 2                                  NUREG 1021, Revision
E,F ,G.H.N-,
 
102(1-, 124 a E"F"G,HJ.J,N-14&AB,C,D,KL,M.Nl 147c.-,
Appendix C                                  Page 7 of 7                          Form ES-C-1 JPM CUE SHEET 2008 NRC JPM SRO A4 Plant Conditions
F,G"H"I.,-J 192(1-, 214<: A*B,C,D,E",K,l F,G"H"I,J"M,H 215 t ,-zse-A.B,C,D,E"K,l 237 t\-, 2&sect;9a A,,B,C,D,E.F,,K,l GI'H.tJ..M.N
* Increasing RCS leakage required a MANUAL Reactor Trip and Safety Injection
:260(1-32&A"B,C,D,F,G.HJ<,l E."I"J"M.N 327 t ,-347(1 A.B,C,D,H,K,L E"F"G.I,J,M.NRev.16 Wind Evacuat,e; She-Iter rn recti 00 Subzones Subzone'S{From'tfj 327 0-010='A,D,I<B"C"E,F,G"H,,1,,J,,L,M,N 011 0-05&'A,K n57&deg; A tUL 8 F G_HL.LMN 1251;1-1'91=A,H"L C.D,E"F.G,H,I,J,KM.N I 1920-214.: A,B C,D,E.F"G,H,tJ,K.LM.N 215 Cl-259='A,B.e 2600-A,e ,G"H"LJ.,K,l,M,N 282 c-3(14':'A,C,D B"E,f,G,.H"I"JJ<.LM,N 305(1-A,D B"C,,E,F,G.,H,,I,,J,,K,LM.N Page 18 of 261
* The TDAFW Pump is cleared and tagged
=Attachment3-PROTECTIVE ACTION RECOMMENDATION PROCESS Sheet 2 of 2 Acceptable changes in initial PARS would include expanding evacuation but would not allow a change from evacuation of zones to sheltering of those zones.1.Indicationsthatsubstantialcoredamageis imminentorhasoccurredinclude:a)Core damage>1&deg;A, melt.b)CoreExit Thermocouple readings2300&deg;F.c)Core uncovered>30minutes.2.Indicationsthata significantlossofreactorcoolant is imminentorhasoccurredinclude:
* The RCS leak escalated to a large-break LOCA while the crew was performing PATH-1
a)Containment radiation reading>10,000RlHrwithoutspray or>4,000R/Hrwithspray.
* Containment Spray actuated
b)Containmenthydrogengas concentration>
* There is a RED CSF on INTEGRITY
1 o.k>.c)Rapidvessel depressurization.d)Alargebreaklossofcoolantaccident.3.Indicationsthat containmentfailure(primaryorS/G)is imminentorhasoccurredareindicatedby:a)Areleaseofradioactivity greaterthantheprojecteddoseofeither:*1000mRemTEDEatorbeyondthesiteboundary.5000mRemThyroidCDEatorbeyondthesiteboundary.Ora measureddoserateofeither:
* The EAL Network was entered at Point X
>1000 mRem/hratorbeyondthesiteboundary.
* A Site Area Emergency (SAE) is in effect with the RCS breached (EAL 2-1-3) and Containment jeopardized
1-131 equivalent concentration>3.9E-6 IJCi/ccatorbeyondthesiteboundary.b)Primary containmentpressurecannotbemaintainedbelowdesignbasispressureof45psig.c)Primary containment H 2gasconcentrationcannotbemaintainedbelow combustiblelimitof4%byvolume.d)Faulted/RupturedS/Gwithareliefvalveopen.4.Accidentswhichresultinadirectreleasepathwaytothe environmentwillmostlikelybethyroiddoselimiting.ForafaultedandrupturedS/G,waterlevelmustbebelowthetubebundles(S/GNarrowRange<25%normal containmentconditionsor<40%adverse containmentconditions)withareliefvalveopenbeforeitisconsideredadirectreleasepathwaytotheenvironment.For circumstancesinvolvingadirectreleasepathwaytotheenvironment:
* Outside temperature is 62 of
a)Consider anyFuelBreach sufficient to warrant the determinationthatsubstantialcoredamagehasoccurred.
* Thunderstorms are moving into the area
b)Consider anyRCSBreach sufficienttowarrantthe determinationthatasignificantlossofreactorcoolanthasoccurred.NOTE:Adirectreleaseisdefinedasapathwayfromthe containmenttoanyenviron-mentoutsidethe containment when containmentorsystemisolationisrequiredduetoasafetyinjectionsignal, containment pressure greaterthan3psig,oravalid containmentventilationisolationsignalandthepathwaycannotbeisolatedfromtheMainControlRoom.
* The wind is blowing at 12 MPH from 126 degrees
Containmentmonitorscanprovideindicationofbothcore damageandRCSbreach.Monitorreadingsusedtoquantifyan amount of damageorcoolantleakageshouldbe complimentedbyotherindicationsandengineering judgment.Ifareleaseisinprogress:*Performdose assessmentassoonaspossibleto determineifPAGsareexceededandifadditionalSubzonesrequireevacuation.*AddanySubzonesrequiringevacuationas determinedbydose assessmenttotheplant-basedPARs.Ifnoreleaseisinprogress:*Performdoseprojectionon possibleconditionsastimepermitsto determineifPAGscouldbe exceeded.ConsideraddinganySubzonesrequiring"evacuationasdeterminedbydoseprojectiontotheplant-basedPARs.
* Since the SAE declaration, the following has occurred:
I PEP-110Rev.16Page19of261 Attachment9-NUCLEAR POWER PLANT EMERGENCY NOTIFICATION FORM rz!::Of 11.IDRILL I&sect;JACTUALEVENT MESSAGE#_N Today 2.1 INITIAL@JFOLLOW-UPNOTIFICATION:TIME ow DATE__/__/__AUTHENTICATION#_3.SITE: HNPConfirmationPhone#(__)_4.EMERGENCYUNUSUALEVENT I&sect;I ALERT 19SITEAREAEMERGENCY*GENERALEMERGENCY CLASSIFICATION:BASEDONEAL
* Plant computers are down which will require any additional notifications to be done using a manual notification form
#2-1-4EALDESCRIPTION:
* Off-site power was lost and EDG 1B failed while starting
3 FPBs Breached/Jeopardized 19HasOccurredIIsOccurring5.PROTECTIVEACTION RECOMMENDATIONS:NONE IEVACUATE 2 mile radius and Subzones A,B,L ISHELTER Subzones C,D,E,F,G,H,I,J,K,M,N IQI CONSIDERTHEUSEOF KI (POTASSIUMIODIDE)IN ACCORDANCE WITH STATEPLANSANDPOLICY.
* ECCS cold leg recirculation alignment on Train "A" was just completed
I&sect;OTHER_6.EMERGENCYRELEASE:
* Containment Pressure is 3.8 PSIG, lowering slowly
IUnderevaluationShutdownatTime Date_/__/_ShutdownatTime Date_/__/_ShutdownatTime Date_/__/_ri\I Not applicable BWithinnormaloperating I!j limitsImprovingIStableWindDirection*from 126 degreesAbovenormaloperating limits 19 DegradingWindSpeed*
* Containment Area Radiation Monitors are in HIGH alarm, rising slowly
12 mph(*NotRequiredforInitialNotifications)
* Contalnrnent High Range Monitors are rising but not in alarm
Precipitation*StabilityClass*I&sect;J 19 (QJ I&sect;lEI I&sect;I10.IDECLARATION I&sect;J TERMINATION TimeDate//_(Enters Current Date and Time)11.AFFECTEDUNIT(S):*
* Plant Vent Stack #1 Monitor is rising slowly but not in alarm
[J[I I6ill 12.UNITSTATUS:
* Charging Pump "A" Room Monitor went into HIGH alarm after cold leg recirculation was initiated
I U1_0_0/0 Power(UnaffectedUnit(s)StatusNotRequiredforInitial Notifications)U2__%Power&sect;U3__0/0 Power 7.RELEASESIGNIFICANCE:
* Chemistry has analyzed a sample and reports an Iodine Dose Equivalent RCS concentration of 410 uCilcc HARRIS 2008 NRC SRO A4 Revision 2                                        NUREG 1021, Revision
8.EVENTPROGNOSIS:
 
9.METEOROLOGICALDATA:13.REMARKS:
tE~
_FOLLOW-UP INFORMATION (Lines 14 through 16 Not Required for Initial Notifications)
                                                                                                                    ~
EMERGENCY RELEASEDATA.NOTREQUIREDIFLINE6AISSELECTED.
Attachment            3 - PROTECTIVE ACTION RECOMMENDATION PROCESS Sheet 1 of 2 No No Fuel Breach)
14.RELEASECHARACTERIZATION:
No (Yes/ due to           Res   Breach) 2 MliileRadius :5 Miles Downwind Wiind             IEvacuaie         Shelter               Wind            Evacuat,e;            She-Iter Direction         Subzones       :Subzooes             rn recti 00        Subzones            Subzone'S
TYPE:Elevated I&sect;I Mixed 19 Ground UNITS:Ci I&sect;J Ci/sec 19EstimatedReleaseDurationHours
          ~From                                                    {From 'tfj 34a~
____Date_/__/__StopTime_____Date_/__/__StopTime_MAGNITUDE:NobleGases:
                - 010' AB,C,O;H,U<.L     E.F~G,J,M.N                     -
lodines: Particulates:
327 0 010='        A,D,I<      B"C"E,F,G"H,,1,,J,,L,M,N 01 1&deg; - ~      A1B,C,D,HJ.t'~L  E"F"G,J,M.N              011 0 - 05&'        A,K          B.C"D"E,f,G"H.I"J"L,~,4.N cse- -DIg-::    AB,C,o,tJ,Y~L.M  E,F,G.H.N                n57&deg; -1?4~          A tUL        8 C"D~E F G_HL.LMN 080~ -, 101~    ~B,C,D,J,I<."L,M E.F~G,.HJ,N                      -
Other:_FORM:AirborneStartTime Date_/__/__I&sect;JLiquidStartTime Date_/__/__15.PROJECTIONPARAMETERS:Projectionperiod:HoursAdultThyroidCDE(mrem)
1251;1 1'91=        A,H"L        C.D,E"F.G,H,I,J,KM.N        I 102(1 -, 124a  AFB,C,D,r~l,U    E"F"G,HJ.J,N            1920- 214.:        A,B          C,D,E.F"G,H,tJ,K.LM.N 125~ 14&-      AB,C,D,KL,M.Nl    E"F~G,HJ.J              215  Cl
DISTANCEProjectionperformed:Time Date_/__/__TEDE(mrem) 16.PROJECTEDDOSE:Siteboundary 2 Miles 5 Miles10MilesPage33 of 51 I Time Time Date_/__/__Date//IRev.21 (Sign and Date)Title--------RECEIVED BY: I PEP-31017.APPROVED BY: NOTIFIED BY:}}
                                                                            -259='     A,B.e        D,E"F.G,HJ.J,K.L,MJ~
147c. -, 191'~  AfB,C,D,E~K,LM.t4 F,G"H"I.,-J              2600 - 2B1~        A,e          B"D~E,F ,G"H"LJ.,K,l,M,N 192(1 -, 214<: A*B,C,D,E",K,l    F,G"H"I,J"M,H                    -
282c 3(14':'        A,C,D        B"E,f,G,.H"I"JJ<.LM,N 215 t , - zse-  A.B,C,D,E"K,l    f,G"HJ"J~M,N             305(1 -   328~      A,D          B"C,,E,F,G.,H,,I,,J,,K,LM.N 237 t \ -, 2&sect;9a A,,B,C,D,E.F,,K,l GI'H.tJ..M.N
:260(1 - 32&    A"B,C,D,F,G.HJ<,l E."I"J"M.N 327 t , - 347(1 A.B,C,D,H,K,L    E"F"G.I,J,M.N IPEP-110                                          Rev. 16                                                                Page 18 of 261
 
                                                                                                    ~
Attachment 3 - PROTECTIVE ACTION RECOMMENDATION PROCESS
                                                                                                    =
Sheet 2 of 2 Acceptable changes in initial PARS would include expanding evacuation but would not allow a change from evacuation of zones to sheltering of those zones.
: 1. Indications that substantial core damage is imminent or has occurred include:
a) Core damage> 1&deg;A, melt.
b) Core Exit Thermocouple readings        ~ 2300&deg; F.
c)  Core uncovered> 30 minutes.
: 2. Indications that a significant loss of reactor coolant is imminent or has occurred include:
a) Containment radiation reading> 10,000 RlHr without spray or> 4,000 R/Hr with spray.
b) Containment hydrogen gas concentration> 1o.k>.
c) Rapid vessel depressurization.
d) A large break loss of coolant accident.
: 3. Indications that containment failure (primary or S/G) is imminent or has occurred are indicated by:
a) A release of radioactivity greater than the projected dose of either:
* 1000 mRem TEDE at or beyond the site boundary.
5000 mRem Thyroid CDE at or beyond the site boundary.
Or a measured dose rate of either:
                    >1000 mRem/hr at or beyond the site boundary.
1-131 equivalent concentration> 3.9 E-6 IJCi/cc at or beyond the site boundary.
b) Primary containment pressure can not be maintained below design basis pressure of 45 psig.
c)   Primary containment H2 gas concentration can not be maintained below combustible limit of 4%
by volume.
d) Faulted/Ruptured S/G with a relief valve open.
: 4. Accidents which result in a direct release pathway to the environment will most likely be thyroid dose limiting. For a faulted and ruptured S/G, water level must be below the tube bundles (S/G Narrow Range < 25% normal containment conditions or < 40% adverse containment conditions) with a relief valve open before it is considered a direct release pathway to the environment. For circumstances involving a direct release pathway to the environment:
a) Consider any Fuel Breach sufficient to warrant the determination that substantial core damage has occurred.
b) Consider any RCS Breach sufficient to warrant the determination that a significant loss of reactor coolant has occurred.
NOTE: A direct release is defined as a pathway from the containment to any environ-ment outside the containment when containment or system isolation is required due to a safety injection signal, containment pressure greater than 3 psig, or a valid containment ventilation isolation signal and the pathway cannot be isolated from the Main Control Room.
Containment monitors can provide indication of both core damage and RCS breach. Monitor readings used to quantify an amount of damage or coolant leakage should be complimented by other indications and engineering judgment.
If a release is in progress:
* Perform dose assessment as soon as possible to determine if PAGs are exceeded and if additional Subzones require evacuation.
* Add any Subzones requiring evacuation as determined by dose assessment to the plant-based PARs.
If no release is in progress:
* Perform dose projection on possible conditions as time permits to determine if PAGs could be exceeded. Consider adding any Subzones requiring "evacuation as determined by dose projection to the plant-based PARs.
I PEP-110                                          Rev. 16                                            Page 19 of 261
: 1. I Attachment 9 - NUCLEAR POWER PLANT EMERGENCY NOTIFICATION FORM DRILL        I&sect;J ACTUAL EVENT rz!::Of MESSAGE #
1
                    ~                                                              N                      Today 2.1 INITIAL          @JFOLLOW-UPNOTIFICATION:TIME                                    ow        DATE_ _/_ _/_ _ AUTHENTICATION #                                _
: 3. SITE:        HNP                                                                                        Confirmation Phone # (_ _)                            _
: 4. EMERGENCY CLASSIFICATION:
                              ~ UNUSUAL EVENT                  I&sect;I ALERT              19 SITE AREA EMERGENCY
* GENERAL EMERGENCY BASED ON EAL #          2 4                  EAL DESCRIPTION:                3 FPBs Breached/ Jeopardized
: 5. PROTECTIVE ACTION RECOMMENDATIONS:                                       ~ NONE IEVACUATE 2 mile                radius and Subzones A,B,L ISHELTER Subzones C,D,E,F,G,H,I,J,K,M,N IQI CONSIDER THE USE OF KI (POTASSIUM IODIDE) IN ACCORDANCE WITH STATE PLANS AND POLICY.
I&sect; OTHER                                                                                                                                      _
: 6. EMERGENCY RELEASE:                          ~None                  I  Is Occurring                  19 Has Occurred
: 7. RELEASE SIGNIFICANCE:                      ri\I Not applicable I!j B Within limits normal operating        Above normal operating limits I Under evaluation
: 8. EVENT PROGNOSIS:                            ~ Improving            I Stable                            19 Degrading
: 9. METEOROLOGICAL DATA:                            Wind Direction* from          126      degrees        Wind Speed*      12 mph
(*Not Requiredfor Initial Notifications)          Precipitation*                                          Stability Class* ~    I&sect;J  19  (QJ I&sect;    lEI  I&sect;I
: 10. I DECLARATION I&sect;J TERMINATION                                        Time                          Date        /      /        _
(Enters Current Date and Time)
: 11. AFFECTED UNIT(S):              *    [J    [I        I6ill
: 12. UNIT STATUS:                                                I  U1 _0_0/0 Power        Shutdown at Time                    Date _ /_ _/ _
(Unaffected Unit(s) Status Not Required for Initial Notifications)                                            ~ U2 _ _% Power            Shutdown at Time                    Date _ /_ _/ _
                                                                &sect;  U3 _ _0/0 Power        Shutdown at Time                    Date _ /_ _/ _
: 13. REMARKS:                                                                                                                                                  _
FOLLOW-UP INFORMATION (Lines 14 through 16 Not Required for Initial Notifications)
EMERGENCY RELEASE DATA. NOT REQUIRED IF LINE 6 A IS SELECTED.
: 14. RELEASE CHARACTERIZATION:                      TYPE: ~ Elevated          I&sect;I Mixed  19  Ground          UNITS: ~ Ci    I&sect;J  Ci/sec 19 ~Ci/sec MAGNITUDE:          Noble Gases:                    lodines:                    Particulates:              Other:                _
FORM: ~ Airborne        Start Time _ _ _ _ Date _ /_ _/__Stop Time                                      _ Date _ /_ _/__
I&sect;J Liquid      Start Time _ _ _ _ Date _ /_ _/__Stop Time                                      _ Date _ /_ _/__
: 15. PROJECTION PARAMETERS:                  Projection period:                    Hours          Estimated Release Duration                  Hours Projection performed:      Time                    Date _ /_ _/__
: 16. PROJECTED DOSE:                        DISTANCE                                    TEDE (mrem)                    Adult Thyroid CDE (mrem)
Site boundary 2 Miles 5 Miles 10 Miles
: 17. APPROVED BY:                (Sign and Date)                            Title                                    Time                Date_/_ _/__
NOTIFIED                                        RECEIVED BY:                                              BY:                                                    Time                Date      /    /
I PEP-310                                      I                          Rev. 21                                              Page 33 of 51       I}}

Latest revision as of 00:09, 13 March 2020

March 05000400-08-301 Exam Final JPMs (Admin)
ML082200212
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/07/2008
From:
- No Known Affiliation
To:
NRC/RGN-II
References
50-400/08-301
Download: ML082200212 (86)


Text

Final Submittal (Blue Paper)

Final Submittal (Blue Paper)

Ifl£e:LsaoB{50 /

Ope(ClT'f'l~ "Te5{ ~J.1I~ "Sllo ~3)3JUU?

FINAL JPMS ADMINISTRATIVE JPMs

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.: 301144H601 Task

Title:

Determine the Cold, Xenon-free JPM No.: 2008. NRC JPM Boron Concentration Requirement RO/SRO A1-1 for a Natural Circulation Cooldown KIA

Reference:

2.1.25 (2.8/3.1)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator - - - Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

INITIAL

  • The unit tripped due to a loss of off-site power. All control rods CONDITIONS: have inserted.
  • The operating crew is performing EPP-005, NATURAL CIRCULATION COOLDOWN.
  • The unit will be taken to Cold Shutdown.
  • PowerTrax is not available.
  • Current RCS Boron concentration is 1125 ppm.
  • Core Burnup is 130 EFPD.
  • RCS B-10 Atom Percent is 19.36
  • Temperature is 140°F.

Task Standard: Calculations within specified range.

Required Materials: Calculator General

References:

  • EPP-005, NATURAL CIRCULATION COOLDOWN
  • OST-1036, SDM CALCULATION MODES 1-5
  • Curve Book Handouts:
  • EPP-005, Step 7
  • OST-1036
  • Curve Book (Ensure Curve A-X-22 is available and unmarked) 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initiating Cue: USCG has directed you to perform step 7.a of EPP-005, determine the corrected Xe-free cold shutdown boron concentration using OST-1036.

Record values on this cue sheet once it is determined if SDM requirements are met by the current boron concentration.

C RODS _

CCURVE _

C REQ, _

C RCS, _

CSDM _

MET / NOT MET (Circle one)

Time Critical Task: NO Validation Time: 15 minutes 2008 HARRIS NRC RO-SRO At-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 3 of 8 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a ~)

Start Time: _

Performance Step: 1 Reviews EPP-005, Step 7.

Standard: Determines OST-1036 applies.

Evaluator Cue: Provide EPP-005, Step 7.

Comment:

Performance Step: 2 Locates/reviews OST -1036.

Standard: Determines OST-1036, Section 7.2 applies.

Evaluator Cue: Provide OST-1036.

Comment:

Performance Step: 3 Record the following:

  • Core burn up from MCR Status board.
  • Temperature for which this SDM calculation is taking credit.

Standard :;. From Initial Conditions, records:

  • 200°F, or less
  • 1125 ppm Comment:

2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Record the following:

  • RCS B-10 ATOM percent from MCR Status Board OR RWST B-10 Atom percent, IF following Core Reload.

Standard: Records 19.36 Evaluator Cue: RCS 8-10 ATOM percent from cue sheet Comment:

Performance Step: 5 Check rod status as follows:

  • If all rods are inserted, record CRODS = 0 in Step 7.2.2.a and N/A Step 7.2.2.b.

Standard: Records 0 in 7.2.2.a and N/A's 7.2.2.b.

Comment:

Performance Step: 6 Determine Xenon free SDM boron concentration, CSDM, as follows:

a. Record the following information:
  • Boron addition to compensate for stuck rods from Attachment 1 or Step 7.2.2.a.

Standard: Enters O.

Comment:

2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 5 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 Determine Xenon free SOM boron concentration, CSOM, as follows:

a. Record the following information:
  • Uncorrected required SOM boron concentration from curve A-X-22 (Use action level line on curve.)

Standard: Reads 2020 to 2040 ppm Evaluator Cue:

Comment:

Performance Step: 8 Determine required Xenon free SOM uncorrected boron concentration CREQ:

CREQ ~ CROOS + CCURVE CREQ= _

Standard: CREQ = 2020 to 2040 ppm Comment:

~ Performance Step: 9 Determine Xenon free SOM corrected boron concentration, CSOM:

19.9/Arcs x CREQ Standard: Divides 19.9 by 19.36 and multiplies by CREQ:

19.9/19.36 (2020 to 2040 ppm) =

Records 2076 to 2097 ppm Comment:

2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION

~ Performance Step: 10 Determine whether SDM requirements can be met by Xenon free SOM calculation:

Compare RCS boron concentration, CRCS, and Xenon free SOM corrected boron concentration, CSDM:

  • CSOM Xenon free SDM corrected boron concentration from Step 7.2.3.c.

If CRCS is less than or equal to CSDM, then continue with Step 7.2.5 to take credit for Xenon effects.

Standard: Determines current RCS boron concentration is <CSDM boron concentration.

Comment:

Terminating Cue: When the candidate proceeds to Step 7.2.5: This JPM is complete.

Stop Time: _

2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION QF COMPLETION Job Performance Measure No.: 2008 NRC JPM RO/SRO A1-1 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete: .

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The unit tripped due to a loss of off-site power. All control rods have inserted.
  • The operating crew is performing EPP-005, NATURAL CIRCULATION COOLDOWN.
  • The unit will be taken to Cold Shutdown.
  • PowerTrax is not available.
  • Current RCS Boron concentration is 1125 ppm.
  • Core Burnup is 130 EFPD.
  • RCS B-10 Atom Percent is 19.36
  • Temperature is 140°F.

INITIATING CUE: USCO has directed you to perform step 7.a of EPP-005, determine the corrected Xe-free cold shutdown boron concentration using OST-1036.

Record values on this cue sheet once it is determined if SDM requirements are met by the current boron concentration.

C RODS _

CCURVE _

CREQ _

CRCS _

C SDM _

MET / NOT MET (Circle one) 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 8 of 8 JPM CUE SHEET INITIAL CONDITIONS:

  • The unit tripped due to a toss of off-site power. All control rods have inserted.
  • The operating crew is performing EPP-005 NATURAL 7 CIRCULATION COOLDOWN.
  • The unit will be taken to Cold Shutdown.
  • PowerTrax is not available.
  • Current ReS Boron concentration is 1125 ppm.
  • Core Burnup is 130 EFPD.
  • ReS B-10 Atom Percent is 19.36
  • Temperature is 140°F.

INITIATING CUE: usee has directed you to perform step 7.aof EPP-005~

determine the corrected Xe-free cold shutdown boron concentration using OST-1036.

Record values on this cue sheet once it is determined if 8DM requirements are met by the current boron concentration.

~:.

CRODS C"'}

..,./

("' ) () ..., /r"j . r; I ...~

CCURVE (1.(),~.}O l/7(j(;2o I~O Bo<.fq)

C REQ ~c\:3t) ( 9t)(~o,,\nc} (9c.)((())

eRCS \ l L.~)

CS DM f) b '7(~ t (c, (90'7& +~ deft 7)

MET I~~~V (Circle one) 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.: 005016H101 Task

Title:

Estimate Primary to Secondary JPM No.: 2008 NRC RO ADM Leak Rate JPM A1-2 KIA

Reference:

2.1.31 (4.2)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: This JPM should be performed on a frozen simulator.

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied. .

Initial Conditions:

  • The plant is at 100% power.
  • AOP-016 has been entered and actions are in progress.
  • OSI-PI is not available.
  • Chemistry sampling has not commenced.
  • Motivating air is isolated.

Task Standard: Determines leak rate to be --25 gpd using Method 1 of AOP-016, Att. 1.

Required Materials: None General

References:

AOP-016, Excessive Primary Plant Leakage, Rev 37 Curve Book Handouts: AOP-016, Attachment 1 Initiating Cue: The USCG has directed you to perform AOP-016, Excessive Primary Plant Leakage, Attachment 1 step 3 to estimate primary to secondary leakage.

Time Critical Task: No Validation Time: 10 minutes HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP IC-19 imf RMS079 (REM-1TV-3534 CVPETS) to 6.00 E-7 uCi/ml.

NOTE: Must go to RUN for the malfunction to show.

Leave simulator in FREEZE once malfunction has appeared.

HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9

Appendix C Page 3'of 6 Form ES-C-1 '

PERFORMANCE INFORMATION (Denote Critical Steps with a ~)

Start Time: _

Performance Step: 1 Obtain procedure.

Standard: Locates and reviews procedures.

Evaluator Cue: Provide Curve Book and AOP-016, Att. 1, step 3 after the procedure is located.

Comment:

~ Performance Step: 2 ESTIMATE Primary-To-Secondary leak rate using ONE of the methods listed (no preferred method):

Method 1: Use Condenser Vacuum Pump Rad Monitor REM-3534 (Grid 2), Curve H-X-15A, Curve H-X-15B, or H-X-15C (Depending on status of motivating air)

Standard: Determines that Method 1 is required.

Comment:

~ Performance Step: 3 Operates RM-11 to obtain reading for REM-1TV-3534 (Grid 2).

Standard: Reads REM-1TV-3534 as 6.00 E-7 ~Ci/ml.

Comment:

HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION

~ Performance Step: 4 Determines which curve from Curve Book to use.

Standard: Uses Curve H-X-15C since motivating air is isolated.

Comment:

~ Performance Step: 5 Calculates Primary to Secondary leak rate.

Standard: Determines Primary to Secondary leak rate is between 22 gpd to 27 gpd).

Comment: +/- 2.5 gpd is margin of error based on reading data from graph Terminating Cue: When the primary to secondary leak rate has been determined and reported to the USCO: Evaluation on this JPM is complete.

Stop Time: _

HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9

Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC RO ADM JPM A1-2 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9

Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is at 100 % power.
  • AOP-016 has been entered and actions are in progress.
  • OSI-PI is not available.
  • Chemistry sampling has not commenced.
  • Motivating air is isolated.

INITIATING CUE: The USCO has directed you to perform AOP-016, Excessive Primary Plant Leakage, Attachment 1 step 3 to estimate primary to secondary leakage.

HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.: 341010H302 Task

Title:

Perform Review of Daily JPM No.: 2008 NRC SRO A1-2 Surveillance Requirements Log KJA

Reference:

2.1.18 (3.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: x Classroom X Simulator - - - Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant is in Mode 2, waiting for management approval to proceed to Mode 1.
  • EDG "8" is synchronized to the grid for a post-maintenance test.
  • The Daily Surveillance Logs (OST-1021 , Attachment 4) for 2100 have been completed.
  • ERFIS Pressurizer Pressures are unavailable.

Task Standard: All errors and TS actions identified Required Materials: Perform in a location with TS or electronic access to TS available.

General

References:

  • OST-1021 , DAILY SURVEILLANCE REQUIREMENTS, DAILY INTERVAL, MODE 1 AND 2
  • Technical Specifications HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Handouts:

  • Copy of a completed OST-1021 , Attachment 4.
  • Delete all notes.
  • Substitute the following incorrect data:
  • Modify log readings on p.19 of OST-1021 so that the 1500 reading of 457 and 456 are low and together average < 2205.
  • Include 455 approximately 60 psig high so that the channel check is unsat.
  • Condensate Storage Tank Level (both channels) progressively lowering from 85% to 60% throughout the day (TS).
  • RCS Loop Flow Channel FI-424 progressively lowering from 100.21 to 98.13 throughout the day (TS).
  • EDG Room Temperature channel TDG6903B @ 121°F (should be circled)

Initiating Cue: You are the USCG and have just completed an emergency watch relief due to illness of the scheduled person. Review the OST-1021 ,

Attachment 4 logs. At the conclusion of your review, discuss any findings with me.

Time Critical Task: No Validation Time: 20 minutes HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a ~)

Start Time: _

Performance Step: 1 Obtain completed log.

Standard: Reviews handout.

Evaluator Cue:

  • Provide handout for NRC SRO A1-2 after the Initial Conditions are reviewed and the Initiating Cue is provided.
  • If necessary, after the applicant discusses each finding:

What action, if any, is required relative to this reading?

Evaluator Note: Only the incorrect items in the logs are identified in the JPM Steps.

Comment:

-v Performance Step: 2 Review OST -1021, Attachment 4 for approval.

Standard:

  • Identifies that Pressurizer Pressure Channel 455. fails it's channel check.

Comment:

HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION

'./ Performance Step: 3 Review OST-1021, Attachment 4 for approval.

Standard:

  • Identifies that the Pressurizer Pressures should have the calculations completed.
  • Pressurizer pressure should be identified low out of spec based on performing calculation with only Channels 456 and 457.

Evaluator Cue: SRO may send paperwork back to RO to do the calculations.

If so cue the SRO to perform the calculations.

Comment:

'./ Performance Step: 4 Review OST-1021, Attachment 4 for approval.

Standard:

  • Identifies one RCS Loop "B" Flow Channel (Sheet 5) is below Acceptance Criteria.
  • Reading should be circled. TS does not apply in Mode 2.

Comment:

'./ Performance Step: 5 Review OST-1021 , Attachment 4 for approval.

Standard:

  • Condensate Storage Tank Level (Sheet 7) is below Acceptance Criteria.
  • Reading should be circled and entry into TS 3.7.1.3 Action a -

restore to operable or be in HSB within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, is required.

Comment:

HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION

-Y Performance Step: 6 Review OST-1021, Attachment 4 for approval.

Standard:

  • Identifies Diesel Generator Room 261 temperature TDG6903B (Sheet 10) exceeds Acceptance Criteria.
  • Reading should be circled and investigative/corrective actions implemented.

Evaluator Cue: If requested: EDG "B" has been running for 30 minutes.

Evaluator Note: Reading does not meet criteria for declaring equipment in the room inoperable. '

Comment:

Terminating Cue: After all findings have been reviewed: Evaluation on this JPM is complete.

Stop Time: _

HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SRO A1-2 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is in Mode 2, waiting for management approval to proceed to Mode 1.
  • EDG "8" is synchronized to the grid tor.a post-maintenance test.
  • The Daily Surveillance Logs (OST-1021 , Attachment 4) for 2100 have been completed.
  • ERFIS Pressurizer Pressures are unavailable.

INITIATING CUE: You are the USCG and have just completed an emergency watch relief due to illness of the scheduled person. Review the OST-1021, Attachment 4 logs. At the conclusion of your review, discuss any findings with me.

HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Attachment 4 ... Daily Surveillance Requirements Log Sheet 1 of 15 TECH SPEC 4.5.1,1.a.1 1 a.z Eees ACCUMULATORS PARAMETER etA A PRESSURE CLA B PRESSURE CLA C PRESSURE INSTRUMENT PI- 921 PI- 923 PI-925 PI ..927 Pl-929 PI ... 931 ACCEPTANCE Between 585 and 665 psig OPEN CRITER!A MODE 1~ 2 AND 3 WITH ReS PRESSURE ABOVE 1000 PSIG 0300 0900 1500 210q TECH SPEC a.s. 1.1,8.1 14.5.1.1, b (partial)

ECCS A.CCUMULATORS PARAMETER CLA A LEVEL CLA B LEVEL CLA C LEVEL SampUng Not Sampling Not SampUng Not INSTRUMENT LI ..920 Lt ..922 Required per LI ~ 924 Ll- 926* Required per Ll ..928 U ~. 930 Required per AU6 Att 6 Aft 6 ACCEPTANCE between 66 and 96 ok Indicated level viith CRiTERIA less tha.~ 9(}k cumulative level increase(excludfng makeup from operable RWST) ~inye last satisfact() sample MODE 1 2 AND 3 WITH ReS PRESSUREABOVE 1000 PSIG 1

Previous Days Level 0300 0900 1500 2100 4.3.2.1.10 2c, Sa3 3b3~ 3c3~ 4c 1 1 1 TECH SPEC 4A.6,2,1.b 5c, Bd,6g; 4,3.3.6.1a; 4J3.1.4 CNMTSUMP SUMP PARAMETER CNMT SUMP LEVEL CONTAINMENT PRESSURE FLOW MONITORiNG LEAK RATE ALB 1 URE URE LeT LeT PI PI iNSTRUMENT ERF1S N/A 9001 9002 7161A 7161B 950 953 PROGRAM ACCEPTANCE NO CHECKS CHAN.

N/A NfA LESSTHAN 1.6 PSfG CRITERIA ALARM PER CHECK OP..163 MODE 0300 0900 1500 2100

[6ST-1021 Rev. 66 Page 17 of~O I

Attachment 4 - Daily Surveillance Requirements Log Sheet 2 of 15 TECH SPEC 4.1.2.6.a.2; 4.5.4.a.1; 4.3.2.1. 7b, se: 4.3.3.6.9 4.1.2.6.a.2~ a.3 PARAMETER RWST LEVEL BORIC ACID TANK INSTRUMENT L!..990 Ll...991 LI-992 LI..993 N/A LI-106 L1..161.158 TCS7240 GREATER THAN ACCEPTANCE GREATER THAN OR EQUAL TO 92°k>

CHANNEL GREATER THAN OR OR EQUAL TO CRITERJA CHECK EQUAL TO 74%> QF 65 MODE 1.2 13) and.4 1.2,3 and 4 0300 C,iP C1C-, (il.l 9,5 IC)-(~) 2? I gc:) Ci~?

~

0900 .:

'~

, .... /:

1500 2100 ;h(')

V TECH SPEC 4.5,2.a 4.4.9.3 PRZ PARAMETER ECCS VALVE ALIGNMENT SPRAY ~T INSTRUMENT 181..340 181-341 181-359 I 181-86 I 1$1-52 I 181-107 TJ-123 TI-454.1 OPEN AND PULLEDTO LESS THAN ACCEPTANCE SHUT AND PULLED TO LOCK WITH LOCK WiTH CONTROL OR EQUAL CRITERIA CONTROL POWER OFF POWER OFF TO 625°F DURINGAUX MODE 1 r 2, and 3 SPRAY OPS 0300 Ai) (\41 rtJ r\O (;~~J

", dl~) tJ /;~

0900 :b .~ th*

,~f~ .:~ ~~. ~ f.J If~

r~;U ~1:)

1500 r-~\)

. ~ ~ ~ If,JIA 2100 "k) ~O 'A-~O {h0 itO ihQ

) l "if (-)

~ lJ V V V TECH SPEC 4.4.3,1: 4.3.1.1.11: 4.3.3.6.5 PARAMETER PRESSURIZER LEVEL INSTRUMENT LI-460 LI-461.1 LI-459A.1 N/A ACCEPTANCE LESS THAN OR CHANNEL CRITERIA EQUAL TO 90% CHECK MODE 1} 2. and 3 1 0300 -(0 \ (~/O &; c !r<J

~l{~

0900 lor (t;;; C> 00 ,,-

1500 CbiJ (0(\ j (0 [) (';A 2100 (),rQ\. (0 (') &(~) {~~7 v

I 08T-1021 Rev. 66 Page 18 of 40 I

Attachment 4 -Daily Surveillance Requirements Log Sheet 3 of 15

~ .

TECH SPEC 4.2.5.1; 4.3,1.1.9, 10; 4.32.1,1d~ 3a3} 3c3, 5c t 6 d PARAMETER PRESSURIZER PRESSURE tNDEPENDENT CALCULATION VERIFICATION ACCEPTANCE N/A COMPLETED COMPLETED CRITERIA MET ACCEPTANCE N/A CHANNEL SEE BELOW N/A NiA C-RtTERIA CHECK MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE: Calculations must be done with either the MCB Indicators OR ERFIS lndlcsuons, NOT a combination.

NOTE: If all operable channels ~re greater than or equal to the acceptance criteria, calculations are not required.

CALCULATIONS FOR PRESSURIZER PRESSURE 0300:

PRC0457"~'

+

~~P-RC~O-4-5 +

._.........,.....-~~

= ~ (# Operable PRC0455 Channels used PRESSURTzEFf>>~

PI--457 P\-456 PI~455 Normally 3) PRESSURE 0900: + +  ::: (# Operable PRC0457 PRC0456 PRC0455 Channels used PRESSURIZER PI~457 PI..456 PI-455 Normally 3) PRESSURE Q-1500: .~,.,,~:Q:;too .+ Wy :;l~05 + = (# Operable = ~6~.5 PRC0457 PRC0456 PRC0455 Channels used *"***P"RESSURIZER PI..457 PI-456 Pl...455 Normally 3) PRESSURE 2100: + + (#Operable  :=

PRC04~ PRC0456 PRC0455- Channels used PRESSURIZER PI-457 PI-456 Pl~455 Normally 3) PRESSURE ACCEPTANCEGRITER1A FOR PRESSURIZER PRESSURE (must meet one of the following):

1. Average of operable Mea indicator channels greater than or equal to 2205 psig.

2, Average of operable ERF1S points greater than or equal to 2202 psig.

3, If three MeB indicators are not available, then the lowest channel should be greater than or equal to 2220 psig+

4. If three ERFIS points are not available, then the lowest channel should be greater than or equal to 2211 pSlg, IOST~1021 Rev. 66 Page 19 of 40 I

Attachment 4 .. Daily Surveillance Requirements Log Sheet 4 of 15 TECH $PEC 4,2.5.1 PARAMETER Res LOOP TAVG INDEPENDENT INSTRUMENT TRC0412D TRC04220 TRC0432D CALCULATION VERIFICATION ACCEPTANCE (MeB OR ERFlS) TI~412D TI-422D TI..432D COMPLETED CRITERIA MET COMPLETED ACCEPTANCE SEE BELOW NIA NfA N/A CRtTERIA MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE: Calculatlons must be done with either the Mea Indicators OR ERFIS lndicatlons, NOT a combination.

IfaU operable channels are less than or equal to the acceptance critena, calculations are not required..

CALCULATIONSF.OR ReS LOOP TAVG 0300: + + = (# Operable =

TRC0412D -~..-- H~'TRC0432D Channels used Res LOOP TI~412D TI~432D Normally 3) TAVG 0900: + + =: + (# Operable  ::::

~--

TRC0412.D TRC0422D TRC0432D Channels used ReS LOOP TI...412D Tt-422D TI...432D Normally 3) TAVG 1500: + +  :: (# Operable =

TRC0412D TRC0422D W""'r"R"C043W- Channels used RCSLOOP Tt-412D Ti-422D TI~432D Normally 3) TAVG 2100: + + = (# Operable  :: ~ _

TRC0412D TRC04226""~ TRC0432D --~- Channels used ReS LOOP 11-412D Tt w422D TI-432D Normally 3) TAVG ACCI;PT ANCE CRITERIA FOR ReS LOOpTAVG. (must meet one of the following):

1, Average of operable Mea indicator channels mustbe less than or equal to 592.5 QF.

2. Average of operable ERF1S points less than or equal to 593.1 "F.
3. If three Mea indicators are notavallable, then the highest channel should be less than or equal to 591,3>:>F.
4. If three ERFIS points are not available, then the highest channel should be less than or equal to 592,3 OF.

IOST~1021 Rev. 66 Page 20 of 40 I

Attachment4,. DailySurveillance Requirements Log Sheet 50f 15 TECH SPEC 4,3.2.1 4.4.6.2.1.e FLANGE PARAMETER Res PRESSURE LEAKOFF TEMP OTliT OPllT PROTECTIONllT Ttw412C}

Tl..-412B)

TJ... 412A* TJ..422At iNSTRUMENT PI-403.1 P1402,1 TI401 TI422C 2 TI..422B~

Tl-432A TI..432C TI-4328 ACCEPTANCE CHANNEL CHECK N/A CHANNELCHECK CRITERIA MODE 0300 0900 1500 2100 INSTRUCTION If ReS flow acceptance criteria is not met, perform EST-70B, RCSFlowDetermination.

TeCH SPEC PARAMETER INSTRUMENT FRC0414 FRC0434 FI..414 F(~434 ACCEPTANCE ~ 98.30/0 CRITER~A 0900 1500 2100 Tf?CH SPEC 4.4.6.2.1.d PARAMETER OST~1004 or INSTRUMENT OST~1204 COMPLETED ACCEPTANCE COMPLETED (Typically on Night Shift)

CRITER1A 1 above 15%

MODE 1~ 2~3~ and 4 Power 0300 rOST-1021 Rev. 56 I Page 210f 40 I

Attachment 4 Daily Surveillance Requirements Log M

Sheet 6 of 15 TECH SPEC 4.4.1.t 4.3.1.1.12 PARAMETER* Res LOOP FLOWS FRC0414 FRC0415 FRC0416 FRC0424 FRC0425 FRC0426 INSTRUMENT RCPA N/A Reps N/A FI-414 FI-415 F1..4 16 FI-424 Fl-425 FI-426 ACCEPTANCE POSITIVE INDICAT10N OF FLOW WITH CHANNEL POSITIVE INDICATION OF FLOW WITH CHANNEL CR1TERIA Rep RUNNING INDICATION CHECK Rep RUNNING lNDICATION CHECK MODE 1 12 1 1.2 1 0300 ~() { ,\(~)

.... k) A'O AD AtO y.. . . .

MJ (~0 (uD rIO 0900 ~b ~

~

~

~.

... (:ti JiJ. ~:D ~ r:J)

\:. y~ ~

(&

\-

1500 (~\ ~~ ~ ~ll ~~ f~~ ("1. r,l\- (j. ~

(11

..~.:~.

2100 ( J

\J

~6J

\1

~.()

"J lo

~

to

, t\1()

V

(~

rf()

V r¥-J v

At£)

v TECH SPEC 4.4.1.1: 4.3.1.1.12 4.3.1.1.2a.2b. 5.6 POWER INTERMEDIATE SOURCE PARAMETER Res LOOP FLOWS RANGE RANGE RANGE FRC0434 FRC0435 FRC0436 Nt-41, Nl-42 Nl..35 Nl-31 INSTRUMENT RCPC N/A FI-434 FJ*435 FI-436 N143, NI-44 NI-36 NI-32 ACCEPTANCE POSITIVE INDICATION OF FLOW WITH CHANNEL CHANNEL CHECK CRITERIA Rep RUNNING iNDICATION CHECK MODE 1,2 1 1} 2 1 <<P-10). 2 2 <<P..6), 3.4.5 0300 (~() A6"') ~ ~iC) r\£) (~kL) ,'\1 //) rJ/A 0900 ~~ ~14 ~~ ~ ~~. ~ ' 1/'1 f\l~ fJ N li~

~~ (~) r~

(~....

1500 ~. J+.  ;~~ \J)

\. f\l if-\ j\J fA 2100 (~) r-b rK) ~/r\() 1-10 )to l~ Ifi t J 114-

'v v \J V V v 4.3.2.1.1e. 3a3. 3c3 1 4d, sc, 6d, 69 TECH SPEC 4.3.1.1.14 4.3.3.6.6 PARAMETER STEAM LINE PRESSURE Pl..474.1. PI-484.1 Pi-494 INSTRUMENT Pl..475. PI-476 PI..485. PI486 PI-495. PI-496.1 ACCEPTANCE CHANNEL CHECK CHANNEL CHECK CRITERIA MODE t, 2. 3 and 4 1,2 0300 0900 1500 2100 I OST~1021 Rev. 66 Page 22 of 40 I

Attachment 4 - Daily Surveillance Requirements Log Sheet 7 of 15 TECH SPEC 4,3,1.1,13;4.3.1> 1~ 14; 4.3.2.1 .se. ec, 10~t 4.3.3.6,7 4,7,1,3,1 PARAMETER SG LEVEL CST LEVEL Ll~483f LI..484 LI..493 LI-494 LI~901 081 l

INSTRUMENT LI-9010A.1 SA S8 LI~485~ L148j Lt:.,,495~ Lj...496 ACCEPTANCE GREATER THAN OR CHANNEL CHECK CRITERIA EQUAL-.TO 62%

MOPE 0300 0900 1500 2100 TECH SPEC 4.7.1.3.2 PARAMETER. ESWTOAFW 1SW..121 1SW++'124 18W..127 1SW...130 INSTRUMENT 1SW-123 1SW+M126 1SW-129 1SW-132 ACCEPTANCE OPEN (only when supplying CRITERIA AFW pumps)

MODE 1 2,- and3 t

0300 ~)rpr' .....*..............."'W.<<.>>;.;-;.,;.;,.;.X/Vo."",.,..NNA*I'.";.

0900 rJ If\" ~X>>m-:-:->Jo>>>;'>>>

1500 tJltPr

      • )0

~~~/

., ;. " -", .,___K_

-<<-~

N>>>
':~;MYN>>~>>Y>>'

2100 ~0/A ~:-:<<~<N.~  ;;::>

IOST-1021 Rev. 66 ~age 23 of 40 I

Attachment 4 .. Daily Surveillance Requirements Log Sheet 8 of 15 INSTRUCTIONS

1. ERFIS is the preferred source for verifying CNTMT AVG TEMP.
2. VerIfy TCV97540 computer point quality code is acceptable. If acceptable, record the ERFlS value for CNTMT AVG TEMP and verify Jess than or equal to 120°F.
3. If computer point TCV97540 is not available, verify both MeB indicators for CNTMT AVG TEMP less than or equal to 120 0 F.

TECH SPEC PLP-114 4.6.1.5 N/A 4.6.1.4 PLP-114 A EDG ELEC B EDG ELEC CONTAINMENT CONTROL ROOM PARAMETER CNMT AVG TEMP ROOM 261 ROOM 261 PRESSURE ENVELOPE 305 TCV97540 TJ-7542 TI-7541 PDl*7680 PDI-7680 TI-7837 TI-7837 INSTRUMENT ALB 27/1..3 SA SB A SA B 58 A1SA B188 NO ALARM ~ 116 0 F) LOCAL ACCEPTANCE LESS THAN OR EQUAL TO GREATER THAN -1.0 LESS THAN OR TEMP IS NEEDED IF ALARM IS CRITERiA 120°F JNWG EQUAL TO 85 QF PRESENT WHENEVER THE WHENEVER THE EQUIPMENT EQUtPMENT IN AN IN AN AFFECTED AREA IS 1. 2. 3. and 4 AFFECTED AREA MODE R'EQU1RED TO BE OPERABLE IS REQUlRED TO BE OPERABLE 0300 (\UJ 'l f 0900 1500 2100

\/

TECH SPEC PLp ..114 ROD SA ELECT 5B ELECT STEAM 1A35SA.

PARAMETER FHB EMER EXH AREA CNTRL CAB PENET PENET TUNNEL 1B35SB 261 AREA 305 AREA 261 AREA 261 INSTRUMENT Tl ..6 537A1SA TI..6 5378158 ALB 23/3-5 ALB 23J2-11 ALB 2312-8 ALB 23/2..5 ACCEPTANCE LESS THAN OR EQUAL TO NO ALARM NO ALARM NO ALARM CRITERIA 104°F << 104°F) << 122°F) (LESS THAN OR EQUAL TO 104°F)

WHENEVER THE EQUIPMENT IN AN WHENEVER THE EQUIPMENT ,IN AN AFFECTED AREA IS REQUIRED TO BE MODE AFFECTED AREA IS OPERABLE (LOCAL TEMP MUST BE TAKEN IF ALARM IS PRESENT)

REQUIRED TO BE OPERABLE 0300 tv c( ro ~'?

.) ~6J kC) A-o rro rJp:)

(&

./

0900 {j-/d (~() I ~ ~ \tJ9.

cL "- (~

1500 &'-1 rv ~l '~. <~~,

t A '~J) ~~

(ro

. "",)

2100 (0"7 Cv cl (~O k~:) ~:> )}-6~)

\J 'J V \t

'J IOST-1021 Rev. 66 Page 24 of 40 I

Attachment 4 - Daily Surveillance Requirements Log Sheet 9 of 15 TECH SPEC PLp ...114 CHILLER AFW I CCW PUMPS A..SA B-S8 1C-SAB SW BSTR MECH & ELEC PARAMETER PIPE & VALVE & HX AFW CSIP ROOM CSI? ROOM C$1iP ROOM B-SB PUMP PENETAREA AREA 261 PUMPS 236 236 236 236 236 236 ALB 23/2-6 ALB 23/1*6 ALB 23/2..9 INSTRUMENT ALB 23/1 ..5 ALB 23/1-4 ALB 23/1-11 ALB 23/2...7 ALB 23/1-7 ALB 23/2-10 ACCEPTANCE NO ALARM (LESS THAN OR EQUAL TO 104¢F)

CRITERIA WHENEVERTHE EQUiPMENT IN AN AFFECTED AREA IS REQU1RED TO BE OPERABLE MODE LOCAL TEMP MUST BE TAKEN IF ALARM lS PRESENT 0300 0900 1500 2100 TECH SPEC I PLP ..114 4.9.1*1 COMMITMENT CSAT& WPB A*SA BwSB FUEL POOLS HVAC HVAC CS~ RHR 1 CS, RHR~

PARAMETER EQUIP RM EQUIPRM HVAC HVAC SPENT FP NEWFP SFPC SFP D 216 236 190 190 INSTRUMENT ALB 23/1-8 ALB 23/1 w9 ALB 23/1..10 ALB 23/4-17 ALB 23/5-17 ALB 23/4*18 ALB 23/5..18 ACCEPTANCE NO ALARM (LESS THAN OR EQUAL TO 104 OF) NO ALARM (GREATER THAN 23 FT)

CRITERIA WHENEVER THE EQUIPMENT IN AN AFFECTED AREA 18REQUIRED TO BE OPERABLE WHEN IRRADIATED FUEL IS IN THE POOL MODE (LOCAL TEMP MUST BE TAKEN IF ALARM IS (LOCAL LEVEL MUST BE TAKEN IF ALARM rs PRESENT)

PRESENT) 0300 d<) {~) ({O ~ ,.))

0900 '-~~ '~~

<.-. ')~ ~dJ- "-~J)~

~~ V~'} I/~

l~

' ...,;:. ~

.~

1500 .~

b .~- ..

2100 (kJ r!P )tto ko

~.J \/ v 'tJ I OST-1021 Rev. 56 Page 25 of 40 I

Attachment 4 ... Daily Surveillance Requirements Log Sheet 10 of 15 TECH SPEC I ESR 97..00272 ESR 95~00425 ESR 97-00272 COMMiTMENT SPENT FUEL POOL HIGH SPENTFUEL POOLHIGH NEW FUEL POOLHIGH PARAMETER TEMPERATURE ALARM TEMPERATURE ALARM TEMPERATUR~ALARM INSTRUMENT ALB 23/4..16 ALB 23/4...15 ALB 2315~15 ALB 23/5.. 16 ACCEPTANCE NO ALARM NO ALARM NO ALARM CRiTERIA MODE 0300 0900 1500 2100 TECH SPEC PLP-114 ESWELECEQUJP ROOM 261 ESW PUMP ROOM 261 EDG ROOM: 261 PARAMETER INSTRUMENT TEV6588A TEV658~~ TEV6592A TEV6592B TDG6903A TDG6903f.3 . .

ACCEPTANCE LESS THAN OR EQUAL LESS THAN OR EQUAL TO LESS THAN OR EQUAL TO CRITERIA TO 116$;)F122~F WHENEVER THE EQUIPfv1ENT IN AN AFFECTED AREA IS RE.QUIRED TO BE OPERABl.E 0900 1500 2100 IOST-1021 Rev. 66 Page 26 of 40 I

Attachment 4 .. Daily Surveillance Requirements Log Sheet 11 of 15 NOTE 1: If a reservoir level computer point is bad, manual reservoir level determination can be performed per OP w163.

NOTE 2: If a reservoir temperature computer point is bad, manual reservoir temperature readings can be performed per OP-163.

INSTRUCTION

1. Due to a 3°F instrument inaccuracy associated with the permanently installed reservoir TSWs, if TSW9114ITSW9115 'indicate 291 °F obtain local temperature J readings per OP-163.

4.1.2.6b TECH SPEC 4.5.4.b 4.7.5 RWST AUX RSVR PARAMETER TEMP AUX RSVR LEVEL TEMP MAIN RSVR LEVEL MAIN RSVR TEMP lNSTRUMENT TCT7110 LSC8752A LSC87528 TSW9114 LSC8750A LSC8750B TSW9115

~40°F GREATER THAN OR GREATER THAN OR EQUAL ACCEPTANCE AND EQUAL TO 250 FT  ::; 94°F TO 215 FT s 94°F CRITERlA < 125°F NOTE 1 NOTE 2 NOTE 1 NOTE 2 MODE 1 ~ 2) 3 and 4 0300 5~7. &.' (9-5Jl i: r?~S L ~S(} l{() t o.;.:; 9Jt\~;S  ;)17" (0 I 4&v6 0900 1500 t~~-7 ,5 ~SI\5 /)5~ j 5<1 L(~t3~ l)r9. Sec, J,j 15 ~ W l

J <7

-:l LJS... ...,....,{

..... ~...

~

2100 INSTRUCTION

1. The ECCS leakage outside RABEES reading is only required every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Perform on Sunday, WednesdaYt and Friday (mark as N/A on other days).
2. If any ECCS leakage outside RABEES is measured, record the cumulative leakrate on Attachment 7 along with the locations leaking.

t TECH SPEC PLP-114 PARAMETER ECCS leakage outside RABEES INSTRUMENT N/A ACCEPTANCE LESS THAN 2 GPH (125 cc/min) cumulative CRITERIA MODE 1,2,3 and 4 0300 0900 1500 VJ/t\

2100 IOST-1021 Rev. 66 Page 27 of 40 I

Attachment 4 - Daily Surveillance Requirements Log Sheet 12 of15 NOTE 1: Meteorological Channel check includes: (1) Initialing for a acceptable quality code if using ERFIS or verifying data quality is consistent with actual weather conditions if using a Personal Computer(PC) to access the meteorological tower, and (2)

Recording present values and verifying trend appears normal.

NOTE 1: During calm wind conditions (approximately 2 mph or less) it is normal to see disagreement between the upper and lower wind direction indicators. At times the vanes may actually rotate in opposite directions.

NOTE 1: The following shall be used for performing the daily channel check of the meteorological instrumentation channels:

  • On ERFIS observe the points for wind speed, wind direction, and differential temperature.
  • . Using a PC , access the meteoroloqical tower and observe upper and lower wind speed, upper and lower wind directlon. and differential temperature (or stability class).

The meteorological instrumentation should only be considered inoperable if both of the above methods are unavailable.

NOTE 2: MIMS Channel check should include, as a minimum, both a Self Test and an Audio Monitoring Test of all operable channels. Op 182 contains guidance for resetting the wo CPU FAILED light if lit.

(Reference 2.6.4)

TECH SPEC PLP-114 PLP-114 METEOROLOGICAL MIMS PARAMETER LOWER WIND UPPER WIND LOWER WIND UPPER WIND A1R SPEED SPEED DIRECTION D1RECTION llT ALL INSTRUMENT MMT1008 MMT1010 MMT1014 MMT1013 MMT1004 MMT1Q05 CHANNELS CHANNEL CHECK NOTE 1 CHANNEL ACCEPTANCE CHECK CRITERIA Value Init Value Init Value Init Value Init Value Init Value Init NOTE 2 MODE AT ALL TlMES 1,2 0300 C\t/& M;~) 'f) 7 1)

J. '.7~ S~f) 3~:;*21 Z-3 li J f1/31 rh-J \ L.~,,~ 1.(0 11..55" j,.-I,() A"0"f) i

~.'.. '

-s : 'J' 0900

.~

1500 ~'},J~ '~ll "11 jlL3<6 ~ ~{Z~ l2. l~

(,<1/l3 ~~ *-~Lgti 'J) -l,'7J '~J2

~'

2100 IOST-1021 I Page 28 of 40'1

Attachment 4 - Daily Surveillance Requirements Log Sheet 13 of 15 LOCAL TEMPERATURES TECH SPEC PLp..114 SFP PUMP & TANK AREA E-6 ROOMS 261 PARAMETER HX ROOM 236 A-SA B-SB lNSTRUMENT LOCAL THERMOMETER LESS THAN ACCEPTANCE OR EQUAL TO LESS THAN OR EQUAL TO 104.oF VERIFIED CRlTERIA 115.5 of WHENEVER THE EQUIPMENT iN AN AFECTED t*:,':.:,-.:.: *::.*\.:;>~~}~t~.: (;/}~:::::~:r.:::~*:**

MODE AT ALL TIMES AREA IS REQUIRED TO BE*OPERABLE  :::.:;.;.;: '::-:,:.:

0100-0400 1.--7 S

,) I 0:?G7 L{

t & v-1 ~ .:) &L/~ 7 )D la it, ~ Lf " c.( C:i r7~

1300..1600 ~51\"3 t9?? ~ (p &, .- l '/ C!..-/

TECH SPEC PLP-114 EDG HVAC ROOM 280 EDG HVAC ROOM 292 DFOST BLDG PARAMETER 242 A-SA B-58 A-SA B-SB lNSTRUMENT LOCAL THERMOMETER LESS THAN ACCEPTANCE LESS THAN OR EQUAL TO LESS THAN OR EQUAL TO OR EQUAL VERIFIED CRITERIA 118°F 122°F QF TO 122 WHEN THE EQUIPMENT iN THE AFFECTEDAREA 18 REQUlRED TO BE MODE OPERABLE 0100..0400 ~-?&( GI g::)

.... ~

D *'7t;5t '*'7 if If>3 <>>. <./ (~QJ 1300-1600 ~~7? \,~5' 71 L{td ' ") ~1 ~ "j 7l0~fo C:Ol , L( ~~Q ~.;}

I OST-1021 Rev. 66 Page 29 of 40 I

Attachment 4 .. Daily Surveillance Requirements Log Sheet 14 of 15 LOCAL TEMPERATURES INSTRUCTION

1. If battery room temperature is less than 71 of, perform Step 7.0.5.

TECH SPEC PLp..114 ELECT SW1TCHGEAR PENETRAT'ON SATIERY ROOM286 ACP 286 PARAMETER ROOM 286 AREA 286 A..SA BwSB A-SA B-S8 A..SA I B...SB INSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR LESS THAN OR LESS THAN OR

~ 71°F AND ~ 85°F VERIF1ED CRITERIA EQUAL TO 104°F EQUAL TO gO°F EQUAL TO gO°F

'.. . :.:.:..>..: /':.':",::,

WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS REQUIRED TO BE O:':':':::::::',\,~: ':',::' .':':

MODE OPERABLE 0900-1200 &~;;)\ G.' '~7[{ (to y\, C:j '7~~1~ c1 ~*-?0. ~ "7ip ~ i? .-~] ~7 ~ '--7 l l"~J 2100-2400 (0:--Q ~ ci -7 L(J~. ~t\t _~3 ~7<l, , ':-7~S ~ t:t "7~J ~ C} "7'7. \ G <:1 :1;)

TECH SPEC PLp w114 AUX TRANSFER PANEL ROOM PIC ROOMS PARAMETER 286 286 A-SA B..SB 17 19 t 18 INSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR EQUAL TO LESS THAN OR EQUAL TO CRITERJA 104°F 85°F WHENEVER THE EQUIPMENT iN AN AFFEOTED AREA IS VERiFIED MODE REQUIRED TO BE OPERABLE 0900...1200 --7~:) ~ ~~-'1 '~'7 ~1.

(... ~),

(-~ "'}~, c. "'7:5~ C) 2100 ...2400 "'7 2..-- ~ '~7 '-'7 2 '<2- ~~7

'(>,. ~ £2'J ~7 Lo( t ~l TECH SPEC PLP-114 ARPROOM AH-15 VENTILATION PARAMETER PIC ROOM 305 305 ROOM INSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR EQUAL TO LESS THAN OR VERIF1ED CRITERIA 85°F EQUAL TO 104°F

':.'. :-:/. :-:::.,:.,'. ......' ....:

WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS MODE REQUIRED TO BE OPERABLE 0900-1200 ~7 t . 0 {(i{a , ~ 4,0 \ ( r0

~

2100-2400 ~7C) ~ ~6 (&~~ ~ '~7 &0 ~ (~) ~

1 OST-1021 Rev. 66 Page 30 of 40 I

Attachment 4 - Daily Surveillance Requirements Log Sheet 15 of 15 NOTE 1: These readings are only required on Sundays. These readings may be marked N/A on other days.

TECH SPEC 4.1.2.2.a BORJCACID BORIC ACID VCTVALVE BAT EMER BORATION PARAMETER XFER PUMP XFER PUMP GALLERY ROOM VALVE RM VALVE GALLERY ROOM INSTRUMENT LOCAL THERMOMETER ACCEPTANCE GREATER THAN OR EQUAL TO 65°F CR1TERIA MODE 1,2 and 3 1300-1600 (NOTE 1) rrJ lA- ....__..-......---...------Y'O"+i'---.M........-.-....................,.-.. ........---------- ---._~

TECH SPEC 4.1.2.2.a BAT TO CSt? SUCTION HEADER PfPE TEMPERATURE (IF ANY OF THESE INSTRUMENTS FAIL. INITIATE CORRECTIVE ACTION AND NOTE IN COMMENTS PARAMETER SECTION. USE SECONDARY INSTRUMENTS TO SATISFY THE SURVEILLANCE REQUfREMENT)

HT-18753C HT-18753C HT-18753B HT~18753B HT..18753B HT..18753B INSTRUMENT ACCEPTANCE C2-1 I C2-2 I C1-9 I C1-13 I C2..3 I C2-5 CRiTERIA GREATER THAN OR EQUAL TO 65°F MODE 1,2 and 3 1300..1600 (NOTE 1) N. I r. r~

.~. \_*. *---------1------- tI ~J I

1 I

--~~.-_"'-~

TECH SPEC 4.1.2.2.8 BAT TO CSIP SUCTION HEADER PlPE TEMPERATURE (THESE ARE SECONDARY INSTRUMENTS. THESE SHOULD BE USED WHEN PRIMARY INSTRUMENTS PARAMETER INSTRUMENT HT-18753CC C2-1 I HT..18753CC C2...2 I FAll. (N/A IF NOT BE1NG USED.)

HT-18753BB C1v9 I HT-18753BB C1-13 1 HT..187538B C2 ...3 I HT-18753BB C2-5 ACCEPTANCE CRITERIA GREATER THAN OR EQUAL TO 65°F MODE 1,2 and 3 1300-1600 (NOTE 1) f~1 f) 1---*-----.1- I i. 1I -.~----;.""i IOST-1021 Rev,66 Page 31 of 40 I

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.: 015004H201 Task

Title:

Perform the Quadrant Power Tilt JPM No.: 2008 NRC RO A2 Ratio Surveillance KIA

Reference:

2.2.12 (3.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method oftesting:

Simulated Performance: Actual Performance: x Classroom X Simulator - - - Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant has been stabilized at 100 % power following a dropped rod in Control Bank "B" (M-6).
  • The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND" INDICATION SYSTEM.
  • No deficiency tags on PRNls.

Task Standard: Calculations within required band.

Required Materials: Calculator General

References:

OST-1039, CALCULATION OF QPTR, Revision 13 Handouts:

  • OST-1039
  • Curve Book (Ensure F-X-8 included and unmarked)

Initiating Cue: The USCO has directed you to perform a manual QPTR lAW OST-1039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.

For the purposes of the examination, there will be no independent verification of your work.

Time Critical Task: NO Validation Time: 12 minutes HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 2 of 10 Form ES-C-1 VERIFICATION OF COMPLETION (Denote Critical Steps with a ~)

Start Time: _

Performance Step: 1 Obtain procedure.

Standard: Reviews procedure.

Evaluator Cue: Provide OST-1039.

Evaluator Note: A KEY is provided for your use on JPM Page 7.

Comment:

Performance Step: 2 Completes Prerequisites section:

  • Instrumentation needed for the performance of this test is free of deficiency tags that affect instrument indication.
  • Verify the most recent Curve F-X-8 is used in the performance of this procedure.
  • Verify all prerequisites are met, then obtain Unit SCO permission to perform this OST.

Standard:

  • Logs F-X-8 revision number (NRC Exam)
  • Initials/signs all blocks Evaluator Cue:

Comment:

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 30f 10 Form ES-C-1 VERIFICATION OF COMPLETION Performance Step: 3

  • If Quadrant Power Tilt Ratio Calculation Computer Program is used, perform Section 7.1, and N/A section 7.2.
  • If manual calculation of the Quadrant Power Tilt Ratio is used, perform Section 7.2, and N/A section 7.1.

Standard:

  • Marks Section 7.1 N/A
  • Proceeds to Section 7.2 Comment:

Performance Step: 4 Prior to reading the value of detector current, ensure the meter range/rate switch is in the 400 J,lAlSLOW position.

Standard: Verifies meter range/rate switches were in the 400 J,lAlSLOW position when the readings were taken.

Evaluator Cue:

Comment:

Performance Step: 5 Record on Attachment 2, in Column A, the upper and lower detector currents from all operable power range channels as read on the Nuclear Instrumentation Cabinet.

Standard: Transposes readings from PRNIS Readings Table onto Attachment 2.

Comment:

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 4 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Performance Step: 6 Record on Attachment 2, in Column B, the 100% power normalized current for each channel. (Refer to Curve F-X-8)

Standard: Transposes TOP and BOTTOM 100 % current values from the Curve Book provided.

Evaluator Cue:

Comment:

Performance Step: 7 Divide values in Column A by the respective normalized current in Column B and record the result in Column C as the Normalized Fraction.

Standard: Divides each Upper and Lower reading by the respective 100%

normalized current value and records in Column C.

Comment:

Performance Step: 8 Calculate the average value for the upper and the lower Normalized Fractions by adding the Normalized Fraction in each section of Column C and divide by the number of operable NI channels. Record in Column D of Attachment 2.

Standard: Adds all Normalized Fractions for the same plane, divides by four and records result in Column D.

Evaluator Note: On the KEY, this value is shown at the bottom of Column C.

Comment:

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 5 of 10 Form ES-C-1 VERIFICATION OF COMPLETION

~ Performance Step: 9 Using the formula and values from Attachment 2 calculate the Upper and Lower Ratios.

Standard:

  • Divides the Maximum Normalized Fraction by the Average Normalized Fraction on each plane.
  • Determines both UPPER and LOWER ~ 1.029.

Evaluator Note: The applicant may inform the USCO as soon as any calculation is > 1.02. If so, acknowledge and direct applicant to complete.

Comment:

Performance Step: 10 Perform independent verification of all calculations made on Attachment 2.

Standard: Requests Independent Verifier.

Evaluator Cue: If necessary, repeat Initiating Cue: For the purpose of this examination, there will be no independent verification of your work.

Comment: Candidate may choose to check calculations.

~ Performance Step: 11 The upper ratio or the lower ratio, whichever is greater, is the quadrant power tilt ratio (QPTR). Record QPTR and verify QPTR is less than or equal to 1.02.

Standard: Records Maximum QPTR value 1.026 to 1.036 (N44 UPPER)

Comment: Acceptable band is +/- 50/0 (rounded to .005) around 1.031.

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 6 of 10 Form ES-C-1 VERIFICATION OF COMPLETION

-v Performance Step: 12 Complete applicable sections of Attachment 3, Certifications and Reviews and inform the Unit SCO when this test is completed.

Standard:

  • Check marks Periodic Surveillance or notes AOP-001 in Comments section
  • Plant Condition: 100% Power (may note dropped rod)
  • Mode 1
  • Today's Date
  • Current Time
  • OST Completed By: Applicant's name
  • Initials/Name
  • Indicate in General Comments Section and/or informs USCG that the limit is exceeded (-V)

Evaluator Cue: Acknowledge any report.

Comment:

Terminating Cue: After the USCO has been notified: Evaluation on this JPM is complete.

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 7 of 10 Form ES-C-1 VERIFICATION OF COMPLETION KEY A B C UPPER UPPER UPPER 100% POWER NORMALIZED UPPER DETECTOR NORMALIZED FRACTION DETECTOR CURRENT CURRENT (NOTE 1)

N-41 149.7 155.2 .965 N-42 177.9 175.6 1.013 N-43 202.0 200.0 1..010 N-44 165.5 159.5 1.038 SUM 4.026/4 =

1.0065 A B C LOWER LOWER LOWER 100% POWER NORMALIZED LOWER DETECTOR NORMALIZED FRACTION DETECTOR CURRENT CURRENT (NOTE 1)

N-41 169.2 176.1 .961 N-42 202.6 202.2 1.002 N-43 221.1 221.2 .9995 N-44 197.5 192.3 1.027 SUM 3.99/4 =

.9975 Highest Upper (N-44) 1.038/1.0065 = 1.031 Highest Lower (N-44) 1.027/.9975 = 1.0296 (1.03)

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 8 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC RO A2 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION HARRIS 2008 NRC RO JPM A2 Curve F-X-8 HANDOUT Revision Number: NRC Exam NIS Current Setpoint Table uA, 100 % power N41 155.2 176.1 N42 175.6 202.2 N43 200.0 221.2 N44 159.5 192.3 HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 10 of 10 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant has been stabilized at 100% power following a dropped rod in Control Bank "B" (M-6).
  • The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.
  • No deficiency tags on PRNls.

INITIATING CUE: The USCO has directed you to perform a manual QPTR lAW OST-1039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.

For the purposes of the examination, there will be no independent verification of your work.

PRNIS Readings N41 149.7 169.2 N42 177.9 202.6 N43 202.0 221.1 N44 165.5 197.5

  • All values were taken, with the Range/Rate switch in 400 IJAiSlow position.

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.:

Task

Title:

Review the Completed OST for JPM No.: 2008 NRC SRO A2 Auxiliary Feedwater Pump 1A-SA KIA

Reference:

2.2.12 (3.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: x Classroom X Simulator ---

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The unit is in Mode 1 at 100% power
  • All major controllers are in AUTO
  • No TS Action Statements are in effect
  • OST-1211, AUXILIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4, has just been completed Task Standard: All errors (4) identified Required Materials: None General

References:

OST-1211, AUXILIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4 Handout: Completed OST-1211 with the errors incorporated.

Initiating Cue: You are the USCO. Completely review the procedure and note any problems in the

GENERAL COMMENT

S section of Attachment 6 -

Certification and Review. Discuss your review with me at the conclusion.

HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Time Critical Task: No Validation Time: 12 minutes HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP N/A HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Review procedure Standard: Ensures proper conditions, signatures/initials, and may verify the current revision of the procedure Evaluator Cue:

  • Provide the completed OST-1211.

Comment:

~ Performance Step: 2 Review the completed OST Standard: Attachment 1 (Page 16) - Identifies stopwatch is past calibration date Evaluator Note: This makes the OST invalid and/or any timed elements would have to be repeated.

Comment:

HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 5 of 8 Form ES-C-1 PERFORMANCE INFORMATION

-v Performance Step: 3 Review the completed OST Standard:

  • Attachment 2, Sheet 1 (Page 17) - wrong Specific Volume used to determine ilPcorr.

Evaluator Note: l\Pcorr still exceeds minimum requirement but is incorrect.

Comment:

-v Performance Step: 4 Review the completed OST Standard:

  • Attachment 3 (Page 20) - Outboard Horizontal Vibration reading is in the ALERT range but there is no documentation in accordance with Instructions 1.a and 1.b.

Evaluator Note: The pump would still be operable but this could prevent corrective action or the required increase in surveillance frequency.

Comment:

-v Performance Step: 5 Review the completed OST Standard: Attachment 4 (Page 21) - 1AF-74 SHUT time exceeds CODE CRITERIA and, in accordance with Step 7.0.1, should have been retested immediately.

Comment:

HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 6 Review the completed OST Standard: Returns the procedure unsigned or, if signed, with EXCEPTIONS circled and all errors identified in the

GENERAL COMMENT

S section.

Comment:

Terminating Cue: When the procedure is returned: Evaluation on this JPM is complete.

STOP TIME:

HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SRO A2 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The unit is in Mode 1 at 100 % power
  • All major controllers are in AUTO
  • No TS Action Statements are in effect
  • OST -1211, AUXI LIARY FEEDWATER PUMP 1A-SA OPERABI LITY TEST QUARTERLY INTERVAL MODES 1-4,'

has just been completed INITIATING CUE: You are the USCO. Completely review the procedure and note any problems in the

GENERAL COMMENT

S section of Attachment 6 - Certification and Review. Discuss your review with me at the conclusion.

HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

C CO*NTINUOUS USE HARRIS NUCLEAR PLANT PLANT OPERATING MAN UAl VOLUME 3 PART 9 QPERAT10NS SU*RVEllLANCE TEST NUMBER:

OST-1211 TITLE: A*U:XILIARY FEEDWATER PUMP 1A.-SA OPERABILITY TEST QUARTERLYI*NTERVAL MOD:ES 1 -4 NOTE: Thlsprccedure has been screened perPLP-1 00 Criteria and determined to be CASE Iii, :additionalmanagementinvolveme*nt is required.

.... . *1 I OST-1211 Rev, 16 Page 1 of 261

Attachment 1 -Calibration Data Sheet Sheet 1 of 1 Cal Due Date I o~ o c QT' 0 (JT" N.A

Rev. 16 Page 18 of 261

A'ttaehm.ent 2 ~ Performance Data Sheet 1 of*3 Auxiliary Peecwater Pump 1A..SA NOTE1:Caiculate DifferentiaiPressure as foltows:

lb{)() < (iSIS = J514~d, psid Step 7'. 1.21 Step 7~ 1.18 Step 7.1.23*

L!==========:,======= . ::=.:.. .=====;======~

NOTE* 2: Satisfactory Acceptance Criteria is .determlnedby u.sing the following

~.rH l~-HO and verifying the correcteodlfterenttatpressure ts \tifit.hinthe

.- :_- ~t;:t;. \i.~ Iltj'~: la:

tlP corr :::; Corrected DifferentIal Pressure APind  := tndlq.~ted Discharge Pressure minus Indicated sucuon Pressure Uf =: SpeCific Volume (ftslfbm) for saturated Iiquidwater (u,) for suction temperature recorded inStep7.. *1.22. This number can be determined from Sheet3 of this Attachment or Standard Steam Tabtes~

7.1.24 I0$1-1211 r w

Rev. 16 Page 11 of 26 ,

Attachm.ent 2 ~ Performance Data Sheet 2 of 3 INSTRUC*TIONS

1. If pump hydrauHcdatEfdoes not meet acceptance criteria:

a~ Declare the pump iNOPERABLE.,

b~ Inlti:ate a :CR.

ST*Ep***

NO.

7.1.3 7.1.18 Test Gauqe psig 2: 15 psig CE~42 . .V*2 7.1.20 Test G:8uge at1AF-11*HV.2 {CodD psig N/A ERFISPoint 7.1.22 TCE901 . *::or Suction Temperature N/A Har~dheld Porom~t~(*

Test Gauqe at 1AF-7 OifferentlalPressure Calculated per NOTE 1 Calculated per 7.1 ~26 Differenual Pressure NOTE 2 (C:orrected (liPcorr)

  • Circle instrument used.
    • 50 to 54 inches water column is equivalent to 50 to 52 gpm IOST~1211 Rev. 16 Page 18 of 261

Attachm.ent 2* Performance Data Sheet 3 of 3 Specific Volume (ft 3/Ibm) For Saturated Liquid Water {ud Temperature Specific Volume Temperature l:s.. peciflc VO~.unne 59 0:.016034 80 I 0.016074 60 0.. =016035 81 0.016076 61 0.016036 82 0.016079 103 62 0.0160:38 83 0.016081 63 0.01603:9 84 105 64 as 66 (t016044 81 67 CL016046 88 109 6*8 0.01.60:48 89 0..0=16097 69 O~01'6050 111 0.0'16110 70 0.016052 11:2 0.016174 11 113 0.016177 7*2 0.016056' 73 0.01605$ 12 1 74 0.016060 95 OJJ*16.115 116 0.016189 75 0.016062 96 117 76 0.016064 1 77 0.016061 98 0.016125 119 0.016201 78 0.Ot6069 120 79 0.016011 tOO 0.016131 0.016209 I Rev. 16 Page 19 of 26 I

Attachment 3 ~ Vibration Data Sheet 1 of 1 IN'STRUCTIONS:

1. If pump vibration data is greater than the Acceptable Range but within the Alert Range:
a. Prepare enE-man or MenlO to the Surveillance Testing Scheduling Coordinator directing the test frequency of the pump to be doubled,
b. Attach a copy of the E-mail or Memo to the test package.
2. If pump vibration data meets the Required Action Criteria:

B. Declare the pump INOPERABLE.

b. Initiate a Condition Report (CR)v F s Vibration ACCEPTANCE :CRITERIA

.location IN/SEC Acceptable Range Alert Range Required Action Axial ~ *J.1Q :s.0.285  :> O~285 to ~ 0.68.4 > O~68*4 Outboard ~. 0.2325 > 0.232'5 to .s:O.558 > O~558 Horizontal l~Gt~3 ) *.. .,.".,.,:;">>,,.,~~, .*,.".~;-.,..

Outboard s O~2775 >ON2775 tos 0.666 > 0,666

/'0

............. ~

Vertical Inboard s O~265 *>O.2.i5Sto*s O~63.6  :> 0:.636 Hortzontat I Vertica' :

{DC( J s O~315 > 0.315 to s 0.70 >0.'70 Inboard

... ". '* . I~G /;1:0

\,

L~~::!~~.* ,_~_~~,_"_"__~~~ . .* . L _ _2~e ~o ~!~

Attachment 4 Valve Test Data M*.

Sheet 1 of 1

_um""''''''''''h -" .",.:,u......*.._.

~ .,. <_,,~. ____. ~. h_

PRETEST FAIL SAFE rosrrssr ALIGNMENT FULL

........ -.......... STROKE TEST

............. TEST ALIGNMENT ACCEPTANCE y",,131TERIA (SEC)

CODE CR.tTERI.A Verification Stroke Time LIMlT1NGVALUE ofT"ravel by (SEC) I OPEN SHUT

'Valve Pretest Ind Lights  : Fail Safe Position Pusttes!

Number Position I:Htt (lNIT) OPEN SHUT: Positlon Verified *Pos.iUon Pos lnit Vert loit Low High Low High OPEN SHUT 1AF-55 Open ffO !fJ l/Pt~fo 1&.1" NIA NtA Open }6=>. :u 14.25 19~28 14,34 19;40 25~15 23.00 1AF...74 Open Aio Aw bb61~~;P~ -e, :0' NlA NIA Open

~ :i) f5~48 20.94 14,84 20.07 27.31 23.00 Comments: .,..".,.....,.,.....- .<<ovm<_'<<"=_ .* " *****.*._.vwm.*..... wm"hwu.

...* *.*.* *.VII' * ...,..._ _*..a* *b*.*.* *.'.* ' ~ "A <<.:...:A.:.:..,_O'<< ".:*.*: ' .....:. b *:**v*.i( * *..**** * * *** ** **

....... ~  ;.;.; ; ;.: ,.; <N._ N .-"...; N .. ~_ _ J'.I'_.+-.-. _ _*_,.v.*.*..I'>............................................................ . . . - ._..-.-'w ~ .....-vvY.y.,..w. ~

~ ..

...-;~-...x<<<<o: -:<;;Xo<<~~ __. _~ cccccccee <.;..OC;"':O:':<_........-_<hV<hV<hV<hV h~AQ;y,;<<o;.y;;oc;.,.; .~.--"..No'N:N NN N~........:<< <<<<'i.<<-;-; ;.; ;*;..:*:.:*;.:.:-:<<.>>: :<< : : -'- <N ~" :.:.-.~.w.r.*.*.* * *** NU *"""""" ......:. ~~.; .."j /vu'**u.* u.*.*.*.*

L?ST~1211 I Rev. 16 I Page 21 0126 1

Attachment 5- Valve Retest Data S'heet Sheet 1 of 2 NOTE: This entire Attachment is N/A if no valve is retested due to exceeding the CodeCrttena.

Determine if the. stroke time exceeds the Limiting Value,

1. If the stroke time exceeds the limlting Value, declare the valve inoperable and initiat.e* aCR~ (NIAifstroke time is less than the LirnltlnqValue) 2.. lfthe stroke time is. less than the Limiting Value.but outside the Code Onteria limits, perform the foUovving :Steps:
8. If the cause is known to be mechanical failure~or if a retest cannot be performed expeditiously, declare the valve inoperable and inJUate a CR(Except PMTRs).
b. If retestlng the valve is desired perform the following:

N:OTE:. If necessary separate markedup sheets of this CST maybe used to document necessary manlpulatlons. sheets would this procedure and noted in the comments Section of Attachment 7.

(1) Determine wbich Ste:ps need to beperfcrrned up conditionstor testing the valve. Unit SeQ concurrence must be obtained and documented in the Comments section of Attachment 7>

(2) Perform the Steps determlned in the previous Ste'p anddocument stroke times/valve positioning on Sheet2.

(3) ~f retest results are still outside the Code Crlteria~declare the valve inoperable and initiate aCR (except Prv1T),

(4) 1f retest results-are Within the Code Criteria perform the .following:

y (a) Dec~are the valve operable.

(b) Inltl~.tea CR. identify1ng test findings for the first and second tests.

(c) Send test results to Responsible Engineer (1ST) for evaluation and docurnentanonon the CR.

IOST-1211 Page 22 of 26 I

Attachment 5 ~ V,alveRetest Data Sheet Sheet 2. of 2 (1) FUI out PRETEST ALIGNMENT POSTT;EST ALIGNMENT, and ACCEPTANCE CRITERIA values for the velvets) being t

tested using the values in the initIal test Attachment,

~~

~~::....;;..;.:.:y:w .':..->>...:***..:. ........ ,-

PRETEST ALIGNMENT (1) F.]J.~l. STROKETt=$T POSTIEST ALIGNMENT (1) ". <<-=<<-x-CO.9.E CRITERIA ACCEPTANCECRJTERIA (SEC) tt}

I I

J Time ~

(SE:C) OPf:N $HVT... LIMITfNG VALUE Pretest

  • \l'a'dve i!'l:\JlnUf.:n

. Posmon tntt: OPEN SHUT Posttest Position Pes lnit Verflnif Low High Low High OPEN I i .StrUT

~

~

I i

~

~

~~11*. ,,_.........:MW ~

... . .... . , _=t Rev. 16 I Page 23 of ~61

Attachment 6*~ Certification and Review Sheet 1 of 2 T:hiS CST was performed as a: Periodic Surveillance Requirement: _~ __

Postmalrrtenance OperabHity Test: _

Redundant SUbsystem Test:

PlantConottlons: Mode:

--~~~~~----------_.............--

OST Compl.etedBy: - ..-..-< Date: ToDAt Time: tq~3(~)

OS.1 . P~.rfofrf1ed Bv:

Initials Name (Print) Initials Name (Print)

General Comments/Recomm:endation/Corrective ActionslExceptions:

I()$T-1211* L Rev. 16 m mJ Page 24 of 26 I

Attachment 6 ~ Certifications and Reviews Sheet 2 of 2-Step 7,1.11 1A..SA AF\'V Pump Inoperable Time: fJ10 t::.

~-~'~"oXA ~v;o;,o ;o;.~

'Tc)J:r-ti Date: :~"X'.xo;:<<  ;~_"_~-o;,"XX..;-

Step 7~1.32 1A-SA AFW Pump Operable- Time:_~__=l-L Date: ~:IJ:fDfft=_

Step 7.2.1.c 1A-SA and 1 B-S-B AFWPump Inoperable Time:tot5 __~ Date: ~Jilt Step 7~2~1,p 1A-SA-and 1B.. SBAFW Pump Operable Time: 1,~;~.,5"" . .- Date: ~JcJtfl~t,~,

Pa.ges Used: Atl~_~~_

CST Completed with NO EXCEPT10NS1EXCEPTIONS:

Reviewed By: Date:

Unit SeQ ResponsibieEngin"eer (1ST)

Reviewed By: Date:

ANn ----

After receiving the final review signature, this OS:T becomes a a-A RECORD and should be submitted to Document Servloes. .

IOST-1211 Revy16

R~.vtsion S~Jmmary General Revision 16 updates the procedure reference to the new 1ST Program Plan, Des9ription o.fChanges

  • Page. Section Ghange Description Ail All Updated revision level.

3 1~O+2 Adde.d check valves 1AF-231 54 92, 11 O~and 73.

1 3 t~O.4 Deleted, 5 2~7.4 HNP-*lST-003, HNP 1ST Program Plan - 3rd tntervat, 8 6+0~1.e~(1 ) Changedacceptancecriterla per calc, (Also cbanqed on Atta'chme*nt2) 8 6~O.1.b Deleted "Parnat'strcke 8 6.Q.1.c Added check valves 1AF-23, 54$ 92 1 110~ and 73.

9 7.1.5 Added check valves 1AF~54,92~ and 73.

11 7+1.24 Added check va'hte1AF-23$110 17 Attachment 2 Added checkvalves 1AF*-23*~541 92, 110 , and 73~

Rev. 16 Page 26 of 26 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.:

Task

Title:

Given a Declared Emergency, JPM No.: 2008 NRC RO-SRO A3 Determine the Dose Rate, Dose Limit, and the Number of People to Perform a Task.

KJA

Reference:

2.3.4 (2.5/3.1)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant Perform in a location with the general references available or with electronic access to the references.

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • A large break LOCA has occurred.
  • The ECCS is in cold leg recirculation.
  • RHR Pump "8" is running. RHR Pump "A" showed evidence of gas binding and was stopped.
  • A Site Area Emergency (SAE) is in effect.
  • The Emergency Engineering Organization has determined that the RHR Pump "A" should be vented to ensure that a backup is available.
  • The general radiation level in the area is 16 R/hour
  • The OSC estimates that the total task will take. 75 man-hours.
  • The Site Emergency Coordinator has specified that he/she will not authorize an extension to the site emergency workers dose limit for performance of this task.

Task Standard: Number of people and stay times calculated within specified limits.

Required Materials: Calculator HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet General

References:

  • PEP-330, RADIOLOGICAL CONSEQUENCES
  • NGGM-PM-0002, RADIATION CONTROL AND PROTECTION MANUAL Initiating Cue: The site emergency workers listed in the table below are available.

They will be utilized from lowest to highest accumulated TEDE dose.

Using the minimum number of workers possible, DETERMINE:

  • the total number of workers required to perform the task and
  • the maximum stay time for each individual who will be utilized.

Assume no dose in transit and round off to the nearest minute below the limit.

Time Critical Task: NO Validation Time:

HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP N/A HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Determine total estimated dose for the task.

Standard: 16 R/hour x .75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> = 12 Rem Comment:

Performance Step: 2 Determine the dose limit for site emergency workers Standard: Per PEP-330 - Attachment 1: 5 Rem Comment:

~ Performance Step: 3 Determine the number of people required Standard: Workers A, B, and C would have to be used (~) to reach the 12 Rem total estimated dose (4700 + 4450 + 4300 = 13.45)

Comment:

HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION

~ Performance Step: 4 Stay Time for Workers Standard: A: 4.7/16 x 60 minutes = 17 minutes B: 4.55/16 x 60 minutes = 17 minutes C: 4.30/16 x 60 minutes = 16 minutes Comment:

Terminating Cue: After the maximum stay time for the workers to be used is calculated: Evaluation on this JPM is complete.

STOP TIME:

HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC RO-SRO A3 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • A large break LOCA has occurred.
  • The ECCS is in cold leg recirculation.
  • RHR Pump "B" is running. RHR Pump "A" showed evidence of gas binding and was stopped.
  • A Site Area Emergency (SAE) is in effect.
  • The Emergency Engineering Organization has determined that the RHR Pump "A" should be vented to ensure that a backup is available.
  • The general radiation level in the area is 16 R/hour
  • The OSC estimates that the total task will take. 75 man-hours.
  • The Site Emergency Coordinator has specified that he/she will not authorize an extension to the site emergency workers dose limit for performance of this task.

INITIATING CUE: The site emergency workers listed in the table below are available. They will be utilized from lowest to highest accumulated TEDE dose.

Using the minimum number of workers possible, DETERMINE:

  • the total number of workers required to perform the task and
  • the maximum stay time for each individual who will be utilized.

Assume no dose in transit and round off to the nearest minute below the limit.

Site Emergency Worker Accumulated TEDE Dose This Year A 300 mr B 450 mr C 700 mr D 800 mr E 850 mr F 1000 mr G 1050 mr H 1150 mr I 1200 mr J 1300 mr K 1500 mr L 1650 mr HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.: 345001H602 Task

Title:

Evaluate a Change in Conditions on JPM No.: 2008 NRC JPM SRO an Existing EAL A4 KIA

Reference:

2.4.41 (4.1)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: This JPM can be performed in any setting with the required references available.

Simulated Performance: Actual Performance: x Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: See Plant Conditions handout.

Task Standard: Upgrade EAL to GE and correct PAR within required time.

Required Materials: None General

References:

  • PEP-110, EMERGENCY CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS, Rev. 16
  • PEP-230, CONTROL ROOM OPERATIONS, Rev.14
  • PEP-310, NOTIFICATIONS AND COMMUNICATIONS, Rev. 21 Handouts:
  • Attached Initial Conditions
  • PEP-110
  • PEP-310
  • EP/EAL Guidelines
  • PEP-230, Attachment 1 - SITE EMERGENCY COORDINATOR Initiating Cue: You are the Site Emergency Coordinator. Review the plant conditions handout sheet and determine the current Emergency Action Level (EAL). This is a time critical JPM. The clock starts after you have reviewed the Plant Conditions sheet.

Time Critical Task: YES - 15 minutes to classify then 15 more minutes to make the PAR.

HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

Appendix C Job Performance Measure Form ES-C-1 Worksheet Validation Time: 10 minutes to classify, 12 minutes for PAR/Emergency Notification Form.

HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a ~)

Start Time: _

Performance Step: 1 Evaluate changing conditions.

Standard: Compares conditions against EAL Flowchart criteria.

Evaluator Cue:

  • Provide Initial Conditions sheet (last page of JPM).
  • Provide reference materials if not available in the JPM performance location.

. Comment: Classification Start Time _

-Y Performance Step: 2 Determine EAL.

Standard: Upgrade to GE (2-1-4) required:

  • Fuel Breached - DEI sample> 300 uCi/cc
  • CNMT Jeopardized - Pressure> 3 PSIG Evaluator Note:
  • It may be necessary to cue the PAR performance. The facility normally splits the EAL and the PAR into two JPM's.
  • If the applicant incorrectly classifies then skip to the Evaluator Cue in Performance Step 3.

Comment: Classification End Time/PAR Start Time _

HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION

~ Performance Step: 3 Determine PAR (PEP-230, Attachment 1, Step 10).

Standard: Refers to PEP-110, Attachment 3:

PROTECTIVE ACTION RECOMMENDATION:

  • EVACUATE: 2 mile radius
  • EVACUATE: Subzones A, B, L
  • SHELTER: Subzones C, D, E, F, G, H, I, J, K, M, N Evaluator Cue: The computer program is not available. Hand write a paper copy of the Manual Notification Form in accordance with PEP-230, Attachment 1, Step 11.b.

Comment:

~ Performance Step: 4 Complete the ENF.

Standard: Critical Elements:

  • Block 4: GE
  • Block 4 EAL: 2-1-4
  • Block 5 PAR: Evacuate 2 mile radius and Subzones A, B, L; Shelter Subzones C, D, E, F, G, H, I, J, K,M,N
  • Block 6 Emergency Release: Is Occurring 0
  • Block 9 Wind Direction from: 126
  • Block 10: DECLARATION; Current TIME; Current DATE
  • Block 17: Applicant signature/Title/Current Time/ Current Date
  • Provide form to Communicator Evaluator Note: An ENF KEY is attached, Comment: PAR Notification End Time _

Terminating Cue: After the ENF is handed to the communicator: Evaluation on this JPM is complete.

HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

Appendix C Page 5 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC JPM SRO A4 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

Appendix C Page 6 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: See Plant Conditions handout.

INITIATING CUE: You are the Site Emergency Coordinator. Review the plant conditions handout sheet and determine the current Emergency Action Level (EAL). This is a time critical JPM. The clock starts after you have reviewed the Plant Conditions sheet.

HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET 2008 NRC JPM SRO A4 Plant Conditions

  • The TDAFW Pump is cleared and tagged
  • The RCS leak escalated to a large-break LOCA while the crew was performing PATH-1
  • There is a RED CSF on INTEGRITY
  • The EAL Network was entered at Point X
  • A Site Area Emergency (SAE) is in effect with the RCS breached (EAL 2-1-3) and Containment jeopardized
  • Outside temperature is 62 of
  • Thunderstorms are moving into the area
  • The wind is blowing at 12 MPH from 126 degrees
  • Since the SAE declaration, the following has occurred:
  • Plant computers are down which will require any additional notifications to be done using a manual notification form
  • Off-site power was lost and EDG 1B failed while starting
  • ECCS cold leg recirculation alignment on Train "A" was just completed
  • Containment Pressure is 3.8 PSIG, lowering slowly
  • Containment Area Radiation Monitors are in HIGH alarm, rising slowly
  • Contalnrnent High Range Monitors are rising but not in alarm
  • Plant Vent Stack #1 Monitor is rising slowly but not in alarm
  • Charging Pump "A" Room Monitor went into HIGH alarm after cold leg recirculation was initiated
  • Chemistry has analyzed a sample and reports an Iodine Dose Equivalent RCS concentration of 410 uCilcc HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

tE~

~

Attachment 3 - PROTECTIVE ACTION RECOMMENDATION PROCESS Sheet 1 of 2 No No Fuel Breach)

No (Yes/ due to Res Breach) 2 MliileRadius :5 Miles Downwind Wiind IEvacuaie Shelter Wind Evacuat,e; She-Iter Direction Subzones :Subzooes rn recti 00 Subzones Subzone'S

~From {From 'tfj 34a~

- 010' AB,C,O;H,U<.L E.F~G,J,M.N -

327 0 010=' A,D,I< B"C"E,F,G"H,,1,,J,,L,M,N 01 1° - ~ A1B,C,D,HJ.t'~L E"F"G,J,M.N 011 0 - 05&' A,K B.C"D"E,f,G"H.I"J"L,~,4.N cse- -DIg-:: AB,C,o,tJ,Y~L.M E,F,G.H.N n57° -1?4~ A tUL 8 C"D~E F G_HL.LMN 080~ -, 101~ ~B,C,D,J,I<."L,M E.F~G,.HJ,N -

1251;1 1'91= A,H"L C.D,E"F.G,H,I,J,KM.N I 102(1 -, 124a AFB,C,D,r~l,U E"F"G,HJ.J,N 1920- 214.: A,B C,D,E.F"G,H,tJ,K.LM.N 125~ 14&- AB,C,D,KL,M.Nl E"F~G,HJ.J 215 Cl

-259=' A,B.e D,E"F.G,HJ.J,K.L,MJ~

147c. -, 191'~ AfB,C,D,E~K,LM.t4 F,G"H"I.,-J 2600 - 2B1~ A,e B"D~E,F ,G"H"LJ.,K,l,M,N 192(1 -, 214<: A*B,C,D,E",K,l F,G"H"I,J"M,H -

282c 3(14':' A,C,D B"E,f,G,.H"I"JJ<.LM,N 215 t , - zse- A.B,C,D,E"K,l f,G"HJ"J~M,N 305(1 - 328~ A,D B"C,,E,F,G.,H,,I,,J,,K,LM.N 237 t \ -, 2§9a A,,B,C,D,E.F,,K,l GI'H.tJ..M.N

260(1 - 32& A"B,C,D,F,G.HJ<,l E."I"J"M.N 327 t , - 347(1 A.B,C,D,H,K,L E"F"G.I,J,M.N IPEP-110 Rev. 16 Page 18 of 261

~

Attachment 3 - PROTECTIVE ACTION RECOMMENDATION PROCESS

=

Sheet 2 of 2 Acceptable changes in initial PARS would include expanding evacuation but would not allow a change from evacuation of zones to sheltering of those zones.

1. Indications that substantial core damage is imminent or has occurred include:

a) Core damage> 1°A, melt.

b) Core Exit Thermocouple readings ~ 2300° F.

c) Core uncovered> 30 minutes.

2. Indications that a significant loss of reactor coolant is imminent or has occurred include:

a) Containment radiation reading> 10,000 RlHr without spray or> 4,000 R/Hr with spray.

b) Containment hydrogen gas concentration> 1o.k>.

c) Rapid vessel depressurization.

d) A large break loss of coolant accident.

3. Indications that containment failure (primary or S/G) is imminent or has occurred are indicated by:

a) A release of radioactivity greater than the projected dose of either:

  • 1000 mRem TEDE at or beyond the site boundary.

5000 mRem Thyroid CDE at or beyond the site boundary.

Or a measured dose rate of either:

>1000 mRem/hr at or beyond the site boundary.

1-131 equivalent concentration> 3.9 E-6 IJCi/cc at or beyond the site boundary.

b) Primary containment pressure can not be maintained below design basis pressure of 45 psig.

c) Primary containment H2 gas concentration can not be maintained below combustible limit of 4%

by volume.

d) Faulted/Ruptured S/G with a relief valve open.

4. Accidents which result in a direct release pathway to the environment will most likely be thyroid dose limiting. For a faulted and ruptured S/G, water level must be below the tube bundles (S/G Narrow Range < 25% normal containment conditions or < 40% adverse containment conditions) with a relief valve open before it is considered a direct release pathway to the environment. For circumstances involving a direct release pathway to the environment:

a) Consider any Fuel Breach sufficient to warrant the determination that substantial core damage has occurred.

b) Consider any RCS Breach sufficient to warrant the determination that a significant loss of reactor coolant has occurred.

NOTE: A direct release is defined as a pathway from the containment to any environ-ment outside the containment when containment or system isolation is required due to a safety injection signal, containment pressure greater than 3 psig, or a valid containment ventilation isolation signal and the pathway cannot be isolated from the Main Control Room.

Containment monitors can provide indication of both core damage and RCS breach. Monitor readings used to quantify an amount of damage or coolant leakage should be complimented by other indications and engineering judgment.

If a release is in progress:

  • Perform dose assessment as soon as possible to determine if PAGs are exceeded and if additional Subzones require evacuation.
  • Add any Subzones requiring evacuation as determined by dose assessment to the plant-based PARs.

If no release is in progress:

  • Perform dose projection on possible conditions as time permits to determine if PAGs could be exceeded. Consider adding any Subzones requiring "evacuation as determined by dose projection to the plant-based PARs.

I PEP-110 Rev. 16 Page 19 of 261

1. I Attachment 9 - NUCLEAR POWER PLANT EMERGENCY NOTIFICATION FORM DRILL I§J ACTUAL EVENT rz!::Of MESSAGE #

1

~ N Today 2.1 INITIAL @JFOLLOW-UPNOTIFICATION:TIME ow DATE_ _/_ _/_ _ AUTHENTICATION # _

3. SITE: HNP Confirmation Phone # (_ _) _
4. EMERGENCY CLASSIFICATION:

~ UNUSUAL EVENT I§I ALERT 19 SITE AREA EMERGENCY

  • GENERAL EMERGENCY BASED ON EAL # 2 4 EAL DESCRIPTION: 3 FPBs Breached/ Jeopardized
5. PROTECTIVE ACTION RECOMMENDATIONS: ~ NONE IEVACUATE 2 mile radius and Subzones A,B,L ISHELTER Subzones C,D,E,F,G,H,I,J,K,M,N IQI CONSIDER THE USE OF KI (POTASSIUM IODIDE) IN ACCORDANCE WITH STATE PLANS AND POLICY.

I§ OTHER _

6. EMERGENCY RELEASE: ~None I Is Occurring 19 Has Occurred
7. RELEASE SIGNIFICANCE: ri\I Not applicable I!j B Within limits normal operating Above normal operating limits I Under evaluation
8. EVENT PROGNOSIS: ~ Improving I Stable 19 Degrading
9. METEOROLOGICAL DATA: Wind Direction* from 126 degrees Wind Speed* 12 mph

(*Not Requiredfor Initial Notifications) Precipitation* Stability Class* ~ I§J 19 (QJ I§ lEI I§I

10. I DECLARATION I§J TERMINATION Time Date / / _

(Enters Current Date and Time)

11. AFFECTED UNIT(S): * [J [I I6ill
12. UNIT STATUS: I U1 _0_0/0 Power Shutdown at Time Date _ /_ _/ _

(Unaffected Unit(s) Status Not Required for Initial Notifications) ~ U2 _ _% Power Shutdown at Time Date _ /_ _/ _

§ U3 _ _0/0 Power Shutdown at Time Date _ /_ _/ _

13. REMARKS: _

FOLLOW-UP INFORMATION (Lines 14 through 16 Not Required for Initial Notifications)

EMERGENCY RELEASE DATA. NOT REQUIRED IF LINE 6 A IS SELECTED.

14. RELEASE CHARACTERIZATION: TYPE: ~ Elevated I§I Mixed 19 Ground UNITS: ~ Ci I§J Ci/sec 19 ~Ci/sec MAGNITUDE: Noble Gases: lodines: Particulates: Other: _

FORM: ~ Airborne Start Time _ _ _ _ Date _ /_ _/__Stop Time _ Date _ /_ _/__

I§J Liquid Start Time _ _ _ _ Date _ /_ _/__Stop Time _ Date _ /_ _/__

15. PROJECTION PARAMETERS: Projection period: Hours Estimated Release Duration Hours Projection performed: Time Date _ /_ _/__
16. PROJECTED DOSE: DISTANCE TEDE (mrem) Adult Thyroid CDE (mrem)

Site boundary 2 Miles 5 Miles 10 Miles

17. APPROVED BY: (Sign and Date) Title Time Date_/_ _/__

NOTIFIED RECEIVED BY: BY: Time Date / /

I PEP-310 I Rev. 21 Page 33 of 51 I