=Text=
=Text=
{{#Wiki_filter:Final Submittal(BluePaper)  
{{#Wiki_filter:Final Submittal (Blue Paper)
Final Submittal(BluePaper)
 
Ifl£e:LsaoB{50
Final Submittal (Blue Paper)
/"Te5{"Sllo
Ifl£e:LsaoB{50 /
FINAL JPMS ADMINISTRATIVE
Ope(ClT'f'l~ "Te5{   ~J.1I~ "Sllo ~3)3JUU?
JPMs
FINAL JPMS ADMINISTRATIVE JPMs
AppendixC Job Performance
 
Measure WorksheetFormES-C-1
Appendix C                                Job Performance Measure                       Form ES-C-1 Worksheet Facility:               HARRIS                                  Task No.:     301144H601 Task
Facility: HARRISTaskNo.:301144H601TaskTitle:DeterminetheCold, Xenon-free
 
Boron Concentration
==Title:==
RequirementforaNaturalCirculationCooldownJPMNo.:2008.NRCJPMRO/SROA1-1KIAReference:2.1.25(2.8/3.1)
Determine the Cold, Xenon-free           JPM No.:     2008. NRC JPM Boron Concentration Requirement                        RO/SRO A1-1 for a Natural Circulation Cooldown KIA
Examinee:NRCExaminer:FacilityEvaluator:
 
Date:Methodoftesting:
==Reference:==
Simulated Performance:
2.1.25 (2.8/3.1)
ClassroomREADTOTHE EXAMINEE X SimulatorActualPerformance:
Examinee:                                                     NRC Examiner:
Plant---XIwillexplaintheinitialconditions,whichstepstosimulateordiscuss,andprovideinitiatingcues.Whenyou
Facility Evaluator:                                           Date:
completethetasksuccessfully,theobjectiveforthisJobPerformanceMeasurewillbesatisfied.
Method of testing:
INITIAL*Theunittrippedduetoalossofoff-sitepower.Allcontrolrods
Simulated Performance:                                       Actual Performance:        X Classroom          X     Simulator    - - - Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
CONDITIONS:haveinserted.*Theoperatingcrewis
INITIAL
performingEPP-005,NATURAL
* The unit tripped due to a loss of off-site power. All control rods CONDITIONS:                         have inserted.
CIRCULATION
* The operating crew is performing EPP-005, NATURAL CIRCULATION COOLDOWN.
COOLDOWN.*TheunitwillbetakentoColdShutdown.*PowerTraxisnotavailable.*CurrentRCSBoron
* The unit will be taken to Cold Shutdown.
concentrationis1125ppm.*CoreBurnupis130EFPD.*RCSB-10AtomPercentis19.36
* PowerTrax is not available.
*Temperatureis140°F.TaskStandard:
* Current RCS Boron concentration is 1125 ppm.
Calculationswithinspecifiedrange.RequiredMaterials:
* Core Burnup is 130 EFPD.
CalculatorGeneralReferences:*EPP-005, NATURAL CIRCULATION
* RCS B-10 Atom Percent is 19.36
COOLDOWN*OST-1036,SDM
* Temperature is 140°F.
CALCULATIONMODES1-5*CurveBook
Task Standard:             Calculations within specified range.
Handouts:*EPP-005,Step7
Required Materials:         Calculator General
*OST-1036*CurveBook (EnsureCurveA-X-22is
 
available and unmarked)2008HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9
==References:==
Appendix C Job Performance
* EPP-005, NATURAL CIRCULATION COOLDOWN
Measure WorksheetFormES-C-1InitiatingCue:TimeCriticalTask:
* OST-1036, SDM CALCULATION MODES 1-5
Validation
* Curve Book Handouts:
Time:USCGhas directedyoutoperformstep7.aofEPP-005, determine the corrected Xe-freecoldshutdownboron
* EPP-005, Step 7
concentrationusingOST-1036.Recordvaluesonthiscuesheetonceitis
* OST-1036
determinedifSDM requirementsaremetbythecurrentboron
* Curve Book (Ensure Curve A-X-22 is available and unmarked) 2008 HARRIS NRC RO-SRO A1-1 Rev 2                                              NUREG 1021, Revision 9
concentration.
 
CRODS_CCURVE_CREQ ,_CRCS ,_CSDM_MET/NOTMET(Circleone)
Appendix C                           Job Performance Measure                   Form ES-C-1 Worksheet Initiating Cue:     USCG has directed you to perform step 7.a of EPP-005, determine the corrected Xe-free cold shutdown boron concentration using OST-1036.
NO15minutes2008HARRISNRCRO-SRO
Record values on this cue sheet once it is determined if SDM requirements are met by the current boron concentration.
At-1Rev2NUREG1021,Revision9
C RODS        _
Appendix C (DenoteCriticalStepswithaStartTime:_Page3of8 PERFORMANCE
CCURVE          _
INFORMATIONFormES-C-1
C REQ,         _
Performance
C RCS,         _
Step: 1 Standard: Evaluator Cue: Comment: Performance
CSDM          _
Step: 2 Standard: Evaluator Cue: Comment: Performance
MET / NOT MET (Circle one)
Step: 3 Standard:;.Comment:ReviewsEPP-005,Step7.
Time Critical Task: NO Validation Time:    15 minutes 2008 HARRIS NRC RO-SRO At-1 Rev 2                                NUREG 1021, Revision 9
Determines
 
OST-1036 applies.Provide EPP-005, Step 7.Locates/reviewsOST-1036.Determines
Appendix C                                     Page 3 of 8                    Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a ~)
OST-1036,Section7.2applies.
Start Time:         _
Provide OST-1036.Recordthefollowing:*CoreburnupfromMCRStatusboard.
Performance Step: 1        Reviews EPP-005, Step 7.
*TemperatureforwhichthisSDM
Standard:                  Determines OST-1036 applies.
calculationistaking credit.*Latest availableRCSboronsample.FromInitial
Evaluator Cue:              Provide EPP-005, Step 7.
Conditions, records:*130EFPD*200°F,orless*1125ppm 2008 HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9
Comment:
Appendix CPage4of8 PERFORMANCE
Performance Step: 2        Locates/reviews OST -1036.
INFORMATIONFormES-C-1
Standard:                  Determines OST-1036, Section 7.2 applies.
Performance
Evaluator Cue:              Provide OST-1036.
Step: 4 Standard: Evaluator Cue: Comment: Performance
Comment:
Step: 5 Standard: Comment: Performance
Performance Step: 3        Record the following:
Step: 6 Standard: Comment:Recordthefollowing:*RCSB-10ATOM
* Core burn up from MCR Status board.
percentfromMCRStatusBoardORRWSTB-10Atompercent, IF followingCoreReload.Records19.36
* Temperature for which this SDM calculation is taking credit.
RCS 8-10 ATOM percent from cue sheet Checkrodstatusasfollows:*Ifallrodsareinserted,record
* Latest available RCS boron sample.
CRODS=0inStep7.2.2.aandN/AStep7.2.2.b.Records0in7.2.2.aandN/A's7.2.2.b.
Standard :;.                From Initial Conditions, records:
DetermineXenonfreeSDMboron
* 130 EFPD
concentration,CSDM,as follows:a.Recordthefollowing
* 200°F, or less
information:*Boronadditionto
* 1125 ppm Comment:
compensateforstuckrodsfrom
2008 HARRIS NRC RO-SRO A1-1 Rev 2                                  NUREG 1021, Revision 9
Attachment1orStep7.2.2.a.
 
Enters O.2008HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9
Appendix C                              Page 4 of 8                        Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Record the following:
Appendix CPage5of8 PERFORMANCE
* RCS B-10 ATOM percent from MCR Status Board OR RWST B-10 Atom percent, IF following Core Reload.
INFORMATIONFormES-C-1
Standard:          Records 19.36 Evaluator Cue:      RCS 8-10 ATOM percent from cue sheet Comment:
PerformanceStep:7 Standard: Evaluator Cue: Comment: PerformanceStep:8 Standard: Comment:PerformanceStep:9 Standard: Comment: DetermineXenonfreeSOMboron
Performance Step: 5 Check rod status as follows:
concentration,CSOM,as follows:a.Recordthe
* If all rods are inserted, record CRODS = 0 in Step 7.2.2.a and N/A Step 7.2.2.b.
following information:
Standard:          Records 0 in 7.2.2.a and N/A's 7.2.2.b.
*UncorrectedrequiredSOMboron
Comment:
concentration
Performance Step: 6 Determine Xenon free SDM boron concentration, CSDM, as follows:
fromcurveA-X-22(Useactionlevellineoncurve.)Reads2020to2040ppm
: a. Record the following information:
DeterminerequiredXenonfreeSOM
* Boron addition to compensate for stuck rods from Attachment 1 or Step 7.2.2.a.
uncorrected
Standard:          Enters O.
boron concentration
Comment:
CREQ: CREQCROOS+CCURVE CREQ=_CREQ=2020to2040ppm
2008 HARRIS NRC RO-SRO A1-1 Rev 2                              NUREG 1021, Revision 9
DetermineXenonfreeSOM
 
corrected boron concentration, CSOM: 19.9/ArcsxCREQDivides19.9by19.36and
Appendix C                              Page 5 of 8                        Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 Determine Xenon free SOM boron concentration, CSOM, as follows:
multipliesbyCREQ: 19.9/19.36(2020to2040ppm)=Records2076to2097ppm
: a. Record the following information:
2008 HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9
* Uncorrected required SOM boron concentration from curve A-X-22 (Use action level line on curve.)
AppendixCPage6of8 PERFORMANCE
Standard:          Reads 2020 to 2040 ppm Evaluator Cue:
INFORMATIONFormES-C-1Performance
Comment:
Step: 10 Standard: Comment: Terminating
Performance Step: 8 Determine required Xenon free SOM uncorrected boron concentration CREQ:
Cue: Determine whetherSDMrequirementscanbemetbyXenonfreeSOMcalculation:CompareRCSboron
CREQ ~ CROOS + CCURVE CREQ=               _
concentration,CRCS,andXenonfreeSOMcorrectedboron
Standard:          CREQ = 2020 to 2040 ppm Comment:
concentration, CSDM:*CRCSRCSboronsamplefromStep7.2.1.*CSOMXenonfreeSDMcorrectedboron
~  Performance Step: 9 Determine Xenon free SOM corrected boron concentration, CSOM:
concentrationfromStep7.2.3.c.IfCRCSislessthanorequaltoCSDM,thencontinuewithStep7.2.5totakecreditforXenoneffects.
19.9/Arcs x CREQ Standard:          Divides 19.9 by 19.36 and multiplies by CREQ:
DeterminescurrentRCSboron
19.9/19.36 (2020 to 2040 ppm) =
concentrationis<CSDMboron
Records 2076 to 2097 ppm Comment:
concentration.Whenthe candidate proceeds toStep7.2.5:
2008 HARRIS NRC RO-SRO A1-1 Rev 2                                NUREG 1021, Revision 9
ThisJPMis complete.StopTime:_2008HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9
 
Appendix CPage7of8 VERIFICATION
Appendix C                              Page 6 of 8                        Form ES-C-1 PERFORMANCE INFORMATION
QF COMPLETIONFormES-C-1
~  Performance Step: 10 Determine whether SDM requirements can be met by Xenon free SOM calculation:
Job PerformanceMeasureNo.:2008NRCJPMRO/SROA1-1
Compare RCS boron concentration, CRCS, and Xenon free SOM corrected boron concentration, CSDM:
Examinee's
* CRCS              RCS boron sample from Step 7.2.1.
Name:DatePerformed:FacilityEvaluator:
* CSOM              Xenon free SDM corrected boron concentration from Step 7.2.3.c.
NumberofAttempts:TimetoComplete:.
If CRCS is less than or equal to CSDM, then continue with Step 7.2.5 to take credit for Xenon effects.
Standard:            Determines current RCS boron concentration is <CSDM boron concentration.
Comment:
Terminating Cue:        When the candidate proceeds to Step 7.2.5: This JPM is complete.
Stop Time:             _
2008 HARRIS NRC RO-SRO A1-1 Rev 2                                NUREG 1021, Revision 9
 
Appendix C                            Page 7 of 8                  Form ES-C-1 VERIFICATION QF COMPLETION Job Performance Measure No.: 2008 NRC JPM RO/SRO A1-1 Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete: .
Question Documentation:
Question Documentation:
Question: Response: Result: Examiner's
Question:
Signature:
 
SAT UNSAT Date:2008HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9
===Response===
Appendix CPage8of8JPMCUE SHEETFormES-C-1
Result:                     SAT            UNSAT Examiner's Signature:                                 Date:
INITIAL CONDITIONS:
2008 HARRIS NRC RO-SRO A1-1 Rev 2                          NUREG 1021, Revision 9
INITIATING
 
CUE:*Theunit trippedduetoalossofoff-sitepower.Allcontrolrodshaveinserted.*The operatingcrewis performing
Appendix C                                Page 8 of 8                        Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
EPP-005, NATURALCIRCULATIONCOOLDOWN.*TheunitwillbetakentoColdShutdown.
* The unit tripped due to a loss of off-site power. All control rods have inserted.
*PowerTraxisnotavailable.
* The operating crew is performing EPP-005, NATURAL CIRCULATION COOLDOWN.
*CurrentRCSBoron concentrationis1125ppm.*CoreBurnupis130EFPD.*RCSB-10AtomPercentis19.36
* The unit will be taken to Cold Shutdown.
*Temperatureis140&deg;F.USCOhas directedyoutoperformstep7.aofEPP-005, determine the corrected Xe-freecoldshutdownboron
* PowerTrax is not available.
concentrationusingOST-1036.Recordvaluesonthiscuesheetonceitis
* Current RCS Boron concentration is 1125 ppm.
determinedifSDM requirementsaremetbythe
* Core Burnup is 130 EFPD.
current boron concentration.
* RCS B-10 Atom Percent is 19.36
CRODS_CCURVE_CREQ_CRCS_CSDM_MET/NOTMET(Circleone)2008HARRISNRCRO-SROA1-1Rev2NUREG1021,Revision9
* Temperature is 140&deg;F.
Appendix C Page 8 of 8JPMCUE SHEET INITIAL CONDITIONS:
INITIATING CUE:        USCO has directed you to perform step 7.a of EPP-005, determine the corrected Xe-free cold shutdown boron concentration using OST-1036.
INITIATING
Record values on this cue sheet once it is determined if SDM requirements are met by the current boron concentration.
CUE:*The unit tripped duetoa toss of off-site power.All control rods have inserted.*The operating crew is performing
C RODS            _
EPP-005 7 NATURAL CIRCULATION
CCURVE        _
COOLDOWN.*Theunitwillbe
CREQ            _
takentoCold Shutdown.*PowerTraxisnot available.
CRCS            _
*Current ReS Boron concentration
C SDM            _
is 1125 ppm.*Core Burnupis130 EFPD.*ReS B-10 Atom Percent is 19.36*Temperature
MET / NOT MET (Circle one) 2008 HARRIS NRC RO-SRO A1-1 Rev 2                                NUREG 1021, Revision 9
is 140&deg;F.usee has directedyouto perform step 7.aof
 
determine the corrected Xe-free cold shutdown boron concentration
Appendix C                                         Page 8 of 8 JPM CUE SHEET INITIAL CONDITIONS:
using OST-1036.Record values on this cue sheet onceitis determined
* The unit tripped due to a toss of off-site power. All control rods have inserted.
if 8DM requirements
* The operating crew is performing EPP-005 NATURAL  7 CIRCULATION COOLDOWN.
are met by the current boron concentration.
* The unit will be taken to Cold Shutdown.
CRODS C"'}..,./("')()...,/r"j.r;ICCURVE
* PowerTrax is not available.
l/7(j(;2o Bo<.fq)CREQ
* Current ReS Boron concentration is 1125 ppm.
(
* Core Burnup is 130 EFPD.
(9c.)((())
* ReS B-10 Atom Percent is 19.36
eRCS\lCSDM f)bt (c, (90'7&deft 7)MET(Circleone)
* Temperature is 140&deg;F.
2008 HARRIS NRC RO-SROA1-1Rev2 NUREG 1021, Revision 9  
INITIATING CUE:          usee has directed you to perform step 7.aof EPP-005~
Appendix C Job Performance
determine the corrected Xe-free cold shutdown boron concentration using OST-1036.
Measure WorksheetFormES-C-1
Record values on this cue sheet once it is determined if 8DM requirements are met by the current boron concentration.
Facility: HARRISTaskNo.:005016H101TaskTitle:KIAReference:
:~:.
Examinee:EstimatePrimaryto
CRODS       C"'}
SecondaryLeakRate2.1.31(4.2)JPMNo.:2008NRCROADMJPMA1-2NRCExaminer:FacilityEvaluator:
                                        ..,./
Date:Methodoftesting:ThisJPM should be performedona frozen simulator.SimulatedPerformance:
("' ) () ...,   /r"j . r; I    ...~
ClassroomREADTOTHE EXAMINEE SimulatorActualPerformance:XPlant XIwillexplaintheinitialconditions,whichstepstosimulateordiscuss,andprovideinitiatingcues.Whenyoucompletethetask
CCURVE (1.(),~.}O        l/7(j(;2o I~O Bo<.fq)
successfully,theobjectiveforthisJob
C REQ  ~c\:3t)          ( 9t)(~o,,\nc} (9c.)((())
PerformanceMeasurewillbesatisfied.
eRCS   \ l L.~)
.Initial Conditions:*Theplantisat100
CS DM f) b  '7(~    t (c, (90'7&     +~ deft 7)
%power.*Asteam generatortubeleakisinprogress.
MET   I~~~V (Circle one) 2008 HARRIS NRC RO-SRO A1-1 Rev 2                                            NUREG 1021, Revision 9
*AOP-016hasbeenenteredandactionsareinprogress.*OSI-PIisnotavailable.
 
*Chemistrysamplinghasnotcommenced.*Motivatingairisisolated.TaskStandard:Determinesleakratetobe
Appendix C                                 Job Performance Measure                   Form ES-C-1 Worksheet Facility:               HARRIS                                    Task No.:   005016H101 Task
--25gpdusingMethod1ofAOP-016,Att.1.RequiredMaterials:NoneGeneralReferences:AOP-016,ExcessivePrimaryPlantLeakage,Rev37CurveBook Handouts:InitiatingCue:TimeCriticalTask:ValidationTime:
 
AOP-016, Attachment
==Title:==
1TheUSCGhas
Estimate Primary to Secondary            JPM No.:   2008 NRC RO ADM Leak Rate                                            JPM A1-2 KIA
directedyoutoperformAOP-016,ExcessivePrimaryPlantLeakage, Attachment1step3toestimateprimaryto
 
secondary leakage.No10minutesHARRIS2008NRCROA1-2REVISION2NUREG1021,Revision9
==Reference:==
Appendix C Job Performance
2.1.31 (4.2)
Measure Worksheet SIMULATOR SETUPFormES-C-1
Examinee:                                                       NRC Examiner:
IC-19imfRMS079 (REM-1TV-3534
Facility Evaluator:                                             Date:
CVPETS)to6.00E-7uCi/ml.NOTE:MustgotoRUNforthe
Method of testing: This JPM should be performed on a frozen simulator.
malfunctiontoshow.Leave simulator in FREEZE once malfunction
Simulated Performance:                                         Actual Performance:    X Classroom                Simulator        X      Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.                                                                .
has appeared.HARRIS2008NRCROA1-2
Initial Conditions:
REVISION 2NUREG1021,Revision9
* The plant is at 100% power.
Appendix C (DenoteCriticalStepswithaStartTime:_
* A steam generator tube leak is in progress.
Page 3'of 6 PERFORMANCE
* AOP-016 has been entered and actions are in progress.
INFORMATIONFormES-C-1'
* OSI-PI is not available.
PerformanceStep:1 Standard: Evaluator Cue: Comment:PerformanceStep:2 Standard: Comment:PerformanceStep:3 Standard: Comment: Obtain procedure.Locatesandreviews
* Chemistry sampling has not commenced.
procedures.
* Motivating air is isolated.
Provide Curve BookandAOP-016,Att.1, step 3 after the procedure is located.ESTIMATE Primary-To-SecondaryleakrateusingONEofthe
Task Standard:             Determines leak rate to be --25 gpd using Method 1 of AOP-016, Att. 1.
methodslisted(no preferred method):Method1:Use
Required Materials:         None General
CondenserVacuumPumpRad
 
Monitor3534(Grid2),CurveH-X-15A,CurveH-X-15B,or
==References:==
H-X-15C (Dependingonstatusof
AOP-016, Excessive Primary Plant Leakage, Rev 37 Curve Book Handouts:                   AOP-016, Attachment 1 Initiating Cue:            The USCG has directed you to perform AOP-016, Excessive Primary Plant Leakage, Attachment 1 step 3 to estimate primary to secondary leakage.
motivating
Time Critical Task:        No Validation Time:            10 minutes HARRIS 2008 NRC RO A1-2 REVISION 2                                            NUREG 1021, Revision 9
air)DeterminesthatMethod1isrequired.
 
OperatesRM-11toobtainreadingfor
Appendix C                         Job Performance Measure         Form ES-C-1 Worksheet SIMULATOR SETUP IC-19 imf RMS079 (REM-1TV-3534 CVPETS) to 6.00 E-7 uCi/ml.
REM-1TV-3534(Grid2).Reads REM-1TV-3534as6.00E-7
NOTE: Must go to RUN for the malfunction to show.
HARRIS2008NRCROA1-2
Leave simulator in FREEZE once malfunction has appeared.
REVISION 2NUREG1021,Revision9
HARRIS 2008 NRC RO A1-2 REVISION 2                        NUREG 1021, Revision 9
Appendix CPerformance
 
Step: 4Page4of6 PERFORMANCE
Appendix C                                     Page 3'of 6                     Form ES-C-1 '
INFORMATION
PERFORMANCE INFORMATION (Denote Critical Steps with a ~)
DetermineswhichcurvefromCurveBooktouse.FormES-C-1
Start Time:          _
Standard: Comment:Performance
Performance Step: 1         Obtain procedure.
Step: 5 Standard: Comment: Terminating
Standard:                  Locates and reviews procedures.
Cue: StopTime:_UsesCurve H-X-15Csincemotivatingairisisolated.
Evaluator Cue:              Provide Curve Book and AOP-016, Att. 1, step 3 after the procedure is located.
Calculates
Comment:
Primary to Secondaryleakrate.Determines
~  Performance Step: 2        ESTIMATE Primary-To-Secondary leak rate using ONE of the methods listed (no preferred method):
Primary to Secondaryleakrateisbetween22gpdto27gpd).+/-2.5 gpd is margin of errorbasedon reading data from graphWhenthe primary to secondaryleakratehasbeen
Method 1: Use Condenser Vacuum Pump Rad Monitor REM-3534 (Grid 2), Curve H-X-15A, Curve H-X-15B, or H-X-15C (Depending on status of motivating air)
determined
Standard:                  Determines that Method 1 is required.
and reported totheUSCO: Evaluation
Comment:
on thisJPMis complete.HARRIS2008NRCROA1-2REVISION2NUREG1021,Revision9
~  Performance Step: 3        Operates RM-11 to obtain reading for REM-1TV-3534 (Grid 2).
AppendixCPage5of6 VERIFICATION
Standard:                    Reads REM-1TV-3534 as 6.00 E-7   ~Ci/ml.
OF COMPLETIONFormES-C-1JobPerformanceMeasureNo.:2008NRCROADMJPMA1-2
Comment:
Examinee's
HARRIS 2008 NRC RO A1-2 REVISION 2                                    NUREG 1021, Revision 9
Name:DatePerformed:FacilityEvaluator:NumberofAttempts:TimetoComplete:
 
Appendix C                            Page 4 of 6                        Form ES-C-1 PERFORMANCE INFORMATION
Performance Step: 4  Determines which curve from Curve Book to use.
Standard:           Uses Curve H-X-15C since motivating air is isolated.
Comment:
~  Performance Step: 5  Calculates Primary to Secondary leak rate.
Standard:            Determines Primary to Secondary leak rate is between 22 gpd to 27 gpd).
Comment:            +/- 2.5 gpd is margin of error based on reading data from graph Terminating Cue:        When the primary to secondary leak rate has been determined and reported to the USCO: Evaluation on this JPM is complete.
Stop Time:        _
HARRIS 2008 NRC RO A1-2 REVISION 2                            NUREG 1021, Revision 9
 
Appendix C                            Page 5 of 6                  Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC RO ADM JPM A1-2 Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question Documentation:
Question: Response: Result: Examiner's
Question:
Signature:
 
SAT UNSAT Date:HARRIS2008NRCROA1-2REVISION2NUREG1021,Revision9
===Response===
Appendix CPage6of6JPMCUE SHEETFormES-C-1
Result:                     SAT            UNSAT Examiner's Signature:                                 Date:
INITIAL CONDITIONS:
HARRIS 2008 NRC RO A1-2 REVISION 2                          NUREG 1021, Revision 9
INITIATING
 
CUE:*Theplantisat100
Appendix C                              Page 6 of 6                        Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
%power.*Asteam generatortubeleakisinprogress.
* The plant is at 100 % power.
*AOP-016hasbeenenteredandactionsareinprogress.*OSI-PIisnotavailable.
* A steam generator tube leak is in progress.
*Chemistry samplinghasnot commenced.
* AOP-016 has been entered and actions are in progress.
*Motivatingairisisolated.TheUSCOhas
* OSI-PI is not available.
directedyoutoperformAOP-016,Excessive
* Chemistry sampling has not commenced.
PrimaryPlantLeakage, Attachment1step3to estimate primary to secondary leakage.HARRIS2008NRCROA1-2
* Motivating air is isolated.
REVISION 2NUREG1021,Revision9
INITIATING CUE:        The USCO has directed you to perform AOP-016, Excessive Primary Plant Leakage, Attachment 1 step 3 to estimate primary to secondary leakage.
Appendix CJobPerformanceMeasure
HARRIS 2008 NRC RO A1-2 REVISION 2                            NUREG 1021, Revision 9
WorksheetFormES-C-1
 
Facility: HARRISTaskNo.: 341010H302TaskTitle:PerformReviewofDaily
Appendix C                                  Job Performance Measure                    Form ES-C-1 Worksheet Facility:               HARRIS                                  Task No.:   341010H302 Task
SurveillanceRequirementsLogJPMNo.:2008NRCSROA1-2
 
KJAReference:
==Title:==
2.1.18 (3.0)Examinee:NRCExaminer:FacilityEvaluator:
Perform Review of Daily                  JPM No.:   2008 NRC SRO A1-2 Surveillance Requirements Log KJA
Date:Methodoftesting:SimulatedPerformance:
 
ClassroomREADTOTHE EXAMINEE X SimulatorActualPerformance:
==Reference:==
Plant---xIwillexplaintheinitialconditions,whichstepstosimulateordiscuss,andprovideinitiatingcues.Whenyou
2.1.18 (3.0)
completethetasksuccessfully,theobjectiveforthisJob
Examinee:                                                     NRC Examiner:
PerformanceMeasurewillbesatisfied.InitialConditions:*TheplantisinMode2,waitingfor
Facility Evaluator:                                          Date:
managementapprovaltoproceedtoMode1.*EDG"8" is synchronizedtothegridfora
Method of testing:
post-maintenance
Simulated Performance:                                       Actual Performance:       x Classroom            X   Simulator  - - - Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
test.*TheDailySurveillanceLogs(OST-1021, Attachment4)for2100havebeencompleted.*ERFIS PressurizerPressuresareunavailable.TaskStandard:AllerrorsandTSactionsidentifiedRequiredMaterials:PerforminalocationwithTSor
Initial Conditions:
electronicaccesstoTSavailable.GeneralReferences:*OST-1021,DAILY
* The plant is in Mode 2, waiting for management approval to proceed to Mode 1.
SURVEILLANCE
* EDG "8" is synchronized to the grid for a post-maintenance test.
REQUIREMENTS, DAILYINTERVAL,MODE1AND2*Technical
* The Daily Surveillance Logs (OST-1021 , Attachment 4) for 2100 have been completed.
SpecificationsHARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9
* ERFIS Pressurizer Pressures are unavailable.
Appendix C Job Performance
Task Standard:             All errors and TS actions identified Required Materials:         Perform in a location with TS or electronic access to TS available.
Measure WorksheetFormES-C-1
General
Handouts:InitiatingCue:TimeCriticalTask:ValidationTime:*Copyofa completedOST-1021, Attachment
 
4.*Deleteallnotes.
==References:==
*Substitute
* OST-1021 , DAILY SURVEILLANCE REQUIREMENTS, DAILY INTERVAL, MODE 1 AND 2
the following incorrect data:*Modifylogreadingsonp.19ofOST-1021sothatthe1500readingof457and456arelowand
* Technical Specifications HARRIS 2008 NRC SRO A1-2 Rev 2                                              NUREG 1021, Revision 9
together average<2205.*Include455
 
approximately60psighighsothatthechannelcheckisunsat.
Appendix C                           Job Performance Measure                 Form ES-C-1 Worksheet Handouts:
*Condensate
* Copy of a completed OST-1021 , Attachment 4.
StorageTankLevel(both
* Delete all notes.
channels)progressivelyloweringfrom
* Substitute the following incorrect data:
85%to 60%throughouttheday(TS).*RCSLoopFlowChannelFI-424
* Modify log readings on p.19 of OST-1021 so that the 1500 reading of 457 and 456 are low and together average < 2205.
progressivelyloweringfrom100.21to98.13
* Include 455 approximately 60 psig high so that the channel check is unsat.
throughouttheday(TS).*EDGRoom Temperature
* Condensate Storage Tank Level (both channels) progressively lowering from 85% to 60% throughout the day (TS).
channel TDG6903B@121&deg;F(shouldbecircled)YouaretheUSCGandhave
* RCS Loop Flow Channel FI-424 progressively lowering from 100.21 to 98.13 throughout the day (TS).
just completed an emergencywatchreliefduetoillnessofthe
* EDG Room Temperature channel TDG6903B @ 121&deg;F (should be circled)
scheduledperson.ReviewtheOST-1021, Attachment4logs.Atthe
Initiating Cue:    You are the USCG and have just completed an emergency watch relief due to illness of the scheduled person. Review the OST-1021 ,
conclusionofyourreview,discussanyfindingswithme.
Attachment 4 logs. At the conclusion of your review, discuss any findings with me.
No20minutes HARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9
Time Critical Task: No Validation Time:    20 minutes HARRIS 2008 NRC SRO A1-2 Rev 2                                    NUREG 1021, Revision 9
Appendix C(DenoteCriticalStepswithaStartTime:_Page3of7 PERFORMANCE
 
INFORMATIONFormES-C-1
Appendix C                                       Page 3 of 7                      Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a ~)
PerformanceStep:1 Standard: Evaluator Cue: Evaluator Note: Comment:-v Performance
Start Time:           _
Step: 2 Standard: Comment: Obtain completed log.Reviewshandout.
Performance Step: 1          Obtain completed log.
*Provide handout forNRCSROA1-2
Standard:                    Reviews handout.
after the Initial Conditions
Evaluator Cue:
are reviewedandthe InitiatingCueis provided.*If necessary, after the applicant discusses each finding: What action,ifany,is required relative to this reading?Only the incorrect itemsinthe logs are identifiedintheJPM Steps.ReviewOST-1021, Attachment4forapproval.
* Provide handout for NRC SRO A1-2 after the Initial Conditions are reviewed and the Initiating Cue is provided.
*Identifies
* If necessary, after the applicant discusses each finding:
that PressurizerPressureChannel
What action, if any, is required relative to this reading?
455.failsit'schannelcheck.HARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9
Evaluator Note:              Only the incorrect items in the logs are identified in the JPM Steps.
Appendix C'./PerformanceStep:3Page4of7 PERFORMANCE
Comment:
INFORMATION
-v Performance Step: 2          Review OST -1021, Attachment 4 for approval.
Review OST-1021, Attachment4forapproval.FormES-C-1
Standard:
Standard: Evaluator Cue: Comment: './PerformanceStep:4 Standard: Comment: './PerformanceStep:5 Standard: Comment:*Identifiesthatthe Pressurizer
* Identifies that Pressurizer Pressure Channel 455. fails it's channel check.
Pressuresshouldhavethe
Comment:
calculations
HARRIS 2008 NRC SRO A1-2 Rev 2                                          NUREG 1021, Revision 9
completed.
 
*Pressurizerpressureshouldbeidentifiedlowoutofspecbasedon performing
Appendix C                                  Page 4 of 7                        Form ES-C-1 PERFORMANCE INFORMATION
calculationwithonly Channels456and 457.SROmay send paperwork back toROtodothe calculations.IfsocuetheSROto
'./ Performance Step: 3  Review OST-1021, Attachment 4 for approval.
perform the calculations.
Standard:
Review OST-1021, Attachment4forapproval.
* Identifies that the Pressurizer Pressures should have the calculations completed.
*IdentifiesoneRCSLoop"B"FlowChannel(Sheet5)isbelow
* Pressurizer pressure should be identified low out of spec based on performing calculation with only Channels 456 and 457.
Acceptance
Evaluator Cue:      SRO may send paperwork back to RO to do the calculations.
Criteria.*Readingshouldbecircled.TSdoesnotapplyinMode2.
If so cue the SRO to perform the calculations.
ReviewOST-1021, Attachment4forapproval.
Comment:
*Condensate
'./  Performance Step: 4  Review OST-1021, Attachment 4 for approval.
Storage TankLevel(Sheet7)isbelow
Standard:
Acceptance
* Identifies one RCS Loop "B" Flow Channel (Sheet 5) is below Acceptance Criteria.
Criteria.*ReadingshouldbecircledandentryintoTS
* Reading should be circled. TS does not apply in Mode 2.
3.7.1.3Actionarestoreto operableorbeinHSBwithin6hours,isrequired.HARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9
Comment:
Appendix C-Y PerformanceStep:6Page5of7 PERFORMANCE
'./ Performance Step: 5  Review OST-1021 , Attachment 4 for approval.
INFORMATION
Standard:
Review OST-1021, Attachment4forapproval.FormES-C-1
* Condensate Storage Tank Level (Sheet 7) is below Acceptance Criteria.
Standard: Evaluator Cue: Evaluator Note: Comment: Terminating
* Reading should be circled and entry into TS 3.7.1.3 Action a -
Cue: StopTime:_*Identifies
restore to operable or be in HSB within 6 hours, is required.
Diesel GeneratorRoom261 temperature
Comment:
TDG6903B(Sheet10)exceeds Acceptance
HARRIS 2008 NRC SRO A1-2 Rev 2                                    NUREG 1021, Revision 9
Criteria.*Readingshouldbecircledand
 
investigative/corrective
Appendix C                              Page 5 of 7                        Form ES-C-1 PERFORMANCE INFORMATION
actions implemented.
-Y Performance Step: 6  Review OST-1021, Attachment 4 for approval.
If requested:
Standard:
EDG"B"hasbeen running for 30 minutes.Reading does not meet criteria for declaring equipment in the room inoperable.
* Identifies Diesel Generator Room 261 temperature TDG6903B (Sheet 10) exceeds Acceptance Criteria.
'After all findingshavebeen reviewed: Evaluation
* Reading should be circled and investigative/corrective actions implemented.
on thisJPMis complete.HARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9
Evaluator Cue:        If requested: EDG "B" has been running for 30 minutes.
AppendixCPage6of7 VERIFICATION
Evaluator Note:      Reading does not meet criteria for declaring equipment in the room inoperable.         '
OF COMPLETIONFormES-C-1JobPerformanceMeasureNo.:2008NRCSROA1-2Examinee'sName:DatePerformed:FacilityEvaluator:NumberofAttempts:TimetoComplete:
Comment:
Terminating Cue:        After all findings have been reviewed: Evaluation on this JPM is complete.
Stop Time:        _
HARRIS 2008 NRC SRO A1-2 Rev 2                                NUREG 1021, Revision 9
 
Appendix C                            Page 6 of 7                Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SRO A1-2 Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question Documentation:
Question: Response: Result: Examiner's
Question:
Signature:
 
SAT UNSAT Date:HARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9
===Response===
Appendix CPage7of7JPMCUESHEETFormES-C-1
Result:                     SAT            UNSAT Examiner's Signature:                               Date:
INITIAL CONDITIONS:
HARRIS 2008 NRC SRO A1-2 Rev 2                          NUREG 1021, Revision 9
INITIATING
 
CUE:*TheplantisinMode2,waitingfor
Appendix C                                Page 7 of 7                      Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
managementapprovalto
* The plant is in Mode 2, waiting for management approval to proceed to Mode 1.
proceedtoMode1.*EDG"8" is synchronizedtothegridtor.a
* EDG "8" is synchronized to the grid tor.a post-maintenance test.
post-maintenance
* The Daily Surveillance Logs (OST-1021 , Attachment 4) for 2100 have been completed.
test.*TheDaily SurveillanceLogs(OST-1021, Attachment4)for2100havebeencompleted.*ERFIS PressurizerPressuresare
* ERFIS Pressurizer Pressures are unavailable.
unavailable.YouaretheUSCGandhavejust
INITIATING CUE:        You are the USCG and have just completed an emergency watch relief due to illness of the scheduled person. Review the OST-1021, Attachment 4 logs. At the conclusion of your review, discuss any findings with me.
completed an emergency watchreliefduetoillnessofthe
HARRIS 2008 NRC SRO A1-2 Rev 2                                    NUREG 1021, Revision 9
scheduledperson.Reviewthe1021, Attachment4logs.Atthe
 
conclusionofyourreview, discuss any findingswithme.HARRIS2008NRCSROA1-2Rev2NUREG1021,Revision9
Attachment 4 ... Daily Surveillance Requirements Log Sheet 1 of 15 TECH SPEC                                                              4.5.1,1.a.1 1 a.z Eees ACCUMULATORS PARAMETER etA A PRESSURE               CLA B PRESSURE              CLA C PRESSURE INSTRUMENT      PI- 921          PI- 923      PI-925      PI ..927       Pl-929       PI ... 931 ACCEPTANCE                                 Between 585 and 665 psig                                                        OPEN CRITER!A MODE                                         1~ 2 AND 3 WITH ReS PRESSURE ABOVE 1000 PSIG 0300 0900 1500 210q TECH SPEC                                                     a.s. 1.1,8.1 14.5.1.1, b (partial)
4.5.1 , 1.a.1 1 a.zTECHSPEC Attachment
ECCS A.CCUMULATORS PARAMETER CLA A LEVEL                                  CLA B LEVEL                                  CLA C LEVEL SampUng Not                                   Sampling Not                                 SampUng Not INSTRUMENT    LI ..920       Lt ..922   Required per       LI ~ 924      Ll- 926*     Required per       Ll ..928     U ~. 930      Required per AU6                                          Att 6                                        Aft 6 ACCEPTANCE                                               between 66 and 96 ok Indicated level viith CRiTERIA          less tha.~ 9(}k cumulative level increase(excludfng makeup from operable RWST) ~inye last satisfact() sample MODE                                          1 2 AND 3 WITH ReS PRESSUREABOVE 1000 PSIG 1
4...Daily Surveillance
Previous Days Level 0300 0900 1500 2100 4.3.2.1.10 2c, Sa3 3b3~ 3c3~ 4c 1         1            1 TECH SPEC                                        4A.6,2,1.b 5c, Bd,6g; 4,3.3.6.1a; 4J3.1.4 CNMTSUMP                     SUMP PARAMETER                                                            CNMT SUMP LEVEL                        CONTAINMENT PRESSURE FLOW MONITORiNG                LEAK RATE ALB 1                          URE       URE           LeT               LeT           PI                         PI iNSTRUMENT                    ERF1S                                                                                                          N/A 9001      9002        7161A              7161B          950                        953 PROGRAM ACCEPTANCE      NO            CHECKS                                                                                                        CHAN.
Requirements
N/A                          NfA                        LESSTHAN 1.6 PSfG CRITERIA    ALARM              PER                                                                                                      CHECK OP..163 MODE 0300 0900 1500 2100
LogSheet1of15
[6ST-1021                                                       Rev. 66                                                       Page 17 of~O      I
etA A PRESSURECLAB PRESSURECLAC PRESSURE Between 585 and 665 psig OPEN Eees ACCUMULATORS
 
PI..927 Pl-929 PI...931 PI-925 PI-923 PI-921 PARAMETER INSTRUMENT
Attachment 4 - Daily Surveillance Requirements Log Sheet 2 of 15 TECH SPEC             4.1.2.6.a.2; 4.5.4.a.1; 4.3.2.1. 7b,             se: 4.3.3.6.9                                     4.1.2.6.a.2~ a.3 PARAMETER                                 RWST LEVEL                                                                  BORIC ACID TANK INSTRUMENT    L!..990         Ll...991         LI-992        LI..993             N/A                   LI-106         L1..161.158             TCS7240 GREATER THAN ACCEPTANCE      GREATER THAN OR EQUAL TO 92&deg;k>
ACCEPTANCE
CHANNEL                    GREATER THAN OR OR EQUAL TO CRITERJA                                                                     CHECK                          EQUAL TO 74%>                         QF 65 MODE                                       1.2   13) and.4                                                               1.2,3 and 4 0300         C,iP C1C-,                       (il.l       9,5               IC)-(~)                    2? I           gc:)               Ci~?
CRITER!A MODE 12AND 3 WITH ReS PRESSUREABOVE1000 PSIG 0300 0900 1500 210q TECH SPEC a.s.1.1,8.1 14.5.1.1, b (partial)PARAMETER ECCS A.CCUMULATORSCLAALEVEL CLABLEVELCLACLEVEL INSTRUMENT
                                                                                    ~
SampUng Not Sampling Not SampUng Not LI..920 Lt..922 Required per LI924 Ll-926*Required per Ll..928 U930 Required per AU 6 Att 6Aft6 ACCEPTANCE
0900                                                   .:
CRiTERIA MODE between 66 and 96 ok Indicated level viith less
                                                                                    '~
9(}k cumulative
                                              , ....                   /:
level increase (excludfngmakeupfrom
1500 2100                                                                       ;h(')
operable RWST)
V TECH SPEC                                                       4.5,2.a                                                                 4.4.9.3 PRZ PARAMETER                                          ECCS VALVE ALIGNMENT SPRAY ~T INSTRUMENT      181..340             181-341             181-359         I   181-86     I 1$1-52           I   181-107 TJ-123 TI-454.1 OPEN AND PULLEDTO                                                                                                        LESS THAN ACCEPTANCE                                                       SHUT AND PULLED TO LOCK WITH LOCK WiTH CONTROL                                                                                                       OR EQUAL CRITERIA                                                                CONTROL POWER OFF POWER OFF                                                                                                     TO 625&deg;F DURINGAUX MODE                                                       1 r 2, and 3 SPRAY OPS 0300         Ai)                   (\41           rtJ               r\O              (;~~J
last satisfact()
                                                                                                  ",                 dl~)                  tJ /;~
sample 1 1 2 AND 3 WITHReSPRESSUREABOVE
0900         ''':b                .~                th*
1000 PSIG Previous Days Level 0300 0900 1500 2100 TECH SPEC 4A.6,2,1.b
                                                              ,~f~            .:~            ~~.                    ~                    f.J If~
4.3.2.1.10
r~;U                                ~1:)
1 2c , Sa3 14c 1 5c, Bd, 6g;4,3.3.6.1a;
1500          r-~\)
4J3.1.4 PARAMETER CNMTSUMP FLOW MONITORiNG
                      ;:.                                  ~                                  ~                    ~                      If,JIA 2100          "k)                ~O                'A-~O              {h0             itO                   ihQ
SUMP LEAK RATECNMTSUMPLEVEL
                                                                                                                      ) l                    "if (-)
CONTAINMENT
                          ~              lJ                V                                 V                   V TECH SPEC                                                               4.4.3,1: 4.3.1.1.11: 4.3.3.6.5 PARAMETER                                                                   PRESSURIZER LEVEL INSTRUMENT                 LI-460                                 LI-461.1                               LI-459A.1                           N/A ACCEPTANCE                                                  LESS THAN OR                                                                  CHANNEL CRITERIA                                                 EQUAL TO 90%                                                                   CHECK MODE                                                        1} 2. and 3                                                                      1 0300                 -(0 \                                 (~/O                                      &; c                         !r<J
PRESSURE PROGRAM ACCEPTANCE
                                                                                                                                            ~l{~
NO CHECKS CRITERIA ALARM PEROP..163 iNSTRUMENTALB1 ERF1S URE URE 9001 9002 N/A LeT LeT 7161A 7161B NfA PI 950 LESS THAN 1.6 PSfG PI 953 N/A CHAN.CHECK MODE 0300 0900 1500 2100[6ST-1021 Rev.66 Page 17 I  
0900                   lor                                   (t;;; C>                                 00                             ,,-
Attachment4-Daily Surveillance
1500                   CbiJ                                 (0(\   j                                    (0 [)                       (';A 2100                     (),rQ\.                             (0 (')                                     &(~)                    {~~7 v
Requirements
I 08T-1021                                                                    Rev. 66                                                          Page 18 of 40 I
Log Sheet2of15 TECH SPEC 4.1.2.6.a.2;
 
4.5.4.a.1;
Attachment 4 -Daily Surveillance Requirements Log Sheet 3 of 15
4.3.2.1.7b, se: 4.3.3.6.9
                                                                                          ~ .
a.3 PARAMETER RWST LEVELBORICACIDTANK
TECH SPEC                                       4.2.5.1; 4.3,1.1.9, 10; 4.32.1,1d~ 3a3} 3c3, 5c t 6 d PARAMETER                                                    PRESSURIZER PRESSURE tNDEPENDENT CALCULATION         VERIFICATION         ACCEPTANCE             N/A COMPLETED           COMPLETED           CRITERIA MET ACCEPTANCE                                                                             N/A CHANNEL SEE BELOW                            N/A                                   NiA C-RtTERIA                                                                                                                CHECK MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE:         Calculations must be done with either the MCB Indicators OR ERFIS lndlcsuons, NOT a combination.
INSTRUMENTL!..990 Ll...991 LI-992LI..993 N/A LI-106 L1..161.158 TCS7240 ACCEPTANCECHANNELGREATER
NOTE:          If all operable channels ~re greater than or equal to the acceptance criteria, calculations are not required.
THAN OR GREATER THAN GREATER THAN OR EQUAL TO 92&deg;k>OR EQUAL TO CRITERJA CHECKEQUALTO 74%>65 QF MODE 1.2 13)and.4 1.2,3and4 0300 C,iP C1C-, (il.l 9,5
CALCULATIONS FOR PRESSURIZER PRESSURE 0300:
2?I gc:).::,0900.: ,..../:.::'.....::-.1500 2100;h(')V TECH SPEC 4.5,2.a 4.4.9.3 PARAMETERECCSVALVEALIGNMENT
PRC0457"~'
PRZ SPRAY INSTRUMENT181..340 181-341 181-359 I 181-86 I 1$1-52 I 181-107 TJ-123 TI-454.1 ACCEPTANCE
                            +
OPEN ANDPULLEDTO SHUT AND PULLED TO LOCK WITHLESSTHAN CRITERIA LOCK WiTH CONTROL CONTROL POWER OFF OR EQUAL POWER OFF TO 625&deg;F MODE 1 r2,and3 DURINGAUX SPRAY OPS 0300 Ai)(\41 rtJ r\OtJ(;", 0900''':bth*f.J1500If,JIA;:.2100"k)
                              ~~P-RC~O-4-5                                              +
{h0 itO ihQ"if (-))llJ V V V TECH SPEC 4.4.3,1: 4.3.1.1.11:
                                                ._.........,.....-~~
4.3.3.6.5 PARAMETER PRESSURIZER
                                                                    =                   ~      (# Operable PRC0455                                    Channels used             PRESSURTzEFf>>~
LEVEL INSTRUMENT
PI--457          P\-456            PI~455                                    Normally 3)                 PRESSURE 0900:                    +                +                      :::                        (# Operable PRC0457          PRC0456          PRC0455                                    Channels used             PRESSURIZER PI~457          PI..456            PI-455                                    Normally 3)                 PRESSURE Q-1500:    .~,.,,~:Q:;too .+ Wy :;l~05      +                     =                          (# Operable         = ~6~.5 PRC0457          PRC0456          PRC0455                                    Channels used           *"***P"RESSURIZER PI..457          PI-456            Pl...455                                  Normally 3)                PRESSURE 2100:                    +                +                                                (#Operable          :=
LI-460 LI-461.1 LI-459A.1 N/A ACCEPTANCELESSTHANOR
PRC04~            PRC0456          PRC0455-                                    Channels used              PRESSURIZER PI-457          PI-456            Pl~455                                      Normally 3)                PRESSURE ACCEPTANCEGRITER1A FOR PRESSURIZER PRESSURE (must meet one of the following):
CHANNEL CRITERIA EQUALTO90%CHECK MODE1}2.and3 1 0300-(0\&;c!r<J 0900 lor (t;;;C>00,,-1500 CbiJ (0(\(0[)(';A j 2100 (),rQ\.(0 (') v I 08T-1021Rev.66Page18of40
: 1. Average of operable   Mea indicator channels greater than          or equal to 2205 psig.
I
2,     Average of operable ERF1S points greater than or equal to 2202 psig.
Attachment
3,     If three MeB indicators are not available, then the lowest channel should be greater than or equal to 2220 psig+
4-Daily Surveillance
: 4.     If three ERFIS points are not available, then the lowest channel should be greater than or equal to 2211 pSlg, IOST~1021                                                      Rev. 66                                                 Page 19 of 40  I
Requirements
 
LogSheet3 of 15 TECH SPEC PARAMETER.4.2.5.1;4.3,1.1.9, 10;
Attachment 4 .. Daily Surveillance Requirements Log Sheet 4 of 15 TECH $PEC                                                      4,2.5.1 PARAMETER                                                  Res LOOP TAVG INDEPENDENT INSTRUMENT         TRC0412D     TRC04220       TRC0432D     CALCULATION VERIFICATION ACCEPTANCE (MeB OR ERFlS)        TI~412D      TI-422D         TI..432D     COMPLETED                             CRITERIA MET COMPLETED ACCEPTANCE                      SEE BELOW                         NIA             NfA                   N/A CRtTERIA MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE:       Calculatlons must be done with either the Mea Indicators OR ERFIS lndicatlons, NOT a combination.
3a3}3c3, 5c t6d PRESSURIZER
IfaU operable channels are less than or equal to the acceptance critena, calculations are not required..
PRESSURE tNDEPENDENT
CALCULATIONSF.OR ReS LOOP TAVG 0300:                   +                 +                 =                   (# Operable     =
CALCULATION
TRC0412D            -~..--        H~'TRC0432D                        Channels used            Res LOOP TI~412D                             TI~432D                           Normally 3)                TAVG 0900:                    +                +                  =:            +   (# Operable     ::::
VERIFICATION
                                                                    ~--
ACCEPTANCE
TRC0412.D        TRC0422D          TRC0432D                          Channels used             ReS LOOP TI...412D        Tt-422D          TI...432D                        Normally 3)                TAVG 1500:                   +                 +                 ::                 (# Operable     =
COMPLETED COMPLETED CRITERIA MET ACCEPTANCE
TRC0412D          TRC0422D        W""'r"R"C043W-                    Channels used             RCSLOOP Tt-412D          Ti-422D          TI~432D                            Normally 3)              TAVG 2100:                   +                 +                 =                   (# Operable      :: ~              _
C-RtTERIASEEBELOW N/A N/A NiA N/A CHANNEL CHECK MODE 0300 0900 1500 2100 INSTRUCTIONS
TRC0412D         TRC04226""~        TRC0432D          --~-            Channels used            ReS LOOP 11-412D           Tt w422D TI-432D                           Normally 3)               TAVG ACCI;PT ANCE CRITERIA FOR ReS LOOpTAVG. (must meet one of the following):
NOTE: NOTE:Calculationsmust
1,     Average of operable   Mea indicator channels mustbe less than or equal to 592.5 QF.
bedonewitheithertheMCBIndicatorsORERFIS
: 2.     Average of operable ERF1S points less than or equal to 593.1 "F.
lndlcsuons, NOTacombination.
: 3.     If three Mea indicators are notavallable, then the highest channel should be less than or equal to 591,3>:>F.
If all operable channelsgreaterthanor
: 4.     If three ERFIS points are not available, then the highest channel should be less than or equal to 592,3 OF.
equal to theacceptancecriteria, calculations
IOST~1021                                                  Rev. 66                                      Page 20 of 40 I
are not required.CALCULATIONS
 
FOR PRESSURIZER
Attachment4,. DailySurveillance Requirements Log Sheet 50f 15 TECH SPEC          4,3.2.1         4.4.6.2.1.e FLANGE PARAMETER     Res PRESSURE LEAKOFF TEMP OTliT       OPllT       PROTECTIONllT Ttw412C}
PRESSURE
Tl..-412B)
PRESSURE (#Operable Channels used Normally 3)PRC0455
TJ... 412A* TJ..422At iNSTRUMENT   PI-403.1     P1402,1     TI401               TI422C  2   TI..422B~
++=
Tl-432A TI..432C    TI-4328 ACCEPTANCE CHANNEL CHECK              N/A                          CHANNELCHECK CRITERIA MODE 0300 0900 1500 2100 INSTRUCTION If ReS flow acceptance criteria is not met, perform EST-70B, RCSFlowDetermination.
PI--457 P\-456 0300: 0900:+PRC0457 PRC0456
TeCH SPEC PARAMETER INSTRUMENT   FRC0414                                                         FRC0434 FI..414                                                          F(~434 ACCEPTANCE                                                                            ~ 98.30/0 CRITER~A 0900 1500 2100 Tf?CH SPEC                                4.4.6.2.1.d PARAMETER OST~1004    or INSTRUMENT OST~1204 COMPLETED ACCEPTANCE   COMPLETED             (Typically on Night Shift)
PI..456 1500:
CRITER1A 1 above 15%
.+Wy
MODE                                1~ 2~3~  and 4 Power 0300 rOST-1021                                            Rev. 56 I                   Page 210f 40     I
PRC0457 PRC0456 PI..457 PI-456+::: PRC0455 PI-455+=PRC0455 Pl...455 (#Operable Channels used Normally 3)Q-(#Operable Channels used Normally 3)PRESSURIZER
 
PRESSURE=
Attachment 4 Daily Surveillance Requirements Log M
*"***P"RESSURIZER
Sheet 6 of 15 TECH SPEC                                                                      4.4.1.t 4.3.1.1.12 PARAMETER*                                                                     Res LOOP FLOWS FRC0414 FRC0415                         FRC0416                                 FRC0424 FRC0425 FRC0426 INSTRUMENT                                                      RCPA               N/A                                                 Reps           N/A FI-414         FI-415                 F1..4 16                                FI-424           Fl-425             FI-426 ACCEPTANCE     POSITIVE INDICAT10N OF FLOW WITH                              CHANNEL        POSITIVE INDICATION OF FLOW WITH                    CHANNEL CR1TERIA               Rep RUNNING INDICATION                                  CHECK                     Rep RUNNING lNDICATION                   CHECK MODE                                       1 12                                   1                                 1.2                             1 0300         ~()            { ,\(~)
PRESSURE
                                      ....            k)           A'O           AD         AtO y.. . . .
PRC0456 PRC0455-PI-457 PI-456
MJ                (~0    (uD        rIO 0900        ~b              ~
2100:++(#Operable
                                  ~
Channels used Normally 3):=PRESSURIZER
                                                      ~
PRESSURE ACCEPT ANCEGRITER1A
                                                        ~.
FOR PRESSURIZER
                                                        ...         (:ti          JiJ.       ~:D              ~                r:J)
PRESSURE (must meetoneof the following):
                                                                                                                                  \:. y~          ~
1.Average of operable Mea indicator channels greater thanorequalto 2205 psig.2,Averageof operable ERF1S points greaterthanor equal to 2202 psig.3, If three MeB indicators
(&
are not available,thenthe lowest channelshouldbegreaterthanorequalto2220
                                                                                  \-
psig+4.If three ERFISpointsare not available, thenthelowest channel should be greaterthanor equalto2211 pSlg, IRev.66 Page19of40 I  
1500    (~\              ~~                    ~            ~ll            ~~          f~~              ("1.             r,l\-     (j.      ~
TECH$PEC PARAMETER Attachment
(11
4..Daily Surveillance
              ..~.:~.
Requirements
2100          ( J
Log Sheet 4 of 15 4,2.5.1 ResLOOPTAVG INSTRUMENT(MeBOR ERFlS)ACCEPTANCE
                    \J
CRtTERIA TRC0412D TRC04220 TRC0432D CALCULATION
                                ~6J
TI-422D TI..432D COMPLETED SEE BELOW NIA INDEPENDENT
                                \1
VERIFICATION
                                                      ~.()
COMPLETED NfA ACCEPTANCE
                                                      "J lo
CRITERIA MET N/A MODE 0300 0900 1500 2100 INSTRUCTIONS
                                                                  ~
NOTE:Calculatlonsmustbe
to
done with either the Mea IndicatorsORERFIS lndicatlons, NOT a combination.
                                                                                  ,            t\1()
IfaU operable channels are lessthanor equal to the acceptance
V
critena, calculations
(~
are not required..CALCULATIONSF.OR
rf()
ReS LOOP TAVG 0300: TRC0412D
V r&#xa5;-J v
++=
At&#xa3;)
(#Operable Channels usedNormally3)
v TECH SPEC                                  4.4.1.1: 4.3.1.1.12                                                       4.3.1.1.2a.2b. 5.6 POWER                  INTERMEDIATE            SOURCE PARAMETER                                 Res LOOP FLOWS RANGE                       RANGE             RANGE FRC0434 FRC0435 FRC0436                                                         Nt-41, Nl-42                       Nl..35           Nl-31 INSTRUMENT                                                      RCPC              N/A FI-434         FJ*435               FI-436                                   N143, NI-44                         NI-36             NI-32 ACCEPTANCE      POSITIVE INDICATION OF FLOW WITH                              CHANNEL CHANNEL CHECK CRITERIA               Rep RUNNING iNDICATION                                  CHECK MODE                                       1,2                                   1                   1} 2               1 <<P-10). 2      2 <<P..6), 3.4.5 0300      (~()            A6"')                 ~          ~iC)          r\&#xa3;)                     (~kL)            ,'\1 //)               rJ/A 0900     ~~              ~14                  ~~          ~              ~~.                    ~                  ' 1/'1 f\lfJ             N li~
=Res LOOP TAVG 0900:++=:TRC0412.DTRC0422DTRC0432D
                ~~            (~)                                              r~
TI...412D Tt-422D TI...432D+(#Operable::::Channels used ReS LOOP Normally 3)TAVG 1500: TRC0412D Tt-412D+TRC0422D Ti-422D+
(~....
:: (#Operable Channels used Normally 3)=RCSLOOP TAVG 2100:++=TRC0412D
1500                                            ~.          J+.            ;~~            \J)
TRC0432D11-412D Tt w422D TI-432D (#Operable::_Channels used ReS LOOP Normally 3)TAVG ACCI;PT ANCE CRITERIA FOR ReS LOOpTAVG.(must meetoneof the following):
                                                                                                \.                      f\l if-\             j\J fA 2100        (~)            r-b                 rK)       ~/r\()          1-10             )to                      l~ Ifi              t J 114-
1, Average of operable Mea indicator channels mustbe lessthanor equal to 592.5 QF.2.Averageof
                  'v           v                   \J         V               V               v 4.3.2.1.1e. 3a3. 3c3 1 4d, sc, 6d, 69 TECH SPEC                                                                                                              4.3.1.1.14 4.3.3.6.6 PARAMETER                    STEAM LINE PRESSURE Pl..474.1.                 PI-484.1                Pi-494 INSTRUMENT Pl..475. PI-476              PI..485. PI486     PI-495. PI-496.1 ACCEPTANCE CHANNEL CHECK                                                                   CHANNEL CHECK CRITERIA MODE                                    t, 2. 3 and 4                                                                     1,2 0300 0900 1500 2100 I OST~1021                                                                  Rev. 66                                                          Page 22 of 40    I
operable ERF1S points less than or equal to 593.1"F.3.If three Meaindicatorsare
 
notavallable, then the highest channel shouldbeless than or equal to 591 ,3>:>F.4.Ifthree ERFISpointsarenot
Attachment 4 - Daily Surveillance Requirements Log Sheet 7 of 15 TECH SPEC   4,3,1.1,13;4.3.1> 1~ 14; 4.3.2.1                                                           .se. ec, 10~t 4.3.3.6,7                        4,7,1,3,1 PARAMETER                                                    SG LEVEL                                                                                CST LEVEL Ll~483f LI..484                                               LI..493 LI-494 LI~901 081 l
available, then the highest channel should be lessthanor equalto592,3 OF.IRev.66Page20of40
INSTRUMENT                                                                                                                                  LI-9010A.1 SA                  S8 LI~485~ L148j                                                Lt:.,,495~ Lj...496 ACCEPTANCE                                                                                                                                        GREATER THAN OR CHANNEL CHECK CRITERIA                                                                                                                                          EQUAL-.TO 62%
I
MOPE 0300 0900 1500 2100 TECH SPEC                                                                         4.7.1.3.2 PARAMETER.                                                       ESWTOAFW 1SW..121             1SW++'124                                                           18W..127             1SW...130 INSTRUMENT 1SW-123               1SW+M126                                                             1SW-129             1SW-132 ACCEPTANCE                     OPEN (only when supplying CRITERIA                                                           AFW pumps)
Attachment
MODE                                                                       1 2,- and3 t
4,.Daily Surveillance
0300     ~)rpr'                .....*..............."'W.<<.>>;.;-;.,;.;,.;.X/Vo."",.,..NNA*I'.";.
Requirements
0900     rJ If\"               ~X>>m-:-:->Jo>>>;'>>>
Log Sheet 50f 15TECHSPEC 4,3.2.1 ,.4.4.6.2.1.e
1500   tJltPr
PARAMETER Res PRESSURE FLANGE LEAKOFF TEMP OTliT OPllT PROTECTIONllT
                                                                                                                      *** )0
iNSTRUMENT
                                                                                                                                        ~~~/
PI-403.1 P1402,1 TI401 Tt w412C}TI422C 2 TI..432C Tl..-412B)
                            ., ;. " -", .,___K_
TI..
                        -<<-~
TI-4328 TJ....412A*TJ..422A t Tl-432A ACCEPTANCE
                                ;N>>>:':~;MYN>>~>>Y>>'
CRITERIA MODE 0300 0900 1500 2100 CHANNEL CHECK N/ACHANNELCHECK
2100    ~0/A                                                                                      ~:-:<<~<N.~                  ;;::>
INSTRUCTIONIfReS flow acceptance
IOST-1021                                                                                                              Rev. 66                                                ~age 23 of 40 I
criteria is not met, perform EST-70B, RCSFlowDetermination.
 
INSTRUMENT
Attachment 4 .. Daily Surveillance Requirements Log Sheet 8 of 15 INSTRUCTIONS
FRC0414 FI..41498.30/0 FRC0434
: 1.       ERFIS is the preferred source for verifying CNTMT AVG TEMP.
4.4.6.2.1.d
: 2.       VerIfy TCV97540 computer point quality code is acceptable. If acceptable, record the ERFlS value for CNTMT AVG TEMP and verify Jess than or equal to 120&deg;F.
or
: 3.       If computer point TCV97540 is not available, verify both MeB indicators for CNTMT AVG TEMP less than or equal to 120 0 F.
2100 1500 0900 Tf?CH SPEC PARAMETER PARAMETER INSTRUMENT
TECH SPEC                    PLP-114              4.6.1.5             N/A                    4.6.1.4               PLP-114 A EDG ELEC          B EDG ELEC                                              CONTAINMENT          CONTROL ROOM PARAMETER                                                CNMT AVG TEMP ROOM 261              ROOM 261                                                PRESSURE            ENVELOPE 305 TCV97540      TJ-7542      TI-7541    PDl*7680    PDI-7680  TI-7837 TI-7837 INSTRUMENT                    ALB 27/1..3 SA          SB        A SA        B 58      A1SA        B188 NO ALARM ~ 116 0 F) LOCAL ACCEPTANCE                                            LESS THAN OR EQUAL TO                GREATER THAN -1.0        LESS THAN OR TEMP IS NEEDED IF ALARM IS CRITERiA                                                      120&deg;F                            JNWG              EQUAL TO 85  QF PRESENT WHENEVER THE WHENEVER THE EQUIPMENT                                                                            EQUtPMENT IN AN IN AN AFFECTED AREA IS                    1. 2. 3. and 4                                        AFFECTED AREA MODE R'EQU1RED TO BE OPERABLE                                                                            IS REQUlRED TO BE OPERABLE 0300            (\UJ                                                                                            'l f 0900 1500 2100
TeCH SPEC ACCEPTANCE
                          \/
ACCEPTANCE
TECH SPEC                                                            PLp ..114 ROD                              SA ELECT            5B ELECT STEAM                                                  1A35SA.
CRITER1A COMPLETED COMPLETED (Typically
PARAMETER            FHB EMER EXH AREA          CNTRL CAB                            PENET              PENET TUNNEL                                                1B35SB 261 AREA 305                            AREA 261          AREA 261 INSTRUMENT    Tl ..6 537A1SA    TI..6 5378158  ALB 23/3-5    ALB 23J2-11                  ALB 2312-8                ALB 23/2..5 ACCEPTANCE      LESS THAN OR EQUAL TO            NO ALARM        NO ALARM                              NO ALARM CRITERIA                    104&deg;F              << 104&deg;F)        << 122&deg;F)                (LESS THAN OR EQUAL TO 104&deg;F)
on Night Shift)MODE 1 above 15%Powerand 4 0300 r OST-1021Rev.56 I Page 210f 40 I  
WHENEVER THE EQUIPMENT IN AN WHENEVER THE EQUIPMENT ,IN AN AFFECTED AREA IS REQUIRED TO BE MODE               AFFECTED AREA IS OPERABLE (LOCAL TEMP MUST BE TAKEN IF ALARM IS PRESENT)
Attachment
REQUIRED TO BE OPERABLE 0300             tv c(         ro     ~'?
4 M Daily Surveillance
:.)    ~6J            kC)               A-o               rro               rJp:)
Requirements
(&
LogSheet6of15TECHSPEC 4.4.1.t 4.3.1.1.12
                                        ./
PARAMETER*
0900           {j-/d            (~()      I      ~                                ~                \tJ9.
ResLOOPFLOWS FRC0414 FRC0415 FRC0416 RCPA N/A FRC0424FRC0425FRC0426
cL "-         (~
Reps N/A INSTRUMENT
1500             &'-1           rv     ~l      '~.            <~~,
FI-414 FI-415 F1..416 FI-424 Fl-425 FI-426 ACCEPTANCE
t A               '~J)            ~~
POSITIVE INDICAT10NOFFLOWWITHCHANNEL
(ro
POSITIVEINDICATIONOFFLOWWITH
                                            . "",)
CHANNEL CR1TERIA RepRUNNINGINDICATION
2100             (0"7           Cv cl         (~O              k~:)            ~:>                                )}-6~)
CHECK Rep RUNNING lNDICATION
                                                      \J               'J               V                   \t
CHECK MODE 1 12 1 1.2 1 0300
                                                                                                                            'J IOST-1021                                                    Rev. 66                                               Page 24 of 40      I
k)A'O AD AtO MJ (uD rIO{....(:ti JiJ.y........r:J)0900...\-\:.1500("1.r,l\-(&(11 (j...lo to t\1()rf()r&#xa5;-J At&#xa3;)2100 (J\J\1"J, V....V v vTECHSPEC 4.4.1.1: 4.3.1.1.12
 
4.3.1.1.2a.2b.
Attachment 4 - Daily Surveillance Requirements Log Sheet 9 of 15 TECH SPEC                                                          PLp ...114 CHILLER AFW I        CCW PUMPS            A..SA            B-S8        1C-SAB        SW BSTR              MECH & ELEC PARAMETER   PIPE & VALVE         & HX AFW        CSIP ROOM     CSI? ROOM       C$1iP ROOM     B-SB PUMP            PENETAREA AREA 261          PUMPS 236           236               236           236               236                  236 ALB 23/2-6       ALB 23/1*6                                                                               ALB 23/2..9 INSTRUMENT                                                ALB 23/1 ..5           ALB 23/1-4    ALB 23/1-11 ALB 23/2...7      ALB 23/1-7                                                                              ALB 23/2-10 ACCEPTANCE NO ALARM (LESS THAN OR EQUAL TO 104&#xa2;F)
5.6 PARAMETER ResLOOPFLOWSPOWERINTERMEDIATE
CRITERIA WHENEVERTHE EQUiPMENT IN AN AFFECTED AREA IS REQU1RED TO BE OPERABLE MODE LOCAL TEMP MUST BE TAKEN IF ALARM lS PRESENT 0300 0900 1500 2100 TECH SPEC I PLP ..114                                                     4.9.1*1 COMMITMENT CSAT&           WPB           A*SA         BwSB                              FUEL POOLS HVAC          HVAC         CS~ RHR 1   CS, RHR~
SOURCE RANGE RANGE RANGE INSTRUMENT
PARAMETER EQUIP RM       EQUIPRM         HVAC         HVAC           SPENT FP       NEWFP                 SFPC          SFP D 216           236           190           190 INSTRUMENT ALB 23/1-8     ALB 23/1 w9 ALB 23/1..10           ALB 23/4-17   ALB 23/5-17     ALB 23/4*18         ALB 23/5..18 ACCEPTANCE NO ALARM (LESS THAN OR EQUAL TO 104 OF)                             NO ALARM (GREATER THAN 23 FT)
FRC0434 FRC0435 FRC0436 RCPC N/A Nt-41, Nl-42 Nl..35 Nl-31 FI-434 FJ*435 FI-436 N143, NI-44 NI-36 NI-32ACCEPTANCEPOSITIVEINDICATIONOFFLOWWITH
CRITERIA WHENEVER THE EQUIPMENT IN AN AFFECTED AREA 18REQUIRED TO BE OPERABLE                               WHEN IRRADIATED FUEL IS IN THE POOL MODE (LOCAL TEMP MUST BE TAKEN IF ALARM IS                     (LOCAL LEVEL MUST BE TAKEN IF ALARM             rs PRESENT)
CHANNELCHANNELCHECK
PRESENT) 0300       d<)           {~)            ({O         ~                                                ,.))
CRITERIA RepRUNNINGiNDICATION
0900     '-~~          '~~
CHECK MODE 1,2 1 1}2 1<<P-10).22<<P..6), 3.4.5 0300A6"')r\&#xa3;)
                              <.-.         ')~          ~dJ-            "-~J)~
,'\1//)rJ/A 0900'1/'1 Nf\l fJ 1500....\J)f\l if-\j\J fA J+.\.2100r-b rK)
                                                                                        ~~                                V~'} I/~
1-10)toIfi t J 114-'v v\J V V vTECHSPEC PARAMETER INSTRUMENT
l~
ACCEPTANCE
                                                                                                          ' ...,;:. ~
CRITERIA MODE 0300 0900 1500 2100 I4.3.2.1.1e.3a3.
                                                        .~
3c3 1 4d, sc, 6d, 69 4.3.3.6.6STEAMLINEPRESSURE
1500    .~
Pl..474.1.PI-484.1Pi-494Pl..475.PI-476PI..
b            .~-                                                            ..
485.PI486 PI-495.PI-496.1 CHANNEL CHECK t,2.3and4Rev.66 4.3.1.1.14
2100     (kJ           r!P           )tto ko
CHANNEL CHECK 1,2 Page22of40 I  
              ~.J            \/           v           'tJ I OST-1021                                                  Rev. 56                                                    Page 25 of 40    I
Attachment
 
4-Daily Surveillance
Attachment 4 ... Daily Surveillance Requirements Log Sheet 10 of 15 TECH SPEC I ESR 97..00272                ESR 95~00425                    ESR 97-00272 COMMiTMENT SPENT FUEL POOL HIGH         SPENTFUEL POOLHIGH                NEW FUEL POOLHIGH PARAMETER    TEMPERATURE ALARM           TEMPERATURE ALARM                TEMPERATUR~ALARM INSTRUMENT        ALB 23/4..16      ALB 23/4...15     ALB 2315~15            ALB 23/5.. 16 ACCEPTANCE          NO ALARM                       NO ALARM                        NO ALARM CRiTERIA MODE 0300 0900 1500 2100 TECH SPEC                                  PLP-114 ESWELECEQUJP ROOM 261          ESW PUMP ROOM 261              EDG ROOM: 261 PARAMETER INSTRUMENT  TEV6588A TEV658~~ TEV6592A        TEV6592B    TDG6903A      TDG6903f.3 . .
Requirements
ACCEPTANCE  LESS THAN OR EQUAL LESS THAN OR EQUAL TO       LESS THAN OR EQUAL TO CRITERIA        TO 116$;)F122~F WHENEVER THE EQUIPfv1ENT IN AN AFFECTED AREA IS RE.QUIRED TO BE OPERABl.E 0900 1500 2100 IOST-1021                                      Rev. 66                                    Page 26 of 40 I
LogSheet7of15
 
TECH SPEC PARAMETER 4,3,1.1,13;4.3.1>
Attachment 4 .. Daily Surveillance Requirements Log Sheet 11 of 15 NOTE 1:      If a reservoir level computer point is bad, manual reservoir level determination can be performed per OP            w163.
114;4.3.2.1.se.ec, 4.3.3.6,7SGLEVEL 4,7,1,3,1CSTLEVEL
NOTE 2:      If a reservoir temperature computer point is bad, manual reservoir temperature readings can be performed per OP-163.
081 S8GREATERTHANOR
EQUAL-.TO 62%LI-9010A.1
SA
LI..484 LI..493 l LI-494
L148*j
Lj...496 CHANNEL CHECK 2100 1500 0900 0300 MOPE INSTRUMENT
ACCEPTANCE
CRITERIA TECH SPEC 4.7.1.3.2 PARAMETER.
ESWTOAFW INSTRUMENT
1SW..121 1SW++'124 18W..127 1SW...130 1SW-123 1SW+M126 1SW-129 1SW-132 ACCEPTANCE
OPEN (only when supplying CRITERIA AFW pumps)MODE 1 t 2,-and 3 0300
.....*...............
"'W.<<.>>;.;-;.,;.;,.;.X/Vo."",.,..NNA*I'.";.
0900 r J If\"
':;;:>1500 tJltPr***)0
2100.,..,;.;.""-",,,.,,___K_
;;::>IOST-1021 Rev.66 23 of 40 I  
Attachment
4..Daily Surveillance
Requirements
Log Sheet8of15 INSTRUCTIONS
1.ERFIS is the preferred source for verifying CNTMT AVG TEMP.2.VerIfy TCV97540 computer point quality code is acceptable.
If acceptable,recordthe ERFlS value for CNTMT AVG TEMP and verify Jess than or equal to 120&deg;F.3.If computer point TCV97540 is not available, verify both MeB indicators
for CNTMT AVG TEMP lessthanorequalto120
0 F.TECHSPEC PARAMETER INSTRUMENT
ACCEPTANCE
CRITERiA MODE PLP-114AEDGELECBEDGELECROOM261ROOM
261 ALB27/1..3 NO ALARM116 0F)LOCALTEMPIS NEEDED IF ALARM IS PRESENT WHENEVERTHEEQUIPMENTINAN AFFECTED AREA IS R'EQU1REDTOBE OPERABLE 4.6.1.5 N/ACNMTAVGTEMP
TCV97540 TJ-7542 TI-7541SASBLESSTHANOR
EQUAL TO 120&deg;F 1.2.3.and4 4.6.1.4 CONTAINMENT
PRESSURE PDl*7680 PDI-7680 A SA B 58 GREATER THAN-1.0 JNWG PLP-114 CONTROL ROOM ENVELOPE 305 TI-7837 TI-7837 A1SA B188 LESS THAN OREQUALTO85 QF WHENEVER THE EQUtPMENT IN ANAFFECTEDAREA
IS REQUlRED TO BE OPERABLE 0300 0900 1500 2100 (\UJ\/'l f TECH SPECPLp..114 ROD STEAMSAELECT 5B ELECT 1A35SA.PARAMETERFHBEMEREXHAREA
CNTRL CAB PENET PENETAREA305 TUNNELAREA261AREA2611B35SB 261 INSTRUMENT
Tl..6537A1SA TI..65378158ALB23/3-5 ALB 23J2-11 ALB 2312-8 ALB23/2..5 ACCEPTANCE
LESS THAN OR EQUALTONO ALARM NO ALARM NO ALARM CRITERIA 104&deg;F<<104&deg;F)<<122&deg;F)(LESS THAN OR EQUAL TO 104&deg;F)WHENEVERTHE
EQUIPMENTINAN WHENEVER THE EQUIPMENT ,IN AN AFFECTED AREA IS REQUIREDTOBE MODE AFFECTED AREA IS REQUIREDTOBE OPERABLE (LOCAL TEMP MUST BE TAKENIFALARM IS PRESENT)OPERABLE 0300 tv c(ro kC)A-o rro rJp:)./:.)0900{j-/dI(&\tJ9.cL"-1500&'-1 rv t A."",)2100 (0"7 Cv cl(ro
\J'J V\t'J I OST-1021Rev.66 Page24of40 I  
TECH SPEC Attachment4-Daily Surveillance
Requirements
LogSheet9of15
PLp...114 PARAMETER CHILLER IAFWCCWPUMPS
PIPE&VALVE&HX AFWAREA261PUMPS236A..SAB-S81C-SAB
CSIP ROOM CSI?ROOM C$1iP ROOM 236 236 236 SW BSTRB-SBPUMP 236 MECH&ELECPENETAREA 236 INSTRUMENT
ALB 23/2-6 ALB 23/1*6 ALB 23/2...7 ALB 23/1-7 ALB 23/1..5 ALB 23/1-4ALB23/1-11
ALB 23/2..9 ALB 23/2-10 ACCEPTANCE
CRITERIA MODE 0300 0900 1500 2100 NO ALARM (LESS THAN OR EQUAL TO 104&#xa2;F)WHENEVERTHE
EQUiPMENTINANAFFECTEDAREAIS
REQU1RED TO BE OPERABLE LOCAL TEMP MUST BE TAKEN IF ALARM lS PRESENT TECH SPEC IPLP..114 4.9.1*1 COMMITMENT
CSAT&WPB A*SA BwSBFUELPOOLS PARAMETER HVAC HVACRHR 1 CS,EQUIP RM EQUIPRM HVAC HVAC SPENT FP NEWFP SFPCSFPD 216 236 190 190 INSTRUMENT
ALB 23/1-8 ALB 23/1 w9 ALB23/1..10 ALB 23/4-17 ALB 23/5-17 ALB 23/4*18 ALB23/5..18 ACCEPTANCENOALARM(LESSTHANOREQUALTO104 OF)NO ALARM (GREATER THAN23FT)CRITERIA WHENEVER THE EQUIPMENT IN AN AFFECTED MODEAREA18 REQUIREDTOBE OPERABLE WHEN IRRADIATED
FUEL IS INTHEPOOL (LOCAL TEMP MUST BE TAKEN IF ALARM IS (LOCAL LEVEL MUST BE TAKEN IF ALARM rs PRESENT)PRESENT)0300 d<)({O,.))0900<.-.V}'...,;:.1500b.......2100 (kJ r!P)tto ko\/v'tJ I OST-1021Rev.56Page25of40
I
Attachment
4...Daily Surveillance
Requirements
LogSheet10of15TECHSPEC I COMMiTMENT
PARAMETER INSTRUMENT
ACCEPTANCE
CRiTERIA MODE 0300 0900 1500 2100TECHSPECESR97..00272SPENTFUELPOOL
HIGH TEMPERATURE
ALARM ALB 23/4..16NOALARM ESR
SPENTFUELPOOL HIGH TEMPERATURE
ALARM ALB 23/4...15 ALB
NO ALARM PLP-114 ESR 97-00272 NEW FUEL POOL HIGH
ALB 23/5...16 NO ALARM PARAMETER INSTRUMENT
ACCEPTANCE
CRITERIA 0900 1500 2100 IOST-1021 ESWELECEQUJPROOM261ESWPUMPROOM261
EDG ROOM: 261 TEV6588A
TEV6592ATEV6592BTDG6903A
TDG6903f.3
...LESSTHANOREQUAL
LESS THAN OR EQUALTOLESSTHANOR
EQUAL TO TO
WHENEVER THE EQUIPfv1ENT
IN AN AFFECTED AREA IS RE.QUIRED TO BE OPERABl.E Rev.66 Page26of40 I
Attachment
4..Daily Surveillance
Requirements
Log Sheet11of15NOTE1:Ifa reservoir level computerpointis bad, manual reservoir level determinationcanbe performed per OP w163.NOTE2:Ifa reservoir temperature
computerpointis bad, manual reservoir temperature
readingscanbe performedperOP-163.
INSTRUCTION
INSTRUCTION
1.Duetoa 3&deg;F instrument
: 1.     Due to a 3&deg;F instrument inaccuracy associated with the permanently installed reservoir TSWs, if TSW9114ITSW9115 'indicate 291 &deg;F obtain local temperature       J readings per OP-163.
inaccuracy
4.1.2.6b TECH SPEC         4.5.4.b                                                             4.7.5 RWST                                          AUX RSVR PARAMETER         TEMP              AUX RSVR LEVEL                TEMP               MAIN RSVR LEVEL      MAIN RSVR TEMP lNSTRUMENT       TCT7110           LSC8752A LSC87528             TSW9114            LSC8750A      LSC8750B      TSW9115
associatedwiththe permanently
                    ~40&deg;F            GREATER THAN OR                              GREATER THAN OR EQUAL ACCEPTANCE         AND               EQUAL TO 250 FT              ::; 94&deg;F                TO 215 FT             s 94&deg;F CRITERlA       < 125&deg;F                  NOTE 1                  NOTE 2                    NOTE 1              NOTE 2 MODE                                                                  1 ~ 2) 3 and 4 0300         5~7. &.'         (9-5Jl i:     r?~S L ~S(}    l{() t o.;.:;     9Jt\~;S      ;)17" (0 I       4&v6 0900 1500       t~~-7  ,5          ~SI\5        /)5~ j    5<1   L(~t3~          l)r9. Sec, J,j 15 ~ W l
installed reservoir TSWs, if TSW9114ITSW9115
J <7
'indicate 291&deg;F Jobtainlocal
                                                                                                          -:l LJS... ...,....,{
temperature
                        .....               ~...
readings per OP-163.4.1.2.6b TECH SPEC 4.5.4.b 4.7.5 RWSTAUXRSVR PARAMETER TEMPAUXRSVRLEVEL
                                                ~
TEMP MAINRSVRLEVELMAINRSVR TEMP lNSTRUMENT
2100 INSTRUCTION
TCT7110 LSC8752A LSC87528 TSW9114LSC8750ALSC8750B
: 1.     The ECCS leakage outside RABEES reading is only required every 72 hours. Perform on Sunday, WednesdaYt and Friday (mark as N/A on other days).
TSW9115GREATERTHANOR
: 2.     If any ECCS leakage outside RABEES is measured, record the cumulative leakrate on Attachment 7 along with the locations leaking.
GREATER THAN OR EQUAL ACCEPTANCE
t TECH SPEC                                   PLP-114 PARAMETER                       ECCS leakage outside RABEES INSTRUMENT                                       N/A ACCEPTANCE                LESS THAN 2 GPH (125 cc/min) cumulative CRITERIA MODE                                   1,2,3 and 4 0300 0900 1500                                 VJ/t\
AND EQUALTO250FT::;94&deg;FTO215 FT s 94&deg;F CRITERlA<125&deg;FNOTE1NOTE2NOTE1NOTE2 MODE 12)3and4 0300&.'(9-5Jl i: Ll{()t o.;.:;
2100 IOST-1021                                                          Rev. 66                                        Page 27 of 40      I
;)17" (0 I 4&v6:"-', 0900 1500
 
, 5j 5<1
Attachment 4 - Daily Surveillance Requirements Log Sheet 12 of15 NOTE 1:     Meteorological Channel check includes: (1) Initialing for a acceptable quality code if using ERFIS or verifying data quality is consistent with actual weather conditions if using a Personal Computer(PC) to access the meteorological tower, and (2)
l)r9.Sec, J,j l 15 J<7 LJS..,.....,W-:l....{........':':.2100 INSTRUCTION1.TheECCSleakageoutsideRABEESreadingis
Recording present values and verifying trend appears normal.
onlyrequiredevery72hours.Perform
NOTE 1:     During calm wind conditions (approximately 2 mph or less) it is normal to see disagreement between the upper and lower wind direction indicators. At times the vanes may actually rotate in opposite directions.
on Sunday,WednesdaYtandFriday(markas
NOTE 1:     The following shall be used for performing the daily channel check of the meteorological instrumentation channels:
N/A on other days).2.If any ECCS leakageoutsideRABEES
* On ERFIS observe the points for wind speed, wind direction, and differential temperature.
is measured,recordthe cumulative
                  * . Using a PC , access the meteoroloqical tower and observe upper and lower wind speed, upper and lower wind directlon. and differential temperature (or stability class).
leakrate on Attachment
The meteorological instrumentation should only be considered inoperable if both of the above methods are unavailable.
7 talongwiththe
NOTE 2:     MIMS Channel check should include, as a minimum, both a Self Test and an Audio Monitoring Test of all operable channels. Op 182 contains guidance for resetting the wo CPU FAILED light if lit.
locations leaking.TECH SPEC PLP-114 PARAMETER ECCS leakage outside RABEES INSTRUMENT
(Reference 2.6.4)
N/A ACCEPTANCELESSTHAN2GPH(125
TECH SPEC                                                    PLP-114                                                   PLP-114 METEOROLOGICAL MIMS PARAMETER   LOWER WIND           UPPER WIND       LOWER WIND           UPPER WIND               A1R SPEED                 SPEED         DIRECTION           D1RECTION                 llT ALL INSTRUMENT     MMT1008               MMT1010           MMT1014            MMT1013    MMT1004          MMT1Q05 CHANNELS CHANNEL CHECK NOTE 1                                                CHANNEL ACCEPTANCE CHECK CRITERIA     Value     Init     Value     Init Value       Init   Value   Init Value   Init     Value Init NOTE 2 MODE                                                    AT ALL TlMES                                                  1,2 0300     C\t/&       M;~)      'f) 7 1)
cc/min)cumulative
J. '.7~  S~f)  3~:;*21 Z-3 li J   f1/31   rh-J \ L.~,,~ 1.(0 11..55"   j,.-I,()     A"0"f) i
CRITERIA MODE 1,2,3and4 0300 0900 1500 VJ/t\2100 I OST-1021Rev.66Page27of40
                          ~.'.. '
I
                                              -s :                                                                         'J' 0900
Attachment4-Daily Surveillance
                                                                                                                          .~
Requirements
1500    ~'},J~    '~ll "11     jlL3<6    ~      ~{Z~ l2. l~
LogSheet12 of15 NOTE 1: Meteorological
(,<1/l3 ~~    *-~Lgti  'J) -l,'7J '~J2
Channel check includes: (1)Initialingfora acceptable
                                                                                                ~'
qualitycodeif using ERFISorverifyingdataqualityisconsistentwith
2100 IOST-1021                                                                             I                          Page 28 of      40'1
actual weather conditions
 
ifusinga Personal Computer(PC)
Attachment 4 - Daily Surveillance Requirements Log Sheet 13 of 15 LOCAL TEMPERATURES TECH SPEC                                      PLp..114 SFP PUMP &       TANK AREA                          E-6 ROOMS 261 PARAMETER HX ROOM                  236                   A-SA             B-SB lNSTRUMENT                             LOCAL THERMOMETER LESS THAN ACCEPTANCE OR EQUAL TO                  LESS THAN OR EQUAL TO 104.oF                                   VERIFIED CRlTERIA 115.5 of WHENEVER THE EQUIPMENT iN AN AFECTED                         t*:,':.:,-.:.: *::.*\.:;>~~}~t~.: (;/}~:::::~:r.:::~*:**
to access the meteorologicaltower,and(2)Recordingpresentvaluesandverifyingtrendappearsnormal.NOTE1:Duringcalm
MODE      AT ALL TIMES AREA IS REQUIRED TO BE*OPERABLE                        :::.:;.;.;: '::-:,:.:
wind conditions (approximately2mphorless)
0100-0400     1.--7 S
itisnormaltosee
                ,)  I              0:?G7 L{
disagreement
t              & v-1 ~ .:)       &L/~    7                               )D la it, ~ Lf                               " c.(   C:i                           r7~
between the upper and lower wind direction indicators.
1300..1600    ~51\"3                                    t9?? ~  (p        &, .- l '/                                 C!..-/
At times the vanesmayactually
TECH SPEC                                            PLP-114 EDG HVAC ROOM 280                    EDG HVAC ROOM 292 DFOST BLDG PARAMETER 242 A-SA           B-58                   A-SA             B-SB lNSTRUMENT                                 LOCAL THERMOMETER LESS THAN ACCEPTANCE    LESS THAN OR EQUAL TO              LESS THAN OR EQUAL TO OR EQUAL                                 VERIFIED CRITERIA             118&deg;F                                   122&deg;F                         QF TO 122 WHEN THE EQUIPMENT iN THE AFFECTEDAREA 18 REQUlRED TO BE MODE OPERABLE 0100..0400  ~-?&(  GI      g::)
rotate in opposite directions.NOTE1:The followingshallbeusedfor
                                ....  ~
performing
D       *'7t;5t     '*'7     if If>3         <>>.     <./                                       (~QJ 1300-1600    ~~7? \,~5'  71 L{td             ' ") ~1 ~ "j         7l0~fo          C:Ol , L(                                       ~~Q ~.;}
the daily channel checkofthe meteorological
I OST-1021                                                        Rev. 66                                                                                Page 29 of 40 I
instrumentation
 
channels:*OnERFISobservethepointsfor
Attachment 4 .. Daily Surveillance Requirements Log Sheet 14 of 15 LOCAL TEMPERATURES INSTRUCTION
wind speed, wind direction, and differential
: 1.           If battery room temperature is less than 71 of, perform Step 7.0.5.
temperature.*.UsingaPC
TECH SPEC                                                               PLp..114 ELECT SW1TCHGEAR PENETRAT'ON                                                SATIERY ROOM286                  ACP 286 PARAMETER                                              ROOM 286 AREA 286 A..SA         BwSB         A-SA           B-S8               A..SA     I B...SB INSTRUMENT                                                     LOCAL THERMOMETER ACCEPTANCE             LESS THAN OR                LESS THAN OR                                             LESS THAN OR
,accessthe meteoroloqicaltowerandobserveupper
                                                                                    ~ 71&deg;F AND ~ 85&deg;F                                                            VERIF1ED CRITERIA         EQUAL TO 104&deg;F                EQUAL TO gO&deg;F                                            EQUAL TO gO&deg;F
and lowerwindspeed, upperandlowerwind
                                                                                                                                                            '.. . :.:.:..>..:         /':.':",::,
directlon.
WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS REQUIRED TO BE                                                                    O:':':':::::::',\,~:  ':',::'      .':':
and differential
MODE OPERABLE 0900-1200         &~;;)\ G.'     '~7[{ (to     y\, C:j        '7~~1~  c1      ~*-?0. ~      "7ip ~  i?  .-~] ~7 ~ '--7                                                   l l"~J 2100-2400         (0:--Q ~ ci   -7 L(J~.    ~t\t _~3        ~7<l,    ,      ':-7~S ~ t:t  "7~J ~  C}  "7'7. \ G          <:1                                     :1;)
temperature (or stability class).The meteorological
TECH SPEC                                                   PLp w114 AUX TRANSFER PANEL ROOM                                         PIC ROOMS PARAMETER                             286                                               286 A-SA                  B..SB                   17 19 t                   18 INSTRUMENT                                       LOCAL THERMOMETER ACCEPTANCE                LESS THAN OR EQUAL TO                          LESS THAN OR EQUAL TO CRITERJA                           104&deg;F                                             85&deg;F WHENEVER THE EQUIPMENT iN AN AFFEOTED AREA IS                                           VERiFIED MODE REQUIRED TO BE OPERABLE 0900...1200         --7~:) ~ ~~-'1        '~'7 ~1.
instrumentation
(...   ~),
shouldonlybe considered
(-~        "'}~,      c.            "'7:5~ C) 2100 ...2400       "'7 2..-- ~ '~7      '-'7 2 '<2-               ~~7
inoperableifbothof the above methods are unavailable.
                                                                          '(>,. ~ &#xa3;2'J        ~7 Lo( t ~l TECH SPEC                                                     PLP-114 ARPROOM                   AH-15 VENTILATION PARAMETER               PIC ROOM 305                           305                    ROOM INSTRUMENT                                         LOCAL THERMOMETER ACCEPTANCE                      LESS THAN OR EQUAL TO                                    LESS THAN OR VERIF1ED CRITERIA                                     85&deg;F                                     EQUAL TO 104&deg;F
NOTE2:MIMS Channel check should include,asa minimum,botha Self TestandanAudio
                                                                                                                    ':.'. :-:/. :-:::.,:.,'. ......' ....:
Monitoring
WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS MODE REQUIRED TO BE OPERABLE 0900-1200            ~7 t . 0                         {(i{a , ~                          4,0 \ (                                 r0
Testofall operable channels.Op wo182 contains guidance for resetting the CPU FAILED lightiflit.(Reference
                                                                                                                                        ~
2.6.4)TECHSPEC PLP-114 PLP-114 METEOROLOGICAL
2100-2400               ~7C) ~ ~6                        (&~~ ~ '~7                      &0 ~ (~)                              ~
MIMS PARAMETER LOWER WIND UPPER WIND LOWER WIND UPPER WIND A1R SPEED SPEED DIRECTION D1RECTION llT INSTRUMENT
1 OST-1021                                                                      Rev. 66                                                                                          Page 30 of 40      I
MMT1008 MMT1010 MMT1014MMT1013MMT1004
 
MMT1Q05 ALL CHANNELS ACCEPTANCE
Attachment 4 - Daily Surveillance Requirements Log Sheet 15 of 15 NOTE 1:       These readings are only required on Sundays. These readings may be marked N/A on other days.
CHANNEL CHECKNOTE1 CHANNEL CRITERIA Value Init Value Init Value Init Value Init Value Init Value Init CHECKNOTE2 MODEATALLTlMES
TECH SPEC                                                                                                                   4.1.2.2.a BORJCACID                                BORIC ACID VCTVALVE                                         BAT                                                                     EMER BORATION PARAMETER                                                                                                                 XFER PUMP                                XFER PUMP GALLERY                                     ROOM                                                                           VALVE RM VALVE GALLERY                                 ROOM INSTRUMENT                                                                                                             LOCAL THERMOMETER ACCEPTANCE                                                                                           GREATER THAN OR EQUAL TO 65&deg;F CR1TERIA MODE                                                                                                                     1,2 and 3 1300-1600 (NOTE 1)         rrJ lA-            ....__..-......---...------Y'O"+i'---.M........-.-....................,.-.. ........----------                               ---._~
1,2 0300 C\t/&'f)7 1)
TECH SPEC                                                                                                                   4.1.2.2.a BAT TO CSt? SUCTION HEADER PfPE TEMPERATURE (IF ANY OF THESE INSTRUMENTS FAIL. INITIATE CORRECTIVE ACTION AND NOTE IN COMMENTS PARAMETER             SECTION. USE SECONDARY INSTRUMENTS TO SATISFY THE SURVEILLANCE REQUfREMENT)
Z-3 li J f1/31 rh-J\
HT-18753C                 HT-18753C                                                             HT-18753B         HT~18753B      HT..18753B     HT..18753B INSTRUMENT ACCEPTANCE C2-1     I                        C2-2                                 I                    C1-9       I    C1-13     I      C2..3   I      C2-5 CRiTERIA                                                                                           GREATER THAN OR EQUAL TO 65&deg;F MODE                                                                                                                     1,2 and 3 1300..1600 (NOTE 1)    N. I r. r~
1.(0 11..55" j,.-I,()A f)J.i"0"..'-s: 'J'0900
                          ;.~.      \_*. *---------1-------                                                                       tI              ~J I
'"11 jlL3<6l2.(,<1/l3
1 I
'J)-l,'7J15002100 I OST-1021 IPage28of 40'1  
                                                                                                                                                                          --~~.-_"'-~
Attachment4-Daily Surveillance
TECH SPEC                                                                                                                   4.1.2.2.8 BAT TO CSIP SUCTION HEADER PlPE TEMPERATURE (THESE ARE SECONDARY INSTRUMENTS. THESE SHOULD BE USED WHEN PRIMARY INSTRUMENTS PARAMETER INSTRUMENT HT-18753CC C2-1 I      HT..18753CC C2...2                                I FAll. (N/A IF NOT BE1NG USED.)
Requirements
HT-18753BB C1v9      I HT-18753BB C1-13      1 HT..187538B C2 ...3 I  HT-18753BB C2-5 ACCEPTANCE CRITERIA                                                                                            GREATER THAN OR EQUAL TO 65&deg;F MODE                                                                                                                     1,2 and 3 1300-1600 (NOTE 1)        f~1 f)         1---*-----.1-                                                                                   I               i.             1I      -.~----;.""i IOST-1021                                                                                                               Rev,66                                    Page 31 of 40        I
LogSheet13of15
 
LOCAL TEMPERATURESTECHSPEC PLp..114 PARAMETERSFPPUMP&TANKAREAE-6ROOMS261HXROOM 236 A-SA B-SB lNSTRUMENT
Appendix C                                   Job Performance Measure                   Form ES-C-1 Worksheet Facility:               HARRIS                                 Task No.:     015004H201 Task
LOCAL THERMOMETER
 
ACCEPTANCELESSTHAN OR EQUAL TOLESSTHANOREQUAL
==Title:==
TO 104.oF VERIFIED CRlTERIA 115.5 ofWHENEVERTHE
Perform the Quadrant Power Tilt         JPM No.:     2008 NRC RO A2 Ratio Surveillance KIA  
EQUIPMENT iN AN AFECTED:.:, MODE ATALLTIMES t*:,':.:,-.:.::
 
AREA IS REQUIRED TO BE*OPERABLE
==Reference:==
:::.:;.;.;:
2.2.12 (3.4)
'::-.:,:.: 0100-0400 1.--7 S 0:?G7 t L{&v-1.:)7)D ,)I1300..1600
Examinee:                                                   NRC Examiner:
la it,Lf t9??(p" c.(C: i&,.-l'/C!..-/TECHSPEC PLP-114EDGHVACROOM280EDGHVACROOM292
Facility Evaluator:                                         Date:
DFOST BLDG PARAMETER A-SA B-58 A-SA B-SB 242 lNSTRUMENT
Method oftesting:
LOCAL THERMOMETER
Simulated Performance:                                       Actual Performance:       x Classroom            X    Simulator    - - - Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
ACCEPTANCELESSTHANOR
Initial Conditions:
EQUAL TOLESSTHANOREQUAL
* The plant has been stabilized at 100 % power following a dropped rod in Control Bank "B" (M-6).
TOLESSTHAN OR EQUAL VERIFIED CRITERIA 118&deg;F 122&deg;F TO 122 QF MODE WHEN THE EQUIPMENT iNTHEAFFECTEDAREA18
* The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND" INDICATION SYSTEM.
REQUlREDTOBE OPERABLE 0100..0400GI g::)D*'7t;5t'*'7 if If>3<>>.<./....
* No deficiency tags on PRNls.
71 L{td''")"j
Task Standard:             Calculations within required band.
C:Ol , L( 1300-1600I OST-1021Rev.66Page29of40
Required Materials:         Calculator General
I  
 
Attachment
==References:==
4..Daily Surveillance
OST-1039, CALCULATION OF QPTR, Revision 13 Handouts:
Requirements
* OST-1039
Log Sheet14of15 LOCAL TEMPERATURES
* Curve Book (Ensure F-X-8 included and unmarked)
INSTRUCTION1.If battery room temperatureislessthan71
Initiating Cue:            The USCO has directed you to perform a manual QPTR lAW OST-1039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.
of, performStep7.0.5.
For the purposes of the examination, there will be no independent verification of your work.
TECH SPEC PLp..114 ELECT SW1TCHGEAR
Time Critical Task:        NO Validation Time:            12 minutes HARRIS 2008 NRC RO A2 Revision 2                                            NUREG 1021, Revision 9
PARAMETER PENETRAT'ONROOM286 SA TIERYROOM286ACP286 AREA 286 A..SA BwSB A-SA B-S8 A..SA I B...SB INSTRUMENT
 
LOCAL THERMOMETER
Appendix C                                     Page 2 of 10                          Form ES-C-1 VERIFICATION OF COMPLETION (Denote Critical Steps with a ~)
ACCEPTANCE
Start Time:          _
LESS THAN OR LESS THAN OR71&deg;F AND85&deg;FLESSTHANOR
Performance Step: 1         Obtain procedure.
VERIF1ED CRITERIA EQUAL TO 104&deg;FEQUALTO gO&deg;FEQUALTO gO&deg;F WHENEVER THE EQUIPMENTINAN AFFECTED AREA IS REQUIREDTOBE'.....:.:..:.>..:/':.':",::, MODE
Standard:                   Reviews procedure.
':',::'.':': OPERABLE y\, C:j
Evaluator Cue:              Provide OST-1039.
c1"7ipi?l 0900-1200
Evaluator Note:            A KEY is provided for your use on JPM Page 7.
G.'(to.'--7 2100-2400 Q ci-7 L( ,t:tC}"7'7 G:1;)(0:--.\<:1 TECH SPEC PLp w114 AUX TRANSFER PANEL ROOM PIC ROOMS PARAMETER 286 286 A-SAB..SB 17 t 19 18 INSTRUMENT
Comment:
LOCAL THERMOMETER
Performance Step: 2        Completes Prerequisites section:
ACCEPTANCELESSTHANOR
* Instrumentation needed for the performance of this test is free of deficiency tags that affect instrument indication.
EQUAL TOLESSTHANOR
* Verify the most recent Curve F-X-8 is used in the performance of this procedure.
EQUAL TO CRITERJA 104&deg;F 85&deg;F MODE WHENEVER THE EQUIPMENT iN AN AFFEOTED AREA IS REQUIRED TO BE OPERABLE 0900...1200 c.
* Verify all prerequisites are met, then obtain Unit SCO permission to perform this OST.
C)(...2100...2400"'7 2..--'-'7 2'<2-.&#xa3;2 Lo(t'(>,'J VERiFIED TECH SPEC PLP-114 ARPROOM AH-15 VENTILATION
Standard:
PARAMETER PICROOM305 305 ROOM INSTRUMENT
* Logs F-X-8 revision number (NRC Exam)
LOCAL THERMOMETER
* Initials/signs all blocks Evaluator Cue:
ACCEPTANCELESSTHANOREQUALTOLESSTHANOR
Comment:
VERIF1ED CRITERIA 85&deg;F EQUAL TO 104&deg;F WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS':.'.:-:/.:-:::.,:.,'
HARRIS 2008 NRC RO A2 Revision 2                                        NUREG 1021, Revision 9
.......'....: MODE REQUIREDTOBE OPERABLEt.0{(i{a ,4,0\(0900-1200 r0 2100-2400&01 OST-1021Rev.66Page30of40
 
I
Appendix C                             Page 30f 10                         Form ES-C-1 VERIFICATION OF COMPLETION Performance Step: 3
Attachment4-Daily Surveillance
* If Quadrant Power Tilt Ratio Calculation Computer Program is used, perform Section 7.1, and N/A section 7.2.
Requirements
* If manual calculation of the Quadrant Power Tilt Ratio is used, perform Section 7.2, and N/A section 7.1.
Log Sheet15of15 NOTE 1: These readings are only required on Sundays.These readings may be marked N/A on other days.TECH SPEC 4.1.2.2.a VCTVALVE BAT BORJCACIDEMERBORATION
Standard:
BORIC ACID PARAMETER GALLERY ROOM XFER PUMPVALVERMXFERPUMP VALVE GALLERY ROOM INSTRUMENT
* Marks Section 7.1 N/A
LOCAL THERMOMETER
* Proceeds to Section 7.2 Comment:
ACCEPTANCE
Performance Step: 4  Prior to reading the value of detector current, ensure the meter range/rate switch is in the 400 J,lAlSLOW position.
GREATER THAN OR EQUAL TO 65&deg;F CR1TERIA MODE 1,2and3 1300-1600 rrJ lA-(NOTE 1)....__..-......---...------Y'O"+i'---.M........-.-
Standard:            Verifies meter range/rate switches were in the 400 J,lAlSLOW position when the readings were taken.
..................
Evaluator Cue:
..,.-..........----------
Comment:
TECH SPEC 4.1.2.2.aBATTO CSt?SUCTION HEADER PfPE TEMPERATURE (IF ANY OF THESE INSTRUMENTS
Performance Step: 5  Record on Attachment 2, in Column A, the upper and lower detector currents from all operable power range channels as read on the Nuclear Instrumentation Cabinet.
FAIL.INITIATE CORRECTIVE
Standard:            Transposes readings from PRNIS Readings Table onto Attachment 2.
ACTION AND NOTE IN COMMENTS PARAMETER SECTION.USE SECONDARY INSTRUMENTS
Comment:
TO SATISFY THE SURVEILLANCE
HARRIS 2008 NRC RO A2 Revision 2                                NUREG 1021, Revision 9
REQUfREMENT)
 
HT-18753C I HT-18753C I HT-18753B I
Appendix C                            Page 4 of 10                        Form ES-C-1 VERIFICATION OF COMPLETION Performance Step: 6 Record on Attachment 2, in Column B, the 100% power normalized current for each channel. (Refer to Curve F-X-8)
I HT..18753B IHT..18753B INSTRUMENT
Standard:            Transposes TOP and BOTTOM 100 % current values from the Curve Book provided.
C2-1 C2-2 C1-9 C1-13 C2..3 C2-5 ACCEPTANCE
Evaluator Cue:
CRiTERIA GREATER THAN OR EQUAL TO 65&deg;F MODE 1,2and31300..1600
Comment:
\_*..*---------1-------
Performance Step: 7  Divide values in Column A by the respective normalized current in Column B and record the result in Column C as the Normalized Fraction.
tJ 1
Standard:            Divides each Upper and Lower reading by the respective 100%
.I r.(NOTE 1)NI I I TECH SPEC 4.1.2.2.8BATTOCSIPSUCTIONHEADER
normalized current value and records in Column C.
PlPE TEMPERATURE (THESE ARE SECONDARY INSTRUMENTS.
Comment:
THESE SHOULD BE USED WHEN PRIMARY INSTRUMENTS
Performance Step: 8  Calculate the average value for the upper and the lower Normalized Fractions by adding the Normalized Fraction in each section of Column C and divide by the number of operable NI channels. Record in Column D of Attachment 2.
PARAMETER FAll.(N/AIFNOT BE1NG USED.)HT-18753CC
Standard:            Adds all Normalized Fractions for the same plane, divides by four and records result in Column D.
IHT..18753CC I HT-18753BB
Evaluator Note:      On the KEY, this value is shown at the bottom of Column C.
I HT-18753BB
Comment:
1HT..187538B I HT-18753BB
HARRIS 2008 NRC RO A2 Revision 2                              NUREG 1021, Revision 9
INSTRUMENT
 
C2-1 C2...2 C1v9 C1-13 C2...3 C2-5 ACCEPTANCE
Appendix C                              Page 5 of 10                        Form ES-C-1 VERIFICATION OF COMPLETION
CRITERIAGREATERTHANOREQUALTO65&deg;F
~  Performance Step: 9 Using the formula and values from Attachment 2 calculate the Upper and Lower Ratios.
MODE 1,2and3 1300-1600 f)1---*-----.1-
Standard:
I i.1 (NOTE 1)I I OST-1021 Rev,66Page31of40
* Divides the Maximum Normalized Fraction by the Average Normalized Fraction on each plane.
I
* Determines both UPPER and LOWER ~ 1.029.
Appendix C Job Performance
Evaluator Note:      The applicant may inform the USCO as soon as any calculation is > 1.02. If so, acknowledge and direct applicant to complete.
Measure WorksheetFormES-C-1
Comment:
Facility: HARRIS Task No.: 015004H201
Performance Step: 10 Perform independent verification of all calculations made on Attachment 2.
Task Title: Perform the Quadrant Power Tilt Ratio SurveillanceJPMNo.: 2008NRCROA2 KIA Reference:
Standard:            Requests Independent Verifier.
2.2.12 (3.4)Examinee: NRC Examiner: Facility Evaluator:
Evaluator Cue:      If necessary, repeat Initiating Cue: For the purpose of this examination, there will be no independent verification of your work.
Date: Method of testing: Simulated Performance:
Comment:            Candidate may choose to check calculations.
ClassroomREADTOTHE EXAMINEE X Simulator Actual Performance:
~  Performance Step: 11 The upper ratio or the lower ratio, whichever is greater, is the quadrant power tilt ratio (QPTR). Record QPTR and verify QPTR is less than or equal to 1.02.
Plant---xIwill explaintheinitial
Standard:            Records Maximum QPTR value 1.026 to 1.036 (N44 UPPER)
conditions, which steps to simulate or discuss, and provide initiating
Comment:            Acceptable band is +/- 50/0 (rounded to .005) around 1.031.
cues.When you complete the task successfully, the objectiveforthisJob
HARRIS 2008 NRC RO A2 Revision 2                                 NUREG 1021, Revision 9
Performance
 
Measurewillbe satisfied.
Appendix C                                Page 6 of 10                    Form ES-C-1 VERIFICATION OF COMPLETION
Initial Conditions:*The planthasbeen stabilizedat100%power following a droppedrodin Control Bank"B"(M-6).*The crew is performing
-v Performance Step: 12 Complete applicable sections of Attachment 3, Certifications and Reviews and inform the Unit SCO when this test is completed.
AOP-001, MALFUNCTIONOFROD CONTROL AND" INDICATION
Standard:
SYSTEM.*No deficiencytagson PRNls.Task Standard: Calculations
* Check marks Periodic Surveillance or notes AOP-001 in Comments section
within required band.Required Materials:
* Plant Condition: 100% Power (may note dropped rod)
Calculator
* Mode 1
General References:
* Today's Date
OST-1039, CALCULATION
* Current Time
OF QPTR,Revision13
* OST Completed By: Applicant's name
Handouts: Initiating
* Initials/Name
Cue: Time Critical Task: Validation
* Indicate in General Comments Section and/or informs USCG that the limit is exceeded (-V)
Time:*OST-1039*Curve Book (Ensure F-X-8 included and unmarked)The USCO has directedyouto perform a manual QPTR lAW OST-1039, CALCULATION
Evaluator Cue:        Acknowledge any report.
OF QPTR.The PowerRangeNIS readings are providedinthe table below.Forthe purposesofthe examination, therewillbeno independent
Comment:
verification
Terminating Cue:        After the USCO has been notified: Evaluation on this JPM is complete.
of your work.NO 12 minutes HARRIS 2008NRCROA2 Revision 2NUREG1021,Revision9
HARRIS 2008 NRC RO A2 Revision 2                              NUREG 1021, Revision 9
Appendix C (DenoteCriticalStepswithaStartTime:_Page2of10 VERIFICATION
 
OF COMPLETIONFormES-C-1
Appendix C                                Page 7 of 10                        Form ES-C-1 VERIFICATION OF COMPLETION KEY A                 B                 C UPPER           UPPER UPPER        100% POWER       NORMALIZED UPPER             DETECTOR         NORMALIZED       FRACTION DETECTOR            CURRENT          CURRENT          (NOTE 1)
PerformanceStep:1 Standard: Evaluator Cue: Evaluator Note: Comment: PerformanceStep:2 Standard: Evaluator Cue: Comment:Obtainprocedure.
N-41                 149.7             155.2           .965 N-42                 177.9             175.6           1.013 N-43               202.0             200.0           1..010 N-44                 165.5             159.5           1.038 SUM         4.026/4 =
Reviews procedure.
1.0065 A                 B                   C LOWER             LOWER LOWER           100% POWER         NORMALIZED LOWER             DETECTOR           NORMALIZED         FRACTION DETECTOR            CURRENT            CURRENT            (NOTE 1)
Provide OST-1039.AKEYis provided for youruseonJPMPage7.
N-41                 169.2             176.1               .961 N-42               202.6               202.2             1.002 N-43               221.1               221.2             .9995 N-44                 197.5             192.3             1.027 SUM             3.99/4 =
Completes Prerequisites
                                                                          .9975 Highest Upper (N-44) 1.038/1.0065 = 1.031 Highest Lower (N-44) 1.027/.9975 = 1.0296 (1.03)
section:*Instrumentationneededforthe
HARRIS 2008 NRC RO A2 Revision 2                                NUREG 1021, Revision 9
performanceofthistestisfreeof deficiencytagsthataffect
 
instrument
Appendix C                            Page 8 of 10                Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC RO A2 Examinee's Name:
indication.*VerifythemostrecentCurveF-X-8isusedinthe
Date Performed:
performanceofthis procedure.*Verifyall
Facility Evaluator:
prerequisitesaremet,thenobtainUnitSCO
Number of Attempts:
permissiontoperformthisOST.*LogsF-X-8revision
Time to Complete:
number(NRCExam)*Initials/signsallblocks HARRIS2008NRCROA2Revision2NUREG1021,Revision9
Appendix C Page 30f 10 VERIFICATION
OF COMPLETIONFormES-C-1
PerformanceStep:3 Standard: Comment: PerformanceStep:4 Standard: Evaluator Cue: Comment: PerformanceStep:5 Standard: Comment:*If QuadrantPowerTiltRatio
Calculation
Computer Programisused,performSection7.1,andN/Asection7.2.*Ifmanual calculationofthe QuadrantPowerTiltRatioisused,performSection7.2,andN/Asection7.1.*MarksSection7.1N/A*ProceedstoSection7.2Priortoreadingthevalueof
detectorcurrent,ensurethemeter
range/rateswitchisinthe400
J,lAlSLOW position.Verifiesmeter
range/rateswitcheswereinthe400
J,lAlSLOWpositionwhenthereadingsweretaken.Recordon Attachment2,inColumnA,theupperandlower
detector currentsfromall operablepowerrange
channels asreadonthe Nuclear Instrumentation
Cabinet.Transposes
readingsfromPRNISReadingsTableonto
Attachment
2.HARRIS2008NRCROA2Revision2NUREG1021,Revision9
Appendix CPage4of10 VERIFICATION
OF COMPLETIONFormES-C-1
Performance
Step: 6 Standard: Evaluator Cue: Comment: Performance
Step: 7 Standard: Comment: Performance
Step: 8 Standard: Evaluator Note: Comment:Recordon Attachment2,inColumnB,the100
%power normalized
currentforeachchannel.(RefertoCurveF-X-8)
TransposesTOPandBOTTOM100
%currentvaluesfromtheCurveBookprovided.DividevaluesinColumnAbytherespective
normalized
currentinColumnBandrecordtheresultinColumnCasthe
Normalized
Fraction.DivideseachUpperandLowerreadingbytherespective100
%normalized
currentvalueandrecordsinColumnC.
Calculatetheaveragevaluefortheupperandthelower
Normalized
Fractionsbyaddingthe
NormalizedFractionineachsectionofColumnCanddividebythe
numberofoperableNIchannels.RecordinColumnDof
Attachment
2.Addsall Normalized
Fractionsforthesameplane,dividesbyfourandrecordsresultinColumnD.
On the KEY, this value is shown at the bottom of Column C.HARRIS2008NRCROA2Revision2NUREG1021,Revision9
Appendix CPage5of10 VERIFICATION
OF COMPLETIONFormES-C-1PerformanceStep:9 Standard: Evaluator Note: Comment: PerformanceStep:10 Standard: Evaluator Cue: Comment:PerformanceStep:11 Standard: Comment:Usingthe formula and values from Attachment
2 calculate the Upper and Lower Ratios.*Divides the Maximum Normalized
Fractionbythe Average Normalized
Fractiononeachplane.
*Determines
both UPPER and LOWER1.029.The applicant may informtheUSCOas soonasany calculation
is>1.02.Ifso, acknowledge
and direct applicant to complete.Perform independent
verificationofall calculationsmadeon Attachment
2.Requests Independent
Verifier.If necessary, repeat InitiatingCue:Forthe
purpose of this examination, there willbeno independent
verification
of your work.Candidate may choose to check calculations.
The upperratioorthe
lower ratio, whichever is greater,isthe quadrant powertiltratio (QPTR).Record QPTR and verify QPTRislessthanorequalto1.02.
Records Maximum QPTR value 1.026 to 1.036 (N44 UPPER)Acceptablebandis+/-50/0 (rounded to.005)around 1.031.HARRIS 2008NRCROA2 Revision 2 NUREG1021,Revision9
Appendix CPage6of10 VERIFICATION
OF COMPLETIONFormES-C-1-v PerformanceStep:12 Standard: Evaluator Cue: Comment: Terminating
Cue: Complete applicable
sections of Attachment
3, Certifications
andReviewsandinformtheUnitSCOwhenthistestis
completed.
*CheckmarksPeriodic
SurveillanceornotesAOP-001in
Comments section*PlantCondition:100
%Power(maynote
dropped rod)*Mode1*Today's Date*Current Time*OST Completed By: Applicant's
name*Initials/Name
*IndicateinGeneral Comments Section and/orinformsUSCGthatthelimitis
exceeded (-V)Acknowledge
any report.After theUSCOhasbeen
notified: Evaluation
on thisJPMis complete.HARRIS2008NRCROA2Revision2NUREG1021,Revision9
Appendix CPage7of10 VERIFICATION
OF COMPLETION
KEYFormES-C-1
A B C UPPER UPPERUPPER100%POWER NORMALIZED
UPPER DETECTOR NORMALIZED
FRACTION DETECTORCURRENTCURRENT(NOTE1)N-41 149.7 155.2.965 N-42 177.9 175.6 1.013 N-43 202.0 200.0 1..010 N-44 165.5 159.5 1.038 SUM 4.026/4=1.0065 A B C LOWER LOWER LOWER 100%POWER NORMALIZED
LOWER DETECTOR NORMALIZED
FRACTION DETECTORCURRENTCURRENT(NOTE1)N-41 169.2 176.1.961 N-42 202.6 202.2 1.002 N-43 221.1 221.2.9995 N-44 197.5 192.3 1.027 SUM 3.99/4=.9975 Highest Upper (N-44)1.038/1.0065
=1.031 HighestLower(N-44)
1.027/.9975
=1.0296 (1.03)HARRIS2008NRCROA2Revision2NUREG1021,Revision9
AppendixCPage8of10 VERIFICATION
OF COMPLETIONFormES-C-1
Job PerformanceMeasureNo.:2008NRCROA2
Examinee's
Name:DatePerformed:FacilityEvaluator:NumberofAttempts:TimetoComplete:
Question Documentation:
Question Documentation:
Question: Response: Result: Examiner's
Question:
Signature:
 
SAT UNSAT Date:HARRIS2008NRCROA2Revision2NUREG1021,Revision9
===Response===
Appendix CPage9 of 10 VERIFICATION
Result:                     SAT            UNSAT Examiner's Signature:                               Date:
OF COMPLETIONHARRIS2008NRCROJPM
HARRIS 2008 NRC RO A2 Revision 2                          NUREG 1021, Revision 9
A2CurveF-X-8
 
HANDOUTRevisionNumber:NRCExamNISCurrentSetpoint
Appendix C                            Page 9 of 10             Form ES-C-1 VERIFICATION OF COMPLETION HARRIS 2008 NRC RO JPM A2 Curve F-X-8 HANDOUT Revision Number: NRC Exam NIS Current Setpoint Table uA, 100 % power N41                       155.2                 176.1 N42                        175.6                 202.2 N43                        200.0                 221.2 N44                        159.5                 192.3 HARRIS 2008 NRC RO A2 Revision 2                       NUREG 1021, Revision 9
TableuA,100%powerFormES-C-1
 
N41 N42 N43 N44 155.2
Appendix C                                      Page 10 of 10                      Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
175.6 200.0 159.5 176.1 202.2
* The plant has been stabilized at 100% power following a dropped rod in Control Bank "B" (M-6).
221.2 192.3HARRIS2008NRCROA2Revision2NUREG1021,Revision9
* The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.
Appendix CPage10of10JPMCUE SHEETFormES-C-1
* No deficiency tags on PRNls.
INITIAL CONDITIONS:
INITIATING CUE:                The USCO has directed you to perform a manual QPTR lAW OST-1039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.
INITIATING
For the purposes of the examination, there will be no independent verification of your work.
CUE:*Theplanthasbeenstabilizedat100
PRNIS Readings N41                               149.7                           169.2 N42                                177.9                         202.6 N43                              202.0                          221.1 N44                                165.5                          197.5
%powerfollowinga
* All values were taken, with the Range/Rate switch in 400 IJAiSlow position.
droppedrodinControlBank"B"(M-6).*Thecrewis
HARRIS 2008 NRC RO A2 Revision 2                                        NUREG 1021, Revision 9
performing
 
AOP-001, MALFUNCTION
Appendix C                                  Job Performance Measure                   Form ES-C-1 Worksheet Facility:                HARRIS                                  Task No.:
OF ROD CONTROL AND INDICATION
Task
SYSTEM.*No deficiencytagsonPRNls.TheUSCOhasdirectedyoutoperformamanualQPTRlAW
 
OST-1039, CALCULATIONOFQPTR.ThePowerRangeNIS
==Title:==
readingsareprovidedinthetablebelow.Forthe purposesofthe examination,therewillbeno
Review the Completed OST for            JPM No.:    2008 NRC SRO A2 Auxiliary Feedwater Pump 1A-SA KIA
independent
 
verificationofyourwork.
==Reference:==
PRNIS Readings N41 N42 N43 N44 149.7 177.9 202.0 165.5 169.2 202.6 221.1 197.5*Allvaluesweretaken,withthe
2.2.12 (3.4)
Range/Rateswitchin400
Examinee:                                                     NRC Examiner:
IJAiSlow position.HARRIS2008NRCROA2Revision2NUREG1021,Revision9
Facility Evaluator:                                           Date:
AppendixC Facility: HARRIS Job Performance
Method of testing:
Measure WorksheetTaskNo.:FormES-C-1TaskTitle:Reviewthe
Simulated Performance:                                         Actual Performance:      x Classroom            X   Simulator    ---
CompletedOSTfor Auxiliary FeedwaterPump1A-SAJPMNo.:2008NRCSROA2KIAReference:2.2.12(3.4)
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Examinee:NRCExaminer:FacilityEvaluator:
Initial Conditions:
Date:Methodoftesting:
* The unit is in Mode 1 at 100% power
Simulated Performance:
* All major controllers are in AUTO
ClassroomREADTOTHE EXAMINEE X SimulatorActualPerformance:
* No TS Action Statements are in effect
Plant---xIwillexplaintheinitialconditions,whichstepstosimulateordiscuss,andprovideinitiatingcues.Whenyou
* OST-1211, AUXILIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4, has just been completed Task Standard:             All errors (4) identified Required Materials:         None General
completethetasksuccessfully,theobjectiveforthisJob
 
PerformanceMeasurewillbesatisfied.InitialConditions:*TheunitisinMode1at100
==References:==
%power*AllmajorcontrollersareinAUTO*NoTSAction
OST-1211, AUXILIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4 Handout:                   Completed OST-1211 with the errors incorporated.
Statementsareineffect*OST-1211, AUXILIARY FEEDWATERPUMP1A-SA OPERABILITY
Initiating Cue:            You are the USCO. Completely review the procedure and note any problems in the
TEST QUARTERLY INTERVALMODES1-4,hasjustbeen
 
completedTaskStandard:Allerrors(4)identifiedRequiredMaterials:NoneGeneralReferences:
==GENERAL COMMENT==
OST-1211, AUXILIARY FEEDWATERPUMP1A-SA OPERABILITY
S section of Attachment 6 -
TEST QUARTERLY INTERVALMODES1-4 Handout:InitiatingCue:
Certification and Review. Discuss your review with me at the conclusion.
CompletedOST-1211withtheerrorsincorporated.YouaretheUSCO.
HARRIS 2008 NRC SRO A2 Revision 2                                            NUREG 1021, Revision 9
Completelyreviewtheprocedureandnoteany
 
problemsinthe GENERAL COMMENTSsectionof Attachment6 CertificationandReview.Discussyourreviewwithmeatthe
Appendix C                    Job Performance Measure         Form ES-C-1 Worksheet Time Critical Task: No Validation Time:    12 minutes HARRIS 2008 NRC SRO A2 Revision 2                      NUREG 1021, Revision 9
conclusion.HARRIS2008NRCSROA2Revision2NUREG1021,Revision9
 
Appendix CTimeCriticalTask:ValidationTime:
Appendix C                     Job Performance Measure         Form ES-C-1 Worksheet SIMULATOR SETUP N/A HARRIS 2008 NRC SRO A2 Revision 2                      NUREG 1021, Revision 9
No12minutes Job Performance
 
Measure WorksheetFormES-C-1HARRIS2008NRCSROA2Revision2NUREG1021,Revision9
Appendix C                                  Page 4 of 8                        Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
Appendix C Job Performance
START TIME:
Measure Worksheet SIMULATOR SETUP N/AFormES-C-1
Performance Step: 1       Review procedure Standard:                 Ensures proper conditions, signatures/initials, and may verify the current revision of the procedure Evaluator Cue:
HARRIS2008NRCSROA2Revision2NUREG1021,Revision9
* Provide the completed OST-1211.
Appendix CPage4of8 PERFORMANCE
Comment:
INFORMATIONFormES-C-1 (Denote Critical Steps with a check mark)STARTTIME:
~  Performance Step: 2      Review the completed OST Standard:                Attachment 1 (Page 16) - Identifies stopwatch is past calibration date Evaluator Note:          This makes the OST invalid and/or any timed elements would have to be repeated.
PerformanceStep:1 Standard: Evaluator Cue: Comment:PerformanceStep:2 Standard: Evaluator Note: Comment: Review procedure Ensures proper conditions, signatures/initials,andmayverifythe
Comment:
currentrevisionofthe
HARRIS 2008 NRC SRO A2 Revision 2                                  NUREG 1021, Revision 9
procedure*Provide the completed OST-1211.Reviewthe completed OST Attachment1(Page16)-
 
Identifiesstopwatchispastcalibration
Appendix C                                 Page 5 of 8                        Form ES-C-1 PERFORMANCE INFORMATION
date This makestheOST invalid and/or any timed elements wouldhavetobe repeated.HARRIS2008NRCSROA2Revision2NUREG1021,Revision9
-v Performance Step: 3  Review the completed OST Standard:
Appendix C-v PerformanceStep:3Page5of8 PERFORMANCE
* Attachment 2, Sheet 1 (Page 17) - wrong Specific Volume used to determine ilPcorr.
INFORMATIONReviewthe completed OSTFormES-C-1
Evaluator Note:      l\Pcorr still exceeds minimum requirement but is incorrect.
Standard: Evaluator Note: Comment:-v PerformanceStep:4 Standard: Evaluator Note: Comment:-v PerformanceStep:5 Standard: Comment:*Attachment2,Sheet1(Page17)-wrongSpecificVolumeusedto determine ilPcorr.l\Pcorr still exceeds minimum requirementbutisincorrect.Reviewthe completed OST*Attachment3(Page20)-
Comment:
Outboard Horizontal
-v Performance Step: 4  Review the completed OST Standard:
VibrationreadingisintheALERTrangebutthereisno
* Attachment 3 (Page 20) - Outboard Horizontal Vibration reading is in the ALERT range but there is no documentation in accordance with Instructions 1.a and 1.b.
documentation
Evaluator Note:      The pump would still be operable but this could prevent corrective action or the required increase in surveillance frequency.
in accordance
Comment:
with Instructions1.aand1.b.Thepumpwouldstillbe
-v Performance Step: 5    Review the completed OST Standard:            Attachment 4 (Page 21) - 1AF-74 SHUT time exceeds CODE CRITERIA and, in accordance with Step 7.0.1, should have been retested immediately.
operablebutthiscouldprevent
Comment:
correctiveactionortherequired
HARRIS 2008 NRC SRO A2 Revision 2                                NUREG 1021, Revision 9
increase in surveillance
 
frequency.Reviewthe completed OST Attachment4(Page21)-
Appendix C                               Page 6 of 8                      Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 6  Review the completed OST Standard:           Returns the procedure unsigned or, if signed, with EXCEPTIONS circled and all errors identified in the
1AF-74SHUTtime exceeds CODE CRITERIAand,in accordancewithStep7.0.1,shouldhavebeen
 
retested immediately.
==GENERAL COMMENT==
HARRIS2008NRCSROA2
S section.
Revision 2NUREG1021,Revision9
Comment:
Appendix C Performance
Terminating Cue:        When the procedure is returned: Evaluation on this JPM is complete.
Step: 6Page6of8 PERFORMANCE
STOP TIME:
INFORMATIONReviewthe completed OSTFormES-C-1
HARRIS 2008 NRC SRO A2 Revision 2                                  NUREG 1021, Revision 9
Standard: Comment: Terminating
 
Cue:STOPTIME:Returnsthe
Appendix C                            Page 7 of 8                Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SRO A2 Examinee's Name:
procedureunsignedor,ifsigned,with
Date Performed:
EXCEPTIONScircledandallerrorsidentifiedinthe
Facility Evaluator:
GENERAL COMMENTS section.Whenthe procedure is returned: Evaluation
Number of Attempts:
on thisJPMis complete.HARRIS2008NRCSROA2Revision2NUREG1021,Revision9
Time to Complete:
Appendix CPage7of8 VERIFICATION
OF COMPLETIONFormES-C-1
Job PerformanceMeasureNo.:2008NRCSROA2
Examinee's
Name:DatePerformed:FacilityEvaluator:NumberofAttempts:TimetoComplete:
Question Documentation:
Question Documentation:
Question: Response: Result: Examiner's
Question:
Signature:
 
SAT UNSAT Date:HARRIS2008NRCSROA2Revision2NUREG1021,Revision9
===Response===
Appendix CPage8of8JPMCUE SHEETFormES-C-1
Result:                     SAT            UNSAT Examiner's Signature:                               Date:
INITIAL CONDITIONS:
HARRIS 2008 NRC SRO A2 Revision 2                        NUREG 1021, Revision 9
INITIATING
 
CUE:*TheunitisinMode1at100
Appendix C                                Page 8 of 8                    Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
%power*All major controllersareinAUTO*NoTSAction
* The unit is in Mode 1 at 100 % power
Statementsareineffect*OST-1211,AUXILIARY
* All major controllers are in AUTO
FEEDWATERPUMP1 A-SA OPERABI LITY TEST QUARTERLY I NTERVAL MODES 1-4,'has just been completedYouaretheUSCO.
* No TS Action Statements are in effect
Completelyreviewthe procedureandnote any problemsinthe GENERAL COMMENTS section of Attachment6-CertificationandReview.Discussyourreviewwithmeatthe
* OST -1211, AUXI LIARY FEEDWATER PUMP 1A-SA OPERABI LITY TEST QUARTERLY INTERVAL MODES 1-4,'
conclusion.
has just been completed INITIATING CUE:        You are the USCO. Completely review the procedure and note any problems in the
HARRIS2008NRCSROA2Revision2NUREG1021,Revision9
 
NUMBER: C CO*NTINUOUS
==GENERAL COMMENT==
USE HARRIS NUCLEAR PLANT PLANT OPERATING MAN UAl VOLUME 3PART9 QPERAT10NS
S section of Attachment 6 - Certification and Review. Discuss your review with me at the conclusion.
SU*RVEllLANCE
HARRIS 2008 NRC SRO A2 Revision 2                              NUREG 1021, Revision 9
TEST OST-1211 TITLE: NOTE: A*U:XILIARY
 
FEEDWATER PUMP 1A.-SA OPERABILITY
C CO*NTINUOUS USE HARRIS NUCLEAR PLANT PLANT OPERATING MAN UAl VOLUME 3 PART 9 QPERAT10NS SU*RVEllLANCE TEST NUMBER:
TEST QUARTERLYI*NTERVAL
OST-1211 TITLE:     A*U:XILIARY FEEDWATER PUMP 1A.-SA OPERABILITY TEST QUARTERLYI*NTERVAL MOD:ES 1 -4 NOTE:  Thlsprccedure has been screened perPLP-1 00 Criteria and determined to be CASE Iii,       :additionalmanagementinvolveme*nt is required.
MOD:ES 1-4 Thlsprccedure
                    .... . *1 I OST-1211                                Rev, 16                             Page 1 of 261
has been screened perPLP-1 00 Criteria and determined
 
to be CASE Iii,:additionalmanagementinvolveme*nt
Attachment 1 -Calibration Data Sheet Sheet 1 of 1 Cal Due Date     I o~    o c                    QT'   0 (JT" N.A
is required.I OST-1211......*1 Rev, 16 Page1of 261  
::     Rev. 16                     Page 18 of 261
Attachment
 
1-Calibration
A'ttaehm.ent 2 ~ Performance Data Sheet 1 of*3 Auxiliary Peecwater Pump 1A..SA NOTE1:Caiculate DifferentiaiPressure as foltows:
Data Sheet Sheet 1 of 1 Cal Due Date-97-I o N.A QT'0 (JT" c:: Rev.16 Page 18 of 261  
lb{)()                           <  (iSIS                =  J514~d,    psid Step 7'. 1.21                         Step 7~ 1.18             Step 7.1.23*
A'ttaehm.ent
L!==========:,=======                                           . ::=.:..   .=====;======~
2Performance
NOTE* 2:   Satisfactory Acceptance Criteria is .determlnedby u.sing the following
DataSheet1 of*3 Auxiliary Peecwater Pump 1A..SA NOTE1:Caiculate
                  ~.rH l~-HO and verifying the correcteodlfterenttatpressure ts \tifit.hinthe
DifferentiaiPressure
                  .-   :_-   ~t;:t;. \i.~ Iltj'~: la:
as foltows: lb{)()Step 7'.1.21<(iSIS Step1.18= psid Step 7.1.23*L!==========:,======
tlP corr :::; Corrected DifferentIal Pressure APind   :=   tndlq.~ted Discharge                Pressure minus Indicated sucuon Pressure Uf       =:   SpeCific Volume (ftslfbm) for saturated Iiquidwater (u,) for suction temperature recorded inStep7.. *1.22. This number can be determined from Sheet3 of this Attachment or Standard Steam Tabtes~
=..::=.:..
7.1.24 I0$1-1211                                 r w
NOTE*2: Satisfactory
Rev. 16                           Page 11 of 26 ,
Acceptance
 
Criteria is.determlnedby
Attachm.ent 2 ~ Performance Data Sheet 2 of 3 INSTRUC*TIONS
u.sing the following
: 1.     If pump hydrauHcdatEfdoes not meet acceptance criteria:
and verifying the correcteodlfterenttatpressure
a~      Declare the pump iNOPERABLE.,
ts\tifit.hinthe
b~      Inlti:ate a :CR.
.-:_-
ST*Ep***
la: tlPcorr:::;APind:=Uf=: 7.1.24 Corrected DifferentIal
NO.
Pressure
7.1.3 7.1.18                                   Test Gauqe              psig 2: 15 psig CE~42 . .V*2 7.1.20                                    Test G:8uge at1AF-11*HV.2       {CodD psig    N/A ERFISPoint 7.1.22                                  TCE901 . *::or Suction Temperature                                          N/A Har~dheld Porom~t~(*
Discharge Pressure minus Indicated sucuon Pressure SpeCific Volume (ftslfbm)for saturated Iiquidwater (u,)for suction temperature
Test Gauqe at 1AF-7 OifferentlalPressure      Calculated per NOTE 1 Calculated per 7.1 ~26      Differenual Pressure          NOTE 2 (C:orrected (liPcorr)
recorded inStep7..*1.22.This number can be determined
* Circle instrument used.
from Sheet3 of this Attachment
**      50 to 54 inches water column is equivalent to 50 to 52 gpm IOST~1211                                      Rev. 16                       Page 18 of 261
or Standard Steam
 
I 0$1-1211 r w Rev.16 Page 11 of26,  
Attachm.ent 2* Performance Data Sheet 3 of 3 Specific Volume (ft 3/Ibm) For Saturated Liquid Water {ud Temperature Specific Volume   Temperature   l:s.. peciflc VO~.unne 59         0:.016034          80        I      0.016074 60         0.. =016035        81                0.016076 61        0.016036            82                0.016079      103 62        0.0160:38           83                0.016081 63        0.01603:9           84                                105 64                            as 66        (t016044           81 67        CL016046           88                                109 6*8        0.01.60:48           89                0..0=16097 69        O~01'6050                                            111      0.0'16110 70        0.016052                                              11:2      0.016174 11                                                              113      0.016177 7*2        0.016056' 73        0.01605$                                      12    1 74        0.016060            95                OJJ*16.115    116      0.016189 75        0.016062            96                              117 76        0.016064                                              1 77        0.016061            98                0.016125      119      0.016201 78        0.Ot6069                                              120 79        0.016011            tOO                0.016131                0.016209 I                Rev. 16                       Page 19 of 26 I
Attachm.ent
 
2Performance
Attachment 3 ~ Vibration Data Sheet 1 of 1 IN'STRUCTIONS:
Data Sheet 2of3 INSTRUC*TIONS
: 1. If pump vibration data is greater than the Acceptable Range but within the Alert Range:
1.If pump hydrauHcdatEfdoes
: a.                           Prepare enE-man or MenlO to the Surveillance Testing Scheduling Coordinator directing the test frequency of the pump to be doubled,
not meet acceptance
: b.                         Attach a copy of the E-mail or Memo to the test package.
criteria:Declare the pump iNOPERABLE., bInlti:ate a:CR.ST*Ep***NO.7.1.3 7.1.18 7.1.20 7.1.22 7.1 Suction Temperature
: 2. If pump vibration data meets the Required Action Criteria:
OifferentlalPressure
B.                           Declare the pump INOPERABLE.
Differenual
: b.                          Initiate a Condition Report (CR)v F                                                               s Vibration                                                                                                     ACCEPTANCE :CRITERIA
Pressure Test Gauqe
  .location                 IN/SEC                                                 Acceptable Range                   Alert Range     Required Action Axial             ~ *J.1Q                                                         :s.0.285                   :> O~285 to ~ 0.68.4   > O~68*4 Outboard                                                                              ~. 0.2325                 > 0.232'5 to .s:O.558   > O~558 Horizontal    l~Gt~3 )                     *.. .,.".,.,:;">>,,.,~~, .*,.".~;-.,..
...V*2 Test G:8uge at1AF-11*HV.2
Outboard                                                                              s O~2775                  >ON2775 tos 0.666       > 0,666
ERFISPoint
                  /'0
TCE901..*::or
                                ............. ~
Test Gauqe at 1AF-7 Calculated
Vertical Inboard                                                                               s O~265                  *>O.2.i5Sto*s O~63.6    :> 0:.636 Hortzontat   I Vertica' :
per NOTE 1 Calculated
{DC( J s O~315                    > 0.315 to s 0.70       >0.'70 Inboard
perNOTE2 (C:orrected (liP corr)psig{Cod D psig 2: 15 psig N/A N/A***Circle instrument
                    ... ". '* . I~G  /;1:0
used.50 to54inches water column is equivalent
                \,
to 50 to52gpm IRev.16 Page 18 of 261  
L~~::!~~.*                                  ,_~_~~,_"_"__~~~ . .* .                                         L _ _2~e ~o ~!~
Attachm.ent
 
2*Performance
Attachment 4 Valve Test Data                                          M*.
Data Sheet 3 of 3 Specific Volume (ft 3/Ibm)For Saturated Liquid Water{ud Temperature
Sheet 1 of 1
Specific Volume Temperature
_um""'''''''''''''''h                                 -"                                                                                                                                                                                                                                                                                                                                 .",.:,u......*.._.
l:s...peciflc
                                                                                                                                                                                                                                                                                                                                                                                                    ~                  .,.                                                                                 <_,,~.                 ____.      ~.      h_
59 60 61 62 63 64 66 67 6*8 69 70 11 7*2 73 74 75 76 77 78 79 0:.016034 0..=016035 0.016036 0.0160:38 0.01603:9 (t016044 CL016046 0.01.60:48
PRETEST                                                                                                                                            FAIL SAFE                                                                      rosrrssr ALIGNMENT                                                   FULL
0.016052 0.016056'0.01605$0.016060 0.016062 0.016064 0.016061 0.Ot6069 0.016011 I 80 I 81 82 83 84 as 81 88 89 95 96 98 tOO 0.016074 0.016076 0.016079 0.016081 0..0=16097 12 OJJ*16.115
                                                                              ........ -.......... STROKE TEST
0.016125 0.016131Rev.16 103 105 109 111 11:2 113 1 116 117 1 119 120 0.0'16110 0.016174 0.016177 0.016189 0.016201 0.016209 Page 19 of 26 I
                                                                                                                        .............                                                   TEST                                                              ALIGNMENT                                                                                                                                                  ACCEPTANCE y",,131TERIA (SEC)
Attachment
CODE CR.tTERI.A Verification                      Stroke Time                                                                                                                                                                                                                                                                                                                                                                            LIMlT1NGVALUE ofT"ravel by                                     (SEC)                               I                                                                                                                                                                                                           OPEN                                                                         SHUT
3Vibration Data Sheet1of1 IN'STRUCTIONS:
  'Valve                 Pretest                                         Ind Lights                                                                           : Fail Safe Position Pusttes!
1.If pump vibration data is greater than the Acceptable
Number                 Position                         I:Htt             (lNIT)                   OPEN SHUT: Positlon Verified *Pos.iUon Pos lnit Vert loit                                                                                                                                                                                               Low                               High                                   Low                   High                             OPEN                               SHUT 1AF-55                 Open ffO !fJ                                     l/Pt~fo                      1&.1" NIA                                     NtA                     Open                     }6=>.                                 :u                                                 14.25                             19~28                                14,34                   19;40                               25~15                              23.00 1AF...74               Open Aio Aw                                               bb61~~;P~    -e,                                          :0' NlA                                     NIA                     Open
Range but within the Alert Range: a.Prepare enE-man orMenlOtothe
                                                                                                                                                                                                                                                                    ~ :i)                                                                                   f5~48                          20.94                                   14,84                   20.07                               27.31                             23.00 Comments:                         .,..".,.....,.,.....-           .<<ovm<_'<<"=_ .*                                                                                                                                                                                                                                                                                                                     " *****.*._.vwm.*..... wm"hwu.
Surveillance
                                                                                                                                                                                                                                                                                                                                                                                    ...* *.*.*     *.VII'           * ...,..._ _*..a*     *b*.*.* *.'.* ' "A <<.:...:A.:.:..,_O'<< ".:*.*:   '           .....:. b *:**v*.i( * *..**** * * *** **   **
Testing Scheduling
                                                                                                                                                                              ....... ~                ;.;.; ; ;.: ,.; <N._  N          .-"...; N .. ~_ _        J'.I'_.+-.-. _ _*_,.v.*.*..I'>............................................................                                                                                                                                 .     . . - ._..-.-'w       ~        .....-vvY.y.,..w. ~
Coordinator
~                ..
directing the testfrequencyofthe
  ...-;~-...x<<<<o: -:<;;Xo<<~~ __. _~                      cccccccee                                                                  <.;..OC;"':O:':<_........-_<hV<hV<hV<hV     h~AQ;y,;<<o;.y;;oc;.,.;                 .~.--"..No'N:N       NN    N~........:<<  <<<<'i.<<-;-; ;.; ;*;..:*:.:*;.:.:-:<<.>>: :<< : :    -'-    <N                              ~" :.:.-.~.w.r.*.*.* * ***  NU *""""""        ......:.   ~~.; .."j    /vu'**u.* u.*.*.*.*
pumptobedoubled,b.Attachacopy
L?ST~1211                                                                                      I                                                  Rev. 16                                                                                      I                                                                                            Page 21 0126 1
of the E-mailorMemoto the test package.2.If pump vibration data meets the Required Action Criteria: B.b.Declare the pump INOPERABLE.
 
Initiate a Condition Report (CR)v F s\, Vibration ACCEPTANCE
Attachment 5- Valve Retest Data S'heet Sheet 1 of 2 NOTE:      This entire Attachment is N/A if no valve is retested due to exceeding the CodeCrttena.
:CRITERIA.location IN/SEC Acceptable
Determine if the. stroke time exceeds the Limiting Value,
Range Alert Range Required Action Axial*J.1Q:s.0.285:>
: 1.      If the stroke time exceeds the limlting Value, declare the valve inoperable and initiat.e* aCR~ (NIAifstroke time is less than the LirnltlnqValue) 2..      lfthe stroke time is. less than the Limiting Value.but outside the Code Onteria limits, perform the foUovving :Steps:
to0.68.4>
: 8.         If the cause is known to be mechanical failure~or if a retest cannot be performed expeditiously, declare the valve inoperable and inJUate a CR(Except PMTRs).
Outboard0.2325>0.232'5 to.s:O.558>
: b.       If retestlng the valve is desired perform the following:
)Horizontal
N:OTE:. If necessary separate markedup sheets of this CST maybe used to document necessary manlpulatlons.                      sheets would                    this procedure and noted in the comments Section of Attachment 7.
Outboard*.....*..s
(1)     Determine wbich Ste:ps need to beperfcrrned                up conditionstor testing the valve. Unit SeQ concurrence must be obtained and documented in the Comments section of Attachment 7>
>ON2775 tos 0.666>0,666 Vertical/'0.............Inboard I s
(2)      Perform the Steps determlned in the previous Ste'p anddocument stroke times/valve positioning on Sheet2.
*>O.2.i5Sto*s
(3)     ~f retest results are still outside the Code Crlteria~declare the valve inoperable and initiate aCR (except Prv1T),
:>0:.636 Hortzontat
(4)    1f retest results-are Within the Code Criteria perform the .following:
{DC(J Inboard Vertica': s
y (a)    Dec~are  the valve operable.
>0.315 to s 0.70>0.'70'*../;1:0...".__....*..L__
(b)    Inltl~.tea CR. identify1ng test findings for the first and second tests.
Attachment
(c)     Send test results to Responsible Engineer (1ST) for evaluation and docurnentanonon the CR.
4 M*.Valve Test Data Sheet 1of1_um""'''''''''''''''h
IOST-1211                                                                                            Page 22 of 26 I
-".",.:,u......*.._..,.
 
____.h_PRETESTFAILSAFE rosrrssr ALIGNMENT FULL STROKE TEST TEST ALIGNMENT ACCEPTANCE
Attachment 5 ~ V,alveRetest Data Sheet Sheet 2. of 2 (1)         FUI out PRETEST ALIGNMENT POSTT;EST ALIGNMENT, and ACCEPTANCE CRITERIA values for the velvets) being t
y",,131TERIA (SEC)........-..........
tested using the values in the initIal test Attachment,
".."........-.............
                                                                                                                              ~~
CODE CR.tTERI.A
                                                                                                                                        ~~::....;;..;.:.:y:w .':..->>...:***..:.           ........   ,-
VerificationStrokeTime
PRETEST ALIGNMENT (1)                                  F.]J.~l. STROKETt=$T POSTIEST ALIGNMENT (1) ".     <<-=<<-x-CO.9.E CRITERIA ACCEPTANCECRJTERIA (SEC) tt}
LIMlT1NGVALUE
I I
ofT"ravel by (SEC)I OPEN SHUT'Valve Pretest Ind Lights:Fail Safe Position Pusttes!Number Position I:Htt (lNIT)OPEN SHUT: Positlon Verified*Pos.iUonPoslnit Vert loit Low High Low High OPEN SHUT 1AF-55 Open ffO!fJ
J Time                                                                                                                ~
1&.1" NIA NtA Open}6=>.:u 14.25
(SE:C)                                                  OPf:N                                          $HVT...             LIMITfNG VALUE Pretest
14,34 19;40
*\l'a'dve i!''''l:\JlnUf.:n
23.00 1AF...74 Open Aio Aw
                        . Posmon                        tntt:   OPEN          SHUT Posttest Position    Pes lnit    Verflnif      Low                High                        Low      High        OPEN      I i  .StrUT
NlA NIA Open:i)
                                                                                                                              ~
20.94 14,84 20.07 27.31 23.00-e,:0'Comments:.,..".,.....,.,.....-
                                                                                                                                                                                                    ~
.<<ovm<_'<<"=_
I           i
.*"*****.*._.vwm.*
                                                                                                                                                                                                    ~
.....wm"hwu....**.*.**.VII'*...,...__*..a**b*.*.**.'.*'"A<<.:...:A.:.:
                                                                                                                ~
..,_O'<<".:*.*: '.....:.b*:**v*.i(**..*************
~~11*.                           ,,_.........:MW  ~
.......;.;.;;;.: ,.;<N._N.-"...;N..__J'.I'_.+-.-.
                                              ... . .... . , _=t                    Rev. 16                    I                Page 23 of ~61
__*_,.v.*.*..I'>..................................
 
.....................
Attachment 6*~ Certification and Review Sheet 1 of 2 T:hiS CST was performed as a:                       Periodic Surveillance Requirement: _~ __
..........-._..-.-'w.....-vvY.y.,..w.
Postmalrrtenance OperabHity Test:            _
..
Redundant SUbsystem Test:
__.cccccccee<.;..OC;"':O:':<_........-_<hV<hV<hV<hV
PlantConottlons:                                                                Mode:
NN
                    --~~~~~----------_.............--
<<<<'i.<<-;-;
OST Compl.etedBy:                    -                              ..-..-< Date:  ToDAt Time:   tq~3(~)
;.;;*;..:*:.:*;.:.:-:<<.>>:
OS.1 . P~.rfofrf1ed Bv:
:<<::-'-<N****NU*""""""......:..."j/vu'**u.*u.*.*.*.*
Initials          Name (Print)                    Initials      Name (Print)
I Rev.16 I Page 21 0126 1
General Comments/Recomm:endation/Corrective ActionslExceptions:
Attachment
I()$T-1211*                      L            Rev. 16        m    mJ Page 24 of 26 I
5-Valve Retest Data S'heet Sheet 1 of 2 NOTE: This entire Attachment
 
is N/A if no valve is retested due to exceeding the CodeCrttena.
Attachment 6 ~ Certifications and Reviews Sheet 2 of 2-Step 7,1.11      1A..SA AF\'V Pump Inoperable                  Time:  fJ10 t::.
Determine if the.stroke time exceeds the Limiting Value,1.Ifthe stroke time exceeds the limlting Value, declare the valve inoperable
                                                                      ~-~'~"oXA ~v;o;,o ;o;.~
and initiat.e*(NIAifstroke
                                                                                                        'Tc)J:r-ti Date: :~"X'.xo;:<<    ;~_"_~-o;,"XX..;-
time is less than the LirnltlnqValue)
Step  7~1.32      1A-SA AFW Pump Operable-                      Time:_~__=l-L Date:                    ~:IJ:fDfft=_
2..lfthe stroke time is.less than the Limiting Value.but outsidetheCodeOnteria
Step 7.2.1.c      1A-SA and 1 B-S-B AFWPump Inoperable          Time:tot5 __~ Date: ~Jilt Step  7~2~1,p    1A-SA-and 1B.. SBAFW Pump Operable            Time: 1,~;~.,5"" . .-        Date: ~JcJtfl~t,~,
limits, perform the foUovving:Steps: 8.Ifthe cause is knowntobe mechanical
Pa.ges Used:      Atl~_~~_
if a retest cannot be performed expeditiously, declarethevalve inoperable
and inJUate a CR(Except PMTRs).b.If retestlng the valve is desired$perform the following:
N:OTE:.If necessary separate markedup sheets of this CST maybe used to document necessary manlpulatlons.
sheets would this procedure and noted in the comments SectionofAttachment
7.(1)Determine wbich Ste:psneedto beperfcrrned
up conditionstor
testing the valve.Unit SeQ concurrence
must be obtained and documented
in the Comments section of Attachment
7>(2)Perform
the Steps determlned
in the previous Ste'p anddocument
stroke times/valve
positioning
on Sheet2.(3) retest results are still outside the Code
the valve inoperable
and initiate aCR (except Prv1T), (4)1f retest results-are
Within the Code Criteria y perform the.following: (a)
the valve operable.(b)
CR.identify1ng
test findings for the first and second tests.(c)Send test results to Responsible
Engineer (1ST)for evaluation
and docurnentanonon
the CR.IOST-1211 Page 22 of 26 I
Attachment
5V,alveRetest
Data Sheet Sheet 2.of 2 (1)FUI out PRETEST ALIGNMENT t POSTT;EST ALIGNMENT, and ACCEPTANCE
CRITERIA valuesforthe velvets)being tested using the valuesinthe initIal test Attachment,
.':..->>...:***..:.........,-J PRETEST POSTIEST ALIGNMENT ALIGNMENT ACCEPTANCECRJTERIA (SEC)(1)
STROKE Tt=$T (1)".<<-=<<-x-tt}I CO.9.E CRITERIA I Time(SE:C)OPf:N$HVT...LIMITfNG VALUE Pretest Posttest I*\l'a'dve i!''''l:\JlnUf
..:n Posmon tntt: OPEN SHUT Position Pes lnit Verflnif Low High Low High OPEN i.StrUTIi'.<'.-
,,_.........:MW
.........,_=t Rev.16 I Page 23 of
AttachmentCertification
and Review Sheet 1 of 2 Periodic Surveillance
Requirement:__Postmalrrtenance
OperabHity
Test:_Redundant SUbsystem Test: Mode: PlantConottlons:
T:hiS CST was performed as a: OST Compl.etedBy:
-..-..-<Date: ToDAt Time:
OS.1..
Bv: Initials Name (Print)Initials Name (Print)General Comments/Recomm:endation/Corrective
ActionslExceptions:
I ()$T-1211*L Rev.16 m mJ Page 24 of 26 I
Attachment
6Certifications
and Reviews Sheet2of 2-Step 7,1.11 Step
Step 7.2.1.c Step
1A..SA AF\'V Pump Inoperable1A-SAAFWPump
Operable-1A-SA and 1 B-S-B AFWPump Inoperable
1A-SA-and1B..SBAFW Pump Operable Time: fJ10 t::.Date: 'Tc)J:r-ti.*.
..... o
........
__=l-L Date:
Time:tot5__Date:
Time:...-Date: Pa.ges Used: A
CST Completed with NO EXCEPT10NS1EXCEPTIONS:
CST Completed with NO EXCEPT10NS1EXCEPTIONS:
Reviewed By: Unit SeQ ResponsibieEngin"eer
Reviewed By:                                                                         Date:
(1ST)Reviewed By: ANn Date:----Date:----After receiving the final review signature, this OS:T becomes a a-A RECORD and should be submitted to Document Servloes..IOST-1211 Revy16  
Unit SeQ ResponsibieEngin"eer (1ST)
Reviewed By:                                                                         Date:
ANn                                                    ----
After receiving the final review signature, this OS:T becomes a a-A RECORD and should be submitted to Document Servloes.                                                                                 .
IOST-1211                                       Revy16
 
R~.vtsion S~Jmmary General Revision 16 updates the procedure reference to the new 1ST Program Plan, Des9ription o.fChanges
*Page.              Section      Ghange Description Ail                    All      Updated revision level.
3                    1~O+2      Adde.d check valves 1AF-231 54 92, 11 O~and 73.
1 3                    t~O.4      Deleted, 5                    2~7.4      HNP-*lST-003, HNP 1ST Program Plan - 3rd tntervat, 8                6+0~1.e~(1 )  Changedacceptancecriterla per calc, (Also cbanqed on Atta'chme*nt2) 8                  6~O.1.b      Deleted "Parnat'strcke 8                  6.Q.1.c      Added check valves 1AF-23, 54$ 92 1 110~ and 73.
9                    7.1.5      Added check valves  1AF~54,92~  and 73.
11                  7+1.24      Added check va'hte1AF-23$110 17              Attachment 2    Added checkvalves 1AF*-23*~541 92, 110 , and 73~
Rev. 16                            Page 26 of 26 1
 
Appendix C                                  Job Performance Measure                    Form ES-C-1 Worksheet Facility:                HARRIS                                    Task No.:
Task
 
==Title:==
Given a Declared Emergency,              JPM No.:    2008 NRC RO-SRO A3 Determine the Dose Rate, Dose Limit, and the Number of People to Perform a Task.
KJA
 
==Reference:==
2.3.4 (2.5/3.1)
Examinee:                                                    NRC Examiner:
Facility Evaluator:                                          Date:
Method of testing:
Simulated Performance:                                        Actual Performance:        X Classroom          X      Simulator            Plant Perform in a location with the general references available or with electronic access to the references.
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
* A large break LOCA has occurred.
* The ECCS is in cold leg recirculation.
* RHR Pump "8" is running. RHR Pump "A" showed evidence of gas binding and was stopped.
* A Site Area Emergency (SAE) is in effect.
* The Emergency Engineering Organization has determined that the RHR Pump "A" should be vented to ensure that a backup is available.
* The general radiation level in the area is 16 R/hour
* The OSC estimates that the total task will take. 75 man-hours.
* The Site Emergency Coordinator has specified that he/she will not authorize an extension to the site emergency workers dose limit for performance of this task.
Task Standard:              Number of people and stay times calculated within specified limits.
Required Materials:        Calculator HARRIS08 NRC RO-SRO A3 Revision 2                                            NUREG 1021, Revision 9
 
Appendix C                          Job Performance Measure                    Form ES-C-1 Worksheet General
 
==References:==
* PEP-330, RADIOLOGICAL CONSEQUENCES
* NGGM-PM-0002, RADIATION CONTROL AND PROTECTION MANUAL Initiating Cue:    The site emergency workers listed in the table below are available.
They will be utilized from lowest to highest accumulated TEDE dose.
Using the minimum number of workers possible, DETERMINE:
* the total number of workers required to perform the task and
* the maximum stay time for each individual who will be utilized.
Assume no dose in transit and round off to the nearest minute below the limit.
Time Critical Task: NO Validation Time:
HARRIS08 NRC RO-SRO A3 Revision 2                                  NUREG 1021, Revision 9


General Revision16updates the procedurereferenceto
Appendix C                   Job Performance Measure         Form ES-C-1 Worksheet SIMULATOR SETUP N/A HARRIS08 NRC RO-SRO A3 Revision 2                    NUREG 1021, Revision 9
the new 1ST Program Plan, Des9ription
 
o.fChanges
Appendix C                                   Page 4 of 7                      Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
*Page.Section Ghange Description
START TIME:
Ail 3 3 5 8 8 8 9 11 17 All 1
Performance Step: 1       Determine total estimated dose for the task.
)
Standard:                16 R/hour x .75 hours = 12 Rem Comment:
6.Q.1.c 7.1.5 7+1.24 Attachment
Performance Step: 2      Determine the dose limit for site emergency workers Standard:                Per PEP-330 - Attachment 1: 5 Rem Comment:
2 Updated revision level.Adde.d check valves 1AF-23 1 54 1 92, 11
~  Performance Step: 3      Determine the number of people required Standard:                Workers A, B, and C would have to be used (~) to reach the 12 Rem total estimated dose (4700 + 4450 + 4300 = 13.45)
73.Deleted, HNP-*lST-003, HNP 1ST Program Plan-3rd tntervat, Changedacceptancecriterla
Comment:
per calc, (Also cbanqed on Atta'chme*nt2
HARRIS08 NRC RO-SRO A3 Revision 2                                   NUREG 1021, Revision 9
)Deleted"Parnat'strcke
 
Added check valves 1AF-23, 54$92 1and 73.Added check valves
Appendix C                            Page 5 of 7                      Form ES-C-1 PERFORMANCE INFORMATION
and 73.Added check va'hte1AF-23$110
~  Performance Step: 4 Stay Time for Workers Standard:           A: 4.7/16 x 60 minutes = 17 minutes B: 4.55/16 x 60 minutes = 17 minutes C: 4.30/16 x 60 minutes = 16 minutes Comment:
Added checkvalves
Terminating Cue:       After the maximum stay time for the workers to be used is calculated: Evaluation on this JPM is complete.
92, 110 , andRev.16 Page26of 26 1
STOP TIME:
Appendix C Facility: HARRIS Job Performance
HARRIS08 NRC RO-SRO A3 Revision 2                          NUREG 1021, Revision 9
Measure Worksheet Task No.:FormES-C-1
 
Task Title:Givena Declared Emergency,JPMNo.: 2008NRCRO-SROA3
Appendix C                            Page 6 of 7               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC RO-SRO A3 Examinee's Name:
DeterminetheDoseRate,DoseLimit,andthe
Date Performed:
NumberofPeopletoPerformaTask.
Facility Evaluator:
KJ A Reference:
Number of Attempts:
2.3.4 (2.5/3.1)Examinee: NRC Examiner: Facility Evaluator:
Time to Complete:
Date:Methodoftesting:
Simulated Performance:
Actual Performance:
X Classroom X Simulator Plant Perform in a location with the general references
available or with electronic
access to the references.
READTOTHE EXAMINEEIwillexplaintheinitial
conditions,whichstepsto
simulateordiscuss,andprovide
initiatingcues.Whenyou
completethetask successfully, the objectiveforthisJob
Performance
Measurewillbe satisfied.
Initial Conditions:*AlargebreakLOCAhas
occurred.*TheECCSisincoldleg
recirculation.*RHRPump"8"isrunning.RHRPump"A"showed
evidence ofgasbindingandwas
stopped.*ASiteArea
Emergency(SAE)isineffect.*The Emergency Engineering
Organization
has determined
thattheRHRPump"A" shouldbeventedtoensurethata
backup is available.*The general radiationlevelintheareais16R/hour*TheOSC estimatesthatthetotaltaskwill
take.75 man-hours.*TheSite Emergency Coordinator
has specifiedthathe/shewill
not authorize an extensiontothesite emergency workers doselimitfor performanceofthistask.
Task Standard: Numberofpeopleandstay
times calculated
within specified limits.RequiredMaterials:
Calculator
HARRIS08 NRC RO-SROA3Revision2NUREG1021,Revision9
AppendixCJobPerformanceMeasure
WorksheetFormES-C-1GeneralReferences:*PEP-330, RADIOLOGICAL
CONSEQUENCES
*NGGM-PM-0002, RADIATION CONTROLANDPROTECTION
MANUALInitiatingCue:Thesite
emergencyworkerslistedinthetablebelowareavailable.Theywillbeutilizedfromlowesttohighest
accumulatedTEDEdose.Usingtheminimumnumberofworkerspossible,DETERMINE:*thetotalnumberofworkersrequiredtoperformthetaskand*themaximumstaytimeforeachindividualwhowillbeutilized.Assumenodoseintransitandroundofftothenearestminutebelowthe
limit.TimeCriticalTask:NOValidationTime:
HARRIS08NRCRO-SROA3Revision2NUREG1021,Revision9
Appendix C Job Performance
Measure Worksheet SIMULATOR SETUP N/AFormES-C-1
HARRIS08 NRC RO-SROA3Revision2NUREG1021,Revision9
Appendix CPage4of7 PERFORMANCE
INFORMATIONFormES-C-1 (Denote Critical Steps with a check mark)START TIME: Performance
Step: 1 Standard: Comment: PerformanceStep:2 Standard: Comment:PerformanceStep:3 Standard: Comment: Determine total estimateddoseforthetask.
16 R/hourx.75hours=12Rem Determinethedoselimitforsite
emergency workers Per PEP-330-Attachment1:5Rem Determine the number of people required WorkersA,B,andCwouldhavetobeusedtoreachthe12Remtotal estimateddose(4700+4450+4300=13.45)
HARRIS08 NRC RO-SRO A3 Revision 2 NUREG1021,Revision9
Appendix CPerformanceStep:4 Standard: Comment:Page5of7 PERFORMANCE
INFORMATIONStayTimefor
Workers A: 4.7/16x60minutes
=17minutes B: 4.55/16x60minutes
=17minutes C: 4.30/16x60minutes
=16minutesFormES-C-1
Terminating
Cue:STOPTIME: After the maximum stay time for the workerstobeusedis
calculated:
Evaluation
on thisJPMis complete.HARRIS08 NRC RO-SROA3Revision2NUREG1021,Revision9
AppendixCPage6of 7 VERIFICATION
OF COMPLETIONFormES-C-1
Job PerformanceMeasureNo.:2008NRCRO-SROA3
Examinee's
Name:DatePerformed:FacilityEvaluator:NumberofAttempts:TimetoComplete:
Question Documentation:
Question Documentation:
Question: Response: Result:Examiner'sSignature:
Question:
SAT UNSAT Date:HARRIS08NRCRO-SROA3Revision2NUREG1021,Revision9
 
Appendix CPage7of7JPMCUE SHEETFormES-C-1
===Response===
INITIAL CONDITIONS:
Result:                     SAT            UNSAT Examiner's Signature:                               Date:
INITIATING
HARRIS08 NRC RO-SRO A3 Revision 2                        NUREG 1021, Revision 9
CUE:*AlargebreakLOCAhas
 
occurred.*TheECCSisincoldleg
Appendix C                                    Page 7 of 7                        Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
recirculation.*RHRPump"B"isrunning.RHRPump"A"showed
* A large break LOCA has occurred.
evidenceofgasbindingandwasstopped.*ASiteArea
* The ECCS is in cold leg recirculation.
Emergency(SAE)isineffect.*The Emergency Engineering
* RHR Pump "B" is running. RHR Pump "A" showed evidence of gas binding and was stopped.
Organization
* A Site Area Emergency (SAE) is in effect.
has determinedthattheRHRPump"A"shouldbeventedtoensurethatabackupisavailable.*Thegeneralradiationlevelintheareais16R/hour*TheOSC estimatesthatthetotaltaskwill
* The Emergency Engineering Organization has determined that the RHR Pump "A" should be vented to ensure that a backup is available.
take.75 hours.*TheSite Emergency Coordinator
* The general radiation level in the area is 16 R/hour
has specifiedthathe/shewillnot authorizeanextensiontothesite
* The OSC estimates that the total task will take. 75 man-hours.
emergency workersdoselimitfor
* The Site Emergency Coordinator has specified that he/she will not authorize an extension to the site emergency workers dose limit for performance of this task.
performanceofthistask.Thesite emergencyworkerslistedinthetablebeloware
INITIATING CUE:            The site emergency workers listed in the table below are available. They will be utilized from lowest to highest accumulated TEDE dose.
available.Theywillbeutilizedfromlowesttohighest
Using the minimum number of workers possible, DETERMINE:
accumulatedTEDEdose.Usingtheminimumnumberof
* the total number of workers required to perform the task and
workers possible, DETERMINE:*thetotal number of workersrequiredtoperformthetask
* the maximum stay time for each individual who will be utilized.
and*the maximumstaytimeforeachindividualwhowillbe
Assume no dose in transit and round off to the nearest minute below the limit.
utilized.Assumenodoseintransitandroundofftothenearestminute
Site Emergency Worker                     Accumulated TEDE Dose This Year A                                              300 mr B                                              450 mr C                                              700 mr D                                              800 mr E                                              850 mr F                                              1000 mr G                                              1050 mr H                                              1150 mr I                                              1200 mr J                                              1300 mr K                                              1500 mr L                                              1650 mr HARRIS08 NRC RO-SRO A3 Revision 2                                    NUREG 1021, Revision 9
belowthelimit.Site Emergency Worker AccumulatedTEDEDoseThisYear
 
A300mr B450mr C700mr D800mr E850mr F1000mr G1050mr H1150mr I1200mr J1300mr K1500mr L1650mr HARRIS08NRCRO-SROA3Revision2NUREG1021,Revision9
Appendix C                                 Job Performance Measure                      Form ES-C-1 Worksheet Facility:               HARRIS                                  Task No.:   345001H602 Task
Appendix C Facility:TaskTitle:KIAReference:
 
Examinee: Job Performance
==Title:==
Measure Worksheet HARRISTaskNo.:EvaluateaChangeinConditionsonJPMNo.:anExistingEAL2.4.41(4.1)NRCExaminer:FormES-C-1
Evaluate a Change in Conditions on      JPM No.:   2008 NRC JPM SRO an Existing EAL                                      A4 KIA
345001H6022008NRCJPMSRO
 
A4FacilityEvaluator:
==Reference:==
Date:Methodoftesting:ThisJPMcanbe
2.4.41 (4.1)
performed in any settingwiththe required references
Examinee:                                                    NRC Examiner:
available.SimulatedPerformance:
Facility Evaluator:                                         Date:
ClassroomREADTOTHE EXAMINEE X SimulatorActualPerformance:
Method of testing: This JPM can be performed in any setting with the required references available.
Plant xIwillexplaintheinitialconditions,whichstepstosimulateordiscuss,andprovideinitiatingcues.Whenyoucompletethetasksuccessfully,theobjectiveforthisJob
Simulated Performance:                                      Actual Performance:       x Classroom            X   Simulator              Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
PerformanceMeasurewillbesatisfied.InitialConditions:SeePlant
Initial Conditions:         See Plant Conditions handout.
Conditions
Task Standard:             Upgrade EAL to GE and correct PAR within required time.
handout.TaskStandard:UpgradeEALtoGEand
Required Materials:         None General
correctPARwithinrequiredtime.RequiredMaterials:NoneGeneralReferences:*PEP-110, EMERGENCY CLASSIFICATION
 
AND PROTECTIVE
==References:==
ACTION RECOMMENDATIONS,Rev.16*PEP-230, CONTROL ROOM OPERATIONS, Rev.14*PEP-310, NOTIFICATIONS
* PEP-110, EMERGENCY CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS, Rev. 16
AND COMMUNICATIONS,Rev.21 Handouts:InitiatingCue:TimeCriticalTask:*AttachedInitial
* PEP-230, CONTROL ROOM OPERATIONS, Rev.14
Conditions*EALFlowcharts*PEP-110*PEP-310*EP/EAL Guidelines*PEP-230, Attachment1-SITE EMERGENCY COORDINATORYouaretheSite
* PEP-310, NOTIFICATIONS AND COMMUNICATIONS, Rev. 21 Handouts:
Emergency Coordinator.Reviewtheplantconditionshandoutsheetand
* Attached Initial Conditions
determinethecurrentEmergencyActionLevel(EAL).ThisisatimecriticalJPM.TheclockstartsafteryouhavereviewedthePlant
* EAL Flowcharts
Conditions
* PEP-110
sheet.YES-15minutesto
* PEP-310
classifythen15moreminutestomakethePAR.HARRIS2008NRCSROA4Revision2NUREG1021,Revision  
* EP/EAL Guidelines
Appendix C Job Performance
* PEP-230, Attachment 1 - SITE EMERGENCY COORDINATOR Initiating Cue:            You are the Site Emergency Coordinator. Review the plant conditions handout sheet and determine the current Emergency Action Level (EAL). This is a time critical JPM. The clock starts after you have reviewed the Plant Conditions sheet.
Measure WorksheetFormES-C-1ValidationTime:10minutestoclassify,12minutesfor
Time Critical Task:        YES - 15 minutes to classify then 15 more minutes to make the PAR.
PAR/Emergency
HARRIS 2008 NRC SRO A4 Revision 2                                          NUREG 1021, Revision
Notification
 
Form.HARRIS2008NRCSROA4Revision2NUREG1021,Revision  
Appendix C                       Job Performance Measure                 Form ES-C-1 Worksheet Validation Time: 10 minutes to classify, 12 minutes for PAR/Emergency Notification Form.
Appendix C(DenoteCriticalStepswithaStartTime:_Page3of7 PERFORMANCE
HARRIS 2008 NRC SRO A4 Revision 2                                NUREG 1021, Revision
INFORMATIONFormES-C-1
 
PerformanceStep:1 Standard: Evaluator Cue:.Comment:-Y PerformanceStep:2 Standard: Evaluator Note: Comment:Evaluatechangingconditions.
Appendix C                                     Page 3 of 7                        Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a ~)
Compares conditionsagainstEAL
Start Time:          _
Flowchart criteria.*Provide Initial Conditions
Performance Step: 1       Evaluate changing conditions.
sheet (lastpageofJPM).
Standard:                 Compares conditions against EAL Flowchart criteria.
*Provide reference materials if not availableintheJPM performance
Evaluator Cue:
location.Classification
* Provide Initial Conditions sheet (last page of JPM).
StartTime_Determine EAL.UpgradetoGE(2-1-4)required:*RCSBreached*FuelBreached-DEI
* Provide reference materials if not available in the JPM performance location.
sample>300uCi/cc*CNMT Jeopardized
  . Comment:                  Classification Start Time          _
-Pressure>3PSIG*Itmaybe necessarytocue the PAR performance.
-Y  Performance Step: 2        Determine EAL.
The facility normally splitstheEALandthePAR
Standard:                  Upgrade to GE (2-1-4) required:
into two JPM's.*If the applicant incorrectly
* RCS Breached
classifies
* Fuel Breached - DEI sample> 300 uCi/cc
then skiptothe EvaluatorCuein Performance
* CNMT Jeopardized - Pressure> 3 PSIG Evaluator Note:
Step 3.ClassificationEndTime/PAR
* It may be necessary to cue the PAR performance. The facility normally splits the EAL and the PAR into two JPM's.
StartTime_HARRIS2008NRCSROA4Revision2NUREG1021,Revision  
* If the applicant incorrectly classifies then skip to the Evaluator Cue in Performance Step 3.
Appendix CPerformance
Comment:                  Classification End Time/PAR Start Time              _
Step: 3Page4of7 PERFORMANCE
HARRIS 2008 NRC SRO A4 Revision 2                                      NUREG 1021, Revision
INFORMATION
 
DeterminePAR(PEP-230, Attachment1,Step10).FormES-C-1
Appendix C                              Page 4 of 7                          Form ES-C-1 PERFORMANCE INFORMATION
Standard: Evaluator Cue: Comment:Performance
~  Performance Step: 3  Determine PAR (PEP-230, Attachment 1, Step 10).
Step: 4 Standard: Evaluator Note: Comment: Terminating
Standard:           Refers to PEP-110, Attachment 3:
Cue:ReferstoPEP-110, Attachment
PROTECTIVE ACTION RECOMMENDATION:
3: PROTECTIVE
* EVACUATE: 2 mile radius
ACTION RECOMMENDATION:*EVACUATE:2mileradius
* EVACUATE: Subzones A, B, L
*EVACUATE: SubzonesA,B,L*SHELTER: SubzonesC,D,E,F,G,H,I, J,K,M,N The computer program is not available.
* SHELTER: Subzones C, D, E, F, G, H, I, J, K, M, N Evaluator Cue:      The computer program is not available. Hand write a paper copy of the Manual Notification Form in accordance with PEP-230, Attachment 1, Step 11.b.
Hand write a paper copy of the Manual Notification
Comment:
Form in accordance
~  Performance Step: 4  Complete the ENF.
with PEP-230, Attachment
Standard:            Critical Elements:
1, Step 11.b.CompletetheENF.CriticalElements:*Block4:GE*Block4EAL:2-1-4*Block 5 PAR: Evacuate2mileradiusand
* Block 4: GE
SubzonesA,B, L;Shelter SubzonesC,D,E,F,G,H,I,J, K,M,N*Block6 EmergencyRelease:IsOccurring*Block9WindDirectionfrom:126
* Block 4 EAL: 2-1-4
0*Block10: DECLARATION;
* Block 5 PAR: Evacuate 2 mile radius and Subzones A, B, L; Shelter Subzones C, D, E, F, G, H, I, J, K,M,N
Current TIME;Current DATE*Block17: Applicant signature/Title/Current
* Block 6 Emergency Release: Is Occurring 0
Time/Current Date*Provideformto
* Block 9 Wind Direction from: 126
CommunicatorAnENFKEYis
* Block 10: DECLARATION; Current TIME; Current DATE
attached, PAR Notification
* Block 17: Applicant signature/Title/Current Time/ Current Date
End Time_After theENFis handed to the communicator:
* Provide form to Communicator Evaluator Note:      An ENF KEY is attached, Comment:            PAR Notification End Time                _
Evaluation
Terminating Cue:        After the ENF is handed to the communicator: Evaluation on this JPM is complete.
on thisJPMis complete.HARRIS2008NRCSROA4Revision2NUREG1021,Revision  
HARRIS 2008 NRC SRO A4 Revision 2                                    NUREG 1021, Revision
Appendix CPage5of7 VERIFICATION
 
OF COMPLETIONFormES-C-1
Appendix C                            Page 5 of 7                Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC JPM SRO A4 Examinee's Name:
Job PerformanceMeasureNo.:2008NRCJPMSROA4
Date Performed:
Examinee's
Facility Evaluator:
Name:DatePerformed:FacilityEvaluator:
Number of Attempts:
NumberofAttempts:TimetoComplete:
Time to Complete:
Question Documentation:
Question Documentation:
Question: Response: Result: Examiner's
Question:
Signature:
 
SAT UNSAT Date:HARRIS2008NRCSROA4Revision2NUREG1021,Revision  
===Response===
AppendixC INITIAL CONDITIONS:Page6of7JPMCUESHEETSeePlantConditionshandout.FormES-C-1INITIATINGCUE:YouaretheSite
Result:                     SAT            UNSAT Examiner's Signature:                               Date:
EmergencyCoordinator.Reviewtheplant
HARRIS 2008 NRC SRO A4 Revision 2                          NUREG 1021, Revision
conditionshandoutsheetanddeterminethecurrent
 
EmergencyActionLevel(EAL).ThisisatimecriticalJPM.TheclockstartsafteryouhavereviewedthePlantConditionssheet.HARRIS2008NRCSROA4Revision2NUREG1021,Revision  
Appendix C                             Page 6 of 7                          Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:     See Plant Conditions handout.
Appendix CPage7of7JPMCUESHEET2008NRCJPMSROA4Plant
INITIATING CUE:        You are the Site Emergency Coordinator. Review the plant conditions handout sheet and determine the current Emergency Action Level (EAL). This is a time critical JPM. The clock starts after you have reviewed the Plant Conditions sheet.
ConditionsFormES-C-1
HARRIS 2008 NRC SRO A4 Revision 2                                  NUREG 1021, Revision
*IncreasingRCSleakagerequireda
 
MANUALReactorTripandSafetyInjection*The TDAFWPumpisclearedandtagged*TheRCSleak
Appendix C                                  Page 7 of 7                          Form ES-C-1 JPM CUE SHEET 2008 NRC JPM SRO A4 Plant Conditions
escalatedtoa large-breakLOCAwhilethecrewwas
* Increasing RCS leakage required a MANUAL Reactor Trip and Safety Injection
performing
* The TDAFW Pump is cleared and tagged
PATH-1*Containment
* The RCS leak escalated to a large-break LOCA while the crew was performing PATH-1
Spray actuated*ThereisaREDCSFon
* Containment Spray actuated
INTEGRITY*TheEAL NetworkwasenteredatPointX*ASiteArea
* There is a RED CSF on INTEGRITY
Emergency(SAE)isineffectwiththeRCS
* The EAL Network was entered at Point X
breached(EAL2-1-3)and
* A Site Area Emergency (SAE) is in effect with the RCS breached (EAL 2-1-3) and Containment jeopardized
Containment
* Outside temperature is 62 of
jeopardized*Outside temperatureis62 of*Thunderstormsaremovingintothearea*Thewindisblowingat12MPHfrom126
* Thunderstorms are moving into the area
degrees*SincetheSAE
* The wind is blowing at 12 MPH from 126 degrees
declaration, the followinghasoccurred:*Plant computersaredownwhichwillrequireany
* Since the SAE declaration, the following has occurred:
additional
* Plant computers are down which will require any additional notifications to be done using a manual notification form
notificationstobedoneusingamanual
* Off-site power was lost and EDG 1B failed while starting
notification
* ECCS cold leg recirculation alignment on Train "A" was just completed
form*Off-sitepowerwaslostandEDG1Bfailedwhile
* Containment Pressure is 3.8 PSIG, lowering slowly
starting*ECCScoldleg
* Containment Area Radiation Monitors are in HIGH alarm, rising slowly
recirculation
* Contalnrnent High Range Monitors are rising but not in alarm
alignmentonTrain"A"wasjust
* Plant Vent Stack #1 Monitor is rising slowly but not in alarm
completed*Containment
* Charging Pump "A" Room Monitor went into HIGH alarm after cold leg recirculation was initiated
Pressureis3.8PSIG,lowering
* Chemistry has analyzed a sample and reports an Iodine Dose Equivalent RCS concentration of 410 uCilcc HARRIS 2008 NRC SRO A4 Revision 2                                        NUREG 1021, Revision
slowly*ContainmentAreaRadiation
 
MonitorsareinHIGHalarm,risingslowly
tE~
*ContalnrnentHighRange Monitorsarerisingbutnotinalarm*PlantVentStack#1
                                                                                                                    ~
Monitorisrisingslowlybutnotinalarm
Attachment            3 - PROTECTIVE ACTION RECOMMENDATION PROCESS Sheet 1 of 2 No No Fuel Breach)
*ChargingPump"A"Room
No (Yes/ due to           Res   Breach) 2 MliileRadius :5 Miles Downwind Wiind             IEvacuaie         Shelter               Wind            Evacuat,e;            She-Iter Direction         Subzones       :Subzooes             rn recti 00        Subzones            Subzone'S
MonitorwentintoHIGHalarmaftercoldleg
          ~From                                                    {From 'tfj 34a~
recirculationwasinitiated
                - 010' AB,C,O;H,U<.L     E.F~G,J,M.N                     -
*Chemistry has analyzed a sampleandreportsanIodineDose
327 0 010='        A,D,I<      B"C"E,F,G"H,,1,,J,,L,M,N 01 1&deg; - ~      A1B,C,D,HJ.t'~L  E"F"G,J,M.N              011 0 - 05&'        A,K          B.C"D"E,f,G"H.I"J"L,~,4.N cse- -DIg-::    AB,C,o,tJ,Y~L.M  E,F,G.H.N                n57&deg; -1?4~          A tUL        8 C"D~E F G_HL.LMN 080~ -, 101~    ~B,C,D,J,I<."L,M  E.F~G,.HJ,N                      -
Equivalent
1251;1 1'91=        A,H"L        C.D,E"F.G,H,I,J,KM.N       I 102(1 -, 124a  AFB,C,D,r~l,U    E"F"G,HJ.J,N             1920- 214.:        A,B         C,D,E.F"G,H,tJ,K.LM.N 125~ 14&-      AB,C,D,KL,M.Nl    E"F~G,HJ.J               215  Cl
RCS concentrationof410 uCilccHARRIS2008NRCSROA4Revision2NUREG1021,Revision  
                                                                            -259='      A,B.e        D,E"F.G,HJ.J,K.L,MJ~
Attachment3-PROTECTIVE
147c. -, 191'~  AfB,C,D,E~K,LM.t4 F,G"H"I.,-J              2600 - 2B1~        A,e          B"D~E,F ,G"H"LJ.,K,l,M,N 192(1 -, 214<: A*B,C,D,E",K,l    F,G"H"I,J"M,H                    -
ACTION RECOMMENDATION
282c 3(14':'       A,C,D       B"E,f,G,.H"I"JJ<.LM,N 215 t , - zse- A.B,C,D,E"K,l    f,G"HJ"J~M,N            305(1 -  328~      A,D          B"C,,E,F,G.,H,,I,,J,,K,LM.N 237 t \ -, 2&sect;9a A,,B,C,D,E.F,,K,l GI'H.tJ..M.N
PROCESS Sheet 1 of 2 No No Fuel Breach)No (Yes/due to Res Breach)2 MliileRadius
:260(1 - 32&   A"B,C,D,F,G.HJ<,l E."I"J"M.N 327 t , - 347(1 A.B,C,D,H,K,L    E"F"G.I,J,M.N IPEP-110                                          Rev. 16                                                                Page 18 of 261
:5 Miles Downwind IPEP-110 Wiind IEvacuaie Shelter Direction Subzones:Subzooes
 
-"-010'AB,C,O;H,U<.L
                                                                                                    ~
01 1&deg;-
Attachment 3 - PROTECTIVE ACTION RECOMMENDATION PROCESS
E"F"G,J,M.N
                                                                                                    =
cse--DIg-::
Sheet 2 of 2 Acceptable changes in initial PARS would include expanding evacuation but would not allow a change from evacuation of zones to sheltering of those zones.
E,F ,G.H.N-,
: 1. Indications that substantial core damage is imminent or has occurred include:
102(1-, 124 a
a) Core damage> 1&deg;A, melt.
E"F"G,HJ.J,N-14&AB,C,D,KL,M.Nl
b) Core Exit Thermocouple readings        ~ 2300&deg; F.
147c.-,
c)  Core uncovered> 30 minutes.
F,G"H"I.,-J
: 2. Indications that a significant loss of reactor coolant is imminent or has occurred include:
192(1-, 214<: A*B,C,D,E",K,l
a) Containment radiation reading> 10,000 RlHr without spray or> 4,000 R/Hr with spray.
F,G"H"I,J"M,H
b) Containment hydrogen gas concentration> 1o.k>.
215 t ,-zse-A.B,C,D,E"K,l
c) Rapid vessel depressurization.
237 t\-, 2&sect;9a A,,B,C,D,E.F,,K,l
d) A large break loss of coolant accident.
GI'H.tJ..M.N
: 3. Indications that containment failure (primary or S/G) is imminent or has occurred are indicated by:
:260(1-32&A"B,C,D,F,G.HJ<,l
a) A release of radioactivity greater than the projected dose of either:
E."I"J"M.N
* 1000 mRem TEDE at or beyond the site boundary.
327 t ,-347(1 A.B,C,D,H,K,L
5000 mRem Thyroid CDE at or beyond the site boundary.
E"F"G.I,J,M.NRev.16 Wind Evacuat,e;
Or a measured dose rate of either:
She-Iter rn recti 00 Subzones Subzone'S{From'tfj 327 0-010='A,D,I<B"C"E,F,G"H,,1,,J,,L,M,N
                    >1000 mRem/hr at or beyond the site boundary.
011 0-05&'A,K
1-131 equivalent concentration> 3.9 E-6 IJCi/cc at or beyond the site boundary.
n57&deg;
b) Primary containment pressure can not be maintained below design basis pressure of 45 psig.
A tUL 8
c)  Primary containment H2 gas concentration can not be maintained below combustible limit of 4%
F G_HL.LMN 1251;1-1'91=A,H"L C.D,E"F.G,H,I,J,KM.N
by volume.
I 1920-214.: A,B C,D,E.F"G,H,tJ,K.LM.N
d) Faulted/Ruptured S/G with a relief valve open.
215 Cl-259='A,B.e
: 4. Accidents which result in a direct release pathway to the environment will most likely be thyroid dose limiting. For a faulted and ruptured S/G, water level must be below the tube bundles (S/G Narrow Range < 25% normal containment conditions or < 40% adverse containment conditions) with a relief valve open before it is considered a direct release pathway to the environment. For circumstances involving a direct release pathway to the environment:
2600-A,e ,G"H"LJ.,K,l,M,N
a) Consider any Fuel Breach sufficient to warrant the determination that substantial core damage has occurred.
282 c-3(14':'A,C,D B"E,f,G,.H"I"JJ<.LM,N
b) Consider any RCS Breach sufficient to warrant the determination that a significant loss of reactor coolant has occurred.
305(1-A,D B"C,,E,F,G.,H,,I,,J,,K,LM.N
NOTE: A direct release is defined as a pathway from the containment to any environ-ment outside the containment when containment or system isolation is required due to a safety injection signal, containment pressure greater than 3 psig, or a valid containment ventilation isolation signal and the pathway cannot be isolated from the Main Control Room.
Page 18 of 261
Containment monitors can provide indication of both core damage and RCS breach. Monitor readings used to quantify an amount of damage or coolant leakage should be complimented by other indications and engineering judgment.
=Attachment3-PROTECTIVE
If a release is in progress:
ACTION RECOMMENDATION
* Perform dose assessment as soon as possible to determine if PAGs are exceeded and if additional Subzones require evacuation.
PROCESS Sheet 2 of 2 Acceptable
* Add any Subzones requiring evacuation as determined by dose assessment to the plant-based PARs.
changes in initial PARS would include expanding evacuation
If no release is in progress:
but would not allow a change from evacuation
* Perform dose projection on possible conditions as time permits to determine if PAGs could be exceeded. Consider adding any Subzones requiring "evacuation as determined by dose projection to the plant-based PARs.
of zones to sheltering
I PEP-110                                          Rev. 16                                            Page 19 of 261
of those zones.1.Indicationsthatsubstantialcoredamageis
: 1. I Attachment 9 - NUCLEAR POWER PLANT EMERGENCY NOTIFICATION FORM DRILL        I&sect;J ACTUAL EVENT rz!::Of MESSAGE #
imminentorhasoccurredinclude:a)Core damage>1&deg;A, melt.b)CoreExit
1
Thermocouple
                    ~                                                              N                      Today 2.1 INITIAL          @JFOLLOW-UPNOTIFICATION:TIME                                    ow        DATE_ _/_ _/_ _ AUTHENTICATION #                                _
readings2300&deg;F.c)Core uncovered>30minutes.2.Indicationsthata
: 3. SITE:        HNP                                                                                        Confirmation Phone # (_ _)                             _
significantlossofreactorcoolant
: 4. EMERGENCY CLASSIFICATION:
is imminentorhasoccurredinclude:
                              ~ UNUSUAL EVENT                  I&sect;I ALERT              19 SITE AREA EMERGENCY
a)Containment
* GENERAL EMERGENCY BASED ON EAL #          2 4                  EAL DESCRIPTION:               3 FPBs Breached/ Jeopardized
radiation reading>10,000RlHrwithoutspray
: 5. PROTECTIVE ACTION RECOMMENDATIONS:                                       ~ NONE IEVACUATE 2 mile                radius and Subzones A,B,L ISHELTER Subzones C,D,E,F,G,H,I,J,K,M,N IQI CONSIDER THE USE OF KI (POTASSIUM IODIDE) IN ACCORDANCE WITH STATE PLANS AND POLICY.
or>4,000R/Hrwithspray.
I&sect; OTHER                                                                                                                                      _
b)Containmenthydrogengas
: 6. EMERGENCY RELEASE:                          ~None                  I   Is Occurring                  19 Has Occurred
concentration>
: 7. RELEASE SIGNIFICANCE:                       ri\I Not applicable I!j B Within limits normal operating        Above normal operating limits I Under evaluation
1 o.k>.c)Rapidvessel
: 8. EVENT PROGNOSIS:                           ~ Improving            I Stable                            19 Degrading
depressurization.d)Alargebreaklossofcoolantaccident.3.Indicationsthat
: 9. METEOROLOGICAL DATA:                           Wind Direction* from          126      degrees        Wind Speed*      12 mph
containmentfailure(primaryorS/G)is
(*Not Requiredfor Initial Notifications)          Precipitation*                                          Stability Class* ~    I&sect;J  19  (QJ I&sect;    lEI  I&sect;I
imminentorhasoccurredareindicatedby:a)Areleaseofradioactivity
: 10. I DECLARATION I&sect;J TERMINATION                                        Time                          Date        /      /        _
greaterthantheprojecteddoseofeither:*1000mRemTEDEatorbeyondthesiteboundary.5000mRemThyroidCDEatorbeyondthesiteboundary.Ora measureddoserateofeither:
(Enters Current Date and Time)
>1000 mRem/hratorbeyondthesiteboundary.
: 11. AFFECTED UNIT(S):              *    [J    [I        I6ill
1-131 equivalent
: 12. UNIT STATUS:                                                I  U1 _0_0/0 Power        Shutdown at Time                    Date _ /_ _/ _
concentration>3.9E-6 IJCi/ccatorbeyondthesiteboundary.b)Primary containmentpressurecannotbemaintainedbelowdesignbasispressureof45psig.c)Primary containment
(Unaffected Unit(s) Status Not Required for Initial Notifications)                                            ~ U2 _ _% Power            Shutdown at Time                    Date _ /_ _/ _
H 2gasconcentrationcannotbemaintainedbelow
                                                                &sect;  U3 _ _0/0 Power        Shutdown at Time                    Date _ /_ _/ _
combustiblelimitof4%byvolume.d)Faulted/RupturedS/Gwithareliefvalveopen.4.Accidentswhichresultinadirectreleasepathwaytothe
: 13. REMARKS:                                                                                                                                                  _
environmentwillmostlikelybethyroiddoselimiting.ForafaultedandrupturedS/G,waterlevelmustbebelowthetubebundles(S/GNarrowRange<25%normal
FOLLOW-UP INFORMATION (Lines 14 through 16 Not Required for Initial Notifications)
containmentconditionsor<40%adverse
EMERGENCY RELEASE DATA. NOT REQUIRED IF LINE 6 A IS SELECTED.
containmentconditions)withareliefvalveopenbeforeitisconsideredadirectreleasepathwaytotheenvironment.For
: 14. RELEASE CHARACTERIZATION:                      TYPE: ~ Elevated          I&sect;I Mixed  19  Ground          UNITS: ~ Ci    I&sect;J  Ci/sec 19 ~Ci/sec MAGNITUDE:          Noble Gases:                    lodines:                    Particulates:              Other:                _
circumstancesinvolvingadirectreleasepathwaytotheenvironment:
FORM: ~ Airborne        Start Time _ _ _ _ Date _ /_ _/__Stop Time                                      _ Date _ /_ _/__
a)Consider anyFuelBreach
I&sect;J Liquid      Start Time _ _ _ _ Date _ /_ _/__Stop Time                                      _ Date _ /_ _/__
sufficient
: 15. PROJECTION PARAMETERS:                  Projection period:                    Hours          Estimated Release Duration                  Hours Projection performed:      Time                    Date _ /_ _/__
to warrant the determinationthatsubstantialcoredamagehasoccurred.
: 16. PROJECTED DOSE:                        DISTANCE                                    TEDE (mrem)                    Adult Thyroid CDE (mrem)
b)Consider anyRCSBreach sufficienttowarrantthe
Site boundary 2 Miles 5 Miles 10 Miles
determinationthatasignificantlossofreactorcoolanthasoccurred.NOTE:Adirectreleaseisdefinedasapathwayfromthe
: 17. APPROVED BY:                (Sign and Date)                            Title                                    Time                Date_/_ _/__
containmenttoanyenviron-mentoutsidethe
NOTIFIED                                        RECEIVED BY:                                              BY:                                                    Time                Date      /    /
containment
I PEP-310                                      I                          Rev. 21                                              Page 33 of 51       I}}
when containmentorsystemisolationisrequiredduetoasafetyinjectionsignal, containment
pressure greaterthan3psig,oravalid
containmentventilationisolationsignalandthepathwaycannotbeisolatedfromtheMainControlRoom.
Containmentmonitorscanprovideindicationofbothcore
damageandRCSbreach.Monitorreadingsusedtoquantifyan
amount of damageorcoolantleakageshouldbe
complimentedbyotherindicationsandengineering
judgment.Ifareleaseisinprogress:*Performdose
assessmentassoonaspossibleto
determineifPAGsareexceededandifadditionalSubzonesrequireevacuation.*AddanySubzonesrequiringevacuationas
determinedbydose assessmenttotheplant-basedPARs.Ifnoreleaseisinprogress:*Performdoseprojectionon
possibleconditionsastimepermitsto
determineifPAGscouldbe
exceeded.ConsideraddinganySubzonesrequiring"evacuationasdeterminedbydoseprojectiontotheplant-basedPARs.
I PEP-110Rev.16Page19of261
Attachment9-NUCLEAR POWER PLANT EMERGENCY NOTIFICATION
FORM rz!::Of 11.IDRILL I&sect;JACTUALEVENT
MESSAGE#_N Today 2.1 INITIAL@JFOLLOW-UPNOTIFICATION:TIME
ow DATE__/__/__AUTHENTICATION#_3.SITE: HNPConfirmationPhone#(__)_4.EMERGENCYUNUSUALEVENT
I&sect;I ALERT 19SITEAREAEMERGENCY*GENERALEMERGENCY
CLASSIFICATION:BASEDONEAL
#2-1-4EALDESCRIPTION:
3 FPBs Breached/Jeopardized
19HasOccurredIIsOccurring5.PROTECTIVEACTION
RECOMMENDATIONS:NONE IEVACUATE 2 mile radius and Subzones A,B,L ISHELTER Subzones C,D,E,F,G,H,I,J,K,M,N
IQI CONSIDERTHEUSEOF KI (POTASSIUMIODIDE)IN ACCORDANCE
WITH STATEPLANSANDPOLICY.
I&sect;OTHER_6.EMERGENCYRELEASE:
IUnderevaluationShutdownatTime
Date_/__/_ShutdownatTime
Date_/__/_ShutdownatTime
Date_/__/_ri\I Not applicable
BWithinnormaloperating
I!j limitsImprovingIStableWindDirection*from
126 degreesAbovenormaloperating
limits 19 DegradingWindSpeed*
12 mph(*NotRequiredforInitialNotifications)
Precipitation*StabilityClass*I&sect;J 19 (QJ I&sect;lEI I&sect;I10.IDECLARATION
I&sect;J TERMINATION
TimeDate//_(Enters Current Date and Time)11.AFFECTEDUNIT(S):*
[J[I I6ill 12.UNITSTATUS:
I U1_0_0/0 Power(UnaffectedUnit(s)StatusNotRequiredforInitial
Notifications)U2__%Power&sect;U3__0/0 Power 7.RELEASESIGNIFICANCE:
8.EVENTPROGNOSIS:
9.METEOROLOGICALDATA:13.REMARKS:
_FOLLOW-UP INFORMATION (Lines 14 through 16 Not Required for Initial Notifications)
EMERGENCY RELEASEDATA.NOTREQUIREDIFLINE6AISSELECTED.
14.RELEASECHARACTERIZATION:
TYPE:Elevated I&sect;I Mixed 19 Ground UNITS:Ci I&sect;J Ci/sec 19EstimatedReleaseDurationHours
____Date_/__/__StopTime_____Date_/__/__StopTime_MAGNITUDE:NobleGases:
lodines: Particulates:
Other:_FORM:AirborneStartTime
Date_/__/__I&sect;JLiquidStartTime
Date_/__/__15.PROJECTIONPARAMETERS:Projectionperiod:HoursAdultThyroidCDE(mrem)
DISTANCEProjectionperformed:Time
Date_/__/__TEDE(mrem)
16.PROJECTEDDOSE:Siteboundary
2 Miles 5 Miles10MilesPage33 of 51 I Time Time Date_/__/__Date//IRev.21 (Sign and Date)Title--------RECEIVED BY: I PEP-31017.APPROVED
BY: NOTIFIED BY:
}}

Latest revision as of 00:09, 13 March 2020

March 05000400-08-301 Exam Final JPMs (Admin)
ML082200212
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/07/2008
From:
- No Known Affiliation
To:
NRC/RGN-II
References
50-400/08-301
Download: ML082200212 (86)


Text

Final Submittal (Blue Paper)

Final Submittal (Blue Paper)

Ifl£e:LsaoB{50 /

Ope(ClT'f'l~ "Te5{ ~J.1I~ "Sllo ~3)3JUU?

FINAL JPMS ADMINISTRATIVE JPMs

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.: 301144H601 Task

Title:

Determine the Cold, Xenon-free JPM No.: 2008. NRC JPM Boron Concentration Requirement RO/SRO A1-1 for a Natural Circulation Cooldown KIA

Reference:

2.1.25 (2.8/3.1)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator - - - Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

INITIAL

  • The unit tripped due to a loss of off-site power. All control rods CONDITIONS: have inserted.
  • The operating crew is performing EPP-005, NATURAL CIRCULATION COOLDOWN.
  • The unit will be taken to Cold Shutdown.
  • PowerTrax is not available.
  • Current RCS Boron concentration is 1125 ppm.
  • Core Burnup is 130 EFPD.
  • RCS B-10 Atom Percent is 19.36
  • Temperature is 140°F.

Task Standard: Calculations within specified range.

Required Materials: Calculator General

References:

  • EPP-005, NATURAL CIRCULATION COOLDOWN
  • OST-1036, SDM CALCULATION MODES 1-5
  • Curve Book Handouts:
  • EPP-005, Step 7
  • OST-1036
  • Curve Book (Ensure Curve A-X-22 is available and unmarked) 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initiating Cue: USCG has directed you to perform step 7.a of EPP-005, determine the corrected Xe-free cold shutdown boron concentration using OST-1036.

Record values on this cue sheet once it is determined if SDM requirements are met by the current boron concentration.

C RODS _

CCURVE _

C REQ, _

C RCS, _

CSDM _

MET / NOT MET (Circle one)

Time Critical Task: NO Validation Time: 15 minutes 2008 HARRIS NRC RO-SRO At-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 3 of 8 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a ~)

Start Time: _

Performance Step: 1 Reviews EPP-005, Step 7.

Standard: Determines OST-1036 applies.

Evaluator Cue: Provide EPP-005, Step 7.

Comment:

Performance Step: 2 Locates/reviews OST -1036.

Standard: Determines OST-1036, Section 7.2 applies.

Evaluator Cue: Provide OST-1036.

Comment:

Performance Step: 3 Record the following:

  • Core burn up from MCR Status board.
  • Temperature for which this SDM calculation is taking credit.

Standard :;. From Initial Conditions, records:

  • 200°F, or less
  • 1125 ppm Comment:

2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Record the following:

  • RCS B-10 ATOM percent from MCR Status Board OR RWST B-10 Atom percent, IF following Core Reload.

Standard: Records 19.36 Evaluator Cue: RCS 8-10 ATOM percent from cue sheet Comment:

Performance Step: 5 Check rod status as follows:

  • If all rods are inserted, record CRODS = 0 in Step 7.2.2.a and N/A Step 7.2.2.b.

Standard: Records 0 in 7.2.2.a and N/A's 7.2.2.b.

Comment:

Performance Step: 6 Determine Xenon free SDM boron concentration, CSDM, as follows:

a. Record the following information:
  • Boron addition to compensate for stuck rods from Attachment 1 or Step 7.2.2.a.

Standard: Enters O.

Comment:

2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 5 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 Determine Xenon free SOM boron concentration, CSOM, as follows:

a. Record the following information:
  • Uncorrected required SOM boron concentration from curve A-X-22 (Use action level line on curve.)

Standard: Reads 2020 to 2040 ppm Evaluator Cue:

Comment:

Performance Step: 8 Determine required Xenon free SOM uncorrected boron concentration CREQ:

CREQ ~ CROOS + CCURVE CREQ= _

Standard: CREQ = 2020 to 2040 ppm Comment:

~ Performance Step: 9 Determine Xenon free SOM corrected boron concentration, CSOM:

19.9/Arcs x CREQ Standard: Divides 19.9 by 19.36 and multiplies by CREQ:

19.9/19.36 (2020 to 2040 ppm) =

Records 2076 to 2097 ppm Comment:

2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION

~ Performance Step: 10 Determine whether SDM requirements can be met by Xenon free SOM calculation:

Compare RCS boron concentration, CRCS, and Xenon free SOM corrected boron concentration, CSDM:

  • CSOM Xenon free SDM corrected boron concentration from Step 7.2.3.c.

If CRCS is less than or equal to CSDM, then continue with Step 7.2.5 to take credit for Xenon effects.

Standard: Determines current RCS boron concentration is <CSDM boron concentration.

Comment:

Terminating Cue: When the candidate proceeds to Step 7.2.5: This JPM is complete.

Stop Time: _

2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION QF COMPLETION Job Performance Measure No.: 2008 NRC JPM RO/SRO A1-1 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete: .

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The unit tripped due to a loss of off-site power. All control rods have inserted.
  • The operating crew is performing EPP-005, NATURAL CIRCULATION COOLDOWN.
  • The unit will be taken to Cold Shutdown.
  • PowerTrax is not available.
  • Current RCS Boron concentration is 1125 ppm.
  • Core Burnup is 130 EFPD.
  • RCS B-10 Atom Percent is 19.36
  • Temperature is 140°F.

INITIATING CUE: USCO has directed you to perform step 7.a of EPP-005, determine the corrected Xe-free cold shutdown boron concentration using OST-1036.

Record values on this cue sheet once it is determined if SDM requirements are met by the current boron concentration.

C RODS _

CCURVE _

CREQ _

CRCS _

C SDM _

MET / NOT MET (Circle one) 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Page 8 of 8 JPM CUE SHEET INITIAL CONDITIONS:

  • The unit tripped due to a toss of off-site power. All control rods have inserted.
  • The operating crew is performing EPP-005 NATURAL 7 CIRCULATION COOLDOWN.
  • The unit will be taken to Cold Shutdown.
  • PowerTrax is not available.
  • Current ReS Boron concentration is 1125 ppm.
  • Core Burnup is 130 EFPD.
  • ReS B-10 Atom Percent is 19.36
  • Temperature is 140°F.

INITIATING CUE: usee has directed you to perform step 7.aof EPP-005~

determine the corrected Xe-free cold shutdown boron concentration using OST-1036.

Record values on this cue sheet once it is determined if 8DM requirements are met by the current boron concentration.

~:.

CRODS C"'}

..,./

("' ) () ..., /r"j . r; I ...~

CCURVE (1.(),~.}O l/7(j(;2o I~O Bo<.fq)

C REQ ~c\:3t) ( 9t)(~o,,\nc} (9c.)((())

eRCS \ l L.~)

CS DM f) b '7(~ t (c, (90'7& +~ deft 7)

MET I~~~V (Circle one) 2008 HARRIS NRC RO-SRO A1-1 Rev 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.: 005016H101 Task

Title:

Estimate Primary to Secondary JPM No.: 2008 NRC RO ADM Leak Rate JPM A1-2 KIA

Reference:

2.1.31 (4.2)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: This JPM should be performed on a frozen simulator.

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied. .

Initial Conditions:

  • The plant is at 100% power.
  • AOP-016 has been entered and actions are in progress.
  • OSI-PI is not available.
  • Chemistry sampling has not commenced.
  • Motivating air is isolated.

Task Standard: Determines leak rate to be --25 gpd using Method 1 of AOP-016, Att. 1.

Required Materials: None General

References:

AOP-016, Excessive Primary Plant Leakage, Rev 37 Curve Book Handouts: AOP-016, Attachment 1 Initiating Cue: The USCG has directed you to perform AOP-016, Excessive Primary Plant Leakage, Attachment 1 step 3 to estimate primary to secondary leakage.

Time Critical Task: No Validation Time: 10 minutes HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP IC-19 imf RMS079 (REM-1TV-3534 CVPETS) to 6.00 E-7 uCi/ml.

NOTE: Must go to RUN for the malfunction to show.

Leave simulator in FREEZE once malfunction has appeared.

HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9

Appendix C Page 3'of 6 Form ES-C-1 '

PERFORMANCE INFORMATION (Denote Critical Steps with a ~)

Start Time: _

Performance Step: 1 Obtain procedure.

Standard: Locates and reviews procedures.

Evaluator Cue: Provide Curve Book and AOP-016, Att. 1, step 3 after the procedure is located.

Comment:

~ Performance Step: 2 ESTIMATE Primary-To-Secondary leak rate using ONE of the methods listed (no preferred method):

Method 1: Use Condenser Vacuum Pump Rad Monitor REM-3534 (Grid 2), Curve H-X-15A, Curve H-X-15B, or H-X-15C (Depending on status of motivating air)

Standard: Determines that Method 1 is required.

Comment:

~ Performance Step: 3 Operates RM-11 to obtain reading for REM-1TV-3534 (Grid 2).

Standard: Reads REM-1TV-3534 as 6.00 E-7 ~Ci/ml.

Comment:

HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION

~ Performance Step: 4 Determines which curve from Curve Book to use.

Standard: Uses Curve H-X-15C since motivating air is isolated.

Comment:

~ Performance Step: 5 Calculates Primary to Secondary leak rate.

Standard: Determines Primary to Secondary leak rate is between 22 gpd to 27 gpd).

Comment: +/- 2.5 gpd is margin of error based on reading data from graph Terminating Cue: When the primary to secondary leak rate has been determined and reported to the USCO: Evaluation on this JPM is complete.

Stop Time: _

HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9

Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC RO ADM JPM A1-2 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9

Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is at 100 % power.
  • AOP-016 has been entered and actions are in progress.
  • OSI-PI is not available.
  • Chemistry sampling has not commenced.
  • Motivating air is isolated.

INITIATING CUE: The USCO has directed you to perform AOP-016, Excessive Primary Plant Leakage, Attachment 1 step 3 to estimate primary to secondary leakage.

HARRIS 2008 NRC RO A1-2 REVISION 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.: 341010H302 Task

Title:

Perform Review of Daily JPM No.: 2008 NRC SRO A1-2 Surveillance Requirements Log KJA

Reference:

2.1.18 (3.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: x Classroom X Simulator - - - Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant is in Mode 2, waiting for management approval to proceed to Mode 1.
  • EDG "8" is synchronized to the grid for a post-maintenance test.
  • The Daily Surveillance Logs (OST-1021 , Attachment 4) for 2100 have been completed.
  • ERFIS Pressurizer Pressures are unavailable.

Task Standard: All errors and TS actions identified Required Materials: Perform in a location with TS or electronic access to TS available.

General

References:

  • OST-1021 , DAILY SURVEILLANCE REQUIREMENTS, DAILY INTERVAL, MODE 1 AND 2
  • Technical Specifications HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Handouts:

  • Copy of a completed OST-1021 , Attachment 4.
  • Delete all notes.
  • Substitute the following incorrect data:
  • Modify log readings on p.19 of OST-1021 so that the 1500 reading of 457 and 456 are low and together average < 2205.
  • Include 455 approximately 60 psig high so that the channel check is unsat.
  • Condensate Storage Tank Level (both channels) progressively lowering from 85% to 60% throughout the day (TS).
  • RCS Loop Flow Channel FI-424 progressively lowering from 100.21 to 98.13 throughout the day (TS).
  • EDG Room Temperature channel TDG6903B @ 121°F (should be circled)

Initiating Cue: You are the USCG and have just completed an emergency watch relief due to illness of the scheduled person. Review the OST-1021 ,

Attachment 4 logs. At the conclusion of your review, discuss any findings with me.

Time Critical Task: No Validation Time: 20 minutes HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a ~)

Start Time: _

Performance Step: 1 Obtain completed log.

Standard: Reviews handout.

Evaluator Cue:

  • Provide handout for NRC SRO A1-2 after the Initial Conditions are reviewed and the Initiating Cue is provided.
  • If necessary, after the applicant discusses each finding:

What action, if any, is required relative to this reading?

Evaluator Note: Only the incorrect items in the logs are identified in the JPM Steps.

Comment:

-v Performance Step: 2 Review OST -1021, Attachment 4 for approval.

Standard:

  • Identifies that Pressurizer Pressure Channel 455. fails it's channel check.

Comment:

HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION

'./ Performance Step: 3 Review OST-1021, Attachment 4 for approval.

Standard:

  • Identifies that the Pressurizer Pressures should have the calculations completed.
  • Pressurizer pressure should be identified low out of spec based on performing calculation with only Channels 456 and 457.

Evaluator Cue: SRO may send paperwork back to RO to do the calculations.

If so cue the SRO to perform the calculations.

Comment:

'./ Performance Step: 4 Review OST-1021, Attachment 4 for approval.

Standard:

  • Identifies one RCS Loop "B" Flow Channel (Sheet 5) is below Acceptance Criteria.
  • Reading should be circled. TS does not apply in Mode 2.

Comment:

'./ Performance Step: 5 Review OST-1021 , Attachment 4 for approval.

Standard:

  • Condensate Storage Tank Level (Sheet 7) is below Acceptance Criteria.
  • Reading should be circled and entry into TS 3.7.1.3 Action a -

restore to operable or be in HSB within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, is required.

Comment:

HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION

-Y Performance Step: 6 Review OST-1021, Attachment 4 for approval.

Standard:

  • Identifies Diesel Generator Room 261 temperature TDG6903B (Sheet 10) exceeds Acceptance Criteria.
  • Reading should be circled and investigative/corrective actions implemented.

Evaluator Cue: If requested: EDG "B" has been running for 30 minutes.

Evaluator Note: Reading does not meet criteria for declaring equipment in the room inoperable. '

Comment:

Terminating Cue: After all findings have been reviewed: Evaluation on this JPM is complete.

Stop Time: _

HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SRO A1-2 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is in Mode 2, waiting for management approval to proceed to Mode 1.
  • EDG "8" is synchronized to the grid tor.a post-maintenance test.
  • The Daily Surveillance Logs (OST-1021 , Attachment 4) for 2100 have been completed.
  • ERFIS Pressurizer Pressures are unavailable.

INITIATING CUE: You are the USCG and have just completed an emergency watch relief due to illness of the scheduled person. Review the OST-1021, Attachment 4 logs. At the conclusion of your review, discuss any findings with me.

HARRIS 2008 NRC SRO A1-2 Rev 2 NUREG 1021, Revision 9

Attachment 4 ... Daily Surveillance Requirements Log Sheet 1 of 15 TECH SPEC 4.5.1,1.a.1 1 a.z Eees ACCUMULATORS PARAMETER etA A PRESSURE CLA B PRESSURE CLA C PRESSURE INSTRUMENT PI- 921 PI- 923 PI-925 PI ..927 Pl-929 PI ... 931 ACCEPTANCE Between 585 and 665 psig OPEN CRITER!A MODE 1~ 2 AND 3 WITH ReS PRESSURE ABOVE 1000 PSIG 0300 0900 1500 210q TECH SPEC a.s. 1.1,8.1 14.5.1.1, b (partial)

ECCS A.CCUMULATORS PARAMETER CLA A LEVEL CLA B LEVEL CLA C LEVEL SampUng Not Sampling Not SampUng Not INSTRUMENT LI ..920 Lt ..922 Required per LI ~ 924 Ll- 926* Required per Ll ..928 U ~. 930 Required per AU6 Att 6 Aft 6 ACCEPTANCE between 66 and 96 ok Indicated level viith CRiTERIA less tha.~ 9(}k cumulative level increase(excludfng makeup from operable RWST) ~inye last satisfact() sample MODE 1 2 AND 3 WITH ReS PRESSUREABOVE 1000 PSIG 1

Previous Days Level 0300 0900 1500 2100 4.3.2.1.10 2c, Sa3 3b3~ 3c3~ 4c 1 1 1 TECH SPEC 4A.6,2,1.b 5c, Bd,6g; 4,3.3.6.1a; 4J3.1.4 CNMTSUMP SUMP PARAMETER CNMT SUMP LEVEL CONTAINMENT PRESSURE FLOW MONITORiNG LEAK RATE ALB 1 URE URE LeT LeT PI PI iNSTRUMENT ERF1S N/A 9001 9002 7161A 7161B 950 953 PROGRAM ACCEPTANCE NO CHECKS CHAN.

N/A NfA LESSTHAN 1.6 PSfG CRITERIA ALARM PER CHECK OP..163 MODE 0300 0900 1500 2100

[6ST-1021 Rev. 66 Page 17 of~O I

Attachment 4 - Daily Surveillance Requirements Log Sheet 2 of 15 TECH SPEC 4.1.2.6.a.2; 4.5.4.a.1; 4.3.2.1. 7b, se: 4.3.3.6.9 4.1.2.6.a.2~ a.3 PARAMETER RWST LEVEL BORIC ACID TANK INSTRUMENT L!..990 Ll...991 LI-992 LI..993 N/A LI-106 L1..161.158 TCS7240 GREATER THAN ACCEPTANCE GREATER THAN OR EQUAL TO 92°k>

CHANNEL GREATER THAN OR OR EQUAL TO CRITERJA CHECK EQUAL TO 74%> QF 65 MODE 1.2 13) and.4 1.2,3 and 4 0300 C,iP C1C-, (il.l 9,5 IC)-(~) 2? I gc:) Ci~?

~

0900 .:

'~

, .... /:

1500 2100 ;h(')

V TECH SPEC 4.5,2.a 4.4.9.3 PRZ PARAMETER ECCS VALVE ALIGNMENT SPRAY ~T INSTRUMENT 181..340 181-341 181-359 I 181-86 I 1$1-52 I 181-107 TJ-123 TI-454.1 OPEN AND PULLEDTO LESS THAN ACCEPTANCE SHUT AND PULLED TO LOCK WITH LOCK WiTH CONTROL OR EQUAL CRITERIA CONTROL POWER OFF POWER OFF TO 625°F DURINGAUX MODE 1 r 2, and 3 SPRAY OPS 0300 Ai) (\41 rtJ r\O (;~~J

", dl~) tJ /;~

0900 :b .~ th*

,~f~ .:~ ~~. ~ f.J If~

r~;U ~1:)

1500 r-~\)

. ~ ~ ~ If,JIA 2100 "k) ~O 'A-~O {h0 itO ihQ

) l "if (-)

~ lJ V V V TECH SPEC 4.4.3,1: 4.3.1.1.11: 4.3.3.6.5 PARAMETER PRESSURIZER LEVEL INSTRUMENT LI-460 LI-461.1 LI-459A.1 N/A ACCEPTANCE LESS THAN OR CHANNEL CRITERIA EQUAL TO 90% CHECK MODE 1} 2. and 3 1 0300 -(0 \ (~/O &; c !r<J

~l{~

0900 lor (t;;; C> 00 ,,-

1500 CbiJ (0(\ j (0 [) (';A 2100 (),rQ\. (0 (') &(~) {~~7 v

I 08T-1021 Rev. 66 Page 18 of 40 I

Attachment 4 -Daily Surveillance Requirements Log Sheet 3 of 15

~ .

TECH SPEC 4.2.5.1; 4.3,1.1.9, 10; 4.32.1,1d~ 3a3} 3c3, 5c t 6 d PARAMETER PRESSURIZER PRESSURE tNDEPENDENT CALCULATION VERIFICATION ACCEPTANCE N/A COMPLETED COMPLETED CRITERIA MET ACCEPTANCE N/A CHANNEL SEE BELOW N/A NiA C-RtTERIA CHECK MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE: Calculations must be done with either the MCB Indicators OR ERFIS lndlcsuons, NOT a combination.

NOTE: If all operable channels ~re greater than or equal to the acceptance criteria, calculations are not required.

CALCULATIONS FOR PRESSURIZER PRESSURE 0300:

PRC0457"~'

+

~~P-RC~O-4-5 +

._.........,.....-~~

= ~ (# Operable PRC0455 Channels used PRESSURTzEFf>>~

PI--457 P\-456 PI~455 Normally 3) PRESSURE 0900: + +  ::: (# Operable PRC0457 PRC0456 PRC0455 Channels used PRESSURIZER PI~457 PI..456 PI-455 Normally 3) PRESSURE Q-1500: .~,.,,~:Q:;too .+ Wy :;l~05 + = (# Operable = ~6~.5 PRC0457 PRC0456 PRC0455 Channels used *"***P"RESSURIZER PI..457 PI-456 Pl...455 Normally 3) PRESSURE 2100: + + (#Operable  :=

PRC04~ PRC0456 PRC0455- Channels used PRESSURIZER PI-457 PI-456 Pl~455 Normally 3) PRESSURE ACCEPTANCEGRITER1A FOR PRESSURIZER PRESSURE (must meet one of the following):

1. Average of operable Mea indicator channels greater than or equal to 2205 psig.

2, Average of operable ERF1S points greater than or equal to 2202 psig.

3, If three MeB indicators are not available, then the lowest channel should be greater than or equal to 2220 psig+

4. If three ERFIS points are not available, then the lowest channel should be greater than or equal to 2211 pSlg, IOST~1021 Rev. 66 Page 19 of 40 I

Attachment 4 .. Daily Surveillance Requirements Log Sheet 4 of 15 TECH $PEC 4,2.5.1 PARAMETER Res LOOP TAVG INDEPENDENT INSTRUMENT TRC0412D TRC04220 TRC0432D CALCULATION VERIFICATION ACCEPTANCE (MeB OR ERFlS) TI~412D TI-422D TI..432D COMPLETED CRITERIA MET COMPLETED ACCEPTANCE SEE BELOW NIA NfA N/A CRtTERIA MODE 0300 0900 1500 2100 INSTRUCTIONS NOTE: Calculatlons must be done with either the Mea Indicators OR ERFIS lndicatlons, NOT a combination.

IfaU operable channels are less than or equal to the acceptance critena, calculations are not required..

CALCULATIONSF.OR ReS LOOP TAVG 0300: + + = (# Operable =

TRC0412D -~..-- H~'TRC0432D Channels used Res LOOP TI~412D TI~432D Normally 3) TAVG 0900: + + =: + (# Operable  ::::

~--

TRC0412.D TRC0422D TRC0432D Channels used ReS LOOP TI...412D Tt-422D TI...432D Normally 3) TAVG 1500: + +  :: (# Operable =

TRC0412D TRC0422D W""'r"R"C043W- Channels used RCSLOOP Tt-412D Ti-422D TI~432D Normally 3) TAVG 2100: + + = (# Operable  :: ~ _

TRC0412D TRC04226""~ TRC0432D --~- Channels used ReS LOOP 11-412D Tt w422D TI-432D Normally 3) TAVG ACCI;PT ANCE CRITERIA FOR ReS LOOpTAVG. (must meet one of the following):

1, Average of operable Mea indicator channels mustbe less than or equal to 592.5 QF.

2. Average of operable ERF1S points less than or equal to 593.1 "F.
3. If three Mea indicators are notavallable, then the highest channel should be less than or equal to 591,3>:>F.
4. If three ERFIS points are not available, then the highest channel should be less than or equal to 592,3 OF.

IOST~1021 Rev. 66 Page 20 of 40 I

Attachment4,. DailySurveillance Requirements Log Sheet 50f 15 TECH SPEC 4,3.2.1 4.4.6.2.1.e FLANGE PARAMETER Res PRESSURE LEAKOFF TEMP OTliT OPllT PROTECTIONllT Ttw412C}

Tl..-412B)

TJ... 412A* TJ..422At iNSTRUMENT PI-403.1 P1402,1 TI401 TI422C 2 TI..422B~

Tl-432A TI..432C TI-4328 ACCEPTANCE CHANNEL CHECK N/A CHANNELCHECK CRITERIA MODE 0300 0900 1500 2100 INSTRUCTION If ReS flow acceptance criteria is not met, perform EST-70B, RCSFlowDetermination.

TeCH SPEC PARAMETER INSTRUMENT FRC0414 FRC0434 FI..414 F(~434 ACCEPTANCE ~ 98.30/0 CRITER~A 0900 1500 2100 Tf?CH SPEC 4.4.6.2.1.d PARAMETER OST~1004 or INSTRUMENT OST~1204 COMPLETED ACCEPTANCE COMPLETED (Typically on Night Shift)

CRITER1A 1 above 15%

MODE 1~ 2~3~ and 4 Power 0300 rOST-1021 Rev. 56 I Page 210f 40 I

Attachment 4 Daily Surveillance Requirements Log M

Sheet 6 of 15 TECH SPEC 4.4.1.t 4.3.1.1.12 PARAMETER* Res LOOP FLOWS FRC0414 FRC0415 FRC0416 FRC0424 FRC0425 FRC0426 INSTRUMENT RCPA N/A Reps N/A FI-414 FI-415 F1..4 16 FI-424 Fl-425 FI-426 ACCEPTANCE POSITIVE INDICAT10N OF FLOW WITH CHANNEL POSITIVE INDICATION OF FLOW WITH CHANNEL CR1TERIA Rep RUNNING INDICATION CHECK Rep RUNNING lNDICATION CHECK MODE 1 12 1 1.2 1 0300 ~() { ,\(~)

.... k) A'O AD AtO y.. . . .

MJ (~0 (uD rIO 0900 ~b ~

~

~

~.

... (:ti JiJ. ~:D ~ r:J)

\:. y~ ~

(&

\-

1500 (~\ ~~ ~ ~ll ~~ f~~ ("1. r,l\- (j. ~

(11

..~.:~.

2100 ( J

\J

~6J

\1

~.()

"J lo

~

to

, t\1()

V

(~

rf()

V r¥-J v

At£)

v TECH SPEC 4.4.1.1: 4.3.1.1.12 4.3.1.1.2a.2b. 5.6 POWER INTERMEDIATE SOURCE PARAMETER Res LOOP FLOWS RANGE RANGE RANGE FRC0434 FRC0435 FRC0436 Nt-41, Nl-42 Nl..35 Nl-31 INSTRUMENT RCPC N/A FI-434 FJ*435 FI-436 N143, NI-44 NI-36 NI-32 ACCEPTANCE POSITIVE INDICATION OF FLOW WITH CHANNEL CHANNEL CHECK CRITERIA Rep RUNNING iNDICATION CHECK MODE 1,2 1 1} 2 1 <<P-10). 2 2 <<P..6), 3.4.5 0300 (~() A6"') ~ ~iC) r\£) (~kL) ,'\1 //) rJ/A 0900 ~~ ~14 ~~ ~ ~~. ~ ' 1/'1 f\l~ fJ N li~

~~ (~) r~

(~....

1500 ~. J+.  ;~~ \J)

\. f\l if-\ j\J fA 2100 (~) r-b rK) ~/r\() 1-10 )to l~ Ifi t J 114-

'v v \J V V v 4.3.2.1.1e. 3a3. 3c3 1 4d, sc, 6d, 69 TECH SPEC 4.3.1.1.14 4.3.3.6.6 PARAMETER STEAM LINE PRESSURE Pl..474.1. PI-484.1 Pi-494 INSTRUMENT Pl..475. PI-476 PI..485. PI486 PI-495. PI-496.1 ACCEPTANCE CHANNEL CHECK CHANNEL CHECK CRITERIA MODE t, 2. 3 and 4 1,2 0300 0900 1500 2100 I OST~1021 Rev. 66 Page 22 of 40 I

Attachment 4 - Daily Surveillance Requirements Log Sheet 7 of 15 TECH SPEC 4,3,1.1,13;4.3.1> 1~ 14; 4.3.2.1 .se. ec, 10~t 4.3.3.6,7 4,7,1,3,1 PARAMETER SG LEVEL CST LEVEL Ll~483f LI..484 LI..493 LI-494 LI~901 081 l

INSTRUMENT LI-9010A.1 SA S8 LI~485~ L148j Lt:.,,495~ Lj...496 ACCEPTANCE GREATER THAN OR CHANNEL CHECK CRITERIA EQUAL-.TO 62%

MOPE 0300 0900 1500 2100 TECH SPEC 4.7.1.3.2 PARAMETER. ESWTOAFW 1SW..121 1SW++'124 18W..127 1SW...130 INSTRUMENT 1SW-123 1SW+M126 1SW-129 1SW-132 ACCEPTANCE OPEN (only when supplying CRITERIA AFW pumps)

MODE 1 2,- and3 t

0300 ~)rpr' .....*..............."'W.<<.>>;.;-;.,;.;,.;.X/Vo."",.,..NNA*I'.";.

0900 rJ If\" ~X>>m-:-:->Jo>>>;'>>>

1500 tJltPr

      • )0

~~~/

., ;. " -", .,___K_

-<<-~

N>>>
':~;MYN>>~>>Y>>'

2100 ~0/A ~:-:<<~<N.~  ;;::>

IOST-1021 Rev. 66 ~age 23 of 40 I

Attachment 4 .. Daily Surveillance Requirements Log Sheet 8 of 15 INSTRUCTIONS

1. ERFIS is the preferred source for verifying CNTMT AVG TEMP.
2. VerIfy TCV97540 computer point quality code is acceptable. If acceptable, record the ERFlS value for CNTMT AVG TEMP and verify Jess than or equal to 120°F.
3. If computer point TCV97540 is not available, verify both MeB indicators for CNTMT AVG TEMP less than or equal to 120 0 F.

TECH SPEC PLP-114 4.6.1.5 N/A 4.6.1.4 PLP-114 A EDG ELEC B EDG ELEC CONTAINMENT CONTROL ROOM PARAMETER CNMT AVG TEMP ROOM 261 ROOM 261 PRESSURE ENVELOPE 305 TCV97540 TJ-7542 TI-7541 PDl*7680 PDI-7680 TI-7837 TI-7837 INSTRUMENT ALB 27/1..3 SA SB A SA B 58 A1SA B188 NO ALARM ~ 116 0 F) LOCAL ACCEPTANCE LESS THAN OR EQUAL TO GREATER THAN -1.0 LESS THAN OR TEMP IS NEEDED IF ALARM IS CRITERiA 120°F JNWG EQUAL TO 85 QF PRESENT WHENEVER THE WHENEVER THE EQUIPMENT EQUtPMENT IN AN IN AN AFFECTED AREA IS 1. 2. 3. and 4 AFFECTED AREA MODE R'EQU1RED TO BE OPERABLE IS REQUlRED TO BE OPERABLE 0300 (\UJ 'l f 0900 1500 2100

\/

TECH SPEC PLp ..114 ROD SA ELECT 5B ELECT STEAM 1A35SA.

PARAMETER FHB EMER EXH AREA CNTRL CAB PENET PENET TUNNEL 1B35SB 261 AREA 305 AREA 261 AREA 261 INSTRUMENT Tl ..6 537A1SA TI..6 5378158 ALB 23/3-5 ALB 23J2-11 ALB 2312-8 ALB 23/2..5 ACCEPTANCE LESS THAN OR EQUAL TO NO ALARM NO ALARM NO ALARM CRITERIA 104°F << 104°F) << 122°F) (LESS THAN OR EQUAL TO 104°F)

WHENEVER THE EQUIPMENT IN AN WHENEVER THE EQUIPMENT ,IN AN AFFECTED AREA IS REQUIRED TO BE MODE AFFECTED AREA IS OPERABLE (LOCAL TEMP MUST BE TAKEN IF ALARM IS PRESENT)

REQUIRED TO BE OPERABLE 0300 tv c( ro ~'?

.) ~6J kC) A-o rro rJp:)

(&

./

0900 {j-/d (~() I ~ ~ \tJ9.

cL "- (~

1500 &'-1 rv ~l '~. <~~,

t A '~J) ~~

(ro

. "",)

2100 (0"7 Cv cl (~O k~:) ~:> )}-6~)

\J 'J V \t

'J IOST-1021 Rev. 66 Page 24 of 40 I

Attachment 4 - Daily Surveillance Requirements Log Sheet 9 of 15 TECH SPEC PLp ...114 CHILLER AFW I CCW PUMPS A..SA B-S8 1C-SAB SW BSTR MECH & ELEC PARAMETER PIPE & VALVE & HX AFW CSIP ROOM CSI? ROOM C$1iP ROOM B-SB PUMP PENETAREA AREA 261 PUMPS 236 236 236 236 236 236 ALB 23/2-6 ALB 23/1*6 ALB 23/2..9 INSTRUMENT ALB 23/1 ..5 ALB 23/1-4 ALB 23/1-11 ALB 23/2...7 ALB 23/1-7 ALB 23/2-10 ACCEPTANCE NO ALARM (LESS THAN OR EQUAL TO 104¢F)

CRITERIA WHENEVERTHE EQUiPMENT IN AN AFFECTED AREA IS REQU1RED TO BE OPERABLE MODE LOCAL TEMP MUST BE TAKEN IF ALARM lS PRESENT 0300 0900 1500 2100 TECH SPEC I PLP ..114 4.9.1*1 COMMITMENT CSAT& WPB A*SA BwSB FUEL POOLS HVAC HVAC CS~ RHR 1 CS, RHR~

PARAMETER EQUIP RM EQUIPRM HVAC HVAC SPENT FP NEWFP SFPC SFP D 216 236 190 190 INSTRUMENT ALB 23/1-8 ALB 23/1 w9 ALB 23/1..10 ALB 23/4-17 ALB 23/5-17 ALB 23/4*18 ALB 23/5..18 ACCEPTANCE NO ALARM (LESS THAN OR EQUAL TO 104 OF) NO ALARM (GREATER THAN 23 FT)

CRITERIA WHENEVER THE EQUIPMENT IN AN AFFECTED AREA 18REQUIRED TO BE OPERABLE WHEN IRRADIATED FUEL IS IN THE POOL MODE (LOCAL TEMP MUST BE TAKEN IF ALARM IS (LOCAL LEVEL MUST BE TAKEN IF ALARM rs PRESENT)

PRESENT) 0300 d<) {~) ({O ~ ,.))

0900 '-~~ '~~

<.-. ')~ ~dJ- "-~J)~

~~ V~'} I/~

l~

' ...,;:. ~

.~

1500 .~

b .~- ..

2100 (kJ r!P )tto ko

~.J \/ v 'tJ I OST-1021 Rev. 56 Page 25 of 40 I

Attachment 4 ... Daily Surveillance Requirements Log Sheet 10 of 15 TECH SPEC I ESR 97..00272 ESR 95~00425 ESR 97-00272 COMMiTMENT SPENT FUEL POOL HIGH SPENTFUEL POOLHIGH NEW FUEL POOLHIGH PARAMETER TEMPERATURE ALARM TEMPERATURE ALARM TEMPERATUR~ALARM INSTRUMENT ALB 23/4..16 ALB 23/4...15 ALB 2315~15 ALB 23/5.. 16 ACCEPTANCE NO ALARM NO ALARM NO ALARM CRiTERIA MODE 0300 0900 1500 2100 TECH SPEC PLP-114 ESWELECEQUJP ROOM 261 ESW PUMP ROOM 261 EDG ROOM: 261 PARAMETER INSTRUMENT TEV6588A TEV658~~ TEV6592A TEV6592B TDG6903A TDG6903f.3 . .

ACCEPTANCE LESS THAN OR EQUAL LESS THAN OR EQUAL TO LESS THAN OR EQUAL TO CRITERIA TO 116$;)F122~F WHENEVER THE EQUIPfv1ENT IN AN AFFECTED AREA IS RE.QUIRED TO BE OPERABl.E 0900 1500 2100 IOST-1021 Rev. 66 Page 26 of 40 I

Attachment 4 .. Daily Surveillance Requirements Log Sheet 11 of 15 NOTE 1: If a reservoir level computer point is bad, manual reservoir level determination can be performed per OP w163.

NOTE 2: If a reservoir temperature computer point is bad, manual reservoir temperature readings can be performed per OP-163.

INSTRUCTION

1. Due to a 3°F instrument inaccuracy associated with the permanently installed reservoir TSWs, if TSW9114ITSW9115 'indicate 291 °F obtain local temperature J readings per OP-163.

4.1.2.6b TECH SPEC 4.5.4.b 4.7.5 RWST AUX RSVR PARAMETER TEMP AUX RSVR LEVEL TEMP MAIN RSVR LEVEL MAIN RSVR TEMP lNSTRUMENT TCT7110 LSC8752A LSC87528 TSW9114 LSC8750A LSC8750B TSW9115

~40°F GREATER THAN OR GREATER THAN OR EQUAL ACCEPTANCE AND EQUAL TO 250 FT  ::; 94°F TO 215 FT s 94°F CRITERlA < 125°F NOTE 1 NOTE 2 NOTE 1 NOTE 2 MODE 1 ~ 2) 3 and 4 0300 5~7. &.' (9-5Jl i: r?~S L ~S(} l{() t o.;.:; 9Jt\~;S  ;)17" (0 I 4&v6 0900 1500 t~~-7 ,5 ~SI\5 /)5~ j 5<1 L(~t3~ l)r9. Sec, J,j 15 ~ W l

J <7

-:l LJS... ...,....,{

..... ~...

~

2100 INSTRUCTION

1. The ECCS leakage outside RABEES reading is only required every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Perform on Sunday, WednesdaYt and Friday (mark as N/A on other days).
2. If any ECCS leakage outside RABEES is measured, record the cumulative leakrate on Attachment 7 along with the locations leaking.

t TECH SPEC PLP-114 PARAMETER ECCS leakage outside RABEES INSTRUMENT N/A ACCEPTANCE LESS THAN 2 GPH (125 cc/min) cumulative CRITERIA MODE 1,2,3 and 4 0300 0900 1500 VJ/t\

2100 IOST-1021 Rev. 66 Page 27 of 40 I

Attachment 4 - Daily Surveillance Requirements Log Sheet 12 of15 NOTE 1: Meteorological Channel check includes: (1) Initialing for a acceptable quality code if using ERFIS or verifying data quality is consistent with actual weather conditions if using a Personal Computer(PC) to access the meteorological tower, and (2)

Recording present values and verifying trend appears normal.

NOTE 1: During calm wind conditions (approximately 2 mph or less) it is normal to see disagreement between the upper and lower wind direction indicators. At times the vanes may actually rotate in opposite directions.

NOTE 1: The following shall be used for performing the daily channel check of the meteorological instrumentation channels:

  • On ERFIS observe the points for wind speed, wind direction, and differential temperature.
  • . Using a PC , access the meteoroloqical tower and observe upper and lower wind speed, upper and lower wind directlon. and differential temperature (or stability class).

The meteorological instrumentation should only be considered inoperable if both of the above methods are unavailable.

NOTE 2: MIMS Channel check should include, as a minimum, both a Self Test and an Audio Monitoring Test of all operable channels. Op 182 contains guidance for resetting the wo CPU FAILED light if lit.

(Reference 2.6.4)

TECH SPEC PLP-114 PLP-114 METEOROLOGICAL MIMS PARAMETER LOWER WIND UPPER WIND LOWER WIND UPPER WIND A1R SPEED SPEED DIRECTION D1RECTION llT ALL INSTRUMENT MMT1008 MMT1010 MMT1014 MMT1013 MMT1004 MMT1Q05 CHANNELS CHANNEL CHECK NOTE 1 CHANNEL ACCEPTANCE CHECK CRITERIA Value Init Value Init Value Init Value Init Value Init Value Init NOTE 2 MODE AT ALL TlMES 1,2 0300 C\t/& M;~) 'f) 7 1)

J. '.7~ S~f) 3~:;*21 Z-3 li J f1/31 rh-J \ L.~,,~ 1.(0 11..55" j,.-I,() A"0"f) i

~.'.. '

-s : 'J' 0900

.~

1500 ~'},J~ '~ll "11 jlL3<6 ~ ~{Z~ l2. l~

(,<1/l3 ~~ *-~Lgti 'J) -l,'7J '~J2

~'

2100 IOST-1021 I Page 28 of 40'1

Attachment 4 - Daily Surveillance Requirements Log Sheet 13 of 15 LOCAL TEMPERATURES TECH SPEC PLp..114 SFP PUMP & TANK AREA E-6 ROOMS 261 PARAMETER HX ROOM 236 A-SA B-SB lNSTRUMENT LOCAL THERMOMETER LESS THAN ACCEPTANCE OR EQUAL TO LESS THAN OR EQUAL TO 104.oF VERIFIED CRlTERIA 115.5 of WHENEVER THE EQUIPMENT iN AN AFECTED t*:,':.:,-.:.: *::.*\.:;>~~}~t~.: (;/}~:::::~:r.:::~*:**

MODE AT ALL TIMES AREA IS REQUIRED TO BE*OPERABLE  :::.:;.;.;: '::-:,:.:

0100-0400 1.--7 S

,) I 0:?G7 L{

t & v-1 ~ .:) &L/~ 7 )D la it, ~ Lf " c.( C:i r7~

1300..1600 ~51\"3 t9?? ~ (p &, .- l '/ C!..-/

TECH SPEC PLP-114 EDG HVAC ROOM 280 EDG HVAC ROOM 292 DFOST BLDG PARAMETER 242 A-SA B-58 A-SA B-SB lNSTRUMENT LOCAL THERMOMETER LESS THAN ACCEPTANCE LESS THAN OR EQUAL TO LESS THAN OR EQUAL TO OR EQUAL VERIFIED CRITERIA 118°F 122°F QF TO 122 WHEN THE EQUIPMENT iN THE AFFECTEDAREA 18 REQUlRED TO BE MODE OPERABLE 0100..0400 ~-?&( GI g::)

.... ~

D *'7t;5t '*'7 if If>3 <>>. <./ (~QJ 1300-1600 ~~7? \,~5' 71 L{td ' ") ~1 ~ "j 7l0~fo C:Ol , L( ~~Q ~.;}

I OST-1021 Rev. 66 Page 29 of 40 I

Attachment 4 .. Daily Surveillance Requirements Log Sheet 14 of 15 LOCAL TEMPERATURES INSTRUCTION

1. If battery room temperature is less than 71 of, perform Step 7.0.5.

TECH SPEC PLp..114 ELECT SW1TCHGEAR PENETRAT'ON SATIERY ROOM286 ACP 286 PARAMETER ROOM 286 AREA 286 A..SA BwSB A-SA B-S8 A..SA I B...SB INSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR LESS THAN OR LESS THAN OR

~ 71°F AND ~ 85°F VERIF1ED CRITERIA EQUAL TO 104°F EQUAL TO gO°F EQUAL TO gO°F

'.. . :.:.:..>..: /':.':",::,

WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS REQUIRED TO BE O:':':':::::::',\,~: ':',::' .':':

MODE OPERABLE 0900-1200 &~;;)\ G.' '~7[{ (to y\, C:j '7~~1~ c1 ~*-?0. ~ "7ip ~ i? .-~] ~7 ~ '--7 l l"~J 2100-2400 (0:--Q ~ ci -7 L(J~. ~t\t _~3 ~7<l, , ':-7~S ~ t:t "7~J ~ C} "7'7. \ G <:1 :1;)

TECH SPEC PLp w114 AUX TRANSFER PANEL ROOM PIC ROOMS PARAMETER 286 286 A-SA B..SB 17 19 t 18 INSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR EQUAL TO LESS THAN OR EQUAL TO CRITERJA 104°F 85°F WHENEVER THE EQUIPMENT iN AN AFFEOTED AREA IS VERiFIED MODE REQUIRED TO BE OPERABLE 0900...1200 --7~:) ~ ~~-'1 '~'7 ~1.

(... ~),

(-~ "'}~, c. "'7:5~ C) 2100 ...2400 "'7 2..-- ~ '~7 '-'7 2 '<2- ~~7

'(>,. ~ £2'J ~7 Lo( t ~l TECH SPEC PLP-114 ARPROOM AH-15 VENTILATION PARAMETER PIC ROOM 305 305 ROOM INSTRUMENT LOCAL THERMOMETER ACCEPTANCE LESS THAN OR EQUAL TO LESS THAN OR VERIF1ED CRITERIA 85°F EQUAL TO 104°F

':.'. :-:/. :-:::.,:.,'. ......' ....:

WHENEVER THE EQUIPMENT IN AN AFFECTED AREA IS MODE REQUIRED TO BE OPERABLE 0900-1200 ~7 t . 0 {(i{a , ~ 4,0 \ ( r0

~

2100-2400 ~7C) ~ ~6 (&~~ ~ '~7 &0 ~ (~) ~

1 OST-1021 Rev. 66 Page 30 of 40 I

Attachment 4 - Daily Surveillance Requirements Log Sheet 15 of 15 NOTE 1: These readings are only required on Sundays. These readings may be marked N/A on other days.

TECH SPEC 4.1.2.2.a BORJCACID BORIC ACID VCTVALVE BAT EMER BORATION PARAMETER XFER PUMP XFER PUMP GALLERY ROOM VALVE RM VALVE GALLERY ROOM INSTRUMENT LOCAL THERMOMETER ACCEPTANCE GREATER THAN OR EQUAL TO 65°F CR1TERIA MODE 1,2 and 3 1300-1600 (NOTE 1) rrJ lA- ....__..-......---...------Y'O"+i'---.M........-.-....................,.-.. ........---------- ---._~

TECH SPEC 4.1.2.2.a BAT TO CSt? SUCTION HEADER PfPE TEMPERATURE (IF ANY OF THESE INSTRUMENTS FAIL. INITIATE CORRECTIVE ACTION AND NOTE IN COMMENTS PARAMETER SECTION. USE SECONDARY INSTRUMENTS TO SATISFY THE SURVEILLANCE REQUfREMENT)

HT-18753C HT-18753C HT-18753B HT~18753B HT..18753B HT..18753B INSTRUMENT ACCEPTANCE C2-1 I C2-2 I C1-9 I C1-13 I C2..3 I C2-5 CRiTERIA GREATER THAN OR EQUAL TO 65°F MODE 1,2 and 3 1300..1600 (NOTE 1) N. I r. r~

.~. \_*. *---------1------- tI ~J I

1 I

--~~.-_"'-~

TECH SPEC 4.1.2.2.8 BAT TO CSIP SUCTION HEADER PlPE TEMPERATURE (THESE ARE SECONDARY INSTRUMENTS. THESE SHOULD BE USED WHEN PRIMARY INSTRUMENTS PARAMETER INSTRUMENT HT-18753CC C2-1 I HT..18753CC C2...2 I FAll. (N/A IF NOT BE1NG USED.)

HT-18753BB C1v9 I HT-18753BB C1-13 1 HT..187538B C2 ...3 I HT-18753BB C2-5 ACCEPTANCE CRITERIA GREATER THAN OR EQUAL TO 65°F MODE 1,2 and 3 1300-1600 (NOTE 1) f~1 f) 1---*-----.1- I i. 1I -.~----;.""i IOST-1021 Rev,66 Page 31 of 40 I

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.: 015004H201 Task

Title:

Perform the Quadrant Power Tilt JPM No.: 2008 NRC RO A2 Ratio Surveillance KIA

Reference:

2.2.12 (3.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method oftesting:

Simulated Performance: Actual Performance: x Classroom X Simulator - - - Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant has been stabilized at 100 % power following a dropped rod in Control Bank "B" (M-6).
  • The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND" INDICATION SYSTEM.
  • No deficiency tags on PRNls.

Task Standard: Calculations within required band.

Required Materials: Calculator General

References:

OST-1039, CALCULATION OF QPTR, Revision 13 Handouts:

  • OST-1039
  • Curve Book (Ensure F-X-8 included and unmarked)

Initiating Cue: The USCO has directed you to perform a manual QPTR lAW OST-1039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.

For the purposes of the examination, there will be no independent verification of your work.

Time Critical Task: NO Validation Time: 12 minutes HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 2 of 10 Form ES-C-1 VERIFICATION OF COMPLETION (Denote Critical Steps with a ~)

Start Time: _

Performance Step: 1 Obtain procedure.

Standard: Reviews procedure.

Evaluator Cue: Provide OST-1039.

Evaluator Note: A KEY is provided for your use on JPM Page 7.

Comment:

Performance Step: 2 Completes Prerequisites section:

  • Instrumentation needed for the performance of this test is free of deficiency tags that affect instrument indication.
  • Verify the most recent Curve F-X-8 is used in the performance of this procedure.
  • Verify all prerequisites are met, then obtain Unit SCO permission to perform this OST.

Standard:

  • Logs F-X-8 revision number (NRC Exam)
  • Initials/signs all blocks Evaluator Cue:

Comment:

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 30f 10 Form ES-C-1 VERIFICATION OF COMPLETION Performance Step: 3

  • If Quadrant Power Tilt Ratio Calculation Computer Program is used, perform Section 7.1, and N/A section 7.2.
  • If manual calculation of the Quadrant Power Tilt Ratio is used, perform Section 7.2, and N/A section 7.1.

Standard:

  • Marks Section 7.1 N/A
  • Proceeds to Section 7.2 Comment:

Performance Step: 4 Prior to reading the value of detector current, ensure the meter range/rate switch is in the 400 J,lAlSLOW position.

Standard: Verifies meter range/rate switches were in the 400 J,lAlSLOW position when the readings were taken.

Evaluator Cue:

Comment:

Performance Step: 5 Record on Attachment 2, in Column A, the upper and lower detector currents from all operable power range channels as read on the Nuclear Instrumentation Cabinet.

Standard: Transposes readings from PRNIS Readings Table onto Attachment 2.

Comment:

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 4 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Performance Step: 6 Record on Attachment 2, in Column B, the 100% power normalized current for each channel. (Refer to Curve F-X-8)

Standard: Transposes TOP and BOTTOM 100 % current values from the Curve Book provided.

Evaluator Cue:

Comment:

Performance Step: 7 Divide values in Column A by the respective normalized current in Column B and record the result in Column C as the Normalized Fraction.

Standard: Divides each Upper and Lower reading by the respective 100%

normalized current value and records in Column C.

Comment:

Performance Step: 8 Calculate the average value for the upper and the lower Normalized Fractions by adding the Normalized Fraction in each section of Column C and divide by the number of operable NI channels. Record in Column D of Attachment 2.

Standard: Adds all Normalized Fractions for the same plane, divides by four and records result in Column D.

Evaluator Note: On the KEY, this value is shown at the bottom of Column C.

Comment:

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 5 of 10 Form ES-C-1 VERIFICATION OF COMPLETION

~ Performance Step: 9 Using the formula and values from Attachment 2 calculate the Upper and Lower Ratios.

Standard:

  • Divides the Maximum Normalized Fraction by the Average Normalized Fraction on each plane.
  • Determines both UPPER and LOWER ~ 1.029.

Evaluator Note: The applicant may inform the USCO as soon as any calculation is > 1.02. If so, acknowledge and direct applicant to complete.

Comment:

Performance Step: 10 Perform independent verification of all calculations made on Attachment 2.

Standard: Requests Independent Verifier.

Evaluator Cue: If necessary, repeat Initiating Cue: For the purpose of this examination, there will be no independent verification of your work.

Comment: Candidate may choose to check calculations.

~ Performance Step: 11 The upper ratio or the lower ratio, whichever is greater, is the quadrant power tilt ratio (QPTR). Record QPTR and verify QPTR is less than or equal to 1.02.

Standard: Records Maximum QPTR value 1.026 to 1.036 (N44 UPPER)

Comment: Acceptable band is +/- 50/0 (rounded to .005) around 1.031.

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 6 of 10 Form ES-C-1 VERIFICATION OF COMPLETION

-v Performance Step: 12 Complete applicable sections of Attachment 3, Certifications and Reviews and inform the Unit SCO when this test is completed.

Standard:

  • Check marks Periodic Surveillance or notes AOP-001 in Comments section
  • Plant Condition: 100% Power (may note dropped rod)
  • Mode 1
  • Today's Date
  • Current Time
  • OST Completed By: Applicant's name
  • Initials/Name
  • Indicate in General Comments Section and/or informs USCG that the limit is exceeded (-V)

Evaluator Cue: Acknowledge any report.

Comment:

Terminating Cue: After the USCO has been notified: Evaluation on this JPM is complete.

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 7 of 10 Form ES-C-1 VERIFICATION OF COMPLETION KEY A B C UPPER UPPER UPPER 100% POWER NORMALIZED UPPER DETECTOR NORMALIZED FRACTION DETECTOR CURRENT CURRENT (NOTE 1)

N-41 149.7 155.2 .965 N-42 177.9 175.6 1.013 N-43 202.0 200.0 1..010 N-44 165.5 159.5 1.038 SUM 4.026/4 =

1.0065 A B C LOWER LOWER LOWER 100% POWER NORMALIZED LOWER DETECTOR NORMALIZED FRACTION DETECTOR CURRENT CURRENT (NOTE 1)

N-41 169.2 176.1 .961 N-42 202.6 202.2 1.002 N-43 221.1 221.2 .9995 N-44 197.5 192.3 1.027 SUM 3.99/4 =

.9975 Highest Upper (N-44) 1.038/1.0065 = 1.031 Highest Lower (N-44) 1.027/.9975 = 1.0296 (1.03)

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 8 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC RO A2 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION HARRIS 2008 NRC RO JPM A2 Curve F-X-8 HANDOUT Revision Number: NRC Exam NIS Current Setpoint Table uA, 100 % power N41 155.2 176.1 N42 175.6 202.2 N43 200.0 221.2 N44 159.5 192.3 HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 10 of 10 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant has been stabilized at 100% power following a dropped rod in Control Bank "B" (M-6).
  • The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.
  • No deficiency tags on PRNls.

INITIATING CUE: The USCO has directed you to perform a manual QPTR lAW OST-1039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.

For the purposes of the examination, there will be no independent verification of your work.

PRNIS Readings N41 149.7 169.2 N42 177.9 202.6 N43 202.0 221.1 N44 165.5 197.5

  • All values were taken, with the Range/Rate switch in 400 IJAiSlow position.

HARRIS 2008 NRC RO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.:

Task

Title:

Review the Completed OST for JPM No.: 2008 NRC SRO A2 Auxiliary Feedwater Pump 1A-SA KIA

Reference:

2.2.12 (3.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: x Classroom X Simulator ---

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The unit is in Mode 1 at 100% power
  • All major controllers are in AUTO
  • No TS Action Statements are in effect
  • OST-1211, AUXILIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4, has just been completed Task Standard: All errors (4) identified Required Materials: None General

References:

OST-1211, AUXILIARY FEEDWATER PUMP 1A-SA OPERABILITY TEST QUARTERLY INTERVAL MODES 1-4 Handout: Completed OST-1211 with the errors incorporated.

Initiating Cue: You are the USCO. Completely review the procedure and note any problems in the

GENERAL COMMENT

S section of Attachment 6 -

Certification and Review. Discuss your review with me at the conclusion.

HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Time Critical Task: No Validation Time: 12 minutes HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP N/A HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Review procedure Standard: Ensures proper conditions, signatures/initials, and may verify the current revision of the procedure Evaluator Cue:

  • Provide the completed OST-1211.

Comment:

~ Performance Step: 2 Review the completed OST Standard: Attachment 1 (Page 16) - Identifies stopwatch is past calibration date Evaluator Note: This makes the OST invalid and/or any timed elements would have to be repeated.

Comment:

HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 5 of 8 Form ES-C-1 PERFORMANCE INFORMATION

-v Performance Step: 3 Review the completed OST Standard:

  • Attachment 2, Sheet 1 (Page 17) - wrong Specific Volume used to determine ilPcorr.

Evaluator Note: l\Pcorr still exceeds minimum requirement but is incorrect.

Comment:

-v Performance Step: 4 Review the completed OST Standard:

  • Attachment 3 (Page 20) - Outboard Horizontal Vibration reading is in the ALERT range but there is no documentation in accordance with Instructions 1.a and 1.b.

Evaluator Note: The pump would still be operable but this could prevent corrective action or the required increase in surveillance frequency.

Comment:

-v Performance Step: 5 Review the completed OST Standard: Attachment 4 (Page 21) - 1AF-74 SHUT time exceeds CODE CRITERIA and, in accordance with Step 7.0.1, should have been retested immediately.

Comment:

HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 6 Review the completed OST Standard: Returns the procedure unsigned or, if signed, with EXCEPTIONS circled and all errors identified in the

GENERAL COMMENT

S section.

Comment:

Terminating Cue: When the procedure is returned: Evaluation on this JPM is complete.

STOP TIME:

HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC SRO A2 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The unit is in Mode 1 at 100 % power
  • All major controllers are in AUTO
  • No TS Action Statements are in effect
  • OST -1211, AUXI LIARY FEEDWATER PUMP 1A-SA OPERABI LITY TEST QUARTERLY INTERVAL MODES 1-4,'

has just been completed INITIATING CUE: You are the USCO. Completely review the procedure and note any problems in the

GENERAL COMMENT

S section of Attachment 6 - Certification and Review. Discuss your review with me at the conclusion.

HARRIS 2008 NRC SRO A2 Revision 2 NUREG 1021, Revision 9

C CO*NTINUOUS USE HARRIS NUCLEAR PLANT PLANT OPERATING MAN UAl VOLUME 3 PART 9 QPERAT10NS SU*RVEllLANCE TEST NUMBER:

OST-1211 TITLE: A*U:XILIARY FEEDWATER PUMP 1A.-SA OPERABILITY TEST QUARTERLYI*NTERVAL MOD:ES 1 -4 NOTE: Thlsprccedure has been screened perPLP-1 00 Criteria and determined to be CASE Iii, :additionalmanagementinvolveme*nt is required.

.... . *1 I OST-1211 Rev, 16 Page 1 of 261

Attachment 1 -Calibration Data Sheet Sheet 1 of 1 Cal Due Date I o~ o c QT' 0 (JT" N.A

Rev. 16 Page 18 of 261

A'ttaehm.ent 2 ~ Performance Data Sheet 1 of*3 Auxiliary Peecwater Pump 1A..SA NOTE1:Caiculate DifferentiaiPressure as foltows:

lb{)() < (iSIS = J514~d, psid Step 7'. 1.21 Step 7~ 1.18 Step 7.1.23*

L!==========:,======= . ::=.:.. .=====;======~

NOTE* 2: Satisfactory Acceptance Criteria is .determlnedby u.sing the following

~.rH l~-HO and verifying the correcteodlfterenttatpressure ts \tifit.hinthe

.- :_- ~t;:t;. \i.~ Iltj'~: la:

tlP corr :::; Corrected DifferentIal Pressure APind  := tndlq.~ted Discharge Pressure minus Indicated sucuon Pressure Uf =: SpeCific Volume (ftslfbm) for saturated Iiquidwater (u,) for suction temperature recorded inStep7.. *1.22. This number can be determined from Sheet3 of this Attachment or Standard Steam Tabtes~

7.1.24 I0$1-1211 r w

Rev. 16 Page 11 of 26 ,

Attachm.ent 2 ~ Performance Data Sheet 2 of 3 INSTRUC*TIONS

1. If pump hydrauHcdatEfdoes not meet acceptance criteria:

a~ Declare the pump iNOPERABLE.,

b~ Inlti:ate a :CR.

ST*Ep***

NO.

7.1.3 7.1.18 Test Gauqe psig 2: 15 psig CE~42 . .V*2 7.1.20 Test G:8uge at1AF-11*HV.2 {CodD psig N/A ERFISPoint 7.1.22 TCE901 . *::or Suction Temperature N/A Har~dheld Porom~t~(*

Test Gauqe at 1AF-7 OifferentlalPressure Calculated per NOTE 1 Calculated per 7.1 ~26 Differenual Pressure NOTE 2 (C:orrected (liPcorr)

  • Circle instrument used.
    • 50 to 54 inches water column is equivalent to 50 to 52 gpm IOST~1211 Rev. 16 Page 18 of 261

Attachm.ent 2* Performance Data Sheet 3 of 3 Specific Volume (ft 3/Ibm) For Saturated Liquid Water {ud Temperature Specific Volume Temperature l:s.. peciflc VO~.unne 59 0:.016034 80 I 0.016074 60 0.. =016035 81 0.016076 61 0.016036 82 0.016079 103 62 0.0160:38 83 0.016081 63 0.01603:9 84 105 64 as 66 (t016044 81 67 CL016046 88 109 6*8 0.01.60:48 89 0..0=16097 69 O~01'6050 111 0.0'16110 70 0.016052 11:2 0.016174 11 113 0.016177 7*2 0.016056' 73 0.01605$ 12 1 74 0.016060 95 OJJ*16.115 116 0.016189 75 0.016062 96 117 76 0.016064 1 77 0.016061 98 0.016125 119 0.016201 78 0.Ot6069 120 79 0.016011 tOO 0.016131 0.016209 I Rev. 16 Page 19 of 26 I

Attachment 3 ~ Vibration Data Sheet 1 of 1 IN'STRUCTIONS:

1. If pump vibration data is greater than the Acceptable Range but within the Alert Range:
a. Prepare enE-man or MenlO to the Surveillance Testing Scheduling Coordinator directing the test frequency of the pump to be doubled,
b. Attach a copy of the E-mail or Memo to the test package.
2. If pump vibration data meets the Required Action Criteria:

B. Declare the pump INOPERABLE.

b. Initiate a Condition Report (CR)v F s Vibration ACCEPTANCE :CRITERIA

.location IN/SEC Acceptable Range Alert Range Required Action Axial ~ *J.1Q :s.0.285  :> O~285 to ~ 0.68.4 > O~68*4 Outboard ~. 0.2325 > 0.232'5 to .s:O.558 > O~558 Horizontal l~Gt~3 ) *.. .,.".,.,:;">>,,.,~~, .*,.".~;-.,..

Outboard s O~2775 >ON2775 tos 0.666 > 0,666

/'0

............. ~

Vertical Inboard s O~265 *>O.2.i5Sto*s O~63.6  :> 0:.636 Hortzontat I Vertica' :

{DC( J s O~315 > 0.315 to s 0.70 >0.'70 Inboard

... ". '* . I~G /;1:0

\,

L~~::!~~.* ,_~_~~,_"_"__~~~ . .* . L _ _2~e ~o ~!~

Attachment 4 Valve Test Data M*.

Sheet 1 of 1

_um""''''''''''h -" .",.:,u......*.._.

~ .,. <_,,~. ____. ~. h_

PRETEST FAIL SAFE rosrrssr ALIGNMENT FULL

........ -.......... STROKE TEST

............. TEST ALIGNMENT ACCEPTANCE y",,131TERIA (SEC)

CODE CR.tTERI.A Verification Stroke Time LIMlT1NGVALUE ofT"ravel by (SEC) I OPEN SHUT

'Valve Pretest Ind Lights  : Fail Safe Position Pusttes!

Number Position I:Htt (lNIT) OPEN SHUT: Positlon Verified *Pos.iUon Pos lnit Vert loit Low High Low High OPEN SHUT 1AF-55 Open ffO !fJ l/Pt~fo 1&.1" NIA NtA Open }6=>. :u 14.25 19~28 14,34 19;40 25~15 23.00 1AF...74 Open Aio Aw bb61~~;P~ -e, :0' NlA NIA Open

~ :i) f5~48 20.94 14,84 20.07 27.31 23.00 Comments: .,..".,.....,.,.....- .<<ovm<_'<<"=_ .* " *****.*._.vwm.*..... wm"hwu.

...* *.*.* *.VII' * ...,..._ _*..a* *b*.*.* *.'.* ' ~ "A <<.:...:A.:.:..,_O'<< ".:*.*: ' .....:. b *:**v*.i( * *..**** * * *** ** **

....... ~  ;.;.; ; ;.: ,.; <N._ N .-"...; N .. ~_ _ J'.I'_.+-.-. _ _*_,.v.*.*..I'>............................................................ . . . - ._..-.-'w ~ .....-vvY.y.,..w. ~

~ ..

...-;~-...x<<<<o: -:<;;Xo<<~~ __. _~ cccccccee <.;..OC;"':O:':<_........-_<hV<hV<hV<hV h~AQ;y,;<<o;.y;;oc;.,.; .~.--"..No'N:N NN N~........:<< <<<<'i.<<-;-; ;.; ;*;..:*:.:*;.:.:-:<<.>>: :<< : : -'- <N ~" :.:.-.~.w.r.*.*.* * *** NU *"""""" ......:. ~~.; .."j /vu'**u.* u.*.*.*.*

L?ST~1211 I Rev. 16 I Page 21 0126 1

Attachment 5- Valve Retest Data S'heet Sheet 1 of 2 NOTE: This entire Attachment is N/A if no valve is retested due to exceeding the CodeCrttena.

Determine if the. stroke time exceeds the Limiting Value,

1. If the stroke time exceeds the limlting Value, declare the valve inoperable and initiat.e* aCR~ (NIAifstroke time is less than the LirnltlnqValue) 2.. lfthe stroke time is. less than the Limiting Value.but outside the Code Onteria limits, perform the foUovving :Steps:
8. If the cause is known to be mechanical failure~or if a retest cannot be performed expeditiously, declare the valve inoperable and inJUate a CR(Except PMTRs).
b. If retestlng the valve is desired perform the following:

N:OTE:. If necessary separate markedup sheets of this CST maybe used to document necessary manlpulatlons. sheets would this procedure and noted in the comments Section of Attachment 7.

(1) Determine wbich Ste:ps need to beperfcrrned up conditionstor testing the valve. Unit SeQ concurrence must be obtained and documented in the Comments section of Attachment 7>

(2) Perform the Steps determlned in the previous Ste'p anddocument stroke times/valve positioning on Sheet2.

(3) ~f retest results are still outside the Code Crlteria~declare the valve inoperable and initiate aCR (except Prv1T),

(4) 1f retest results-are Within the Code Criteria perform the .following:

y (a) Dec~are the valve operable.

(b) Inltl~.tea CR. identify1ng test findings for the first and second tests.

(c) Send test results to Responsible Engineer (1ST) for evaluation and docurnentanonon the CR.

IOST-1211 Page 22 of 26 I

Attachment 5 ~ V,alveRetest Data Sheet Sheet 2. of 2 (1) FUI out PRETEST ALIGNMENT POSTT;EST ALIGNMENT, and ACCEPTANCE CRITERIA values for the velvets) being t

tested using the values in the initIal test Attachment,

~~

~~::....;;..;.:.:y:w .':..->>...:***..:. ........ ,-

PRETEST ALIGNMENT (1) F.]J.~l. STROKETt=$T POSTIEST ALIGNMENT (1) ". <<-=<<-x-CO.9.E CRITERIA ACCEPTANCECRJTERIA (SEC) tt}

I I

J Time ~

(SE:C) OPf:N $HVT... LIMITfNG VALUE Pretest

  • \l'a'dve i!'l:\JlnUf.:n

. Posmon tntt: OPEN SHUT Posttest Position Pes lnit Verflnif Low High Low High OPEN I i .StrUT

~

~

I i

~

~

~~11*. ,,_.........:MW ~

... . .... . , _=t Rev. 16 I Page 23 of ~61

Attachment 6*~ Certification and Review Sheet 1 of 2 T:hiS CST was performed as a: Periodic Surveillance Requirement: _~ __

Postmalrrtenance OperabHity Test: _

Redundant SUbsystem Test:

PlantConottlons: Mode:

--~~~~~----------_.............--

OST Compl.etedBy: - ..-..-< Date: ToDAt Time: tq~3(~)

OS.1 . P~.rfofrf1ed Bv:

Initials Name (Print) Initials Name (Print)

General Comments/Recomm:endation/Corrective ActionslExceptions:

I()$T-1211* L Rev. 16 m mJ Page 24 of 26 I

Attachment 6 ~ Certifications and Reviews Sheet 2 of 2-Step 7,1.11 1A..SA AF\'V Pump Inoperable Time: fJ10 t::.

~-~'~"oXA ~v;o;,o ;o;.~

'Tc)J:r-ti Date: :~"X'.xo;:<<  ;~_"_~-o;,"XX..;-

Step 7~1.32 1A-SA AFW Pump Operable- Time:_~__=l-L Date: ~:IJ:fDfft=_

Step 7.2.1.c 1A-SA and 1 B-S-B AFWPump Inoperable Time:tot5 __~ Date: ~Jilt Step 7~2~1,p 1A-SA-and 1B.. SBAFW Pump Operable Time: 1,~;~.,5"" . .- Date: ~JcJtfl~t,~,

Pa.ges Used: Atl~_~~_

CST Completed with NO EXCEPT10NS1EXCEPTIONS:

Reviewed By: Date:

Unit SeQ ResponsibieEngin"eer (1ST)

Reviewed By: Date:

ANn ----

After receiving the final review signature, this OS:T becomes a a-A RECORD and should be submitted to Document Servloes. .

IOST-1211 Revy16

R~.vtsion S~Jmmary General Revision 16 updates the procedure reference to the new 1ST Program Plan, Des9ription o.fChanges

  • Page. Section Ghange Description Ail All Updated revision level.

3 1~O+2 Adde.d check valves 1AF-231 54 92, 11 O~and 73.

1 3 t~O.4 Deleted, 5 2~7.4 HNP-*lST-003, HNP 1ST Program Plan - 3rd tntervat, 8 6+0~1.e~(1 ) Changedacceptancecriterla per calc, (Also cbanqed on Atta'chme*nt2) 8 6~O.1.b Deleted "Parnat'strcke 8 6.Q.1.c Added check valves 1AF-23, 54$ 92 1 110~ and 73.

9 7.1.5 Added check valves 1AF~54,92~ and 73.

11 7+1.24 Added check va'hte1AF-23$110 17 Attachment 2 Added checkvalves 1AF*-23*~541 92, 110 , and 73~

Rev. 16 Page 26 of 26 1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.:

Task

Title:

Given a Declared Emergency, JPM No.: 2008 NRC RO-SRO A3 Determine the Dose Rate, Dose Limit, and the Number of People to Perform a Task.

KJA

Reference:

2.3.4 (2.5/3.1)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant Perform in a location with the general references available or with electronic access to the references.

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • A large break LOCA has occurred.
  • The ECCS is in cold leg recirculation.
  • RHR Pump "8" is running. RHR Pump "A" showed evidence of gas binding and was stopped.
  • A Site Area Emergency (SAE) is in effect.
  • The Emergency Engineering Organization has determined that the RHR Pump "A" should be vented to ensure that a backup is available.
  • The general radiation level in the area is 16 R/hour
  • The OSC estimates that the total task will take. 75 man-hours.
  • The Site Emergency Coordinator has specified that he/she will not authorize an extension to the site emergency workers dose limit for performance of this task.

Task Standard: Number of people and stay times calculated within specified limits.

Required Materials: Calculator HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet General

References:

  • PEP-330, RADIOLOGICAL CONSEQUENCES
  • NGGM-PM-0002, RADIATION CONTROL AND PROTECTION MANUAL Initiating Cue: The site emergency workers listed in the table below are available.

They will be utilized from lowest to highest accumulated TEDE dose.

Using the minimum number of workers possible, DETERMINE:

  • the total number of workers required to perform the task and
  • the maximum stay time for each individual who will be utilized.

Assume no dose in transit and round off to the nearest minute below the limit.

Time Critical Task: NO Validation Time:

HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP N/A HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Determine total estimated dose for the task.

Standard: 16 R/hour x .75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> = 12 Rem Comment:

Performance Step: 2 Determine the dose limit for site emergency workers Standard: Per PEP-330 - Attachment 1: 5 Rem Comment:

~ Performance Step: 3 Determine the number of people required Standard: Workers A, B, and C would have to be used (~) to reach the 12 Rem total estimated dose (4700 + 4450 + 4300 = 13.45)

Comment:

HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION

~ Performance Step: 4 Stay Time for Workers Standard: A: 4.7/16 x 60 minutes = 17 minutes B: 4.55/16 x 60 minutes = 17 minutes C: 4.30/16 x 60 minutes = 16 minutes Comment:

Terminating Cue: After the maximum stay time for the workers to be used is calculated: Evaluation on this JPM is complete.

STOP TIME:

HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC RO-SRO A3 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • A large break LOCA has occurred.
  • The ECCS is in cold leg recirculation.
  • RHR Pump "B" is running. RHR Pump "A" showed evidence of gas binding and was stopped.
  • A Site Area Emergency (SAE) is in effect.
  • The Emergency Engineering Organization has determined that the RHR Pump "A" should be vented to ensure that a backup is available.
  • The general radiation level in the area is 16 R/hour
  • The OSC estimates that the total task will take. 75 man-hours.
  • The Site Emergency Coordinator has specified that he/she will not authorize an extension to the site emergency workers dose limit for performance of this task.

INITIATING CUE: The site emergency workers listed in the table below are available. They will be utilized from lowest to highest accumulated TEDE dose.

Using the minimum number of workers possible, DETERMINE:

  • the total number of workers required to perform the task and
  • the maximum stay time for each individual who will be utilized.

Assume no dose in transit and round off to the nearest minute below the limit.

Site Emergency Worker Accumulated TEDE Dose This Year A 300 mr B 450 mr C 700 mr D 800 mr E 850 mr F 1000 mr G 1050 mr H 1150 mr I 1200 mr J 1300 mr K 1500 mr L 1650 mr HARRIS08 NRC RO-SRO A3 Revision 2 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: HARRIS Task No.: 345001H602 Task

Title:

Evaluate a Change in Conditions on JPM No.: 2008 NRC JPM SRO an Existing EAL A4 KIA

Reference:

2.4.41 (4.1)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: This JPM can be performed in any setting with the required references available.

Simulated Performance: Actual Performance: x Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: See Plant Conditions handout.

Task Standard: Upgrade EAL to GE and correct PAR within required time.

Required Materials: None General

References:

  • PEP-110, EMERGENCY CLASSIFICATION AND PROTECTIVE ACTION RECOMMENDATIONS, Rev. 16
  • PEP-230, CONTROL ROOM OPERATIONS, Rev.14
  • PEP-310, NOTIFICATIONS AND COMMUNICATIONS, Rev. 21 Handouts:
  • Attached Initial Conditions
  • PEP-110
  • PEP-310
  • EP/EAL Guidelines
  • PEP-230, Attachment 1 - SITE EMERGENCY COORDINATOR Initiating Cue: You are the Site Emergency Coordinator. Review the plant conditions handout sheet and determine the current Emergency Action Level (EAL). This is a time critical JPM. The clock starts after you have reviewed the Plant Conditions sheet.

Time Critical Task: YES - 15 minutes to classify then 15 more minutes to make the PAR.

HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

Appendix C Job Performance Measure Form ES-C-1 Worksheet Validation Time: 10 minutes to classify, 12 minutes for PAR/Emergency Notification Form.

HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a ~)

Start Time: _

Performance Step: 1 Evaluate changing conditions.

Standard: Compares conditions against EAL Flowchart criteria.

Evaluator Cue:

  • Provide Initial Conditions sheet (last page of JPM).
  • Provide reference materials if not available in the JPM performance location.

. Comment: Classification Start Time _

-Y Performance Step: 2 Determine EAL.

Standard: Upgrade to GE (2-1-4) required:

  • Fuel Breached - DEI sample> 300 uCi/cc
  • CNMT Jeopardized - Pressure> 3 PSIG Evaluator Note:
  • It may be necessary to cue the PAR performance. The facility normally splits the EAL and the PAR into two JPM's.
  • If the applicant incorrectly classifies then skip to the Evaluator Cue in Performance Step 3.

Comment: Classification End Time/PAR Start Time _

HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION

~ Performance Step: 3 Determine PAR (PEP-230, Attachment 1, Step 10).

Standard: Refers to PEP-110, Attachment 3:

PROTECTIVE ACTION RECOMMENDATION:

  • EVACUATE: 2 mile radius
  • EVACUATE: Subzones A, B, L
  • SHELTER: Subzones C, D, E, F, G, H, I, J, K, M, N Evaluator Cue: The computer program is not available. Hand write a paper copy of the Manual Notification Form in accordance with PEP-230, Attachment 1, Step 11.b.

Comment:

~ Performance Step: 4 Complete the ENF.

Standard: Critical Elements:

  • Block 4: GE
  • Block 4 EAL: 2-1-4
  • Block 5 PAR: Evacuate 2 mile radius and Subzones A, B, L; Shelter Subzones C, D, E, F, G, H, I, J, K,M,N
  • Block 6 Emergency Release: Is Occurring 0
  • Block 9 Wind Direction from: 126
  • Block 10: DECLARATION; Current TIME; Current DATE
  • Block 17: Applicant signature/Title/Current Time/ Current Date
  • Provide form to Communicator Evaluator Note: An ENF KEY is attached, Comment: PAR Notification End Time _

Terminating Cue: After the ENF is handed to the communicator: Evaluation on this JPM is complete.

HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

Appendix C Page 5 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC JPM SRO A4 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

Appendix C Page 6 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: See Plant Conditions handout.

INITIATING CUE: You are the Site Emergency Coordinator. Review the plant conditions handout sheet and determine the current Emergency Action Level (EAL). This is a time critical JPM. The clock starts after you have reviewed the Plant Conditions sheet.

HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET 2008 NRC JPM SRO A4 Plant Conditions

  • The TDAFW Pump is cleared and tagged
  • The RCS leak escalated to a large-break LOCA while the crew was performing PATH-1
  • There is a RED CSF on INTEGRITY
  • The EAL Network was entered at Point X
  • A Site Area Emergency (SAE) is in effect with the RCS breached (EAL 2-1-3) and Containment jeopardized
  • Outside temperature is 62 of
  • Thunderstorms are moving into the area
  • The wind is blowing at 12 MPH from 126 degrees
  • Since the SAE declaration, the following has occurred:
  • Plant computers are down which will require any additional notifications to be done using a manual notification form
  • Off-site power was lost and EDG 1B failed while starting
  • ECCS cold leg recirculation alignment on Train "A" was just completed
  • Containment Pressure is 3.8 PSIG, lowering slowly
  • Containment Area Radiation Monitors are in HIGH alarm, rising slowly
  • Contalnrnent High Range Monitors are rising but not in alarm
  • Plant Vent Stack #1 Monitor is rising slowly but not in alarm
  • Charging Pump "A" Room Monitor went into HIGH alarm after cold leg recirculation was initiated
  • Chemistry has analyzed a sample and reports an Iodine Dose Equivalent RCS concentration of 410 uCilcc HARRIS 2008 NRC SRO A4 Revision 2 NUREG 1021, Revision

tE~

~

Attachment 3 - PROTECTIVE ACTION RECOMMENDATION PROCESS Sheet 1 of 2 No No Fuel Breach)

No (Yes/ due to Res Breach) 2 MliileRadius :5 Miles Downwind Wiind IEvacuaie Shelter Wind Evacuat,e; She-Iter Direction Subzones :Subzooes rn recti 00 Subzones Subzone'S

~From {From 'tfj 34a~

- 010' AB,C,O;H,U<.L E.F~G,J,M.N -

327 0 010=' A,D,I< B"C"E,F,G"H,,1,,J,,L,M,N 01 1° - ~ A1B,C,D,HJ.t'~L E"F"G,J,M.N 011 0 - 05&' A,K B.C"D"E,f,G"H.I"J"L,~,4.N cse- -DIg-:: AB,C,o,tJ,Y~L.M E,F,G.H.N n57° -1?4~ A tUL 8 C"D~E F G_HL.LMN 080~ -, 101~ ~B,C,D,J,I<."L,M E.F~G,.HJ,N -

1251;1 1'91= A,H"L C.D,E"F.G,H,I,J,KM.N I 102(1 -, 124a AFB,C,D,r~l,U E"F"G,HJ.J,N 1920- 214.: A,B C,D,E.F"G,H,tJ,K.LM.N 125~ 14&- AB,C,D,KL,M.Nl E"F~G,HJ.J 215 Cl

-259=' A,B.e D,E"F.G,HJ.J,K.L,MJ~

147c. -, 191'~ AfB,C,D,E~K,LM.t4 F,G"H"I.,-J 2600 - 2B1~ A,e B"D~E,F ,G"H"LJ.,K,l,M,N 192(1 -, 214<: A*B,C,D,E",K,l F,G"H"I,J"M,H -

282c 3(14':' A,C,D B"E,f,G,.H"I"JJ<.LM,N 215 t , - zse- A.B,C,D,E"K,l f,G"HJ"J~M,N 305(1 - 328~ A,D B"C,,E,F,G.,H,,I,,J,,K,LM.N 237 t \ -, 2§9a A,,B,C,D,E.F,,K,l GI'H.tJ..M.N

260(1 - 32& A"B,C,D,F,G.HJ<,l E."I"J"M.N 327 t , - 347(1 A.B,C,D,H,K,L E"F"G.I,J,M.N IPEP-110 Rev. 16 Page 18 of 261

~

Attachment 3 - PROTECTIVE ACTION RECOMMENDATION PROCESS

=

Sheet 2 of 2 Acceptable changes in initial PARS would include expanding evacuation but would not allow a change from evacuation of zones to sheltering of those zones.

1. Indications that substantial core damage is imminent or has occurred include:

a) Core damage> 1°A, melt.

b) Core Exit Thermocouple readings ~ 2300° F.

c) Core uncovered> 30 minutes.

2. Indications that a significant loss of reactor coolant is imminent or has occurred include:

a) Containment radiation reading> 10,000 RlHr without spray or> 4,000 R/Hr with spray.

b) Containment hydrogen gas concentration> 1o.k>.

c) Rapid vessel depressurization.

d) A large break loss of coolant accident.

3. Indications that containment failure (primary or S/G) is imminent or has occurred are indicated by:

a) A release of radioactivity greater than the projected dose of either:

  • 1000 mRem TEDE at or beyond the site boundary.

5000 mRem Thyroid CDE at or beyond the site boundary.

Or a measured dose rate of either:

>1000 mRem/hr at or beyond the site boundary.

1-131 equivalent concentration> 3.9 E-6 IJCi/cc at or beyond the site boundary.

b) Primary containment pressure can not be maintained below design basis pressure of 45 psig.

c) Primary containment H2 gas concentration can not be maintained below combustible limit of 4%

by volume.

d) Faulted/Ruptured S/G with a relief valve open.

4. Accidents which result in a direct release pathway to the environment will most likely be thyroid dose limiting. For a faulted and ruptured S/G, water level must be below the tube bundles (S/G Narrow Range < 25% normal containment conditions or < 40% adverse containment conditions) with a relief valve open before it is considered a direct release pathway to the environment. For circumstances involving a direct release pathway to the environment:

a) Consider any Fuel Breach sufficient to warrant the determination that substantial core damage has occurred.

b) Consider any RCS Breach sufficient to warrant the determination that a significant loss of reactor coolant has occurred.

NOTE: A direct release is defined as a pathway from the containment to any environ-ment outside the containment when containment or system isolation is required due to a safety injection signal, containment pressure greater than 3 psig, or a valid containment ventilation isolation signal and the pathway cannot be isolated from the Main Control Room.

Containment monitors can provide indication of both core damage and RCS breach. Monitor readings used to quantify an amount of damage or coolant leakage should be complimented by other indications and engineering judgment.

If a release is in progress:

  • Perform dose assessment as soon as possible to determine if PAGs are exceeded and if additional Subzones require evacuation.
  • Add any Subzones requiring evacuation as determined by dose assessment to the plant-based PARs.

If no release is in progress:

  • Perform dose projection on possible conditions as time permits to determine if PAGs could be exceeded. Consider adding any Subzones requiring "evacuation as determined by dose projection to the plant-based PARs.

I PEP-110 Rev. 16 Page 19 of 261

1. I Attachment 9 - NUCLEAR POWER PLANT EMERGENCY NOTIFICATION FORM DRILL I§J ACTUAL EVENT rz!::Of MESSAGE #

1

~ N Today 2.1 INITIAL @JFOLLOW-UPNOTIFICATION:TIME ow DATE_ _/_ _/_ _ AUTHENTICATION # _

3. SITE: HNP Confirmation Phone # (_ _) _
4. EMERGENCY CLASSIFICATION:

~ UNUSUAL EVENT I§I ALERT 19 SITE AREA EMERGENCY

  • GENERAL EMERGENCY BASED ON EAL # 2 4 EAL DESCRIPTION: 3 FPBs Breached/ Jeopardized
5. PROTECTIVE ACTION RECOMMENDATIONS: ~ NONE IEVACUATE 2 mile radius and Subzones A,B,L ISHELTER Subzones C,D,E,F,G,H,I,J,K,M,N IQI CONSIDER THE USE OF KI (POTASSIUM IODIDE) IN ACCORDANCE WITH STATE PLANS AND POLICY.

I§ OTHER _

6. EMERGENCY RELEASE: ~None I Is Occurring 19 Has Occurred
7. RELEASE SIGNIFICANCE: ri\I Not applicable I!j B Within limits normal operating Above normal operating limits I Under evaluation
8. EVENT PROGNOSIS: ~ Improving I Stable 19 Degrading
9. METEOROLOGICAL DATA: Wind Direction* from 126 degrees Wind Speed* 12 mph

(*Not Requiredfor Initial Notifications) Precipitation* Stability Class* ~ I§J 19 (QJ I§ lEI I§I

10. I DECLARATION I§J TERMINATION Time Date / / _

(Enters Current Date and Time)

11. AFFECTED UNIT(S): * [J [I I6ill
12. UNIT STATUS: I U1 _0_0/0 Power Shutdown at Time Date _ /_ _/ _

(Unaffected Unit(s) Status Not Required for Initial Notifications) ~ U2 _ _% Power Shutdown at Time Date _ /_ _/ _

§ U3 _ _0/0 Power Shutdown at Time Date _ /_ _/ _

13. REMARKS: _

FOLLOW-UP INFORMATION (Lines 14 through 16 Not Required for Initial Notifications)

EMERGENCY RELEASE DATA. NOT REQUIRED IF LINE 6 A IS SELECTED.

14. RELEASE CHARACTERIZATION: TYPE: ~ Elevated I§I Mixed 19 Ground UNITS: ~ Ci I§J Ci/sec 19 ~Ci/sec MAGNITUDE: Noble Gases: lodines: Particulates: Other: _

FORM: ~ Airborne Start Time _ _ _ _ Date _ /_ _/__Stop Time _ Date _ /_ _/__

I§J Liquid Start Time _ _ _ _ Date _ /_ _/__Stop Time _ Date _ /_ _/__

15. PROJECTION PARAMETERS: Projection period: Hours Estimated Release Duration Hours Projection performed: Time Date _ /_ _/__
16. PROJECTED DOSE: DISTANCE TEDE (mrem) Adult Thyroid CDE (mrem)

Site boundary 2 Miles 5 Miles 10 Miles

17. APPROVED BY: (Sign and Date) Title Time Date_/_ _/__

NOTIFIED RECEIVED BY: BY: Time Date / /

I PEP-310 I Rev. 21 Page 33 of 51 I