| title = 2011/03/28 Watts Bar 2 OL - TVA Letter to Nrc_Submittal of Pre-op Test Instruction 2-PTI-067-02-B
| title = OL - TVA Letter to Nrc_Submittal of Pre-op Test Instruction 2-PTI-067-02-B
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
{{#Wiki_filter:WBN2Public Resource From:                   Boyd, Desiree L [dlboyd@tva.gov]
Sent: Monday, March 28, 2011 5:08 AM To: Epperson, Dan; Poole, Justin; Raghavan, Rags; Milano, Patrick; Campbell, Stephen Cc: Crouch, William D; Boyd, Desiree L; Hamill, Carol L; Elton, Thomas L
Sent:                   Monday, March 28, 2011 5:08 AM To:                     Epperson, Dan; Poole, Justin; Raghavan, Rags; Milano, Patrick; Campbell, Stephen Cc:                     Crouch, William D; Boyd, Desiree L; Hamill, Carol L; Elton, Thomas L


==Subject:==
==Subject:==
TVA letter to NRC_Submittal of Pre-op Test Instruction 2-PTI-067-02-B Attachments:
TVA letter to NRC_Submittal of Pre-op Test Instruction 2-PTI-067-02-B Attachments:             Submittal of Pre-op Test Instruction 2-PTI-067-02-B_Final.pdf Please see attached TVA letter that was sent to the NRC today.
Submittal of Pre-op Test Instruction 2-PTI-067-02-B_Final.pdf PleaseseeattachedTVAletterthatwassenttotheNRCtoday.
Thank You,
ThankYou, ~*~*~*~*~*~*~*~*~*~*~*~*~*~*~Désireé L. Boyd WBN2LicensingSupportSunTechnicalServicesdlboyd@tva.gov4233658764~*~*~*~*~*~*~*~*~*~*~*~*~*~*~
~*~*~*~*~*~*~*~*~*~*~*~*~*~*~
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 318   Mail Envelope Properties   (7AB41F650F76BD44B5BCAB7C0CCABFAF1D040697)
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 4233658764
~*~*~*~*~*~*~*~*~*~*~*~*~*~*~
1
 
Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           318 Mail Envelope Properties       (7AB41F650F76BD44B5BCAB7C0CCABFAF1D040697)


==Subject:==
==Subject:==
TVA letter to NRC_Submittal of Pre-op Test Instruction 2-PTI-067-02-B Sent Date:   3/28/2011 5:08:24 AM Received Date: 3/28/2011 5:08:45 AM From:   Boyd, Desiree L Created By:   dlboyd@tva.gov Recipients:     "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
TVA letter to NRC_Submittal of Pre-op Test Instruction 2-PTI-067-02-B Sent Date:               3/28/2011 5:08:24 AM Received Date:           3/28/2011 5:08:45 AM From:                   Boyd, Desiree L Created By:             dlboyd@tva.gov Recipients:
Tracking Status: None "Hamill, Carol L" <clhamill@tva.gov> Tracking Status: None "Elton, Thomas L" <tlelton@tva.gov> Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov> Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
"Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> Tracking Status: None Post Office:   TVANUCXVS2.main.tva.gov
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
 
Tracking Status: None "Hamill, Carol L" <clhamill@tva.gov>
Files     Size     Date & Time MESSAGE   326     3/28/2011 5:08:45 AM Submittal of Pre-op Test Instruction 2-PTI-067-02-B_Final.pdf   1481657 Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:      
Tracking Status: None "Elton, Thomas L" <tlelton@tva.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None Post Office:             TVANUCXVS2.main.tva.gov Files                           Size                     Date & Time MESSAGE                         326                     3/28/2011 5:08:45 AM Submittal of Pre-op Test Instruction 2-PTI-067-02-B_Final.pdf                   1481657 Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:


U.S. Nuclear Regulatory Commission Page 2 March 25, 2011 bcc (Enclosure):
U.S. Nuclear Regulatory Commission Page 2 March 25, 2011 bcc (Enclosure):
Stephen Campbell  
Stephen Campbell U.S. Nuclear Regulatory Commission MS 08H4A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Charles Casto, Deputy Regional Administrator for Construction U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257
 
U.S. Nuclear Regulatory Commission  
 
MS 08H4A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738  
 
Charles Casto, Deputy Regional Administrator for Construction U. S. Nuclear Regulatory Commission Region II Marquis One Tower  
 
245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257  
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 3 of 204
 
Table of Contents
 
==1.0 INTRODUCTION==
 
.......................................................................................................... 5 1.1 Test Ob jectives ...........................................................................................................
.. 5 1.2 Scope
............................................................................................................................ 5


==2.0 REFERENCES==
WBN                ERCW SYSTEM FLOW BALANCE                                        2-PTI-067-02-B Unit 1 & 2                                  TRAIN B                                  Rev. 0000 Page 3 of 204 Table of Contents


............................................................................................................. 5 2.1 Performance References .............................................................................................. 5 2.2 Developmental References
==1.0  INTRODUCTION==
........................................................................................... 5 3.0 PRECAUTIONS AND LIMITATIONS ......................................................................... 12 4.0 PREREQUISITE ACTIONS ........................................................................................ 15 4.1 Preliminary Actions ..................................................................................................... 1 5 4.2 Special Tools, Measuring and Test Equipment, Parts, and Supplies. ......................... 18 4.3 Field Pre parations .......................................................................................................
.......................................................................................................... 5 1.1   Test Objectives ............................................................................................................. 5 1.2   Scope............................................................................................................................ 5
18 4.4 Approvals and Notifications ........................................................................................ 28 5.0 ACCEPTANCE CRITERIA
......................................................................................... 28 6.0 PERFORMANCE
........................................................................................................ 35 6.1 Prerequisites .............................................................................................................
.. 35 6.2 UNIT 1 NORMAL PWR - UNI T 2 NORMAL ALIGNMENT .......................................... 40 6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC ............................................... 47 6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN ............................................... 55 6.5 UNIT 1 HOT SHUTDOWN -
UNIT 2 STARTUP .......................................................... 63 7.0 POST-PERFORMANCE ACTIVITIES ........................................................................ 67 8.0 RECO RDS ..................................................................................................................
80 8.1 QA Re cords ................................................................................................................ 80 8.2 Non-QA Records ........................................................................................................ 80 Appendix A: TEST INSTRUCTIONS REFERENCE REVIEW
......................................... 81 Appendix B: TEMPORARY CONDITION LOG ............................................................... 82 Appendix C: PERMANENT PLANT INSTRUMENTATION LOG .................................... 83 WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 4 of 204


Table of Contents (continued) Appendix D: SWITCH LINEUP ....................................................................................... 87 Appendix E: TRAIN B FLOW ELEMENT TEMPORARY TUBING ................................. 96 Appendix F: CALCULATION INFORMATION SHEET ................................................. 100 Appendix G: CALCULATION FLOW ELEMENT CONSTANTS
==2.0  REFERENCES==
................................... 101 Appendix H: COMMON TRAIN FLOW ELEMENT TEMPORARY TUBING ................. 103 Appendix I: FLOW BALANCE INSTRUCTIONS
............................................................................................................. 5 2.1  Performance References .............................................................................................. 5 2.2  Developmental References........................................................................................... 5 3.0  PRECAUTIONS AND LIMITATIONS ......................................................................... 12 4.0  PREREQUISITE ACTIONS ........................................................................................ 15 4.1  Preliminary Actions ..................................................................................................... 15 4.2  Special Tools, Measuring and Test Equipment, Parts, and Supplies. ......................... 18 4.3  Field Preparations ....................................................................................................... 18 4.4  Approvals and Notifications ........................................................................................ 28 5.0  ACCEPTANCE CRITERIA ......................................................................................... 28 6.0  PERFORMANCE ........................................................................................................ 35 6.1   Prerequisites ............................................................................................................... 35 6.2  UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT .......................................... 40 6.3  UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC ............................................... 47 6.4  UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN ............................................... 55 6.5  UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP .......................................................... 63 7.0  POST-PERFORMANCE ACTIVITIES ........................................................................ 67 8.0  RECORDS .................................................................................................................. 80 8.1   QA Records ................................................................................................................ 80 8.2   Non-QA Records ........................................................................................................ 80 Appendix A:     TEST INSTRUCTIONS REFERENCE REVIEW......................................... 81 Appendix B:      TEMPORARY CONDITION LOG ............................................................... 82 Appendix C:      PERMANENT PLANT INSTRUMENTATION LOG .................................... 83
......................................................... 105 Data Sheet 1: TRAIN B - UNIT 1 NO RMAL - UNIT 2 NORMAL MODE ......................... 107 Data Sheet 2: TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC ................................ 119 Data Sheet 3: TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN) ............................... 131 Data Sheet 4: U-1 HOT SHUTDOWN, - U-2 STARTUP ................................................. 141 Data Sheet 5: TRAIN B THRO TTLE VALVE SETPOINTS ............................................. 154 Data Sheet 6: PUMP DATA -U1 COLD SHUTDOWN, U-2 LOCA-RECIRC ................... 158 Data Sheet 7: PUMP DATA - U1 LOCA-RECIRC, U-2 COLD SHUTDOWN .................. 160 Checklist 1: SUPPLY HEADER 2B POWER ALIGNMENT ......................................... 162 Checklist 2: B - TRAIN POWER CHECKLIST
............................................................. 163 Checklist 3: SUPPLY HDR 1B VALVE ALIGNMENT .................................................. 168 Checklist 4: SUPPLY HDR 2B VALVE ALIGNMENT .................................................. 189


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 5 of 204  
WBN           ERCW SYSTEM FLOW BALANCE                           2-PTI-067-02-B Unit 1 & 2                  TRAIN B                                  Rev. 0000 Page 4 of 204 Table of Contents (continued)
Appendix D:    SWITCH LINEUP ....................................................................................... 87 Appendix E:    TRAIN B FLOW ELEMENT TEMPORARY TUBING ................................. 96 Appendix F:    CALCULATION INFORMATION SHEET ................................................. 100 Appendix G:    CALCULATION FLOW ELEMENT CONSTANTS ................................... 101 Appendix H:    COMMON TRAIN FLOW ELEMENT TEMPORARY TUBING ................. 103 Appendix I:    FLOW BALANCE INSTRUCTIONS ......................................................... 105 Data Sheet 1:  TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE ......................... 107 Data Sheet 2:  TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC ................................ 119 Data Sheet 3:  TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN) ............................... 131 Data Sheet 4:  U-1 HOT SHUTDOWN, - U-2 STARTUP ................................................. 141 Data Sheet 5:  TRAIN B THROTTLE VALVE SETPOINTS ............................................. 154 Data Sheet 6:  PUMP DATA -U1 COLD SHUTDOWN, U-2 LOCA-RECIRC ................... 158 Data Sheet 7:  PUMP DATA - U1 LOCA-RECIRC, U-2 COLD SHUTDOWN .................. 160 Checklist 1:  SUPPLY HEADER 2B POWER ALIGNMENT ......................................... 162 Checklist 2:  B - TRAIN POWER CHECKLIST ............................................................. 163 Checklist 3:  SUPPLY HDR 1B VALVE ALIGNMENT .................................................. 168 Checklist 4:  SUPPLY HDR 2B VALVE ALIGNMENT .................................................. 189


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                        TRAIN B                    Rev. 0000 Page 5 of 204 Data Package: Page ____ of ____                                       Date ________


==1.0 INTRODUCTION==
==1.0     INTRODUCTION==
1.1 Test Objectives The purpose of this test is to verify proper flow balancing of the Essential Raw Cooling Water System (ERCW), Train B, for combined Unit 1 and Unit 2 operation.
ERCW components will be observed for any obvious excessive vibration during steady state flow conditions. The system boundary for this test includes the piping, instrumentation, valves and heat exchangers of both Unit 1 and Unit 2. Flow rates


will primarily be monitored via electronic flow measurement devices, although use of  
1.1    Test Objectives The purpose of this test is to verify proper flow balancing of the Essential Raw Cooling Water System (ERCW), Train B, for combined Unit 1 and Unit 2 operation.
 
ERCW components will be observed for any obvious excessive vibration during steady state flow conditions. The system boundary for this test includes the piping, instrumentation, valves and heat exchangers of both Unit 1 and Unit 2. Flow rates will primarily be monitored via electronic flow measurement devices, although use of dp gauges is permissible as determined by the applicable test engineer.
dp gauges is permissible as determined by the applicable test engineer.
1.2     Scope A. Two ERCW pumps on Train B provide design flow to all applicable components under the following conditions:
1.2 Scope A. Two ERCW pumps on Train B provide design flow to all applicable components under the following conditions: 1. Unit 1 Normal Operating Mode, Unit 2 Normal Operating Mode
: 1. Unit 1 Normal Operating Mode, Unit 2 Normal Operating Mode
: 2. Unit 1 Cold Shutdown, Unit 2 LOCA RECIRC
: 2. Unit 1 Cold Shutdown, Unit 2 LOCA RECIRC
: 3. Unit 1 LOCA RECIRC, Unit 2 Cold Shutdown
: 3. Unit 1 LOCA RECIRC, Unit 2 Cold Shutdown
: 4. Unit 1 Hot Shutdown, Unit 2 Startup B. CCS Heat Exchangers bypass anticavitation valves will be tested for reduction of system piping vibration.  
: 4. Unit 1 Hot Shutdown, Unit 2 Startup B. CCS Heat Exchangers bypass anticavitation valves will be tested for reduction of system piping vibration.


==2.0 REFERENCES==
==2.0     REFERENCES==
2.1 Performance References A. SMP-9.0, Conduct of Test 2.2 Developmental References A. Final Safety Analysis Report 1. FSAR - Amendment 103 a. Section 9.2.1, Essential Raw Cooling Water
: b. Table 14.2-1, Sheets 4 and 5 of 89 WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 6 of 204


Data Package: Page ____ of ____    Date ________
2.1    Performance References A. SMP-9.0, Conduct of Test 2.2    Developmental References A. Final Safety Analysis Report
: 1. FSAR - Amendment 103
: a. Section 9.2.1, Essential Raw Cooling Water
: b. Table 14.2-1, Sheets 4 and 5 of 89


2.2 Developmental References (continued)  
WBN            ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 6 of 204 Data Package: Page ____ of ____                                Date ________
2.2     Developmental References (continued)
B. Drawings
: 1. Flow Drawings
: a. 1-47W845-1 Rev 57, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 56341-001 Rev 0
: b. 1-47W845-2 Rev 76, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 55992-40 Rev 0 (2) 55992-41 Rev 0 (3) 55992-42 Rev 0 (4) 55992-43 Rev 0 (5) 53545-02-25 Rev 0 (6) 53545-02-26 Rev 0
: c. 2-47W845-2 Rev 0, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 52796-195 Rev 0
: d. 1-47W845-3 Rev 25, Series Mechanical Flow Diagram, Essential Raw Cooling Water
: e. 2-47W845-3 Rev 1, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 52796-001 Rev 0 (2) 52796-002 Rev 2 (3) 53817-008 Rev 0 (4) 53817-009 Rev 0 (5) 53817-010 Rev 0 (6) 53817-011 Rev 0


B. Drawings 1. Flow Drawings a. 1-47W845-1 Rev 57, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 56341-001 Rev 0 b. 1-47W845-2 Rev 76, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 55992-40 Rev 0 (2) 55992-41 Rev 0 (3) 55992-42 Rev 0 (4) 55992-43 Rev 0 (5) 53545-02-25 Rev 0 (6) 53545-02-26 Rev 0 c. 2-47W845-2 Rev 0, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 52796-195 Rev 0 d. 1-47W845-3 Rev 25, Series Mechanical Flow Diagram, Essential Raw Cooling Water e. 2-47W845-3 Rev 1, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 52796-001 Rev 0 (2) 52796-002 Rev 2 (3) 53817-008 Rev 0 (4) 53817-009 Rev 0 (5) 53817-010 Rev 0 (6) 53817-011 Rev 0 WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 7 of 204
WBN          ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                  TRAIN B                  Rev. 0000 Page 7 of 204 Data Package: Page ____ of ____                              Date ________
2.2    Developmental References (continued)
(7) 53817-014 Rev 0 (8) 53817-018 Rev 0 (9) 53817-020 Rev 0 (10) 54903-011 Rev 0 (11) 54903-012 Rev 0 (12) 54903-014 Rev 0 (13) 53545-01-032 Rev 1
: f. 1-47W845-4 Rev 32, Series Mechanical Flow Diagram, Essential Raw Cooling Water
: g. 2-47W845-4 Rev 0, Series Mechanical Flow Diagram, Essential Raw Cooling Water
: h. 1-47W845-5 Rev 38, Series Mechanical Flow Diagram, Essential Raw Cooling Water
: i. 2-47W845-5 Rev 1, Series Mechanical Flow Diagram, Essential Raw Cooling Water
: j. 1-47W845-7 Rev 18, Series Mechanical Flow Diagram, Essential Raw Cooling Water
: k. 2-47W845-7 Rev 0, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 52764-004 Rev 0 (2) 52764-007 Rev 0 (3) 52764-009 Rev 0 (4) 52764-011 Rev 0 (5) 52764-015 Rev 0 (6) 52764-016 Rev 0 (7) 52764-017 Rev 0


Data Package:  Page ____ of ____    Date ________
WBN           ERCW SYSTEM FLOW BALANCE               2-PTI-067-02-B Unit 1 & 2                  TRAIN B                    Rev. 0000 Page 8 of 204 Data Package: Page ____ of ____                                 Date ________
 
2.2     Developmental References (continued)
2.2 Developmental References (continued)
(8) 53817-013 Rev 0 (9) 53986-042 Rev 0 (10) 53986-044 Rev 0 (11) 53986-046 Rev 0 (12) 54923-351 Rev 0
 
: l. 2-47W848-5 Rev 1, Mechanical Flow Diagram Control Air (1) 53276-304 Rev 0
(7) 53817-014 Rev 0 (8) 53817-018 Rev 0 (9) 53817-020 Rev 0 (10) 54903-011 Rev 0 (11) 54903-012 Rev 0 (12) 54903-014 Rev 0 (13) 53545-01-032 Rev 1 f. 1-47W845-4 Rev 32, Series Mechanical Flow Diagram, Essential Raw Cooling Water g. 2-47W845-4 Rev 0, Series Mechanical Flow Diagram, Essential Raw Cooling Water h. 1-47W845-5 Rev 38, Series Mechanical Flow Diagram, Essential Raw Cooling Water i. 2-47W845-5 Rev 1, Series Mechanical Flow Diagram, Essential Raw Cooling Water j. 1-47W845-7 Rev 18, Series Mechanical Flow Diagram, Essential Raw Cooling Water k. 2-47W845-7 Rev 0, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 52764-004 Rev 0 (2) 52764-007 Rev 0 (3) 52764-009 Rev 0 (4) 52764-011 Rev 0 (5) 52764-015 Rev 0 (6) 52764-016 Rev 0 (7) 52764-017 Rev 0 WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 8 of 204  
: m. 1-47W848-9 Rev 15, Mechanical Flow Diagram Control Air
 
Data Package: Page ____ of ____     Date ________  
 
2.2 Developmental References (continued)  
 
(8) 53817-013 Rev 0 (9) 53986-042 Rev 0 (10) 53986-044 Rev 0 (11) 53986-046 Rev 0 (12) 54923-351 Rev 0 l. 2-47W848-5 Rev 1, Mechanical Flow Diagram Control Air (1) 53276-304 Rev 0 m. 1-47W848-9 Rev 15, Mechanical Flow Diagram Control Air
: n. 2-47W848-9 Rev 1, Mechanical Flow Diagram Control Air (1) 53276-306 Rev 0 (2) 53340-001 Rev 0 (3) 53917-57 Rev 0
: n. 2-47W848-9 Rev 1, Mechanical Flow Diagram Control Air (1) 53276-306 Rev 0 (2) 53340-001 Rev 0 (3) 53917-57 Rev 0
: 2. Control a. 1-47W610-67-1 Rev 27, Electrical Control Diagram, ERCW System
: 2. Control
: b. 1-47W610-67-1A Rev 16, Electrical Control Diagram, ERCW System (1) 52376-08-008 Rev 0 (2) 52376-08-009 Rev 0 (3) 52376-08-010 Rev 0 (4) 52376-11-011 Rev 0 (5) 53111-06-047 Rev 0 c. 1-47W610-67-2 Rev 17, Electrical Control Diagram, ERCW System
: a. 1-47W610-67-1 Rev 27, Electrical Control Diagram, ERCW System
: d. 2-47W610-67-2 Rev 1, Electrical Control Diagram, ERCW System (1) 52796-005 Rev 0 WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 9 of 204
: b. 1-47W610-67-1A Rev 16, Electrical Control Diagram, ERCW System (1) 52376-08-008 Rev 0 (2) 52376-08-009 Rev 0 (3) 52376-08-010 Rev 0 (4) 52376-11-011 Rev 0 (5) 53111-06-047 Rev 0
 
: c. 1-47W610-67-2 Rev 17, Electrical Control Diagram, ERCW System
Data Package:  Page ____ of ____    Date ________
: d. 2-47W610-67-2 Rev 1, Electrical Control Diagram, ERCW System (1) 52796-005 Rev 0


2.2 Developmental References (continued)  
WBN          ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2                  TRAIN B      Rev. 0000 Page 9 of 204 Data Package: Page ____ of ____                  Date ________
2.2     Developmental References (continued)
(2) 52796-006 Rev 0 (3) 53649-103 Rev 0 (4) 53649-105 Rev 0 (5) 53746-104 Rev 0 (6) 53746-105 Rev 0 (7) 53746-106 Rev 0 (8) 53746-107 Rev 0 (9) 53746-110 Rev 0 (10) 53746-111 Rev 0 (11) 53746-114 Rev 0 (12) 53746-115 Rev 0 (13) 53986-003 Rev 0 (14) 53986-004 Rev 0 (15) 54039-045 Rev 0 (16) 54039-046 Rev 0 (17) 54039-047 Rev 0 (18) 54039-048 Rev 0 (19) 54039-050 Rev 0 (20) 54850-027 Rev 0 (21) 54850-028 Rev 0 (22) 54850-032 Rev 0 (23) 54850-031 Rev 0


(2) 52796-006 Rev 0 (3) 53649-103 Rev 0 (4) 53649-105 Rev 0 (5) 53746-104 Rev 0 (6) 53746-105 Rev 0 (7) 53746-106 Rev 0 (8) 53746-107 Rev 0 (9) 53746-110 Rev 0 (10) 53746-111 Rev 0 (11) 53746-114 Rev 0 (12) 53746-115 Rev 0 (13) 53986-003 Rev 0 (14) 53986-004 Rev 0 (15) 54039-045 Rev 0 (16) 54039-046 Rev 0 (17) 54039-047 Rev 0 (18) 54039-048 Rev 0 (19) 54039-050 Rev 0 (20) 54850-027 Rev 0 (21) 54850-028 Rev 0 (22) 54850-032 Rev 0 (23) 54850-031 Rev 0 WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 10 of 204
WBN          ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                  TRAIN B                    Rev. 0000 Page 10 of 204 Data Package: Page ____ of ____                                  Date ________
2.2    Developmental References (continued)
: e. 1-47W610-67-2A Rev 8, Electrical Control Diagram, ERCW System (1) 55802-004 Rev 0 (2) 55050-566 Rev 0
: f. 1-47W610-67-3 Rev 13, Electrical Control Diagram, ERCW System
: g. 2-47W610-67-3 Rev 3, Electrical Control Diagram, ERCW System (1) 53817-031 Rev 0 (2) 53545-01-055 Rev 0 (3) 54039-053 Rev 0 (4) 54039-054 Rev 0 (5) 54039-057 Rev 1 (6) 54039-058 Rev 1 (7) 54039-060 Rev 0 (8) 53643-011 Rev 0 (9) 53643-012 Rev 0 (10) 54903-314 Rev 0
: h. 1-47W610-67-3A Rev 7,Electrical Control Diagram, ERCW System (1) 53545-01-051 Rev 0 (2) 53545-01-053 Rev 0
: i. 1-47W610-67-4 Rev 17, Electrical Control Diagram, ERCW System
: j. 2-47W610-67-4 Rev 0,Electrical Control Diagram, ERCW System
: 3. Electrical
: a. 2-45W751-4 Rev 0, Electrical Power Supplies, RMOV 2A2-A
: b. 2-45W751-5 Rev 0, Electrical Power Supplies, RMOV 2A2-A


Data Package: Page ____ of ____     Date ________  
WBN            ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                  TRAIN B                    Rev. 0000 Page 11 of 204 Data Package: Page ____ of ____                                 Date ________
2.2    Developmental References (continued)
(1) 53746-52 Rev 0 (2) 53817-71 Rev 0 (3) 53817-72 Rev 0 (4) 53288-82 Rev 0 (5) 54850-176 Rev 0 (6) 54850-177 Rev 0
: c. 2-45W751-10 Rev 2, Electrical Power Supplies, RMOV 2B-2B (1) 53270-9 Rev 1 (2) 53817-73 Rev 0 (3) 53817-76 Rev 0 (4) 53986-11 Rev 0 (5) 53293-70 Rev 0 (6) 53554-1 Rev 0 (7) 53554-2 Rev 0 (8) 54850-178 Rev 0 (9) 54903-249 Rev 0
: d. 2-45W751-11 Rev 0, Electrical Power Supplies, RMOV 2B2-B (1) 53817-74 Rev 0 (2) 53986-12 Rev 0 (3) 53293-71 Rev 0 (4) 54850-179 Rev 0 C. Documents
: 1. N3-67-4002 System Description for Essential Raw Cooling Water System, Rev 25


2.2 Developmental References (continued)
WBN               ERCW SYSTEM FLOW BALANCE                 2-PTI-067-02-B Unit 1 & 2                       TRAIN B                   Rev. 0000 Page 12 of 204 Data Package: Page ____ of ____                                         Date ________
: e. 1-47W610-67-2A Rev 8, Electrical Control Diagram, ERCW System (1) 55802-004 Rev 0 (2) 55050-566 Rev 0 f. 1-47W610-67-3 Rev 13, Electrical Control Diagram, ERCW System
2.2     Developmental References (continued)
: g. 2-47W610-67-3 Rev 3, Electrical Control Diagram, ERCW System (1) 53817-031 Rev 0 (2) 53545-01-055 Rev 0 (3) 54039-053 Rev 0 (4) 54039-054 Rev 0 (5) 54039-057 Rev 1 (6) 54039-058 Rev 1 (7) 54039-060 Rev 0 (8) 53643-011 Rev 0 (9) 53643-012 Rev 0 (10) 54903-314 Rev 0 h. 1-47W610-67-3A Rev 7,Electrical Control Diagram, ERCW System (1) 53545-01-051 Rev 0 (2) 53545-01-053 Rev 0 i. 1-47W610-67-4 Rev 17, Electrical Control Diagram, ERCW System j. 2-47W610-67-4 Rev 0,Electrical Control Diagram, ERCW System
: 2. 2-TSD-67, Essential Raw Cooling Water System, Rev 1
: 3. Electrical a. 2-45W751-4 Rev 0, Electrical Power Supplies, RMOV 2A2-A
: 3. SOI-67.1, Essential Raw Cooling Water System Operating Instruction, Draft Rev 0000
: b. 2-45W751-5 Rev 0, Electrical Power Supplies, RMOV 2A2-A WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 11 of 204
: 4. GOI-7, Rev 0038, Generic Equipment Operating Guidelines
 
: 5. VTD-M359-003 Rev 0, Valve Technical Manual for Metrex Model FTVA-400-WAT 4 2 War Refrigerant Pressure Activated Condenser Cooling Water Control Valve.
Data Package:  Page ____ of ____    Date ________
: 6. 1-SOI-30.05, Auxiliary Building HVAC Systems, Rev 0050
 
2.2 Developmental References (continued)
 
(1) 53746-52 Rev 0 (2) 53817-71 Rev 0 (3) 53817-72 Rev 0 (4) 53288-82 Rev 0 (5) 54850-176 Rev 0 (6) 54850-177 Rev 0 c. 2-45W751-10 Rev 2, Electrical Power Supplies, RMOV 2B-2B (1) 53270-9 Rev 1 (2) 53817-73 Rev 0 (3) 53817-76 Rev 0 (4) 53986-11 Rev 0 (5) 53293-70 Rev 0 (6) 53554-1 Rev 0 (7) 53554-2 Rev 0 (8) 54850-178 Rev 0 (9) 54903-249 Rev 0 d. 2-45W751-11 Rev 0, Electrical Power Supplies, RMOV 2B2-B (1) 53817-74 Rev 0 (2) 53986-12 Rev 0 (3) 53293-71 Rev 0 (4) 54850-179 Rev 0 C. Documents 1. N3-67-4002 System Description for Essential Raw Cooling Water System, Rev 25 WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 12 of 204  
 
Data Package: Page ____ of ____     Date ________  
 
2.2 Developmental References (continued)
: 2. 2-TSD-67, Essential Raw Cooling Water System, Rev 1 3. SOI-67.1, Essential Raw Cooling Water System Operating Instruction, Draft Rev 0000 4. GOI-7, Rev 0038, Generic Equipment Operating Guidelines
: 5. VTD-M359-003 Rev 0, Valve Technical Manual for Metrex Model FTVA-400-WAT 4 2 War Refrigerant Pressure Activated Condenser Cooling Water Control Valve. 6. 1-SOI-30.05, Auxiliary Building HVAC Systems, Rev 0050
: 7. 0-PI-OPS-17.0, 18 Month Locked Valve Verification Rev 0044
: 7. 0-PI-OPS-17.0, 18 Month Locked Valve Verification Rev 0044
: 8. Primary Orifice Plate Calculation for 1,2-FE-67-62 and 1,2-FE-67-61 (T71 101008 804) 3.0 PRECAUTIONS AND LIMITATIONS A. This PTI should be performed with U-1 WBN in Modes 5, 6 (or no mode core unloaded) and no fuel loaded in U-2 Reactor. Appropriate risk management must be performed to allow testing on protected equipment. B. Standard precautions shall be followed for working around energized electrical equipment in accordance with TVA Safety Manual Procedure 1021. C. Discrepancies between component ID tags and the description in a procedure/instruction if the UNIDs match, exclusive of place keeping zeros and train designators (e.g.; 2-HS-31-468 vs. 2-HS-031-0468) and the noun description is sufficient to identify the component. This condition does not  
: 8. Primary Orifice Plate Calculation for 1,2-FE-67-62 and 1,2-FE-67-61 (T71 101008 804) 3.0     PRECAUTIONS AND LIMITATIONS A. This PTI should be performed with U-1 WBN in Modes 5, 6 (or no mode core unloaded) and no fuel loaded in U-2 Reactor. Appropriate risk management must be performed to allow testing on protected equipment.
 
B. Standard precautions shall be followed for working around energized electrical equipment in accordance with TVA Safety Manual Procedure 1021.
require a TDN in accordance SMP-14.0. If the component label needs to be changed, a Tag Request Form (TR Card) should be processed in accordance  
C. Discrepancies between component ID tags and the description in a procedure/instruction if the UNIDs match, exclusive of place keeping zeros and train designators (e.g.; 2-HS-31-468 vs. 2-HS-031-0468) and the noun description is sufficient to identify the component. This condition does not require a TDN in accordance SMP-14.0. If the component label needs to be changed, a Tag Request Form (TR Card) should be processed in accordance with TI-12.14. Make an entry in the CTL and continue testing.
 
D. Steps may be repeated if all components cannot be tested in a step. However, if the test has been exited, prerequisite steps must be re-verified and a Chronological Test Log (CTL) entry made.
with TI-12.14. Make an entry in the CTL and continue testing. D. Steps may be repeated if all components cannot be tested in a step. However, if the test has been exited, prerequisite steps must be re-verified and a  
 
Chronological Test Log (CTL) entry made.
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 13 of 204


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                        TRAIN B                      Rev. 0000 Page 13 of 204 Data Package: Page ____ of ____                                           Date ________
3.0    PRECAUTIONS AND LIMITATIONS (continued)
E. Component tags and labels may differ slightly (abbreviations, punctuation, letter case, etc.) from the description given in this test. If this situation occurs, it shall not be considered a test deficiency or procedure deviation. It shall be documented in the CTL and reconciled by way of a plant labeling request or drawing discrepancy or single-line date typo change in the procedure as appropriate.
F. To maintain the operating pressures in the Header to within design limits during low flow conditions DO NOT exceed 133 psig at 0-PT-67-17, ERCW HEADER B PRESS, or 0-PT-67-18, ERCW HEADER A PRESS.
G. Equipment shall be operated in accordance with applicable instructions.
H. The following motor operating and starting limitations for the Essential Raw Cooling Water Pumps should NOT be exceeded:
: 1. Motor cold-two starts in succession.
: 2. Motor at operating temperature-one start.
I. Prior to any additional starts for either case above, either:
: 1. Allow motor to cool for 20 minutes while running at normal or no load.
: 2. Allow motor to cool for 45 minutes while standing idle before each additional restart.
J. In most cases it will be preferable to allow the motor to run for 20 minutes cooling cycle so that it will be available for any immediate restart.
K. ERCW Motor bearing temperatures should NOT exceed 122F above ambient.
L. ERCW Pump upper bearing vibration should NOT exceed 3 mils displacement.
M. Plug Valves used for throttling flow in the ERCW System should NOT be throttled more than 80%.
N. The Upper Flow Values on the flow balance data sheets are based on Engineering's recommended maximum flows. The Engineering values were provided for operating purposes and may be exceeded (i.e., error corrections could result in higher than indicated flows) if this does NOT result in excessive vibration.


3.0 PRECAUTIONS AND LIMITATIONS (continued)  
WBN                ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                        TRAIN B                  Rev. 0000 Page 14 of 204 Data Package: Page ____ of ____                                          Date ________
3.0     PRECAUTIONS AND LIMITATIONS (continued)
O. Flow rates will primarily be monitored via electronic flow measurement devices, although use of dp gauges is permissible as determined by the applicable Test Director.
P. Ensure that the pressure rating for all test equipment is greater than the maximum possible system pressure it will encounter during testing.
Q. TI-31.08, Flow Balancing Valves Setpoint Positions, must be revised after performance of 2-PTI-067-02-A and 2-PTI-067-02-B.
R. If flow is to be isolated to a component for any reason in this instruction, notify the Unit SRO(s) and consider any applicable LCOs.
S. The Test Director should inform the Unit Operators of current plant conditions when test is to be stopped for longer than a shift with plant equipment not in normal configuration.
T. To satisfy the retest requirements for post-work test of multiple ERCW System work orders, system components will be monitored for leakage during performance of the flow balance. Any observed leakage will be rectified through initiation of work requests.
U. All open problems (including non Tech Spec testing acceptance criteria) are to be tracked by a corrective action document and entered on the appropriate system punchlist.
V. Problems identified during the test shall be annotated on the CTL from SMP-9.0 including a description of the problem, the procedure step when/where the problem was identified, corrective action steps taken to resolve the problem, and the number of the corrective action document, if one was required.
W. Observe all Radiation Protection (RP) requirements when working in or near contaminated areas.
X. Manual continuous backwash flow >450 gpm is to be maintained for duration of test activities (all modes).
Y. Operations must be aware that Station Air Compressors will be cooled by Train B ERCW during the flow balance. Temperatures must be monitored and steps taken to restore Control Air cooling in event of a Loss of Control Air.


E. Component tags and labels may differ slightly (abbreviations, punctuation, letter case, etc.) from the description given in this test. If this situation occurs, it shall not be considered a test deficiency or procedure deviation. It shall be
WBN              ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                        TRAIN B                    Rev. 0000 Page 15 of 204 Data Package: Page ____ of ____                                          Date ________
4.0    PREREQUISITE ACTIONS NOTES
: 1)  The following prerequisites apply to all sections of the test unless specified otherwise.
: 2)  Preliminary action steps may be performed in any order with Test Directors approval.
4.1    Preliminary Actions
[1]    VERIFY the test/performance copy of this Preoperational Test Instruction (PTI) is the current revision including any change notices and as needed, each test person assisting in this test has the current revision including any change notices.                ________
[2]    OBTAIN copies of the applicable forms from the latest revision of SMP-9.0, AND ATTACH to this PTI for use during the performance of this PTI.        ________
[3]    ENSURE changes to the references listed on Appendix A, Test Instruction Reference Review, have been reviewed, and determined NOT to adversely affect the test performance.              ________
[4]    VERIFY current revisions and change paper for referenced drawings has been reviewed and determined NOT to adversely affect the test performance, AND ATTACH documentation of current drawing revision numbers and change paper that were reviewed to the data package.               ________
[5]    EVALUATE punch list items on Open Watts Bar Integrated Task Equipment List (WITEL) AND ENSURE that respective punch list items will NOT adversely affect the test performance.                                          ________
[6]    ENSURE required Component Testing has been completed prior to start of test.                                               ________
[7]    ENSURE outstanding Design Change Notices (DCNs),
Engineering Design change Requests (EDCRs) or Temporary Alterations (TAs) do NOT adversely impact testing.                   ________


documented in the CTL and reconciled by way of a plant labeling request or drawing discrepancy or single-line date typo change in the procedure as
WBN             ERCW SYSTEM FLOW BALANCE                 2-PTI-067-02-B Unit 1 & 2                         TRAIN B                   Rev. 0000 Page 16 of 204 Data Package: Page ____ of ____                                       Date ________
 
4.1     Preliminary Actions (continued)
appropriate. F. To maintain the operating pressures in the Header to within design limits during low flow conditions DO NOT exceed 133 psig at 0-PT-67-17, ERCW HEADER B PRESS, or 0-PT-67-18, ERCW HEADER A PRESS. G. Equipment shall be operated in accordance with applicable instructions.
[8]   ENSURE a review of outstanding Clearances has been coordinated with Operations for impact to the test performance, AND RECORD in Appendix B, Temporary Condition Log if required.           ________
H. The following motor operating and starting limitations for the Essential Raw Cooling Water Pumps should NOT be exceeded: 1. Motor cold-two starts in succession.
[9]   VERIFY system cleanliness as required for the performance of this test has been completed in accordance with SMP-7.0.             ________
: 2. Motor at operating temperature-one start. I. Prior to any additional starts for either case above, either: 1. Allow motor to cool for 20 minutes while running at normal or no load.
[10]   VERIFY plant instruments, listed on Appendix C, Permanent Plant Instrumentation Log, are placed in service and are within their calibration interval.                                         ________
: 2. Allow motor to cool for 45 minutes while standing idle before each additional restart. J. In most cases it will be preferable to allow the motor to run for 20 minutes cooling cycle so that it will be available for any immediate restart. K. ERCW Motor bearing temperatures should NOT exceed 122F above ambient. L. ERCW Pump upper bearing vibration should NOT exceed 3 mils displacement.
M. Plug Valves used for throttling flow in the ERCW System should NOT be throttled more than 80%. N. The Upper Flow Values on the flow balance data sheets are based on Engineering's recommended maximum flows. The Engineering values were provided for operating purposes and may be exceeded (i.e., error corrections could result in higher than indicated flows) if this does NOT result in excessive
 
vibration.
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 14 of 204
 
Data Package:  Page ____ of ____    Date ________
 
3.0 PRECAUTIONS AND LIMITATIONS (continued)
 
O. Flow rates will primarily be monitored via electronic flow measurement devices, although use of dp gauges is permissible as determined by the applicable Test
 
Director. P. Ensure that the pressure rating for all test equipment is greater than the maximum possible system pressure it will encounter during testing. Q. TI-31.08, Flow Balancing Valves Setpoint Positions, must be revised after performance of 2-PTI-067-02-A and 2-PTI-067-02-B. R. If flow is to be isolated to a component for any reason in this instruction, notify the Unit SRO(s) and consider any applicable LCOs. S. The Test Director should inform the Unit Operators of current plant conditions when test is to be stopped for longer than a shift with plant equipment not in
 
normal configuration. T. To satisfy the retest requirements for post-work test of multiple ERCW System work orders, system components will be monitored for leakage during performance of the flow balance. Any observed leakage will be rectified through initiation of work requests. U. All open problems (including non Tech Spec testing acceptance criteria) are to be tracked by a corrective action document and entered on the appropriate system punchlist. V. Problems identified during the test shall be annotated on the CTL from SMP-9.0 including a description of the problem, the procedure step when/where the problem was identified, corrective action steps taken to resolve the problem, and the number of the corrective action document, if one was required. W. Observe all Radiation Protection (RP) requirements when working in or near contaminated areas. X. Manual continuous backwash flow >450 gpm is to be maintained for duration of test activities (all modes). Y. Operations must be aware that Station Air Compressors will be cooled by Train B ERCW during the flow balance. Temperatures must be monitored and steps
 
taken to restore Control Air cooling in event of a Loss of Control Air.
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 15 of 204
 
Data Package:  Page ____ of ____    Date ________
 
4.0 PREREQUISITE ACTIONS NOTES 1) The following prerequisites apply to all sections of the test unless specified otherwise. 2) Preliminary action steps may be performed in any order with Test Directors approval. 4.1 Preliminary Actions
[1] VERIFY the test/performance copy of this Preoperational Test Instruction (PTI) is the current revision including any change
 
notices and as needed, each test person assisting in this test has the current revision including any change notices. ________
[2] OBTAIN copies of the applicable forms from the latest revision of SMP-9.0, AND  ATTACH to this PTI for use during the performance of this PTI. ________
[3] ENSURE changes to the references listed on Appendix A, Test Instruction Reference Review, have been reviewed, and
 
determined NOT to adversely affect the test performance. ________
[4] VERIFY current revisions and change paper for referenced drawings has been reviewed and determined NOT to adversely affect the test performance, AND  ATTACH documentation of current drawing revision numbers and change paper that were reviewed to the data package. ________
[5] EVALUATE punch list items on Open Watts Bar Integrated Task Equipment List (WITEL)
AND  ENSURE that respective punch list items will NOT adversely affect the test performance. ________
[6] ENSURE required Component Testing has been completed prior to start of test. ________
[7] ENSURE outstanding Design Change Notices (DCNs), Engineering Design change Requests (EDCRs) or Temporary
 
Alterations (TAs) do NOT adversely impact testing. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 16 of 204  
 
Data Package: Page ____ of ____     Date ________  
 
4.1 Preliminary Actions (continued)  
 
[8] ENSURE a review of outstanding Clearances has been coordinated with Operations for impact to the test  
 
performance, AND RECORD in Appendix B, Temporary Condition Log if required. ________
[9] VERIFY system cleanliness as required for the performance of this test has been completed in accordance with SMP-7.0. ________
[10] VERIFY plant instruments, listed on Appendix C, Permanent Plant Instrumentation Log, are placed in service and are within their calibration interval. ________
NOTE Substitution of electronic or ultra-sonic flow measurement devices is acceptable provided the accuracy range is equal to or exceeds range specified, and calibration status is current.
NOTE Substitution of electronic or ultra-sonic flow measurement devices is acceptable provided the accuracy range is equal to or exceeds range specified, and calibration status is current.
[11] VERIFY Measuring and Test Equipment (M&TE) required for test performance has been (as required) filled, vented, place in  
[11]   VERIFY Measuring and Test Equipment (M&TE) required for test performance has been (as required) filled, vented, place in service and recorded on Measuring and Test Equipment Log in SMP-9.0.                                                          ________
[12]  VERIFY Measuring and Test Equipment (M&TE) calibration due dates will support the completion of this test performance.      ________
[13]  ENSURE components contained within the boundaries of this test are under the jurisdictional control of Preoperational Startup Engineering (PSE) and/or Plant Operations.                  ________
[14]  VERIFY the Plant Computer is available and the computer points for the ERCW pump bearings are active and the description and status for each computer point has been verified.                                                            ________
[15]  VERIFY the following systems are operational and have been placed in service to the extent necessary to perform this test:
A. System 032, Control Air, Provides control air to all AOVs      ________
B. System 211, 6.9KV Shutdown Power System                        ________
C. System 213, Reactor Motor Operated Valve Power System                                                        ________


service and recorded on Measuring and Test Equipment Log in SMP-9.0. ________
WBN              ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                      TRAIN B                    Rev. 0000 Page 17 of 204 Data Package: Page ____ of ____                                      Date ________
[12] VERIFY Measuring and Test Equipment (M&TE) calibration due dates will support the completion of this test performance. ________
4.1    Preliminary Actions (continued)
[13] ENSURE components contained within the boundaries of this test are under the jurisdictional control of Preoperational Startup Engineering (PSE) and/or Plant Operations. ________
D. System 214, 480V Control and Auxiliary Vent Power System                                                        ________
[14] VERIFY the Plant Computer is available and the computer points for the ERCW pump bearings are active and the
E. System 215, Diesel Auxiliary Power System                    ________
F. System 237, 120VAC Instrument Power System                    ________
[16]  PERFORM a pretest walkdown on equipment to be tested to ensure no conditions exist that will impact test performance.      ________
[17]  CONDUCT a pretest briefing with Test and Operations personnel in accordance with SMP-9.0.                               ________
[18]   ENSURE that communications are available for areas where testing is to be conducted.                                        ________
[19]  ENSURE Operations has all essential loads aligned to the A-Train such as EBR chiller, MCR chiller, SDBR chiller, SFPCC A-Train is in service and is cooled by CCS HTX A or B.                                                              ________
[20]  ENSURE RHR A-Train is in service if required.                       ________
[21]   ENSURE A-Train ECCS room and area coolers, A-Train EGTS, ABGTS, penetration room and pipe chase coolers are protected, if so desired by Operations.                            ________
[22]  VERIFY Design Change Notices (DCNs) for Type 1 Supports are implemented or temporary supports installed as needed for U-2 System 67 testing are issued.                                   ________
[23]   VERIFY remaining supports required for U2 System 67 testing are in place or an equivalent engineering approved temporary support is installed.                                              ________
[24]  VERIFY spring cans identified for U-2 System 67 testing are installed, unpinned, and on scale with no visual indication of damage, loose parts or interferences.                              ________
[25]  VERIFY snubbers identified for U-2 System 67 testing are installed with no visual indication of damage, loose parts or interferences.                                                      ________


description and status for each computer point has been
WBN               ERCW SYSTEM FLOW BALANCE               2-PTI-067-02-B Unit 1 & 2                         TRAIN B                 Rev. 0000 Page 18 of 204 Data Package: Page ____ of ____                                     Date ________
 
4.2     Special Tools, Measuring and Test Equipment, Parts, and Supplies.
verified. ________
NOTES
[15] VERIFY the following systems are operational and have been placed in service to the extent necessary to perform this test: A. System 032, Control Air, Provides control air to all AOVs ________
: 1) Substitution of electronic or ultra-sonic flow measurement devices is acceptable provided the accuracy range is equal to or exceeds range specified, and calibration status is current.
B. System 211, 6.9KV Shutdown Power System ________
: 2) If electronic flow measurement devices are used, applicable steps in Section 4.3 related to other devices (such as dp gauges) may be N/A'd. Actual use of other flow measurement devices will be appropriately documented along with required calibration data
C. System 213, Reactor Motor Operated Valve Power System ________
: 1. 0-50 psid Differential Pressure Gauge (r1%) (4 gauges ERCW Pumps)
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 17 of 204
: 2. 19 ea 0-200 psig Pressure Gauge (r1% accuracy)
 
: 3. Ultrasonic Flowmeters (r3%). (Upstream of 0-FE-67-226, ERCW SUP TO CCS C HX)
Data Package:  Page ____ of ____    Date ________
: 4. Ultrasonic Flowmeters (r3%) Various components flow points as specified in Appendix E, Data Sheet 1
 
: 5. Nitrogen bottle 4.3     Field Preparations
4.1 Preliminary Actions (continued)
[1]     RECORD work order used to install Electronic Flow Device (EFDs) for components as listed in Appendix H for common train items.                                                     ________
 
WO#
D. System 214, 480V Control and Auxiliary Vent Power System ________ E. System 215, Diesel Auxiliary Power System ________
[2]     RECORD work order used to install EFDs for components listed in Appendix E for Train B.                                 ________
F. System 237, 120VAC Instrument Power System ________
WO#
[16] PERFORM a pretest walkdown on equipment to be tested to ensure no conditions exist that will impact test performance. ________
[3]     OBTAIN Operations approval to perform Electrical Switch alignment (Appendix D).                                           ________
[17] CONDUCT a pretest briefing with Test and Operations personnel in accordance with SMP-9.0. ________
SM/Unit SRO
[18] ENSURE that communications are available for areas where testing is to be conducted. ________
[19] ENSURE Operations has all essential loads aligned to the A-Train such as EBR chiller, MCR chiller, SDBR chiller, SFPCC A-Train is in service and is cooled by CCS HTX A or B. ________
[20] ENSURE RHR A-Train is in service if required. ________
[21] ENSURE A-Train ECCS room and area coolers, A-Train EGTS, ABGTS, penetration room and pipe chase coolers are protected, if so desired by Operations. ________
[22] VERIFY Design Change Notices (DCNs) for Type 1 Supports are implemented or temporary supports installed as needed for U-2 System 67 testing are issued. ________
[23] VERIFY remaining supports required for U2 System 67 testing are in place or an equivalent engineering approved temporary support is installed. ________
[24] VERIFY spring cans identified for U-2 System 67 testing are installed, unpinned, and on scale with no visual indication of damage, loose parts or interferences. ________
[25] VERIFY snubbers identified for U-2 System 67 testing are installed with no visual indication of damage, loose parts or
 
interferences. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 18 of 204  
 
Data Package: Page ____ of ____     Date ________  
 
4.2 Special Tools, Measuring and Test Equipment, Parts, and Supplies.
NOTES 1) Substitution of electronic or ultra-sonic flow measurement devices is acceptable provided the accuracy range is equal to or exceeds range specified, and calibration  
 
status is current. 2) If electronic flow measurement devices are used, applicable steps in Section 4.3 related to other devices (such as dp gauges) may be N/A'd. Actual use of other flow measurement devices will be appropriately documented along with required calibration  
 
data 1. 0-50 psid Differential Pressure Gauge (1%) (4 gauges ERCW Pumps) 2. 19 ea 0-200 psig Pressure Gauge (1% accuracy) 3. Ultrasonic Flowmeters (3%). (Upstream of 0-FE-67-226, ERCW SUP TO CCS C HX) 4. Ultrasonic Flowmeters (3%) Various components flow points as specified in Appendix E, Data Sheet 1 5. Nitrogen bottle 4.3 Field Preparations
[1] RECORD work order used to install Electronic Flow Device (EFDs) for components as listed in Appendix H for common train items. ________ WO#   [2] RECORD work order used to install EFDs for components listed in Appendix E for Train B. ________ WO#   [3] OBTAIN Operations approval to perform Electrical Switch alignment (Appendix D). ________
SM/Unit SRO  
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 19 of 204
 
Data Package:  Page ____ of ____    Date ________
 
4.3 Field Preparations (continued)
 
NOTES 1) The following step 4.3[4] through 4.3[8]impacts Unit 1 configuration. The B Train RHR, CCP and SIS pump room coolers will be failed OPEN. 2) Electrically operated valves may be manually opened/closed if the electrical component is unavailable during testing.
[4] OBTAIN Operations approval to perform Supply HDR 2B Power Alignment and B Tr. Power Checklist (CHECKLIST 1 &


2), Supply HDR. 1B Valve Alignment (CHECKLIST 3) and Supply HDR 2B Valve Alignment (CHECKLIST 4). ________
WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                        TRAIN B                    Rev. 0000 Page 19 of 204 Data Package: Page ____ of ____                                      Date ________
4.3      Field Preparations (continued)
NOTES
: 1)  The following step 4.3[4] through 4.3[8]impacts Unit 1 configuration. The B Train RHR, CCP and SIS pump room coolers will be failed OPEN.
: 2)  Electrically operated valves may be manually opened/closed if the electrical component is unavailable during testing.
[4]    OBTAIN Operations approval to perform Supply HDR 2B Power Alignment and B Tr. Power Checklist (CHECKLIST 1 &
2), Supply HDR. 1B Valve Alignment (CHECKLIST 3) and Supply HDR 2B Valve Alignment (CHECKLIST 4).                     ________
SM/Unit SRO
SM/Unit SRO
[5] PERFORM CHECKLIST 1, 2, 3 AND 4. ________
[5]     PERFORM CHECKLIST 1, 2, 3 AND 4.                                 ________
[6] PERFORM Electrical Switch alignment (Appendix D). ________
[6]     PERFORM Electrical Switch alignment (Appendix D).                 ________
[7] VERIFY that the listed Air Isolation Valves have been CLOSED and the air BLED OFF to the following Control Valves and Control Valves are FULL OPEN : ________
[7]     VERIFY that the listed Air Isolation Valves have been CLOSED and the air BLED OFF to the following Control Valves and Control Valves are FULL OPEN :                         ________
Air Isol. Valve CLOSED Control Valve OPEN INITIALS INITIALS 1-ISV-32-3563   1-TCV-67-100 LWR CNTMT VENT CLR 1B-B OUT TEMP CNTL 1-ISV-32-3565 1-TCV-67-101 CRDM CLR 1B-B OUT TEMP CNTL 1-ISV-32-3564 1-TCV-67-102 RCP 2 MTR CLR ERCW SUP CNTL 1-ISV-32-3605 1-TCV-67-108 LWR CNTMT VENT CLR 1D-B OUT TEMP CNTL 1-ISV-32-3606 1-TCV-67-109 CRDM CLR 1D-D OUT TEMP CNTL 1-ISV-32-3607 1-TCV-67-110  RCP 4 MTR CLR ERCW SUP CNTL WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 20 of 204
Air Isol. Valve       CLOSED                       Control Valve                 OPEN INITIALS                                                 INITIALS 1-ISV-32-3563                     1-TCV-67-100 LWR CNTMT VENT CLR 1B-B OUT TEMP CNTL 1-ISV-32-3565                     1-TCV-67-101 CRDM CLR 1B-B OUT TEMP CNTL 1-ISV-32-3564                     1-TCV-67-102 RCP 2 MTR CLR ERCW SUP CNTL 1-ISV-32-3605                     1-TCV-67-108 LWR CNTMT VENT CLR 1D-B OUT TEMP CNTL 1-ISV-32-3606                     1-TCV-67-109 CRDM CLR 1D-D OUT TEMP CNTL 1-ISV-32-3607                     1-TCV-67-110 RCP 4 MTR CLR ERCW SUP CNTL
 
Data Package:  Page ____ of ____    Date ________
 
4.3 Field Preparations (continued)
 
Air Isol. Valve CLOSED Control Valve OPEN INITIALS INITIALS 1-ISV-32-3159  1-TCV-67-137  UPR CNTMT VENT CLR 1B ERCW RET TEMP CNTL 1-ISV-32-3160  1-TCV-67-140  UPR CNTMT VENT CLR 1D ERCWRET TEMP CNTL 1-ISV-32-3283  1-FCV-67-215  SFP TBBP SPACE CLR 1B-B ERCW SUP FLOW CNTL 1-ISV-32-2929  1-FCV-67-172  PDP ROOM COOLER 1C ERCW SUP FLOW CNTL 1-ISV-32-2956  1-FCV-67-348  PENT ROOM COOLER 1B-B ERCW SUP FLOW CNTL 1-ISV-32-3147  1-FCV-67-352  PENT ROOM COOLER 1B-B ERCW SUP FLOW CNTL 1-ISV-32-3295  1-FCV-67-356  PENT ROOM COOLER 1B-B ERCW SUP FLOW CNTL 1-ISV-32-2960  1-FCV-67-344  PIPE CHASE COOLER 1B-B ERCW SUP FLOW CNTL 1-ISV-32-3063  1-FCV-67-164  CCS AFWP SPACE CLR 1B-B ERCW SUP FLOW CNTL 2-ISV-32-3410  2-FCV-67-338  EGTS ROOM COOLER 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3031  2-FCV-67-219  BA XFER/AFW PMP SPACE CLR 2B-B ERCW FLOW CNTL 2-ISV-32-3563  2-TCV-67-100  LWR CNTMT VENT CLR 2B-B OUT TEMP CNTL 2-ISV-32-3565  2-TCV-67-101  CRDM CLR 2B-B OUT TEMP CNTL  2-ISV-32-3564  2-TCV-67-102  RCP 2 MTR CLR ERCW SUP CNTL WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 21 of 204
 
Data Package:  Page ____ of ____    Date ________
 
4.3 Field Preparations (continued)
 
Air Isol. Valve CLOSED Control Valve OPEN INITIALS INITIALS 2-ISV-32-3605  2-TCV-67-108  LWR CNTMT VENT CLR 2D-B OUT TEMP CNTL 2-ISV-32-3606  2-TCV-67-109  CRDM CLR 2D-D OUT TEMP CNTL  2-ISV-32-3607  2-TCV-67-110 RCP 4 MTR CLR OUT TEMP CNTL  2-ISV-32-3116  2-TCV-67-137  UPR CNTMT VENT CLR 2B ERCW RET TEMP CNTL 2-ISV-32-3115  2-TCV-67-140  UPR CNTMT VENT CLR 2D ERCW RET TEMP CNTL 2-ISV-32-2880  2-FCV-67-182  SIP ROOM COOLER 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3028  2-FCV-67-186  CS PMP RM CLR 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3323  2-FCV-67-356  PENT ROOM COOLER 2B-B ERCW SUP FLOW CNTL  
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 22 of 204


Data Package: Page ____ of ____     Date ________  
WBN            ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 20 of 204 Data Package: Page ____ of ____                                 Date ________
4.3      Field Preparations (continued)
Air Isol. Valve    CLOSED                    Control Valve                  OPEN INITIALS                                              INITIALS 1-ISV-32-3159                  1-TCV-67-137 UPR CNTMT VENT CLR 1B ERCW RET TEMP CNTL 1-ISV-32-3160                  1-TCV-67-140 UPR CNTMT VENT CLR 1D ERCWRET TEMP CNTL 1-ISV-32-3283                  1-FCV-67-215 SFP TBBP SPACE CLR 1B-B ERCW SUP FLOW CNTL 1-ISV-32-2929                  1-FCV-67-172 PDP ROOM COOLER 1C ERCW SUP FLOW CNTL 1-ISV-32-2956                  1-FCV-67-348 PENT ROOM COOLER 1B-B ERCW SUP FLOW CNTL 1-ISV-32-3147                  1-FCV-67-352 PENT ROOM COOLER 1B-B ERCW SUP FLOW CNTL 1-ISV-32-3295                  1-FCV-67-356 PENT ROOM COOLER 1B-B ERCW SUP FLOW CNTL 1-ISV-32-2960                  1-FCV-67-344 PIPE CHASE COOLER 1B-B ERCW SUP FLOW CNTL 1-ISV-32-3063                  1-FCV-67-164 CCS AFWP SPACE CLR 1B-B ERCW SUP FLOW CNTL 2-ISV-32-3410                  2-FCV-67-338 EGTS ROOM COOLER 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3031                  2-FCV-67-219 BA XFER/AFW PMP SPACE CLR 2B-B ERCW FLOW CNTL 2-ISV-32-3563                  2-TCV-67-100 LWR CNTMT VENT CLR 2B-B OUT TEMP CNTL 2-ISV-32-3565                  2-TCV-67-101 CRDM CLR 2B-B OUT TEMP CNTL 2-ISV-32-3564                  2-TCV-67-102 RCP 2 MTR CLR ERCW SUP CNTL


4.3 Field Preparations (continued)  
WBN            ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 21 of 204 Data Package: Page ____ of ____                                Date ________
4.3     Field Preparations (continued)
Air Isol. Valve    CLOSED                    Control Valve                  OPEN INITIALS                                              INITIALS 2-ISV-32-3605                  2-TCV-67-108 LWR CNTMT VENT CLR 2D-B OUT TEMP CNTL 2-ISV-32-3606                  2-TCV-67-109 CRDM CLR 2D-D OUT TEMP CNTL 2-ISV-32-3607                  2-TCV-67-110 RCP 4 MTR CLR OUT TEMP CNTL 2-ISV-32-3116                  2-TCV-67-137 UPR CNTMT VENT CLR 2B ERCW RET TEMP CNTL 2-ISV-32-3115                  2-TCV-67-140 UPR CNTMT VENT CLR 2D ERCW RET TEMP CNTL 2-ISV-32-2880                  2-FCV-67-182 SIP ROOM COOLER 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3028                  2-FCV-67-186 CS PMP RM CLR 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3323                  2-FCV-67-356 PENT ROOM COOLER 2B-B ERCW SUP FLOW CNTL


NOTE The following valves are in 0-PI-OPS-17.0 program and will have to be locked when not in use. [8] VERIFY that the listed Air Isolation Valves have been CLOSED and the air BLED OFF to the following Control Valves and Control Valves are FULL OPEN ________
WBN              ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                        TRAIN B                  Rev. 0000 Page 22 of 204 Data Package: Page ____ of ____                                    Date ________
Air Isol.
4.3      Field Preparations (continued)
Valve CLOSED Control Valve OPEN INTIALS INTIALS2-ISV-32-2964 2-FCV-67-348 PENT ROOM COOLER 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3167 2-FCV-67-352 PENT ROOM COOLER 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3805 2-FCV-67-344 PIPE CHASE COOLER 2B-B ERCW SUP FLOW CNTL
NOTE The following valves are in 0-PI-OPS-17.0 program and will have to be locked when not in use.
[9] VERIFY that Work Orders have been prepared to support the following activities:
[8]   VERIFY that the listed Air Isolation Valves have been CLOSED and the air BLED OFF to the following Control Valves and Control Valves are FULL OPEN                           ________
A. Nitrogen supply connection to 1-TCV-67-118, INSTR RM WATER CLR 1B SUPPLY CONTROL VLV, capillary tubing with 200 psig regulator ________ WO#   B. Nitrogen supply connection to 2-TCV-67-118, INSTR RM WATER CLR 2B SUPPLY CONTROL VLV, capillary tubing with 200 psig regulator ________ WO#   C. Adjust the limit switches for Component Cooling System Heat Exchanger flow control valves 0-FCV-67-152, CCS HX C OUTLET ERCW HDR B FLOW CNTL. ________ WO#
Air Isol.     CLOSED                       Control Valve                 OPEN Valve        INTIALS                                                     INTIALS 2-ISV-32-2964                   2-FCV-67-348 PENT ROOM COOLER 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3167                   2-FCV-67-352 PENT ROOM COOLER 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3805                   2-FCV-67-344 PIPE CHASE COOLER 2B-B ERCW SUP FLOW CNTL
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 23 of 204
[9]   VERIFY that Work Orders have been prepared to support the following activities:
A. Nitrogen supply connection to 1-TCV-67-118, INSTR RM WATER CLR 1B SUPPLY CONTROL VLV, capillary tubing with 200 psig regulator                               ________
WO#
B. Nitrogen supply connection to 2-TCV-67-118, INSTR RM WATER CLR 2B SUPPLY CONTROL VLV, capillary tubing with 200 psig regulator                               ________
WO#
C. Adjust the limit switches for Component Cooling System Heat Exchanger flow control valves 0-FCV-67-152, CCS HX C OUTLET ERCW HDR B FLOW CNTL.                           ________
WO#


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                        TRAIN B                    Rev. 0000 Page 23 of 204 Data Package: Page ____ of ____                                       Date ________
 
4.3     Field Preparations (continued)
4.3 Field Preparations (continued)  
[10]   ENSURE the station air compressors are RUNNING or available to receive flow to the intercoolers.                       ________
 
[10] ENSURE the station air compressors are RUNNING or available to receive flow to the intercoolers. ________
NOTE When completing the steps to install M&TE differential pressure gauges or electronic flow devices (EFD), the word INSTALL is understood to mean attach and place in service. That is, attach gauge/device, open the root/isolation valve, and vent as necessary to place the gauge/device in service.
NOTE When completing the steps to install M&TE differential pressure gauges or electronic flow devices (EFD), the word INSTALL is understood to mean attach and place in service. That is, attach gauge/device, open the root/isolation valve, and vent as necessary to place the gauge/device in service.
[11] ENSURE test EFDs, pressure gauges or P devices are installed at the following locations:
[11]   ENSURE test EFDs, pressure gauges or 'P devices are installed at the following locations:
A. INSTALL EFDs at or near FEs as listed in Appendix E & Data Sheet 1.
A. INSTALL EFDs at or near FEs as listed in Appendix E &
B. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at valve 2-VTV-67-534B, CS HX 2B SUP HDR VENT. ________
Data Sheet 1.
 
B. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 2-VTV-67-534B, CS HX 2B SUP HDR VENT.                 ________
________
CV M&TE                                 Cal Due Date C. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at the upstream side of 1-FE-67-62, ERCW SUP HEADER 1B FLOW.                                                 ________
CV M&TE Cal Due Date C. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at the upstream side of 1-FE-67-62, ERCW SUP HEADER 1B FLOW. ________
CV M&TE                                 Cal Due Date D. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at the downstream side of 1-FE-67-62, ERCW SUP HEADER 1B FLOW.                                                 ________
 
CV M&TE                                 Cal Due Date
________
CV M&TE Cal Due Date D. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at the downstream side of 1-FE-67-62, ERCW SUP HEADER 1B FLOW. ________
 
________
CV M&TE  Cal Due Date WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 24 of 204
 
Data Package:  Page ____ of ____    Date ________
 
4.3 Field Preparations (continued)
 
E. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at the upstream side of 2-FE-67-62, ERCW SUP HEADER 2B FLOW. ________
 
________
CV M&TE  Cal Due Date F. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at the downstream side of 2-FE-67-62, ERCW SUP HEADER 2B FLOW. ________
 
________
CV M&TE  Cal Due Date G. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at the inlet side of 0-DRV-67-547, CCS HX C ERCW DRAIN. ________
 
________
CV M&TE  Cal Due Date H. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at valve 0-TV-67-621B, MCR WTR CHILLER B-B ERCW SUP TEST CONN. ________
 
________
CV M&TE  Cal Due Date I. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at valve 1-TV-67-690B, UPPER CNTMT VENT CLR 1B ERCW SUP HDR TEST VENT. ________
 
________
CV M&TE  Cal Due Date WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 25 of 204
 
Data Package:  Page ____ of ____    Date ________
 
4.3 Field Preparations (continued)
 
J. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at valve 2-TV-67-690B, UPPER CNTMT VENT CLR 2B ERCW SUP HDR TEST VENT. ________
 
________
CV M&TE  Cal Due Date K. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at valve 0-VTV-67-616B, ELEC BD RM A/C COND B  ERCW SUP TEST VENT CONN. ________
 
________
CV M&TE  Cal Due Date L. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at valve 0-RTV-67-813A, 0-PT-67-48/0-PS-67-484 ROOT, mounted at the same elevation as 0-PI-67-48B. ________
 
________
CV M&TE  Cal Due Date M. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at valve 0-RTV-67-812A, 0-PT-67-52/0-PS-67-485 ROOT, mounted at the same elevation as 0-PI-67-52B. ________
 
________
CV M&TE  Cal Due Date N. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at valve 0-RTV-67-814A, 0-PT-67-56/0-PS-67-486 ROOT, mounted at the same elevation as 0-PI-67-56B. ________
 
________
CV M&TE  Cal Due Date WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 26 of 204
 
Data Package:  Page ____ of ____    Date ________
 
4.3 Field Preparations (continued)
 
O. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at valve 0-RTV-67-811A, 0-PT-67-60/0-PS-67-487 ROOT, mounted at the same elevation as 0-PI-67-60B. ________
 
________
CV M&TE Cal Due Date P. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at valve 1-PI-67-10B, ERCW STRAINER 1B-B OUT PRESS. ________
 
________
CV M&TE  Cal Due Date Q. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at valve 2-PI-67-10B, ERCW STRAINER 2B-B OUT PRESS. ________
 
________
CV M&TE  Cal Due Date R. INSTALL a 0-200 psig pressure gauge, 1.0% accuracy, at valve 0-PI-67-17B, ERCW HEADER B PRESS. ________
 
________
CV M&TE  Cal Due Date S. INSTALL a EFD downstream of TEE on 2B header and upstream of 0-FE-67-226, ERCW CCS HX C SUP, and label it EFD-2. ________
 
________
CV M&TE  Cal Due Date 
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 27 of 204
 
Data Package:  Page ____ of ____    Date ________
 
4.3 Field Preparations (continued)
 
NOTE two running ERCW pumps.
[12] INSTALL a 0-50 psid differential pressure gauge,  1.0% accuracy, between the listed ERCW Pump Discharge pressure transmitters and 0-PT-67-17, ERCW HEADER B PRESS: A. 0-PT-67-48, ERCW PUMP E-B DISCH PRESS ________  1st
________
CV M&TE  Cal Due Date  B. 0-PT-67-52, ERCW PUMP F-B DISCH PRESS ________  1st  ________
CV M&TE  Cal Due Date  C. 0-PT-67-56, ERCW PUMP G-B DISCH PRESS ________  1st
________
CV M&TE  Cal Due Date  D. 0-PT-67-60, ERCW PUMP H-B DISCH PRESS ________  1st
________
CV M&TE  Cal Due Date
[13] R EQUEST operations to backwash traveling screens and strainers AND  ESTABLISH a continual backwash flow of  450 gpm (manual). ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 28 of 204
 
Data Package:  Page ____ of ____    Date ________
 
4.4 A pprovals and Notifications
[1] OBTAIN permission of the Preoperational Startup Manager to start the test. Preoperational Startup Manager  Date
[2] OBTAIN the Unit 1 & Unit 2 Shift Supervisor's (US/SRO) or Shift Managers (SM) authorization. U-1 US/SRO/SM Signature  Date    U-2 US/SRO/SM Signature  Date 5.0 ACCEPTANCE CRITERIA A. Two pumps on Train B meet the acceptance criteria specified on listed data sheets for flow to all applicable components under the following conditions: 1. Unit 1 and Unit 2 are flow balanced in Normal Operating Mode configurations. (Normal - Normal). 2. All system components are maintained at acceptable flows with Unit 1 in Cold Shutdown and Unit 2 in LOCA RECIRC. 3. All system components are maintained at acceptable flows with Unit 1 in LOCA RECIRC and Unit 2 in Cold Shutdown. 4. All system components are flow balanced with Unit 1 in Hot Shutdown and Unit 2 in Startup.
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 29 of 204
 
Data Package:  Page ____ of ____    Date ________
 
5.0 ACCEPTANCE CRITERIA (continued)
 
B. CCS HX Throttle Valve Adjustment CCS Heat Exchanger Flows as controlled by the 4-position Outlet Valves are adjusted as follows: Valve No. A Position B Position 0-FCV-67-152  (CCS HX C) >7125 GPM >8800 GPM C. CCS Heat Exchanger C Anticavitation Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, is positioned manually to pass >6000 gpm (Step 6.2[36]). D. Component applicability and status during each test sequence are shown on the attached tables from 2-TSD-67-2, Rev 0000, Tables 5 and 7. E. Individual component flow rates are specified in 2-TSD-67, Rev 0000 Tables 12 and 13 (attached), for their respective test sequence. F. The Station Air Compressors may be individually balanced during power generation, hot shutdown or startup mode balancing. For the remaining modes individual compressor flow balancing is not required.
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 30 of 204
 
Data Package:  Page ____ of ____    Date ________
 
5.0 ACCEPTANCE CRITERIA (continued)
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 31 of 204
 
Data Package:  Page ____ of ____    Date ________
 
5.0 ACCEPTANCE CRITERIA (continued)
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 32 of 204
 
Data Package:  Page ____ of ____    Date ________
 
5.0 ACCEPTANCE CRITERIA (continued)
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 33 of 204
 
Data Package:  Page ____ of ____    Date ________
 
5.0 ACCEPTANCE CRITERIA (continued)
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 34 of 204
 
Data Package:  Page ____ of ____    Date ________
 
5.0 ACCEPTANCE CRITERIA (continued)


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 35 of 204  
WBN           ERCW SYSTEM FLOW BALANCE               2-PTI-067-02-B Unit 1 & 2                      TRAIN B                  Rev. 0000 Page 24 of 204 Data Package: Page ____ of ____                                  Date ________
4.3    Field Preparations (continued)
E. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at the upstream side of 2-FE-67-62, ERCW SUP HEADER 2B FLOW.                                              ________
CV M&TE                              Cal Due Date F. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at the downstream side of 2-FE-67-62, ERCW SUP HEADER 2B FLOW.                                              ________
CV M&TE                              Cal Due Date G. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at the inlet side of 0-DRV-67-547, CCS HX C ERCW DRAIN.                                                      ________
CV M&TE                              Cal Due Date H. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-TV-67-621B, MCR WTR CHILLER B-B ERCW SUP TEST CONN.                                              ________
CV M&TE                              Cal Due Date I. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 1-TV-67-690B, UPPER CNTMT VENT CLR 1B ERCW SUP HDR TEST VENT.                                      ________
CV M&TE                              Cal Due Date


Data Package: Page ____ of ____    Date ________  
WBN            ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 25 of 204 Data Package: Page ____ of ____                                 Date ________
4.3     Field Preparations (continued)
J. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 2-TV-67-690B, UPPER CNTMT VENT CLR 2B ERCW SUP HDR TEST VENT.                                    ________
CV M&TE                          Cal Due Date K. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-VTV-67-616B, ELEC BD RM A/C COND B ERCW SUP TEST VENT CONN.                                  ________
CV M&TE                          Cal Due Date L. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-RTV-67-813A, 0-PT-67-48/0-PS-67-484 ROOT, mounted at the same elevation as 0-PI-67-48B.              ________
CV M&TE                          Cal Due Date M. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-RTV-67-812A, 0-PT-67-52/0-PS-67-485 ROOT, mounted at the same elevation as 0-PI-67-52B.              ________
CV M&TE                          Cal Due Date N. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-RTV-67-814A, 0-PT-67-56/0-PS-67-486 ROOT, mounted at the same elevation as 0-PI-67-56B.              ________
CV M&TE                          Cal Due Date


6.0 PERFORMANCE NOTES 1) If throttle valves in sections 6.1-6.5 are adjusted the preceding PERFORMANCE sections should be re-porformed. 2) Re-Testing of applicable sections should be performed on clean copies of the tested segment with time and date of retest noted and documented on retest pages and in
WBN            ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 26 of 204 Data Package: Page ____ of ____                                Date ________
4.3    Field Preparations (continued)
O. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-RTV-67-811A, 0-PT-67-60/0-PS-67-487 ROOT, mounted at the same elevation as 0-PI-67-60B.              ________
CV M&TE                          Cal Due Date P. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 1-PI-67-10B, ERCW STRAINER 1B-B OUT PRESS.                                                     ________
CV M&TE                          Cal Due Date Q. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 2-PI-67-10B, ERCW STRAINER 2B-B OUT PRESS.                                                    ________
CV M&TE                          Cal Due Date R. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-PI-67-17B, ERCW HEADER B PRESS.                ________
CV M&TE                          Cal Due Date S. INSTALL a EFD downstream of TEE on 2B header and upstream of 0-FE-67-226, ERCW CCS HX C SUP, and label it EFD-2.                                            ________
CV M&TE                          Cal Due Date


CTL. 6.1 Prerequisites
WBN              ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                        TRAIN B                    Rev. 0000 Page 27 of 204 Data Package: Page ____ of ____                                        Date ________
[1] VERIFY prerequisites listed in Section 4.0 have been completed. ________
4.3      Field Preparations (continued)
[2] FULLY OPEN 2-TCV-67-158, SD BD ROOM A/C CHLR B-B ERCW IN TEMP CNTRL, [AB, EL 741, A14-R] by ROTATING the local Metrex valve bypass stem (silver colored knurled
NOTE The intent of the next step is to allow indication of the P across the discharge valve of the two running ERCW pumps.
[12]    INSTALL a 0-50 psid differential pressure gauge, r 1.0%
accuracy, between the listed ERCW Pump Discharge pressure transmitters and 0-PT-67-17, ERCW HEADER B PRESS:
A. 0-PT-67-48, ERCW PUMP E-B DISCH PRESS                          ________
1st CV M&TE                                  Cal Due Date B. 0-PT-67-52, ERCW PUMP F-B DISCH PRESS                          ________
1st CV M&TE                                  Cal Due Date C. 0-PT-67-56, ERCW PUMP G-B DISCH PRESS                          ________
1st CV M&TE                                  Cal Due Date D. 0-PT-67-60, ERCW PUMP H-B DISCH PRESS                          ________
1st CV M&TE                                  Cal Due Date
[13]   REQUEST operations to backwash traveling screens and strainers AND ESTABLISH a continual backwash flow of t 450 gpm (manual). ________


knob) counter-clockwise (when viewed looking down at the Bypass Stem) until it seats against the Hydraulic Bypass Body. ________
WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                        TRAIN B                    Rev. 0000 Page 28 of 204 Data Package: Page ____ of ____                                      Date ________
CAUTION DO NOT over pressurize 1-TCV-67-118 during the next step. MAXIMUM pressure is
4.4    Approvals and Notifications
[1]    OBTAIN permission of the Preoperational Startup Manager to start the test.
Preoperational Startup Manager              Date
[2]    OBTAIN the Unit 1 & Unit 2 Shift Supervisor's (US/SRO) or Shift Managers (SM) authorization.
U-1 US/SRO/SM Signature                  Date U-2 US/SRO/SM Signature                  Date 5.0    ACCEPTANCE CRITERIA A. Two pumps on Train B meet the acceptance criteria specified on listed data sheets for flow to all applicable components under the following conditions:
: 1. Unit 1 and Unit 2 are flow balanced in Normal Operating Mode configurations. (Normal - Normal).
: 2. All system components are maintained at acceptable flows with Unit 1 in Cold Shutdown and Unit 2 in LOCA RECIRC.
: 3. All system components are maintained at acceptable flows with Unit 1 in LOCA RECIRC and Unit 2 in Cold Shutdown.
: 4. All system components are flow balanced with Unit 1 in Hot Shutdown and Unit 2 in Startup.


200  psig.
WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                      TRAIN B                    Rev. 0000 Page 29 of 204 Data Package: Page ____ of ____                                      Date ________
[3] OPEN 1-TCV-67-118, INSTR RM WATER CLR 1B ERCW SUP TEMP CNTL, using a temporary regulated Nitrogen supply (0-200 psig). ________
5.0    ACCEPTANCE CRITERIA (continued)
[4] OPEN 2-TCV-67-118, INSTR RM WATER CLR 2B ERCW SUP TEMP CNTL, using a temporary regulated Nitrogen supply (0-200 psig). ________
B. CCS HX Throttle Valve Adjustment CCS Heat Exchanger Flows as controlled by the 4-position Outlet Valves are adjusted as follows:
[5] OPEN 0-TCV-67-1052, ELEC BD RM A/C COND B-B ERCW RET TEMP CNTL. [CB, EL 696, C13P], on EBR CHILLER B-B, by turning the manual flushing screw at the top of the actuator fully clockwise. ________
Valve No.            A Position            B Position 0-FCV-67-152          >7125 GPM            >8800 GPM (CCS HX C)
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 36 of 204
C. CCS Heat Exchanger C Anticavitation Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, is positioned manually to pass >6000 gpm (Step 6.2[36]).
D. Component applicability and status during each test sequence are shown on the attached tables from 2-TSD-67-2, Rev 0000, Tables 5 and 7.
E. Individual component flow rates are specified in 2-TSD-67, Rev 0000 Tables 12 and 13 (attached), for their respective test sequence.
F. The Station Air Compressors may be individually balanced during power generation, hot shutdown or startup mode balancing. For the remaining modes individual compressor flow balancing is not required.


Data Package: Page ____ of ____     Date ________  
WBN          ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2                TRAIN B      Rev. 0000 Page 30 of 204 Data Package: Page ____ of ____                   Date ________
5.0    ACCEPTANCE CRITERIA (continued)


6.1 Prerequisites (continued)  
WBN          ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2                TRAIN B      Rev. 0000 Page 31 of 204 Data Package: Page ____ of ____                  Date ________
5.0    ACCEPTANCE CRITERIA (continued)


[6] OPEN 0-TCV-67-1053, MCR A/C CHILLER B-B ERCW RET TEMP CNTL [AB, EL. 700, A12U], on MCR CHILLER B-B, by turning the manual flushing screw at the top of the actuator fully clockwise. ________
WBN          ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2                TRAIN B       Rev. 0000 Page 32 of 204 Data Package: Page ____ of ____                  Date ________
[7] ENSURE the following: A. 0-FCV-67-208, STA AIR COMPR ERCW SUP HDR 1B ISOL VALVE, is OPEN. ________ B. 0-FCV-67-205, STA AIR COMPR ERCW SUP HDR 1A ISOL VALVE is CLOSED. ________
5.0     ACCEPTANCE CRITERIA (continued)
NOTE The following steps 6.1[8] through 6.1[11] verify/start two ERCW pumps to support the flow balance. Due to the pump power selector switch options, the allowable pump combinations


are E OR F, and G OR H. The selector switches are positioned, then the applicable pumps are started, with the unselected pump steps NA'd.
WBN          ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2                TRAIN B       Rev. 0000 Page 33 of 204 Data Package: Page ____ of ____                  Date ________
[8] VERIFY/PLACE 0-XS-67-287, ERCW PUMP E-B/F-B DG POWER SEL, at 0-M-27A, to either the pump E-B OR pump F-B position, AND  CIRCLE position below:  
5.0    ACCEPTANCE CRITERIA (continued)


Handswitch position (pump E-B OR pump F-B): ________
WBN           ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2                TRAIN B      Rev. 0000 Page 34 of 204 Data Package: Page ____ of ____                  Date ________
[9] VERIFY/START either ERCW Pump E-B OR F-B, enter NA for the non-applicable step:
5.0    ACCEPTANCE CRITERIA (continued)
A. PLACE Handswitch 0-HS-67-47A, ERCW PUMP E-B, at 0-M-27A, to START, AND VERIFY by light indication that pump ERCW PUMP E STARTS. ________
B. PLACE Handswitch 0-HS-67-51A, ERCW PUMP F-B, at 0-M-27A, to START, AND VERIFY by light indication that pump ERCW PUMP F STARTS. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 37 of 204  


Data Package: Page ____ of ____    Date ________  
WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                        TRAIN B                    Rev. 0000 Page 35 of 204 Data Package: Page ____ of ____                                       Date ________
6.0      PERFORMANCE NOTES
: 1)  If throttle valves in sections 6.1-6.5 are adjusted the preceding PERFORMANCE sections should be re-porformed.
: 2)  Re-Testing of applicable sections should be performed on clean copies of the tested segment with time and date of retest noted and documented on retest pages and in CTL.
6.1      Prerequisites
[1]    VERIFY prerequisites listed in Section 4.0 have been completed.                                                        ________
[2]    FULLY OPEN 2-TCV-67-158, SD BD ROOM A/C CHLR B-B ERCW IN TEMP CNTRL, [AB, EL 741, A14-R] by ROTATING the local Metrex valve bypass stem (silver colored knurled knob) counter-clockwise (when viewed looking down at the Bypass Stem) until it seats against the Hydraulic Bypass Body. ________
CAUTION DO NOT over pressurize 1-TCV-67-118 during the next step. MAXIMUM pressure is 200 psig.
[3]    OPEN 1-TCV-67-118, INSTR RM WATER CLR 1B ERCW SUP TEMP CNTL, using a temporary regulated Nitrogen supply (0-200 psig).                                              ________
[4]    OPEN 2-TCV-67-118, INSTR RM WATER CLR 2B ERCW SUP TEMP CNTL, using a temporary regulated Nitrogen supply (0-200 psig).                                              ________
[5]     OPEN 0-TCV-67-1052, ELEC BD RM A/C COND B-B ERCW RET TEMP CNTL. [CB, EL 696, C13P], on EBR CHILLER B-B, by turning the manual flushing screw at the top of the actuator fully clockwise.                                          ________


6.1 Prerequisites (continued)  
WBN                ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                        TRAIN B                    Rev. 0000 Page 36 of 204 Data Package: Page ____ of ____                                      Date ________
6.1     Prerequisites (continued)
[6]    OPEN 0-TCV-67-1053, MCR A/C CHILLER B-B ERCW RET TEMP CNTL [AB, EL. 700, A12U], on MCR CHILLER B-B, by turning the manual flushing screw at the top of the actuator fully clockwise.                                                  ________
[7]    ENSURE the following:
A. 0-FCV-67-208, STA AIR COMPR ERCW SUP HDR 1B ISOL VALVE, is OPEN.                                        ________
B. 0-FCV-67-205, STA AIR COMPR ERCW SUP HDR 1A ISOL VALVE is CLOSED.                                        ________
NOTE The following steps 6.1[8] through 6.1[11] verify/start two ERCW pumps to support the flow balance. Due to the pump power selector switch options, the allowable pump combinations are E OR F, and G OR H. The selector switches are positioned, then the applicable pumps are started, with the unselected pump steps NA'd.
[8]    VERIFY/PLACE 0-XS-67-287, ERCW PUMP E-B/F-B DG POWER SEL, at 0-M-27A, to either the pump E-B OR pump F-B position, AND CIRCLE position below:
Handswitch position (pump E-B OR pump F-B):                        ________
[9]    VERIFY/START either ERCW Pump E-B OR F-B, enter NA for the non-applicable step:
A. PLACE Handswitch 0-HS-67-47A, ERCW PUMP E-B, at 0-M-27A, to START, AND VERIFY by light indication that pump ERCW PUMP E STARTS.                                                      ________
B. PLACE Handswitch 0-HS-67-51A, ERCW PUMP F-B, at 0-M-27A, to START, AND VERIFY by light indication that pump ERCW PUMP F STARTS.                                                      ________


[10] VERIFY/PLACE 0-XS-67-288, ERCW PUMP G-B/H-B DG POWER SEL, at 0-M-27A, to either the pump G-B OR pump H-B position AND CIRCLE position below:  
WBN              ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                      TRAIN B                Rev. 0000 Page 37 of 204 Data Package: Page ____ of ____                                  Date ________
6.1    Prerequisites (continued)
[10]   VERIFY/PLACE 0-XS-67-288, ERCW PUMP G-B/H-B DG POWER SEL, at 0-M-27A, to either the pump G-B OR pump H-B position AND CIRCLE position below:
Handswitch position (pump G-B OR pump H-B):                    ________
[11]  VERIFY/START either ERCW Pump G-B OR H-B, enter NA for the non-applicable step:
A. PLACE Handswitch 0-HS-67-55A, ERCW PUMP G-B, at 0-M-27A, to START, AND VERIFY by light indication that pump ERCW PUMP G-B STARTS.                                                    ________
B. PLACE Handswitch 0-HS-67-59A, ERCW PUMP H-B, at 0-M-27A, to START, AND VERIFY by light indication that pump ERCW PUMP H-B STARTS.                                                    ________
[12]  ENSURE 1-HS-67-67A, DG 1B-B NORM SUP, on 0-M-27A, is in the CLOSED position by light indication.                    ________
[13]  ENSURE 2-HS-67-67A, DG 2B-B NORM SUP, on 0-M-27A, is in the OPEN position by light indication.                      ________
[14]  NOTE as found POSITIONS for A, B and C Station Air Compressors.
STATION AIR COMPR A (0-HS-32-25D) ___________
STATION AIR COMPR B (0-HS-32-26A) ___________
STATION AIR COMPR C (0-HS-32-27A) ___________
[15]  PLACE Station and Control Air compressors A, B & C in Manual (Hand) using SOI-32.10, AND ENSURE running unloaded (D in normal service operation).      ________


Handswitch position (pump G-B OR pump H-B): ________
WBN              ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                        TRAIN B                   Rev. 0000 Page 38 of 204 Data Package: Page ____ of ____                                          Date ________
[11] VERIFY/START either ERCW Pump G-B OR H-B, enter NA for the non-applicable step:
6.1    Prerequisites (continued)
A. PLACE Handswitch 0-HS-67-55A, ERCW PUMP G-B, at 0-M-27A, to START, AND VERIFY by light indication that pump ERCW PUMP G-B STARTS. ________
NOTES
B. PLACE Handswitch 0-HS-67-59A, ERCW PUMP H-B, at 0-M-27A, to START, AND VERIFY by light indication that pump ERCW PUMP H-B STARTS. ________
: 1)  The following steps will isolate CAS from ACAS train B.
[12] ENSURE 1-HS-67-67A, DG 1B-B NORM SUP, on 0-M-27A, is in the CLOSED position by light indication. ________
: 2)  Pressure on B train essential air header will drop to point of starting the B train ACAS compressor.
[13] ENSURE 2-HS-67-67A, DG 2B-B NORM SUP, on 0-M-27A, is in the OPEN position by light indication. ________
: 3)  The B train ACAS compressor should start between t 78 and d 86 psig on 0-PI-32-89
[14] NOTE as found POSITIONS for A, B and C Station Air Compressors.
: 4)  The compressor should load and unload at ~90 psig and ~100 psig respectively.
: 5)  0-FSV-67-1223 will open (de-energize) when the compressor starts and close (energize) when the compressor is NOT running.
: 6)  0-FSV-67-1223 is installed in series with a thermostat and will NOT pass water until the jacket water temperature reaches a predetermined level some time after starting the compressor.
: 7)  Up to a 3 minute delay may be expected while air pressure falls to compressor start setpoint.
: 8)  Annunciator 137-B, AUX AIR TR-B PRESS LO, setpoint is 68 psig.
[16]   NOTIFY Unit Operator (UO) that cycling 0-FSV-67-1223 will require running Auxiliary Control Air Compressor B-B with its attendant equipment (Essential Raw Cooling Water, etc.).               ________
[17]   RECORD as-found position of 0-HS-32-86, AUX CNTL AIR COMPR B-B MODE SELECTOR:
AUTO OFF START
[18]  ENSURE Auxiliary Control Air Compressor B-B is NOT running, AND ENSURE 0-HS-32-86 is in the AUTO position.                             ________


STATION AIR COMPR A (0-HS-32-25D)  ___________
WBN              ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                      TRAIN B                  Rev. 0000 Page 39 of 204 Data Package: Page ____ of ____                                    Date ________
6.1    Prerequisites (continued)
[19]  CLOSE 0-FCV-32-85 using 0-HS-32-85, AND VERIFY Auxiliary Control Air Compressor B-B starts at t 78 and d 86 psig on 0-PI-32-89, ESSENT CONTROL AIR TR B RECEIVER PRESS, AND RECORD time compressor starts: _____________.                    ________
[20]  RECORD ERCW flow: ___________GPM                                ________
[20.1]  IF desired ERCW flow is not achieved THEN.
[20.2]  Throttle OPEN 0-DRV-32-285, ESSENT CONTROL AIR TR B AFTERFILTER DRAIN, to maintain approximately 92 psig on receiver pressure indicator 0-PI-32-89 to keep the compressor loaded.        ________


STATION AIR COMPR B (0-HS-32-26A)  ___________
WBN             ERCW SYSTEM FLOW BALANCE               2-PTI-067-02-B Unit 1 & 2                       TRAIN B                   Rev. 0000 Page 40 of 204 Data Package: Page ____ of ____                                     Date ________
 
6.2     UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT Heat Exchanger C Anticavitation Test, CCS Heat Exchanger C Discharge Valve Setting, and Flow Balance in Normal Mode.
STATION AIR COMPR C (0-HS-32-27A)  ___________
________
[15] PLACE Station and Control Air compressors A, B & C in Manual (Hand) using SOI-32.10, AND ENSURE running unloaded (D in normal service operation). ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 38 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.1 Prerequisites (continued)
 
NOTES 1) The following steps will isolate CAS from ACAS train B. 2) Pressure on B train essential air header will drop to point of starting the B train ACAS compressor. 3) The B train ACAS compressor should start between  78 and  86 psig on 0-PI-32-89 4) The compressor should load and unload at ~90 psig and ~100 psig respectively. 5) 0-FSV-67-1223 will open (de-energize) when the compressor starts and close (energize) when the compressor is NOT running. 6) 0-FSV-67-1223 is installed in series with a thermostat and will NOT pass water until the jacket water temperature reaches a predetermined level some time after starting the compressor. 7) Up to a 3 minute delay may be expected while air pressure falls to compressor start setpoint. 8) Annunciator 137-B, AUX AIR TR-B PRESS LO, setpoint is 68 psig.
[16] NOTIFY Unit Operator (UO) that cycling 0-FSV-67-1223 will require running Auxiliary Control Air Compressor B-B with its attendant equipment (Essential Raw Cooling Water, etc.). ________
[17] RECORD as-found position of 0-HS-32-86, AUX CNTL AIR COMPR B-B MODE SELECTOR:
 
AUTO  OFF  START  [18] ENSURE Auxiliary Control Air Compressor B-B is NOT running, AND  ENSURE 0-HS-32-86 is in the AUTO position. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 39 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.1 Prerequisites (continued)
 
[19] CLOSE 0-FCV-32-85 using 0-HS-32-85, AND  VERIFY Auxiliary Control Air Compressor B-B starts at  78 and  86 psig on 0-PI-32-89, ESSENT CONTROL AIR TR B RECEIVER PRESS, AND RECORD time compressor starts:  _____________. ________
[20] RECORD ERCW flow:  ___________GPM ________
[20.1] IF desired ERCW flow is not achieved THEN. [20.2] Throttle OPEN 0-DRV-32-285, ESSENT CONTROL AIR TR B AFTERFILTER DRAIN, to maintain
 
approximately 92 psig on receiver pressure indicator 0-PI-32-89 to keep the compressor loaded. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 40 of 204  
 
Data Package: Page ____ of ____     Date ________  
 
6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT Heat Exchanger C Anticavitation Test, CCS Heat Exchanger C Discharge Valve Setting, and Flow Balance in Normal Mode.
NOTE The Normal Mode flow balance is done solely to put the system in a configuration for setting of the Component Cooling Heat Exchanger discharge valve limit switches.
NOTE The Normal Mode flow balance is done solely to put the system in a configuration for setting of the Component Cooling Heat Exchanger discharge valve limit switches.
[1] ENSURE Normal Operation Mode flow alignment in accordance with CHECKLIST 3 and 4 has been performed. ________
[1]     ENSURE Normal Operation Mode flow alignment in accordance with CHECKLIST 3 and 4 has been performed.           ________
[2] ENSURE the flow through 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, on Data Sheet 1 is >6000 gpm. ________
[2]     ENSURE the flow through 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, on Data Sheet 1 is >6000 gpm.               ________
[3] PERFORM Normal Operation Mode flow balance in accordance with Appendix I and Data Sheet 1, AND VERIFY flows are equal to or greater than the minimum required flows. Do not document on Data Sheet 1. ________
[3]     PERFORM Normal Operation Mode flow balance in accordance with Appendix I and Data Sheet 1, AND VERIFY flows are equal to or greater than the minimum required flows. Do not document on Data Sheet 1.                 ________
NOTE The following steps 6.2[4] through 6.2[24] set Valve 0-FCV-67-152, CCS HX C OUTLET ERCW HDR B FLOW CNTL HX C, limit switches for "A and "B" positions.
NOTE The following steps 6.2[4] through 6.2[24] set Valve 0-FCV-67-152, CCS HX C OUTLET ERCW HDR B FLOW CNTL HX C, limit switches for "A and "B" positions.
[4] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to POS A, AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS A. ________
[4]     PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to POS A, AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS A.                                                       ________
[5] VERIFY/PLACE Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-144 is CLOSED. ________
[5]     VERIFY/PLACE Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-144 is CLOSED.                                                         ________
[6] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to POS OPEN, AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS. ________
[6]     PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to POS OPEN, AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS.       ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 41 of 204


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                        TRAIN B                      Rev. 0000 Page 41 of 204 Data Package: Page ____ of ____                                         Date ________
6.2      UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)
[7]    OPEN breaker 0-BKR-67-152B at Compt 12B on 480V RMOV BD 2B2-B for CCS HX OUT ERCW HDR B FLOW CNTL (0-FCV-67-152).                                                      ________
[8]    RECORD on the calibration data for the flow indication 0-FI-67-226 (EFD-2) with 0-FCV-67-152 at FULL OPEN (N/A M&TE if temporary flow element not installed).                        ________
GPM M&TE                                  Cal Due Date CAUTION To maintain the operating pressures in the header to within design limits, DO NOT exceed 133 psig at 0-PT-67-17, ERCW HEADER B PRESS. If necessary, one of the ERCW pumps may be stopped.
NOTES
: 1)  Keep track of the number of turns from Full Open that Valve 0-FCV-67-152 is throttled for the various flow rates; this information is required for the >8800, and >7125 gpm data points.
: 2)  IF electronic/ultra-sonic flow devices are used, enter actual flow in respective column of Data Sheet 1. ('P column may be N/Ad if actual flow is measured)
[9]    MANUALLY ADJUST 0-FCV-67-152, CCS HX C ERCW HDR 1B OUT FLOW, to obtain a flow rate of >8800 (8800-9200) gpm at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL, AND RECORD flow rate at 0-FE-67-226 ( EFD-2) on Data Sheet 1 in Column 5.                                                          ________
[10]  RECORD flow rate and the number of valve turns from FULL OPEN for the "B" Limit Switch position.                              ________
Valve Turns From Full Open 0-FI-67-226 (gpm)
EDF-2 (gpm)


6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)
WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                       TRAIN B                   Rev. 0000 Page 42 of 204 Data Package: Page ____ of ____                                     Date ________
[7] OPEN breaker 0-BKR-67-152B at Compt 12B on 480V RMOV BD 2B2-B for CCS HX OUT ERCW HDR B FLOW CNTL
6.2     UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)
 
[11]   MANUALLY ADJUST 0-FCV-67-152, CCS HX C ERCW HDR 1B OUT FLOW, to obtain a flow rate of >7125 (7125-7525) gpm at 0-FT-67-226 ( EFD -2), CCS HX C OUTLET ERCW HDR B FLOW CNTL, AND RECORD 'P and the number of valve turns from FULL OPEN for the "A" Limit Switch position.                               ________
(0-FCV-67-152). ________
Valve Turns From Full Open 0-FE-67-226 (gpm)
[8] RECORD on the calibration data for the flow indication 0-FI-67-226 (EFD-2) with 0-FCV-67-152 at FULL OPEN (N/A M&TE if temporary flow element not installed). ________ GPM    M&TE  Cal Due Date CAUTION To maintain the operating pressures in the header to within design limits, DO NOT exceed 133 psig at 0-PT-67-17, ERCW HEADER B PRESS. If necessary, one of the ERCW pumps may be stopped.
EDF-2 (gpm)
NOTES 1) Keep track of the number of turns from Full Open that Valve 0-FCV-67-152 is throttled for the various flow rates; this information is required for the >8800, and >7125 gpm
[12]   PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS A.                               ________
 
[13]   CLOSE breaker 0-BKR-67-152B at Compt 12B on 480V RMOV BD 2B2-B for CCS HX OUT ERCW HDR B FLOW CNTL (0-FCV-67-152), AND VERIFY by light indication that Valve 0-FCV-67-152 repositions to the POS A.                                         ________
data points. 2) IF electronic/ultra-sonic flow devices are used, enter actual flow in respective column of Data Sheet 1.  (P column may be N/Ad if actual flow is measured)
Valve Turns From Full Open 0-FE-67-226 (gpm)
[9] MANUALLY ADJUST 0-FCV-67-152, CCS HX C ERCW HDR 1B OUT FLOW, to obtain a flow rate of >8800
EDF-2 (gpm)
 
(8800-9200) gpm at 0-FT-67-226 (EFD-2), CCS HX C
 
OUTLET ERCW HDR B FLOW CNTL, AND  RECORD flow rate at 0-FE-67-226 ( EFD-2) on Data Sheet 1 in Column 5. ________
[10] RECORD flow rate and the number of valve turns from FULL OPEN for the "B" Limit Switch position. ________ Valve Turns From Full Open  0-FI-67-226 (gpm)  EDF-2 (gpm) 
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 42 of 204  
 
Data Package: Page ____ of ____     Date ________  
 
6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)
[11] MANUALLY ADJUST 0-FCV-67-152, CCS HX C ERCW HDR 1B OUT FLOW, to obtain a flow rate of >7125 (7125-7525)  
 
gpm at 0-FT-67-226 ( EFD -2), CCS HX C OUTLET ERCW  
 
HDR B FLOW CNTL, AND   RECORD P and the number of valve turns from FULL OPEN for the "A" Limit Switch position. ________ Valve Turns From Full Open   0-FE-67-226 (gpm)   EDF-2 (gpm)
[12] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS A. ________
[13] CLOSE breaker 0-BKR-67-152B at Compt 12B on 480V RMOV BD 2B2-B for CCS HX OUT ERCW HDR B FLOW  
 
CNTL (0-FCV-67-152), AND VERIFY by light indication that Valve 0-FCV-67-152 repositions to the POS A. ________ Valve Turns From Full Open   0-FE-67-226 (gpm)   EDF-2 (gpm)
NOTE Steps 6.2[14] through 6.2[21] will test the CCS HX C anticavitation bypass Valve 0-FCV-67-144.
NOTE Steps 6.2[14] through 6.2[21] will test the CCS HX C anticavitation bypass Valve 0-FCV-67-144.
[14] OPEN breaker 0-BKR-67-144B for CCS HX C OUT ERCW FLOW CNTL BYP (0-FCV-67-144), at 480V RMOV BD 1B2-B Compt 17D. ________
[14]   OPEN breaker 0-BKR-67-144B for CCS HX C OUT ERCW FLOW CNTL BYP (0-FCV-67-144), at 480V RMOV BD 1B2-B Compt 17D.                                                       ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 43 of 204


Data Package: Page ____ of ____     Date ________  
WBN            ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                      TRAIN B                  Rev. 0000 Page 43 of 204 Data Package: Page ____ of ____                                   Date ________
6.2      UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)
[15]  OPEN 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, to obtain a flow rate of >6000 gpm at 0-FI-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL.                  ________
[16]  PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, 0-M-27A, to CLOSE AND VERIFY that Valve 0-FCV-67-152 CLOSES.                          ________
[17]  MANUALLY OPEN 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, to FULL OPEN position.                      ________
[18]  RECORD flow rate at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL.                                    ________
0-FI-67-226 =                    gpm EDF-2 Flow Rate =                    gpm M&TE                            or/Cal Due Date
[19]  IF Flow Rate measurement is in H2O 'P using temporary 'P gauge, THEN CALCULATE flow through CCS HX C as follows OTHERWISE, N/A this step:                                        ________
1st CV M&TE              ____________________        Cal Due Date          _________________
EFD-2 FLOW        ____________________        GPM M&TE              ____________________        Cal Due Date          _________________
FLOW 'P =        ____________________        inches H2O K (P)1/2 =              852 ( )1/2 =        _________________      GPM


6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)
WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                     TRAIN B                   Rev. 0000 Page 44 of 204 Data Package: Page ____ of ____                                     Date ________
[15] OPEN 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, to obtain a flow rate of >6000 gpm at 0-FI-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL. ________
6.2     UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)
[16] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, 0-M-27A, to CLOSE AND VERIFY that Valve 0-FCV-67-152 CLOSES. ________
[17] MANUALLY OPEN 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, to FULL OPEN position. ________
[18] RECORD  flow rate at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL. ________
0-FI-67-226 = gpm  EDF-2 Flow Rate  =  gpm  M&TE  or/Cal Due Date
[19] IF Flow Rate measurement is in H 2 O P using temporary P gauge, THEN  CALCULATE flow through CCS HX C as follows
 
OTHERWISE, N/A this step: ________  1st
________
CV M&TE ____________________ Cal Due Date _________________
EFD-2 FLOW ____________________ GPM M&TE ____________________ Cal Due Date _________________
FLOW P = ____________________ inches H 2 O  1/2 =  852 (  )
1/2 = _________________ GPM
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 44 of 204  
 
Data Package: Page ____ of ____     Date ________  
 
6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)
CAUTION To maintain the operating pressures in the header to within design limits DO NOT exceed 133 psig at 0-PT-67-17, ERCW HEADER B PRESS. If necessary, one of the ERCW pumps may be stopped.
CAUTION To maintain the operating pressures in the header to within design limits DO NOT exceed 133 psig at 0-PT-67-17, ERCW HEADER B PRESS. If necessary, one of the ERCW pumps may be stopped.
[20] CYCLE 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, manually from full OPEN down to a flow rate of  
[20]   CYCLE 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, manually from full OPEN down to a flow rate of
 
              ~3330 gpm at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL, and back to full open while monitoring bypass piping for steady state and transient vibrations.                                                       ________
~3330 gpm at 0-FT-67-226 (EFD-2), CCS HX C OUTLET  
[21]   NOTE flow which exhibits the worst case vibration characteristics, AND RECORD flow through CCS C HX at 0-FI-67-226
 
__________ gpm.                                                   ________
ERCW HDR B FLOW CNTL, and back to full open while  
1st CV
 
[22]   CLOSE breaker 0-BKR-67-144B for 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, at 480V RMOV BD 1B2-B, Compt 17D.                                                       ________
monitoring bypass piping for steady state and transient  
[23]   ADJUST Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to obtain a flow rate of >6000 gpm.           ________
 
[24]   PERFORM the Work Order to adjust the limit switches for 0-FCV-67-152, CCS HX C ERCW HDR B OUT FLOW, for the POS A and B positions.                                           ________
vibrations. ________
[25]   AFTER the HOLD ORDER is REMOVED, THEN PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A to the POS A AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS A.                                                       ________
[21] NOTE flow which exhibits the worst case vibration characteristics, AND RECORD flow through CCS C HX at 0-FI-67-226   __________ gpm. ________
1st
________
CV [22] CLOSE breaker 0-BKR-67-144B for 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, at 480V RMOV BD 1B2-B, Compt 17D. ________
[23] ADJUST Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to obtain a flow rate of >6000 gpm. ________
[24] PERFORM the Work Order to adjust the limit switches for 0-FCV-67-152, CCS HX C ERCW HDR B OUT FLOW, for the POS A and B positions. ________
[25] AFTER the HOLD ORDER is REMOVED, THEN PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A to the POS A AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS A. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 45 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)
[26] PLACE Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, CLOSES. ________
[27] RECORD the flow rate in POS A at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL.
__________ gpm ________
[28] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS B, AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS B. ________
[29] RECORD flow rate in POS B at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL.
__________ gpm ________
[30] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR A, on 0-M-27A, to POS OPEN, AND VERIFY by light indication that valve 0-FCV-67-152 OPENS. ________
[31] RECORD the flow rate in POS OPEN at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL.__________ gpm _________
[32] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS B, AND VERIFY by light indication that Valve 0-FCV-67-152 CLOSES to the POS B, AND RECORD EFD-2 flow rate __________ gpm. (>8800 gpm)
(ACC CRIT) ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 46 of 204
 
Data Package:  Page ____ of ____    Date ________  


6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)
WBN              ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                      TRAIN B                  Rev. 0000 Page 45 of 204 Data Package: Page ____ of ____                                    Date ________
[33] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS A, AND VERIFY by light indication that Valve 0-FCV-67-151 CLOSES to the POS A.  
6.2     UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)
[26]   PLACE Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, CLOSES.                            ________
[27]  RECORD the flow rate in POS A at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL.
__________ gpm                                                  ________
[28]  PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS B, AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS B.                                                      ________
[29]  RECORD flow rate in POS B at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL.
__________ gpm                                                  ________
[30]  PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR A, on 0-M-27A, to POS OPEN, AND VERIFY by light indication that valve 0-FCV-67-152 OPENS.        ________
[31]  RECORD the flow rate in POS OPEN at 0-FT-67-226 (EFD-2),
CCS HX C OUTLET ERCW HDR B FLOW CNTL.__________ gpm                                            _________
[32]  PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS B, AND VERIFY by light indication that Valve 0-FCV-67-152 CLOSES to the POS B, AND RECORD EFD-2 flow rate __________ gpm. (>8800 gpm)
(ACC CRIT)                                                      ________


WBN              ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                      TRAIN B                  Rev. 0000 Page 46 of 204 Data Package: Page ____ of ____                                    Date ________
6.2    UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)
[33]  PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS A, AND VERIFY by light indication that Valve 0-FCV-67-151 CLOSES to the POS A.
RECORD flow rate __________ gpm. (>7125 gpm)
RECORD flow rate __________ gpm. (>7125 gpm)
(ACC CRIT) ________
(ACC CRIT)                                                       ________
[34] PLACE Handswitch 0-HS-67-144A, CCS HX C ALT DISCH TO HDR A, on 0-M-27A, to OPEN, AND ADJUST 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, OPEN to obtain 3000-6000 gpm flow rate. ________
[34]   PLACE Handswitch 0-HS-67-144A, CCS HX C ALT DISCH TO HDR A, on 0-M-27A, to OPEN, AND ADJUST 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, OPEN to obtain 3000-6000 gpm flow rate.               ________
[35] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-152 CLOSES. ________
[35]   PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-152 CLOSES.       ________
[36] ADJUST 0-HS-67-144A, CCS HC C ALT DISCH TO HDR A to obtain >6000 gpm.(ACC CRIT) ________
[36]   ADJUST 0-HS-67-144A, CCS HC C ALT DISCH TO HDR A to obtain >6000 gpm.(ACC CRIT)                                     ________
[37] PERFORM Normal Operation Mode flow balance in accordance with Appendix I and Data Sheet 1, AND VERIFY flows are equal to or greater than the minimum required flows. ________ (ACC CRIT)
[37]   PERFORM Normal Operation Mode flow balance in accordance with Appendix I and Data Sheet 1, AND VERIFY flows are equal to or greater than the minimum required flows.                                                 ________
RECORD throttle valve positions on Data Sheet 5. ________ [38] RECORD applicable pressure data on Data Sheet 1. ________  
(ACC CRIT)
 
RECORD throttle valve positions on Data Sheet 5.
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 47 of 204
[38]   RECORD applicable pressure data on Data Sheet 1.                 ________
 
Data Package:  Page ____ of ____    Date ________
 
6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC
[1] VERIFY prerequisites listed in Section 4.0 and Section 6.1 for Section 6.3 have been completed. ________
[2] VERIFY applicable flows are equal to or greater than the minimum required flows as specified in Data Sheet 1. ________
[3] PLACE 0-HS-32-682, AUX CNTL AIR COMPR B to the START position. ________
[4] PLACE Handswitch 2-HS-67-99A, LWR CNTMT B CLRS SUP CIV-B, on 0-M-27A, to CLOSE, AND  VERIFY by light indication that Valve 2-FCV-67-99 CLOSES. ________
[5] PLACE Handswitch 2-HS-67-107A, LWR CNTMT D CLRS SUP CIV-B, on 0-M-27A, to CLOSE, AND  VERIFY by light indication that Valve 2-FCV-67-107 CLOSES. ________
[6] PLACE Handswitch 2-HS-67-138A, UPR CNTMT CLR B SUP CIV-B, on 0-M-27A, to CLOSE, AND  VERIFY by light indication that Valve 2-FCV-67-138 CLOSES. ________
[7] PLACE Handswitch 2-HS-67-141A, UPR CNTMT CLR D SUP CIV-B, on 0-M-27A, to CLOSE, AND  VERIFY by light indication that Valve 2-FCV-67-141 CLOSES. ________
[8] PLACE Handswitch 2-HS-67-123A, CNTMT SPRAY HX 2B INLET, on 0-M-27A, to OPEN, AND  VERIFY by light indication that Valve 2-FCV-67-123 OPENS. ________
[9] PLACE Handswitch 2-HS-67-124A, CNTMT SPRAY HTX 2B RETURN, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-124 OPENS. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 48 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)
 
[10] CLOSE air bleed off valve 2-ISV-32-2880 to the following Control Valve 2-FCV-67-182, SIP ROOM COOLER 2B-B
 
ERCW SUP FLOW CNTL and the Control Valves are FULL OPEN. ________ [11] CLOSE air bleed off valve 2-ISV-32-3028 to the following  Control Valve 2-FCV-67-186, CSP ROOM COOLER 2B-B
 
ERCW SUP FLOW CNTL, and the Control Valves are FULL OPEN. ________ [12] VERIFY with Test Director that there is flow through 2B SI pump room cooler. ________
[13] VERIFY with Test Director that there is flow through 2B CS pump room cooler. ________
[14] PLACE Handswitch 2-HS-67-67A, DG 2B-B NORM SUP, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-67 OPENS. ________
[15] PLACE Handswitch 1-HS-67-67A, DG 1B-B NORM SUP, on 0-M-27A, to OPEN, AND  VERIFY by light indication that Valve 2-FCV-67-67 OPENS. ________
[16] PLACE Handswitch 0-HS-67-152A, CCS HTX C ALT DISCH TO HDR B, on 0-M-27A, to POS A, AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the A position. ________
[17] PLACE Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, CLOSES. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 49 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)
 
[18] RECORD data for calculation then 
 
CALCULATE differential pressure required to simulate the loss of a downstream dam: ________
1st
________
CV River level 0-LI-67-490, INTAKE PUMP STATION RIVER WATER LEVEL, [0-PNL-276-L147A, IPS, EL 722, West side] local at Intake Pumping Station feet Header Pressure (0-PI-67-18B)  psig 31.2)666 Level River (31.2 1 666 Level River DP  psid [19] RECORD the running ERCW pump discharge valve numbers for pumps
 
for the applicable pump. A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___ ________ P =  psid  M&TE  Cal Due Date  B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___ ________ P =  psid  M&TE  Cal Due Date WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 50 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)
 
[20] RECORD data, AND  CALCULATE the revised P (this P simulates loss of downstream dam)
A. psid__________
P P P vised Re 18 Step 1#Pump 1#Pump  ________  1st
________
CV B. psid__________
P P P vised Re 18 Step 2#Pump 2#Pump  ________  1st
________
CV [21] ADJUST the running pumps discharge valvescalculated in Step 6.3[20] (it may be necessary to readjust each valve several
 
times to achieve required results), AND RECORD valve turns from OPEN. A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___ ________ Turns Open  P =  psid  M&TE  Cal Due Date  B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___ ________ Turns Open  P =  psid  M&TE  Cal Due Date 
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 51 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)


NOTE Adjustment for flow through any of the newly added components for this mode, identified on Data Sheet 2, DOES NOT invalidate setpoints from previous modes. Adjustment of components set in previous modes, requires a RETEST of the previous mode but does not
WBN            ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                      TRAIN B                    Rev. 0000 Page 47 of 204 Data Package: Page ____ of ____                                      Date ________
6.3    UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC
[1]    VERIFY prerequisites listed in Section 4.0 and Section 6.1 for Section 6.3 have been completed.                                    ________
[2]    VERIFY applicable flows are equal to or greater than the minimum required flows as specified in Data Sheet 1.                ________
[3]    PLACE 0-HS-32-682, AUX CNTL AIR COMPR B to the START position.                                                    ________
[4]    PLACE Handswitch 2-HS-67-99A, LWR CNTMT B CLRS SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-99 CLOSES.          ________
[5]    PLACE Handswitch 2-HS-67-107A, LWR CNTMT D CLRS SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-107 CLOSES.          ________
[6]    PLACE Handswitch 2-HS-67-138A, UPR CNTMT CLR B SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-138 CLOSES.          ________
[7]    PLACE Handswitch 2-HS-67-141A, UPR CNTMT CLR D SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-141 CLOSES.          ________
[8]    PLACE Handswitch 2-HS-67-123A, CNTMT SPRAY HX 2B INLET, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-123 OPENS.           ________
[9]    PLACE Handswitch 2-HS-67-124A, CNTMT SPRAY HTX 2B RETURN, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-124 OPENS.          ________


constitute a test deficiancy.
WBN            ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                      TRAIN B                    Rev. 0000 Page 48 of 204 Data Package: Page ____ of ____                                      Date ________
[22] PERFORM Train B flow balance in accordance with Appendix I and Data Sheet 2, for TR B U-1 COLD SHUTDOWN, U-2  
6.3    UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)
[10]  CLOSE air bleed off valve 2-ISV-32-2880 to the following Control Valve 2-FCV-67-182, SIP ROOM COOLER 2B-B ERCW SUP FLOW CNTL and the Control Valves are FULL OPEN.                                                             ________
[11]   CLOSE air bleed off valve 2-ISV-32-3028 to the following Control Valve 2-FCV-67-186, CSP ROOM COOLER 2B-B ERCW SUP FLOW CNTL, and the Control Valves are FULL OPEN.                                                              ________
[12]  VERIFY with Test Director that there is flow through 2B SI pump room cooler.                                                  ________
[13]  VERIFY with Test Director that there is flow through 2B CS pump room cooler.                                                  ________
[14]  PLACE Handswitch 2-HS-67-67A, DG 2B-B NORM SUP, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-67 OPENS.          ________
[15]  PLACE Handswitch 1-HS-67-67A, DG 1B-B NORM SUP, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-67 OPENS.          ________
[16]  PLACE Handswitch 0-HS-67-152A, CCS HTX C ALT DISCH TO HDR B, on 0-M-27A, to POS A, AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the A position.                                                    ________
[17]  PLACE Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, CLOSES.                              ________


LOCA-RECIRC, AND RECORD throttle valve positions on Data Sheet 5. ________
WBN              ERCW SYSTEM FLOW BALANCE                      2-PTI-067-02-B Unit 1 & 2                          TRAIN B                      Rev. 0000 Page 49 of 204 Data Package: Page ____ of ____                                            Date ________
[23] RE-VERIFY A. CALCULATE
6.3    UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)
____________
[18]  RECORD data for calculation then CALCULATE differential pressure required to simulate the loss of a downstream dam:                                                ________
9.0*]2/P 2#Valve P 1#Valve[  ________  1st
1st CV River level 0-LI-67-490, INTAKE PUMP STATION RIVER WATER LEVEL, [0-PNL-276-L147A, IPS, EL 722, West side]
________
local at Intake Pumping Station feet Header Pressure (0-PI-67-18B)                            psig 1 &#xba;    &sect; (River Level  666)
CV B. CALCULATE
* DP    River Level  666 <<            &#xa8;                    &#xb8;
____________
                                              &#xac; 2.31>>1/4 &#xa9;        2.31        &#xb9;              psid
1.1*]2/P 2#Valve P 1#Valve[  ________  1st
[19]   RECORD the running ERCW pump discharge valve numbers for pumps selected in Step 6.1[9] or 6.1[11] and P from the M&TE used in Step 4.3[12]
________
for the applicable pump.
CV [24] ENTER an "NA" if the values in Step 6.3[25]A & 6.3[25]B are greater than the lower limit value of Step 6.3[23]A and less than the upper limit value of Step 6.3[23]B. ________
A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___                      ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 52 of 204
                'P =                        psid M&TE                                    Cal Due Date B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___                      ________
                'P =                        psid M&TE                                    Cal Due Date


Data Package: Page ____ of ____    Date ________  
WBN              ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                        TRAIN B                      Rev. 0000 Page 50 of 204 Data Package: Page ____ of ____                                         Date ________
6.3     UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)
[20]  RECORD data, AND CALCULATE the revised 'P (this 'P simulates loss of downstream dam)
A. Re vised ' PPump #1                            __________ psid
                                        ' PPump #1  ' PStep >18 @
1st CV B. Re vised 'PPump # 2                                __________ psid
                                        'PPump # 2        'PStep  >18 @
1st CV
[21]  ADJUST the running pumps discharge valves to obtain the revised P calculated in Step 6.3[20] (it may be necessary to readjust each valve several times to achieve required results), AND RECORD valve turns from OPEN.
A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___                      ________
Turns Open                    'P =                        psid M&TE                                  Cal Due Date B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___                      ________
Turns Open                    'P =                        psid M&TE                                  Cal Due Date


6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)  
WBN              ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                        TRAIN B                        Rev. 0000 Page 51 of 204 Data Package: Page ____ of ____                                          Date ________
6.3     UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)
NOTE Adjustment for flow through any of the newly added components for this mode, identified on Data Sheet 2, DOES NOT invalidate setpoints from previous modes. Adjustment of components set in previous modes, requires a RETEST of the previous mode but does not constitute a test deficiancy.
[22]  PERFORM Train B flow balance in accordance with Appendix I and Data Sheet 2, for TR B U-1 COLD SHUTDOWN, U-2 LOCA-RECIRC, AND RECORD throttle valve positions on Data Sheet 5.                        ________
[23]  RE-VERIFY the ERCW pump discharge valve P as follows:
A. CALCULATE the lower limit P from 6.3[19] values:
[                        / 2 ]
* 0 .9  __________ __
Valve#1 'P  Valve#2 'P 1st CV B. CALCULATE the upper limit P from 6.3[19] values:
[                        / 2]
* 1. 1  __________ __
Valve#1 'P  Valve#2 'P 1st CV
[24]  ENTER an "NA" if the values in Step 6.3[25]A & 6.3[25]B are greater than the lower limit value of Step 6.3[23]A and less than the upper limit value of Step 6.3[23]B.                            ________


[25] RECORDA. ERCW Pump #1 Discharge Valve 0-ISV-67-504___ ________ P = psid   M&TE Cal Due Date   B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___ ________ P = psid   M&TE Cal Due Date NOTE Only valves that have been adjusted after the throttle setpoints recorded in Data Sheet 5 need to be reperformed. This would be the case if this subsection is being retested  
WBN              ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                        TRAIN B                    Rev. 0000 Page 52 of 204 Data Package: Page ____ of ____                                        Date ________
 
6.3      UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)
because of valve adjustment in a succeeding section.
[25]   RECORD the running ERCW pump discharge valves P:
[26] DETERMINE the total flow through CCS C HX (EFD-2)
A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___                   ________
AND RECORD data below: ________ EFD-2 (gpm) (CCS C HX)
                  'P =                     psid M&TE                                 Cal Due Date B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___                   ________
[27] VERIFY the following: (ACC CRIT)
                  'P =                     psid M&TE                                 Cal Due Date NOTE Only valves that have been adjusted after the throttle setpoints recorded in Data Sheet 5 need to be reperformed. This would be the case if this subsection is being retested because of valve adjustment in a succeeding section.
A. 0-FCV-67-152 (POS A) flow > 7125 gpm. ________
[26]   DETERMINE the total flow through CCS C HX (EFD-2) AND RECORD data below:                                                   ________
[28] VERIFY that all flows on Data Sheet 2 meet the listed acceptance criteria in column 9. (ACC CRIT) ________
EFD-2 (gpm) (CCS C HX)
[27]   VERIFY the following: (ACC CRIT)
A. 0-FCV-67-152 (POS A) flow > 7125 gpm.                           ________
[28]   VERIFY that all flows on Data Sheet 2 meet the listed acceptance criteria in column 9. (ACC CRIT)                         ________
NOTE The following step is NOT applicable if this section is being retested due to valve adjustment in another mode invalidating the original setpoint.
NOTE The following step is NOT applicable if this section is being retested due to valve adjustment in another mode invalidating the original setpoint.
[29] RECORD pump data on Data Sheet 6. ________
[29]   RECORD pump data on Data Sheet 6.                                   ________
[30] RECORD applicable pressure data on Data Sheet 2. ________
[30]   RECORD applicable pressure data on Data Sheet 2.                     ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 53 of 204


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                      TRAIN B                  Rev. 0000 Page 53 of 204 Data Package: Page ____ of ____                                     Date ________
6.3      UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)
NOTE IF Section 6.4 is to be performed immediately upon completion of Section 6.3, step 6.3[31]
may be N/Ad.
[31]  OPEN ERCW pump discharge valves throttled in Step 6.3[21].        ________
[32]  PLACE Handswitch 2-HS-67-99A, LWR CNTMT B CLRS SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-99 OPENS.          ________
[33]  PLACE Handswitch 2-HS-67-107A, LWR CNTMT D CLRS SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-107 OPENS.          ________
[34]  PLACE Handswitch 2-HS-67-138A, UPR CNTMT CLR B SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-138 OPENS.          ________
[35]  CLOSE 2-FCV-67-182, AND VERIFY NO flow through 2B SI pump room cooler.                    ________
[36]  CLOSE 2-FCV-67-186, AND VERIFY NO flow through 2B CS pump room cooler.                    ________
[37]  PLACE Handswitch 2-HS-67-141A, UPR CNTMT CLR D SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-141 OPENS.          ________
[38]  PLACE Handswitch 2-HS-67-123A, CNTMT SPRAY HX 2B INLET, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-123 CLOSES.        ________
[39]  PLACE Handswitch 2-HS-67-124A, CNTMT SPRAY HTX 2B RETURN, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-124 CLOSES.        ________


6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)  
WBN            ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                      TRAIN B                  Rev. 0000 Page 54 of 204 Data Package: Page ____ of ____                                    Date ________
6.3     UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)
[40]  OPEN air bleed off valve 2-ISV-32-2880 to the following Control Valve 2-FCV-67-182, SIP ROOM COOLER 2B-B ERCW SUP FLOW CNTL and the Control Valves are FULL CLOSED.                                                          ________
[41]  OPEN air bleed off valve 2-ISV-32-3028 to the following Control Valve 2-FCV-67-186, CSP ROOM COOLER 2B-B ERCW SUP FLOW CNTL and the Control Valves are FULL CLOSED.                                                          ________
[42]  PLACE Handswitch 0-HS-67-144A, CCS HTX C DISCH TO HDR A, on 0-M-27A, to OPEN AND ADJUST Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, to obtain 4000-6000 gpm flowrate.                ________
[43]  PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-152 CLOSES.      ________
[44]  ADJUST 0-HS-67-144 to obtain flow rate of >6000 gpm.            ________


NOTE IF Section 6.4 is to be performed immediately upon completion of Section 6.3, step 6.3[31] may be N/Ad.
WBN            ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                      TRAIN B                    Rev. 0000 Page 55 of 204 Data Package: Page ____ of ____                                      Date ________
[31] OPEN ERCW pump discharge valves throttled in Step 6.3[21]. ________
6.4     UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN
[32] PLACE Handswitch 2-HS-67-99A, LWR CNTMT B CLRS SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-99 OPENS. ________
[1]    VERIFY prerequisites listed in Section 4.0 and 6.1 for Section 6.4 have been completed.                                           ________
[33] PLACE Handswitch 2-HS-67-107A, LWR CNTMT D CLRS SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-107 OPENS. ________
[2]   VERIFY flows are equal to or greater than the minimum required flows, as specified by Data Sheet 1.                       ________
[34] PLACE Handswitch 2-HS-67-138A, UPR CNTMT CLR B SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-138 OPENS. ________
[3]   PLACE Handswitch 1-HS-67-99A, LWR CNTMT B CLRS SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-99 CLOSES.           ________
[35] CLOSE 2-FCV-67-182, AND VERIFY NO flow through 2B SI pump room cooler. ________
[4]   PLACE Handswitch 1-HS-67-107A, LWR CNTMT D CLRS SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-107 CLOSES.         ________
[36] CLOSE 2-FCV-67-186, AND VERIFY NO flow through 2B CS pump room cooler. ________
[5]   PLACE Handswitch 1-HS-67-138A, UPR CNTMT CLR B SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-138 CLOSES.         ________
[37] PLACE Handswitch 2-HS-67-141A, UPR CNTMT CLR D SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-141 OPENS. ________
[6]   PLACE Handswitch 1-HS-67-141A, UPR CNTMT CLR D SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-141 CLOSES.         ________
[38] PLACE Handswitch 2-HS-67-123A, CNTMT SPRAY HX 2B INLET, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-123 CLOSES. ________
[7]   PLACE Handswitch 1-HS-67-123A, CNTMT SPRAY HX 1B INLET, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-123 OPENS.           ________
[39] PLACE Handswitch 2-HS-67-124A, CNTMT SPRAY HTX 2B RETURN, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-124 CLOSES. ________
[8]   PLACE Handswitch 1-HS-67-124A, CNTMT SPRAY HTX 1B RETURN, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-126 OPENS.           ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 54 of 204
[9]    CLOSE air bleed off valve 1-ISV-32-2983 to the following Conol Valve 1-FCV-67-182, SIP ROOM COOLER 1B-B ERCW SUP FLOW CNTL, and the Control Valves are FULL OPEN.               ________


Data Package:  Page ____ of ____    Date ________
WBN             ERCW SYSTEM FLOW BALANCE                 2-PTI-067-02-B Unit 1 & 2                     TRAIN B                     Rev. 0000 Page 56 of 204 Data Package: Page ____ of ____                                     Date ________
 
6.4     UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)
6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)
[10]   CLOSE air bleed off valve 1-ISV-32-3017 to the following Control Valve 1-FCV-67-186, CSP ROOM COOLER 1B-B ERCW SUP FLOW CNTL,and the Control Valves are FULL OPEN.                                                             ________
 
[11]   VERIFY with Test Director that there is flow through 1B SI pump room cooler.                                                 ________
[40] OPEN air bleed off valve 2-ISV-32-2880 to the following Control Valve 2-FCV-67-182, SIP ROOM COOLER 2B-B
[12]   VERIFY with Test Director that there is flow through 1B CS pump room cooler.                                                 ________
 
[13]   PLACE Handswitch 0-HS-67-152A, CCS HTX C DISCH TO HDR B, on 0-M-27A, to POS A AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS A.                                                         ________
ERCW SUP FLOW CNTL and the Control Valves are FULL CLOSED. ________ [41] OPEN air bleed off valve 2-ISV-32-3028 to the following Control Valve 2-FCV-67-186, CSP ROOM COOLER 2B-B
[14]   PLACE Handswitch 0-HS-67-144A, CCS HTX C BYPASS FLOW CNTL, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, CLOSES.                               ________
 
[15]   PLACE Handswitch 0-HS-67-152A, CCS HTX C DISCH TO HDR B, on 0-M-27A, to POS B AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS B.                                                         ________
ERCW SUP FLOW CNTL and the Control Valves are FULL CLOSED. ________ [42] PLACE Handswitch 0-HS-67-144A, CCS HTX C DISCH TO HDR A, on 0-M-27A, to OPEN AND  ADJUST Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, to obtain 4000-6000 gpm flowrate. ________
[43] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-152 CLOSES. ________
[44] ADJUST 0-HS-67-144 to obtain flow rate of >6000 gpm. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 55 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN
[1] VERIFY prerequisites listed in Section 4.0 and 6.1 for Section 6.4 have been completed. ________
[2] VERIFY flows are equal to or greater than the minimum required flows, as specified by Data Sheet 1. ________
[3] PLACE Handswitch 1-HS-67-99A, LWR CNTMT B CLRS SUP CIV-B, on 0-M-27A, to CLOSE, AND  VERIFY by light indication that Valve 2-FCV-67-99 CLOSES. ________
[4] PLACE Handswitch 1-HS-67-107A, LWR CNTMT D CLRS SUP CIV-B, on 0-M-27A, to CLOSE, AND  VERIFY by light indication that Valve 1-FCV-67-107 CLOSES. ________
[5] PLACE Handswitch 1-HS-67-138A, UPR CNTMT CLR B SUP CIV-B, on 0-M-27A, to CLOSE, AND  VERIFY by light indication that Valve 2-FCV-67-138 CLOSES. ________
[6] PLACE Handswitch 1-HS-67-141A, UPR CNTMT CLR D SUP CIV-B, on 0-M-27A, to CLOSE, AND  VERIFY by light indication that Valve 2-FCV-67-141 CLOSES. ________
[7] PLACE Handswitch 1-HS-67-123A, CNTMT SPRAY HX 1B INLET, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-123 OPENS. ________
[8] PLACE Handswitch 1-HS-67-124A, CNTMT SPRAY HTX 1B RETURN, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-126 OPENS. ________
[9] CLOSE air bleed off valve 1-ISV-32-2983 to the following Conol Valve 1-FCV-67-182, SIP ROOM COOLER 1B-B ERCW SUP FLOW CNTL, and the Control Valves are FULL OPEN.
________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 56 of 204  
 
Data Package: Page ____ of ____     Date ________  
 
6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)  
 
[10] CLOSE air bleed off valve 1-ISV-32-3017 to the following Control Valve 1-FCV-67-186, CSP ROOM COOLER 1B-B  
 
ERCW SUP FLOW CNTL,and the Control Valves are FULL OPEN. ________ [11] VERIFY with Test Director that there is flow through 1B SI pump room cooler. ________
[12] VERIFY with Test Director that there is flow through 1B CS pump room cooler. ________
[13] PLACE Handswitch 0-HS-67-152A, CCS HTX C DISCH TO HDR B, on 0-M-27A, to POS A AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS A. ________
[14] PLACE Handswitch 0-HS-67-144A, CCS HTX C BYPASS FLOW CNTL, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, CLOSES. ________
[15] PLACE Handswitch 0-HS-67-152A, CCS HTX C DISCH TO HDR B, on 0-M-27A, to POS B AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS B. ________  
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 57 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)


WBN              ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                        TRAIN B                    Rev. 0000 Page 57 of 204 Data Package: Page ____ of ____                                        Date ________
6.4      UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)
NOTE If ERCW pump discharge valves are throttled (Step 6.3[21]) and pump alignments are unchanged, THEN (Step 6.4[16]) through 6.4[19] may be N/Ad
NOTE If ERCW pump discharge valves are throttled (Step 6.3[21]) and pump alignments are unchanged, THEN (Step 6.4[16]) through 6.4[19] may be N/Ad
[16] RECORD data, AND CALCULATE differential pressure required to simulate the loss of a downstream dam: ________
[16]   RECORD data, AND CALCULATE differential pressure required to simulate the loss of a downstream dam:                                           ________
1st
1st CV River level (0-LI-67-479) local at Intake Pumping Station         feet Header Pressure (0-PI-67-17B)                           psig 1 &#xba; &sect; River Level  666
________
* DP    River Level  666 <<      >> &#xa8;                  &#xb8;
CV River level (0-LI-67-479) local at Intake Pumping Station feet Header Pressure (0-PI-67-17B) psig 31.2 666 Level River 31.2 1 666 Level River DP  psid [17] RECORD the running ERCW pump discharge valve numbers m the M&TE used in step 4.3[12] for the applicable pump : A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___ ________ P = psid   M&TE Cal Due Date   B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___ ________ P = psid   M&TE Cal Due Date WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 58 of 204
                                              &#xac; 2.311/4 &#xa9;        2.31      &#xb9;              psid
 
[17]   RECORD the running ERCW pump discharge valve numbers for pumps selected in Steps 6.1[9] or 6.1[11] and P from the M&TE used in step 4.3[12] for the applicable pump :
Data Package:  Page ____ of ____    Date ________
A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___                   ________
                  'P =                     psid M&TE                                 Cal Due Date B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___                   ________
                  'P =                     psid M&TE                                 Cal Due Date


6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)  
WBN              ERCW SYSTEM FLOW BALANCE                          2-PTI-067-02-B Unit 1 & 2                        TRAIN B                          Rev. 0000 Page 58 of 204 Data Package: Page ____ of ____                                              Date ________
 
6.4     UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)
[18] RECORD data, AND   CALCULATE the revised P (this P simulates loss of downstream dam).
[18]   RECORD data, AND CALCULATE the revised 'P (this 'P simulates loss of downstream dam).
A. psid__________
A. Re vised'PPump #1                                   __________ psid
P P P vised Re]16[STEP 1#Pump 1#Pump ________  1st
                                        'PPump #1       'PSTEP    [16 ]
________
1st CV B. Re vised'PPump # 2                             __________ psid
CV B. psid__________
                                        'PPump # 2   'PStep [16 ]
P P P vised Re]16[Step 2#Pump 2#Pump  ________  1st
1st CV
________
[19]   ADJUST the running pumps discharge valves to obtain the revised P calculated in the Step 6.4[18] (it may be necessary to readjust each valve several times to achieve required results).
CV [19] ADJUST the running pumps discharge valves to obtain the  
A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___                           ________
 
                'P =                     psid Turns from FULL OPEN M&TE                                   Cal Due Date B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___                           ________
to readjust each valve several times to achieve required  
                'P =                     psid Turns from FULL OPEN M&TE                                   Cal Due Date
 
results). A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___ ________ P = psid   Turns from FULL OPEN   M&TE Cal Due Date   B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___ ________ P = psid   Turns from FULL OPEN   M&TE Cal Due Date  
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 59 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)


WBN              ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                        TRAIN B                        Rev. 0000 Page 59 of 204 Data Package: Page ____ of ____                                          Date ________
6.4      UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)
NOTE if Step 6.4[16]) through 6.4[19] were previously N/Ad, then Steps 6.4[20] through 6.4[22]may be N/Ad.
NOTE if Step 6.4[16]) through 6.4[19] were previously N/Ad, then Steps 6.4[20] through 6.4[22]may be N/Ad.
[20] RE-VERIFY A. CALCULATE
[20]   RE-VERIFY the ERCW pump discharge valve P as follows:
____________
A. CALCULATE the lower limit P from Step 6.4[19] values:
9.0*]2/P 2#Valve P 1#Valve[ ________ 1st
[                        / 2 ]
________
* 0 .9 __________ __
CV B. CALCULATE
Valve#1'P    Valve#2'P                                               ________
____________
1st CV B. CALCULATE the upper limit P from Step 6.4[19] values:
1.1*]2/P 2#Valve P 1#Valve[ ________ 1st
[                        / 2 ]
________
* 1 .1 __________ __
CV [21] ENTER an "NA" if the values in Steps 6.4[22]A & 6.4[22]B are greater than the lower limit value of Step 6.4[20]A and less than the upper limit value of Step 6.4[20]B. ________
Valve#1'P   Valve#2'P                                               ________
[22] RECORDA. ERCW Pump #1 Discharge Valve 0-ISV-67-504___ ________ P = psid   M&TE Cal Due Date   B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___ ________ P = psid   M&TE Cal Due Date  
1st CV
[21]   ENTER an "NA" if the values in Steps 6.4[22]A & 6.4[22]B are greater than the lower limit value of Step 6.4[20]A and less than the upper limit value of Step 6.4[20]B.     ________
[22]   RECORD the running ERCW pump discharge valves P:
A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___                     ________
                    'P =                     psid M&TE                                   Cal Due Date B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___                     ________
                    'P =                     psid M&TE                                   Cal Due Date


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 60 of 204  
WBN             ERCW SYSTEM FLOW BALANCE                 2-PTI-067-02-B Unit 1 & 2                      TRAIN B                    Rev. 0000 Page 60 of 204 Data Package: Page ____ of ____                                       Date ________
 
6.4     UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)
Data Package: Page ____ of ____     Date ________  
NOTE Only valves that have been adjusted after the throttle setpoints recorded in Data Sheet 5 need to be reperformed. This would be the case if this subsection is being retested because of valve adjustment in a succeeding subsection.
 
[23]   VERIFY the following:
6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)  
A. 0-FCV-67-152 (POS B) flow is >8800 gpm as indicated by EFD-2. (ACC CRIT).                                             ________
 
NOTE Only valves that have been adjusted after the throttle setpoints recorded in Data Sheet 5 need to be reperformed. This would be the case if this subsection is being retested  
 
because of valve adjustment in a succeeding subsection.
[23] VERIFY the following: A. 0-FCV-67-152 (POS B) flow is >8800 gpm as indicated by EFD-2. (ACC CRIT). ________
NOTE Adjustment for flow through any of the newly added components for this mode, identified on Data Sheet 3, DOES NOT invalidate setpoints from previous modes. Adjustment of components set in previous modes, requires a RETEST of the previous mode.
NOTE Adjustment for flow through any of the newly added components for this mode, identified on Data Sheet 3, DOES NOT invalidate setpoints from previous modes. Adjustment of components set in previous modes, requires a RETEST of the previous mode.
[24] PERFORM Train B flow balance in accordance with Appendix I and Data Sheet 3, for TRAIN B UNIT 1 LOCA-RECIRC -  
[24]   PERFORM Train B flow balance in accordance with Appendix I and Data Sheet 3, for TRAIN B UNIT 1 LOCA-RECIRC -
 
UNIT 2 COLD SHUTDOWN. (ACC CRIT)                                     ________
UNIT 2 COLD SHUTDOWN. (ACC CRIT) ________  
RECORD throttle valve positions on Data Sheet 5.                     ________
 
RECORD throttle valve positions on Data Sheet 5. ________
NOTE The following step is NOT applicable if this subsection is being retested due to valve adjustment in another mode invalidating the original setpoint.
NOTE The following step is NOT applicable if this subsection is being retested due to valve adjustment in another mode invalidating the original setpoint.
[25] RECORD applicable pressure data on Data Sheet 3. ________
[25]   RECORD applicable pressure data on Data Sheet 3.                     ________
[26] RECORD pump data on Data Sheet 7. ________
[26]   RECORD pump data on Data Sheet 7.                                   ________
[27] OPEN ERCW pump discharge valves throttled in Step 6.4[19]. ________
[27]   OPEN ERCW pump discharge valves throttled in Step 6.4[19].           ________
[28] PLACE Handswitch 1-HS-67-123A, CNTMT SPRAY HX 1B INLET, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-123 CLOSES. ________
[28]   PLACE Handswitch 1-HS-67-123A, CNTMT SPRAY HX 1B INLET, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-123 CLOSES.           ________
[29] PLACE Handswitch 1-HS-67-124A, CNTMT SPRAY HTX 1B RETURN, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-124 CLOSES. ________
[29]   PLACE Handswitch 1-HS-67-124A, CNTMT SPRAY HTX 1B RETURN, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-124 CLOSES.           ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 61 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)
 
[30] CLOSE air bleed off valve 1-ISV-32-2983 to the following Control Valve 1-FCV-67-182, SIP ROOM COOLER 1B-B
 
ERCW SUP FLOW CNTL, and the Control Valves are FULL OPEN. ________ [31] CLOSE air bleed off valve 1-ISV-32-3017 to the following Control Valve 1-FCV-67-186, CSP ROOM COOLER 1B-B
 
ERCW SUP FLOW CNTL, and the Control Valves are FULL OPEN. ________ [32] PLACE Handswitch 1-HS-67-67A, DG 1B-B NORM SUP, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-67 CLOSES. ________
[33] PLACE Handswitch 2-HS-67-67A, DG 2B-B NORM SUP, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-67 CLOSES. ________
[34] PLACE Handswitch 1-HS-67-99A, LWR CNTMT B CLRS SUP CIV-B, on 0-M-27A, to OPEN, AND  VERIFY by light indication that Valve 1-FCV-67-99 OPENS. ________
[35] PLACE Handswitch 1-HS-67-107A, LWR CNTMT D CLRS SUP CIV-B, on 0-M-27A, to OPEN, AND  VERIFY by light indication that Valve 1-FCV-67-107 OPENS. ________
[36] PLACE Handswitch 1-HS-67-138A, UPR CNTMT CLR B SUP CIV-B, on 0-M-27A, to OPEN, AND  VERIFY by light indication that Valve 1-FCV-67-138 OPENS. ________
[37] PLACE Handswitch 1-HS-67-141A, UPR CNTMT CLR D SUP CIV-B, on 0-M-27A, to OPEN, AND  VERIFY by light indication that Valve 1-FCV-67-141 OPENS. ________
[38] CLOSE 1-FCV-67-182 VERIFY NO flow through B SI pump room cooler. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 62 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)
 
[39] CLOSE 1-FCV-67-186, AND  VERIFY NO flow through 1B CS pump room cooler. ________
[40] PLACE Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to OPEN (>6000 gpm), AND VERIFY by light indication that Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, OPENS. ________
[41] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, is in the CLOSED position, AND VERIFY by light indication that Valve 0-FCV-67-152 goes CLOSED. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 63 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.5 UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP Heat Exchanger C Anticavitation Test, CCS Heat Exchanger C Discharge Valve Setting, and Train B Flow Balance in Normal Mode Both Units NOTE The Normal Mode flow balance is done solely to put the system in a configuration for setting of the Component Cooling Heat Exchanger discharge valve limit switches, and
 
DOES NOT constitute acceptance criteria.
[1] VERIFY prerequisites listed in Sections 4.0 and 6.1 for Section 6.5 have been completed. ________
[2] ENSURE Normal Operation Mode flow balance has been performed in accordance with Appendix I and Data Sheet 1, AND  VERIFY flows are equal to or greater than the minimum required flows on Data Sheet 1. ________
[3] VERIFY that the flow through 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, is >6000 gpm.  (ACC CRIT) ________
[4] ENSURE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, is in the CLOSED position, AND VERIFY by light indication that Valve 0-FCV-67-152 is CLOSED. ________
[5] PLACE Handswitch 1-HS-67-146A, CCS HX A ALT DISCH TO HDR B, on 0-M-27A, to the POS B, AND  VERIFY by light indication that Valve 1-FCV-67-146 OPENS to the POS B. ________
[6] PLACE Handswitch 2-HS-67-146A, CCS HX B ALT DISCH TO HDR B, on 0-M-27A, to the POS B, AND  VERIFY by light indication that Valve 2-FCV-67-146 OPENS to the POS B. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 64 of 204
 
Data Package:  Page ____ of ____    Date ________
 
6.5 UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP (continued)
 
[7] POSITION Handswitch 1-HS-67-143A, CCS HX A DISCH TO HDR B, on 0-M-27A, to obtain total indicated flow (EFD-1) of
 
>6650 gpm (ACC CRIT). ________
[8] POSITION Handswitch 2-HS-67-143A, CCS HX B DISCH TO HDR B, on 0-M-27A, to obtain total indicated flow
 
(2-FI-67-222) (EFD-1) of >5850 gpm (ACC CRIT). ________
[9] RECORD the EFD-1 flow rate (or differential pressure from the
 
ERCW SUP FLOW, AND ,
CALCULATE flow rate through CCS HX B M&TE ____________________ Cal Due Date _________________
EFD-1 FLOW ____________________ GPM M&TE ____________________ Cal Due Date _________________
FLOW P = ____________________ inches H 2 O  1/2 =  852 (  )
1/2 = _________________ GPM
________  1st  ________  CV [10] CALCULATE the total flow rate by subtracting EFD-1 from 2-FT-67-222 to obtain flow through CCS HTX B as follows: ________
1st
________
CV 2-FT-67-222 flow ______gpm (-) EFD-1 flow _______gpm
= __________ gpm CCS B HX
[11] AS NECESSARY, ADJUST Handswitch 1-HS-67-143A, CCS HX A DISCH TO HDR B, on 0-M-27A, to obtain total indicated flow (EFD-1) of >6650 gpm. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 65 of 204
 
Data Package:  Page ____ of ____    Date ________  


6.5 UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP (continued)  
WBN            ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                      TRAIN B                  Rev. 0000 Page 61 of 204 Data Package: Page ____ of ____                                    Date ________
6.4    UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)
[30]  CLOSE air bleed off valve 1-ISV-32-2983 to the following Control Valve 1-FCV-67-182, SIP ROOM COOLER 1B-B ERCW SUP FLOW CNTL, and the Control Valves are FULL OPEN.                                                            ________
[31]  CLOSE air bleed off valve 1-ISV-32-3017 to the following Control Valve 1-FCV-67-186, CSP ROOM COOLER 1B-B ERCW SUP FLOW CNTL, and the Control Valves are FULL OPEN.                                                            ________
[32]  PLACE Handswitch 1-HS-67-67A, DG 1B-B NORM SUP, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-67 CLOSES.        ________
[33]  PLACE Handswitch 2-HS-67-67A, DG 2B-B NORM SUP, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-67 CLOSES.        ________
[34]  PLACE Handswitch 1-HS-67-99A, LWR CNTMT B CLRS SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-99 OPENS.        ________
[35]  PLACE Handswitch 1-HS-67-107A, LWR CNTMT D CLRS SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-107 OPENS.        ________
[36]  PLACE Handswitch 1-HS-67-138A, UPR CNTMT CLR B SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-138 OPENS.        ________
[37]  PLACE Handswitch 1-HS-67-141A, UPR CNTMT CLR D SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-141 OPENS.        ________
[38]  CLOSE 1-FCV-67-182 VERIFY NO flow through B SI pump room cooler.                                                    ________


[12] AS NECESSARY, ADJUST Handswitch 2-HS-67-143A, CCS HX B DISCH TO HDR A, on 0-M-27A, to obtain total indicated flow (EDF-2) of >5850 gpm. ________
WBN            ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                      TRAIN B                  Rev. 0000 Page 62 of 204 Data Package: Page ____ of ____                                    Date ________
[13] RECORD the total flow rate at 0-FT-67-226, CCS HX C SUP FLOW, (or EDF if used)
6.4    UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)
AND ,
[39]   CLOSE 1-FCV-67-186, AND VERIFY NO flow through 1B CS pump room cooler.                  ________
DETERMINE the total flow is >6000 gpm (ACC CRIT). ________ 1st
[40]  PLACE Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to OPEN (>6000 gpm), AND VERIFY by light indication that Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, OPENS.                             ________
________
[41]   PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, is in the CLOSED position, AND VERIFY by light indication that Valve 0-FCV-67-152 goes CLOSED.                                                         ________
CV M&TE ____________________ Cal Due Date _________________
EFD-2 FLOW ____________________ GPM M&TE ____________________ Cal Due Date _________________
FLOW P = ____________________ inches H 2 O  1/2 =  852 (  )
1/2 = _________________ GPM
[14] VERIFY the following: (ACC CRIT)
A. CCS A HX TOTAL FLOW >6650 gpm. ________
B. CCS B HX TOTAL FLOW >5850 gpm. ________
C. CCS C HX TOTAL FLOW >6000 gpm. ________
[15] PERFORM Train B flow balance, AND  RECORD data in accordance with Appendix I and Data Sheet 4, for U-1 HOT SHUTDOWN, U-2 STARTUP. ________  


RECORD throttle valve positions on Data Sheet 5. ________
WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                        TRAIN B                  Rev. 0000 Page 63 of 204 Data Package: Page ____ of ____                                    Date ________
[16] IF flow balance adjustments were required, THEN: A. VERIFY 1-FCV-67-143, CCS HX A DISCH TO HDR B, on 0-M-27A is positioned to obtain flow of >6650 gpm.
6.5      UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP Heat Exchanger C Anticavitation Test, CCS Heat Exchanger C Discharge Valve Setting, and Train B Flow Balance in Normal Mode Both Units NOTE The Normal Mode flow balance is done solely to put the system in a configuration for setting of the Component Cooling Heat Exchanger discharge valve limit switches, and DOES NOT constitute acceptance criteria.
(ACC CRIT)
[1]    VERIFY prerequisites listed in Sections 4.0 and 6.1 for Section 6.5 have been completed.                                ________
________
[2]    ENSURE Normal Operation Mode flow balance has been performed in accordance with Appendix I and Data Sheet 1, AND VERIFY flows are equal to or greater than the minimum required flows on Data Sheet 1.                                 ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 66 of 204
[3]     VERIFY that the flow through 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, is >6000 gpm. (ACC CRIT)                                                            ________
[4]    ENSURE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, is in the CLOSED position, AND VERIFY by light indication that Valve 0-FCV-67-152 is CLOSED.                                                          ________
[5]    PLACE Handswitch 1-HS-67-146A, CCS HX A ALT DISCH TO HDR B, on 0-M-27A, to the POS B, AND VERIFY by light indication that Valve 1-FCV-67-146 OPENS to the POS B.                                                       ________
[6]    PLACE Handswitch 2-HS-67-146A, CCS HX B ALT DISCH TO HDR B, on 0-M-27A, to the POS B, AND VERIFY by light indication that Valve 2-FCV-67-146 OPENS to the POS B.                                                       ________


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                        TRAIN B                    Rev. 0000 Page 64 of 204 Data Package: Page ____ of ____                                     Date ________
6.5      UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP (continued)
[7]    POSITION Handswitch 1-HS-67-143A, CCS HX A DISCH TO HDR B, on 0-M-27A, to obtain total indicated flow (EFD-1) of
                >6650 gpm (ACC CRIT).                                              ________
[8]    POSITION Handswitch 2-HS-67-143A, CCS HX B DISCH TO HDR B, on 0-M-27A, to obtain total indicated flow (2-FI-67-222) (EFD-1) of >5850 gpm (ACC CRIT).                    ________
[9]    RECORD the EFD-1 flow rate (or differential pressure from the
                P gauge/device at 2-FT-67-222, CCS HEAT EXCHANGER B ERCW SUP FLOW, AND, CALCULATE flow rate through CCS HX B M&TE                ____________________        Cal Due Date           _________________
EFD-1 FLOW          ____________________        GPM M&TE                ____________________        Cal Due Date            _________________
FLOW 'P =          ____________________        inches H2O K (P)1/2 =                852 ( )1/2 =          _________________      GPM 1st CV
[10]  CALCULATE the total flow rate by subtracting EFD-1 from 2-FT-67-222 to obtain flow through CCS HTX B as follows:          ________
1st CV
                                                              =
2-FT-67-222 flow    ______gpm    (-)  EFD-1 flow _______gpm      __________ gpm  CCS B HX
[11]  AS NECESSARY, ADJUST Handswitch 1-HS-67-143A, CCS HX A DISCH TO HDR B, on 0-M-27A, to obtain total indicated flow (EFD-1) of >6650 gpm.                                        ________


6.5 UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP (continued)  
WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                        TRAIN B                  Rev. 0000 Page 65 of 204 Data Package: Page ____ of ____                                    Date ________
6.5     UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP (continued)
[12]  AS NECESSARY, ADJUST Handswitch 2-HS-67-143A, CCS HX B DISCH TO HDR A, on 0-M-27A, to obtain total indicated flow (EDF-2) of >5850 gpm.                                        ________
[13]  RECORD the total flow rate at 0-FT-67-226, CCS HX C SUP FLOW, (or EDF if used) AND, DETERMINE the total flow is >6000 gpm (ACC CRIT).                  ________
1st CV M&TE              ____________________        Cal Due Date            _________________
EFD-2 FLOW        ____________________        GPM M&TE              ____________________        Cal Due Date            _________________
FLOW 'P =          ____________________        inches H2O K (P)1/2 =                852 ( )1/2 =        _________________      GPM
[14]  VERIFY the following: (ACC CRIT)
A. CCS A HX TOTAL FLOW >6650 gpm.                              ________
B. CCS B HX TOTAL FLOW >5850 gpm.                              ________
C. CCS C HX TOTAL FLOW >6000 gpm.                              ________
[15]  PERFORM Train B flow balance, AND RECORD data in accordance with Appendix I and Data Sheet 4, for U-1 HOT SHUTDOWN, U-2 STARTUP.                              ________
RECORD throttle valve positions on Data Sheet 5.                  ________
[16]  IF flow balance adjustments were required, THEN:
A. VERIFY 1-FCV-67-143, CCS HX A DISCH TO HDR B, on 0-M-27A is positioned to obtain flow of >6650 gpm.
(ACC CRIT)                                                  ________


WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                      TRAIN B                    Rev. 0000 Page 66 of 204 Data Package: Page ____ of ____                                      Date ________
6.5      UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP (continued)
B. VERIFY 2-FCV-67-143, CCS HX B DISCH TO HDR A, on 0-M-27A is positioned to obtain flow of >5850 gpm.
B. VERIFY 2-FCV-67-143, CCS HX B DISCH TO HDR A, on 0-M-27A is positioned to obtain flow of >5850 gpm.
(ACC CRIT)
(ACC CRIT)                                                   ________
________ C. VERIFY 0-FCV-67-144, CCS HX C DISCH TO HDR A, on 0-M-27A is positioned to obtain flow of >6000 gpm.
C. VERIFY 0-FCV-67-144, CCS HX C DISCH TO HDR A, on 0-M-27A is positioned to obtain flow of >6000 gpm.
(ACC CRIT). ________
(ACC CRIT).                                                   ________
OTHERWISE NOTE If the next step is performed print pages for steps 6.5[5] through 6.5[16]C D. RE-PERFORM steps 6.5[5] through 6.5[16]C. (This step may be N/A if not performed.) ________
OTHERWISE NOTE If the next step is performed print pages for steps 6.5[5] through 6.5[16]C D. RE-PERFORM steps 6.5[5] through 6.5[16]C. (This step may be N/A if not performed.)                                 ________
[17] RECORD applicable pressure data on Data Sheet 4. ________
[17]   RECORD applicable pressure data on Data Sheet 4.                   ________
[18] PLACE Handswitch 1-HS-67-146A, CCS HX A ALT DISCH TO HDR B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-146 CLOSES. ________
[18]   PLACE Handswitch 1-HS-67-146A, CCS HX A ALT DISCH TO HDR B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-146 CLOSES.         ________
[19] ADJUST Handswitch 1-HS-67-143A, CCS HX A DISCH TO HDR B, on 0-M-27A, to obtain > 6000 (6000-6500) gpm flow  
[19]   ADJUST Handswitch 1-HS-67-143A, CCS HX A DISCH TO HDR B, on 0-M-27A, to obtain > 6000 (6000-6500) gpm flow rate (EFD-1) OR as specified by U-1 Operations.                   ________
 
[20]   PLACE Handswitch 2-HS-67-146A, CCS HX B ALT DISCH TO HDR A, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-146 CLOSES.         ________
rate (EFD-1)
[21]   ADJUST Handswitch 2-HS-67-143A, CCS HX B DISCH TO HDR A, on 0-M-27A, to obtain >1000 (1000-3000) gpm flow rate as indicated by 2-FT-67-222 (Total flow rate minus EFD-1 flow) OR as specified by U-1 Operations.                           ________
OR as specified by U-1 Operations. ________
[22]   ADJUST Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to obtain > 6000 (6000-6500) gpm flow rate as indicated by EFD-2.                                       ________
[20] PLACE Handswitch 2-HS-67-146A, CCS HX B ALT DISCH TO HDR A, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-146 CLOSES. ________
[21] ADJUST Handswitch 2-HS-67-143A, CCS HX B DISCH TO HDR A, on 0-M-27A, to obtain >1000 (1000-3000) gpm flow  
 
rate as indicated by 2-FT-67-222 (Total flow rate minus EFD-1  
 
flow) OR as specified by U-1 Operations. ________
[22] ADJUST Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to obtain > 6000 (6000-6500) gpm flow rate as indicated by EFD-2. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 67 of 204
 
Data Package:  Page ____ of ____    Date ________
 
7.0 POST-PERFORMANCE ACTIVITIES
[1] REQUEST Operations to terminate ERCW strainer backwash operation and return the strainer alignment to normal


configuration. ________
WBN                ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                      TRAIN B                    Rev. 0000 Page 67 of 204 Data Package: Page ____ of ____                                      Date ________
[2] RESTORE Station and Control Air compressors A, B & C to automatic operation per SOI-32.01. ________
7.0      POST-PERFORMANCE ACTIVITIES
[3] ENSURE the Auxiliary Air Compressors control switches are placed in auto per SOI-32.02. ________
[1]    REQUEST Operations to terminate ERCW strainer backwash operation and return the strainer alignment to normal configuration.                                                     ________
[4] NOTE any excessive vibration identified in the CTL. ________
[2]   RESTORE Station and Control Air compressors A, B & C to automatic operation per SOI-32.01.                                 ________
[3]   ENSURE the Auxiliary Air Compressors control switches are placed in auto per SOI-32.02.                                     ________
[4]   NOTE any excessive vibration identified in the CTL.               ________
NOTE The following steps return the Compressor to normal Standby configuration.
NOTE The following steps return the Compressor to normal Standby configuration.
[5] IF 0-DRV-32-285, ESSENT CONTROL AIR TR B AFTERFILTER DRAIN, was opened during step [5.1]
[5]   IF 0-DRV-32-285, ESSENT CONTROL AIR TR B AFTERFILTER DRAIN, was opened during step [5.1] THEN, CLOSE afterfilter drain valve 0-DRV-32-285 to allow the compressor to unload.                                             ________
THEN ,
[6]   OPEN 0-FCV-32-85 using 0-HS-32-85, AND RECORD time when valve is opened: ____________.                   ________
CLOSE afterfilter drain valve 0-DRV-32-285 to allow the compressor to unload. ________
[7]   ENSURE 0-HS-32-86 is in AUTO.                                     ________
[6] OPEN 0-FCV-32-85 using 0-HS-32-85, AND RECORD time when valve is opened: ____________. ________
[8]   ENSURE compressor STOPS after running unloaded for for about 5 minutes.                                               ________
[7] ENSURE 0-HS-32-86 is in AUTO. ________
[9]   VERIFY 0-DRV-32-285, ESSENT CONTROL AIR TR B AFTERFILTER DRAIN, is CLOSED.                                     ________
[8] ENSURE compressor STOPS after running unloaded for for about 5 minutes. ________
IV
[9] VERIFY 0-DRV-32-285, ESSENT CONTROL AIR TR B AFTERFILTER DRAIN, is CLOSED. ________
[10]   NOTIFY US, or designee, that the B train ACAS portion of this test is complete and that the B Train ACAS compressor is returned to normal standby configuration.                         ________
IV [10] NOTIFY US, or designee, that the B train ACAS portion of this test is complete and that the B Train ACAS compressor is returned to normal standby configuration. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 68 of 204
 
Data Package:  Page ____ of ____    Date ________  


7.0 POST-PERFORMANCE ACTIVITIES (continued)  
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 68 of 204 Data Package: Page ____ of ____                                Date ________
7.0     POST-PERFORMANCE ACTIVITIES (continued)
[11]  RETURN the A, B and C Station Air Compressors to the AS FOUND POSITIONS from step 6.1[14].
STATION AIR COMPR A (0-HS-32-25D) ___________
STATION AIR COMPR B (0-HS-32-26A) ___________
STATION AIR COMPR C (0-HS-32-27A) ___________
[12]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3563 to RESTORE air to 1-TCV-67-100, LWR CNTMT VENT CLR 1B-B OUT TEMP CNTL.                                                        ________
1st CV
[13]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3563 to RESTORE air to 2-TCV-67-100, LWR CNTMT VENT CLR 2B-B OUT TEMP CNTL.                                                        ________
1st CV
[14]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3565 to RESTORE air to 1-TCV-67-101, CRD VENT CLR 1B-B OUT TEMP CNTL.              ________
1st CV


[11] RETURN the A, B and C Station Air Compressors to the AS FOUND POSITIONS from step 6.1[14].  
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 69 of 204 Data Package: Page ____ of ____                                Date ________
7.0    POST-PERFORMANCE ACTIVITIES (continued)
[15]   CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3565 to RESTORE air to 2-TCV-67-101, CRD VENT CLR 2B-B OUT TEMP CNTL.              ________
1st CV
[16]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3564 to RESTORE air to 1-TCV-67-102, U-1 RCP MTR CLR 1-2.                          ________
1st CV
[17]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3564 to RESTORE air to 2-TCV-67-102, U-2 RCP MTR CLR 2-2.                           ________
1st CV
[18]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3605 to RESTORE air to 1-TCV-67-108, LWR CNTMT VENT CLR 1D.                        ________
1st CV
[19]   CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3605 to RESTORE air to 2-TCV-67-108, LWR CNTMT VENT CLR 2D.                         ________
1st CV


STATION AIR COMPR A (0-HS-32-25D)  ___________
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 70 of 204 Data Package: Page ____ of ____                                Date ________
7.0    POST-PERFORMANCE ACTIVITIES (continued)
[20]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3606 to RESTORE air to 1-TCV-67-109, CRDM VENT CLR 1D.                              ________
1st CV
[21]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3606 to RESTORE air to 2-TCV-67-109, CRDM VENT CLR 2D.                              ________
1st CV
[22]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3607 to RESTORE air to 1-TCV-67-110, RCP MTR CLR 1-4.                              ________
1st CV
[23]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3607 to RESTORE air to 2-TCV-67-110, RCP MTR CLR 2-4.                              ________
1st CV
[24]    CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3159 to RESTORE air to 1-TCV-67-137, UPR CNTMT VENT CLR 1B.                        ________
1st CV


STATION AIR COMPR B (0-HS-32-26A)  ___________
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 71 of 204 Data Package: Page ____ of ____                                Date ________
7.0    POST-PERFORMANCE ACTIVITIES (continued)
[25]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3160 to RESTORE air to 1-TCV-67-140, UPR CNTMT VENT CLR 1D.                        ________
1st CV
[26]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3116 to RESTORE air to 2-TCV-67-137, UPR CNTMT VENT CLR 2B.                        ________
1st CV
[27]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3115 to RESTORE air to 2-TCV-67-140, UPR CNTMT VENT CLR 2D.                        ________
1st CV
[28]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-2929 to RESTORE air to 1-FCV-67-172, RECIP PMP RM CLR.                              ________
1st CV
[29]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3283 to RESTORE air to 1-FCV-67-215, SF PIT & TB BSTR PMP SPACE CLR 2B-B.          ________
1st CV


STATION AIR COMPR C (0-HS-32-27A) ___________
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 72 of 204 Data Package: Page ____ of ____                                Date ________
________
7.0    POST-PERFORMANCE ACTIVITIES (continued)
[12] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3563 to RESTORE air to 1-TCV-67-100, LWR CNTMT VENT CLR 1B-B OUT TEMP CNTL. ________
[30]   CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3063 to RESTORE air to 1-FCV-67-164, CCS & AF PMPS SPACE CLR 1B-B.                 ________
1st
1st CV
________
[31]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-2983 to RESTORE air to 1-FCV-67-182, SI PMP RM CLR 1B.                              ________
CV [13] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3563 to RESTORE air to 2-TCV-67-100, LWR CNTMT VENT CLR 2B-B OUT TEMP CNTL. ________
1st CV
1st
[32]   CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-2880 to RESTORE air to 2-FCV-67-182, SI PMP RM CLR 2B.                             ________
________
1st CV
CV  [14] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3565 to RESTORE air to 1-TCV-67-101, CRD VENT CLR 1B-B OUT TEMP CNTL. ________
[33]   CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3017 to RESTORE air to 1-FCV-67-186, CS PMP RM CLR 1B.                             ________
1st
1st CV
________
[34]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3028 to RESTORE air to 2-FCV-67-186, CS PMP RM CLR 2B.                             ________
CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 69 of 204
1st CV


Data Package: Page ____ of ____    Date ________  
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 73 of 204 Data Package: Page ____ of ____                               Date ________
7.0     POST-PERFORMANCE ACTIVITIES (continued)
[35]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-2956 to RESTORE air to 1-FCV-67-348, PEN RM CLR 1B1.                                ________
1st CV
[36]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-2956 to RESTORE air to 2-FCV-67-348, PEN RM CLR 2B1.                                ________
1st CV
[37]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3147 to RESTORE air to 1-FCV-67-352, PEN RM CLR 1B2.                                ________
1st CV
[38]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3167 to RESTORE air to 2-FCV-67-352, PEN RM CLR 2B2.                                ________
1st CV
[39]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3295 to RESTORE air to 1-FCV-67-356, PEN RM CLR 1B3.                                ________
1st CV


7.0 POST-PERFORMANCE ACTIVITIES (continued)  
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 74 of 204 Data Package: Page ____ of ____                                Date ________
7.0     POST-PERFORMANCE ACTIVITIES (continued)
[40]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3323 to RESTORE air to 2-FCV-67-356, PEN RM CLR 2B3.                                ________
1st CV
[41]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-2960 to RESTORE air to 1-FCV-67-344, PIPE CHASE CLR 1B.                            ________
1st CV
[42]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3805 to RESTORE air to 2-FCV-67-344, PIPE CHASE CLR 2B.                            ________
1st CV
[43]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3410 to RESTORE air to 2-FCV-67-338, EMER GAS TRTMT RM CLR 2B.                      ________
1st CV
[44]  CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3031 to RESTORE air to 2-FCV-67-219, BA XFER PMPS & AF PMPS SP CLR 2B.              ________
1st CV


[15] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3565 to RESTORE air to 2-TCV-67-101, CRD VENT CLR 2B-B OUT TEMP CNTL. ________
WBN              ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                      TRAIN B                    Rev. 0000 Page 75 of 204 Data Package: Page ____ of ____                                          Date ________
1st
7.0    POST-PERFORMANCE ACTIVITIES (continued)
________
[45]  RESTORE 0-TCV-67-1052, ELEC BD RM A/C COND B-B ERCW RET TEMP CNTL. [CB, EL 696, C13P], on EBR CHILLER B-B, to normal operation by turning the Manual Flushing Screw at the top of the actuator fully counter-clockwise to allow pilot valve control.                        ________
CV  [16] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3564 to RESTORE air to 1-TCV-67-102, U-1 RCP MTR CLR 1-2. ________
1st CV
1st
[46]   RESTORE 0-TCV-67-1053, MCR A/C CHILLER B-B ERCW RET TEMP CNTL [AB, EL. 700, A12U], on MCR CHILLER B-B, to normal operation by turning the Manual Flushing Screw at the top of the actuator fully counter-clockwise to allow pilot valve control.                                                         ________
________
1st CV
CV [17] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3564 to RESTORE air to 2-TCV-67-102, U-2 RCP MTR CLR 2-2. ________
[47]   RETURN TO NORMAL 0-TCV-67-1053 by ensuring the bypass stem (silver colored knurled knob) is rotated fully clockwise until the knurled knob is lightly seated. (B SHTDN BD RM A/C TEMP CONTROL).                                               ________
1st
[48]   PLACE Handswitch 0-HS-67-208A, SS AND CNTL AIR COMPR SUP HDR 1B ISOL, on 0-M-27A to OPEN, AND VERIFY by light indication that Valve 0-FCV-67-208 OPENS.              ________
________
[49]  RESTORE 1-TCV-67-118, INSTR RM WATER CLR 1B ERCW SUP TEMP CNTL, to normal by removing the temporary nitrogen supply.                                                       ________
CV  [18] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3605 to RESTORE air to 1-TCV-67-108, LWR CNTMT VENT CLR 1D. ________
1st CV
1st
[50]   RESTORE 2-TCV-67-118, INSTR RM WATER CLR 2B ERCW SUP TEMP CNTL, to normal by removing the temporary nitrogen supply.                                                       ________
________
1st CV
CV [19] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3605 to RESTORE air to 2-TCV-67-108, LWR CNTMT VENT CLR 2D. ________
1st
________
CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 70 of 204


Data Package: Page ____ of ____    Date ________  
WBN              ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                      TRAIN B                Rev. 0000 Page 76 of 204 Data Package: Page ____ of ____                                 Date ________
7.0     POST-PERFORMANCE ACTIVITIES (continued)
[51]  REMOVE the EFD-2 downstrem of TEE on 2B header and upstream of 0-FT-67-226, CCS HX C OUTLET ERCW HDR B FLOW CNTL, installed at Step 4.3[11]S.                        ________
1st CV
[52]  REMOVE a 0-200 psig test gauge, +0.25% accuracy, at Test Connection 0-PT-67-48, ERCW PUMP E-B DISCH PRESS, installed at Step 4.3[11]L.                                    ________
1st CV
[53]  REMOVE a 0-200 psig test gauge, +0.25% accuracy, at Test Connection 0-PT-67-52, ERCW PUMP F-B DISCH PRESS, installed at Step 4.3[11]M.                                    ________
1st CV
[54]  REMOVE a 0-200 psig test gauge, +0.25% accuracy, at Test Connection 0-PT-67-56, ERCW PUMP G-B DISCH PRESS, installed at Step 4.3[11]N.                                    ________
1st CV
[55]  REMOVE a 0-200 psig test gauge, +0.25% accuracy, at Test Connection 0-PT-67-60, ERCW PUMP H-B DISCH PRESS, installed at Step 4.3[11]O.                                    ________
1st CV
[56]  REMOVE the 0-50 psid differential pressure gauges, between the listed ERCW Pump Discharge pressure transmitters and 0-PT-67-17, ERCW HEADER B PRESS, installed at Step 4.3[12]:
A. 0-PT-67-48, ERCW PUMP E-B DISCH PRESS                    ________
1st CV


7.0 POST-PERFORMANCE ACTIVITIES (continued)  
WBN          ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                  TRAIN B                    Rev. 0000 Page 77 of 204 Data Package: Page ____ of ____                                  Date ________
7.0     POST-PERFORMANCE ACTIVITIES (continued)
B. 0-PT-67-52, ERCW PUMP F-B DISCH PRESS                      ________
1st CV C. 0-PT-67-56, ERCW PUMP G-B DISCH PRESS                      ________
1st CV D. 0-PT-67-60, ERCW PUMP H-B DISCH PRESS                      ________
1st CV
[57]  REMOVE the pressure gauge at the inlet to 1-FE-67-62, ERCW SUPPLY HDR B FLOW, installed at Step 4.3[11]C.            ________
1st CV
[58]  REMOVE the pressure gauge at the outlet to 1-FE-67-62, ERCW SUPPLY HDR B FLOW, installed at Step 4.3[11]D.            ________
1st CV
[59]  REMOVE the pressure gauge at the inlet to 2-FE-67-62, ERCW SUPPLY HDR B FLOW, installed at Step 4.3[11]E.            ________
1st CV
[60]  REMOVE the pressure gauge at the outlet to 2-FE-67-62, ERCW SUPPLY HDR B FLOW, installed at Step 4.3[11]F.            ________
1st CV


[20] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3606 to RESTORE air to 1-TCV-67-109, CRDM VENT CLR 1D. ________
WBN              ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                      TRAIN B            Rev. 0000 Page 78 of 204 Data Package: Page ____ of ____                              Date ________
1st
7.0    POST-PERFORMANCE ACTIVITIES (continued)
________
[61]   REMOVE the pressure gauge at 1-VTV-67-534B, CS HX 1B ERCW SUP HDR VENT, installed at Step 4.3[11]B.             ________
CV [21] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3606 to RESTORE air to 2-TCV-67-109, CRDM VENT CLR 2D. ________
1st CV
1st
[62]   REMOVE the pressure gauge at 0-DRV-67-547, ERCW CCS HX C DRAIN, installed at Step 4.3[11]G.                     ________
________
1st CV
CV  [22] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3607 to RESTORE air to 1-TCV-67-110, RCP MTR CLR 1-4. ________
[63]   REMOVE the pressure gauge at 0-TV-67-621B, MCR WTR CHLR B-B ERCW SUP TEST CONN, installed at Step 4.3[11]H.                                                  ________
1st
1st CV
________
[64]   REMOVE the pressure gauge at 1-TV-67-690B, UPPER CNTMT VENT CLR 1B ERCW SUP HDR TEST VENT, installed at Step 4.3[11]I.                                ________
CV [23] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3607 to RESTORE air to 2-TCV-67-110, RCP MTR CLR 2-4. ________
1st CV
1st
[65]   REMOVE the pressure gauge at 2-TV-67-690B, UPPER CNTMT VENT CLR 2B ERCW SUP HDR TEST VENT, installed at Step 4.3[11]J.                                 ________
________
1st CV
CV [24] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3159 to RESTORE air to 1-TCV-67-137, UPR CNTMT VENT CLR 1B. ________
[66]  REMOVE the pressure gauge at 0-VTV-67-614B, ELEC BD RM A/C COND A-A ERCW SUP VENT, installed at Step 4.3[11]K.                                                   ________
1st
1st CV
________
CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 71 of 204


Data Package: Page ____ of ____    Date ________  
WBN            ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                      TRAIN B                    Rev. 0000 Page 79 of 204 Data Package: Page ____ of ____                                     Date ________
7.0     POST-PERFORMANCE ACTIVITIES (continued)
[67]  REMOVE the pressure gauge at 1-PI-67-10B, ERCW STRAINER 1B-B OUT PRESS installed at Step 4.3[11]P.                ________
1st CV
[68]  REMOVE the pressure gauge at 2-PI-67-10B, ERCW STRAINER 2B-B OUT PRESS installed at Step 4.3[11]Q.                ________
1st CV
[69]  Notify Operations that Containment Spray Heat Exchangers may be placed in layup condition in accordance with SOI-67.02, if so desired by Unit 1 Operations.                    ________
[70]  VERIFY that Post-test calibration of the M&TE used to record quantitative acceptance criteria has been satisfactorily performed and the results recorded on Measuring and Test Equipment (M&TE) Log in SMP-9.0.                                  ________
[71]  VERIFY that Post-test calibration of permanent plant instruments used to record quantitative acceptance criteria has been satisfactorily performed, AND RECORD the results on Appendix C, Permanent Plant Instrumentation Log.                                              ________
[72]  NOTIFY the Unit 2 and Unit 1 SM/SRO of the test completion and system alignment.                                              ________


7.0 POST-PERFORMANCE ACTIVITIES (continued)  
WBN          ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2                  TRAIN B    Rev. 0000 Page 80 of 204 Data Package: Page ____ of ____                  Date ________
8.0     RECORDS 8.1    QA Records Completed Test Package (PTI) 8.2    Non-QA Records None


[25] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3160 to RESTORE air to 1-TCV-67-140, UPR CNTMT VENT CLR 1D. ________
WBN             ERCW SYSTEM FLOW BALANCE           2-PTI-067-02-B Unit 1 & 2                         TRAIN B             Rev. 0000 Page 81 of 204 Appendix A (Page 1 of 1)
1st
TEST INSTRUCTIONS REFERENCE REVIEW Data Package: Page ____ of ____                                 Date ________
________
CV [26] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3116 to RESTORE air to 2-TCV-67-137, UPR CNTMT VENT CLR 2B. ________
1st
________
CV [27] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3115 to RESTORE air to 2-TCV-67-140, UPR CNTMT VENT CLR 2D. ________  1st  ________
CV [28] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-2929 to RESTORE air to 1-FCV-67-172, RECIP PMP RM CLR. ________
1st
________
CV [29] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3283 to RESTORE air to 1-FCV-67-215, SF PIT & TB BSTR PMP SPACE CLR 2B-B. ________
1st
________
CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 72 of 204
 
Data Package:  Page ____ of ____    Date ________
 
7.0 POST-PERFORMANCE ACTIVITIES (continued)
 
[30] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3063 to RESTORE air to 1-FCV-67-164, CCS & AF PMPS SPACE CLR 1B-B. ________
1st
________
CV [31] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-2983 to RESTORE air to 1-FCV-67-182, SI PMP RM CLR 1B. ________
1st
________
CV [32] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-2880 to RESTORE air to 2-FCV-67-182, SI PMP RM CLR 2B. ________  1st  ________
CV [33] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3017 to RESTORE air to 1-FCV-67-186, CS PMP RM CLR 1B. ________
1st
________
CV [34] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3028 to RESTORE air to 2-FCV-67-186, CS PMP RM CLR 2B. ________
1st
________
CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 73 of 204
 
Data Package:  Page ____ of ____    Date ________
 
7.0 POST-PERFORMANCE ACTIVITIES (continued)
 
[35] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-2956 to RESTORE air to 1-FCV-67-348, PEN RM CLR 1B1. ________
1st
________
CV [36] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-2956 to RESTORE air to 2-FCV-67-348, PEN RM CLR 2B1. ________
1st
________
CV [37] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3147 to RESTORE air to 1-FCV-67-352, PEN RM CLR 1B2. ________  1st  ________
CV [38] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3167 to RESTORE air to 2-FCV-67-352, PEN RM CLR 2B2. ________
1st
________
CV [39] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3295 to RESTORE air to 1-FCV-67-356, PEN RM CLR 1B3. ________
1st
________
CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 74 of 204
 
Data Package:  Page ____ of ____    Date ________
 
7.0 POST-PERFORMANCE ACTIVITIES (continued)
 
[40] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3323 to RESTORE air to 2-FCV-67-356, PEN RM CLR 2B3. ________
1st
________
CV [41] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-2960 to RESTORE air to 1-FCV-67-344, PIPE CHASE CLR 1B. ________
1st
________
CV [42] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3805 to RESTORE air to 2-FCV-67-344, PIPE CHASE CLR 2B. ________  1st  ________
CV [43] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3410 to RESTORE air to 2-FCV-67-338, EMER GAS TRTMT RM CLR 2B. ________
1st
________
CV [44] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3031 to RESTORE air to 2-FCV-67-219, BA XFER PMPS & AF PMPS SP CLR 2B. ________
1st
________
CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 75 of 204
 
Data Package:  Page ____ of ____    Date ________
 
7.0 POST-PERFORMANCE ACTIVITIES (continued)
 
[45] RESTORE 0-TCV-67-1052, ELEC BD RM A/C COND B-B ERCW RET TEMP CNTL. [CB, EL 696, C13P], on EBR
 
CHILLER B-B, to normal operation by turning the Manual Flushing Screw at the top of the actuator fully counter-clockwise to allow pilot valve control. ________
1st
________
CV [46] RESTORE 0-TCV-67-1053, MCR A/C CHILLER B-B ERCW RET TEMP CNTL [AB, EL. 700, A12U], on MCR CHILLER
 
B-B, to normal operation by turning the Manual Flushing Screw
 
at the top of the actuator fully counter-clockwise to allow pilot valve control. ________
1st
________
CV  [47] RETURN TO NORMAL 0-TCV-67-1053 by ensuring the bypass stem (silver colored knurled knob) is rotated fully clockwise until the knurled knob is lightly seated. (B SHTDN BD RM A/C TEMP CONTROL). ________
[48] PLACE Handswitch 0-HS-67-208A, SS AND CNTL AIR COMPR SUP HDR 1B ISOL, on 0-M-27A to OPEN, AND VERIFY by light indication that Valve 0-FCV-67-208 OPENS. ________
[49] RESTORE 1-TCV-67-118, INSTR RM WATER CLR 1B ERCW SUP TEMP CNTL, to normal by removing the temporary nitrogen supply. ________
1st
________
CV  [50] RESTORE 2-TCV-67-118, INSTR RM WATER CLR 2B ERCW SUP TEMP CNTL, to normal by removing the temporary nitrogen supply. ________
1st
________
CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 76 of 204
 
Data Package:  Page ____ of ____    Date ________
 
7.0 POST-PERFORMANCE ACTIVITIES (continued)
 
[51] REMOVE the EFD-2 downstrem of TEE on 2B header and upstream of 0-FT-67-226, CCS HX C OUTLET ERCW HDR B FLOW CNTL, installed at Step 4.3[11]S. ________
1st
________
CV [52] REMOVE a 0-200 psig test gauge, +0.25% accuracy, at Test Connection 0-PT-67-48, ERCW PUMP E-B DISCH PRESS, installed at Step 4.3[11]L. ________
1st
________
CV [53] REMOVE a 0-200 psig test gauge, +0.25% accuracy, at Test Connection 0-PT-67-52, ERCW PUMP F-B DISCH PRESS, installed at Step 4.3[11]M. ________
1st
________
CV [54] REMOVE a 0-200 psig test gauge, +0.25% accuracy, at Test Connection 0-PT-67-56, ERCW PUMP G-B DISCH PRESS, installed at Step 4.3[11]N. ________
1st
________
CV [55] REMOVE a 0-200 psig test gauge, +0.25% accuracy, at Test Connection 0-PT-67-60, ERCW PUMP H-B DISCH PRESS, installed at Step 4.3[11]O. ________
1st
________
CV [56] REMOVE the 0-50  psid differential pressure gauges, between the listed ERCW Pump Discharge pressure transmitters and
 
0-PT-67-17, ERCW HEADER B PRESS, installed at Step
 
4.3[12]: A. 0-PT-67-48, ERCW PUMP E-B DISCH PRESS ________  1st
________
CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 77 of 204
 
Data Package:  Page ____ of ____    Date ________
 
7.0 POST-PERFORMANCE ACTIVITIES (continued)
 
B. 0-PT-67-52, ERCW PUMP F-B DISCH PRESS ________  1st
________
CV C. 0-PT-67-56, ERCW PUMP G-B DISCH PRESS ________  1st
________
CV D. 0-PT-67-60, ERCW PUMP H-B DISCH PRESS ________  1st
________
CV  [57] REMOVE the pressure gauge at the inlet to 1-FE-67-62, ERCW SUPPLY HDR B FLOW, installed at Step 4.3[11]C. ________
1st
________
CV [58] REMOVE the pressure gauge at the outlet to 1-FE-67-62, ERCW SUPPLY HDR B FLOW, installed at Step 4.3[11]D. ________
1st
________
CV [59] REMOVE the pressure gauge at the inlet to 2-FE-67-62, ERCW SUPPLY HDR B FLOW, installed at Step 4.3[11]E. ________
1st
________
CV [60] REMOVE the pressure gauge at the outlet to 2-FE-67-62, ERCW SUPPLY HDR B FLOW, installed at Step 4.3[11]F. ________
1st
________
CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 78 of 204
 
Data Package:  Page ____ of ____    Date ________
 
7.0 POST-PERFORMANCE ACTIVITIES (continued)
 
[61] REMOVE the pressure gauge at 1-VTV-67-534B, CS HX 1B ERCW SUP HDR VENT, installed at Step 4.3[11]B. ________
1st
________
CV [62] REMOVE the pressure gauge at 0-DRV-67-547, ERCW CCS HX C DRAIN, installed at Step 4.3[11]G. ________
1st
________
CV [63] REMOVE the pressure gauge at 0-TV-67-621B, MCR WTR CHLR B-B ERCW SUP TEST CONN, installed at Step
 
4.3[11]H. ________
1st
________
CV [64] REMOVE the pressure gauge at 1-TV-67-690B, UPPER CNTMT VENT CLR 1B ERCW SUP HDR TEST VENT, installed at Step 4.3[11]I. ________  1st
________
CV [65] REMOVE the pressure gauge at 2-TV-67-690B, UPPER CNTMT VENT CLR 2B ERCW SUP HDR TEST VENT, installed at Step 4.3[11]J. ________
1st
________
CV [66] REMOVE the pressure gauge at 0-VTV-67-614B, ELEC BD RM A/C COND A-A ERCW SUP VENT, installed at Step
 
4.3[11]K. ________
1st
________
CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 79 of 204
 
Data Package:  Page ____ of ____    Date ________
 
7.0 POST-PERFORMANCE ACTIVITIES (continued)
 
[67] REMOVE the pressure gauge at 1-PI-67-10B, ERCW STRAINER 1B-B OUT PRESS installed at Step 4.3[11]P. ________
1st
________
CV [68] REMOVE the pressure gauge at 2-PI-67-10B, ERCW STRAINER 2B-B OUT PRESS installed at Step 4.3[11]Q. ________
1st
________
CV  [69] Notify Operations that Containment Spray Heat Exchangers may be placed in layup condition in accordance with SOI-67.02, if so desired by Unit 1 Operations. ________
[70] VERIFY that Post-test calibration of the M&TE used to record quantitative acceptance criteria has been satisfactorily
 
performed and the results recorded on Measuring and Test Equipment (M&TE) Log in SMP-9.0. ________
[71] VERIFY that Post-test calibration of permanent plant instruments used to record quantitative acceptance criteria has
 
been satisfactorily performed, AND  RECORD the results on Appendix C, Permanent Plant Instrumentation Log. ________
[72] NOTIFY the Unit 2 and Unit 1 SM/SRO of the test completion and system alignment. ________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 80 of 204
 
Data Package:  Page ____ of ____    Date ________
 
8.0 RECORDS 8.1 QA Records Completed Test Package (PTI) 8.2 Non-QA Records None WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 81 of 204 Appendix A (Page 1 of 1) TEST INSTRUCTIONS REFERENCE REVIEW Data Package: Page ____ of ____     Date ________
Additional copies of this table may be made as necessary.
Additional copies of this table may be made as necessary.
PROCEDURE/ INSTRUCTION REVISION/CHANGES INITIAL AND DATE. (N/A for no change)
PROCEDURE/                                                 INITIAL AND DATE.
FSAR Section 9.2.1 Table 14.2-1 Shts 4 & 5 of 89 N3-67-4002 System Description for Essential Raw Cooling Water System 2-TSD-067, Essential Raw Cooling Water System SOI-67.1, Essential Raw Cooling Water System  
REVISION/CHANGES INSTRUCTION                                                (N/A for no change)
FSAR Section 9.2.1 Table 14.2-1 Shts 4 & 5 of 89 N3-67-4002 System Description for Essential Raw Cooling Water System 2-TSD-067, Essential Raw Cooling Water System SOI-67.1, Essential Raw Cooling Water System Operating Instruction GOI-7, Generic Equipment Operating Guidelines VTD-M359-003, Valve Technical Manual for Metrex Model FTVA-400-WAT 4 2 War Refrigerant Pressure Activated Condenser Cooling Water Control Valve 1-SOI-30.05, Auxiliary Building HVAC Systems 0-PI-OPS-17.0


Operating Instruction GOI-7, Generic Equipment Operating Guidelines VTD-M359-003, Valve Technical Manual for Metrex
WBN             ERCW SYSTEM FLOW BALANCE             2-PTI-067-02-B Unit 1 & 2                        TRAIN B                Rev. 0000 Page 82 of 204 Appendix B (Page 1 of 1)
 
TEMPORARY CONDITION LOG Data Package: Page ____ of ____                                   Date ________
Model FTVA-400-WAT 4 2
 
War Refrigerant Pressure
 
Activated Condenser Cooling Water Control Valve 1-SOI-30.05, Auxiliary Building HVAC Systems 0-PI-OPS-17.0 WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 82 of 204 Appendix B (Page 1 of 1)
TEMPORARY CONDITION LOG Data Package: Page ____ of ____     Date ________
Additional copies of this table may be made as necessary.
Additional copies of this table may be made as necessary.
ITEM No. TEMPORARY CONDITION DESCRIPTION PERFORMED RETURNED TO NORMAL Step No. Performed By/DateCV By/Date Step No. Returned By/Date CV By/Date WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 83 of 204 Appendix C (Page 1 of 4) PERMANENT PLANT INSTRUMENTATION LOG Data Package:  Page ____ of ____    Date ________
ITEM   TEMPORARY CONDITION                     PERFORMED             RETURNED TO NORMAL No. DESCRIPTION                        Step  Performed By/Date   Step   Returned By/Date No. CV By/Date         No. CV By/Date
INSTRUMENT OR INSTRUMENT LOOP # CAL DUE DATE FILLED AND VENTED 1  PLACED IN SERVICE 1 USED FOR QUANTITATIVE ACC CRIT POST-TEST CAL DATE 2 POST-TEST CALIBRATION ACCEPTABLE 2 INITIAL/DATE INIT/DATE INIT/DATE YES NO 0-FIS-67-209        1-FI-67-74        1-FI-67-267        2-FI-67-267        1-FI-67-269        2-FI-67-269        1-FI-67-280        2-FI-67-74        2-FI-67-280        1-LPF-67-62        2-LPF-67-62        1-LPF-67-122        2-LPF-67-122 WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 84 of 204 Appendix C (Page 2 of 4) PERMANENT PLANT INSTRUMENTATION LOG
 
Data Package:  Page ____ of ____    Date ________
 
INSTRUMENT OR INSTRUMENT LOOP # CAL DUE DATE FILLED AND VENTED 1  PLACED IN SERVICE 1 USED FOR QUANTITATIVE ACC CRIT POST-TEST CAL DATE 2 POST-TEST CALIBRATION ACCEPTABLE 2 INITIAL/DATE INIT/DATE INIT/DATE YES NO 0-LPP-67-17        1-PI-67-10B        2-PI-67-10B        1-PI-67-10A        2-PI-67-10A        0-PDI-67-447A        0-PS-67-484        0-PS-67-485        0-PS-67-486        0-PS-67-487        0-PS-67-461 WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 85 of 204 Appendix C (Page 3 of 4) PERMANENT PLANT INSTRUMENTATION LOG
 
Data Package:  Page ____ of ____    Date ________
 
INSTRUMENT OR INSTRUMENT LOOP # CAL DUE DATE FILLED AND VENTED 1  PLACED IN SERVICE 1 USED FOR QUANTITATIVE ACC CRIT POST-TEST CAL DATE 2 POST-TEST CALIBRATION ACCEPTABLE 2 INITIAL/DATE INIT/DATE INIT/DATE YES NO 0-PS-67-463        0-LPP-67-48        0-LPP-67-52        0-LPP-67-56        0-LPP-67-60        0-LPT-67-45A        0-LPT-67-45B        0-LPT-67-49A        0-LPT-67-49B        0-LPT-67-53A        0-LPT-67-53B WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 86 of 204 Appendix C (Page 4 of 4) PERMANENT PLANT INSTRUMENTATION LOG
 
Data Package:  Page ____ of ____    Date ________
 
INSTRUMENT OR INSTRUMENT LOOP # CAL DUE DATE FILLED AND VENTED 1  PLACED IN SERVICE 1 USED FOR QUANTITATIVE ACC CRIT POST-TEST CAL DATE 2 POST-TEST CALIBRATION ACCEPTABLE 2 INITIAL/DATE INIT/DATE INIT/DATE YES NO 0-LPT-67-57A        0-LPT-67-57B        1-LPF-67-122        0-LI-67-479                1 These items may be initialed and dated by personnel performing the task. Instrumentation not required to be filled and vented may be identified as Not Applicable. (N/A) 2 May be identified as Not Applicable (N/A) if instrument was not used to verify/record quantitative acceptance criteria data.
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 87 of 204 Appendix D (Page 1 of 9)
SWITCH LINEUP Data Package:  Page ____ of ____    Date ________
Switch Location Descri ptionPositionVerifiedDate0-HS-67-208 A 0-M-27A C&SS COMPR SUP FROM HDR1BOPEN1-HS-67-128B 0-M-27A 1B AB CLRS C&SS AUX AIR B SUP HDR PD/OPEN1-HS-67-139 A 0-M-27A UPR CNTMT CLR 1B RET CIV-B A A UTO1-HS-67-297 A 0-M-27A UPR CNTMT CLR 1B RET CIV-B A A UTO1-HS-67-138 A 0-M-27A UPR CNTMT CLR 1B SUP CIV-B A A UTO1-HS-67-124 A 0-M-27A CNTMT SPRAY HX 1B RETURNCLOSED1-HS-67-123 A 0-M-27A CNTMT SPRAY HX 1B INLETCLOSED1-HS-67-142 A 0-M-27A UPR CNTMT CLRS 1D RET CIV-B A A UTO1-HS-67-298 A 0-M-27A UPR CNTMT CLRS 1D DRET CIV-B A A UTO1-HS-67-141 A 0-M-27A UPR CNTMT CLR 1D SUP CIV-B A A UTO1-HS-67-104 A 0-M-27A LWR CNTMT 1B CLRS RET CIV-B A A UTO1-HS-67-103 A 0-M-27A LWR CNTMT 1B CLRS RET CIV-B A A UTO1-HS-67-102 A 0-M-27A RCP 2 MTR CLR SUP TCVP A UTO1-HS-67-101 A 0-M-27 A CRDM CLR 1D-B OUTLET TCVP A UTO1-HS-67-100 A 0-M-27 A LWR CNTMT CLR 1B OUTLET TCVP A UTO1-HS-67-105 A 0-M-27A LWR CNTMT 1B CLRS SUP CIV-B A A UTO 1-HS-67-99 A 0-M-27A LWR CNTMT 1B CLRS SUP CIV-B A A UTO1-HS-67-112 A 0-M-27A LWR CNTMT 1D CLRS RET CIV-B A A UTO WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 88 of 204 Appendix D (Page 2 of 9)
SWITCH LINEUP
 
Data Package:  Page ____ of ____    Date ________
 
Switch Location Descri ptionPositionVerifiedDate1-HS-67-111 A 0-M-27A LWR CNTMT 1D CLRS RET CIV-B A A UTO1-HS-67-110 0-M-27A RCP 4 MTR CLR SUP TCVP A UTO1-HS-67-109 A 0-M-27A CRDM CLR 1D-B OUTLET TCVP A UTO1-HS-67-108 A 0-M-27A LWR CNTMT CLR 1D OUTLET TCVP A UTO1-HS-67-113 A 0-M-27A LWR CNTMT 1D CLRS SUP CIV-B A A UTO1-HS-67-107 A 0-M-27A LWR CNTMT 1D CLRS SUP CIV-B A A UTO 1-HS-67-82 A 0-M-27A AB SUP HDR1BPD/OPEN 1-HS-67-24 A 0-M-27A STRAINER 1B-B INLETPD/OPEN 1-HS-67-67 A 0-M-27A DG 1B-B NORM SUPP A UTO 2-HS-67-67 A 0-M-27A DG 2B-B NORM SUPOPEN 1-HS-67-65 A 0-M-27A DG 1B-B BACKUP SUPP A UTO 2-HS-67-65 A 0-M-27A DG 2B-B BACKUP SUPP A UTO 2-HS-67-82 A 0-M-27A AB SUPPLY HDR2BNORMAL 2-HS-67-24 A 0-M-27A STRAINER 2B-B INLETNORMAL0-HS-67-208B 0-M-27A C&SS COMPR SUP FROM HDR1BNORMAL2-HS-67-128 A 0-M-27A 2B AB CLRS C&SS AUX AIR B SUP HDR NORMAL WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 89 of 204 Appendix D (Page 3 of 9)
SWITCH LINEUP
 
Data Package:  Page ____ of ____    Date ________
 
Switch Location Descri ptionPositionVerifiedDate2-HS-67-139 A 0-M-27A UPR CNTMT CLR 2B RET CIV-B A A UTO2-HS-67-297 A 0-M-27A UPR CNTMT CLR 2B RET CIV-B A A UTO2-HS-67-138 A 0-M-27A UPR CNTMT CLR 2B SUP CIV-B A A UTO2-HS-67-124 A 0-M-27A CNTMT SPRAY HX 2B RETURNCLOSED2-HS-67-123 A 0-M-27A CNTMT SPRAY HX 2B INLETCLOSED2-HS-67-142 A 0-M-27A UPR CNTMT CLR 2D RET CIV-B A A UTO2-HS-67-298 A 0-M-27A UPR CNTMT CLR 2D RET CIV-B A A UTO2-HS-67-141 A 0-M-27A UPR CNTMT CLR 2D SUP CIV-B A A UTO2-HS-67-104 A 0-M-27A LWR CNTMT 2B CLRS RET CIV-B A A UTO2-HS-67-103 A 0-M-27A LWR CNTMT 2B CLRS RET CIV-B A A UTO2-HS-67-102 A 0-M-27A RCP 2 MTR CLR SUP TCVP A UTO2-HS-67-109 A 0-M-27A CRDM CLR 2B-B OUTLET TCVP A UTO2-HS-67-100 A 0-M-27A LWR CNTMT CLR 2B OUTLET TCVP A UTO2-HS-67-105 A 0-M-27A LWR CNTMT 2B CLRS SUP CIV-B A A UTO 2-HS-67-99 A 0-M-27A LWR CNTMT 2B CLRS SUP CIV-B A A UTO2-HS-67-112 A 0-M-27A LWR CNTMT 2D CLRS RET CIV-B A A UTO WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 90 of 204 Appendix D (Page 4 of 9)
SWITCH LINEUP
 
Data Package:  Page ____ of ____    Date ________
 
Switch Location Descri ptionPositionVerifiedDate2-HS-67-111 A 0-M-27A LWR CNTMT 2D CLRS RET CIV-B A A UTO2-HS-67-102 A 0-M-27A RCP 2 MTR CLR SUP TCVP A UTO2-HS-67-101 A 0-M-27A CRDM CLR 2B-B OUTLET TCVP A UTO2-HS-67-108 A 0-M-27A LWR CNTMT CLR 2D OUTLET TCVP A UTO2-HS-67-113 A 0-M-27A LWR CNTMT 2D CLRS SUP CIV-B A A UTO2-HS-67-107 A 0-M-27A LWR CNTMT 2D CLRS SUP CIV-B A A UTO0-XS-67-287 0-M-27A ERCW PUMP E-B/F-B DG POWER SEL PUMP E-B 0-HS-67-47 A 0-M-27A ERCW PMP E-B A A UTO 0-HS-67-51 A 0-M-27A ERCW PMP F-B A A UTO1-HS-67-440 A 0-M-27A SCRN WASH PMP & TRAV SCRN 1B-B P A UTO1-HS-67-147 A 0-M-27A CCS HX C SUP FROM HDR2BPD/CLOSED0-HS-67-151 A 0-M-27A CCS HX C ALT DISCH TO HDR APD/CLOSED0-HS-67-144 A 0-M-27A CCS HX C DISCH TO HDR ACLOSED0-HS-67-152 A 0-M-27A CCS HX C DISCH TO HDRBCLOSED0-HS-67-362 A 0-M-27A DISCH HDRB TO CT BASINOPEN0-HS-67-360 A 0-M-27A DISCH HDR A TO CT BASINOPEN WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 91 of 204 Appendix D (Page 5 of 9)
SWITCH LINEUP
 
Data Package:  Page ____ of ____    Date ________
 
Switch Location Descri ptionPositionVerifiedDate2-HS-67-447a 0-M-27A SCRN WASH PMP & TRAV SCRN 2B-B P A UTO 0-HS-67-55 A 0-M-27A ERCW PUMP G-B A A UTO 0-HS-67-59 A 0-M-27A ERCW PUMP H-B A A UTO0-XS-67-288 0-M-27A ERCW PMP G-B/H-B DG POWER SEL PUMP H-B2-HS-67-147 A 0-M-27A CCS HX C SUP FROM HDR2BPD/OPEN 1-XS-67 A 480V RMOV BD TRANSFER SWITCHNORMAL1-HS-67-97C-A 480V RMOV BD 1-FCV-67 A CONTROL SWITCHNORMAL1-HS-67-89C 480V RMOV BD 1-FCV-67 A CONTROL SWITCHNORMAL 1-XS-67 A 480V RMOV BD TRANSFER SWITCHNORMAL 1-XS-67 A 480V RMOV BD TRANSFER SWITCHNORMAL1-HS-67-87C 480V RMOV BD 1-FCV-67 A CONTROL SWITCHNORMAL 1-XS-67 A 480V RMOV BD TRANSFER SWITCHNORMAL1-HS-67-82C 480V RMOV BD 1-FCV-67 A CONTROL SWITCHNORMAL 2-XS-67 A 480V RMOV BD TRANSFER SWITCHNORMAL2-HS-67-97C-A 480V RMOV BD 2-FCV-67 A CONTROL SWITCHNORMAL 1-XS-67 A 480V RMOV BD TRANSFER SWITCHNORMAL WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 92 of 204 Appendix D (Page 6 of 9)
SWITCH LINEUP


Data Package: Page ____ of ____     Date ________  
WBN            ERCW SYSTEM FLOW BALANCE        2-PTI-067-02-B Unit 1 & 2                  TRAIN B              Rev. 0000 Page 83 of 204 Appendix C (Page 1 of 4)
PERMANENT PLANT INSTRUMENTATION LOG Data Package: Page ____ of ____                             Date ________
INSTRUMENT    CAL DUE        FILLED AND    PLACED IN      USED FOR        POST-TEST      POST-TEST OR            DATE          VENTED1      SERVICE1      QUANTITATIVE    CAL DATE2      CALIBRATION INSTRUMENT                                                ACC CRIT                      ACCEPTABLE2 LOOP #                                                                                    INITIAL/DATE INIT/DATE    INIT/DATE      YES      NO 0-FIS-67-209 1-FI-67-74 1-FI-67-267 2-FI-67-267 1-FI-67-269 2-FI-67-269 1-FI-67-280 2-FI-67-74 2-FI-67-280 1-LPF-67-62 2-LPF-67-62 1-LPF-67-122 2-LPF-67-122


Switch Location Descri ptionPositionVerifiedDate1-HS-67-95C 480V RMOV BD 1-FCV-67 A CONTROL SWITCHNORMAL2-HS-67-89C 480V RMOV BD 2-FCV-67 A CONTROL SWITCHNORMAL 2-XS-67 A 480V RMOV BD TRANSFER SWITCHNORMAL 2-XS-67 A 480V RMOV BD TRANSFER SWITCHNORMAL2-HS-67-87C 480V RMOV BD 2-FCV-67 A CONTROL SWITCHNORMAL 2-XS-67 A 480V RMOV BD TRANSFER SWITCHNORMAL2-HS-67-82C 480V RMOV BD 2-FCV-67 A CONTROL SWITCHNORMAL 1-XS-67-128-A 480V RMOV BD TRANSFER SWITCHNORMAL1-HS-67-128C 480V RMOV BD 1-FCV-67-128-A CONTROL SWITCHNORMAL1-XS-67-147 480V RMOV BD TRANSFER SWITCHNORMAL1-HS-67-147C 480V RMOV BD 1-FCV-67-147-B CONTROL SWITCHNORMAL0-XS-67-151-A 480V RMOV BD TRANSFER SWITCHNORMAL0-HS-67-151C 480V RMOV BD 0-FCV-67-151 CONTROL SWITCHNORMAL 2-XS-67 A 480V RMOV BD TRANSFER SWITCHNORMAL2-HS-67-95C 480V RMOV BD 2-FCV-67 A CONTROL SWITCHNORMAL1-XS-67-88-B 480V RMOV BD TRANSFER SWITCHNORMAL WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 93 of 204 Appendix D (Page 7 of 9)
WBN            ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                   TRAIN B                Rev. 0000 Page 84 of 204 Appendix C (Page 2 of 4)
SWITCH LINEUP
PERMANENT PLANT INSTRUMENTATION LOG Data Package: Page ____ of ____                            Date ________
INSTRUMENT      CAL DUE        FILLED AND    PLACED IN      USED FOR        POST-TEST  POST-TEST OR              DATE            VENTED1      SERVICE1      QUANTITATIVE    CAL DATE2  CALIBRATION INSTRUMENT                                                  ACC CRIT                    ACCEPTABLE2 LOOP #                                                                                    INITIAL/DATE INIT/DATE    INIT/DATE      YES      NO 0-LPP-67-17 1-PI-67-10B 2-PI-67-10B 1-PI-67-10A 2-PI-67-10A 0-PDI-67-447A 0-PS-67-484 0-PS-67-485 0-PS-67-486 0-PS-67-487 0-PS-67-461


Data Package: Page ____ of ____     Date ________  
WBN            ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                  TRAIN B                Rev. 0000 Page 85 of 204 Appendix C (Page 3 of 4)
PERMANENT PLANT INSTRUMENTATION LOG Data Package: Page ____ of ____                             Date ________
INSTRUMENT      CAL DUE        FILLED AND    PLACED IN      USED FOR        POST-TEST  POST-TEST OR              DATE            VENTED1      SERVICE1      QUANTITATIVE    CAL DATE2  CALIBRATION INSTRUMENT                                                  ACC CRIT                    ACCEPTABLE2 LOOP #                                                                                    INITIAL/DATE INIT/DATE    INIT/DATE      YES      NO 0-PS-67-463 0-LPP-67-48 0-LPP-67-52 0-LPP-67-56 0-LPP-67-60 0-LPT-67-45A 0-LPT-67-45B 0-LPT-67-49A 0-LPT-67-49B 0-LPT-67-53A 0-LPT-67-53B


Switch Location Descri ptionPositionVerifiedDate1-HS-67-88C 480V RMOV BD 1-FCV-67-88-B CONTROL SWITCHNORMAL1-XS-67-96-B 480V RMOV BD TRANSFER SWITCHNORMAL1-HS-67-96C 480V RMOV BD 1-FCV-67-96-B CONTROL SWITCHNORMAL1-XS-67-91-B 480V RMOV BD TRANSFER SWITCHNORMAL1-HS-67-91C 480V RMOV BD 1-FCV-67-91-B CONTROL SWITCHNORMAL1-XS-67-83-B 480V RMOV BD TRANSFER SWITCHNORMAL1-HS-67-83C 480V RMOV BD 1-FCV-67-83-B CONTROL SWITCHNORMAL 2-XS-67-128-A 480V RMOV BD TRANSFER SWITCHNORMAL2-HS-67-128C 480V RMOV BD 2-FCV-67-128-A CONTROL SWITCHNORMAL0-XS-67-208-B 480V RMOV BD TRANSFER SWITCHNORMAL0-HS-67-208C 480V RMOV BD 0-FCV-67-208-B CONTROL SWITCHNORMAL0-XS-67-362-B 480V RMOV BD TRANSFER SWITCHNORMAL0-HS-67-362C 480V RMOV BD 0-FCV-67-362-B CONTROL SWITCHNORMAL0-XS-67-144-B 480V RMOV BD TRANSFER SWITCHNORMAL0-HS-67-144C 480V RMOV BD 0-FCV-67-144-B CONTROL SWITCHNORMAL 2-XS-67 A 480V RMOV BD TRANSFER SWITCHNORMAL WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 94 of 204 Appendix D (Page 8 of 9)
WBN                        ERCW SYSTEM FLOW BALANCE                                    2-PTI-067-02-B Unit 1 & 2                                     TRAIN B                                   Rev. 0000 Page 86 of 204 Appendix C (Page 4 of 4)
SWITCH LINEUP
PERMANENT PLANT INSTRUMENTATION LOG Data Package: Page ____ of ____                                                                        Date ________
INSTRUMENT          CAL DUE                  FILLED AND                PLACED IN                USED FOR                      POST-TEST            POST-TEST OR                  DATE                    VENTED1                    SERVICE1                QUANTITATIVE                  CAL DATE2            CALIBRATION INSTRUMENT                                                                                      ACC CRIT                                            ACCEPTABLE2 LOOP #                                                                                                                                              INITIAL/DATE INIT/DATE                  INIT/DATE                YES              NO 0-LPT-67-57A 0-LPT-67-57B 1-LPF-67-122 0-LI-67-479 1
These items may be initialed and dated by personnel performing the task. Instrumentation not required to be filled and vented may be identified as Not Applicable. (N/A) 2 May be identified as Not Applicable (N/A) if instrument was not used to verify/record quantitative acceptance criteria data.


Data Package: Page ____ of ____     Date ________  
WBN          ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                  TRAIN B              Rev. 0000 Page 87 of 204 Appendix D (Page 1 of 9)
SWITCH LINEUP Data Package: Page ____ of ____                             Date ________
Switch        Location                Description              Position        Verified Date 0-HS-67-208A      0-M-27A    C&SS COMPR SUP FROM HDR 1B              OPEN 1-HS-67-128B      0-M-27A    1B AB CLRS C&SS AUX AIR B SUP HDR    PD/OPEN 1-HS-67-139A      0-M-27A    UPR CNTMT CLR 1B RET CIV-IB            A AUTO 1-HS-67-297A      0-M-27A    UPR CNTMT CLR 1B RET CIV-IB            A AUTO 1-HS-67-138A      0-M-27A    UPR CNTMT CLR 1B SUP CIV-IB            A AUTO 1-HS-67-124A      0-M-27A    CNTMT SPRAY HX 1B RETURN              CLOSED 1-HS-67-123A      0-M-27A    CNTMT SPRAY HX 1B INLET                CLOSED 1-HS-67-142A      0-M-27A    UPR CNTMT CLRS 1D RET CIV-IB          A AUTO 1-HS-67-298A      0-M-27A    UPR CNTMT CLRS 1D DRET CIV-IB          A AUTO 1-HS-67-141A      0-M-27A    UPR CNTMT CLR 1D SUP CIV-IB            A AUTO 1-HS-67-104A      0-M-27A    LWR CNTMT 1B CLRS RET CIV-IB          A AUTO 1-HS-67-103A      0-M-27A    LWR CNTMT 1B CLRS RET CIV-IB          A AUTO 1-HS-67-102A      0-M-27A    RCP 2 MTR CLR SUP TCV                  P AUTO 1-HS-67-101A      0-M-27A    CRDM CLR 1D-B OUTLET TCV              P AUTO 1-HS-67-100A      0-M-27A    LWR CNTMT CLR 1B OUTLET TCV            P AUTO 1-HS-67-105A      0-M-27A    LWR CNTMT 1B CLRS SUP CIV-IB          A AUTO 1-HS-67-99A      0-M-27A    LWR CNTMT 1B CLRS SUP CIV-IB          A AUTO 1-HS-67-112A      0-M-27A    LWR CNTMT 1D CLRS RET CIV-IB          A AUTO


Switch Location Descri ptionPositionVerifiedDate2-HS-67-24C 480V RMOV BD 2-FCV-67 A CONTROL SWITCHNORMAL0-XS-67-360 480V RMOV BD TRANSFER SWITCHNORMAL0-HS-67-360C 480V RMOV BD 0-FCV-67-360 CONTROL SWITCHNORMAL0-XS-67-152 480V RMOV BD TRANSFER SWITCHNORMAL0-HS-67-152C 480V RMOV BD 0-FCV-67-152-B CONTROL SWITCHNORMAL2-XS-67-147 480V RMOV BD TRANSFER SWITCHNORMAL2-HS-67-147C 480V RMOV BD 2-FCV-67-147-B CONTROL SWITCHNORMAL 1-XS-67-84 1-L-11 A TRANSFER SWITCHNORMAL 1-XS-67-85 1-L-11 A TRANSFER SWITCHNORMAL 1-XS-67-92 1-L-11 A TRANSFER SWITCHNORMAL 1-XS-67-93 1-L-11 A TRANSFER SWITCHNORMAL2-XS-67-84 2-L-11B TRANSFER SWITCHNORMAL2-XS-67-85 2-L-11B TRANSFER SWITCHNORMAL2-XS-67-92 2-L-11B TRANSFER SWITCHNORMAL2-XS-67-93 2-L-11B TRANSFER SWITCHNORMAL0-XS-67-51 6900V TRANSFER SWITCHNORMAL WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 95 of 204 Appendix D (Page 9 of 9)
WBN          ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                  TRAIN B                Rev. 0000 Page 88 of 204 Appendix D (Page 2 of 9)
SWITCH LINEUP
SWITCH LINEUP Data Package: Page ____ of ____                            Date ________
Switch         Location                 Description                Position  Verified Date 1-HS-67-111A        0-M-27A    LWR CNTMT 1D CLRS RET CIV-IB            A AUTO 1-HS-67-110        0-M-27A    RCP 4 MTR CLR SUP TCV                  P AUTO 1-HS-67-109A        0-M-27A    CRDM CLR 1D-B OUTLET TCV                P AUTO 1-HS-67-108A        0-M-27A    LWR CNTMT CLR 1D OUTLET TCV            P AUTO 1-HS-67-113A        0-M-27A    LWR CNTMT 1D CLRS SUP CIV-IB            A AUTO 1-HS-67-107A        0-M-27A    LWR CNTMT 1D CLRS SUP CIV-IB            A AUTO 1-HS-67-82A        0-M-27A    AB SUP HDR 1B                          PD/OPEN 1-HS-67-24A        0-M-27A    STRAINER 1B-B INLET                    PD/OPEN 1-HS-67-67A        0-M-27A    DG 1B-B NORM SUP                        P AUTO 2-HS-67-67A        0-M-27A    DG 2B-B NORM SUP                        OPEN 1-HS-67-65A        0-M-27A    DG 1B-B BACKUP SUP                      P AUTO 2-HS-67-65A        0-M-27A    DG 2B-B BACKUP SUP                      P AUTO 2-HS-67-82A        0-M-27A    AB SUPPLY HDR 2B                        NORMAL 2-HS-67-24A        0-M-27A    STRAINER 2B-B INLET                    NORMAL 0-HS-67-208B        0-M-27A    C&SS COMPR SUP FROM HDR 1B              NORMAL 2-HS-67-128A        0-M-27A    2B AB CLRS C&SS AUX AIR B SUP HDR      NORMAL


Data Package: Page ____ of ____     Date ________  
WBN          ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                TRAIN B                Rev. 0000 Page 89 of 204 Appendix D (Page 3 of 9)
SWITCH LINEUP Data Package: Page ____ of ____                           Date ________
Switch          Location                Description                Position  Verified Date 2-HS-67-139A        0-M-27A    UPR CNTMT CLR 2B RET CIV-IB            A AUTO 2-HS-67-297A        0-M-27A    UPR CNTMT CLR 2B RET CIV-IB            A AUTO 2-HS-67-138A        0-M-27A    UPR CNTMT CLR 2B SUP CIV-IB            A AUTO 2-HS-67-124A        0-M-27A    CNTMT SPRAY HX 2B RETURN              CLOSED 2-HS-67-123A        0-M-27A    CNTMT SPRAY HX 2B INLET                CLOSED 2-HS-67-142A        0-M-27A    UPR CNTMT CLR 2D RET CIV-IB            A AUTO 2-HS-67-298A        0-M-27A    UPR CNTMT CLR 2D RET CIV-IB            A AUTO 2-HS-67-141A        0-M-27A    UPR CNTMT CLR 2D SUP CIV-IB            A AUTO 2-HS-67-104A        0-M-27A    LWR CNTMT 2B CLRS RET CIV-IB          A AUTO 2-HS-67-103A        0-M-27A    LWR CNTMT 2B CLRS RET CIV-IB          A AUTO 2-HS-67-102A        0-M-27A    RCP 2 MTR CLR SUP TCV                  P AUTO 2-HS-67-109A        0-M-27A    CRDM CLR 2B-B OUTLET TCV              P AUTO 2-HS-67-100A        0-M-27A    LWR CNTMT CLR 2B OUTLET TCV            P AUTO 2-HS-67-105A        0-M-27A    LWR CNTMT 2B CLRS SUP CIV-IB          A AUTO 2-HS-67-99A        0-M-27A    LWR CNTMT 2B CLRS SUP CIV-IB          A AUTO 2-HS-67-112A        0-M-27A    LWR CNTMT 2D CLRS RET CIV-IB          A AUTO


Switch Location Descri ptionPositionVerifiedDate0-XS-67-47 6900V TRANSFER SWITCHNORMAL0-XS-67-55 6900V TRANSFER SWITCHNORMAL0-XS-67-59 6900V TRANSFER SWITCHNORMAL1-XS-67-65 480V DIESEL TRANSFER SWITCHNORMAL1-HS-67-65C 480V DIESEL 1-FCV-67-65-B CONTROL SWITCHNORMAL1-XS-67-67 480V DIESEL TRANSFER SWITCHNORMAL1-HS-67-67C 480V DIESEL 1-FCV-67-67-B CONTROL SWITCHNORMAL2-XS-67-65 480V DIESEL TRANSFER SWITCHNORMAL2-HS-67-65C 480V DIESEL 2-FCV-67-65-B CONTROL SWITCHNORMAL2-XS-67-67 480V DIESEL TRANSFER SWITCHNORMAL2-HS-67-67C 480V DIESEL 2-FCV-67-67-B CONTROL SWITCHNORMAL2-HS-67-65D DIESEL GEN EMER DSL HTX B1 & B2 SUP VLV FROM CLOSE2-HS-67-67D DIESEL EMER DSL HTX B1 & B2 SUP VLV FROM CLOSE1-HS-67-65D DIESEL GEN EMER DSL HTX B1 & B2 SUP VLV FROM CLOSE1-HS-67-67D DIESEL GEN EMER DSL HTX B1 & B2 SUP VLV FROM CLOSE
WBN          ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                  TRAIN B                Rev. 0000 Page 90 of 204 Appendix D (Page 4 of 9)
SWITCH LINEUP Data Package: Page ____ of ____                            Date ________
Switch         Location                 Description                Position  Verified Date 2-HS-67-111A        0-M-27A    LWR CNTMT 2D CLRS RET CIV-IB            A AUTO 2-HS-67-102A        0-M-27A    RCP 2 MTR CLR SUP TCV                  P AUTO 2-HS-67-101A        0-M-27A    CRDM CLR 2B-B OUTLET TCV                P AUTO 2-HS-67-108A        0-M-27A    LWR CNTMT CLR 2D OUTLET TCV            P AUTO 2-HS-67-113A        0-M-27A    LWR CNTMT 2D CLRS SUP CIV-IB            A AUTO 2-HS-67-107A        0-M-27A    LWR CNTMT 2D CLRS SUP CIV-IB            A AUTO 0-XS-67-287        0-M-27A    ERCW PUMP E-B/F-B DG POWER SEL        PUMP E-B 0-HS-67-47A        0-M-27A    ERCW PMP E-B                            A AUTO 0-HS-67-51A        0-M-27A    ERCW PMP F-B                           A AUTO 1-HS-67-440A        0-M-27A    SCRN WASH PMP & TRAV SCRN 1B-B          P AUTO 1-HS-67-147A        0-M-27A    CCS HX C SUP FROM HDR 2B              PD/CLOSED 0-HS-67-151A        0-M-27A    CCS HX C ALT DISCH TO HDR A          PD/CLOSED 0-HS-67-144A        0-M-27A    CCS HX C DISCH TO HDR A                CLOSED 0-HS-67-152A        0-M-27A    CCS HX C DISCH TO HDR B                CLOSED 0-HS-67-362A        0-M-27A    DISCH HDR B TO CT BASIN                  OPEN 0-HS-67-360A        0-M-27A    DISCH HDR A TO CT BASIN                  OPEN


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 96 of 204 Appendix E (Page 1 of 4)
WBN           ERCW SYSTEM FLOW BALANCE           2-PTI-067-02-B Unit 1 & 2                  TRAIN B                Rev. 0000 Page 91 of 204 Appendix D (Page 5 of 9)
TRAIN B FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____     Date ________
SWITCH LINEUP Data Package: Page ____ of ____                           Date ________
TEMPORARY TUBING/FITTINGS FLOW ELEMENT DESCRIPTION Installed Removed ROOT VALVES  INIT/DATE WO# INIT/DATE 2ND PARTY INIT/DATE 2-TV-67-822A 2-FE-67-159 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-822B 2-FE-67-159 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-861A 1-FE-67-259 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-861B 1-FE-67-259 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-862A 1-FE-67-255 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-862B 1-FE-67-255 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-863A 1-FE-67-249 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-863B 1-FE-67-249 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-876A 2-FE-67-339 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-876B 2-FE-67-339 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-877A 2-FE-67-340 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-877B 2-FE-67-340 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-878A 2-FE-67-220 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-878B 2-FE-67-220 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-879A 1-FE-67-173 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-879B 1-FE-67-173 TEST POINT ______/____  ______/____ ______/____
Switch          Location                  Description              Position Verified Date 2-HS-67-447a        0-M-27A    SCRN WASH PMP & TRAV SCRN 2B-B          P AUTO 0-HS-67-55A        0-M-27A    ERCW PUMP G-B                          A AUTO 0-HS-67-59A        0-M-27A    ERCW PUMP H-B                          A AUTO 0-XS-67-288        0-M-27A    ERCW PMP G-B/H-B DG POWER SEL          PUMP H-B 2-HS-67-147A        0-M-27A    CCS HX C SUP FROM HDR 2B              PD/OPEN 1-XS-67-97-A    480V RMOV BD  TRANSFER SWITCH                        NORMAL 1-HS-67-97C-A    480V RMOV BD  1-FCV-67-97-A CONTROL SWITCH            NORMAL 1-HS-67-89C      480V RMOV BD  1-FCV-67-89-A CONTROL SWITCH            NORMAL 1-XS-67-89-A    480V RMOV BD  TRANSFER SWITCH                        NORMAL 1-XS-67-87-A    480V RMOV BD  TRANSFER SWITCH                        NORMAL 1-HS-67-87C      480V RMOV BD  1-FCV-67-87-A CONTROL SWITCH            NORMAL 1-XS-67-82-A    480V RMOV BD  TRANSFER SWITCH                        NORMAL 1-HS-67-82C      480V RMOV BD  1-FCV-67-82-A CONTROL SWITCH            NORMAL 2-XS-67-97-A    480V RMOV BD  TRANSFER SWITCH                        NORMAL 2-HS-67-97C-A    480V RMOV BD  2-FCV-67-97-A CONTROL SWITCH            NORMAL 1-XS-67-95-A    480V RMOV BD  TRANSFER SWITCH                        NORMAL
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 97 of 204 Appendix E (Page 2 of 4)
TRAIN B FLOW ELEMENT TEMPORARY TUBING


Data Package: Page ____ of ____     Date ________  
WBN          ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                  TRAIN B                Rev. 0000 Page 92 of 204 Appendix D (Page 6 of 9)
SWITCH LINEUP Data Package: Page ____ of ____                             Date ________
Switch          Location                  Description                Position  Verified Date 1-HS-67-95C      480V RMOV BD  1-FCV-67-95-A CONTROL SWITCH            NORMAL 2-HS-67-89C      480V RMOV BD  2-FCV-67-89-A CONTROL SWITCH            NORMAL 2-XS-67-89-A    480V RMOV BD  TRANSFER SWITCH                          NORMAL 2-XS-67-87-A    480V RMOV BD  TRANSFER SWITCH                          NORMAL 2-HS-67-87C      480V RMOV BD  2-FCV-67-87-A CONTROL SWITCH            NORMAL 2-XS-67-82-A    480V RMOV BD  TRANSFER SWITCH                          NORMAL 2-HS-67-82C      480V RMOV BD  2-FCV-67-82-A CONTROL SWITCH            NORMAL 1-XS-67-128-A    480V RMOV BD  TRANSFER SWITCH                          NORMAL 1-HS-67-128C      480V RMOV BD  1-FCV-67-128-A CONTROL SWITCH            NORMAL 1-XS-67-147      480V RMOV BD  TRANSFER SWITCH                          NORMAL 1-HS-67-147C      480V RMOV BD  1-FCV-67-147-B CONTROL SWITCH            NORMAL 0-XS-67-151-A    480V RMOV BD  TRANSFER SWITCH                          NORMAL 0-HS-67-151C      480V RMOV BD  0-FCV-67-151 CONTROL SWITCH              NORMAL 2-XS-67-95-A    480V RMOV BD  TRANSFER SWITCH                          NORMAL 2-HS-67-95C      480V RMOV BD  2-FCV-67-95-A CONTROL SWITCH            NORMAL 1-XS-67-88-B    480V RMOV BD  TRANSFER SWITCH                          NORMAL


TEMPORARY TUBING/FITTINGS FLOW ELEMENT  DESCRIPTION Installed Removed ROOT VALVES  INIT/DATE WO# INIT/DATE 2ND PARTY INIT/DATE 1-TV-67-880A 1-FE-67-183 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-880B 1-FE-67-183 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-881A 1-FE-67-187 TEST POINT ______/____ ______/____ ______/____ 1-TV-67-881B 1-FE-67-187 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-882A 1-FE-67-191 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-882B 1-FE-67-191 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-883A 1-FE-67-349 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-883B 1-FE-67-349 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-883A 2-FE-67-349 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-883B 2-FE-67-349 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-884A 1-FE-67-353 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-884B 1-FE-67-353 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-884A 2-FE-67-353 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-884B 2-FE-67-353 TEST POINT ______/____  ______/____ ______/____
WBN          ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                  TRAIN B                Rev. 0000 Page 93 of 204 Appendix D (Page 7 of 9)
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 98 of 204 Appendix E (Page 3 of 4)
SWITCH LINEUP Data Package: Page ____ of ____                             Date ________
TRAIN B FLOW ELEMENT TEMPORARY TUBING
Switch          Location                  Description                Position Verified Date 1-HS-67-88C      480V RMOV BD  1-FCV-67-88-B CONTROL SWITCH            NORMAL 1-XS-67-96-B    480V RMOV BD  TRANSFER SWITCH                          NORMAL 1-HS-67-96C      480V RMOV BD 1-FCV-67-96-B CONTROL SWITCH            NORMAL 1-XS-67-91-B    480V RMOV BD  TRANSFER SWITCH                          NORMAL 1-HS-67-91C      480V RMOV BD  1-FCV-67-91-B CONTROL SWITCH            NORMAL 1-XS-67-83-B    480V RMOV BD  TRANSFER SWITCH                          NORMAL 1-HS-67-83C      480V RMOV BD  1-FCV-67-83-B CONTROL SWITCH            NORMAL 2-XS-67-128-A    480V RMOV BD  TRANSFER SWITCH                          NORMAL 2-HS-67-128C      480V RMOV BD  2-FCV-67-128-A CONTROL SWITCH            NORMAL 0-XS-67-208-B    480V RMOV BD  TRANSFER SWITCH                          NORMAL 0-HS-67-208C      480V RMOV BD  0-FCV-67-208-B CONTROL SWITCH            NORMAL 0-XS-67-362-B    480V RMOV BD  TRANSFER SWITCH                          NORMAL 0-HS-67-362C      480V RMOV BD  0-FCV-67-362-B CONTROL SWITCH            NORMAL 0-XS-67-144-B    480V RMOV BD  TRANSFER SWITCH                          NORMAL 0-HS-67-144C      480V RMOV BD  0-FCV-67-144-B CONTROL SWITCH            NORMAL 2-XS-67-24-A    480V RMOV BD  TRANSFER SWITCH                          NORMAL


Data Package: Page ____ of ____     Date ________  
WBN          ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                  TRAIN B                Rev. 0000 Page 94 of 204 Appendix D (Page 8 of 9)
SWITCH LINEUP Data Package: Page ____ of ____                             Date ________
Switch          Location                  Description                Position  Verified Date 2-HS-67-24C    480V RMOV BD  2-FCV-67-24-A CONTROL SWITCH            NORMAL 0-XS-67-360    480V RMOV BD  TRANSFER SWITCH                          NORMAL 0-HS-67-360C    480V RMOV BD  0-FCV-67-360 CONTROL SWITCH              NORMAL 0-XS-67-152    480V RMOV BD  TRANSFER SWITCH                          NORMAL 0-HS-67-152C    480V RMOV BD  0-FCV-67-152-B CONTROL SWITCH            NORMAL 2-XS-67-147    480V RMOV BD  TRANSFER SWITCH                          NORMAL 2-HS-67-147C    480V RMOV BD  2-FCV-67-147-B CONTROL SWITCH            NORMAL 1-XS-67-84        1-L-11A    TRANSFER SWITCH                          NORMAL 1-XS-67-85        1-L-11A    TRANSFER SWITCH                          NORMAL 1-XS-67-92        1-L-11A    TRANSFER SWITCH                          NORMAL 1-XS-67-93        1-L-11A    TRANSFER SWITCH                          NORMAL 2-XS-67-84        2-L-11B    TRANSFER SWITCH                          NORMAL 2-XS-67-85        2-L-11B    TRANSFER SWITCH                          NORMAL 2-XS-67-92        2-L-11B    TRANSFER SWITCH                          NORMAL 2-XS-67-93        2-L-11B    TRANSFER SWITCH                          NORMAL 0-XS-67-51          6900V    TRANSFER SWITCH                          NORMAL


TEMPORARY TUBING/FITTINGS FLOW ELEMENT  DESCRIPTION Installed Removed ROOT VALVES  INIT/DATE WO# INIT/DATE 2ND PARTY INIT/DATE 1-TV-67-885A 1-FE-67-357 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-885B 1-FE-67-357 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-885A 2-FE-67-357 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-885B 2-FE-67-357 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-886A 1-FE-67-345 TEST POINT ______/____  ______/____ ______/____ 1-TV-67-886B 1-FE-67-345 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-886A 2-FE-67-345 TEST POINT ______/____  ______/____ ______/____ 2-TV-67-886B 2-FE-67-345 TEST POINT ______/____  ______/____ ______/___ 1-TV-67-888A 1-FE-67-171 TEST POINT ______/____  ______/____ ______/___ 1-TV-67-888B 1-FE-67-171 TEST POINT ______/____  ______/____ ______/___ 0-TV-67-889A 0-FE-67-200 TEST POINT ______/____  ______/____ ______/___ 0-TV-67-889B 0-FE-67-200 TEST POINT ______/____  ______/____ ______/___ 0-TV-67-890A 0-FE-67-202 TEST POINT ______/____  ______/____ ______/___ 0-TV-67-890B 0-FE-67-202 TEST POINT ______/____  ______/____ ______/___
WBN          ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                  TRAIN B                Rev. 0000 Page 95 of 204 Appendix D (Page 9 of 9)
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 99 of 204 Appendix E (Page 4 of 4)
SWITCH LINEUP Data Package: Page ____ of ____                           Date ________
TRAIN B FLOW ELEMENT TEMPORARY TUBING
Switch          Location                  Description              Position Verified Date 0-XS-67-47        6900V      TRANSFER SWITCH                        NORMAL 0-XS-67-55        6900V      TRANSFER SWITCH                        NORMAL 0-XS-67-59        6900V      TRANSFER SWITCH                        NORMAL 1-XS-67-65    480V DIESEL    TRANSFER SWITCH                        NORMAL 1-HS-67-65C    480V DIESEL    1-FCV-67-65-B CONTROL SWITCH            NORMAL 1-XS-67-67     480V DIESEL    TRANSFER SWITCH                        NORMAL 1-HS-67-67C    480V DIESEL    1-FCV-67-67-B CONTROL SWITCH            NORMAL 2-XS-67-65    480V DIESEL    TRANSFER SWITCH                        NORMAL 2-HS-67-65C    480V DIESEL    2-FCV-67-65-B CONTROL SWITCH            NORMAL 2-XS-67-67     480V DIESEL    TRANSFER SWITCH                        NORMAL 2-HS-67-67C    480V DIESEL    2-FCV-67-67-B CONTROL SWITCH            NORMAL 2-HS-67-65D      DIESEL GEN    EMER DSL HTX B1 & B2 SUP VLV FROM        CLOSE 2-HS-67-67D        DIESEL    EMER DSL HTX B1 & B2 SUP VLV FROM        CLOSE 1-HS-67-65D      DIESEL GEN    EMER DSL HTX B1 & B2 SUP VLV FROM        CLOSE 1-HS-67-67D      DIESEL GEN    EMER DSL HTX B1 & B2 SUP VLV FROM        CLOSE


Data Package: Page ____ of ____     Date ________  
WBN            ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 96 of 204 Appendix E (Page 1 of 4)
TRAIN B FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____                                   Date ________
TEMPORARY TUBING/FITTINGS FLOW ELEMENT                  DESCRIPTION                            Installed                  Removed ROOT VALVES                                                  INIT/DATE        WO#        INIT/DATE  2ND PARTY INIT/DATE 2-TV-67-822A            2-FE-67-159 TEST POINT              ______/____                  ______/____ ______/____
2-TV-67-822B            2-FE-67-159 TEST POINT              ______/____                  ______/____ ______/____
1-TV-67-861A            1-FE-67-259 TEST POINT              ______/____                  ______/____ ______/____
1-TV-67-861B            1-FE-67-259 TEST POINT              ______/____                  ______/____ ______/____
1-TV-67-862A            1-FE-67-255 TEST POINT              ______/____                  ______/____ ______/____
1-TV-67-862B            1-FE-67-255 TEST POINT              ______/____                  ______/____ ______/____
1-TV-67-863A            1-FE-67-249 TEST POINT              ______/____                  ______/____ ______/____
1-TV-67-863B            1-FE-67-249 TEST POINT              ______/____                  ______/____ ______/____
2-TV-67-876A            2-FE-67-339 TEST POINT              ______/____                  ______/____ ______/____
2-TV-67-876B            2-FE-67-339 TEST POINT              ______/____                  ______/____ ______/____
2-TV-67-877A            2-FE-67-340 TEST POINT              ______/____                  ______/____ ______/____
2-TV-67-877B            2-FE-67-340 TEST POINT              ______/____                  ______/____ ______/____
2-TV-67-878A            2-FE-67-220 TEST POINT              ______/____                  ______/____ ______/____
2-TV-67-878B            2-FE-67-220 TEST POINT              ______/____                  ______/____ ______/____
1-TV-67-879A            1-FE-67-173 TEST POINT              ______/____                  ______/____ ______/____
1-TV-67-879B            1-FE-67-173 TEST POINT              ______/____                  ______/____ ______/____


TEMPORARY TUBING/FITTINGS FLOW ELEMENT DESCRIPTION Installed Removed ROOT VALVES INIT/DATE WO# INIT/DATE 2ND PARTY INIT/DATE 1-TV-67-896A 1-FE-67-216 TEST POINT ______/____ ______/____ ______/___ 1-TV-67-896B 1-FE-67-216 TEST POINT ______/____ ______/____ ______/___ 1-TV-67-897A 1-FE-67-165 TEST POINT ______/____ ______/____ ______/___ 1-TV-67-897B 1-FE-67-165 TEST POINT ______/____ ______/____ ______/___ 1-TV-67-911 1-FE-67-475 TEST POINT ______/____ ______/____ ______/___ 1-TV-67-912 1-FE-67-475 TEST POINT ______/____ ______/____ ______/___ 1-TV-67-913 1-FE-67-477 TEST POINT ______/____ ______/____ ______/___ 1-TV-67-914 1-FE-67-477 TEST POINT ______/____  ______/____ ______/___ 1-TV-67-921A 1-FE-67-474 TEST POINT ______/____ ______/____ ______/___ 1-TV-67-921B 1-FE-67-474 TEST POINT ______/____ ______/____ ______/___ 1-TV-67-922A 1-FE-67-476 TEST POINT ______/____  ______/____ ______/___ 1-TV-67-922B 1-FE-67-476 TEST POINT ______/____ ______/____ ______/___
WBN            ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 97 of 204 Appendix E (Page 2 of 4)
TRAIN B FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____                                Date ________
TEMPORARY TUBING/FITTINGS FLOW ELEMENT                     DESCRIPTION                             Installed               Removed ROOT VALVES                                                     INIT/DATE         WO#   INIT/DATE   2ND PARTY INIT/DATE 1-TV-67-880A              1-FE-67-183 TEST POINT             ______/____             ______/____ ______/____
1-TV-67-880B              1-FE-67-183 TEST POINT             ______/____             ______/____ ______/____
1-TV-67-881A              1-FE-67-187 TEST POINT             ______/____             ______/____ ______/____
1-TV-67-881B              1-FE-67-187 TEST POINT             ______/____             ______/____ ______/____
1-TV-67-882A              1-FE-67-191 TEST POINT             ______/____             ______/____ ______/____
1-TV-67-882B              1-FE-67-191 TEST POINT             ______/____             ______/____ ______/____
1-TV-67-883A              1-FE-67-349 TEST POINT             ______/____             ______/____ ______/____
1-TV-67-883B              1-FE-67-349 TEST POINT             ______/____              ______/____  ______/____
2-TV-67-883A              2-FE-67-349 TEST POINT              ______/____              ______/____  ______/____
2-TV-67-883B              2-FE-67-349 TEST POINT             ______/____             ______/____ ______/____
1-TV-67-884A              1-FE-67-353 TEST POINT             ______/____             ______/____ ______/____
1-TV-67-884B              1-FE-67-353 TEST POINT             ______/____              ______/____  ______/____
2-TV-67-884A              2-FE-67-353 TEST POINT              ______/____              ______/____  ______/____
2-TV-67-884B              2-FE-67-353 TEST POINT             ______/____             ______/____ ______/____


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 100 of 204 Appendix F (Page 1 of 1)
WBN             ERCW SYSTEM FLOW BALANCE             2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 98 of 204 Appendix E (Page 3 of 4)
CALCULATION INFORMATION SHEET Data Package: Page ____ of ____     Date ________
TRAIN B FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____                                 Date ________
At 1 or 2-FE-67-62, Maximum Flow = 20,000 gpm with Maximum 2 O Therefore:
TEMPORARY TUBING/FITTINGS FLOW ELEMENT                      DESCRIPTION                            Installed              Removed ROOT VALVES                                                      INIT/DATE        WO#    INIT/DATE  2ND PARTY INIT/DATE 1-TV-67-885A              1-FE-67-357 TEST POINT              ______/____              ______/____  ______/____
3805.1437)605.193/ 605.193 ( *000 , 20 K)605.193/]O 2 H[" INPUT ( SQRT *K 000 , 20 ]GPM[Output  P*3805.1437 Q gpm Constants:
1-TV-67-885B              1-FE-67-357 TEST POINT              ______/____              ______/____  ______/____
Pd= discharge pressure = 1bf/in 2 x 144 in 2/ft 2 3 x lbf/lbm = 62.37 lbf/ft 3 (average river temperature of 60 F) Q ft/sec = Pump flow(gpm) x 0.002228 ft 3/sec-gpm  Ad= Pump discharge cross-sectional area = 2.18 ft g= Gravitational constant = 32.143 ft/sec 2 zd= elevation difference between the discharge of pump (datum line) and gauge
2-TV-67-885A              2-FE-67-357 TEST POINT              ______/____              ______/____ ______/____
= -16.5 ft Ps/p= Suction pressure (River level -653.08 ft)
2-TV-67-885B              2-FE-67-357 TEST POINT              ______/____              ______/____ ______/____
As= Pump Suction cross-sectional area = 6.30 ft 2  Zs= Elevation difference between the discharge of pump (datum line) and suction inlet = -90.25 ft NOTE: The velocity heads (Q 2/Ad 2 2g and Q 2/As 2 2g) may be assumed to be zero since their results are insignificant.
1-TV-67-886A              1-FE-67-345 TEST POINT              ______/____              ______/____ ______/____
level River 8.726)31.2*Pd (         
1-TV-67-886B              1-FE-67-345 TEST POINT              ______/____              ______/____ ______/____
2-TV-67-886A              2-FE-67-345 TEST POINT              ______/____              ______/____ ______/____
2-TV-67-886B              2-FE-67-345 TEST POINT              ______/____              ______/____  ______/___
1-TV-67-888A              1-FE-67-171 TEST POINT              ______/____              ______/____  ______/___
1-TV-67-888B              1-FE-67-171 TEST POINT              ______/____              ______/____  ______/___
0-TV-67-889A              0-FE-67-200 TEST POINT              ______/____              ______/____  ______/___
0-TV-67-889B              0-FE-67-200 TEST POINT              ______/____              ______/____  ______/___
0-TV-67-890A              0-FE-67-202 TEST POINT              ______/____              ______/____  ______/___
0-TV-67-890B              0-FE-67-202 TEST POINT              ______/____              ______/____  ______/___


)25.90 (0 08.653/Ps ()5.16 (0 37.62 144*Pd         
WBN            ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 99 of 204 Appendix E (Page 4 of 4)
TRAIN B FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____                                Date ________
TEMPORARY TUBING/FITTINGS FLOW ELEMENT                      DESCRIPTION                            Installed              Removed ROOT VALVES                                                      INIT/DATE        WO#    INIT/DATE  2ND PARTY INIT/DATE 1-TV-67-896A              1-FE-67-216 TEST POINT              ______/____              ______/____  ______/___
1-TV-67-896B              1-FE-67-216 TEST POINT              ______/____              ______/____  ______/___
1-TV-67-897A              1-FE-67-165 TEST POINT              ______/____              ______/____  ______/___
1-TV-67-897B              1-FE-67-165 TEST POINT              ______/____              ______/____  ______/___
1-TV-67-911              1-FE-67-475 TEST POINT              ______/____              ______/____  ______/___
1-TV-67-912              1-FE-67-475 TEST POINT              ______/____              ______/____  ______/___
1-TV-67-913              1-FE-67-477 TEST POINT              ______/____              ______/____  ______/___
1-TV-67-914              1-FE-67-477 TEST POINT              ______/____              ______/____  ______/___
1-TV-67-921A              1-FE-67-474 TEST POINT              ______/____              ______/____  ______/___
1-TV-67-921B              1-FE-67-474 TEST POINT              ______/____              ______/____  ______/___
1-TV-67-922A              1-FE-67-476 TEST POINT              ______/____              ______/____  ______/___
1-TV-67-922B              1-FE-67-476 TEST POINT              ______/____              ______/____  ______/___


)Zs g 2*As/Q/Ps ( )Zd g 2 *Ad/Q/Pd ( )ft (TDH 2 2 2 2 WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 101 of 204 Appendix G (Page 1 of 2)
WBN                 ERCW SYSTEM FLOW BALANCE                         2-PTI-067-02-B Unit 1 & 2                            TRAIN B                          Rev. 0000 Page 100 of 204 Appendix F (Page 1 of 1)
CALCULATION FLOW ELEMENT CONSTANTS Data Package: Page ____ of ____     Date ________
CALCULATION INFORMATION SHEET Data Package: Page ____ of ____                                                     Date ________
Flow Element Bore  (maximum size) ( H 2 O) Flow (gpm)  P Flow K 2-FE-67-159 4.3446 100 750 75.0 1-FE-67-165 2.056 207 215 14.9 1-FE-67-171 1.170 52 36 3.9 2-FE-67-171 1.1696 52 36 3.9 1-FE-67-173 1.0092 60 30 3.9 1-FE-67-183 1.0430 60 30 6.0 2-FE-67-183 1.2655 25 30 6.0 1-FE-67-187 1.4582 15 33 8.5 2-FE-67-187 1.455 15 33 8.5 1-FE-67-191 1.0112 60 30 3.9 2-FE-67-191 1.013 60 30 3.9 0-FE-67-200 3.4405 100 440 44.0 0-FE-67-202 3.681 100.5 500 35.0 0-FE-67-204 1.4505 25 42 8.4 0-FE-67-207 1.4505 25 42 8.4 0-FE-67-210 1.4505 25 42 8.4 0-FE-67-211 1.4122 100 78 7.8 1-FE-67-216 1.3999 30 42 7.7 2-FE-67-220 0.50486 100 85 8.5 1-FE-67-249 1.9875 100 150 15 2-FE-67-249 1.9875 100 150 15 1-FE-67-255 1.9875 100 150 15 2-FE-67-255 1.9875 100 150 15 1-FE-67-259 1.011 123 43 3.9 2-FE-67-259 1.011 123 43 3.9 2-FE-67-339 0.995 60 30 3.9 1-FE-67-340 0.67 60 15 1.9 2-FE-67-340 0.6978 60 15 1.9 1-FE-67-345 1.347 100 70 7.0 1-FE-67-345 1.347 100 70 7.0 WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 102 of 204 Appendix G (Page 2 of 2)
At 1 or 2-FE-67-62, Maximum Flow = 20,000 gpm with Maximum P = 193.605 H2O Output [GPM] 20,000 K
CALCULATION FLOW ELEMENT CONSTANTS
* SQRT (INPUT[" H 2O] / 193.605)
Therefore:
K  20,000 * ( 193.605 / 193.605) 1437.3805 Q gpm  1437.3805 * 'P Constants:
x      Pd= discharge pressure = 1bf/in2 x 144 in2/ft2 x      = Discharge fluid density = 62.37 lbm/ft3 x lbf/lbm = 62.37 lbf/ft3 (average river temperature of 60qF) x      Qft/sec = Pump flow(gpm) x 0.002228 ft3/sec-gpm x      Ad= Pump discharge cross-sectional area = 2.18 ft2 x      g= Gravitational constant = 32.143 ft/sec2 x      zd= elevation difference between the discharge of pump (datum line) and gauge
          = -16.5 ft x      Ps/p= Suction pressure (River level -653.08 ft) x      As= Pump Suction cross-sectional area = 6.30 ft2 x      Zs= Elevation difference between the discharge of pump (datum line) and suction inlet = -90.25 ft NOTE: The velocity heads (Q2/Ad2 2g and Q2/As2 2g) may be assumed to be zero since their results are insignificant.
TDH (ft ) (Pd / U  Q 2 / Ad 2
* 2g  Zd)  (Ps / U  Q 2 / As 2
* 2g  Zs) 144 x                      Pd *       0  (16.5)  (Ps / U  653.08  0  (90.25) 62.37 (Pd
* 2.31)  726.8  River level


Data Package: Page ____ of ____     Date ________  
WBN          ERCW SYSTEM FLOW BALANCE      2-PTI-067-02-B Unit 1 & 2                  TRAIN B          Rev. 0000 Page 101 of 204 Appendix G (Page 1 of 2)
CALCULATION FLOW ELEMENT CONSTANTS Data Package: Page ____ of ____                       Date ________
Flow Element          Bore              P      Flow (maximum size)      ( H2O)    (gpm)        K  Flow
                                                                        'P 2-FE-67-159        4.3446            100        750              75.0 1-FE-67-165          2.056            207        215              14.9 1-FE-67-171          1.170            52        36              3.9 2-FE-67-171        1.1696            52        36              3.9 1-FE-67-173        1.0092            60        30              3.9 1-FE-67-183        1.0430            60        30              6.0 2-FE-67-183        1.2655            25        30              6.0 1-FE-67-187        1.4582            15        33              8.5 2-FE-67-187          1.455            15        33              8.5 1-FE-67-191        1.0112            60        30              3.9 2-FE-67-191          1.013            60        30              3.9 0-FE-67-200        3.4405            100        440              44.0 0-FE-67-202          3.681          100.5      500              35.0 0-FE-67-204        1.4505            25        42              8.4 0-FE-67-207        1.4505            25        42              8.4 0-FE-67-210        1.4505            25        42              8.4 0-FE-67-211        1.4122            100        78              7.8 1-FE-67-216        1.3999            30        42              7.7 2-FE-67-220        0.50486            100        85              8.5 1-FE-67-249        1.9875            100        150              15 2-FE-67-249        1.9875            100        150              15 1-FE-67-255        1.9875            100        150              15 2-FE-67-255        1.9875            100        150              15 1-FE-67-259          1.011            123        43              3.9 2-FE-67-259          1.011            123        43              3.9 2-FE-67-339          0.995            60        30              3.9 1-FE-67-340          0.67            60        15              1.9 2-FE-67-340        0.6978            60        15              1.9 1-FE-67-345          1.347            100        70              7.0 1-FE-67-345          1.347            100        70              7.0


Flow Element Bore (maximum size) ( H 2 O) Flow (gpm) P Flow K 1-FE-67-349 1.044 60 30 3.9 2-FE-67-349 1.044 60 30 3.9 1-FE-67-353 1.044 60 30 3.9 2-FE-67-353 1.044 60 30 3.9 1-FE-67-357 1.044 60 30 3.9 2-FE-67-357 1.044 60 30 3.9 1-FE-67-477 1.794 222 177 11.9 2-FE-67-477 1.794 222 177 11.9 1-FE-67-474 3.5227 50 320 45.3 2-FE-67-474 3.525 50 320 45.3 1-FE-67-476 3.5227 50 320 45.3 2-FE-67-476 3.525 50 320 45.3 1-FE-67-475 1.794 222 177 11.9 2-FE-67-475 1.801 222 177 11.9  
WBN          ERCW SYSTEM FLOW BALANCE      2-PTI-067-02-B Unit 1 & 2                  TRAIN B          Rev. 0000 Page 102 of 204 Appendix G (Page 2 of 2)
CALCULATION FLOW ELEMENT CONSTANTS Data Package: Page ____ of ____                        Date ________
Flow Element         Bore               P      Flow (maximum size)       ( H2O)   (gpm)         K  Flow
                                                                        'P 1-FE-67-349         1.044             60         30               3.9 2-FE-67-349         1.044             60         30               3.9 1-FE-67-353         1.044             60         30               3.9 2-FE-67-353         1.044             60         30               3.9 1-FE-67-357         1.044             60         30               3.9 2-FE-67-357         1.044             60         30               3.9 1-FE-67-477         1.794             222       177             11.9 2-FE-67-477         1.794             222       177             11.9 1-FE-67-474       3.5227             50       320             45.3 2-FE-67-474         3.525             50       320             45.3 1-FE-67-476       3.5227             50       320             45.3 2-FE-67-476         3.525             50       320             45.3 1-FE-67-475         1.794             222       177             11.9 2-FE-67-475         1.801             222       177             11.9


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 103 of 204 Appendix H (Page 1 of 2)
WBN             ERCW SYSTEM FLOW BALANCE           2-PTI-067-02-B Unit 1 & 2                  TRAIN B                    Rev. 0000 Page 103 of 204 Appendix H (Page 1 of 2)
COMMON TRAIN FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____     Date ________
COMMON TRAIN FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____                                 Date ________
TEMPORARY TUBING/FITTINGS FLOW ELEMENT ROOT VALVES DESCRIPTION Installed Removed INITIAL/DATE WO # INITIAL/DATE 2ND PARTY INITIAL/DATE NA 2-FT-67-222 Calibration Tap _______/______ _______/______ _______/______ _______/______ NA 2-FT-67-222 Calibration Tap _______/______ _______/______ _______/______ _______/______ NA 2-FT-67-61 Calibration Tap _______/______ _______/______ _______/______ _______/______ NA 2-FT-67-61 Calibration Tap _______/______ _______/______ _______/______ _______/______ NA 2-FT-67-62 Calibration Tap _______/______ _______/______ _______/______ _______/______ NA 2-FT-67-62 Calibration Tap _______/______ _______/______ _______/______ _______/______ NA 2-FT-67-226 Calibration Tap _______/______ _______/______ _______/______ _______/______ NA 0-FT-67-226 Calibration Tap _______/______ _______/______ _______/______ _______/______ 0-TV-67-898A 0-FE-67-207 Test Point _______/______ _______/______ _______/______ _______/______ 0-TV-67-898B 0-FE-67-207 Test Point _______/______ _______/______ _______/______ _______/______ 0-TV-67-899A 0-FE-67-210 Test Point _______/______ _______/______ _______/______ _______/______ 0-TV-67-898B 0-FE-67-210 Test Point _______/______ _______/______ _______/______ _______/______ 0-TV-67-900A 0-FE-67-204 Test Point _______/______ _______/______ _______/______ _______/______
TEMPORARY TUBING/FITTINGS FLOW           DESCRIPTION                       Installed                           Removed ELEMENT ROOT                                  INITIAL/DATE           WO #           INITIAL/DATE       2ND PARTY VALVES                                                                                        INITIAL/DATE NA     2-FT-67-222 Calibration Tap _______/______     _______/______   _______/______   _______/______
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 104 of 204 Appendix H (Page 2 of 2)
NA     2-FT-67-222 Calibration Tap _______/______     _______/______   _______/______   _______/______
COMMON TRAIN FLOW ELEMENT TEMPORARY TUBING
NA       2-FT-67-61 Calibration Tap _______/______     _______/______   _______/______   _______/______
NA       2-FT-67-61 Calibration Tap _______/______     _______/______   _______/______   _______/______
NA       2-FT-67-62 Calibration Tap _______/______     _______/______   _______/______   _______/______
NA       2-FT-67-62 Calibration Tap _______/______     _______/______   _______/______   _______/______
NA     2-FT-67-226 Calibration Tap _______/______     _______/______   _______/______   _______/______
NA     0-FT-67-226 Calibration Tap _______/______     _______/______   _______/______   _______/______
0-TV-67-898A   0-FE-67-207 Test Point   _______/______     _______/______   _______/______   _______/______
0-TV-67-898B   0-FE-67-207 Test Point   _______/______     _______/______   _______/______   _______/______
0-TV-67-899A   0-FE-67-210 Test Point   _______/______     _______/______   _______/______   _______/______
0-TV-67-898B   0-FE-67-210 Test Point   _______/______     _______/______   _______/______   _______/______
0-TV-67-900A   0-FE-67-204 Test Point   _______/______     _______/______   _______/______   _______/______


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                  TRAIN B                    Rev. 0000 Page 104 of 204 Appendix H (Page 2 of 2)
COMMON TRAIN FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____                                 Date ________
TEMPORARY TUBING/FITTINGS FLOW            DESCRIPTION                        Installed                            Removed ELEMENT ROOT                                    INITIAL/DATE          WO #          INITIAL/DATE      2ND PARTY VALVES                                                                                          INITIAL/DATE 0-TV-67-900B    0-FE-67-204 Test Point    _______/______      _______/______    _______/______  _______/______
0-TV-67-910A    0-FE-67-211 Test Point    _______/______      _______/______    _______/______  _______/______
0-TV-67-910B    0-FE-67-211 Test Point    _______/______      _______/______    _______/______  _______/______
NA        1-FT-67-222 Calibration Tap _______/______      _______/______    _______/______  _______/______
NA        1-FT-67-222 Calibration Tap _______/______      _______/______    _______/______  _______/______


TEMPORARY TUBING/FITTINGS FLOW ELEMENT ROOT VALVES DESCRIPTION Installed Removed INITIAL/DATE WO # INITIAL/DATE 2ND PARTY INITIAL/DATE 0-TV-67-900B 0-FE-67-204 Test Point _______/______ _______/______ _______/______ _______/______ 0-TV-67-910A 0-FE-67-211 Test Point _______/______ _______/______ _______/______ _______/______ 0-TV-67-910B 0-FE-67-211 Test Point _______/______ _______/______ _______/______ _______/______ NA 1-FT-67-222 Calibration Tap _______/______ _______/______ _______/______ _______/______ NA 1-FT-67-222 Calibration Tap _______/______ _______/______ _______/______ _______/______
WBN                ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                          TRAIN B                      Rev. 0000 Page 105 of 204 Appendix I (Page 1 of 2)
FLOW BALANCE INSTRUCTIONS Data Package: Page ____ of ____                                            Date ________
1.0      FLOW BALANCE Flow balancing is an iterative process. The steps to balance each component may be repeated several times to align flow for all components on the data sheet. No initials, dates or calculations will be completed until the final proof run described in Step 1.0[2] is performed.
When a P gauge is required, connect at the flow element test tubing quick disconnects. When an Ultrasonic Flowmeter is required, install it on the component piping per the flowmeter instruction. Permanent plant flow indicators will be utilized as they meet accuracy and calibration requirements for flow balance.
[1]      BALANCE the Components Listed in Colume [1] On the ERCW FLOW BALANCE DATA SHEET, Specified in Section 6.0, WITHOUT Making Any Entries On the Data Sheet for Performance of the Following Steps:
A. VERIFY/INSTALL (where applicable) a P gauge or ultrasonic flowmeter with a range as indicated in column [3] of the data sheet.
NOTE Throttle valve in the CLOSED direction to set flow. If flow is initially too low, OPEN valve until an increase in flow above the setpoint is observed, then CLOSE down on the valve to attain proper flow.
B. THROTTLE the valve listed in column [2] of the data sheet to obtain the Target Value P or flow as indicated on the first line in column [9] of the data sheet.
C. REMOVE the P gauge or ultrasonic flowmeter if needed for another test point, or leave it in place until the flow balance is complete.
D. REPEAT Steps 1.0[1]A through 1.0[1]C for each component on the data sheet.
E. REPEAT the entire data sheet until all Target Values (column [9]) are obtained without any throttle valve adjustment.


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 105 of 204 Appendix I (Page 1 of 2)
WBN               ERCW SYSTEM FLOW BALANCE                   2-PTI-067-02-B Unit 1 & 2                         TRAIN B                     Rev. 0000 Page 106 of 204 Appendix I (Page 2 of 2)
FLOW BALANCE INSTRUCTIONS Data Package:  Page ____ of ____    Date ________
FLOW BALANCE INSTRUCTIONS Data Package: Page ____ of ____                                           Date ________
1.0 FLOW BALANCE Flow balancing is an iterative process. The steps to balance each component may be repeated several times to align flow for all components on the data sheet. No initials, dates or calculations will be completed until the final proof run described in
1.0     FLOW BALANCE (continued)
 
[2]   DOCUMENT the Flow Balance for All Components On the Data Sheet as Follows:
Step 1.0[2] is performed.
A. VERIFY/INSTALL a differential pressure gauge with a range as indicated in column [3] of the data sheet, or a EFD as indicated for the component under test and RECORD the test equipment M&TE number (column [3]) if applicable.
disconnects. When an Ultrasonic Flowmeter is required, install it on the component piping per the flowmeter instruction. Permanent plant flow indicators will be utilized as they meet accuracy and calibration requirements for flow balance.
B. RECORD the P or Flow in column [5].
[1] BALANCE the Components Listed in Colume [1] On the ERCW FLOW BALANCE DATA SHEET, Specified in Section 6.0, WITHOUT Making Any Entries On the Data Sheet for Performance of the Following Steps:
C. DETERMINE the throttle valve position for the valve listed in column [2]
A. VERIFY/INSTALLflowmeter with a range as indicated in column [3] of the data sheet.
NOTE Throttle valve in the CLOSED direction to set flow. If flow is initially too low, OPEN valve until an increase in flow above the setpoint is observed, then CLOSE down on the valve to
 
attain proper flow.
B. THROTTLE the valve listed in column [2] of the data sheet to obtain the ow as indicated on the first line in column [9] of the
 
data sheet.
C. REMOVEeter if needed for another test point, or leave it in place until the flow balance is complete.
D. REPEAT Steps 1.0[1]A through 1.0[1]C for each component on the data sheet. E. REPEAT the entire data sheet until all Target Values (column [9]) are obtained without any throttle valve adjustment.
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 106 of 204 Appendix I (Page 2 of 2)
FLOW BALANCE INSTRUCTIONS  
 
Data Package: Page ____ of ____     Date ________  
 
1.0 FLOW BALANCE (continued)  
 
[2] DOCUMENT the Flow Balance for All Components On the Data Sheet as Follows: A. VERIFY/INSTALL a differential pressure gauge with a range as indicated in column [3] of the data sheet, or a EFD as indicated for the component under test and RECORD the test equipment M&TE number (column [3]) if applicable.
B. RECORD C. DETERMINE the throttle valve position for the valve listed in column [2]
in accordance with Data Sheet 5.
in accordance with Data Sheet 5.
D. MULTIPLY the value in column [5] by the Correction Multiplier (second line in column [4]).
D. MULTIPLY the value in column [5] by the Correction Multiplier (second line in column [4]).
E. RECORD the result of Step 1.0[2]D in column [8], Flow (corrected) line. F. When the Flow device in column [2] is an FE, RECORD the result of CALCULATE the square root of this value and RECORD on the second line in column [6].
E. RECORD the result of Step 1.0[2]D in column [8], Flow (corrected) line.
F. When the Flow device in column [2] is an FE, RECORD the result of Step 2.4 in column [6], P (corrected) 1st line. CALCULATE the square root of this value and RECORD on the second line in column [6].
MULTIPLY this result by the k value (column [7]) and RECORD the result in column [8], Flow (corrected) line.
MULTIPLY this result by the k value (column [7]) and RECORD the result in column [8], Flow (corrected) line.
NOTE Second party verification of test equipment removal is completed in Section 7.0 when all temporary connections are removed from Flow Element test valves.
NOTE Second party verification of test equipment removal is completed in Section 7.0 when all temporary connections are removed from Flow Element test valves.
G. REMOVE the differential pressure gauge or ultrasonic flowmeter if needed for another test point, or leave it in place until the flow balance is  
G. REMOVE the differential pressure gauge or ultrasonic flowmeter if needed for another test point, or leave it in place until the flow balance is complete.
 
H. REPEAT Steps 1.0[2]A through 1.0[2]G for each of the components on the data sheet.
complete.
H. REPEAT Steps 1.0[2]A through 1.0[2]G for each of the components on the data sheet.  


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 107 of 204 Data Sheet 1 (Page 1 of 12)
WBN                 ERCW SYSTEM FLOW BALANCE                 2-PTI-067-02-B Unit 1 & 2                              TRAIN B                Rev. 0000 Page 107 of 204 Data Sheet 1 (Page 1 of 12)
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____     Date ________
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____                                               Date ________
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge  
[1]                 [2]             [3]                 [4]             [5]       [6]                 [7]                 [8]             [9]
# Target Value/(Corr.
Component         Flow Device         EDF or             Target        P( H2O)  Pcorrected                            Flowcorrected  Acc. Criteria M&TE Gauge         Value/(Corr. or Flow(gpm)       1/2                k               OR EDF       Flow (gpm)
Multiplier) H 2 O)  or Flow(gpm) corrected  k Flowcorrected  OR EDF (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 CCS HTX C (bypass) 0-FE-67-226 ________ 0-100 H 2 O 6000 GPM (.917) ________ ________  852.0 ________ 6000 0-FCV-67-144 _______ Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
Throttle Valve                                                        (P)
_ DSL GEN CLR 2B1 2-FI-67-74 NA 700-760 gpm
                                            #              Multiplier)                                                            (gpm)           (Max)
(.929) ________ NA 85 ________ 650 (1200) 2-ISV-67-510B NA Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
CCS HTX C         0-FE-67-226        ________          !6000 GPM                    ________
_ DSL GEN CLR 2B2 2-FI-67-280 700-760 gpm
(bypass)       0-FCV-67-144        0-100 H2O            (.917)         ________   _______              852.0             ________         !6000 Steps and calculations performed by (init./date): ___________/_______             Calculations verified by (init./date): ___________/_______
(.929) ________ NA 85 ________ 650 (1200) 2-ISV-67-515B NA Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
DSL GEN CLR         2-FI-67-74                           700-760 gpm                     NA                                                      t650 2B1          2-ISV-67-510B          NA                (.929)         ________       NA                   85             ________         (1200)
_ SD BD RM A/C B 2-FE-67-159 ________ 0-100 H 2 O 60 H 2 O (.931) ________ ________
Steps and calculations performed by (init./date): ___________/_______             Calculations verified by (init./date): ___________/_______
75.0 ________ 560 (560) 2-ISV-67-555 ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ ELEC BD RM A/C B 0-FE-67-200 ________ 0-100 H 2 O 76 H 2 O (.936) ________ ________
DSL GEN CLR         2-FI-67-280                         700-760 gpm                     NA                                                      t650 2B2          2-ISV-67-515B                            (.929)         ________       NA                   85             ________         (1200)
44.0 ________ 370 (490) 0-ISV-67-618B _______ Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
Steps and calculations performed by (init./date): ___________/_______             Calculations verified by (init./date): ___________/_______
_
SD BD RM A/C       2-FE-67-159                             t60 H2O                    ________                                                   t560 B            2-ISV-67-555                            (.931)         ________   ________               75.0             ________           (560) 0-100 H2O Steps and calculations performed by (init./date): ___________/_________           Calculations verified by (init./date): ___________/_________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 108 of 204 Data Sheet 1 (Page 2 of 12)
ELEC BD RM         0-FE-67-200                             t76 H2O                    ________                                                   t370 A/C B          0-ISV-67-618B                            (.936)         ________   _______                44.0             ________           (490) 0-100 H2O Steps and calculations performed by (init./date): ___________/_______             Calculations verified by (init./date): ___________/_______
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE


Data Package: Page ____ of ____    Date ________  
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                                TRAIN B                  Rev. 0000 Page 108 of 204 Data Sheet 1 (Page 2 of 12)
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____                                               Date ________
[1]              [2]              [3]                  [4]              [5]        [6]                [7]                  [8]            [9]
Component        Flow Device          EDF or              Target        P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE Gauge          Value/(Corr. or Flow(gpm)        1/2              k                OR EDF        Flow (gpm)
Throttle Valve                                                          (P)
                                          #              Multiplier)                                                            (gpm)          (Max)
MAIN          0-FE-67-202                              t76 H2O                    ________                                                  t293 CONTROL RM      0-ISV-67-623B        ________              (.928)        ________    ________              35.0              ________          (460)
A/C B                            0-200 H2O Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
LWR CNTMT        1-FE-67-474        ________          t48.75 H2O                    ________                                                  t306 CLR 1B        1-ISV-67-564B      0-50 H2O              (.940)        ________    ________              45.3              ________          (1060)
Steps and calculations performed by (init./date): ___________/_________            Calculations verified by (init./date): ___________/_________
LWR CNTMT        1-FE-67-476        ________          t48.75 H2O                    ________                                                  t306 CLR 1D        1-ISV-67-564D      0-50 H2O              (.940)        ________    ________              45.3              ________          (1060)
Steps and calculations performed by (init./date): ___________/_________            Calculations verified by (init./date): ___________/_________
CRDM CLR 1B      1-FE-67-477        ________            t118 H2O                    ________                                                  t124 1-ISV-67-567B      0-200 H2O            (.931)        ________    ________              11.9              ________          (390)
Steps and calculations performed by (init./date): ___________/_________            Calculations verified by (init./date): ___________/_________
CRDM CLR 1D      1-FE-67-475        ________            t118 H2O                    ________                                                  t124 1-ISV-67-567D      0-200 H2O            (.931)        ________     ________             11.9              ________          (390)
Steps and calculations performed by (init./date): ___________/_________            Calculations verified by (init./date): ___________/_________


[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge  
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 109 of 204 Data Sheet 1 (Page 3 of 12)
# Target Value/(Corr.
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____                                              Date ________
Multiplier) H 2 O)  or Flow(gpm) corrected  k Flowcorrected  OR EDF (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 MAIN CONTROL RM A/C B 0-FE-67-202  ________ 0-200 H 2 O 76 H 2 O (.928) ________ ________
[1]               [2]               [3]                 [4]             [5]         [6]                 [7]                 [8]             [9]
35.0 ________ 293 (460) 0-ISV-67-623B ________ Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
Component         Flow Device         EDF or               Target        P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE Gauge           Value/(Corr. or Flow(gpm)         1/2              k               OR EDF       Flow (gpm)
_ LWR CNTMT CLR 1B 1-FE-67-474 ________ 0-50 H 2 O 48.75 H 2 O (.940) ________ ________
Throttle Valve                                                          (P)
45.________ 306 (1060) 1-ISV-67-564B ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ LWR CNTMT CLR 1D 1-FE-67-476 ________ 0-50 H 2 O 48.75 H 2 O (.940) ________ ________
                                          #              Multiplier)                                                              (gpm)           (Max)
45.________ 306 (1060) 1-ISV-67-564D ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ CRDM CLR 1B 1-FE-67-477 ________ 0-200 H 2 O 118 H 2 O (.931) ________ ________
U1 RCP MTR        1-FE-67-249        ________            t58 H2O                    ________                                                   t110 CLR 2        1-ISV-67-572B      0-100 H2O            (.930)         ________     ________               15.0             ________         (220)
11.________ 124 (390) 1-ISV-67-567B ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ CRDM CLR 1D 1-FE-67-475 ________ 0-200 H 2 O 118 H 2 O (.931) ________ ________
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/_________
11.9 ________ 124 (390) 1-ISV-67-567D ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________
U1 RCP MTR        1-FE-67-255        ________            t58 H2O                    ________                                                   t110 CLR 4        1-ISV-67-572D      0-100 H2O            (.930)         ________     ________               15.0              ________         (220)
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 109 of 204 Data Sheet 1 (Page 3 of 12)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/_________
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE
CCS & AFW        1-FE-67-165                            t108 H2O                    ________                                                   t102 PUMP SP CLR      1-THV-67-643B        ________              (.928)         ________     ________               10.2              ________         (670) 1B                              0-200 H2O Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
BA TRF &        2-FE-67-220        ________             t55 H2O                    ________                                                    t60 AFW SP CLR      2-THV-67-673B      0-100 H2O            (.929)         ________     ________               8.5              ________         (360) 2B Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
INST RM WAT        1-FE-67-259        ________            t65 H2O                    ________                                                   t30 CLR 1B        1-ISV-67-527B      0-100 H2O            (.933)         ________     ________               3.9             ________         (200)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________


Data Package: Page ____ of ____    Date ________  
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 110 of 204 Data Sheet 1 (Page 4 of 12)
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____                                               Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component          Flow Device        EDF or              Target        P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE Gauge          Value/(Corr. or Flow(gpm)          1/2              k                OR EDF      Flow (gpm)
Throttle Valve                                                          (P)
                                          #              Multiplier)                                                              (gpm)          (Max)
SFP & TB        1-FE-67-216                            t16 H2O                    ________                                                  t29 BSTR PMP        1-THV-67-646B        ________              (.910)        ________    ________              7.7              ________        (170)
CLR 1B                            0-50 H2O Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
CNTMT SPR          1-FE-67187        ________            t13 H2O                      ________                                                  t28 PMP RM CLR      1-THV-67-605B        0-50 H2O            (.895)        ________     ________               8.5              ________        (190) 1B-B Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
CENT CHG          1-FE-67-171        ________            t28 H2O                    ________                                                  t25 PMP CLR 1B        1-ISV-67-601B      0-100 H2O            (.904)        ________    ________              5.0              ________          (28)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
UPPER          1-FI-67-267                            24-25 gpm                        NA                                                    t23 CNTMT CLR        1-THV-67-588B                              (.958)        ________        NA                5.0              ________          (26) 1B Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________


[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge  
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 111 of 204 Data Sheet 1 (Page 5 of 12)
# Target Value/(Corr.
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____                                              Date ________
Multiplier) H 2 O)  or Flow(gpm) corrected  k Flowcorrected  OR EDF (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 U1 RCP MTR CLR 2 1-FE-67-249 ________ 0-100 H 2 O 58 H 2 O (.930) ________ ________
[1]               [2]               [3]                 [4]             [5]         [6]               [7]                   [8]           [9]
15.0 ________ 110 (220) 1-ISV-67-572B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________ U1 RCP MTR CLR 4 1-FE-67-255 ________ 0-100 H 2 O 58 H 2 O (.930) ________ ________
Component         Flow Device         EDF or               Target        P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE Gauge           Value/(Corr. or Flow(gpm)         1/2              k                 OR EDF       Flow (gpm)
15.________ 110 (220) 1-ISV-67-572D ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________ CCS & AFW PUMP SP CLR 1B 1-FE-67-165  ________ 0-200 H 2 O 108 H 2 O (.928) ________ ________
Throttle Valve                                                          (P)
10.________ 102 (670) 1-THV-67-643B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
                                          #              Multiplier)                                                              (gpm)         (Max)
BA TRF & AFW SP CLR 2B 2-FE-67-220 ________ 0-100 H 2 O 55 H 2 O (.929) ________ ________
UPPER          1-FI-67-269                            24-25 gpm                        NA                                                    t23 CNTMT CLR       1-THV-67-588D                              (.958)       ________         NA                5.0               ________         (26) 1D Steps and calculations performed by (init./date): ___________/___________           Calculations verified by (init./date): ___________/___________
8.________ 60 (360) 2-THV-67-673B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________ INST RM WAT CLR 1B 1-FE-67-259 ________ 0-100 H 2 O 65 H 2 O (.933) ________ ________
SI PMP RM        1-FE-67-183        ________             t36 H2O                    ________                                                  t22 CLR 1B        1-THV-67-604B      0-100 H2O              (.914)       ________     ________               3.9              ________         (25)
3.________ 30 (200) 1-ISV-67-527B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 110 of 204 Data Sheet 1 (Page 4 of 12)
RHR PMP RM        1-FE-67-191        ________            t30 H2O                    ________                                                  t19 CLR 1B-B      1-THV-67-606B      0-100 H2O              (.907)       ________     ________               3.9              ________         (21)
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE
Steps and calculations performed by (init./date): ___________/___________           Calculations verified by (init./date): ___________/___________
PIPE CHASE        1-FE-67-345        ________             t36 H2O                        NA                                                    t15 CLR 1B        1-THV-67-611B        0-50 H2O              (.907)       ________         NA                7.0              ________         (17)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PIPE CHASE        2-FE-67-345        ________             t6 H2O                        NA                                                    t15 CLR 2B        2-THV-67-611B        0-50 H2O              (.907)       ________         NA                7.0              ________         (17)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________


Data Package: Page ____ of ____    Date ________  
WBN                ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 112 of 204 Data Sheet 1 (Page 6 of 12)
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____                                               Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device          EDF or              Target          P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE Gauge          Value/(Corr. or Flow(gpm)          1/2              k                OR EDF      Flow (gpm)
Throttle Valve                                                          (P)
                                          #              Multiplier)                                                              (gpm)          (Max)
PEN RM CLR        1-FE-67-349        ________            t12 H2O                      ________                                                  t12 1B1          1-THV-67-608B      0-100 H2O            (.907)        ________    ________              3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        1-FE-67-353        ________            t12 H2O                      ________                                                  t11 1B2          1-THV-67-609B      0-100 H2O            (.907)        ________    ________              3.9              ________          (13)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        1-FE-67-357        ________            t12 H2O                      ________                                                  t12 1B3          1-THV-67-610B      0-100 H2O            (.907)        ________    ________              3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        2-FE-67-349        ________            t12 H2O                      ________                                                  t12 2B1          2-THV-67-608B      0-100 H2O            (.907)        ________     ________               3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        2-FE-67-353        ________            t12 H2O                      ________                                                  t11 2B2          2-THV-67-609B      0-100 H2O            (.907)        ________    ________              3.9              ________          (13)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________


[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge  
WBN                  ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                                TRAIN B                  Rev. 0000 Page 113 of 204 Data Sheet 1 (Page 7 of 12)
# Target Value/(Corr.
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____                                              Date ________
Multiplier) H 2 O)  or Flow(gpm) corrected  k Flowcorrected  OR EDF (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 SFP & TB BSTR PMP CLR 1B 1-FE-67-216  ________ 0-50 H 2 O 16 H 2 O (.910) ________ ________
[1]               [2]               [3]                 [4]             [5]         [6]                 [7]                 [8]             [9]
7.________ 29 (170) 1-THV-67-646B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ CNTMT SPR PMP RM CLR 1B-B 1-FE-67187 ________ 0-50 H 2 O 13 H 2 O (.895) ________ ________
Component         Flow Device         EDF or             Target          P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE Gauge         Value/(Corr. or Flow(gpm)         1/2              k               OR EDF       Flow (gpm)
8.________ 28 (190) 1-THV-67-605B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
Throttle Valve                                                          (P)
CENT CHG PMP CLR 1B 1-FE-67-171 ________ 0-100 H 2 O 28 H 2 O (.904) ________ ________
                                          #              Multiplier)                                                              (gpm)           (Max)
5.________ 25 (28) 1-ISV-67-601B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
PEN RM CLR        2-FE-67-357        ________            t12 H2O                      ________                                                     t12 2B3          2-THV-67-610B      0-100 H2O            (.907)         ________     ________               3.9              ________           (14)
UPPER CNTMT CLR 1B 1-FI-67-267 24-25 gpm
Steps and calculations performed by (init./date): ___________/___________           Calculations verified by (init./date): ___________/___________
(.958) ________ NA  5.0 ________ 23 (26) 1-THV-67-588B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
EMER GAS TR          2-FE-67-339        ________            t8 H2O                      ________                                                    t10 RM CLR 2B        2-THV-67-685B      0-100 H2O            (.907)         ________     ________               3.9              ________           (11)
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 111 of 204 Data Sheet 1 (Page 5 of 12)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/___________
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE
RECIP CHG           1-FE-67-173        ________          t11 H2O                      ________                                                    t12 PMP CLR 1C        1-THV-67-640      0-100 H2O            (.907)         ________     ________               3.9              ________           (14)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/___________
ST AIR COMP        0-FIS-67-209                          183-196 gpm                         NA                                                      183 (header)       0-THV-67-632C        ________              (.932)            NA           NA                  NA              ________          (196)
Steps and calculations performed by (init./date): ___________/___________           Calculations verified by (init./date): ___________/___________
LWR CNTMT        2-FE-67-474        ________          t48.75 H2O                    ________                                                    t306 CLR 2B                            0-50 H2O              (.940)        ________                            45.3              ________          (1060) 2-ISV-67-564B                                                          ________
Steps and calculations performed by (init./date): ___________/_________              Calculations verified by (init./date): ___________/_________


Data Package: Page ____ of ____    Date ________  
WBN                ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 114 of 204 Data Sheet 1 (Page 8 of 12)
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____                                               Date ________
[1]                [2]              [3]                [4]              [5]        [6]                [7]                  [8]            [9]
Component        Flow Device          EDF or              Target        P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE Gauge          Value/(Corr. or Flow(gpm)        1/2              k                OR EDF        Flow (gpm)
Throttle Valve                                                          (P)
                                          #              Multiplier)                                                            (gpm)          (Max)
LWR CNTMT        2-FE-67-476        ________          t48.75 H2O                    ________                                                  t306 CLR 2D        2-ISV-67-564D        0-50 H2O            (.940)        ________    ________              45.3              ________          (1060)
Steps and calculations performed by (init./date): ___________/_________            Calculations verified by (init./date): ___________/_________
CRDM CLR 2B        2-FE-67-477        ________            t118 H2O                    ________                                                  t124 2-ISV-67-567B      0-200 H2O            (.931)        ________    ________              11.9              ________          (390)
Steps and calculations performed by (init./date): ___________/_________            Calculations verified by (init./date): ___________/_________
CRDM CLR 2D        2-FE-67-475        ________            t118 H2O                    ________                                                  t124 2-ISV-67-567D      0-200 H2O            (.931)        ________    ________              11.9              ________          (390)
Steps and calculations performed by (init./date): ___________/_________            Calculations verified by (init./date): ___________/_________
U2 RCP MTR        2-FE-67-249        ________            t58 H2O                    ________                                                  t110 CLR 2        2-ISV-67-572B      0-100 H2O            (.930)        ________    ________              15.0              ________          (220)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/_________
U2 RCP MTR        2-FE-67-255        ________            t58 H2O                    ________
CLR 4        2-ISV-67-572D      0-100 H2O            (.930)        ________     ________             15.0              ________          t110 (220)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/_________


[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge  
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 115 of 204 Data Sheet 1 (Page 9 of 12)
# Target Value/(Corr.
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____                                              Date ________
Multiplier) H 2 O)  or Flow(gpm) corrected  k Flowcorrected  OR EDF (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 UPPER CNTMT CLR 1D 1-FI-67-269 24-25 gpm
[1]               [2]               [3]                 [4]             [5]         [6]               [7]                   [8]           [9]
(.958) ________ NA  5.0  ________ 23 (26) 1-THV-67-588D NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
Component         Flow Device         EDF or               Target        P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE Gauge           Value/(Corr. or Flow(gpm)         1/2              k                 OR EDF       Flow (gpm)
SI PMP RM CLR 1B 1-FE-67-183 ________ 0-100 H 2 O 36 H 2 O (.914) ________ ________
Throttle Valve                                                         (P)
3.9 ________ 22 (25) 1-THV-67-604B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
                                            #              Multiplier)                                                             (gpm)         (Max)
RHR PMP RM CLR 1B-B 1-FE-67-191 ________ 0-100 H 2 O 30 H 2 O (.907) ________ ________
INST RM WAT        2-FE-67-259                            t65 H2O                    ________                                                   t30 CLR 2B          2-ISV-67-527B                            (.933)         ________     ________               3.9               ________         (200) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________         Calculations verified by (init./date): ___________/___________
3.________ 19 (21) 1-THV-67-606B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
CNTMT SPR          2-FE-67187                              t13 H2O                    ________                                                  t28 PMP RM CLR       2-THV-67-605B                              (.895)         ________     ________               8.5              ________         (190) 2B-B 0-50 H2O Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
PIPE CHASE CLR 1B 1-FE-67-345 ________ 0-50 H 2 O 36 H 2 O (.907) ________ NA  7.0 ________ 15 (17) 1-THV-67-611B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
CENT CHG          2-FE-67-171                            t28 H2O                    ________                                                   t25 PMP CLR 2B        2-ISV-67-601B                            (.904)         ________     ________              5.0               ________         (28) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
PIPE CHASE CLR 2B 2-FE-67-345 ________ 0-50 H 2 O 6 H 2 O (.907) ________ NA 7.0 ________ 15 (17) 2-THV-67-611B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
UPPER          2-FI-67-267                            24-25 gpm                        NA CNTMT CLR        2-THV-67-588B                              (.958)         ________         NA                 5.0               ________         t23 2B                                                                                                                                            (26)
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 112 of 204 Data Sheet 1 (Page 6 of 12)
Steps and calculations performed by (init./date): ___________/___________           Calculations verified by (init./date): ___________/___________
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE


Data Package: Page ____ of ____    Date ________  
WBN                  ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                              TRAIN B                    Rev. 0000 Page 116 of 204 Data Sheet 1 (Page 10 of 12)
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____                                               Date ________
[1]                [2]              [3]                  [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device        EDF or              Target          P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE Gauge          Value/(Corr. or Flow(gpm)          1/2              k                OR EDF      Flow (gpm)
Throttle Valve                                                          (P)
                                          #              Multiplier)                                                              (gpm)          (Max)
UPPER          2-FI-67-269                            24-25 gpm                          NA                                                    t23 CNTMT CLR      2-THV-67-588D                              (.958)        ________        NA                5.0              ________          (26) 2D Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/___________
SI PMP RM        2-FE-67-183        ________            t36 H2O                      ________                                                  t22 CLR 2B        2-THV-67-604B      0-100 H2O              (.914)        ________    ________              3.9              ________          (25)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
RHR PMP RM          2-FE-67-191        ________            t30 H2O                      ________                                                  t19 CLR 2B-B        2-THV-67-606B      0-100 H2O            (.907)        ________     ________               3.9              ________          (21)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/___________
AUX CNTL AIR      2-FE-67-340        ________              t5 H2O                      ________                                                  t3.5 COMP B        2-THV-67-683        0-50 H2O              (.910)        ________    ________              1.9              ________        (185)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/___________


[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge
WBN          ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                   TRAIN B                Rev. 0000 Page 117 of 204 Data Sheet 1 (Page 11 of 12)
# Target Value/(Corr.
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____                              Date ________
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected  OR EDF  (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 PEN RM CLR 1B1 1-FE-67-349 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
Component UNID              DESCRIPTION                  M&TE #       PRESSURE (PSIG) INITIALS 1-VTV-67-534B      CS HX 1B ERCW SUP HDR VT 2-VTV-67-534B      CS HX 2B ERCW SUP HDR VT 1-FE-67-62          ERCW SUP HDR 1B (up strm) 1-FE-67-62          ERCW SUP HDR 1B (dn strm) 2-FE-67-62          ERCW SUP HDR 1B (up strm) 2-FE-67-62          ERCW SUP HDR 1B (dn strm) 0-DRV-67-547        ERCW CCS HX C DR.
3.9  ________ 12 (14) 1-THV-67-608B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 1B2 1-FE-67-353 ________ 0-100 H 2 O 12 H 2 O (.907) ________ ________
0-TV-67-621B        MCR CHLR B-B ERCW CONN.
3.9  ________ 11 (13) 1-THV-67-609B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 1B3 1-FE-67-357 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
1-TV-67-690B        UCC 1B ERCW SUP TEST CONN 2-TV-67-690B        UCC 2B ERCW SUP TEST CONN 0-TV-67-616B        EBR B ERCW SUP TEST CONN 0-ISV-67-813A      ERCW PMP E-B DISCH PRESS 0-ISV-67-812A      ERCW PMP F-B DISCH PRESS 0-ISV-67-814A      ERCW PMP G-B DISCH PRESS 0-ISV-67-811A      ERCW PMP H-B DISCH PRESS 1-PI-67-10B        ERCW STRNR 1B-B OUT PRESS
3.9  ________ 12 (14) 1-THV-67-610B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 2B1 2-FE-67-349 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________ 12 (14) 2-THV-67-608B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 2B2 2-FE-67-353 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________ 11 (13) 2-THV-67-609B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 113 of 204 Data Sheet 1 (Page 7 of 12)
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE


Data Package: Page ____ of ____     Date ________  
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 118 of 204 Data Sheet 1 (Page 12 of 12)
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____                                 Date ________
Component UNID                DESCRIPTION                M&TE #      PRESSURE (PSIG) INITIALS 2-PI-67-10B          ERCW STRNR 2B-B OUT PRESS 0-PI-67-17B          ERCW HDR B PRESS 1-PI-67-10A          ERCW STRNR 1B-B SUPPLY PRESS 2-PI-67-10A          ERCW STRNR 2B-B SUPPLY PRESS ERCW Strainer DP is recorded below:
Equation                                        Data Entry                            INITIALS 1-PI-67-10A PI-67-10B = DP    _______________ - _______________ = _____________
2-PI-67-10A PI-67-10B = DP    _______________ - _______________ = _____________


[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                                TRAIN B                  Rev. 0000 Page 119 of 204 Data Sheet 2 (Page 1 of 12)
# Target Value/(Corr.
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____                                                Date ________
Multiplier) H 2 O)  or Flow(gpm) corrected  k Flowcorrected  OR EDF  (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 PEN RM CLR 2B3 2-FE-67-357 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
[1]               [2]             [3]                 [4]               [5]         [6]                 [7]                 [8]             [9]
3.9  ________ 12 (14) 2-THV-67-610B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
Component         Flow Device         EDF or             Target          P( H2O)  Pcorrected                            Flowcorrected  Acc. Criteria M&TE             Value/(Corr. or Flow(gpm)         1/2              k                 (gpm)       Flow (gpm)
EMER GAS TR RM CLR 2B 2-FE-67-339 ________ 0-100 H 2 O 8 H 2 O (.907) ________ ________
Throttle Valve                                                          (P)
3.9  ________ 10 (11) 2-THV-67-685B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
Gauge #            Multiplier)                                                                            (Max)
RECIP CHG PMP CLR 1C 1-FE-67-173 ________ 0-100 H 2 O 11 H 2 O (.907) ________ ________
CCS HTX C          0-FE-67-226        ________           !7125-7500                    ________
3.9  ________ 12 (14) 1-THV-67-640 ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
(A position)     0-FCV-67-152      0-100 H2O              H2O          ________    _______              852.0              ________         !7125
ST AIR COMP (header) 0-FIS-67-209  ________ 183-196 gpm
(.935)
(.932) NA NA  NA  ________ (196) 0-THV-67-632C NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ LWR CNTMT CLR 2B 2-FE-67-474 ________ 0-50 H 2 O 48.75 H 2 O (.940) ________ ________
Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
45.3  ________ 306 (1060) 2-ISV-67-564B ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________
CNTMT SPR          2-FI-67-122                          !5200-6200                        NA HTX 2B         2-ISV-67-537B          NA                gpm                NA          NA                  NA              ________         t5200
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 114 of 204 Data Sheet 1 (Page 8 of 12)
(.926)                                                                               (11,500)
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE
Steps and calculations performed by (init./date): ___________/___________           Calculations verified by (init./date): ___________/___________
DSL GEN CLR           1-FI-67-74                          700-760 gpm                        NA                                                      t650 1B1          1-ISV-67-510B                            (.929)         ________       NA                                  ________         (1200)
Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
DSL GEN CLR          1-FI-67-280                          700-760 gpm                       NA                                                      t650 1B2          1-ISV-67-515B                            (.929)         ________        NA                                   ________         (1200)
Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
DSL GEN CLR           2-FI-67-74                          700-760 gpm                        NA                                                      t650 2B1          2-ISV-67-510B                            (.929)         ________       NA                                  ________         (1200)
Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______


Data Package: Page ____ of ____    Date ________  
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 120 of 204 Data Sheet 2 (Page 2 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____                                               Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component          Flow Device          EDF or            Target        P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #          Multiplier)                                                                              (Max)
DSL GEN CLR          2-FI-67-280                          700-760 gpm                        NA                                                      t650 2B2          2-ISV-67-515B                            (.929)        ________        NA                                  ________          (1200)
Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
SD BD RM A/C        2-FE-67-159          ________          t60 H2O                    ________                                                    t560 B            2-ISV-67-555        0-100 H2O          (.931)        ________     ________               75.0              ________          (560)
Steps and calculations performed by (init./date): ___________/_________              Calculations verified by (init./date): ___________/_________
ELEC BD RM        0-FE-67-200          ________          t76 H2O                    ________                                                    t370 A/C B          0-ISV-67-618B        0-100 H2O          (.936)        ________    _______                44.0              ________          (490)
Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
MAIN            0-FE-67-202                            t76 H2O                    ________                                                    t293 CONTROL RM        0-ISV-67-623B        ________            (.928)        ________    ________              35.0              ________          (460)
A/C B                              0-200 H2O Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
INST RM WAT        1-FE-67-259          ________            t65 H2O                    ________                                                    t30 CLR 1B        1-ISV-67-527B        0-100 H2O            (.933)        ________    ________                3.9              ________          (200)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________


[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                                TRAIN B                  Rev. 0000 Page 121 of 204 Data Sheet 2 (Page 3 of 12)
# Target Value/(Corr.
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____                                              Date ________
Multiplier) H 2 O)  or Flow(gpm) corrected  k Flowcorrected  OR EDF  (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 LWR CNTMT CLR 2D 2-FE-67-476 ________ 0-50 H 2 O 48.75 H 2 O (.940) ________ ________
[1]               [2]             [3]                 [4]             [5]         [6]                 [7]                 [8]             [9]
45.3 ________ 306 (1060) 2-ISV-67-564D ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ CRDM CLR 2B 2-FE-67-477 ________ 0-200 H 2 O 118 H 2 O (.931) ________ ________
Component       Flow Device         EDF or             Target          P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE           Value/(Corr. or Flow(gpm)         1/2              k                 (gpm)       Flow (gpm)
11.________ 124 (390) 2-ISV-67-567B ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ CRDM CLR 2D 2-FE-67-475 ________ 0-200 H 2 O 118 H 2 O (.931) ________ ________
Throttle Valve                                                          (P)
11.9 ________ 124 (390) 2-ISV-67-567D ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ U2 RCP MTR CLR 2 2-FE-67-249 ________ 0-100 H 2 O 58 H 2 O (.930)  ________ ________
Gauge #            Multiplier)                                                                            (Max)
15.0  ________ 110 (220) 2-ISV-67-572B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________ U2 RCP MTR CLR 4 2-FE-67-255 ________ 0-100 H 2 O 58 H 2 O (.930) ________ ________
LWR CNTMT       1-FE-67-474                            t48.75 H2O                    ________                                                   t306 CLR 1B      1-ISV-67-564B                              (.940)         ________     ________             45.3             ________         (1060) 0-50 H2O Steps and calculations performed by (init./date): ___________/_________             Calculations verified by (init./date): ___________/_________
15.________ 110 (220) 2-ISV-67-572D ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________
LWR CNTMT      1-FE-67-476                            t48.75 H2O                    ________                                                   t306 CLR 1D      1-ISV-67-564D                              (.940)         ________     ________             45.3              ________         (1060) 0-50 H2O Steps and calculations performed by (init./date): ___________/_________             Calculations verified by (init./date): ___________/_________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 115 of 204 Data Sheet 1 (Page 9 of 12)
CRDM CLR 1B      1-FE-67-477        ________            t118 H2O                    ________                                                   t124 1-ISV-67-567B      0-200 H2O              (.931)         ________     ________             11.9             ________           (390)
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE
Steps and calculations performed by (init./date): ___________/_________             Calculations verified by (init./date): ___________/_________
CRDM CLR 1D      1-FE-67-475                              t118 H2O                    ________                                                   t124 1-ISV-67-567D                              (.931)         ________     ________             11.9              ________           (390) 0-200 H2O Steps and calculations performed by (init./date): ___________/_________            Calculations verified by (init./date): ___________/_________


Data Package: Page ____ of ____    Date ________  
WBN                ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 122 of 204 Data Sheet 2 (Page 4 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____                                               Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device        EDF or              Target        P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                              (Max)
UPPER          1-FI-67-267                            24-25 gpm                        NA                                                      t23 CNTMT CLR      1-THV-67-588                              (.958)        ________        NA                  5.0              ________          (26) 1B                B Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
UPPER          1-FI-67-269                            24-25 gpm                        NA                                                      t23 CNTMT CLR      1-THV-67-588                              (.958)        ________        NA                  5.0              ________          (26) 1D                D Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
U1 RCP MTR      1-FE-67-249                              t58 H2O                    ________                                                    t110 CLR 2        1-ISV-67-572B                              (.930)        ________     ________               15.0              ________          (220) 0-100 H2O Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/_________
U1 RCP MTR      1-FE-67-255                              t58 H2O                    ________                                                    t110 CLR 4      1-ISV-67-572D                              (.930)        ________    ________              15.0              ________          (220) 0-100 H2O Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/_________


[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 123 of 204 Data Sheet 2 (Page 5 of 12)
# Target Value/(Corr.
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____                                              Date ________
Multiplier) H 2 O)  or Flow(gpm) corrected  k Flowcorrected  OR EDF  (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 INST RM WAT CLR 2B 2-FE-67-259  ________ 0-100 H 2 O 65 H 2 O (.933) ________ ________
[1]                 [2]               [3]               [4]             [5]         [6]               [7]                 [8]             [9]
3.________ 30 (200) 2-ISV-67-527B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________ CNTMT SPR PMP RM CLR 2B-B 2-FE-67187  ________ 0-50 H 2 O 13 H 2 O (.895) ________ ________
Component         Flow Device         EDF or             Target        P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE             Value/(Corr. or Flow(gpm)         1/2              k                 (gpm)       Flow (gpm)
8.5 ________ 28 (190) 2-THV-67-605B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
Throttle Valve                                                          (P)
CENT CHG PMP CLR 2B 2-FE-67-171  ________ 0-100 H 2 O 28 H 2 O (.904) ________ ________
Gauge #            Multiplier)                                                                            (Max)
5.________ 25 (28) 2-ISV-67-601B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
CCS & AFW          1-FE-67-165        ________          t108 H2O                    ________                                                   t102 PUMP SP CLR        1-THV-67-643B      0-200 H2O            (.928)         ________     ________             10.2              ________         (670) 1B Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
UPPER CNTMT CLR 2B 2-FI-67-267 24-25 gpm
BA TRF &          2-FE-67-220                            t55 H2O                      ________                                                   t60 AFW SP CLR        2-THV-67-673B                            (.929)         ________     ________               8.5               ________         (360) 2B 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________         Calculations verified by (init./date): ___________/___________
(.958) ________ NA  5.0  ________ 23 (26) 2-THV-67-588B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
SFP & TB        1-FE-67-216                            t16 H2O                    ________                                                   t29 BSTR PMP        1-THV-67-646B        ________            (.910)         ________     ________               7.7              ________         (170)
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 116 of 204 Data Sheet 1 (Page 10 of 12)
CLR 1B                            0-50 H2O Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE
CNTMT SPR          1-FE-67187                            t13 H2O                    ________                                                  t28 PMP RM CLR         1-THV-67-605B                            (.895)         ________    ________               8.5               ________         (190) 1B-B 0-50 H2O Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________


Data Package: Page ____ of ____    Date ________  
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 124 of 204 Data Sheet 2 (Page 6 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____                                               Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device          EDF or              Target        P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                            (Max)
CENT CHG          1-FE-67-171                            t28 H2O                    ________                                                  t25 PMP CLR 1B        1-ISV-67-601B                            (.904)        ________     ________               5.0              ________          (28) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
SI PMP RM          1-FE-67-183                            t36 H2O                    ________                                                  t22 CLR 1B        1-THV-67-604B        ________            (.914)        ________    ________              3.9              ________          (25) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
RHR PMP RM          1-FE-67-191        ________            t30 H2O                    ________                                                  t19 CLR 1B-B        1-THV-67-606B      0-100 H2O            (.907)        ________    ________              3.9              ________          (21)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
UPPER          1-FI-67-267                            24-25 gpm                        NA                                                    t23 CNTMT CLR        1-THV-67-588                              (.958)        ________        NA                5.0              ________          (26) 1B                B Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________


[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge
WBN                ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 125 of 204 Data Sheet 2 (Page 7 of 12)
# Target Value/(Corr.
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____                                              Date ________
Multiplier) H 2 O)  or Flow(gpm) corrected  k Flowcorrected  OR EDF  (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 UPPER CNTMT CLR 2D 2-FI-67-269 24-25 gpm
[1]               [2]             [3]                 [4]             [5]         [6]               [7]                 [8]             [9]
(.958) ________ NA 5.0 ________ 23 (26) 2-THV-67-588D NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
Component         Flow Device         EDF or               Target        P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE             Value/(Corr. or Flow(gpm)         1/2              k                 (gpm)       Flow (gpm)
SI PMP RM CLR 2B 2-FE-67-183 ________ 0-100 H 2 O 36 H 2 O (.914) ________ ________
Throttle Valve                                                          (P)
3.9  ________ 22 (25) 2-THV-67-604B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
Gauge #            Multiplier)                                                                            (Max)
RHR PMP RM CLR 2B-B 2-FE-67-191 ________ 0-100 H 2 O 30 H 2 O (.907) ________ ________
UPPER          1-FI-67-269                             24-25 gpm                         NA                                                    t23 CNTMT CLR      1-THV-67-588                                (.958)       ________         NA                 5.0               ________         (26) 1D                D Steps and calculations performed by (init./date): ___________/___________           Calculations verified by (init./date): ___________/___________
3.9 ________ 19 (21) 2-THV-67-606B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
PIPE CHASE        1-FE-67-345        ________             t6 H2O                        NA                                                    t15 CLR 1B        1-THV-67-611B        0-50 H2O              (.907)       ________         NA                7.0              ________         (17)
AUX CNTL AIR COMP B 2-FE-67-340 ________ 0-50 H 2 O 5 H 2 O (.910) ________ ________
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
1.9 ________ 3.5 (185) 2-THV-67-683 ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
PIPE CHASE        2-FE-67-345        ________              t6 H2O                        NA                                                    t15 CLR 2B        2-THV-67-611B        0-50 H2O              (.907)        ________         NA                7.0              ________          (17)
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 117 of 204 Data Sheet 1 (Page 11 of 12)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE
PEN RM CLR       1-FE-67-349        ________             t12 H2O                    ________                                                  t12 1B1        1-THV-67-608B      0-100 H2O              (.907)       ________     ________               3.9               ________         (14)
Steps and calculations performed by (init./date): ___________/___________           Calculations verified by (init./date): ___________/___________
PEN RM CLR        1-FE-67-353        ________             t12 H2O                    ________                                                  t11 1B2        1-THV-67-609B                              (.907)       ________     ________               3.9               ________         (13) 0-100 H2O Steps and calculations performed by (init./date): ___________/___________           Calculations verified by (init./date): ___________/___________


Data Package: Page ____ of ____    Date ________  
WBN                ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 126 of 204 Data Sheet 2 (Page 8 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____                                             Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device        EDF or              Target          P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                            (Max)
PEN RM CLR        1-FE-67-357        ________            t12 H2O                      ________                                                  t12 1B3        1-THV-67-610B      0-100 H2O            (.907)        ________    ________              3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        2-FE-67-349        ________            t12 H2O                      ________                                                  t12 2B1        2-THV-67-608B      0-100 H2O            (.907)        ________    ________              3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        2-FE-67-353        ________            t12 H2O                      ________                                                  t11 2B2        2-THV-67-609B      0-100 H2O            (.907)        ________    ________              3.9              ________          (13)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        2-FE-67-357        ________            t12 H2O                      ________                                                  t12 2B3        2-THV-67-610B      0-100 H2O            (.907)        ________     ________               3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
EMER GAS TR        2-FE-67-339        ________            t8 H2O                      ________                                                  t10 RM CLR 2B      2-THV-67-685B                              (.907)        ________    ________              3.9              ________          (11) 0-100 H2O Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________


Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 1-VTV-67-534B CS HX 1B ERCW SUP HDR VT    2-VTV-67-534B CS HX 2B ERCW SUP HDR VT    1-FE-67-62 ERCW SUP HDR 1B (up strm)   1-FE-67-62 ERCW SUP HDR 1B (dn strm)   2-FE-67-62 ERCW SUP HDR 1B (up strm)   2-FE-67-62 ERCW SUP HDR 1B (dn strm)    0-DRV-67-547 ERCW CCS HX C DR. 0-TV-67-621B MCR CHLR B-B ERCW CONN. 1-TV-67-690B UCC 1B ERCW SUP TEST CONN    2-TV-67-690B UCC 2B ERCW SUP TEST CONN    0-TV-67-616B EBR B ERCW SUP TEST CONN    0-ISV-67-813A ERCW PMP E-B DISCH PRESS    0-ISV-67-812A ERCW PMP F-B DISCH PRESS    0-ISV-67-814A ERCW PMP G-B DISCH PRESS    0-ISV-67-811A ERCW PMP H-B DISCH PRESS    1-PI-67-10B ERCW STRNR 1B-B OUT PRESS WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 118 of 204 Data Sheet 1 (Page 12 of 12)
WBN                ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 127 of 204 Data Sheet 2 (Page 9 of 12)
TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____                                              Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component         Flow Device        EDF or              Target          P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE             Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #           Multiplier)                                                                            (Max)
RECIP CHG        1-FE-67-173        ________            t11 H2O                      ________                                                  t12 PMP CLR 1C        1-THV-67-640      0-100 H2O            (.907)        ________    ________              3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
ST AIR COMP        0-FIS-67-209                        183-196 gpm                        NA                                                    t183 (header)       0-THV-67-632C                              (.932)            NA          NA                NA                ________        (196)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
AUX CNTL AIR        2-FE-67-340        ________            t4 H2O                      ________                                                  t3.5 COMP B          2-THV-67-683        0-50 H2O            (.910)        ________    ________              1.9              ________        (185)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
INST RM WAT        2-FE-67-259        ________            t65 H2O                      ________                                                  t30 CLR 2B         2-ISV-67-527B      0-100 H2O            (.933)        ________    ________              3.9              ________        (200)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
CNTMT SPR          2-FE-67187        ________            t13 H2O                      ________                                                  t28 PMP RM CLR      2-THV-67-605B        0-50 H2O            (.895)        ________    ________              8.5              ________        (190) 2B-B Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________


Data Package: Page ____ of ____    Date ________  
WBN                  ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                              TRAIN B                    Rev. 0000 Page 128 of 204 Data Sheet 2 (Page 10 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____                                               Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device          EDF or            Target          P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                              (Max)
CENT CHG          2-FE-67-171        ________          t28 H2O                      ________                                                  t25 PMP CLR 2B        2-ISV-67-601B      0-100 H2O            (.904)          ________    ________              5.0              ________          (28)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
RHR PMP RM        2-FE-67-191        ________          t30 H2O                      ________                                                  t19 CLR 2B-B        2-THV-67-606B      0-100 H2O            (.907)          ________     ________               3.9              ________          (21)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/___________
SI PMP RM        2-FE-67-183        ________          t36 H2O                      ________                                                  t22 CLR 2B        2-THV-67-604B      0-100 H2O            (.914)          ________    ________              3.9              ________          (25)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________


Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 2-PI-67-10B ERCW STRNR 2B-B OUT PRESS    0-PI-67-17B ERCW HDR B PRESS    1-PI-67-10A ERCW STRNR 1B-B SUPPLY PRESS    2-PI-67-10A ERCW STRNR 2B-B SUPPLY PRESS ERCW Strainer DP is recorded below:  Equation Data Entry INITIALS 1-PI-67-10A  - 1-PI-67-10B = DP  _______________  - _______________  = _____________  2-PI-67-10A  - 2-PI-67-10B = DP  _______________  - _______________  = _____________ 
WBN          ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                  TRAIN B                Rev. 0000 Page 129 of 204 Data Sheet 2 (Page 11 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____                            Date ________
Component UNID               DESCRIPTION                 M&TE #     PRESSURE (PSIG) INITIALS 1-VTV-67-534B      CS HX 1B ERCW SUP HDR VT 2-VTV-67-534B      CS HX 2B ERCW SUP HDR VT 1-FE-67-62          ERCW SUP HDR 1B (up strm) 1-FE-67-62          ERCW SUP HDR 1B (dn strm) 2-FE-67-62          ERCW SUP HDR 1B (up strm) 2-FE-67-62          ERCW SUP HDR 1B (dn strm) 0-DRV-67-547        ERCW CCS HX C DR.
0-TV-67-621B        MCR CHLR B-B ERCW CONN.
1-TV-67-690B        UCC 1B ERCW SUP TEST CONN 2-TV-67-690B        UCC 2B ERCW SUP TEST CONN 0-TV-67-616B        EBR B ERCW SUP TEST CONN 0-ISV-67-813A      ERCW PMP E-B DISCH PRESS 0-ISV-67-812A      ERCW PMP F-B DISCH PRESS 0-ISV-67-814A      ERCW PMP G-B DISCH PRESS 0-ISV-67-811A      ERCW PMP H-B DISCH PRESS 1-PI-67-10B         ERCW STRNR 1B-B OUT PRESS


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 119 of 204 Data Sheet 2 (Page 1 of 12)
WBN           ERCW SYSTEM FLOW BALANCE           2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 130 of 204 Data Sheet 2 (Page 12 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____     Date ________
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____                                 Date ________
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Component UNID                DESCRIPTION                  M&TE #     PRESSURE (PSIG) INITIALS 2-PI-67-10B          ERCW STRNR 2B-B OUT PRESS 0-PI-67-17B          ERCW HDR B PRESS 1-PI-67-10A          ERCW STRNR 1B-B SUPPLY PRESS 2-PI-67-10A          ERCW STRNR 2B-B SUPPLY PRESS ERCW Strainer DP is recorded below:
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 CCS HTX C (A position) 0-FE-67-226 ________ 0-100 H 2 O 7125-7500 H 2 O (.935)  ________ ________  852.0  ________  7125 0-FCV-67-152 _______ Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
Equation                                        Data Entry                            INITIALS 1-PI-67-10A PI-67-10B = DP    _______________ - _______________ = _____________
_ CNTMT SPR HTX 2B 2-FI-67-122 NA 5200-6200  gpm (.926)  NA NA  NA  ________  5200 (11,500) 2-ISV-67-537B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ DSL GEN CLR 1B1 1-FI-67-74 700-760 gpm
2-PI-67-10A PI-67-10B = DP    _______________ - _______________ = _____________
(.929)  ________ NA    ________ 650 (1200) 1-ISV-67-510B NA Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_ DSL GEN CLR 1B2 1-FI-67-280 700-760 gpm
(.929)  ________ NA    ________ 650 (1200) 1-ISV-67-515B NA Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_ DSL GEN CLR 2B1 2-FI-67-74 700-760 gpm
(.929)  ________ NA    ________ 650 (1200) 2-ISV-67-510B NA Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 120 of 204 Data Sheet 2 (Page 2 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC


Data Package:  Page ____ of ____    Date ________
WBN                 ERCW SYSTEM FLOW BALANCE                   2-PTI-067-02-B Unit 1 & 2                               TRAIN B                 Rev. 0000 Page 131 of 204 Data Sheet 3 (Page 1 of 10)
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 DSL GEN CLR 2B2 2-FI-67-280 700-760 gpm
(.929)  ________ NA    ________ 650 (1200) 2-ISV-67-515B NA Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_ SD BD RM A/C B 2-FE-67-159 ________ 0-100 H 2 O 60 H 2 O (.931)  ________ ________
75.0  ________ 560 (560) 2-ISV-67-555 ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ ELEC BD RM A/C B 0-FE-67-200 ________ 0-100 H 2 O 76 H 2 O (.936)  ________ ________
44.0  ________ 370 (490) 0-ISV-67-618B _______ Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_ MAIN CONTROL RM A/C B 0-FE-67-202  ________ 0-200 H 2 O 76 H 2 O (.928)  ________ ________
35.0  ________ 293 (460) 0-ISV-67-623B ________ Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_ INST RM WAT CLR 1B 1-FE-67-259 ________ 0-100 H 2 O 65 H 2 O (.933)  ________ ________
3.9  ________ 30 (200) 1-ISV-67-527B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 121 of 204 Data Sheet 2 (Page 3 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 LWR CNTMT CLR 1B 1-FE-67-474  ________ 0-50 H 2 O 48.75 H 2 O (.940)  ________ ________
45.3  ________ 306 (1060) 1-ISV-67-564B ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ LWR CNTMT CLR 1D 1-FE-67-476  ________ 0-50 H 2 O 48.75 H 2 O (.940)  ________ ________
45.3  ________ 306 (1060) 1-ISV-67-564D ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ CRDM CLR 1B 1-FE-67-477 ________ 0-200 H 2 O 118 H 2 O (.931)  ________ ________
11.9  ________ 124 (390) 1-ISV-67-567B ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ CRDM CLR 1D 1-FE-67-475  ________ 0-200 H 2 O 118 H 2 O (.931)  ________ ________
11.9  ________ 124 (390) 1-ISV-67-567D ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 122 of 204 Data Sheet 2 (Page 4 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 UPPER CNTMT CLR 1B 1-FI-67-267 24-25 gpm
(.958)  ________ NA  5.0  ________ 23 (26) 1-THV-67-588 B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
UPPER CNTMT CLR 1D 1-FI-67-269 24-25 gpm
(.958)  ________ NA  5.0  ________ 23 (26) 1-THV-67-588 D NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
U1 RCP MTR CLR 2 1-FE-67-249  ________ 0-100 H 2 O 58 H 2 O (.930)  ________ ________
15.0  ________ 110 (220) 1-ISV-67-572B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________ U1 RCP MTR CLR 4 1-FE-67-255  ________ 0-100 H 2 O 58 H 2 O (.930)  ________ ________
15.0  ________ 110 (220) 1-ISV-67-572D ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 123 of 204 Data Sheet 2 (Page 5 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 CCS & AFW PUMP SP CLR 1B 1-FE-67-165 ________ 0-200 H 2 O 108 H 2 O (.928)  ________ ________
10.2  ________ 102 (670) 1-THV-67-643B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
BA TRF & AFW SP CLR 2B 2-FE-67-220  ________ 0-100 H 2 O 55 H 2 O (.929)  ________ ________
8.5  ________ 60 (360) 2-THV-67-673B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
SFP & TB BSTR PMP CLR 1B 1-FE-67-216  ________ 0-50 H 2 O 16 H 2 O (.910)  ________ ________
7.7  ________ 29 (170) 1-THV-67-646B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ CNTMT SPR PMP RM CLR 1B-B 1-FE-67187  ________ 0-50 H 2 O 13 H 2 O (.895)  ________ ________
8.5  ________ 28 (190) 1-THV-67-605B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 124 of 204 Data Sheet 2 (Page 6 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 CENT CHG PMP CLR 1B 1-FE-67-171  ________ 0-100 H 2 O 28 H 2 O (.904)  ________ ________
5.0  ________ 25 (28) 1-ISV-67-601B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
SI PMP RM CLR 1B 1-FE-67-183  ________ 0-100 H 2 O 36 H 2 O (.914)  ________ ________
3.9  ________ 22 (25) 1-THV-67-604B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
RHR PMP RM CLR 1B-B 1-FE-67-191 ________ 0-100 H 2 O 30 H 2 O (.907)  ________ ________
3.9  ________ 19 (21) 1-THV-67-606B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
UPPER CNTMT CLR 1B 1-FI-67-267 24-25 gpm
(.958)  ________ NA  5.0  ________ 23 (26) 1-THV-67-588 B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 125 of 204 Data Sheet 2 (Page 7 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 UPPER CNTMT CLR 1D 1-FI-67-269 24-25 gpm
(.958)  ________ NA  5.0  ________ 23 (26) 1-THV-67-588 D NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
PIPE CHASE CLR 1B 1-FE-67-345 ________ 0-50 H 2 O 6 H 2 O (.907)  ________ NA  7.0  ________ 15 (17) 1-THV-67-611B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
PIPE CHASE CLR 2B 2-FE-67-345 ________ 0-50 H 2 O 6 H 2 O (.907)  ________ NA  7.0  ________ 15 (17) 2-THV-67-611B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 1B1 1-FE-67-349 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________ 12 (14) 1-THV-67-608B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 1B2 1-FE-67-353 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________ 11 (13) 1-THV-67-609B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 126 of 204 Data Sheet 2 (Page 8 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 PEN RM CLR 1B3 1-FE-67-357 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________ 12 (14) 1-THV-67-610B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 2B1 2-FE-67-349 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________ 12 (14) 2-THV-67-608B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 2B2 2-FE-67-353 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________ 11 (13) 2-THV-67-609B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 2B3 2-FE-67-357 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________ 12 (14) 2-THV-67-610B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
EMER GAS TR RM CLR 2B 2-FE-67-339 ________ 0-100 H 2 O 8 H 2 O (.907)  ________ ________
3.9  ________ 10 (11) 2-THV-67-685B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 127 of 204 Data Sheet 2 (Page 9 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 RECIP CHG PMP CLR 1C 1-FE-67-173 ________ 0-100 H 2 O 11 H 2 O (.907)  ________ ________
3.9  ________ 12 (14) 1-THV-67-640 ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
ST AIR COMP (header) 0-FIS-67-209 183-196 gpm
(.932)  NA NA  NA  ________ 183 (196) 0-THV-67-632C NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
AUX CNTL AIR COMP B 2-FE-67-340 ________ 0-50 H 2 O 4 H 2 O (.910)  ________ ________
1.9  ________ 3.5 (185) 2-THV-67-683 ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ INST RM WAT CLR 2B 2-FE-67-259 ________ 0-100 H 2 O 65 H 2 O (.933)  ________ ________
3.9  ________ 30 (200) 2-ISV-67-527B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________ CNTMT SPR PMP RM CLR 2B-B 2-FE-67187 ________ 0-50 H 2 O 13 H 2 O (.895)  ________ ________
8.5  ________ 28 (190) 2-THV-67-605B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 128 of 204 Data Sheet 2 (Page 10 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 CENT CHG PMP CLR 2B 2-FE-67-171 ________ 0-100 H 2 O 28 H 2 O (.904)  ________ ________
5.0  ________ 25 (28) 2-ISV-67-601B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
RHR PMP RM CLR 2B-B 2-FE-67-191 ________ 0-100 H 2 O 30 H 2 O (.907)  ________ ________
3.9  ________ 19 (21) 2-THV-67-606B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
SI PMP RM CLR 2B 2-FE-67-183 ________ 0-100 H 2 O 36 H 2 O (.914)  ________ ________
3.9  ________ 22 (25) 2-THV-67-604B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 129 of 204 Data Sheet 2 (Page 11 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC
 
Data Package:  Page ____ of ____    Date ________
 
Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 1-VTV-67-534B CS HX 1B ERCW SUP HDR VT    2-VTV-67-534B CS HX 2B ERCW SUP HDR VT    1-FE-67-62 ERCW SUP HDR 1B (up strm)    1-FE-67-62 ERCW SUP HDR 1B (dn strm)    2-FE-67-62 ERCW SUP HDR 1B (up strm)    2-FE-67-62 ERCW SUP HDR 1B (dn strm)    0-DRV-67-547 ERCW CCS HX C DR. 0-TV-67-621B MCR CHLR B-B ERCW CONN. 1-TV-67-690B UCC 1B ERCW SUP TEST CONN    2-TV-67-690B UCC 2B ERCW SUP TEST CONN    0-TV-67-616B EBR B ERCW SUP TEST CONN    0-ISV-67-813A ERCW PMP E-B DISCH PRESS    0-ISV-67-812A ERCW PMP F-B DISCH PRESS    0-ISV-67-814A ERCW PMP G-B DISCH PRESS    0-ISV-67-811A ERCW PMP H-B DISCH PRESS    1-PI-67-10B ERCW STRNR 1B-B OUT PRESS WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 130 of 204 Data Sheet 2 (Page 12 of 12)
TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC
 
Data Package:  Page ____ of ____    Date ________
 
Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 2-PI-67-10B ERCW STRNR 2B-B OUT PRESS    0-PI-67-17B ERCW HDR B PRESS    1-PI-67-10A ERCW STRNR 1B-B SUPPLY PRESS    2-PI-67-10A ERCW STRNR 2B-B SUPPLY PRESS ERCW Strainer DP is recorded below:  Equation Data Entry INITIALS 1-PI-67-10A  -  1-PI-67-10B = DP  _______________  -  _______________  = _____________  2-PI-67-10A  -  2-PI-67-10B = DP  _______________  -  _______________  = _____________ 
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 131 of 204 Data Sheet 3 (Page 1 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN)
Data Package: Page ____ of ____     Date ________
Data Package: Page ____ of ____                                               Date ________
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
[1]               [2]             [3]                 [4]             [5]         [6]                 [7]                 [8]             [9]
Multiplier) H 2 O)  or Flow(gpm) corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 CCS HTX C (B position) 0-FE-67-226 ________ 0-100 H 2 O 8800-9000 H 2 O (.935)  ________ ________  852.0 ________ 8800 0-FCV-67-152 _______ Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
Component         Flow Device         EDF or               Target        P( H2O)  Pcorrected                            Flowcorrected  Acc. Criteria M&TE             Value/(Corr. or Flow(gpm)         1/2              k                 (gpm)       Flow (gpm)
_ CNTMT SPR HTX 1B 1-FI-67-122 5700-6200 gpm (.926)   NA    ________  5200 (11,800) 1-ISV-67-537B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ DSL GEN CLR 2B1 1-FI-67-74 700-760 gpm
Throttle Valve                                                          (P)
(.929) ________ NA   ________ (1200) 1-ISV-67-510B NA Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
Gauge #            Multiplier)                                                                            (Max)
_ DSL GEN CLR 2B2 1-FI-67-280 700-760 gpm
CCS HTX C           0-FE-67-226                           !8800-9000                    ________
(.929) ________ NA   ________ (1200) 1-ISV-67-515B NA Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
(B position)      0-FCV-67-152                                H2O          ________   _______              852.0             ________         !8800
_ DSL GEN CLR 2B1 2-FI-67-74 700-760 gpm
(.935) 0-100 H2O Steps and calculations performed by (init./date): ___________/_______               Calculations verified by (init./date): ___________/_______
(.929) ________ NA   ________ (1200) 2-ISV-67-510B NA Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
CNTMT SPR           1-FI-67-122                           5700-6200                       NA HTX 1B        1-ISV-67-537B                              gpm                           NA                                  ________          t5200
_
(.926)                                                                               (11,800)
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 132 of 204 Data Sheet 3 (Page 2 of 10)
Steps and calculations performed by (init./date): ___________/___________           Calculations verified by (init./date): ___________/___________
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN
DSL GEN CLR           1-FI-67-74                         700-760 gpm                       NA                                                      650 2B1          1-ISV-67-510B                              (.929)         ________       NA                                   ________         (1200)
 
Steps and calculations performed by (init./date): ___________/_______               Calculations verified by (init./date): ___________/_______
Data Package:  Page ____ of ____    Date ________
DSL GEN CLR         1-FI-67-280                         700-760 gpm                       NA                                                      650 2B2          1-ISV-67-515B                              (.929)         ________       NA                                   ________         (1200)
 
Steps and calculations performed by (init./date): ___________/_______               Calculations verified by (init./date): ___________/_______
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
DSL GEN CLR           2-FI-67-74                         700-760 gpm                       NA                                                      650 2B1          2-ISV-67-510B                              (.929)         ________       NA                                   ________         (1200)
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 DSL GEN CLR 2B2 2-FI-67-280 700-760 gpm
Steps and calculations performed by (init./date): ___________/_______               Calculations verified by (init./date): ___________/_______
(.929)  ________ NA    ________  (1200) 2-ISV-67-515B NA Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_ SD BD RM A/C B 2-FE-67-159 ________ 0-100 H 2 O 60 H 2 O (.931)  ________ ________
75.0  ________  (560) 2-ISV-67-555 ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ ELEC BD RM A/C B 0-FE-67-200 ________ 0-100 H 2 O 76 H 2 O (.936)  ________ ________
44.0  ________  (490) 0-ISV-67-618B _______ Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_ MAIN CONTROL RM A/C B 0-FE-67-202 ________ 0-200 H 2 O 76 H 2 O (.928)  ________ ________
35.0  ________  (460) 0-ISV-67-623B ________ Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_ CCS & AFW PUMP SP CLR 1B 1-FE-67-165  ________ 0-200 H 2 O 108 H 2 O (.928)  ________ ________
10.2  ________  (670) 1-THV-67-643B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 133 of 204 Data Sheet 3 (Page 3 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 BA TRF & AFW SP CLR 2B 2-FE-67-220 ________ 0-100 H 2 O 55 H 2 O (.929)  ________ ________
8.5  ________  (360) 2-THV-67-673B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
SFP & TB BSTR PMP CLR 1B 1-FE-67-216  ________ 0-50 H 2 O 16 H 2 O (.910)  ________ ________
7.7  ________  (170) 1-THV-67-646B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ CNTMT SPR PMP RM CLR 1B-B 1-FE-67187  ________ 0-50 H 2 O 13 H 2 O (.895)  ________ ________
8.5  ________  (190) 1-THV-67-605B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
CENT CHG PMP CLR 1B 1-FE-67-171  ________ 0-100 H 2 O 28 H 2 O (.904)  ________ ________
5.0  ________  (28) 1-ISV-67-601B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 134 of 204 Data Sheet 3 (Page 4 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 SI PMP RM CLR 1B 1-FE-67-183 ________ 0-100 H 2 O 36 H 2 O (.914)  ________ ________
3.9  ________  (25) 1-THV-67-604B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
RHR PMP RM CLR 1B-B 1-FE-67-191 ________ 0-100 H 2 O 30 H 2 O (.907)  ________ ________
3.9  ________  (21) 1-THV-67-606B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
PIPE CHASE CLR 1B 1-FE-67-345 ________ 0-50 H 2 O 6 H 2 O (.907)  ________ NA  7.0  ________  (17) 1-THV-67-611B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
PIPE CHASE CLR 2B 2-FE-67-345 ________ 0-50 H 2 O 6 H 2 O (.907)  ________ NA  7.0  ________  (17) 2-THV-67-611B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 1B1 1-FE-67-349  ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (14) 1-THV-67-608B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 135 of 204 Data Sheet 3 (Page 5 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 PEN RM CLR 1B2 1-FE-67-353 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (13) 1-THV-67-609B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 1B3 1-FE-67-357 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (14) 1-THV-67-610B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 2B1 2-FE-67-349 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (14) 2-THV-67-608B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 2B2 2-FE-67-353 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (13) 2-THV-67-609B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 2B3 2-FE-67-357  ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (14) 2-THV-67-610B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 136 of 204 Data Sheet 3 (Page 6 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 EMER GAS TR RM CLR 2B 2-FE-67-339 ________ 0-100 H 2 O 8 H 2 O (.907)  ________ ________
3.9  ________  (11) 2-THV-67-685B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
RECIP CHG PMP CLR 1C 1-FE-67-173 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (14) 1-THV-67-640 ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
ST AIR COMP (header) 0-FIS-67-209 183-196 gpm
(.932)  NA NA  NA  ________  (196) 0-THV-67-632C NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
AUX CNTL AIR COMP B 2-FE-67-340 ________ 0-50 H 2 O 4 H 2 O (.910)  ________ ________
1.9  ________ (185) 2-THV-67-683 ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ LWR CNTMT CLR 2B 2-FE-67-474  ________ 0-50 H 2 O 48.75 H 2 O (.940)  ________ ________
45.3  ________  (1060) 2-ISV-67-564B ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 137 of 204 Data Sheet 3 (Page 7 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 LWR CNTMT CLR 2D 2-FE-67-476 ________ 0-50 H 2 O 48.75 H 2 O (.940)  ________ ________
45.3  ________  (1060) 2-ISV-67-564D ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ CRDM CLR 2B 2-FE-67-477  ________ 0-200 H 2 O 118 H 2 O (.931)  ________ ________
11.9  ________  (390) 2-ISV-67-567B ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ CRDM CLR 2D 2-FE-67-475 ________ 0-200 H 2 O 118 H 2 O (.931)  ________ ________
11.9  ________  (390) 2-ISV-67-567D ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ U2 RCP MTR CLR 2 2-FE-67-249 ________ 0-100 H 2 O 58 H 2 O (.930)  ________ ________
15.0  ________  (220) 2-ISV-67-572B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________ U2 RCP MTR CLR 4 2-FE-67-255 ________ 0-100 H 2 O 58 H 2 O (.930)  ________ ________
15.0  ________  (220) 2-ISV-67-572D ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 138 of 204 Data Sheet 3 (Page 8 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 INST RM WAT CLR 2B 2-FE-67-259 ________ 0-100 H 2 O 65 H 2 O (.933)  ________ ________
3.9  ________  (200) 2-ISV-67-527B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________ CNTMT SPR PMP RM CLR 2B-B 2-FE-67187 ________ 0-50 H 2 O 13 H 2 O (.895)  ________ ________
8.5  ________  (190) 2-THV-67-605B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
CENT CHG PMP CLR 2B 2-FE-67-171 ________ 0-100 H 2 O 28 H 2 O (.904)  ________ ________
5.0  ________  (28) 2-ISV-67-601B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
RHR PMP RM CLR 2B-B 2-FE-67-191 ________ 0-100 H 2 O 30 H 2 O (.907)  ________ ________
3.9  ________  (21) 2-THV-67-606B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
SI PMP RM CLR 2B 2-FE-67-183 ________ 0-100 H 2 O 36 H 2 O (.914)  ________ ________
3.9  ________  (25) 2-THV-67-604B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 139 of 204 Data Sheet 3 (Page 9 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN
 
Data Package:  Page ____ of ____    Date ________
 
Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 1-VTV-67-534B CS HX 1B ERCW SUP HDR VT    2-VTV-67-534B CS HX 2B ERCW SUP HDR VT    1-FE-67-62 ERCW SUP HDR 1B (up strm)    1-FE-67-62 ERCW SUP HDR 1B (dn strm)    2-FE-67-62 ERCW SUP HDR 1B (up strm)    2-FE-67-62 ERCW SUP HDR 1B (dn strm)    0-DRV-67-547 ERCW CCS HX C DR. 0-TV-67-621B MCR CHLR B-B ERCW CONN. 1-TV-67-690B UCC 1B ERCW SUP TEST CONN    2-TV-67-690B UCC 2B ERCW SUP TEST CONN    0-TV-67-616B EBR B ERCW SUP TEST CONN    0-ISV-67-813A ERCW PMP E-B DISCH PRESS    0-ISV-67-812A ERCW PMP F-B DISCH PRESS    0-ISV-67-814A ERCW PMP G-B DISCH PRESS    0-ISV-67-811A ERCW PMP H-B DISCH PRESS    1-PI-67-10B ERCW STRNR 1B-B OUT PRESS WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 140 of 204 Data Sheet 3 (Page 10 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN
 
Data Package:  Page ____ of ____    Date ________
 
Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 2-PI-67-10B ERCW STRNR 2B-B OUT PRESS    0-PI-67-17B ERCW HDR B PRESS    1-PI-67-10A ERCW STRNR 1B-B SUPPLY PRESS    ERCW Strainer DP is recorded below:  Equation Data Entry INITIALS 1-PI-67-10A  -  1-PI-67-10B = DP  _______________  -  _______________  = _____________  2-PI-67-10A  -  2-PI-67-10B = DP  _______________  -  _______________  = _____________ 
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 141 of 204 Data Sheet 4 (Page 1 of 13) U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package:  Page ____ of ____    Date ________
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 CCS HTX A (B POS + BYPASS) EFD-1  NA 6650-7100  gpm (.926)  NA  EFD-1  ________  6650 1-FCV-67-146 Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
CCS HTX B (B POS + BYPASS) 2-FI-67-222 NA 5850-6200  gpm (.926)  NA  2-FI-67-222 - EFD-1 = _____GPM  ________  5850 2-FCV-67-146 Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
CCS HTX C (BYPASS) 0-FE-67-226  ________ 0-100 H 2 O 6000-6600 H 2 O (.935)  ________ ________  852.0  ________  6000 0-FCV-67-144 _______ Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_ DSL GEN CLR 2B1 2-FI-67-74 NA 700-760 gpm
(.929)  ________ NA  NA  ________  (1200) 2-ISV-67-510B NA Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_ DSL GEN CLR 2B2 2-FI-67-280 700-760 gpm
(.929)  ________ NA    ________  (1200) 2-ISV-67-515B NA Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 142 of 204 Data Sheet 4 (Page 2 of 13) U-1 HOT SHUTDOWN, - U-2 STARTUP
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 SD BD RM A/C B 2-FE-67-159  ________ 0-100 H 2 O 60 H 2 O (.931)  ________ ________
75.0  ________  (560) 2-ISV-67-555 ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ ELEC BD RM A/C B 0-FE-67-200  ________ 0-100 H 2 O 76 H 2 O (.936)  ________ ________
44.0  ________  (490) 0-ISV-67-618B _______ Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_ MAIN CONTROL RM A/C B 0-FE-67-202  ________ 0-200 H 2 O 76 H 2 O (.928)  ________ ________
35.0  ________  (460) 0-ISV-67-623B ________ Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/______
_ INST RM WAT CLR 1B 1-FE-67-259  ________ 0-100 H 2 O 65 H 2 O (.933)  ________ ________
3.9  ________ 30 (200) 1-ISV-67-527B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 143 of 204 Data Sheet 4 (Page 3 of 13) U-1 HOT SHUTDOWN, - U-2 STARTUP
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 CCS & AFW PUMP SP CLR 1B 1-FE-67-165  ________ 0-200 H 2 O 108 H 2 O (.928)  ________ ________
10.2  ________  (670) 1-THV-67-643B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
BA TRF & AFW SP CLR 2B 2-FE-67-220  ________ 0-100 H 2 O 55 H 2 O (.929)  ________ ________
8.5  ________  (360) 2-THV-67-673B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
SFP & TB BSTR PMP CLR 1B 1-FE-67-216  ________ 0-50 H 2 O 16 H 2 O (.910)  ________ ________
7.7  ________  (170) 1-THV-67-646B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ CNTMT SPR PMP RM CLR 1B-B 1-FE-67187  ________ 0-50 H 2 O 13 H 2 O (.895)  ________ ________
8.5  ________  (190) 1-THV-67-605B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 144 of 204 Data Sheet 4 (Page 4 of 13) U-1 HOT SHUTDOWN, - U-2 STARTUP
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 CENT CHG PMP CLR 1B 1-FE-67-171 ________ 0-100 H 2 O 28 H 2 O (.904)  ________ ________
5.0  ________  (28) 1-ISV-67-601B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
SI PMP RM CLR 1B 1-FE-67-183 ________ 0-100 H 2 O 36 H 2 O (.914)  ________ ________
3.9  ________  (25) 1-THV-67-604B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
RHR PMP RM CLR 1B-B 1-FE-67-191 ________ 0-100 H 2 O 30 H 2 O (.907)  ________ ________
3.9  ________  (21) 1-THV-67-606B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
PIPE CHASE CLR 1B 1-FE-67-345 ________ 0-50 H 2 O 6 H 2 O (.907)  ________ NA  7.0  ________  (17) 1-THV-67-611B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
PIPE CHASE CLR 2B 2-FE-67-345  ________ 0-50 H 2 O 6 H 2 O (.907)  ________ NA  7.0  ________  (17) 2-THV-67-611B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 145 of 204 Data Sheet 4 (Page 5 of 13) U-1 HOT SHUTDOWN, - U-2 STARTUP
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 PEN RM CLR 1B1 1-FE-67-349 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (14) 1-THV-67-608B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 1B2 1-FE-67-353 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (13) 1-THV-67-609B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 1B3 1-FE-67-357 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (14) 1-THV-67-610B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
PEN RM CLR 2B1 2-FE-67-349 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (14) 2-THV-67-608B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ PEN RM CLR 2B2 2-FE-67-353 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (13) 2-THV-67-609B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 146 of 204 Data Sheet 4 (Page 6 of 13) U-1 HOT SHUTDOWN, - U-2 STARTUP
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 PEN RM CLR 2B3 2-FE-67-357 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (14) 2-THV-67-610B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
EMER GAS TR RM CLR 2B 2-FE-67-339 ________ 0-100 H 2 O 8 H 2 O (.907)  ________ ________
3.9  ________  (11) 2-THV-67-685B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
RECIP CHG PMP CLR 1C 1-FE-67-173 ________ 0-100 H 2 O 12 H 2 O (.907)  ________ ________
3.9  ________  (14) 1-THV-67-640 ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
ST AIR COMP (header) 0-FIS-67-209 NA 183-196 gpm
(.932)  NA NA  NA  ________  (196) 0-THV-67-632C NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
AUX CNTL AIR COMP B 2-FE-67-340  ________ 0-50 H 2 O 4 H 2 O (.910)  ________ ________
1.9  ________ (185) 2-THV-67-683 ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 147 of 204 Data Sheet 4 (Page 7 of 13) U-1 HOT SHUTDOWN, - U-2 STARTUP
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 CRDM CLR 1B 1-FE-67-477 ________ 0-200 H 2 O 118 H 2 O (.931)  ________ ________
11.9  ________ 124 (390) 1-ISV-67-567B ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ CRDM CLR 1D 1-FE-67-475 ________ 0-200 H 2 O 118 H 2 O (.931)  ________ ________
11.9  ________ 124 (390) 1-ISV-67-567D ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ U1 RCP MTR CLR 2 1-FE-67-249 ________ 0-100 H 2 O 58 H 2 O (.930)  ________ ________
15.0  ________  (220) 1-ISV-67-572B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________ U1 RCP MTR CLR 4 1-FE-67-255 ________ 0-100 H 2 O 58 H 2 O (.930)  ________ ________
15.0  ________  (220) 1-ISV-67-572D ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________ UPPER CNTMT CLR 1B 1-FI-67-267 24-25 gpm
(.958)  ________ NA    ________  (26) 1-THV-67-588B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 148 of 204 Data Sheet 4 (Page 8 of 13) U-1 HOT SHUTDOWN, - U-2 STARTUP
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 UPPER CNTMT CLR 1D 1-FI-67-269 24-25 gpm
(.958)  ________ NA    ________  (26) 1-THV-67-588D NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________ LWR CNTMT CLR 1B 1-FE-67-474 ________ 0-50 H 2 O 48.75 H 2 O (.940)  ________ ________
45.3  ________  (1060) 1-ISV-67-564B ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ LWR CNTMT CLR 1D 1-FE-67-476 ________ 0-50 H 2 O 48.75 H 2 O (.940)  ________ ________
45.3  ________  (1060) 1-ISV-67-564D ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ CRDM CLR 2B 2-FE-67-477 ________ 0-200 H 2 O 118 H 2 O (.931)  ________ ________
11.9  ________  (390) 2-ISV-67-567B ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ U2 RCP MTR CLR 2 2-FE-67-249 ________ 0-100 H 2 O 58 H 2 O (.930)  ________ ________
15.0  ________  (220) 2-ISV-67-572B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 149 of 204 Data Sheet 4 (Page 9 of 13) U-1 HOT SHUTDOWN, - U-2 STARTUP
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 U2 RCP MTR CLR 4 2-FE-67-255 ________ 0-100 H 2 O 58 H 2 O (.930)  ________ ________
15.0  ________  (220) 2-ISV-67-572D ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________ CRDM CLR 2D 2-FE-67-475 ________ 0-200 H 2 O 118 H 2 O (.931)  ________ ________
11.9  ________  (390) 2-ISV-67-567D ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ INST RM WAT CLR 2B 2-FE-67-259 ________ 0-100 H 2 O 65 H 2 O (.933)  ________ ________
3.9  ________  (200) 2-ISV-67-527B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________ CNTMT SPR PMP RM CLR 2B-B 2-FE-67187 ________ 0-50 H 2 O 13 H 2 O (.895)  ________ ________
8.5  ________  (190) 2-THV-67-605B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
CENT CHG PMP CLR 2B 2-FE-67-171 ________ 0-100 H 2 O 28 H 2 O (.904)  ________ ________
5.0  ________  (28) 2-ISV-67-601B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 150 of 204 Data Sheet 4 (Page 10 of 13) U-1 HOT SHUTDOWN, - U-2 STARTUP
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 RHR PMP RM CLR 2B-B 2-FE-67-191 ________ 0-100 H 2 O 30 H 2 O (.907)  ________ ________
3.9  ________  (21) 2-THV-67-606B ________ Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
SI PMP RM CLR 2B 2-FE-67-183  ________ 0-100 H 2 O 36 H 2 O (.914)  ________ ________
3.9  ________  (25) 2-THV-67-604B ________ Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________ LWR CNTMT CLR 2B 2-FE-67-474  ________ 0-50 H 2 O 48.75 H 2 O (.940)  ________ ________
45.3  ________  (1060) 2-ISV-67-564B ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________ LWR CNTMT CLR 2D 2-FE-67-476  ________ 0-50 H 2 O 48.75 H 2 O (.940)  ________ ________
45.3  ________  (1060) 2-ISV-67-564D ________ Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 151 of 204 Data Sheet 4 (Page 11 of 13) U-1 HOT SHUTDOWN, - U-2 STARTUP
 
Data Package:  Page ____ of ____    Date ________
 
[1] [2] [3] [4] [5] [6] [7] [8] [9] Component Flow Device EDF or M&TE Gauge # Target Value/(Corr.
Multiplier) H 2 O)  or Flow(gpm)  corrected  k Flowcorrected (gpm) Acc. Criteria Flow (gpm) (Max) Throttle Valve 1/2 UPPER CNTMT CLR 2B 2-FI-67-267 24-25 gpm
(.958)  ________ NA    ________  23 (26) 2-THV-67-588 B NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
UPPER CNTMT CLR 2D 2-FI-67-269 24-25 gpm
(.958)  ________ NA    ________ 23 (26) 2-THV-67-588 D NA Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 152 of 204 Data Sheet 4 (Page 12 of 13) U-1 HOT SHUTDOWN, - U-2 STARTUP
 
Data Package:  Page ____ of ____    Date ________
 
Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 1-VTV-67-534B CS HX 1B ERCW SUP HDR VT    2-VTV-67-534B CS HX 2B ERCW SUP HDR VT    1-FE-67-62 ERCW SUP HDR 1B (up strm)    1-FE-67-62 ERCW SUP HDR 1B (dn strm)    2-FE-67-62 ERCW SUP HDR 1B (up strm)    2-FE-67-62 ERCW SUP HDR 1B (dn strm)    0-DRV-67-547 ERCW CCS HX C DR. 0-TV-67-621B MCR CHLR B-B ERCW CONN. 1-TV-67-690B UCC 1B ERCW SUP TEST CONN    2-TV-67-690B UCC 2B ERCW SUP TEST CONN    0-TV-67-616B EBR B ERCW SUP TEST CONN    0-ISV-67-813A ERCW PMP E-B DISCH PRESS    0-ISV-67-812A ERCW PMP F-B DISCH PRESS    0-ISV-67-814A ERCW PMP G-B DISCH PRESS    0-ISV-67-811A ERCW PMP H-B DISCH PRESS WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 153 of 204 Data Sheet 4 (Page 13 of 13) U-1 HOT SHUTDOWN, - U-2 STARTUP
 
Data Package:  Page ____ of ____    Date ________
 
Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 1-PI-67-10B ERCW STRNR 1B-B OUT PRESS    2-PI-67-10B ERCW STRNR 2B-B OUT PRESS    0-PI-67-17B ERCW HRD B PRESS    1-PI-67-10A ERCW STRNR 1B-B SUPPLY PRESS    ERCW Strainer DP is recorded below:  Equation Data Entry INITIALS 1-PI-67-10A  -  1-PI-67-10B = DP  _______________  -  _______________  = _____________  2-PI-67-10A  -  2-PI-67-10B = DP  _______________  -  _______________  = _____________ 
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 154 of 204 Data Sheet 5 (Page 1 of 4) TRAIN B THROTTLE VALVE SETPOINTS Data Package:  Page ____ of ____    Date ________
1.0 APPLICATION Use this data sheet only for the valves adjusted in the flow mode applicable to the subsection of the procedure being performed (i.e. only valves applicable to the Cold
 
Shutdown Mode are completed with Subsection 6.3 Train B Flow Balance
 
Verification for Cold Shutdown Mode.
2.0 PROCEDURE [1] Determine valve throttle position as follows: [2] Open the valve to the full open stop.
[3] Close the valve while counting the number of turns until the flow returns to that previously recorded on the data sheet. [4] Record the number of turns from the full open stop to the desired flow position to the nearest 1/4 turn. DO NOT discount
 
any handwheel movement as valve slack, count ALL turns.
For plug valves (0-90 travel) record the position to the nearest
: 15. [5] Close the valve fully. [6] Open the valve while counting the number of turns until the flow returns to that previously recorded on the data sheet. [7] Record the number of turns from full closed position to the desired flow position to the nearest 1/4 turn. DO NOT discount
 
any handwheel movement as valve slack, count ALL turns.
For plug valves (0-90 travel) record the position to the nearest 15 of rotation.
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 155 of 204 Data Sheet 5 (Page 2 of 4) TRAIN B THROTTLE VALVE SETPOINTS
 
Data Package:  Page ____ of ____    Date ________
 
2.0 PROCEDURE (continued)
 
Component Throttle Valve Mode ApplicationTurns From Initial/Date Full Open Full Closed AUX CNTRL AIR  COMP B-B 2-ISV 67-683 LOCA  _______/_______
BA TRF & AFW SP CLR 2B 2-THV-67-673B Normal  _______/_______CCS HTX A 1-FCV-67-143 Normal  _______/_______CCS HTX C 0-FCV-67-144 Normal  _______/_______CCS & AFW PMP SP CLR 1B 1-THV-67-643B Normal  _______/_______CC PMP 1B-B 1-THV-67-601B Normal  _______/_______CSS HTX 1B 1-ISV-67-537B LOCA  _______/_______CSS PMP  RM CLR 1B-B 1-THV-67-605B Normal  _______/______ CRDM CLR 1B 1-ISV-67-567B Normal  _______/______ CRDM CLR 1D 1-ISV-67-567D Normal  _______/______ DSL GEN CLR 1B1 1-ISV-67-510B LOCA  _______/______ DSL GEN CLR 1B2 1-ISV-67-515B LOCA  _______/______ DSL GEN CLR 2B1 2-ISV-67-510B LOCA  _______/______ DSL GEN CLR 2B2 2-ISV-67-515B LOCA  _______/______ ELEC BD RM A/C B 0-ISV-67-618B Normal  _______/______ EGTS RM CLR 2B 2-THV-67-685B Normal  _____/________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 156 of 204 Data Sheet 5 (Page 3 of 4) TRAIN B THROTTLE VALVE SETPOINTS
 
Data Package:  Page ____ of ____    Date ________
 
2.0 PROCEDURE (continued)
 
Component Throttle Valve Mode ApplicationTurns From Initial/Date Full Open Full Closed INST RM WTR CLR 1B 1-ISV-67-527B Normal  _______/______ LWR CNTMT CLR 1B 1-ISV-67-564B Normal  _______/______ MCR A/C B 0-ISV-67-623B Normal  _______/______ PEN RM CLR 1B1 1-THV-67-608B Normal  _______/______ PEN RM CLR 1B2 1-THV-67-609B Normal  _______/______ PEN RM CLR 1B3 1-THV-67-610B Normal  _______/______ PEN RM CLR 2B1 2-THV-67-608B Normal  _______/______ PEN RM CLR 2B2 2-THV-67-609B Normal  _______/______ PEN RM CLR 2B3 2-THV-67-610B Normal  _______/______ PIPE CHASE CLR 1B 1-THV-67-611B Normal  _______/______ PIPE CHASE CLR 2B 2-THV-67-611B Normal  _______/______ RCP MTR CLR 1-2 1-ISV-67-572B Normal  _______/______ RCP MTR CLR 1-4 1-ISV-67-572D Normal  _______/______ RECIP CHG PMP RM CLR 1C 1-THV-67-640 Normal  _______/______ RHR PMP RM CLR 1B-B 1-THV-606B Normal  _______/______ SD BD RM A/C B 2-ISV-67-555 Normal  _______/______
SFP & TB BSTR PMP CLR 1B 1-THV-67-646B Normal  _______/______
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 157 of 204 Data Sheet 5 (Page 4 of 4) TRAIN B THROTTLE VALVE SETPOINTS
 
Data Package:  Page ____ of ____    Date ________
 
2.0 PROCEDURE (continued)
 
Component Throttle Valve Mode ApplicationTurns From Initial/Date Full Open Full Closed SI PMP RM CLR 1B 1-THV-67-604B Normal  _______/______ UPR CNTMT CLR 1B 1-THV-67-588B Normal  _______/______ UPR CNTMT CLR 1D 1-THV-67-588DNormal  _______/______ CC PMP 2B-B 2-THV-67-601B Normal  _______/______ CSS HTX 2B 2-ISV-67-537B LOCA  ________/______CSS PMP RM CLR 2B-B 2-THV-67-605B Normal  _______/______ CRDM CLR 2B 2-ISV-67-567B Normal  _____/________ CRDM CLR 2D 2-ISV-67-567D Normal  _______/______ INST RM WTR CLR 2B 2-ISV-67-527B Normal  _______/______ LWR CNTMT CLR 2B 2-ISV-67-564B Normal  _______/______ RCP MTR CLR 2-2 2-ISV-67-572B Normal  _______/______ RCP MTR CLR 2-4 2-ISV-67-572D Normal  _______/______ RECIP CHG PMP RM CLR 2C 2-THV-67-640 Normal  _______/______ RHR PMP RM CLR 2B-B 2-THV-67-606B Normal  _______/______ SI PMP RM CLR 2B 2-THV-67-604B Normal  _______/______ UPR CNTMT CLR 2B 2-THV-67-588B Normal  _______/______ UPR CNTMT CLR 2D 2-THV-67-588DNormal  _______/______
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 158 of 204 Data Sheet 6 (Page 1 of 2) PUMP DATA -U1 COLD SHUTDOWN, U-2 LOCA-RECIRC Data Package:  Page ____ of ____    Date ________
Location /Component Instrument M&TE# Reading Range/Accuracy Initial/Date 1-FE-67-62 ________ ________  H 2 O 200 H 2 O/1% ________/________  2-FE-67-62 ________ ________  H 2 O 200 H 2 O/1% ________/________
Discharge Pressures at ERCW Pumps 0-PI-67-48B (Pump E) ________ psig 200 psig/4 psig  ________/________ NA data for pumps NOT running 0-PI-67-52B (Pump F) ________ psig 200 psig/4 psig ________/________  0-PI-67-56B (Pump G) ________ psig 200 psig/4 psig ________/________  0-PI-67-60B (Pump H) ________ psig 200 psig/4 psig ________/________ Header Pressure 0-PI-67-17B  ________ psig 200 psig/4 psig ________/________ Strainer 1B-B Outlet 1-PI-67-10B  ________ psig 200 psig/1.75% ________/________
Strainer 2B-B Outlet Strainer 1B-B & 2B-B Backwash Flow 2-PI-67-10B ________ ________ psig
________  H 2 O 200 psig/2 psig 100  H 2 O/1% ________/________
________/________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 159 of 204 Data Sheet 6 (Page 2 of 2) PUMP DATA -U1 COLD SHUTDOWN, U-2 LOCA-RECIRC 
 
Data Package:  Page ____ of ____    Date ________
 
Location /Component Instrument M&TE# Reading Range/Accuracy Initial/Date Aux Bldg HDR pressures at flow elements 1-FE-67-62 Inlet ________ ________ psig 200 psig/2 psig  ________/________  1-FE-67-62 Outlet ________ ________ psig 200 psig/1% ________/________  2-FE-67-62 Inlet ________ ________ psig 200 psig/1% ________/________  2-FE-67-62 Outlet ________ ________ psig 200 psig/1% ________/________ CCS HTX C 0-DRV-67-547 ________ ________ psig 200 psig/1% ________/________ CCS HTX A 1-DRV-67-547 ________ ________ psig 200 psig/1% ________/________ MCR A/C 0-TV-67-621B ________ ________ psig 200 psig/1% ________/________ Air Compr HDR 0-VTV-67-625B ________ ________ psig 200 psig/1% ________/________ UCV 1-TV-67-690B ________ ________ psig 200 psig/1% ________/________ EBR A/C 0-VTV-67-614B ________ ________ psig 200 psig/1% ________/________ Disch HDR Vent 1-VTV-67-947B ________ ________ psig 200 psig/1% ________/________
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 160 of 204 Data Sheet 7 (Page 1 of 2) PUMP DATA - U1 LOCA-RECIRC, U-2 COLD SHUTDOWN Data Package:  Page ____ of ____    Date ________
Location /Component  Instrument M&TE# Reading Range/Accuracy Initial/Date 1-FE-67-62 ________ ________  H 2 O 200 psig/1% ________/________  2-FE-67-62 ________ ________  H 2 O 200 psig/1% ________/________
Discharge Pressures at ERCW Pumps 0-PI-67-48B (Pump E) ________ psig 200 psig/4 psig  ________/________ NA pumps NOT running 0-PI-67-52B (Pump F) ________ psig 200 psig/4 psig ________/________  0-PI-67-56B (Pump G) ________ psig 200 psig/4 psig ________/________  0-PI-67-60B (Pump H) ________ psig 200 psig/4 psig ________/________ Header Pressure 0-PI-67-17B 200 psig/4 psig 200 psig/4 psig ________/________ Strainer 1B-B Outlet 1-PI-67-10B  ________ psig 200 psig/1.75% ________/________
Strainer 2B-B Outlet Strainer 1B-B & 2B-B  Backwash Flow 2-PI-67-10B ________ ________ psig
________  H 2 O 200 psig/2 psig  100  H 2 O/1% ________/________
________/________
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 161 of 204 Data Sheet 7 (Page 2 of 2)
PUMP DATA - U1 LOCA
 
Data Package:  Page ____ of ____    Date ________
 
Location /Component  Instrument M&TE# Reading Range/Accuracy Initial/Date Aux Bldg HDR pressures at flow elements 1-FE-67-62 Inlet ________ ________ psig 200 psig/2 psig  ________/________  1-FE-67-62 Outlet ________ ________ psig 200 psig/1% ________/________  2-FE-67-62 Inlet ________ ________ psig 200 psig/1% ________/________  2-FE-67-62 Outlet ________ ________ psig 200 psig/1% ________/________ CCS HTX C 0-DRV-67-547 ________ ________ psig 200 psig/1% ________/________ CCS HTX A 1-DRV-67-547 ________ ________ psig 200 psig/1% ________/________ MCR A/C 0-TV-67-621B ________ ________ psig 200 psig/1% ________/________ Air Compr HDR 0-VTV-67-625B ________ ________ psig 200 psig/1% ________/________ UCV 1-TV-67-690B ________ ________ psig 200 psig/1% ________/________ EBR A/C 0-VTV-67-614B ________ ________ psig 200 psig/1% ________/________ Disch HDR Vent 1-VTV-67-947B ________ ________ psig 200 psig/1% ________/________
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 162 of 204 Checklist 1 (Page 1 of 1)
SUPPLY HEADER 2B POWER ALIGNMENT Data Package:  Page ____ of ____    Date ________
NOMENCLATURE LOCAT ION POSITION UNID PERF INITIAL VERIF INITIAL C&A Vent Bd 2B1-B ERCW STRAINER 2B-B (2-STR-67-10) C/6B ON 2-BKR-67-10B/1 CVERCW STR 2B-B FLUSH (2-FCV-67-10B) C/6E ON 2-BKR-67-10B/2 CVERCW STR 2B-B BACKWASH (2-FCV-67-10A) C/4E ON 2-BKR-67-10A CV Rx MOV Bd 2A2-A CCS HX B OUT ERCW FLOW CNTL BYP (2-FCV-67-143) C/15A 0-PI-OPS-17.1 OFF AND LOCKED 2-BKR-67-143 CV Rx MOV Bd 2B2-B ERCW STRAINER 2B-B IN ISOL (2-FCV-67-24) C/8A 0-PI-OPS-17.1 OFF AND LOCKED 2-BKR-67-24 CVAB ERCW SUP HDR 2B ISOL (2-FCV-67-82) C/8B 0-PI-OPS-17.1 OFF AND LOCKED 2-BKR-67-82 CVCCS HX C ERCW HDR 2B SUP ISOL (2-FCV-67-147) C/13A 0-PI-OPS-17.1 OFF AND LOCKED 2-BKR-67-147 CVCCS HX C OUT ERCW HDR B FLOW CNTL (0-FCV-67-152) C/12B ON 0-BKR-67-152 CVAB AIR CLR ERCW SUP HDR 2B ISOL (2-FCV-67-128) C/11A 0-PI-OPS-17.1 OFF AND LOCKED 2-BKR-67-128 CV Diesel Aux Bd 1A2-A DG HX 1A1/1A2 ERCW HDR 2B ISOL (1-FCV-67-68) C/3A ON 1-BKR-67-68 CV Diesel Aux Bd 2A2-A DG HX 2A1/2A2 ERCW HDR 2B ISOL (2-FCV-67-68) C/3A ON 2-BKR-67-68 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 163 of 204 Checklist 2 (Page 1 of 5)
B - TRAIN POWER CHECKLIST Data Package:  Page ____ of ____    Date ________
NOTES 1) Alignment assumes IPS and main headers into Aux Bldg are currently aligned and in service. This particular checklist is only for electrical power to valves needed to
 
conduct 2-PTI-067-02-B. 2) Inside and outside containment isolation valves are both A and B train valves. This checklist contains B Tr. power supplies necessary to establish the desired flowpath.
NOMENCLATURE LOCATIONPOSITION UNID PERF INITIAL VERIF INITIAL Diesel Aux Bd 1B1/1B2 DG HX 1B1-B ERCW HDR 1B ISOL (1-FCV-67-67) C/3A CLOSED 1-BKR-67-67 CVDG HX 1B2-A ERCW HDR 2A SUPPLY (1-FCV-67-65) C/3A CLOSED 1-BKR-67-65 CV Diesel Aux Bd 2B1/2B2 DG HX 2B1/2B2 ERCW HDR 1B ISOL (2-FCV-67-67) C/3A CLOSED 2-BKR-67-67 CVDG HX 2B2-A ERCW HDR 2A SUPPLY (2-FCV-67-65) C/3A CLOSED 2-BKR-67-65 CV Rx MOV Bd 1A2-A LWR CNTMT 1B CLR E SUP (1-FCV-67-99) C/9A ON 1-BKR-67-99 CVLWR CNTMT 1B CLR ERCW RETURN (1-FCV-67-104) C/9B ON 1-BKR-67-104 CVLWR CNTMT 1D CLR E SUP (1-FCV-67-107) C/8D ON 1-BKR-67-107 CVLWR CNTMT CLR 1D DISCH (1-FCV-67-112) C/10A ON 1-BKR-67-112 CV UPPER CNTMT VT CLR 1B ERCW RET (1-FCV-67-139) C/9F ON 1-BKR-67-139 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 164 of 204 Checklist 2 (Page 2 of 5)
B - TRAIN POWER CHECKLIST
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATIONPOSITION UNID PERF INITIAL VERIF INITIAL UPPER CNTMT VT CLR 1D ERCW RET (1-FCV-67-142) C/10F ON 1-BKR-67-142 CV Rx MOV Bd 1B2-B CNTMT SPRAY HX 1A-A ERCW IN (1-FCV-67-123) C/5E ON 1-BKR-67-123 CV CNTMT SPRAY HX 1A-A ERCW OUT (1-FCV-67-124) C/5F ON 1-BKR-67-124 CVAB AIR CLR ERCW SUP HDR 1B ISOL (1-FCV-67-128) C/11A ON 1-BKR-67-128 CV UPPER CNTMT VT CLR 1B ERCW SUP (1-FCV-67-138) C/11B ON 1-BKR-67-138 CVSTA AIR COMPR ERCW SUP HDR 1A (0-FCV-67-208) C/12B ON 0-BKR-67-208 CVLWR CNTMT 1B CLR ERCW RETURN(1-FCV-67-103) C/7D ON 1-BKR-67-103 CV UPPER CNTMT VT CLR 1D ERCW SUP (1-FCV-67-141) C/10F ON 1-BKR-67-141 CV UPPER CNTMT VT CLR 1D ERCW RET (1-FCV-67-298) C/10D ON 1-BKR-67-298 CV UPPER CNTMT VT CLR 1B ERCW RET (1-FCV-67-297) C/9D ON 1-BKR-67-297 CVLWR CNTMT CLR HDR 1D
 
ERCW SUP (1-FCV-67-113) C/5C ON 1-BKR-67-113 CVLWR CNTMT 1D CLR ERCW
 
RETURN (1-FCV-67-111) C/8D ON 1-BKR-67-111 CVERCW DISCH HDR B CT ISOL (0-FCV-67-362)  C/12A ON 0-BKR-67-362 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 165 of 204 Checklist 2 (Page 3 of 5)
B - TRAIN POWER CHECKLIST
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATIONPOSITION UNID PERF INITIAL VERIF INITIAL LWR CNTMT 2B CLR SUP ISOL (1-FCV-67-105) C/11D ON 1-BKR-67-105 Rx MOV Bd 2A2-A ERCW DISCH HDR A CT ISOL
 
(0-FCV-67-360)  C/13B ON 0-BKR-67-360 CVLWR CNTMT 2B CLR ERCW RETURN (2-FCV-67-104) C/7D ON 2-BKR-67-104 CVLWR CNTMT CLR 1D DISCH
 
(2-FCV-67-112) C/10A ON 2-BKR-67-112 CVLWR CNTMT CLR 1D DISCH (2-FCV-67-139) C/9F ON 2-BKR-67-139 CV UPPER CNTMT VT CLR 2D ERCW RET (2-FCV-67-142) C/10F ON 2-BKR-67-142 CV Rx MOV Bd 2B2-B CNTMT SPRAY HX 1A-A ERCW IN (2-FCV-67-123) C/5E ON 2-BKR-67-123 CV CNTMT SPRAY HX 1A-A ERCW OUT (2-FCV-67-124) C/5F ON 2-BKR-67-124 CVLWR CNTMT 2B CLR SUP ISOL (2-FCV-67-99) C/10A ON 2-BKR-67-99 CVLWR CNTMT A CLR ERCW RETURN (2-FCV-67-103) C/7D ON 2-BKR-67-103 CVLWR CNTMT 2D CLR SUP ISOL (2-FCV-67-107) C/10B ON 2-BKR-67-107 CVLWR CNTMT 2D CLR ERCW
 
RETURN  (2-FCV-67-111) C/8D ON 2-BKR-67-111 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 166 of 204 Checklist 2 (Page 4 of 5)
B - TRAIN POWER CHECKLIST
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATIONPOSITION UNID PERF INITIAL VERIF INITIAL UPPER CNTMT VT CLR 2B ERCW RET (2-FCV-67-297) C/9D ON 2-BKR-67-297 CV UPPER CNTMT VT CLR 2B
 
ERCW SUP (2-FCV-67-138) C/9F ON 2-BKR-67-138 CV UPPER CNTMT VT CLR 1D ERCW RET (2-FCV-67-298) C/10D ON 2-BKR-67-298 CV UPPER CNTMT VT CLR 1D ERCW SUP (2-FCV-67-141) C/10F ON 2-BKR-67-141 CVAB AIR CLR ERCW SUP HDR 1B ISOL (2-FCV-67-128) C/11A ON 2-BKR-67-128 CVLWR CNTMT 2B CLR SUP ISOL
 
(2-FCV-67-105) C/11B ON 2-BKR-67-105 CVLWR CNTMT 2D CLR SUP ISOL (2-FCV-67-113) C/5C ON 2-BKR-67-113 CVERCW FCV for each ESF room cooler is powered from that cooler's control circuit and opens by de-energizing the FSV, EXCEPT for 67-170 (CCP) and FCV-67-190 (RHRP) which are de-energized OPEN for Appendix R.
C & A VENT Bd 1B1-B RHR PUMP RM CLR
 
1-PMCL-30-176 C/9A OFF 1-BKR-30-176 CV CS PUMP RM CLR 1-PMCL-30-178 C/3C ON 1-BKR-30-178 CV SIS PUMP RM CLR
 
1-PMCL-30-179 C/8A OFF 1-BKR-30-179 CVCCP 1B-B PMP RM CLR
 
1-PMCL-30-182 C/10A OFF 1-BKR-30-182 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 167 of 204 Checklist 2 (Page 5 of 5)
B - TRAIN POWER CHECKLIST
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATIONPOSITION UNID PERF INITIAL VERIF INITIAL C & A VENT Bd 2B1-B RHR PUMP RM CLR
 
2-PMCL-30-176 C/9A OFF 2-BKR-30-176 CV CS PUMP RM CLR
 
2-PMCL-30-178 C/3C ON 2-BKR-30-178 CV SIS PUMP RM CLR 2-PMCL-30-179 C/8A OFF 2-BKR-30-179 CVCCP 1A-A PMP RM CLR
 
2-PMCL-30-182 C/10A OFF 2-BKR-30-182 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 168 of 204 Checklist 3 (Page 1 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package:  Page ____ of ____    Date ________
NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL IPS el 722 ERCW STRAINER 1B-B BACKWASH IPS/722 CLOSED 1-FCV-67-10A CVERCW STRAINER 1B-B FLUSH CONTROL IPS/722 CLOSED 1-FCV-67-10B CVERCW STRAINER 1B-B INLET ISOL IPS/722 0-PI-OPS-17.0 LO 1-FCV-67-24 CVERCW STRAINER 1B-B OUT ISOL IPS/722 0-PI-OPS-17.0 LO 1-ISV-67-505B CV ERCW B TRAIN HDR CROSSTIE ISOL IPS/722 CLOSED 1-ISV-67-1118 CV ERCW CROSS-TIE HEADER VENT. IPS/722 CLOSED 1-VTV-67-1125 CV ERCW CROSS-TIE HEADER DRAIN IPS/722 CLOSED 1-DRV-67-1124 CV1-PDT-67-10A/10D/10F &
1-PI-67-10A ROOT IPS/722 OPEN 1-RTV-67-901A CV1-PDT-67-10A/1-PI-67-10B ROOT IPS/722 OPEN 1-RTV-67-902A CVERCW STRAINER 1B-B VENT IPS/722 CLOSED  1-VTV-67-907B CV1-PDT-67-10F ROOT IPS/722 OPEN 1-RTV-67-925A CV1-PDT-67-10D ROOT IPS/722 OPEN 1-RTV-67-926A CVYARD 1-FT-67-62/1-FT-67-62C ROOT U-1 PIPE TUNNEL OPEN 1-RTV-67-802A CV1-FT-67-62/1-FT-67-62C ROOT U-1 PIPE TUNNEL OPEN 1-RTV-67-802B CVERCW SPARE YARD CLOSED 2-ISV-67-984 CVERCW SPARE YARD CLOSED 2-ISV-67-985 CV ERCW DISCH HDR B COOLING TOWER ISOL North of U2 RWST POSITION AS NEEDED 0-FCV-67-362 CVERCW HDR 1B BACKWASH ISOL YARD 0-PI-OPS-17.0 1-ISV-67-506B CVDG 1B-B ERCW SUP HDR ISOL  YARD 0-PI-OPS-17.0 1-ISV-67-507C CVDG 2B-B ERCW SUP HDR ISOL YARD 0-PI-OPS-17.0 1-ISV-67-507D CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 169 of 204 Checklist 3 (Page 2 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATIONPOSITION UNID PERF INITIAL VERIFIER INITIAL DG Bldg el 742 1-FT-67-74 ROOT RM 1BB OPEN 1-RTV-67-825A  CV1-FI-67-74 ROOT RM 1BB OPEN 1-RTV-67-825B  CV1-FI-67-280 ROOT RM 1BB OPEN 1-RTV-67-826A  CV1-FI-67-280 ROOT RM 1BB OPEN 1-RTV-67-826B  CV DG 1B-B OUT ERCW HDR
 
VENT RM 1BB  CLOSED 1-VTV-67-983 CVDG HX 1B1 ERCW DRAIN RM 1BB CLOSED 1-DRV-67-981B  CVDG HX 1B2 ERCW DRAIN RM 1BB CLOSED 1-DRV-67-980B  CVDG HX 2B2 ERCW DRAIN RM 2BB CLOSED 2-DRV-67-980B  CV2-FI-67-74 ROOT RM 2BB  OPEN 2-RTV-67-825A  CV2-FI-67-74 ROOT RM 2BB  OPEN 2-RTV-67-825B  CV2-FI-67-280 ROOT RM 2BB  OPEN 2-RTV-67-826A  CV2-FI-67-280 ROOT RM 2BB  OPEN 2-RTV-67-826B  CVDG HX 2B1 ERCW DRAIN RM 2BB  CLOSED 2-DRV-67-981B  CVDG 2B-B HX ERCW OUT HDR VENT RM 2BB  CLOSED 2-VTV-67-983 CV DG HX 1B1/1B2 ERCW SUP HDR 1B ISOL  DGB/742  CLOSED 1-FCV-67-67 CVDG HX 1B1 ERCW OUT THROTTLE DGB/742 0-PI-OPS-17.0 LT 1-THV-67-510B CV DG HX 1B1/1B2 ERCW DISCH HDR B ISOL DGB/742 0-PI-OPS-17.0 LO 1-ISV-67-511B CVDG HX 1B2 ERCW OUT THROTTLE DGB/742 0-PI-OPS-17.0 LT 1-THV-67-515B CV DG HX 1B1/1B2 ERCW DISCH HDR A ISOL DGB/742 0-PI-OPS-17.0 LO 1-ISV-67-516A CV DG HX 1B1/1B2 ERCW DISCH HDR THROTTLE DGB/742 0-PI-OPS-17.0 LT 1-THV-67-8021 CVDG HX 1B2 SUP VENT DGB/742 CLOSED 1-VTV-67-518B  CVDG HX 1B1 ERCW SUP VENT DGB/742 CLOSED 1-VTV-67-519B  CVERCW HDR 2A/2B FLUSH RETURN CONNECTION DGB/742 CLOSED 1-FLV-67-653B CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 170 of 204 Checklist 3 (Page 3 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL DG Bldg el 742 DG HX 2B1/2B2 ERCW SUP
 
HDR 1B ISOL DGB/742 CLOSED 2-FCV-67-67 CVDG HX 2B1 ERCW OUT THROTTLE DGB/742 0-PI-OPS-17.0 LT 2-THV-67-510B CV DG HX 2B1/2B2 ERCW DISCH HDR B ISOL DGB/742 0-PI-OPS-17.0 LO 2-ISV-67-511B CVDG HX 2B2 ERCW OUT THROTTLE DGB/742 0-PI-OPS-17.0 LT 2-THV-67-515B CV DG HX 2B1/2B2 ERCW DISCH HDR A ISOL DGB/742 0-PI-OPS-17.0 LO 2-ISV-67-516A CV DG HX 2B1/2B2 ERCW DISCH HDR THROTTLE DGB/742 0-PI-OPS-17.0 LT 2-THV-67-8021 CVDG HX 2B2 ERCW SUP VENT DGB/742 CLOSED 2-VTV-67-518B  CVDG HX 2B1 ERCW SUP VENT DGB/742 CLOSED 2-VTV-67-519B  CVControl Bldg el 692 0-FE-67-200 TEST POINT C12P/692 CLOSED 0-TV-67-889A  CV0-FE-67-200 TEST POINT C12P/692 CLOSED 0-TV-67-889B  CV ELECT BD RM A/C COND B-B ERCW SUP ISOL C12P/694 0-PI-OPS-17.0 LO 0-ISV-67-615B CV ELEC BD RM A/C COND B-B ERCW RET THROTTLE C12P/696 0-PI-OPS-17.0 LT 0-THV-67-618B CV ELEC BD RM A/C COND B-B ERCW SUP VENT C12P/701 CLOSED 0-VTV-67-614B CV ELEC BD RM A/C COND B-B ERCW SUP TEST CONN C13P/692 CLOSED 0-TV-67-616B CV ELEC BD RM A/C COND B-B ERCW RET TEST CONN C13P/692 CLOSED 0-TV-67-617B CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 171 of 204 Checklist 3 (Page 4 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL Aux Bldg el 676 CS PMP RM CLR 1B-B ERCW RET THROTTLE A7U/676 0-PI-OPS-17.0 LT 1-THV-67-605B CVCONTROL AIR ISOLATION VALVE TO 1-FCV-67-190 A7U/676 0-PI-OPS-17.0 LC 1-ISV-32-3022 CVCSP ROOM COOLER 1B-B ERCW SUP FLOW CNTL A7U/676 OPERABLE 1-FCV-67-186 CV CS PMP 1B-B RM COOLER FLUSH CONNECTION A6U/676 CLOSED 1-ISV-67-622 CVRHR PMP RM CLR 1B-B ERCW RET THROTTLE A7V/676 0-PI-OPS-17.0 LT 1-THV-67-606B CVRHRP ROOM COOLER 1B-B ERCW SUP FLOW CNTL A7V/676 0-PI-OPS-17.0 LO 1-FCV-67-190 CVRHR PMP 1B-B RM COOLER FLUSH CONNECTION A7V/676 CLOSED 1-ISV-67-623-B CV1-FE-67-187 TEST POINT A7U/676 CLOSED 1-TV-67-881A CV1-FE-67-187 TEST POINT A7U/676 CLOSED 1-TV-67-881B CVCONTROL AIR ISOLATION VALVE TO 1-FCV-67-186 A7W/676 OPEN 1-ISV-32-3017 CV1-FE-67-191 TEST POINT A7V/676 CLOSED 1-TV-67-882A CV1-FE-67-191 TEST POINT A7V/676 CLOSED 1-TV-67-882B CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 172 of 204 Checklist 3 (Page 5 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL Aux Bldg el 692 BIOCIDE RECIRC ERCW SUP TO AFW TURB PMP 1A-S A1T/692 CLOSED 1-ISV-67-712 CVBIOCIDE RECIRC ERCW SUP TO AFW TURB PMP 1A-S A1U/692 CLOSED 1-ISV-67-711 CVBIOCIDE RECIRC ERCW SUP TO AFW TURB PMP 1A-S A1U/692 CLOSED 1-ISV-67-713 CVBIOCIDE RECIRC ERCW SUP TO AFW TURB PMP 1A-S A1U/692 CLOSED 1-ISV-67-714 CVLOWER CNTMT VENT CLR 1B & 1D ERCW SUP ISOL A2U/692 0-PI-OPS-17.0 LO 1-ISV-67-523B CVINSTR RM WATER CLR 1B ERCW SUP ISOL A2U/692 OPEN 1-ISV-67-524B CVLOWER CNTMT CLR HDR B ERCW SUP HDR TEST CONN A2U/692 CLOSED 1-TV-67-560B CVLOWER CNTMT CLR HDR D ERCW SUP HDR TEST CONN A2U/692 CLOSED 1-TV-67-560D CVLOWER CNTMT CLR HDR B ERCW RET TEST CONN A2U/692 CLOSED 1-TV-67-576B CVLOWER CNTMT CLR HDR D ERCW RET TEST CONN A2U/692 CLOSED 1-TV-67-576D CVPIPE CHASE COOLER 1B-B ERCW SUP FLOW CNTL A2U/692 OPERABLE 1-FCV-67-344 CVCONTROL AIR ISOLATION VALVE TO 1-FCV-67-344 A2U/692 OPEN 1-ISV-32-2960 CVCCP ROOM COOLER 1B-B ERCW SUP FLOW CNTL A4T/692 0-PI-OPS-17.0 LO 1-FCV-67-170 CVCONTROL AIR ISOLATION VALVE TO 1-FCV-67-170 A4T/695 0-PI-OPS-17.0 LC 1-ISV-32-2936 CVCVCS CCP ROOM CLR 1B-B ERCW SUP ISOL A4T/692 0-PI-OPS-17.0 LO 1-ISV-67-600B CVCONTROL AIR ISOLATION VALVE TO 1-FCV-67-348 A4U/692 OPEN 1-ISV-32-2956 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 173 of 204 Checklist 3 (Page 6 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL Aux Bldg el 692 PENT ROOM COOLER 1B-B ERCW SUP FLOW CNTL A4V/692 OPERABLE 1-FCV-67-348 CVPENT ROOM CLR 1B-B ERCW RET THROTTLE A4V/692 0-PI-OPS-17.0 LT 1-THV-67-608B CV1-FE-67-349 TEST POINT A4V/700 CLOSED 1-TV-67-883A CV1-FE-67-349 TEST POINT A4V/700 CLOSED 1-TV-67-883B CVINSTR RM WATER CLR 1B ERCW IN TEST CONN  A4W/692 CLOSED 1-TV-67-525B CVINSTR RM WATER CLR 1B
 
ERCW OUT TEST CONN A4W/692 CLOSED 1-TV-67-526B CVINSTR RM WATER CLR 1B ERCW RET THROTTLE A4W/692 TI-31.08 1-THV-67-527B CVCVCS PDP RM CLR 1C
 
ERCW SUP ISOL A5T/692 OPEN 1-ISV-67-639 CVCVCS PDP RM CLR 1C ERCW RET THROTTLE A5T/692 TI-31.08 1-THV-67-640 CV1-FE-67-173 TEST POINT A5T/698 CLOSED 1-TV-67-879A CV1-FE-67-173 TEST POINT A5T/698 CLOSED 1-TV-67-879B CVCVCS PDP RM CLR 1C ERCW RET ISOL A5T/692 OPEN 1-ISV-67-641 CV PDP ROOM COOLER 1C ERCW SUP FLOW CNTL A5T/692 OPERABLE 1-FCV-67-172 CVCONTROL AIR ISOLATION
 
VALVE TO 1-FCV-67-172 A5T/692 OPEN 1-ISV-32-2929 CVSI PMP 1B-B RM COOLER FLUSH CONNECTION A6U/692 CLOSED 1-ISV-67-625-B CV1-FE-67-183 TEST POINT A7V/692 CLOSED 1-TV-67-880A CV1-FE-67-183 TEST POINT A7V/692 CLOSED 1-TV-67-880B CVSIP ROOM COOLER 1B-B ERCW SUP FLOW CNTL A7V/692 OPERABLE 1-FCV-67-182 CVCONTROL AIR ISOLATION VALVE TO 1-FCV-67-182  A7U/692 OPEN 1-ISV-32-2983 CVSIS PMP RM CLR 1B-B ERCW RET THROTTLE A7V/692 0-PI-OPS-17.0 LO 1-THV-67-604B CVPENT/PIPE CHASE RM CLR ERCW SUP HDR 1B ISOL A7V/692 0-PI-OPS-17.0 LO 1-ISV-67-607B CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 174 of 204 Checklist 3 (Page 7 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL Aux Bldg el 692 CVCS CCP ROOM CLR 1B-B ERCW RET THROTTLE A4T/692 0-PI-OPS-17.0 LT 1-THV-67-601B CV1-FE-67-171 TEST POINT A4T/698 CLOSED  1-TV-67-888A CV1-FE-67-171 TEST POINT A4T/698 CLOSED  1-TV-67-888B CVCVCS CCP ROOM CLR 1B-B ERCW RET ISOL A4T/692 0-PI-OPS-17.0 LO 1-ISV-67-602B CVINSTR RM WATER CLR 1B ERCW SUP ISOL A4W/697 OPEN 1-ISV-67-710B CVSIS/CS/RHR PMP RM CLR ERCW SUP HDR 1B ISOL A7V/703 0-PI-OPS-17.0 LO 1-ISV-67-603B CVPIPE CHASE CLR 1B-B ERCW RET THROTTLE A2U/703 0-PI-OPS-17.0 LT 1-THV-67-611B CV1-FE-67-345 TEST POINT A2U/700 CLOSED  1-TV-67-886A CV1-FE-67-345 TEST POINT A2U/700 CLOSED  1-TV-67-886B CVPENT/PIPE CHASE RM CLR ERCW RET HDR 1B ISOL A8V/703 0-PI-OPS-17.0 LO 1-ISV-67-612B CVSIS/CS/RHR PMP RM CLR ERCW RET HDR 1B ISOL A7V/703 0-PI-OPS-17.0 LO 1-ISV-67-613B CVAUX BLDG ERCW SUP HDR 1B ISOL A1U/706 0-PI-OPS-17.0 LO 1-FCV-67-82 CVERCW SUP HDR 1B DRAIN A1U/707 CLOSED 1-DRV-67-925B CV1-FE-67-259 TEST POINT A4W/708 CLOSED 1-TV-67-861A CV1-FI-67-259 TEST POINT A4W/708 CLOSED 1-TV-67-861B CV1-FI-67-251 ROOT A2U/710 OPEN 1-RTV-67-845A CV1-FI-67-251 ROOT A2U/710 OPEN 1-RTV-67-845B CV1-FI-67-245 ROOT A1U/710 OPEN 1-RTV-67-847B CV1-FI-67-245 ROOT A1U/710 OPEN 1-RTV-67-847A CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 175 of 204 Checklist 3 (Page 8 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL Aux Bldg el 713 1-FI-67-247 ROOT A1V/713 OPEN 1-RTV-67-846A CV1-FI-67-247 ROOT A1V/713 OPEN 1-RTV-67-846B CV0-FIS-67-209 ROOT A2Q/713 OPEN 0-RTV-67-986A CVSTA AIR COMPR ERCW SUP HDR 1B VENT A2Q/726 CLOSED 0-VTV-67-625B CVPENT ROOM CLR 1B-B ERCW RET THROTTLE A2U/713 0-PI-OPS-17.0 LT 1-THV-67-609B CVCONTROL AIR ISOLATION VALVE TO 1-FCV-67-352  A2U/713 OPEN 1-ISV-32-3147 CVPENT ROOM COOLER 1B-B ERCW SUP FLOW CNTL A2V/713 OPERABLE 1-FCV-67-352 CV1-FE-67-353 TEST POINT A2V/719 CLOSED 1-TV-67-884A CV1-FE-67-353 TEST POINT A2V/719 CLOSED 1-TV-67-884B CV0-FIS-67-209 ROOT A2Z/722 OPEN 0-RTV-67-987A CVSTA AIR COMPR ERCW SUP HDR 1B ISOL A2Z/726 OPEN 0-FCV-67-208 CVCCS/AFW PMP SPACE CLR 1B-B ERCW SUP FLOW CNTL A3T/713 OPERABLE 1-FCV-67-164 CV CONTROL AIR ISOL VALVE TO 1-FCV-67-164 A3T/713 OPEN 1-ISV-32-3063 CVCCS/AFW PMP SPACE CLR 1B-B ERCW SUP ISOL A3T/713 0-PI-OPS-17.0 LO 1-ISV-67-642B CVCCS/AFW PMP SPACE CLR 1B-B ERCW RET THROTTLE A3T/721 0-PI-OPS-17.0 LT 1-THV-67-643B CVCCS/AFW PMP SPACE CLR 1B-B ERCW RET ISOL A3T/721 0-PI-OPS-17.0 LO 1-ISV-67-644B CV UPPER CNTMT VENT CLR 1B & 1D ERCW SUP ISOL A3U/713 OPEN 1-ISV-67-531B CV UPPER CNTMT VENT CLR 1B & 1D ERCW RET ISOL A3U/713 OPEN 1-ISV-67-590B CVCONTROL AIR ISOLATION VALVE TO 1-TCV-67-137  A3U/713 OPEN 1-ISV-32-3159 CVCONTROL AIR ISOLATION VALVE TO 1-FCV-67-140  A3U/713 OPEN 1-ISV-32-3160 CV UPPER CNTMT VENT CLR 1B ERCW RET HDR ISOL A3U/713 OPEN 1-ISV-67-587B CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 176 of 204 Checklist 3 (Page 9 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL Aux Bldg el 713 UPPER CNTMT VENT CLR 1D ERCW RET HDR ISOL A3U/713 OPEN 1-ISV-67-587D CV UPPER CNTMT VENT CLR 1B ERCW RET THROTTLE A3U/713 TI-31.08 1-THV-67-588B CV UPPER CNTMT VENT CLR 1D ERCW RET THROTTLE A3U/713 TI-31.08 1-THV-67-588D CV1-TCV-67-137 BYPASS A3U/713 CLOSED  1-BYV-67-589B CV1-TCV-67-140 BYPASS A3U/713 CLOSED  1-BYV-67-589D CV1-FE-67-165 TEST POINT A3U/724 CLOSED  1-TV-67-897A CV1-FE-67-165 TEST POINT A3U/724 CLOSED  1-TV-67-897B CVERCW FLOOD MODE RET
 
SFPC HX ISOL A3U/730 CLOSED 0-ISV-67-556B CV UPPER CNTMT VENT CLR
 
1B ERCW RET TEMP CNTL A3V/713 OPERABLE 1-TCV-67-137 CV UPPER CNTMT VENT CLR 1D ERCW RET TEMP CNTL A3V/713 OPERABLE 1-TCV-67-140 CV1-FI-67-253 ROOT A3V/720 OPEN  1-RTV-67-844A CV1-FI-67-253 ROOT A3V/720 OPEN  1-RTV-67-844B CVLOWER CNTMT VENT CLR
 
1B & 1D ERCW RET ISOL A3V/732 0-PI-OPS-17.0 LO 1-ISV-67-577B CV1-FI-67-334 ROOT A3V/733 OPEN  1-RTV-67-838A CV1-FI-67-334 ROOT A3V/733 OPEN 1-RTV-67-838B  CV1-FI-67-335 ROOT A3V/733 OPEN 1-RTV-67-836A  CV1-FI-67-335 ROOT A3V/733 OPEN 1-RTV-67-836B  CV1-FI-67-267 ROOT A3V/733 OPEN 1-RTV-67-839A  CV1-FI-67-267 ROOT A3V/733 OPEN 1-RTV-67-839B  CV1-FI-67-269 ROOT A3V/733 OPEN 1-RTV-67-837A  CV1-FI-67-269 ROOT A3V/733 OPEN 1-RTV-67-837B  CV
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 177 of 204 Checklist 3 (Page 10 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL Aux Bldg el 713 ERCW DISCHARGE HDR B ARV ISOLATION VALVE  AUX / 713 (2) 0-ISV-67-1107B CVERCW DISCHARGE HDR B ARV TV VALVE AUX / 713 CLOSED 0-TV-67-1113B CVERCW DISCHARGE HDR. B AIR
 
RELEASE VALVE AUX/713 (1) 0-ARV-067-1109B CVINSTR RM WATER CLR 1B ERCW RET ISOL A3W/713 OPEN 1-ISV-67-530B CVBIOCIDE RECIRC ERCW HDR 1B ISOL A4S/713 CLOSED 1-ISV-67-716B CVERCW HDR B A/C EQUIP RET ISOL A4T/713 0-PI-OPS-17.0LO 1-ISV-67-554B CVBIOCIDE RECIRC ERCW HDR 1B ISOL A4T/720 CLOSED 1-ISV-67-715B CVCNTMT SPRAY HX 1B ERCW BIOCIDE CIRC BYP A4V/713 CLOSED 1-ISV-67-538B CV CNTMT SPRAY HX 1B-B ERCW RETURN A4V/730 CLOSED 1-FCV-67-124 CV UPPER CNTMT VENT CLR 1B ERCW SUP HDR TEST CONN A4V/732 CLOSED 1-TV-67-578B CV UPPER CNTMT VENT CLR 1D ERCW SUP HDR TEST CONN A4V/732 CLOSED 1-TV-67-578D CV UPPER CNTMT VENT CLR 1B ERCW RET HDR TEST CONN A4V/732 CLOSED 1-TV-67-586B CV UPPER CNTMT VENT CLR 1D ERCW RET HDR TEST CONN A4V/732 CLOSED 1-TV-67-586D CVCS HX 1B ERCW RET THROTTLE A5V/713 0-PI-OPS-17.0LT 1-THV-67-537B CV1-FT-67-122 ROOT A5V/713 OPEN 1-RTV-67-832A CV1-FT-67-122 ROOT A5V/713 OPEN 1-RTV-67-832B CV 1 Check 30 inch ERCW discharge header level >
26 inches above the bottom of the pipe; B train 12" ERCW header to AFW pumps header > 10 inches.
2 Valve may be full open or throttled as needed to dampen turbulence creating fluctuating water level in the 0-ARV-067-1109B.
 
WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 178 of 204 Checklist 3 (Page 11 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT
 
Data Package:  Page ____ of ____    Date ________
 
NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL TD AFW PUMP ERCW SUP HDR VENT A5S/730 CLOSED 1-VTV-67-945 CVAux Bldg el 713 CS HX 1B ERCW DRAIN A7V/713 CLOSED 1-DRV-67-536B CVCS HX 1B ERCW VENT A7V/713 CLOSED 1-VTV-67-535B CV TD AFW PUMP ERCW SUP HDR VENT A8S/730 CLOSED 1-VTV-67-923 CV TD AFW PUMP SUP HDR
 
DRAIN A8S/723 CLOSED 1-DRV-67-946A CV TD AFW PUMP ERCW SUP
 
HDR DRAIN A11S/713 CLOSED 1-DRV-67-985 CV TD AFW PUMP ERCW SUP HDR ISOL A12U/731 0-PI-OPS-17.0 LO 1-ISV-67-924B CVTD & MD AFWP ERCW SUP HDR DRN A12T/718 CLOSED 1-DRV-67-779 CVMCR WTR CHLR B-B ERCW RET ISOL A12U/731 0-PI-OPS-17.0 LO 0-ISV-67-591B CV TD AFW PUMP ERCW SUP HDR VENT A12T/733 CLOSED 1-VTV-67-947A CVAux Bldg el 737 ERCW FLOOD MODE SUP RCW/ICE COND ISOL A3U/737 CLOSED 0-ISV-67-532B CVPENT ROOM COOLER 1B-B ERCW RET THROTTLE A3V/737 0-PI-OPS-17.0 LT 1-THV-67-610B CVCCS SURGE TNK A ERCW SUP HDR ISOL A4T/746 CLOSED 1-ISV-67-543B CVAUX BLDG AIR CLR ERCW SUP HDR 1B ISOL A4T/752 0-PI-OPS-17.0 LO 1-FCV-67-128 CVCCS HX A HDR 1B ERCW SUP A4T/752 0-PI-OPS-17.0 LC 1-FCV-67-458 CVMCR WTR CHLR B-B ERCW SUP VENT A4T/754 A5U/754 CLOSED 0-VTV-67-619B CVCNTMT SPRAY HX 1B ERCW
 
BIOCIDE CIRC BYP A4U/737 CLOSED 1-ISV-67-533B CVCSS HX 1B INLETERCW FLUSH A4U/737 0-PI-OPS-17.0 LC 1-FLV-67-925 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 179 of 204 Checklist 3 (Page 12 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT


Data Package: Page ____ of ____    Date ________  
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 132 of 204 Data Sheet 3 (Page 2 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____                                               Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component          Flow Device          EDF or              Target        P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                              (Max)
DSL GEN CLR          2-FI-67-280                          700-760 gpm                        NA                                                      650 2B2          2-ISV-67-515B                            (.929)        ________        NA                                  ________          (1200)
Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
SD BD RM A/C        2-FE-67-159        ________            t60 H2O                    ________                                                    560 B            2-ISV-67-555      0-100 H2O            (.931)        ________    ________              75.0              ________          (560)
Steps and calculations performed by (init./date): ___________/_________              Calculations verified by (init./date): ___________/_________
ELEC BD RM        0-FE-67-200        ________            t76 H2O                    ________                                                    370 A/C B          0-ISV-67-618B      0-100 H2O            (.936)        ________      _______              44.0              ________          (490)
Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
MAIN            0-FE-67-202        ________            t76 H2O                    ________                                                    293 CONTROL RM        0-ISV-67-623B      0-200 H2O            (.928)        ________     ________               35.0              ________          (460)
A/C B Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
CCS & AFW          1-FE-67-165                            t108 H2O                    ________                                                    102 PUMP SP CLR        1-THV-67-643B        ________            (.928)        ________    ________              10.2              ________          (670) 1B                              0-200 H2O Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/___________


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIF INITIAL PENT ROOM COOLER 1B-B ERCW SUP FLOW CNTL A4V/737 OPERABLE 1-FCV-67-356 CVCONTROL AIR ISOLATION VALVE TO 1-FCV-67-356 A4V/737 OPEN 1-ISV-32-3295 CV1-FE-67-357 TEST POINT A4V/744 CLOSED 1-TV-67-885A  CV1-FE-67-357 TEST POINT A4V/744 CLOSED 1-TV-67-885B  CVAux Bldg el 737 CS HX 1B ERCW SUP HDR
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 133 of 204 Data Sheet 3 (Page 3 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____                                              Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device          EDF or            Target          P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                            (Max)
BA TRF &        2-FE-67-220        ________          t55 H2O                      ________                                                  60 AFW SP CLR        2-THV-67-673B      0-100 H2O            (.929)        ________    ________              8.5              ________        (360) 2B Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
SFP & TB        1-FE-67-216                            t16 H2O                      ________                                                  29 BSTR PMP        1-THV-67-646B        ________            (.910)        ________    ________              7.7              ________        (170)
CLR 1B                            0-50 H2O Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
CNTMT SPR          1-FE-67187                            t13 H2O                      ________                                                  28 PMP RM CLR        1-THV-67-605B                            (.895)        ________    ________              8.5              ________        (190) 1B-B 0-50 H2O Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
CENT CHG          1-FE-67-171                            t28 H2O                      ________                                                  25 PMP CLR 1B        1-ISV-67-601B                            (.904)        ________    ________              5.0              ________          (28) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________


VENT A5U/737 CLOSED 1-VTV-67-534B CV CNTMT SPRAY HX 1B-B ERCW SUPPLY A5U/746 CLOSED 1-FCV-67-123 CV SFP/TBBP SPACE CLR 1B-B ERCW SUP FLOW CNTL A5W/737 OPERABLE 1-FCV-67-215 CVCONTROL AIR ISOLATION VALVE TO 1-FCV-67-215 A5W/737 OPEN 1-ISV-32-3283 CVSFP/TBBP SPACE CLR B-B ERCW SUP ISOL A5W/737 0-PI-OPS-17.0 LO 1-ISV-67-645B CVSFP/TBBP SPACE CLR B-B ERCW THROTTLE A5W/737 0-PI-OPS-17.0 LT 1-THV-67-646B CV SFP/TBBP SPACE CLR 1B-B ERCW RET ISOL A5W/737 0-PI-OPS-17.0 LO 1-ISV-67-647B CV1-FE-67-216 TEST POINT A8W/750 CLOSED 1-TV-67-896A CV1-FE-67-216 TEST POINT A8W/750 CLOSED 1-TV-67-896B CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 180 of 204 Checklist 3 (Page 13 of 21)
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 134 of 204 Data Sheet 3 (Page 4 of 10)
SUPPLY HDR 1B VALVE ALIGNMENT
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____                                              Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device          EDF or            Target          P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                            (Max)
SI PMP RM        1-FE-67-183        ________          t36 H2O                      ________                                                  22 CLR 1B        1-THV-67-604B      0-100 H2O            (.914)        ________    ________              3.9              ________          (25)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
RHR PMP RM        1-FE-67-191        ________          t30 H2O                      ________                                                  19 CLR 1B-B       1-THV-67-606B      0-100 H2O            (.907)        ________    ________              3.9              ________          (21)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PIPE CHASE        1-FE-67-345        ________            t6 H2O                          NA                                                    15 CLR 1B         1-THV-67-611B      0-50 H2O            (.907)        ________        NA                7.0              ________          (17)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PIPE CHASE        2-FE-67-345        ________            t6 H2O                          NA                                                    15 CLR 2B        2-THV-67-611B      0-50 H2O            (.907)        ________        NA                7.0              ________          (17)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        1-FE-67-349                            t12 H2O                      ________                                                  12 1B1          1-THV-67-608B                            (.907)        ________    ________              3.9              ________          (14) 0-100 H2O Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________


Data Package: Page ____ of ____    Date ________  
WBN                ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 135 of 204 Data Sheet 3 (Page 5 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____                                               Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device        EDF or              Target          P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                            (Max)
PEN RM CLR        1-FE-67-353        ________            t12 H2O                      ________                                                  11 1B2          1-THV-67-609B      0-100 H2O            (.907)        ________     ________               3.9              ________          (13)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        1-FE-67-357        ________            t12 H2O                      ________                                                  12 1B3          1-THV-67-610B      0-100 H2O            (.907)        ________    ________              3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        2-FE-67-349        ________            t12 H2O                      ________                                                  12 2B1          2-THV-67-608B      0-100 H2O            (.907)        ________    ________              3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        2-FE-67-353        ________            t12 H2O                      ________                                                  11 2B2          2-THV-67-609B      0-100 H2O            (.907)        ________    ________              3.9              ________          (13)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        2-FE-67-357                            t12 H2O                      ________                                                  12 2B3          2-THV-67-610B                              (.907)        ________    ________              3.9              ________          (14) 0-100 H2O Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIF INITIAL Aux Bldg el 737 MCR WTR CHLR B-B  
WBN                  ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                                TRAIN B                  Rev. 0000 Page 136 of 204 Data Sheet 3 (Page 6 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____                                              Date ________
[1]                [2]              [3]                  [4]              [5]          [6]                [7]                  [8]              [9]
Component        Flow Device          EDF or              Target          P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                              (Max)
EMER GAS TR        2-FE-67-339        ________            t8 H2O                      ________                                                    10 RM CLR 2B      2-THV-67-685B      0-100 H2O            (.907)        ________    ________                3.9              ________            (11)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/___________
RECIP CHG          1-FE-67-173        ________            t12 H2O                      ________                                                    12 PMP CLR 1C        1-THV-67-640      0-100 H2O            (.907)        ________    ________                3.9              ________            (14)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/___________
ST AIR COMP        0-FIS-67-209                          183-196 gpm                        NA                                                      183 (header)      0-THV-67-632C                              (.932)            NA          NA                  NA              ________          (196)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/___________
AUX CNTL AIR        2-FE-67-340        ________            t4 H2O                      ________                                                    3.5 COMP B         2-THV-67-683        0-50 H2O            (.910)        ________    ________                1.9              ________          (185)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/___________
LWR CNTMT          2-FE-67-474                          t48.75 H2O                    ________                                                    306 CLR 2B        2-ISV-67-564B                              (.940)        ________    ________              45.3              ________          (1060) 0-50 H2O Steps and calculations performed by (init./date): ___________/_________              Calculations verified by (init./date): ___________/_________


ERCW SUP ISOL A12T/737 0-PI-OPS-17.0 LO (3) 0-ISV-67-620B CVMCR WTRCHIL B-B ERCW SUP TEST CONN A12T/737 CLOSED 0-TV-67-621B CVMCR WTR CHLR B-B ERCW OUT TEST CONN A12T/737 CLOSED 0-TV-67-622B CVMCR CHLR B-B ERCW DRAIN  A12T/737  CLOSED  0-DRV-67-2226 CV0-FE-67-202 TEST POINT A12T/737 CLOSED 0-TV-67-890A CV0-FE-67-202 TEST POINT A12T/737 CLOSED 0-TV-67-890B CVMCR WTR CHLR B-B ERCW OUT THROTTLE A12T/737 0-PI-OPS-17.0 LT (3) 0-THV-67-623B CVMCR WTR CHLR B-B ERCW OUT VENT A12T/737 CLOSED 0-VTV-67-624B CVERCW B DISC HDR VENT A12T/730 CLOSED 0-VTV-67-1111 (4) CV C CCS HX ERCW INLET TEST CONN RTV  A5S/742 CLOSED 0-RTV-67-1063 CVC CCS HX ERCW OUTLET TEST CONN RTV A10S/742 CLOSED 0-RTV-67-1064 CV (3) See Precaution and Limitation R. (4) 0-VTV-67-1111 capped.
WBN                ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 137 of 204 Data Sheet 3 (Page 7 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____                                              Date ________
[1]                [2]              [3]                [4]              [5]        [6]                [7]                  [8]            [9]
Component        Flow Device        EDF or              Target          P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)        1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                        (P)
Gauge #            Multiplier)                                                                            (Max)
LWR CNTMT        2-FE-67-476        ________          t48.75 H2O                    ________                                                  306 CLR 2D        2-ISV-67-564D      0-50 H2O            (.940)        ________    ________              45.3              ________          (1060)
Steps and calculations performed by (init./date): ___________/_________            Calculations verified by (init./date): ___________/_________
CRDM CLR 2B        2-FE-67-477                            t118 H2O                    ________                                                  124 2-ISV-67-567B      ________              (.931)        ________    ________              11.9              ________          (390) 0-200 H2O Steps and calculations performed by (init./date): ___________/_________            Calculations verified by (init./date): ___________/_________
CRDM CLR 2D        2-FE-67-475        ________            t118 H2O                    ________                                                  124 2-ISV-67-567D      0-200 H2O            (.931)        ________    ________              11.9              ________          (390)
Steps and calculations performed by (init./date): ___________/_________            Calculations verified by (init./date): ___________/_________
U2 RCP MTR        2-FE-67-249        ________            t58 H2O                      ________                                                  110 CLR 2        2-ISV-67-572B      0-100 H2O            (.930)        ________    ________              15.0              ________          (220)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/_________
U2 RCP MTR        2-FE-67-255        ________            t58 H2O                      ________                                                  110 CLR 4        2-ISV-67-572D      0-100 H2O            (.930)        ________    ________              15.0              ________          (220)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/_________


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 181 of 204 Checklist 3 (Page 14 of 21)
WBN                 ERCW SYSTEM FLOW BALANCE                   2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 138 of 204 Data Sheet 3 (Page 8 of 10)
SUPPLY HDR 1B VALVE ALIGNMENT
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____                                              Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device          EDF or            Target          P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                            (Max)
INST RM WAT        2-FE-67-259        ________          t65 H2O                      ________                                                  30 CLR 2B        2-ISV-67-527B      0-100 H2O            (.933)        ________    ________              3.9              ________        (200)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
CNTMT SPR          2-FE-67187        ________          t13 H2O                      ________                                                  28 PMP RM CLR        2-THV-67-605B      0-50 H2O            (.895)        ________    ________              8.5              ________        (190) 2B-B Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
CENT CHG          2-FE-67-171        ________          t28 H2O                      ________                                                  25 PMP CLR 2B        2-ISV-67-601B      0-100 H2O            (.904)        ________    ________              5.0              ________          (28)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
RHR PMP RM          2-FE-67-191        ________          t30 H2O                      ________                                                  19 CLR 2B-B        2-THV-67-606B      0-100 H2O            (.907)        ________    ________              3.9              ________          (21)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
SI PMP RM        2-FE-67-183        ________          t36 H2O                      ________                                                  22 CLR 2B        2-THV-67-604B      0-100 H2O            (.914)        ________    ________              3.9              ________          (25)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________


Data Package: Page ____ of ____     Date ________  
WBN          ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                  TRAIN B                Rev. 0000 Page 139 of 204 Data Sheet 3 (Page 9 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____                           Date ________
Component UNID            DESCRIPTION                M&TE #        PRESSURE (PSIG) INITIALS 1-VTV-67-534B      CS HX 1B ERCW SUP HDR VT 2-VTV-67-534B      CS HX 2B ERCW SUP HDR VT 1-FE-67-62          ERCW SUP HDR 1B (up strm) 1-FE-67-62          ERCW SUP HDR 1B (dn strm) 2-FE-67-62          ERCW SUP HDR 1B (up strm) 2-FE-67-62          ERCW SUP HDR 1B (dn strm) 0-DRV-67-547        ERCW CCS HX C DR.
0-TV-67-621B        MCR CHLR B-B ERCW CONN.
1-TV-67-690B        UCC 1B ERCW SUP TEST CONN 2-TV-67-690B        UCC 2B ERCW SUP TEST CONN 0-TV-67-616B        EBR B ERCW SUP TEST CONN 0-ISV-67-813A      ERCW PMP E-B DISCH PRESS 0-ISV-67-812A      ERCW PMP F-B DISCH PRESS 0-ISV-67-814A      ERCW PMP G-B DISCH PRESS 0-ISV-67-811A      ERCW PMP H-B DISCH PRESS 1-PI-67-10B        ERCW STRNR 1B-B OUT PRESS


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U1 Annulus LOWER CNTMT CLR HDR B ERCW SUP ISOL Annulus 718/Az 180 OPEN 1-FCV-67-99 CVLOWER CNTMT CLR HDR B ERCW RET VENT Annulus 718/Az 177 CLOSED 1-VTV-67-693B CVLOWER CNTMT CLR HDR B ERCW SUP VENT Annulus 718/Az 173 CLOSED 1-VTV-67-694B CVLOWER CNTMT CLR HDR B ERCW RET ISOL Annulus 720/Az 171 OPEN 1-FCV-67-104 CVLOWER CNTMT CLR HDR D ERCW SUP ISOL Annulus 715/Az 353 OPEN 1-FCV-67-107 CVLOWER CNTMT CLR HDR D ERCW RET ISOL Annulus 715/Az 350 OPEN 1-FCV-67-112 CVLOWER CNTMT CLR
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 140 of 204 Data Sheet 3 (Page 10 of 10)
TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____                                Date ________
Component UNID                DESCRIPTION                M&TE #        PRESSURE (PSIG) INITIALS 2-PI-67-10B          ERCW STRNR 2B-B OUT PRESS 0-PI-67-17B          ERCW HDR B PRESS 1-PI-67-10A          ERCW STRNR 1B-B SUPPLY PRESS ERCW Strainer DP is recorded below:
Equation                                        Data Entry                            INITIALS 1-PI-67-10A PI-67-10B = DP    _______________ - _______________ = _____________
2-PI-67-10A PI-67-10B = DP    _______________ - _______________ = _____________


HDR D ERCW SUP VENT Annulus 717/Az 351 CLOSED 1-VTV-67-694D CVLOWER CNTMT CLR  
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                                TRAIN B                  Rev. 0000 Page 141 of 204 Data Sheet 4 (Page 1 of 13)
U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____                                                Date ________
[1]                [2]              [3]                [4]              [5]        [6]                [7]                  [8]            [9]
Component        Flow Device          EDF or              Target          P( H2O)  Pcorrected                            Flowcorrected  Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)        1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                            (Max)
CCS HTX A (B          EFD-1                            !6650-7100 POS +          1-FCV-67-146          NA                gpm                NA                  EFD-1                       ________          !6650 BYPASS)                                                  (.926)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
CCS HTX B (B        2-FI-67-222                          !5850-6200 POS +          2-FCV-67-146          NA                gpm                NA        2-FI-67-222 - EFD-1 =                ________          !5850 BYPASS)                                                  (.926)                                _____GPM Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
CCS HTX C          0-FE-67-226                          !6000-6600                    ________
(BYPASS)        0-FCV-67-144                              H2O          ________    _______              852.0              ________          !6000
(.935) 0-100 H2O Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
DSL GEN CLR         2-FI-67-74                          700-760 gpm                        NA                                                      650 2B1          2-ISV-67-510B          NA                (.929)          ________        NA                  NA              ________          (1200)
Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
DSL GEN CLR        2-FI-67-280                          700-760 gpm                        NA                                                      650 2B2          2-ISV-67-515B                            (.929)          ________        NA                                  ________          (1200)
Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______


HDR D ERCW RET VENT Annulus 721/Az 346 CLOSED 1-VTV-67-693D CV UPPER CNTMT VENT CLR 1D ERCW SUP HDR ISOL Annulus 795/Az 315 OPEN 1-FCV-67-141 CV UPPER CNTMT VENT CLR 1D ERCW RET HDR ISOL Annulus 795/Az 315 OPEN 1-FCV-67-142 CV UPPER CNTMT VENT CLR
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 142 of 204 Data Sheet 4 (Page 2 of 13)
U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____                                              Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device          EDF or            Target        P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #          Multiplier)                                                                              (Max)
SD BD RM A/C      2-FE-67-159                            t60 H2O                    ________                                                    560 B            2-ISV-67-555                            (.931)        ________    ________              75.0              ________          (560) 0-100 H2O Steps and calculations performed by (init./date): ___________/_________              Calculations verified by (init./date): ___________/_________
ELEC BD RM        0-FE-67-200                            t76 H2O                    ________                                                    370 A/C B        0-ISV-67-618B                            (.936)        ________    _______                44.0              ________          (490) 0-100 H2O Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
MAIN          0-FE-67-202                            t76 H2O                    ________                                                    293 CONTROL RM        0-ISV-67-623B        ________            (.928)        ________    ________              35.0              ________          (460)
A/C B                              0-200 H2O Steps and calculations performed by (init./date): ___________/_______              Calculations verified by (init./date): ___________/_______
INST RM WAT      1-FE-67-259                              t65 H2O                    ________                                                    t30 CLR 1B        1-ISV-67-527B                              (.933)        ________    ________                3.9              ________          (200) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________


1B ERCW SUP HDR VENT Annulus 795/Az 315 CLOSED 1-VTV-67-689B CV UPPER CNTMT VENT CLR 1D ERCW SUP HDR VENT Annulus 795/Az 315 CLOSED 1-VTV-67-689D CV UPPER CNTMT VENT CLR 1B ERCW SUP HDR VENT Annulus 798/Az 315 CLOSED 1-VTV-67-688B CV UPPER CNTMT VENT CLR 1D ERCW SUP HDR VENT Annulus 798/AZ 315 CLOSED 1-VTV-67-688D CV UPPER CNTMT VENT CLR  
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 143 of 204 Data Sheet 4 (Page 3 of 13)
U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____                                              Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component          Flow Device          EDF or              Target        P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                            (Max)
CCS & AFW          1-FE-67-165                            t108 H2O                    ________                                                  102 PUMP SP CLR       1-THV-67-643B        ________            (.928)        ________    ________              10.2              ________        (670) 1B                               0-200 H2O Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
BA TRF &          2-FE-67-220                            t55 H2O                      ________                                                    60 AFW SP CLR         2-THV-67-673B                            (.929)        ________    ________              8.5              ________        (360) 2B 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
SFP & TB        1-FE-67-216                            t16 H2O                    ________                                                    29 BSTR PMP        1-THV-67-646B        ________            (.910)        ________    ________              7.7              ________        (170)
CLR 1B                            0-50 H2O Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
CNTMT SPR          1-FE-67187                            t13 H2O                    ________                                                    28 PMP RM CLR         1-THV-67-605B                            (.895)        ________    ________              8.5              ________        (190) 1B-B 0-50 H2O Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________


1B ERCW SUP HDR ISOL Annulus 798/Az 315 OPEN 1-FCV-67-138 CV UPPER CNTMT VENT CLR  
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 144 of 204 Data Sheet 4 (Page 4 of 13)
U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____                                              Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device          EDF or            Target          P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                            (Max)
CENT CHG          1-FE-67-171        ________          t28 H2O                      ________                                                  25 PMP CLR 1B        1-ISV-67-601B      0-100 H2O            (.904)        ________    ________              5.0              ________          (28)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
SI PMP RM        1-FE-67-183        ________          t36 H2O                      ________                                                  22 CLR 1B        1-THV-67-604B      0-100 H2O            (.914)        ________    ________              3.9              ________          (25)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
RHR PMP RM        1-FE-67-191        ________          t30 H2O                      ________                                                  19 CLR 1B-B        1-THV-67-606B      0-100 H2O            (.907)        ________    ________              3.9              ________          (21)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PIPE CHASE        1-FE-67-345        ________            t6 H2O                          NA                                                    15 CLR 1B        1-THV-67-611B      0-50 H2O            (.907)        ________        NA                7.0              ________          (17)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PIPE CHASE        2-FE-67-345                            t6 H2O                          NA                                                    15 CLR 2B        2-THV-67-611B                            (.907)        ________        NA                7.0              ________          (17) 0-50 H2O Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________


1B ERCW RET HDR ISOL Annulus 795/Az 315 OPEN 1-FCV-67-139 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 182 of 204 Checklist 3 (Page 15 of 21)
WBN                 ERCW SYSTEM FLOW BALANCE                   2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 145 of 204 Data Sheet 4 (Page 5 of 13)
SUPPLY HDR 1B VALVE ALIGNMENT
U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____                                              Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device        EDF or              Target          P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                            (Max)
PEN RM CLR        1-FE-67-349        ________            t12 H2O                      ________                                                  12 1B1          1-THV-67-608B      0-100 H2O            (.907)        ________    ________              3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        1-FE-67-353        ________            t12 H2O                      ________                                                  11 1B2          1-THV-67-609B      0-100 H2O            (.907)        ________    ________              3.9              ________          (13)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        1-FE-67-357        ________            t12 H2O                      ________                                                  12 1B3          1-THV-67-610B      0-100 H2O            (.907)        ________    ________              3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        2-FE-67-349        ________            t12 H2O                      ________                                                  12 2B1          2-THV-67-608B      0-100 H2O            (.907)        ________    ________              3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
PEN RM CLR        2-FE-67-353        ________            t12 H2O                      ________                                                  11 2B2          2-THV-67-609B      0-100 H2O            (.907)        ________    ________              3.9              ________          (13)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________


Data Package: Page ____ of ____    Date ________  
WBN                ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 146 of 204 Data Sheet 4 (Page 6 of 13)
U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____                                             Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device        EDF or              Target          P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                            (Max)
PEN RM CLR        2-FE-67-357        ________            t12 H2O                      ________                                                    12 2B3        2-THV-67-610B      0-100 H2O            (.907)        ________    ________              3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
EMER GAS TR        2-FE-67-339        ________            t8 H2O                      ________                                                    10 RM CLR 2B      2-THV-67-685B      0-100 H2O            (.907)        ________    ________              3.9              ________          (11)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
RECIP CHG        1-FE-67-173        ________            t12 H2O                      ________                                                    12 PMP CLR 1C      1-THV-67-640      0-100 H2O            (.907)        ________    ________              3.9              ________          (14)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
ST AIR COMP        0-FIS-67-209                        183-196 gpm                        NA                                                    183 (header)      0-THV-67-632C            NA                (.932)            NA          NA                NA                ________        (196)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
AUX CNTL AIR      2-FE-67-340                            t4 H2O                      ________                                                  3.5 COMP B        2-THV-67-683                              (.910)        ________     ________               1.9              ________        (185) 0-50 H2O Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________


NOMENCLATURE LOCATION POSITION UNID  INITIAL  INITIAL U1 Containment - #2 Fan Rm LWR CNTMT VENT CLR B-B ERCW SUP HDR VENT
WBN                  ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 147 of 204 Data Sheet 4 (Page 7 of 13)
#2 Fan Rm IC/727  Az 152 CLOSED 1-VTV-67-698B CV1-FE-67-474 TEST POINT
U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____                                              Date ________
#2 Fan Rm IC/724  Az 156 CLOSED 1-TV-67-921A CV1-FE-67-474 TEST POINT
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
#2 Fan Rm IC/724  Az 156 CLOSED 1-TV-67-921B CVLWR CNTMT VENT CLR 1B-B ERCW RET HDR VENT #2 Fan Rm IC/725  Az 165 CLOSED 1-VTV-67-699B CVRCP 2 MTR CLR ERCW SUP CNTL #2 Fan Rm IC/725  Az 167 OPERABLE 1-TCV-67-102 CVCONTROL AIR ISOLATION VALVE TO 1-TCV-67-102
Component        Flow Device          EDF or              Target        P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
#2 Fan Rm IC/725  Az 167 OPEN 1-ISV-32-3564 CVLWR CNTMT VENT CLR 1B-B OUT TEMP CNTL
Throttle Valve                                                          (P)
#2 Fan Rm IC/723  Az 168 OPERABLE 1-TCV-67-100 CVCONTROL AIR ISOLATION VALVE TO 1-TCV-67-100  
Gauge #            Multiplier)                                                                              (Max)
#2 Fan Rm IC/723  Az 168 OPEN 1-ISV-32-3563 CVLOWER CNTMT CLR HDR B ERCW RET ISOL
CRDM CLR 1B      1-FE-67-477        ________            t118 H2O                    ________                                                    t124 1-ISV-67-567B      0-200 H2O            (.931)        ________    ________              11.9              ________          (390)
#2 Fan Rm IC/720  Az 171 OPEN 1-FCV-67-103 CVRCP 2 MTR CLR ERCW RET HDR THROTTLE
Steps and calculations performed by (init./date): ___________/_________            Calculations verified by (init./date): ___________/_________
#2 Fan Rm IC/725  Az 171 TI-31.08 1-THV-67-572B CVLOWER CNTMT CLR HDR B ERCW RET TEST CONN #2 Fan Rm IC/720  Az 171 CLOSED 1-TV-67-574B CVLOWER CNTMT CLR HDR ERCW RET VENT
CRDM CLR 1D      1-FE-67-475        ________            t118 H2O                    ________                                                    t124 1-ISV-67-567D      0-200 H2O            (.931)        ________    ________              11.9              ________          (390)
#2 Fan Rm IC/726 Az 171 CLOSED 1-VTV-67-695B CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 183 of 204 Checklist 3 (Page 16 of 21)
Steps and calculations performed by (init./date): ___________/_________            Calculations verified by (init./date): ___________/_________
SUPPLY HDR 1B VALVE ALIGNMENT
U1 RCP MTR      1-FE-67-249        ________            t58 H2O                    ________                                                    110 CLR 2       1-ISV-67-572B      0-100 H2O            (.930)        ________    ________              15.0              ________          (220)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/_________
U1 RCP MTR      1-FE-67-255        ________            t58 H2O                    ________                                                    110 CLR 4        1-ISV-67-572D      0-100 H2O            (.930)        ________    ________              15.0              ________          (220)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/_________
UPPER          1-FI-67-267                          24-25 gpm                        NA                                                      23 CNTMT CLR       1-THV-67-588B                            (.958)        ________        NA                                  ________          (26) 1B Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________


Data Package: Page ____ of ____    Date ________  
WBN                ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 148 of 204 Data Sheet 4 (Page 8 of 13)
U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____                                               Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]              [9]
Component        Flow Device        EDF or              Target        P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                              (Max)
UPPER            1-FI-67-269                          24-25 gpm                        NA                                                      23 CNTMT CLR      1-THV-67-588D                              (.958)        ________        NA                                  ________            (26) 1D Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
LWR CNTMT        1-FE-67-474        ________          t48.75 H2O                    ________                                                    306 CLR 1B        1-ISV-67-564B      0-50 H2O            (.940)        ________    ________              45.3              ________          (1060)
Steps and calculations performed by (init./date): ___________/_________              Calculations verified by (init./date): ___________/_________
LWR CNTMT        1-FE-67-476        ________          t48.75 H2O                    ________                                                    306 CLR 1D        1-ISV-67-564D      0-50 H2O            (.940)        ________    ________              45.3              ________          (1060)
Steps and calculations performed by (init./date): ___________/_________              Calculations verified by (init./date): ___________/_________
CRDM CLR 2B        2-FE-67-477        ________            t118 H2O                    ________                                                    124 2-ISV-67-567B      0-200 H2O            (.931)        ________    ________              11.9              ________          (390)
Steps and calculations performed by (init./date): ___________/_________              Calculations verified by (init./date): ___________/_________
U2 RCP MTR        2-FE-67-249        ________              t58 H2O                    ________                                                    110 CLR 2        2-ISV-67-572B      0-100 H2O              (.930)        ________     ________               15.0              ________          (220)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/_________


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U1 Containment - #2 Fan Rm LOWER CNTMT CLR HDR B ERCW RET ISOL
WBN                ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 149 of 204 Data Sheet 4 (Page 9 of 13)
#2 Fan Rm IC/726  Az 171 0-PI-OPS-17.0 1-ISV-67-1005B CVCRD VENT CLR 1B-B OUT TEMP CNTL
U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____                                              Date ________
#2 Fan Rm IC/727  Az 171 OPERABLE 1-TCV-67-101 CVCONTROL AIR ISOLATION VALVE TO 1-TCV-67-101
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
#2 Fan Rm IC/727  Az 171 OPEN 1-ISV-32-3565 CVLOWER CNTMT CLR HDR B ERCW RET DRAIN
Component        Flow Device        EDF or              Target        P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
#2 Fan Rm IC/716  Az 172 CLOSED (5) 1-DRV-67-773 CVLOWER CNTMT CLR HDR B ERCW SUP DRAIN
Throttle Valve                                                          (P)
#2 Fan Rm IC/716  Az 172 CLOSED (5) 1-DRV-67-774 CVLOWER CNTMT CLR HDR B ERCW SUP ISOL
Gauge #            Multiplier)                                                                              (Max)
#2 Fan Rm IC/720  Az 173 OPEN 1-FCV-67-105 CVLOWER CNTMT CLR HDR B ERCW SUP HDR TEST CONN
U2 RCP MTR        2-FE-67-255        ________            t58 H2O                      ________                                                    110 CLR 4        2-ISV-67-572D      0-100 H2O              (.930)        ________    ________              15.0              ________          (220)
#2 Fan Rm IC/720  Az 173 CLOSED 1-TV-67-563B CVLWR CNTMT VENT CLR 1B-B ERCW SUP HDR THROTTLE #2 Fan Rm IC/726  Az 173 0-PI-OPS-17.0 LT 1-THV-67-564B CVLOWER CNTMT CLR HDR B ERCW SUP ISOL
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/_________
#2 Fan Rm IC/726  Az 173 0-PI-OPS-17.0 LO 1-ISV-67-1004B CV CRD VENT CLR 1B-B ERCW SUP HDR THROTTLE #2 Fan Rm IC/726  Az 353 TI-31.08 1-THV-67-567B CV (5) VERIFY blind flange or threaded cap INSTALLED.  
CRDM CLR 2D        2-FE-67-475        ________            t118 H2O                    ________                                                    124 2-ISV-67-567D      0-200 H2O            (.931)        ________    ________              11.9              ________          (390)
Steps and calculations performed by (init./date): ___________/_________              Calculations verified by (init./date): ___________/_________
INST RM WAT        2-FE-67-259        ________            t65 H2O                      ________                                                    30 CLR 2B          2-ISV-67-527B      0-100 H2O            (.933)        ________    ________                3.9              ________          (200)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
CNTMT SPR          2-FE-67187        ________            t13 H2O                    ________                                                    28 PMP RM CLR       2-THV-67-605B        0-50 H2O            (.895)        ________    ________                8.5              ________          (190) 2B-B Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
CENT CHG          2-FE-67-171        ________            t28 H2O                      ________                                                    25 PMP CLR 2B        2-ISV-67-601B      0-100 H2O            (.904)        ________    ________                5.0              ________          (28)
Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 184 of 204 Checklist 3 (Page 17 of 21)
WBN                 ERCW SYSTEM FLOW BALANCE                   2-PTI-067-02-B Unit 1 & 2                              TRAIN B                    Rev. 0000 Page 150 of 204 Data Sheet 4 (Page 10 of 13)
SUPPLY HDR 1B VALVE ALIGNMENT
U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____                                                Date ________
[1]                [2]              [3]                [4]              [5]          [6]                [7]                  [8]            [9]
Component        Flow Device          EDF or            Target          P( H2O)    Pcorrected                            Flowcorrected  Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)          1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                              (Max)
RHR PMP RM        2-FE-67-191        ________          t30 H2O                      ________                                                    19 CLR 2B-B        2-THV-67-606B      0-100 H2O            (.907)          ________    ________                3.9              ________          (21)
Steps and calculations performed by (init./date): ___________/___________            Calculations verified by (init./date): ___________/___________
SI PMP RM        2-FE-67-183                            t36 H2O                      ________                                                    22 CLR 2B        2-THV-67-604B                            (.914)          ________    ________                3.9              ________          (25) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________          Calculations verified by (init./date): ___________/___________
LWR CNTMT        2-FE-67-474                            t48.75 H2O                    ________                                                    306 CLR 2B        2-ISV-67-564B                              (.940)          ________    ________              45.3              ________          (1060) 0-50 H2O Steps and calculations performed by (init./date): ___________/_________              Calculations verified by (init./date): ___________/_________
LWR CNTMT        2-FE-67-476                            t48.75 H2O                    ________                                                    306 CLR 2D        2-ISV-67-564D                              (.940)          ________    ________              45.3              ________          (1060) 0-50 H2O Steps and calculations performed by (init./date): ___________/_________              Calculations verified by (init./date): ___________/_________


Data Package: Page ____ of ____     Date ________  
WBN                ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                              TRAIN B                  Rev. 0000 Page 151 of 204 Data Sheet 4 (Page 11 of 13)
U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____                                               Date ________
[1]                [2]              [3]                [4]              [5]        [6]                [7]                  [8]            [9]
Component        Flow Device        EDF or              Target          P( H2O)    Pcorrected                            Flowcorrected Acc. Criteria M&TE            Value/(Corr. or Flow(gpm)        1/2              k                (gpm)        Flow (gpm)
Throttle Valve                                                          (P)
Gauge #            Multiplier)                                                                            (Max)
UPPER        2-FI-67-267                            24-25 gpm                        NA CNTMT CLR      2-THV-67-588                              (.958)          ________        NA                                  ________          t23 2B                B                                                                                                                          (26)
Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________
UPPER        2-FI-67-269                            24-25 gpm                        NA                                                    t23 CNTMT CLR      2-THV-67-588                              (.958)          ________        NA                                  ________          (26) 2D                D Steps and calculations performed by (init./date): ___________/___________          Calculations verified by (init./date): ___________/___________


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U1 Containment - #1 Fan Rm CRD VENT CLR 1D-B ERCW SUP HDR THROTTLE
WBN          ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                  TRAIN B                 Rev. 0000 Page 152 of 204 Data Sheet 4 (Page 12 of 13)
#1 Fan Rm IC/726  Az 173 TI-31.08 1-THV-67-567D CVLOWER CNTMT CLR HDR D ERCW RET DRAIN
U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____                            Date ________
#1 Fan Rm IC/718  Az 353 CLOSED 1-DRV-67-771 CVLOWER CNTMT CLR HDR D ERCW SUP DRAIN 
Component UNID            DESCRIPTION                M&TE #       PRESSURE (PSIG) INITIALS 1-VTV-67-534B      CS HX 1B ERCW SUP HDR VT 2-VTV-67-534B      CS HX 2B ERCW SUP HDR VT 1-FE-67-62          ERCW SUP HDR 1B (up strm) 1-FE-67-62          ERCW SUP HDR 1B (dn strm) 2-FE-67-62          ERCW SUP HDR 1B (up strm) 2-FE-67-62          ERCW SUP HDR 1B (dn strm) 0-DRV-67-547        ERCW CCS HX C DR.
#1 Fan Rm IC/718  Az 351 CLOSED 1-DRV-67-772 CVLOWER CNTMT CLR HDR D ERCW RET ISOL
0-TV-67-621B        MCR CHLR B-B ERCW CONN.
#1 Fan Rm IC/720  Az 357 OPEN 1-FCV-67-111 CVLOWER CNTMT CLR HDR D ERCW SUP ISOL
1-TV-67-690B        UCC 1B ERCW SUP TEST CONN 2-TV-67-690B        UCC 2B ERCW SUP TEST CONN 0-TV-67-616B        EBR B ERCW SUP TEST CONN 0-ISV-67-813A      ERCW PMP E-B DISCH PRESS 0-ISV-67-812A      ERCW PMP F-B DISCH PRESS 0-ISV-67-814A      ERCW PMP G-B DISCH PRESS 0-ISV-67-811A      ERCW PMP H-B DISCH PRESS
#1 Fan Rm IC/720  Az 353 OPEN 1-FCV-67-113 CVLOWER CNTMT CLR HDR D ERCW SUP HDR TEST CONN
#1 Fan Rm IC/720  Az 353 CLOSED 1-TV-67-563D CVLOWER CNTMT CLR HDR D ERCW RET TEST CONN
#1 Fan Rm IC/720  Az 351 CLOSED 1-TV-67-574D CVLWR CNTMT VENT CLR 1D-B OUT TEMP CNTL
#1 Fan Rm IC/723  Az 349 OPERABLE 1-TCV-67-108 CVCONTROL AIR ISOLATION VALVE TO 1-TCV-67-108
#1 Fan Rm IC/723  Az 349 OPEN 1-ISV-32-3605 CV1-FE-67-476 TEST POINT
#1 Fan Rm IC/724  Az 336 CLOSED 1-TV-67-922A CV1-FE-67-476 TEST POINT
#1 Fan Rm IC/724  Az 336 CLOSED 1-TV-67-922B CVCRD VENT CLR 1D-B OUT TEMP CNTL
#1 Fan Rm IC/725  Az 351 OPERABLE 1-TCV-67-109 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 185 of 204 Checklist 3 (Page 18 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT


Data Package: Page ____ of ____     Date ________  
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 153 of 204 Data Sheet 4 (Page 13 of 13)
U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____                                 Date ________
Component UNID                DESCRIPTION                M&TE #        PRESSURE (PSIG) INITIALS 1-PI-67-10B          ERCW STRNR 1B-B OUT PRESS 2-PI-67-10B          ERCW STRNR 2B-B OUT PRESS 0-PI-67-17B          ERCW HRD B PRESS 1-PI-67-10A          ERCW STRNR 1B-B SUPPLY PRESS ERCW Strainer DP is recorded below:
Equation                                        Data Entry                            INITIALS 1-PI-67-10A PI-67-10B = DP    _______________ - _______________ = _____________
2-PI-67-10A PI-67-10B = DP    _______________ - _______________ = _____________


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U1 Containment - #1 Fan Rm LWR CNTMT VENT CLR D-B ERCW SUP HDR VENT
WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                        TRAIN B                    Rev. 0000 Page 154 of 204 Data Sheet 5 (Page 1 of 4)
#1 Fan Rm IC/727  Az 332 CLOSED 1-VTV-67-698D CVLOWER CNTMT VENT CLR D-B ERCW RET HDR VENT
TRAIN B THROTTLE VALVE SETPOINTS Data Package: Page ____ of ____                                        Date ________
#1 Fan Rm IC/725  Az 345 CLOSED 1-VTV-67-699D CVRCP 4 MTR CLR ERCW SUP CNTL #1 Fan Rm IC/727  Az 347 OPERABLE 1-TCV-67-110 CVCONTROL AIR ISOLATION VALVE TO 1-TCV-67-110
1.0    APPLICATION Use this data sheet only for the valves adjusted in the flow mode applicable to the subsection of the procedure being performed (i.e. only valves applicable to the Cold Shutdown Mode are completed with Subsection 6.3 Train B Flow Balance Verification for Cold Shutdown Mode.
#1 Fan Rm IC/727  Az 347 OPEN 1-ISV-32-3607 CVCONTROL AIR ISOLATION VALVE TO 1-TCV-67-109
2.0    PROCEDURE
#1 Fan Rm IC/725  Az 351 OPEN 1-ISV-32-3606 CVRCP 4 MTR CLR ERCW RET HDR THROTTLE
[1]    Determine valve throttle position as follows:
#1 Fan Rm IC/725  Az 351 TI-31.08 1-THV-67-572D CVLOWER CNTMT CLR HDR ERCW RET VENT
[2]    Open the valve to the full open stop.
#1 Fan Rm IC/726  Az 351 CLOSED 1-VTV-67-695D CVLOWER CNTMT CLR HDR D ERCW RET ISOL
[3]    Close the valve while counting the number of turns until the flow returns to that previously recorded on the data sheet.
#1 Fan Rm IC/726  Az 351 0-PI-OPS-17.0 1-ISV-67-1005D CVLWR CNTMT VENT CLR 1D-B ERCW SUP HDR THROTTLE #1 Fan Rm IC/726  Az 353 0-PI-OPS-17.0 1-THV-67-564D CVLOWER CNTMT CLR HDR D ERCW SUP ISOL
[4]    Record the number of turns from the full open stop to the desired flow position to the nearest 1/4 turn. DO NOT discount any handwheel movement as valve slack, count ALL turns.
#1 Fan Rm IC/726  Az 353 0-PI-OPS-17.0 1-ISV-67-1004D CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 186 of 204 Checklist 3 (Page 19 of 21)
For plug valves (0-90q travel) record the position to the nearest 15.
SUPPLY HDR 1B VALVE ALIGNMENT
[5]    Close the valve fully.
[6]    Open the valve while counting the number of turns until the flow returns to that previously recorded on the data sheet.
[7]    Record the number of turns from full closed position to the desired flow position to the nearest 1/4 turn. DO NOT discount any handwheel movement as valve slack, count ALL turns.
For plug valves (0-90q travel) record the position to the nearest 15 of rotation.


Data Package: Page ____ of ____    Date ________  
WBN          ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 155 of 204 Data Sheet 5 (Page 2 of 4)
TRAIN B THROTTLE VALVE SETPOINTS Data Package: Page ____ of ____                               Date ________
2.0      PROCEDURE (continued)
Component        Throttle Valve      Mode      Turns From Application Full    Full Open     Closed      Initial/Date AUX CNTRL AIR      2-ISV 67-683      LOCA                      _______/_______
COMP B-B BA TRF & AFW SP      2-THV-67-673B      Normal                      _______/_______
CLR 2B CCS HTX A        1-FCV-67-143      Normal                      _______/_______
CCS HTX C        0-FCV-67-144      Normal                      _______/_______
CCS & AFW PMP SP      1-THV-67-643B      Normal                      _______/_______
CLR 1B CC PMP 1B-B      1-THV-67-601B      Normal                      _______/_______
CSS HTX 1B      1-ISV-67-537B      LOCA                      _______/_______
CSS PMP        1-THV-67-605B      Normal                      _______/______
RM CLR 1B-B CRDM CLR 1B      1-ISV-67-567B      Normal                      _______/______
CRDM CLR 1D      1-ISV-67-567D      Normal                      _______/______
DSL GEN CLR 1B1      1-ISV-67-510B      LOCA                        _______/______
DSL GEN CLR 1B2      1-ISV-67-515B      LOCA                        _______/______
DSL GEN CLR 2B1      2-ISV-67-510B      LOCA                        _______/______
DSL GEN CLR 2B2      2-ISV-67-515B      LOCA                        _______/______
ELEC BD RM A/C B      0-ISV-67-618B      Normal                      _______/______
EGTS RM CLR 2B      2-THV-67-685B      Normal                      _____/________


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U1 Containment UPPER CNTMT VENT CLR 1B ERCW SUP HDR ISOL IC/805  Az 135 (1) OPEN 1-ISV-67-691B CVRCP MTR CLR 2 ERCW IN SUP VENT IC/732  Az 137 CLOSED 1-VTV-67-700B CV UPPER CNTMT VENT CLR 1B ERCW RET HDR ISOL IC/808  Az 143 (1) OPEN 1-ISV-67-583B CV1-FE-67-249 TEST POINT IC/729  Az 143 CLOSED 1-TV-67-863A CV1-FE-67-249 TEST POINT IC/729  Az 143 CLOSED 1-TV-67-863B CV UPPER CNTMT VENT CLR 1B ERCW RET HDR ISOL IC/807  Az 150 (1) OPEN 1-ISV-67-692B CV UPPER CNTMT VENT CLR 1B ERCW SUP HDR TEST CONN IC/808  Az 150 (1) LC & CAPPED 1-TV-67-579B CV UPPER CNTMT VENT CLR 1B ERCW SUP HDR TEST CONN IC/808  Az 150 (1) CLOSED 1-TV-67-581B CV UPPER CNTMT VENT CLR 1B ERCW SUP HDR TEST VENT IC/809  Az 150 (1) CLOSED 1-TV-67-690B CV UPPER CNTMT VENT CLR 1B ERCW RET ISOL IC/807  Az 152 (1) OPEN 1-FCV-67-297 CV UPPER CNTMT VENT CLR 1B ERCW RET HDR TEST VALVE IC/807  Az 152 (1) CLOSED 1-TV-67-1211 CV UPPER CNTMT VENT CLR 1B ERCW RET HDR TEST CONN IC/808  Az 155 (1) CLOSED 1-TV-67-584B CVRCP MTR CLR 2 ERCW RET HDR VENT IC/726  Az 171 CLOSED 1-VTV-67-696B CV1-FE-67-477 TEST POINT IC/730  Az 189 CLOSED 1-TV-67-913 CV1-FE-67-477 TEST POINT IC/730  Az 189 CLOSED 1-TV-67-914 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 187 of 204 Checklist 3 (Page 20 of 21)
WBN          ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 156 of 204 Data Sheet 5 (Page 3 of 4)
SUPPLY HDR 1B VALVE ALIGNMENT
TRAIN B THROTTLE VALVE SETPOINTS Data Package: Page ____ of ____                                Date ________
2.0      PROCEDURE (continued)
Component        Throttle Valve      Mode      Turns From Application Full    Full Open    Closed      Initial/Date INST RM WTR CLR 1B    1-ISV-67-527B      Normal                      _______/______
LWR CNTMT CLR 1B     1-ISV-67-564B      Normal                      _______/______
MCR A/C B        0-ISV-67-623B      Normal                      _______/______
PEN RM CLR 1B1      1-THV-67-608B      Normal                      _______/______
PEN RM CLR 1B2      1-THV-67-609B      Normal                      _______/______
PEN RM CLR 1B3      1-THV-67-610B      Normal                      _______/______
PEN RM CLR 2B1      2-THV-67-608B      Normal                      _______/______
PEN RM CLR 2B2      2-THV-67-609B      Normal                      _______/______
PEN RM CLR 2B3      2-THV-67-610B      Normal                      _______/______
PIPE CHASE CLR 1B     1-THV-67-611B      Normal                      _______/______
PIPE CHASE CLR 2B    2-THV-67-611B      Normal                      _______/______
RCP MTR CLR 1-2      1-ISV-67-572B      Normal                      _______/______
RCP MTR CLR 1-4      1-ISV-67-572D      Normal                      _______/______
RECIP CHG PMP RM      1-THV-67-640      Normal                      _______/______
CLR 1C RHR PMP RM CLR 1B-B      1-THV-606B      Normal                      _______/______
SD BD RM A/C B      2-ISV-67-555      Normal                      _______/______
SFP & TB BSTR PMP    1-THV-67-646B      Normal                      _______/______
CLR 1B


Data Package: Page ____ of ____    Date ________  
WBN          ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 157 of 204 Data Sheet 5 (Page 4 of 4)
TRAIN B THROTTLE VALVE SETPOINTS Data Package: Page ____ of ____                               Date ________
2.0      PROCEDURE (continued)
Component        Throttle Valve      Mode      Turns From Application Full    Full Open     Closed      Initial/Date SI PMP RM CLR 1B    1-THV-67-604B      Normal                      _______/______
UPR CNTMT CLR 1B      1-THV-67-588B      Normal                      _______/______
UPR CNTMT CLR 1D    1-THV-67-588D      Normal                      _______/______
CC PMP 2B-B      2-THV-67-601B      Normal                      _______/______
CSS HTX 2B      2-ISV-67-537B      LOCA                      ________/______
CSS PMP RM CLR 2B-B    2-THV-67-605B      Normal                      _______/______
CRDM CLR 2B      2-ISV-67-567B      Normal                      _____/________
CRDM CLR 2D      2-ISV-67-567D      Normal                      _______/______
INST RM WTR CLR 2B    2-ISV-67-527B      Normal                      _______/______
LWR CNTMT CLR 2B      2-ISV-67-564B      Normal                      _______/______
RCP MTR CLR 2-2      2-ISV-67-572B      Normal                      _______/______
RCP MTR CLR 2-4      2-ISV-67-572D      Normal                      _______/______
RECIP CHG PMP RM      2-THV-67-640      Normal                      _______/______
CLR 2C RHR PMP RM CLR 2B-B    2-THV-67-606B      Normal                      _______/______
SI PMP RM CLR 2B    2-THV-67-604B      Normal                      _______/______
UPR CNTMT CLR 2B      2-THV-67-588B      Normal                      _______/______
UPR CNTMT CLR 2D    2-THV-67-588D      Normal                      _______/______


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U1 Containment UPPER CNTMT VENT CLR 1D ERCW SUP HDR ISOL IC/805  Az 225 (6) OPEN 1-ISV-67-691D CV UPPER CNTMT VENT CLR 1D ERCW RET HDR DRAIN IC/789  Az 300 (7) LC & CAPPED 1-DRV-67-764 CV UPPER CNTMT VENT CLR 1D ERCW SUP HDR DRAIN IC/790  Az 300 (2) LC & CAPPED 1-DRV-67-763 CV UPPER CNTMT VENT CLR 1B ERCW SUP HDR DRAIN IC/793  Az 300 2) LC & CAPPED 1-DRV-67-765 CV UPPER CNTMT VENT CLR 1B ERCW RET HDR DRAIN IC/794  Az 300 (2) LC & CAPPED 1-DRV-67-766 CV UPPER CNTMT VENT CLR 1D ERCW SUP HDR TEST VENT IC/807  Az 318 (1) CLOSED 1-TV-67-690D CVRCP MTR CLR 4 ERCW IN SUP VENT IC/732  Az 319 CLOSED 1-VTV-67-700D CV1-FE-67-255 TEST POINT IC/729  Az 325 CLOSED 1-TV-67-862A CV1-FE-67-255 TEST POINT IC/729  Az 325 CLOSED 1-TV-67-862B CVRCP VENT CLR 4 SUP ERCW HDR DRAIN IC/729  Az 325 CLOSED 1-DRV-67-1001 CV UPPER CNTMT VENT CLR 1D ERCW RET HDR ISOL IC/808  Az 325 (1) OPEN 1-ISV-67-583D CV UPPER CNTMT VENT CLR 1D ERCW RET HDR ISOL IC 807  Az 330 (1) OPEN 1-ISV-67-692D CV UPPER CNTMT VENT CLR 1D ERCW SUP HDR TEST CONN IC/808  Az 330 (1) LC & CAPPED 1-TV-67-579D CV UPPER CNTMT VENT CLR 1D ERCW SUP HDR TEST CONN IC/808  Az 330 (1) CLOSED 1-TV-67-581D CV UPPER CNTMT VENT CLR 1D ERCW RET ISOL IC/807  Az 332 (1) OPEN 1-FCV-67-298 CV UPPER CNTMT VENT CLR 1D ERCW RET HDR TEST VALVE IC/807  Az 332 (1) CLOSED 1-TV-67-1213 CV (6) Top of S/G doghouse. (7) Next to spiral staircase.
WBN              ERCW SYSTEM FLOW BALANCE    2-PTI-067-02-B Unit 1 & 2                    TRAIN B          Rev. 0000 Page 158 of 204 Data Sheet 6 (Page 1 of 2)
PUMP DATA -U1 COLD SHUTDOWN, U-2 LOCA-RECIRC Data Package: Page ____ of ____                            Date ________
Location /Component        Instrument        M&TE#        Reading    Range/Accuracy                Initial/Date Header Flow Elem P        1-FE-67-62        ________  ________  H2O  200 H2O/r1%              ________/________
2-FE-67-62        ________  ________  H2O  200 H2O/r1%              ________/________
Discharge Pressures at      0-PI-67-48B (Pump E)      ________ psig  200 psig/r4 psig ERCW Pumps                                                                                    ________/________
NA data for pumps NOT        0-PI-67-52B (Pump F)       ________ psig  200 psig/r4 psig          ________/________
running 0-PI-67-56B (Pump G)       ________ psig  200 psig/r4 psig          ________/________
0-PI-67-60B (Pump H)       ________ psig  200 psig/r4 psig          ________/________
Header Pressure        0-PI-67-17B                  ________ psig  200 psig/r4 psig          ________/________
Strainer 1B-B Outlet      1-PI-67-10B                  ________ psig  200 psig/r1.75%            ________/________
Strainer 2B-B Outlet      2-PI-67-10B      ________  ________ psig  200 psig/r2 psig          ________/________
Strainer 1B-B & 2B-B                                  ________  H2O  100  H2O/r1%            ________/________
Backwash Flow


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 188 of 204 Checklist 3 (Page 21 of 21)
WBN             ERCW SYSTEM FLOW BALANCE         2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 159 of 204 Data Sheet 6 (Page 2 of 2)
SUPPLY HDR 1B VALVE ALIGNMENT
PUMP DATA -U1 COLD SHUTDOWN, U-2 LOCA-RECIRC Data Package: Page ____ of ____                              Date ________
Location /Component      Instrument        M&TE#        Reading          Range/Accuracy      Initial/Date Aux Bldg HDR        1-FE-67-62 Inlet  ________  ________ psig        200 psig/r2 psig ________/________
pressures at flow elements 1-FE-67-62 Outlet  ________  ________ psig          200 psig/r1%  ________/________
2-FE-67-62 Inlet  ________  ________ psig          200 psig/r1%  ________/________
2-FE-67-62 Outlet  ________  ________ psig          200 psig/r1%  ________/________
CCS HTX C          0-DRV-67-547      ________  ________ psig          200 psig/r1%  ________/________
CCS HTX A          1-DRV-67-547      ________  ________ psig          200 psig/r1%  ________/________
MCR A/C          0-TV-67-621B      ________  ________ psig          200 psig/r1%  ________/________
Air Compr HDR       0-VTV-67-625B      ________  ________ psig          200 psig/r1%  ________/________
UCV            1-TV-67-690B      ________  ________ psig          200 psig/r1%  ________/________
EBR A/C          0-VTV-67-614B      ________  ________ psig          200 psig/r1%  ________/________
Disch HDR Vent      1-VTV-67-947B      ________  ________ psig          200 psig/r1%  ________/________


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE      2-PTI-067-02-B Unit 1 & 2                    TRAIN B          Rev. 0000 Page 160 of 204 Data Sheet 7 (Page 1 of 2)
PUMP DATA - U1 LOCA-RECIRC, U-2 COLD SHUTDOWN Data Package: Page ____ of ____                             Date ________
Location /Component        Instrument        M&TE#        Reading      Range/Accuracy                  Initial/Date Header Flow Elem P        1-FE-67-62        ________  ________  H2O      200 psig/r1%            ________/________
2-FE-67-62        ________  ________  H2O      200 psig/r1%            ________/________
Discharge Pressures at      0-PI-67-48B (Pump E)      ________ psig    200 psig/r4 psig ERCW Pumps                                                                                      ________/________
NA pumps NOT running        0-PI-67-52B (Pump F)      ________ psig    200 psig/r4 psig          ________/________
0-PI-67-56B (Pump G)      ________ psig    200 psig/r4 psig          ________/________
0-PI-67-60B (Pump H)      ________ psig    200 psig/r4 psig          ________/________
Header Pressure        0-PI-67-17B                200 psig/r4 psig  200 psig/r4 psig          ________/________
Strainer 1B-B Outlet      1-PI-67-10B                  ________ psig    200 psig/r1.75%            ________/________
Strainer 2B-B Outlet      2-PI-67-10B      ________  ________ psig    200 psig/r2 psig          ________/________
Strainer 1B-B & 2B-B Backwash Flow                                      ________  H2O                              ________/________
100  H2O/r1%


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U1 Containment RCP MTR CLR 4 ERCW RET HDR VENT IC/726  Az 351 CLOSED 1-VTV-67-696D CV1-FE-67-475 TEST POINT IC/720  Az 351 CLOSED 1-TV-67-911 CV1-FE-67-475 TEST POINT IC/720  Az 351 CLOSED 1-TV-67-912 CV CRD VENT CLR D-B RET ERCW HDR DRAIN IC/720  Az 351 CLOSED 1-DRV-67-999 CV CRD VENT CLR D-B SUP ERCW HDR DRAIN IC/726  Az 353 CLOSED 1-DRV-67-997 CV UPPER CNTMT VENT CLR 1D ERCW RET HDR TEST CONN IC/808  Az 355 (8) CLOSED 1-TV-67-584D CV (8) Top of S/G doghouse.
WBN              ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 161 of 204 Data Sheet 7 (Page 2 of 2)
PUMP DATA - U1 LOCA Data Package: Page ____ of ____                              Date ________
Location /Component      Instrument      M&TE#        Reading          Range/Accuracy      Initial/Date Aux Bldg HDR           1-FE-67-62 Inlet  ________  ________ psig        200 psig/r2 psig ________/________
pressures at flow elements 1-FE-67-62 Outlet  ________  ________ psig          200 psig/r1%  ________/________
2-FE-67-62 Inlet  ________  ________ psig          200 psig/r1%  ________/________
2-FE-67-62 Outlet  ________  ________ psig          200 psig/r1%  ________/________
CCS HTX C                0-DRV-67-547      ________  ________ psig          200 psig/r1%  ________/________
CCS HTX A                1-DRV-67-547      ________  ________ psig          200 psig/r1%  ________/________
MCR A/C                  0-TV-67-621B      ________  ________ psig          200 psig/r1%  ________/________
Air Compr HDR           0-VTV-67-625B      ________  ________ psig          200 psig/r1%  ________/________
UCV                      1-TV-67-690B      ________  ________ psig          200 psig/r1%  ________/________
EBR A/C                0-VTV-67-614B      ________  ________ psig          200 psig/r1%  ________/________
Disch HDR Vent          1-VTV-67-947B      ________  ________ psig          200 psig/r1%  ________/________


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 189 of 204 Checklist 4 (Page 1 of 16)
WBN             ERCW SYSTEM FLOW BALANCE               2-PTI-067-02-B Unit 1 & 2                    TRAIN B                    Rev. 0000 Page 162 of 204 Checklist 1 (Page 1 of 1)
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____     Date ________
SUPPLY HEADER 2B POWER ALIGNMENT Data Package: Page ____ of ____                                     Date ________
NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL IPS el 722 ERCW STRAINER 2B-B INLET ISOL IPS/722 0-PI-OPS-17.0 LO 2-FCV-67-24 CVERCW STRAINER 2B-B OUT ISOL IPS/722 0-PI-OPS-17.0 LO 2-ISV-67-505B CV ERCW B TRAIN HDR CROSSTIE ISOL IPS/722 CLOSED 2-ISV-67-1120 CVERCW CROSS-TIE HEADER DRAIN IPS/722 CLOSED 2-DRV-67-1126 CV2-PDT-67-10A/10D/10F &
NOMENCLATURE         LOCAT      POSITION           UNID         PERF       VERIF ION                                      INITIAL     INITIAL C&A Vent Bd 2B1-B ERCW STRAINER 2B-B           C/6B          ON        2-BKR-67-10B/1 (2-STR-67-10)                                                                            CV ERCW STR 2B-B FLUSH          C/6E          ON        2-BKR-67-10B/2 (2-FCV-67-10B)                                                                          CV ERCW STR 2B-B BACKWASH      C/4E          ON        2-BKR-67-10A (2-FCV-67-10A)                                                                          CV Rx MOV Bd 2A2-A CCS HX B OUT ERCW FLOW      C/15A    0-PI-OPS-17.1    2-BKR-67-143 CNTL BYP (2-FCV-67-143)
2-PI-67-10A ROOT IPS/722 OPEN 2-RTV-67-901A CV2-PDT-67-10A/2-PI-67-10B ROOT IPS/722 OPEN 2-RTV-67-902A CVERCW STRAINER 2B-B VENT IPS/722 CLOSED  2-VTV-67-907B CV2-PDT-67-10F ROOT IPS/722 OPEN  2-RTV-67-925A CV2-PDT-67-10D ROOT IPS/722 OPEN  2-RTV-67-926A CVERCW STRAINER 2B-B
OFF AND LOCKED                                          CV Rx MOV Bd 2B2-B ERCW STRAINER 2B-B IN ISOL   C/8A    0-PI-OPS-17.1    2-BKR-67-24 (2-FCV-67-24)
OFF AND LOCKED                                          CV AB ERCW SUP HDR 2B ISOL     C/8B    0-PI-OPS-17.1    2-BKR-67-82 (2-FCV-67-82)
OFF AND LOCKED                                          CV CCS HX C ERCW HDR 2B SUP    C/13A    0-PI-OPS-17.1    2-BKR-67-147 ISOL (2-FCV-67-147)
OFF AND LOCKED                                          CV CCS HX C OUT ERCW HDR B      C/12B          ON        0-BKR-67-152 FLOW CNTL (0-FCV-67-152)                                                                CV AB AIR CLR ERCW SUP          C/11A    0-PI-OPS-17.1    2-BKR-67-128 HDR 2B ISOL (2-FCV-67-128)
OFF AND LOCKED                                          CV Diesel Aux Bd 1A2-A DG HX 1A1/1A2 ERCW HDR 2B    C/3A          ON          1-BKR-67-68 ISOL (1-FCV-67-68)                                                                      CV Diesel Aux Bd 2A2-A DG HX 2A1/2A2 ERCW HDR 2B    C/3A          ON          2-BKR-67-68 ISOL (2-FCV-67-68)                                                                      CV


BACKWASH IPS/722 CLOSED 2-FCV-67-10A CVERCW STRAINER 2B-B FLUSH IPS/722 CLOSED 2-FCV-67-10B CV Yard el 729 ERCW HDR 2B BACKWASH ISOL YARD 0-PI-OPS-17.0 LC 2-ISV-67-506B CVDG 1A-A/2A-A ERCW SUP HDR 2B ISOL YARD 0-PI-OPS-17.0 LO 2-ISV-67-507B CV2-FT-67-62/2-FT-67-62C ROOT YARD OPEN  2-RTV-67-802A CV2-FT-67-62/2-FT-67-62C ROOT YARD OPEN  2-RTV-67-802B CVDG Bldg DG HX 1A1/1A2 ERCW SUP HDR 2B ISOL DGB RM 1AA CLOSED 1-FCV-67-68 CV DG HX 2A1/2A2 ERCW SUP HDR 2B ISOL DGB RM 2AA CLOSED 2-FCV-67-68 CVDG 2A-A FLUSH CONNECTION FOR ERCW HDR 2B DGB RM 2AA CLOSED 2-FLV-67-651A (1) CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 190 of 204 Checklist 4 (Page 2 of 16)
WBN              ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                        TRAIN B                      Rev. 0000 Page 163 of 204 Checklist 2 (Page 1 of 5)
SUPPLY HDR 2B VALVE ALIGNMENT
B - TRAIN POWER CHECKLIST Data Package: Page ____ of ____                                          Date ________
NOTES
: 1)  Alignment assumes IPS and main headers into Aux Bldg are currently aligned and in service. This particular checklist is only for electrical power to valves needed to conduct 2-PTI-067-02-B.
: 2)  Inside and outside containment isolation valves are both A and B train valves. This checklist contains B Tr. power supplies necessary to establish the desired flowpath.
NOMENCLATURE            LOCATION      POSITION          UNID        PERF        VERIF INITIAL    INITIAL Diesel Aux Bd 1B1/1B2 DG HX 1B1-B ERCW HDR 1B          C/3A        CLOSED         1-BKR-67-67 ISOL (1-FCV-67-67)                                                                              CV DG HX 1B2-A ERCW HDR 2A          C/3A        CLOSED        1-BKR-67-65 SUPPLY (1-FCV-67-65)                                                                            CV Diesel Aux Bd 2B1/2B2 DG HX 2B1/2B2 ERCW HDR 1B        C/3A        CLOSED        2-BKR-67-67 ISOL (2-FCV-67-67)                                                                              CV DG HX 2B2-A ERCW HDR 2A          C/3A        CLOSED        2-BKR-67-65 SUPPLY (2-FCV-67-65)                                                                            CV Rx MOV Bd 1A2-A LWR CNTMT 1B CLR E SUP            C/9A            ON          1-BKR-67-99 (1-FCV-67-99)                                                                                  CV LWR CNTMT 1B CLR ERCW            C/9B            ON        1-BKR-67-104 RETURN (1-FCV-67-104)                                                                          CV LWR CNTMT 1D CLR E SUP            C/8D            ON        1-BKR-67-107 (1-FCV-67-107)                                                                                  CV LWR CNTMT CLR 1D DISCH          C/10A            ON        1-BKR-67-112 (1-FCV-67-112)                                                                                 CV UPPER CNTMT VT CLR 1B            C/9F            ON        1-BKR-67-139 ERCW RET (1-FCV-67-139)                                                                         CV


Data Package: Page ____ of ____     Date ________  
WBN            ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                  TRAIN B                Rev. 0000 Page 164 of 204 Checklist 2 (Page 2 of 5)
B - TRAIN POWER CHECKLIST Data Package: Page ____ of ____                               Date ________
NOMENCLATURE        LOCATION    POSITION        UNID      PERF        VERIF INITIAL    INITIAL UPPER CNTMT VT CLR 1D        C/10F        ON      1-BKR-67-142 ERCW RET (1-FCV-67-142)                                                            CV Rx MOV Bd 1B2-B CNTMT SPRAY HX 1A-A ERCW      C/5E        ON      1-BKR-67-123 IN (1-FCV-67-123)                                                                  CV CNTMT SPRAY HX 1A-A ERCW      C/5F        ON      1-BKR-67-124 OUT (1-FCV-67-124)                                                                  CV AB AIR CLR ERCW SUP          C/11A        ON      1-BKR-67-128 HDR 1B ISOL (1-FCV-67-128)                                                          CV UPPER CNTMT VT CLR 1B        C/11B        ON      1-BKR-67-138 ERCW SUP (1-FCV-67-138)                                                            CV STA AIR COMPR ERCW SUP      C/12B        ON      0-BKR-67-208 HDR 1A (0-FCV-67-208)                                                              CV LWR CNTMT 1B CLR ERCW        C/7D        ON      1-BKR-67-103 RETURN(1-FCV-67-103)                                                                CV UPPER CNTMT VT CLR 1D        C/10F        ON      1-BKR-67-141 ERCW SUP (1-FCV-67-141)                                                            CV UPPER CNTMT VT CLR 1D        C/10D        ON      1-BKR-67-298 ERCW RET (1-FCV-67-298)                                                            CV UPPER CNTMT VT CLR 1B        C/9D        ON      1-BKR-67-297 ERCW RET (1-FCV-67-297)                                                            CV LWR CNTMT CLR HDR 1D        C/5C        ON      1-BKR-67-113 ERCW SUP (1-FCV-67-113)                                                            CV LWR CNTMT 1D CLR ERCW        C/8D        ON      1-BKR-67-111 RETURN (1-FCV-67-111)                                                              CV ERCW DISCH HDR B CT ISOL    C/12A        ON      0-BKR-67-362 (0-FCV-67-362)                                                                      CV


NOMENCLATURE LOCATIONPOSITION UNID PERF INITIAL VERIFIER INITIAL DG 1A-A FLUSH CONNECTION FOR ERCW HDR 2B DGB RM 1AA CLOSED 1-FLV-67-651A (1)  CVAux Bldg el 676 RHRP ROOM COOLER 2B-B ERCW SUP FLOW CNTL A7V/676 OPEN 2-FCV-67-190 CVRHR PMP RM CLR 2B-B ERCW RET THROTTLE A7V/676 OPEN 2-THV-67-606B CV2-FE-67-191 TEST POINT A9V/682 CLOSED 2-TV-67-882A CV2-FE-67-191 TEST POINT A9V/682 CLOSED 2-TV-67-882A CV CS PMP RM CLR 2A-A ERCW RET THROTTLE A9U/679 CLOSED 2-THV-67-605B CV2-FE-67-187 TEST POINT A9U/681 CLOSED 2-TV-67-881A CV2-FE-67-187 TEST POINT A9U/681 CLOSED 2-TV-67-881B CVCSP ROOM COOLER 2B-B ERCW SUP FLOW CNTL A7U/676 CLOSED 2-FCV-67-186 CVAux Bldg el 692 ERCW SUP HDR 2B DRAIN  A15U/706 CLOSED 2-DRV-67-925B CVPIPE CHASE COOLER 2B-B ERCW RET THROTTLE A14U/692 0-PI-OPS-17.0 LT 2-THV-67-611B CVPIPE CHASE COOLER 2B-B ERCW SUP FLOW CNTL A14U/692 0-PI-OPS-17.0 LO (1)2-FCV-67-344 CVCONTROL AIR ISO VLV TO 2-FCV-67-344 A14U/692 0-PI-OPS-17.0 LC 2-ISV-32-3805 CVPENT ROOM COOLER 2B-B ERCW SUP FLOW CNTL A12V/692 0-PI-OPS-17.0 LO (1)2-FCV-67-348 CVCONTROL AIR ISO VLV TO 2-FCV-67-348 A12U/692 0-PI-OPS-17.0 LC 2-ISV-32-2964 CV2-FE-67-349 TEST POINT A12V/692 CLOSED 2-TV-67-883A CV2-FE-67-349 TEST POINT A12V/692 CLOSED 2-TV-67-883B CV2-FE-67-345 TEST POINT A14U/692 CLOSED 2-TV-67-886A CV2-FE-67-345 TEST POINT A14U/692 CLOSED 2-TV-67-886B CVPENT ROOM COOLER 2B-B ERCW RET THROTTLE A12V/702 0-PI-OPS-17.0 LT 2-THV-67-608B CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 191 of 204 Checklist 4 (Page 3 of 16)
WBN            ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                  TRAIN B                Rev. 0000 Page 165 of 204 Checklist 2 (Page 3 of 5)
SUPPLY HDR 2B VALVE ALIGNMENT
B - TRAIN POWER CHECKLIST Data Package: Page ____ of ____                              Date ________
NOMENCLATURE       LOCATION    POSITION        UNID       PERF       VERIF INITIAL     INITIAL LWR CNTMT 2B CLR SUP ISOL    C/11D        ON      1-BKR-67-105 (1-FCV-67-105)
Rx MOV Bd 2A2-A ERCW DISCH HDR A CT ISOL    C/13B        ON      0-BKR-67-360 (0-FCV-67-360)                                                                      CV LWR CNTMT 2B CLR ERCW        C/7D        ON      2-BKR-67-104 RETURN (2-FCV-67-104)                                                              CV LWR CNTMT CLR 1D DISCH      C/10A        ON      2-BKR-67-112 (2-FCV-67-112)                                                                      CV LWR CNTMT CLR 1D DISCH        C/9F        ON      2-BKR-67-139 (2-FCV-67-139)                                                                      CV UPPER CNTMT VT CLR 2D        C/10F        ON      2-BKR-67-142 ERCW RET (2-FCV-67-142)                                                            CV Rx MOV Bd 2B2-B CNTMT SPRAY HX 1A-A ERCW     C/5E        ON      2-BKR-67-123 IN (2-FCV-67-123)                                                                  CV CNTMT SPRAY HX 1A-A ERCW     C/5F        ON      2-BKR-67-124 OUT (2-FCV-67-124)                                                                  CV LWR CNTMT 2B CLR SUP ISOL    C/10A        ON      2-BKR-67-99 (2-FCV-67-99)                                                                      CV LWR CNTMT A CLR ERCW        C/7D        ON      2-BKR-67-103 RETURN (2-FCV-67-103)                                                              CV LWR CNTMT 2D CLR SUP ISOL    C/10B        ON      2-BKR-67-107 (2-FCV-67-107)                                                                      CV LWR CNTMT 2D CLR ERCW       C/8D        ON      2-BKR-67-111 RETURN (2-FCV-67-111)                                                               CV


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE                      2-PTI-067-02-B Unit 1 & 2                        TRAIN B                        Rev. 0000 Page 166 of 204 Checklist 2 (Page 4 of 5)
B - TRAIN POWER CHECKLIST Data Package: Page ____ of ____                                               Date ________
NOMENCLATURE            LOCATION        POSITION            UNID            PERF        VERIF INITIAL      INITIAL UPPER CNTMT VT CLR 2B              C/9D          ON          2-BKR-67-297 ERCW RET (2-FCV-67-297)                                                                                CV UPPER CNTMT VT CLR 2B              C/9F          ON          2-BKR-67-138 ERCW SUP (2-FCV-67-138)                                                                                CV UPPER CNTMT VT CLR 1D            C/10D          ON          2-BKR-67-298 ERCW RET (2-FCV-67-298)                                                                                CV UPPER CNTMT VT CLR 1D            C/10F          ON          2-BKR-67-141 ERCW SUP (2-FCV-67-141)                                                                                CV AB AIR CLR ERCW SUP              C/11A          ON          2-BKR-67-128 HDR 1B ISOL (2-FCV-67-128)                                                                            CV LWR CNTMT 2B CLR SUP ISOL        C/11B          ON          2-BKR-67-105 (2-FCV-67-105)                                                                                        CV LWR CNTMT 2D CLR SUP ISOL          C/5C          ON          2-BKR-67-113 (2-FCV-67-113)                                                                                        CV ERCW FCV for each ESF room cooler is powered from that cooler's control circuit and opens by de-energizing the FSV, EXCEPT for 67-170 (CCP) and FCV-67-190 (RHRP) which are de-energized OPEN for Appendix R.
C & A VENT Bd 1B1-B RHR PUMP RM CLR                    C/9A          OFF          1-BKR-30-176 1-PMCL-30-176                                                                                          CV CS PUMP RM CLR                    C/3C          ON          1-BKR-30-178 1-PMCL-30-178                                                                                          CV SIS PUMP RM CLR                    C/8A          OFF          1-BKR-30-179 1-PMCL-30-179                                                                                          CV CCP 1B-B PMP RM CLR              C/10A          OFF          1-BKR-30-182 1-PMCL-30-182                                                                                          CV


NOMENCLATURE LOCATIONPOSITION UNID PERF INITIAL VERIFIER INITIAL PENT/PIPE CHASE RM CLR ERCW SUP HDR 2B ISOL A8V/703 0-PI-OPS-17.0 LO 2-ISV-67-607B CVPENT/PIPE CHASE RM CLR ERCW RET HDR 2B ISOL A8V/703 0-PI-OPS-17.0 LO 2-ISV-67-612B CVAUX BLDG ERCW SUP HDR 2B ISOL A15U/706 0-PI-OPS-17.0 LO 2-FCV-67-82 CVCVCS CCP ROOM CLR 2B-B ERCW SUP ISOL A12T/695 OPEN 2-ISV-67-600B CVAux Bldg el 692 CVCS CCP ROOM CLR 2B-B ERCW RET ISOL A12T/695 OPEN 2-ISV-67-602B CVSIS PMP RM CLR 2B-B ERCW RET THROTTLE A7V/696 CLOSED 2-THV-67-604B CV2-FE-67-183 TEST POINT A7V/692 CLOSED 2-TV-67-880A CV2-FE-67-183 TEST POINT A7V/692 CLOSED 2-TV-67-880A CVSIP ROOM COOLER 2B-B ERCW SUP FLOW CNTL A7V/692 CLOSED 2-FCV-67-182 CVINSTR RM WATER CLR 2B ERCW SUP ISOL A2U/692 OPEN 2-ISV-67-524B CVINSTR RM WATER CLR 2B ERCW SUP ISOL A5W/697 OPEN 2-ISV-67-710B CVINSTR RM WATER CLR 2B ERCW SUP TEMP CNTL A11W/693 OPEN 2-TCV-67-118 CVINSTR RM WATER CLR 2B ERCW IN TEST CONN A5W/692 CLOSED 2-TV-67-525B CVINSTR RM WATER CLR 2B ERCW OUT TEST CONN A5W/692 CLOSED 2-TV-67-526B CV2-FE-67-259 TEST POINT A12W/708 CLOSED 2-RTV-67-861A CV2-FE-67-259 TEST POINT A12W/708 CLOSED 2-RTV-67-861B CVINSTR RM WATER CLR 2B ERCW RET THROTTLE A4W/692 OPEN 2-THV-67-527B CVINSTR RM WATER CLR 2B ERCW RET ISOL A11W/692 OPEN 2-ISV-67-530B CVLOWER CNTMT CLR HDR B ERCW RET TEST CONN A2U/692 CLOSED 2-TV-67-576B CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 192 of 204 Checklist 4 (Page 4 of 16)
WBN          ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                 TRAIN B                   Rev. 0000 Page 167 of 204 Checklist 2 (Page 5 of 5)
SUPPLY HDR 2B VALVE ALIGNMENT
B - TRAIN POWER CHECKLIST Data Package: Page ____ of ____                                  Date ________
NOMENCLATURE      LOCATION      POSITION        UNID      PERF        VERIF INITIAL    INITIAL C & A VENT Bd 2B1-B RHR PUMP RM CLR             C/9A          OFF        2-BKR-30-176 2-PMCL-30-176                                                                        CV CS PUMP RM CLR             C/3C          ON        2-BKR-30-178 2-PMCL-30-178                                                                        CV SIS PUMP RM CLR             C/8A          OFF        2-BKR-30-179 2-PMCL-30-179                                                                        CV CCP 1A-A PMP RM CLR         C/10A        OFF        2-BKR-30-182 2-PMCL-30-182                                                                        CV


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                      TRAIN B                Rev. 0000 Page 168 of 204 Checklist 3 (Page 1 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                   Date ________
NOMENCLATURE          LOCATION      POSITION        UNID        PERF    VERIFIER INITIAL    INITIAL IPS el 722 ERCW STRAINER 1B-B          IPS/722        CLOSED      1-FCV-67-10A BACKWASH                                                                                CV ERCW STRAINER 1B-B          IPS/722        CLOSED      1-FCV-67-10B FLUSH CONTROL                                                                          CV ERCW STRAINER 1B-B          IPS/722    0-PI-OPS-17.0  1-FCV-67-24 INLET ISOL                                    LO                                        CV ERCW STRAINER 1B-B          IPS/722    0-PI-OPS-17.0 1-ISV-67-505B OUT ISOL                                      LO                                        CV ERCW B TRAIN HDR            IPS/722        CLOSED    1-ISV-67-1118 CROSSTIE ISOL                                                                          CV ERCW CROSS-TIE              IPS/722        CLOSED    1-VTV-67-1125 HEADER VENT.                                                                            CV ERCW CROSS-TIE              IPS/722        CLOSED    1-DRV-67-1124 HEADER DRAIN                                                                            CV 1-PDT-67-10A/10D/10F &      IPS/722        OPEN      1-RTV-67-901A 1-PI-67-10A ROOT                                                                        CV 1-PDT-67-10A/1-PI-67-10B    IPS/722        OPEN      1-RTV-67-902A ROOT                                                                                    CV ERCW STRAINER 1B-B          IPS/722        CLOSED    1-VTV-67-907B VENT                                                                                    CV 1-PDT-67-10F ROOT          IPS/722        OPEN      1-RTV-67-925A                    CV 1-PDT-67-10D ROOT          IPS/722        OPEN      1-RTV-67-926A                    CV YARD 1-FT-67-62/1-FT-67-62C      U-1 PIPE        OPEN      1-RTV-67-802A ROOT                        TUNNEL                                                      CV 1-FT-67-62/1-FT-67-62C      U-1 PIPE        OPEN      1-RTV-67-802B ROOT                        TUNNEL                                                      CV ERCW SPARE                  YARD          CLOSED      2-ISV-67-984                    CV ERCW SPARE                  YARD          CLOSED      2-ISV-67-985                    CV ERCW DISCH HDR B          North of U2  POSITION AS    0-FCV-67-362 COOLING TOWER ISOL          RWST          NEEDED                                      CV ERCW HDR 1B                  YARD      0-PI-OPS-17.0 1-ISV-67-506B BACKWASH ISOL                                                                          CV DG 1B-B ERCW SUP HDR        YARD      0-PI-OPS-17.0 1-ISV-67-507C ISOL                                                                                    CV DG 2B-B ERCW SUP HDR        YARD      0-PI-OPS-17.0 1-ISV-67-507D ISOL                                                                                    CV


NOMENCLATURE LOCATIONPOSITION UNID PERF INITIAL VERIFIER INITIAL LOWER CNTMT CLR HDR D ERCW RET TEST CONN A14U/692 CLOSED 2-TV-67-576D CVLOWER CNTMT CLR HDR B ERCW SUP HDR TEST CONN A2U/692 CLOSED 2-TV-67-560B CVLOWER CNTMT CLR HDR D ERCW SUP HDR TEST CONN A14U/692 CLOSED 2-TV-67-560D CV2-FI-67-245 ROOT A1U/692 OPEN 2-RTV-67-847A CV2-FI-67-245 ROOT A1U/692 OPEN 2-RTV-67-847B CV2-FI-67-251 ROOT A2U/692 OPEN 2-RTV-67-845A CV2-FI-67-251 ROOT A2U/692 OPEN 2-RTV-67-845B CVLOWER CNTMT CLR HDR B ERCW RET TEST CONN A2U/692 CLOSED 2-TV-67-576B CVLOWER CNTMT CLR HDR D ERCW RET TEST CONN A14U/692 CLOSED 2-TV-67-576D CVLOWER CNTMT VENT CLR 2B & 2D ERCW SUP ISOL A2U/692 OPEN 2-ISV-67-523B CVERCW FLOOD MODE RET HDR B ISOL A14V/692 CLOSED 0-ISV-67-528B CVBIOCIDE RECIRC ERCW HDR 2B ISOL A4T/695 CLOSED 2-ISV-67-715B CVCVCS PDP RM CLR 2C ERCW SUP ISOL A11T/692 OPEN 2-ISV-67-639 CVCVCS PDP RM CLR 2B-B ERCW RET ISOL A11T/692 OPEN 2-ISV-67-641 CVSIS/CS/RHR PMP RM CLR ERCW RET
WBN          ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 169 of 204 Checklist 3 (Page 2 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                Date ________
NOMENCLATURE       LOCATION      POSITION          UNID         PERF   VERIFIER INITIAL   INITIAL DG Bldg el 742 1-FT-67-74 ROOT            RM 1BB        OPEN      1-RTV-67-825A                    CV 1-FI-67-74 ROOT            RM 1BB        OPEN      1-RTV-67-825B                    CV 1-FI-67-280 ROOT          RM 1BB        OPEN      1-RTV-67-826A                    CV 1-FI-67-280 ROOT          RM 1BB        OPEN      1-RTV-67-826B                    CV DG 1B-B OUT ERCW HDR       RM 1BB        CLOSED      1-VTV-67-983 VENT                                                                                  CV DG HX 1B1 ERCW DRAIN      RM 1BB        CLOSED     1-DRV-67-981B                    CV DG HX 1B2 ERCW DRAIN      RM 1BB        CLOSED     1-DRV-67-980B                    CV DG HX 2B2 ERCW DRAIN      RM 2BB        CLOSED     2-DRV-67-980B                    CV 2-FI-67-74 ROOT           RM 2BB        OPEN       2-RTV-67-825A                    CV 2-FI-67-74 ROOT           RM 2BB        OPEN       2-RTV-67-825B                    CV 2-FI-67-280 ROOT           RM 2BB        OPEN       2-RTV-67-826A                    CV 2-FI-67-280 ROOT           RM 2BB        OPEN       2-RTV-67-826B                    CV DG HX 2B1 ERCW DRAIN      RM 2BB      CLOSED       2-DRV-67-981B                    CV DG 2B-B HX ERCW OUT HDR   RM 2BB        CLOSED       2-VTV-67-983 VENT                                                                                 CV DG HX 1B1/1B2 ERCW SUP     DGB/742      CLOSED      1-FCV-67-67 HDR 1B ISOL                                                                           CV DG HX 1B1 ERCW OUT        DGB/742    0-PI-OPS-17.0  1-THV-67-510B THROTTLE                                    LT                                        CV DG HX 1B1/1B2 ERCW        DGB/742    0-PI-OPS-17.0  1-ISV-67-511B DISCH HDR B ISOL                           LO                                        CV DG HX 1B2 ERCW OUT        DGB/742    0-PI-OPS-17.0  1-THV-67-515B THROTTLE                                    LT                                        CV DG HX 1B1/1B2 ERCW        DGB/742    0-PI-OPS-17.0  1-ISV-67-516A DISCH HDR A ISOL                            LO                                        CV DG HX 1B1/1B2 ERCW        DGB/742    0-PI-OPS-17.0 1-THV-67-8021 DISCH HDR THROTTLE                          LT                                        CV DG HX 1B2 SUP VENT        DGB/742      CLOSED     1-VTV-67-518B                    CV DG HX 1B1 ERCW SUP VENT    DGB/742      CLOSED      1-VTV-67-519B                    CV ERCW HDR 2A/2B FLUSH      DGB/742      CLOSED      1-FLV-67-653B RETURN CONNECTION                                                                    CV


HDR 2B ISOL A8V/692 OPEN 2-ISV-67-613B CVSIS/CS/RHR PMP RM CLR ERCW SUP  
WBN            ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                    TRAIN B                      Rev. 0000 Page 170 of 204 Checklist 3 (Page 3 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                    Date ________
NOMENCLATURE        LOCATION      POSITION          UNID      PERF    VERIFIER INITIAL    INITIAL DG Bldg el 742 DG HX 2B1/2B2 ERCW SUP    DGB/742        CLOSED        2-FCV-67-67 HDR 1B ISOL                                                                             CV DG HX 2B1 ERCW OUT        DGB/742    0-PI-OPS-17.0  2-THV-67-510B THROTTLE                                    LT                                        CV DG HX 2B1/2B2 ERCW        DGB/742    0-PI-OPS-17.0  2-ISV-67-511B DISCH HDR B ISOL                            LO                                        CV DG HX 2B2 ERCW OUT        DGB/742    0-PI-OPS-17.0  2-THV-67-515B THROTTLE                                    LT                                        CV DG HX 2B1/2B2 ERCW        DGB/742    0-PI-OPS-17.0  2-ISV-67-516A DISCH HDR A ISOL                            LO                                        CV DG HX 2B1/2B2 ERCW        DGB/742    0-PI-OPS-17.0  2-THV-67-8021 DISCH HDR THROTTLE                          LT                                        CV DG HX 2B2 ERCW SUP VENT    DGB/742        CLOSED      2-VTV-67-518B                    CV DG HX 2B1 ERCW SUP VENT    DGB/742        CLOSED      2-VTV-67-519B                    CV Control Bldg el 692 0-FE-67-200 TEST POINT    C12P/692       CLOSED        0-TV-67-889A                    CV 0-FE-67-200 TEST POINT    C12P/692      CLOSED        0-TV-67-889B                    CV ELECT BD RM A/C COND B-B  C12P/694    0-PI-OPS-17.0  0-ISV-67-615B ERCW SUP ISOL                                LO                                        CV ELEC BD RM A/C COND B-B    C12P/696    0-PI-OPS-17.0  0-THV-67-618B ERCW RET THROTTLE                            LT                                        CV ELEC BD RM A/C COND B-B    C12P/701      CLOSED      0-VTV-67-614B ERCW SUP VENT                                                                          CV ELEC BD RM A/C COND B-B    C13P/692      CLOSED        0-TV-67-616B ERCW SUP TEST CONN                                                                      CV ELEC BD RM A/C COND B-B    C13P/692      CLOSED        0-TV-67-617B ERCW RET TEST CONN                                                                      CV


HDR 2B ISOL A7V/703 OPEN 2-ISV-67-603B CVAux Bldg el 713 PENT ROOM COOLER 2B-B ERCW SUP  
WBN            ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 171 of 204 Checklist 3 (Page 4 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                Date ________
NOMENCLATURE          LOCATION    POSITION        UNID        PERF    VERIFIER INITIAL  INITIAL Aux Bldg el 676 CS PMP RM CLR 1B-B          A7U/676  0-PI-OPS-17.0 1-THV-67-605B ERCW RET THROTTLE                          LT                                      CV CONTROL AIR ISOLATION      A7U/676  0-PI-OPS-17.0 1-ISV-32-3022 VALVE TO 1-FCV-67-190                      LC                                      CV CSP ROOM COOLER 1B-B        A7U/676    OPERABLE      1-FCV-67-186 ERCW SUP FLOW CNTL                                                                  CV CS PMP 1B-B RM COOLER      A6U/676    CLOSED      1-ISV-67-622 FLUSH CONNECTION                                                                    CV RHR PMP RM CLR 1B-B        A7V/676  0-PI-OPS-17.0 1-THV-67-606B ERCW RET THROTTLE                          LT                                      CV RHRP ROOM COOLER 1B-B       A7V/676  0-PI-OPS-17.0  1-FCV-67-190 ERCW SUP FLOW CNTL                          LO                                      CV RHR PMP 1B-B RM COOLER      A7V/676      CLOSED    1-ISV-67-623-B FLUSH CONNECTION                                                                    CV 1-FE-67-187 TEST POINT      A7U/676    CLOSED      1-TV-67-881A                    CV 1-FE-67-187 TEST POINT      A7U/676    CLOSED      1-TV-67-881B                    CV CONTROL AIR ISOLATION      A7W/676      OPEN      1-ISV-32-3017 VALVE TO 1-FCV-67-186                                                                CV 1-FE-67-191 TEST POINT      A7V/676    CLOSED      1-TV-67-882A                    CV 1-FE-67-191 TEST POINT      A7V/676    CLOSED      1-TV-67-882B                    CV


FLOW CNTL A14V/713 0-PI-OPS-17.0 LO 2-FCV-67-352 CV CONTROL AIR ISOLATION VALVE TO 2-FCV-67-352 A14U/713 0-PI-OPS-17.0 LC 2-ISV-32-3167 CV BA XFER/AFW PMP SPACE CLR 2B-B ERCW THROTTLE A15T/713 0-PI-OPS-17.0 LT 2-THV-67-673B CV BA XFER/AFW PMP SPACE CLR 2B-B ERCW RET ISOL A15T/713 0-PI-OPS-17.0 LO 2-ISV-67-674B CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 193 of 204 Checklist 4 (Page 5 of 16)
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                  TRAIN B                  Rev. 0000 Page 172 of 204 Checklist 3 (Page 5 of 21)
SUPPLY HDR 2B VALVE ALIGNMENT
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                Date ________
NOMENCLATURE        LOCATION      POSITION        UNID        PERF    VERIFIER INITIAL    INITIAL Aux Bldg el 692 BIOCIDE RECIRC ERCW SUP    A1T/692      CLOSED      1-ISV-67-712 TO AFW TURB PMP 1A-S                                                                CV BIOCIDE RECIRC ERCW SUP    A1U/692      CLOSED      1-ISV-67-711 TO AFW TURB PMP 1A-S                                                                CV BIOCIDE RECIRC ERCW SUP    A1U/692      CLOSED      1-ISV-67-713 TO AFW TURB PMP 1A-S                                                                CV BIOCIDE RECIRC ERCW SUP    A1U/692      CLOSED      1-ISV-67-714 TO AFW TURB PMP 1A-S                                                                CV LOWER CNTMT VENT CLR      A2U/692    0-PI-OPS-17.0 1-ISV-67-523B 1B & 1D ERCW SUP ISOL                      LO                                       CV INSTR RM WATER CLR 1B      A2U/692        OPEN      1-ISV-67-524B ERCW SUP ISOL                                                                        CV LOWER CNTMT CLR HDR B      A2U/692      CLOSED    1-TV-67-560B ERCW SUP HDR TEST CONN                                                              CV LOWER CNTMT CLR HDR D      A2U/692      CLOSED    1-TV-67-560D ERCW SUP HDR TEST CONN                                                              CV LOWER CNTMT CLR HDR B      A2U/692      CLOSED    1-TV-67-576B ERCW RET TEST CONN                                                                  CV LOWER CNTMT CLR HDR D      A2U/692      CLOSED    1-TV-67-576D ERCW RET TEST CONN                                                                  CV PIPE CHASE COOLER 1B-B    A2U/692    OPERABLE    1-FCV-67-344 ERCW SUP FLOW CNTL                                                                  CV CONTROL AIR ISOLATION     A2U/692        OPEN      1-ISV-32-2960 VALVE TO 1-FCV-67-344                                                                CV CCP ROOM COOLER 1B-B      A4T/692    0-PI-OPS-17.0 1-FCV-67-170 ERCW SUP FLOW CNTL                          LO                                      CV CONTROL AIR ISOLATION      A4T/695    0-PI-OPS-17.0 1-ISV-32-2936 VALVE TO 1-FCV-67-170                      LC                                      CV CVCS CCP ROOM CLR 1B-B     A4T/692    0-PI-OPS-17.0 1-ISV-67-600B ERCW SUP ISOL                              LO                                      CV CONTROL AIR ISOLATION      A4U/692        OPEN      1-ISV-32-2956 VALVE TO 1-FCV-67-348                                                                CV


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 173 of 204 Checklist 3 (Page 6 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                               Date ________
NOMENCLATURE        LOCATION      POSITION        UNID        PERF    VERIFIER INITIAL  INITIAL Aux Bldg el 692 PENT ROOM COOLER 1B-B      A4V/692    OPERABLE      1-FCV-67-348 ERCW SUP FLOW CNTL                                                                  CV PENT ROOM CLR 1B-B        A4V/692    0-PI-OPS-17.0 1-THV-67-608B ERCW RET THROTTLE                          LT                                      CV 1-FE-67-349 TEST POINT    A4V/700      CLOSED      1-TV-67-883A                  CV 1-FE-67-349 TEST POINT    A4V/700      CLOSED      1-TV-67-883B                  CV INSTR RM WATER CLR 1B      A4W/692      CLOSED      1-TV-67-525B ERCW IN TEST CONN                                                                  CV INSTR RM WATER CLR 1B      A4W/692      CLOSED      1-TV-67-526B ERCW OUT TEST CONN                                                                  CV INSTR RM WATER CLR 1B      A4W/692      TI-31.08  1-THV-67-527B ERCW RET THROTTLE                                                                  CV CVCS PDP RM CLR 1C        A5T/692        OPEN      1-ISV-67-639 ERCW SUP ISOL                                                                      CV CVCS PDP RM CLR 1C        A5T/692      TI-31.08    1-THV-67-640 ERCW RET THROTTLE                                                                  CV 1-FE-67-173 TEST POINT    A5T/698      CLOSED      1-TV-67-879A                  CV 1-FE-67-173 TEST POINT    A5T/698      CLOSED      1-TV-67-879B                  CV CVCS PDP RM CLR 1C        A5T/692        OPEN      1-ISV-67-641 ERCW RET ISOL                                                                      CV PDP ROOM COOLER 1C        A5T/692    OPERABLE      1-FCV-67-172 ERCW SUP FLOW CNTL                                                                  CV CONTROL AIR ISOLATION      A5T/692        OPEN      1-ISV-32-2929 VALVE TO 1-FCV-67-172                                                              CV SI PMP 1B-B RM COOLER      A6U/692      CLOSED    1-ISV-67-625-B FLUSH CONNECTION                                                                    CV 1-FE-67-183 TEST POINT    A7V/692      CLOSED      1-TV-67-880A                  CV 1-FE-67-183 TEST POINT    A7V/692      CLOSED      1-TV-67-880B                  CV SIP ROOM COOLER 1B-B      A7V/692    OPERABLE      1-FCV-67-182 ERCW SUP FLOW CNTL                                                                  CV CONTROL AIR ISOLATION      A7U/692        OPEN      1-ISV-32-2983 VALVE TO 1-FCV-67-182                                                              CV SIS PMP RM CLR 1B-B        A7V/692    0-PI-OPS-17.0 1-THV-67-604B ERCW RET THROTTLE                          LO                                      CV PENT/PIPE CHASE RM CLR    A7V/692    0-PI-OPS-17.0 1-ISV-67-607B ERCW SUP HDR 1B ISOL                        LO                                      CV


NOMENCLATURE LOCATIONPOSITION UNID PERF INITIAL VERIFIER INITIAL 2-FI-67-247 ROOT A14V/713 OPEN 2-RTV-67-846A CV2-FI-67-247 ROOT A14V/713 OPEN 2-RTV-67-846B CV2-FI-67-253 ROOT A13V/713 OPEN 2-RTV-67-844A CV2-FI-67-253 ROOT A13V/713 OPEN 2-RTV-67-844B CV2-FI-67-335 ROOT A3V/713 OPEN 2-RTV-67-836A CV2-FI-67-335 ROOT A3V/713 OPEN 2-RTV-67-836B CV2-FI-67-269 ROOT A3V/713 OPEN 2-RTV-67-837A CV2-FI-67-269 ROOT A3V/713 OPEN 2-RTV-67-837B CV2-FI-67-334 ROOT A3V/730 OPEN 2-RTV-67-838A CV2-FI-67-334 ROOT A3V/730 OPEN 2-RTV-67-838B CV2-FI-67-267 ROOT A3V/713 OPEN 2-RTV-67-839A CV2-FI-67-267 ROOT A3V/713 OPEN 2-RTV-67-839B CV UPPER CNTMT VENT CLR 2D ERCW RET TEMP CNTL A3V/713 OPERABLE 2-TCV-67-140 CV CONTROL AIR ISOLATION VALVE TO 2-FCV-67-140 A3V/713 OPEN 2-ISV-32-3115 CVUPPER CNTMT VENT CLR 2B ERCW RET TEMP CNTL A3V/713 OPERABLE 2-TCV-67-137 CV CONTROL AIR ISOLATION VALVE TO 2-FCV-67-137 A3V/713 OPEN 2-ISV-32-3116 CV UPPER CTNMT VENT CLR 2D ERCW RET THROTTLE A13U/713 OPEN 2-THV-67-588D CV UPPER CNTMT VENT CLR 2D ERCW RET HDR ISOL A3U/713 OPEN 2-ISV-67-587D CV UPPER CTNMT VENT CLR 2B ERCW RET THROTTLE A13U/713 OPEN 2-THV-67-588B CV UPPER CNTMT VENT CLR 2B ERCW RET HDR ISOL A3U/713 OPEN 2-ISV-67-587D CVLOWER CNTMT VENT CLR 2B & 2D ERCW RET ISOL A3V/732 OPEN 2-ISV-67-577B CV UPPER CNTMT VENT CLR 2B & 2D ERCW RET ISOL A3U/713 OPEN 2-ISV-67-590B CVTD AFW PUMP ERCW SUP HDR ISOL A12U/731 CLOSED 2-ISV-67-924B  CV2-FE-67-220 TEST POINT A15T/713 CLOSED 2-TV-67-878A CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 194 of 204 Checklist 4 (Page 6 of 16)
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 174 of 204 Checklist 3 (Page 7 of 21)
SUPPLY HDR 2B VALVE ALIGNMENT
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                  Date ________
NOMENCLATURE         LOCATION      POSITION          UNID         PERF   VERIFIER INITIAL   INITIAL Aux Bldg el 692 CVCS CCP ROOM CLR          A4T/692    0-PI-OPS-17.0  1-THV-67-601B 1B-B ERCW RET                              LT THROTTLE                                                                              CV 1-FE-67-171 TEST POINT    A4T/698      CLOSED      1-TV-67-888A CV 1-FE-67-171 TEST POINT    A4T/698      CLOSED      1-TV-67-888B CV CVCS CCP ROOM CLR          A4T/692    0-PI-OPS-17.0  1-ISV-67-602B 1B-B ERCW RET ISOL                          LO                                        CV INSTR RM WATER CLR 1B      A4W/697        OPEN      1-ISV-67-710B ERCW SUP ISOL                                                                        CV SIS/CS/RHR PMP RM CLR      A7V/703    0-PI-OPS-17.0  1-ISV-67-603B ERCW SUP HDR 1B ISOL                        LO                                        CV PIPE CHASE CLR 1B-B        A2U/703    0-PI-OPS-17.0  1-THV-67-611B ERCW RET THROTTLE                          LT                                        CV 1-FE-67-345 TEST POINT    A2U/700      CLOSED      1-TV-67-886A CV 1-FE-67-345 TEST POINT    A2U/700      CLOSED      1-TV-67-886B CV PENT/PIPE CHASE RM        A8V/703    0-PI-OPS-17.0  1-ISV-67-612B CLR ERCW RET HDR 1B                        LO ISOL                                                                                  CV SIS/CS/RHR PMP RM CLR      A7V/703    0-PI-OPS-17.0  1-ISV-67-613B ERCW RET HDR 1B ISOL                        LO                                        CV AUX BLDG ERCW SUP          A1U/706    0-PI-OPS-17.0  1-FCV-67-82 HDR 1B ISOL                                LO                                        CV ERCW SUP HDR 1B DRAIN      A1U/707      CLOSED      1-DRV-67-925B                    CV 1-FE-67-259 TEST POINT    A4W/708      CLOSED        1-TV-67-861A                    CV 1-FI-67-259 TEST POINT    A4W/708      CLOSED        1-TV-67-861B                    CV 1-FI-67-251 ROOT          A2U/710        OPEN       1-RTV-67-845A                    CV 1-FI-67-251 ROOT          A2U/710        OPEN       1-RTV-67-845B                    CV 1-FI-67-245 ROOT          A1U/710        OPEN      1-RTV-67-847B                    CV 1-FI-67-245 ROOT          A1U/710        OPEN      1-RTV-67-847A                    CV


Data Package: Page ____ of ____     Date ________  
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                  TRAIN B                  Rev. 0000 Page 175 of 204 Checklist 3 (Page 8 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                               Date ________
NOMENCLATURE        LOCATION      POSITION        UNID        PERF  VERIFIER INITIAL  INITIAL Aux Bldg el 713 1-FI-67-247 ROOT          A1V/713        OPEN      1-RTV-67-846A                  CV 1-FI-67-247 ROOT          A1V/713        OPEN      1-RTV-67-846B                  CV 0-FIS-67-209 ROOT          A2Q/713        OPEN      0-RTV-67-986A                  CV STA AIR COMPR ERCW SUP    A2Q/726      CLOSED    0-VTV-67-625B HDR 1B VENT                                                                        CV PENT ROOM CLR 1B-B        A2U/713    0-PI-OPS-17.0 1-THV-67-609B ERCW RET THROTTLE                          LT                                      CV CONTROL AIR ISOLATION      A2U/713        OPEN      1-ISV-32-3147 VALVE TO 1-FCV-67-352                                                              CV PENT ROOM COOLER 1B-B      A2V/713    OPERABLE      1-FCV-67-352 ERCW SUP FLOW CNTL                                                                  CV 1-FE-67-353 TEST POINT    A2V/719      CLOSED      1-TV-67-884A                  CV 1-FE-67-353 TEST POINT    A2V/719      CLOSED      1-TV-67-884B                  CV 0-FIS-67-209 ROOT          A2Z/722        OPEN      0-RTV-67-987A                  CV STA AIR COMPR ERCW SUP    A2Z/726        OPEN      0-FCV-67-208 HDR 1B ISOL                                                                        CV CCS/AFW PMP SPACE CLR      A3T/713    OPERABLE      1-FCV-67-164 1B-B ERCW SUP FLOW CNTL                                                                                CV CONTROL AIR ISOL VALVE    A3T/713        OPEN      1-ISV-32-3063 TO 1-FCV-67-164                                                                    CV CCS/AFW PMP SPACE CLR      A3T/713    0-PI-OPS-17.0 1-ISV-67-642B 1B-B ERCW SUP ISOL                          LO                                      CV CCS/AFW PMP SPACE CLR      A3T/721    0-PI-OPS-17.0 1-THV-67-643B 1B-B ERCW RET THROTTLE                      LT                                      CV CCS/AFW PMP SPACE CLR      A3T/721    0-PI-OPS-17.0 1-ISV-67-644B 1B-B ERCW RET ISOL                          LO                                      CV UPPER CNTMT VENT CLR      A3U/713        OPEN      1-ISV-67-531B 1B & 1D ERCW SUP ISOL                                                              CV UPPER CNTMT VENT CLR      A3U/713        OPEN      1-ISV-67-590B 1B & 1D ERCW RET ISOL                                                              CV CONTROL AIR ISOLATION      A3U/713        OPEN      1-ISV-32-3159 VALVE TO 1-TCV-67-137                                                              CV CONTROL AIR ISOLATION      A3U/713        OPEN      1-ISV-32-3160 VALVE TO 1-FCV-67-140                                                              CV UPPER CNTMT VENT CLR      A3U/713        OPEN      1-ISV-67-587B 1B ERCW RET HDR ISOL                                                                CV


Aux Bldg el 713 2-FE-67-220 TEST POINT A15T/713 CLOSED 2-TV-67-878B CVPENT ROOM COOLER 2B-B ERCW RET THROTTLE A14U/713 0-PI-OPS-17.0 LT 2-THV-67-609 B  CV2-FE-67-353 TEST POINT A14V/713 CLOSED 2-TV-67-884A CV2-FE-67-353 TEST POINT A14V/713 CLOSED 2-TV-67-884B CVCSS HX 2B ERCW BIOCIDE CIRC BYP A12V/715 OPEN 2-ISV-67-538B CV BA XFER/AFW PMP SPACE CLR 2B-B ERCW FLOW CNTL A15T/713 OPERABLE 2-FCV-67-219 CV CONTROL AIR ISOLATION VALVE TO 2-FCV-67-219 A15T/713 OPEN 2-ISV-32-3031 CV BA XFER/AFW PMP SPACE CLR 2B-B ERCW SUP ISOL  A15T/713 0-PI-OPS-17.0 LO 2-ISV-67-648B CVCCS HX C OUTLET ERCW FLOW CNTL ISOL A11S/737 0-PI-OPS-17.0 LO 0-ISV-67-553 CV2-FE-67-159 TEST POINT A13R/744 CLOSED 2-TV-67-822A CV2-FE-67-159 TEST POINT A13R/744 CLOSED 2-TV-67-822B CVERCW HDR 2B A/C EQUIP RET ISOL A12T/735 0-PI-OPS-17.0 LO 2-ISV-67-554B CVCS HX 2B ERCW DRAIN A9V/713 CLOSED 2-DRV-67-536B  CVCS HX 2B CS HX 2B A9V/730 OPEN 2-ISV-67-537B CV CNTMT SPRAY HX 2B-B ERCW RETURN A13V/713 CLOSED 2-FCV-67-124 CV UPPER CNTMT VENT CLR 2B ERCW RET HDR TEST CONN A13V/732 CLOSED 2-TV-67-586B CV UPPER CNTMT VENT CLR 2D ERCW RET HDR TEST CONN A13V/732 CLOSED 2-TV-67-586D CV UPPER CNTMT VENT CLR 2B & 2D ERCW SUP ISOL A13U/713 OPEN 2-ISV-67-531B CVAux Bldg el 737 CSS HX 2B ERCW BIOCIDE CIRC BYP A12U/737 OPEN 2-ISV-67-533B CVCCS HX C ERCW VENT A5T/737 CLOSED 0-VTV-67-540 CVNOMENCLATURE LOCATIONPOSITION UNID PERF INITIAL VERIFIER INITIAL WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 195 of 204 Checklist 4 (Page 7 of 16)
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 176 of 204 Checklist 3 (Page 9 of 21)
SUPPLY HDR 2B VALVE ALIGNMENT
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                  Date ________
NOMENCLATURE        LOCATION      POSITION          UNID        PERF    VERIFIER INITIAL    INITIAL Aux Bldg el 713 UPPER CNTMT VENT CLR      A3U/713        OPEN      1-ISV-67-587D 1D ERCW RET HDR ISOL                                                                  CV UPPER CNTMT VENT CLR      A3U/713       TI-31.08    1-THV-67-588B 1B ERCW RET THROTTLE                                                                  CV UPPER CNTMT VENT CLR      A3U/713      TI-31.08    1-THV-67-588D 1D ERCW RET THROTTLE                                                                   CV 1-TCV-67-137 BYPASS        A3U/713       CLOSED      1-BYV-67-589B CV 1-TCV-67-140 BYPASS        A3U/713      CLOSED      1-BYV-67-589D CV 1-FE-67-165 TEST POINT     A3U/724      CLOSED       1-TV-67-897A CV 1-FE-67-165 TEST POINT     A3U/724      CLOSED       1-TV-67-897B CV ERCW FLOOD MODE RET        A3U/730      CLOSED      0-ISV-67-556B SFPC HX ISOL                                                                          CV UPPER CNTMT VENT CLR      A3V/713    OPERABLE      1-TCV-67-137 1B ERCW RET TEMP CNTL                                                                 CV UPPER CNTMT VENT CLR      A3V/713     OPERABLE       1-TCV-67-140 1D ERCW RET TEMP CNTL                                                                  CV 1-FI-67-253 ROOT          A3V/720        OPEN       1-RTV-67-844A CV 1-FI-67-253 ROOT          A3V/720        OPEN      1-RTV-67-844B CV LOWER CNTMT VENT CLR      A3V/732    0-PI-OPS-17.0 1-ISV-67-577B 1B & 1D ERCW RET ISOL                      LO                                        CV 1-FI-67-334 ROOT          A3V/733        OPEN      1-RTV-67-838A CV 1-FI-67-334 ROOT          A3V/733        OPEN      1-RTV-67-838B                    CV 1-FI-67-335 ROOT          A3V/733        OPEN      1-RTV-67-836A                    CV 1-FI-67-335 ROOT          A3V/733        OPEN       1-RTV-67-836B                    CV 1-FI-67-267 ROOT          A3V/733        OPEN      1-RTV-67-839A                    CV 1-FI-67-267 ROOT          A3V/733        OPEN      1-RTV-67-839B                    CV 1-FI-67-269 ROOT          A3V/733        OPEN       1-RTV-67-837A                    CV 1-FI-67-269 ROOT          A3V/733        OPEN      1-RTV-67-837B                    CV


Data Package: Page ____ of ____     Date ________  
WBN                ERCW SYSTEM FLOW BALANCE                      2-PTI-067-02-B Unit 1 & 2                          TRAIN B                        Rev. 0000 Page 177 of 204 Checklist 3 (Page 10 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                                 Date ________
NOMENCLATURE              LOCATION          POSITION            UNID          PERF      VERIFIER INITIAL      INITIAL Aux Bldg el 713 ERCW DISCHARGE HDR B ARV          AUX / 713            (2)        0-ISV-67-1107B ISOLATION VALVE                                                                                            CV ERCW DISCHARGE HDR B ARV          AUX / 713        CLOSED        0-TV-67-1113B TV VALVE                                                                                                    CV ERCW DISCHARGE HDR. B AIR          AUX/713            (1)      0-ARV-067-1109B RELEASE VALVE                                                                                              CV INSTR RM WATER CLR 1B ERCW          A3W/713          OPEN          1-ISV-67-530B RET ISOL                                                                                                    CV BIOCIDE RECIRC ERCW HDR 1B          A4S/713          CLOSED        1-ISV-67-716B ISOL                                                                                                        CV ERCW HDR B A/C EQUIP RET            A4T/713      0-PI-OPS-17.0    1-ISV-67-554B ISOL                                                    LO                                                CV BIOCIDE RECIRC ERCW HDR 1B          A4T/720          CLOSED        1-ISV-67-715B ISOL                                                                                                        CV CNTMT SPRAY HX 1B ERCW              A4V/713          CLOSED        1-ISV-67-538B BIOCIDE CIRC BYP                                                                                            CV CNTMT SPRAY HX 1B-B ERCW            A4V/730          CLOSED        1-FCV-67-124 RETURN                                                                                                      CV UPPER CNTMT VENT CLR 1B              A4V/732          CLOSED        1-TV-67-578B ERCW SUP HDR TEST CONN                                                                                      CV UPPER CNTMT VENT CLR 1D              A4V/732          CLOSED        1-TV-67-578D ERCW SUP HDR TEST CONN                                                                                      CV UPPER CNTMT VENT CLR 1B              A4V/732          CLOSED        1-TV-67-586B ERCW RET HDR TEST CONN                                                                                      CV UPPER CNTMT VENT CLR 1D              A4V/732          CLOSED        1-TV-67-586D ERCW RET HDR TEST CONN                                                                                      CV CS HX 1B ERCW RET THROTTLE          A5V/713      0-PI-OPS-17.0    1-THV-67-537B LT                                                CV 1-FT-67-122 ROOT                    A5V/713          OPEN        1-RTV-67-832A                          CV 1-FT-67-122 ROOT                    A5V/713          OPEN        1-RTV-67-832B                          CV 1
Check 30 inch ERCW discharge header level > 26 inches above the bottom of the pipe; B train 12" ERCW header to AFW pumps header > 10 inches.
2 Valve may be full open or throttled as needed to dampen turbulence creating fluctuating water level in the 0-ARV-067-1109B.


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL CCS HX C ERCW VENT A10T/737 CLOSED 0-VTV-67-541 CVSD BD ROOM A/C CHLR B-B ERCW RET THROTTLE A13R/737 0-PI-OPS-17.0 LT 2-THV-67-555 CVPENT ROOM COOLER 2B-B ERCW SUP FLOW CNTL A12V/737 OPERABLE 2-FCV-67-356 CV CONTROL AIR ISOLATION VALVE TO 2-FCV-67-356 A12V/737 OPEN 2-ISV-32-3323 CVPENT ROOM COOLER 2B-B ERCW RET THROTTLE A12V/737 0-PI-OPS-17.0 LT 2-THV-67-610 B  CV2-FE-67-357 TEST POINT A11V/737 CLOSED 2-TV-67-885A CV2-FE-67-357 TEST POINT A11V/737 CLOSED 2-TV-67-885B CV2-TCV-67-137 BYPASS A3V/713 CLOSED 2-BYV-67-589 B  CV2-TCV-67-137 BYPASS A3V/713 CLOSED 2-BYV-67-589 D  CVSD BD ROOM A/C CHLR B-B ERCW
WBN          ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 178 of 204 Checklist 3 (Page 11 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                  Date ________
NOMENCLATURE         LOCATION       POSITION         UNID       PERF     VERIFIER INITIAL   INITIAL TD AFW PUMP ERCW SUP        A5S/730        CLOSED      1-VTV-67-945 HDR VENT                                                                              CV Aux Bldg el 713 CS HX 1B ERCW DRAIN        A7V/713        CLOSED    1-DRV-67-536B                    CV CS HX 1B ERCW VENT         A7V/713        CLOSED    1-VTV-67-535B                    CV TD AFW PUMP ERCW SUP        A8S/730        CLOSED     1-VTV-67-923 HDR VENT                                                                              CV TD AFW PUMP SUP HDR        A8S/723        CLOSED    1-DRV-67-946A DRAIN                                                                                  CV TD AFW PUMP ERCW SUP        A11S/713      CLOSED      1-DRV-67-985 HDR DRAIN                                                                              CV TD AFW PUMP ERCW SUP        A12U/731    0-PI-OPS-17.0 1-ISV-67-924B HDR ISOL                                      LO                                      CV TD & MD AFWP ERCW SUP      A12T/718      CLOSED      1-DRV-67-779 HDR DRN                                                                                CV MCR WTR CHLR B-B ERCW       A12U/731    0-PI-OPS-17.0 0-ISV-67-591B RET ISOL                                      LO                                      CV TD AFW PUMP ERCW SUP        A12T/733      CLOSED    1-VTV-67-947A HDR VENT                                                                              CV Aux Bldg el 737 ERCW FLOOD MODE SUP        A3U/737       CLOSED    0-ISV-67-532B RCW/ICE COND ISOL                                                                      CV PENT ROOM COOLER 1B-B       A3V/737     0-PI-OPS-17.0 1-THV-67-610B ERCW RET THROTTLE                            LT                                      CV CCS SURGE TNK A ERCW SUP    A4T/746      CLOSED    1-ISV-67-543B HDR ISOL                                                                              CV AUX BLDG AIR CLR ERCW SUP    A4T/752    0-PI-OPS-17.0  1-FCV-67-128 HDR 1B ISOL                                  LO                                      CV CCS HX A HDR 1B ERCW SUP    A4T/752    0-PI-OPS-17.0  1-FCV-67-458 LC                                      CV MCR WTR CHLR B-B ERCW      A4T/754        CLOSED     0-VTV-67-619B SUP VENT                    A5U/754                                                    CV CNTMT SPRAY HX 1B ERCW      A4U/737        CLOSED    1-ISV-67-533B BIOCIDE CIRC BYP                                                                      CV CSS HX 1B INLETERCW FLUSH  A4U/737    0-PI-OPS-17.0 1-FLV-67-925 LC                                      CV


SUP TEST CONN A13R/740 CLOSED 2-TV-67-676 CVSD BD ROOM A/C CHLR B-B ERCW RET TEST CONN A13R/740 CLOSED 2-TV-67-677 CVCCS HX C OUTLET ERCW HDR B FLOW CNTL A10T/746 OPERABLE 0-FCV-67-152 CVCCS SURGE TANK B ERCW SUP HDR 2B ISOL A13T/749 CLOSED 2-ISV-67-543B CVCCS HX C ERCW HDR 2B SUPPLY ISOL A3S/752 0-PI-OPS-17.0 LO 2-FCV-67-147 CVSD BD ROOM A/C CHLR B-B ERCW SUP ISOL A12R/752 (1)  0-PI-OPS-17.0 LO 2-ISV-67-675 CVERCW RETURN HDR 2B VENT A12T/752 CLOSED 2-VTV-67-994 CVEGTS ROOM COOLER B ERCW RET HDR DRAIN A12V/753 CLOSED 2-DRV-67-993 CVEGTS ROOM COOLER B ERCW SUP HDR DRAIN A12V/753 CLOSED 2-DRV-67-995 CV CNTMT SPRAY HX 2B-B ERCW SUPPLY A13U/737 CLOSED 2-FCV-67-123 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 196 of 204 Checklist 4 (Page 8 of 16)
WBN              ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 179 of 204 Checklist 3 (Page 12 of 21)
SUPPLY HDR 2B VALVE ALIGNMENT
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                  Date ________
NOMENCLATURE          LOCATION      POSITION        UNID          PERF      VERIF INITIAL  INITIAL PENT ROOM COOLER          A4V/737      OPERABLE      1-FCV-67-356 1B-B ERCW SUP FLOW CNTL                                                                                  CV CONTROL AIR ISOLATION      A4V/737        OPEN      1-ISV-32-3295 VALVE TO 1-FCV-67-356                                                                  CV 1-FE-67-357 TEST POINT    A4V/744      CLOSED       1-TV-67-885A                    CV 1-FE-67-357 TEST POINT    A4V/744      CLOSED       1-TV-67-885B                    CV Aux Bldg el 737 CS HX 1B ERCW SUP HDR     A5U/737      CLOSED      1-VTV-67-534B VENT                                                                                  CV CNTMT SPRAY HX 1B-B       A5U/746       CLOSED      1-FCV-67-123 ERCW SUPPLY                                                                            CV SFP/TBBP SPACE CLR        A5W/737      OPERABLE       1-FCV-67-215 1B-B ERCW SUP FLOW CNTL                                                                                  CV CONTROL AIR ISOLATION      A5W/737        OPEN      1-ISV-32-3283 VALVE TO 1-FCV-67-215                                                                  CV SFP/TBBP SPACE CLR B-B    A5W/737    0-PI-OPS-17.0 1-ISV-67-645B ERCW SUP ISOL                                LO                                        CV SFP/TBBP SPACE CLR B-B     A5W/737    0-PI-OPS-17.0 1-THV-67-646B ERCW THROTTLE                                LT                                        CV SFP/TBBP SPACE CLR        A5W/737    0-PI-OPS-17.0 1-ISV-67-647B 1B-B ERCW RET ISOL                          LO                                        CV 1-FE-67-216 TEST POINT    A8W/750      CLOSED       1-TV-67-896A CV 1-FE-67-216 TEST POINT    A8W/750      CLOSED       1-TV-67-896B CV


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                        TRAIN B                    Rev. 0000 Page 180 of 204 Checklist 3 (Page 13 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                       Date ________
NOMENCLATURE            LOCATION        POSITION          UNID        PERF      VERIF INITIAL  INITIAL Aux Bldg el 737 MCR WTR CHLR B-B              A12T/737    0-PI-OPS-17.0    0-ISV-67-620B ERCW SUP ISOL LO(3)                                      CV MCR WTRCHIL B-B ERCW          A12T/737        CLOSED        0-TV-67-621B SUP TEST CONN                                                                                CV MCR WTR CHLR B-B              A12T/737      CLOSED        0-TV-67-622B ERCW OUT TEST CONN                                                                          CV MCR CHLR B-B ERCW              A12T/737        CLOSED      0-DRV-67-2226 DRAIN                                                                                        CV 0-FE-67-202 TEST POINT        A12T/737      CLOSED        0-TV-67-890A                    CV 0-FE-67-202 TEST POINT        A12T/737      CLOSED        0-TV-67-890B                    CV MCR WTR CHLR B-B              A12T/737    0-PI-OPS-17.0  0-THV-67-623B ERCW OUT THROTTLE                                LT (3)
CV MCR WTR CHLR B-B              A12T/737      CLOSED        0-VTV-67-624B ERCW OUT VENT                                                                                CV (4)
ERCW B DISC HDR VENT          A12T/730      CLOSED      0-VTV-67-1111                    CV C CCS HX ERCW INLET            A5S/742      CLOSED        0-RTV-67-1063 TEST CONN RTV                                                                                CV C CCS HX ERCW OUTLET          A10S/742        CLOSED      0-RTV-67-1064 TEST CONN RTV                                                                                CV (3)  See Precaution and Limitation R.
(4)  0-VTV-67-1111 capped.


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL CS HX 2B ERCW SUP HDR VENT A12U/737 CLOSED 2-VTV-67-534B CVCS HX 2B ERCW VENT A9V/745 CLOSED 2-VTV-67-535B CVAux Bldg el 737 AUX BLDG AIR CLR ERCW SUP HDR 2B ISOL A12T/754 0-PI-OPS-17.0 LO 2-FCV-67-128 CV2-FE-67-340 TEST POINT A9U/754 CLOSED  2-TV-67-877A CV2-FE-67-340 TEST POINT A9U/754 CLOSED 2-TV-67-877B CVAux Bldg el 757 AUX CNTL AIR COMPR B-B ERCW SUP ISOL A9U/757 0-PI-OPS-17.0 LO 2-ISV-67-680 CVAUX CNTL AIR COMPR B-B ERCW INLET BYPASS A9U/757 0-PI-OPS-17.0 LC 0-BYV-67-682 CVAUX CNTL AIR COMPR B ERCW SUP ISOL A9U/757 0-PI-OPS-17.0 LO 0-ISV-67-681A CVAUX CNTL AIR COMPR B ERCW SUP ISOL A9U/757 0-PI-OPS-17.0 LO 0-ISV-67-681B CVAUX CNTL AIR COMPR B-B ERCW RET THROTTLE A9U/757 0-PI-OPS-17.0 LT 2-THV-67-683 CVEGTS ROOM COOLER 2B-B ERCW RET THROTTLE EGTS ROOM A12W/757 0-PI-OPS-17.0 LT 2-THV-67-685 B  CV2-FE-67-339 TEST POINT EGTS ROOM A12W/757 CLOSED 2-TV-67-876A CV2-FE-67-339 TEST POINT EGTS ROOM A12W/757 CLOSED 2-TV-67-876B CVEGTS ROOM COOLER 2B-B ERCW SUPPLY FLOW CNTL EGTS ROOM A11W/772 OPERABLE 2-FCV-67-338 CV CONTROL AIR ISOLATION VALVE TO 2-FCV-67-338 EGTS ROOM A11W/772 OPEN 2-ISV-32-3410 CVEGTS ROOM COOLER 2B-B ERCW SUP ISOL EGTS ROOM A11W/772 0-PI-OPS-17.0 LO 2-ISV-67-684B CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 197 of 204 Checklist 4 (Page 9 of 16)
WBN            ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                  Rev. 0000 Page 181 of 204 Checklist 3 (Page 14 of 21)
SUPPLY HDR 2B VALVE ALIGNMENT
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                  Date ________
NOMENCLATURE       LOCATION     POSITION           UNID           PERF     VERIFIER INITIAL   INITIAL U1 Annulus LOWER CNTMT CLR          Annulus      OPEN        1-FCV-67-99 HDR B ERCW SUP ISOL    718/Az 180                                                    CV LOWER CNTMT CLR          Annulus      CLOSED       1-VTV-67-693B HDR B ERCW RET VENT     718/Az 177                                                    CV LOWER CNTMT CLR          Annulus      CLOSED       1-VTV-67-694B HDR B ERCW SUP VENT    718/Az 173                                                    CV LOWER CNTMT CLR          Annulus      OPEN        1-FCV-67-104 HDR B ERCW RET ISOL    720/Az 171                                                    CV LOWER CNTMT CLR          Annulus      OPEN        1-FCV-67-107 HDR D ERCW SUP ISOL    715/Az 353                                                    CV LOWER CNTMT CLR          Annulus      OPEN        1-FCV-67-112 HDR D ERCW RET ISOL    715/Az 350                                                    CV LOWER CNTMT CLR          Annulus      CLOSED       1-VTV-67-694D HDR D ERCW SUP VENT    717/Az 351                                                    CV LOWER CNTMT CLR          Annulus      CLOSED      1-VTV-67-693D HDR D ERCW RET VENT    721/Az 346                                                    CV UPPER CNTMT VENT CLR    Annulus      OPEN        1-FCV-67-141 1D ERCW SUP HDR ISOL   795/Az 315                                                    CV UPPER CNTMT VENT CLR    Annulus      OPEN        1-FCV-67-142 1D ERCW RET HDR ISOL   795/Az 315                                                    CV UPPER CNTMT VENT CLR    Annulus      CLOSED      1-VTV-67-689B 1B ERCW SUP HDR VENT      795/Az 315q                                                        CV UPPER CNTMT VENT CLR    Annulus      CLOSED      1-VTV-67-689D 1D ERCW SUP HDR VENT      795/Az 315q                                                        CV UPPER CNTMT VENT CLR    Annulus      CLOSED       1-VTV-67-688B 1B ERCW SUP HDR VENT      798/Az 315q                                                        CV UPPER CNTMT VENT CLR    Annulus      CLOSED       1-VTV-67-688D 1D ERCW SUP HDR VENT    798/AZ 315                                                    CV UPPER CNTMT VENT CLR    Annulus      OPEN        1-FCV-67-138 1B ERCW SUP HDR ISOL   798/Az 315                                                    CV UPPER CNTMT VENT CLR    Annulus      OPEN        1-FCV-67-139 1B ERCW RET HDR ISOL    795/Az 315                                                    CV


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                    TRAIN B                      Rev. 0000 Page 182 of 204 Checklist 3 (Page 15 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                     Date ________
NOMENCLATURE          LOCATION      POSITION            UNID        INITIAL    INITIAL U1 Containment - #2 Fan Rm LWR CNTMT VENT CLR        #2 Fan Rm      CLOSED        1-VTV-67-698B B-B ERCW SUP HDR VENT        IC/727 Az 152                                                        CV 1-FE-67-474 TEST POINT    #2 Fan Rm      CLOSED        1-TV-67-921A IC/724 Az 156                                                        CV 1-FE-67-474 TEST POINT    #2 Fan Rm      CLOSED        1-TV-67-921B IC/724 Az 156                                                        CV LWR CNTMT VENT CLR        #2 Fan Rm      CLOSED        1-VTV-67-699B 1B-B ERCW RET HDR            IC/725 VENT                        Az 165                                                        CV RCP 2 MTR CLR ERCW        #2 Fan Rm    OPERABLE        1-TCV-67-102 SUP CNTL                    IC/725 Az 167                                                        CV CONTROL AIR ISOLATION      #2 Fan Rm        OPEN        1-ISV-32-3564 VALVE TO 1-TCV-67-102        IC/725 Az 167                                                        CV LWR CNTMT VENT CLR        #2 Fan Rm    OPERABLE        1-TCV-67-100 1B-B OUT TEMP CNTL          IC/723 Az 168                                                        CV CONTROL AIR ISOLATION      #2 Fan Rm        OPEN        1-ISV-32-3563 VALVE TO 1-TCV-67-100        IC/723 Az 168                                                        CV LOWER CNTMT CLR            #2 Fan Rm        OPEN          1-FCV-67-103 HDR B ERCW RET ISOL          IC/720 Az 171                                                        CV RCP 2 MTR CLR ERCW        #2 Fan Rm      TI-31.08      1-THV-67-572B RET HDR THROTTLE            IC/725 Az 171                                                        CV LOWER CNTMT CLR            #2 Fan Rm      CLOSED        1-TV-67-574B HDR B ERCW RET TEST          IC/720 CONN                        Az 171                                                        CV LOWER CNTMT CLR HDR        #2 Fan Rm      CLOSED        1-VTV-67-695B ERCW RET VENT                IC/726 Az 171                                                        CV


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U2 Annulus LOWER CNTMT CLR HDR B ERCW SUP ISOL Annulus 718/Az 180 OPEN 2-FCV-67-99 CVLOWER CNTMT CLR HDR B ERCW RET VENT Annulus 718/Az 177 CLOSED 2-VTV-67-693B CVLOWER CNTMT CLR HDR B ERCW SUP VENT Annulus 718/Az 173 CLOSED 2-VTV-67-694B CVLOWER CNTMT CLR HDR B ERCW  
WBN                    ERCW SYSTEM FLOW BALANCE                    2-PTI-067-02-B Unit 1 & 2                              TRAIN B                      Rev. 0000 Page 183 of 204 Checklist 3 (Page 16 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                                Date ________
NOMENCLATURE                 LOCATION         POSITION             UNID       PERF   VERIFIER INITIAL   INITIAL U1 Containment - #2 Fan Rm LOWER CNTMT CLR HDR                 #2 Fan Rm    0-PI-OPS-17.0    1-ISV-67-1005B B ERCW RET ISOL                       IC/726 Az 171                                                        CV CRD VENT CLR 1B-B OUT              #2 Fan Rm      OPERABLE        1-TCV-67-101 TEMP CNTL                            IC/727 Az 171                                                        CV CONTROL AIR ISOLATION              #2 Fan Rm        OPEN           1-ISV-32-3565 VALVE TO 1-TCV-67-101                IC/727 Az 171                                                        CV LOWER CNTMT CLR                     #2 Fan Rm      CLOSED (5)        1-DRV-67-773 HDR B ERCW RET DRAIN                  IC/716 Az 172                                                        CV LOWER CNTMT CLR                    #2 Fan Rm      CLOSED (5)        1-DRV-67-774 HDR B ERCW SUP DRAIN                  IC/716 Az 172                                                        CV LOWER CNTMT CLR                                       OPEN          1-FCV-67-105
                                    #2 Fan Rm HDR B ERCW SUP ISOL                  IC/720 Az 173                                                       CV LOWER CNTMT CLR                    #2 Fan Rm        CLOSED         1-TV-67-563B HDR B ERCW SUP HDR                    IC/720 TEST CONN                            Az 173                                                        CV LWR CNTMT VENT CLR                  #2 Fan Rm    0-PI-OPS-17.0    1-THV-67-564B 1B-B ERCW SUP HDR                    IC/726            LT THROTTLE                              Az 173                                                        CV LOWER CNTMT CLR                     #2 Fan Rm    0-PI-OPS-17.0    1-ISV-67-1004B HDR B ERCW SUP ISOL                  IC/726            LO Az 173                                                        CV CRD VENT CLR 1B-B                  #2 Fan Rm        TI-31.08      1-THV-67-567B ERCW SUP HDR                          IC/726 THROTTLE                              Az 353                                                        CV (5) VERIFY blind flange or threaded cap INSTALLED.


RET ISOL Annulus 720/Az 171 OPEN 2-FCV-67-104 CVLOWER CNTMT CLR HDR D ERCW  
WBN            ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                    Rev. 0000 Page 184 of 204 Checklist 3 (Page 17 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                    Date ________
NOMENCLATURE        LOCATION      POSITION            UNID        PERF    VERIFIER INITIAL    INITIAL U1 Containment - #1 Fan Rm CRD VENT CLR 1D-B ERCW    #1 Fan Rm      TI-31.08      1-THV-67-567D SUP HDR THROTTLE            IC/726 Az 173                                                      CV LOWER CNTMT CLR HDR D      #1 Fan Rm    CLOSED          1-DRV-67-771 ERCW RET DRAIN              IC/718 Az 353                                                      CV LOWER CNTMT CLR HDR D      #1 Fan Rm    CLOSED          1-DRV-67-772 ERCW SUP DRAIN              IC/718 Az 351                                                      CV LOWER CNTMT CLR HDR D      #1 Fan Rm      OPEN          1-FCV-67-111 ERCW RET ISOL               IC/720 Az 357                                                      CV LOWER CNTMT CLR HDR D      #1 Fan Rm      OPEN         1-FCV-67-113 ERCW SUP ISOL                IC/720 Az 353                                                      CV LOWER CNTMT CLR HDR D      #1 Fan Rm    CLOSED          1-TV-67-563D ERCW SUP HDR TEST CONN      IC/720 Az 353                                                      CV LOWER CNTMT CLR HDR D     #1 Fan Rm    CLOSED          1-TV-67-574D ERCW RET TEST CONN          IC/720 Az 351                                                      CV LWR CNTMT VENT CLR 1D-B    #1 Fan Rm    OPERABLE        1-TCV-67-108 OUT TEMP CNTL                IC/723 Az 349                                                      CV CONTROL AIR ISOLATION      #1 Fan Rm      OPEN        1-ISV-32-3605 VALVE TO 1-TCV-67-108        IC/723 Az 349                                                      CV 1-FE-67-476 TEST POINT    #1 Fan Rm    CLOSED          1-TV-67-922A IC/724 Az 336                                                      CV 1-FE-67-476 TEST POINT    #1 Fan Rm    CLOSED          1-TV-67-922B IC/724 Az 336                                                      CV CRD VENT CLR 1D-B OUT      #1 Fan Rm    OPERABLE        1-TCV-67-109 TEMP CNTL                    IC/725 Az 351                                                      CV


SUP ISOL Annulus 715/Az 353 OPEN 2-FCV-67-107 CVLOWER CNTMT CLR HDR D ERCW RET ISOL Annulus 715/Az 350 OPEN 2-FCV-67-112 CVLOWER CNTMT CLR HDR D ERCW  
WBN            ERCW SYSTEM FLOW BALANCE                  2-PTI-067-02-B Unit 1 & 2                    TRAIN B                      Rev. 0000 Page 185 of 204 Checklist 3 (Page 18 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                      Date ________
NOMENCLATURE        LOCATION      POSITION              UNID          PERF    VERIFIER INITIAL    INITIAL U1 Containment - #1 Fan Rm LWR CNTMT VENT CLR      #1 Fan Rm      CLOSED          1-VTV-67-698D D-B ERCW SUP HDR VENT      IC/727 Az 332                                                          CV LOWER CNTMT VENT CLR    #1 Fan Rm      CLOSED          1-VTV-67-699D D-B ERCW RET HDR VENT      IC/725 Az 345                                                          CV RCP 4 MTR CLR ERCW      #1 Fan Rm    OPERABLE          1-TCV-67-110 SUP CNTL                  IC/727 Az 347                                                          CV CONTROL AIR ISOLATION    #1 Fan Rm      OPEN            1-ISV-32-3607 VALVE TO 1-TCV-67-110      IC/727 Az 347                                                          CV CONTROL AIR ISOLATION    #1 Fan Rm      OPEN           1-ISV-32-3606 VALVE TO 1-TCV-67-109      IC/725 Az 351                                                          CV RCP 4 MTR CLR ERCW      #1 Fan Rm      TI-31.08        1-THV-67-572D RET HDR THROTTLE          IC/725 Az 351                                                          CV LOWER CNTMT CLR HDR      #1 Fan Rm      CLOSED          1-VTV-67-695D ERCW RET VENT              IC/726 Az 351                                                          CV LOWER CNTMT CLR          #1 Fan Rm 0-PI-OPS-17.0      1-ISV-67-1005D HDR D ERCW RET ISOL       IC/726 Az 351                                                          CV LWR CNTMT VENT CLR      #1 Fan Rm 0-PI-OPS-17.0        1-THV-67-564D 1D-B ERCW SUP HDR          IC/726 THROTTLE                  Az 353                                                          CV LOWER CNTMT CLR         #1 Fan Rm 0-PI-OPS-17.0      1-ISV-67-1004D HDR D ERCW SUP ISOL        IC/726 Az 353                                                          CV


SUP VENT Annulus 717/Az 351 CLOSED 2-VTV-67-694 D CVLOWER CNTMT CLR HDR D ERCW  
WBN            ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 186 of 204 Checklist 3 (Page 19 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                Date ________
NOMENCLATURE        LOCATION        POSITION        UNID        PERF    VERIFIER INITIAL  INITIAL U1 Containment UPPER CNTMT VENT CLR 1B      IC/805          OPEN    1-ISV-67-691B ERCW SUP HDR ISOL          Az 135(1)                                                CV RCP MTR CLR 2 ERCW IN        IC/732        CLOSED    1-VTV-67-700B SUP VENT                     Az 137                                                  CV UPPER CNTMT VENT CLR 1B      IC/808          OPEN    1-ISV-67-583B ERCW RET HDR ISOL          Az 143(1)                                                CV 1-FE-67-249 TEST POINT      IC/729        CLOSED    1-TV-67-863A Az 143                                                  CV 1-FE-67-249 TEST POINT      IC/729        CLOSED     1-TV-67-863B Az 143                                                  CV UPPER CNTMT VENT CLR 1B      IC/807          OPEN    1-ISV-67-692B ERCW RET HDR ISOL          Az 150(1)                                                CV UPPER CNTMT VENT CLR 1B      IC/808      LC & CAPPED 1-TV-67-579B ERCW SUP HDR TEST CONN      Az 150(1)                                                CV UPPER CNTMT VENT CLR 1B      IC/808        CLOSED    1-TV-67-581B ERCW SUP HDR TEST CONN      Az 150(1)                                                CV UPPER CNTMT VENT CLR 1B      IC/809        CLOSED    1-TV-67-690B ERCW SUP HDR TEST VENT      Az 150(1)                                                CV UPPER CNTMT VENT CLR 1B      IC/807          OPEN    1-FCV-67-297 ERCW RET ISOL              Az 152(1)                                                CV UPPER CNTMT VENT CLR 1B      IC/807        CLOSED    1-TV-67-1211 ERCW RET HDR TEST VALVE    Az 152(1)                                                CV UPPER CNTMT VENT CLR 1B      IC/808        CLOSED    1-TV-67-584B ERCW RET HDR TEST CONN      Az 155(1)                                                CV RCP MTR CLR 2 ERCW RET      IC/726        CLOSED    1-VTV-67-696B HDR VENT                    Az 171                                                  CV 1-FE-67-477 TEST POINT      IC/730        CLOSED      1-TV-67-913 Az 189                                                  CV 1-FE-67-477 TEST POINT      IC/730        CLOSED      1-TV-67-914 Az 189                                                  CV


RET VENT Annulus 721/Az 346 CLOSED 2-VTV-67-693 D  CV UPPER CNTMT VENT CLR 2D ERCW SUP HDR ISOL Annulus 795/Az 315 OPEN 2-FCV-67-141 CV UPPER CNTMT VENT CLR 2D ERCW RET HDR ISOL Annulus 795/Az 315 OPEN 2-FCV-67-142 CV UPPER CNTMT VENT CLR 2B ERCW SUP HDR VENT Annulus 795/Az 315 CLOSED 2-VTV-67-689B CV UPPER CNTMT VENT CLR 2D ERCW SUP HDR VENT Annulus 795/Az 315 CLOSED 2-VTV-67-689 D  CV UPPER CNTMT VENT CLR 2B ERCW SUP HDR VENT Annulus 798/Az 315 CLOSED 2-VTV-67-688B CV UPPER CNTMT VENT CLR 2D ERCW SUP HDR VENT Annulus 798/AZ 315 CLOSED 2-VTV-67-688 D  CV UPPER CNTMT VENT CLR 2B ERCW SUP HDR ISOL Annulus 798/Az 315 OPEN 2-FCV-67-138 CV UPPER CNTMT VENT CLR 2B ERCW RET HDR ISOL Annulus 795/Az 315 OPEN 2-FCV-67-139 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 198 of 204 Checklist 4 (Page 10 of 16)
WBN                  ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                          TRAIN B                Rev. 0000 Page 187 of 204 Checklist 3 (Page 20 of 21)
SUPPLY HDR 2B VALVE ALIGNMENT
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                        Date ________
NOMENCLATURE                LOCATION        POSITION        UNID        PERF    VERIFIER INITIAL  INITIAL U1 Containment UPPER CNTMT VENT CLR 1D            IC/805          OPEN    1-ISV-67-691D ERCW SUP HDR ISOL                 Az 225(6)                                                CV UPPER CNTMT VENT CLR 1D            IC/789      LC & CAPPED  1-DRV-67-764 ERCW RET HDR DRAIN                Az 300(7)                                                CV UPPER CNTMT VENT CLR 1D            IC/790      LC & CAPPED  1-DRV-67-763 ERCW SUP HDR DRAIN                Az 300(2)                                                CV UPPER CNTMT VENT CLR 1B            IC/793      LC & CAPPED  1-DRV-67-765 ERCW SUP HDR DRAIN                Az 3002)                                                  CV UPPER CNTMT VENT CLR 1B            IC/794      LC & CAPPED  1-DRV-67-766 ERCW RET HDR DRAIN                Az 300(2)                                                CV UPPER CNTMT VENT CLR 1D            IC/807        CLOSED    1-TV-67-690D ERCW SUP HDR TEST VENT             Az 318(1)                                                CV RCP MTR CLR 4 ERCW IN              IC/732        CLOSED   1-VTV-67-700D SUP VENT                           Az 319                                                  CV 1-FE-67-255 TEST POINT              IC/729        CLOSED    1-TV-67-862A Az 325                                                  CV 1-FE-67-255 TEST POINT              IC/729        CLOSED     1-TV-67-862B Az 325                                                  CV RCP VENT CLR 4 SUP ERCW             IC/729        CLOSED   1-DRV-67-1001 HDR DRAIN                          Az 325                                                  CV UPPER CNTMT VENT CLR 1D            IC/808          OPEN    1-ISV-67-583D ERCW RET HDR ISOL                 Az 325(1)                                                CV UPPER CNTMT VENT CLR 1D            IC 807          OPEN   1-ISV-67-692D ERCW RET HDR ISOL                  Az 330(1)                                                CV UPPER CNTMT VENT CLR 1D            IC/808      LC & CAPPED  1-TV-67-579D ERCW SUP HDR TEST CONN            Az 330(1)                                                CV UPPER CNTMT VENT CLR 1D            IC/808        CLOSED    1-TV-67-581D ERCW SUP HDR TEST CONN            Az 330(1)                                                CV UPPER CNTMT VENT CLR 1D            IC/807          OPEN     1-FCV-67-298 ERCW RET ISOL                      Az 332(1)                                                CV UPPER CNTMT VENT CLR 1D            IC/807        CLOSED    1-TV-67-1213 ERCW RET HDR TEST VALVE            Az 332(1)                                                CV (6)  Top of S/G doghouse.
(7)   Next to spiral staircase.


Data Package: Page ____ of ____     Date ________  
WBN              ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                      TRAIN B                    Rev. 0000 Page 188 of 204 Checklist 3 (Page 21 of 21)
SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____                                       Date ________
NOMENCLATURE            LOCATION      POSITION        UNID          PERF    VERIFIER INITIAL  INITIAL U1 Containment RCP MTR CLR 4 ERCW RET          IC/726        CLOSED    1-VTV-67-696D HDR VENT                        Az 351                                                    CV 1-FE-67-475 TEST POINT          IC/720        CLOSED      1-TV-67-911 Az 351                                                    CV 1-FE-67-475 TEST POINT          IC/720        CLOSED      1-TV-67-912 Az 351                                                    CV CRD VENT CLR D-B RET            IC/720        CLOSED      1-DRV-67-999 ERCW HDR DRAIN                  Az 351                                                    CV CRD VENT CLR D-B SUP            IC/726        CLOSED      1-DRV-67-997 ERCW HDR DRAIN                  Az 353                                                    CV UPPER CNTMT VENT CLR 1D        IC/808        CLOSED      1-TV-67-584D ERCW RET HDR TEST CONN        Az 355(8)                                                  CV (8)  Top of S/G doghouse.


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U2 Containment - #2 Fan Rm LWR CNTMT VENT CLR B-B ERCW SUP HDR VENT
WBN              ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                      TRAIN B                  Rev. 0000 Page 189 of 204 Checklist 4 (Page 1 of 16)
#2 Fan Rm IC/727  Az 152 CLOSED 2-VTV-67-698B CV2-FE-67-474 TEST POINT
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                    Date ________
#2 Fan Rm IC/724  Az 156 CLOSED 2-TV-67-921A CV2-FE-67-474 TEST POINT
NOMENCLATURE         LOCATION     POSITION         UNID         PERF     VERIFIER INITIAL   INITIAL IPS el 722 ERCW STRAINER 2B-B INLET      IPS/722  0-PI-OPS-17.0    2-FCV-67-24 ISOL                                          LO                                          CV ERCW STRAINER 2B-B OUT        IPS/722  0-PI-OPS-17.0  2-ISV-67-505B ISOL                                          LO                                          CV ERCW B TRAIN HDR               IPS/722      CLOSED      2-ISV-67-1120 CROSSTIE ISOL                                                                              CV ERCW CROSS-TIE HEADER          IPS/722      CLOSED     2-DRV-67-1126 DRAIN                                                                                      CV 2-PDT-67-10A/10D/10F &        IPS/722      OPEN      2-RTV-67-901A 2-PI-67-10A ROOT                                                                          CV 2-PDT-67-10A/2-PI-67-10B      IPS/722      OPEN      2-RTV-67-902A ROOT                                                                                      CV ERCW STRAINER 2B-B VENT       IPS/722      CLOSED     2-VTV-67-907B CV 2-PDT-67-10F ROOT              IPS/722      OPEN      2-RTV-67-925A CV 2-PDT-67-10D ROOT              IPS/722      OPEN       2-RTV-67-926A CV ERCW STRAINER 2B-B             IPS/722      CLOSED      2-FCV-67-10A BACKWASH                                                                                  CV ERCW STRAINER 2B-B FLUSH      IPS/722      CLOSED      2-FCV-67-10B CV Yard el 729 ERCW HDR 2B BACKWASH            YARD    0-PI-OPS-17.0  2-ISV-67-506B ISOL                                          LC                                          CV DG 1A-A/2A-A ERCW SUP          YARD    0-PI-OPS-17.0 2-ISV-67-507B HDR 2B ISOL                                   LO                                          CV 2-FT-67-62/2-FT-67-62C ROOT    YARD        OPEN       2-RTV-67-802A CV 2-FT-67-62/2-FT-67-62C ROOT    YARD        OPEN       2-RTV-67-802B CV DG Bldg DG HX 1A1/1A2 ERCW SUP          DGB        CLOSED       1-FCV-67-68 HDR 2B ISOL                    RM 1AA                                                      CV DG HX 2A1/2A2 ERCW SUP          DGB        CLOSED       2-FCV-67-68 HDR 2B ISOL                    RM 2AA                                                      CV (1)
#2 Fan Rm IC/724  Az 156 CLOSED 2-TV-67-921B CVLWR CNTMT VENT CLR 2B-B ERCW RET HDR VENT  
DG 2A-A FLUSH CONNECTION        DGB        CLOSED    2-FLV-67-651A FOR ERCW HDR 2B               RM 2AA                                                      CV
#2 Fan Rm IC/725  Az 165 CLOSED 2-VTV-67-699B CVRCP 2 MTR CLR ERCW SUP CNTL
#2 Fan Rm IC/725  Az 167 OPERABLE 2-TCV-67-102 CV CONTROL AIR ISOLATION VALVE TO 2-TCV-67-102
#2 Fan Rm IC/725  Az 167 OPEN 2-ISV-32-3564 CVLWR CNTMT VENT CLR 2B-B OUT TEMP CNTL
#2 Fan Rm IC/723  Az 168 OPERABLE 2-TCV-67-100 CV CONTROL AIR ISOLATION VALVE TO 2-TCV-67-100
#2 Fan Rm IC/723 Az 168 OPEN 2-ISV-32-3563 CVLOWER CNTMT CLR HDR B ERCW RET ISOL #2 Fan Rm IC/720  Az 171 OPEN 2-FCV-67-103 CVRCP 2 MTR CLR ERCW RET HDR THROTTLE #2 Fan Rm IC/725  Az 171 OPEN 2-THV-67-572 B  CVLOWER CNTMT CLR HDR B ERCW RET TEST CONN
#2 Fan Rm IC/720  Az 171 CLOSED 2-TV-67-574B CVLOWER CNTMT CLR HDR ERCW RET VENT #2 Fan Rm IC/726 Az 171 CLOSED 2-VTV-67-695B CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 199 of 204 Checklist 4 (Page 11 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT


Data Package: Page ____ of ____     Date ________  
WBN            ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                    TRAIN B                      Rev. 0000 Page 190 of 204 Checklist 4 (Page 2 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                   Date ________
NOMENCLATURE            LOCATION      POSITION          UNID      PERF  VERIFIER INITIAL  INITIAL DG 1A-A FLUSH CONNECTION FOR        DGB        CLOSED      1-FLV-67-651A(1
                                                                    )
ERCW HDR 2B                        RM 1AA                                                  CV Aux Bldg el 676 RHRP ROOM COOLER 2B-B ERCW SUP      A7V/676      OPEN      2-FCV-67-190 FLOW CNTL                                                                      CV RHR PMP RM CLR 2B-B ERCW RET      A7V/676      OPEN      2-THV-67-606B THROTTLE                                                                      CV 2-FE-67-191 TEST POINT      A9V/682    CLOSED      2-TV-67-882A                  CV 2-FE-67-191 TEST POINT      A9V/682    CLOSED      2-TV-67-882A                  CV CS PMP RM CLR 2A-A ERCW RET      A9U/679    CLOSED      2-THV-67-605B THROTTLE                                                                      CV 2-FE-67-187 TEST POINT      A9U/681    CLOSED      2-TV-67-881A                  CV 2-FE-67-187 TEST POINT      A9U/681    CLOSED      2-TV-67-881B                  CV CSP ROOM COOLER 2B-B ERCW SUP      A7U/676    CLOSED      2-FCV-67-186 FLOW CNTL                                                                      CV Aux Bldg el 692 ERCW SUP HDR 2B DRAIN              A15U/706    CLOSED      2-DRV-67-925B                  CV PIPE CHASE COOLER 2B-B ERCW RET    A14U/692  0-PI-OPS-17.0 2-THV-67-611B THROTTLE                                            LT                                      CV (1)
PIPE CHASE COOLER 2B-B ERCW SUP    A14U/692  0-PI-OPS-17.0    2-FCV-67-344 FLOW CNTL                                          LO                                      CV CONTROL AIR ISO VLV TO            A14U/692  0-PI-OPS-17.0  2-ISV-32-3805 2-FCV-67-344                                        LC                                      CV (1)
PENT ROOM COOLER 2B-B ERCW SUP    A12V/692  0-PI-OPS-17.0    2-FCV-67-348 FLOW CNTL                                          LO                                      CV CONTROL AIR ISO VLV TO            A12U/692  0-PI-OPS-17.0  2-ISV-32-2964 2-FCV-67-348                                        LC                                      CV 2-FE-67-349 TEST POINT            A12V/692    CLOSED        2-TV-67-883A                  CV 2-FE-67-349 TEST POINT            A12V/692    CLOSED        2-TV-67-883B                  CV 2-FE-67-345 TEST POINT            A14U/692    CLOSED        2-TV-67-886A                  CV 2-FE-67-345 TEST POINT            A14U/692    CLOSED        2-TV-67-886B                  CV PENT ROOM COOLER 2B-B ERCW RET    A12V/702  0-PI-OPS-17.0 2-THV-67-608B THROTTLE                                            LT                                      CV


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U2 Containment - #2 Fan Rm LOWER CNTMT CLR HDR B ERCW RET ISOL #2 Fan Rm IC/726  Az 171 OPEN 2-ISV-67-100 5B CVCRD VENT CLR 2B-B OUT TEMP CNTL #2 Fan Rm IC/727 Az 171 OPERABLE 2-TCV-67-10 1  CV CONTROL AIR ISOLATION VALVE TO 2-TCV-67-101
WBN          ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                  TRAIN B                  Rev. 0000 Page 191 of 204 Checklist 4 (Page 3 of 16)
#2 Fan Rm IC/727  Az 171 OPEN 2-ISV-32-356 5  CVLOWER CNTMT CLR HDR B ERCW RET DRAIN
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                Date ________
#2 Fan Rm IC/716  Az 172 CLOSED (2) 2-DRV-67-77 3  CVLOWER CNTMT CLR HDR B ERCW SUP DRAIN
NOMENCLATURE           LOCATION     POSITION         UNID       PERF   VERIFIER INITIAL INITIAL PENT/PIPE CHASE RM CLR ERCW SUP  A8V/703  0-PI-OPS-17.0 2-ISV-67-607B HDR 2B ISOL                                      LO                                    CV PENT/PIPE CHASE RM CLR ERCW RET   A8V/703  0-PI-OPS-17.0 2-ISV-67-612B HDR 2B ISOL                                      LO                                    CV AUX BLDG ERCW SUP HDR 2B ISOL    A15U/706 0-PI-OPS-17.0 2-FCV-67-82 LO                                    CV CVCS CCP ROOM CLR 2B-B ERCW      A12T/695      OPEN      2-ISV-67-600B SUP ISOL                                                                                CV Aux Bldg el 692 CVCS CCP ROOM CLR 2B-B ERCW      A12T/695      OPEN     2-ISV-67-602B RET ISOL                                                                                CV SIS PMP RM CLR 2B-B ERCW RET     A7V/696    CLOSED      2-THV-67-604B THROTTLE                                                                                CV 2-FE-67-183 TEST POINT            A7V/692    CLOSED       2-TV-67-880A                CV 2-FE-67-183 TEST POINT            A7V/692    CLOSED      2-TV-67-880A                CV SIP ROOM COOLER 2B-B ERCW SUP     A7V/692    CLOSED       2-FCV-67-182 FLOW CNTL                                                                              CV INSTR RM WATER CLR 2B ERCW SUP    A2U/692      OPEN      2-ISV-67-524B ISOL                                                                                    CV INSTR RM WATER CLR 2B ERCW SUP   A5W/697      OPEN     2-ISV-67-710B ISOL                                                                                    CV INSTR RM WATER CLR 2B ERCW SUP   A11W/693      OPEN      2-TCV-67-118 TEMP CNTL                                                                              CV INSTR RM WATER CLR 2B ERCW IN    A5W/692    CLOSED       2-TV-67-525B TEST CONN                                                                              CV INSTR RM WATER CLR 2B ERCW OUT    A5W/692    CLOSED      2-TV-67-526B TEST CONN                                                                              CV 2-FE-67-259 TEST POINT          A12W/708    CLOSED      2-RTV-67-861A                CV 2-FE-67-259 TEST POINT          A12W/708    CLOSED      2-RTV-67-861B                CV INSTR RM WATER CLR 2B ERCW RET    A4W/692      OPEN     2-THV-67-527B THROTTLE                                                                                CV INSTR RM WATER CLR 2B ERCW RET  A11W/692      OPEN     2-ISV-67-530B ISOL                                                                                    CV LOWER CNTMT CLR HDR B ERCW RET    A2U/692    CLOSED      2-TV-67-576B TEST CONN                                                                              CV
#2 Fan Rm IC/716  Az 172 CLOSED (2) 2-DRV-67-77 4  CVLOWER CNTMT CLR HDR B ERCW SUP ISOL #2 Fan Rm IC/720  Az 173 OPEN 2-FCV-67-10 5  CVLOWER CNTMT CLR HDR B ERCW SUP HDR TEST CONN
#2 Fan Rm IC/720  Az 173 CLOSED 2-TV-67-563 B  CVLWR CNTMT VENT CLR 2B-B ERCW SUP HDR THROTTLE
#2 Fan Rm IC/726  Az 173 OPEN 2-THV-67-56 4B  CVLOWER CNTMT CLR HDR B ERCW SUP ISOL #2 Fan Rm IC/726  Az 173 OPEN 2-ISV-67-100 4B  CVCRD VENT CLR 2B-B ERCW SUP HDR THROTTLE
#2 Fan Rm IC/726  Az 353 OPEN 2-THV-67-56 7B  CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 200 of 204 Checklist 4 (Page 12 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT


Data Package: Page ____ of ____     Date ________  
WBN          ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                  TRAIN B                    Rev. 0000 Page 192 of 204 Checklist 4 (Page 4 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                 Date ________
NOMENCLATURE          LOCATION      POSITION        UNID      PERF  VERIFIER INITIAL  INITIAL LOWER CNTMT CLR HDR D ERCW RET    A14U/692      CLOSED      2-TV-67-576D TEST CONN                                                                                CV LOWER CNTMT CLR HDR B ERCW SUP    A2U/692      CLOSED      2-TV-67-560B HDR TEST CONN                                                                            CV LOWER CNTMT CLR HDR D ERCW SUP    A14U/692      CLOSED      2-TV-67-560D HDR TEST CONN                                                                            CV 2-FI-67-245 ROOT                  A1U/692        OPEN      2-RTV-67-847A                CV 2-FI-67-245 ROOT                  A1U/692        OPEN      2-RTV-67-847B                CV 2-FI-67-251 ROOT                  A2U/692        OPEN      2-RTV-67-845A                CV 2-FI-67-251 ROOT                  A2U/692        OPEN      2-RTV-67-845B                CV LOWER CNTMT CLR HDR B ERCW RET    A2U/692      CLOSED      2-TV-67-576B TEST CONN                                                                                CV LOWER CNTMT CLR HDR D ERCW RET    A14U/692      CLOSED      2-TV-67-576D TEST CONN                                                                                CV LOWER CNTMT VENT CLR 2B & 2D      A2U/692        OPEN      2-ISV-67-523B ERCW SUP ISOL                                                                            CV ERCW FLOOD MODE RET HDR B ISOL    A14V/692      CLOSED    0-ISV-67-528B                CV BIOCIDE RECIRC ERCW HDR 2B ISOL    A4T/695      CLOSED    2-ISV-67-715B                CV CVCS PDP RM CLR 2C ERCW SUP        A11T/692      OPEN      2-ISV-67-639 ISOL                                                                                      CV CVCS PDP RM CLR 2B-B ERCW RET      A11T/692      OPEN      2-ISV-67-641 ISOL                                                                                      CV SIS/CS/RHR PMP RM CLR ERCW RET    A8V/692        OPEN      2-ISV-67-613B HDR 2B ISOL                                                                              CV SIS/CS/RHR PMP RM CLR ERCW SUP    A7V/703        OPEN      2-ISV-67-603B HDR 2B ISOL                                                                              CV Aux Bldg el 713 PENT ROOM COOLER 2B-B ERCW SUP    A14V/713  0-PI-OPS-17.0  2-FCV-67-352 FLOW CNTL                                          LO                                    CV CONTROL AIR ISOLATION VALVE TO    A14U/713  0-PI-OPS-17.0 2-ISV-32-3167 2-FCV-67-352                                        LC                                    CV BA XFER/AFW PMP SPACE CLR 2B-B    A15T/713  0-PI-OPS-17.0 2-THV-67-673B ERCW THROTTLE                                      LT                                    CV BA XFER/AFW PMP SPACE CLR 2B-B    A15T/713  0-PI-OPS-17.0 2-ISV-67-674B ERCW RET ISOL                                      LO                                    CV


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U2 Containment - #1 Fan Rm CRD VENT CLR 2D-B ERCW SUP HDR THROTTLE
WBN          ERCW SYSTEM FLOW BALANCE          2-PTI-067-02-B Unit 1 & 2                  TRAIN B              Rev. 0000 Page 193 of 204 Checklist 4 (Page 5 of 16)
#1 Fan Rm IC/726  Az 173 OPEN 2-THV-67-567 D  CVLOWER CNTMT CLR HDR D ERCW RET DRAIN
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                            Date ________
#1 Fan Rm IC/718  Az 353 CLOSED 2-DRV-67-771 CVLOWER CNTMT CLR HDR D ERCW SUP DRAIN 
NOMENCLATURE           LOCATION   POSITION     UNID       PERF   VERIFIER INITIAL INITIAL 2-FI-67-247 ROOT                  A14V/713    OPEN  2-RTV-67-846A                CV 2-FI-67-247 ROOT                  A14V/713    OPEN  2-RTV-67-846B                CV 2-FI-67-253 ROOT                  A13V/713    OPEN  2-RTV-67-844A                CV 2-FI-67-253 ROOT                  A13V/713    OPEN  2-RTV-67-844B                CV 2-FI-67-335 ROOT                  A3V/713      OPEN  2-RTV-67-836A                CV 2-FI-67-335 ROOT                  A3V/713      OPEN   2-RTV-67-836B                CV 2-FI-67-269 ROOT                  A3V/713      OPEN  2-RTV-67-837A                CV 2-FI-67-269 ROOT                  A3V/713      OPEN  2-RTV-67-837B                CV 2-FI-67-334 ROOT                  A3V/730      OPEN   2-RTV-67-838A                CV 2-FI-67-334 ROOT                  A3V/730      OPEN   2-RTV-67-838B                CV 2-FI-67-267 ROOT                  A3V/713      OPEN  2-RTV-67-839A                CV 2-FI-67-267 ROOT                  A3V/713      OPEN  2-RTV-67-839B                CV UPPER CNTMT VENT CLR 2D ERCW      A3V/713  OPERABLE   2-TCV-67-140 RET TEMP CNTL                                                                        CV CONTROL AIR ISOLATION VALVE TO     A3V/713      OPEN  2-ISV-32-3115 2-FCV-67-140                                                                        CV UPPER CNTMT VENT CLR 2B ERCW      A3V/713  OPERABLE  2-TCV-67-137 RET TEMP CNTL                                                                        CV CONTROL AIR ISOLATION VALVE TO    A3V/713      OPEN   2-ISV-32-3116 2-FCV-67-137                                                                        CV UPPER CTNMT VENT CLR 2D ERCW      A13U/713    OPEN  2-THV-67-588D RET THROTTLE                                                                        CV UPPER CNTMT VENT CLR 2D ERCW      A3U/713      OPEN  2-ISV-67-587D RET HDR ISOL                                                                        CV UPPER CTNMT VENT CLR 2B ERCW      A13U/713    OPEN  2-THV-67-588B RET THROTTLE                                                                        CV UPPER CNTMT VENT CLR 2B ERCW      A3U/713      OPEN  2-ISV-67-587D RET HDR ISOL                                                                        CV LOWER CNTMT VENT CLR 2B & 2D       A3V/732      OPEN  2-ISV-67-577B ERCW RET ISOL                                                                        CV UPPER CNTMT VENT CLR 2B & 2D      A3U/713      OPEN  2-ISV-67-590B ERCW RET ISOL                                                                        CV TD AFW PUMP ERCW SUP HDR ISOL      A12U/731    CLOSED  2-ISV-67-924B                CV 2-FE-67-220 TEST POINT            A15T/713    CLOSED  2-TV-67-878A                CV
#1 Fan Rm IC/718  Az 351 CLOSED 2-DRV-67-772 CVLOWER CNTMT CLR HDR D ERCW RET ISOL #1 Fan Rm IC/720  Az 357 OPEN 2-FCV-67-111 CVLOWER CNTMT CLR HDR D ERCW SUP ISOL #1 Fan Rm IC/720  Az 353 OPEN 2-FCV-67-113 CVLOWER CNTMT CLR HDR D ERCW SUP HDR TEST CONN
#1 Fan Rm IC/720  Az 353 CLOSED 2-TV-67-563D CVLOWER CNTMT CLR HDR D ERCW RET TEST CONN
#1 Fan Rm IC/720  Az 351 CLOSED 2-TV-67-574D CVLWR CNTMT VENT CLR 2D-B OUT TEMP CNTL
#1 Fan Rm IC/723  Az 349 OPERABLE 2-TCV-67-108 CV CONTROL AIR ISOLATION VALVE TO 2-TCV-67-108
#1 Fan Rm IC/723  Az 349 OPEN 2-ISV-32-3605 CV2-FE-67-476 TEST POINT
#1 Fan Rm IC/724  Az 336 CLOSED 2-TV-67-922A CV2-FE-67-476 TEST POINT
#1 Fan Rm IC/724  Az 336 CLOSED 2-TV-67-922B CVCRD VENT CLR 2D-B OUT TEMP CNTL #1 Fan Rm IC/725  Az 351 OPERABLE 2-TCV-67-109 CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 201 of 204 Checklist 4 (Page 13 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT


Data Package: Page ____ of ____     Date ________  
WBN          ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                  TRAIN B                    Rev. 0000 Page 194 of 204 Checklist 4 (Page 6 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                 Date ________
NOMENCLATURE          LOCATION      POSITION        UNID      PERF  VERIFIER INITIAL  INITIAL Aux Bldg el 713 2-FE-67-220 TEST POINT          A15T/713      CLOSED      2-TV-67-878B                  CV PENT ROOM COOLER 2B-B ERCW      A14U/713    0-PI-OPS-17.0 2-THV-67-609 RET THROTTLE                                      LT            B                      CV 2-FE-67-353 TEST POINT          A14V/713      CLOSED      2-TV-67-884A                  CV 2-FE-67-353 TEST POINT          A14V/713      CLOSED      2-TV-67-884B                  CV CSS HX 2B ERCW BIOCIDE CIRC    A12V/715        OPEN      2-ISV-67-538B BYP                                                                                      CV BA XFER/AFW PMP SPACE CLR      A15T/713    OPERABLE    2-FCV-67-219 2B-B ERCW FLOW CNTL                                                                      CV CONTROL AIR ISOLATION VALVE    A15T/713        OPEN      2-ISV-32-3031 TO 2-FCV-67-219                                                                          CV BA XFER/AFW PMP SPACE CLR      A15T/713    0-PI-OPS-17.0 2-ISV-67-648B 2B-B ERCW SUP ISOL                                LO                                    CV CCS HX C OUTLET ERCW FLOW      A11S/737    0-PI-OPS-17.0  0-ISV-67-553 CNTL ISOL                                        LO                                    CV 2-FE-67-159 TEST POINT          A13R/744      CLOSED      2-TV-67-822A                  CV 2-FE-67-159 TEST POINT          A13R/744      CLOSED      2-TV-67-822B                  CV ERCW HDR 2B A/C EQUIP RET      A12T/735    0-PI-OPS-17.0 2-ISV-67-554B ISOL                                              LO                                    CV CS HX 2B ERCW DRAIN            A9V/713      CLOSED        2-DRV                                                                536B                      CV CS HX 2B CS HX 2B              A9V/730        OPEN      2-ISV-67-537B                  CV CNTMT SPRAY HX 2B-B ERCW        A13V/713      CLOSED    2-FCV-67-124 RETURN                                                                                  CV UPPER CNTMT VENT CLR 2B        A13V/732      CLOSED    2-TV-67-586B ERCW RET HDR TEST CONN                                                                  CV UPPER CNTMT VENT CLR 2D        A13V/732      CLOSED    2-TV-67-586D ERCW RET HDR TEST CONN                                                                  CV UPPER CNTMT VENT CLR 2B & 2D    A13U/713        OPEN      2-ISV-67-531B ERCW SUP ISOL                                                                            CV Aux Bldg el 737 CSS HX 2B ERCW BIOCIDE CIRC    A12U/737        OPEN      2-ISV-67-533B BYP                                                                                      CV CCS HX C ERCW VENT              A5T/737      CLOSED      0-VTV-67-540                  CV


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U2 Containment - #1 Fan Rm LWR CNTMT VENT CLR D-B ERCW  
WBN          ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                  TRAIN B                  Rev. 0000 Page 195 of 204 Checklist 4 (Page 7 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                Date ________
NOMENCLATURE           LOCATION     POSITION         UNID       PERF   VERIFIER INITIAL   INITIAL CCS HX C ERCW VENT              A10T/737      CLOSED    0-VTV-67-541                    CV SD BD ROOM A/C CHLR B-B ERCW    A13R/737  0-PI-OPS-17.0 2-THV-67-555 RET THROTTLE                                    LT                                      CV PENT ROOM COOLER 2B-B ERCW      A12V/737    OPERABLE    2-FCV-67-356 SUP FLOW CNTL                                                                            CV CONTROL AIR ISOLATION VALVE    A12V/737      OPEN      2-ISV-32-3323 TO 2-FCV-67-356                                                                          CV PENT ROOM COOLER 2B-B ERCW      A12V/737  0-PI-OPS-17.0 2-THV-67-610 RET THROTTLE                                    LT            B                        CV 2-FE-67-357 TEST POINT          A11V/737      CLOSED    2-TV-67-885A                    CV 2-FE-67-357 TEST POINT          A11V/737      CLOSED    2-TV-67-885B                    CV 2-TCV-67-137 BYPASS            A3V/713      CLOSED    2-BYV-67-589 B                        CV 2-TCV-67-137 BYPASS            A3V/713      CLOSED    2-BYV-67-589 D                        CV SD BD ROOM A/C CHLR B-B ERCW    A13R/740      CLOSED      2-TV-67-676 SUP TEST CONN                                                                            CV SD BD ROOM A/C CHLR B-B ERCW    A13R/740      CLOSED      2-TV-67-677 RET TEST CONN                                                                            CV CCS HX C OUTLET ERCW HDR B      A10T/746    OPERABLE    0-FCV-67-152 FLOW CNTL                                                                                CV CCS SURGE TANK B ERCW SUP      A13T/749      CLOSED    2-ISV-67-543B HDR 2B ISOL                                                                              CV CCS HX C ERCW HDR 2B SUPPLY    A3S/752    0-PI-OPS-17.0 2-FCV-67-147 ISOL                                            LO                                      CV SD BD ROOM A/C CHLR B-B ERCW    A12R/752        (1)      2-ISV-67-675 SUP ISOL                                  0-PI-OPS-17.0 LO                                      CV ERCW RETURN HDR 2B VENT        A12T/752      CLOSED    2-VTV-67-994 CV EGTS ROOM COOLER B ERCW        A12V/753      CLOSED    2-DRV-67-993 RET HDR DRAIN                                                                            CV EGTS ROOM COOLER B ERCW        A12V/753      CLOSED    2-DRV-67-995 SUP HDR DRAIN                                                                            CV CNTMT SPRAY HX 2B-B ERCW       A13U/737      CLOSED    2-FCV-67-123 SUPPLY                                                                                  CV


SUP HDR VENT  
WBN          ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                  TRAIN B                    Rev. 0000 Page 196 of 204 Checklist 4 (Page 8 of 16)
#1 Fan Rm IC/727  Az 332 CLOSED 2-VTV-67-698 D  CVLOWER CNTMT VENT CLR D-B ERCW RET HDR VENT  
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                  Date ________
#1 Fan Rm IC/725  Az 345 CLOSED 2-VTV-67-699 D  CVRCP 4 MTR CLR ERCW SUP CNTL
NOMENCLATURE          LOCATION      POSITION        UNID        PERF    VERIFIER INITIAL  INITIAL CS HX 2B ERCW SUP HDR VENT     A12U/737      CLOSED     2-VTV-67-534B                  CV CS HX 2B ERCW VENT             A9V/745      CLOSED     2-VTV-67-535B                  CV Aux Bldg el 737 AUX BLDG AIR CLR ERCW SUP       A12T/754    0-PI-OPS-17.0 2-FCV-67-128 HDR 2B ISOL                                      LO                                      CV 2-FE-67-340 TEST POINT          A9U/754        CLOSED      2-TV-67-877A CV 2-FE-67-340 TEST POINT          A9U/754        CLOSED      2-TV-67-877B CV Aux Bldg el 757 AUX CNTL AIR COMPR B-B ERCW     A9U/757    0-PI-OPS-17.0 2-ISV-67-680 SUP ISOL                                          LO                                      CV AUX CNTL AIR COMPR B-B ERCW     A9U/757    0-PI-OPS-17.0 0-BYV-67-682 INLET BYPASS                                      LC                                      CV AUX CNTL AIR COMPR B ERCW       A9U/757    0-PI-OPS-17.0 0-ISV-67-681A SUP ISOL                                         LO                                      CV AUX CNTL AIR COMPR B ERCW      A9U/757    0-PI-OPS-17.0 0-ISV-67-681B SUP ISOL                                          LO                                      CV AUX CNTL AIR COMPR B-B ERCW     A9U/757    0-PI-OPS-17.0 2-THV-67-683 RET THROTTLE                                      LT                                      CV EGTS ROOM COOLER 2B-B ERCW      EGTS      0-PI-OPS-17.0 2-THV-67-685 RET THROTTLE                    ROOM            LT            B A12W/757                                                  CV 2-FE-67-339 TEST POINT          EGTS          CLOSED      2-TV-67-876A ROOM A12W/757                                                  CV 2-FE-67-339 TEST POINT          EGTS          CLOSED      2-TV-67-876B ROOM A12W/757                                                  CV EGTS ROOM COOLER 2B-B ERCW       EGTS        OPERABLE      2-FCV-67-338 SUPPLY FLOW CNTL                ROOM A11W/772                                                  CV CONTROL AIR ISOLATION VALVE      EGTS          OPEN      2-ISV-32-3410 TO 2-FCV-67-338                  ROOM A11W/772                                                  CV EGTS ROOM COOLER 2B-B ERCW      EGTS      0-PI-OPS-17.0 2-ISV-67-684B SUP ISOL                        ROOM            LO A11W/772                                                  CV
#1 Fan Rm IC/727 Az 347 OPERABLE 2-TCV-67-110 CV CONTROL AIR ISOLATION VALVE TO 2-TCV-67-110
#1 Fan Rm IC/727  Az 347 OPEN 2-ISV-32-3607 CV CONTROL AIR ISOLATION VALVE TO 2-TCV-67-109
#1 Fan Rm IC/725  Az 351 OPEN 2-ISV-32-3606 CVRCP 4 MTR CLR ERCW RET HDR THROTTLE #1 Fan Rm IC/725 Az 351 OPEN 2-THV-67-572 D  CVLOWER CNTMT CLR HDR ERCW RET VENT #1 Fan Rm IC/726 Az 351 CLOSED 2-VTV-67-695 D  CVLOWER CNTMT CLR HDR D ERCW RET ISOL #1 Fan Rm IC/726  Az 351 OPEN 2-ISV-67-1005 D  CVLWR CNTMT VENT CLR 2D-B ERCW SUP HDR THROTTLE
#1 Fan Rm IC/726 Az 353 OPEN 2-THV-67-564 D CVLOWER CNTMT CLR HDR D ERCW SUP ISOL #1 Fan Rm IC/726  Az 353 OPEN 2-ISV-67-1004 D  CV WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 202 of 204 Checklist 4 (Page 14 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT


Data Package: Page ____ of ____     Date ________  
WBN          ERCW SYSTEM FLOW BALANCE            2-PTI-067-02-B Unit 1 & 2                  TRAIN B                Rev. 0000 Page 197 of 204 Checklist 4 (Page 9 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                               Date ________
NOMENCLATURE          LOCATION      POSITION      UNID        PERF    VERIFIER INITIAL  INITIAL U2 Annulus LOWER CNTMT CLR HDR B ERCW      Annulus        OPEN    2-FCV-67-99 SUP ISOL                      718/Az 180                                              CV LOWER CNTMT CLR HDR B ERCW      Annulus      CLOSED  2-VTV-67-693B RET VENT                      718/Az 177                                              CV LOWER CNTMT CLR HDR B ERCW      Annulus      CLOSED  2-VTV-67-694B SUP VENT                      718/Az 173                                              CV LOWER CNTMT CLR HDR B ERCW      Annulus        OPEN    2-FCV-67-104 RET ISOL                      720/Az 171                                              CV LOWER CNTMT CLR HDR D ERCW      Annulus        OPEN    2-FCV-67-107 SUP ISOL                      715/Az 353                                              CV LOWER CNTMT CLR HDR D ERCW      Annulus        OPEN    2-FCV-67-112 RET ISOL                      715/Az 350                                              CV LOWER CNTMT CLR HDR D ERCW      Annulus      CLOSED  2-VTV-67-694 SUP VENT                      717/Az 351                    D                        CV LOWER CNTMT CLR HDR D ERCW      Annulus      CLOSED  2-VTV-67-693 RET VENT                      721/Az 346                    D                        CV UPPER CNTMT VENT CLR 2D        Annulus        OPEN    2-FCV-67-141 ERCW SUP HDR ISOL            795/Az 315                                              CV UPPER CNTMT VENT CLR 2D        Annulus        OPEN    2-FCV-67-142 ERCW RET HDR ISOL            795/Az 315                                              CV UPPER CNTMT VENT CLR 2B        Annulus      CLOSED  2-VTV-67-689B ERCW SUP HDR VENT            795/Az 315q                                            CV UPPER CNTMT VENT CLR 2D        Annulus      CLOSED  2-VTV-67-689 ERCW SUP HDR VENT            795/Az 315q                    D                        CV UPPER CNTMT VENT CLR 2B        Annulus      CLOSED  2-VTV-67-688B ERCW SUP HDR VENT            798/Az 315q                                            CV UPPER CNTMT VENT CLR 2D        Annulus      CLOSED  2-VTV-67-688 ERCW SUP HDR VENT            798/AZ 315                    D                        CV UPPER CNTMT VENT CLR 2B        Annulus        OPEN    2-FCV-67-138 ERCW SUP HDR ISOL            798/Az 315                                              CV UPPER CNTMT VENT CLR 2B        Annulus        OPEN    2-FCV-67-139 ERCW RET HDR ISOL            795/Az 315                                              CV


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U2 Containment UPPER CNTMT VENT CLR 2B ERCW SUP HDR ISOL IC/805  Az 135 (9) OPEN 2-ISV-67-691B CVRCP MTR CLR 2 ERCW IN SUP VENT IC/732  Az 137 CLOSED 2-VTV-67-700B CV UPPER CNTMT VENT CLR 2B ERCW RET HDR ISOL IC/808  Az 143 (1) OPEN 2-ISV-67-583B CV2-FE-67-249 TEST POINT IC/729  Az 143 CLOSED 2-TV-67-863A CV2-FE-67-249 TEST POINT IC/729  Az 143 CLOSED 2-TV-67-863B CV UPPER CNTMT VENT CLR 2B ERCW RET HDR ISOL IC/807  Az 150 (1) OPEN 2-ISV-67-692B CV UPPER CNTMT VENT CLR 2B ERCW SUP HDR TEST CONN IC/808  Az 150 (1) CLOSED 2-TV-67-579B CV UPPER CNTMT VENT CLR 2B ERCW SUP HDR TEST CONN IC/808  Az 150 (1) CLOSED 2-TV-67-581B CV UPPER CNTMT VENT CLR 2B ERCW SUP HDR TEST VENT IC/809  Az 150 (1) CLOSED 2-TV-67-690B CV UPPER CNTMT VENT CLR 2B ERCW RET ISOL IC/807  Az 152 (1) OPEN 2-FCV-67-297 CV UPPER CNTMT VENT CLR 2B ERCW RET HDR TEST VALVE IC/807  Az 152 (1) CLOSED 2-TV-67-1211 CV UPPER CNTMT VENT CLR 2B ERCW RET HDR TEST CONN IC/808  Az 155 (1) CLOSED 2-TV-67-584B CVRCP MTR CLR 2 ERCW RET HDR VENT IC/726  Az 171 CLOSED 2-VTV-67-696B CV2-FE-67-477 TEST POINT IC/730  Az 189 CLOSED 2-TV-67-913 CV2-FE-67-477 TEST POINT IC/730  Az 189 CLOSED 2-TV-67-914 CV (9) Top of S/G doghouse.
WBN          ERCW SYSTEM FLOW BALANCE                2-PTI-067-02-B Unit 1 & 2                  TRAIN B                    Rev. 0000 Page 198 of 204 Checklist 4 (Page 10 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                  Date ________
NOMENCLATURE           LOCATION     POSITION           UNID       PERF   VERIFIER INITIAL   INITIAL U2 Containment - #2 Fan Rm LWR CNTMT VENT CLR B-B ERCW   #2 Fan Rm      CLOSED       2-VTV-67-698B SUP HDR VENT                     IC/727 Az 152                                                    CV 2-FE-67-474 TEST POINT         #2 Fan Rm      CLOSED       2-TV-67-921A IC/724 Az 156                                                    CV 2-FE-67-474 TEST POINT         #2 Fan Rm      CLOSED       2-TV-67-921B IC/724 Az 156                                                    CV LWR CNTMT VENT CLR 2B-B        #2 Fan Rm      CLOSED      2-VTV-67-699B ERCW RET HDR VENT                IC/725 Az 165                                                    CV RCP 2 MTR CLR ERCW SUP CNTL    #2 Fan Rm    OPERABLE        2-TCV-67-102 IC/725 Az 167                                                    CV CONTROL AIR ISOLATION VALVE    #2 Fan Rm      OPEN        2-ISV-32-3564 TO 2-TCV-67-102                  IC/725 Az 167                                                    CV LWR CNTMT VENT CLR 2B-B OUT    #2 Fan Rm    OPERABLE        2-TCV-67-100 TEMP CNTL                        IC/723 Az 168                                                    CV CONTROL AIR ISOLATION VALVE    #2 Fan Rm      OPEN       2-ISV-32-3563 TO 2-TCV-67-100                  IC/723 Az 168                                                    CV LOWER CNTMT CLR HDR B ERCW     #2 Fan Rm      OPEN        2-FCV-67-103 RET ISOL                        IC/720 Az 171                                                    CV RCP 2 MTR CLR ERCW RET HDR     #2 Fan Rm      OPEN        2-THV-67-572 THROTTLE                        IC/725                          B Az 171                                                    CV LOWER CNTMT CLR HDR B ERCW    #2 Fan Rm      CLOSED       2-TV-67-574B RET TEST CONN                    IC/720 Az 171                                                    CV LOWER CNTMT CLR HDR ERCW      #2 Fan Rm      CLOSED       2-VTV-67-695B RET VENT                        IC/726 Az 171                                                    CV


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 203 of 204 Checklist 4 (Page 15 of 16)
WBN           ERCW SYSTEM FLOW BALANCE             2-PTI-067-02-B Unit 1 & 2                  TRAIN B                    Rev. 0000 Page 199 of 204 Checklist 4 (Page 11 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT  
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                  Date ________
NOMENCLATURE          LOCATION      POSITION          UNID      PERF    VERIFIER INITIAL  INITIAL U2 Containment - #2 Fan Rm LOWER CNTMT CLR HDR B ERCW    #2 Fan Rm      OPEN      2-ISV-67-100 RET ISOL                        IC/726                      5B Az 171                                                  CV CRD VENT CLR 2B-B OUT TEMP    #2 Fan Rm    OPERABLE      2-TCV-67-10 CNTL                            IC/727                        1 Az 171                                                  CV CONTROL AIR ISOLATION VALVE  #2 Fan Rm      OPEN      2-ISV-32-356 TO 2-TCV-67-101                IC/727                        5 Az 171                                                  CV LOWER CNTMT CLR HDR B ERCW    #2 Fan Rm  CLOSED (2) 2-DRV-67-77 RET DRAIN                      IC/716                        3 Az 172                                                  CV LOWER CNTMT CLR HDR B ERCW    #2 Fan Rm  CLOSED (2) 2-DRV-67-77 SUP DRAIN                      IC/716                        4 Az 172                                                  CV LOWER CNTMT CLR HDR B ERCW                  OPEN        2-FCV-67-10
                              #2 Fan Rm SUP ISOL                        IC/720                        5 Az 173                                                  CV LOWER CNTMT CLR HDR B ERCW    #2 Fan Rm    CLOSED      2-TV-67-563 SUP HDR TEST CONN              IC/720                        B Az 173                                                  CV LWR CNTMT VENT CLR 2B-B      #2 Fan Rm      OPEN        2-THV-67-56 ERCW SUP HDR THROTTLE          IC/726                      4B Az 173                                                  CV LOWER CNTMT CLR HDR B ERCW    #2 Fan Rm      OPEN      2-ISV-67-100 SUP ISOL                        IC/726                      4B Az 173                                                  CV CRD VENT CLR 2B-B ERCW SUP    #2 Fan Rm      OPEN        2-THV-67-56 HDR THROTTLE                    IC/726                      7B Az 353                                                  CV


Data Package: Page ____ of ____     Date ________  
WBN          ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                  TRAIN B                    Rev. 0000 Page 200 of 204 Checklist 4 (Page 12 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                   Date ________
NOMENCLATURE          LOCATION    POSITION        UNID          PERF      VERIFIER INITIAL    INITIAL U2 Containment - #1 Fan Rm CRD VENT CLR 2D-B ERCW SUP    #1 Fan Rm      OPEN        2-THV-67-567 HDR THROTTLE                    IC/726                          D Az 173                                                    CV LOWER CNTMT CLR HDR D ERCW    #1 Fan Rm    CLOSED        2-DRV-67-771 RET DRAIN                        IC/718 Az 353                                                    CV LOWER CNTMT CLR HDR D ERCW    #1 Fan Rm    CLOSED        2-DRV-67-772 SUP DRAIN                        IC/718 Az 351                                                    CV LOWER CNTMT CLR HDR D ERCW    #1 Fan Rm      OPEN        2-FCV-67-111 RET ISOL                        IC/720 Az 357                                                    CV LOWER CNTMT CLR HDR D ERCW    #1 Fan Rm      OPEN        2-FCV-67-113 SUP ISOL                        IC/720 Az 353                                                    CV LOWER CNTMT CLR HDR D ERCW    #1 Fan Rm    CLOSED        2-TV-67-563D SUP HDR TEST CONN                IC/720 Az 353                                                    CV LOWER CNTMT CLR HDR D ERCW    #1 Fan Rm    CLOSED        2-TV-67-574D RET TEST CONN                    IC/720 Az 351                                                    CV LWR CNTMT VENT CLR 2D-B OUT    #1 Fan Rm    OPERABLE      2-TCV-67-108 TEMP CNTL                        IC/723 Az 349                                                    CV CONTROL AIR ISOLATION VALVE    #1 Fan Rm      OPEN        2-ISV-32-3605 TO 2-TCV-67-108                  IC/723 Az 349                                                    CV 2-FE-67-476 TEST POINT        #1 Fan Rm    CLOSED        2-TV-67-922A IC/724 Az 336                                                    CV 2-FE-67-476 TEST POINT        #1 Fan Rm    CLOSED        2-TV-67-922B IC/724 Az 336                                                    CV CRD VENT CLR 2D-B OUT TEMP    #1 Fan Rm    OPERABLE      2-TCV-67-109 CNTL                            IC/725 Az 351                                                    CV


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U2 Containment UPPER CNTMT VENT CLR 2D ERCW SUP HDR ISOL IC/805  Az 225 (10) OPEN 2-ISV-67-691D CV UPPER CNTMT VENT CLR 2D ERCW RET HDR DRAIN IC/789  Az 300 (11) CLOSED 2-DRV-67-764 CV UPPER CNTMT VENT CLR 2D ERCW SUP HDR DRAIN IC/790  Az 300 (11) CLOSED 2-DRV-67-763 CV UPPER CNTMT VENT CLR 2B ERCW SUP HDR DRAIN IC/793  Az 300 (11) CLOSED 2-DRV-67-765 CV UPPER CNTMT VENT CLR 2B ERCW RET HDR DRAIN IC/794  Az 300 (11) CLOSED 2-DRV-67-766 CV UPPER CNTMT VENT CLR 2D ERCW SUP HDR TEST VENT IC/807  Az 318 (10) CLOSED 2-TV-67-690D CVRCP MTR CLR 4 ERCW IN SUP VENT IC/732  Az 319 CLOSED 2-VTV-67-700D CV2-FE-67-255 TEST POINT IC/729  Az 325 CLOSED 2-TV-67-862A CV2-FE-67-255 TEST POINT IC/729  Az 325 CLOSED 2-TV-67-862B CVRCP VENT CLR 4 SUP ERCW HDR DRAIN IC/729  Az 325 CLOSED 2-DRV-67-1001 CV UPPER CNTMT VENT CLR 2D ERCW RET HDR ISOL IC/808  Az 325 (10) OPEN 2-ISV-67-583D CV UPPER CNTMT VENT CLR 2D ERCW RET HDR ISOL IC 807  Az 330 (10) OPEN 2-ISV-67-692D CV UPPER CNTMT VENT CLR 2D ERCW SUP HDR TEST CONN IC/808  Az 330 (10) CLOSED 2-TV-67-579D CV UPPER CNTMT VENT CLR 2D ERCW SUP HDR TEST CONN IC/808  Az 330 (10) CLOSED 2-TV-67-581D CV UPPER CNTMT VENT CLR 2D ERCW RET ISOL IC/807  Az 332 (10) OPEN 2-FCV-67-298 CV UPPER CNTMT VENT CLR 2D ERCW RET HDR TEST VALVE IC/807  Az 332 (10) CLOSED 2-TV-67-1213 CV (10) Top of S/G doghouse. (11) Next to spiral staircase.
WBN          ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                  TRAIN B                    Rev. 0000 Page 201 of 204 Checklist 4 (Page 13 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                  Date ________
NOMENCLATURE           LOCATION     POSITION         UNID       PERF   VERIFIER INITIAL   INITIAL U2 Containment - #1 Fan Rm LWR CNTMT VENT CLR D-B ERCW   #1 Fan Rm      CLOSED       2-VTV-67-698 SUP HDR VENT                    IC/727                          D Az 332                                                  CV LOWER CNTMT VENT CLR D-B      #1 Fan Rm      CLOSED       2-VTV-67-699 ERCW RET HDR VENT              IC/725                          D Az 345                                                  CV RCP 4 MTR CLR ERCW SUP CNTL  #1 Fan Rm    OPERABLE      2-TCV-67-110 IC/727 Az 347                                                  CV CONTROL AIR ISOLATION VALVE  #1 Fan Rm      OPEN        2-ISV-32-3607 TO 2-TCV-67-110                IC/727 Az 347                                                  CV CONTROL AIR ISOLATION VALVE  #1 Fan Rm      OPEN        2-ISV-32-3606 TO 2-TCV-67-109                IC/725 Az 351                                                  CV RCP 4 MTR CLR ERCW RET HDR    #1 Fan Rm      OPEN        2-THV-67-572 THROTTLE                        IC/725                          D Az 351                                                  CV LOWER CNTMT CLR HDR ERCW      #1 Fan Rm      CLOSED       2-VTV-67-695 RET VENT                        IC/726                          D Az 351                                                  CV LOWER CNTMT CLR HDR D ERCW   #1 Fan Rm      OPEN       2-ISV-67-1005 RET ISOL                       IC/726                          D Az 351                                                  CV LWR CNTMT VENT CLR 2D-B      #1 Fan Rm      OPEN        2-THV-67-564 ERCW SUP HDR THROTTLE          IC/726                          D Az 353                                                  CV LOWER CNTMT CLR HDR D ERCW   #1 Fan Rm      OPEN       2-ISV-67-1004 SUP ISOL                        IC/726                          D Az 353                                                  CV


WBN Unit 1 & 2 ERCW SYSTEM FLOW BALANCE TRAIN B 2-PTI-067-02-B Rev. 0000 Page 204 of 204 Checklist 4 (Page 16 of 16)
WBN             ERCW SYSTEM FLOW BALANCE           2-PTI-067-02-B Unit 1 & 2                    TRAIN B                Rev. 0000 Page 202 of 204 Checklist 4 (Page 14 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT  
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                Date ________
NOMENCLATURE            LOCATION      POSITION      UNID      PERF    VERIFIER INITIAL  INITIAL U2 Containment UPPER CNTMT VENT CLR 2B            IC/805        OPEN  2-ISV-67-691B ERCW SUP HDR ISOL                Az 135(9)                                            CV RCP MTR CLR 2 ERCW IN SUP          IC/732        CLOSED  2-VTV-67-700B VENT                              Az 137                                              CV UPPER CNTMT VENT CLR 2B            IC/808        OPEN  2-ISV-67-583B ERCW RET HDR ISOL                Az 143(1)                                            CV 2-FE-67-249 TEST POINT            IC/729        CLOSED  2-TV-67-863A Az 143                                              CV 2-FE-67-249 TEST POINT            IC/729        CLOSED  2-TV-67-863B Az 143                                              CV UPPER CNTMT VENT CLR 2B            IC/807        OPEN  2-ISV-67-692B ERCW RET HDR ISOL                Az 150(1)                                            CV UPPER CNTMT VENT CLR 2B            IC/808      CLOSED    2-TV-67-579B ERCW SUP HDR TEST CONN            Az 150(1)                                            CV UPPER CNTMT VENT CLR 2B            IC/808      CLOSED    2-TV-67-581B ERCW SUP HDR TEST CONN            Az 150(1)                                            CV UPPER CNTMT VENT CLR 2B            IC/809      CLOSED    2-TV-67-690B ERCW SUP HDR TEST VENT            Az 150(1)                                            CV UPPER CNTMT VENT CLR 2B            IC/807        OPEN    2-FCV-67-297 ERCW RET ISOL                    Az 152(1)                                            CV UPPER CNTMT VENT CLR 2B            IC/807      CLOSED    2-TV-67-1211 ERCW RET HDR TEST VALVE          Az 152(1)                                            CV UPPER CNTMT VENT CLR 2B            IC/808      CLOSED    2-TV-67-584B ERCW RET HDR TEST CONN            Az 155(1)                                            CV RCP MTR CLR 2 ERCW RET HDR        IC/726        CLOSED  2-VTV-67-696B VENT                              Az 171                                              CV 2-FE-67-477 TEST POINT            IC/730        CLOSED    2-TV-67-913 Az 189                                              CV 2-FE-67-477 TEST POINT            IC/730        CLOSED    2-TV-67-914 Az 189                                              CV (9)  Top of S/G doghouse.


Data Package: Page ____ of ____     Date ________  
WBN                ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                            TRAIN B                  Rev. 0000 Page 203 of 204 Checklist 4 (Page 15 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                         Date ________
NOMENCLATURE              LOCATION        POSITION        UNID        PERF    VERIFIER INITIAL  INITIAL U2 Containment UPPER CNTMT VENT CLR 2D            IC/805          OPEN    2-ISV-67-691D ERCW SUP HDR ISOL                  Az 225(10)                                                CV UPPER CNTMT VENT CLR 2D            IC/789          CLOSED    2-DRV-67-764 ERCW RET HDR DRAIN                Az 300(11)                                                CV UPPER CNTMT VENT CLR 2D            IC/790          CLOSED    2-DRV-67-763 ERCW SUP HDR DRAIN                Az 300(11)                                                CV UPPER CNTMT VENT CLR 2B            IC/793          CLOSED    2-DRV-67-765 ERCW SUP HDR DRAIN                Az 300(11)                                                CV UPPER CNTMT VENT CLR 2B            IC/794          CLOSED    2-DRV-67-766 ERCW RET HDR DRAIN                Az 300(11)                                                CV UPPER CNTMT VENT CLR 2D            IC/807          CLOSED    2-TV-67-690D ERCW SUP HDR TEST VENT            Az 318(10)                                                CV RCP MTR CLR 4 ERCW IN              IC/732          CLOSED    2-VTV-67-700D SUP VENT                            Az 319                                                    CV 2-FE-67-255 TEST POINT              IC/729          CLOSED    2-TV-67-862A Az 325                                                    CV 2-FE-67-255 TEST POINT              IC/729          CLOSED    2-TV-67-862B Az 325                                                    CV RCP VENT CLR 4 SUP ERCW            IC/729          CLOSED    2-DRV-67-1001 HDR DRAIN                          Az 325                                                    CV UPPER CNTMT VENT CLR 2D            IC/808          OPEN    2-ISV-67-583D ERCW RET HDR ISOL                  Az 325(10)                                                CV UPPER CNTMT VENT CLR 2D            IC 807          OPEN    2-ISV-67-692D ERCW RET HDR ISOL                  Az 330(10)                                                CV UPPER CNTMT VENT CLR 2D            IC/808          CLOSED    2-TV-67-579D ERCW SUP HDR TEST CONN            Az 330(10)                                                CV UPPER CNTMT VENT CLR 2D            IC/808          CLOSED    2-TV-67-581D ERCW SUP HDR TEST CONN            Az 330(10)                                                CV UPPER CNTMT VENT CLR 2D            IC/807          OPEN      2-FCV-67-298 ERCW RET ISOL                      Az 332(10)                                                CV UPPER CNTMT VENT CLR 2D            IC/807          CLOSED    2-TV-67-1213 ERCW RET HDR TEST VALVE            Az 332(10)                                                CV (10)  Top of S/G doghouse.
(11)  Next to spiral staircase.


NOMENCLATURE LOCATION POSITION UNID PERF INITIAL VERIFIER INITIAL U2 Containment RCP MTR CLR 4 ERCW RET HDR VENT IC/726 Az 351 CLOSED 2-VTV-67-696D CV2-FE-67-475 TEST POINT IC/720 Az 351 CLOSED 2-TV-67-911 CV2-FE-67-475 TEST POINT IC/720 Az 351 CLOSED 2-TV-67-912 CV CRD VENT CLR D-B RET ERCW HDR DRAIN IC/720 Az 351 CLOSED 2-DRV-67-999 CV CRD VENT CLR D-B SUP ERCW HDR DRAIN IC/726 Az 353 CLOSED 2-DRV-67-997 CV UPPER CNTMT VENT CLR 2D ERCW RET HDR TEST CONN IC/808 Az 355 (1) CLOSED 2-TV-67-584D CV}}
WBN            ERCW SYSTEM FLOW BALANCE              2-PTI-067-02-B Unit 1 & 2                    TRAIN B                    Rev. 0000 Page 204 of 204 Checklist 4 (Page 16 of 16)
SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____                                    Date ________
NOMENCLATURE         LOCATION       POSITION         UNID         PERF   VERIFIER INITIAL   INITIAL U2 Containment RCP MTR CLR 4 ERCW RET       IC/726       CLOSED     2-VTV-67-696D HDR VENT                    Az 351                                                    CV 2-FE-67-475 TEST POINT       IC/720       CLOSED       2-TV-67-911 Az 351                                                    CV 2-FE-67-475 TEST POINT       IC/720       CLOSED       2-TV-67-912 Az 351                                                    CV CRD VENT CLR D-B RET         IC/720       CLOSED     2-DRV-67-999 ERCW HDR DRAIN              Az 351                                                    CV CRD VENT CLR D-B SUP         IC/726       CLOSED     2-DRV-67-997 ERCW HDR DRAIN              Az 353                                                    CV UPPER CNTMT VENT CLR 2D     IC/808       CLOSED     2-TV-67-584D ERCW RET HDR TEST CONN      Az 355(1)                                                  CV}}

Latest revision as of 04:44, 11 March 2020

OL - TVA Letter to Nrc_Submittal of Pre-op Test Instruction 2-PTI-067-02-B
ML111050061
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/28/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML111050061 (208)


Text

WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]

Sent: Monday, March 28, 2011 5:08 AM To: Epperson, Dan; Poole, Justin; Raghavan, Rags; Milano, Patrick; Campbell, Stephen Cc: Crouch, William D; Boyd, Desiree L; Hamill, Carol L; Elton, Thomas L

Subject:

TVA letter to NRC_Submittal of Pre-op Test Instruction 2-PTI-067-02-B Attachments: Submittal of Pre-op Test Instruction 2-PTI-067-02-B_Final.pdf Please see attached TVA letter that was sent to the NRC today.

Thank You,

~*~*~*~*~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 4233658764

~*~*~*~*~*~*~*~*~*~*~*~*~*~*~

1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 318 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF1D040697)

Subject:

TVA letter to NRC_Submittal of Pre-op Test Instruction 2-PTI-067-02-B Sent Date: 3/28/2011 5:08:24 AM Received Date: 3/28/2011 5:08:45 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients:

"Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Hamill, Carol L" <clhamill@tva.gov>

Tracking Status: None "Elton, Thomas L" <tlelton@tva.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 326 3/28/2011 5:08:45 AM Submittal of Pre-op Test Instruction 2-PTI-067-02-B_Final.pdf 1481657 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

U.S. Nuclear Regulatory Commission Page 2 March 25, 2011 bcc (Enclosure):

Stephen Campbell U.S. Nuclear Regulatory Commission MS 08H4A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Charles Casto, Deputy Regional Administrator for Construction U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 3 of 204 Table of Contents

1.0 INTRODUCTION

.......................................................................................................... 5 1.1 Test Objectives ............................................................................................................. 5 1.2 Scope............................................................................................................................ 5

2.0 REFERENCES

............................................................................................................. 5 2.1 Performance References .............................................................................................. 5 2.2 Developmental References........................................................................................... 5 3.0 PRECAUTIONS AND LIMITATIONS ......................................................................... 12 4.0 PREREQUISITE ACTIONS ........................................................................................ 15 4.1 Preliminary Actions ..................................................................................................... 15 4.2 Special Tools, Measuring and Test Equipment, Parts, and Supplies. ......................... 18 4.3 Field Preparations ....................................................................................................... 18 4.4 Approvals and Notifications ........................................................................................ 28 5.0 ACCEPTANCE CRITERIA ......................................................................................... 28 6.0 PERFORMANCE ........................................................................................................ 35 6.1 Prerequisites ............................................................................................................... 35 6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT .......................................... 40 6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC ............................................... 47 6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN ............................................... 55 6.5 UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP .......................................................... 63 7.0 POST-PERFORMANCE ACTIVITIES ........................................................................ 67 8.0 RECORDS .................................................................................................................. 80 8.1 QA Records ................................................................................................................ 80 8.2 Non-QA Records ........................................................................................................ 80 Appendix A: TEST INSTRUCTIONS REFERENCE REVIEW......................................... 81 Appendix B: TEMPORARY CONDITION LOG ............................................................... 82 Appendix C: PERMANENT PLANT INSTRUMENTATION LOG .................................... 83

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 4 of 204 Table of Contents (continued)

Appendix D: SWITCH LINEUP ....................................................................................... 87 Appendix E: TRAIN B FLOW ELEMENT TEMPORARY TUBING ................................. 96 Appendix F: CALCULATION INFORMATION SHEET ................................................. 100 Appendix G: CALCULATION FLOW ELEMENT CONSTANTS ................................... 101 Appendix H: COMMON TRAIN FLOW ELEMENT TEMPORARY TUBING ................. 103 Appendix I: FLOW BALANCE INSTRUCTIONS ......................................................... 105 Data Sheet 1: TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE ......................... 107 Data Sheet 2: TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC ................................ 119 Data Sheet 3: TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN) ............................... 131 Data Sheet 4: U-1 HOT SHUTDOWN, - U-2 STARTUP ................................................. 141 Data Sheet 5: TRAIN B THROTTLE VALVE SETPOINTS ............................................. 154 Data Sheet 6: PUMP DATA -U1 COLD SHUTDOWN, U-2 LOCA-RECIRC ................... 158 Data Sheet 7: PUMP DATA - U1 LOCA-RECIRC, U-2 COLD SHUTDOWN .................. 160 Checklist 1: SUPPLY HEADER 2B POWER ALIGNMENT ......................................... 162 Checklist 2: B - TRAIN POWER CHECKLIST ............................................................. 163 Checklist 3: SUPPLY HDR 1B VALVE ALIGNMENT .................................................. 168 Checklist 4: SUPPLY HDR 2B VALVE ALIGNMENT .................................................. 189

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 5 of 204 Data Package: Page ____ of ____ Date ________

1.0 INTRODUCTION

1.1 Test Objectives The purpose of this test is to verify proper flow balancing of the Essential Raw Cooling Water System (ERCW), Train B, for combined Unit 1 and Unit 2 operation.

ERCW components will be observed for any obvious excessive vibration during steady state flow conditions. The system boundary for this test includes the piping, instrumentation, valves and heat exchangers of both Unit 1 and Unit 2. Flow rates will primarily be monitored via electronic flow measurement devices, although use of dp gauges is permissible as determined by the applicable test engineer.

1.2 Scope A. Two ERCW pumps on Train B provide design flow to all applicable components under the following conditions:

1. Unit 1 Normal Operating Mode, Unit 2 Normal Operating Mode
2. Unit 1 Cold Shutdown, Unit 2 LOCA RECIRC
3. Unit 1 LOCA RECIRC, Unit 2 Cold Shutdown
4. Unit 1 Hot Shutdown, Unit 2 Startup B. CCS Heat Exchangers bypass anticavitation valves will be tested for reduction of system piping vibration.

2.0 REFERENCES

2.1 Performance References A. SMP-9.0, Conduct of Test 2.2 Developmental References A. Final Safety Analysis Report

1. FSAR - Amendment 103
a. Section 9.2.1, Essential Raw Cooling Water
b. Table 14.2-1, Sheets 4 and 5 of 89

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 6 of 204 Data Package: Page ____ of ____ Date ________

2.2 Developmental References (continued)

B. Drawings

1. Flow Drawings
a. 1-47W845-1 Rev 57, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 56341-001 Rev 0
b. 1-47W845-2 Rev 76, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 55992-40 Rev 0 (2) 55992-41 Rev 0 (3) 55992-42 Rev 0 (4) 55992-43 Rev 0 (5) 53545-02-25 Rev 0 (6) 53545-02-26 Rev 0
c. 2-47W845-2 Rev 0, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 52796-195 Rev 0
d. 1-47W845-3 Rev 25, Series Mechanical Flow Diagram, Essential Raw Cooling Water
e. 2-47W845-3 Rev 1, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 52796-001 Rev 0 (2) 52796-002 Rev 2 (3) 53817-008 Rev 0 (4) 53817-009 Rev 0 (5) 53817-010 Rev 0 (6) 53817-011 Rev 0

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 7 of 204 Data Package: Page ____ of ____ Date ________

2.2 Developmental References (continued)

(7) 53817-014 Rev 0 (8) 53817-018 Rev 0 (9) 53817-020 Rev 0 (10) 54903-011 Rev 0 (11) 54903-012 Rev 0 (12) 54903-014 Rev 0 (13) 53545-01-032 Rev 1

f. 1-47W845-4 Rev 32, Series Mechanical Flow Diagram, Essential Raw Cooling Water
g. 2-47W845-4 Rev 0, Series Mechanical Flow Diagram, Essential Raw Cooling Water
h. 1-47W845-5 Rev 38, Series Mechanical Flow Diagram, Essential Raw Cooling Water
i. 2-47W845-5 Rev 1, Series Mechanical Flow Diagram, Essential Raw Cooling Water
j. 1-47W845-7 Rev 18, Series Mechanical Flow Diagram, Essential Raw Cooling Water
k. 2-47W845-7 Rev 0, Series Mechanical Flow Diagram, Essential Raw Cooling Water (1) 52764-004 Rev 0 (2) 52764-007 Rev 0 (3) 52764-009 Rev 0 (4) 52764-011 Rev 0 (5) 52764-015 Rev 0 (6) 52764-016 Rev 0 (7) 52764-017 Rev 0

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 8 of 204 Data Package: Page ____ of ____ Date ________

2.2 Developmental References (continued)

(8) 53817-013 Rev 0 (9) 53986-042 Rev 0 (10) 53986-044 Rev 0 (11) 53986-046 Rev 0 (12) 54923-351 Rev 0

l. 2-47W848-5 Rev 1, Mechanical Flow Diagram Control Air (1) 53276-304 Rev 0
m. 1-47W848-9 Rev 15, Mechanical Flow Diagram Control Air
n. 2-47W848-9 Rev 1, Mechanical Flow Diagram Control Air (1) 53276-306 Rev 0 (2) 53340-001 Rev 0 (3) 53917-57 Rev 0
2. Control
a. 1-47W610-67-1 Rev 27, Electrical Control Diagram, ERCW System
b. 1-47W610-67-1A Rev 16, Electrical Control Diagram, ERCW System (1) 52376-08-008 Rev 0 (2) 52376-08-009 Rev 0 (3) 52376-08-010 Rev 0 (4) 52376-11-011 Rev 0 (5) 53111-06-047 Rev 0
c. 1-47W610-67-2 Rev 17, Electrical Control Diagram, ERCW System
d. 2-47W610-67-2 Rev 1, Electrical Control Diagram, ERCW System (1) 52796-005 Rev 0

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 9 of 204 Data Package: Page ____ of ____ Date ________

2.2 Developmental References (continued)

(2) 52796-006 Rev 0 (3) 53649-103 Rev 0 (4) 53649-105 Rev 0 (5) 53746-104 Rev 0 (6) 53746-105 Rev 0 (7) 53746-106 Rev 0 (8) 53746-107 Rev 0 (9) 53746-110 Rev 0 (10) 53746-111 Rev 0 (11) 53746-114 Rev 0 (12) 53746-115 Rev 0 (13) 53986-003 Rev 0 (14) 53986-004 Rev 0 (15) 54039-045 Rev 0 (16) 54039-046 Rev 0 (17) 54039-047 Rev 0 (18) 54039-048 Rev 0 (19) 54039-050 Rev 0 (20) 54850-027 Rev 0 (21) 54850-028 Rev 0 (22) 54850-032 Rev 0 (23) 54850-031 Rev 0

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 10 of 204 Data Package: Page ____ of ____ Date ________

2.2 Developmental References (continued)

e. 1-47W610-67-2A Rev 8, Electrical Control Diagram, ERCW System (1) 55802-004 Rev 0 (2) 55050-566 Rev 0
f. 1-47W610-67-3 Rev 13, Electrical Control Diagram, ERCW System
g. 2-47W610-67-3 Rev 3, Electrical Control Diagram, ERCW System (1) 53817-031 Rev 0 (2) 53545-01-055 Rev 0 (3) 54039-053 Rev 0 (4) 54039-054 Rev 0 (5) 54039-057 Rev 1 (6) 54039-058 Rev 1 (7) 54039-060 Rev 0 (8) 53643-011 Rev 0 (9) 53643-012 Rev 0 (10) 54903-314 Rev 0
h. 1-47W610-67-3A Rev 7,Electrical Control Diagram, ERCW System (1) 53545-01-051 Rev 0 (2) 53545-01-053 Rev 0
i. 1-47W610-67-4 Rev 17, Electrical Control Diagram, ERCW System
j. 2-47W610-67-4 Rev 0,Electrical Control Diagram, ERCW System
3. Electrical
a. 2-45W751-4 Rev 0, Electrical Power Supplies, RMOV 2A2-A
b. 2-45W751-5 Rev 0, Electrical Power Supplies, RMOV 2A2-A

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 11 of 204 Data Package: Page ____ of ____ Date ________

2.2 Developmental References (continued)

(1) 53746-52 Rev 0 (2) 53817-71 Rev 0 (3) 53817-72 Rev 0 (4) 53288-82 Rev 0 (5) 54850-176 Rev 0 (6) 54850-177 Rev 0

c. 2-45W751-10 Rev 2, Electrical Power Supplies, RMOV 2B-2B (1) 53270-9 Rev 1 (2) 53817-73 Rev 0 (3) 53817-76 Rev 0 (4) 53986-11 Rev 0 (5) 53293-70 Rev 0 (6) 53554-1 Rev 0 (7) 53554-2 Rev 0 (8) 54850-178 Rev 0 (9) 54903-249 Rev 0
d. 2-45W751-11 Rev 0, Electrical Power Supplies, RMOV 2B2-B (1) 53817-74 Rev 0 (2) 53986-12 Rev 0 (3) 53293-71 Rev 0 (4) 54850-179 Rev 0 C. Documents
1. N3-67-4002 System Description for Essential Raw Cooling Water System, Rev 25

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 12 of 204 Data Package: Page ____ of ____ Date ________

2.2 Developmental References (continued)

2. 2-TSD-67, Essential Raw Cooling Water System, Rev 1
3. SOI-67.1, Essential Raw Cooling Water System Operating Instruction, Draft Rev 0000
4. GOI-7, Rev 0038, Generic Equipment Operating Guidelines
5. VTD-M359-003 Rev 0, Valve Technical Manual for Metrex Model FTVA-400-WAT 4 2 War Refrigerant Pressure Activated Condenser Cooling Water Control Valve.
6. 1-SOI-30.05, Auxiliary Building HVAC Systems, Rev 0050
7. 0-PI-OPS-17.0, 18 Month Locked Valve Verification Rev 0044
8. Primary Orifice Plate Calculation for 1,2-FE-67-62 and 1,2-FE-67-61 (T71 101008 804) 3.0 PRECAUTIONS AND LIMITATIONS A. This PTI should be performed with U-1 WBN in Modes 5, 6 (or no mode core unloaded) and no fuel loaded in U-2 Reactor. Appropriate risk management must be performed to allow testing on protected equipment.

B. Standard precautions shall be followed for working around energized electrical equipment in accordance with TVA Safety Manual Procedure 1021.

C. Discrepancies between component ID tags and the description in a procedure/instruction if the UNIDs match, exclusive of place keeping zeros and train designators (e.g.; 2-HS-31-468 vs. 2-HS-031-0468) and the noun description is sufficient to identify the component. This condition does not require a TDN in accordance SMP-14.0. If the component label needs to be changed, a Tag Request Form (TR Card) should be processed in accordance with TI-12.14. Make an entry in the CTL and continue testing.

D. Steps may be repeated if all components cannot be tested in a step. However, if the test has been exited, prerequisite steps must be re-verified and a Chronological Test Log (CTL) entry made.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 13 of 204 Data Package: Page ____ of ____ Date ________

3.0 PRECAUTIONS AND LIMITATIONS (continued)

E. Component tags and labels may differ slightly (abbreviations, punctuation, letter case, etc.) from the description given in this test. If this situation occurs, it shall not be considered a test deficiency or procedure deviation. It shall be documented in the CTL and reconciled by way of a plant labeling request or drawing discrepancy or single-line date typo change in the procedure as appropriate.

F. To maintain the operating pressures in the Header to within design limits during low flow conditions DO NOT exceed 133 psig at 0-PT-67-17, ERCW HEADER B PRESS, or 0-PT-67-18, ERCW HEADER A PRESS.

G. Equipment shall be operated in accordance with applicable instructions.

H. The following motor operating and starting limitations for the Essential Raw Cooling Water Pumps should NOT be exceeded:

1. Motor cold-two starts in succession.
2. Motor at operating temperature-one start.

I. Prior to any additional starts for either case above, either:

1. Allow motor to cool for 20 minutes while running at normal or no load.
2. Allow motor to cool for 45 minutes while standing idle before each additional restart.

J. In most cases it will be preferable to allow the motor to run for 20 minutes cooling cycle so that it will be available for any immediate restart.

K. ERCW Motor bearing temperatures should NOT exceed 122F above ambient.

L. ERCW Pump upper bearing vibration should NOT exceed 3 mils displacement.

M. Plug Valves used for throttling flow in the ERCW System should NOT be throttled more than 80%.

N. The Upper Flow Values on the flow balance data sheets are based on Engineering's recommended maximum flows. The Engineering values were provided for operating purposes and may be exceeded (i.e., error corrections could result in higher than indicated flows) if this does NOT result in excessive vibration.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 14 of 204 Data Package: Page ____ of ____ Date ________

3.0 PRECAUTIONS AND LIMITATIONS (continued)

O. Flow rates will primarily be monitored via electronic flow measurement devices, although use of dp gauges is permissible as determined by the applicable Test Director.

P. Ensure that the pressure rating for all test equipment is greater than the maximum possible system pressure it will encounter during testing.

Q. TI-31.08, Flow Balancing Valves Setpoint Positions, must be revised after performance of 2-PTI-067-02-A and 2-PTI-067-02-B.

R. If flow is to be isolated to a component for any reason in this instruction, notify the Unit SRO(s) and consider any applicable LCOs.

S. The Test Director should inform the Unit Operators of current plant conditions when test is to be stopped for longer than a shift with plant equipment not in normal configuration.

T. To satisfy the retest requirements for post-work test of multiple ERCW System work orders, system components will be monitored for leakage during performance of the flow balance. Any observed leakage will be rectified through initiation of work requests.

U. All open problems (including non Tech Spec testing acceptance criteria) are to be tracked by a corrective action document and entered on the appropriate system punchlist.

V. Problems identified during the test shall be annotated on the CTL from SMP-9.0 including a description of the problem, the procedure step when/where the problem was identified, corrective action steps taken to resolve the problem, and the number of the corrective action document, if one was required.

W. Observe all Radiation Protection (RP) requirements when working in or near contaminated areas.

X. Manual continuous backwash flow >450 gpm is to be maintained for duration of test activities (all modes).

Y. Operations must be aware that Station Air Compressors will be cooled by Train B ERCW during the flow balance. Temperatures must be monitored and steps taken to restore Control Air cooling in event of a Loss of Control Air.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 15 of 204 Data Package: Page ____ of ____ Date ________

4.0 PREREQUISITE ACTIONS NOTES

1) The following prerequisites apply to all sections of the test unless specified otherwise.
2) Preliminary action steps may be performed in any order with Test Directors approval.

4.1 Preliminary Actions

[1] VERIFY the test/performance copy of this Preoperational Test Instruction (PTI) is the current revision including any change notices and as needed, each test person assisting in this test has the current revision including any change notices. ________

[2] OBTAIN copies of the applicable forms from the latest revision of SMP-9.0, AND ATTACH to this PTI for use during the performance of this PTI. ________

[3] ENSURE changes to the references listed on Appendix A, Test Instruction Reference Review, have been reviewed, and determined NOT to adversely affect the test performance. ________

[4] VERIFY current revisions and change paper for referenced drawings has been reviewed and determined NOT to adversely affect the test performance, AND ATTACH documentation of current drawing revision numbers and change paper that were reviewed to the data package. ________

[5] EVALUATE punch list items on Open Watts Bar Integrated Task Equipment List (WITEL) AND ENSURE that respective punch list items will NOT adversely affect the test performance. ________

[6] ENSURE required Component Testing has been completed prior to start of test. ________

[7] ENSURE outstanding Design Change Notices (DCNs),

Engineering Design change Requests (EDCRs) or Temporary Alterations (TAs) do NOT adversely impact testing. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 16 of 204 Data Package: Page ____ of ____ Date ________

4.1 Preliminary Actions (continued)

[8] ENSURE a review of outstanding Clearances has been coordinated with Operations for impact to the test performance, AND RECORD in Appendix B, Temporary Condition Log if required. ________

[9] VERIFY system cleanliness as required for the performance of this test has been completed in accordance with SMP-7.0. ________

[10] VERIFY plant instruments, listed on Appendix C, Permanent Plant Instrumentation Log, are placed in service and are within their calibration interval. ________

NOTE Substitution of electronic or ultra-sonic flow measurement devices is acceptable provided the accuracy range is equal to or exceeds range specified, and calibration status is current.

[11] VERIFY Measuring and Test Equipment (M&TE) required for test performance has been (as required) filled, vented, place in service and recorded on Measuring and Test Equipment Log in SMP-9.0. ________

[12] VERIFY Measuring and Test Equipment (M&TE) calibration due dates will support the completion of this test performance. ________

[13] ENSURE components contained within the boundaries of this test are under the jurisdictional control of Preoperational Startup Engineering (PSE) and/or Plant Operations. ________

[14] VERIFY the Plant Computer is available and the computer points for the ERCW pump bearings are active and the description and status for each computer point has been verified. ________

[15] VERIFY the following systems are operational and have been placed in service to the extent necessary to perform this test:

A. System 032, Control Air, Provides control air to all AOVs ________

B. System 211, 6.9KV Shutdown Power System ________

C. System 213, Reactor Motor Operated Valve Power System ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 17 of 204 Data Package: Page ____ of ____ Date ________

4.1 Preliminary Actions (continued)

D. System 214, 480V Control and Auxiliary Vent Power System ________

E. System 215, Diesel Auxiliary Power System ________

F. System 237, 120VAC Instrument Power System ________

[16] PERFORM a pretest walkdown on equipment to be tested to ensure no conditions exist that will impact test performance. ________

[17] CONDUCT a pretest briefing with Test and Operations personnel in accordance with SMP-9.0. ________

[18] ENSURE that communications are available for areas where testing is to be conducted. ________

[19] ENSURE Operations has all essential loads aligned to the A-Train such as EBR chiller, MCR chiller, SDBR chiller, SFPCC A-Train is in service and is cooled by CCS HTX A or B. ________

[20] ENSURE RHR A-Train is in service if required. ________

[21] ENSURE A-Train ECCS room and area coolers, A-Train EGTS, ABGTS, penetration room and pipe chase coolers are protected, if so desired by Operations. ________

[22] VERIFY Design Change Notices (DCNs) for Type 1 Supports are implemented or temporary supports installed as needed for U-2 System 67 testing are issued. ________

[23] VERIFY remaining supports required for U2 System 67 testing are in place or an equivalent engineering approved temporary support is installed. ________

[24] VERIFY spring cans identified for U-2 System 67 testing are installed, unpinned, and on scale with no visual indication of damage, loose parts or interferences. ________

[25] VERIFY snubbers identified for U-2 System 67 testing are installed with no visual indication of damage, loose parts or interferences. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 18 of 204 Data Package: Page ____ of ____ Date ________

4.2 Special Tools, Measuring and Test Equipment, Parts, and Supplies.

NOTES

1) Substitution of electronic or ultra-sonic flow measurement devices is acceptable provided the accuracy range is equal to or exceeds range specified, and calibration status is current.
2) If electronic flow measurement devices are used, applicable steps in Section 4.3 related to other devices (such as dp gauges) may be N/A'd. Actual use of other flow measurement devices will be appropriately documented along with required calibration data
1. 0-50 psid Differential Pressure Gauge (r1%) (4 gauges ERCW Pumps)
2. 19 ea 0-200 psig Pressure Gauge (r1% accuracy)
3. Ultrasonic Flowmeters (r3%). (Upstream of 0-FE-67-226, ERCW SUP TO CCS C HX)
4. Ultrasonic Flowmeters (r3%) Various components flow points as specified in Appendix E, Data Sheet 1
5. Nitrogen bottle 4.3 Field Preparations

[1] RECORD work order used to install Electronic Flow Device (EFDs) for components as listed in Appendix H for common train items. ________

WO#

[2] RECORD work order used to install EFDs for components listed in Appendix E for Train B. ________

WO#

[3] OBTAIN Operations approval to perform Electrical Switch alignment (Appendix D). ________

SM/Unit SRO

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 19 of 204 Data Package: Page ____ of ____ Date ________

4.3 Field Preparations (continued)

NOTES

1) The following step 4.3[4] through 4.3[8]impacts Unit 1 configuration. The B Train RHR, CCP and SIS pump room coolers will be failed OPEN.
2) Electrically operated valves may be manually opened/closed if the electrical component is unavailable during testing.

[4] OBTAIN Operations approval to perform Supply HDR 2B Power Alignment and B Tr. Power Checklist (CHECKLIST 1 &

2), Supply HDR. 1B Valve Alignment (CHECKLIST 3) and Supply HDR 2B Valve Alignment (CHECKLIST 4). ________

SM/Unit SRO

[5] PERFORM CHECKLIST 1, 2, 3 AND 4. ________

[6] PERFORM Electrical Switch alignment (Appendix D). ________

[7] VERIFY that the listed Air Isolation Valves have been CLOSED and the air BLED OFF to the following Control Valves and Control Valves are FULL OPEN : ________

Air Isol. Valve CLOSED Control Valve OPEN INITIALS INITIALS 1-ISV-32-3563 1-TCV-67-100 LWR CNTMT VENT CLR 1B-B OUT TEMP CNTL 1-ISV-32-3565 1-TCV-67-101 CRDM CLR 1B-B OUT TEMP CNTL 1-ISV-32-3564 1-TCV-67-102 RCP 2 MTR CLR ERCW SUP CNTL 1-ISV-32-3605 1-TCV-67-108 LWR CNTMT VENT CLR 1D-B OUT TEMP CNTL 1-ISV-32-3606 1-TCV-67-109 CRDM CLR 1D-D OUT TEMP CNTL 1-ISV-32-3607 1-TCV-67-110 RCP 4 MTR CLR ERCW SUP CNTL

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 20 of 204 Data Package: Page ____ of ____ Date ________

4.3 Field Preparations (continued)

Air Isol. Valve CLOSED Control Valve OPEN INITIALS INITIALS 1-ISV-32-3159 1-TCV-67-137 UPR CNTMT VENT CLR 1B ERCW RET TEMP CNTL 1-ISV-32-3160 1-TCV-67-140 UPR CNTMT VENT CLR 1D ERCWRET TEMP CNTL 1-ISV-32-3283 1-FCV-67-215 SFP TBBP SPACE CLR 1B-B ERCW SUP FLOW CNTL 1-ISV-32-2929 1-FCV-67-172 PDP ROOM COOLER 1C ERCW SUP FLOW CNTL 1-ISV-32-2956 1-FCV-67-348 PENT ROOM COOLER 1B-B ERCW SUP FLOW CNTL 1-ISV-32-3147 1-FCV-67-352 PENT ROOM COOLER 1B-B ERCW SUP FLOW CNTL 1-ISV-32-3295 1-FCV-67-356 PENT ROOM COOLER 1B-B ERCW SUP FLOW CNTL 1-ISV-32-2960 1-FCV-67-344 PIPE CHASE COOLER 1B-B ERCW SUP FLOW CNTL 1-ISV-32-3063 1-FCV-67-164 CCS AFWP SPACE CLR 1B-B ERCW SUP FLOW CNTL 2-ISV-32-3410 2-FCV-67-338 EGTS ROOM COOLER 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3031 2-FCV-67-219 BA XFER/AFW PMP SPACE CLR 2B-B ERCW FLOW CNTL 2-ISV-32-3563 2-TCV-67-100 LWR CNTMT VENT CLR 2B-B OUT TEMP CNTL 2-ISV-32-3565 2-TCV-67-101 CRDM CLR 2B-B OUT TEMP CNTL 2-ISV-32-3564 2-TCV-67-102 RCP 2 MTR CLR ERCW SUP CNTL

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 21 of 204 Data Package: Page ____ of ____ Date ________

4.3 Field Preparations (continued)

Air Isol. Valve CLOSED Control Valve OPEN INITIALS INITIALS 2-ISV-32-3605 2-TCV-67-108 LWR CNTMT VENT CLR 2D-B OUT TEMP CNTL 2-ISV-32-3606 2-TCV-67-109 CRDM CLR 2D-D OUT TEMP CNTL 2-ISV-32-3607 2-TCV-67-110 RCP 4 MTR CLR OUT TEMP CNTL 2-ISV-32-3116 2-TCV-67-137 UPR CNTMT VENT CLR 2B ERCW RET TEMP CNTL 2-ISV-32-3115 2-TCV-67-140 UPR CNTMT VENT CLR 2D ERCW RET TEMP CNTL 2-ISV-32-2880 2-FCV-67-182 SIP ROOM COOLER 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3028 2-FCV-67-186 CS PMP RM CLR 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3323 2-FCV-67-356 PENT ROOM COOLER 2B-B ERCW SUP FLOW CNTL

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 22 of 204 Data Package: Page ____ of ____ Date ________

4.3 Field Preparations (continued)

NOTE The following valves are in 0-PI-OPS-17.0 program and will have to be locked when not in use.

[8] VERIFY that the listed Air Isolation Valves have been CLOSED and the air BLED OFF to the following Control Valves and Control Valves are FULL OPEN ________

Air Isol. CLOSED Control Valve OPEN Valve INTIALS INTIALS 2-ISV-32-2964 2-FCV-67-348 PENT ROOM COOLER 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3167 2-FCV-67-352 PENT ROOM COOLER 2B-B ERCW SUP FLOW CNTL 2-ISV-32-3805 2-FCV-67-344 PIPE CHASE COOLER 2B-B ERCW SUP FLOW CNTL

[9] VERIFY that Work Orders have been prepared to support the following activities:

A. Nitrogen supply connection to 1-TCV-67-118, INSTR RM WATER CLR 1B SUPPLY CONTROL VLV, capillary tubing with 200 psig regulator ________

WO#

B. Nitrogen supply connection to 2-TCV-67-118, INSTR RM WATER CLR 2B SUPPLY CONTROL VLV, capillary tubing with 200 psig regulator ________

WO#

C. Adjust the limit switches for Component Cooling System Heat Exchanger flow control valves 0-FCV-67-152, CCS HX C OUTLET ERCW HDR B FLOW CNTL. ________

WO#

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 23 of 204 Data Package: Page ____ of ____ Date ________

4.3 Field Preparations (continued)

[10] ENSURE the station air compressors are RUNNING or available to receive flow to the intercoolers. ________

NOTE When completing the steps to install M&TE differential pressure gauges or electronic flow devices (EFD), the word INSTALL is understood to mean attach and place in service. That is, attach gauge/device, open the root/isolation valve, and vent as necessary to place the gauge/device in service.

[11] ENSURE test EFDs, pressure gauges or 'P devices are installed at the following locations:

A. INSTALL EFDs at or near FEs as listed in Appendix E &

Data Sheet 1.

B. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 2-VTV-67-534B, CS HX 2B SUP HDR VENT. ________

CV M&TE Cal Due Date C. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at the upstream side of 1-FE-67-62, ERCW SUP HEADER 1B FLOW. ________

CV M&TE Cal Due Date D. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at the downstream side of 1-FE-67-62, ERCW SUP HEADER 1B FLOW. ________

CV M&TE Cal Due Date

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 24 of 204 Data Package: Page ____ of ____ Date ________

4.3 Field Preparations (continued)

E. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at the upstream side of 2-FE-67-62, ERCW SUP HEADER 2B FLOW. ________

CV M&TE Cal Due Date F. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at the downstream side of 2-FE-67-62, ERCW SUP HEADER 2B FLOW. ________

CV M&TE Cal Due Date G. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at the inlet side of 0-DRV-67-547, CCS HX C ERCW DRAIN. ________

CV M&TE Cal Due Date H. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-TV-67-621B, MCR WTR CHILLER B-B ERCW SUP TEST CONN. ________

CV M&TE Cal Due Date I. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 1-TV-67-690B, UPPER CNTMT VENT CLR 1B ERCW SUP HDR TEST VENT. ________

CV M&TE Cal Due Date

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 25 of 204 Data Package: Page ____ of ____ Date ________

4.3 Field Preparations (continued)

J. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 2-TV-67-690B, UPPER CNTMT VENT CLR 2B ERCW SUP HDR TEST VENT. ________

CV M&TE Cal Due Date K. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-VTV-67-616B, ELEC BD RM A/C COND B ERCW SUP TEST VENT CONN. ________

CV M&TE Cal Due Date L. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-RTV-67-813A, 0-PT-67-48/0-PS-67-484 ROOT, mounted at the same elevation as 0-PI-67-48B. ________

CV M&TE Cal Due Date M. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-RTV-67-812A, 0-PT-67-52/0-PS-67-485 ROOT, mounted at the same elevation as 0-PI-67-52B. ________

CV M&TE Cal Due Date N. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-RTV-67-814A, 0-PT-67-56/0-PS-67-486 ROOT, mounted at the same elevation as 0-PI-67-56B. ________

CV M&TE Cal Due Date

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 26 of 204 Data Package: Page ____ of ____ Date ________

4.3 Field Preparations (continued)

O. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-RTV-67-811A, 0-PT-67-60/0-PS-67-487 ROOT, mounted at the same elevation as 0-PI-67-60B. ________

CV M&TE Cal Due Date P. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 1-PI-67-10B, ERCW STRAINER 1B-B OUT PRESS. ________

CV M&TE Cal Due Date Q. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 2-PI-67-10B, ERCW STRAINER 2B-B OUT PRESS. ________

CV M&TE Cal Due Date R. INSTALL a 0-200 psig pressure gauge, r1.0% accuracy, at valve 0-PI-67-17B, ERCW HEADER B PRESS. ________

CV M&TE Cal Due Date S. INSTALL a EFD downstream of TEE on 2B header and upstream of 0-FE-67-226, ERCW CCS HX C SUP, and label it EFD-2. ________

CV M&TE Cal Due Date

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 27 of 204 Data Package: Page ____ of ____ Date ________

4.3 Field Preparations (continued)

NOTE The intent of the next step is to allow indication of the P across the discharge valve of the two running ERCW pumps.

[12] INSTALL a 0-50 psid differential pressure gauge, r 1.0%

accuracy, between the listed ERCW Pump Discharge pressure transmitters and 0-PT-67-17, ERCW HEADER B PRESS:

A. 0-PT-67-48, ERCW PUMP E-B DISCH PRESS ________

1st CV M&TE Cal Due Date B. 0-PT-67-52, ERCW PUMP F-B DISCH PRESS ________

1st CV M&TE Cal Due Date C. 0-PT-67-56, ERCW PUMP G-B DISCH PRESS ________

1st CV M&TE Cal Due Date D. 0-PT-67-60, ERCW PUMP H-B DISCH PRESS ________

1st CV M&TE Cal Due Date

[13] REQUEST operations to backwash traveling screens and strainers AND ESTABLISH a continual backwash flow of t 450 gpm (manual). ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 28 of 204 Data Package: Page ____ of ____ Date ________

4.4 Approvals and Notifications

[1] OBTAIN permission of the Preoperational Startup Manager to start the test.

Preoperational Startup Manager Date

[2] OBTAIN the Unit 1 & Unit 2 Shift Supervisor's (US/SRO) or Shift Managers (SM) authorization.

U-1 US/SRO/SM Signature Date U-2 US/SRO/SM Signature Date 5.0 ACCEPTANCE CRITERIA A. Two pumps on Train B meet the acceptance criteria specified on listed data sheets for flow to all applicable components under the following conditions:

1. Unit 1 and Unit 2 are flow balanced in Normal Operating Mode configurations. (Normal - Normal).
2. All system components are maintained at acceptable flows with Unit 1 in Cold Shutdown and Unit 2 in LOCA RECIRC.
3. All system components are maintained at acceptable flows with Unit 1 in LOCA RECIRC and Unit 2 in Cold Shutdown.
4. All system components are flow balanced with Unit 1 in Hot Shutdown and Unit 2 in Startup.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 29 of 204 Data Package: Page ____ of ____ Date ________

5.0 ACCEPTANCE CRITERIA (continued)

B. CCS HX Throttle Valve Adjustment CCS Heat Exchanger Flows as controlled by the 4-position Outlet Valves are adjusted as follows:

Valve No. A Position B Position 0-FCV-67-152 >7125 GPM >8800 GPM (CCS HX C)

C. CCS Heat Exchanger C Anticavitation Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, is positioned manually to pass >6000 gpm (Step 6.2[36]).

D. Component applicability and status during each test sequence are shown on the attached tables from 2-TSD-67-2, Rev 0000, Tables 5 and 7.

E. Individual component flow rates are specified in 2-TSD-67, Rev 0000 Tables 12 and 13 (attached), for their respective test sequence.

F. The Station Air Compressors may be individually balanced during power generation, hot shutdown or startup mode balancing. For the remaining modes individual compressor flow balancing is not required.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 30 of 204 Data Package: Page ____ of ____ Date ________

5.0 ACCEPTANCE CRITERIA (continued)

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 31 of 204 Data Package: Page ____ of ____ Date ________

5.0 ACCEPTANCE CRITERIA (continued)

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 32 of 204 Data Package: Page ____ of ____ Date ________

5.0 ACCEPTANCE CRITERIA (continued)

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 33 of 204 Data Package: Page ____ of ____ Date ________

5.0 ACCEPTANCE CRITERIA (continued)

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 34 of 204 Data Package: Page ____ of ____ Date ________

5.0 ACCEPTANCE CRITERIA (continued)

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 35 of 204 Data Package: Page ____ of ____ Date ________

6.0 PERFORMANCE NOTES

1) If throttle valves in sections 6.1-6.5 are adjusted the preceding PERFORMANCE sections should be re-porformed.
2) Re-Testing of applicable sections should be performed on clean copies of the tested segment with time and date of retest noted and documented on retest pages and in CTL.

6.1 Prerequisites

[1] VERIFY prerequisites listed in Section 4.0 have been completed. ________

[2] FULLY OPEN 2-TCV-67-158, SD BD ROOM A/C CHLR B-B ERCW IN TEMP CNTRL, [AB, EL 741, A14-R] by ROTATING the local Metrex valve bypass stem (silver colored knurled knob) counter-clockwise (when viewed looking down at the Bypass Stem) until it seats against the Hydraulic Bypass Body. ________

CAUTION DO NOT over pressurize 1-TCV-67-118 during the next step. MAXIMUM pressure is 200 psig.

[3] OPEN 1-TCV-67-118, INSTR RM WATER CLR 1B ERCW SUP TEMP CNTL, using a temporary regulated Nitrogen supply (0-200 psig). ________

[4] OPEN 2-TCV-67-118, INSTR RM WATER CLR 2B ERCW SUP TEMP CNTL, using a temporary regulated Nitrogen supply (0-200 psig). ________

[5] OPEN 0-TCV-67-1052, ELEC BD RM A/C COND B-B ERCW RET TEMP CNTL. [CB, EL 696, C13P], on EBR CHILLER B-B, by turning the manual flushing screw at the top of the actuator fully clockwise. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 36 of 204 Data Package: Page ____ of ____ Date ________

6.1 Prerequisites (continued)

[6] OPEN 0-TCV-67-1053, MCR A/C CHILLER B-B ERCW RET TEMP CNTL [AB, EL. 700, A12U], on MCR CHILLER B-B, by turning the manual flushing screw at the top of the actuator fully clockwise. ________

[7] ENSURE the following:

A. 0-FCV-67-208, STA AIR COMPR ERCW SUP HDR 1B ISOL VALVE, is OPEN. ________

B. 0-FCV-67-205, STA AIR COMPR ERCW SUP HDR 1A ISOL VALVE is CLOSED. ________

NOTE The following steps 6.1[8] through 6.1[11] verify/start two ERCW pumps to support the flow balance. Due to the pump power selector switch options, the allowable pump combinations are E OR F, and G OR H. The selector switches are positioned, then the applicable pumps are started, with the unselected pump steps NA'd.

[8] VERIFY/PLACE 0-XS-67-287, ERCW PUMP E-B/F-B DG POWER SEL, at 0-M-27A, to either the pump E-B OR pump F-B position, AND CIRCLE position below:

Handswitch position (pump E-B OR pump F-B): ________

[9] VERIFY/START either ERCW Pump E-B OR F-B, enter NA for the non-applicable step:

A. PLACE Handswitch 0-HS-67-47A, ERCW PUMP E-B, at 0-M-27A, to START, AND VERIFY by light indication that pump ERCW PUMP E STARTS. ________

B. PLACE Handswitch 0-HS-67-51A, ERCW PUMP F-B, at 0-M-27A, to START, AND VERIFY by light indication that pump ERCW PUMP F STARTS. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 37 of 204 Data Package: Page ____ of ____ Date ________

6.1 Prerequisites (continued)

[10] VERIFY/PLACE 0-XS-67-288, ERCW PUMP G-B/H-B DG POWER SEL, at 0-M-27A, to either the pump G-B OR pump H-B position AND CIRCLE position below:

Handswitch position (pump G-B OR pump H-B): ________

[11] VERIFY/START either ERCW Pump G-B OR H-B, enter NA for the non-applicable step:

A. PLACE Handswitch 0-HS-67-55A, ERCW PUMP G-B, at 0-M-27A, to START, AND VERIFY by light indication that pump ERCW PUMP G-B STARTS. ________

B. PLACE Handswitch 0-HS-67-59A, ERCW PUMP H-B, at 0-M-27A, to START, AND VERIFY by light indication that pump ERCW PUMP H-B STARTS. ________

[12] ENSURE 1-HS-67-67A, DG 1B-B NORM SUP, on 0-M-27A, is in the CLOSED position by light indication. ________

[13] ENSURE 2-HS-67-67A, DG 2B-B NORM SUP, on 0-M-27A, is in the OPEN position by light indication. ________

[14] NOTE as found POSITIONS for A, B and C Station Air Compressors.

STATION AIR COMPR A (0-HS-32-25D) ___________

STATION AIR COMPR B (0-HS-32-26A) ___________

STATION AIR COMPR C (0-HS-32-27A) ___________

[15] PLACE Station and Control Air compressors A, B & C in Manual (Hand) using SOI-32.10, AND ENSURE running unloaded (D in normal service operation). ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 38 of 204 Data Package: Page ____ of ____ Date ________

6.1 Prerequisites (continued)

NOTES

1) The following steps will isolate CAS from ACAS train B.
2) Pressure on B train essential air header will drop to point of starting the B train ACAS compressor.
3) The B train ACAS compressor should start between t 78 and d 86 psig on 0-PI-32-89
4) The compressor should load and unload at ~90 psig and ~100 psig respectively.
5) 0-FSV-67-1223 will open (de-energize) when the compressor starts and close (energize) when the compressor is NOT running.
6) 0-FSV-67-1223 is installed in series with a thermostat and will NOT pass water until the jacket water temperature reaches a predetermined level some time after starting the compressor.
7) Up to a 3 minute delay may be expected while air pressure falls to compressor start setpoint.
8) Annunciator 137-B, AUX AIR TR-B PRESS LO, setpoint is 68 psig.

[16] NOTIFY Unit Operator (UO) that cycling 0-FSV-67-1223 will require running Auxiliary Control Air Compressor B-B with its attendant equipment (Essential Raw Cooling Water, etc.). ________

[17] RECORD as-found position of 0-HS-32-86, AUX CNTL AIR COMPR B-B MODE SELECTOR:

AUTO OFF START

[18] ENSURE Auxiliary Control Air Compressor B-B is NOT running, AND ENSURE 0-HS-32-86 is in the AUTO position. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 39 of 204 Data Package: Page ____ of ____ Date ________

6.1 Prerequisites (continued)

[19] CLOSE 0-FCV-32-85 using 0-HS-32-85, AND VERIFY Auxiliary Control Air Compressor B-B starts at t 78 and d 86 psig on 0-PI-32-89, ESSENT CONTROL AIR TR B RECEIVER PRESS, AND RECORD time compressor starts: _____________. ________

[20] RECORD ERCW flow: ___________GPM ________

[20.1] IF desired ERCW flow is not achieved THEN.

[20.2] Throttle OPEN 0-DRV-32-285, ESSENT CONTROL AIR TR B AFTERFILTER DRAIN, to maintain approximately 92 psig on receiver pressure indicator 0-PI-32-89 to keep the compressor loaded. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 40 of 204 Data Package: Page ____ of ____ Date ________

6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT Heat Exchanger C Anticavitation Test, CCS Heat Exchanger C Discharge Valve Setting, and Flow Balance in Normal Mode.

NOTE The Normal Mode flow balance is done solely to put the system in a configuration for setting of the Component Cooling Heat Exchanger discharge valve limit switches.

[1] ENSURE Normal Operation Mode flow alignment in accordance with CHECKLIST 3 and 4 has been performed. ________

[2] ENSURE the flow through 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, on Data Sheet 1 is >6000 gpm. ________

[3] PERFORM Normal Operation Mode flow balance in accordance with Appendix I and Data Sheet 1, AND VERIFY flows are equal to or greater than the minimum required flows. Do not document on Data Sheet 1. ________

NOTE The following steps 6.2[4] through 6.2[24] set Valve 0-FCV-67-152, CCS HX C OUTLET ERCW HDR B FLOW CNTL HX C, limit switches for "A and "B" positions.

[4] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to POS A, AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS A. ________

[5] VERIFY/PLACE Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-144 is CLOSED. ________

[6] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to POS OPEN, AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 41 of 204 Data Package: Page ____ of ____ Date ________

6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)

[7] OPEN breaker 0-BKR-67-152B at Compt 12B on 480V RMOV BD 2B2-B for CCS HX OUT ERCW HDR B FLOW CNTL (0-FCV-67-152). ________

[8] RECORD on the calibration data for the flow indication 0-FI-67-226 (EFD-2) with 0-FCV-67-152 at FULL OPEN (N/A M&TE if temporary flow element not installed). ________

GPM M&TE Cal Due Date CAUTION To maintain the operating pressures in the header to within design limits, DO NOT exceed 133 psig at 0-PT-67-17, ERCW HEADER B PRESS. If necessary, one of the ERCW pumps may be stopped.

NOTES

1) Keep track of the number of turns from Full Open that Valve 0-FCV-67-152 is throttled for the various flow rates; this information is required for the >8800, and >7125 gpm data points.
2) IF electronic/ultra-sonic flow devices are used, enter actual flow in respective column of Data Sheet 1. ('P column may be N/Ad if actual flow is measured)

[9] MANUALLY ADJUST 0-FCV-67-152, CCS HX C ERCW HDR 1B OUT FLOW, to obtain a flow rate of >8800 (8800-9200) gpm at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL, AND RECORD flow rate at 0-FE-67-226 ( EFD-2) on Data Sheet 1 in Column 5. ________

[10] RECORD flow rate and the number of valve turns from FULL OPEN for the "B" Limit Switch position. ________

Valve Turns From Full Open 0-FI-67-226 (gpm)

EDF-2 (gpm)

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 42 of 204 Data Package: Page ____ of ____ Date ________

6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)

[11] MANUALLY ADJUST 0-FCV-67-152, CCS HX C ERCW HDR 1B OUT FLOW, to obtain a flow rate of >7125 (7125-7525) gpm at 0-FT-67-226 ( EFD -2), CCS HX C OUTLET ERCW HDR B FLOW CNTL, AND RECORD 'P and the number of valve turns from FULL OPEN for the "A" Limit Switch position. ________

Valve Turns From Full Open 0-FE-67-226 (gpm)

EDF-2 (gpm)

[12] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS A. ________

[13] CLOSE breaker 0-BKR-67-152B at Compt 12B on 480V RMOV BD 2B2-B for CCS HX OUT ERCW HDR B FLOW CNTL (0-FCV-67-152), AND VERIFY by light indication that Valve 0-FCV-67-152 repositions to the POS A. ________

Valve Turns From Full Open 0-FE-67-226 (gpm)

EDF-2 (gpm)

NOTE Steps 6.2[14] through 6.2[21] will test the CCS HX C anticavitation bypass Valve 0-FCV-67-144.

[14] OPEN breaker 0-BKR-67-144B for CCS HX C OUT ERCW FLOW CNTL BYP (0-FCV-67-144), at 480V RMOV BD 1B2-B Compt 17D. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 43 of 204 Data Package: Page ____ of ____ Date ________

6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)

[15] OPEN 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, to obtain a flow rate of >6000 gpm at 0-FI-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL. ________

[16] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, 0-M-27A, to CLOSE AND VERIFY that Valve 0-FCV-67-152 CLOSES. ________

[17] MANUALLY OPEN 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, to FULL OPEN position. ________

[18] RECORD flow rate at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL. ________

0-FI-67-226 = gpm EDF-2 Flow Rate = gpm M&TE or/Cal Due Date

[19] IF Flow Rate measurement is in H2O 'P using temporary 'P gauge, THEN CALCULATE flow through CCS HX C as follows OTHERWISE, N/A this step: ________

1st CV M&TE ____________________ Cal Due Date _________________

EFD-2 FLOW ____________________ GPM M&TE ____________________ Cal Due Date _________________

FLOW 'P = ____________________ inches H2O K (P)1/2 = 852 ( )1/2 = _________________ GPM

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 44 of 204 Data Package: Page ____ of ____ Date ________

6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)

CAUTION To maintain the operating pressures in the header to within design limits DO NOT exceed 133 psig at 0-PT-67-17, ERCW HEADER B PRESS. If necessary, one of the ERCW pumps may be stopped.

[20] CYCLE 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, manually from full OPEN down to a flow rate of

~3330 gpm at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL, and back to full open while monitoring bypass piping for steady state and transient vibrations. ________

[21] NOTE flow which exhibits the worst case vibration characteristics, AND RECORD flow through CCS C HX at 0-FI-67-226

__________ gpm. ________

1st CV

[22] CLOSE breaker 0-BKR-67-144B for 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, at 480V RMOV BD 1B2-B, Compt 17D. ________

[23] ADJUST Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to obtain a flow rate of >6000 gpm. ________

[24] PERFORM the Work Order to adjust the limit switches for 0-FCV-67-152, CCS HX C ERCW HDR B OUT FLOW, for the POS A and B positions. ________

[25] AFTER the HOLD ORDER is REMOVED, THEN PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A to the POS A AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS A. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 45 of 204 Data Package: Page ____ of ____ Date ________

6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)

[26] PLACE Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, CLOSES. ________

[27] RECORD the flow rate in POS A at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL.

__________ gpm ________

[28] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS B, AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS B. ________

[29] RECORD flow rate in POS B at 0-FT-67-226 (EFD-2), CCS HX C OUTLET ERCW HDR B FLOW CNTL.

__________ gpm ________

[30] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR A, on 0-M-27A, to POS OPEN, AND VERIFY by light indication that valve 0-FCV-67-152 OPENS. ________

[31] RECORD the flow rate in POS OPEN at 0-FT-67-226 (EFD-2),

CCS HX C OUTLET ERCW HDR B FLOW CNTL.__________ gpm _________

[32] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS B, AND VERIFY by light indication that Valve 0-FCV-67-152 CLOSES to the POS B, AND RECORD EFD-2 flow rate __________ gpm. (>8800 gpm)

(ACC CRIT) ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 46 of 204 Data Package: Page ____ of ____ Date ________

6.2 UNIT 1 NORMAL PWR - UNIT 2 NORMAL ALIGNMENT (continued)

[33] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS A, AND VERIFY by light indication that Valve 0-FCV-67-151 CLOSES to the POS A.

RECORD flow rate __________ gpm. (>7125 gpm)

(ACC CRIT) ________

[34] PLACE Handswitch 0-HS-67-144A, CCS HX C ALT DISCH TO HDR A, on 0-M-27A, to OPEN, AND ADJUST 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, OPEN to obtain 3000-6000 gpm flow rate. ________

[35] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-152 CLOSES. ________

[36] ADJUST 0-HS-67-144A, CCS HC C ALT DISCH TO HDR A to obtain >6000 gpm.(ACC CRIT) ________

[37] PERFORM Normal Operation Mode flow balance in accordance with Appendix I and Data Sheet 1, AND VERIFY flows are equal to or greater than the minimum required flows. ________

(ACC CRIT)

RECORD throttle valve positions on Data Sheet 5.

[38] RECORD applicable pressure data on Data Sheet 1. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 47 of 204 Data Package: Page ____ of ____ Date ________

6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC

[1] VERIFY prerequisites listed in Section 4.0 and Section 6.1 for Section 6.3 have been completed. ________

[2] VERIFY applicable flows are equal to or greater than the minimum required flows as specified in Data Sheet 1. ________

[3] PLACE 0-HS-32-682, AUX CNTL AIR COMPR B to the START position. ________

[4] PLACE Handswitch 2-HS-67-99A, LWR CNTMT B CLRS SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-99 CLOSES. ________

[5] PLACE Handswitch 2-HS-67-107A, LWR CNTMT D CLRS SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-107 CLOSES. ________

[6] PLACE Handswitch 2-HS-67-138A, UPR CNTMT CLR B SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-138 CLOSES. ________

[7] PLACE Handswitch 2-HS-67-141A, UPR CNTMT CLR D SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-141 CLOSES. ________

[8] PLACE Handswitch 2-HS-67-123A, CNTMT SPRAY HX 2B INLET, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-123 OPENS. ________

[9] PLACE Handswitch 2-HS-67-124A, CNTMT SPRAY HTX 2B RETURN, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-124 OPENS. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 48 of 204 Data Package: Page ____ of ____ Date ________

6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)

[10] CLOSE air bleed off valve 2-ISV-32-2880 to the following Control Valve 2-FCV-67-182, SIP ROOM COOLER 2B-B ERCW SUP FLOW CNTL and the Control Valves are FULL OPEN. ________

[11] CLOSE air bleed off valve 2-ISV-32-3028 to the following Control Valve 2-FCV-67-186, CSP ROOM COOLER 2B-B ERCW SUP FLOW CNTL, and the Control Valves are FULL OPEN. ________

[12] VERIFY with Test Director that there is flow through 2B SI pump room cooler. ________

[13] VERIFY with Test Director that there is flow through 2B CS pump room cooler. ________

[14] PLACE Handswitch 2-HS-67-67A, DG 2B-B NORM SUP, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-67 OPENS. ________

[15] PLACE Handswitch 1-HS-67-67A, DG 1B-B NORM SUP, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-67 OPENS. ________

[16] PLACE Handswitch 0-HS-67-152A, CCS HTX C ALT DISCH TO HDR B, on 0-M-27A, to POS A, AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the A position. ________

[17] PLACE Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, CLOSES. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 49 of 204 Data Package: Page ____ of ____ Date ________

6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)

[18] RECORD data for calculation then CALCULATE differential pressure required to simulate the loss of a downstream dam: ________

1st CV River level 0-LI-67-490, INTAKE PUMP STATION RIVER WATER LEVEL, [0-PNL-276-L147A, IPS, EL 722, West side]

local at Intake Pumping Station feet Header Pressure (0-PI-67-18B) psig 1 º § (River Level  666)

  • DP River Level  666 << ¨ ¸

¬ 2.31>>1/4 © 2.31 ¹ psid

[19] RECORD the running ERCW pump discharge valve numbers for pumps selected in Step 6.1[9] or 6.1[11] and P from the M&TE used in Step 4.3[12]

for the applicable pump.

A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___ ________

'P = psid M&TE Cal Due Date B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___ ________

'P = psid M&TE Cal Due Date

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 50 of 204 Data Package: Page ____ of ____ Date ________

6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)

[20] RECORD data, AND CALCULATE the revised 'P (this 'P simulates loss of downstream dam)

A. Re vised ' PPump #1  __________ psid

' PPump #1 ' PStep >18 @

1st CV B. Re vised 'PPump # 2  __________ psid

'PPump # 2 'PStep >18 @

1st CV

[21] ADJUST the running pumps discharge valves to obtain the revised P calculated in Step 6.3[20] (it may be necessary to readjust each valve several times to achieve required results), AND RECORD valve turns from OPEN.

A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___ ________

Turns Open 'P = psid M&TE Cal Due Date B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___ ________

Turns Open 'P = psid M&TE Cal Due Date

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 51 of 204 Data Package: Page ____ of ____ Date ________

6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)

NOTE Adjustment for flow through any of the newly added components for this mode, identified on Data Sheet 2, DOES NOT invalidate setpoints from previous modes. Adjustment of components set in previous modes, requires a RETEST of the previous mode but does not constitute a test deficiancy.

[22] PERFORM Train B flow balance in accordance with Appendix I and Data Sheet 2, for TR B U-1 COLD SHUTDOWN, U-2 LOCA-RECIRC, AND RECORD throttle valve positions on Data Sheet 5. ________

[23] RE-VERIFY the ERCW pump discharge valve P as follows:

A. CALCULATE the lower limit P from 6.3[19] values:

[  / 2 ]

  • 0 .9 __________ __

Valve#1 'P Valve#2 'P 1st CV B. CALCULATE the upper limit P from 6.3[19] values:

[  / 2]

  • 1. 1 __________ __

Valve#1 'P Valve#2 'P 1st CV

[24] ENTER an "NA" if the values in Step 6.3[25]A & 6.3[25]B are greater than the lower limit value of Step 6.3[23]A and less than the upper limit value of Step 6.3[23]B. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 52 of 204 Data Package: Page ____ of ____ Date ________

6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)

[25] RECORD the running ERCW pump discharge valves P:

A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___ ________

'P = psid M&TE Cal Due Date B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___ ________

'P = psid M&TE Cal Due Date NOTE Only valves that have been adjusted after the throttle setpoints recorded in Data Sheet 5 need to be reperformed. This would be the case if this subsection is being retested because of valve adjustment in a succeeding section.

[26] DETERMINE the total flow through CCS C HX (EFD-2) AND RECORD data below: ________

EFD-2 (gpm) (CCS C HX)

[27] VERIFY the following: (ACC CRIT)

A. 0-FCV-67-152 (POS A) flow > 7125 gpm. ________

[28] VERIFY that all flows on Data Sheet 2 meet the listed acceptance criteria in column 9. (ACC CRIT) ________

NOTE The following step is NOT applicable if this section is being retested due to valve adjustment in another mode invalidating the original setpoint.

[29] RECORD pump data on Data Sheet 6. ________

[30] RECORD applicable pressure data on Data Sheet 2. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 53 of 204 Data Package: Page ____ of ____ Date ________

6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)

NOTE IF Section 6.4 is to be performed immediately upon completion of Section 6.3, step 6.3[31]

may be N/Ad.

[31] OPEN ERCW pump discharge valves throttled in Step 6.3[21]. ________

[32] PLACE Handswitch 2-HS-67-99A, LWR CNTMT B CLRS SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-99 OPENS. ________

[33] PLACE Handswitch 2-HS-67-107A, LWR CNTMT D CLRS SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-107 OPENS. ________

[34] PLACE Handswitch 2-HS-67-138A, UPR CNTMT CLR B SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-138 OPENS. ________

[35] CLOSE 2-FCV-67-182, AND VERIFY NO flow through 2B SI pump room cooler. ________

[36] CLOSE 2-FCV-67-186, AND VERIFY NO flow through 2B CS pump room cooler. ________

[37] PLACE Handswitch 2-HS-67-141A, UPR CNTMT CLR D SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 2-FCV-67-141 OPENS. ________

[38] PLACE Handswitch 2-HS-67-123A, CNTMT SPRAY HX 2B INLET, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-123 CLOSES. ________

[39] PLACE Handswitch 2-HS-67-124A, CNTMT SPRAY HTX 2B RETURN, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-124 CLOSES. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 54 of 204 Data Package: Page ____ of ____ Date ________

6.3 UNIT 1 COLD SHUTDOWN - UNIT 2 LOCA-RECIRC (continued)

[40] OPEN air bleed off valve 2-ISV-32-2880 to the following Control Valve 2-FCV-67-182, SIP ROOM COOLER 2B-B ERCW SUP FLOW CNTL and the Control Valves are FULL CLOSED. ________

[41] OPEN air bleed off valve 2-ISV-32-3028 to the following Control Valve 2-FCV-67-186, CSP ROOM COOLER 2B-B ERCW SUP FLOW CNTL and the Control Valves are FULL CLOSED. ________

[42] PLACE Handswitch 0-HS-67-144A, CCS HTX C DISCH TO HDR A, on 0-M-27A, to OPEN AND ADJUST Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, to obtain 4000-6000 gpm flowrate. ________

[43] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, to the POS CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-152 CLOSES. ________

[44] ADJUST 0-HS-67-144 to obtain flow rate of >6000 gpm. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 55 of 204 Data Package: Page ____ of ____ Date ________

6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN

[1] VERIFY prerequisites listed in Section 4.0 and 6.1 for Section 6.4 have been completed. ________

[2] VERIFY flows are equal to or greater than the minimum required flows, as specified by Data Sheet 1. ________

[3] PLACE Handswitch 1-HS-67-99A, LWR CNTMT B CLRS SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-99 CLOSES. ________

[4] PLACE Handswitch 1-HS-67-107A, LWR CNTMT D CLRS SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-107 CLOSES. ________

[5] PLACE Handswitch 1-HS-67-138A, UPR CNTMT CLR B SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-138 CLOSES. ________

[6] PLACE Handswitch 1-HS-67-141A, UPR CNTMT CLR D SUP CIV-B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-141 CLOSES. ________

[7] PLACE Handswitch 1-HS-67-123A, CNTMT SPRAY HX 1B INLET, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-123 OPENS. ________

[8] PLACE Handswitch 1-HS-67-124A, CNTMT SPRAY HTX 1B RETURN, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-126 OPENS. ________

[9] CLOSE air bleed off valve 1-ISV-32-2983 to the following Conol Valve 1-FCV-67-182, SIP ROOM COOLER 1B-B ERCW SUP FLOW CNTL, and the Control Valves are FULL OPEN. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 56 of 204 Data Package: Page ____ of ____ Date ________

6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)

[10] CLOSE air bleed off valve 1-ISV-32-3017 to the following Control Valve 1-FCV-67-186, CSP ROOM COOLER 1B-B ERCW SUP FLOW CNTL,and the Control Valves are FULL OPEN. ________

[11] VERIFY with Test Director that there is flow through 1B SI pump room cooler. ________

[12] VERIFY with Test Director that there is flow through 1B CS pump room cooler. ________

[13] PLACE Handswitch 0-HS-67-152A, CCS HTX C DISCH TO HDR B, on 0-M-27A, to POS A AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS A. ________

[14] PLACE Handswitch 0-HS-67-144A, CCS HTX C BYPASS FLOW CNTL, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, CLOSES. ________

[15] PLACE Handswitch 0-HS-67-152A, CCS HTX C DISCH TO HDR B, on 0-M-27A, to POS B AND VERIFY by light indication that Valve 0-FCV-67-152 OPENS to the POS B. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 57 of 204 Data Package: Page ____ of ____ Date ________

6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)

NOTE If ERCW pump discharge valves are throttled (Step 6.3[21]) and pump alignments are unchanged, THEN (Step 6.4[16]) through 6.4[19] may be N/Ad

[16] RECORD data, AND CALCULATE differential pressure required to simulate the loss of a downstream dam: ________

1st CV River level (0-LI-67-479) local at Intake Pumping Station feet Header Pressure (0-PI-67-17B) psig 1 º § River Level  666

  • DP River Level  666 << >> ¨ ¸

¬ 2.311/4 © 2.31 ¹ psid

[17] RECORD the running ERCW pump discharge valve numbers for pumps selected in Steps 6.1[9] or 6.1[11] and P from the M&TE used in step 4.3[12] for the applicable pump :

A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___ ________

'P = psid M&TE Cal Due Date B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___ ________

'P = psid M&TE Cal Due Date

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 58 of 204 Data Package: Page ____ of ____ Date ________

6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)

[18] RECORD data, AND CALCULATE the revised 'P (this 'P simulates loss of downstream dam).

A. Re vised'PPump #1  __________ psid

'PPump #1 'PSTEP [16 ]

1st CV B. Re vised'PPump # 2  __________ psid

'PPump # 2 'PStep [16 ]

1st CV

[19] ADJUST the running pumps discharge valves to obtain the revised P calculated in the Step 6.4[18] (it may be necessary to readjust each valve several times to achieve required results).

A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___ ________

'P = psid Turns from FULL OPEN M&TE Cal Due Date B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___ ________

'P = psid Turns from FULL OPEN M&TE Cal Due Date

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 59 of 204 Data Package: Page ____ of ____ Date ________

6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)

NOTE if Step 6.4[16]) through 6.4[19] were previously N/Ad, then Steps 6.4[20] through 6.4[22]may be N/Ad.

[20] RE-VERIFY the ERCW pump discharge valve P as follows:

A. CALCULATE the lower limit P from Step 6.4[19] values:

[  / 2 ]

  • 0 .9 __________ __

Valve#1'P Valve#2'P ________

1st CV B. CALCULATE the upper limit P from Step 6.4[19] values:

[  / 2 ]

  • 1 .1 __________ __

Valve#1'P Valve#2'P ________

1st CV

[21] ENTER an "NA" if the values in Steps 6.4[22]A & 6.4[22]B are greater than the lower limit value of Step 6.4[20]A and less than the upper limit value of Step 6.4[20]B. ________

[22] RECORD the running ERCW pump discharge valves P:

A. ERCW Pump #1 Discharge Valve 0-ISV-67-504___ ________

'P = psid M&TE Cal Due Date B. ERCW Pump #2 Discharge Valve 0-ISV-67-504___ ________

'P = psid M&TE Cal Due Date

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 60 of 204 Data Package: Page ____ of ____ Date ________

6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)

NOTE Only valves that have been adjusted after the throttle setpoints recorded in Data Sheet 5 need to be reperformed. This would be the case if this subsection is being retested because of valve adjustment in a succeeding subsection.

[23] VERIFY the following:

A. 0-FCV-67-152 (POS B) flow is >8800 gpm as indicated by EFD-2. (ACC CRIT). ________

NOTE Adjustment for flow through any of the newly added components for this mode, identified on Data Sheet 3, DOES NOT invalidate setpoints from previous modes. Adjustment of components set in previous modes, requires a RETEST of the previous mode.

[24] PERFORM Train B flow balance in accordance with Appendix I and Data Sheet 3, for TRAIN B UNIT 1 LOCA-RECIRC -

UNIT 2 COLD SHUTDOWN. (ACC CRIT) ________

RECORD throttle valve positions on Data Sheet 5. ________

NOTE The following step is NOT applicable if this subsection is being retested due to valve adjustment in another mode invalidating the original setpoint.

[25] RECORD applicable pressure data on Data Sheet 3. ________

[26] RECORD pump data on Data Sheet 7. ________

[27] OPEN ERCW pump discharge valves throttled in Step 6.4[19]. ________

[28] PLACE Handswitch 1-HS-67-123A, CNTMT SPRAY HX 1B INLET, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-123 CLOSES. ________

[29] PLACE Handswitch 1-HS-67-124A, CNTMT SPRAY HTX 1B RETURN, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-124 CLOSES. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 61 of 204 Data Package: Page ____ of ____ Date ________

6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)

[30] CLOSE air bleed off valve 1-ISV-32-2983 to the following Control Valve 1-FCV-67-182, SIP ROOM COOLER 1B-B ERCW SUP FLOW CNTL, and the Control Valves are FULL OPEN. ________

[31] CLOSE air bleed off valve 1-ISV-32-3017 to the following Control Valve 1-FCV-67-186, CSP ROOM COOLER 1B-B ERCW SUP FLOW CNTL, and the Control Valves are FULL OPEN. ________

[32] PLACE Handswitch 1-HS-67-67A, DG 1B-B NORM SUP, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-67 CLOSES. ________

[33] PLACE Handswitch 2-HS-67-67A, DG 2B-B NORM SUP, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-67 CLOSES. ________

[34] PLACE Handswitch 1-HS-67-99A, LWR CNTMT B CLRS SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-99 OPENS. ________

[35] PLACE Handswitch 1-HS-67-107A, LWR CNTMT D CLRS SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-107 OPENS. ________

[36] PLACE Handswitch 1-HS-67-138A, UPR CNTMT CLR B SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-138 OPENS. ________

[37] PLACE Handswitch 1-HS-67-141A, UPR CNTMT CLR D SUP CIV-B, on 0-M-27A, to OPEN, AND VERIFY by light indication that Valve 1-FCV-67-141 OPENS. ________

[38] CLOSE 1-FCV-67-182 VERIFY NO flow through B SI pump room cooler. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 62 of 204 Data Package: Page ____ of ____ Date ________

6.4 UNIT 1 LOCA-RECIRC - UNIT 2 COLD SHUTDOWN (continued)

[39] CLOSE 1-FCV-67-186, AND VERIFY NO flow through 1B CS pump room cooler. ________

[40] PLACE Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to OPEN (>6000 gpm), AND VERIFY by light indication that Valve 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, OPENS. ________

[41] PLACE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, is in the CLOSED position, AND VERIFY by light indication that Valve 0-FCV-67-152 goes CLOSED. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 63 of 204 Data Package: Page ____ of ____ Date ________

6.5 UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP Heat Exchanger C Anticavitation Test, CCS Heat Exchanger C Discharge Valve Setting, and Train B Flow Balance in Normal Mode Both Units NOTE The Normal Mode flow balance is done solely to put the system in a configuration for setting of the Component Cooling Heat Exchanger discharge valve limit switches, and DOES NOT constitute acceptance criteria.

[1] VERIFY prerequisites listed in Sections 4.0 and 6.1 for Section 6.5 have been completed. ________

[2] ENSURE Normal Operation Mode flow balance has been performed in accordance with Appendix I and Data Sheet 1, AND VERIFY flows are equal to or greater than the minimum required flows on Data Sheet 1. ________

[3] VERIFY that the flow through 0-FCV-67-144, CCS HX C OUTLET ERCW FLOW CNTL BYP, is >6000 gpm. (ACC CRIT) ________

[4] ENSURE Handswitch 0-HS-67-152A, CCS HX C ALT DISCH TO HDR B, on 0-M-27A, is in the CLOSED position, AND VERIFY by light indication that Valve 0-FCV-67-152 is CLOSED. ________

[5] PLACE Handswitch 1-HS-67-146A, CCS HX A ALT DISCH TO HDR B, on 0-M-27A, to the POS B, AND VERIFY by light indication that Valve 1-FCV-67-146 OPENS to the POS B. ________

[6] PLACE Handswitch 2-HS-67-146A, CCS HX B ALT DISCH TO HDR B, on 0-M-27A, to the POS B, AND VERIFY by light indication that Valve 2-FCV-67-146 OPENS to the POS B. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 64 of 204 Data Package: Page ____ of ____ Date ________

6.5 UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP (continued)

[7] POSITION Handswitch 1-HS-67-143A, CCS HX A DISCH TO HDR B, on 0-M-27A, to obtain total indicated flow (EFD-1) of

>6650 gpm (ACC CRIT). ________

[8] POSITION Handswitch 2-HS-67-143A, CCS HX B DISCH TO HDR B, on 0-M-27A, to obtain total indicated flow (2-FI-67-222) (EFD-1) of >5850 gpm (ACC CRIT). ________

[9] RECORD the EFD-1 flow rate (or differential pressure from the

P gauge/device at 2-FT-67-222, CCS HEAT EXCHANGER B ERCW SUP FLOW, AND, CALCULATE flow rate through CCS HX B M&TE ____________________ Cal Due Date _________________

EFD-1 FLOW ____________________ GPM M&TE ____________________ Cal Due Date _________________

FLOW 'P = ____________________ inches H2O K (P)1/2 = 852 ( )1/2 = _________________ GPM 1st CV

[10] CALCULATE the total flow rate by subtracting EFD-1 from 2-FT-67-222 to obtain flow through CCS HTX B as follows: ________

1st CV

=

2-FT-67-222 flow ______gpm (-) EFD-1 flow _______gpm __________ gpm CCS B HX

[11] AS NECESSARY, ADJUST Handswitch 1-HS-67-143A, CCS HX A DISCH TO HDR B, on 0-M-27A, to obtain total indicated flow (EFD-1) of >6650 gpm. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 65 of 204 Data Package: Page ____ of ____ Date ________

6.5 UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP (continued)

[12] AS NECESSARY, ADJUST Handswitch 2-HS-67-143A, CCS HX B DISCH TO HDR A, on 0-M-27A, to obtain total indicated flow (EDF-2) of >5850 gpm. ________

[13] RECORD the total flow rate at 0-FT-67-226, CCS HX C SUP FLOW, (or EDF if used) AND, DETERMINE the total flow is >6000 gpm (ACC CRIT). ________

1st CV M&TE ____________________ Cal Due Date _________________

EFD-2 FLOW ____________________ GPM M&TE ____________________ Cal Due Date _________________

FLOW 'P = ____________________ inches H2O K (P)1/2 = 852 ( )1/2 = _________________ GPM

[14] VERIFY the following: (ACC CRIT)

A. CCS A HX TOTAL FLOW >6650 gpm. ________

B. CCS B HX TOTAL FLOW >5850 gpm. ________

C. CCS C HX TOTAL FLOW >6000 gpm. ________

[15] PERFORM Train B flow balance, AND RECORD data in accordance with Appendix I and Data Sheet 4, for U-1 HOT SHUTDOWN, U-2 STARTUP. ________

RECORD throttle valve positions on Data Sheet 5. ________

[16] IF flow balance adjustments were required, THEN:

A. VERIFY 1-FCV-67-143, CCS HX A DISCH TO HDR B, on 0-M-27A is positioned to obtain flow of >6650 gpm.

(ACC CRIT) ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 66 of 204 Data Package: Page ____ of ____ Date ________

6.5 UNIT 1 HOT SHUTDOWN - UNIT 2 STARTUP (continued)

B. VERIFY 2-FCV-67-143, CCS HX B DISCH TO HDR A, on 0-M-27A is positioned to obtain flow of >5850 gpm.

(ACC CRIT) ________

C. VERIFY 0-FCV-67-144, CCS HX C DISCH TO HDR A, on 0-M-27A is positioned to obtain flow of >6000 gpm.

(ACC CRIT). ________

OTHERWISE NOTE If the next step is performed print pages for steps 6.5[5] through 6.5[16]C D. RE-PERFORM steps 6.5[5] through 6.5[16]C. (This step may be N/A if not performed.) ________

[17] RECORD applicable pressure data on Data Sheet 4. ________

[18] PLACE Handswitch 1-HS-67-146A, CCS HX A ALT DISCH TO HDR B, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 1-FCV-67-146 CLOSES. ________

[19] ADJUST Handswitch 1-HS-67-143A, CCS HX A DISCH TO HDR B, on 0-M-27A, to obtain > 6000 (6000-6500) gpm flow rate (EFD-1) OR as specified by U-1 Operations. ________

[20] PLACE Handswitch 2-HS-67-146A, CCS HX B ALT DISCH TO HDR A, on 0-M-27A, to CLOSE, AND VERIFY by light indication that Valve 2-FCV-67-146 CLOSES. ________

[21] ADJUST Handswitch 2-HS-67-143A, CCS HX B DISCH TO HDR A, on 0-M-27A, to obtain >1000 (1000-3000) gpm flow rate as indicated by 2-FT-67-222 (Total flow rate minus EFD-1 flow) OR as specified by U-1 Operations. ________

[22] ADJUST Handswitch 0-HS-67-144A, CCS HX C DISCH TO HDR A, on 0-M-27A, to obtain > 6000 (6000-6500) gpm flow rate as indicated by EFD-2. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 67 of 204 Data Package: Page ____ of ____ Date ________

7.0 POST-PERFORMANCE ACTIVITIES

[1] REQUEST Operations to terminate ERCW strainer backwash operation and return the strainer alignment to normal configuration. ________

[2] RESTORE Station and Control Air compressors A, B & C to automatic operation per SOI-32.01. ________

[3] ENSURE the Auxiliary Air Compressors control switches are placed in auto per SOI-32.02. ________

[4] NOTE any excessive vibration identified in the CTL. ________

NOTE The following steps return the Compressor to normal Standby configuration.

[5] IF 0-DRV-32-285, ESSENT CONTROL AIR TR B AFTERFILTER DRAIN, was opened during step [5.1] THEN, CLOSE afterfilter drain valve 0-DRV-32-285 to allow the compressor to unload. ________

[6] OPEN 0-FCV-32-85 using 0-HS-32-85, AND RECORD time when valve is opened: ____________. ________

[7] ENSURE 0-HS-32-86 is in AUTO. ________

[8] ENSURE compressor STOPS after running unloaded for for about 5 minutes. ________

[9] VERIFY 0-DRV-32-285, ESSENT CONTROL AIR TR B AFTERFILTER DRAIN, is CLOSED. ________

IV

[10] NOTIFY US, or designee, that the B train ACAS portion of this test is complete and that the B Train ACAS compressor is returned to normal standby configuration. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 68 of 204 Data Package: Page ____ of ____ Date ________

7.0 POST-PERFORMANCE ACTIVITIES (continued)

[11] RETURN the A, B and C Station Air Compressors to the AS FOUND POSITIONS from step 6.1[14].

STATION AIR COMPR A (0-HS-32-25D) ___________

STATION AIR COMPR B (0-HS-32-26A) ___________

STATION AIR COMPR C (0-HS-32-27A) ___________

[12] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3563 to RESTORE air to 1-TCV-67-100, LWR CNTMT VENT CLR 1B-B OUT TEMP CNTL. ________

1st CV

[13] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3563 to RESTORE air to 2-TCV-67-100, LWR CNTMT VENT CLR 2B-B OUT TEMP CNTL. ________

1st CV

[14] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3565 to RESTORE air to 1-TCV-67-101, CRD VENT CLR 1B-B OUT TEMP CNTL. ________

1st CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 69 of 204 Data Package: Page ____ of ____ Date ________

7.0 POST-PERFORMANCE ACTIVITIES (continued)

[15] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3565 to RESTORE air to 2-TCV-67-101, CRD VENT CLR 2B-B OUT TEMP CNTL. ________

1st CV

[16] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3564 to RESTORE air to 1-TCV-67-102, U-1 RCP MTR CLR 1-2. ________

1st CV

[17] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3564 to RESTORE air to 2-TCV-67-102, U-2 RCP MTR CLR 2-2. ________

1st CV

[18] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3605 to RESTORE air to 1-TCV-67-108, LWR CNTMT VENT CLR 1D. ________

1st CV

[19] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3605 to RESTORE air to 2-TCV-67-108, LWR CNTMT VENT CLR 2D. ________

1st CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 70 of 204 Data Package: Page ____ of ____ Date ________

7.0 POST-PERFORMANCE ACTIVITIES (continued)

[20] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3606 to RESTORE air to 1-TCV-67-109, CRDM VENT CLR 1D. ________

1st CV

[21] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3606 to RESTORE air to 2-TCV-67-109, CRDM VENT CLR 2D. ________

1st CV

[22] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3607 to RESTORE air to 1-TCV-67-110, RCP MTR CLR 1-4. ________

1st CV

[23] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3607 to RESTORE air to 2-TCV-67-110, RCP MTR CLR 2-4. ________

1st CV

[24] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3159 to RESTORE air to 1-TCV-67-137, UPR CNTMT VENT CLR 1B. ________

1st CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 71 of 204 Data Package: Page ____ of ____ Date ________

7.0 POST-PERFORMANCE ACTIVITIES (continued)

[25] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3160 to RESTORE air to 1-TCV-67-140, UPR CNTMT VENT CLR 1D. ________

1st CV

[26] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3116 to RESTORE air to 2-TCV-67-137, UPR CNTMT VENT CLR 2B. ________

1st CV

[27] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3115 to RESTORE air to 2-TCV-67-140, UPR CNTMT VENT CLR 2D. ________

1st CV

[28] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-2929 to RESTORE air to 1-FCV-67-172, RECIP PMP RM CLR. ________

1st CV

[29] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3283 to RESTORE air to 1-FCV-67-215, SF PIT & TB BSTR PMP SPACE CLR 2B-B. ________

1st CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 72 of 204 Data Package: Page ____ of ____ Date ________

7.0 POST-PERFORMANCE ACTIVITIES (continued)

[30] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3063 to RESTORE air to 1-FCV-67-164, CCS & AF PMPS SPACE CLR 1B-B. ________

1st CV

[31] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-2983 to RESTORE air to 1-FCV-67-182, SI PMP RM CLR 1B. ________

1st CV

[32] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-2880 to RESTORE air to 2-FCV-67-182, SI PMP RM CLR 2B. ________

1st CV

[33] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3017 to RESTORE air to 1-FCV-67-186, CS PMP RM CLR 1B. ________

1st CV

[34] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3028 to RESTORE air to 2-FCV-67-186, CS PMP RM CLR 2B. ________

1st CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 73 of 204 Data Package: Page ____ of ____ Date ________

7.0 POST-PERFORMANCE ACTIVITIES (continued)

[35] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-2956 to RESTORE air to 1-FCV-67-348, PEN RM CLR 1B1. ________

1st CV

[36] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-2956 to RESTORE air to 2-FCV-67-348, PEN RM CLR 2B1. ________

1st CV

[37] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3147 to RESTORE air to 1-FCV-67-352, PEN RM CLR 1B2. ________

1st CV

[38] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3167 to RESTORE air to 2-FCV-67-352, PEN RM CLR 2B2. ________

1st CV

[39] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-3295 to RESTORE air to 1-FCV-67-356, PEN RM CLR 1B3. ________

1st CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 74 of 204 Data Package: Page ____ of ____ Date ________

7.0 POST-PERFORMANCE ACTIVITIES (continued)

[40] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3323 to RESTORE air to 2-FCV-67-356, PEN RM CLR 2B3. ________

1st CV

[41] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 1-ISV-32-2960 to RESTORE air to 1-FCV-67-344, PIPE CHASE CLR 1B. ________

1st CV

[42] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3805 to RESTORE air to 2-FCV-67-344, PIPE CHASE CLR 2B. ________

1st CV

[43] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3410 to RESTORE air to 2-FCV-67-338, EMER GAS TRTMT RM CLR 2B. ________

1st CV

[44] CLOSE the air bleed petcock, AND OPEN Air Supply Valve 2-ISV-32-3031 to RESTORE air to 2-FCV-67-219, BA XFER PMPS & AF PMPS SP CLR 2B. ________

1st CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 75 of 204 Data Package: Page ____ of ____ Date ________

7.0 POST-PERFORMANCE ACTIVITIES (continued)

[45] RESTORE 0-TCV-67-1052, ELEC BD RM A/C COND B-B ERCW RET TEMP CNTL. [CB, EL 696, C13P], on EBR CHILLER B-B, to normal operation by turning the Manual Flushing Screw at the top of the actuator fully counter-clockwise to allow pilot valve control. ________

1st CV

[46] RESTORE 0-TCV-67-1053, MCR A/C CHILLER B-B ERCW RET TEMP CNTL [AB, EL. 700, A12U], on MCR CHILLER B-B, to normal operation by turning the Manual Flushing Screw at the top of the actuator fully counter-clockwise to allow pilot valve control. ________

1st CV

[47] RETURN TO NORMAL 0-TCV-67-1053 by ensuring the bypass stem (silver colored knurled knob) is rotated fully clockwise until the knurled knob is lightly seated. (B SHTDN BD RM A/C TEMP CONTROL). ________

[48] PLACE Handswitch 0-HS-67-208A, SS AND CNTL AIR COMPR SUP HDR 1B ISOL, on 0-M-27A to OPEN, AND VERIFY by light indication that Valve 0-FCV-67-208 OPENS. ________

[49] RESTORE 1-TCV-67-118, INSTR RM WATER CLR 1B ERCW SUP TEMP CNTL, to normal by removing the temporary nitrogen supply. ________

1st CV

[50] RESTORE 2-TCV-67-118, INSTR RM WATER CLR 2B ERCW SUP TEMP CNTL, to normal by removing the temporary nitrogen supply. ________

1st CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 76 of 204 Data Package: Page ____ of ____ Date ________

7.0 POST-PERFORMANCE ACTIVITIES (continued)

[51] REMOVE the EFD-2 downstrem of TEE on 2B header and upstream of 0-FT-67-226, CCS HX C OUTLET ERCW HDR B FLOW CNTL, installed at Step 4.3[11]S. ________

1st CV

[52] REMOVE a 0-200 psig test gauge, +0.25% accuracy, at Test Connection 0-PT-67-48, ERCW PUMP E-B DISCH PRESS, installed at Step 4.3[11]L. ________

1st CV

[53] REMOVE a 0-200 psig test gauge, +0.25% accuracy, at Test Connection 0-PT-67-52, ERCW PUMP F-B DISCH PRESS, installed at Step 4.3[11]M. ________

1st CV

[54] REMOVE a 0-200 psig test gauge, +0.25% accuracy, at Test Connection 0-PT-67-56, ERCW PUMP G-B DISCH PRESS, installed at Step 4.3[11]N. ________

1st CV

[55] REMOVE a 0-200 psig test gauge, +0.25% accuracy, at Test Connection 0-PT-67-60, ERCW PUMP H-B DISCH PRESS, installed at Step 4.3[11]O. ________

1st CV

[56] REMOVE the 0-50 psid differential pressure gauges, between the listed ERCW Pump Discharge pressure transmitters and 0-PT-67-17, ERCW HEADER B PRESS, installed at Step 4.3[12]:

A. 0-PT-67-48, ERCW PUMP E-B DISCH PRESS ________

1st CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 77 of 204 Data Package: Page ____ of ____ Date ________

7.0 POST-PERFORMANCE ACTIVITIES (continued)

B. 0-PT-67-52, ERCW PUMP F-B DISCH PRESS ________

1st CV C. 0-PT-67-56, ERCW PUMP G-B DISCH PRESS ________

1st CV D. 0-PT-67-60, ERCW PUMP H-B DISCH PRESS ________

1st CV

[57] REMOVE the pressure gauge at the inlet to 1-FE-67-62, ERCW SUPPLY HDR B FLOW, installed at Step 4.3[11]C. ________

1st CV

[58] REMOVE the pressure gauge at the outlet to 1-FE-67-62, ERCW SUPPLY HDR B FLOW, installed at Step 4.3[11]D. ________

1st CV

[59] REMOVE the pressure gauge at the inlet to 2-FE-67-62, ERCW SUPPLY HDR B FLOW, installed at Step 4.3[11]E. ________

1st CV

[60] REMOVE the pressure gauge at the outlet to 2-FE-67-62, ERCW SUPPLY HDR B FLOW, installed at Step 4.3[11]F. ________

1st CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 78 of 204 Data Package: Page ____ of ____ Date ________

7.0 POST-PERFORMANCE ACTIVITIES (continued)

[61] REMOVE the pressure gauge at 1-VTV-67-534B, CS HX 1B ERCW SUP HDR VENT, installed at Step 4.3[11]B. ________

1st CV

[62] REMOVE the pressure gauge at 0-DRV-67-547, ERCW CCS HX C DRAIN, installed at Step 4.3[11]G. ________

1st CV

[63] REMOVE the pressure gauge at 0-TV-67-621B, MCR WTR CHLR B-B ERCW SUP TEST CONN, installed at Step 4.3[11]H. ________

1st CV

[64] REMOVE the pressure gauge at 1-TV-67-690B, UPPER CNTMT VENT CLR 1B ERCW SUP HDR TEST VENT, installed at Step 4.3[11]I. ________

1st CV

[65] REMOVE the pressure gauge at 2-TV-67-690B, UPPER CNTMT VENT CLR 2B ERCW SUP HDR TEST VENT, installed at Step 4.3[11]J. ________

1st CV

[66] REMOVE the pressure gauge at 0-VTV-67-614B, ELEC BD RM A/C COND A-A ERCW SUP VENT, installed at Step 4.3[11]K. ________

1st CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 79 of 204 Data Package: Page ____ of ____ Date ________

7.0 POST-PERFORMANCE ACTIVITIES (continued)

[67] REMOVE the pressure gauge at 1-PI-67-10B, ERCW STRAINER 1B-B OUT PRESS installed at Step 4.3[11]P. ________

1st CV

[68] REMOVE the pressure gauge at 2-PI-67-10B, ERCW STRAINER 2B-B OUT PRESS installed at Step 4.3[11]Q. ________

1st CV

[69] Notify Operations that Containment Spray Heat Exchangers may be placed in layup condition in accordance with SOI-67.02, if so desired by Unit 1 Operations. ________

[70] VERIFY that Post-test calibration of the M&TE used to record quantitative acceptance criteria has been satisfactorily performed and the results recorded on Measuring and Test Equipment (M&TE) Log in SMP-9.0. ________

[71] VERIFY that Post-test calibration of permanent plant instruments used to record quantitative acceptance criteria has been satisfactorily performed, AND RECORD the results on Appendix C, Permanent Plant Instrumentation Log. ________

[72] NOTIFY the Unit 2 and Unit 1 SM/SRO of the test completion and system alignment. ________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 80 of 204 Data Package: Page ____ of ____ Date ________

8.0 RECORDS 8.1 QA Records Completed Test Package (PTI) 8.2 Non-QA Records None

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 81 of 204 Appendix A (Page 1 of 1)

TEST INSTRUCTIONS REFERENCE REVIEW Data Package: Page ____ of ____ Date ________

Additional copies of this table may be made as necessary.

PROCEDURE/ INITIAL AND DATE.

REVISION/CHANGES INSTRUCTION (N/A for no change)

FSAR Section 9.2.1 Table 14.2-1 Shts 4 & 5 of 89 N3-67-4002 System Description for Essential Raw Cooling Water System 2-TSD-067, Essential Raw Cooling Water System SOI-67.1, Essential Raw Cooling Water System Operating Instruction GOI-7, Generic Equipment Operating Guidelines VTD-M359-003, Valve Technical Manual for Metrex Model FTVA-400-WAT 4 2 War Refrigerant Pressure Activated Condenser Cooling Water Control Valve 1-SOI-30.05, Auxiliary Building HVAC Systems 0-PI-OPS-17.0

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 82 of 204 Appendix B (Page 1 of 1)

TEMPORARY CONDITION LOG Data Package: Page ____ of ____ Date ________

Additional copies of this table may be made as necessary.

ITEM TEMPORARY CONDITION PERFORMED RETURNED TO NORMAL No. DESCRIPTION Step Performed By/Date Step Returned By/Date No. CV By/Date No. CV By/Date

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 83 of 204 Appendix C (Page 1 of 4)

PERMANENT PLANT INSTRUMENTATION LOG Data Package: Page ____ of ____ Date ________

INSTRUMENT CAL DUE FILLED AND PLACED IN USED FOR POST-TEST POST-TEST OR DATE VENTED1 SERVICE1 QUANTITATIVE CAL DATE2 CALIBRATION INSTRUMENT ACC CRIT ACCEPTABLE2 LOOP # INITIAL/DATE INIT/DATE INIT/DATE YES NO 0-FIS-67-209 1-FI-67-74 1-FI-67-267 2-FI-67-267 1-FI-67-269 2-FI-67-269 1-FI-67-280 2-FI-67-74 2-FI-67-280 1-LPF-67-62 2-LPF-67-62 1-LPF-67-122 2-LPF-67-122

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 84 of 204 Appendix C (Page 2 of 4)

PERMANENT PLANT INSTRUMENTATION LOG Data Package: Page ____ of ____ Date ________

INSTRUMENT CAL DUE FILLED AND PLACED IN USED FOR POST-TEST POST-TEST OR DATE VENTED1 SERVICE1 QUANTITATIVE CAL DATE2 CALIBRATION INSTRUMENT ACC CRIT ACCEPTABLE2 LOOP # INITIAL/DATE INIT/DATE INIT/DATE YES NO 0-LPP-67-17 1-PI-67-10B 2-PI-67-10B 1-PI-67-10A 2-PI-67-10A 0-PDI-67-447A 0-PS-67-484 0-PS-67-485 0-PS-67-486 0-PS-67-487 0-PS-67-461

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 85 of 204 Appendix C (Page 3 of 4)

PERMANENT PLANT INSTRUMENTATION LOG Data Package: Page ____ of ____ Date ________

INSTRUMENT CAL DUE FILLED AND PLACED IN USED FOR POST-TEST POST-TEST OR DATE VENTED1 SERVICE1 QUANTITATIVE CAL DATE2 CALIBRATION INSTRUMENT ACC CRIT ACCEPTABLE2 LOOP # INITIAL/DATE INIT/DATE INIT/DATE YES NO 0-PS-67-463 0-LPP-67-48 0-LPP-67-52 0-LPP-67-56 0-LPP-67-60 0-LPT-67-45A 0-LPT-67-45B 0-LPT-67-49A 0-LPT-67-49B 0-LPT-67-53A 0-LPT-67-53B

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 86 of 204 Appendix C (Page 4 of 4)

PERMANENT PLANT INSTRUMENTATION LOG Data Package: Page ____ of ____ Date ________

INSTRUMENT CAL DUE FILLED AND PLACED IN USED FOR POST-TEST POST-TEST OR DATE VENTED1 SERVICE1 QUANTITATIVE CAL DATE2 CALIBRATION INSTRUMENT ACC CRIT ACCEPTABLE2 LOOP # INITIAL/DATE INIT/DATE INIT/DATE YES NO 0-LPT-67-57A 0-LPT-67-57B 1-LPF-67-122 0-LI-67-479 1

These items may be initialed and dated by personnel performing the task. Instrumentation not required to be filled and vented may be identified as Not Applicable. (N/A) 2 May be identified as Not Applicable (N/A) if instrument was not used to verify/record quantitative acceptance criteria data.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 87 of 204 Appendix D (Page 1 of 9)

SWITCH LINEUP Data Package: Page ____ of ____ Date ________

Switch Location Description Position Verified Date 0-HS-67-208A 0-M-27A C&SS COMPR SUP FROM HDR 1B OPEN 1-HS-67-128B 0-M-27A 1B AB CLRS C&SS AUX AIR B SUP HDR PD/OPEN 1-HS-67-139A 0-M-27A UPR CNTMT CLR 1B RET CIV-IB A AUTO 1-HS-67-297A 0-M-27A UPR CNTMT CLR 1B RET CIV-IB A AUTO 1-HS-67-138A 0-M-27A UPR CNTMT CLR 1B SUP CIV-IB A AUTO 1-HS-67-124A 0-M-27A CNTMT SPRAY HX 1B RETURN CLOSED 1-HS-67-123A 0-M-27A CNTMT SPRAY HX 1B INLET CLOSED 1-HS-67-142A 0-M-27A UPR CNTMT CLRS 1D RET CIV-IB A AUTO 1-HS-67-298A 0-M-27A UPR CNTMT CLRS 1D DRET CIV-IB A AUTO 1-HS-67-141A 0-M-27A UPR CNTMT CLR 1D SUP CIV-IB A AUTO 1-HS-67-104A 0-M-27A LWR CNTMT 1B CLRS RET CIV-IB A AUTO 1-HS-67-103A 0-M-27A LWR CNTMT 1B CLRS RET CIV-IB A AUTO 1-HS-67-102A 0-M-27A RCP 2 MTR CLR SUP TCV P AUTO 1-HS-67-101A 0-M-27A CRDM CLR 1D-B OUTLET TCV P AUTO 1-HS-67-100A 0-M-27A LWR CNTMT CLR 1B OUTLET TCV P AUTO 1-HS-67-105A 0-M-27A LWR CNTMT 1B CLRS SUP CIV-IB A AUTO 1-HS-67-99A 0-M-27A LWR CNTMT 1B CLRS SUP CIV-IB A AUTO 1-HS-67-112A 0-M-27A LWR CNTMT 1D CLRS RET CIV-IB A AUTO

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 88 of 204 Appendix D (Page 2 of 9)

SWITCH LINEUP Data Package: Page ____ of ____ Date ________

Switch Location Description Position Verified Date 1-HS-67-111A 0-M-27A LWR CNTMT 1D CLRS RET CIV-IB A AUTO 1-HS-67-110 0-M-27A RCP 4 MTR CLR SUP TCV P AUTO 1-HS-67-109A 0-M-27A CRDM CLR 1D-B OUTLET TCV P AUTO 1-HS-67-108A 0-M-27A LWR CNTMT CLR 1D OUTLET TCV P AUTO 1-HS-67-113A 0-M-27A LWR CNTMT 1D CLRS SUP CIV-IB A AUTO 1-HS-67-107A 0-M-27A LWR CNTMT 1D CLRS SUP CIV-IB A AUTO 1-HS-67-82A 0-M-27A AB SUP HDR 1B PD/OPEN 1-HS-67-24A 0-M-27A STRAINER 1B-B INLET PD/OPEN 1-HS-67-67A 0-M-27A DG 1B-B NORM SUP P AUTO 2-HS-67-67A 0-M-27A DG 2B-B NORM SUP OPEN 1-HS-67-65A 0-M-27A DG 1B-B BACKUP SUP P AUTO 2-HS-67-65A 0-M-27A DG 2B-B BACKUP SUP P AUTO 2-HS-67-82A 0-M-27A AB SUPPLY HDR 2B NORMAL 2-HS-67-24A 0-M-27A STRAINER 2B-B INLET NORMAL 0-HS-67-208B 0-M-27A C&SS COMPR SUP FROM HDR 1B NORMAL 2-HS-67-128A 0-M-27A 2B AB CLRS C&SS AUX AIR B SUP HDR NORMAL

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 89 of 204 Appendix D (Page 3 of 9)

SWITCH LINEUP Data Package: Page ____ of ____ Date ________

Switch Location Description Position Verified Date 2-HS-67-139A 0-M-27A UPR CNTMT CLR 2B RET CIV-IB A AUTO 2-HS-67-297A 0-M-27A UPR CNTMT CLR 2B RET CIV-IB A AUTO 2-HS-67-138A 0-M-27A UPR CNTMT CLR 2B SUP CIV-IB A AUTO 2-HS-67-124A 0-M-27A CNTMT SPRAY HX 2B RETURN CLOSED 2-HS-67-123A 0-M-27A CNTMT SPRAY HX 2B INLET CLOSED 2-HS-67-142A 0-M-27A UPR CNTMT CLR 2D RET CIV-IB A AUTO 2-HS-67-298A 0-M-27A UPR CNTMT CLR 2D RET CIV-IB A AUTO 2-HS-67-141A 0-M-27A UPR CNTMT CLR 2D SUP CIV-IB A AUTO 2-HS-67-104A 0-M-27A LWR CNTMT 2B CLRS RET CIV-IB A AUTO 2-HS-67-103A 0-M-27A LWR CNTMT 2B CLRS RET CIV-IB A AUTO 2-HS-67-102A 0-M-27A RCP 2 MTR CLR SUP TCV P AUTO 2-HS-67-109A 0-M-27A CRDM CLR 2B-B OUTLET TCV P AUTO 2-HS-67-100A 0-M-27A LWR CNTMT CLR 2B OUTLET TCV P AUTO 2-HS-67-105A 0-M-27A LWR CNTMT 2B CLRS SUP CIV-IB A AUTO 2-HS-67-99A 0-M-27A LWR CNTMT 2B CLRS SUP CIV-IB A AUTO 2-HS-67-112A 0-M-27A LWR CNTMT 2D CLRS RET CIV-IB A AUTO

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 90 of 204 Appendix D (Page 4 of 9)

SWITCH LINEUP Data Package: Page ____ of ____ Date ________

Switch Location Description Position Verified Date 2-HS-67-111A 0-M-27A LWR CNTMT 2D CLRS RET CIV-IB A AUTO 2-HS-67-102A 0-M-27A RCP 2 MTR CLR SUP TCV P AUTO 2-HS-67-101A 0-M-27A CRDM CLR 2B-B OUTLET TCV P AUTO 2-HS-67-108A 0-M-27A LWR CNTMT CLR 2D OUTLET TCV P AUTO 2-HS-67-113A 0-M-27A LWR CNTMT 2D CLRS SUP CIV-IB A AUTO 2-HS-67-107A 0-M-27A LWR CNTMT 2D CLRS SUP CIV-IB A AUTO 0-XS-67-287 0-M-27A ERCW PUMP E-B/F-B DG POWER SEL PUMP E-B 0-HS-67-47A 0-M-27A ERCW PMP E-B A AUTO 0-HS-67-51A 0-M-27A ERCW PMP F-B A AUTO 1-HS-67-440A 0-M-27A SCRN WASH PMP & TRAV SCRN 1B-B P AUTO 1-HS-67-147A 0-M-27A CCS HX C SUP FROM HDR 2B PD/CLOSED 0-HS-67-151A 0-M-27A CCS HX C ALT DISCH TO HDR A PD/CLOSED 0-HS-67-144A 0-M-27A CCS HX C DISCH TO HDR A CLOSED 0-HS-67-152A 0-M-27A CCS HX C DISCH TO HDR B CLOSED 0-HS-67-362A 0-M-27A DISCH HDR B TO CT BASIN OPEN 0-HS-67-360A 0-M-27A DISCH HDR A TO CT BASIN OPEN

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 91 of 204 Appendix D (Page 5 of 9)

SWITCH LINEUP Data Package: Page ____ of ____ Date ________

Switch Location Description Position Verified Date 2-HS-67-447a 0-M-27A SCRN WASH PMP & TRAV SCRN 2B-B P AUTO 0-HS-67-55A 0-M-27A ERCW PUMP G-B A AUTO 0-HS-67-59A 0-M-27A ERCW PUMP H-B A AUTO 0-XS-67-288 0-M-27A ERCW PMP G-B/H-B DG POWER SEL PUMP H-B 2-HS-67-147A 0-M-27A CCS HX C SUP FROM HDR 2B PD/OPEN 1-XS-67-97-A 480V RMOV BD TRANSFER SWITCH NORMAL 1-HS-67-97C-A 480V RMOV BD 1-FCV-67-97-A CONTROL SWITCH NORMAL 1-HS-67-89C 480V RMOV BD 1-FCV-67-89-A CONTROL SWITCH NORMAL 1-XS-67-89-A 480V RMOV BD TRANSFER SWITCH NORMAL 1-XS-67-87-A 480V RMOV BD TRANSFER SWITCH NORMAL 1-HS-67-87C 480V RMOV BD 1-FCV-67-87-A CONTROL SWITCH NORMAL 1-XS-67-82-A 480V RMOV BD TRANSFER SWITCH NORMAL 1-HS-67-82C 480V RMOV BD 1-FCV-67-82-A CONTROL SWITCH NORMAL 2-XS-67-97-A 480V RMOV BD TRANSFER SWITCH NORMAL 2-HS-67-97C-A 480V RMOV BD 2-FCV-67-97-A CONTROL SWITCH NORMAL 1-XS-67-95-A 480V RMOV BD TRANSFER SWITCH NORMAL

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 92 of 204 Appendix D (Page 6 of 9)

SWITCH LINEUP Data Package: Page ____ of ____ Date ________

Switch Location Description Position Verified Date 1-HS-67-95C 480V RMOV BD 1-FCV-67-95-A CONTROL SWITCH NORMAL 2-HS-67-89C 480V RMOV BD 2-FCV-67-89-A CONTROL SWITCH NORMAL 2-XS-67-89-A 480V RMOV BD TRANSFER SWITCH NORMAL 2-XS-67-87-A 480V RMOV BD TRANSFER SWITCH NORMAL 2-HS-67-87C 480V RMOV BD 2-FCV-67-87-A CONTROL SWITCH NORMAL 2-XS-67-82-A 480V RMOV BD TRANSFER SWITCH NORMAL 2-HS-67-82C 480V RMOV BD 2-FCV-67-82-A CONTROL SWITCH NORMAL 1-XS-67-128-A 480V RMOV BD TRANSFER SWITCH NORMAL 1-HS-67-128C 480V RMOV BD 1-FCV-67-128-A CONTROL SWITCH NORMAL 1-XS-67-147 480V RMOV BD TRANSFER SWITCH NORMAL 1-HS-67-147C 480V RMOV BD 1-FCV-67-147-B CONTROL SWITCH NORMAL 0-XS-67-151-A 480V RMOV BD TRANSFER SWITCH NORMAL 0-HS-67-151C 480V RMOV BD 0-FCV-67-151 CONTROL SWITCH NORMAL 2-XS-67-95-A 480V RMOV BD TRANSFER SWITCH NORMAL 2-HS-67-95C 480V RMOV BD 2-FCV-67-95-A CONTROL SWITCH NORMAL 1-XS-67-88-B 480V RMOV BD TRANSFER SWITCH NORMAL

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 93 of 204 Appendix D (Page 7 of 9)

SWITCH LINEUP Data Package: Page ____ of ____ Date ________

Switch Location Description Position Verified Date 1-HS-67-88C 480V RMOV BD 1-FCV-67-88-B CONTROL SWITCH NORMAL 1-XS-67-96-B 480V RMOV BD TRANSFER SWITCH NORMAL 1-HS-67-96C 480V RMOV BD 1-FCV-67-96-B CONTROL SWITCH NORMAL 1-XS-67-91-B 480V RMOV BD TRANSFER SWITCH NORMAL 1-HS-67-91C 480V RMOV BD 1-FCV-67-91-B CONTROL SWITCH NORMAL 1-XS-67-83-B 480V RMOV BD TRANSFER SWITCH NORMAL 1-HS-67-83C 480V RMOV BD 1-FCV-67-83-B CONTROL SWITCH NORMAL 2-XS-67-128-A 480V RMOV BD TRANSFER SWITCH NORMAL 2-HS-67-128C 480V RMOV BD 2-FCV-67-128-A CONTROL SWITCH NORMAL 0-XS-67-208-B 480V RMOV BD TRANSFER SWITCH NORMAL 0-HS-67-208C 480V RMOV BD 0-FCV-67-208-B CONTROL SWITCH NORMAL 0-XS-67-362-B 480V RMOV BD TRANSFER SWITCH NORMAL 0-HS-67-362C 480V RMOV BD 0-FCV-67-362-B CONTROL SWITCH NORMAL 0-XS-67-144-B 480V RMOV BD TRANSFER SWITCH NORMAL 0-HS-67-144C 480V RMOV BD 0-FCV-67-144-B CONTROL SWITCH NORMAL 2-XS-67-24-A 480V RMOV BD TRANSFER SWITCH NORMAL

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 94 of 204 Appendix D (Page 8 of 9)

SWITCH LINEUP Data Package: Page ____ of ____ Date ________

Switch Location Description Position Verified Date 2-HS-67-24C 480V RMOV BD 2-FCV-67-24-A CONTROL SWITCH NORMAL 0-XS-67-360 480V RMOV BD TRANSFER SWITCH NORMAL 0-HS-67-360C 480V RMOV BD 0-FCV-67-360 CONTROL SWITCH NORMAL 0-XS-67-152 480V RMOV BD TRANSFER SWITCH NORMAL 0-HS-67-152C 480V RMOV BD 0-FCV-67-152-B CONTROL SWITCH NORMAL 2-XS-67-147 480V RMOV BD TRANSFER SWITCH NORMAL 2-HS-67-147C 480V RMOV BD 2-FCV-67-147-B CONTROL SWITCH NORMAL 1-XS-67-84 1-L-11A TRANSFER SWITCH NORMAL 1-XS-67-85 1-L-11A TRANSFER SWITCH NORMAL 1-XS-67-92 1-L-11A TRANSFER SWITCH NORMAL 1-XS-67-93 1-L-11A TRANSFER SWITCH NORMAL 2-XS-67-84 2-L-11B TRANSFER SWITCH NORMAL 2-XS-67-85 2-L-11B TRANSFER SWITCH NORMAL 2-XS-67-92 2-L-11B TRANSFER SWITCH NORMAL 2-XS-67-93 2-L-11B TRANSFER SWITCH NORMAL 0-XS-67-51 6900V TRANSFER SWITCH NORMAL

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 95 of 204 Appendix D (Page 9 of 9)

SWITCH LINEUP Data Package: Page ____ of ____ Date ________

Switch Location Description Position Verified Date 0-XS-67-47 6900V TRANSFER SWITCH NORMAL 0-XS-67-55 6900V TRANSFER SWITCH NORMAL 0-XS-67-59 6900V TRANSFER SWITCH NORMAL 1-XS-67-65 480V DIESEL TRANSFER SWITCH NORMAL 1-HS-67-65C 480V DIESEL 1-FCV-67-65-B CONTROL SWITCH NORMAL 1-XS-67-67 480V DIESEL TRANSFER SWITCH NORMAL 1-HS-67-67C 480V DIESEL 1-FCV-67-67-B CONTROL SWITCH NORMAL 2-XS-67-65 480V DIESEL TRANSFER SWITCH NORMAL 2-HS-67-65C 480V DIESEL 2-FCV-67-65-B CONTROL SWITCH NORMAL 2-XS-67-67 480V DIESEL TRANSFER SWITCH NORMAL 2-HS-67-67C 480V DIESEL 2-FCV-67-67-B CONTROL SWITCH NORMAL 2-HS-67-65D DIESEL GEN EMER DSL HTX B1 & B2 SUP VLV FROM CLOSE 2-HS-67-67D DIESEL EMER DSL HTX B1 & B2 SUP VLV FROM CLOSE 1-HS-67-65D DIESEL GEN EMER DSL HTX B1 & B2 SUP VLV FROM CLOSE 1-HS-67-67D DIESEL GEN EMER DSL HTX B1 & B2 SUP VLV FROM CLOSE

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 96 of 204 Appendix E (Page 1 of 4)

TRAIN B FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____ Date ________

TEMPORARY TUBING/FITTINGS FLOW ELEMENT DESCRIPTION Installed Removed ROOT VALVES INIT/DATE WO# INIT/DATE 2ND PARTY INIT/DATE 2-TV-67-822A 2-FE-67-159 TEST POINT ______/____ ______/____ ______/____

2-TV-67-822B 2-FE-67-159 TEST POINT ______/____ ______/____ ______/____

1-TV-67-861A 1-FE-67-259 TEST POINT ______/____ ______/____ ______/____

1-TV-67-861B 1-FE-67-259 TEST POINT ______/____ ______/____ ______/____

1-TV-67-862A 1-FE-67-255 TEST POINT ______/____ ______/____ ______/____

1-TV-67-862B 1-FE-67-255 TEST POINT ______/____ ______/____ ______/____

1-TV-67-863A 1-FE-67-249 TEST POINT ______/____ ______/____ ______/____

1-TV-67-863B 1-FE-67-249 TEST POINT ______/____ ______/____ ______/____

2-TV-67-876A 2-FE-67-339 TEST POINT ______/____ ______/____ ______/____

2-TV-67-876B 2-FE-67-339 TEST POINT ______/____ ______/____ ______/____

2-TV-67-877A 2-FE-67-340 TEST POINT ______/____ ______/____ ______/____

2-TV-67-877B 2-FE-67-340 TEST POINT ______/____ ______/____ ______/____

2-TV-67-878A 2-FE-67-220 TEST POINT ______/____ ______/____ ______/____

2-TV-67-878B 2-FE-67-220 TEST POINT ______/____ ______/____ ______/____

1-TV-67-879A 1-FE-67-173 TEST POINT ______/____ ______/____ ______/____

1-TV-67-879B 1-FE-67-173 TEST POINT ______/____ ______/____ ______/____

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 97 of 204 Appendix E (Page 2 of 4)

TRAIN B FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____ Date ________

TEMPORARY TUBING/FITTINGS FLOW ELEMENT DESCRIPTION Installed Removed ROOT VALVES INIT/DATE WO# INIT/DATE 2ND PARTY INIT/DATE 1-TV-67-880A 1-FE-67-183 TEST POINT ______/____ ______/____ ______/____

1-TV-67-880B 1-FE-67-183 TEST POINT ______/____ ______/____ ______/____

1-TV-67-881A 1-FE-67-187 TEST POINT ______/____ ______/____ ______/____

1-TV-67-881B 1-FE-67-187 TEST POINT ______/____ ______/____ ______/____

1-TV-67-882A 1-FE-67-191 TEST POINT ______/____ ______/____ ______/____

1-TV-67-882B 1-FE-67-191 TEST POINT ______/____ ______/____ ______/____

1-TV-67-883A 1-FE-67-349 TEST POINT ______/____ ______/____ ______/____

1-TV-67-883B 1-FE-67-349 TEST POINT ______/____ ______/____ ______/____

2-TV-67-883A 2-FE-67-349 TEST POINT ______/____ ______/____ ______/____

2-TV-67-883B 2-FE-67-349 TEST POINT ______/____ ______/____ ______/____

1-TV-67-884A 1-FE-67-353 TEST POINT ______/____ ______/____ ______/____

1-TV-67-884B 1-FE-67-353 TEST POINT ______/____ ______/____ ______/____

2-TV-67-884A 2-FE-67-353 TEST POINT ______/____ ______/____ ______/____

2-TV-67-884B 2-FE-67-353 TEST POINT ______/____ ______/____ ______/____

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 98 of 204 Appendix E (Page 3 of 4)

TRAIN B FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____ Date ________

TEMPORARY TUBING/FITTINGS FLOW ELEMENT DESCRIPTION Installed Removed ROOT VALVES INIT/DATE WO# INIT/DATE 2ND PARTY INIT/DATE 1-TV-67-885A 1-FE-67-357 TEST POINT ______/____ ______/____ ______/____

1-TV-67-885B 1-FE-67-357 TEST POINT ______/____ ______/____ ______/____

2-TV-67-885A 2-FE-67-357 TEST POINT ______/____ ______/____ ______/____

2-TV-67-885B 2-FE-67-357 TEST POINT ______/____ ______/____ ______/____

1-TV-67-886A 1-FE-67-345 TEST POINT ______/____ ______/____ ______/____

1-TV-67-886B 1-FE-67-345 TEST POINT ______/____ ______/____ ______/____

2-TV-67-886A 2-FE-67-345 TEST POINT ______/____ ______/____ ______/____

2-TV-67-886B 2-FE-67-345 TEST POINT ______/____ ______/____ ______/___

1-TV-67-888A 1-FE-67-171 TEST POINT ______/____ ______/____ ______/___

1-TV-67-888B 1-FE-67-171 TEST POINT ______/____ ______/____ ______/___

0-TV-67-889A 0-FE-67-200 TEST POINT ______/____ ______/____ ______/___

0-TV-67-889B 0-FE-67-200 TEST POINT ______/____ ______/____ ______/___

0-TV-67-890A 0-FE-67-202 TEST POINT ______/____ ______/____ ______/___

0-TV-67-890B 0-FE-67-202 TEST POINT ______/____ ______/____ ______/___

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 99 of 204 Appendix E (Page 4 of 4)

TRAIN B FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____ Date ________

TEMPORARY TUBING/FITTINGS FLOW ELEMENT DESCRIPTION Installed Removed ROOT VALVES INIT/DATE WO# INIT/DATE 2ND PARTY INIT/DATE 1-TV-67-896A 1-FE-67-216 TEST POINT ______/____ ______/____ ______/___

1-TV-67-896B 1-FE-67-216 TEST POINT ______/____ ______/____ ______/___

1-TV-67-897A 1-FE-67-165 TEST POINT ______/____ ______/____ ______/___

1-TV-67-897B 1-FE-67-165 TEST POINT ______/____ ______/____ ______/___

1-TV-67-911 1-FE-67-475 TEST POINT ______/____ ______/____ ______/___

1-TV-67-912 1-FE-67-475 TEST POINT ______/____ ______/____ ______/___

1-TV-67-913 1-FE-67-477 TEST POINT ______/____ ______/____ ______/___

1-TV-67-914 1-FE-67-477 TEST POINT ______/____ ______/____ ______/___

1-TV-67-921A 1-FE-67-474 TEST POINT ______/____ ______/____ ______/___

1-TV-67-921B 1-FE-67-474 TEST POINT ______/____ ______/____ ______/___

1-TV-67-922A 1-FE-67-476 TEST POINT ______/____ ______/____ ______/___

1-TV-67-922B 1-FE-67-476 TEST POINT ______/____ ______/____ ______/___

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 100 of 204 Appendix F (Page 1 of 1)

CALCULATION INFORMATION SHEET Data Package: Page ____ of ____ Date ________

At 1 or 2-FE-67-62, Maximum Flow = 20,000 gpm with Maximum P = 193.605 H2O Output [GPM] 20,000 K

  • SQRT (INPUT[" H 2O] / 193.605)

Therefore:

K 20,000 * ( 193.605 / 193.605) 1437.3805 Q gpm 1437.3805 * 'P Constants:

x Pd= discharge pressure = 1bf/in2 x 144 in2/ft2 x = Discharge fluid density = 62.37 lbm/ft3 x lbf/lbm = 62.37 lbf/ft3 (average river temperature of 60qF) x Qft/sec = Pump flow(gpm) x 0.002228 ft3/sec-gpm x Ad= Pump discharge cross-sectional area = 2.18 ft2 x g= Gravitational constant = 32.143 ft/sec2 x zd= elevation difference between the discharge of pump (datum line) and gauge

= -16.5 ft x Ps/p= Suction pressure (River level -653.08 ft) x As= Pump Suction cross-sectional area = 6.30 ft2 x Zs= Elevation difference between the discharge of pump (datum line) and suction inlet = -90.25 ft NOTE: The velocity heads (Q2/Ad2 2g and Q2/As2 2g) may be assumed to be zero since their results are insignificant.

TDH (ft ) (Pd / U  Q 2 / Ad 2

  • 2g  Zd)  (Ps / U  Q 2 / As 2
  • 2g  Zs) 144 x Pd *  0  (16.5)  (Ps / U  653.08  0  (90.25) 62.37 (Pd
  • 2.31)  726.8  River level

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 101 of 204 Appendix G (Page 1 of 2)

CALCULATION FLOW ELEMENT CONSTANTS Data Package: Page ____ of ____ Date ________

Flow Element Bore P Flow (maximum size) ( H2O) (gpm) K Flow

'P 2-FE-67-159 4.3446 100 750 75.0 1-FE-67-165 2.056 207 215 14.9 1-FE-67-171 1.170 52 36 3.9 2-FE-67-171 1.1696 52 36 3.9 1-FE-67-173 1.0092 60 30 3.9 1-FE-67-183 1.0430 60 30 6.0 2-FE-67-183 1.2655 25 30 6.0 1-FE-67-187 1.4582 15 33 8.5 2-FE-67-187 1.455 15 33 8.5 1-FE-67-191 1.0112 60 30 3.9 2-FE-67-191 1.013 60 30 3.9 0-FE-67-200 3.4405 100 440 44.0 0-FE-67-202 3.681 100.5 500 35.0 0-FE-67-204 1.4505 25 42 8.4 0-FE-67-207 1.4505 25 42 8.4 0-FE-67-210 1.4505 25 42 8.4 0-FE-67-211 1.4122 100 78 7.8 1-FE-67-216 1.3999 30 42 7.7 2-FE-67-220 0.50486 100 85 8.5 1-FE-67-249 1.9875 100 150 15 2-FE-67-249 1.9875 100 150 15 1-FE-67-255 1.9875 100 150 15 2-FE-67-255 1.9875 100 150 15 1-FE-67-259 1.011 123 43 3.9 2-FE-67-259 1.011 123 43 3.9 2-FE-67-339 0.995 60 30 3.9 1-FE-67-340 0.67 60 15 1.9 2-FE-67-340 0.6978 60 15 1.9 1-FE-67-345 1.347 100 70 7.0 1-FE-67-345 1.347 100 70 7.0

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 102 of 204 Appendix G (Page 2 of 2)

CALCULATION FLOW ELEMENT CONSTANTS Data Package: Page ____ of ____ Date ________

Flow Element Bore P Flow (maximum size) ( H2O) (gpm) K Flow

'P 1-FE-67-349 1.044 60 30 3.9 2-FE-67-349 1.044 60 30 3.9 1-FE-67-353 1.044 60 30 3.9 2-FE-67-353 1.044 60 30 3.9 1-FE-67-357 1.044 60 30 3.9 2-FE-67-357 1.044 60 30 3.9 1-FE-67-477 1.794 222 177 11.9 2-FE-67-477 1.794 222 177 11.9 1-FE-67-474 3.5227 50 320 45.3 2-FE-67-474 3.525 50 320 45.3 1-FE-67-476 3.5227 50 320 45.3 2-FE-67-476 3.525 50 320 45.3 1-FE-67-475 1.794 222 177 11.9 2-FE-67-475 1.801 222 177 11.9

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 103 of 204 Appendix H (Page 1 of 2)

COMMON TRAIN FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____ Date ________

TEMPORARY TUBING/FITTINGS FLOW DESCRIPTION Installed Removed ELEMENT ROOT INITIAL/DATE WO # INITIAL/DATE 2ND PARTY VALVES INITIAL/DATE NA 2-FT-67-222 Calibration Tap _______/______ _______/______ _______/______ _______/______

NA 2-FT-67-222 Calibration Tap _______/______ _______/______ _______/______ _______/______

NA 2-FT-67-61 Calibration Tap _______/______ _______/______ _______/______ _______/______

NA 2-FT-67-61 Calibration Tap _______/______ _______/______ _______/______ _______/______

NA 2-FT-67-62 Calibration Tap _______/______ _______/______ _______/______ _______/______

NA 2-FT-67-62 Calibration Tap _______/______ _______/______ _______/______ _______/______

NA 2-FT-67-226 Calibration Tap _______/______ _______/______ _______/______ _______/______

NA 0-FT-67-226 Calibration Tap _______/______ _______/______ _______/______ _______/______

0-TV-67-898A 0-FE-67-207 Test Point _______/______ _______/______ _______/______ _______/______

0-TV-67-898B 0-FE-67-207 Test Point _______/______ _______/______ _______/______ _______/______

0-TV-67-899A 0-FE-67-210 Test Point _______/______ _______/______ _______/______ _______/______

0-TV-67-898B 0-FE-67-210 Test Point _______/______ _______/______ _______/______ _______/______

0-TV-67-900A 0-FE-67-204 Test Point _______/______ _______/______ _______/______ _______/______

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 104 of 204 Appendix H (Page 2 of 2)

COMMON TRAIN FLOW ELEMENT TEMPORARY TUBING Data Package: Page ____ of ____ Date ________

TEMPORARY TUBING/FITTINGS FLOW DESCRIPTION Installed Removed ELEMENT ROOT INITIAL/DATE WO # INITIAL/DATE 2ND PARTY VALVES INITIAL/DATE 0-TV-67-900B 0-FE-67-204 Test Point _______/______ _______/______ _______/______ _______/______

0-TV-67-910A 0-FE-67-211 Test Point _______/______ _______/______ _______/______ _______/______

0-TV-67-910B 0-FE-67-211 Test Point _______/______ _______/______ _______/______ _______/______

NA 1-FT-67-222 Calibration Tap _______/______ _______/______ _______/______ _______/______

NA 1-FT-67-222 Calibration Tap _______/______ _______/______ _______/______ _______/______

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 105 of 204 Appendix I (Page 1 of 2)

FLOW BALANCE INSTRUCTIONS Data Package: Page ____ of ____ Date ________

1.0 FLOW BALANCE Flow balancing is an iterative process. The steps to balance each component may be repeated several times to align flow for all components on the data sheet. No initials, dates or calculations will be completed until the final proof run described in Step 1.0[2] is performed.

When a P gauge is required, connect at the flow element test tubing quick disconnects. When an Ultrasonic Flowmeter is required, install it on the component piping per the flowmeter instruction. Permanent plant flow indicators will be utilized as they meet accuracy and calibration requirements for flow balance.

[1] BALANCE the Components Listed in Colume [1] On the ERCW FLOW BALANCE DATA SHEET, Specified in Section 6.0, WITHOUT Making Any Entries On the Data Sheet for Performance of the Following Steps:

A. VERIFY/INSTALL (where applicable) a P gauge or ultrasonic flowmeter with a range as indicated in column [3] of the data sheet.

NOTE Throttle valve in the CLOSED direction to set flow. If flow is initially too low, OPEN valve until an increase in flow above the setpoint is observed, then CLOSE down on the valve to attain proper flow.

B. THROTTLE the valve listed in column [2] of the data sheet to obtain the Target Value P or flow as indicated on the first line in column [9] of the data sheet.

C. REMOVE the P gauge or ultrasonic flowmeter if needed for another test point, or leave it in place until the flow balance is complete.

D. REPEAT Steps 1.0[1]A through 1.0[1]C for each component on the data sheet.

E. REPEAT the entire data sheet until all Target Values (column [9]) are obtained without any throttle valve adjustment.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 106 of 204 Appendix I (Page 2 of 2)

FLOW BALANCE INSTRUCTIONS Data Package: Page ____ of ____ Date ________

1.0 FLOW BALANCE (continued)

[2] DOCUMENT the Flow Balance for All Components On the Data Sheet as Follows:

A. VERIFY/INSTALL a differential pressure gauge with a range as indicated in column [3] of the data sheet, or a EFD as indicated for the component under test and RECORD the test equipment M&TE number (column [3]) if applicable.

B. RECORD the P or Flow in column [5].

C. DETERMINE the throttle valve position for the valve listed in column [2]

in accordance with Data Sheet 5.

D. MULTIPLY the value in column [5] by the Correction Multiplier (second line in column [4]).

E. RECORD the result of Step 1.0[2]D in column [8], Flow (corrected) line.

F. When the Flow device in column [2] is an FE, RECORD the result of Step 2.4 in column [6], P (corrected) 1st line. CALCULATE the square root of this value and RECORD on the second line in column [6].

MULTIPLY this result by the k value (column [7]) and RECORD the result in column [8], Flow (corrected) line.

NOTE Second party verification of test equipment removal is completed in Section 7.0 when all temporary connections are removed from Flow Element test valves.

G. REMOVE the differential pressure gauge or ultrasonic flowmeter if needed for another test point, or leave it in place until the flow balance is complete.

H. REPEAT Steps 1.0[2]A through 1.0[2]G for each of the components on the data sheet.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 107 of 204 Data Sheet 1 (Page 1 of 12)

TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Gauge Value/(Corr. or Flow(gpm) 1/2 k OR EDF Flow (gpm)

Throttle Valve (P)

  1. Multiplier) (gpm) (Max)

CCS HTX C 0-FE-67-226 ________ !6000 GPM ________

(bypass) 0-FCV-67-144 0-100 H2O (.917) ________ _______ 852.0 ________ !6000 Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

DSL GEN CLR 2-FI-67-74 700-760 gpm NA t650 2B1 2-ISV-67-510B NA (.929) ________ NA 85 ________ (1200)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

DSL GEN CLR 2-FI-67-280 700-760 gpm NA t650 2B2 2-ISV-67-515B (.929) ________ NA 85 ________ (1200)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

SD BD RM A/C 2-FE-67-159 t60 H2O ________ t560 B 2-ISV-67-555 (.931) ________ ________ 75.0 ________ (560) 0-100 H2O Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

ELEC BD RM 0-FE-67-200 t76 H2O ________ t370 A/C B 0-ISV-67-618B (.936) ________ _______ 44.0 ________ (490) 0-100 H2O Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 108 of 204 Data Sheet 1 (Page 2 of 12)

TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Gauge Value/(Corr. or Flow(gpm) 1/2 k OR EDF Flow (gpm)

Throttle Valve (P)

  1. Multiplier) (gpm) (Max)

MAIN 0-FE-67-202 t76 H2O ________ t293 CONTROL RM 0-ISV-67-623B ________ (.928) ________ ________ 35.0 ________ (460)

A/C B 0-200 H2O Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

LWR CNTMT 1-FE-67-474 ________ t48.75 H2O ________ t306 CLR 1B 1-ISV-67-564B 0-50 H2O (.940) ________ ________ 45.3 ________ (1060)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

LWR CNTMT 1-FE-67-476 ________ t48.75 H2O ________ t306 CLR 1D 1-ISV-67-564D 0-50 H2O (.940) ________ ________ 45.3 ________ (1060)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

CRDM CLR 1B 1-FE-67-477 ________ t118 H2O ________ t124 1-ISV-67-567B 0-200 H2O (.931) ________ ________ 11.9 ________ (390)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

CRDM CLR 1D 1-FE-67-475 ________ t118 H2O ________ t124 1-ISV-67-567D 0-200 H2O (.931) ________ ________ 11.9 ________ (390)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 109 of 204 Data Sheet 1 (Page 3 of 12)

TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Gauge Value/(Corr. or Flow(gpm) 1/2 k OR EDF Flow (gpm)

Throttle Valve (P)

  1. Multiplier) (gpm) (Max)

U1 RCP MTR 1-FE-67-249 ________ t58 H2O ________ t110 CLR 2 1-ISV-67-572B 0-100 H2O (.930) ________ ________ 15.0 ________ (220)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________

U1 RCP MTR 1-FE-67-255 ________ t58 H2O ________ t110 CLR 4 1-ISV-67-572D 0-100 H2O (.930) ________ ________ 15.0 ________ (220)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________

CCS & AFW 1-FE-67-165 t108 H2O ________ t102 PUMP SP CLR 1-THV-67-643B ________ (.928) ________ ________ 10.2 ________ (670) 1B 0-200 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

BA TRF & 2-FE-67-220 ________ t55 H2O ________ t60 AFW SP CLR 2-THV-67-673B 0-100 H2O (.929) ________ ________ 8.5 ________ (360) 2B Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

INST RM WAT 1-FE-67-259 ________ t65 H2O ________ t30 CLR 1B 1-ISV-67-527B 0-100 H2O (.933) ________ ________ 3.9 ________ (200)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 110 of 204 Data Sheet 1 (Page 4 of 12)

TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Gauge Value/(Corr. or Flow(gpm) 1/2 k OR EDF Flow (gpm)

Throttle Valve (P)

  1. Multiplier) (gpm) (Max)

SFP & TB 1-FE-67-216 t16 H2O ________ t29 BSTR PMP 1-THV-67-646B ________ (.910) ________ ________ 7.7 ________ (170)

CLR 1B 0-50 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

CNTMT SPR 1-FE-67187 ________ t13 H2O ________ t28 PMP RM CLR 1-THV-67-605B 0-50 H2O (.895) ________ ________ 8.5 ________ (190) 1B-B Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

CENT CHG 1-FE-67-171 ________ t28 H2O ________ t25 PMP CLR 1B 1-ISV-67-601B 0-100 H2O (.904) ________ ________ 5.0 ________ (28)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

UPPER 1-FI-67-267 24-25 gpm NA t23 CNTMT CLR 1-THV-67-588B (.958) ________ NA 5.0 ________ (26) 1B Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 111 of 204 Data Sheet 1 (Page 5 of 12)

TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Gauge Value/(Corr. or Flow(gpm) 1/2 k OR EDF Flow (gpm)

Throttle Valve (P)

  1. Multiplier) (gpm) (Max)

UPPER 1-FI-67-269 24-25 gpm NA t23 CNTMT CLR 1-THV-67-588D (.958) ________ NA 5.0 ________ (26) 1D Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

SI PMP RM 1-FE-67-183 ________ t36 H2O ________ t22 CLR 1B 1-THV-67-604B 0-100 H2O (.914) ________ ________ 3.9 ________ (25)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

RHR PMP RM 1-FE-67-191 ________ t30 H2O ________ t19 CLR 1B-B 1-THV-67-606B 0-100 H2O (.907) ________ ________ 3.9 ________ (21)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PIPE CHASE 1-FE-67-345 ________ t36 H2O NA t15 CLR 1B 1-THV-67-611B 0-50 H2O (.907) ________ NA 7.0 ________ (17)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PIPE CHASE 2-FE-67-345 ________ t6 H2O NA t15 CLR 2B 2-THV-67-611B 0-50 H2O (.907) ________ NA 7.0 ________ (17)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 112 of 204 Data Sheet 1 (Page 6 of 12)

TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Gauge Value/(Corr. or Flow(gpm) 1/2 k OR EDF Flow (gpm)

Throttle Valve (P)

  1. Multiplier) (gpm) (Max)

PEN RM CLR 1-FE-67-349 ________ t12 H2O ________ t12 1B1 1-THV-67-608B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 1-FE-67-353 ________ t12 H2O ________ t11 1B2 1-THV-67-609B 0-100 H2O (.907) ________ ________ 3.9 ________ (13)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 1-FE-67-357 ________ t12 H2O ________ t12 1B3 1-THV-67-610B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 2-FE-67-349 ________ t12 H2O ________ t12 2B1 2-THV-67-608B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 2-FE-67-353 ________ t12 H2O ________ t11 2B2 2-THV-67-609B 0-100 H2O (.907) ________ ________ 3.9 ________ (13)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 113 of 204 Data Sheet 1 (Page 7 of 12)

TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Gauge Value/(Corr. or Flow(gpm) 1/2 k OR EDF Flow (gpm)

Throttle Valve (P)

  1. Multiplier) (gpm) (Max)

PEN RM CLR 2-FE-67-357 ________ t12 H2O ________ t12 2B3 2-THV-67-610B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

EMER GAS TR 2-FE-67-339 ________ t8 H2O ________ t10 RM CLR 2B 2-THV-67-685B 0-100 H2O (.907) ________ ________ 3.9 ________ (11)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

RECIP CHG 1-FE-67-173 ________ t11 H2O ________ t12 PMP CLR 1C 1-THV-67-640 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

ST AIR COMP 0-FIS-67-209 183-196 gpm NA 183 (header) 0-THV-67-632C ________ (.932) NA NA NA ________ (196)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

LWR CNTMT 2-FE-67-474 ________ t48.75 H2O ________ t306 CLR 2B 0-50 H2O (.940) ________ 45.3 ________ (1060) 2-ISV-67-564B ________

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 114 of 204 Data Sheet 1 (Page 8 of 12)

TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Gauge Value/(Corr. or Flow(gpm) 1/2 k OR EDF Flow (gpm)

Throttle Valve (P)

  1. Multiplier) (gpm) (Max)

LWR CNTMT 2-FE-67-476 ________ t48.75 H2O ________ t306 CLR 2D 2-ISV-67-564D 0-50 H2O (.940) ________ ________ 45.3 ________ (1060)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

CRDM CLR 2B 2-FE-67-477 ________ t118 H2O ________ t124 2-ISV-67-567B 0-200 H2O (.931) ________ ________ 11.9 ________ (390)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

CRDM CLR 2D 2-FE-67-475 ________ t118 H2O ________ t124 2-ISV-67-567D 0-200 H2O (.931) ________ ________ 11.9 ________ (390)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

U2 RCP MTR 2-FE-67-249 ________ t58 H2O ________ t110 CLR 2 2-ISV-67-572B 0-100 H2O (.930) ________ ________ 15.0 ________ (220)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________

U2 RCP MTR 2-FE-67-255 ________ t58 H2O ________

CLR 4 2-ISV-67-572D 0-100 H2O (.930) ________ ________ 15.0 ________ t110 (220)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 115 of 204 Data Sheet 1 (Page 9 of 12)

TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Gauge Value/(Corr. or Flow(gpm) 1/2 k OR EDF Flow (gpm)

Throttle Valve (P)

  1. Multiplier) (gpm) (Max)

INST RM WAT 2-FE-67-259 t65 H2O ________ t30 CLR 2B 2-ISV-67-527B (.933) ________ ________ 3.9 ________ (200) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

CNTMT SPR 2-FE-67187 t13 H2O ________ t28 PMP RM CLR 2-THV-67-605B (.895) ________ ________ 8.5 ________ (190) 2B-B 0-50 H2O Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

CENT CHG 2-FE-67-171 t28 H2O ________ t25 PMP CLR 2B 2-ISV-67-601B (.904) ________ ________ 5.0 ________ (28) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

UPPER 2-FI-67-267 24-25 gpm NA CNTMT CLR 2-THV-67-588B (.958) ________ NA 5.0 ________ t23 2B (26)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 116 of 204 Data Sheet 1 (Page 10 of 12)

TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Gauge Value/(Corr. or Flow(gpm) 1/2 k OR EDF Flow (gpm)

Throttle Valve (P)

  1. Multiplier) (gpm) (Max)

UPPER 2-FI-67-269 24-25 gpm NA t23 CNTMT CLR 2-THV-67-588D (.958) ________ NA 5.0 ________ (26) 2D Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

SI PMP RM 2-FE-67-183 ________ t36 H2O ________ t22 CLR 2B 2-THV-67-604B 0-100 H2O (.914) ________ ________ 3.9 ________ (25)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

RHR PMP RM 2-FE-67-191 ________ t30 H2O ________ t19 CLR 2B-B 2-THV-67-606B 0-100 H2O (.907) ________ ________ 3.9 ________ (21)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

AUX CNTL AIR 2-FE-67-340 ________ t5 H2O ________ t3.5 COMP B 2-THV-67-683 0-50 H2O (.910) ________ ________ 1.9 ________ (185)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 117 of 204 Data Sheet 1 (Page 11 of 12)

TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____ Date ________

Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 1-VTV-67-534B CS HX 1B ERCW SUP HDR VT 2-VTV-67-534B CS HX 2B ERCW SUP HDR VT 1-FE-67-62 ERCW SUP HDR 1B (up strm) 1-FE-67-62 ERCW SUP HDR 1B (dn strm) 2-FE-67-62 ERCW SUP HDR 1B (up strm) 2-FE-67-62 ERCW SUP HDR 1B (dn strm) 0-DRV-67-547 ERCW CCS HX C DR.

0-TV-67-621B MCR CHLR B-B ERCW CONN.

1-TV-67-690B UCC 1B ERCW SUP TEST CONN 2-TV-67-690B UCC 2B ERCW SUP TEST CONN 0-TV-67-616B EBR B ERCW SUP TEST CONN 0-ISV-67-813A ERCW PMP E-B DISCH PRESS 0-ISV-67-812A ERCW PMP F-B DISCH PRESS 0-ISV-67-814A ERCW PMP G-B DISCH PRESS 0-ISV-67-811A ERCW PMP H-B DISCH PRESS 1-PI-67-10B ERCW STRNR 1B-B OUT PRESS

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 118 of 204 Data Sheet 1 (Page 12 of 12)

TRAIN B - UNIT 1 NORMAL - UNIT 2 NORMAL MODE Data Package: Page ____ of ____ Date ________

Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 2-PI-67-10B ERCW STRNR 2B-B OUT PRESS 0-PI-67-17B ERCW HDR B PRESS 1-PI-67-10A ERCW STRNR 1B-B SUPPLY PRESS 2-PI-67-10A ERCW STRNR 2B-B SUPPLY PRESS ERCW Strainer DP is recorded below:

Equation Data Entry INITIALS 1-PI-67-10A PI-67-10B = DP _______________ - _______________ = _____________

2-PI-67-10A PI-67-10B = DP _______________ - _______________ = _____________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 119 of 204 Data Sheet 2 (Page 1 of 12)

TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

CCS HTX C 0-FE-67-226 ________ !7125-7500 ________

(A position) 0-FCV-67-152 0-100 H2O H2O ________ _______ 852.0 ________ !7125

(.935)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

CNTMT SPR 2-FI-67-122 !5200-6200 NA HTX 2B 2-ISV-67-537B NA gpm NA NA NA ________ t5200

(.926) (11,500)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

DSL GEN CLR 1-FI-67-74 700-760 gpm NA t650 1B1 1-ISV-67-510B (.929) ________ NA ________ (1200)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

DSL GEN CLR 1-FI-67-280 700-760 gpm NA t650 1B2 1-ISV-67-515B (.929) ________ NA ________ (1200)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

DSL GEN CLR 2-FI-67-74 700-760 gpm NA t650 2B1 2-ISV-67-510B (.929) ________ NA ________ (1200)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 120 of 204 Data Sheet 2 (Page 2 of 12)

TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

DSL GEN CLR 2-FI-67-280 700-760 gpm NA t650 2B2 2-ISV-67-515B (.929) ________ NA ________ (1200)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

SD BD RM A/C 2-FE-67-159 ________ t60 H2O ________ t560 B 2-ISV-67-555 0-100 H2O (.931) ________ ________ 75.0 ________ (560)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

ELEC BD RM 0-FE-67-200 ________ t76 H2O ________ t370 A/C B 0-ISV-67-618B 0-100 H2O (.936) ________ _______ 44.0 ________ (490)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

MAIN 0-FE-67-202 t76 H2O ________ t293 CONTROL RM 0-ISV-67-623B ________ (.928) ________ ________ 35.0 ________ (460)

A/C B 0-200 H2O Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

INST RM WAT 1-FE-67-259 ________ t65 H2O ________ t30 CLR 1B 1-ISV-67-527B 0-100 H2O (.933) ________ ________ 3.9 ________ (200)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 121 of 204 Data Sheet 2 (Page 3 of 12)

TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

LWR CNTMT 1-FE-67-474 t48.75 H2O ________ t306 CLR 1B 1-ISV-67-564B (.940) ________ ________ 45.3 ________ (1060) 0-50 H2O Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

LWR CNTMT 1-FE-67-476 t48.75 H2O ________ t306 CLR 1D 1-ISV-67-564D (.940) ________ ________ 45.3 ________ (1060) 0-50 H2O Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

CRDM CLR 1B 1-FE-67-477 ________ t118 H2O ________ t124 1-ISV-67-567B 0-200 H2O (.931) ________ ________ 11.9 ________ (390)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

CRDM CLR 1D 1-FE-67-475 t118 H2O ________ t124 1-ISV-67-567D (.931) ________ ________ 11.9 ________ (390) 0-200 H2O Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 122 of 204 Data Sheet 2 (Page 4 of 12)

TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

UPPER 1-FI-67-267 24-25 gpm NA t23 CNTMT CLR 1-THV-67-588 (.958) ________ NA 5.0 ________ (26) 1B B Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

UPPER 1-FI-67-269 24-25 gpm NA t23 CNTMT CLR 1-THV-67-588 (.958) ________ NA 5.0 ________ (26) 1D D Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

U1 RCP MTR 1-FE-67-249 t58 H2O ________ t110 CLR 2 1-ISV-67-572B (.930) ________ ________ 15.0 ________ (220) 0-100 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________

U1 RCP MTR 1-FE-67-255 t58 H2O ________ t110 CLR 4 1-ISV-67-572D (.930) ________ ________ 15.0 ________ (220) 0-100 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 123 of 204 Data Sheet 2 (Page 5 of 12)

TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

CCS & AFW 1-FE-67-165 ________ t108 H2O ________ t102 PUMP SP CLR 1-THV-67-643B 0-200 H2O (.928) ________ ________ 10.2 ________ (670) 1B Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

BA TRF & 2-FE-67-220 t55 H2O ________ t60 AFW SP CLR 2-THV-67-673B (.929) ________ ________ 8.5 ________ (360) 2B 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

SFP & TB 1-FE-67-216 t16 H2O ________ t29 BSTR PMP 1-THV-67-646B ________ (.910) ________ ________ 7.7 ________ (170)

CLR 1B 0-50 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

CNTMT SPR 1-FE-67187 t13 H2O ________ t28 PMP RM CLR 1-THV-67-605B (.895) ________ ________ 8.5 ________ (190) 1B-B 0-50 H2O Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 124 of 204 Data Sheet 2 (Page 6 of 12)

TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

CENT CHG 1-FE-67-171 t28 H2O ________ t25 PMP CLR 1B 1-ISV-67-601B (.904) ________ ________ 5.0 ________ (28) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

SI PMP RM 1-FE-67-183 t36 H2O ________ t22 CLR 1B 1-THV-67-604B ________ (.914) ________ ________ 3.9 ________ (25) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

RHR PMP RM 1-FE-67-191 ________ t30 H2O ________ t19 CLR 1B-B 1-THV-67-606B 0-100 H2O (.907) ________ ________ 3.9 ________ (21)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

UPPER 1-FI-67-267 24-25 gpm NA t23 CNTMT CLR 1-THV-67-588 (.958) ________ NA 5.0 ________ (26) 1B B Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 125 of 204 Data Sheet 2 (Page 7 of 12)

TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

UPPER 1-FI-67-269 24-25 gpm NA t23 CNTMT CLR 1-THV-67-588 (.958) ________ NA 5.0 ________ (26) 1D D Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PIPE CHASE 1-FE-67-345 ________ t6 H2O NA t15 CLR 1B 1-THV-67-611B 0-50 H2O (.907) ________ NA 7.0 ________ (17)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PIPE CHASE 2-FE-67-345 ________ t6 H2O NA t15 CLR 2B 2-THV-67-611B 0-50 H2O (.907) ________ NA 7.0 ________ (17)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 1-FE-67-349 ________ t12 H2O ________ t12 1B1 1-THV-67-608B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 1-FE-67-353 ________ t12 H2O ________ t11 1B2 1-THV-67-609B (.907) ________ ________ 3.9 ________ (13) 0-100 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 126 of 204 Data Sheet 2 (Page 8 of 12)

TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

PEN RM CLR 1-FE-67-357 ________ t12 H2O ________ t12 1B3 1-THV-67-610B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 2-FE-67-349 ________ t12 H2O ________ t12 2B1 2-THV-67-608B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 2-FE-67-353 ________ t12 H2O ________ t11 2B2 2-THV-67-609B 0-100 H2O (.907) ________ ________ 3.9 ________ (13)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 2-FE-67-357 ________ t12 H2O ________ t12 2B3 2-THV-67-610B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

EMER GAS TR 2-FE-67-339 ________ t8 H2O ________ t10 RM CLR 2B 2-THV-67-685B (.907) ________ ________ 3.9 ________ (11) 0-100 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 127 of 204 Data Sheet 2 (Page 9 of 12)

TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

RECIP CHG 1-FE-67-173 ________ t11 H2O ________ t12 PMP CLR 1C 1-THV-67-640 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

ST AIR COMP 0-FIS-67-209 183-196 gpm NA t183 (header) 0-THV-67-632C (.932) NA NA NA ________ (196)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

AUX CNTL AIR 2-FE-67-340 ________ t4 H2O ________ t3.5 COMP B 2-THV-67-683 0-50 H2O (.910) ________ ________ 1.9 ________ (185)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

INST RM WAT 2-FE-67-259 ________ t65 H2O ________ t30 CLR 2B 2-ISV-67-527B 0-100 H2O (.933) ________ ________ 3.9 ________ (200)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

CNTMT SPR 2-FE-67187 ________ t13 H2O ________ t28 PMP RM CLR 2-THV-67-605B 0-50 H2O (.895) ________ ________ 8.5 ________ (190) 2B-B Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 128 of 204 Data Sheet 2 (Page 10 of 12)

TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

CENT CHG 2-FE-67-171 ________ t28 H2O ________ t25 PMP CLR 2B 2-ISV-67-601B 0-100 H2O (.904) ________ ________ 5.0 ________ (28)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

RHR PMP RM 2-FE-67-191 ________ t30 H2O ________ t19 CLR 2B-B 2-THV-67-606B 0-100 H2O (.907) ________ ________ 3.9 ________ (21)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

SI PMP RM 2-FE-67-183 ________ t36 H2O ________ t22 CLR 2B 2-THV-67-604B 0-100 H2O (.914) ________ ________ 3.9 ________ (25)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 129 of 204 Data Sheet 2 (Page 11 of 12)

TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 1-VTV-67-534B CS HX 1B ERCW SUP HDR VT 2-VTV-67-534B CS HX 2B ERCW SUP HDR VT 1-FE-67-62 ERCW SUP HDR 1B (up strm) 1-FE-67-62 ERCW SUP HDR 1B (dn strm) 2-FE-67-62 ERCW SUP HDR 1B (up strm) 2-FE-67-62 ERCW SUP HDR 1B (dn strm) 0-DRV-67-547 ERCW CCS HX C DR.

0-TV-67-621B MCR CHLR B-B ERCW CONN.

1-TV-67-690B UCC 1B ERCW SUP TEST CONN 2-TV-67-690B UCC 2B ERCW SUP TEST CONN 0-TV-67-616B EBR B ERCW SUP TEST CONN 0-ISV-67-813A ERCW PMP E-B DISCH PRESS 0-ISV-67-812A ERCW PMP F-B DISCH PRESS 0-ISV-67-814A ERCW PMP G-B DISCH PRESS 0-ISV-67-811A ERCW PMP H-B DISCH PRESS 1-PI-67-10B ERCW STRNR 1B-B OUT PRESS

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 130 of 204 Data Sheet 2 (Page 12 of 12)

TR B - U1 COLD SHUTDOWN, U2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 2-PI-67-10B ERCW STRNR 2B-B OUT PRESS 0-PI-67-17B ERCW HDR B PRESS 1-PI-67-10A ERCW STRNR 1B-B SUPPLY PRESS 2-PI-67-10A ERCW STRNR 2B-B SUPPLY PRESS ERCW Strainer DP is recorded below:

Equation Data Entry INITIALS 1-PI-67-10A PI-67-10B = DP _______________ - _______________ = _____________

2-PI-67-10A PI-67-10B = DP _______________ - _______________ = _____________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 131 of 204 Data Sheet 3 (Page 1 of 10)

TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN)

Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

CCS HTX C 0-FE-67-226 !8800-9000 ________

(B position) 0-FCV-67-152 H2O ________ _______ 852.0 ________ !8800

(.935) 0-100 H2O Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

CNTMT SPR 1-FI-67-122 5700-6200 NA HTX 1B 1-ISV-67-537B gpm NA ________ t5200

(.926) (11,800)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

DSL GEN CLR 1-FI-67-74 700-760 gpm NA 650 2B1 1-ISV-67-510B (.929) ________ NA ________ (1200)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

DSL GEN CLR 1-FI-67-280 700-760 gpm NA 650 2B2 1-ISV-67-515B (.929) ________ NA ________ (1200)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

DSL GEN CLR 2-FI-67-74 700-760 gpm NA 650 2B1 2-ISV-67-510B (.929) ________ NA ________ (1200)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 132 of 204 Data Sheet 3 (Page 2 of 10)

TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

DSL GEN CLR 2-FI-67-280 700-760 gpm NA 650 2B2 2-ISV-67-515B (.929) ________ NA ________ (1200)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

SD BD RM A/C 2-FE-67-159 ________ t60 H2O ________ 560 B 2-ISV-67-555 0-100 H2O (.931) ________ ________ 75.0 ________ (560)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

ELEC BD RM 0-FE-67-200 ________ t76 H2O ________ 370 A/C B 0-ISV-67-618B 0-100 H2O (.936) ________ _______ 44.0 ________ (490)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

MAIN 0-FE-67-202 ________ t76 H2O ________ 293 CONTROL RM 0-ISV-67-623B 0-200 H2O (.928) ________ ________ 35.0 ________ (460)

A/C B Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

CCS & AFW 1-FE-67-165 t108 H2O ________ 102 PUMP SP CLR 1-THV-67-643B ________ (.928) ________ ________ 10.2 ________ (670) 1B 0-200 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 133 of 204 Data Sheet 3 (Page 3 of 10)

TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

BA TRF & 2-FE-67-220 ________ t55 H2O ________ 60 AFW SP CLR 2-THV-67-673B 0-100 H2O (.929) ________ ________ 8.5 ________ (360) 2B Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

SFP & TB 1-FE-67-216 t16 H2O ________ 29 BSTR PMP 1-THV-67-646B ________ (.910) ________ ________ 7.7 ________ (170)

CLR 1B 0-50 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

CNTMT SPR 1-FE-67187 t13 H2O ________ 28 PMP RM CLR 1-THV-67-605B (.895) ________ ________ 8.5 ________ (190) 1B-B 0-50 H2O Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

CENT CHG 1-FE-67-171 t28 H2O ________ 25 PMP CLR 1B 1-ISV-67-601B (.904) ________ ________ 5.0 ________ (28) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 134 of 204 Data Sheet 3 (Page 4 of 10)

TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

SI PMP RM 1-FE-67-183 ________ t36 H2O ________ 22 CLR 1B 1-THV-67-604B 0-100 H2O (.914) ________ ________ 3.9 ________ (25)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

RHR PMP RM 1-FE-67-191 ________ t30 H2O ________ 19 CLR 1B-B 1-THV-67-606B 0-100 H2O (.907) ________ ________ 3.9 ________ (21)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PIPE CHASE 1-FE-67-345 ________ t6 H2O NA 15 CLR 1B 1-THV-67-611B 0-50 H2O (.907) ________ NA 7.0 ________ (17)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PIPE CHASE 2-FE-67-345 ________ t6 H2O NA 15 CLR 2B 2-THV-67-611B 0-50 H2O (.907) ________ NA 7.0 ________ (17)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 1-FE-67-349 t12 H2O ________ 12 1B1 1-THV-67-608B (.907) ________ ________ 3.9 ________ (14) 0-100 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 135 of 204 Data Sheet 3 (Page 5 of 10)

TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

PEN RM CLR 1-FE-67-353 ________ t12 H2O ________ 11 1B2 1-THV-67-609B 0-100 H2O (.907) ________ ________ 3.9 ________ (13)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 1-FE-67-357 ________ t12 H2O ________ 12 1B3 1-THV-67-610B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 2-FE-67-349 ________ t12 H2O ________ 12 2B1 2-THV-67-608B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 2-FE-67-353 ________ t12 H2O ________ 11 2B2 2-THV-67-609B 0-100 H2O (.907) ________ ________ 3.9 ________ (13)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 2-FE-67-357 t12 H2O ________ 12 2B3 2-THV-67-610B (.907) ________ ________ 3.9 ________ (14) 0-100 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 136 of 204 Data Sheet 3 (Page 6 of 10)

TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

EMER GAS TR 2-FE-67-339 ________ t8 H2O ________ 10 RM CLR 2B 2-THV-67-685B 0-100 H2O (.907) ________ ________ 3.9 ________ (11)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

RECIP CHG 1-FE-67-173 ________ t12 H2O ________ 12 PMP CLR 1C 1-THV-67-640 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

ST AIR COMP 0-FIS-67-209 183-196 gpm NA 183 (header) 0-THV-67-632C (.932) NA NA NA ________ (196)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

AUX CNTL AIR 2-FE-67-340 ________ t4 H2O ________ 3.5 COMP B 2-THV-67-683 0-50 H2O (.910) ________ ________ 1.9 ________ (185)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

LWR CNTMT 2-FE-67-474 t48.75 H2O ________ 306 CLR 2B 2-ISV-67-564B (.940) ________ ________ 45.3 ________ (1060) 0-50 H2O Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 137 of 204 Data Sheet 3 (Page 7 of 10)

TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

LWR CNTMT 2-FE-67-476 ________ t48.75 H2O ________ 306 CLR 2D 2-ISV-67-564D 0-50 H2O (.940) ________ ________ 45.3 ________ (1060)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

CRDM CLR 2B 2-FE-67-477 t118 H2O ________ 124 2-ISV-67-567B ________ (.931) ________ ________ 11.9 ________ (390) 0-200 H2O Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

CRDM CLR 2D 2-FE-67-475 ________ t118 H2O ________ 124 2-ISV-67-567D 0-200 H2O (.931) ________ ________ 11.9 ________ (390)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

U2 RCP MTR 2-FE-67-249 ________ t58 H2O ________ 110 CLR 2 2-ISV-67-572B 0-100 H2O (.930) ________ ________ 15.0 ________ (220)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________

U2 RCP MTR 2-FE-67-255 ________ t58 H2O ________ 110 CLR 4 2-ISV-67-572D 0-100 H2O (.930) ________ ________ 15.0 ________ (220)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 138 of 204 Data Sheet 3 (Page 8 of 10)

TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

INST RM WAT 2-FE-67-259 ________ t65 H2O ________ 30 CLR 2B 2-ISV-67-527B 0-100 H2O (.933) ________ ________ 3.9 ________ (200)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

CNTMT SPR 2-FE-67187 ________ t13 H2O ________ 28 PMP RM CLR 2-THV-67-605B 0-50 H2O (.895) ________ ________ 8.5 ________ (190) 2B-B Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

CENT CHG 2-FE-67-171 ________ t28 H2O ________ 25 PMP CLR 2B 2-ISV-67-601B 0-100 H2O (.904) ________ ________ 5.0 ________ (28)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

RHR PMP RM 2-FE-67-191 ________ t30 H2O ________ 19 CLR 2B-B 2-THV-67-606B 0-100 H2O (.907) ________ ________ 3.9 ________ (21)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

SI PMP RM 2-FE-67-183 ________ t36 H2O ________ 22 CLR 2B 2-THV-67-604B 0-100 H2O (.914) ________ ________ 3.9 ________ (25)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 139 of 204 Data Sheet 3 (Page 9 of 10)

TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____ Date ________

Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 1-VTV-67-534B CS HX 1B ERCW SUP HDR VT 2-VTV-67-534B CS HX 2B ERCW SUP HDR VT 1-FE-67-62 ERCW SUP HDR 1B (up strm) 1-FE-67-62 ERCW SUP HDR 1B (dn strm) 2-FE-67-62 ERCW SUP HDR 1B (up strm) 2-FE-67-62 ERCW SUP HDR 1B (dn strm) 0-DRV-67-547 ERCW CCS HX C DR.

0-TV-67-621B MCR CHLR B-B ERCW CONN.

1-TV-67-690B UCC 1B ERCW SUP TEST CONN 2-TV-67-690B UCC 2B ERCW SUP TEST CONN 0-TV-67-616B EBR B ERCW SUP TEST CONN 0-ISV-67-813A ERCW PMP E-B DISCH PRESS 0-ISV-67-812A ERCW PMP F-B DISCH PRESS 0-ISV-67-814A ERCW PMP G-B DISCH PRESS 0-ISV-67-811A ERCW PMP H-B DISCH PRESS 1-PI-67-10B ERCW STRNR 1B-B OUT PRESS

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 140 of 204 Data Sheet 3 (Page 10 of 10)

TR B - U1 LOCA-RECIRC, U2 COLD SHUTDOWN Data Package: Page ____ of ____ Date ________

Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 2-PI-67-10B ERCW STRNR 2B-B OUT PRESS 0-PI-67-17B ERCW HDR B PRESS 1-PI-67-10A ERCW STRNR 1B-B SUPPLY PRESS ERCW Strainer DP is recorded below:

Equation Data Entry INITIALS 1-PI-67-10A PI-67-10B = DP _______________ - _______________ = _____________

2-PI-67-10A PI-67-10B = DP _______________ - _______________ = _____________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 141 of 204 Data Sheet 4 (Page 1 of 13)

U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

CCS HTX A (B EFD-1 !6650-7100 POS + 1-FCV-67-146 NA gpm NA EFD-1 ________ !6650 BYPASS) (.926)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

CCS HTX B (B 2-FI-67-222 !5850-6200 POS + 2-FCV-67-146 NA gpm NA 2-FI-67-222 - EFD-1 = ________ !5850 BYPASS) (.926) _____GPM Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

CCS HTX C 0-FE-67-226 !6000-6600 ________

(BYPASS) 0-FCV-67-144 H2O ________ _______ 852.0 ________ !6000

(.935) 0-100 H2O Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

DSL GEN CLR 2-FI-67-74 700-760 gpm NA 650 2B1 2-ISV-67-510B NA (.929) ________ NA NA ________ (1200)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

DSL GEN CLR 2-FI-67-280 700-760 gpm NA 650 2B2 2-ISV-67-515B (.929) ________ NA ________ (1200)

Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 142 of 204 Data Sheet 4 (Page 2 of 13)

U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

SD BD RM A/C 2-FE-67-159 t60 H2O ________ 560 B 2-ISV-67-555 (.931) ________ ________ 75.0 ________ (560) 0-100 H2O Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

ELEC BD RM 0-FE-67-200 t76 H2O ________ 370 A/C B 0-ISV-67-618B (.936) ________ _______ 44.0 ________ (490) 0-100 H2O Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

MAIN 0-FE-67-202 t76 H2O ________ 293 CONTROL RM 0-ISV-67-623B ________ (.928) ________ ________ 35.0 ________ (460)

A/C B 0-200 H2O Steps and calculations performed by (init./date): ___________/_______ Calculations verified by (init./date): ___________/_______

INST RM WAT 1-FE-67-259 t65 H2O ________ t30 CLR 1B 1-ISV-67-527B (.933) ________ ________ 3.9 ________ (200) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 143 of 204 Data Sheet 4 (Page 3 of 13)

U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

CCS & AFW 1-FE-67-165 t108 H2O ________ 102 PUMP SP CLR 1-THV-67-643B ________ (.928) ________ ________ 10.2 ________ (670) 1B 0-200 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

BA TRF & 2-FE-67-220 t55 H2O ________ 60 AFW SP CLR 2-THV-67-673B (.929) ________ ________ 8.5 ________ (360) 2B 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

SFP & TB 1-FE-67-216 t16 H2O ________ 29 BSTR PMP 1-THV-67-646B ________ (.910) ________ ________ 7.7 ________ (170)

CLR 1B 0-50 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

CNTMT SPR 1-FE-67187 t13 H2O ________ 28 PMP RM CLR 1-THV-67-605B (.895) ________ ________ 8.5 ________ (190) 1B-B 0-50 H2O Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 144 of 204 Data Sheet 4 (Page 4 of 13)

U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

CENT CHG 1-FE-67-171 ________ t28 H2O ________ 25 PMP CLR 1B 1-ISV-67-601B 0-100 H2O (.904) ________ ________ 5.0 ________ (28)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

SI PMP RM 1-FE-67-183 ________ t36 H2O ________ 22 CLR 1B 1-THV-67-604B 0-100 H2O (.914) ________ ________ 3.9 ________ (25)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

RHR PMP RM 1-FE-67-191 ________ t30 H2O ________ 19 CLR 1B-B 1-THV-67-606B 0-100 H2O (.907) ________ ________ 3.9 ________ (21)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PIPE CHASE 1-FE-67-345 ________ t6 H2O NA 15 CLR 1B 1-THV-67-611B 0-50 H2O (.907) ________ NA 7.0 ________ (17)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PIPE CHASE 2-FE-67-345 t6 H2O NA 15 CLR 2B 2-THV-67-611B (.907) ________ NA 7.0 ________ (17) 0-50 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 145 of 204 Data Sheet 4 (Page 5 of 13)

U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

PEN RM CLR 1-FE-67-349 ________ t12 H2O ________ 12 1B1 1-THV-67-608B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 1-FE-67-353 ________ t12 H2O ________ 11 1B2 1-THV-67-609B 0-100 H2O (.907) ________ ________ 3.9 ________ (13)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 1-FE-67-357 ________ t12 H2O ________ 12 1B3 1-THV-67-610B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 2-FE-67-349 ________ t12 H2O ________ 12 2B1 2-THV-67-608B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

PEN RM CLR 2-FE-67-353 ________ t12 H2O ________ 11 2B2 2-THV-67-609B 0-100 H2O (.907) ________ ________ 3.9 ________ (13)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 146 of 204 Data Sheet 4 (Page 6 of 13)

U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

PEN RM CLR 2-FE-67-357 ________ t12 H2O ________ 12 2B3 2-THV-67-610B 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

EMER GAS TR 2-FE-67-339 ________ t8 H2O ________ 10 RM CLR 2B 2-THV-67-685B 0-100 H2O (.907) ________ ________ 3.9 ________ (11)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

RECIP CHG 1-FE-67-173 ________ t12 H2O ________ 12 PMP CLR 1C 1-THV-67-640 0-100 H2O (.907) ________ ________ 3.9 ________ (14)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

ST AIR COMP 0-FIS-67-209 183-196 gpm NA 183 (header) 0-THV-67-632C NA (.932) NA NA NA ________ (196)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

AUX CNTL AIR 2-FE-67-340 t4 H2O ________ 3.5 COMP B 2-THV-67-683 (.910) ________ ________ 1.9 ________ (185) 0-50 H2O Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 147 of 204 Data Sheet 4 (Page 7 of 13)

U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

CRDM CLR 1B 1-FE-67-477 ________ t118 H2O ________ t124 1-ISV-67-567B 0-200 H2O (.931) ________ ________ 11.9 ________ (390)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

CRDM CLR 1D 1-FE-67-475 ________ t118 H2O ________ t124 1-ISV-67-567D 0-200 H2O (.931) ________ ________ 11.9 ________ (390)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

U1 RCP MTR 1-FE-67-249 ________ t58 H2O ________ 110 CLR 2 1-ISV-67-572B 0-100 H2O (.930) ________ ________ 15.0 ________ (220)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________

U1 RCP MTR 1-FE-67-255 ________ t58 H2O ________ 110 CLR 4 1-ISV-67-572D 0-100 H2O (.930) ________ ________ 15.0 ________ (220)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________

UPPER 1-FI-67-267 24-25 gpm NA 23 CNTMT CLR 1-THV-67-588B (.958) ________ NA ________ (26) 1B Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 148 of 204 Data Sheet 4 (Page 8 of 13)

U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

UPPER 1-FI-67-269 24-25 gpm NA 23 CNTMT CLR 1-THV-67-588D (.958) ________ NA ________ (26) 1D Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

LWR CNTMT 1-FE-67-474 ________ t48.75 H2O ________ 306 CLR 1B 1-ISV-67-564B 0-50 H2O (.940) ________ ________ 45.3 ________ (1060)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

LWR CNTMT 1-FE-67-476 ________ t48.75 H2O ________ 306 CLR 1D 1-ISV-67-564D 0-50 H2O (.940) ________ ________ 45.3 ________ (1060)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

CRDM CLR 2B 2-FE-67-477 ________ t118 H2O ________ 124 2-ISV-67-567B 0-200 H2O (.931) ________ ________ 11.9 ________ (390)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

U2 RCP MTR 2-FE-67-249 ________ t58 H2O ________ 110 CLR 2 2-ISV-67-572B 0-100 H2O (.930) ________ ________ 15.0 ________ (220)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 149 of 204 Data Sheet 4 (Page 9 of 13)

U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

U2 RCP MTR 2-FE-67-255 ________ t58 H2O ________ 110 CLR 4 2-ISV-67-572D 0-100 H2O (.930) ________ ________ 15.0 ________ (220)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/_________

CRDM CLR 2D 2-FE-67-475 ________ t118 H2O ________ 124 2-ISV-67-567D 0-200 H2O (.931) ________ ________ 11.9 ________ (390)

Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

INST RM WAT 2-FE-67-259 ________ t65 H2O ________ 30 CLR 2B 2-ISV-67-527B 0-100 H2O (.933) ________ ________ 3.9 ________ (200)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

CNTMT SPR 2-FE-67187 ________ t13 H2O ________ 28 PMP RM CLR 2-THV-67-605B 0-50 H2O (.895) ________ ________ 8.5 ________ (190) 2B-B Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

CENT CHG 2-FE-67-171 ________ t28 H2O ________ 25 PMP CLR 2B 2-ISV-67-601B 0-100 H2O (.904) ________ ________ 5.0 ________ (28)

Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 150 of 204 Data Sheet 4 (Page 10 of 13)

U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

RHR PMP RM 2-FE-67-191 ________ t30 H2O ________ 19 CLR 2B-B 2-THV-67-606B 0-100 H2O (.907) ________ ________ 3.9 ________ (21)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

SI PMP RM 2-FE-67-183 t36 H2O ________ 22 CLR 2B 2-THV-67-604B (.914) ________ ________ 3.9 ________ (25) 0-100 H2O Steps and calculations performed by (init./date): ___________/_____________ Calculations verified by (init./date): ___________/___________

LWR CNTMT 2-FE-67-474 t48.75 H2O ________ 306 CLR 2B 2-ISV-67-564B (.940) ________ ________ 45.3 ________ (1060) 0-50 H2O Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

LWR CNTMT 2-FE-67-476 t48.75 H2O ________ 306 CLR 2D 2-ISV-67-564D (.940) ________ ________ 45.3 ________ (1060) 0-50 H2O Steps and calculations performed by (init./date): ___________/_________ Calculations verified by (init./date): ___________/_________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 151 of 204 Data Sheet 4 (Page 11 of 13)

U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____ Date ________

[1] [2] [3] [4] [5] [6] [7] [8] [9]

Component Flow Device EDF or Target P( H2O) Pcorrected Flowcorrected Acc. Criteria M&TE Value/(Corr. or Flow(gpm) 1/2 k (gpm) Flow (gpm)

Throttle Valve (P)

Gauge # Multiplier) (Max)

UPPER 2-FI-67-267 24-25 gpm NA CNTMT CLR 2-THV-67-588 (.958) ________ NA ________ t23 2B B (26)

Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

UPPER 2-FI-67-269 24-25 gpm NA t23 CNTMT CLR 2-THV-67-588 (.958) ________ NA ________ (26) 2D D Steps and calculations performed by (init./date): ___________/___________ Calculations verified by (init./date): ___________/___________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 152 of 204 Data Sheet 4 (Page 12 of 13)

U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____ Date ________

Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 1-VTV-67-534B CS HX 1B ERCW SUP HDR VT 2-VTV-67-534B CS HX 2B ERCW SUP HDR VT 1-FE-67-62 ERCW SUP HDR 1B (up strm) 1-FE-67-62 ERCW SUP HDR 1B (dn strm) 2-FE-67-62 ERCW SUP HDR 1B (up strm) 2-FE-67-62 ERCW SUP HDR 1B (dn strm) 0-DRV-67-547 ERCW CCS HX C DR.

0-TV-67-621B MCR CHLR B-B ERCW CONN.

1-TV-67-690B UCC 1B ERCW SUP TEST CONN 2-TV-67-690B UCC 2B ERCW SUP TEST CONN 0-TV-67-616B EBR B ERCW SUP TEST CONN 0-ISV-67-813A ERCW PMP E-B DISCH PRESS 0-ISV-67-812A ERCW PMP F-B DISCH PRESS 0-ISV-67-814A ERCW PMP G-B DISCH PRESS 0-ISV-67-811A ERCW PMP H-B DISCH PRESS

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 153 of 204 Data Sheet 4 (Page 13 of 13)

U-1 HOT SHUTDOWN, - U-2 STARTUP Data Package: Page ____ of ____ Date ________

Component UNID DESCRIPTION M&TE # PRESSURE (PSIG) INITIALS 1-PI-67-10B ERCW STRNR 1B-B OUT PRESS 2-PI-67-10B ERCW STRNR 2B-B OUT PRESS 0-PI-67-17B ERCW HRD B PRESS 1-PI-67-10A ERCW STRNR 1B-B SUPPLY PRESS ERCW Strainer DP is recorded below:

Equation Data Entry INITIALS 1-PI-67-10A PI-67-10B = DP _______________ - _______________ = _____________

2-PI-67-10A PI-67-10B = DP _______________ - _______________ = _____________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 154 of 204 Data Sheet 5 (Page 1 of 4)

TRAIN B THROTTLE VALVE SETPOINTS Data Package: Page ____ of ____ Date ________

1.0 APPLICATION Use this data sheet only for the valves adjusted in the flow mode applicable to the subsection of the procedure being performed (i.e. only valves applicable to the Cold Shutdown Mode are completed with Subsection 6.3 Train B Flow Balance Verification for Cold Shutdown Mode.

2.0 PROCEDURE

[1] Determine valve throttle position as follows:

[2] Open the valve to the full open stop.

[3] Close the valve while counting the number of turns until the flow returns to that previously recorded on the data sheet.

[4] Record the number of turns from the full open stop to the desired flow position to the nearest 1/4 turn. DO NOT discount any handwheel movement as valve slack, count ALL turns.

For plug valves (0-90q travel) record the position to the nearest 15.

[5] Close the valve fully.

[6] Open the valve while counting the number of turns until the flow returns to that previously recorded on the data sheet.

[7] Record the number of turns from full closed position to the desired flow position to the nearest 1/4 turn. DO NOT discount any handwheel movement as valve slack, count ALL turns.

For plug valves (0-90q travel) record the position to the nearest 15 of rotation.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 155 of 204 Data Sheet 5 (Page 2 of 4)

TRAIN B THROTTLE VALVE SETPOINTS Data Package: Page ____ of ____ Date ________

2.0 PROCEDURE (continued)

Component Throttle Valve Mode Turns From Application Full Full Open Closed Initial/Date AUX CNTRL AIR 2-ISV 67-683 LOCA _______/_______

COMP B-B BA TRF & AFW SP 2-THV-67-673B Normal _______/_______

CLR 2B CCS HTX A 1-FCV-67-143 Normal _______/_______

CCS HTX C 0-FCV-67-144 Normal _______/_______

CCS & AFW PMP SP 1-THV-67-643B Normal _______/_______

CLR 1B CC PMP 1B-B 1-THV-67-601B Normal _______/_______

CSS HTX 1B 1-ISV-67-537B LOCA _______/_______

CSS PMP 1-THV-67-605B Normal _______/______

RM CLR 1B-B CRDM CLR 1B 1-ISV-67-567B Normal _______/______

CRDM CLR 1D 1-ISV-67-567D Normal _______/______

DSL GEN CLR 1B1 1-ISV-67-510B LOCA _______/______

DSL GEN CLR 1B2 1-ISV-67-515B LOCA _______/______

DSL GEN CLR 2B1 2-ISV-67-510B LOCA _______/______

DSL GEN CLR 2B2 2-ISV-67-515B LOCA _______/______

ELEC BD RM A/C B 0-ISV-67-618B Normal _______/______

EGTS RM CLR 2B 2-THV-67-685B Normal _____/________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 156 of 204 Data Sheet 5 (Page 3 of 4)

TRAIN B THROTTLE VALVE SETPOINTS Data Package: Page ____ of ____ Date ________

2.0 PROCEDURE (continued)

Component Throttle Valve Mode Turns From Application Full Full Open Closed Initial/Date INST RM WTR CLR 1B 1-ISV-67-527B Normal _______/______

LWR CNTMT CLR 1B 1-ISV-67-564B Normal _______/______

MCR A/C B 0-ISV-67-623B Normal _______/______

PEN RM CLR 1B1 1-THV-67-608B Normal _______/______

PEN RM CLR 1B2 1-THV-67-609B Normal _______/______

PEN RM CLR 1B3 1-THV-67-610B Normal _______/______

PEN RM CLR 2B1 2-THV-67-608B Normal _______/______

PEN RM CLR 2B2 2-THV-67-609B Normal _______/______

PEN RM CLR 2B3 2-THV-67-610B Normal _______/______

PIPE CHASE CLR 1B 1-THV-67-611B Normal _______/______

PIPE CHASE CLR 2B 2-THV-67-611B Normal _______/______

RCP MTR CLR 1-2 1-ISV-67-572B Normal _______/______

RCP MTR CLR 1-4 1-ISV-67-572D Normal _______/______

RECIP CHG PMP RM 1-THV-67-640 Normal _______/______

CLR 1C RHR PMP RM CLR 1B-B 1-THV-606B Normal _______/______

SD BD RM A/C B 2-ISV-67-555 Normal _______/______

SFP & TB BSTR PMP 1-THV-67-646B Normal _______/______

CLR 1B

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 157 of 204 Data Sheet 5 (Page 4 of 4)

TRAIN B THROTTLE VALVE SETPOINTS Data Package: Page ____ of ____ Date ________

2.0 PROCEDURE (continued)

Component Throttle Valve Mode Turns From Application Full Full Open Closed Initial/Date SI PMP RM CLR 1B 1-THV-67-604B Normal _______/______

UPR CNTMT CLR 1B 1-THV-67-588B Normal _______/______

UPR CNTMT CLR 1D 1-THV-67-588D Normal _______/______

CC PMP 2B-B 2-THV-67-601B Normal _______/______

CSS HTX 2B 2-ISV-67-537B LOCA ________/______

CSS PMP RM CLR 2B-B 2-THV-67-605B Normal _______/______

CRDM CLR 2B 2-ISV-67-567B Normal _____/________

CRDM CLR 2D 2-ISV-67-567D Normal _______/______

INST RM WTR CLR 2B 2-ISV-67-527B Normal _______/______

LWR CNTMT CLR 2B 2-ISV-67-564B Normal _______/______

RCP MTR CLR 2-2 2-ISV-67-572B Normal _______/______

RCP MTR CLR 2-4 2-ISV-67-572D Normal _______/______

RECIP CHG PMP RM 2-THV-67-640 Normal _______/______

CLR 2C RHR PMP RM CLR 2B-B 2-THV-67-606B Normal _______/______

SI PMP RM CLR 2B 2-THV-67-604B Normal _______/______

UPR CNTMT CLR 2B 2-THV-67-588B Normal _______/______

UPR CNTMT CLR 2D 2-THV-67-588D Normal _______/______

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 158 of 204 Data Sheet 6 (Page 1 of 2)

PUMP DATA -U1 COLD SHUTDOWN, U-2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

Location /Component Instrument M&TE# Reading Range/Accuracy Initial/Date Header Flow Elem P 1-FE-67-62 ________ ________ H2O 200 H2O/r1% ________/________

2-FE-67-62 ________ ________ H2O 200 H2O/r1% ________/________

Discharge Pressures at 0-PI-67-48B (Pump E) ________ psig 200 psig/r4 psig ERCW Pumps ________/________

NA data for pumps NOT 0-PI-67-52B (Pump F) ________ psig 200 psig/r4 psig ________/________

running 0-PI-67-56B (Pump G) ________ psig 200 psig/r4 psig ________/________

0-PI-67-60B (Pump H) ________ psig 200 psig/r4 psig ________/________

Header Pressure 0-PI-67-17B ________ psig 200 psig/r4 psig ________/________

Strainer 1B-B Outlet 1-PI-67-10B ________ psig 200 psig/r1.75% ________/________

Strainer 2B-B Outlet 2-PI-67-10B ________ ________ psig 200 psig/r2 psig ________/________

Strainer 1B-B & 2B-B ________ H2O 100 H2O/r1% ________/________

Backwash Flow

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 159 of 204 Data Sheet 6 (Page 2 of 2)

PUMP DATA -U1 COLD SHUTDOWN, U-2 LOCA-RECIRC Data Package: Page ____ of ____ Date ________

Location /Component Instrument M&TE# Reading Range/Accuracy Initial/Date Aux Bldg HDR 1-FE-67-62 Inlet ________ ________ psig 200 psig/r2 psig ________/________

pressures at flow elements 1-FE-67-62 Outlet ________ ________ psig 200 psig/r1% ________/________

2-FE-67-62 Inlet ________ ________ psig 200 psig/r1% ________/________

2-FE-67-62 Outlet ________ ________ psig 200 psig/r1% ________/________

CCS HTX C 0-DRV-67-547 ________ ________ psig 200 psig/r1% ________/________

CCS HTX A 1-DRV-67-547 ________ ________ psig 200 psig/r1% ________/________

MCR A/C 0-TV-67-621B ________ ________ psig 200 psig/r1% ________/________

Air Compr HDR 0-VTV-67-625B ________ ________ psig 200 psig/r1% ________/________

UCV 1-TV-67-690B ________ ________ psig 200 psig/r1% ________/________

EBR A/C 0-VTV-67-614B ________ ________ psig 200 psig/r1% ________/________

Disch HDR Vent 1-VTV-67-947B ________ ________ psig 200 psig/r1% ________/________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 160 of 204 Data Sheet 7 (Page 1 of 2)

PUMP DATA - U1 LOCA-RECIRC, U-2 COLD SHUTDOWN Data Package: Page ____ of ____ Date ________

Location /Component Instrument M&TE# Reading Range/Accuracy Initial/Date Header Flow Elem P 1-FE-67-62 ________ ________ H2O 200 psig/r1% ________/________

2-FE-67-62 ________ ________ H2O 200 psig/r1% ________/________

Discharge Pressures at 0-PI-67-48B (Pump E) ________ psig 200 psig/r4 psig ERCW Pumps ________/________

NA pumps NOT running 0-PI-67-52B (Pump F) ________ psig 200 psig/r4 psig ________/________

0-PI-67-56B (Pump G) ________ psig 200 psig/r4 psig ________/________

0-PI-67-60B (Pump H) ________ psig 200 psig/r4 psig ________/________

Header Pressure 0-PI-67-17B 200 psig/r4 psig 200 psig/r4 psig ________/________

Strainer 1B-B Outlet 1-PI-67-10B ________ psig 200 psig/r1.75% ________/________

Strainer 2B-B Outlet 2-PI-67-10B ________ ________ psig 200 psig/r2 psig ________/________

Strainer 1B-B & 2B-B Backwash Flow ________ H2O ________/________

100 H2O/r1%

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 161 of 204 Data Sheet 7 (Page 2 of 2)

PUMP DATA - U1 LOCA Data Package: Page ____ of ____ Date ________

Location /Component Instrument M&TE# Reading Range/Accuracy Initial/Date Aux Bldg HDR 1-FE-67-62 Inlet ________ ________ psig 200 psig/r2 psig ________/________

pressures at flow elements 1-FE-67-62 Outlet ________ ________ psig 200 psig/r1% ________/________

2-FE-67-62 Inlet ________ ________ psig 200 psig/r1% ________/________

2-FE-67-62 Outlet ________ ________ psig 200 psig/r1% ________/________

CCS HTX C 0-DRV-67-547 ________ ________ psig 200 psig/r1% ________/________

CCS HTX A 1-DRV-67-547 ________ ________ psig 200 psig/r1% ________/________

MCR A/C 0-TV-67-621B ________ ________ psig 200 psig/r1% ________/________

Air Compr HDR 0-VTV-67-625B ________ ________ psig 200 psig/r1% ________/________

UCV 1-TV-67-690B ________ ________ psig 200 psig/r1% ________/________

EBR A/C 0-VTV-67-614B ________ ________ psig 200 psig/r1% ________/________

Disch HDR Vent 1-VTV-67-947B ________ ________ psig 200 psig/r1% ________/________

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 162 of 204 Checklist 1 (Page 1 of 1)

SUPPLY HEADER 2B POWER ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCAT POSITION UNID PERF VERIF ION INITIAL INITIAL C&A Vent Bd 2B1-B ERCW STRAINER 2B-B C/6B ON 2-BKR-67-10B/1 (2-STR-67-10) CV ERCW STR 2B-B FLUSH C/6E ON 2-BKR-67-10B/2 (2-FCV-67-10B) CV ERCW STR 2B-B BACKWASH C/4E ON 2-BKR-67-10A (2-FCV-67-10A) CV Rx MOV Bd 2A2-A CCS HX B OUT ERCW FLOW C/15A 0-PI-OPS-17.1 2-BKR-67-143 CNTL BYP (2-FCV-67-143)

OFF AND LOCKED CV Rx MOV Bd 2B2-B ERCW STRAINER 2B-B IN ISOL C/8A 0-PI-OPS-17.1 2-BKR-67-24 (2-FCV-67-24)

OFF AND LOCKED CV AB ERCW SUP HDR 2B ISOL C/8B 0-PI-OPS-17.1 2-BKR-67-82 (2-FCV-67-82)

OFF AND LOCKED CV CCS HX C ERCW HDR 2B SUP C/13A 0-PI-OPS-17.1 2-BKR-67-147 ISOL (2-FCV-67-147)

OFF AND LOCKED CV CCS HX C OUT ERCW HDR B C/12B ON 0-BKR-67-152 FLOW CNTL (0-FCV-67-152) CV AB AIR CLR ERCW SUP C/11A 0-PI-OPS-17.1 2-BKR-67-128 HDR 2B ISOL (2-FCV-67-128)

OFF AND LOCKED CV Diesel Aux Bd 1A2-A DG HX 1A1/1A2 ERCW HDR 2B C/3A ON 1-BKR-67-68 ISOL (1-FCV-67-68) CV Diesel Aux Bd 2A2-A DG HX 2A1/2A2 ERCW HDR 2B C/3A ON 2-BKR-67-68 ISOL (2-FCV-67-68) CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 163 of 204 Checklist 2 (Page 1 of 5)

B - TRAIN POWER CHECKLIST Data Package: Page ____ of ____ Date ________

NOTES

1) Alignment assumes IPS and main headers into Aux Bldg are currently aligned and in service. This particular checklist is only for electrical power to valves needed to conduct 2-PTI-067-02-B.
2) Inside and outside containment isolation valves are both A and B train valves. This checklist contains B Tr. power supplies necessary to establish the desired flowpath.

NOMENCLATURE LOCATION POSITION UNID PERF VERIF INITIAL INITIAL Diesel Aux Bd 1B1/1B2 DG HX 1B1-B ERCW HDR 1B C/3A CLOSED 1-BKR-67-67 ISOL (1-FCV-67-67) CV DG HX 1B2-A ERCW HDR 2A C/3A CLOSED 1-BKR-67-65 SUPPLY (1-FCV-67-65) CV Diesel Aux Bd 2B1/2B2 DG HX 2B1/2B2 ERCW HDR 1B C/3A CLOSED 2-BKR-67-67 ISOL (2-FCV-67-67) CV DG HX 2B2-A ERCW HDR 2A C/3A CLOSED 2-BKR-67-65 SUPPLY (2-FCV-67-65) CV Rx MOV Bd 1A2-A LWR CNTMT 1B CLR E SUP C/9A ON 1-BKR-67-99 (1-FCV-67-99) CV LWR CNTMT 1B CLR ERCW C/9B ON 1-BKR-67-104 RETURN (1-FCV-67-104) CV LWR CNTMT 1D CLR E SUP C/8D ON 1-BKR-67-107 (1-FCV-67-107) CV LWR CNTMT CLR 1D DISCH C/10A ON 1-BKR-67-112 (1-FCV-67-112) CV UPPER CNTMT VT CLR 1B C/9F ON 1-BKR-67-139 ERCW RET (1-FCV-67-139) CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 164 of 204 Checklist 2 (Page 2 of 5)

B - TRAIN POWER CHECKLIST Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIF INITIAL INITIAL UPPER CNTMT VT CLR 1D C/10F ON 1-BKR-67-142 ERCW RET (1-FCV-67-142) CV Rx MOV Bd 1B2-B CNTMT SPRAY HX 1A-A ERCW C/5E ON 1-BKR-67-123 IN (1-FCV-67-123) CV CNTMT SPRAY HX 1A-A ERCW C/5F ON 1-BKR-67-124 OUT (1-FCV-67-124) CV AB AIR CLR ERCW SUP C/11A ON 1-BKR-67-128 HDR 1B ISOL (1-FCV-67-128) CV UPPER CNTMT VT CLR 1B C/11B ON 1-BKR-67-138 ERCW SUP (1-FCV-67-138) CV STA AIR COMPR ERCW SUP C/12B ON 0-BKR-67-208 HDR 1A (0-FCV-67-208) CV LWR CNTMT 1B CLR ERCW C/7D ON 1-BKR-67-103 RETURN(1-FCV-67-103) CV UPPER CNTMT VT CLR 1D C/10F ON 1-BKR-67-141 ERCW SUP (1-FCV-67-141) CV UPPER CNTMT VT CLR 1D C/10D ON 1-BKR-67-298 ERCW RET (1-FCV-67-298) CV UPPER CNTMT VT CLR 1B C/9D ON 1-BKR-67-297 ERCW RET (1-FCV-67-297) CV LWR CNTMT CLR HDR 1D C/5C ON 1-BKR-67-113 ERCW SUP (1-FCV-67-113) CV LWR CNTMT 1D CLR ERCW C/8D ON 1-BKR-67-111 RETURN (1-FCV-67-111) CV ERCW DISCH HDR B CT ISOL C/12A ON 0-BKR-67-362 (0-FCV-67-362) CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 165 of 204 Checklist 2 (Page 3 of 5)

B - TRAIN POWER CHECKLIST Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIF INITIAL INITIAL LWR CNTMT 2B CLR SUP ISOL C/11D ON 1-BKR-67-105 (1-FCV-67-105)

Rx MOV Bd 2A2-A ERCW DISCH HDR A CT ISOL C/13B ON 0-BKR-67-360 (0-FCV-67-360) CV LWR CNTMT 2B CLR ERCW C/7D ON 2-BKR-67-104 RETURN (2-FCV-67-104) CV LWR CNTMT CLR 1D DISCH C/10A ON 2-BKR-67-112 (2-FCV-67-112) CV LWR CNTMT CLR 1D DISCH C/9F ON 2-BKR-67-139 (2-FCV-67-139) CV UPPER CNTMT VT CLR 2D C/10F ON 2-BKR-67-142 ERCW RET (2-FCV-67-142) CV Rx MOV Bd 2B2-B CNTMT SPRAY HX 1A-A ERCW C/5E ON 2-BKR-67-123 IN (2-FCV-67-123) CV CNTMT SPRAY HX 1A-A ERCW C/5F ON 2-BKR-67-124 OUT (2-FCV-67-124) CV LWR CNTMT 2B CLR SUP ISOL C/10A ON 2-BKR-67-99 (2-FCV-67-99) CV LWR CNTMT A CLR ERCW C/7D ON 2-BKR-67-103 RETURN (2-FCV-67-103) CV LWR CNTMT 2D CLR SUP ISOL C/10B ON 2-BKR-67-107 (2-FCV-67-107) CV LWR CNTMT 2D CLR ERCW C/8D ON 2-BKR-67-111 RETURN (2-FCV-67-111) CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 166 of 204 Checklist 2 (Page 4 of 5)

B - TRAIN POWER CHECKLIST Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIF INITIAL INITIAL UPPER CNTMT VT CLR 2B C/9D ON 2-BKR-67-297 ERCW RET (2-FCV-67-297) CV UPPER CNTMT VT CLR 2B C/9F ON 2-BKR-67-138 ERCW SUP (2-FCV-67-138) CV UPPER CNTMT VT CLR 1D C/10D ON 2-BKR-67-298 ERCW RET (2-FCV-67-298) CV UPPER CNTMT VT CLR 1D C/10F ON 2-BKR-67-141 ERCW SUP (2-FCV-67-141) CV AB AIR CLR ERCW SUP C/11A ON 2-BKR-67-128 HDR 1B ISOL (2-FCV-67-128) CV LWR CNTMT 2B CLR SUP ISOL C/11B ON 2-BKR-67-105 (2-FCV-67-105) CV LWR CNTMT 2D CLR SUP ISOL C/5C ON 2-BKR-67-113 (2-FCV-67-113) CV ERCW FCV for each ESF room cooler is powered from that cooler's control circuit and opens by de-energizing the FSV, EXCEPT for 67-170 (CCP) and FCV-67-190 (RHRP) which are de-energized OPEN for Appendix R.

C & A VENT Bd 1B1-B RHR PUMP RM CLR C/9A OFF 1-BKR-30-176 1-PMCL-30-176 CV CS PUMP RM CLR C/3C ON 1-BKR-30-178 1-PMCL-30-178 CV SIS PUMP RM CLR C/8A OFF 1-BKR-30-179 1-PMCL-30-179 CV CCP 1B-B PMP RM CLR C/10A OFF 1-BKR-30-182 1-PMCL-30-182 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 167 of 204 Checklist 2 (Page 5 of 5)

B - TRAIN POWER CHECKLIST Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIF INITIAL INITIAL C & A VENT Bd 2B1-B RHR PUMP RM CLR C/9A OFF 2-BKR-30-176 2-PMCL-30-176 CV CS PUMP RM CLR C/3C ON 2-BKR-30-178 2-PMCL-30-178 CV SIS PUMP RM CLR C/8A OFF 2-BKR-30-179 2-PMCL-30-179 CV CCP 1A-A PMP RM CLR C/10A OFF 2-BKR-30-182 2-PMCL-30-182 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 168 of 204 Checklist 3 (Page 1 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL IPS el 722 ERCW STRAINER 1B-B IPS/722 CLOSED 1-FCV-67-10A BACKWASH CV ERCW STRAINER 1B-B IPS/722 CLOSED 1-FCV-67-10B FLUSH CONTROL CV ERCW STRAINER 1B-B IPS/722 0-PI-OPS-17.0 1-FCV-67-24 INLET ISOL LO CV ERCW STRAINER 1B-B IPS/722 0-PI-OPS-17.0 1-ISV-67-505B OUT ISOL LO CV ERCW B TRAIN HDR IPS/722 CLOSED 1-ISV-67-1118 CROSSTIE ISOL CV ERCW CROSS-TIE IPS/722 CLOSED 1-VTV-67-1125 HEADER VENT. CV ERCW CROSS-TIE IPS/722 CLOSED 1-DRV-67-1124 HEADER DRAIN CV 1-PDT-67-10A/10D/10F & IPS/722 OPEN 1-RTV-67-901A 1-PI-67-10A ROOT CV 1-PDT-67-10A/1-PI-67-10B IPS/722 OPEN 1-RTV-67-902A ROOT CV ERCW STRAINER 1B-B IPS/722 CLOSED 1-VTV-67-907B VENT CV 1-PDT-67-10F ROOT IPS/722 OPEN 1-RTV-67-925A CV 1-PDT-67-10D ROOT IPS/722 OPEN 1-RTV-67-926A CV YARD 1-FT-67-62/1-FT-67-62C U-1 PIPE OPEN 1-RTV-67-802A ROOT TUNNEL CV 1-FT-67-62/1-FT-67-62C U-1 PIPE OPEN 1-RTV-67-802B ROOT TUNNEL CV ERCW SPARE YARD CLOSED 2-ISV-67-984 CV ERCW SPARE YARD CLOSED 2-ISV-67-985 CV ERCW DISCH HDR B North of U2 POSITION AS 0-FCV-67-362 COOLING TOWER ISOL RWST NEEDED CV ERCW HDR 1B YARD 0-PI-OPS-17.0 1-ISV-67-506B BACKWASH ISOL CV DG 1B-B ERCW SUP HDR YARD 0-PI-OPS-17.0 1-ISV-67-507C ISOL CV DG 2B-B ERCW SUP HDR YARD 0-PI-OPS-17.0 1-ISV-67-507D ISOL CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 169 of 204 Checklist 3 (Page 2 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL DG Bldg el 742 1-FT-67-74 ROOT RM 1BB OPEN 1-RTV-67-825A CV 1-FI-67-74 ROOT RM 1BB OPEN 1-RTV-67-825B CV 1-FI-67-280 ROOT RM 1BB OPEN 1-RTV-67-826A CV 1-FI-67-280 ROOT RM 1BB OPEN 1-RTV-67-826B CV DG 1B-B OUT ERCW HDR RM 1BB CLOSED 1-VTV-67-983 VENT CV DG HX 1B1 ERCW DRAIN RM 1BB CLOSED 1-DRV-67-981B CV DG HX 1B2 ERCW DRAIN RM 1BB CLOSED 1-DRV-67-980B CV DG HX 2B2 ERCW DRAIN RM 2BB CLOSED 2-DRV-67-980B CV 2-FI-67-74 ROOT RM 2BB OPEN 2-RTV-67-825A CV 2-FI-67-74 ROOT RM 2BB OPEN 2-RTV-67-825B CV 2-FI-67-280 ROOT RM 2BB OPEN 2-RTV-67-826A CV 2-FI-67-280 ROOT RM 2BB OPEN 2-RTV-67-826B CV DG HX 2B1 ERCW DRAIN RM 2BB CLOSED 2-DRV-67-981B CV DG 2B-B HX ERCW OUT HDR RM 2BB CLOSED 2-VTV-67-983 VENT CV DG HX 1B1/1B2 ERCW SUP DGB/742 CLOSED 1-FCV-67-67 HDR 1B ISOL CV DG HX 1B1 ERCW OUT DGB/742 0-PI-OPS-17.0 1-THV-67-510B THROTTLE LT CV DG HX 1B1/1B2 ERCW DGB/742 0-PI-OPS-17.0 1-ISV-67-511B DISCH HDR B ISOL LO CV DG HX 1B2 ERCW OUT DGB/742 0-PI-OPS-17.0 1-THV-67-515B THROTTLE LT CV DG HX 1B1/1B2 ERCW DGB/742 0-PI-OPS-17.0 1-ISV-67-516A DISCH HDR A ISOL LO CV DG HX 1B1/1B2 ERCW DGB/742 0-PI-OPS-17.0 1-THV-67-8021 DISCH HDR THROTTLE LT CV DG HX 1B2 SUP VENT DGB/742 CLOSED 1-VTV-67-518B CV DG HX 1B1 ERCW SUP VENT DGB/742 CLOSED 1-VTV-67-519B CV ERCW HDR 2A/2B FLUSH DGB/742 CLOSED 1-FLV-67-653B RETURN CONNECTION CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 170 of 204 Checklist 3 (Page 3 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL DG Bldg el 742 DG HX 2B1/2B2 ERCW SUP DGB/742 CLOSED 2-FCV-67-67 HDR 1B ISOL CV DG HX 2B1 ERCW OUT DGB/742 0-PI-OPS-17.0 2-THV-67-510B THROTTLE LT CV DG HX 2B1/2B2 ERCW DGB/742 0-PI-OPS-17.0 2-ISV-67-511B DISCH HDR B ISOL LO CV DG HX 2B2 ERCW OUT DGB/742 0-PI-OPS-17.0 2-THV-67-515B THROTTLE LT CV DG HX 2B1/2B2 ERCW DGB/742 0-PI-OPS-17.0 2-ISV-67-516A DISCH HDR A ISOL LO CV DG HX 2B1/2B2 ERCW DGB/742 0-PI-OPS-17.0 2-THV-67-8021 DISCH HDR THROTTLE LT CV DG HX 2B2 ERCW SUP VENT DGB/742 CLOSED 2-VTV-67-518B CV DG HX 2B1 ERCW SUP VENT DGB/742 CLOSED 2-VTV-67-519B CV Control Bldg el 692 0-FE-67-200 TEST POINT C12P/692 CLOSED 0-TV-67-889A CV 0-FE-67-200 TEST POINT C12P/692 CLOSED 0-TV-67-889B CV ELECT BD RM A/C COND B-B C12P/694 0-PI-OPS-17.0 0-ISV-67-615B ERCW SUP ISOL LO CV ELEC BD RM A/C COND B-B C12P/696 0-PI-OPS-17.0 0-THV-67-618B ERCW RET THROTTLE LT CV ELEC BD RM A/C COND B-B C12P/701 CLOSED 0-VTV-67-614B ERCW SUP VENT CV ELEC BD RM A/C COND B-B C13P/692 CLOSED 0-TV-67-616B ERCW SUP TEST CONN CV ELEC BD RM A/C COND B-B C13P/692 CLOSED 0-TV-67-617B ERCW RET TEST CONN CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 171 of 204 Checklist 3 (Page 4 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL Aux Bldg el 676 CS PMP RM CLR 1B-B A7U/676 0-PI-OPS-17.0 1-THV-67-605B ERCW RET THROTTLE LT CV CONTROL AIR ISOLATION A7U/676 0-PI-OPS-17.0 1-ISV-32-3022 VALVE TO 1-FCV-67-190 LC CV CSP ROOM COOLER 1B-B A7U/676 OPERABLE 1-FCV-67-186 ERCW SUP FLOW CNTL CV CS PMP 1B-B RM COOLER A6U/676 CLOSED 1-ISV-67-622 FLUSH CONNECTION CV RHR PMP RM CLR 1B-B A7V/676 0-PI-OPS-17.0 1-THV-67-606B ERCW RET THROTTLE LT CV RHRP ROOM COOLER 1B-B A7V/676 0-PI-OPS-17.0 1-FCV-67-190 ERCW SUP FLOW CNTL LO CV RHR PMP 1B-B RM COOLER A7V/676 CLOSED 1-ISV-67-623-B FLUSH CONNECTION CV 1-FE-67-187 TEST POINT A7U/676 CLOSED 1-TV-67-881A CV 1-FE-67-187 TEST POINT A7U/676 CLOSED 1-TV-67-881B CV CONTROL AIR ISOLATION A7W/676 OPEN 1-ISV-32-3017 VALVE TO 1-FCV-67-186 CV 1-FE-67-191 TEST POINT A7V/676 CLOSED 1-TV-67-882A CV 1-FE-67-191 TEST POINT A7V/676 CLOSED 1-TV-67-882B CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 172 of 204 Checklist 3 (Page 5 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL Aux Bldg el 692 BIOCIDE RECIRC ERCW SUP A1T/692 CLOSED 1-ISV-67-712 TO AFW TURB PMP 1A-S CV BIOCIDE RECIRC ERCW SUP A1U/692 CLOSED 1-ISV-67-711 TO AFW TURB PMP 1A-S CV BIOCIDE RECIRC ERCW SUP A1U/692 CLOSED 1-ISV-67-713 TO AFW TURB PMP 1A-S CV BIOCIDE RECIRC ERCW SUP A1U/692 CLOSED 1-ISV-67-714 TO AFW TURB PMP 1A-S CV LOWER CNTMT VENT CLR A2U/692 0-PI-OPS-17.0 1-ISV-67-523B 1B & 1D ERCW SUP ISOL LO CV INSTR RM WATER CLR 1B A2U/692 OPEN 1-ISV-67-524B ERCW SUP ISOL CV LOWER CNTMT CLR HDR B A2U/692 CLOSED 1-TV-67-560B ERCW SUP HDR TEST CONN CV LOWER CNTMT CLR HDR D A2U/692 CLOSED 1-TV-67-560D ERCW SUP HDR TEST CONN CV LOWER CNTMT CLR HDR B A2U/692 CLOSED 1-TV-67-576B ERCW RET TEST CONN CV LOWER CNTMT CLR HDR D A2U/692 CLOSED 1-TV-67-576D ERCW RET TEST CONN CV PIPE CHASE COOLER 1B-B A2U/692 OPERABLE 1-FCV-67-344 ERCW SUP FLOW CNTL CV CONTROL AIR ISOLATION A2U/692 OPEN 1-ISV-32-2960 VALVE TO 1-FCV-67-344 CV CCP ROOM COOLER 1B-B A4T/692 0-PI-OPS-17.0 1-FCV-67-170 ERCW SUP FLOW CNTL LO CV CONTROL AIR ISOLATION A4T/695 0-PI-OPS-17.0 1-ISV-32-2936 VALVE TO 1-FCV-67-170 LC CV CVCS CCP ROOM CLR 1B-B A4T/692 0-PI-OPS-17.0 1-ISV-67-600B ERCW SUP ISOL LO CV CONTROL AIR ISOLATION A4U/692 OPEN 1-ISV-32-2956 VALVE TO 1-FCV-67-348 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 173 of 204 Checklist 3 (Page 6 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL Aux Bldg el 692 PENT ROOM COOLER 1B-B A4V/692 OPERABLE 1-FCV-67-348 ERCW SUP FLOW CNTL CV PENT ROOM CLR 1B-B A4V/692 0-PI-OPS-17.0 1-THV-67-608B ERCW RET THROTTLE LT CV 1-FE-67-349 TEST POINT A4V/700 CLOSED 1-TV-67-883A CV 1-FE-67-349 TEST POINT A4V/700 CLOSED 1-TV-67-883B CV INSTR RM WATER CLR 1B A4W/692 CLOSED 1-TV-67-525B ERCW IN TEST CONN CV INSTR RM WATER CLR 1B A4W/692 CLOSED 1-TV-67-526B ERCW OUT TEST CONN CV INSTR RM WATER CLR 1B A4W/692 TI-31.08 1-THV-67-527B ERCW RET THROTTLE CV CVCS PDP RM CLR 1C A5T/692 OPEN 1-ISV-67-639 ERCW SUP ISOL CV CVCS PDP RM CLR 1C A5T/692 TI-31.08 1-THV-67-640 ERCW RET THROTTLE CV 1-FE-67-173 TEST POINT A5T/698 CLOSED 1-TV-67-879A CV 1-FE-67-173 TEST POINT A5T/698 CLOSED 1-TV-67-879B CV CVCS PDP RM CLR 1C A5T/692 OPEN 1-ISV-67-641 ERCW RET ISOL CV PDP ROOM COOLER 1C A5T/692 OPERABLE 1-FCV-67-172 ERCW SUP FLOW CNTL CV CONTROL AIR ISOLATION A5T/692 OPEN 1-ISV-32-2929 VALVE TO 1-FCV-67-172 CV SI PMP 1B-B RM COOLER A6U/692 CLOSED 1-ISV-67-625-B FLUSH CONNECTION CV 1-FE-67-183 TEST POINT A7V/692 CLOSED 1-TV-67-880A CV 1-FE-67-183 TEST POINT A7V/692 CLOSED 1-TV-67-880B CV SIP ROOM COOLER 1B-B A7V/692 OPERABLE 1-FCV-67-182 ERCW SUP FLOW CNTL CV CONTROL AIR ISOLATION A7U/692 OPEN 1-ISV-32-2983 VALVE TO 1-FCV-67-182 CV SIS PMP RM CLR 1B-B A7V/692 0-PI-OPS-17.0 1-THV-67-604B ERCW RET THROTTLE LO CV PENT/PIPE CHASE RM CLR A7V/692 0-PI-OPS-17.0 1-ISV-67-607B ERCW SUP HDR 1B ISOL LO CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 174 of 204 Checklist 3 (Page 7 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL Aux Bldg el 692 CVCS CCP ROOM CLR A4T/692 0-PI-OPS-17.0 1-THV-67-601B 1B-B ERCW RET LT THROTTLE CV 1-FE-67-171 TEST POINT A4T/698 CLOSED 1-TV-67-888A CV 1-FE-67-171 TEST POINT A4T/698 CLOSED 1-TV-67-888B CV CVCS CCP ROOM CLR A4T/692 0-PI-OPS-17.0 1-ISV-67-602B 1B-B ERCW RET ISOL LO CV INSTR RM WATER CLR 1B A4W/697 OPEN 1-ISV-67-710B ERCW SUP ISOL CV SIS/CS/RHR PMP RM CLR A7V/703 0-PI-OPS-17.0 1-ISV-67-603B ERCW SUP HDR 1B ISOL LO CV PIPE CHASE CLR 1B-B A2U/703 0-PI-OPS-17.0 1-THV-67-611B ERCW RET THROTTLE LT CV 1-FE-67-345 TEST POINT A2U/700 CLOSED 1-TV-67-886A CV 1-FE-67-345 TEST POINT A2U/700 CLOSED 1-TV-67-886B CV PENT/PIPE CHASE RM A8V/703 0-PI-OPS-17.0 1-ISV-67-612B CLR ERCW RET HDR 1B LO ISOL CV SIS/CS/RHR PMP RM CLR A7V/703 0-PI-OPS-17.0 1-ISV-67-613B ERCW RET HDR 1B ISOL LO CV AUX BLDG ERCW SUP A1U/706 0-PI-OPS-17.0 1-FCV-67-82 HDR 1B ISOL LO CV ERCW SUP HDR 1B DRAIN A1U/707 CLOSED 1-DRV-67-925B CV 1-FE-67-259 TEST POINT A4W/708 CLOSED 1-TV-67-861A CV 1-FI-67-259 TEST POINT A4W/708 CLOSED 1-TV-67-861B CV 1-FI-67-251 ROOT A2U/710 OPEN 1-RTV-67-845A CV 1-FI-67-251 ROOT A2U/710 OPEN 1-RTV-67-845B CV 1-FI-67-245 ROOT A1U/710 OPEN 1-RTV-67-847B CV 1-FI-67-245 ROOT A1U/710 OPEN 1-RTV-67-847A CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 175 of 204 Checklist 3 (Page 8 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL Aux Bldg el 713 1-FI-67-247 ROOT A1V/713 OPEN 1-RTV-67-846A CV 1-FI-67-247 ROOT A1V/713 OPEN 1-RTV-67-846B CV 0-FIS-67-209 ROOT A2Q/713 OPEN 0-RTV-67-986A CV STA AIR COMPR ERCW SUP A2Q/726 CLOSED 0-VTV-67-625B HDR 1B VENT CV PENT ROOM CLR 1B-B A2U/713 0-PI-OPS-17.0 1-THV-67-609B ERCW RET THROTTLE LT CV CONTROL AIR ISOLATION A2U/713 OPEN 1-ISV-32-3147 VALVE TO 1-FCV-67-352 CV PENT ROOM COOLER 1B-B A2V/713 OPERABLE 1-FCV-67-352 ERCW SUP FLOW CNTL CV 1-FE-67-353 TEST POINT A2V/719 CLOSED 1-TV-67-884A CV 1-FE-67-353 TEST POINT A2V/719 CLOSED 1-TV-67-884B CV 0-FIS-67-209 ROOT A2Z/722 OPEN 0-RTV-67-987A CV STA AIR COMPR ERCW SUP A2Z/726 OPEN 0-FCV-67-208 HDR 1B ISOL CV CCS/AFW PMP SPACE CLR A3T/713 OPERABLE 1-FCV-67-164 1B-B ERCW SUP FLOW CNTL CV CONTROL AIR ISOL VALVE A3T/713 OPEN 1-ISV-32-3063 TO 1-FCV-67-164 CV CCS/AFW PMP SPACE CLR A3T/713 0-PI-OPS-17.0 1-ISV-67-642B 1B-B ERCW SUP ISOL LO CV CCS/AFW PMP SPACE CLR A3T/721 0-PI-OPS-17.0 1-THV-67-643B 1B-B ERCW RET THROTTLE LT CV CCS/AFW PMP SPACE CLR A3T/721 0-PI-OPS-17.0 1-ISV-67-644B 1B-B ERCW RET ISOL LO CV UPPER CNTMT VENT CLR A3U/713 OPEN 1-ISV-67-531B 1B & 1D ERCW SUP ISOL CV UPPER CNTMT VENT CLR A3U/713 OPEN 1-ISV-67-590B 1B & 1D ERCW RET ISOL CV CONTROL AIR ISOLATION A3U/713 OPEN 1-ISV-32-3159 VALVE TO 1-TCV-67-137 CV CONTROL AIR ISOLATION A3U/713 OPEN 1-ISV-32-3160 VALVE TO 1-FCV-67-140 CV UPPER CNTMT VENT CLR A3U/713 OPEN 1-ISV-67-587B 1B ERCW RET HDR ISOL CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 176 of 204 Checklist 3 (Page 9 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL Aux Bldg el 713 UPPER CNTMT VENT CLR A3U/713 OPEN 1-ISV-67-587D 1D ERCW RET HDR ISOL CV UPPER CNTMT VENT CLR A3U/713 TI-31.08 1-THV-67-588B 1B ERCW RET THROTTLE CV UPPER CNTMT VENT CLR A3U/713 TI-31.08 1-THV-67-588D 1D ERCW RET THROTTLE CV 1-TCV-67-137 BYPASS A3U/713 CLOSED 1-BYV-67-589B CV 1-TCV-67-140 BYPASS A3U/713 CLOSED 1-BYV-67-589D CV 1-FE-67-165 TEST POINT A3U/724 CLOSED 1-TV-67-897A CV 1-FE-67-165 TEST POINT A3U/724 CLOSED 1-TV-67-897B CV ERCW FLOOD MODE RET A3U/730 CLOSED 0-ISV-67-556B SFPC HX ISOL CV UPPER CNTMT VENT CLR A3V/713 OPERABLE 1-TCV-67-137 1B ERCW RET TEMP CNTL CV UPPER CNTMT VENT CLR A3V/713 OPERABLE 1-TCV-67-140 1D ERCW RET TEMP CNTL CV 1-FI-67-253 ROOT A3V/720 OPEN 1-RTV-67-844A CV 1-FI-67-253 ROOT A3V/720 OPEN 1-RTV-67-844B CV LOWER CNTMT VENT CLR A3V/732 0-PI-OPS-17.0 1-ISV-67-577B 1B & 1D ERCW RET ISOL LO CV 1-FI-67-334 ROOT A3V/733 OPEN 1-RTV-67-838A CV 1-FI-67-334 ROOT A3V/733 OPEN 1-RTV-67-838B CV 1-FI-67-335 ROOT A3V/733 OPEN 1-RTV-67-836A CV 1-FI-67-335 ROOT A3V/733 OPEN 1-RTV-67-836B CV 1-FI-67-267 ROOT A3V/733 OPEN 1-RTV-67-839A CV 1-FI-67-267 ROOT A3V/733 OPEN 1-RTV-67-839B CV 1-FI-67-269 ROOT A3V/733 OPEN 1-RTV-67-837A CV 1-FI-67-269 ROOT A3V/733 OPEN 1-RTV-67-837B CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 177 of 204 Checklist 3 (Page 10 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL Aux Bldg el 713 ERCW DISCHARGE HDR B ARV AUX / 713 (2) 0-ISV-67-1107B ISOLATION VALVE CV ERCW DISCHARGE HDR B ARV AUX / 713 CLOSED 0-TV-67-1113B TV VALVE CV ERCW DISCHARGE HDR. B AIR AUX/713 (1) 0-ARV-067-1109B RELEASE VALVE CV INSTR RM WATER CLR 1B ERCW A3W/713 OPEN 1-ISV-67-530B RET ISOL CV BIOCIDE RECIRC ERCW HDR 1B A4S/713 CLOSED 1-ISV-67-716B ISOL CV ERCW HDR B A/C EQUIP RET A4T/713 0-PI-OPS-17.0 1-ISV-67-554B ISOL LO CV BIOCIDE RECIRC ERCW HDR 1B A4T/720 CLOSED 1-ISV-67-715B ISOL CV CNTMT SPRAY HX 1B ERCW A4V/713 CLOSED 1-ISV-67-538B BIOCIDE CIRC BYP CV CNTMT SPRAY HX 1B-B ERCW A4V/730 CLOSED 1-FCV-67-124 RETURN CV UPPER CNTMT VENT CLR 1B A4V/732 CLOSED 1-TV-67-578B ERCW SUP HDR TEST CONN CV UPPER CNTMT VENT CLR 1D A4V/732 CLOSED 1-TV-67-578D ERCW SUP HDR TEST CONN CV UPPER CNTMT VENT CLR 1B A4V/732 CLOSED 1-TV-67-586B ERCW RET HDR TEST CONN CV UPPER CNTMT VENT CLR 1D A4V/732 CLOSED 1-TV-67-586D ERCW RET HDR TEST CONN CV CS HX 1B ERCW RET THROTTLE A5V/713 0-PI-OPS-17.0 1-THV-67-537B LT CV 1-FT-67-122 ROOT A5V/713 OPEN 1-RTV-67-832A CV 1-FT-67-122 ROOT A5V/713 OPEN 1-RTV-67-832B CV 1

Check 30 inch ERCW discharge header level > 26 inches above the bottom of the pipe; B train 12" ERCW header to AFW pumps header > 10 inches.

2 Valve may be full open or throttled as needed to dampen turbulence creating fluctuating water level in the 0-ARV-067-1109B.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 178 of 204 Checklist 3 (Page 11 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL TD AFW PUMP ERCW SUP A5S/730 CLOSED 1-VTV-67-945 HDR VENT CV Aux Bldg el 713 CS HX 1B ERCW DRAIN A7V/713 CLOSED 1-DRV-67-536B CV CS HX 1B ERCW VENT A7V/713 CLOSED 1-VTV-67-535B CV TD AFW PUMP ERCW SUP A8S/730 CLOSED 1-VTV-67-923 HDR VENT CV TD AFW PUMP SUP HDR A8S/723 CLOSED 1-DRV-67-946A DRAIN CV TD AFW PUMP ERCW SUP A11S/713 CLOSED 1-DRV-67-985 HDR DRAIN CV TD AFW PUMP ERCW SUP A12U/731 0-PI-OPS-17.0 1-ISV-67-924B HDR ISOL LO CV TD & MD AFWP ERCW SUP A12T/718 CLOSED 1-DRV-67-779 HDR DRN CV MCR WTR CHLR B-B ERCW A12U/731 0-PI-OPS-17.0 0-ISV-67-591B RET ISOL LO CV TD AFW PUMP ERCW SUP A12T/733 CLOSED 1-VTV-67-947A HDR VENT CV Aux Bldg el 737 ERCW FLOOD MODE SUP A3U/737 CLOSED 0-ISV-67-532B RCW/ICE COND ISOL CV PENT ROOM COOLER 1B-B A3V/737 0-PI-OPS-17.0 1-THV-67-610B ERCW RET THROTTLE LT CV CCS SURGE TNK A ERCW SUP A4T/746 CLOSED 1-ISV-67-543B HDR ISOL CV AUX BLDG AIR CLR ERCW SUP A4T/752 0-PI-OPS-17.0 1-FCV-67-128 HDR 1B ISOL LO CV CCS HX A HDR 1B ERCW SUP A4T/752 0-PI-OPS-17.0 1-FCV-67-458 LC CV MCR WTR CHLR B-B ERCW A4T/754 CLOSED 0-VTV-67-619B SUP VENT A5U/754 CV CNTMT SPRAY HX 1B ERCW A4U/737 CLOSED 1-ISV-67-533B BIOCIDE CIRC BYP CV CSS HX 1B INLETERCW FLUSH A4U/737 0-PI-OPS-17.0 1-FLV-67-925 LC CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 179 of 204 Checklist 3 (Page 12 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIF INITIAL INITIAL PENT ROOM COOLER A4V/737 OPERABLE 1-FCV-67-356 1B-B ERCW SUP FLOW CNTL CV CONTROL AIR ISOLATION A4V/737 OPEN 1-ISV-32-3295 VALVE TO 1-FCV-67-356 CV 1-FE-67-357 TEST POINT A4V/744 CLOSED 1-TV-67-885A CV 1-FE-67-357 TEST POINT A4V/744 CLOSED 1-TV-67-885B CV Aux Bldg el 737 CS HX 1B ERCW SUP HDR A5U/737 CLOSED 1-VTV-67-534B VENT CV CNTMT SPRAY HX 1B-B A5U/746 CLOSED 1-FCV-67-123 ERCW SUPPLY CV SFP/TBBP SPACE CLR A5W/737 OPERABLE 1-FCV-67-215 1B-B ERCW SUP FLOW CNTL CV CONTROL AIR ISOLATION A5W/737 OPEN 1-ISV-32-3283 VALVE TO 1-FCV-67-215 CV SFP/TBBP SPACE CLR B-B A5W/737 0-PI-OPS-17.0 1-ISV-67-645B ERCW SUP ISOL LO CV SFP/TBBP SPACE CLR B-B A5W/737 0-PI-OPS-17.0 1-THV-67-646B ERCW THROTTLE LT CV SFP/TBBP SPACE CLR A5W/737 0-PI-OPS-17.0 1-ISV-67-647B 1B-B ERCW RET ISOL LO CV 1-FE-67-216 TEST POINT A8W/750 CLOSED 1-TV-67-896A CV 1-FE-67-216 TEST POINT A8W/750 CLOSED 1-TV-67-896B CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 180 of 204 Checklist 3 (Page 13 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIF INITIAL INITIAL Aux Bldg el 737 MCR WTR CHLR B-B A12T/737 0-PI-OPS-17.0 0-ISV-67-620B ERCW SUP ISOL LO(3) CV MCR WTRCHIL B-B ERCW A12T/737 CLOSED 0-TV-67-621B SUP TEST CONN CV MCR WTR CHLR B-B A12T/737 CLOSED 0-TV-67-622B ERCW OUT TEST CONN CV MCR CHLR B-B ERCW A12T/737 CLOSED 0-DRV-67-2226 DRAIN CV 0-FE-67-202 TEST POINT A12T/737 CLOSED 0-TV-67-890A CV 0-FE-67-202 TEST POINT A12T/737 CLOSED 0-TV-67-890B CV MCR WTR CHLR B-B A12T/737 0-PI-OPS-17.0 0-THV-67-623B ERCW OUT THROTTLE LT (3)

CV MCR WTR CHLR B-B A12T/737 CLOSED 0-VTV-67-624B ERCW OUT VENT CV (4)

ERCW B DISC HDR VENT A12T/730 CLOSED 0-VTV-67-1111 CV C CCS HX ERCW INLET A5S/742 CLOSED 0-RTV-67-1063 TEST CONN RTV CV C CCS HX ERCW OUTLET A10S/742 CLOSED 0-RTV-67-1064 TEST CONN RTV CV (3) See Precaution and Limitation R.

(4) 0-VTV-67-1111 capped.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 181 of 204 Checklist 3 (Page 14 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U1 Annulus LOWER CNTMT CLR Annulus OPEN 1-FCV-67-99 HDR B ERCW SUP ISOL 718/Az 180 CV LOWER CNTMT CLR Annulus CLOSED 1-VTV-67-693B HDR B ERCW RET VENT 718/Az 177 CV LOWER CNTMT CLR Annulus CLOSED 1-VTV-67-694B HDR B ERCW SUP VENT 718/Az 173 CV LOWER CNTMT CLR Annulus OPEN 1-FCV-67-104 HDR B ERCW RET ISOL 720/Az 171 CV LOWER CNTMT CLR Annulus OPEN 1-FCV-67-107 HDR D ERCW SUP ISOL 715/Az 353 CV LOWER CNTMT CLR Annulus OPEN 1-FCV-67-112 HDR D ERCW RET ISOL 715/Az 350 CV LOWER CNTMT CLR Annulus CLOSED 1-VTV-67-694D HDR D ERCW SUP VENT 717/Az 351 CV LOWER CNTMT CLR Annulus CLOSED 1-VTV-67-693D HDR D ERCW RET VENT 721/Az 346 CV UPPER CNTMT VENT CLR Annulus OPEN 1-FCV-67-141 1D ERCW SUP HDR ISOL 795/Az 315 CV UPPER CNTMT VENT CLR Annulus OPEN 1-FCV-67-142 1D ERCW RET HDR ISOL 795/Az 315 CV UPPER CNTMT VENT CLR Annulus CLOSED 1-VTV-67-689B 1B ERCW SUP HDR VENT 795/Az 315q CV UPPER CNTMT VENT CLR Annulus CLOSED 1-VTV-67-689D 1D ERCW SUP HDR VENT 795/Az 315q CV UPPER CNTMT VENT CLR Annulus CLOSED 1-VTV-67-688B 1B ERCW SUP HDR VENT 798/Az 315q CV UPPER CNTMT VENT CLR Annulus CLOSED 1-VTV-67-688D 1D ERCW SUP HDR VENT 798/AZ 315 CV UPPER CNTMT VENT CLR Annulus OPEN 1-FCV-67-138 1B ERCW SUP HDR ISOL 798/Az 315 CV UPPER CNTMT VENT CLR Annulus OPEN 1-FCV-67-139 1B ERCW RET HDR ISOL 795/Az 315 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 182 of 204 Checklist 3 (Page 15 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID INITIAL INITIAL U1 Containment - #2 Fan Rm LWR CNTMT VENT CLR #2 Fan Rm CLOSED 1-VTV-67-698B B-B ERCW SUP HDR VENT IC/727 Az 152 CV 1-FE-67-474 TEST POINT #2 Fan Rm CLOSED 1-TV-67-921A IC/724 Az 156 CV 1-FE-67-474 TEST POINT #2 Fan Rm CLOSED 1-TV-67-921B IC/724 Az 156 CV LWR CNTMT VENT CLR #2 Fan Rm CLOSED 1-VTV-67-699B 1B-B ERCW RET HDR IC/725 VENT Az 165 CV RCP 2 MTR CLR ERCW #2 Fan Rm OPERABLE 1-TCV-67-102 SUP CNTL IC/725 Az 167 CV CONTROL AIR ISOLATION #2 Fan Rm OPEN 1-ISV-32-3564 VALVE TO 1-TCV-67-102 IC/725 Az 167 CV LWR CNTMT VENT CLR #2 Fan Rm OPERABLE 1-TCV-67-100 1B-B OUT TEMP CNTL IC/723 Az 168 CV CONTROL AIR ISOLATION #2 Fan Rm OPEN 1-ISV-32-3563 VALVE TO 1-TCV-67-100 IC/723 Az 168 CV LOWER CNTMT CLR #2 Fan Rm OPEN 1-FCV-67-103 HDR B ERCW RET ISOL IC/720 Az 171 CV RCP 2 MTR CLR ERCW #2 Fan Rm TI-31.08 1-THV-67-572B RET HDR THROTTLE IC/725 Az 171 CV LOWER CNTMT CLR #2 Fan Rm CLOSED 1-TV-67-574B HDR B ERCW RET TEST IC/720 CONN Az 171 CV LOWER CNTMT CLR HDR #2 Fan Rm CLOSED 1-VTV-67-695B ERCW RET VENT IC/726 Az 171 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 183 of 204 Checklist 3 (Page 16 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U1 Containment - #2 Fan Rm LOWER CNTMT CLR HDR #2 Fan Rm 0-PI-OPS-17.0 1-ISV-67-1005B B ERCW RET ISOL IC/726 Az 171 CV CRD VENT CLR 1B-B OUT #2 Fan Rm OPERABLE 1-TCV-67-101 TEMP CNTL IC/727 Az 171 CV CONTROL AIR ISOLATION #2 Fan Rm OPEN 1-ISV-32-3565 VALVE TO 1-TCV-67-101 IC/727 Az 171 CV LOWER CNTMT CLR #2 Fan Rm CLOSED (5) 1-DRV-67-773 HDR B ERCW RET DRAIN IC/716 Az 172 CV LOWER CNTMT CLR #2 Fan Rm CLOSED (5) 1-DRV-67-774 HDR B ERCW SUP DRAIN IC/716 Az 172 CV LOWER CNTMT CLR OPEN 1-FCV-67-105

  1. 2 Fan Rm HDR B ERCW SUP ISOL IC/720 Az 173 CV LOWER CNTMT CLR #2 Fan Rm CLOSED 1-TV-67-563B HDR B ERCW SUP HDR IC/720 TEST CONN Az 173 CV LWR CNTMT VENT CLR #2 Fan Rm 0-PI-OPS-17.0 1-THV-67-564B 1B-B ERCW SUP HDR IC/726 LT THROTTLE Az 173 CV LOWER CNTMT CLR #2 Fan Rm 0-PI-OPS-17.0 1-ISV-67-1004B HDR B ERCW SUP ISOL IC/726 LO Az 173 CV CRD VENT CLR 1B-B #2 Fan Rm TI-31.08 1-THV-67-567B ERCW SUP HDR IC/726 THROTTLE Az 353 CV (5) VERIFY blind flange or threaded cap INSTALLED.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 184 of 204 Checklist 3 (Page 17 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U1 Containment - #1 Fan Rm CRD VENT CLR 1D-B ERCW #1 Fan Rm TI-31.08 1-THV-67-567D SUP HDR THROTTLE IC/726 Az 173 CV LOWER CNTMT CLR HDR D #1 Fan Rm CLOSED 1-DRV-67-771 ERCW RET DRAIN IC/718 Az 353 CV LOWER CNTMT CLR HDR D #1 Fan Rm CLOSED 1-DRV-67-772 ERCW SUP DRAIN IC/718 Az 351 CV LOWER CNTMT CLR HDR D #1 Fan Rm OPEN 1-FCV-67-111 ERCW RET ISOL IC/720 Az 357 CV LOWER CNTMT CLR HDR D #1 Fan Rm OPEN 1-FCV-67-113 ERCW SUP ISOL IC/720 Az 353 CV LOWER CNTMT CLR HDR D #1 Fan Rm CLOSED 1-TV-67-563D ERCW SUP HDR TEST CONN IC/720 Az 353 CV LOWER CNTMT CLR HDR D #1 Fan Rm CLOSED 1-TV-67-574D ERCW RET TEST CONN IC/720 Az 351 CV LWR CNTMT VENT CLR 1D-B #1 Fan Rm OPERABLE 1-TCV-67-108 OUT TEMP CNTL IC/723 Az 349 CV CONTROL AIR ISOLATION #1 Fan Rm OPEN 1-ISV-32-3605 VALVE TO 1-TCV-67-108 IC/723 Az 349 CV 1-FE-67-476 TEST POINT #1 Fan Rm CLOSED 1-TV-67-922A IC/724 Az 336 CV 1-FE-67-476 TEST POINT #1 Fan Rm CLOSED 1-TV-67-922B IC/724 Az 336 CV CRD VENT CLR 1D-B OUT #1 Fan Rm OPERABLE 1-TCV-67-109 TEMP CNTL IC/725 Az 351 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 185 of 204 Checklist 3 (Page 18 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U1 Containment - #1 Fan Rm LWR CNTMT VENT CLR #1 Fan Rm CLOSED 1-VTV-67-698D D-B ERCW SUP HDR VENT IC/727 Az 332 CV LOWER CNTMT VENT CLR #1 Fan Rm CLOSED 1-VTV-67-699D D-B ERCW RET HDR VENT IC/725 Az 345 CV RCP 4 MTR CLR ERCW #1 Fan Rm OPERABLE 1-TCV-67-110 SUP CNTL IC/727 Az 347 CV CONTROL AIR ISOLATION #1 Fan Rm OPEN 1-ISV-32-3607 VALVE TO 1-TCV-67-110 IC/727 Az 347 CV CONTROL AIR ISOLATION #1 Fan Rm OPEN 1-ISV-32-3606 VALVE TO 1-TCV-67-109 IC/725 Az 351 CV RCP 4 MTR CLR ERCW #1 Fan Rm TI-31.08 1-THV-67-572D RET HDR THROTTLE IC/725 Az 351 CV LOWER CNTMT CLR HDR #1 Fan Rm CLOSED 1-VTV-67-695D ERCW RET VENT IC/726 Az 351 CV LOWER CNTMT CLR #1 Fan Rm 0-PI-OPS-17.0 1-ISV-67-1005D HDR D ERCW RET ISOL IC/726 Az 351 CV LWR CNTMT VENT CLR #1 Fan Rm 0-PI-OPS-17.0 1-THV-67-564D 1D-B ERCW SUP HDR IC/726 THROTTLE Az 353 CV LOWER CNTMT CLR #1 Fan Rm 0-PI-OPS-17.0 1-ISV-67-1004D HDR D ERCW SUP ISOL IC/726 Az 353 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 186 of 204 Checklist 3 (Page 19 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U1 Containment UPPER CNTMT VENT CLR 1B IC/805 OPEN 1-ISV-67-691B ERCW SUP HDR ISOL Az 135(1) CV RCP MTR CLR 2 ERCW IN IC/732 CLOSED 1-VTV-67-700B SUP VENT Az 137 CV UPPER CNTMT VENT CLR 1B IC/808 OPEN 1-ISV-67-583B ERCW RET HDR ISOL Az 143(1) CV 1-FE-67-249 TEST POINT IC/729 CLOSED 1-TV-67-863A Az 143 CV 1-FE-67-249 TEST POINT IC/729 CLOSED 1-TV-67-863B Az 143 CV UPPER CNTMT VENT CLR 1B IC/807 OPEN 1-ISV-67-692B ERCW RET HDR ISOL Az 150(1) CV UPPER CNTMT VENT CLR 1B IC/808 LC & CAPPED 1-TV-67-579B ERCW SUP HDR TEST CONN Az 150(1) CV UPPER CNTMT VENT CLR 1B IC/808 CLOSED 1-TV-67-581B ERCW SUP HDR TEST CONN Az 150(1) CV UPPER CNTMT VENT CLR 1B IC/809 CLOSED 1-TV-67-690B ERCW SUP HDR TEST VENT Az 150(1) CV UPPER CNTMT VENT CLR 1B IC/807 OPEN 1-FCV-67-297 ERCW RET ISOL Az 152(1) CV UPPER CNTMT VENT CLR 1B IC/807 CLOSED 1-TV-67-1211 ERCW RET HDR TEST VALVE Az 152(1) CV UPPER CNTMT VENT CLR 1B IC/808 CLOSED 1-TV-67-584B ERCW RET HDR TEST CONN Az 155(1) CV RCP MTR CLR 2 ERCW RET IC/726 CLOSED 1-VTV-67-696B HDR VENT Az 171 CV 1-FE-67-477 TEST POINT IC/730 CLOSED 1-TV-67-913 Az 189 CV 1-FE-67-477 TEST POINT IC/730 CLOSED 1-TV-67-914 Az 189 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 187 of 204 Checklist 3 (Page 20 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U1 Containment UPPER CNTMT VENT CLR 1D IC/805 OPEN 1-ISV-67-691D ERCW SUP HDR ISOL Az 225(6) CV UPPER CNTMT VENT CLR 1D IC/789 LC & CAPPED 1-DRV-67-764 ERCW RET HDR DRAIN Az 300(7) CV UPPER CNTMT VENT CLR 1D IC/790 LC & CAPPED 1-DRV-67-763 ERCW SUP HDR DRAIN Az 300(2) CV UPPER CNTMT VENT CLR 1B IC/793 LC & CAPPED 1-DRV-67-765 ERCW SUP HDR DRAIN Az 3002) CV UPPER CNTMT VENT CLR 1B IC/794 LC & CAPPED 1-DRV-67-766 ERCW RET HDR DRAIN Az 300(2) CV UPPER CNTMT VENT CLR 1D IC/807 CLOSED 1-TV-67-690D ERCW SUP HDR TEST VENT Az 318(1) CV RCP MTR CLR 4 ERCW IN IC/732 CLOSED 1-VTV-67-700D SUP VENT Az 319 CV 1-FE-67-255 TEST POINT IC/729 CLOSED 1-TV-67-862A Az 325 CV 1-FE-67-255 TEST POINT IC/729 CLOSED 1-TV-67-862B Az 325 CV RCP VENT CLR 4 SUP ERCW IC/729 CLOSED 1-DRV-67-1001 HDR DRAIN Az 325 CV UPPER CNTMT VENT CLR 1D IC/808 OPEN 1-ISV-67-583D ERCW RET HDR ISOL Az 325(1) CV UPPER CNTMT VENT CLR 1D IC 807 OPEN 1-ISV-67-692D ERCW RET HDR ISOL Az 330(1) CV UPPER CNTMT VENT CLR 1D IC/808 LC & CAPPED 1-TV-67-579D ERCW SUP HDR TEST CONN Az 330(1) CV UPPER CNTMT VENT CLR 1D IC/808 CLOSED 1-TV-67-581D ERCW SUP HDR TEST CONN Az 330(1) CV UPPER CNTMT VENT CLR 1D IC/807 OPEN 1-FCV-67-298 ERCW RET ISOL Az 332(1) CV UPPER CNTMT VENT CLR 1D IC/807 CLOSED 1-TV-67-1213 ERCW RET HDR TEST VALVE Az 332(1) CV (6) Top of S/G doghouse.

(7) Next to spiral staircase.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 188 of 204 Checklist 3 (Page 21 of 21)

SUPPLY HDR 1B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U1 Containment RCP MTR CLR 4 ERCW RET IC/726 CLOSED 1-VTV-67-696D HDR VENT Az 351 CV 1-FE-67-475 TEST POINT IC/720 CLOSED 1-TV-67-911 Az 351 CV 1-FE-67-475 TEST POINT IC/720 CLOSED 1-TV-67-912 Az 351 CV CRD VENT CLR D-B RET IC/720 CLOSED 1-DRV-67-999 ERCW HDR DRAIN Az 351 CV CRD VENT CLR D-B SUP IC/726 CLOSED 1-DRV-67-997 ERCW HDR DRAIN Az 353 CV UPPER CNTMT VENT CLR 1D IC/808 CLOSED 1-TV-67-584D ERCW RET HDR TEST CONN Az 355(8) CV (8) Top of S/G doghouse.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 189 of 204 Checklist 4 (Page 1 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL IPS el 722 ERCW STRAINER 2B-B INLET IPS/722 0-PI-OPS-17.0 2-FCV-67-24 ISOL LO CV ERCW STRAINER 2B-B OUT IPS/722 0-PI-OPS-17.0 2-ISV-67-505B ISOL LO CV ERCW B TRAIN HDR IPS/722 CLOSED 2-ISV-67-1120 CROSSTIE ISOL CV ERCW CROSS-TIE HEADER IPS/722 CLOSED 2-DRV-67-1126 DRAIN CV 2-PDT-67-10A/10D/10F & IPS/722 OPEN 2-RTV-67-901A 2-PI-67-10A ROOT CV 2-PDT-67-10A/2-PI-67-10B IPS/722 OPEN 2-RTV-67-902A ROOT CV ERCW STRAINER 2B-B VENT IPS/722 CLOSED 2-VTV-67-907B CV 2-PDT-67-10F ROOT IPS/722 OPEN 2-RTV-67-925A CV 2-PDT-67-10D ROOT IPS/722 OPEN 2-RTV-67-926A CV ERCW STRAINER 2B-B IPS/722 CLOSED 2-FCV-67-10A BACKWASH CV ERCW STRAINER 2B-B FLUSH IPS/722 CLOSED 2-FCV-67-10B CV Yard el 729 ERCW HDR 2B BACKWASH YARD 0-PI-OPS-17.0 2-ISV-67-506B ISOL LC CV DG 1A-A/2A-A ERCW SUP YARD 0-PI-OPS-17.0 2-ISV-67-507B HDR 2B ISOL LO CV 2-FT-67-62/2-FT-67-62C ROOT YARD OPEN 2-RTV-67-802A CV 2-FT-67-62/2-FT-67-62C ROOT YARD OPEN 2-RTV-67-802B CV DG Bldg DG HX 1A1/1A2 ERCW SUP DGB CLOSED 1-FCV-67-68 HDR 2B ISOL RM 1AA CV DG HX 2A1/2A2 ERCW SUP DGB CLOSED 2-FCV-67-68 HDR 2B ISOL RM 2AA CV (1)

DG 2A-A FLUSH CONNECTION DGB CLOSED 2-FLV-67-651A FOR ERCW HDR 2B RM 2AA CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 190 of 204 Checklist 4 (Page 2 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL DG 1A-A FLUSH CONNECTION FOR DGB CLOSED 1-FLV-67-651A(1

)

ERCW HDR 2B RM 1AA CV Aux Bldg el 676 RHRP ROOM COOLER 2B-B ERCW SUP A7V/676 OPEN 2-FCV-67-190 FLOW CNTL CV RHR PMP RM CLR 2B-B ERCW RET A7V/676 OPEN 2-THV-67-606B THROTTLE CV 2-FE-67-191 TEST POINT A9V/682 CLOSED 2-TV-67-882A CV 2-FE-67-191 TEST POINT A9V/682 CLOSED 2-TV-67-882A CV CS PMP RM CLR 2A-A ERCW RET A9U/679 CLOSED 2-THV-67-605B THROTTLE CV 2-FE-67-187 TEST POINT A9U/681 CLOSED 2-TV-67-881A CV 2-FE-67-187 TEST POINT A9U/681 CLOSED 2-TV-67-881B CV CSP ROOM COOLER 2B-B ERCW SUP A7U/676 CLOSED 2-FCV-67-186 FLOW CNTL CV Aux Bldg el 692 ERCW SUP HDR 2B DRAIN A15U/706 CLOSED 2-DRV-67-925B CV PIPE CHASE COOLER 2B-B ERCW RET A14U/692 0-PI-OPS-17.0 2-THV-67-611B THROTTLE LT CV (1)

PIPE CHASE COOLER 2B-B ERCW SUP A14U/692 0-PI-OPS-17.0 2-FCV-67-344 FLOW CNTL LO CV CONTROL AIR ISO VLV TO A14U/692 0-PI-OPS-17.0 2-ISV-32-3805 2-FCV-67-344 LC CV (1)

PENT ROOM COOLER 2B-B ERCW SUP A12V/692 0-PI-OPS-17.0 2-FCV-67-348 FLOW CNTL LO CV CONTROL AIR ISO VLV TO A12U/692 0-PI-OPS-17.0 2-ISV-32-2964 2-FCV-67-348 LC CV 2-FE-67-349 TEST POINT A12V/692 CLOSED 2-TV-67-883A CV 2-FE-67-349 TEST POINT A12V/692 CLOSED 2-TV-67-883B CV 2-FE-67-345 TEST POINT A14U/692 CLOSED 2-TV-67-886A CV 2-FE-67-345 TEST POINT A14U/692 CLOSED 2-TV-67-886B CV PENT ROOM COOLER 2B-B ERCW RET A12V/702 0-PI-OPS-17.0 2-THV-67-608B THROTTLE LT CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 191 of 204 Checklist 4 (Page 3 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL PENT/PIPE CHASE RM CLR ERCW SUP A8V/703 0-PI-OPS-17.0 2-ISV-67-607B HDR 2B ISOL LO CV PENT/PIPE CHASE RM CLR ERCW RET A8V/703 0-PI-OPS-17.0 2-ISV-67-612B HDR 2B ISOL LO CV AUX BLDG ERCW SUP HDR 2B ISOL A15U/706 0-PI-OPS-17.0 2-FCV-67-82 LO CV CVCS CCP ROOM CLR 2B-B ERCW A12T/695 OPEN 2-ISV-67-600B SUP ISOL CV Aux Bldg el 692 CVCS CCP ROOM CLR 2B-B ERCW A12T/695 OPEN 2-ISV-67-602B RET ISOL CV SIS PMP RM CLR 2B-B ERCW RET A7V/696 CLOSED 2-THV-67-604B THROTTLE CV 2-FE-67-183 TEST POINT A7V/692 CLOSED 2-TV-67-880A CV 2-FE-67-183 TEST POINT A7V/692 CLOSED 2-TV-67-880A CV SIP ROOM COOLER 2B-B ERCW SUP A7V/692 CLOSED 2-FCV-67-182 FLOW CNTL CV INSTR RM WATER CLR 2B ERCW SUP A2U/692 OPEN 2-ISV-67-524B ISOL CV INSTR RM WATER CLR 2B ERCW SUP A5W/697 OPEN 2-ISV-67-710B ISOL CV INSTR RM WATER CLR 2B ERCW SUP A11W/693 OPEN 2-TCV-67-118 TEMP CNTL CV INSTR RM WATER CLR 2B ERCW IN A5W/692 CLOSED 2-TV-67-525B TEST CONN CV INSTR RM WATER CLR 2B ERCW OUT A5W/692 CLOSED 2-TV-67-526B TEST CONN CV 2-FE-67-259 TEST POINT A12W/708 CLOSED 2-RTV-67-861A CV 2-FE-67-259 TEST POINT A12W/708 CLOSED 2-RTV-67-861B CV INSTR RM WATER CLR 2B ERCW RET A4W/692 OPEN 2-THV-67-527B THROTTLE CV INSTR RM WATER CLR 2B ERCW RET A11W/692 OPEN 2-ISV-67-530B ISOL CV LOWER CNTMT CLR HDR B ERCW RET A2U/692 CLOSED 2-TV-67-576B TEST CONN CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 192 of 204 Checklist 4 (Page 4 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL LOWER CNTMT CLR HDR D ERCW RET A14U/692 CLOSED 2-TV-67-576D TEST CONN CV LOWER CNTMT CLR HDR B ERCW SUP A2U/692 CLOSED 2-TV-67-560B HDR TEST CONN CV LOWER CNTMT CLR HDR D ERCW SUP A14U/692 CLOSED 2-TV-67-560D HDR TEST CONN CV 2-FI-67-245 ROOT A1U/692 OPEN 2-RTV-67-847A CV 2-FI-67-245 ROOT A1U/692 OPEN 2-RTV-67-847B CV 2-FI-67-251 ROOT A2U/692 OPEN 2-RTV-67-845A CV 2-FI-67-251 ROOT A2U/692 OPEN 2-RTV-67-845B CV LOWER CNTMT CLR HDR B ERCW RET A2U/692 CLOSED 2-TV-67-576B TEST CONN CV LOWER CNTMT CLR HDR D ERCW RET A14U/692 CLOSED 2-TV-67-576D TEST CONN CV LOWER CNTMT VENT CLR 2B & 2D A2U/692 OPEN 2-ISV-67-523B ERCW SUP ISOL CV ERCW FLOOD MODE RET HDR B ISOL A14V/692 CLOSED 0-ISV-67-528B CV BIOCIDE RECIRC ERCW HDR 2B ISOL A4T/695 CLOSED 2-ISV-67-715B CV CVCS PDP RM CLR 2C ERCW SUP A11T/692 OPEN 2-ISV-67-639 ISOL CV CVCS PDP RM CLR 2B-B ERCW RET A11T/692 OPEN 2-ISV-67-641 ISOL CV SIS/CS/RHR PMP RM CLR ERCW RET A8V/692 OPEN 2-ISV-67-613B HDR 2B ISOL CV SIS/CS/RHR PMP RM CLR ERCW SUP A7V/703 OPEN 2-ISV-67-603B HDR 2B ISOL CV Aux Bldg el 713 PENT ROOM COOLER 2B-B ERCW SUP A14V/713 0-PI-OPS-17.0 2-FCV-67-352 FLOW CNTL LO CV CONTROL AIR ISOLATION VALVE TO A14U/713 0-PI-OPS-17.0 2-ISV-32-3167 2-FCV-67-352 LC CV BA XFER/AFW PMP SPACE CLR 2B-B A15T/713 0-PI-OPS-17.0 2-THV-67-673B ERCW THROTTLE LT CV BA XFER/AFW PMP SPACE CLR 2B-B A15T/713 0-PI-OPS-17.0 2-ISV-67-674B ERCW RET ISOL LO CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 193 of 204 Checklist 4 (Page 5 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL 2-FI-67-247 ROOT A14V/713 OPEN 2-RTV-67-846A CV 2-FI-67-247 ROOT A14V/713 OPEN 2-RTV-67-846B CV 2-FI-67-253 ROOT A13V/713 OPEN 2-RTV-67-844A CV 2-FI-67-253 ROOT A13V/713 OPEN 2-RTV-67-844B CV 2-FI-67-335 ROOT A3V/713 OPEN 2-RTV-67-836A CV 2-FI-67-335 ROOT A3V/713 OPEN 2-RTV-67-836B CV 2-FI-67-269 ROOT A3V/713 OPEN 2-RTV-67-837A CV 2-FI-67-269 ROOT A3V/713 OPEN 2-RTV-67-837B CV 2-FI-67-334 ROOT A3V/730 OPEN 2-RTV-67-838A CV 2-FI-67-334 ROOT A3V/730 OPEN 2-RTV-67-838B CV 2-FI-67-267 ROOT A3V/713 OPEN 2-RTV-67-839A CV 2-FI-67-267 ROOT A3V/713 OPEN 2-RTV-67-839B CV UPPER CNTMT VENT CLR 2D ERCW A3V/713 OPERABLE 2-TCV-67-140 RET TEMP CNTL CV CONTROL AIR ISOLATION VALVE TO A3V/713 OPEN 2-ISV-32-3115 2-FCV-67-140 CV UPPER CNTMT VENT CLR 2B ERCW A3V/713 OPERABLE 2-TCV-67-137 RET TEMP CNTL CV CONTROL AIR ISOLATION VALVE TO A3V/713 OPEN 2-ISV-32-3116 2-FCV-67-137 CV UPPER CTNMT VENT CLR 2D ERCW A13U/713 OPEN 2-THV-67-588D RET THROTTLE CV UPPER CNTMT VENT CLR 2D ERCW A3U/713 OPEN 2-ISV-67-587D RET HDR ISOL CV UPPER CTNMT VENT CLR 2B ERCW A13U/713 OPEN 2-THV-67-588B RET THROTTLE CV UPPER CNTMT VENT CLR 2B ERCW A3U/713 OPEN 2-ISV-67-587D RET HDR ISOL CV LOWER CNTMT VENT CLR 2B & 2D A3V/732 OPEN 2-ISV-67-577B ERCW RET ISOL CV UPPER CNTMT VENT CLR 2B & 2D A3U/713 OPEN 2-ISV-67-590B ERCW RET ISOL CV TD AFW PUMP ERCW SUP HDR ISOL A12U/731 CLOSED 2-ISV-67-924B CV 2-FE-67-220 TEST POINT A15T/713 CLOSED 2-TV-67-878A CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 194 of 204 Checklist 4 (Page 6 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL Aux Bldg el 713 2-FE-67-220 TEST POINT A15T/713 CLOSED 2-TV-67-878B CV PENT ROOM COOLER 2B-B ERCW A14U/713 0-PI-OPS-17.0 2-THV-67-609 RET THROTTLE LT B CV 2-FE-67-353 TEST POINT A14V/713 CLOSED 2-TV-67-884A CV 2-FE-67-353 TEST POINT A14V/713 CLOSED 2-TV-67-884B CV CSS HX 2B ERCW BIOCIDE CIRC A12V/715 OPEN 2-ISV-67-538B BYP CV BA XFER/AFW PMP SPACE CLR A15T/713 OPERABLE 2-FCV-67-219 2B-B ERCW FLOW CNTL CV CONTROL AIR ISOLATION VALVE A15T/713 OPEN 2-ISV-32-3031 TO 2-FCV-67-219 CV BA XFER/AFW PMP SPACE CLR A15T/713 0-PI-OPS-17.0 2-ISV-67-648B 2B-B ERCW SUP ISOL LO CV CCS HX C OUTLET ERCW FLOW A11S/737 0-PI-OPS-17.0 0-ISV-67-553 CNTL ISOL LO CV 2-FE-67-159 TEST POINT A13R/744 CLOSED 2-TV-67-822A CV 2-FE-67-159 TEST POINT A13R/744 CLOSED 2-TV-67-822B CV ERCW HDR 2B A/C EQUIP RET A12T/735 0-PI-OPS-17.0 2-ISV-67-554B ISOL LO CV CS HX 2B ERCW DRAIN A9V/713 CLOSED 2-DRV 536B CV CS HX 2B CS HX 2B A9V/730 OPEN 2-ISV-67-537B CV CNTMT SPRAY HX 2B-B ERCW A13V/713 CLOSED 2-FCV-67-124 RETURN CV UPPER CNTMT VENT CLR 2B A13V/732 CLOSED 2-TV-67-586B ERCW RET HDR TEST CONN CV UPPER CNTMT VENT CLR 2D A13V/732 CLOSED 2-TV-67-586D ERCW RET HDR TEST CONN CV UPPER CNTMT VENT CLR 2B & 2D A13U/713 OPEN 2-ISV-67-531B ERCW SUP ISOL CV Aux Bldg el 737 CSS HX 2B ERCW BIOCIDE CIRC A12U/737 OPEN 2-ISV-67-533B BYP CV CCS HX C ERCW VENT A5T/737 CLOSED 0-VTV-67-540 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 195 of 204 Checklist 4 (Page 7 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL CCS HX C ERCW VENT A10T/737 CLOSED 0-VTV-67-541 CV SD BD ROOM A/C CHLR B-B ERCW A13R/737 0-PI-OPS-17.0 2-THV-67-555 RET THROTTLE LT CV PENT ROOM COOLER 2B-B ERCW A12V/737 OPERABLE 2-FCV-67-356 SUP FLOW CNTL CV CONTROL AIR ISOLATION VALVE A12V/737 OPEN 2-ISV-32-3323 TO 2-FCV-67-356 CV PENT ROOM COOLER 2B-B ERCW A12V/737 0-PI-OPS-17.0 2-THV-67-610 RET THROTTLE LT B CV 2-FE-67-357 TEST POINT A11V/737 CLOSED 2-TV-67-885A CV 2-FE-67-357 TEST POINT A11V/737 CLOSED 2-TV-67-885B CV 2-TCV-67-137 BYPASS A3V/713 CLOSED 2-BYV-67-589 B CV 2-TCV-67-137 BYPASS A3V/713 CLOSED 2-BYV-67-589 D CV SD BD ROOM A/C CHLR B-B ERCW A13R/740 CLOSED 2-TV-67-676 SUP TEST CONN CV SD BD ROOM A/C CHLR B-B ERCW A13R/740 CLOSED 2-TV-67-677 RET TEST CONN CV CCS HX C OUTLET ERCW HDR B A10T/746 OPERABLE 0-FCV-67-152 FLOW CNTL CV CCS SURGE TANK B ERCW SUP A13T/749 CLOSED 2-ISV-67-543B HDR 2B ISOL CV CCS HX C ERCW HDR 2B SUPPLY A3S/752 0-PI-OPS-17.0 2-FCV-67-147 ISOL LO CV SD BD ROOM A/C CHLR B-B ERCW A12R/752 (1) 2-ISV-67-675 SUP ISOL 0-PI-OPS-17.0 LO CV ERCW RETURN HDR 2B VENT A12T/752 CLOSED 2-VTV-67-994 CV EGTS ROOM COOLER B ERCW A12V/753 CLOSED 2-DRV-67-993 RET HDR DRAIN CV EGTS ROOM COOLER B ERCW A12V/753 CLOSED 2-DRV-67-995 SUP HDR DRAIN CV CNTMT SPRAY HX 2B-B ERCW A13U/737 CLOSED 2-FCV-67-123 SUPPLY CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 196 of 204 Checklist 4 (Page 8 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL CS HX 2B ERCW SUP HDR VENT A12U/737 CLOSED 2-VTV-67-534B CV CS HX 2B ERCW VENT A9V/745 CLOSED 2-VTV-67-535B CV Aux Bldg el 737 AUX BLDG AIR CLR ERCW SUP A12T/754 0-PI-OPS-17.0 2-FCV-67-128 HDR 2B ISOL LO CV 2-FE-67-340 TEST POINT A9U/754 CLOSED 2-TV-67-877A CV 2-FE-67-340 TEST POINT A9U/754 CLOSED 2-TV-67-877B CV Aux Bldg el 757 AUX CNTL AIR COMPR B-B ERCW A9U/757 0-PI-OPS-17.0 2-ISV-67-680 SUP ISOL LO CV AUX CNTL AIR COMPR B-B ERCW A9U/757 0-PI-OPS-17.0 0-BYV-67-682 INLET BYPASS LC CV AUX CNTL AIR COMPR B ERCW A9U/757 0-PI-OPS-17.0 0-ISV-67-681A SUP ISOL LO CV AUX CNTL AIR COMPR B ERCW A9U/757 0-PI-OPS-17.0 0-ISV-67-681B SUP ISOL LO CV AUX CNTL AIR COMPR B-B ERCW A9U/757 0-PI-OPS-17.0 2-THV-67-683 RET THROTTLE LT CV EGTS ROOM COOLER 2B-B ERCW EGTS 0-PI-OPS-17.0 2-THV-67-685 RET THROTTLE ROOM LT B A12W/757 CV 2-FE-67-339 TEST POINT EGTS CLOSED 2-TV-67-876A ROOM A12W/757 CV 2-FE-67-339 TEST POINT EGTS CLOSED 2-TV-67-876B ROOM A12W/757 CV EGTS ROOM COOLER 2B-B ERCW EGTS OPERABLE 2-FCV-67-338 SUPPLY FLOW CNTL ROOM A11W/772 CV CONTROL AIR ISOLATION VALVE EGTS OPEN 2-ISV-32-3410 TO 2-FCV-67-338 ROOM A11W/772 CV EGTS ROOM COOLER 2B-B ERCW EGTS 0-PI-OPS-17.0 2-ISV-67-684B SUP ISOL ROOM LO A11W/772 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 197 of 204 Checklist 4 (Page 9 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U2 Annulus LOWER CNTMT CLR HDR B ERCW Annulus OPEN 2-FCV-67-99 SUP ISOL 718/Az 180 CV LOWER CNTMT CLR HDR B ERCW Annulus CLOSED 2-VTV-67-693B RET VENT 718/Az 177 CV LOWER CNTMT CLR HDR B ERCW Annulus CLOSED 2-VTV-67-694B SUP VENT 718/Az 173 CV LOWER CNTMT CLR HDR B ERCW Annulus OPEN 2-FCV-67-104 RET ISOL 720/Az 171 CV LOWER CNTMT CLR HDR D ERCW Annulus OPEN 2-FCV-67-107 SUP ISOL 715/Az 353 CV LOWER CNTMT CLR HDR D ERCW Annulus OPEN 2-FCV-67-112 RET ISOL 715/Az 350 CV LOWER CNTMT CLR HDR D ERCW Annulus CLOSED 2-VTV-67-694 SUP VENT 717/Az 351 D CV LOWER CNTMT CLR HDR D ERCW Annulus CLOSED 2-VTV-67-693 RET VENT 721/Az 346 D CV UPPER CNTMT VENT CLR 2D Annulus OPEN 2-FCV-67-141 ERCW SUP HDR ISOL 795/Az 315 CV UPPER CNTMT VENT CLR 2D Annulus OPEN 2-FCV-67-142 ERCW RET HDR ISOL 795/Az 315 CV UPPER CNTMT VENT CLR 2B Annulus CLOSED 2-VTV-67-689B ERCW SUP HDR VENT 795/Az 315q CV UPPER CNTMT VENT CLR 2D Annulus CLOSED 2-VTV-67-689 ERCW SUP HDR VENT 795/Az 315q D CV UPPER CNTMT VENT CLR 2B Annulus CLOSED 2-VTV-67-688B ERCW SUP HDR VENT 798/Az 315q CV UPPER CNTMT VENT CLR 2D Annulus CLOSED 2-VTV-67-688 ERCW SUP HDR VENT 798/AZ 315 D CV UPPER CNTMT VENT CLR 2B Annulus OPEN 2-FCV-67-138 ERCW SUP HDR ISOL 798/Az 315 CV UPPER CNTMT VENT CLR 2B Annulus OPEN 2-FCV-67-139 ERCW RET HDR ISOL 795/Az 315 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 198 of 204 Checklist 4 (Page 10 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U2 Containment - #2 Fan Rm LWR CNTMT VENT CLR B-B ERCW #2 Fan Rm CLOSED 2-VTV-67-698B SUP HDR VENT IC/727 Az 152 CV 2-FE-67-474 TEST POINT #2 Fan Rm CLOSED 2-TV-67-921A IC/724 Az 156 CV 2-FE-67-474 TEST POINT #2 Fan Rm CLOSED 2-TV-67-921B IC/724 Az 156 CV LWR CNTMT VENT CLR 2B-B #2 Fan Rm CLOSED 2-VTV-67-699B ERCW RET HDR VENT IC/725 Az 165 CV RCP 2 MTR CLR ERCW SUP CNTL #2 Fan Rm OPERABLE 2-TCV-67-102 IC/725 Az 167 CV CONTROL AIR ISOLATION VALVE #2 Fan Rm OPEN 2-ISV-32-3564 TO 2-TCV-67-102 IC/725 Az 167 CV LWR CNTMT VENT CLR 2B-B OUT #2 Fan Rm OPERABLE 2-TCV-67-100 TEMP CNTL IC/723 Az 168 CV CONTROL AIR ISOLATION VALVE #2 Fan Rm OPEN 2-ISV-32-3563 TO 2-TCV-67-100 IC/723 Az 168 CV LOWER CNTMT CLR HDR B ERCW #2 Fan Rm OPEN 2-FCV-67-103 RET ISOL IC/720 Az 171 CV RCP 2 MTR CLR ERCW RET HDR #2 Fan Rm OPEN 2-THV-67-572 THROTTLE IC/725 B Az 171 CV LOWER CNTMT CLR HDR B ERCW #2 Fan Rm CLOSED 2-TV-67-574B RET TEST CONN IC/720 Az 171 CV LOWER CNTMT CLR HDR ERCW #2 Fan Rm CLOSED 2-VTV-67-695B RET VENT IC/726 Az 171 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 199 of 204 Checklist 4 (Page 11 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U2 Containment - #2 Fan Rm LOWER CNTMT CLR HDR B ERCW #2 Fan Rm OPEN 2-ISV-67-100 RET ISOL IC/726 5B Az 171 CV CRD VENT CLR 2B-B OUT TEMP #2 Fan Rm OPERABLE 2-TCV-67-10 CNTL IC/727 1 Az 171 CV CONTROL AIR ISOLATION VALVE #2 Fan Rm OPEN 2-ISV-32-356 TO 2-TCV-67-101 IC/727 5 Az 171 CV LOWER CNTMT CLR HDR B ERCW #2 Fan Rm CLOSED (2) 2-DRV-67-77 RET DRAIN IC/716 3 Az 172 CV LOWER CNTMT CLR HDR B ERCW #2 Fan Rm CLOSED (2) 2-DRV-67-77 SUP DRAIN IC/716 4 Az 172 CV LOWER CNTMT CLR HDR B ERCW OPEN 2-FCV-67-10

  1. 2 Fan Rm SUP ISOL IC/720 5 Az 173 CV LOWER CNTMT CLR HDR B ERCW #2 Fan Rm CLOSED 2-TV-67-563 SUP HDR TEST CONN IC/720 B Az 173 CV LWR CNTMT VENT CLR 2B-B #2 Fan Rm OPEN 2-THV-67-56 ERCW SUP HDR THROTTLE IC/726 4B Az 173 CV LOWER CNTMT CLR HDR B ERCW #2 Fan Rm OPEN 2-ISV-67-100 SUP ISOL IC/726 4B Az 173 CV CRD VENT CLR 2B-B ERCW SUP #2 Fan Rm OPEN 2-THV-67-56 HDR THROTTLE IC/726 7B Az 353 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 200 of 204 Checklist 4 (Page 12 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U2 Containment - #1 Fan Rm CRD VENT CLR 2D-B ERCW SUP #1 Fan Rm OPEN 2-THV-67-567 HDR THROTTLE IC/726 D Az 173 CV LOWER CNTMT CLR HDR D ERCW #1 Fan Rm CLOSED 2-DRV-67-771 RET DRAIN IC/718 Az 353 CV LOWER CNTMT CLR HDR D ERCW #1 Fan Rm CLOSED 2-DRV-67-772 SUP DRAIN IC/718 Az 351 CV LOWER CNTMT CLR HDR D ERCW #1 Fan Rm OPEN 2-FCV-67-111 RET ISOL IC/720 Az 357 CV LOWER CNTMT CLR HDR D ERCW #1 Fan Rm OPEN 2-FCV-67-113 SUP ISOL IC/720 Az 353 CV LOWER CNTMT CLR HDR D ERCW #1 Fan Rm CLOSED 2-TV-67-563D SUP HDR TEST CONN IC/720 Az 353 CV LOWER CNTMT CLR HDR D ERCW #1 Fan Rm CLOSED 2-TV-67-574D RET TEST CONN IC/720 Az 351 CV LWR CNTMT VENT CLR 2D-B OUT #1 Fan Rm OPERABLE 2-TCV-67-108 TEMP CNTL IC/723 Az 349 CV CONTROL AIR ISOLATION VALVE #1 Fan Rm OPEN 2-ISV-32-3605 TO 2-TCV-67-108 IC/723 Az 349 CV 2-FE-67-476 TEST POINT #1 Fan Rm CLOSED 2-TV-67-922A IC/724 Az 336 CV 2-FE-67-476 TEST POINT #1 Fan Rm CLOSED 2-TV-67-922B IC/724 Az 336 CV CRD VENT CLR 2D-B OUT TEMP #1 Fan Rm OPERABLE 2-TCV-67-109 CNTL IC/725 Az 351 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 201 of 204 Checklist 4 (Page 13 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U2 Containment - #1 Fan Rm LWR CNTMT VENT CLR D-B ERCW #1 Fan Rm CLOSED 2-VTV-67-698 SUP HDR VENT IC/727 D Az 332 CV LOWER CNTMT VENT CLR D-B #1 Fan Rm CLOSED 2-VTV-67-699 ERCW RET HDR VENT IC/725 D Az 345 CV RCP 4 MTR CLR ERCW SUP CNTL #1 Fan Rm OPERABLE 2-TCV-67-110 IC/727 Az 347 CV CONTROL AIR ISOLATION VALVE #1 Fan Rm OPEN 2-ISV-32-3607 TO 2-TCV-67-110 IC/727 Az 347 CV CONTROL AIR ISOLATION VALVE #1 Fan Rm OPEN 2-ISV-32-3606 TO 2-TCV-67-109 IC/725 Az 351 CV RCP 4 MTR CLR ERCW RET HDR #1 Fan Rm OPEN 2-THV-67-572 THROTTLE IC/725 D Az 351 CV LOWER CNTMT CLR HDR ERCW #1 Fan Rm CLOSED 2-VTV-67-695 RET VENT IC/726 D Az 351 CV LOWER CNTMT CLR HDR D ERCW #1 Fan Rm OPEN 2-ISV-67-1005 RET ISOL IC/726 D Az 351 CV LWR CNTMT VENT CLR 2D-B #1 Fan Rm OPEN 2-THV-67-564 ERCW SUP HDR THROTTLE IC/726 D Az 353 CV LOWER CNTMT CLR HDR D ERCW #1 Fan Rm OPEN 2-ISV-67-1004 SUP ISOL IC/726 D Az 353 CV

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 202 of 204 Checklist 4 (Page 14 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U2 Containment UPPER CNTMT VENT CLR 2B IC/805 OPEN 2-ISV-67-691B ERCW SUP HDR ISOL Az 135(9) CV RCP MTR CLR 2 ERCW IN SUP IC/732 CLOSED 2-VTV-67-700B VENT Az 137 CV UPPER CNTMT VENT CLR 2B IC/808 OPEN 2-ISV-67-583B ERCW RET HDR ISOL Az 143(1) CV 2-FE-67-249 TEST POINT IC/729 CLOSED 2-TV-67-863A Az 143 CV 2-FE-67-249 TEST POINT IC/729 CLOSED 2-TV-67-863B Az 143 CV UPPER CNTMT VENT CLR 2B IC/807 OPEN 2-ISV-67-692B ERCW RET HDR ISOL Az 150(1) CV UPPER CNTMT VENT CLR 2B IC/808 CLOSED 2-TV-67-579B ERCW SUP HDR TEST CONN Az 150(1) CV UPPER CNTMT VENT CLR 2B IC/808 CLOSED 2-TV-67-581B ERCW SUP HDR TEST CONN Az 150(1) CV UPPER CNTMT VENT CLR 2B IC/809 CLOSED 2-TV-67-690B ERCW SUP HDR TEST VENT Az 150(1) CV UPPER CNTMT VENT CLR 2B IC/807 OPEN 2-FCV-67-297 ERCW RET ISOL Az 152(1) CV UPPER CNTMT VENT CLR 2B IC/807 CLOSED 2-TV-67-1211 ERCW RET HDR TEST VALVE Az 152(1) CV UPPER CNTMT VENT CLR 2B IC/808 CLOSED 2-TV-67-584B ERCW RET HDR TEST CONN Az 155(1) CV RCP MTR CLR 2 ERCW RET HDR IC/726 CLOSED 2-VTV-67-696B VENT Az 171 CV 2-FE-67-477 TEST POINT IC/730 CLOSED 2-TV-67-913 Az 189 CV 2-FE-67-477 TEST POINT IC/730 CLOSED 2-TV-67-914 Az 189 CV (9) Top of S/G doghouse.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 203 of 204 Checklist 4 (Page 15 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U2 Containment UPPER CNTMT VENT CLR 2D IC/805 OPEN 2-ISV-67-691D ERCW SUP HDR ISOL Az 225(10) CV UPPER CNTMT VENT CLR 2D IC/789 CLOSED 2-DRV-67-764 ERCW RET HDR DRAIN Az 300(11) CV UPPER CNTMT VENT CLR 2D IC/790 CLOSED 2-DRV-67-763 ERCW SUP HDR DRAIN Az 300(11) CV UPPER CNTMT VENT CLR 2B IC/793 CLOSED 2-DRV-67-765 ERCW SUP HDR DRAIN Az 300(11) CV UPPER CNTMT VENT CLR 2B IC/794 CLOSED 2-DRV-67-766 ERCW RET HDR DRAIN Az 300(11) CV UPPER CNTMT VENT CLR 2D IC/807 CLOSED 2-TV-67-690D ERCW SUP HDR TEST VENT Az 318(10) CV RCP MTR CLR 4 ERCW IN IC/732 CLOSED 2-VTV-67-700D SUP VENT Az 319 CV 2-FE-67-255 TEST POINT IC/729 CLOSED 2-TV-67-862A Az 325 CV 2-FE-67-255 TEST POINT IC/729 CLOSED 2-TV-67-862B Az 325 CV RCP VENT CLR 4 SUP ERCW IC/729 CLOSED 2-DRV-67-1001 HDR DRAIN Az 325 CV UPPER CNTMT VENT CLR 2D IC/808 OPEN 2-ISV-67-583D ERCW RET HDR ISOL Az 325(10) CV UPPER CNTMT VENT CLR 2D IC 807 OPEN 2-ISV-67-692D ERCW RET HDR ISOL Az 330(10) CV UPPER CNTMT VENT CLR 2D IC/808 CLOSED 2-TV-67-579D ERCW SUP HDR TEST CONN Az 330(10) CV UPPER CNTMT VENT CLR 2D IC/808 CLOSED 2-TV-67-581D ERCW SUP HDR TEST CONN Az 330(10) CV UPPER CNTMT VENT CLR 2D IC/807 OPEN 2-FCV-67-298 ERCW RET ISOL Az 332(10) CV UPPER CNTMT VENT CLR 2D IC/807 CLOSED 2-TV-67-1213 ERCW RET HDR TEST VALVE Az 332(10) CV (10) Top of S/G doghouse.

(11) Next to spiral staircase.

WBN ERCW SYSTEM FLOW BALANCE 2-PTI-067-02-B Unit 1 & 2 TRAIN B Rev. 0000 Page 204 of 204 Checklist 4 (Page 16 of 16)

SUPPLY HDR 2B VALVE ALIGNMENT Data Package: Page ____ of ____ Date ________

NOMENCLATURE LOCATION POSITION UNID PERF VERIFIER INITIAL INITIAL U2 Containment RCP MTR CLR 4 ERCW RET IC/726 CLOSED 2-VTV-67-696D HDR VENT Az 351 CV 2-FE-67-475 TEST POINT IC/720 CLOSED 2-TV-67-911 Az 351 CV 2-FE-67-475 TEST POINT IC/720 CLOSED 2-TV-67-912 Az 351 CV CRD VENT CLR D-B RET IC/720 CLOSED 2-DRV-67-999 ERCW HDR DRAIN Az 351 CV CRD VENT CLR D-B SUP IC/726 CLOSED 2-DRV-67-997 ERCW HDR DRAIN Az 353 CV UPPER CNTMT VENT CLR 2D IC/808 CLOSED 2-TV-67-584D ERCW RET HDR TEST CONN Az 355(1) CV