ML11175A224: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 04/15/2011 | | issue date = 04/15/2011 | ||
| title = 2011 Point Beach Nuclear Power Plant Initial License Examination Proposed Control Room JPMs | | title = 2011 Point Beach Nuclear Power Plant Initial License Examination Proposed Control Room JPMs | ||
| author name = | | author name = Mcneil D | ||
| author affiliation = NRC/RGN-III/DRS/OB | | author affiliation = NRC/RGN-III/DRS/OB | ||
| addressee name = | | addressee name = | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Point Beach Nuclear Plant Job Performance Measure (JPM) | {{#Wiki_filter:Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
PERFORM ROD EXERCISE TEST JPM NUMBER: | SITE: Point Beach JPM TITLE: PERFORM ROD EXERCISE TEST JPM NUMBER: CR JPM a REV. 0 RELATED PRA None INFORMATION: | ||
CR JPM a REV. 0 | TASK NUMBERS / TASK PBN P001.020.COT/PERFORM CONTROL ROD EXERCISES TITLE(S): | ||
K/A NUMBERS: 001.K4.02 (3.8/3.8), 001.A3.05 (3.5/3.5), 001.A4.03 (4.0/3.7) | |||
PBN P001.020.COT/PERFORM CONTROL ROD EXERCISES K/A NUMBERS: | |||
001.K4.02 (3.8/3.8), | |||
APPLICABLE METHOD OF TESTING: | APPLICABLE METHOD OF TESTING: | ||
Discussion: | Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room: | ||
Simulate/walkthrough: | Simulator: X Other: | ||
Perform: X | Lab: | ||
In-Plant: | Time for Completion: 20 Minutes Time Critical: No Alternate Path: Yes Page 1 of 12 | ||
X | |||
20 Minutes Time Critical: | |||
No | |||
: Yes | |||
Point Beach Nuclear Plant Perform Rod Exercise Test I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
You are the Unit 1 CO. | * You are the Unit 1 CO. | ||
Unit 1 is at 100% power, steady state Xenon. | * Unit 1 is at 100% power, steady state Xenon. | ||
INITIATING CUES: | INITIATING CUES: | ||
The SRO has directed you to perform TS | * The SRO has directed you to perform TS-5, Rod Exercise Test Unit 1. The Pre-job brief has been completed. | ||
-5, | * An AO is standing by in the Unit 1 Rod Drive MG Set Room to assist in the performance of the test. | ||
-job brief has been completed. | Page 2 of 12 | ||
An AO is standing by in the Unit 1 Rod Drive MG Set Room to assist in the performance of the test. | |||
Point Beach Nuclear Plant Perform Rod Exercise Test | Point Beach Nuclear Plant Perform Rod Exercise Test JPM PERFORMANCE INFORMATION Required Materials: TS-5, Rod Exercise Test Unit 1 REI 7.0, Control Rod Position Determination General | ||
TS-5, Rod Exercise Test Unit 1 REI 7.0, Control Rod Position Determination General | |||
==References:== | ==References:== | ||
TS-5, Rod Exercise Test Unit 1 REI 7.0, Control Rod Position Determination Task Standards: Bank D rods have been exercised, bank overlap counter discrepancy corrected and bank D rods returned to their original position. | |||
Start Time: | |||
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication). | |||
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations. | |||
Performance Step: 1 Review Precautions/Limitations and Initial Conditions Critical N Standard: The examinee reviews TS-5, Rod Exercise Test Precautions and Limitations and Initial Conditions. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 3 of 12 | |||
Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 2 Record the following indications: | |||
Critical Y RDC-LOGIC Cabinet (Key #21): | |||
-Bank Overlap Counter reading Standard: Examinee contacts Unit 1 Turbine Hall Operator and obtains the Bank Overlap Counter Reading. | |||
Evaluator Note: Counter Reading is in the rod control cabinet in the Rod Drive MG set Room. | |||
Point Beach Nuclear Plant Perform Rod Exercise Test | |||
2 | |||
RDC-LOGIC Cabinet (Key #21): | |||
Evaluator Note: | |||
Counter Reading is in the rod control cabinet in the Rod Drive MG set Room. | |||
It is critical to record the correct reading. | It is critical to record the correct reading. | ||
Evaluator Cue: | Evaluator Cue: AO reports that the Bank Overlap Counter is reading 594. | ||
AO reports that the Bank Overlap Counter is reading | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Comments: | |||
SATISFACTORY | Performance Step: 3 Status of the Group Select Lights for the following power cabinets: | ||
3 | Critical N -1AC - Group Select Light C | ||
-2AC - Group Select Light C | |||
-1BD - Group Select Light B Standard: Examinee contacts the U1 TH Operator and obtains the status of the lights. | |||
Evaluator Note: Light status is found on the power cabinets in the RD MG Set Room Evaluator Cue: AO Reports C lights lit for 1AC and 2AC and B light lit for 1BD. | |||
Evaluator Note: | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Light status is found on the power cabinets in the RD MG Set Room Evaluator Cue: | Comments: | ||
AO Reports | Page 4 of 12 | ||
SATISFACTORY | |||
Point Beach Nuclear Plant Perform Rod Exercise Test | Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 4 1C04, Rod Bank Group (Demand) counters: | ||
4 | Critical Y -Control Bank A Group 1 | ||
-Etc. | |||
Standard: The examinee correctly records Control and Shutdown Bank Group Demand counter readings. | |||
Evaluator Note: | Evaluator Note: *All Bank Demand counters should indicate 228 (225) steps except Bank D which should indicate 220 steps. Since only Bank D rods are being exercised for this JPM, only the Bank D readings are critical. | ||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Performance: | Comments: | ||
SATISFACTORY | Performance Step: 5 1C-120A, RPI #1, Bank Position Display Critical N -Bank A | ||
5 | -Bank B | ||
-Bank C | |||
-120A. Evaluator Note: | -Bank D Standard: The examinee correctly records bank positions on 1C-120A. | ||
Bank Positions are indicated behind the Main Control Boards on 1C | Evaluator Note: Bank Positions are indicated behind the Main Control Boards on 1C-120A. | ||
-120A. Examinee may ask permission to go behind the boards. Indicate that the | Examinee may ask permission to go behind the boards. Indicate that the 3rd license will have responsibility for the Unit while the examinee retrieves the readings. | ||
SATISFACTORY | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Point Beach Nuclear Plant Perform Rod Exercise Test | Comments: | ||
6 | Page 5 of 12 | ||
Standard: The examinee obtains a copy of REI 7.0 and compares the Control Bank position with the Bank Overlap Counter and determines whether the readings agree. | |||
Evaluator Note: | Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 6 Compare the Bank Overlap Counter reading to Control Bank position (Step Critical N Counters) in REI 7.0, Control Rod Position Determination. | ||
The examinee should determine that the Control Bank position and Bank Overlap Counter do NOT agree. With Control Bank D at 220 steps, the Bank Overlap Counter should read 595. | Standard: The examinee obtains a copy of REI 7.0 and compares the Control Bank position with the Bank Overlap Counter and determines whether the readings agree. | ||
Performance: | Evaluator Note: The examinee should determine that the Control Bank position and Bank Overlap Counter do NOT agree. With Control Bank D at 220 steps, the Bank Overlap Counter should read 595. | ||
SATISFACTORY | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
7 | Comments: | ||
Standard: The examinee determines the readings do not agree and goes to attachment A. | Performance Step: 7 If the Control Bank Position AND Bank Overlap Counter reading do not agree, Critical Y then perform Attachment A. | ||
Performance: | Standard: The examinee determines the readings do not agree and goes to attachment A. | ||
SATISFACTORY _____ | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Comments: | |||
Performance Step: 8 Place Rod control selector to Manual Critical Y Standard: The examinee places Rod control selector switch to the Manual position. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 6 of 12 | |||
Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 9 Step Control Bank D out 1 step from its current position. | |||
Critical Y Standard: The examinee steps Control Bank D out 1 step. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 10 Bump step Control Bank D in one step. | |||
Critical Y Standard: The examinee bumps Control Bank D in one step. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 11 Check card A105 has the BOTTOM LIGHT ILLUMINATED (top row, 3rd card from Critical N the left in the Rod Control Logic Cabined directly above the Bank Overlap Counter). | |||
Standard: The examinee contacts the Auxiliary Operator in the Rod Drive Room and obtains status of card A105 bottom light. | |||
Evaluator Note: Based on the report from the AO, steps 5.0 and 6.0 of Attachment A will be N/A Evaluator Cue: The AO reports card A105 has the bottom light illuminated. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | Comments: | ||
Page 7 of 12 | |||
Point Beach Nuclear Plant Perform Rod Exercise Test | Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 12 Compare the Bank D Demand Position (Step Counters) to the Bank Overlap Critical N Counter. | ||
Standard: The examinee contacts the AO for the Bank Overlap Counter reading and compares the Step Counter for Bank D to the obtained Bank Overlap Counter reading. | |||
Standard: The examinee | Evaluator Cue: AO reports the Bank Overlap Counter reads 595. | ||
Performance: | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
SATISFACTORY | Comments: | ||
Performance Step: 13 IF the Control Bank D Position (Step Counters) and the Bank Overlap Counter do Critical N not agree, THEN adjust the Bank Overlap Counter at RDC Logic Cabinet by depressing the +1 or -1 button as necessary until the proper value correlating to the Control Rod Bank D Position (Step Counters). | |||
Standard: | Standard: Determine step is not required to be performed and N/A. | ||
Performance: | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
SATISFACTORY | Comments: | ||
Performance Step: 14 Return the Control Rod selector switch to AUTO. | |||
Evaluator Note: | Critical N Standard: The examinee places Control Rod selector to auto. | ||
Evaluator Note: When examinee asks for an Independent Verification of this step, initial the step for IV. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Performance: | Comments: | ||
SATISFACTORY | Page 8 of 12 | ||
Point Beach Nuclear Plant Perform Rod Exercise Test | Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 15 If printed PPCS data is required, then obtain a screen print of PPCS display page Critical N 2121 prior to and following movement of each rod group. | ||
Standard: The examinee requests whether PPCS printed data is required. | |||
Evaluator Note: Examinee may wish to print the data, inform them that it is not required. | |||
Evaluator Cue: Printed PPCS data is not required. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Performance Step: | Comments: | ||
Performance Step: 16 IF Control Bank D is not fully inserted, THEN perform the following exercise test: | |||
Critical Y Place the Control Rod Bank Selector switch to the CBD position. | |||
Standard: The examinee places the Control Rod Bank Selector switch to the CBD position. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 17 Perform the following rod step sequence twice: | |||
Critical N Step Control Bank D out 1 step from its current position. | |||
Standard: The examinee steps Control Bank D out 1 step. | |||
Evaluator Note: This step and the next will be repeated. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
15 | Page 9 of 12 | ||
Standard: The examinee requests whether PPCS printed data is required. | |||
Evaluator Note: | |||
Examinee may wish to print the data, inform them that it is not required. | |||
Evaluator Cue: | |||
Printed PPCS data is not required. | |||
Performance: | |||
SATISFACTORY | |||
16 | |||
Place the Control Rod Bank Selector switch to the CBD position. | |||
Standard: The examinee places the Control Rod Bank Selector switch to the CBD position. | |||
Performance: | |||
SATISFACTORY | |||
17 | |||
Step Control Bank D | Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 18 Bump step Control Bank D in one step. | ||
Standard: The examinee | Critical N Standard: The examinee bumps Control Bank D in one step. | ||
Evaluator Note: | Evaluator Note: This step and the previous will be repeated. | ||
This step and the | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Performance: | Comments: | ||
SATISFACTORY | Performance Step: 19 Insert OR Withdraw Control Bank D at least 10 steps but no more than 20 steps Critical Y while observing movement on individual Control Bank D rods. | ||
Standard: The examinee inserts Control Bank D at least 10 but not more than 20 steps. | |||
Evaluator Note: The examinee must recognize that there is not enough room to withdraw the rods 10 steps and must therefore insert the rods the required distance Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 20 Withdraw OR insert Control Bank D to the position recorded in Step 5.1.3 Critical Y Standard: The examinee withdraws Control Bank D to its original position recorded in Step | |||
====5.1.3. Performance==== | |||
SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 10 of 12 | |||
SATISFACTORY | |||
Point Beach Nuclear Plant Perform Rod Exercise Test | Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 21 Withdraw Control Bank D one step. | ||
Critical Y Standard: The examinee withdraws Control Bank D one step. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 22 Insert Control Bank D one step. | |||
Critical Y Standard: The examinee inserts Control Bank D one step. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 23 Ensure Control Bank D is in the position recorded in Step 5.1.3. | |||
Critical N Standard: The examinee ensures the Control Bank D Group Demand Counter reading matches the number obtained in step 5.1.3. | |||
Evaluator Note: CB D Demand Counter should read 220. When examinee asks for an Independent Verification of this step, initial the step for IV. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Terminating Cues: The JPM is complete. | |||
Stop Time: | |||
Page 11 of 12 | |||
Point Beach Nuclear Plant Perform Rod Exercise Test TURNOVER SHEET INITIAL CONDITIONS: | |||
* You are the Unit 1 CO. | |||
* Unit 1 is at 100% power, steady state Xenon. | |||
INITIATING CUES: | INITIATING CUES: | ||
The SRO has directed you to perform TS | * The SRO has directed you to perform TS-5, Rod Exercise Test Unit 1. The Pre-job brief has been completed. | ||
-5, | * An AO is standing by in the Unit 1 Rod Drive MG Set Room to assist in the performance of the test. | ||
-job brief has been completed. | Page 12 of 12 | ||
An AO is standing by in the Unit 1 Rod Drive MG Set Room to assist in the performance of the test. | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | SITE: Point Beach JPM TITLE: Respond to a Loss of Boration Path JPM NUMBER: CR JPM b. REV. 0 RELATED PRA None INFORMATION: | ||
Respond to a Loss of Boration Path JPM NUMBER: | TASK NUMBERS / TASK PBN P000.050.COT Perform/Respond to Alternate Boration/Loss of Shutdown TITLE(S): Margin K/A NUMBERS: 004.A2.14 (3.8/3.9) | ||
CR JPM b. REV. 0 | |||
PBN P000.050.COT | |||
APPLICABLE METHOD OF TESTING: | APPLICABLE METHOD OF TESTING: | ||
Discussion: | Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room: | ||
Simulate/walkthrough: | Simulator: X Other: | ||
Perform: X | Lab: | ||
In-Plant: | Time for Completion: 20 Minutes Time Critical: NO Alternate Path: YES Page 1 of 10 | ||
Simulator: | |||
X | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
20 Minutes Time Critical: | I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | ||
NO | |||
: YES Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 has experienced an inadvertent Reactor Trip and Safety Injection. | * Unit 1 has experienced an inadvertent Reactor Trip and Safety Injection. | ||
The crew has completed all applicable actions in EOP | * The crew has completed all applicable actions in EOP-0 Reactor Trip or Safety Injection Unit 1 | ||
-0 Reactor Trip or Safety Injection Unit 1 SI Termination criteria is met and the crew has completed up through Step 5 in EOP | * SI Termination criteria is met and the crew has completed up through Step 5 in EOP-1.1 SI Termination Unit 1 INITIATING CUES (IF APPLICABLE): | ||
-1.1 SI Termination Unit 1 INITIATING CUES (IF APPLICABLE): | * OS1 has directed you, the Third License, to continue EOP-1.1 SI termination starting with Step 6. | ||
OS1 has directed you, the Third License, to continue EOP-1.1 SI termination starting with Step 6. | Page 2 of 10 | ||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
EOP 1.1 SI Termination Unit 1 completed through step 5 place kept OP-5B Blender Operation/Dilution/Boration Attachment D General | JPM PERFORMANCE INFORMATION Required Materials: EOP 1.1 SI Termination Unit 1 completed through step 5 place kept OP-5B Blender Operation/Dilution/Boration Attachment D General | ||
==References:== | ==References:== | ||
EOP 1.1 SI Termination Unit 1 OP-5B Blender Operation/Dilution/Boration Task Standards: Initiate boration via alternate means, OP-5B normal boration path. | |||
Start Time: | |||
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication). | |||
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations. | |||
Performance Step: 1 Verify Charging Flow Critical N | |||
* Ensure CV-1298 Normal Charging Isolation is open | |||
* Check Charging Pumps at least one running | |||
* Start additional pumps and adjust charging as necessary to maintain PZR level | |||
* Adjust HC-142 as necessary to maintain Lab Seal P >20 inches Standard: Examinee will verify charging flow is adequate Evaluator Note: Examinee does not have to adjust any charging flow to meet this step. They may elect to adjust to minimum charging based on Pressurizer level and no Letdown lined up. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Page 3 of 10 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
Performance Step: 2 Stop Both SI Pumps Critical N Standard: Examinee takes 1P-15A and 1P-15B Safety Injection Pumps to Auto after Stop. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 3 Stop Both RHR Pumps Critical N Standard: Examinee takes 1P-10A and 1P-10B Residual Heat Removal Pumps to Auto after Stop. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 4 Check SI Flow Not Required Critical N | |||
* Check RCS Subcooling .[80°F] 35°F | |||
* Check PZR Level >[34%] 10% | |||
Standard: Examinee checks SI flow not required Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Page 4 of 10 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
2 | |||
-15B Safety Injection Pumps to Auto after Stop. | |||
Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
3 | |||
-10A and 1P | |||
-10B Residual Heat Removal Pumps to Auto after Stop. | |||
Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: | |||
4 | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
5 | Performance Step: 5 Check if Containment Spray Should be Stopped Critical N | ||
SATISFACTORY UNSATISFACTORY Comments: | * Check any Spray Pumps running Standard: Examinee checks that no Containment Spray Pumps are running Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
6 | Performance Step: 6 Check ALL Control Rods - FULLY INSERTED Critical N Standard: Examinee checks control rods and determines two(2) rods are stuck out thus being required to take actions within the RNO column to emergency borate. | ||
- FULLY INSERTED Standard: Examinee checks control rods and determines two(2) rods are stuck out thus being required to take actions within the RNO column to emergency borate. | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Performance: | Performance Step: 7 IF two or more control rods NOT fully inserted, THEN initiate emergency boration Critical N as follows: | ||
SATISFACTORY UNSATISFACTORY Comments: | |||
7 | |||
: a. Record initial level for in service BAST. | : a. Record initial level for in service BAST. | ||
Standard: Examinee records | Standard: Examinee records A BAST Level. | ||
Evaluator Cue: | Evaluator Cue: If asked, inform examinee that A BAST is aligned to Unit 1. | ||
If asked, inform examinee that | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Performance: | Page 5 of 10 | ||
SATISFACTORY UNSATISFACTORY Comments: | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
8 | Performance Step: 8 IF two or more control rods NOT fully inserted, THEN initiate emergency boration Critical Y as follows: | ||
: b. Start one boric acid transfer pump. | : b. Start one boric acid transfer pump. | ||
Standard: Examinee starts either 1P | Standard: Examinee starts either 1P-4A or 1P-4B Boric Acid Transfer Pump. | ||
-4A or 1P-4B Boric Acid Transfer Pump. | Evaluator Note: 1P-4A Boric Acid Transfer Pump is already running in AUTO. | ||
Evaluator Note: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
1P-4A Boric Acid Transfer Pump is already running in AUTO. Performance: | Performance Step: 9 IF two or more control rods NOT fully inserted, THEN initiate emergency boration Critical Y as follows: | ||
SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: | |||
9 | |||
: c. Establish maximum charging. | : c. Establish maximum charging. | ||
Fully open HC | * Fully open HC-142 | ||
-142 | * Start additional charging pumps | ||
Performance: | * Adjust charging pump speed to maintain less than 140 GPM Standard: Examinee adjusts charging as necessary to get as close as possible to 140 GPM without going off scale high on the meter. | ||
SATISFACTORY UNSATISFACTORY Comments: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Page 6 of 10 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
10 | Performance Step: 10 IF two or more control rods NOT fully inserted, THEN initiate emergency boration Critical N as follows: | ||
: d. Open emergency borate valve 1CV | : d. Open emergency borate valve 1CV-350 Standard: Examinee attempts to open 1CV-350, valve is stuck shut. | ||
-350 | Evaluator Cue: Acknowledge report to OS1 that 1CV-350 is not opening. | ||
-350, valve is stuck shut. | |||
Evaluator Cue: | |||
Acknowledge report to OS1 that 1CV | |||
-350 is not opening. | |||
If PAB AO sent to look at either the valve or associated MOV breaker report back nothing appears abnormal. | If PAB AO sent to look at either the valve or associated MOV breaker report back nothing appears abnormal. | ||
If asked, PAB AO also reports unsuccessful attempt to declutch the motor and locally hand crank the MOV open. | If asked, PAB AO also reports unsuccessful attempt to declutch the motor and locally hand crank the MOV open. | ||
Performance: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
SATISFACTORY UNSATISFACTORY Comments: | Performance Step: 11 IF two or more control rods NOT fully inserted, THEN initiate emergency boration Critical Y as follows: | ||
11 | : e. Borate 2800 gallons for each control rod, greater than one, not fully inserted. Use TLB-5, Boric Acid Storage Tanks, to determine BAST level change. | ||
: e. Borate 2800 gallons for each control rod, greater than one | Standard: Examinee determines amount of acid required (2800 gallons). | ||
, not fully inserted. Use TLB | Evaluator Note: The required amount of acid to satisfy the critical task is 2800 gallons for one control rod, greater than one, not fully inserted. This equates to a level drop of approximately 60%. Borating in excess of 2800 gallons does not constitute failure of the critical task. | ||
-5, Boric Acid Storage Tanks, to determine BAST level change. Standard: Examinee | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Page 7 of 10 | |||
The required amount of acid to satisfy the critical task is 2800 gallons for one control rod, greater than one, not fully inserted. This equates to a level drop of approximately 60%. | |||
Borating in excess of 2800 gallons does not constitute failure of the critical task. | |||
Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
12 | Performance Step: 12 IF two or more control rods NOT fully inserted, THEN initiate emergency boration Critical Y as follows: | ||
: f. IF emergency boration can NOT be established, THEN perform boration per OP-5B, Blender Operation/Dilution/Boration while continuing with this procedure. | : f. IF emergency boration can NOT be established, THEN perform boration per OP-5B, Blender Operation/Dilution/Boration while continuing with this procedure. | ||
Standard: Examinee obtains a copy of OP | Standard: Examinee obtains a copy of OP-5B and uses Attachment D to borate 2800 gallons of acid. | ||
-5B and uses Attachment D to borate 2800 gallons of acid. | Evaluator Cue: If asked or requested, inform examinee the 4th license will continue with EOP 1.1 and they should continue with OP-5B to borate. | ||
Evaluator Cue: | Cue examinee that Section 3.0 of OP-5B Attachment D has already been completed by the 4th license. | ||
If asked or requested, inform examinee the | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
-5B to borate. | Performance Step: 13 Estimate and set the Boric Acid quantity/rate on YIC-110A, Boric Acid Flow Critical Y Controller. | ||
Cue examinee that Section 3.0 of OP | Standard: Set the YIC-110A to deliver boric acid. | ||
-5B Attachment D has already been completed by the | Evaluator Note: The Boric Acid Totalizer can only be set for 999 gallons at a time. | ||
SATISFACTORY UNSATISFACTORY Comments: | |||
13 | |||
Standard: Set the YIC | |||
-110A to deliver boric acid. | |||
Evaluator Note: | |||
The Boric Acid Totalizer can only be set for 999 gallons at a time. | |||
The amount of flow for a single Boric Acid Transfer Pump is around 25 GPM. A second pump cannot be started to increase flow due to the loss of power from SI bus stripping. | The amount of flow for a single Boric Acid Transfer Pump is around 25 GPM. A second pump cannot be started to increase flow due to the loss of power from SI bus stripping. | ||
Performance: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
SATISFACTORY UNSATISFACTORY Comments: | Page 8 of 10 | ||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
14 | Performance Step: 14 Place the Reactor Makeup Mode Selector Switch in BORATE. | ||
Standard: Reactor Makeup Mode Selector Switch to BORATE. | Critical Y Standard: Reactor Makeup Mode Selector Switch to BORATE. | ||
Performance: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
SATISFACTORY UNSATISFACTORY Comments: | Performance Step: 15 Place the Reactor Makeup Control Switch to START. | ||
15 | Critical Y Standard: Reactor Makeup Control Switch to START. | ||
Performance: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
SATISFACTORY UNSATISFACTORY Comments: | Performance Step: 14 While continuing with this procedure, check system for proper response and Critical N monitor the plant. | ||
14 | Standard: Examinee monitors the boration to ensure proper system response. | ||
Standard: Examinee monitors the boration to ensure proper system response. | Evaluator Cue: After examinee starts boration and has verified system response the JPM can be terminated. | ||
Evaluator Cue: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
After examinee starts boration and has verified system response the JPM can be terminated. | Terminating Cues: This completes this JPM Stop Time: | ||
Performance: | Page 9 of 10 | ||
SATISFACTORY UNSATISFACTORY Comments: | |||
This completes this JPM Stop Time: | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
Unit 1 has experienced an inadvertent Reactor Trip and Safety Injection. | TURNOVER SHEET INITIAL CONDITIONS: | ||
The crew has completed all applicable actions in EOP | * Unit 1 has experienced an inadvertent Reactor Trip and Safety Injection. | ||
-0 Reactor Trip or Safety Injection Unit 1 SI Termination criteria is met and the crew has completed up through Step 5 in EOP | * The crew has completed all applicable actions in EOP-0 Reactor Trip or Safety Injection Unit 1 | ||
-1.1 SI Termination Unit 1 | * SI Termination criteria is met and the crew has completed up through Step 5 in EOP-1.1 SI Termination Unit 1 INITIATING CUES: | ||
* OS1 has directed you to continue EOP-1.1 SI termination starting with Step 6. | |||
Page 10 of 10 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
JPM TITLE: Fill the Accumulators JPM NUMBER: CR JPM c. REV. 0 RELATED PRA None INFORMATION: | |||
TASK NUMBERS / TASK PBN P006.002.COT / Fill the Accumulators TITLE(S): | |||
K/A NUMBERS: 006.A1.13 (3.5/3.7) | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
Fill the Accumulators JPM NUMBER: | |||
CR JPM c. REV. 0 | |||
PBN P006.002.COT / Fill the Accumulators K/A NUMBERS: | |||
APPLICABLE METHOD OF TESTING: | APPLICABLE METHOD OF TESTING: | ||
Discussion: | Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room: | ||
Simulate/walkthrough: | Simulator: X Other: | ||
Perform: X | Lab: | ||
In-Plant: | Time for Completion: 30 Minutes Time Critical: No Alternate Path: No Page 1 of 16 | ||
Simulator: | |||
X | |||
30 Minutes Time Critical: | |||
No | |||
: No | |||
Point Beach Nuclear Plant Fill the Accumulators I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 and Unit 2 are operating at 100% steady | * Unit 1 and Unit 2 are operating at 100% steady-state conditions. | ||
-state conditions. | * Annunciator C01B 3-8, 1T-34B ACCUMULATOR LEVEL HIGH OR LOW is lit. | ||
Annunciator C01B 3 | * Emergency Diesel Generators G-01, G-02, G-03 and G-04 are in a normal at-power alignment. | ||
-8, 1T-34B ACCUMULATOR LEVEL HIGH OR LOW is lit. | * 1-TS-ECCS-002 Train A and 1-TS-ECCS-002 Train B, Safeguards System Venting (Monthly) Unit 1 were performed last shift for 1P-15A and 1P-15B, Unit 1 safety injection pumps. | ||
Emergency Diesel Generators G | * Combined SOMS accumulator level drop rate (daily accumulator leakage) is currently 0.3 % per day. | ||
-01, G-02, G-03 and G-04 are in a normal at | * Unit 1 RWST Boron concentration is 2950 ppm. | ||
-power alignment. | INITIATING CUES (IF APPLICABLE): | ||
1-TS-ECCS-002 Train A and 1-TS-ECCS-002 Train B, Safeguards System Venting (Monthly) Unit 1 were performed last shift for 1P | * You are the 3rd Control Operator. | ||
-15A and 1P | * The SRO directs you to raise 1T-34B, Unit 1 B SI accumulator level 5% in accordance with OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1, Section 5.2. | ||
-15B, Unit 1 safety injection pumps. | * Unit 1 Control Operator has been assigned the duties of monitoring accumulator parameters per your request. | ||
Combined SOMS accumulator level drop rate (daily accumulator leakage) is currently 0.3 | Page 2 of 16 | ||
Unit 1 RWST Boron concentration is 2950 ppm. | |||
Point Beach Nuclear Plant Fill the Accumulators JPM PERFORMANCE INFORMATION Required Materials: 1. OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1 General | |||
Point Beach Nuclear Plant Fill the Accumulators | |||
==References:== | ==References:== | ||
OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1 Task Standards: The Examinee raises the 1T-34B, Unit 1 B SI accumulator level 5% (+/- 3%) in accordance with OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1, Section 5.2. | |||
Start Time: | |||
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication). | |||
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations. | |||
Performance Step: 1 5.2.1 Perform the following as applicable: | |||
Critical N a. IF filling 1T-34A, THEN perform Attachment A, Steps 1.0 and 2.0. | |||
Standard: The Examinee notes this step is N/A. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 2 5.2.1 Perform the following as applicable: | |||
Critical N b. IF filling 1T-34B, THEN perform Attachment B, Steps 1.0 and 2.0. | |||
Standard: The Examinee performs Attachment B, 1T-34B Accumulator Level/Pressure Change Data Sheet, Sections 1.0 and 2.0. | |||
Evaluator Cue: 1-TS-ECCS-002 was performed last shift and combined leak rate is < 0.7% per day so it is not necessary to perform PBF-2139. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 3 of 16 | |||
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 3 5.2.1 Perform the following as applicable: | |||
The Examinee | Critical N c. Use SOMS data to determine accumulator leak rate over past 30 days, OR since accumulator was last filled (whichever time period is shorter): | ||
Accumulator leak rate (% per day): _____ | |||
Standard: The Examinee fills in the given leak rate. | |||
Evaluator Cue: 1T-34B SI accumulator leak rate is 0.2 % per day over last 30 days. | |||
Performance Step: | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Comments: | |||
Performance Step: 4 5.2.1 Engineering Verification Critical N d. IF accumulator leakage is greater than 0.7% / day, THEN notify Engineering to perform additional evaluation. | |||
Standard: The Examinee N/As Step 5.2.1.d and proceeds to Step 5.2.2. | |||
Standard: The Examinee | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Comments: | |||
Page 4 of 16 | |||
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 5 5.2.2 Align 1P-15A, Safety Injection Pump, recirc flow path as follows: | |||
Critical N a. Ensure LOCKED OPEN 1SI-876A, 1P-15A SI Pump Discharge Recirc to SI Test Line. | |||
Standard: The Examinee ensures that the 1SI-876A, 1P-15A SI pump discharge recirc to SI test line valve is locked open by dispatching the Primary Auxiliary Building Auxiliary Operator to verify 1SI-876As status. | |||
- | |||
Standard: The Examinee | |||
- | |||
Evaluator Cue: | Evaluator Cue: | ||
* The Primary Auxiliary Building Auxiliary Operator acknowledges your request. | |||
* The Primary Auxiliary Building Auxiliary Operator reports that the 1SI-876A, 1P-15A SI pump discharge recirc to SI test line valve is locked open. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 6 5.2.2 Align 1P-15A, Safety Injection Pump, recirc flow path as follows: | |||
Critical N b. At C01R, ensure OPEN 1SI-897A, SI Test Line Return. | |||
Standard: The Examinee ensures that the 1SI-897A, SI test line return isolation AOV is open. (The green light is off, the red light is on and the control switch for 1SI-897A is in the open position.) | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 5 of 16 | |||
The Primary Auxiliary Building Auxiliary Operator acknowledges your request. The Primary Auxiliary Building Auxiliary Operator reports that the 1SI-876A, 1P-15A SI pump discharge recirc to SI test line valve is locked open. Performance: | |||
SATISFACTORY | |||
6 | |||
-897A, SI test line return isolation AOV is open. | |||
-897A is in the open position.) | |||
Performance: | |||
SATISFACTORY | |||
Point Beach Nuclear Plant Fill the Accumulators | Point Beach Nuclear Plant Fill the Accumulators Performance Step: 7 5.2.2 Align 1P-15A, Safety Injection Pump, recirc flow path as follows: | ||
7 | Critical N c. At C01R, ensure OPEN 1SI-897B, SI Test Line Return Second Off Isolation. | ||
Standard: The Examinee ensures that the 1SI-897B, SI test line return isolation AOV is open. (The green light is off, the red light is on and the control switch for 1SI-897B is on the open position.) | |||
Standard: The Examinee ensures that the 1SI | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
-897B, SI test line return isolation AOV is open. (The green light is off, the red light is on and the control switch for 1SI | Comments: | ||
- | Performance Step: 8 5.2.3 Align the RWST flow path as follows: | ||
Performance: | Critical N | ||
* Ensure OPEN 1SI-825A, 1T-13 RWST Outlet to P-15A/B SI Pump | |||
* Ensure OPEN 1SI-825B, 1T-13 RWST Outlet to P-15A/B SI Pump | |||
* Ensure OPEN 1SI-896A, 1P-15A SI Pump Suction | |||
* Ensure OPEN 1SI-866A, Cold Leg Injection Line Isolation Standard: The Examinee ensures all of the following valves are open: | |||
* 1SI-825A, P-15A/B SI pumps suction from RWST MOV. (The green light is off, the red light is on and the control switch is in the auto position.) | |||
* 1SI-825B, P-15A&B SI pumps suction from RWST MOV. (The green light is off, the red light is on and the control switch is in the auto position.) | |||
* 1SI-896A, 1P-15A pump suction isolation valve is open. (The green light is off, the red light is on and the control switch is in the spring return to center position.) | |||
* 1SI-866A, 1P-15A pump discharge header MOV is open. (The green light is off, the red light is on and the control switch is in the spring return to center position.) | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 6 of 16 | |||
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 9 5.2.4 Declare 1P-15A, Safety Injection Pump INOPERABLE, AND enter Action Critical N Condition A of TS 3.5.2. | |||
Performance Step: | Standard: The Examinee notifies the SRO to declare 1P-15A, Safety Injection Pump INOPERABLE, AND enter TS 3.5.2 Action Condition A. | ||
Evaluator Cue: | |||
* The SRO acknowledges your report. | |||
* The SRO informs you that 1P-15A, Safety Injection Pump is INOPERABLE, TS 3.5.2 Action Condition A has been entered and that the Station and Unit Logs have been updated. | |||
* If asked, opposite train standby emergency power supply has been verified operable (per initial conditions). | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 10 5.2.5 Vent 1P-15A SI pump in accordance with Attachment C. | |||
Critical N Standard: Step 5.2.5 is marked N/A. The Examinee proceeds to Step 5.2.6. | |||
Performance: | Evaluator Note: Step 5.2.5 is marked N/A because 1-TS-ECCS-002 Train A, Safeguards System Venting (Monthly) Unit 1 has been completed within the last 24 hours. This is one of the Initial Conditions. | ||
Evaluator Cue: If examinee begins to implement action to vent 1P-15A, the SRO informs him that venting is not required. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 7 of 16 | |||
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 11 5.2.6 Ensure proper oil level in 1P-15A as follows: | |||
Critical N a. Check for visible level in 1P-15A oil sightglass located next to the oiler bulb. | |||
Point Beach Nuclear Plant Fill the Accumulators | : b. IF oil is NOT visible in sight glass, THEN go to Attachment E. | ||
Standard: The Examinee directs the Primary Auxiliary Building Auxiliary Operator to check for visible level in the 1P-15A, safety injection pump oil sight glass located next to the oiler bulb. When told there is oil visible in the sight glass he N/As step b. | |||
. Standard: The Examinee | Evaluator Cue: | ||
-15A, | * The Primary Auxiliary Building Auxiliary Operator acknowledges your request. | ||
* The Primary Auxiliary Building Auxiliary Operator reports that there is oil visible in the 1P-15A, safety injection pump oil sight glass located next to the oiler bulb. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 12 5.2.6 Ensure proper oil level in 1P-15A as follows: | |||
Critical N c. Check 1P-15A oiler bulb at or above one-half full. | |||
: d. IF oiler bulb less than one-half full, THEN go to Attachment E Standard: The Examinee directs the Primary Auxiliary Building Auxiliary Operator to ensure that the 1P-15A, safety injection pump oil bulb is at or above one-half full. When told the oiler bulb is two-thirds full, he N/As step d. | |||
Evaluator Cue: | Evaluator Cue: | ||
The | * The Primary Auxiliary Building Auxiliary Operator acknowledges your request. | ||
The | * The Primary Auxiliary Building Auxiliary Operator reports that the 1P-15A, safety injection pump oil bulb is two-thirds full. | ||
-15A, | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
. | Comments: | ||
Page 8 of 16 | |||
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 13 5.2.7 IF one EDG is aligned to supply both Units A05 standby emergency Critical N power, THEN perform the following: | |||
Standard: Step 5.2.7 is marked N/A. The examinee proceeds to Step 5.2.8. | |||
Evaluator Note: Step 5.2.7 is marked N/A because G-01, G-02, G-03 and G-04 are in a normal at-power alignment. This is one of the Initial Conditions. | |||
Standard: Step 5.2. | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Comments: | |||
Step 5.2. | Performance Step: 14 5.2.8 Start 1P-15A, Safety Injection Pump. | ||
Critical Y Standard: The Examinee places the control switch for 1P-15A, safety injection pump to the Start position. (The green light is off, the red light is on, 1FI-925, 1P-15A High Head SI Flow, 1P-923, 1P-15A SI Pump Disch Pressure and AC AMPS, 1P-15A SI Pump Current are as read.) | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
-15A, the | Comments: | ||
Performance: | Performance Step: 15 5.2.9 Monitor all available channels for accumulator pressure and level during Critical N accumulator fill. | ||
SATISFACTORY | Standard: Examinee notes which indicators he will be monitoring during accumulator fill. | ||
Comments: | Evaluator Note: Initial conditions stated that the Unit 1 Control Operator is available to monitor accumulator parameters per direction of the Examinee. The Booth operator may be used for this function. | ||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 9 of 16 | |||
Point Beach Nuclear Plant Fill the Accumulators | Point Beach Nuclear Plant Fill the Accumulators Performance Step: 16 5.2.10 IF filling 1T-34A, THEN perform the following: | ||
Critical N Standard: Step 5.2.10 is marked N/A. The examinee proceeds to Step 5.2.11. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
: | Comments: | ||
Performance Step: 17 5.2.11 IF filling 1T-34B, THEN perform the following: | |||
- | Critical Y a. Open 1SI-835B, T34B Accumulator Fill AOV, AND record fill start time (T1). | ||
Standard: | |||
Evaluator | * The Examinee places the control switch for the 1SI-835B, 1T-34B accumulator fill AOV to the Open position (The green light is off and the red light is on.) | ||
The | * AND records the fill start time in HH:MM:SS format. | ||
- | Evaluator Note: | ||
Performance: | * The critical portion of this step is opening 1SI-835B. | ||
SATISFACTORY | * The fill start time is used to calculate accumulator fill time in Attachment B, 1T-34B Accumulator Level/Pressure Change Data Sheet, Section 3.1. | ||
* If examinee directs another operator to note fill start or stop times, the Evaluator will assign the booth operator to record clock times. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | Comments: | ||
Page 10 of 16 | |||
Point Beach Nuclear Plant Fill the Accumulators | Point Beach Nuclear Plant Fill the Accumulators Performance Step: 18 5.2.11 IF filling 1T-34B, THEN perform the following: | ||
Critical Y b. Fill SI accumulator to desired level as indicated on the following level indicators: | |||
* 1LI-934, 1T-34B Accumulator Level Indicator | |||
* 1LI-935, 1T-34B Accumulator Level Indicator Standard: Examinee monitors level indication for 1T-34B and raises the level by 5% (+/- 3%). | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
- | Comments: | ||
Performance Step: 19 5.2.11 IF filling 1T-34B, THEN perform the following: | |||
Performance: | Critical Y c. WHEN desired accumulator level is achieved, THEN stop 1P-15A, Safety Injection Pump AND record fill stop time (T2) | ||
SATISFACTORY | Standard: | ||
* The Examinee places the control switch for 1P-15A, safety injection pump to the Stop position. (The green light is on, the red light is off, 1FI-925, 1P-15A High Head SI Flow, 1PI-923, 1P-15A SI Pump Disch Pressure and AC AMPS, 1P-15A SI Pump Current are as read.) | |||
Standard: The Examinee places the control switch for 1P | * AND records the fill stop time in HH:MM:SS format. | ||
-15A, safety injection pump to the | |||
-925, 1P-15A High Head SI Flow, | |||
-923, 1P-15A SI Pump Disch Pressure and AC AMPS, 1P | |||
-15A SI Pump Current are as read.) | |||
Evaluator Note: | Evaluator Note: | ||
* The critical portion of this step is stopping 1P-15A. | |||
* The fill stop time is used to calculate accumulator fill time in Attachment B, 1T-34B Accumulator Level/Pressure Change Data Sheet, Section 3.1. | |||
* If examinee directs another operator to note fill start or stop times, the Evaluator will assign the booth operator to record clock times. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 11 of 16 | |||
The critical portion of this step is | |||
- | |||
SATISFACTORY | |||
Point Beach Nuclear Plant Fill the Accumulators | Point Beach Nuclear Plant Fill the Accumulators Performance Step: 20 5.2.11 IF filling 1T-34B, THEN perform the following: | ||
Critical N d. SHUT 1SI-835B Standard: The Examinee places the control switch for the 1SI-835B, 1T-34B accumulator fill AOV to the Close position (The green light is on and the red light is off) | |||
-34B, THEN perform the following: | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Comments: | |||
Performance Step: 21 5.2.11 IF filling 1T-34B, THEN perform the following: | |||
-34B and | Critical N e. Ensure control switch for 1P-15A is positioned to AUTO Standard: The Examinee ensures that the control switch for 1P-15A, safety injection pump is in the Auto (after trip) position. | ||
Evaluator Cue: Another license has performed an independent verification of 1P-15A, safety injection pump control switch position. | |||
SATISFACTORY | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Comments: | |||
-34B, THEN perform the following: | Performance Step: 22 5.2.11 IF filling 1T-34B, THEN perform the following: | ||
Critical N f. Declare 1P-15A OPERABLE Standard: The Examinee informs the SRO to declare 1P-15A, safety injection pump OPERABLE. | |||
Standard: | |||
-15A, safety injection pump | |||
-15A | |||
SATISFACTORY | |||
-34B, THEN perform the following: | |||
-15A, safety injection pump | |||
Evaluator Cue: | Evaluator Cue: | ||
* The SRO acknowledges your report. | |||
* The SRO reports that 1P-15A, safety injection pump is OPERABLE and the Station and Unit Logs have been updated. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 12 of 16 | |||
The SRO acknowledges your report. | |||
The SRO reports that 1P | |||
-15A, safety injection pump is OPERABLE and the Station and Unit Logs have been updated. | |||
Performance: | |||
SATISFACTORY | |||
Point Beach Nuclear Plant Fill the Accumulators | Point Beach Nuclear Plant Fill the Accumulators Performance Step: 23 5.2.11 IF filling 1T-34B, THEN perform the following: | ||
Critical N g. Exit Action Condition for TS 3.5.2 for Unit 1. | |||
-34B, THEN perform the following: | Standard: The Examinee informs the SRO to exit TS 3.5.2 Action Condition for 1P-15A, Safety Injection pump. | ||
Standard: The Examinee informs the SRO to exit TS 3.5.2 Action Condition for 1P | |||
-15A, Safety Injection pump. | |||
Evaluator Cue: | Evaluator Cue: | ||
The SRO acknowledges your report. | * The SRO acknowledges your report. | ||
The SRO informs you that the Technical Specification Action Condition associated with 1P | * The SRO informs you that the Technical Specification Action Condition associated with 1P-15A, safety injection pump has been exited and the Station and Unit Logs have been updated. | ||
-15A, safety injection pump | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Performance: | Comments: | ||
SATISFACTORY | Performance Step: 24 5.2.11 IF filling 1T-34B, THEN perform the following: | ||
Critical N h. Using data from Steps 5.2.11.c and 5.2.11.a, calculate Accumulator Fill Time (AFT) in seconds: | |||
-34B, THEN perform the following: | T2-T1=AFT | ||
: i. Record AFT in Step 3.1 of Attachment B Standard: | |||
T2-T1=AFT i. Record AFT in Step 3.1 of Attachment B Standard: | * The Examinee calculates the fill time and records the AFT in Step 3.1 of Attachment B | ||
Another license has performed an independent verification of the calculated accumulator fill time | * The Examinee obtains an independent verification of the calculated fill time Evaluator Cue: | ||
* Another license has performed an independent verification of the calculated accumulator fill time. | |||
SATISFACTORY | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Comments: | Comments: | ||
Page 13 of 16 | |||
Point Beach Nuclear Plant Fill the Accumulators | Point Beach Nuclear Plant Fill the Accumulators Performance Step: 25 5.2.12 IF 2P-15A, Safety Injection Pump, for the opposite Unit was declared Critical N INOPERABLE, THEN perform the following: | ||
Standard: Step 5.2.12 is marked N/A. The examinee proceeds to Step 5.2.13. | |||
: | Evaluator Note: As noted in step 5.2.7, the initial conditions did not require declaring 2P-15A inoperable. | ||
. | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
1T- | Comments: | ||
Performance: | Performance Step: 26 5.2.13 IF 1T-34A was filled, THEN perform the following: | ||
SATISFACTORY | Critical N Standard: Step 5.2.13 is marked N/A. The examinee proceeds to Step 5.2.14. | ||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
-34B, | Comments: | ||
-34B | Performance Step: 27 5.2.14 IF 1T-34B was filled, THEN perform the following: | ||
Critical N a. Complete Attachment B Steps 3.2 and 5.0 - 7.0. | |||
Standard: The Examinee performs Attachment B, "1T-34B Accumulator Level/Pressure Change Data Sheet", Sections 3.2 and 5.0 - 7.0. | |||
Evaluator Cue: Log entries have been made for Attachment B section 7.0 Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 14 of 16 | |||
SATISFACTORY | Point Beach Nuclear Plant Fill the Accumulators Performance Step: 28 5.2.14 IF 1T-34B was filled, THEN perform the following: | ||
Comments: Terminating Cues: | Critical N b. Ensure pressure is between 730 and 760 psig as indicated on the following indicators. | ||
The evolution is complete. | * 1PI-936, 1T34B Accumulator Pressure Indicator | ||
Stop Time: | * 1PI-937, 1T34B Accumulator Pressure Indicator Standard: The Examinee ensures that accumulator pressure is between 730 and 760 psig as indicated on the following indicators: | ||
* 1T-34B accumulator pressure, 1PI-936 (C01) | |||
* 1T-34B accumulator pressure, 1PI-937 (C01R) | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 29 Inform the SRO that 1T-34B, Unit 1 B SI accumulator level has been raised 5% | |||
Critical N in accordance with OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1, Section 5.2. | |||
Standard: The Examinee informs the SRO that 1T-34B, Unit 1 B SI accumulator level has been raised 5% in accordance with OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1, Section 5.2. | |||
Evaluator Cue: The SRO acknowledges your report. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Terminating Cues: The evolution is complete. | |||
Stop Time: | |||
Page 15 of 16 | |||
Point Beach Nuclear Plant Fill the Accumulators | Point Beach Nuclear Plant Fill the Accumulators TURNOVER SHEET INITIAL CONDITIONS: | ||
Unit 1 and Unit 2 are operating at 100% steady | * Unit 1 and Unit 2 are operating at 100% steady-state conditions. | ||
-state conditions. | * Annunciator C01B 3-8, 1T-34B ACCUMULATOR LEVEL HIGH OR LOW is lit. | ||
Annunciator C01B 3 | * Emergency Diesel Generators G-01, G-02, G-03 and G-04 are in a normal at-power alignment. | ||
-8, 1T-34B ACCUMULATOR LEVEL HIGH OR LOW is lit. | * 1-TS-ECCS-002 Train A and 1-TS-ECCS-002 Train B, Safeguards System Venting (Monthly) Unit 1 were performed last shift for 1P-15A and 1P-15B, Unit 1 safety injection pumps. | ||
Emergency Diesel Generators G | * Combined SOMS accumulator level drop rate (daily accumulator leakage) is currently 0.3 % per day. | ||
-01, G-02, G-03 and G-04 are in a normal at | * Unit 1 RWST Boron concentration is 2950 ppm. | ||
-power alignment. | INITIATING CUES (IF APPLICABLE): | ||
1-TS-ECCS-002 Train A and 1 | * You are the 3rd Control Operator. | ||
-TS-ECCS-002 Train B, Safeguards System Venting (Monthly) Unit 1 were performed last shift for 1P | * The SRO directs you to raise 1T-34B, Unit 1 B SI accumulator level 5% in accordance with OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1, Section 5.2. | ||
-15A and 1P | * Unit 1 Control Operator has been assigned the duties of monitoring accumulator parameters per your request. | ||
-15B, Unit 1 safety injection pumps. | Page 16 of 16 | ||
Combined SOMS accumulator level drop rate (daily accumulator leakage) is currently 0.3 % per day. | |||
Unit 1 RWST Boron concentration is 2950 ppm. | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
JPM TITLE: Synchronize Turbine Generator Output With Grid At Minimum Load JPM NUMBER: CR JPM d. REV. 0 RELATED PRA None INFORMATION: | |||
TASK NUMBERS / TASK PBN P045.005.COT / Synchronize Turbine Generator To The Grid With Output At TITLE(S): Minimum Load K/A NUMBERS: 062 A4.01 (3.3/3.1) 062 A4.03(2.8/2.9) 062 A4.07 (3.1/3.1) | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
Synchronize Turbine Generator Output With Grid At Minimum Load JPM NUMBER: | |||
CR JPM d. REV. 0 | |||
PBN P045.005.COT / Synchronize Turbine Generator To The Grid With Output At Minimum Load K/A NUMBERS: | |||
062 A4.01 (3.3/3.1) | |||
APPLICABLE METHOD OF TESTING: | APPLICABLE METHOD OF TESTING: | ||
Discussion: | Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room: | ||
Simulate/walkthrough: | Simulator: X Other: | ||
Perform: X | Lab: | ||
In-Plant: | Time for Completion: 20 Minutes Time Critical: NO Alternate Path: NO Page 1 of 9 | ||
Simulator: | |||
X | |||
20 Minutes Time Critical: | |||
: | |||
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 is at low power with OP-1C, | * Unit 1 is at low power with OP-1C, Startup to Power Operation Unit 1"complete through Step 5.85. The secondary is started up and the turbine generator is ready to be placed on the grid. | ||
* Unit 1 TH Auxiliary Operator is standing by at 1E02 Voltage Regulator Cabinet. | |||
Unit 1 TH Auxiliary Operator is standing by at 1E02 Voltage Regulator Cabinet. | * You are the 3rd license. | ||
You are the | INITIATING CUES (IF APPLICABLE): | ||
OS1 directs you to place the turbine generator on the grid per OP-1C, | * OS1 directs you to place the turbine generator on the grid per OP-1C, Startup to Power Operation Unit 1", starting at Step 5.86. | ||
Page 2 of 9 | |||
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load | |||
OP-1C, "Startup to Power Operation Unit 1" Synchroscope Switch Filled out OP-1C up to step for synchronizing to grid General | Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load JPM PERFORMANCE INFORMATION Required Materials: OP-1C, "Startup to Power Operation Unit 1" Synchroscope Switch Filled out OP-1C up to step for synchronizing to grid General | ||
==References:== | ==References:== | ||
OP-1C, "Startup to Power Operation Unit 1" Task Standards: Main Generator in parallel with the grid at minimum load. | |||
Start Time: | |||
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication). | |||
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations. | |||
Performance Step: 1 Ensure Generator Voltage Regulator Control Switch is in the MANUAL position. | |||
Critical N Standard: Generator Voltage Regulator Control Switch is in the MANUAL position. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 2 Ensure turbine speed between 1750 and 1800 rpm. | |||
Critical N Standard: Turbine speed checked. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 3 of 9 | |||
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load Performance Step:3 CLOSE Unit 1 Generator Exciter Field Breaker. | |||
Critical Y Standard: Unit 1 generator Exciter Field Breaker closed. | |||
Evaluator Note: The following alarms may occur when closing the field breaker: | |||
* C01 A 3-2 Unit 1 Generator Reg/Metering Voltage Failure. | |||
* C01 A 4-4 Unit 1 Voltage Regulator Trouble. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 4 Reset Unit 1 voltage regulator panel alarms at 1E02. | |||
Critical N Standard: Voltage regulator alarms reset. | |||
Evaluator Note: Insert trigger 1 to clear alarms at the Voltage Regulator Panel. | |||
Evaluator Cue: Unit 1 Turbine Hall AO reports that he has reset panel 1E02 and all alarms are clear. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 5 Slowly adjust the Generator Voltage Regulator DC Adjuster to obtain a Critical N Generator Voltmeter indication of approximately 19kV at 1800 rpm. | |||
Standard: Generator voltage raised to approximately 19 kV. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 4 of 9 | |||
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load Performance Step: 6 Check all three phases approximately 19 kV, using Unit 1 Generator Voltmeter Critical N switch. | |||
Standard: Phase voltages verified at approximately 19 kV. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Performance Step: | Comments: | ||
Performance Step: 7 For Automatic Voltage Regulation: | |||
. Standard: | Critical N | ||
* Place Unit 1 Generator Voltage Regulator to TEST, o CHECK yellow light is LIT. | |||
SATISFACTORY | * Ensure Generator Voltage Regulator Balance Meter is at approximately zero using Generator Voltage Regulator AC Adjuster. | ||
Performance Step: | * Place Generator Voltage Regulator to AUTO. | ||
o CHECK red light is LIT. | |||
Standard: | Standard: Automatic Voltage Regulation is set up. | ||
Performance: | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
SATISFACTORY | Comments: | ||
Performance Step: 8 Place the Unit 1 Generator Breaker 122 Synchroscope switch to ON. | |||
Critical Y Standard: Unit 1 Generator Breaker Synchroscope to on. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 5 of 9 | |||
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load | Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load Performance Step: 9 Adjust Incoming Voltmeter reading to match Running Voltmeter reading, using Critical Y Generator Voltage Regulator AC Adjuster. | ||
Standard: Incoming and running voltages matched. | |||
Evaluator Note: Incoming voltmeter reading is generator voltage. Running voltmeter reading represents line voltage. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
. | Comments: | ||
Performance Step: 10 Check Unit 1 Generator Exciter Field Ammeter at less than 23 amps. | |||
SATISFACTORY | Critical N Standard: Exciter Field current verified. | ||
Performance Step: | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Comments: | |||
Standard: | Performance Step: 11 Adjust turbine speed (using Reference Control raise and lower pushbuttons) as Critical Y necessary to rotate the synchroscope 2 to 5 rpm in the "FAST" direction. | ||
Standard: Synchroscope rotating 2 to 5 rpm in "FAST" direction. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Page 6 of 9 | |||
SATISFACTORY | |||
Performance Step: | |||
Standard: | |||
SATISFACTORY | |||
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load | Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load Performance Step: 12 Ensure 1F52-122 Generator Main Breaker Control Switch is removed from Critical N PULLOUT. | ||
Standard: 1F52-122 out of PULLOUT. | |||
SATISFACTORY | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Comments: | |||
Performance Step: 13 WHEN the synchroscope is just before 12:00 AND within the Green Band, Critical Y THEN Close 1F52-122, Unit 1 Generator Main Breaker. | |||
Standard: Unit 1 Generator Main Breaker closed. | |||
Evaluator Note: If Generator is allowed to motor, a Generator Trip and Lockout will occur in 45 seconds after receipt of reverse power alarm. | |||
SATISFACTORY | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Performance Step: | Comments: | ||
Performance Step: 14 Record the time. | |||
Standard: | Critical N Standard: Time the generator main breaker is closed is recorded. | ||
SATISFACTORY | Performance: SATISFACTORY _____ UNSATISFACTORY _____ | ||
Comments: | |||
Page 7 of 9 | |||
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load | Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load Performance Step: 15 Check the following: | ||
Critical N | |||
* 20-30 MWe Unit 1 Generator Wattmeter. | |||
* Unit 1 Generator Varmeter indicates a positive number (MVARS in out direction). | |||
* "LOAD CONTROL" status light is LIT. | |||
Standard: Status of generator load verified. | |||
Evaluator Note: Operation of generator in VARS IN is prohibited due to risk of overheating generator bore ring. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
Comments: | |||
Performance Step: 16 Place the Unit 1 Generator Breaker 122 Synchroscope switch to OFF. | |||
Critical N Standard: Synchroscope OFF. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
1 | Comments: | ||
Performance Step: 17 Make notification that the unit is online and intent to raise power per NP 2.1.5. | |||
Critical N Standard: Notification made to Supervision. | |||
Evaluator Cue: SM will make notifications. | |||
Performance: SATISFACTORY _____ UNSATISFACTORY _____ | |||
SATISFACTORY | |||
Standard: | |||
Performance: | |||
SATISFACTORY | |||
Performance Step: | |||
Performance: | |||
SATISFACTORY | |||
Comments: | Comments: | ||
Terminating Cues: This completes the JPM. | |||
Stop Time: | |||
Page 8 of 9 | |||
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load Turnover Sheet INITIAL CONDITIONS: | |||
1 | * Unit 1 is at low power with OP-1C, Startup to Power Operation Unit 1"complete through Step 5.85. The secondary is started up and the turbine generator is ready to be placed on the grid. | ||
* Unit 1 TH Auxiliary Operator is standing by at 1E02 Voltage Regulator Cabinet. | |||
* You are the 3rd license. | |||
. | INITIATING CUES (IF APPLICABLE): | ||
OS1 directs you to place the turbine generator on the grid per OP-1C, Startup to Power Operation Unit 1", | |||
starting at Step 5.86. | |||
Page 9 of 9 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
JPM TITLE: Perform Accident Fan Surveillance Testing JPM NUMBER: CR JPM e. REV. 0 RELATED PRA None INFORMATION: | |||
TASK NUMBERS / TASK PBN P022.003.COT / Monitor the Containment Recirculation fan units for TITLE(S): proper operation K/A NUMBERS: 022.A4.01 (3.6/3.6) | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
Perform Accident Fan Surveillance Testing JPM NUMBER: | |||
CR JPM e. REV. 0 | |||
PBN P022.003.COT / Monitor the Containment Recirculation fan units for proper operation K/A NUMBERS: | |||
022.A4.01 (3.6/3.6) | |||
APPLICABLE METHOD OF TESTING: | APPLICABLE METHOD OF TESTING: | ||
Discussion: | Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room: | ||
Simulate/walkthrough: | Simulator: X Other: | ||
Perform: X | Lab: | ||
In-Plant: | Time for Completion: 25 Minutes Time Critical: NO Alternate Path: NO Page 1 of 9 | ||
Simulator: | |||
X | |||
25 Minutes Time Critical: | |||
NO | |||
: NO | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | |||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Engineering has requested partial performance of TS 33 Containment Accident Recirculation Fan | * Engineering has requested partial performance of TS 33 Containment Accident Recirculation Fan-Cooler Units (Monthly) Unit 1 for data collection purposes. Stroke timing and flow verifications are to be performed for 1SW-2907 Containment Ventilation Coolers Outlet Emergency Flow Control Valve. | ||
-Cooler Units (Monthly) Unit 1 for data collection purposes. Stroke timing and flow verifications are to be performed for 1SW-2907 Containment Ventilation Coolers Outlet Emergency Flow Control Valve. | * Service Water chlorination is in progress. | ||
Service Water chlorination is in progress. Service Water overboard is aligned to both | * Service Water overboard is aligned to both Units. | ||
An AO is standing by for surveillance support. | * An AO is standing by for surveillance support. | ||
INITIATING CUES | INITIATING CUES: | ||
* OS1 has directed you to performTS-33 Containment Accident Fan Recirculation Fan-Cooler Units (Monthly) Unit 1 for 1SW-2907 starting with Step 5.7. | |||
-33 Containment Accident Fan Recirculation Fan | Page 2 of 9 | ||
-Cooler Units (Monthly) Unit 1 for 1SW-2907 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
TS-33 Containment Accident Fan Recirculation Fan | JPM PERFORMANCE INFORMATION Required Materials: TS-33 Containment Accident Fan Recirculation Fan-Cooler Units (Monthly) Unit 1 marked up for 1SW-2907 testing. | ||
-Cooler Units (Monthly) Unit 1 marked up for | Stop Watch (record serial number and calibration due date on marked-up TS-33) | ||
-up TS-33) General | General | ||
==References:== | ==References:== | ||
TS-33 Containment Accident Fan Recirculation Fan-Cooler Units (Monthly) Unit 1 | |||
OI 70, Service Water System Operation Task Standards: Perform TS-33 Accident Fan testing on 1SW-2907 Containment Ventilation Coolers Outlet Emergency Flow Control Valve. | |||
Start Time: | |||
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication). | |||
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations. | |||
Performance Step: 1 Circle Service Water overboard alignment on Attachment B, Data Sheet, Step 2.0. | |||
Critical N Standard: Examinee circles Both on Data Sheet per turnover. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 2 Circle As-Found condition of the Service Water pumps in the following table: | |||
Critical N Standard: Examinee lists the condition of the Service Water Pumps, ON/OFF. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Page 3 of 9 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
Performance Step: 3 Operate additional Service Water Pumps as necessary per OI 70, Service Water Critical N System Operation. | |||
Standard: Examinee acknowledges guidance of OI 70 and Service Water Pump operation. | |||
Evaluator Cue: If examinee references OI 70, state that the OS2 will ensure OI 70 requirements are addressed. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 4 UNLOCK AND OPEN 1SW-167, 1HX-015A-D Cont Recirc HX Return 1PI-2907 Critical N Isolation. | |||
Standard: Have field AO Unlock and Open 1SW-167. | |||
Evaluator Cue: AO reports back that 1SW-167 is UNLOCKED and OPEN. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 5 IF Unit 2 is in MODE 1, 2, 3, or 4, THEN, for Unit 2, enter the applicable LCO Critical N 3.7.8 Action Condition AND record Date and time. | |||
Standard: Examinee records the time and date for SW TSAC 3.7.8.F entry. | |||
Evaluator Cue: Inform examinee OS2 will have the 4th license make the required log entries for Unit 2 TSAC 3.7.8.F entry. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Page 4 of 9 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
Performance Step: 6 Perform full stroke OPEN timing and position indication verification (PIV) Test of Critical Y 1SW-2907, Cont Vent Coolers Outlet Emer FCV, as follows: | |||
* OPEN AND time 1SW-2907, Cont Vent Coolers Outlet Emer FCV. | |||
* Record time to OPEN on Attachment C, Service Water System Valve Stroke Testing. | |||
* Check rising stem position indicator for OPEN indication AND record local valve position indication on Attachment C, Service Water System Valve Stroke Testing. | |||
Standard: Examinee opens and records correct stroke time for 1SW-2907 FCV. | |||
Evaluator Cue: AO reports back that local position indication is OPEN for 1SW-2907. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 7 WHEN Service Water flow has stabilized, THEN perform Attachment B, Data Critical Y Sheet, Steps 3.0 through 6.0 to obtain As-Found conditions of 1SW-2907 Cont Vent Coolers Outlet Emer FCV. | |||
Standard: Record and calculate data correctly per Attachment B steps 3.0 through 6.0. | |||
Evaluator Cue: PAB AO reports PI-2907reads 19 Hg for Attachment B Table 3.0. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Page 5 of 9 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
Performance Step: 8 IF flow to any Containment Accident Recirculation Hx is outside acceptable flow Critical Y limits as recorded on Attachment B, Data Sheet, Table 6.0, OR following fan cooler maintenance/refueling, OR it is desired to adjust flow per Engineering, THEN perform the following: | |||
Standard: Examinee N/As steps associated with adjusting flow for 1SW-2907 Cont Vent Coolers Outlet Emer FCV. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 9 Perform full stroke SHUT timing and position indication verification (PIV) Test of Critical N 1SW-2907, Cont Vent Coolers Outlet Emer FCV, as follows: | |||
* SHUT AND time 1SW-2907, Cont Vent Coolers Outlet Emer FCV. | |||
* Record time to SHUT on Attachment C, Service Water System Valve Stroke Testing. (For Information Only) | |||
* Check rising stem position indicator for SHUT indication AND record local valve position indication on Attachment C, Service Water System Valve Stroke Testing. | |||
Standard: Examinee shuts and records stroke time for 1SW-2907 FCV. | |||
Evaluator Cue: AO reports back that local position indication is SHUT for 1SW-2907. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 10 SHUT AND LOCK 1SW-167, 1HX-015A-D Cont Recirc HX Return 1PI-2907 Critical N Isolation. | |||
Standard: Have field AO Shut and Lock 1SW-167. | |||
Evaluator Cue: AO reports back that 1SW-167 is SHUT and LOCKED along with being IVd. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Page 6 of 9 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
8 | |||
Standard: Examinee N/ | |||
-2907 Cont Vent Coolers Outlet Emer FCV. | |||
Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
9 | |||
SHUT AND time 1SW-2907, Cont Vent Coolers Outlet Emer FCV. | |||
Record time to SHUT on Attachment C, Service Water System Valve Stroke Testing. (For Information Only) | |||
Check rising stem position indicator for SHUT indication AND record local valve position indication on Attachment C, Service Water System Valve Stroke Testing. Standard: Examinee shuts and records stroke time for 1SW | |||
-2907 FCV. Evaluator Cue: | |||
AO reports back that local position indication is SHUT for 1SW | |||
-2907. Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
-2907 Isolation. | |||
Standard: Have field AO Shut and Lock 1SW | |||
-167. Evaluator Cue: | |||
AO reports back that 1SW | |||
-167 is SHUT and LOCKED along with being | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
Performance Step: 11 IF necessary, THEN place Service Water Pumps to the As-Found alignment. | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Critical N Standard: Examinee N/As this step since Service Water Pump alignment has not changed. | ||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Standard: Examinee | Performance Step: 12 Record the following Containment Accident Recirculation Hx Service Water flows: | ||
Performance: | Critical N Standard: Examinee correctly records SW flows for all 4 Containment Accident Fans. | ||
SATISFACTORY UNSATISFACTORY | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Performance Step: 13 IF entered in Step 5.11, THEN exit the applicable LCO 3.7.8 Action Condition Critical N AND record date and time. | |||
Standard: Examinee records the time and date that TSAC 3.7.8.F is exited. | |||
Evaluator Cue: Inform examinee OS2 will have the 4th license make the required log entry that Unit 2 TSAC 3.7.8.F is exited. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Page 7 of 9 | |||
Comments: | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
Performance Step: 14 Check valve operability by comparing the recorded valve data with the Critical Y Acceptance Criteria on Attachment C, Service Water System Valve Stroke Testing, AND circle the appropriate SAT / UNSAT condition. | |||
Standard: Examinee notifies Chemistry to secure chlorination. | Standard: Examinee circles SAT for acceptance criteria. | ||
Evaluator Cue: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Chemistry has been notified to secure service water chlorination. | Performance Step: 15 IF service water chlorination was required per step 4.3, THEN notify Chemistry to Critical N secure service water chlorination. | ||
Performance: | Standard: Examinee notifies Chemistry to secure chlorination. | ||
SATISFACTORY UNSATISFACTORY Comments: | Evaluator Cue: Chemistry has been notified to secure service water chlorination. | ||
This completes the JPM. | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Stop Time: | Terminating Cues: This completes the JPM. | ||
Stop Time: | |||
Page 8 of 9 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
Engineering has requested partial performance of TS 33 Containment Accident Recirculation Fan | TURNOVER SHEET INITIAL CONDITIONS: | ||
-Cooler Units (Monthly) Unit 1 for data collection purposes. Stroke timing and flow verifications are to be performed for 1SW-2907 Containment Ventilation Coolers Outlet Emergency Flow Control Valve. | * Engineering has requested partial performance of TS 33 Containment Accident Recirculation Fan-Cooler Units (Monthly) Unit 1 for data collection purposes. Stroke timing and flow verifications are to be performed for 1SW-2907 Containment Ventilation Coolers Outlet Emergency Flow Control Valve. | ||
Service Water chlorination is in progress. | * Service Water chlorination is in progress. | ||
Service Water overboard is aligned to Unit 2. | * Service Water overboard is aligned to Unit 2. | ||
An AO is standing by for surveillance support. | * An AO is standing by for surveillance support. | ||
INITIATING CUES: | INITIATING CUES: | ||
OS1 has directed you to performTS | * OS1 has directed you to performTS-33 Containment Accident Fan Recirculation Fan-Cooler Units (Monthly) Unit 1 for 1SW-2907 starting with Step 5.7. | ||
-33 Containment Accident Fan Recirculation Fan | Page 9 of 9 | ||
-Cooler Units (Monthly) Unit 1 for 1SW | |||
-2907 starting with Step 5.7. | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
Respond to a Loss of | JPM TITLE: Respond to a Loss of Reactor Coolant to a Shutdown Unit JPM NUMBER: CR JPM f. REV.0 RELATED PRA None INFORMATION: | ||
CR JPM f. REV.0 | TASK NUMBERS / TASK P000.046.COT / Respond to a Loss of Reactor Coolant to a Shutdown Unit TITLE(S): | ||
009 EA1.01 (4.4/4.3) 009 EA1.04 (3.7/3.5) 009 EA1.08 (4.0/4.1) | |||
P000.046.COT / Respond to a Loss of Reactor Coolant to a Shutdown Unit | K/A NUMBERS: | ||
009 EA1.01 (4.4/4.3) 009 EA1.04 (3.7/3.5) 009 EA1.08 (4.0/4.1) 009 EA1.16 (4.2/4.2) 009 EA2.01 (4.2/4.8) 009 EA2.39 (4.3/4.7) | 009 EA1.16 (4.2/4.2) 009 EA2.01 (4.2/4.8) 009 EA2.39 (4.3/4.7) | ||
APPLICABLE METHOD OF TESTING: | APPLICABLE METHOD OF TESTING: | ||
Discussion: | Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room: | ||
Simulate/walkthrough: | Simulator: X Other: | ||
Perform: X | Lab: | ||
In-Plant: | Time for Completion: 20 Minutes Time Critical: NO Alternate Path: NO Page 1 of 12 | ||
Simulator: | |||
X | |||
20 Minutes Time Critical: | |||
NO | |||
: NO | |||
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 is in the process of cooling down from hot shutdown to cold shutdown. | * Unit 1 is in the process of cooling down from hot shutdown to cold shutdown. | ||
OP-3C in progress; completed through Step 5.21 ready for RHR. | * OP-3C in progress; completed through Step 5.21 ready for RHR. | ||
RCS temperature is approximately 333°F. RCS pressure is approximately 340 psig. Pressurizer level suddenly begins to lower. | * RCS temperature is approximately 333°F. | ||
INITIATING CUES | * RCS pressure is approximately 340 psig. | ||
* Pressurizer level suddenly begins to lower. | |||
INITIATING CUES: | |||
* The OS1 directs you to respond to the loss of pressurizer level in accordance with SEP-2 Unit 1, Shutdown LOCA Analysis. | |||
Page 2 of 12 | |||
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit | Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit JPM PERFORMANCE INFORMATION Required Materials: 1. SEP-2 Unit 1, Shutdown LOCA Analysis | ||
: 2. SEP-2.1 Unit 1, Shutdown LOCA With RHR Aligned For Low Head Injection General | : 2. SEP-2.1 Unit 1, Shutdown LOCA With RHR Aligned For Low Head Injection General | ||
==References:== | ==References:== | ||
: 1. SEP-2 Unit 1, Shutdown LOCA Analysis | : 1. SEP-2 Unit 1, Shutdown LOCA Analysis | ||
: 2. SEP-2.1 Unit 1, Shutdown LOCA With RHR Aligned For Low Head Injection Task Standards: | : 2. SEP-2.1 Unit 1, Shutdown LOCA With RHR Aligned For Low Head Injection Task Standards: The Examinee mitigates the leak such that RCS inventory is stable or rising in accordance with SEP-2 Unit 1, Shutdown LOCA Analysis, and SEP-2.1 Unit 1, Shutdown LOCA With RHR Aligned For Low Head Injection Start Time: | ||
The Examinee mitigates the leak such that RCS inventory is stable or rising in accordance with SEP | NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication). | ||
-2 Unit 1, Shutdown LOCA Analysis, and SEP | IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations. | ||
-2.1 Unit 1, Shutdown LOCA With RHR Aligned For Low Head Injection Start Time: | Performance Step: 1 SEP-2 step 1: Check both SI Accumulators isolated. | ||
NOTE: | Critical N Standard: The Examinee checks both SI accumulators isolated by checking the accumulator MOVs, 1SI-841A and 1SI-841B deenergized and the SI Spray Ready Status Lights for 1SI-841A and 1SI-841B lit. | ||
, the examinee looks or asks for the indication). | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
IMPORTANT: Critical steps are marked with a | Page 3 of 12 | ||
Performance Step: | |||
1 | |||
Standard: The Examinee checks both SI accumulators isolated by checking the accumulator MOVs, 1SI-841A and 1SI | |||
-841B deenergized and the SI Spray Ready Status Lights for 1SI | |||
-841A and 1SI | |||
-841B lit. Performance: | |||
SATISFACTORY UNSATISFACTORY | |||
3 | |||
Comments: Performance Step: | Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 2 2: Check one train of RHR aligned for decay heat removal. | ||
Critical Y Standard: The Examinee checks that RHR is not aligned for decay heat removal by checking the status of 1P-10A&B RHR pumps suction header MOVs, 1RH-700 and 1RH-701 and the RHR return to RC MOV, 1RH-720 and Goes to SEP-2.1 Unit 1, Shutdown LOCA With RHR Aligned For Low Head Injection. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
-2A, 1P-2B and 1P-2C by placing the control switch(es) to the Start position. | Performance Step: 3 SEP-2.1 step 1: | ||
Performance: | Critical Y Isolate RCS Letdown: | ||
SATISFACTORY UNSATISFACTORY Comments: | : a. Shut letdown orifice outlet valves | ||
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit | * 1CV-200A | ||
11 | * 1CV-200B | ||
* 1CV-200C Standard: The Examinee places the control switches for the letdown orifice outlet valves, 1CV-200A, 1CV-200B and 1CV-220C to the close position and verifies they go shut. | |||
Performance: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
SATISFACTORY UNSATISFACTORY Comments: | Performance Step: 4 1: Isolate RCS Letdown Critical Y b. Shut RCS loop B cold leg to CVCS letdown isolation 1RC-427 Standard: The Examinee places the control switch for the RCS loop B cold leg to CVCS letdown isolation, 1RC-427 to the close position and verifies it goes shut. | ||
12 | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
-5). Performance: | Page 4 of 12 | ||
SATISFACTORY UNSATISFACTORY Comments: | |||
13 | Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 5 2: Establish Design Charging Flow Rate Using RWST Suction: | ||
-1A and 1P-1B to the stop position and verifies they are secured. | Critical Y a. Open RWST charging pump suction 1CV-112B Standard: The Examinee places the control switch for the RWST charging pump suction, 1CV-112B to the open position and verifies it goes open. | ||
Performance: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
SATISFACTORY UNSATISFACTORY Comments: | Performance Step: 6 2: Establish Design Charging Flow Rate Using RWST Suction: | ||
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit | Critical Y b. Shut VCT outlet valve 1CV-112C Standard: The Examinee places the control switch for the VCT outlet valve, 1CV-112C to the close position and verifies it shut. | ||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 7 2: Establish Design Charging Flow Rate Using RWST Suction: | |||
Evaluator Cue: | Critical Y c. Establish 76 gpm charging flow Standard: The Examinee adjusts running charging pump(s) speed and 1HC-142 valve position to establish 76 gpm charging flow. | ||
The OS1 acknowledges your request. (if needed) | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Performance: | Page 5 of 12 | ||
SATISFACTORY UNSATISFACTORY Comments: | |||
15 | Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 8 3: Check Leak Rate - GREATER THAN CHARGING FLOW: | ||
Critical Y o PZR LEVEL TRENDING LOWER OR o PZR level less than [34%] 10% | |||
Evaluator Cue: | * 1LI-433 OR o RCS subcooling based on core exit thermocouples less than [80°F] 35°F Standard: The Examinee checks pressurizer level trending lower or less than [34%] 10% on 1LI-433 or RCS subcooling less than [80°F] 35°F. | ||
The OS1 acknowledges your request. | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Performance: | Performance Step: 9 4: Establish Maximum Charging Flow: | ||
SATISFACTORY UNSATISFACTORY Comments: | Critical Y a. Fully open charging flow control valve 1HC-142 Standard: The Examinee fully opens charging flow control valve, 1HC-142. | ||
16 | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Checking Key #3(s) installed and in the on position, | Performance Step: 10 4: Establish Maximum Charging Flow: | ||
-493) light lit and The 1RC-430 Low Temp Overpress Enabled (1PT-420) light lit. | Critical Y b. Start additional charging pumps | ||
Performance: | * 1P-2A | ||
SATISFACTORY UNSATISFACTORY Comments: | * 1P-2B | ||
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit | * 1P-2C Standard: The Examine starts additional available charging pumps, 1P-2A, 1P-2B and 1P-2C by placing the control switch(es) to the Start position. | ||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
-825A and 1SI | Page 6 of 12 | ||
-825B RWST outlet to SI pump valves are open. Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 11 4: Establish Maximum Charging Flow: | ||
18 | Critical Y c. Limit charging flow to less than 140 gpm by adjusting charging pump speed as necessary Standard: The Examinee adjusts running charging pump(s) speed to limit charging flow to less than 140 gpm. | ||
-878A and 1SI | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
-878C to the open position and verifies they open. | Performance Step: 12 5: Initiate Containment Isolation Critical N Standard: The Examinee depresses both containment isolation pushbuttons and acknowledges the annunciator Unit 1 Containment Isolation (C01B 2-5). | ||
Performance: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
SATISFACTORY UNSATISFACTORY Comments: | Performance Step: 13 6: Stop RCPs Critical N | ||
19 | * 1P-1A | ||
* 1P-1B Standard: The Examinee places the control switches for reactor coolant pumps, 1P-1A and 1P-1B to the stop position and verifies they are secured. | |||
-15B to the start position and verifies pump starts and has proper discharge pressure and flow. | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Performance: | Page 7 of 12 | ||
SATISFACTORY UNSATISFACTORY Comments: | |||
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit | Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 14 7: Initiate the following actions Critical N a. Evacuate Containment Standard: The Examinee performs containment evacuation. | ||
20 | Evaluator Cue: The OS1 acknowledges your request. (if needed) | ||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
-866B as necessary to maintain subcooling greater than [80°F] 35°F. | Performance Step: 15 7: Initiate the following actions Critical N b. Notify DCS and implement emergency plan Standard: The Examinee directs the OS1/SM to notify the DCS and implement the Emergency Plan. | ||
Performance: | Evaluator Cue: The OS1 acknowledges your request. | ||
SATISFACTORY UNSATISFACTORY Comments: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Performance Step: 16 8: Check Low Temperature Overpressure Protection In Service Critical N Standard: The Examinee checks Low Temperature Overpressure Protection In Service by: | |||
SATISFACTORY UNSATISFACTORY Comments: | * Checking Key #3(s) installed and in the on position, | ||
22 | * The 1RC-431C Low Temp Overpress Enabled (1PT-493) light lit and | ||
* The 1RC-430 Low Temp Overpress Enabled (1PT-420) light lit. | |||
- GREATER THAN OR EQUAL TO 60% | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Standard: The Examinee checks RWST level greater than 60%. | Page 8 of 12 | ||
Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 17 9: Establish Flow From One SI Pump: | ||
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit | Critical Y a. Open both RWST outlet to SI pump valves | ||
23 | * 1SI-825A | ||
* 1SI-825B Standard: The Examinee verifies 1SI-825A and 1SI-825B RWST outlet to SI pump valves are open. | |||
- GREATER THAN 27 FT Standard: The Examinee checks reactor vessel level narrow range on 1C20 greater than 27 feet. Evaluator Note: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
This is a continuous action step. | Performance Step: 18 9: Establish Flow From One SI Pump: | ||
Performance: | Critical Y b. Open both train B reactor vessel injection valves | ||
SATISFACTORY UNSATISFACTORY Comments: | * 1SI-878A | ||
24 | * 1SI-878C Standard: The Examinee places the control switches for the train B reactor vessel injection valves, 1SI-878A and 1SI-878C to the open position and verifies they open. | ||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Evaluator Note: | Performance Step: 19 9: Establish Flow From One SI Pump: | ||
This is a continuous action step. | Critical Y c. Start SI pump B | ||
Performance: | * 1P-15B Standard: The Examinee places the control switch for the SI pump B, 1P-15B to the start position and verifies pump starts and has proper discharge pressure and flow. | ||
SATISFACTORY UNSATISFACTORY Comments: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
The evolution is complete. | Page 9 of 12 | ||
Stop Time: | |||
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 20 9: Establish Flow From One SI Pump: | |||
Critical N d. Throttle train B SI pump discharge header as necessary to maintain subcooling greater than [80°F] 35°F | |||
* 1SI-866B Standard: The Examinee throttles train B SI pump discharge header, 1SI-866B as necessary to maintain subcooling greater than [80°F] 35°F. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 21 10. Check If Low Head SI Flow Is Required: | |||
Critical N a. RCS subcooling based on core exit thermocouples less than [80°F] | |||
35°F Standard: | |||
* The Examinee checks subcooling greater than [80°F] 35°F and | |||
* Goes to Step 12. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 22 12. Verify Containment Sump Recirculation Not Required: | |||
Critical N a. Check RWST level - GREATER THAN OR EQUAL TO 60% | |||
Standard: The Examinee checks RWST level greater than 60%. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Page 10 of 12 | |||
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 23 13. Verify Adequate Injection Flow: | |||
Critical N a. Check reactor vessel level narrow range - GREATER THAN 27 FT Standard: The Examinee checks reactor vessel level narrow range on 1C20 greater than 27 feet. | |||
Evaluator Note: This is a continuous action step. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 24 13. Verify Adequate Injection Flow: | |||
Critical N b. Check core exit thermocouples STABLE OR TRENDING LOWER Standard: The Examinee checks core exit thermocouples at 1C20 stable or trending lower. | |||
Evaluator Note: This is a continuous action step. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Terminating Cues: The evolution is complete. | |||
Stop Time: | |||
Page 11 of 12 | |||
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit | Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit TURNOVER SHEET INITIAL CONDITIONS: | ||
Unit 1 is in the process of cooling down from hot shutdown to cold shutdown. | * Unit 1 is in the process of cooling down from hot shutdown to cold shutdown. | ||
OP-3C in progress; completed through Step 5.21 ready for RHR. | * OP-3C in progress; completed through Step 5.21 ready for RHR. | ||
RCS temperature is approximately 333°F. | * RCS temperature is approximately 333°F. | ||
RCS pressure is approximately 340 psig. | * RCS pressure is approximately 340 psig. | ||
Pressurizer level suddenly begins to lower. | * Pressurizer level suddenly begins to lower. | ||
INITIATING CUES: | INITIATING CUES: | ||
The OS1 directs you to respond to the loss of pressurizer level in accordance with SEP | * The OS1 directs you to respond to the loss of pressurizer level in accordance with SEP-2 Unit 1, Shutdown LOCA Analysis. | ||
-2 Unit 1, Shutdown LOCA Analysis. | Page 12 of 12 | ||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
Shift Component Cooling Water Pumps JPM NUMBER: | JPM TITLE: Shift Component Cooling Water Pumps JPM NUMBER: CR JPM g REV. 0 RELATED PRA None INFORMATION: | ||
CR JPM g REV. 0 | TASK NUMBERS / TASK PBN P008.003.COT Operate the CCW System TITLE(S): | ||
K/A NUMBERS: 008.A4.04 (2.6*/2.6) | |||
PBN P008.003.COT | |||
008.A4.04 | |||
APPLICABLE METHOD OF TESTING: | APPLICABLE METHOD OF TESTING: | ||
Discussion: | Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room: | ||
Simulate/walkthrough: | Simulator: X Other: | ||
Perform: X | Lab: | ||
In-Plant: | Time for Completion: 15 Minutes Time Critical: NO Alternate Path: NO Page 1 of 7 | ||
Simulator: | |||
X | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
15 Minutes Time Critical: | I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | ||
NO | |||
: NO Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
1P-11B Component Cooling Water (CCW) Pump has been aligned for use after being drained for Maintenance. | * 1P-11B Component Cooling Water (CCW) Pump has been aligned for use after being drained for Maintenance. | ||
1P-11B Component Cooling Water Pump is filled and vented. | * 1P-11B Component Cooling Water Pump is filled and vented. | ||
An AO is standing by at the Unit 1 CCW Pumps for assistance. | * An AO is standing by at the Unit 1 CCW Pumps for assistance. | ||
INITIATING CUES | INITIATING CUES: | ||
* OS1 directs you to start 1P-11B CCW Pump and secure 1P-11A CCW Pump per 1-SOP-CC-001 Component Cooling System Step 5.4.2 Page 2 of 7 | |||
-11B CCW Pump and secure 1P | |||
-11A CCW Pump per 1 | |||
-SOP-CC-001 Component Cooling System Step 5.4.2 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
1-SOP-CC-001 Component Cooling System Section 5.4 General | JPM PERFORMANCE INFORMATION Required Materials: 1-SOP-CC-001 Component Cooling System Section 5.4 General | ||
==References:== | ==References:== | ||
1-SOP-CC-001 Component Cooling System Task Standards: Shift from 1P-11A CCW Pump operating to 1P-11B CCW Pump operating per 0-SOP-CC-001 Component Cooling System. | |||
Start Time: | |||
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication). | |||
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations. | |||
Performance Step: 1 a. Ensure 1P-11B is filled and vented. | |||
Critical N Standard: Examinee sign off 1-SOP-CC-001 per turnover. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 2 b. Ensure 1P-11B has proper valve alignment per 1-CL-CC-001 Component Critical N Cooling valve Lineup: | |||
* 1CC-723B, 1P-11B CC Pump Suction - LOCKED OPEN | |||
* 1CC-725B, 1P-11B CC Pump Discharge - LOCKED OPEN | |||
* 1CC-V-23, 1P-11B CC Pump Casing Vent - SHUT & CAPPED Standard: Examinee signs off valves in correct position. | |||
Evaluator Cue: The AO reports valves are in correct position per Step 5.4.2.b and have been IVd. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Page 3 of 7 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
Performance Step: 3 c. Ensure 1T-12 CC Surge Tank is greater than 45% on 1LI-618B Critical N Standard: Examinee verifies CC Surge Tank >45% level. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 4 d. Open 1CC-738A OR 1CC-738B, (circle one) RHR HX Shell Side Inlet. | |||
Critical Y Standard: Examinee opens 1CC-138A or 1CC-738B and circles. | |||
Evaluator Note: Critical part of step is opening of valve only. | |||
Alarms 1C03 1D 1-4 and 1-5 RCP Low Cooling Water Flow come in and are expected. | |||
Evaluator Cue: If examinee asks or wants to address the alarms, inform them they were briefed as expected alarms during the pre-job brief. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 5 e. IF total flow remains less than 2000 gpm on 1FI-619, THEN perform the Critical N following: | |||
Standard: Examinee should determine flow is >2000 gpm and sub-steps under 5.4.2.e are NOT to be performed. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Page 4 of 7 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
3 | |||
-12 CC Surge Tank is greater than 45% on 1LI | |||
-618B | |||
Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
4 | |||
-738A OR 1CC-738B, (circle one) RHR HX Shell Side Inlet. | |||
Standard: Examinee opens 1CC | |||
-138A or 1CC | |||
-738B and circles. | |||
Evaluator Note: | |||
Critical part of step is opening of valve only. | |||
Alarms 1C03 1D 1 | |||
-4 and 1-5 RCP Low Cooling Water Flow come in and are expected. Evaluator Cue: | |||
If examinee asks or wants to address the alarms, inform them they were briefed as | |||
-job brief. | |||
Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
5 | |||
-619, THEN perform the following: | |||
Standard: Examinee should determine flow is >2000 gpm and sub | |||
-steps under 5.4.2.e are NOT to be performed. | |||
Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
6 | Performance Step: 6 f. Start 1P-11B CCW Pump and run in parallel with 1P-11A. | ||
-11B CCW Pump and run in parallel with 1P-11A. Standard: Examinee starts 1P | Critical Y Standard: Examinee starts 1P-11A and runs for 1 minute while verifying system response. | ||
-11A and runs for 1 minute while verifying system response. | Evaluator Note: Evaluator can cue examinee that 1 minute has expired if desired. | ||
Evaluator Note: | Evaluator Cue: If asked, the AO can report personnel are clear of the area and all conditions are normal for starting 1P-11B CCW Pump. | ||
Evaluator can cue examinee that 1 minute has expired if desired. | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Evaluator Cue: | Performance Step: 7 g. Place and hold in STOP 1P-11A CCW Pump control switch for approximately Critical Y 3 seconds. | ||
If asked, the AO can report personnel are clear of the area and all conditions are normal for starting 1P | Standard: Examinee stops 1P-11A CCW Pump. | ||
-11B CCW Pump. | Evaluator Cue: If asked, the AO can report normal coastdown of 1P-11A CCW Pump and check valve seating was heard for 1P-11A when pump was secured. | ||
Performance: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
SATISFACTORY UNSATISFACTORY Comments: | Performance Step: 8 h. Release 1P-11A CCW Pump control switch and allow it to return to AUTO. | ||
7 | Critical Y Standard: Examinee places 1P-11A CCW Pump to AUTO. | ||
-11A CCW Pump control switch for approximately 3 seconds. | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Standard: Examinee stops 1P | Page 5 of 7 | ||
-11A CCW Pump. | |||
Evaluator Cue: | |||
If asked, the AO can report normal coastdown of 1P | |||
-11A CCW Pump and check valve seating was heard for 1P | |||
-11A when pump was secured. | |||
Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
8 | |||
-11A CCW Pump control switch and allow it to return to AUTO. | |||
Standard: Examinee places 1P | |||
-11A CCW Pump to AUTO. | |||
Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
Performance Step: 9 i. SHUT 1CC-738A OR 1CC-738B RHR HX Shell Inlet Critical Y Standard: Examinee SHUTS 1CC-738A or 1CC-738B, whichever was opened previously. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 10 If step 5.4.2.e was NOT performed then Steps 5.4.2.j through 5.4.2.l are N/A. | |||
Critical N Standard: Examinee N/As Steps 5.4.2.j through 5.4.2.l. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 11 Examinee informs OS1 shifting of CCW Pumps is complete per 1-SOP-CC-001. | |||
Critical N Standard: Report completion of 1-SOP-CC-001 to shift CCW Pumps. | |||
Evaluator Cue: Acknowledge completion of 1-SOP-CC-001 Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Terminating Cues: This completes the JPM. | |||
Stop Time: | |||
Page 6 of 7 | |||
INITIATING CUES | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
TURNOVER SHEET INITIAL CONDITIONS: | |||
-11B CCW Pump and secure 1P | * 1P-11B Component Cooling Water (CCW) Pump has been aligned for use after being drained for Maintenance. | ||
-11A CCW Pump per 1 | * 1P-11B Component Cooling Water Pump is filled and vented. | ||
-SOP-CC-001 Component Cooling System Step 5.4.2 | * An AO is standing by at the Unit 1 CCW Pumps for assistance. | ||
INITIATING CUES: | |||
* OS1 directs you to start 1P-11B CCW Pump and secure 1P-11A CCW Pump per 1-SOP-CC-001 Component Cooling System Step 5.4.2 Page 7 of 7 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
Test High Flux at Shutdown Alarm JPM NUMBER: | SITE: Point Beach JPM TITLE: Test High Flux at Shutdown Alarm JPM NUMBER: Control Room JPM h REV. 0 RELATED PRA None INFORMATION: | ||
Control Room JPM h REV. 0 | TASK NUMBERS / TASK PBN P015.004.COT/ Monitor the Nuclear Instrument System for Proper Operation TITLE(S): | ||
K/A NUMBERS: 015.A3.02 (3.7/3.9) | |||
PBN P015.004.COT/ Monitor the Nuclear Instrument System for Proper Operation K/A NUMBERS: | |||
015.A3.02 (3.7/3.9) | |||
APPLICABLE METHOD OF TESTING: | APPLICABLE METHOD OF TESTING: | ||
Discussion: | Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room: | ||
Simulate/walkthrough: | Simulator: X Other: | ||
Perform: X | Lab: | ||
In-Plant: | Time for Completion: 10 Minutes Time Critical: NO Alternate Path: NO Page 1 of 9 | ||
Simulator: | |||
X | |||
NO | |||
: NO | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. | |||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
You are the Unit 1 BOP Unit 1 has just been drained down in preparation for removing the Reactor Vessel Head. | * You are the Unit 1 BOP | ||
The crew is performing RP | * Unit 1 has just been drained down in preparation for removing the Reactor Vessel Head. | ||
-1A, Preparation for Refueling Attachment A, Reactor Vessel Head Lift Checkoff Data Sheet. | * The crew is performing RP-1A, Preparation for Refueling Attachment A, Reactor Vessel Head Lift Checkoff Data Sheet. | ||
Both Source Range Detectors N | * Both Source Range Detectors N-31 and N-32 are in service. | ||
-31 and N-32 are in service. | * There is an Auxiliary Operator stationed in Containment to support Attachment A evolutions. | ||
There is an Auxiliary Operator stationed in Containment to support Attachment A evolutions. | INITIATING CUES: | ||
INITIATING CUES | * The SRO has requested that you perform Attachment D, Test the High Flux at Shutdown Alarm, to support the completion of RP-1A Attachment A, Reactor Vessel Head Lift Checkoff Data Sheet. | ||
Page 2 of 9 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
RP-1A, Preparation for Refueling, Attachment D General | JPM PERFORMANCE INFORMATION Required Materials: RP-1A, Preparation for Refueling, Attachment D General | ||
==References:== | ==References:== | ||
RP-1A, Preparation for Refueling RP-1A, Preparation for Refueling, Attachment A, Reactor Vessel Head Lift Check off Data Sheet Task Standards: High Flux at Shutdown Alarm tested satisfactorily Start Time: | |||
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication). | |||
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations. | |||
NOTE TO EVALUATORS: This JPM is NOT alternate path/faulted. If during the performance of this JPM switches on the NI cabinets do not seem to work properly cue the examinees to wiggle the switch or try again. At times these switches stick due to their infrequent use. It is recommended to cycle these switches several times prior to JPM implementation to clean corrosion off switch contacts. | |||
Performance Step: 1 Test N-31 if in service (otherwise N/A) | |||
Critical Y On N-31 place the Level Trip switch to bypass, to enable the Operator Select switch. | |||
Standard: Level Trip switch placed in bypass. | |||
Evaluator Note: An alarm will come in at 1C04 and N-31 cabinet when this switch is positioned. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Page 3 of 9 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
Performance Step: 2 On N-31 position the Operator Select switch to the Level Adjust position. | |||
Critical Y Standard: Operator Select switch placed in the Level Adjust position. | |||
, | Evaluator Note: An alarm will come in at 1C04 and N-31 cabinet when this switch is positioned. | ||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 3 Unlock and increase level adjust potentiometer to increase counts to bring in Critical Y alarm. Verify alarm in both control and containment. | |||
Standard: Level adjust potentiometer adjusted up to increase counts AND alarm verified in both control and containment. | |||
Evaluator Note: An alarm will come in at 1C04 and N-31 cabinet when this pot is adjusted. | |||
Evaluator Cue: When AO is contacted, inform examinee that the audible alarm has been received in containment. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Page 4 of 9 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
Performance Step: 4 Reposition level adjust back to zero and lock. Verify alarms clear. | |||
Critical Y Standard: Level adjust potentiometer adjusted back to zero. | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
4 | |||
Standard: Level adjust potentiometer adjusted back to zero. | |||
AND Alarms verified clear. | AND Alarms verified clear. | ||
Evaluator Note: | Evaluator Note: An alarm will clear on 1C04 and N-31 cabinet when this pot is re-positioned. | ||
An alarm will clear on 1C04 and N | Evaluator Cue: When the AO is contacted, report alarm is clear. | ||
-31 cabinet when this pot is re-positioned. | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Evaluator Cue: | Performance Step: 5 Position Operator Selector switch to Normal. | ||
When the AO is contacted, report alarm is clear. | Critical Y Standard: Operator Selector switch returned to normal. | ||
Performance: | Evaluator Note: An alarm will clear on 1C04 and N-31 cabinet when this switch is re-positioned. | ||
SATISFACTORY UNSATISFACTORY Comments: | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
5 | Performance Step: 6 Position Level Trip switch to Normal. | ||
Standard: Operator Selector switch returned to normal. | Critical Y Standard: Level Trip switch returned to normal. | ||
Evaluator Note: | Evaluator Note: An alarm will clear on 1C04 and N-31 cabinet when this switch is re-positioned. | ||
An alarm will clear on 1C04 and N | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
-31 cabinet when this switch is re-positioned. | Page 5 of 9 | ||
Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
6 | Performance Step: 7 Test N-32 if in service (otherwise N/A) | ||
Standard: Level Trip switch returned to normal. | Critical Y On N-32 place the Level Trip switch to bypass, to enable the Operator Select switch. | ||
Evaluator Note: | Standard: Level Trip switch placed in bypass. | ||
An alarm will clear on 1C04 and N | Evaluator Note: An alarm will come in at 1C04 and N-32 cabinet when this switch is positioned. | ||
-31 cabinet when this switch is re-positioned. | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Performance: | Performance Step: 8 On N-32 position the Operator Select switch to the Level Adjust position. | ||
SATISFACTORY UNSATISFACTORY | Critical Y Standard: Operator Select switch placed in the Level Adjust position. | ||
Evaluator Note: An alarm will come in at 1C04 and N-32 cabinet when this switch is positioned. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Page 6 of 9 | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Performance Step: 9 Unlock and increase level adjust potentiometer to increase counts to bring in Critical Y alarm. Verify alarm in both control and containment. | ||
Standard: Level adjust potentiometer adjusted up to increase counts AND alarm verified in both control and containment. | |||
Evaluator Note: An alarm will come in at 1C04 and N-32 cabinet when this pot is adjusted. | |||
Evaluator Cue: When AO is contacted, inform examinee that the audible alarm has been received in containment. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 10 Reposition level adjust back to zero and lock. Verify alarms clear. | |||
Critical Y Standard: Level adjust potentiometer adjusted back to zero. | |||
9 | |||
Standard: Level adjust potentiometer adjusted up to increase counts AND alarm verified in both control and containment. | |||
Evaluator Note: | |||
An alarm will come in at 1C04 and N | |||
- | |||
When AO is contacted, inform examinee that the audible alarm has been received in containment. | |||
Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
10 | |||
Standard: Level adjust potentiometer adjusted back to zero. | |||
AND Alarms verified clear. | AND Alarms verified clear. | ||
Evaluator Note: | Evaluator Note: An alarm will clear on 1C04 and N-32 cabinet when this pot is re-positioned. | ||
An alarm will clear on 1C04 and N | Evaluator Cue: When the AO is contacted, report alarm is clear. | ||
- | Performance: SATISFACTORY UNSATISFACTORY Comments: | ||
Evaluator Cue: | Page 7 of 9 | ||
When the AO is contacted, report alarm is clear. | |||
Performance: | |||
SATISFACTORY UNSATISFACTORY Comments: | |||
Point Beach Nuclear Plant Job Performance Measure (JPM) | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
Performance Step: 11 Position Operator Selector switch to Normal. | |||
Critical Y Standard: Operator Selector switch returned to normal. | |||
Evaluator Note: An alarm will clear on 1C04 and N-32 cabinet when this switch is re-positioned. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 12 Position Level Trip switch to Normal. | |||
Critical Y Standard: Level Trip switch returned to normal. | |||
Evaluator Note: An alarm will clear on 1C04 and N-32 cabinet when this switch is re-positioned. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Performance Step: 13 Document completion of RP-1A Attachment D. | |||
Critical N Standard: Examinee documents condition of High Flux at Shutdown Alarm on Attachment D and informs OS1 testing is complete. | |||
Performance: SATISFACTORY UNSATISFACTORY Comments: | |||
Terminating Cues: This completes this JPM Stop Time: | |||
Page 8 of 9 | |||
INITIATING CUES | Point Beach Nuclear Plant Job Performance Measure (JPM) | ||
TURNOVER SHEET INITIAL CONDITIONS: | |||
-1A Attachment A, Reactor Vessel Head Lift Checkoff Data Sheet.}} | * You are the Unit 1 BOP | ||
* Unit 1 has just been drained down in preparation for removing the Reactor Vessel Head. | |||
* The crew is performing RP-1A, Preparation for Refueling Attachment A, Reactor Vessel Head Lift Checkoff Data Sheet. | |||
* Both Source Range Detectors N-31 and N-32 are in service. | |||
* There is an Auxiliary Operator stationed in Containment to support Attachment A evolutions. | |||
INITIATING CUES: | |||
* The SRO has requested that you perform Attachment D, Test the High Flux at Shutdown Alarm, to support the completion of RP-1A Attachment A, Reactor Vessel Head Lift Checkoff Data Sheet. | |||
Page 9 of 9}} |
Latest revision as of 20:10, 10 March 2020
ML11175A224 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 04/15/2011 |
From: | Mcneil D Operations Branch III |
To: | |
References | |
Download: ML11175A224 (84) | |
Text
Point Beach Nuclear Plant Job Performance Measure (JPM)
SITE: Point Beach JPM TITLE: PERFORM ROD EXERCISE TEST JPM NUMBER: CR JPM a REV. 0 RELATED PRA None INFORMATION:
TASK NUMBERS / TASK PBN P001.020.COT/PERFORM CONTROL ROD EXERCISES TITLE(S):
K/A NUMBERS: 001.K4.02 (3.8/3.8), 001.A3.05 (3.5/3.5), 001.A4.03 (4.0/3.7)
APPLICABLE METHOD OF TESTING:
Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 20 Minutes Time Critical: No Alternate Path: Yes Page 1 of 12
Point Beach Nuclear Plant Perform Rod Exercise Test I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- You are the Unit 1 CO.
- Unit 1 is at 100% power, steady state Xenon.
INITIATING CUES:
- The SRO has directed you to perform TS-5, Rod Exercise Test Unit 1. The Pre-job brief has been completed.
Page 2 of 12
Point Beach Nuclear Plant Perform Rod Exercise Test JPM PERFORMANCE INFORMATION Required Materials: TS-5, Rod Exercise Test Unit 1 REI 7.0, Control Rod Position Determination General
References:
TS-5, Rod Exercise Test Unit 1 REI 7.0, Control Rod Position Determination Task Standards: Bank D rods have been exercised, bank overlap counter discrepancy corrected and bank D rods returned to their original position.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1 Review Precautions/Limitations and Initial Conditions Critical N Standard: The examinee reviews TS-5, Rod Exercise Test Precautions and Limitations and Initial Conditions.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 3 of 12
Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 2 Record the following indications:
Critical Y RDC-LOGIC Cabinet (Key #21):
-Bank Overlap Counter reading Standard: Examinee contacts Unit 1 Turbine Hall Operator and obtains the Bank Overlap Counter Reading.
Evaluator Note: Counter Reading is in the rod control cabinet in the Rod Drive MG set Room.
It is critical to record the correct reading.
Evaluator Cue: AO reports that the Bank Overlap Counter is reading 594.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 3 Status of the Group Select Lights for the following power cabinets:
Critical N -1AC - Group Select Light C
-2AC - Group Select Light C
-1BD - Group Select Light B Standard: Examinee contacts the U1 TH Operator and obtains the status of the lights.
Evaluator Note: Light status is found on the power cabinets in the RD MG Set Room Evaluator Cue: AO Reports C lights lit for 1AC and 2AC and B light lit for 1BD.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 4 of 12
Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 4 1C04, Rod Bank Group (Demand) counters:
Critical Y -Control Bank A Group 1
-Etc.
Standard: The examinee correctly records Control and Shutdown Bank Group Demand counter readings.
Evaluator Note: *All Bank Demand counters should indicate 228 (225) steps except Bank D which should indicate 220 steps. Since only Bank D rods are being exercised for this JPM, only the Bank D readings are critical.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 5 1C-120A, RPI #1, Bank Position Display Critical N -Bank A
-Bank B
-Bank C
-Bank D Standard: The examinee correctly records bank positions on 1C-120A.
Evaluator Note: Bank Positions are indicated behind the Main Control Boards on 1C-120A.
Examinee may ask permission to go behind the boards. Indicate that the 3rd license will have responsibility for the Unit while the examinee retrieves the readings.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 5 of 12
Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 6 Compare the Bank Overlap Counter reading to Control Bank position (Step Critical N Counters) in REI 7.0, Control Rod Position Determination.
Standard: The examinee obtains a copy of REI 7.0 and compares the Control Bank position with the Bank Overlap Counter and determines whether the readings agree.
Evaluator Note: The examinee should determine that the Control Bank position and Bank Overlap Counter do NOT agree. With Control Bank D at 220 steps, the Bank Overlap Counter should read 595.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 7 If the Control Bank Position AND Bank Overlap Counter reading do not agree, Critical Y then perform Attachment A.
Standard: The examinee determines the readings do not agree and goes to attachment A.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 8 Place Rod control selector to Manual Critical Y Standard: The examinee places Rod control selector switch to the Manual position.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 6 of 12
Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 9 Step Control Bank D out 1 step from its current position.
Critical Y Standard: The examinee steps Control Bank D out 1 step.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 10 Bump step Control Bank D in one step.
Critical Y Standard: The examinee bumps Control Bank D in one step.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 11 Check card A105 has the BOTTOM LIGHT ILLUMINATED (top row, 3rd card from Critical N the left in the Rod Control Logic Cabined directly above the Bank Overlap Counter).
Standard: The examinee contacts the Auxiliary Operator in the Rod Drive Room and obtains status of card A105 bottom light.
Evaluator Note: Based on the report from the AO, steps 5.0 and 6.0 of Attachment A will be N/A Evaluator Cue: The AO reports card A105 has the bottom light illuminated.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 7 of 12
Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 12 Compare the Bank D Demand Position (Step Counters) to the Bank Overlap Critical N Counter.
Standard: The examinee contacts the AO for the Bank Overlap Counter reading and compares the Step Counter for Bank D to the obtained Bank Overlap Counter reading.
Evaluator Cue: AO reports the Bank Overlap Counter reads 595.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 13 IF the Control Bank D Position (Step Counters) and the Bank Overlap Counter do Critical N not agree, THEN adjust the Bank Overlap Counter at RDC Logic Cabinet by depressing the +1 or -1 button as necessary until the proper value correlating to the Control Rod Bank D Position (Step Counters).
Standard: Determine step is not required to be performed and N/A.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 14 Return the Control Rod selector switch to AUTO.
Critical N Standard: The examinee places Control Rod selector to auto.
Evaluator Note: When examinee asks for an Independent Verification of this step, initial the step for IV.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 8 of 12
Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 15 If printed PPCS data is required, then obtain a screen print of PPCS display page Critical N 2121 prior to and following movement of each rod group.
Standard: The examinee requests whether PPCS printed data is required.
Evaluator Note: Examinee may wish to print the data, inform them that it is not required.
Evaluator Cue: Printed PPCS data is not required.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 16 IF Control Bank D is not fully inserted, THEN perform the following exercise test:
Critical Y Place the Control Rod Bank Selector switch to the CBD position.
Standard: The examinee places the Control Rod Bank Selector switch to the CBD position.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 17 Perform the following rod step sequence twice:
Critical N Step Control Bank D out 1 step from its current position.
Standard: The examinee steps Control Bank D out 1 step.
Evaluator Note: This step and the next will be repeated.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 9 of 12
Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 18 Bump step Control Bank D in one step.
Critical N Standard: The examinee bumps Control Bank D in one step.
Evaluator Note: This step and the previous will be repeated.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 19 Insert OR Withdraw Control Bank D at least 10 steps but no more than 20 steps Critical Y while observing movement on individual Control Bank D rods.
Standard: The examinee inserts Control Bank D at least 10 but not more than 20 steps.
Evaluator Note: The examinee must recognize that there is not enough room to withdraw the rods 10 steps and must therefore insert the rods the required distance Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 20 Withdraw OR insert Control Bank D to the position recorded in Step 5.1.3 Critical Y Standard: The examinee withdraws Control Bank D to its original position recorded in Step
5.1.3. Performance
SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 10 of 12
Point Beach Nuclear Plant Perform Rod Exercise Test Performance Step: 21 Withdraw Control Bank D one step.
Critical Y Standard: The examinee withdraws Control Bank D one step.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 22 Insert Control Bank D one step.
Critical Y Standard: The examinee inserts Control Bank D one step.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 23 Ensure Control Bank D is in the position recorded in Step 5.1.3.
Critical N Standard: The examinee ensures the Control Bank D Group Demand Counter reading matches the number obtained in step 5.1.3.
Evaluator Note: CB D Demand Counter should read 220. When examinee asks for an Independent Verification of this step, initial the step for IV.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Terminating Cues: The JPM is complete.
Stop Time:
Page 11 of 12
Point Beach Nuclear Plant Perform Rod Exercise Test TURNOVER SHEET INITIAL CONDITIONS:
- You are the Unit 1 CO.
- Unit 1 is at 100% power, steady state Xenon.
INITIATING CUES:
- The SRO has directed you to perform TS-5, Rod Exercise Test Unit 1. The Pre-job brief has been completed.
Page 12 of 12
Point Beach Nuclear Plant Job Performance Measure (JPM)
SITE: Point Beach JPM TITLE: Respond to a Loss of Boration Path JPM NUMBER: CR JPM b. REV. 0 RELATED PRA None INFORMATION:
TASK NUMBERS / TASK PBN P000.050.COT Perform/Respond to Alternate Boration/Loss of Shutdown TITLE(S): Margin K/A NUMBERS: 004.A2.14 (3.8/3.9)
APPLICABLE METHOD OF TESTING:
Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 20 Minutes Time Critical: NO Alternate Path: YES Page 1 of 10
Point Beach Nuclear Plant Job Performance Measure (JPM)
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- Unit 1 has experienced an inadvertent Reactor Trip and Safety Injection.
- The crew has completed all applicable actions in EOP-0 Reactor Trip or Safety Injection Unit 1
- SI Termination criteria is met and the crew has completed up through Step 5 in EOP-1.1 SI Termination Unit 1 INITIATING CUES (IF APPLICABLE):
Page 2 of 10
Point Beach Nuclear Plant Job Performance Measure (JPM)
JPM PERFORMANCE INFORMATION Required Materials: EOP 1.1 SI Termination Unit 1 completed through step 5 place kept OP-5B Blender Operation/Dilution/Boration Attachment D General
References:
EOP 1.1 SI Termination Unit 1 OP-5B Blender Operation/Dilution/Boration Task Standards: Initiate boration via alternate means, OP-5B normal boration path.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1 Verify Charging Flow Critical N
- Ensure CV-1298 Normal Charging Isolation is open
- Check Charging Pumps at least one running
- Start additional pumps and adjust charging as necessary to maintain PZR level
- Adjust HC-142 as necessary to maintain Lab Seal P >20 inches Standard: Examinee will verify charging flow is adequate Evaluator Note: Examinee does not have to adjust any charging flow to meet this step. They may elect to adjust to minimum charging based on Pressurizer level and no Letdown lined up.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 3 of 10
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 2 Stop Both SI Pumps Critical N Standard: Examinee takes 1P-15A and 1P-15B Safety Injection Pumps to Auto after Stop.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Stop Both RHR Pumps Critical N Standard: Examinee takes 1P-10A and 1P-10B Residual Heat Removal Pumps to Auto after Stop.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 Check SI Flow Not Required Critical N
- Check RCS Subcooling .[80°F] 35°F
- Check PZR Level >[34%] 10%
Standard: Examinee checks SI flow not required Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 4 of 10
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 5 Check if Containment Spray Should be Stopped Critical N
- Check any Spray Pumps running Standard: Examinee checks that no Containment Spray Pumps are running Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 Check ALL Control Rods - FULLY INSERTED Critical N Standard: Examinee checks control rods and determines two(2) rods are stuck out thus being required to take actions within the RNO column to emergency borate.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7 IF two or more control rods NOT fully inserted, THEN initiate emergency boration Critical N as follows:
- a. Record initial level for in service BAST.
Standard: Examinee records A BAST Level.
Evaluator Cue: If asked, inform examinee that A BAST is aligned to Unit 1.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 5 of 10
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 8 IF two or more control rods NOT fully inserted, THEN initiate emergency boration Critical Y as follows:
- b. Start one boric acid transfer pump.
Standard: Examinee starts either 1P-4A or 1P-4B Boric Acid Transfer Pump.
Evaluator Note: 1P-4A Boric Acid Transfer Pump is already running in AUTO.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 9 IF two or more control rods NOT fully inserted, THEN initiate emergency boration Critical Y as follows:
- c. Establish maximum charging.
- Fully open HC-142
- Start additional charging pumps
- Adjust charging pump speed to maintain less than 140 GPM Standard: Examinee adjusts charging as necessary to get as close as possible to 140 GPM without going off scale high on the meter.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 6 of 10
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 10 IF two or more control rods NOT fully inserted, THEN initiate emergency boration Critical N as follows:
- d. Open emergency borate valve 1CV-350 Standard: Examinee attempts to open 1CV-350, valve is stuck shut.
Evaluator Cue: Acknowledge report to OS1 that 1CV-350 is not opening.
If PAB AO sent to look at either the valve or associated MOV breaker report back nothing appears abnormal.
If asked, PAB AO also reports unsuccessful attempt to declutch the motor and locally hand crank the MOV open.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 11 IF two or more control rods NOT fully inserted, THEN initiate emergency boration Critical Y as follows:
- e. Borate 2800 gallons for each control rod, greater than one, not fully inserted. Use TLB-5, Boric Acid Storage Tanks, to determine BAST level change.
Standard: Examinee determines amount of acid required (2800 gallons).
Evaluator Note: The required amount of acid to satisfy the critical task is 2800 gallons for one control rod, greater than one, not fully inserted. This equates to a level drop of approximately 60%. Borating in excess of 2800 gallons does not constitute failure of the critical task.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 7 of 10
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 12 IF two or more control rods NOT fully inserted, THEN initiate emergency boration Critical Y as follows:
- f. IF emergency boration can NOT be established, THEN perform boration per OP-5B, Blender Operation/Dilution/Boration while continuing with this procedure.
Standard: Examinee obtains a copy of OP-5B and uses Attachment D to borate 2800 gallons of acid.
Evaluator Cue: If asked or requested, inform examinee the 4th license will continue with EOP 1.1 and they should continue with OP-5B to borate.
Cue examinee that Section 3.0 of OP-5B Attachment D has already been completed by the 4th license.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 13 Estimate and set the Boric Acid quantity/rate on YIC-110A, Boric Acid Flow Critical Y Controller.
Standard: Set the YIC-110A to deliver boric acid.
Evaluator Note: The Boric Acid Totalizer can only be set for 999 gallons at a time.
The amount of flow for a single Boric Acid Transfer Pump is around 25 GPM. A second pump cannot be started to increase flow due to the loss of power from SI bus stripping.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 8 of 10
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 14 Place the Reactor Makeup Mode Selector Switch in BORATE.
Critical Y Standard: Reactor Makeup Mode Selector Switch to BORATE.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 15 Place the Reactor Makeup Control Switch to START.
Critical Y Standard: Reactor Makeup Control Switch to START.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 14 While continuing with this procedure, check system for proper response and Critical N monitor the plant.
Standard: Examinee monitors the boration to ensure proper system response.
Evaluator Cue: After examinee starts boration and has verified system response the JPM can be terminated.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues: This completes this JPM Stop Time:
Page 9 of 10
Point Beach Nuclear Plant Job Performance Measure (JPM)
TURNOVER SHEET INITIAL CONDITIONS:
- Unit 1 has experienced an inadvertent Reactor Trip and Safety Injection.
- The crew has completed all applicable actions in EOP-0 Reactor Trip or Safety Injection Unit 1
- SI Termination criteria is met and the crew has completed up through Step 5 in EOP-1.1 SI Termination Unit 1 INITIATING CUES:
Page 10 of 10
Point Beach Nuclear Plant Job Performance Measure (JPM)
JPM TITLE: Fill the Accumulators JPM NUMBER: CR JPM c. REV. 0 RELATED PRA None INFORMATION:
TASK NUMBERS / TASK PBN P006.002.COT / Fill the Accumulators TITLE(S):
K/A NUMBERS: 006.A1.13 (3.5/3.7)
APPLICABLE METHOD OF TESTING:
Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 30 Minutes Time Critical: No Alternate Path: No Page 1 of 16
Point Beach Nuclear Plant Fill the Accumulators I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- Unit 1 and Unit 2 are operating at 100% steady-state conditions.
- Annunciator C01B 3-8, 1T-34B ACCUMULATOR LEVEL HIGH OR LOW is lit.
- Emergency Diesel Generators G-01, G-02, G-03 and G-04 are in a normal at-power alignment.
- 1-TS-ECCS-002 Train A and 1-TS-ECCS-002 Train B, Safeguards System Venting (Monthly) Unit 1 were performed last shift for 1P-15A and 1P-15B, Unit 1 safety injection pumps.
- Combined SOMS accumulator level drop rate (daily accumulator leakage) is currently 0.3 % per day.
INITIATING CUES (IF APPLICABLE):
- You are the 3rd Control Operator.
- The SRO directs you to raise 1T-34B, Unit 1 B SI accumulator level 5% in accordance with OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1, Section 5.2.
- Unit 1 Control Operator has been assigned the duties of monitoring accumulator parameters per your request.
Page 2 of 16
Point Beach Nuclear Plant Fill the Accumulators JPM PERFORMANCE INFORMATION Required Materials: 1. OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1 General
References:
OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1 Task Standards: The Examinee raises the 1T-34B, Unit 1 B SI accumulator level 5% (+/- 3%) in accordance with OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1, Section 5.2.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1 5.2.1 Perform the following as applicable:
Critical N a. IF filling 1T-34A, THEN perform Attachment A, Steps 1.0 and 2.0.
Standard: The Examinee notes this step is N/A.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 2 5.2.1 Perform the following as applicable:
Critical N b. IF filling 1T-34B, THEN perform Attachment B, Steps 1.0 and 2.0.
Standard: The Examinee performs Attachment B, 1T-34B Accumulator Level/Pressure Change Data Sheet, Sections 1.0 and 2.0.
Evaluator Cue: 1-TS-ECCS-002 was performed last shift and combined leak rate is < 0.7% per day so it is not necessary to perform PBF-2139.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 3 of 16
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 3 5.2.1 Perform the following as applicable:
Critical N c. Use SOMS data to determine accumulator leak rate over past 30 days, OR since accumulator was last filled (whichever time period is shorter):
Accumulator leak rate (% per day): _____
Standard: The Examinee fills in the given leak rate.
Evaluator Cue: 1T-34B SI accumulator leak rate is 0.2 % per day over last 30 days.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 4 5.2.1 Engineering Verification Critical N d. IF accumulator leakage is greater than 0.7% / day, THEN notify Engineering to perform additional evaluation.
Standard: The Examinee N/As Step 5.2.1.d and proceeds to Step 5.2.2.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 4 of 16
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 5 5.2.2 Align 1P-15A, Safety Injection Pump, recirc flow path as follows:
Critical N a. Ensure LOCKED OPEN 1SI-876A, 1P-15A SI Pump Discharge Recirc to SI Test Line.
Standard: The Examinee ensures that the 1SI-876A, 1P-15A SI pump discharge recirc to SI test line valve is locked open by dispatching the Primary Auxiliary Building Auxiliary Operator to verify 1SI-876As status.
Evaluator Cue:
- The Primary Auxiliary Building Auxiliary Operator acknowledges your request.
- The Primary Auxiliary Building Auxiliary Operator reports that the 1SI-876A, 1P-15A SI pump discharge recirc to SI test line valve is locked open.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 6 5.2.2 Align 1P-15A, Safety Injection Pump, recirc flow path as follows:
Critical N b. At C01R, ensure OPEN 1SI-897A, SI Test Line Return.
Standard: The Examinee ensures that the 1SI-897A, SI test line return isolation AOV is open. (The green light is off, the red light is on and the control switch for 1SI-897A is in the open position.)
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 5 of 16
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 7 5.2.2 Align 1P-15A, Safety Injection Pump, recirc flow path as follows:
Critical N c. At C01R, ensure OPEN 1SI-897B, SI Test Line Return Second Off Isolation.
Standard: The Examinee ensures that the 1SI-897B, SI test line return isolation AOV is open. (The green light is off, the red light is on and the control switch for 1SI-897B is on the open position.)
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 8 5.2.3 Align the RWST flow path as follows:
Critical N
- Ensure OPEN 1SI-866A, Cold Leg Injection Line Isolation Standard: The Examinee ensures all of the following valves are open:
- 1SI-825A, P-15A/B SI pumps suction from RWST MOV. (The green light is off, the red light is on and the control switch is in the auto position.)
- 1SI-825B, P-15A&B SI pumps suction from RWST MOV. (The green light is off, the red light is on and the control switch is in the auto position.)
- 1SI-896A, 1P-15A pump suction isolation valve is open. (The green light is off, the red light is on and the control switch is in the spring return to center position.)
- 1SI-866A, 1P-15A pump discharge header MOV is open. (The green light is off, the red light is on and the control switch is in the spring return to center position.)
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 6 of 16
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 9 5.2.4 Declare 1P-15A, Safety Injection Pump INOPERABLE, AND enter Action Critical N Condition A of TS 3.5.2.
Standard: The Examinee notifies the SRO to declare 1P-15A, Safety Injection Pump INOPERABLE, AND enter TS 3.5.2 Action Condition A.
Evaluator Cue:
- The SRO acknowledges your report.
- The SRO informs you that 1P-15A, Safety Injection Pump is INOPERABLE, TS 3.5.2 Action Condition A has been entered and that the Station and Unit Logs have been updated.
- If asked, opposite train standby emergency power supply has been verified operable (per initial conditions).
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 10 5.2.5 Vent 1P-15A SI pump in accordance with Attachment C.
Critical N Standard: Step 5.2.5 is marked N/A. The Examinee proceeds to Step 5.2.6.
Evaluator Note: Step 5.2.5 is marked N/A because 1-TS-ECCS-002 Train A, Safeguards System Venting (Monthly) Unit 1 has been completed within the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This is one of the Initial Conditions.
Evaluator Cue: If examinee begins to implement action to vent 1P-15A, the SRO informs him that venting is not required.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 7 of 16
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 11 5.2.6 Ensure proper oil level in 1P-15A as follows:
Critical N a. Check for visible level in 1P-15A oil sightglass located next to the oiler bulb.
- b. IF oil is NOT visible in sight glass, THEN go to Attachment E.
Standard: The Examinee directs the Primary Auxiliary Building Auxiliary Operator to check for visible level in the 1P-15A, safety injection pump oil sight glass located next to the oiler bulb. When told there is oil visible in the sight glass he N/As step b.
Evaluator Cue:
- The Primary Auxiliary Building Auxiliary Operator acknowledges your request.
- The Primary Auxiliary Building Auxiliary Operator reports that there is oil visible in the 1P-15A, safety injection pump oil sight glass located next to the oiler bulb.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 12 5.2.6 Ensure proper oil level in 1P-15A as follows:
Critical N c. Check 1P-15A oiler bulb at or above one-half full.
- d. IF oiler bulb less than one-half full, THEN go to Attachment E Standard: The Examinee directs the Primary Auxiliary Building Auxiliary Operator to ensure that the 1P-15A, safety injection pump oil bulb is at or above one-half full. When told the oiler bulb is two-thirds full, he N/As step d.
Evaluator Cue:
- The Primary Auxiliary Building Auxiliary Operator acknowledges your request.
- The Primary Auxiliary Building Auxiliary Operator reports that the 1P-15A, safety injection pump oil bulb is two-thirds full.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 8 of 16
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 13 5.2.7 IF one EDG is aligned to supply both Units A05 standby emergency Critical N power, THEN perform the following:
Standard: Step 5.2.7 is marked N/A. The examinee proceeds to Step 5.2.8.
Evaluator Note: Step 5.2.7 is marked N/A because G-01, G-02, G-03 and G-04 are in a normal at-power alignment. This is one of the Initial Conditions.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 14 5.2.8 Start 1P-15A, Safety Injection Pump.
Critical Y Standard: The Examinee places the control switch for 1P-15A, safety injection pump to the Start position. (The green light is off, the red light is on, 1FI-925, 1P-15A High Head SI Flow, 1P-923, 1P-15A SI Pump Disch Pressure and AC AMPS, 1P-15A SI Pump Current are as read.)
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 15 5.2.9 Monitor all available channels for accumulator pressure and level during Critical N accumulator fill.
Standard: Examinee notes which indicators he will be monitoring during accumulator fill.
Evaluator Note: Initial conditions stated that the Unit 1 Control Operator is available to monitor accumulator parameters per direction of the Examinee. The Booth operator may be used for this function.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 9 of 16
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 16 5.2.10 IF filling 1T-34A, THEN perform the following:
Critical N Standard: Step 5.2.10 is marked N/A. The examinee proceeds to Step 5.2.11.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 17 5.2.11 IF filling 1T-34B, THEN perform the following:
Critical Y a. Open 1SI-835B, T34B Accumulator Fill AOV, AND record fill start time (T1).
Standard:
- The Examinee places the control switch for the 1SI-835B, 1T-34B accumulator fill AOV to the Open position (The green light is off and the red light is on.)
- AND records the fill start time in HH:MM:SS format.
Evaluator Note:
- The critical portion of this step is opening 1SI-835B.
- The fill start time is used to calculate accumulator fill time in Attachment B, 1T-34B Accumulator Level/Pressure Change Data Sheet, Section 3.1.
- If examinee directs another operator to note fill start or stop times, the Evaluator will assign the booth operator to record clock times.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 10 of 16
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 18 5.2.11 IF filling 1T-34B, THEN perform the following:
Critical Y b. Fill SI accumulator to desired level as indicated on the following level indicators:
- 1LI-934, 1T-34B Accumulator Level Indicator
- 1LI-935, 1T-34B Accumulator Level Indicator Standard: Examinee monitors level indication for 1T-34B and raises the level by 5% (+/- 3%).
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 19 5.2.11 IF filling 1T-34B, THEN perform the following:
Critical Y c. WHEN desired accumulator level is achieved, THEN stop 1P-15A, Safety Injection Pump AND record fill stop time (T2)
Standard:
- The Examinee places the control switch for 1P-15A, safety injection pump to the Stop position. (The green light is on, the red light is off, 1FI-925, 1P-15A High Head SI Flow, 1PI-923, 1P-15A SI Pump Disch Pressure and AC AMPS, 1P-15A SI Pump Current are as read.)
- AND records the fill stop time in HH:MM:SS format.
Evaluator Note:
- The critical portion of this step is stopping 1P-15A.
- The fill stop time is used to calculate accumulator fill time in Attachment B, 1T-34B Accumulator Level/Pressure Change Data Sheet, Section 3.1.
- If examinee directs another operator to note fill start or stop times, the Evaluator will assign the booth operator to record clock times.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 11 of 16
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 20 5.2.11 IF filling 1T-34B, THEN perform the following:
Critical N d. SHUT 1SI-835B Standard: The Examinee places the control switch for the 1SI-835B, 1T-34B accumulator fill AOV to the Close position (The green light is on and the red light is off)
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 21 5.2.11 IF filling 1T-34B, THEN perform the following:
Critical N e. Ensure control switch for 1P-15A is positioned to AUTO Standard: The Examinee ensures that the control switch for 1P-15A, safety injection pump is in the Auto (after trip) position.
Evaluator Cue: Another license has performed an independent verification of 1P-15A, safety injection pump control switch position.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 22 5.2.11 IF filling 1T-34B, THEN perform the following:
Critical N f. Declare 1P-15A OPERABLE Standard: The Examinee informs the SRO to declare 1P-15A, safety injection pump OPERABLE.
Evaluator Cue:
- The SRO acknowledges your report.
- The SRO reports that 1P-15A, safety injection pump is OPERABLE and the Station and Unit Logs have been updated.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 12 of 16
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 23 5.2.11 IF filling 1T-34B, THEN perform the following:
Critical N g. Exit Action Condition for TS 3.5.2 for Unit 1.
Standard: The Examinee informs the SRO to exit TS 3.5.2 Action Condition for 1P-15A, Safety Injection pump.
Evaluator Cue:
- The SRO acknowledges your report.
- The SRO informs you that the Technical Specification Action Condition associated with 1P-15A, safety injection pump has been exited and the Station and Unit Logs have been updated.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 24 5.2.11 IF filling 1T-34B, THEN perform the following:
Critical N h. Using data from Steps 5.2.11.c and 5.2.11.a, calculate Accumulator Fill Time (AFT) in seconds:
T2-T1=AFT
- i. Record AFT in Step 3.1 of Attachment B Standard:
- The Examinee calculates the fill time and records the AFT in Step 3.1 of Attachment B
- The Examinee obtains an independent verification of the calculated fill time Evaluator Cue:
- Another license has performed an independent verification of the calculated accumulator fill time.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 13 of 16
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 25 5.2.12 IF 2P-15A, Safety Injection Pump, for the opposite Unit was declared Critical N INOPERABLE, THEN perform the following:
Standard: Step 5.2.12 is marked N/A. The examinee proceeds to Step 5.2.13.
Evaluator Note: As noted in step 5.2.7, the initial conditions did not require declaring 2P-15A inoperable.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 26 5.2.13 IF 1T-34A was filled, THEN perform the following:
Critical N Standard: Step 5.2.13 is marked N/A. The examinee proceeds to Step 5.2.14.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 27 5.2.14 IF 1T-34B was filled, THEN perform the following:
Critical N a. Complete Attachment B Steps 3.2 and 5.0 - 7.0.
Standard: The Examinee performs Attachment B, "1T-34B Accumulator Level/Pressure Change Data Sheet", Sections 3.2 and 5.0 - 7.0.
Evaluator Cue: Log entries have been made for Attachment B section 7.0 Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 14 of 16
Point Beach Nuclear Plant Fill the Accumulators Performance Step: 28 5.2.14 IF 1T-34B was filled, THEN perform the following:
Critical N b. Ensure pressure is between 730 and 760 psig as indicated on the following indicators.
- 1PI-936, 1T34B Accumulator Pressure Indicator
- 1PI-937, 1T34B Accumulator Pressure Indicator Standard: The Examinee ensures that accumulator pressure is between 730 and 760 psig as indicated on the following indicators:
- 1T-34B accumulator pressure, 1PI-936 (C01)
- 1T-34B accumulator pressure, 1PI-937 (C01R)
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 29 Inform the SRO that 1T-34B, Unit 1 B SI accumulator level has been raised 5%
Critical N in accordance with OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1, Section 5.2.
Standard: The Examinee informs the SRO that 1T-34B, Unit 1 B SI accumulator level has been raised 5% in accordance with OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1, Section 5.2.
Evaluator Cue: The SRO acknowledges your report.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Terminating Cues: The evolution is complete.
Stop Time:
Page 15 of 16
Point Beach Nuclear Plant Fill the Accumulators TURNOVER SHEET INITIAL CONDITIONS:
- Unit 1 and Unit 2 are operating at 100% steady-state conditions.
- Annunciator C01B 3-8, 1T-34B ACCUMULATOR LEVEL HIGH OR LOW is lit.
- Emergency Diesel Generators G-01, G-02, G-03 and G-04 are in a normal at-power alignment.
- 1-TS-ECCS-002 Train A and 1-TS-ECCS-002 Train B, Safeguards System Venting (Monthly) Unit 1 were performed last shift for 1P-15A and 1P-15B, Unit 1 safety injection pumps.
- Combined SOMS accumulator level drop rate (daily accumulator leakage) is currently 0.3 % per day.
INITIATING CUES (IF APPLICABLE):
- You are the 3rd Control Operator.
- The SRO directs you to raise 1T-34B, Unit 1 B SI accumulator level 5% in accordance with OI 100 Unit 1, Adjusting SI Accumulator Level and Pressure Unit 1, Section 5.2.
- Unit 1 Control Operator has been assigned the duties of monitoring accumulator parameters per your request.
Page 16 of 16
Point Beach Nuclear Plant Job Performance Measure (JPM)
JPM TITLE: Synchronize Turbine Generator Output With Grid At Minimum Load JPM NUMBER: CR JPM d. REV. 0 RELATED PRA None INFORMATION:
TASK NUMBERS / TASK PBN P045.005.COT / Synchronize Turbine Generator To The Grid With Output At TITLE(S): Minimum Load K/A NUMBERS: 062 A4.01 (3.3/3.1) 062 A4.03(2.8/2.9) 062 A4.07 (3.1/3.1)
APPLICABLE METHOD OF TESTING:
Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 20 Minutes Time Critical: NO Alternate Path: NO Page 1 of 9
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- Unit 1 is at low power with OP-1C, Startup to Power Operation Unit 1"complete through Step 5.85. The secondary is started up and the turbine generator is ready to be placed on the grid.
- Unit 1 TH Auxiliary Operator is standing by at 1E02 Voltage Regulator Cabinet.
- You are the 3rd license.
INITIATING CUES (IF APPLICABLE):
- OS1 directs you to place the turbine generator on the grid per OP-1C, Startup to Power Operation Unit 1", starting at Step 5.86.
Page 2 of 9
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load JPM PERFORMANCE INFORMATION Required Materials: OP-1C, "Startup to Power Operation Unit 1" Synchroscope Switch Filled out OP-1C up to step for synchronizing to grid General
References:
OP-1C, "Startup to Power Operation Unit 1" Task Standards: Main Generator in parallel with the grid at minimum load.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1 Ensure Generator Voltage Regulator Control Switch is in the MANUAL position.
Critical N Standard: Generator Voltage Regulator Control Switch is in the MANUAL position.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 2 Ensure turbine speed between 1750 and 1800 rpm.
Critical N Standard: Turbine speed checked.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 3 of 9
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load Performance Step:3 CLOSE Unit 1 Generator Exciter Field Breaker.
Critical Y Standard: Unit 1 generator Exciter Field Breaker closed.
Evaluator Note: The following alarms may occur when closing the field breaker:
- C01 A 3-2 Unit 1 Generator Reg/Metering Voltage Failure.
- C01 A 4-4 Unit 1 Voltage Regulator Trouble.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 4 Reset Unit 1 voltage regulator panel alarms at 1E02.
Critical N Standard: Voltage regulator alarms reset.
Evaluator Note: Insert trigger 1 to clear alarms at the Voltage Regulator Panel.
Evaluator Cue: Unit 1 Turbine Hall AO reports that he has reset panel 1E02 and all alarms are clear.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 5 Slowly adjust the Generator Voltage Regulator DC Adjuster to obtain a Critical N Generator Voltmeter indication of approximately 19kV at 1800 rpm.
Standard: Generator voltage raised to approximately 19 kV.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 4 of 9
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load Performance Step: 6 Check all three phases approximately 19 kV, using Unit 1 Generator Voltmeter Critical N switch.
Standard: Phase voltages verified at approximately 19 kV.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 7 For Automatic Voltage Regulation:
Critical N
- Place Unit 1 Generator Voltage Regulator to TEST, o CHECK yellow light is LIT.
- Ensure Generator Voltage Regulator Balance Meter is at approximately zero using Generator Voltage Regulator AC Adjuster.
- Place Generator Voltage Regulator to AUTO.
o CHECK red light is LIT.
Standard: Automatic Voltage Regulation is set up.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 8 Place the Unit 1 Generator Breaker 122 Synchroscope switch to ON.
Critical Y Standard: Unit 1 Generator Breaker Synchroscope to on.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 5 of 9
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load Performance Step: 9 Adjust Incoming Voltmeter reading to match Running Voltmeter reading, using Critical Y Generator Voltage Regulator AC Adjuster.
Standard: Incoming and running voltages matched.
Evaluator Note: Incoming voltmeter reading is generator voltage. Running voltmeter reading represents line voltage.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 10 Check Unit 1 Generator Exciter Field Ammeter at less than 23 amps.
Critical N Standard: Exciter Field current verified.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 11 Adjust turbine speed (using Reference Control raise and lower pushbuttons) as Critical Y necessary to rotate the synchroscope 2 to 5 rpm in the "FAST" direction.
Standard: Synchroscope rotating 2 to 5 rpm in "FAST" direction.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 6 of 9
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load Performance Step: 12 Ensure 1F52-122 Generator Main Breaker Control Switch is removed from Critical N PULLOUT.
Standard: 1F52-122 out of PULLOUT.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 13 WHEN the synchroscope is just before 12:00 AND within the Green Band, Critical Y THEN Close 1F52-122, Unit 1 Generator Main Breaker.
Standard: Unit 1 Generator Main Breaker closed.
Evaluator Note: If Generator is allowed to motor, a Generator Trip and Lockout will occur in 45 seconds after receipt of reverse power alarm.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 14 Record the time.
Critical N Standard: Time the generator main breaker is closed is recorded.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Page 7 of 9
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load Performance Step: 15 Check the following:
Critical N
- 20-30 MWe Unit 1 Generator Wattmeter.
- Unit 1 Generator Varmeter indicates a positive number (MVARS in out direction).
- "LOAD CONTROL" status light is LIT.
Standard: Status of generator load verified.
Evaluator Note: Operation of generator in VARS IN is prohibited due to risk of overheating generator bore ring.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 16 Place the Unit 1 Generator Breaker 122 Synchroscope switch to OFF.
Critical N Standard: Synchroscope OFF.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 17 Make notification that the unit is online and intent to raise power per NP 2.1.5.
Critical N Standard: Notification made to Supervision.
Evaluator Cue: SM will make notifications.
Performance: SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Terminating Cues: This completes the JPM.
Stop Time:
Page 8 of 9
Point Beach Nuclear Plant Synchronize Turbine Generator Output With Grid At Minimum Load Turnover Sheet INITIAL CONDITIONS:
- Unit 1 is at low power with OP-1C, Startup to Power Operation Unit 1"complete through Step 5.85. The secondary is started up and the turbine generator is ready to be placed on the grid.
- Unit 1 TH Auxiliary Operator is standing by at 1E02 Voltage Regulator Cabinet.
- You are the 3rd license.
INITIATING CUES (IF APPLICABLE):
OS1 directs you to place the turbine generator on the grid per OP-1C, Startup to Power Operation Unit 1",
starting at Step 5.86.
Page 9 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
JPM TITLE: Perform Accident Fan Surveillance Testing JPM NUMBER: CR JPM e. REV. 0 RELATED PRA None INFORMATION:
TASK NUMBERS / TASK PBN P022.003.COT / Monitor the Containment Recirculation fan units for TITLE(S): proper operation K/A NUMBERS: 022.A4.01 (3.6/3.6)
APPLICABLE METHOD OF TESTING:
Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 25 Minutes Time Critical: NO Alternate Path: NO Page 1 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- Engineering has requested partial performance of TS 33 Containment Accident Recirculation Fan-Cooler Units (Monthly) Unit 1 for data collection purposes. Stroke timing and flow verifications are to be performed for 1SW-2907 Containment Ventilation Coolers Outlet Emergency Flow Control Valve.
- Service Water chlorination is in progress.
- Service Water overboard is aligned to both Units.
- An AO is standing by for surveillance support.
INITIATING CUES:
- OS1 has directed you to performTS-33 Containment Accident Fan Recirculation Fan-Cooler Units (Monthly) Unit 1 for 1SW-2907 starting with Step 5.7.
Page 2 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
JPM PERFORMANCE INFORMATION Required Materials: TS-33 Containment Accident Fan Recirculation Fan-Cooler Units (Monthly) Unit 1 marked up for 1SW-2907 testing.
Stop Watch (record serial number and calibration due date on marked-up TS-33)
General
References:
TS-33 Containment Accident Fan Recirculation Fan-Cooler Units (Monthly) Unit 1
OI 70, Service Water System Operation Task Standards: Perform TS-33 Accident Fan testing on 1SW-2907 Containment Ventilation Coolers Outlet Emergency Flow Control Valve.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1 Circle Service Water overboard alignment on Attachment B, Data Sheet, Step 2.0.
Critical N Standard: Examinee circles Both on Data Sheet per turnover.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 2 Circle As-Found condition of the Service Water pumps in the following table:
Critical N Standard: Examinee lists the condition of the Service Water Pumps, ON/OFF.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 3 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 3 Operate additional Service Water Pumps as necessary per OI 70, Service Water Critical N System Operation.
Standard: Examinee acknowledges guidance of OI 70 and Service Water Pump operation.
Evaluator Cue: If examinee references OI 70, state that the OS2 will ensure OI 70 requirements are addressed.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 UNLOCK AND OPEN 1SW-167, 1HX-015A-D Cont Recirc HX Return 1PI-2907 Critical N Isolation.
Standard: Have field AO Unlock and Open 1SW-167.
Evaluator Cue: AO reports back that 1SW-167 is UNLOCKED and OPEN.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 5 IF Unit 2 is in MODE 1, 2, 3, or 4, THEN, for Unit 2, enter the applicable LCO Critical N 3.7.8 Action Condition AND record Date and time.
Standard: Examinee records the time and date for SW TSAC 3.7.8.F entry.
Evaluator Cue: Inform examinee OS2 will have the 4th license make the required log entries for Unit 2 TSAC 3.7.8.F entry.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 4 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 6 Perform full stroke OPEN timing and position indication verification (PIV) Test of Critical Y 1SW-2907, Cont Vent Coolers Outlet Emer FCV, as follows:
- Record time to OPEN on Attachment C, Service Water System Valve Stroke Testing.
- Check rising stem position indicator for OPEN indication AND record local valve position indication on Attachment C, Service Water System Valve Stroke Testing.
Standard: Examinee opens and records correct stroke time for 1SW-2907 FCV.
Evaluator Cue: AO reports back that local position indication is OPEN for 1SW-2907.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7 WHEN Service Water flow has stabilized, THEN perform Attachment B, Data Critical Y Sheet, Steps 3.0 through 6.0 to obtain As-Found conditions of 1SW-2907 Cont Vent Coolers Outlet Emer FCV.
Standard: Record and calculate data correctly per Attachment B steps 3.0 through 6.0.
Evaluator Cue: PAB AO reports PI-2907reads 19 Hg for Attachment B Table 3.0.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 5 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 8 IF flow to any Containment Accident Recirculation Hx is outside acceptable flow Critical Y limits as recorded on Attachment B, Data Sheet, Table 6.0, OR following fan cooler maintenance/refueling, OR it is desired to adjust flow per Engineering, THEN perform the following:
Standard: Examinee N/As steps associated with adjusting flow for 1SW-2907 Cont Vent Coolers Outlet Emer FCV.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 9 Perform full stroke SHUT timing and position indication verification (PIV) Test of Critical N 1SW-2907, Cont Vent Coolers Outlet Emer FCV, as follows:
- Record time to SHUT on Attachment C, Service Water System Valve Stroke Testing. (For Information Only)
- Check rising stem position indicator for SHUT indication AND record local valve position indication on Attachment C, Service Water System Valve Stroke Testing.
Standard: Examinee shuts and records stroke time for 1SW-2907 FCV.
Evaluator Cue: AO reports back that local position indication is SHUT for 1SW-2907.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 10 SHUT AND LOCK 1SW-167, 1HX-015A-D Cont Recirc HX Return 1PI-2907 Critical N Isolation.
Standard: Have field AO Shut and Lock 1SW-167.
Evaluator Cue: AO reports back that 1SW-167 is SHUT and LOCKED along with being IVd.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 6 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 11 IF necessary, THEN place Service Water Pumps to the As-Found alignment.
Critical N Standard: Examinee N/As this step since Service Water Pump alignment has not changed.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 12 Record the following Containment Accident Recirculation Hx Service Water flows:
Critical N Standard: Examinee correctly records SW flows for all 4 Containment Accident Fans.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 13 IF entered in Step 5.11, THEN exit the applicable LCO 3.7.8 Action Condition Critical N AND record date and time.
Standard: Examinee records the time and date that TSAC 3.7.8.F is exited.
Evaluator Cue: Inform examinee OS2 will have the 4th license make the required log entry that Unit 2 TSAC 3.7.8.F is exited.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 7 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 14 Check valve operability by comparing the recorded valve data with the Critical Y Acceptance Criteria on Attachment C, Service Water System Valve Stroke Testing, AND circle the appropriate SAT / UNSAT condition.
Standard: Examinee circles SAT for acceptance criteria.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 15 IF service water chlorination was required per step 4.3, THEN notify Chemistry to Critical N secure service water chlorination.
Standard: Examinee notifies Chemistry to secure chlorination.
Evaluator Cue: Chemistry has been notified to secure service water chlorination.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues: This completes the JPM.
Stop Time:
Page 8 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
TURNOVER SHEET INITIAL CONDITIONS:
- Engineering has requested partial performance of TS 33 Containment Accident Recirculation Fan-Cooler Units (Monthly) Unit 1 for data collection purposes. Stroke timing and flow verifications are to be performed for 1SW-2907 Containment Ventilation Coolers Outlet Emergency Flow Control Valve.
- Service Water chlorination is in progress.
- Service Water overboard is aligned to Unit 2.
- An AO is standing by for surveillance support.
INITIATING CUES:
- OS1 has directed you to performTS-33 Containment Accident Fan Recirculation Fan-Cooler Units (Monthly) Unit 1 for 1SW-2907 starting with Step 5.7.
Page 9 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
JPM TITLE: Respond to a Loss of Reactor Coolant to a Shutdown Unit JPM NUMBER: CR JPM f. REV.0 RELATED PRA None INFORMATION:
TASK NUMBERS / TASK P000.046.COT / Respond to a Loss of Reactor Coolant to a Shutdown Unit TITLE(S):
009 EA1.01 (4.4/4.3) 009 EA1.04 (3.7/3.5) 009 EA1.08 (4.0/4.1)
K/A NUMBERS:
009 EA1.16 (4.2/4.2) 009 EA2.01 (4.2/4.8) 009 EA2.39 (4.3/4.7)
APPLICABLE METHOD OF TESTING:
Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 20 Minutes Time Critical: NO Alternate Path: NO Page 1 of 12
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- Unit 1 is in the process of cooling down from hot shutdown to cold shutdown.
- RCS temperature is approximately 333°F.
- RCS pressure is approximately 340 psig.
- Pressurizer level suddenly begins to lower.
INITIATING CUES:
- The OS1 directs you to respond to the loss of pressurizer level in accordance with SEP-2 Unit 1, Shutdown LOCA Analysis.
Page 2 of 12
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit JPM PERFORMANCE INFORMATION Required Materials: 1. SEP-2 Unit 1, Shutdown LOCA Analysis
References:
- 1. SEP-2 Unit 1, Shutdown LOCA Analysis
- 2. SEP-2.1 Unit 1, Shutdown LOCA With RHR Aligned For Low Head Injection Task Standards: The Examinee mitigates the leak such that RCS inventory is stable or rising in accordance with SEP-2 Unit 1, Shutdown LOCA Analysis, and SEP-2.1 Unit 1, Shutdown LOCA With RHR Aligned For Low Head Injection Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1 SEP-2 step 1: Check both SI Accumulators isolated.
Critical N Standard: The Examinee checks both SI accumulators isolated by checking the accumulator MOVs, 1SI-841A and 1SI-841B deenergized and the SI Spray Ready Status Lights for 1SI-841A and 1SI-841B lit.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 3 of 12
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 2 2: Check one train of RHR aligned for decay heat removal.
Critical Y Standard: The Examinee checks that RHR is not aligned for decay heat removal by checking the status of 1P-10A&B RHR pumps suction header MOVs, 1RH-700 and 1RH-701 and the RHR return to RC MOV, 1RH-720 and Goes to SEP-2.1 Unit 1, Shutdown LOCA With RHR Aligned For Low Head Injection.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 SEP-2.1 step 1:
Critical Y Isolate RCS Letdown:
- a. Shut letdown orifice outlet valves
- 1CV-200C Standard: The Examinee places the control switches for the letdown orifice outlet valves, 1CV-200A, 1CV-200B and 1CV-220C to the close position and verifies they go shut.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 1: Isolate RCS Letdown Critical Y b. Shut RCS loop B cold leg to CVCS letdown isolation 1RC-427 Standard: The Examinee places the control switch for the RCS loop B cold leg to CVCS letdown isolation, 1RC-427 to the close position and verifies it goes shut.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 4 of 12
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 5 2: Establish Design Charging Flow Rate Using RWST Suction:
Critical Y a. Open RWST charging pump suction 1CV-112B Standard: The Examinee places the control switch for the RWST charging pump suction, 1CV-112B to the open position and verifies it goes open.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 2: Establish Design Charging Flow Rate Using RWST Suction:
Critical Y b. Shut VCT outlet valve 1CV-112C Standard: The Examinee places the control switch for the VCT outlet valve, 1CV-112C to the close position and verifies it shut.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7 2: Establish Design Charging Flow Rate Using RWST Suction:
Critical Y c. Establish 76 gpm charging flow Standard: The Examinee adjusts running charging pump(s) speed and 1HC-142 valve position to establish 76 gpm charging flow.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 5 of 12
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 8 3: Check Leak Rate - GREATER THAN CHARGING FLOW:
Critical Y o PZR LEVEL TRENDING LOWER OR o PZR level less than [34%] 10%
- 1LI-433 OR o RCS subcooling based on core exit thermocouples less than [80°F] 35°F Standard: The Examinee checks pressurizer level trending lower or less than [34%] 10% on 1LI-433 or RCS subcooling less than [80°F] 35°F.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 9 4: Establish Maximum Charging Flow:
Critical Y a. Fully open charging flow control valve 1HC-142 Standard: The Examinee fully opens charging flow control valve, 1HC-142.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 10 4: Establish Maximum Charging Flow:
Critical Y b. Start additional charging pumps
- 1P-2C Standard: The Examine starts additional available charging pumps, 1P-2A, 1P-2B and 1P-2C by placing the control switch(es) to the Start position.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 6 of 12
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 11 4: Establish Maximum Charging Flow:
Critical Y c. Limit charging flow to less than 140 gpm by adjusting charging pump speed as necessary Standard: The Examinee adjusts running charging pump(s) speed to limit charging flow to less than 140 gpm.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 12 5: Initiate Containment Isolation Critical N Standard: The Examinee depresses both containment isolation pushbuttons and acknowledges the annunciator Unit 1 Containment Isolation (C01B 2-5).
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 13 6: Stop RCPs Critical N
- 1P-1B Standard: The Examinee places the control switches for reactor coolant pumps, 1P-1A and 1P-1B to the stop position and verifies they are secured.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 7 of 12
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 14 7: Initiate the following actions Critical N a. Evacuate Containment Standard: The Examinee performs containment evacuation.
Evaluator Cue: The OS1 acknowledges your request. (if needed)
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 15 7: Initiate the following actions Critical N b. Notify DCS and implement emergency plan Standard: The Examinee directs the OS1/SM to notify the DCS and implement the Emergency Plan.
Evaluator Cue: The OS1 acknowledges your request.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 16 8: Check Low Temperature Overpressure Protection In Service Critical N Standard: The Examinee checks Low Temperature Overpressure Protection In Service by:
- Checking Key #3(s) installed and in the on position,
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 8 of 12
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 17 9: Establish Flow From One SI Pump:
Critical Y a. Open both RWST outlet to SI pump valves
- 1SI-825B Standard: The Examinee verifies 1SI-825A and 1SI-825B RWST outlet to SI pump valves are open.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 18 9: Establish Flow From One SI Pump:
Critical Y b. Open both train B reactor vessel injection valves
- 1SI-878C Standard: The Examinee places the control switches for the train B reactor vessel injection valves, 1SI-878A and 1SI-878C to the open position and verifies they open.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 19 9: Establish Flow From One SI Pump:
Critical Y c. Start SI pump B
- 1P-15B Standard: The Examinee places the control switch for the SI pump B, 1P-15B to the start position and verifies pump starts and has proper discharge pressure and flow.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 9 of 12
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 20 9: Establish Flow From One SI Pump:
Critical N d. Throttle train B SI pump discharge header as necessary to maintain subcooling greater than [80°F] 35°F
- 1SI-866B Standard: The Examinee throttles train B SI pump discharge header, 1SI-866B as necessary to maintain subcooling greater than [80°F] 35°F.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 21 10. Check If Low Head SI Flow Is Required:
Critical N a. RCS subcooling based on core exit thermocouples less than [80°F]
35°F Standard:
- The Examinee checks subcooling greater than [80°F] 35°F and
- Goes to Step 12.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 22 12. Verify Containment Sump Recirculation Not Required:
Critical N a. Check RWST level - GREATER THAN OR EQUAL TO 60%
Standard: The Examinee checks RWST level greater than 60%.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 10 of 12
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit Performance Step: 23 13. Verify Adequate Injection Flow:
Critical N a. Check reactor vessel level narrow range - GREATER THAN 27 FT Standard: The Examinee checks reactor vessel level narrow range on 1C20 greater than 27 feet.
Evaluator Note: This is a continuous action step.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 24 13. Verify Adequate Injection Flow:
Critical N b. Check core exit thermocouples STABLE OR TRENDING LOWER Standard: The Examinee checks core exit thermocouples at 1C20 stable or trending lower.
Evaluator Note: This is a continuous action step.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues: The evolution is complete.
Stop Time:
Page 11 of 12
Point Beach Nuclear Plant Respond to a Loss of Reactor Coolant to a Shutdown Unit TURNOVER SHEET INITIAL CONDITIONS:
- Unit 1 is in the process of cooling down from hot shutdown to cold shutdown.
- RCS temperature is approximately 333°F.
- RCS pressure is approximately 340 psig.
- Pressurizer level suddenly begins to lower.
INITIATING CUES:
- The OS1 directs you to respond to the loss of pressurizer level in accordance with SEP-2 Unit 1, Shutdown LOCA Analysis.
Page 12 of 12
Point Beach Nuclear Plant Job Performance Measure (JPM)
JPM TITLE: Shift Component Cooling Water Pumps JPM NUMBER: CR JPM g REV. 0 RELATED PRA None INFORMATION:
TASK NUMBERS / TASK PBN P008.003.COT Operate the CCW System TITLE(S):
K/A NUMBERS: 008.A4.04 (2.6*/2.6)
APPLICABLE METHOD OF TESTING:
Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 15 Minutes Time Critical: NO Alternate Path: NO Page 1 of 7
Point Beach Nuclear Plant Job Performance Measure (JPM)
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- 1P-11B Component Cooling Water (CCW) Pump has been aligned for use after being drained for Maintenance.
- 1P-11B Component Cooling Water Pump is filled and vented.
INITIATING CUES:
- OS1 directs you to start 1P-11B CCW Pump and secure 1P-11A CCW Pump per 1-SOP-CC-001 Component Cooling System Step 5.4.2 Page 2 of 7
Point Beach Nuclear Plant Job Performance Measure (JPM)
JPM PERFORMANCE INFORMATION Required Materials: 1-SOP-CC-001 Component Cooling System Section 5.4 General
References:
1-SOP-CC-001 Component Cooling System Task Standards: Shift from 1P-11A CCW Pump operating to 1P-11B CCW Pump operating per 0-SOP-CC-001 Component Cooling System.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
Performance Step: 1 a. Ensure 1P-11B is filled and vented.
Critical N Standard: Examinee sign off 1-SOP-CC-001 per turnover.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 2 b. Ensure 1P-11B has proper valve alignment per 1-CL-CC-001 Component Critical N Cooling valve Lineup:
- 1CC-V-23, 1P-11B CC Pump Casing Vent - SHUT & CAPPED Standard: Examinee signs off valves in correct position.
Evaluator Cue: The AO reports valves are in correct position per Step 5.4.2.b and have been IVd.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 3 of 7
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 3 c. Ensure 1T-12 CC Surge Tank is greater than 45% on 1LI-618B Critical N Standard: Examinee verifies CC Surge Tank >45% level.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 d. Open 1CC-738A OR 1CC-738B, (circle one) RHR HX Shell Side Inlet.
Critical Y Standard: Examinee opens 1CC-138A or 1CC-738B and circles.
Evaluator Note: Critical part of step is opening of valve only.
Alarms 1C03 1D 1-4 and 1-5 RCP Low Cooling Water Flow come in and are expected.
Evaluator Cue: If examinee asks or wants to address the alarms, inform them they were briefed as expected alarms during the pre-job brief.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 5 e. IF total flow remains less than 2000 gpm on 1FI-619, THEN perform the Critical N following:
Standard: Examinee should determine flow is >2000 gpm and sub-steps under 5.4.2.e are NOT to be performed.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 4 of 7
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 6 f. Start 1P-11B CCW Pump and run in parallel with 1P-11A.
Critical Y Standard: Examinee starts 1P-11A and runs for 1 minute while verifying system response.
Evaluator Note: Evaluator can cue examinee that 1 minute has expired if desired.
Evaluator Cue: If asked, the AO can report personnel are clear of the area and all conditions are normal for starting 1P-11B CCW Pump.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 7 g. Place and hold in STOP 1P-11A CCW Pump control switch for approximately Critical Y 3 seconds.
Standard: Examinee stops 1P-11A CCW Pump.
Evaluator Cue: If asked, the AO can report normal coastdown of 1P-11A CCW Pump and check valve seating was heard for 1P-11A when pump was secured.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 8 h. Release 1P-11A CCW Pump control switch and allow it to return to AUTO.
Critical Y Standard: Examinee places 1P-11A CCW Pump to AUTO.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 5 of 7
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 9 i. SHUT 1CC-738A OR 1CC-738B RHR HX Shell Inlet Critical Y Standard: Examinee SHUTS 1CC-738A or 1CC-738B, whichever was opened previously.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 10 If step 5.4.2.e was NOT performed then Steps 5.4.2.j through 5.4.2.l are N/A.
Critical N Standard: Examinee N/As Steps 5.4.2.j through 5.4.2.l.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 11 Examinee informs OS1 shifting of CCW Pumps is complete per 1-SOP-CC-001.
Critical N Standard: Report completion of 1-SOP-CC-001 to shift CCW Pumps.
Evaluator Cue: Acknowledge completion of 1-SOP-CC-001 Performance: SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues: This completes the JPM.
Stop Time:
Page 6 of 7
Point Beach Nuclear Plant Job Performance Measure (JPM)
TURNOVER SHEET INITIAL CONDITIONS:
- 1P-11B Component Cooling Water (CCW) Pump has been aligned for use after being drained for Maintenance.
- 1P-11B Component Cooling Water Pump is filled and vented.
INITIATING CUES:
- OS1 directs you to start 1P-11B CCW Pump and secure 1P-11A CCW Pump per 1-SOP-CC-001 Component Cooling System Step 5.4.2 Page 7 of 7
Point Beach Nuclear Plant Job Performance Measure (JPM)
SITE: Point Beach JPM TITLE: Test High Flux at Shutdown Alarm JPM NUMBER: Control Room JPM h REV. 0 RELATED PRA None INFORMATION:
TASK NUMBERS / TASK PBN P015.004.COT/ Monitor the Nuclear Instrument System for Proper Operation TITLE(S):
K/A NUMBERS: 015.A3.02 (3.7/3.9)
APPLICABLE METHOD OF TESTING:
Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 10 Minutes Time Critical: NO Alternate Path: NO Page 1 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- You are the Unit 1 BOP
- Unit 1 has just been drained down in preparation for removing the Reactor Vessel Head.
- The crew is performing RP-1A, Preparation for Refueling Attachment A, Reactor Vessel Head Lift Checkoff Data Sheet.
- Both Source Range Detectors N-31 and N-32 are in service.
- There is an Auxiliary Operator stationed in Containment to support Attachment A evolutions.
INITIATING CUES:
- The SRO has requested that you perform Attachment D, Test the High Flux at Shutdown Alarm, to support the completion of RP-1A Attachment A, Reactor Vessel Head Lift Checkoff Data Sheet.
Page 2 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
JPM PERFORMANCE INFORMATION Required Materials: RP-1A, Preparation for Refueling, Attachment D General
References:
RP-1A, Preparation for Refueling RP-1A, Preparation for Refueling, Attachment A, Reactor Vessel Head Lift Check off Data Sheet Task Standards: High Flux at Shutdown Alarm tested satisfactorily Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.
NOTE TO EVALUATORS: This JPM is NOT alternate path/faulted. If during the performance of this JPM switches on the NI cabinets do not seem to work properly cue the examinees to wiggle the switch or try again. At times these switches stick due to their infrequent use. It is recommended to cycle these switches several times prior to JPM implementation to clean corrosion off switch contacts.
Performance Step: 1 Test N-31 if in service (otherwise N/A)
Critical Y On N-31 place the Level Trip switch to bypass, to enable the Operator Select switch.
Standard: Level Trip switch placed in bypass.
Evaluator Note: An alarm will come in at 1C04 and N-31 cabinet when this switch is positioned.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 3 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 2 On N-31 position the Operator Select switch to the Level Adjust position.
Critical Y Standard: Operator Select switch placed in the Level Adjust position.
Evaluator Note: An alarm will come in at 1C04 and N-31 cabinet when this switch is positioned.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Unlock and increase level adjust potentiometer to increase counts to bring in Critical Y alarm. Verify alarm in both control and containment.
Standard: Level adjust potentiometer adjusted up to increase counts AND alarm verified in both control and containment.
Evaluator Note: An alarm will come in at 1C04 and N-31 cabinet when this pot is adjusted.
Evaluator Cue: When AO is contacted, inform examinee that the audible alarm has been received in containment.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 4 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 4 Reposition level adjust back to zero and lock. Verify alarms clear.
Critical Y Standard: Level adjust potentiometer adjusted back to zero.
AND Alarms verified clear.
Evaluator Note: An alarm will clear on 1C04 and N-31 cabinet when this pot is re-positioned.
Evaluator Cue: When the AO is contacted, report alarm is clear.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 5 Position Operator Selector switch to Normal.
Critical Y Standard: Operator Selector switch returned to normal.
Evaluator Note: An alarm will clear on 1C04 and N-31 cabinet when this switch is re-positioned.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 Position Level Trip switch to Normal.
Critical Y Standard: Level Trip switch returned to normal.
Evaluator Note: An alarm will clear on 1C04 and N-31 cabinet when this switch is re-positioned.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 5 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 7 Test N-32 if in service (otherwise N/A)
Critical Y On N-32 place the Level Trip switch to bypass, to enable the Operator Select switch.
Standard: Level Trip switch placed in bypass.
Evaluator Note: An alarm will come in at 1C04 and N-32 cabinet when this switch is positioned.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 8 On N-32 position the Operator Select switch to the Level Adjust position.
Critical Y Standard: Operator Select switch placed in the Level Adjust position.
Evaluator Note: An alarm will come in at 1C04 and N-32 cabinet when this switch is positioned.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 6 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 9 Unlock and increase level adjust potentiometer to increase counts to bring in Critical Y alarm. Verify alarm in both control and containment.
Standard: Level adjust potentiometer adjusted up to increase counts AND alarm verified in both control and containment.
Evaluator Note: An alarm will come in at 1C04 and N-32 cabinet when this pot is adjusted.
Evaluator Cue: When AO is contacted, inform examinee that the audible alarm has been received in containment.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 10 Reposition level adjust back to zero and lock. Verify alarms clear.
Critical Y Standard: Level adjust potentiometer adjusted back to zero.
AND Alarms verified clear.
Evaluator Note: An alarm will clear on 1C04 and N-32 cabinet when this pot is re-positioned.
Evaluator Cue: When the AO is contacted, report alarm is clear.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Page 7 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
Performance Step: 11 Position Operator Selector switch to Normal.
Critical Y Standard: Operator Selector switch returned to normal.
Evaluator Note: An alarm will clear on 1C04 and N-32 cabinet when this switch is re-positioned.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 12 Position Level Trip switch to Normal.
Critical Y Standard: Level Trip switch returned to normal.
Evaluator Note: An alarm will clear on 1C04 and N-32 cabinet when this switch is re-positioned.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 13 Document completion of RP-1A Attachment D.
Critical N Standard: Examinee documents condition of High Flux at Shutdown Alarm on Attachment D and informs OS1 testing is complete.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues: This completes this JPM Stop Time:
Page 8 of 9
Point Beach Nuclear Plant Job Performance Measure (JPM)
TURNOVER SHEET INITIAL CONDITIONS:
- You are the Unit 1 BOP
- Unit 1 has just been drained down in preparation for removing the Reactor Vessel Head.
- The crew is performing RP-1A, Preparation for Refueling Attachment A, Reactor Vessel Head Lift Checkoff Data Sheet.
- Both Source Range Detectors N-31 and N-32 are in service.
- There is an Auxiliary Operator stationed in Containment to support Attachment A evolutions.
INITIATING CUES:
- The SRO has requested that you perform Attachment D, Test the High Flux at Shutdown Alarm, to support the completion of RP-1A Attachment A, Reactor Vessel Head Lift Checkoff Data Sheet.
Page 9 of 9