ML112010151: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/01/2011
| issue date = 08/01/2011
| title = Commitment to Submit a License Amendment Request to Transition to 10 CFR 50.48(c), National Fire Protection Association Standard NFPA 805, and Request to Extend Enforcement Discretion - Beaver Valley Power, Unit 1 and 2 and Davis-Besse, Uni
| title = Commitment to Submit a License Amendment Request to Transition to 10 CFR 50.48(c), National Fire Protection Association Standard NFPA 805, and Request to Extend Enforcement Discretion - Beaver Valley Power, Unit 1 and 2 and Davis-Besse, Uni
| author name = Giitter J G
| author name = Giitter J
| author affiliation = NRC/NRR/DORL
| author affiliation = NRC/NRR/DORL
| addressee name = Sena P H
| addressee name = Sena P
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000334, 05000346, 05000412
| docket = 05000334, 05000346, 05000412
Line 13: Line 13:
| document type = Letter
| document type = Letter
| page count = 2
| page count = 2
| project = TAC:ME6613, TAC:ME6627, TAC:ME6628
| stage = Other
}}
}}
=Text=
{{#Wiki_filter:"p..R REGUJ_                                  UNITED STATES V'-          ""'I~
of
......                    0
                            ~
NUCLEAR REGULATORY COMMISSION t!                            t'>                    WASHINGTON, D.C. 20555-0001
<[                              0 In                      ,':                                  Augus t 1, 2011
~                            ~
  "f'".                    ~
      "'"              ...0
            ****i' Mr. Peter H. Sena, III President and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308
==SUBJECT:==
COMMITMENT TO SUBMIT A LICENSE AMENDMENT REQUEST TO TRANSITION TO 10 CFR 50.48(c), NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 805, AND REQUEST TO EXTEND ENFORCEMENT DISCRETION - BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 (TAC NOS. ME6628, ME6627 AND ME6613)
==Dear Mr. Sena:==
By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated June 29, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111800765), the FirstEnergy Nuclear Operating Company (1) committed to submit a license amendment request (LAR) for Beaver Valley Power Station, Unit Nos.1 and 2 by September 30, 2012, and Davis-Besse Nuclear Power Station, Unit No.1 by July 1,2014, to transition to National Fire Protection Association Standard NFPA 805 in accordance with Title 10 of the Code of Federal Regulations 50.48(c), and (2) requested that enforcement discretion for fire protection issues be extended to correspond with the LAR submittal date.
The NRC staff has reviewed your letter and finds it consistent with Commission direction as provided in SRM-SECY-11-0061, dated June 10, 2011 (ADAMS Accession No. ML111610616).
Therefore, your request to extend enforcement discretion is granted in accordance with the Interim Enforcement Policy concerning Enforcement Discretion for Certain Fire Protection Issues as published in the Federal Register on July 12, 2011 (76 FR 40777).
If you are unable to meet the above LAR submittal date, you are requested to contact the NRC staff at least 90 days in advance. Please contact Michael Mahoney at (301) 415-3867 if you have any questions.
Sincerely,
                                                                  ~~.4*:-
                                                              ~ Jo eph G. Giitter, Director
                                                                  . ision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346 cc: Distribution via Listserv
August 1, 2011 Mr. Peter H. Sena, III President and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308
==SUBJECT:==
COMMITMENT TO SUBMIT A LICENSE AMENDMENT REQUEST TO TRANSITION TO 10 CFR 50.48(c). NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 805, AND REQUEST TO EXTEND ENFORCEMENT DISCRETION - BEAVER VALLEY POWER STATION. UNIT NOS. 1 AND 2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 - (TAC NOS. ME6628, ME6627 AND ME6613)
==Dear Mr. Sena:==
By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated June 29, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111800765), the FirstEnergy Nuclear Operating Company (1) committed to submit a license amendment request (LAR) for Beaver Valley Power Station, Unit Nos.1 and 2 by September 30, 2012, and Davis-Besse Nuclear Power Station, Unit No.1 by July 1. 2014, to transition to National Fire Protection Association Standard NFPA 805 in accordance with Title 10 of the Code of Federal Regulations 50.48(c), and (2) requested that enforcement discretion for fire protection issues be extended to correspond with the LAR submittal date.
The NRC Staff has reviewed your letter and finds it consistent with Commission direction as provided in SRM-SECY-11-0061, dated June 10, 2011 (ADAMS Accession No. ML111610616).
Therefore, your request to extend enforcement discretion is granted in accordance with the Interim Enforcement Policy concerning Enforcement Discretion for Certain Fire Protection Issues as published in the Federal Register on July 12, 2011 (76 FR 40777).
If you are unable to meet the above LAR submittal date, you are requested to contact the NRC staff at least 90 days in advance. Please contact Michael Mahoney at (301) 415-3867 if you have any questions.
Sincerely, IRA!
Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412,50-346 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC                                RidsOeMailCenter Resource      RidsNrrPMDavis-Besse Resource Lpl3-2 rlt                            RidsOgcRp Resource            RidsNrrLASRohrer Resource RidsAcrsAcnw_MailCTR Resource          RidsRgn3MailCenter Resource    RidsNrrDorlLpl3-2 Resource RidsNrrDorl Resource                  PLain, NRRlDRAlAFPB            GGulla.OE RidsNrrDra Resource                    HBarrett. NRRlDRAlAFPB        RidsNrrDorlLpl1-1 Resource RidsNrrDraAfpb Resource                JDozier. NRR/DRAIAPLA          RidsNrrPMBeaverValley Resource RidsNrrDraApla Resource                DPickett, NRRlDORL            RidsRgn1 MailCenter Resource ADAMS Accession No. ML112010151                *via email                    NRR-106 OFFICE        DORULPL3-2/PM      DORULPL3-2/LA          DORULPL1-1/PM        DORULPL 1-1/BC NAME          MMahoney          SRohrer                NMorgan              NSalgado*
DATE          7120/11            7127/11                7/20/11              7126111 OFFICE        DORULPL3-2/BC      DRAlAFPB/BC            DRAlAPLAlBC          DORUD NAME          JZimmerrnan      AKlein                  DHarrison            JGiitter DATE          7/29/11          7/25/11                  7/26/11              8/01/11 OFFICIAL RECORD COpy}}

Latest revision as of 19:45, 10 March 2020

Commitment to Submit a License Amendment Request to Transition to 10 CFR 50.48(c), National Fire Protection Association Standard NFPA 805, and Request to Extend Enforcement Discretion - Beaver Valley Power, Unit 1 and 2 and Davis-Besse, Uni
ML112010151
Person / Time
Site: Beaver Valley, Davis Besse
Issue date: 08/01/2011
From: Giitter J
Division of Operating Reactor Licensing
To: Sena P
FirstEnergy Nuclear Operating Co
mahoney, m NRR/DORL/LPLIII-2 415-3867
References
TAC ME6613, TAC ME6627, TAC ME6628
Download: ML112010151 (2)


Text

"p..R REGUJ_ UNITED STATES V'- ""'I~

of

...... 0

~

NUCLEAR REGULATORY COMMISSION t! t'> WASHINGTON, D.C. 20555-0001

<[ 0 In ,': Augus t 1, 2011

~ ~

"f'". ~

"'" ...0

        • i' Mr. Peter H. Sena, III President and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308

SUBJECT:

COMMITMENT TO SUBMIT A LICENSE AMENDMENT REQUEST TO TRANSITION TO 10 CFR 50.48(c), NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 805, AND REQUEST TO EXTEND ENFORCEMENT DISCRETION - BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 (TAC NOS. ME6628, ME6627 AND ME6613)

Dear Mr. Sena:

By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated June 29, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111800765), the FirstEnergy Nuclear Operating Company (1) committed to submit a license amendment request (LAR) for Beaver Valley Power Station, Unit Nos.1 and 2 by September 30, 2012, and Davis-Besse Nuclear Power Station, Unit No.1 by July 1,2014, to transition to National Fire Protection Association Standard NFPA 805 in accordance with Title 10 of the Code of Federal Regulations 50.48(c), and (2) requested that enforcement discretion for fire protection issues be extended to correspond with the LAR submittal date.

The NRC staff has reviewed your letter and finds it consistent with Commission direction as provided in SRM-SECY-11-0061, dated June 10, 2011 (ADAMS Accession No. ML111610616).

Therefore, your request to extend enforcement discretion is granted in accordance with the Interim Enforcement Policy concerning Enforcement Discretion for Certain Fire Protection Issues as published in the Federal Register on July 12, 2011 (76 FR 40777).

If you are unable to meet the above LAR submittal date, you are requested to contact the NRC staff at least 90 days in advance. Please contact Michael Mahoney at (301) 415-3867 if you have any questions.

Sincerely,

~~.4*:-

~ Jo eph G. Giitter, Director

. ision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346 cc: Distribution via Listserv

August 1, 2011 Mr. Peter H. Sena, III President and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308

SUBJECT:

COMMITMENT TO SUBMIT A LICENSE AMENDMENT REQUEST TO TRANSITION TO 10 CFR 50.48(c). NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 805, AND REQUEST TO EXTEND ENFORCEMENT DISCRETION - BEAVER VALLEY POWER STATION. UNIT NOS. 1 AND 2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 - (TAC NOS. ME6628, ME6627 AND ME6613)

Dear Mr. Sena:

By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated June 29, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111800765), the FirstEnergy Nuclear Operating Company (1) committed to submit a license amendment request (LAR) for Beaver Valley Power Station, Unit Nos.1 and 2 by September 30, 2012, and Davis-Besse Nuclear Power Station, Unit No.1 by July 1. 2014, to transition to National Fire Protection Association Standard NFPA 805 in accordance with Title 10 of the Code of Federal Regulations 50.48(c), and (2) requested that enforcement discretion for fire protection issues be extended to correspond with the LAR submittal date.

The NRC Staff has reviewed your letter and finds it consistent with Commission direction as provided in SRM-SECY-11-0061, dated June 10, 2011 (ADAMS Accession No. ML111610616).

Therefore, your request to extend enforcement discretion is granted in accordance with the Interim Enforcement Policy concerning Enforcement Discretion for Certain Fire Protection Issues as published in the Federal Register on July 12, 2011 (76 FR 40777).

If you are unable to meet the above LAR submittal date, you are requested to contact the NRC staff at least 90 days in advance. Please contact Michael Mahoney at (301) 415-3867 if you have any questions.

Sincerely, IRA!

Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412,50-346 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsOeMailCenter Resource RidsNrrPMDavis-Besse Resource Lpl3-2 rlt RidsOgcRp Resource RidsNrrLASRohrer Resource RidsAcrsAcnw_MailCTR Resource RidsRgn3MailCenter Resource RidsNrrDorlLpl3-2 Resource RidsNrrDorl Resource PLain, NRRlDRAlAFPB GGulla.OE RidsNrrDra Resource HBarrett. NRRlDRAlAFPB RidsNrrDorlLpl1-1 Resource RidsNrrDraAfpb Resource JDozier. NRR/DRAIAPLA RidsNrrPMBeaverValley Resource RidsNrrDraApla Resource DPickett, NRRlDORL RidsRgn1 MailCenter Resource ADAMS Accession No. ML112010151 *via email NRR-106 OFFICE DORULPL3-2/PM DORULPL3-2/LA DORULPL1-1/PM DORULPL 1-1/BC NAME MMahoney SRohrer NMorgan NSalgado*

DATE 7120/11 7127/11 7/20/11 7126111 OFFICE DORULPL3-2/BC DRAlAFPB/BC DRAlAPLAlBC DORUD NAME JZimmerrnan AKlein DHarrison JGiitter DATE 7/29/11 7/25/11 7/26/11 8/01/11 OFFICIAL RECORD COpy