MONTHYEARL-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-198, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0707 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-241, Submittal of the Updated Final Safety Analysis Report, Revision 272023-11-29029 November 2023 Submittal of the Updated Final Safety Analysis Report, Revision 27 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 2024-09-17
[Table view] |
Text
FENOC Perry Nuclear Power Plant 10 Center Road ArstEnergy Nuclear Operating Company Po. Box 97 Perry. Ohio 44081 June 29 , 2011 L-11-106 10 CFR 50.4S ATTN : Document Control Desk U. S. Nuclear Regulatory Commission Washington , DC 20555-0001
SUBJECT:
Beaver Valley Power Station , Units No. 1 and 2 BVPS-1 Docket No. 50-334 , License No. DPR-66 BVPS-2 Docket No. 50-412 , License No. NPF-73 Davis-Besse Nuclear Power Station Docket No. 50-346 , License No. NPF-3 10 CFR 50.4S(c) License Amendment Request Submittal Date Commitments and Request for Enforcement Discretion Extension (TAC Nos. ME005S, ME0059, ME3300)
By Interim Enforcement Policy published in the Federal Register (73 FR 52705) on September 10, 200S, the Nuclear Regulatory Commission (NRC) established terms and conditions regarding the extension of enforcement discretion for certain noncompliances related to fire protection programs . As outlined in the Enforcement Policy, an extension to the previously existing period of enforcement discretion would be granted by the NRC on a case-by-case basis , if a licensee has made substantial progress in transition efforts to adopt National Fire Protection Association Standard NFPA S05, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition , in accordance with Section 50.4S(c) of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR 50.4S(c)) . The period of extension would expire six months after NRC approval of the license amendment for the second of two pilot plants involved in the NFPA S05 transition initiative.
By letters dated December 2, 200S (Agencywide Documents Access and Management System (ADAMS) Accession No. MLOS3430005) and January 14, 2010 (ADAMS Accession No. ML 100191S03), FirstEnergy Nuclear Operating Company (FENOC) provided the information necessary to support the requests for enforcement discretion extension for the Beaver Valley Power Station Units No.1 and 2 (BVPS-1 and 2) and the Davis-Besse Nuclear Power Station , respectively. The NRC granted the extensions for BVPS-1 and 2 and DBNPS by letters dated December 17, 200S (ADAMS Accession No. MLOS347053S) and March 23 , 2010 (ADAMS Accession No. ML100670111),
respectively.
On December 29 , 2010 , the NRC approved the license amendment for the second pilot plant, thereby establishing June 29, 2011 as the expiration date for the current enforcement discretion period.
Beaver Valley Power Station Units No. 1 and 2 Davis-Besse Nuclear Power Station L-11 -106 Page 2 By memorandum dated June 10, 2011, STAFF REQUIREMENTS - SECY 11-0061 - A REQUEST TO REVISE THE INTERIM ENFORCEMENT POLICY FOR FIRE PROTECTION ISSUES ON 10 CFR 50.48(C) TO ALLOW LICENSEES TO SUBMIT LICENSE AMENDMENT REQUESTS IN A STAGGERED APPROACH (RIN 3150-AG48) , the Nuclear Regulatory Commission approved an NRC staff recommendation to revise the existing enforcement policy. To obtain the additional extension , licensees would be required to submit a letter by June 29 , 2011 , acknowledging a new commitment date for their license amendment application . In accordance with the proposed policy, enforcement discretion would continue while the NRC staff is processing and responding to the commitment letter. Additionally, the term of enforcement discretion would be further extended to the date specified in the licensee's commitment letter, subject to amendment and approval by the NRC. Once an acceptable application for license amendment is submitted , enforcement discretion for previously identified noncompliances and any newly identified noncompliances would continue to be in place until the NRC dispositions the license amendment request.
To address the above-stated requirement for license amendment application schedules, the following commitments are provided.
- FENOC will submit the application for license amendment to implement 10 CFR 50.48(c) at BVPS-1 and 2 on or before September 30, 2012.
The commitment date for the BVPS-1 and 2 application allows adequate resolution of findings and observations and completion of fire risk evaluations following the industry peer review of the BVPS-2 Probabilistic Risk Analysis, which is scheduled for completion in February 2012. The proposed submittal date for DBNPS is a best estimate , subject to availability of vendor resources and industry experience .
FENOC hereby requests NRC extension of the current enforcement discretion period for BVPS-1 and 2 and DBNPS under the terms and conditions proposed in SECY 11 -
0061 , as approved by the Commission . During the transition to NFPA 805, FENOC continues to maintain fire safety at BVPS-1 and 2 and DBNPS in accordance with the Facility Operating Licenses.
Beaver Valley Power Station Units No. 1 and 2 Davis-Besse Nuclear Power Station L-11-106 Page 3 If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at 330-761-6071.
Sincerely,
~f/~
Peter P. Sena III President, FirstEnergy Nuclear Operating Company
Attachment:
Regulatory Commitment List cc: Director, NRC Office of Enforcement NRC Regional Administrator - Region I NRC Regional Administrator - Region III NRC Resident Inspector - BVPS-1 and 2 NRC Resident Inspector - DBNPS NRC Project Manager - BVPS-1 and 2 NRC Project Manager - DBNPS Director - State of Pennsylvania BRP/DEP Site Representative - State of Pennsylvania BRP/DEP State of Ohio Utility Radiological Safety Board
Attachment L-11-106 Regulatory Commitment List Page 1 of 1 The following list identifies those actions committed to in this document by FirstEnergy Nuclear Operating Company (FENOC) for Beaver Valley Power Station Units No.1 and 2 and Davis-Besse Nuclear Power Station. Any other actions discussed in the submittal represent intended or planned actions by FENOC, are described for information only, and are not Regulatory Commitments. Please notify Thomas A. Lentz, Manager - Fleet Licensing, at 330-761-6071 of any questions regarding this document or associated Regulatory Commitments.
Regulatory Commitments
- 1. FENOC will submit the application for license amendment to implement 10 CFR 50.48(c) at BVPS-1 and 2 on or before September 30, 2012.
- 2. FENOC will submit the application for license amendment to implement 10 CFR 50.48(c) at DBNPS on or before July 1, 2014.