ML112010151: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:"p..R UNITED STATES V'-
{{#Wiki_filter:"p..R REGUJ_                                  UNITED STATES V'-           ""'I~
of NUCLEAR REGULATORY COMMISSION
of
...... WASHINGTON, D.C. 20555-0001 t! t'> <[ 0 In , ' : Augus t 2011 "f'". "'" ...0****i' Mr. Peter H. Sena, President and Chief Operating FirstEnergy Nuclear Operating Mail Stop 76 South Main Akron, OH COMMITMENT TO SUBMIT A LICENSE AMENDMENT REQUEST TO TRANSITION TO 10 CFR 50.48(c), NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 805, AND REQUEST TO EXTEND ENFORCEMENT DISCRETION  
......                     0
-BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 (TAC NOS. ME6628, ME6627 AND ME6613)  
                            ~
NUCLEAR REGULATORY COMMISSION t!                            t'>                    WASHINGTON, D.C. 20555-0001
<[                             0 In                     ,':                                 Augus t 1, 2011
~                            ~
  "f'".                     ~
      "'"               ...0
            ****i' Mr. Peter H. Sena, III President and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308
 
==SUBJECT:==
COMMITMENT TO SUBMIT A LICENSE AMENDMENT REQUEST TO TRANSITION TO 10 CFR 50.48(c), NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 805, AND REQUEST TO EXTEND ENFORCEMENT DISCRETION - BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 (TAC NOS. ME6628, ME6627 AND ME6613)


==Dear Mr. Sena:==
==Dear Mr. Sena:==
By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated June 29, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111800765), the FirstEnergy Nuclear Operating Company (1) committed to submit a license amendment request (LAR) for Beaver Valley Power Station, Unit Nos.1 and 2 by September 30, 2012, and Davis-Besse Nuclear Power Station, Unit No.1 by July 1,2014, to transition to National Fire Protection Association Standard NFPA 805 in accordance with Title 10 of the Code of Federal Regulations 50.48(c), and (2) requested that enforcement discretion for fire protection issues be extended to correspond with the LAR submittal date. The NRC staff has reviewed your letter and finds it consistent with Commission direction as provided in SRM-SECY-11-0061, dated June 10, 2011 (ADAMS Accession No. ML111610616).
 
Therefore, your request to extend enforcement discretion is granted in accordance with the Interim Enforcement Policy concerning Enforcement Discretion for Certain Fire Protection Issues as published in the Federal Register on July 12, 2011 (76 FR 40777). If you are unable to meet the above LAR submittal date, you are requested to contact the NRC staff at least 90 days in advance. Please contact Michael Mahoney at (301) 415-3867 if you have any questions.
By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated June 29, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111800765), the FirstEnergy Nuclear Operating Company (1) committed to submit a license amendment request (LAR) for Beaver Valley Power Station, Unit Nos.1 and 2 by September 30, 2012, and Davis-Besse Nuclear Power Station, Unit No.1 by July 1,2014, to transition to National Fire Protection Association Standard NFPA 805 in accordance with Title 10 of the Code of Federal Regulations 50.48(c), and (2) requested that enforcement discretion for fire protection issues be extended to correspond with the LAR submittal date.
Sincerely, Jo eph G. Giitter, Director . ision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346 cc: Distribution via Listserv August 1, 2011 Mr. Peter H. Sena, III President and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 COMMITMENT TO SUBMIT A LICENSE AMENDMENT REQUEST TO TRANSITION TO 10 CFR 50.48(c).
The NRC staff has reviewed your letter and finds it consistent with Commission direction as provided in SRM-SECY-11-0061, dated June 10, 2011 (ADAMS Accession No. ML111610616).
NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 805, AND REQUEST TO EXTEND ENFORCEMENT DISCRETION  
Therefore, your request to extend enforcement discretion is granted in accordance with the Interim Enforcement Policy concerning Enforcement Discretion for Certain Fire Protection Issues as published in the Federal Register on July 12, 2011 (76 FR 40777).
-BEAVER VALLEY POWER STATION. UNIT NOS. 1 AND 2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 -(TAC NOS. ME6628, ME6627 AND ME6613)  
If you are unable to meet the above LAR submittal date, you are requested to contact the NRC staff at least 90 days in advance. Please contact Michael Mahoney at (301) 415-3867 if you have any questions.
Sincerely,
                                                                  ~~.4*:-
                                                              ~ Jo eph G. Giitter, Director
                                                                  . ision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346 cc: Distribution via Listserv
 
August 1, 2011 Mr. Peter H. Sena, III President and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308
 
==SUBJECT:==
COMMITMENT TO SUBMIT A LICENSE AMENDMENT REQUEST TO TRANSITION TO 10 CFR 50.48(c). NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 805, AND REQUEST TO EXTEND ENFORCEMENT DISCRETION - BEAVER VALLEY POWER STATION. UNIT NOS. 1 AND 2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 - (TAC NOS. ME6628, ME6627 AND ME6613)


==Dear Mr. Sena:==
==Dear Mr. Sena:==
By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated June 29, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111800765), the FirstEnergy Nuclear Operating Company (1) committed to submit a license amendment request (LAR) for Beaver Valley Power Station, Unit Nos.1 and 2 by September 30, 2012, and Davis-Besse Nuclear Power Station, Unit No.1 by July 1. 2014, to transition to National Fire Protection Association Standard NFPA 805 in accordance with Title 10 of the Code of Federal Regulations 50.48(c), and (2) requested that enforcement discretion for fire protection issues be extended to correspond with the LAR submittal date. The NRC Staff has reviewed your letter and finds it consistent with Commission direction as provided in SRM-SECY-11-0061, dated June 10, 2011 (ADAMS Accession No. ML111610616).
 
Therefore, your request to extend enforcement discretion is granted in accordance with the Interim Enforcement Policy concerning Enforcement Discretion for Certain Fire Protection Issues as published in the Federal Register on July 12, 2011 (76 FR 40777). If you are unable to meet the above LAR submittal date, you are requested to contact the NRC staff at least 90 days in advance. Please contact Michael Mahoney at (301) 415-3867 if you have any questions.
By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated June 29, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111800765), the FirstEnergy Nuclear Operating Company (1) committed to submit a license amendment request (LAR) for Beaver Valley Power Station, Unit Nos.1 and 2 by September 30, 2012, and Davis-Besse Nuclear Power Station, Unit No.1 by July 1. 2014, to transition to National Fire Protection Association Standard NFPA 805 in accordance with Title 10 of the Code of Federal Regulations 50.48(c), and (2) requested that enforcement discretion for fire protection issues be extended to correspond with the LAR submittal date.
Sincerely, IRA! Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412,50-346 cc: Distribution via Listserv DISTRIBUTION:
The NRC Staff has reviewed your letter and finds it consistent with Commission direction as provided in SRM-SECY-11-0061, dated June 10, 2011 (ADAMS Accession No. ML111610616).
PUBLIC RidsOeMailCenter Resource RidsNrrPMDavis-Besse Resource Lpl3-2 rlt RidsOgcRp Resource RidsNrrLASRohrer Resource RidsAcrsAcnw_MailCTR Resource RidsRgn3MailCenter Resource RidsNrrDorlLpl3-2 Resource RidsNrrDorl Resource PLain, NRRlDRAlAFPB GGulla.OE RidsNrrDra Resource HBarrett.
Therefore, your request to extend enforcement discretion is granted in accordance with the Interim Enforcement Policy concerning Enforcement Discretion for Certain Fire Protection Issues as published in the Federal Register on July 12, 2011 (76 FR 40777).
NRRlDRAlAFPB RidsNrrDorlLpl1-1 Resource RidsNrrDraAfpb Resource JDozier. NRR/DRAIAPLA RidsNrrPMBeaverValley Resource RidsNrrDraApla Resource DPickett, NRRlDORL RidsRgn1 MailCenter Resource ADAMS Accession No. ML112010151  
If you are unable to meet the above LAR submittal date, you are requested to contact the NRC staff at least 90 days in advance. Please contact Michael Mahoney at (301) 415-3867 if you have any questions.
*via email NRR-106 OFFICE DORULPL3-2/PM DORULPL3-2/LA DORULPL 1-1/PM DORULPL 1-1/BC NAME MMahoney SRohrer NMorgan NSalgado*
Sincerely, IRA!
DATE 7120/11 7127/11 7/20/11 7126111 OFFICE DORULPL3-2/BC DRAlAFPB/BC DRAlAPLAlBC DORUD NAME JZimmerrnan AKlein DHarrison JGiitter DATE 7/29/11 7/25/11 7/26/11 8/01/11 OFFICIAL RECORD COpy}}
Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412,50-346 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC                                 RidsOeMailCenter Resource     RidsNrrPMDavis-Besse Resource Lpl3-2 rlt                             RidsOgcRp Resource             RidsNrrLASRohrer Resource RidsAcrsAcnw_MailCTR Resource         RidsRgn3MailCenter Resource   RidsNrrDorlLpl3-2 Resource RidsNrrDorl Resource                   PLain, NRRlDRAlAFPB           GGulla.OE RidsNrrDra Resource                   HBarrett. NRRlDRAlAFPB         RidsNrrDorlLpl1-1 Resource RidsNrrDraAfpb Resource               JDozier. NRR/DRAIAPLA         RidsNrrPMBeaverValley Resource RidsNrrDraApla Resource               DPickett, NRRlDORL             RidsRgn1 MailCenter Resource ADAMS Accession No. ML112010151                 *via email                   NRR-106 OFFICE         DORULPL3-2/PM     DORULPL3-2/LA           DORULPL1-1/PM         DORULPL 1-1/BC NAME           MMahoney           SRohrer                 NMorgan             NSalgado*
DATE           7120/11           7127/11                 7/20/11             7126111 OFFICE         DORULPL3-2/BC     DRAlAFPB/BC             DRAlAPLAlBC         DORUD NAME           JZimmerrnan       AKlein                   DHarrison           JGiitter DATE           7/29/11           7/25/11                 7/26/11             8/01/11 OFFICIAL RECORD COpy}}

Latest revision as of 19:45, 10 March 2020

Commitment to Submit a License Amendment Request to Transition to 10 CFR 50.48(c), National Fire Protection Association Standard NFPA 805, and Request to Extend Enforcement Discretion - Beaver Valley Power, Unit 1 and 2 and Davis-Besse, Uni
ML112010151
Person / Time
Site: Beaver Valley, Davis Besse
Issue date: 08/01/2011
From: Giitter J
Division of Operating Reactor Licensing
To: Sena P
FirstEnergy Nuclear Operating Co
mahoney, m NRR/DORL/LPLIII-2 415-3867
References
TAC ME6613, TAC ME6627, TAC ME6628
Download: ML112010151 (2)


Text

"p..R REGUJ_ UNITED STATES V'- ""'I~

of

...... 0

~

NUCLEAR REGULATORY COMMISSION t! t'> WASHINGTON, D.C. 20555-0001

<[ 0 In ,': Augus t 1, 2011

~ ~

"f'". ~

"'" ...0

        • i' Mr. Peter H. Sena, III President and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308

SUBJECT:

COMMITMENT TO SUBMIT A LICENSE AMENDMENT REQUEST TO TRANSITION TO 10 CFR 50.48(c), NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 805, AND REQUEST TO EXTEND ENFORCEMENT DISCRETION - BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 (TAC NOS. ME6628, ME6627 AND ME6613)

Dear Mr. Sena:

By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated June 29, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111800765), the FirstEnergy Nuclear Operating Company (1) committed to submit a license amendment request (LAR) for Beaver Valley Power Station, Unit Nos.1 and 2 by September 30, 2012, and Davis-Besse Nuclear Power Station, Unit No.1 by July 1,2014, to transition to National Fire Protection Association Standard NFPA 805 in accordance with Title 10 of the Code of Federal Regulations 50.48(c), and (2) requested that enforcement discretion for fire protection issues be extended to correspond with the LAR submittal date.

The NRC staff has reviewed your letter and finds it consistent with Commission direction as provided in SRM-SECY-11-0061, dated June 10, 2011 (ADAMS Accession No. ML111610616).

Therefore, your request to extend enforcement discretion is granted in accordance with the Interim Enforcement Policy concerning Enforcement Discretion for Certain Fire Protection Issues as published in the Federal Register on July 12, 2011 (76 FR 40777).

If you are unable to meet the above LAR submittal date, you are requested to contact the NRC staff at least 90 days in advance. Please contact Michael Mahoney at (301) 415-3867 if you have any questions.

Sincerely,

~~.4*:-

~ Jo eph G. Giitter, Director

. ision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346 cc: Distribution via Listserv

August 1, 2011 Mr. Peter H. Sena, III President and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308

SUBJECT:

COMMITMENT TO SUBMIT A LICENSE AMENDMENT REQUEST TO TRANSITION TO 10 CFR 50.48(c). NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 805, AND REQUEST TO EXTEND ENFORCEMENT DISCRETION - BEAVER VALLEY POWER STATION. UNIT NOS. 1 AND 2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 - (TAC NOS. ME6628, ME6627 AND ME6613)

Dear Mr. Sena:

By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated June 29, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111800765), the FirstEnergy Nuclear Operating Company (1) committed to submit a license amendment request (LAR) for Beaver Valley Power Station, Unit Nos.1 and 2 by September 30, 2012, and Davis-Besse Nuclear Power Station, Unit No.1 by July 1. 2014, to transition to National Fire Protection Association Standard NFPA 805 in accordance with Title 10 of the Code of Federal Regulations 50.48(c), and (2) requested that enforcement discretion for fire protection issues be extended to correspond with the LAR submittal date.

The NRC Staff has reviewed your letter and finds it consistent with Commission direction as provided in SRM-SECY-11-0061, dated June 10, 2011 (ADAMS Accession No. ML111610616).

Therefore, your request to extend enforcement discretion is granted in accordance with the Interim Enforcement Policy concerning Enforcement Discretion for Certain Fire Protection Issues as published in the Federal Register on July 12, 2011 (76 FR 40777).

If you are unable to meet the above LAR submittal date, you are requested to contact the NRC staff at least 90 days in advance. Please contact Michael Mahoney at (301) 415-3867 if you have any questions.

Sincerely, IRA!

Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412,50-346 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsOeMailCenter Resource RidsNrrPMDavis-Besse Resource Lpl3-2 rlt RidsOgcRp Resource RidsNrrLASRohrer Resource RidsAcrsAcnw_MailCTR Resource RidsRgn3MailCenter Resource RidsNrrDorlLpl3-2 Resource RidsNrrDorl Resource PLain, NRRlDRAlAFPB GGulla.OE RidsNrrDra Resource HBarrett. NRRlDRAlAFPB RidsNrrDorlLpl1-1 Resource RidsNrrDraAfpb Resource JDozier. NRR/DRAIAPLA RidsNrrPMBeaverValley Resource RidsNrrDraApla Resource DPickett, NRRlDORL RidsRgn1 MailCenter Resource ADAMS Accession No. ML112010151 *via email NRR-106 OFFICE DORULPL3-2/PM DORULPL3-2/LA DORULPL1-1/PM DORULPL 1-1/BC NAME MMahoney SRohrer NMorgan NSalgado*

DATE 7120/11 7127/11 7/20/11 7126111 OFFICE DORULPL3-2/BC DRAlAFPB/BC DRAlAPLAlBC DORUD NAME JZimmerrnan AKlein DHarrison JGiitter DATE 7/29/11 7/25/11 7/26/11 8/01/11 OFFICIAL RECORD COpy