ML18208A398: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18208A398
| number = ML18208A398
| issue date = 07/27/2018
| issue date = 07/27/2018
| title = Acceptance Review: Salem 1 & 2 Extend Refueling Water Storage Tank AOT
| title = NRR E-mail Capture - Acceptance Review: Salem 1 & 2 Extend Refueling Water Storage Tank AOT
| author name = Kim J
| author name = Kim J
| author affiliation = NRC/NRR/DORL/LPLI
| author affiliation = NRC/NRR/DORL/LPLI
| addressee name = Duke P R
| addressee name = Duke P
| addressee affiliation = PSEG Nuclear, LLC
| addressee affiliation = PSEG Nuclear, LLC
| docket = 05000272, 05000311
| docket = 05000272, 05000311
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:NRR-DMPSPEm Resource From:                            Kim, James Sent:                            Friday, July 27, 2018 10:23 AM To:                              Duke, Paul R.
Cc:                              Thomas, Brian J.
 
==Subject:==
Acceptance Review: Salem 1 & 2 Extend Refueling Water Storage Tank AOT (EPID:
L-2018-LLA-0184)
By letter dated June 29, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML ML18183A025), Public Service Enterprise Group Nuclear, LCC (PSEG, the licensee) submitted a license amendment request (LAR) for Salem Nuclear Generating Station Units 1 and 2. The proposed amendment would delete duplicative Technical Specifications (TSs) requirements to the refueling water storage tank (RWST) in TS 3.1.2.6, "Borated Water Sources - Operating", and revises TS 3.5.5, "Refueling Water Storage Tank"; to ensure compliance with assumptions used in the design basis accident and containment response analyses and to make Salem TS requirements for the RWST consistent with NUREG 1431, Revision 4, "Standard Technical Specifications - Westinghouse Plants."
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
The NRC staff has estimated that this licensing request will take approximately [[estimated NRC review hours::230 hours]] to complete. The NRC staff expect to complete this review in approximately 12 months, which is July 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any question, please contact me, James Kim, at James.Kim@nrc.gov or 301-415-4125.
James Kim, Project Manager Branch 1, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1
 
Hearing Identifier:    NRR_DMPS Email Number:          497 Mail Envelope Properties    (James.Kim@nrc.gov20180727102200)
 
==Subject:==
Acceptance Review: Salem 1 & 2 Extend Refueling Water Storage Tank AOT (EPID: L-2018-LLA-0184)
Sent Date:              7/27/2018 10:22:48 AM Received Date:          7/27/2018 10:22:00 AM From:                  Kim, James Created By:            James.Kim@nrc.gov Recipients:
"Thomas, Brian J." <Brian.Thomas@pseg.com>
Tracking Status: None "Duke, Paul R." <Paul.Duke@pseg.com>
Tracking Status: None Post Office:
Files                          Size                  Date & Time MESSAGE                        2789                  7/27/2018 10:22:00 AM Options Priority:                      Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:}}

Latest revision as of 10:31, 6 March 2020

NRR E-mail Capture - Acceptance Review: Salem 1 & 2 Extend Refueling Water Storage Tank AOT
ML18208A398
Person / Time
Site: Salem  PSEG icon.png
Issue date: 07/27/2018
From: James Kim
Plant Licensing Branch 1
To: Duke P
Public Service Enterprise Group
References
L-2018-LLA-0184
Download: ML18208A398 (2)


Text

NRR-DMPSPEm Resource From: Kim, James Sent: Friday, July 27, 2018 10:23 AM To: Duke, Paul R.

Cc: Thomas, Brian J.

Subject:

Acceptance Review: Salem 1 & 2 Extend Refueling Water Storage Tank AOT (EPID:

L-2018-LLA-0184)

By letter dated June 29, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML ML18183A025), Public Service Enterprise Group Nuclear, LCC (PSEG, the licensee) submitted a license amendment request (LAR) for Salem Nuclear Generating Station Units 1 and 2. The proposed amendment would delete duplicative Technical Specifications (TSs) requirements to the refueling water storage tank (RWST) in TS 3.1.2.6, "Borated Water Sources - Operating", and revises TS 3.5.5, "Refueling Water Storage Tank"; to ensure compliance with assumptions used in the design basis accident and containment response analyses and to make Salem TS requirements for the RWST consistent with NUREG 1431, Revision 4, "Standard Technical Specifications - Westinghouse Plants."

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

The NRC staff has estimated that this licensing request will take approximately 230 hours9.583 days <br />1.369 weeks <br />0.315 months <br /> to complete. The NRC staff expect to complete this review in approximately 12 months, which is July 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any question, please contact me, James Kim, at James.Kim@nrc.gov or 301-415-4125.

James Kim, Project Manager Branch 1, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1

Hearing Identifier: NRR_DMPS Email Number: 497 Mail Envelope Properties (James.Kim@nrc.gov20180727102200)

Subject:

Acceptance Review: Salem 1 & 2 Extend Refueling Water Storage Tank AOT (EPID: L-2018-LLA-0184)

Sent Date: 7/27/2018 10:22:48 AM Received Date: 7/27/2018 10:22:00 AM From: Kim, James Created By: James.Kim@nrc.gov Recipients:

"Thomas, Brian J." <Brian.Thomas@pseg.com>

Tracking Status: None "Duke, Paul R." <Paul.Duke@pseg.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2789 7/27/2018 10:22:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: