| issue date = 05/05/1988
| issue date = 05/05/1988
| title = Special Rept 88-1:on 880411,six Fire Barrier Floor Penetrations Found Degraded.Cause Undetermined.Fire Watch Will Continue Until All Fire Protection Concerns Re Area Resolved.Penetrations Will Be Sealed After Review
| title = Special Rept 88-1:on 880411,six Fire Barrier Floor Penetrations Found Degraded.Cause Undetermined.Fire Watch Will Continue Until All Fire Protection Concerns Re Area Resolved.Penetrations Will Be Sealed After Review
| author name = ZUPKO J M
| author name = Zupko J
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:0 e Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station u. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555  
{{#Wiki_filter:0 PS~G*                                                              e Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station May 05, 1988
: u. S. Nuclear Regulatory Commission Document Control Desk Washington, DC               20555


==Dear Sir:==
==Dear Sir:==
SALEM GENERATING STATION LICENSE NO. DPR-75 DOCKET NO. 50-311 UNIT NO. 2 SPECIAL REPORT 88-1 May 05, 1988 This Special Report addresses the circumstances surrounding four missed hourly roving fire watches. These fire watches are required by PSE&G Safety Evaluation S-C-M200-NSE-0709-2, "Justification For Continued Operation of Salem Units 1 & 2 With Outstanding Fire Protection Concerns".
 
MJP:pc Distribution The Energy People 8805090118 880505 PDR ADOCK 05000311 S DCD Sincerely
SALEM GENERATING STATION LICENSE NO. DPR-75 DOCKET NO. 50-311 UNIT NO. 2 SPECIAL REPORT 88-1 This Special Report addresses the circumstances surrounding four missed hourly roving fire watches. These fire watches are required by PSE&G Safety Evaluation S-C-M200-NSE-0709-2, "Justification For Continued Operation of Salem Units 1 & 2 With Outstanding Fire Protection Concerns".
: yours, J. M. Zupko, Jr. General Salem Operations 4f..'"2--y 1\1 95-2 1 89 ( 1 I MI 2 -o..:
Sincerely yours,
                                                                  ~~-~
J. M. Zupko, Jr.
General Manager-Salem Operations MJP:pc Distribution 4f..'"2--
y       1\1 The Energy People 8805090118 880505                                                                        95-2 189 ( 1 I MI ~ 2 -o..:
PDR ADOCK 05000311 S                      DCD
 
SPECIAL REPORT NUMBER 88-PLANT IDENTIFICATION:
SPECIAL REPORT NUMBER 88-PLANT IDENTIFICATION:
Salem Generating Station -Unit l... Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:
Salem Generating Station - Unit l...
Technical Specification 3.7.11 -Fire Barrier Impairment Repair > 7 Days Event Date: 04/11/88 Report Date: 05/05/88 This report was initiated by Incident Report No. 88-128. CONDITIONS PRIOR TO OCCURRENCE:
Public Service Electric & Gas Company Hancock's Bridge, New Jersey   08038 IDENTIFICATION OF OCCURRENCE:
Technical Specification 3.7.11 - Fire Barrier Impairment Repair > 7 Days Event Date:   04/11/88 Report Date:   05/05/88 This report was initiated by Incident Report No. 88-128.
CONDITIONS PRIOR TO OCCURRENCE:
N/A DESCRIPTION OF OCCURRENCE:
N/A DESCRIPTION OF OCCURRENCE:
On April 4, 1988 at 1530 hours, six fire barrier floor penetrations were found degraded by Appendix R Task Force Penetration Seal Group personnel during a preliminary walkdown of plant areas. No seal was provided in any of the penetrations.
On April 4, 1988 at 1530 hours, six fire barrier floor penetrations were found degraded by Appendix R Task Force Penetration Seal Group personnel during a preliminary walkdown of plant areas. No seal was provided in any of the penetrations. These penetrations are cable conduits. Three of the conduits had cabling and three were empty.
These penetrations are cable conduits.
The floor penetrations are located in the 100' Inner Mechanical Penetration area (Fire Area lFA-PP-lOOH) of the Auxiliary Building.
Three of the conduits had cabling and three were empty. The floor penetrations are located in the 100' Inner Mechanical Penetration area (Fire Area lFA-PP-lOOH) of the Auxiliary Building.
An hourly roving fire watch had been established for this area previously due to other fire protection concerns. Therefore, the requirements of Technical Specification Action Statement 3.7.11.a, were met.
An hourly roving fire watch had been established for this area previously due to other fire protection concerns.
Technical Specification 3.7.11 states:
Therefore, the requirements of Technical Specification Action Statement 3.7.11.a, were met. Technical Specification 3.7.11 states: "All fire penetrations (including cable penetration barriers, fire doors and fire dampers), in fire zone boundaries, protecting safety related areas shall be functional." Action Statement 3.7.11.a states: "With one (1) or more of the above required fire barrier penetrations non-functional, within one (1) hour either establish a continuous fire watch on at least one (1) side of the affected penetration, or verify the OPERABILITY of fire detectors on at least one (1) side of the non-functional fire barrier and establish an hourly fire watch patrol. Restore the non-functional fire barrier penetration(s) to functional status within 7 days or, in lieu of any other report required by Specification 6.9.l, prepare and submit a Special Report to the Commission pursuant to Specification  
        "All fire penetrations (including cable penetration barriers, fire doors and fire dampers), in fire zone boundaries, protecting safety related areas shall be functional."
Action Statement 3.7.11.a states:
          "With one (1) or more of the above required fire barrier penetrations non-functional, within one (1) hour either establish a continuous fire watch on at least one (1) side of the affected penetration, or verify the OPERABILITY of fire detectors on at least one (1) side of the non-functional fire barrier and establish an hourly fire watch patrol. Restore the non-functional fire barrier penetration(s) to functional status within 7 days or, in lieu of any other report required by Specification 6.9.l, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next (30) days outlining the action taken, the cause of the non-functional penetration and plans and schedule for restoring the fire b~trier penetration(s) to functional status."


====6.9.2 within====
UNIT 1 SPECIAL REPORT 88-1 e
the next (30) days outlining the action taken, the cause of the non-functional penetration and plans and schedule for restoring the fire penetration(s) to functional status." 
APPARENT CAUSE OF OCCURRENCE:
' ; UNIT 1 SPECIAL REPORT 88-1 e APPARENT CAUSE OF OCCURRENCE:
The cause of the degraded fire* barrier penetrations could not be positively determined.
The cause of the degraded fire* barrier penetrations could not be positively determined.
ANALYSIS OF OCCURRENCE:
ANALYSIS OF OCCURRENCE:
The functional integrity of the penetration fire barriers ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility.
The functional integrity of the penetration fire barriers ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility. This design feature minimizes the possibility of a single fire involving several areas of the facility. The penetration fire barriers are a passive element in the facility fire protection program and are subject to periodic inspections. This report satisfies the reporting requirements of Technical Specification Action Statement 3.7.11.a pursuant to Technical Specification 6.9.2 (both Units) since the time between discovery and eventual repair of the fire barrier impairment is greater than seven (7) days. Appropriate actions were taken in accordance with the requirements of Technical Specification Action Statement 3.7.11.a (both Units} to establish a one hour roving fire watch for the impaired fire barrier once the impairments were identified.
This design feature minimizes the possibility of a single fire involving several areas of the facility.
Both areas contain detection in addition to the roving fire watch patrol. Therefore, it is reasonable to assume that a fire in either area would be detected before it could involve the adjacent area.
The penetration fire barriers are a passive element in the facility fire protection program and are subject to periodic inspections.
This occurrence therefore involved no undue risk to the health or safety of the public.
This report satisfies the reporting requirements of Technical Specification Action Statement 3.7.11.a pursuant to Technical Specification 6.9.2 (both Units) since the time between discovery and eventual repair of the fire barrier impairment is greater than seven (7) days. Appropriate actions were taken in accordance with the requirements of Technical Specification Action Statement 3.7.11.a (both Units} to establish a one hour roving fire watch for the impaired fire barrier once the impairments were identified.
CORRECTIVE ACTION:
Both areas contain detection in addition to the roving fire watch patrol. Therefore, it is reasonable to assume that a fire in either area would be detected before it could involve the adjacent area. This occurrence therefore involved no undue risk to the health or safety of the public. CORRECTIVE ACTION: The one hour roving fire watch, as addressed in the Description of Occurrence section, will continue until all fire protection concerns associated with this area are resolved.
The one hour roving fire watch, as addressed in the Description of Occurrence section, will continue until all fire protection concerns associated with this area are resolved.
The repair of the penetrations was not accomplished within seven (7) days due to the additional review being conducted by the Appendix R Task Force Penetration Seal Group. Upon completion of this review the penetrations will be sealed. This review and corrective action will be completed in accordance with PSE&G letter NLR-N88037, dated March 4, 1988, to the NRC which discusses the Penetration Seal Review Program schedule.
The repair of the penetrations was not accomplished within seven (7) days due to the additional review being conducted by the Appendix R Task Force Penetration Seal Group. Upon completion of this review the penetrations will be sealed.
MJP:pc SORC Mtg. 88-039 Manager Salem Operations}}
                                    ~
This review and corrective action will be completed in accordance with PSE&G letter NLR-N88037, dated March 4, 1988, to the NRC which discusses the Penetration Seal Review Program schedule.
                                            ~~
G~neral Manager Salem Operations MJP:pc SORC Mtg. 88-039}}

Latest revision as of 11:47, 23 February 2020

Special Rept 88-1:on 880411,six Fire Barrier Floor Penetrations Found Degraded.Cause Undetermined.Fire Watch Will Continue Until All Fire Protection Concerns Re Area Resolved.Penetrations Will Be Sealed After Review
ML18093A818
Person / Time
Site: Salem PSEG icon.png
Issue date: 05/05/1988
From: Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
88-1, NUDOCS 8805090118
Download: ML18093A818 (3)


Text

0 PS~G* e Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station May 05, 1988

u. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

SALEM GENERATING STATION LICENSE NO. DPR-75 DOCKET NO. 50-311 UNIT NO. 2 SPECIAL REPORT 88-1 This Special Report addresses the circumstances surrounding four missed hourly roving fire watches. These fire watches are required by PSE&G Safety Evaluation S-C-M200-NSE-0709-2, "Justification For Continued Operation of Salem Units 1 & 2 With Outstanding Fire Protection Concerns".

Sincerely yours,

~~-~

J. M. Zupko, Jr.

General Manager-Salem Operations MJP:pc Distribution 4f..'"2--

y 1\1 The Energy People 8805090118 880505 95-2 189 ( 1 I MI ~ 2 -o..:

PDR ADOCK 05000311 S DCD

SPECIAL REPORT NUMBER 88-PLANT IDENTIFICATION:

Salem Generating Station - Unit l...

Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Technical Specification 3.7.11 - Fire Barrier Impairment Repair > 7 Days Event Date: 04/11/88 Report Date: 05/05/88 This report was initiated by Incident Report No.88-128.

CONDITIONS PRIOR TO OCCURRENCE:

N/A DESCRIPTION OF OCCURRENCE:

On April 4, 1988 at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br />, six fire barrier floor penetrations were found degraded by Appendix R Task Force Penetration Seal Group personnel during a preliminary walkdown of plant areas. No seal was provided in any of the penetrations. These penetrations are cable conduits. Three of the conduits had cabling and three were empty.

The floor penetrations are located in the 100' Inner Mechanical Penetration area (Fire Area lFA-PP-lOOH) of the Auxiliary Building.

An hourly roving fire watch had been established for this area previously due to other fire protection concerns. Therefore, the requirements of Technical Specification Action Statement 3.7.11.a, were met.

Technical Specification 3.7.11 states:

"All fire penetrations (including cable penetration barriers, fire doors and fire dampers), in fire zone boundaries, protecting safety related areas shall be functional."

Action Statement 3.7.11.a states:

"With one (1) or more of the above required fire barrier penetrations non-functional, within one (1) hour either establish a continuous fire watch on at least one (1) side of the affected penetration, or verify the OPERABILITY of fire detectors on at least one (1) side of the non-functional fire barrier and establish an hourly fire watch patrol. Restore the non-functional fire barrier penetration(s) to functional status within 7 days or, in lieu of any other report required by Specification 6.9.l, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next (30) days outlining the action taken, the cause of the non-functional penetration and plans and schedule for restoring the fire b~trier penetration(s) to functional status."

UNIT 1 SPECIAL REPORT 88-1 e

APPARENT CAUSE OF OCCURRENCE:

The cause of the degraded fire* barrier penetrations could not be positively determined.

ANALYSIS OF OCCURRENCE:

The functional integrity of the penetration fire barriers ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility. This design feature minimizes the possibility of a single fire involving several areas of the facility. The penetration fire barriers are a passive element in the facility fire protection program and are subject to periodic inspections. This report satisfies the reporting requirements of Technical Specification Action Statement 3.7.11.a pursuant to Technical Specification 6.9.2 (both Units) since the time between discovery and eventual repair of the fire barrier impairment is greater than seven (7) days. Appropriate actions were taken in accordance with the requirements of Technical Specification Action Statement 3.7.11.a (both Units} to establish a one hour roving fire watch for the impaired fire barrier once the impairments were identified.

Both areas contain detection in addition to the roving fire watch patrol. Therefore, it is reasonable to assume that a fire in either area would be detected before it could involve the adjacent area.

This occurrence therefore involved no undue risk to the health or safety of the public.

CORRECTIVE ACTION:

The one hour roving fire watch, as addressed in the Description of Occurrence section, will continue until all fire protection concerns associated with this area are resolved.

The repair of the penetrations was not accomplished within seven (7) days due to the additional review being conducted by the Appendix R Task Force Penetration Seal Group. Upon completion of this review the penetrations will be sealed.

~

This review and corrective action will be completed in accordance with PSE&G letter NLR-N88037, dated March 4, 1988, to the NRC which discusses the Penetration Seal Review Program schedule.

~~

G~neral Manager Salem Operations MJP:pc SORC Mtg.88-039