ML18169A277: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML18169A277 | | number = ML18169A277 | ||
| issue date = 05/31/2018 | | issue date = 05/31/2018 | ||
| title = | | title = Boiling Water Reactor - License Termination Plan Request for Additional Information | ||
| author name = | | author name = Vannoordennen G | ||
| author affiliation = LaCrosseSolutions, LLC | | author affiliation = LaCrosseSolutions, LLC | ||
| addressee name = | | addressee name = | ||
Line 13: | Line 13: | ||
| document type = Letter | | document type = Letter | ||
| page count = 10 | | page count = 10 | ||
| project = | |||
| stage = Request | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:LACROSSESOLUTIONS May 31, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 | {{#Wiki_filter:~ | ||
LACROSSESOLUTIONS May 31, 2018 LC-2018-0038 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046 | |||
==Subject:== | ==Subject:== | ||
License Termination Plan Request for Additional Information | |||
==References:== | ==References:== | ||
: 1) Gerard van Noordennen, LaCrosseSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Amendment Request for the License Termination Plan," dated June 27, 2016 | |||
: 2) Gerard van Noordennen, LaCrosseSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan Update," dated December 1, 2016 | |||
: 1) Gerard van Noordennen, LaCrosseSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Amendment Request for the License Termination Plan," dated June 27, 2016 2) Gerard van Noordennen, LaCrosseSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan Update," dated December 1, 2016 3) Bruce Watson, U.S. Nuclear Regulatory Commission, Letter to John Sauger, EnergySolutions, "La Crosse Boiling Water Reactor-Request for Additional Information Regarding the Lacrosse Solutions License Termination Plan and Associated Conforming | : 3) Bruce Watson, U.S. Nuclear Regulatory Commission, Letter to John Sauger, EnergySolutions, "La Crosse Boiling Water Reactor-Request for Additional Information Regarding the Lacrosse Solutions License Termination Plan and Associated Conforming | ||
* License Amendment," dated August 4, 2017 The La Crosse Boiling Water Reactor (LACBWR) License Termination Plan (LTP) was submitted to the U.S. Nuclear Regulatory Commission (NRC) for review on June 27, 2016 as documented in Reference | * License Amendment," dated August 4, 2017 The La Crosse Boiling Water Reactor (LACBWR) License Termination Plan (LTP) was submitted to the U.S. Nuclear Regulatory Commission (NRC) for review on June 27, 2016 as documented in Reference 1. | ||
Following preliminary review and comments received during a public meeting held between NRC staff and LaCrosseSolutions representatives on October 20, 2016, an update to the LTP was submitted to the NRC on December 1, 2016 as documented in Reference 2. A Request for Additional Information (RAI) was received from the NRC on August 4, 2017 as documented in Reference 3. | |||
Responses to the issues identified in the referenced RAI are provided in Enclosure 1. Supporting documents are provided in Enclosure 2. Enclosure 3 contains a preflight report for Enclosures 1 and 2. | |||
LTP Revision 1 incorporates the RAI responses and will be provided in a separate correspondence. | |||
There are no regulatory commitments contained in this letter. If you have any questions regarding this letter, please contact me at (860) 462-9707. | There are no regulatory commitments contained in this letter. If you have any questions regarding this letter, please contact me at (860) 462-9707. | ||
Respectfully, Gerard van Noordennen Vice President Regulatory Affairs | Respectfully, c;~~~q~ | ||
Gerard van Noordennen Vice President Regulatory Affairs | |||
==Enclosures:== | ==Enclosures:== | ||
Enclosure 1 : RAI Responses Enclosure 2: Supporting Documentation on CD Enclosure 3: Preflight Report for Enclosures 1 and 2 to this submittal cc: Marlayna Vaaler, U.S. NRC Project Manager Regional Administrator, U.S. NRC Region III Service List (Cover Letter, no enclosures) | Enclosure 1: RAI Responses Enclosure 2: Supporting Documentation on CD Enclosure 3: Preflight Report for Enclosures 1 and 2 to this submittal cc: Marlayna Vaaler, U.S. NRC Project Manager Regional Administrator, U.S. NRC Region III Service List (Cover Letter, no enclosures) | ||
S4601 State Highway 35, Genoa, WI 54632 La Crosse Boiling Water Reactor Service List cc: Ken Robuck Group President Disposal and Decommissioning | S4601 State Highway 35, Genoa, WI 54632 | ||
-~ ..... 00 ,2! M ~ | |||
La Crosse Boiling Water Reactor Service List cc: | |||
.\ | Ken Robuck Paul Schmidt, Manager Group President Disposal and Radiation Protection Section Decommissioning Bureau of Environmental and Occupational Health EnergySolutions Division of Public Health 299 South Main Street, Suite 1700 Wisconsin Department of Health Services Salt Lake City, UT 84111 P.O. Box 2659 Madison, WI 53701-2659 John Sauger . | ||
Executive VP and Chief Nuclear Officer Barbara Nick Reactor D&D President and CEO EnergySolutions Dairyland Power Cooperative 121 W. Trade Street, Suite 2700 3200 East Avenue South Charlotte, NC 28202 La Crosse, WI 54602-0817 Gerard van N oordennen Cheryl Olson, ISFSI Manager VP Regulatory Affairs La Crosse Boiling Water Reactor EnergySolutions Dairyland Power Cooperative 121 W. Trade Street, Suite 2700 S4601 State Highway 35 Charlotte, NC 28202 P.O. Box 817 Genoa, WI 54632-8846 Joseph Nowak General Manager Lane Peters LaCrosseSolutions La Crosse Boiling Water Reactor S4601 State Highway 35 Dairyland Power Cooperative Genoa, WI54632-8846 S4601 State Highway 35 Genoa, WI54632-8846 Russ Workman Thomas Zaremba General Counsel Wheeler, Van Sickle and Anderson, S.C. | |||
EnergySolutions 44 East Mifflin Street, Suite 1000 299 South Main Street, Suite 1700 Madison, WI 53703 Salt Lake City, UT 84111 John E. Matthews Jerome Pedretti, Clerk Morgan, Lewis & Bockius LLP Town of Genoa 1111 Pennsylvania A venue, NW E860 Mundsack Road Washington, DC 20004 Genoa, WI54632 Jeffery Kitsembel Division of Energy Regulation Wisconsin Public Service Commission P.O. Box 7854 Madison, WI 53707-7854 | |||
,...,t r,J | |||
300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures< | ~ | ||
300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures | r,J | ||
< 300 ppi, clear and legible | = | ||
< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), | 0 Q. | ||
00 r,J 0 ~ | |||
300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures | u~ | ||
< 300 ppi, clear and legible Document contains scanned document | z | ||
300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible | *~ ~ | ||
~ | |||
300 ppi, clear and legible Document contains | -~ | ||
< 300 ppi, clear and legible | ..... 00 | ||
,2! M | |||
< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts) | ~gQ) I Cll 00 oo Cll - | ||
300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts) | i-..N u*trj u | ||
300 ppi, clear and legible | ....:l ....:l | ||
300 ppi, clear and legible Document contains | |||
< 300 ppi, clear and legible | LaCrosseSolutions LC-2018-0038 ENCL0SURE2 RAI Supporting Documentation | ||
.\j"' - *' * -* -- < ,* ** JIT-.*- ~" | |||
"~\)- | |||
300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), | /'. | ||
rf' \ . ', ,. | |||
l . . * . \*,, | |||
\1 I ' \ ' | |||
~ I , ' , | |||
;,., -. '..'.,/ | |||
I. | |||
I | |||
LaCrosseSolutions LC-2018-003 8 ENCL0SURE3 Preflight Report For Enclosures 1 and 2 | |||
LaCrosseSolutions, LLC LC-2018-003 8: Enclosure 3 Page I of 5 This document serves as preflight report for Enclosure I and 2 to the letter LC-2018-0038. The following files do not pass pre-flight criteria or do not meet NRC criteria, but text is word searchable with clarity/legibility of high quality. | |||
Preflight Document Name File Name Reason Status ENCLOSUREl:RAIRESPONSES Document contains logos, graphics, and LACBWR LTP RAI Responses LACBWR RAI Full Response 05312018 Failed charts < 300 ppi, clear and legible ENCLOSURE 2: SUPPORTING DOCUMENTATION ON CD RS-TD-313196-004, LACBWR Soil DCGL, Basement Concrete DCGL, and Buried Pipe DCGL, Revision 4 and Support Files Document contains scanned document RS-TD-313196-004, LACBWR Soil DCGL, Basement RS-TD-313 196-004 Rev 4 Failed (unembedded fonts), logos, graphics, and Concrete DCGL, and Buried Pipe DCGL, Revision 4 signatures< 300 ppi, clear and legible LACBWR Buried Pipe Circ Excavation DSR Passed 052618 LACBWR Buried Pipe Circ Insitu DSR 052618 Passed LACBWR Buried Pipe Group Excavation DSR Passed 052618 LACBWR Buried Pipe Group Insitu DSR 052618 Passed LACBWR Soil DCGL Initial Suite RESRAD Passed Summary Report 052618 LACBWR Soil UA Cm-243 043018 Passed LACBWR Soil UA Cm-244 043018 Passed Calculations in Support of TSD RS-TD-313196-Calculations in Support of TSD RS-TD-313196-004 Rev 4 NIA Excel File - Calculations 004 Rev4 | |||
LaCrosseSolutions, LLC LC-2018-003 8: Enclosure 3 Page 2 of 5 Preflight Document Name File Name Reason Status Document contains scanned document LACBWR FSS Survey, Unit Ll-010-IOIC FSS Plan IOIC I Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document LACBWR FSS Survey, Unit Ll-010-IOIC FSS Plan 10IC II Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document LACBWR FSS Survey, Unit Ll-010-lOlC FSS Plan lOlC Ill Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible FSS Unit: L 1-010-101 C FSS Plan 10IC Illl WTB Analysis 01052018 NIA Excel File - Data/Analysis Waste Treatment Building Subsoil Excavation Document contains scanned document G3 Barrow RA Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible Certificate of Analysis Report Document contains scanned document ENRG070 LaCrosseSolutions, LLC (672583) G3 Barrow Results I Failed (unembedded fonts), logos, graphics, and Client SDG: 427522 GEL Work Order: 427522 signatures< 300 ppi, clear and legible Document contains scanned document Gamma Spectrum Analysis G3 Barrow Results II Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Ll-SUB-CDR FSS Plan Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible Document contains scanned document Ll-SUB-TDS (102) HTD Coe Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Ll-SUB-TDS FSS Map Failed (unembedded fonts)< 300 ppi, clear and legible | |||
LaCrosseSolutions, LLC LC-2018-0038: Enclosure 3 Page 3 of 5 Preflight Document Name File Name Reason Status Document contains scanned document L 1-SUB-TDS HTD Analyses Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Ll-SUB-TDS Plan Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Gamma Spectrum Analysis L2103 Sloping RA Gamma Spec Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible Document contains scanned document L2 l 03 Sloping RA Plan Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible Document contains scanned document LACBWR Impingement and Entrainment of Failed (unembedded fonts)< 300 ppi, clear and Fishes legible LC-FS-TSD-002 Document contains scanned document Operational Derived Concentration Guideline Levels For LC- FS- TSD 002 Rev 2 OP DCGLs FOR FSS Failed *(unembedded fonts), logos, graphics, and Final Status Survey signatures < 300 ppi, clear and legible LC-FS-PN-002 Document contains scanned document LC-FS-PN-002 Rev O_ Characterization Survey Failed (unembedded fonts), logos, graphics, and Characterization Survey Plan Plan signatures< 300 ppi, clear and legible LC-FS-PR-003 Document contains scanned document LC-FS-PR-003 Rev 2 Radiological Assessments Radiological Assessments and Remedial Action Support Failed (unembedded fonts), logos, graphics, and RASS FINAL 01262018 Surveys (RASS) signatures< 300 ppi, clear and legible LC-FS-TSD-001 Document contains scanned document Use ofISOCS for FSS of End State Sub Structures at LC-FS-TSD-001 Rev 0 Failed (unembedded fonts), logos, graphics, and LACBWR signatures< 300 ppi, clear and legible Endangered Resources Review (ERR Log# 16-648) Document contains scam1ed document LTR WDNR Endangered Resources Review Proposed Dairyland LACBWR Plant Demolition, Vernon Failed (unembedded fonts), logos, graphics, and LACBWR Plant Demolition County, WI (Tl3N R07W S32) signatures < 300 ppi, clear and legible | |||
LaCrosseSolutions, LLC LC-2018-0038: Enclosure 3 Page 4 of 5 Preflight Document Name File Name Reason Status Document contains scanned document Mussel Survey for a Proposed Fleeting Site Mississippi Mussel Survey Fleeting Site Mississippi River Failed (unembedded fonts), logos, graphics, and River Pool 9 near Genoa, Wisconsin 11151999 Pool9 signatures< 300 ppi, clear and legible Document contains scanned document Pedretti Barrow Pit RA Plan Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Pedretti Barrow Pit Results I Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Pedretti Barrow Pit Results II Failed (unembedded fonts)< 300 ppi, clear and legible RS-TD-313196-001 Document contains scanned document Radionuclides of Concern During LACBWR RS-TD-313196-001 Rev 5 Failed (unembedded fonts), logos, graphics, and Decommissioning signatures< 300 ppi, clear and legible RS-TD-313196-004 Document contains scanned document LACBWR Soil DCGL, Basement Concrete DCGL, and RS-TD-313196-004 Rev 4 Failed (unembedded fonts), logos, graphics, and Buried Pipe DCGL signatures< 300 ppi, clear and legible Document contains scanned document Sample Plan B1-010-04A_WGTV Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Sample Plan L2-SUB-WRS-A-Warehouse RA Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Turbine Building Drains III Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Turbine Building Drains IV Failed (unembedded fonts)< 300 ppi, clear and legible | |||
LaCrosseSolutions, LLC LC-2018-0038: Enclosure 3 Page 5 of 5 Preflight Document Name File Name Reason Status Document contains scanned document Warehouse HTDs Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Warehouse RA Gamma I Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Warehouse RA Gamma II Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Warehouse RA Gamma III Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Warehouse RA Gamma IV Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Warehouse RA Sample Map Failed (unembedded fonts)< 300 ppi, clear and legible}} |
Latest revision as of 01:51, 23 February 2020
ML18169A277 | |
Person / Time | |
---|---|
Site: | La Crosse File:Dairyland Power Cooperative icon.png |
Issue date: | 05/31/2018 |
From: | Gerard van Noordennen LaCrosseSolutions |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
References | |
LC-2018-0038 | |
Download: ML18169A277 (10) | |
Text
~
LACROSSESOLUTIONS May 31, 2018 LC-2018-0038 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046
Subject:
License Termination Plan Request for Additional Information
References:
- 1) Gerard van Noordennen, LaCrosseSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Amendment Request for the License Termination Plan," dated June 27, 2016
- 2) Gerard van Noordennen, LaCrosseSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan Update," dated December 1, 2016
- 3) Bruce Watson, U.S. Nuclear Regulatory Commission, Letter to John Sauger, EnergySolutions, "La Crosse Boiling Water Reactor-Request for Additional Information Regarding the Lacrosse Solutions License Termination Plan and Associated Conforming
- License Amendment," dated August 4, 2017 The La Crosse Boiling Water Reactor (LACBWR) License Termination Plan (LTP) was submitted to the U.S. Nuclear Regulatory Commission (NRC) for review on June 27, 2016 as documented in Reference 1.
Following preliminary review and comments received during a public meeting held between NRC staff and LaCrosseSolutions representatives on October 20, 2016, an update to the LTP was submitted to the NRC on December 1, 2016 as documented in Reference 2. A Request for Additional Information (RAI) was received from the NRC on August 4, 2017 as documented in Reference 3.
Responses to the issues identified in the referenced RAI are provided in Enclosure 1. Supporting documents are provided in Enclosure 2. Enclosure 3 contains a preflight report for Enclosures 1 and 2.
LTP Revision 1 incorporates the RAI responses and will be provided in a separate correspondence.
There are no regulatory commitments contained in this letter. If you have any questions regarding this letter, please contact me at (860) 462-9707.
Respectfully, c;~~~q~
Gerard van Noordennen Vice President Regulatory Affairs
Enclosures:
Enclosure 1: RAI Responses Enclosure 2: Supporting Documentation on CD Enclosure 3: Preflight Report for Enclosures 1 and 2 to this submittal cc: Marlayna Vaaler, U.S. NRC Project Manager Regional Administrator, U.S. NRC Region III Service List (Cover Letter, no enclosures)
S4601 State Highway 35, Genoa, WI 54632
La Crosse Boiling Water Reactor Service List cc:
Ken Robuck Paul Schmidt, Manager Group President Disposal and Radiation Protection Section Decommissioning Bureau of Environmental and Occupational Health EnergySolutions Division of Public Health 299 South Main Street, Suite 1700 Wisconsin Department of Health Services Salt Lake City, UT 84111 P.O. Box 2659 Madison, WI 53701-2659 John Sauger .
Executive VP and Chief Nuclear Officer Barbara Nick Reactor D&D President and CEO EnergySolutions Dairyland Power Cooperative 121 W. Trade Street, Suite 2700 3200 East Avenue South Charlotte, NC 28202 La Crosse, WI 54602-0817 Gerard van N oordennen Cheryl Olson, ISFSI Manager VP Regulatory Affairs La Crosse Boiling Water Reactor EnergySolutions Dairyland Power Cooperative 121 W. Trade Street, Suite 2700 S4601 State Highway 35 Charlotte, NC 28202 P.O. Box 817 Genoa, WI 54632-8846 Joseph Nowak General Manager Lane Peters LaCrosseSolutions La Crosse Boiling Water Reactor S4601 State Highway 35 Dairyland Power Cooperative Genoa, WI54632-8846 S4601 State Highway 35 Genoa, WI54632-8846 Russ Workman Thomas Zaremba General Counsel Wheeler, Van Sickle and Anderson, S.C.
EnergySolutions 44 East Mifflin Street, Suite 1000 299 South Main Street, Suite 1700 Madison, WI 53703 Salt Lake City, UT 84111 John E. Matthews Jerome Pedretti, Clerk Morgan, Lewis & Bockius LLP Town of Genoa 1111 Pennsylvania A venue, NW E860 Mundsack Road Washington, DC 20004 Genoa, WI54632 Jeffery Kitsembel Division of Energy Regulation Wisconsin Public Service Commission P.O. Box 7854 Madison, WI 53707-7854
,...,t r,J
~
r,J
=
0 Q.
00 r,J 0 ~
u~
z
- ~ ~
~
-~
..... 00
,2! M
~gQ) I Cll 00 oo Cll -
i-..N u*trj u
....:l ....:l
LaCrosseSolutions LC-2018-0038 ENCL0SURE2 RAI Supporting Documentation
.\j"' - *' * -* -- < ,* ** JIT-.*- ~"
"~\)-
/'.
rf' \ . ', ,.
l . . * . \*,,
\1 I ' \ '
~ I , ' ,
- ,., -. '..'.,/
I.
I
LaCrosseSolutions LC-2018-003 8 ENCL0SURE3 Preflight Report For Enclosures 1 and 2
LaCrosseSolutions, LLC LC-2018-003 8: Enclosure 3 Page I of 5 This document serves as preflight report for Enclosure I and 2 to the letter LC-2018-0038. The following files do not pass pre-flight criteria or do not meet NRC criteria, but text is word searchable with clarity/legibility of high quality.
Preflight Document Name File Name Reason Status ENCLOSUREl:RAIRESPONSES Document contains logos, graphics, and LACBWR LTP RAI Responses LACBWR RAI Full Response 05312018 Failed charts < 300 ppi, clear and legible ENCLOSURE 2: SUPPORTING DOCUMENTATION ON CD RS-TD-313196-004, LACBWR Soil DCGL, Basement Concrete DCGL, and Buried Pipe DCGL, Revision 4 and Support Files Document contains scanned document RS-TD-313196-004, LACBWR Soil DCGL, Basement RS-TD-313 196-004 Rev 4 Failed (unembedded fonts), logos, graphics, and Concrete DCGL, and Buried Pipe DCGL, Revision 4 signatures< 300 ppi, clear and legible LACBWR Buried Pipe Circ Excavation DSR Passed 052618 LACBWR Buried Pipe Circ Insitu DSR 052618 Passed LACBWR Buried Pipe Group Excavation DSR Passed 052618 LACBWR Buried Pipe Group Insitu DSR 052618 Passed LACBWR Soil DCGL Initial Suite RESRAD Passed Summary Report 052618 LACBWR Soil UA Cm-243 043018 Passed LACBWR Soil UA Cm-244 043018 Passed Calculations in Support of TSD RS-TD-313196-Calculations in Support of TSD RS-TD-313196-004 Rev 4 NIA Excel File - Calculations 004 Rev4
LaCrosseSolutions, LLC LC-2018-003 8: Enclosure 3 Page 2 of 5 Preflight Document Name File Name Reason Status Document contains scanned document LACBWR FSS Survey, Unit Ll-010-IOIC FSS Plan IOIC I Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document LACBWR FSS Survey, Unit Ll-010-IOIC FSS Plan 10IC II Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document LACBWR FSS Survey, Unit Ll-010-lOlC FSS Plan lOlC Ill Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible FSS Unit: L 1-010-101 C FSS Plan 10IC Illl WTB Analysis 01052018 NIA Excel File - Data/Analysis Waste Treatment Building Subsoil Excavation Document contains scanned document G3 Barrow RA Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible Certificate of Analysis Report Document contains scanned document ENRG070 LaCrosseSolutions, LLC (672583) G3 Barrow Results I Failed (unembedded fonts), logos, graphics, and Client SDG: 427522 GEL Work Order: 427522 signatures< 300 ppi, clear and legible Document contains scanned document Gamma Spectrum Analysis G3 Barrow Results II Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Ll-SUB-CDR FSS Plan Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible Document contains scanned document Ll-SUB-TDS (102) HTD Coe Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Ll-SUB-TDS FSS Map Failed (unembedded fonts)< 300 ppi, clear and legible
LaCrosseSolutions, LLC LC-2018-0038: Enclosure 3 Page 3 of 5 Preflight Document Name File Name Reason Status Document contains scanned document L 1-SUB-TDS HTD Analyses Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Ll-SUB-TDS Plan Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Gamma Spectrum Analysis L2103 Sloping RA Gamma Spec Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible Document contains scanned document L2 l 03 Sloping RA Plan Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible Document contains scanned document LACBWR Impingement and Entrainment of Failed (unembedded fonts)< 300 ppi, clear and Fishes legible LC-FS-TSD-002 Document contains scanned document Operational Derived Concentration Guideline Levels For LC- FS- TSD 002 Rev 2 OP DCGLs FOR FSS Failed *(unembedded fonts), logos, graphics, and Final Status Survey signatures < 300 ppi, clear and legible LC-FS-PN-002 Document contains scanned document LC-FS-PN-002 Rev O_ Characterization Survey Failed (unembedded fonts), logos, graphics, and Characterization Survey Plan Plan signatures< 300 ppi, clear and legible LC-FS-PR-003 Document contains scanned document LC-FS-PR-003 Rev 2 Radiological Assessments Radiological Assessments and Remedial Action Support Failed (unembedded fonts), logos, graphics, and RASS FINAL 01262018 Surveys (RASS) signatures< 300 ppi, clear and legible LC-FS-TSD-001 Document contains scanned document Use ofISOCS for FSS of End State Sub Structures at LC-FS-TSD-001 Rev 0 Failed (unembedded fonts), logos, graphics, and LACBWR signatures< 300 ppi, clear and legible Endangered Resources Review (ERR Log# 16-648) Document contains scam1ed document LTR WDNR Endangered Resources Review Proposed Dairyland LACBWR Plant Demolition, Vernon Failed (unembedded fonts), logos, graphics, and LACBWR Plant Demolition County, WI (Tl3N R07W S32) signatures < 300 ppi, clear and legible
LaCrosseSolutions, LLC LC-2018-0038: Enclosure 3 Page 4 of 5 Preflight Document Name File Name Reason Status Document contains scanned document Mussel Survey for a Proposed Fleeting Site Mississippi Mussel Survey Fleeting Site Mississippi River Failed (unembedded fonts), logos, graphics, and River Pool 9 near Genoa, Wisconsin 11151999 Pool9 signatures< 300 ppi, clear and legible Document contains scanned document Pedretti Barrow Pit RA Plan Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Pedretti Barrow Pit Results I Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Pedretti Barrow Pit Results II Failed (unembedded fonts)< 300 ppi, clear and legible RS-TD-313196-001 Document contains scanned document Radionuclides of Concern During LACBWR RS-TD-313196-001 Rev 5 Failed (unembedded fonts), logos, graphics, and Decommissioning signatures< 300 ppi, clear and legible RS-TD-313196-004 Document contains scanned document LACBWR Soil DCGL, Basement Concrete DCGL, and RS-TD-313196-004 Rev 4 Failed (unembedded fonts), logos, graphics, and Buried Pipe DCGL signatures< 300 ppi, clear and legible Document contains scanned document Sample Plan B1-010-04A_WGTV Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Sample Plan L2-SUB-WRS-A-Warehouse RA Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Turbine Building Drains III Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Turbine Building Drains IV Failed (unembedded fonts)< 300 ppi, clear and legible
LaCrosseSolutions, LLC LC-2018-0038: Enclosure 3 Page 5 of 5 Preflight Document Name File Name Reason Status Document contains scanned document Warehouse HTDs Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Warehouse RA Gamma I Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Warehouse RA Gamma II Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Warehouse RA Gamma III Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Warehouse RA Gamma IV Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Warehouse RA Sample Map Failed (unembedded fonts)< 300 ppi, clear and legible