License Termination Plan Request for Additional Information
ML18169A277
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 05/31/2018
From: Gerard van Noordennen
LaCrosseSolutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
LC-2018-0038
Download: ML18169A277 (10)


Text

~

LACROSSESOLUTIONS May 31, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046 License Termination Plan Request for Additional Information

References:

LC-2018-0038

1) Gerard van Noordennen, LaCrosseSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Amendment Request for the License Termination Plan," dated June 27, 2016
2) Gerard van Noordennen, LaCrosseSolutions, Letter to U.S. Nuclear Regulatory Commission, "License Termination Plan Update," dated December 1, 2016
3) Bruce Watson, U.S. Nuclear Regulatory Commission, Letter to John Sauger, EnergySolutions, "La Crosse Boiling Water Reactor-Request for Additional Information Regarding the Lacrosse Solutions License Termination Plan and Associated Conforming
  • License Amendment," dated August 4, 2017 The La Crosse Boiling Water Reactor (LACBWR) License Termination Plan (LTP) was submitted to the U.S. Nuclear Regulatory Commission (NRC) for review on June 27, 2016 as documented in Reference 1.

Following preliminary review and comments received during a public meeting held between NRC staff and LaCrosseSolutions representatives on October 20, 2016, an update to the LTP was submitted to the NRC on December 1, 2016 as documented in Reference 2. A Request for Additional Information (RAI) was received from the NRC on August 4, 2017 as documented in Reference 3.

Responses to the issues identified in the referenced RAI are provided in Enclosure 1. Supporting documents are provided in Enclosure 2. Enclosure 3 contains a preflight report for Enclosures 1 and 2.

LTP Revision 1 incorporates the RAI responses and will be provided in a separate correspondence.

There are no regulatory commitments contained in this letter. If you have any questions regarding this letter, please contact me at (860) 462-9707.

Respectfully, c;~~~q~

Gerard van Noordennen Vice President Regulatory Affairs

Enclosures:

RAI Responses : Supporting Documentation on CD : Preflight Report for Enclosures 1 and 2 to this submittal cc:

Marlayna Vaaler, U.S. NRC Project Manager Regional Administrator, U.S. NRC Region III Service List (Cover Letter, no enclosures)

S4601 State Highway 35, Genoa, WI 54632

La Crosse Boiling Water Reactor Service List cc:

Ken Robuck Group President Disposal and Decommissioning Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 John Sauger.

Executive VP and Chief Nuclear Officer Reactor D&D Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Gerard van N oordennen VP Regulatory Affairs Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Joseph Nowak General Manager LaCrosseSolutions S4601 State Highway 35 Genoa, WI54632-8846 Russ Workman General Counsel Energy Solutions 299 South Main Street, Suite 1 700 Salt Lake City, UT 84111 Jerome Pedretti, Clerk Town of Genoa E860 Mundsack Road Genoa, WI54632 Jeffery Kitsembel Division of Energy Regulation Wisconsin Public Service Commission P.O. Box 7854 Madison, WI 53707-7854 Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 Barbara Nick President and CEO Dairyland Power Cooperative 3200 East A venue South La Crosse, WI 54602-0817 Cheryl Olson, ISFSI Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 P.O. Box 817 Genoa, WI 54632-8846 Lane Peters La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI54632-8846 Thomas Zaremba Wheeler, Van Sickle and Anderson, S.C.

44 East Mifflin Street, Suite 1000 Madison, WI 53703 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania A venue, NW Washington, DC 20004

~

-~

..... 00

,2! M

~g Q)

I Cll 00 Cll -

oo i-..N u*

trj u

....:l....:l

,...,t r,J

~

r,J =

0 00 Q.

0 r,J

~

~

u

~

z

  • ~

LaCrosseSolutions LC-2018-0038 ENCL0SURE2 RAI Supporting Documentation

.\\j"' - *' * -* -- <

,* ** JIT-.*- ~"

"~\\)-*,:

l..*. \\*,,

/'.

rf' \\. ',

\\1 I '

\\

~ I

'".... '..'.,/

I.

I

LaCrosseSolutions LC-2018-003 8 ENCL0SURE3 Preflight Report For Enclosures 1 and 2

LaCrosseSolutions, LLC LC-2018-003 8: Enclosure 3 Page I of 5 This document serves as preflight report for Enclosure I and 2 to the letter LC-2018-0038. The following files do not pass pre-flight criteria or do not meet NRC criteria, but text is word searchable with clarity/legibility of high quality.

Document Name File Name Preflight Reason Status ENCLOSUREl:RAIRESPONSES LACBWR L TP RAI Responses LACBWR RAI Full Response 05312018 Failed Document contains logos, graphics, and charts < 300 ppi, clear and legible ENCLOSURE 2: SUPPORTING DOCUMENTATION ON CD RS-TD-313196-004, LACBWR Soil DCGL, Basement Concrete DCGL, and Buried Pipe DCGL, Revision 4 and Support Files RS-TD-313196-004, LACBWR Soil DCGL, Basement Document contains scanned document RS-TD-313 196-004 Rev 4 Failed (unembedded fonts), logos, graphics, and Concrete DCGL, and Buried Pipe DCGL, Revision 4 signatures< 300 ppi, clear and legible LACBWR Buried Pipe Circ Excavation DSR Passed 052618 LACBWR Buried Pipe Circ Insitu DSR 052618 Passed LACBWR Buried Pipe Group Excavation DSR Passed 052618 LACBWR Buried Pipe Group Insitu DSR 052618 Passed LACBWR Soil DCGL Initial Suite RESRAD Passed Summary Report 052618 LACBWR Soil UA Cm-243 043018 Passed LACBWR Soil UA Cm-244 043018 Passed Calculations in Support of TSD RS-TD-313196-004 Rev 4 Calculations in Support of TSD RS-TD-313196-NIA Excel File - Calculations 004 Rev4

LaCrosseSolutions, LLC LC-2018-003 8: Enclosure 3 Page 2 of 5 Document Name LACBWR FSS Survey, Unit Ll-010-IOIC LACBWR FSS Survey, Unit Ll-010-IOIC LACBWR FSS Survey, Unit Ll-010-lOlC FSS Unit: L 1-010-101 C Waste Treatment Building Subsoil Excavation Certificate of Analysis Report ENRG070 LaCrosseSolutions, LLC (672583)

Client SDG: 427522 GEL Work Order: 427522 Gamma Spectrum Analysis File Name FSS Plan IOIC I FSS Plan 10IC II FSS Plan lOlC Ill FSS Plan 10IC Illl WTB Analysis 01052018 G3 Barrow RA G3 Barrow Results I G3 Barrow Results II Ll-SUB-CDR FSS Plan Ll-SUB-TDS (102) HTD Coe Ll-SUB-TDS FSS Map Preflight Reason Status Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible NIA Excel File - Data/ Analysis Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible

LaCrosseSolutions, LLC LC-2018-0038: Enclosure 3 Page 3 of 5 Document Name Gamma Spectrum Analysis LC-FS-TSD-002 Operational Derived Concentration Guideline Levels For Final Status Survey LC-FS-PN-002 Characterization Survey Plan LC-FS-PR-003 Radiological Assessments and Remedial Action Support Surveys (RASS)

LC-FS-TSD-001 Use ofISOCS for FSS of End State Sub Structures at LACBWR Endangered Resources Review (ERR Log# 16-648)

Proposed Dairyland LACBWR Plant Demolition, Vernon County, WI (Tl3N R07W S32)

File Name L 1-SUB-TDS HTD Analyses Ll-SUB-TDS Plan L2103 Sloping RA Gamma Spec L2 l 03 Sloping RA Plan LACBWR Impingement and Entrainment of Fishes LC FS TSD 002 Rev 2 OP DCGLs FOR FSS LC-FS-PN-002 Rev O _ Characterization Survey Plan LC-FS-PR-003 Rev 2 Radiological Assessments RASS FINAL 01262018 LC-FS-TSD-001 Rev 0 L TR WDNR Endangered Resources Review LACBWR Plant Demolition Preflight Reason Status Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Failed

  • (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scam1ed document Failed (unembedded fonts), logos, graphics, and signatures < 300 ppi, clear and legible

LaCrosseSolutions, LLC LC-2018-0038: Enclosure 3 Page 4 of 5 Document Name Mussel Survey for a Proposed Fleeting Site Mississippi River Pool 9 near Genoa, Wisconsin 11151999 RS-TD-313196-001 Radionuclides of Concern During LACBWR Decommissioning RS-TD-313196-004 LACBWR Soil DCGL, Basement Concrete DCGL, and Buried Pipe DCGL File Name Mussel Survey Fleeting Site Mississippi River Pool9 Pedretti Barrow Pit RA Plan Pedretti Barrow Pit Results I Pedretti Barrow Pit Results II RS-TD-313196-001 Rev 5 RS-TD-313196-004 Rev 4 Sample Plan B1-010-04A_ WGTV Sample Plan L2-SUB-WRS-A-Warehouse RA Turbine Building Drains III Turbine Building Drains IV Preflight Reason Status Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document Failed (unembedded fonts)< 300 ppi, clear and legible

LaCrosseSolutions, LLC LC-2018-0038: Enclosure 3 Page 5 of 5 Document Name File Name Warehouse HTDs Warehouse RA Gamma I Warehouse RA Gamma II Warehouse RA Gamma III Warehouse RA Gamma IV Warehouse RA Sample Map Preflight Status Failed Failed Failed Failed Failed Failed Reason Document contains scanned document (unembedded fonts), logos, graphics, and signatures< 300 ppi, clear and legible Document contains scanned document (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document (unembedded fonts)< 300 ppi, clear and legible Document contains scanned document (unembedded fonts)< 300 ppi, clear and legible