ML12089A570: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 68: | Line 68: | ||
GROUND SURFACE ELEVATION IN FEET 140 - 150 130 - 140 120 - 130 110 - 120 100 - 110 90 - 100 80 - 90 70 - 80 60 - 70 50 - 60 40 - 50 EL.= 123' | GROUND SURFACE ELEVATION IN FEET 140 - 150 130 - 140 120 - 130 110 - 120 100 - 110 90 - 100 80 - 90 70 - 80 60 - 70 50 - 60 40 - 50 EL.= 123' | ||
( 30 - 40 20 - 30 EL.= 120' EL.= 123' | ( 30 - 40 20 - 30 EL.= 120' EL.= 123' | ||
( | ( | ||
( 10 - 20 0 - 10 EL.= 50' EL.= 47' EL.= 39' | ( 10 - 20 0 - 10 EL.= 50' EL.= 47' EL.= 39' | ||
( | ( | ||
1 EL.= 61' EL. = 123' | 1 EL.= 61' EL. = 123' | ||
( ! | ( ! | ||
(!( ! | (!( ! | ||
Line 84: | Line 79: | ||
2 ! | 2 ! | ||
( ( | ( ( | ||
EL.= 5.9' EL.= 1.5' Initial Groundwater Elevation | EL.= 5.9' EL.= 1.5' Initial Groundwater Elevation | ||
( ! | ( ! | ||
( EL.= 1.5' Data from Pre-Investigation | ( EL.= 1.5' Data from Pre-Investigation | ||
( | ( | ||
( Property Transaction Wells HUDSON RIVER GZA GeoEnvironmental, Inc. | ( Property Transaction Wells HUDSON RIVER GZA GeoEnvironmental, Inc. | ||
ELEV. ~ | ELEV. ~ |
Latest revision as of 16:48, 6 February 2020
ML12089A570 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 01/07/2008 |
From: | Barvenik M, Powers M, Winslow D GZA GeoEnvironmental |
To: | Evers R Enercon Services, Atomic Safety and Licensing Board Panel |
SECY RAS | |
Shared Package | |
ML12089A566 | List: |
References | |
RAS 22125, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 | |
Download: ML12089A570 (7) | |
Text
ENT00331D Submitted: March 29, 2012 0 1,000 4 2,000 4,000 Feet Site Location GZA GeoEnvironmental, Inc.
One Edgewater Drive Norwood, MA 02062 Phone: (781) 278-3700 Fax: (781) 278-5701 INDIAN POINT ENERGY CENTER BUCHANAN, NEW YORK SITE LOCUS PLAN Proj. Mgr.: MJB Dwg. Date: Figure No.:
11-19-2007 1.1 Designed By: MJB Reviewed By: MJB Operator: GAS Job No.:
41.0017869.10 J:\17,000-18,999\17869\17869-10.DW\Figures\GIS\MXD Documents\1-1_Site Location Plan.mxd
Transformer Substation "H" Tank FPT Trans Storage Tank Tank Tank SCD Fuel Tunnel Chem. Sys.
Trailer Pool Foundation Tank FPT Drain NCD Fuel Chem. Service 80 Pool Pressure Water Utility Tank Storage Tank Tank Pit Tank Pit Reactor Passive Reactor Water Water Tank Water Storage Storage Tank Tank Sphere Foundation Storage Tank Tank Storage Tank LEGEND Drain Sump 90 Storm Drain UNIT 1 Transformers on raised MOB Concrete Pad Storm Drain - Connection Terminated Annulus Footing / Curtain Drain Primary Auxilliary Building Fuel Fuel Storage Primary Fuel Storage Plant North N Pool Building 70 90 Curtain Auxilliary 80 Building Drain Building Nuclear N Transformers on raised Service Transformers Condensate Concrete slab Concrete Pad Building Tank 50 25 0 50 100 150 Curtain Feet 70 Drain Transformer area and switch gear Trans Note: See Figure 1.3 for additional legend.
UNIT 2 Storage Tanks UNIT 3 Containment Spray Sump Trans Stack Tunnel 30 Transformer yard 30 Transformer Yard Trans Superheater / Admin. Building Transformer Yard Utility Trans.
Discharge Canal Turbine Generator Building 1 Aux.
Boiler Building Administration Turbine Generator Building 3 Building Turbine Generator Building 2 Trans.
Heater Bay Transformers Yard (Gravel)
DISCHARGE CANAL Tank GZA GeoEnvironmental, Inc.
One Edgewater Drive Norwood, MA 02062 Phone: (781) 278-3700 Fax: (781) 278-5701 Condensate Polisher Building Unit 1 Screenwell House INDIAN POINT ENERGY CENTER Intake Structure BUCHANAN, NEW YORK Outfall OUTFALL Discharge Canal SITE PLAN Dwg. Date: Figure No.:
Proj. Mgr.: DMW 1-4-2008 Hudson River 1.2 Designed By: MJB/DMW Reviewed By: DMW Job No.:
Operator: GAS/EMD 41.0017869.10 I:\17869\17869-10\Figures\GIS\MXD Documents\1-2_Site Plan [17x11]_v3.mxd
70 130 arki ng lt p Asp 80 ha awning Asphalt 140 Grass Grass G
sto rav parking arerag el a e 90 10 140 0
Asphalt drive 13 0
Transformer area 12 Storage 0
40 Foot Bridge 130 50 Asphalt ng & stora ge Gravel parki 140 110 130 60 0
80 As 14 p ha lt 90 10 0 0 Dri ve 0 14 12 140 100 0
13 curb 0
Co n 11 110 c re 140 te n
Co p c.
As WATERSHED ha Grass lt d As rb p Asphalt drive riv cu As p ha e ha ss lt p Grass Parking Gravel Gra c urb ark in Asphalt Storage lt g curb Stone curbs Asphalt BOUNDARY p parking As ss Gra urb Storage lt c ha As Concrete curb p ha As ph lt alt cu p pa rb As rk Gra ha in lt p g p ss Grass As ark ve Gravel p ha As in dri ha lt c g lt p urb Asphalt parking Gravel parking ark As ph Gravel p in Concrete curb rbs As g e cu ha Asphalt alt pa Asphalt curb Fuel Oil Fuel Oil lt c Sto Storage Tank Storage Tank urb n g rkin Grass Stora ge lt Gra ha ss Asphalt curb As p
Gravel parkin Asphalt curb Gravel parking 10 0
Stone curbs 130 g
curbs 140 Asphalt parking Earth Parking Stone 140 140 g Storage Asphalt parking Gravel Storage units Asphalt parkin storage Gravel parkin Grass Gravel No Access g
Asphalt drive Asphalt rb cu Concrete curb Wooden WATERSHED Gravel parking Stone curbs Sh Co 120 120 rubs n c re te 110 cu rb 10 10 0 100 0 Sh 90 0 120 rubs 11 Concrete curbs 90 110 BOUNDARY 80 110 0 60 ra mp 90 11 p A/C 70 dica on concunit Han re pa te Sh d rubs Shr ubs Ea rth ad ro Transformer Concrete Parking lot A/C Grass curb UNIT Asphalt Asp h al t
Covered Concrete Shrubs 70 110 Grass 80 ph As alt Asphalt Grass Transformer Asphalt drive Substation "H" Asphalt Earth road Asphalt Grass Concrete curb Tank Asphalt FPT Trans Storage Tank Tank Tank Asphalt parking Tunnel SCD Fuel Pool 0 Trailer Foundation Tank 10 Drain FPT NCD Fuel Chem. Service 80 Asphalt Pool Containers Pressure Utility Water Tank Storage Concrete curb ve Dri Tank Tank Pit Tank Pit Reactor Passive Asphalt Reactor Water Water Tank lt Water Storage Tank Storage ha Storage Storage Sphere Driv e 70 Asp Tank Foundation Tank Tank A/C Units Tank Drain Sump Unit 2 90 80 Condensate Storage Tank UNIT 1 Transformers on raised Asphalt Concrete Pad MOB Asp Asphalt ha lt Asph alt Storage Annulus Primary Plant North N Auxilliary Liquid Building Nitrogen Fuel Fuel Storage Fuel Storage Tank Building Primary 70 Pool 90 Curtain Auxilliary 80 Building N
Drain Building Nuclear Courtyard Asphalt 90 80 Transformers on raised Service Transformers Condensate 70 Concrete Pad Building Concrete slab Tank Asphalt parking Asphalt Curtain 60 Drain Transformer area and switch gear 70 Trans Stone retaining wall UNIT 2 Gravel Storage Tanks UNIT 3 Containment 50 Spray Sump Open grate 200 100 0 200 40 Trans Mach.
stand Feet Tunnel Gravel Stack 30 30 90 Transformer yard Gravel Transformer Yard As p Trans Vent pit ha Superheater / Admin. Building lt Transformer Yard Utility dri Conc rete Retaining Wall GZA GeoEnvironmental, Inc.
ve 90 Trans.
Discharge Canal Turbine Generator Building 1 80 70 Asphalt Aux. One Edgewater Drive Boiler Building Norwood, MA 02062 60 Administration Turbine Generator Building 3 Turbine Generator Building 2 Building Phone: (781) 278-3700 Fax: (781) 278-5701 Asphalt 60 Trans.
Overhead Crane Heater Bay INDIAN POINT ENERGY CENTER 50 50 Transformers Asphalt BUCHANAN, NEW YORK 40 Yard (Gravel) 30 Concrete Bridge DISCHARGE 40 CANAL Asphalt parking Tank Co Bridncr e
ge te WATERSHED Warehouse Unit 1 Screenwell House Rip-rap Condensate Polisher Building Intake Structure BOUNDARY MAP Dwg. Date: Figure No.:
Proj. Mgr.: DMW 1-4-2008 3.1 Outfall OUTFALL Designed By: MJB/DMW Concrete pier No Access this Area Reviewed By: DMW Hudson River Operator: GAS/EMD Job No.:
41.0017869.10 I:\17869\17869-10\Figures\GIS\MXD Documents\3-1_Watershed Boundary Map [17x11]_v2.mxd
GROUND SURFACE ELEVATION IN FEET 140 - 150 130 - 140 120 - 130 110 - 120 100 - 110 90 - 100 80 - 90 70 - 80 60 - 70 50 - 60 40 - 50 1
30 - 40 2 3 20 - 30 10 - 20 0 - 10 HUDSON RIVER GZA GeoEnvironmental, Inc.
ELEV. ~
~ 1.0' One Edgewater Drive Norwood, MA 02062 Phone: (781) 278-3700 Fax: (781) 278-5701 INDIAN POINT ENERGY CENTER N
Plant North BUCHANAN, NEW YORK 0 400 800 1,600 2,400 Feet N
REGIONAL TOPOGRAPHY SOURCE : DATA PROVIDED BY THE NEW YORK STATE Proj. Mgr.: MJB Dwg. Date: Figure No.:
GEOGRAPHIC NFORMATION SYSTEMS. 01-02-2008 3.2 Designed By:
Reviewed By: MJB Job No.:
Operator: GAS/EMD 41.0017869.10 J:\17,000-18,999\17869\17869-10.DW\Figures\GIS\MXD Documents\3-2_Regional Topography_v2.mxd
GROUND SURFACE ELEVATION IN FEET 140 - 150 130 - 140 120 - 130 110 - 120 100 - 110 90 - 100 80 - 90 70 - 80 60 - 70 50 - 60 40 - 50 EL.= 123'
( 30 - 40 20 - 30 EL.= 120' EL.= 123'
(
( 10 - 20 0 - 10 EL.= 50' EL.= 47' EL.= 39'
(
1 EL.= 61' EL. = 123'
( !
(!( !
(
EL.= 11' EL.= 1.5' EL.= 1.5' 3 Early Conceptual Site Model -
2 !
( (
EL.= 5.9' EL.= 1.5' Initial Groundwater Elevation
( !
( EL.= 1.5' Data from Pre-Investigation
(
( Property Transaction Wells HUDSON RIVER GZA GeoEnvironmental, Inc.
ELEV. ~
~ 1.0' One Edgewater Drive Norwood, MA 02062 Phone: (781) 278-3700 Fax: (781) 278-5701 INDIAN POINT ENERGY CENTER N
Plant North BUCHANAN, NEW YORK 0 400 800 1,600 2,400 Feet N REGIONAL GROUNDWATER FLOW SOURCE : DATA PROVIDED BY THE NEW YORK STATE Proj. Mgr.: MJB Dwg. Date: Figure No.:
GEOGRAPHIC NFORMATION SYSTEMS. 01-03-2008 3.3 Designed By:
Reviewed By: MJB Job No.:
Operator: GAS/EMD 41.0017869.10 J:\17,000-18,999\17869\17869-10.DW\Figures\GIS\MXD Documents\3-3_Regional Groundwater Flow_v2.mxd
80 CB-27 As ha lt Asphalt p
Grass Transformer Substation "H" Asphalt drive CB-5 CONTAMINANT SOURCE MAP CB-5A (CB-6)
CB-5B (CB-24)
Asphalt E15A LEGEND Asphalt Gras s CB-6 AB Terminated Connection To Storm Drain CB-24 E15 Concrete curb Trans Asphalt CB-28 Footing / Storm Drain Exfiltration CB-3B E14 Inter-Structure Joint / Mud Mat Tunnel Asphalt parking (U1-CB-8) U3-CB-A5 U3-CB-E1 EAST FUEL POOL Containment Spray Sump Trench Trailer Chemical Service FUEL U3-CB-A6 WEST STORAGE 80 CB-A3A U3-CB-A4 Unit 1 West Fuel Pool Asphalt MH16 FUEL POOL BUILDING Containers CB3A CB4 Unit 2 Fuel Pool Utility U3-CB-A3 Concrete curb Storm Drain Asph alt CB3 Water E2B E2C Storage Tank U3-CB (U1-CB-9)
F5 Storm Drain - Connection Terminated MH22 Drive A/C Units F6 U3-CB-A2A F7 Footing / Curtain Drain CB-2C CB-29 90 MH10 UNIT 1 Transformers on raised U3-MH-14 Asphalt MOB Concrete Pad Asphalt Storage U3-CB-A1 ha lt MH21 MH9 CB-2B U3-CB-A2 As p Plant North N MH11 E2 F3 E2A CB-30 U3-CB (U1-CB-10)
FUEL POOL F4 CB N FUEL PAB CB-2A 70 80 U3-CB-A7 STORAGE (U3-CB-11)
CB-B 90 BUILDING Asphalt CSS TRENCH Courtyard CB-E 50 25 0 50 100 150 80 Transformers on raised Transformers CB-31 Feet Concrete slab Asphalt par MH18 Concrete Pad U1-CB-21 U1-CB-22 CB-2 Asphalt CB-32 MH8 MH17 CB-1 Transformer area and switch gear 70 Note: See Figure 1.3 for additional legend.
U1-CB-20 Trans UNIT 2 Gravel UNIT 3 U3-CB-B1 CSS E3B U3-CB-B2 E3A Open grate E3 MH7 U3-CB-B2A Trans Mach.
Tunnel 40 Gravel stand 30 Transformer yard Gravel CB-16 30 D1 U3-CB-B4A U3-CB-B3 MH-5 MH-6 MH23A Trans Superheater / Admin. Building Vent pit U3-CB-B3A CB-F Transformer Yard U3-CB-B5 U3-CB-B4 Utility driv Concrete R etaining Wall CB-13 E4 e
MH-4 MH-4A Trans. E4A Turbine Generator Building 1 CB-B6 Asphalt CB-B6A Turbine Generator Building 3 Turbine Generator Building 2 Asphalt CB-14 U3-CB-B7 D2 E5 B5 Trans. E5A CB-1 MH3 Overhead (CB-G)
Crane E11 Asphalt U3-CB-B8 Transformers Yard MH-2 (Gravel) CB-34 Concrete Bridge DISCHARGE MH13 CB-18 MH15 CB-19 CANAL Asphalt parking Co XX Br ncr GZA GeoEnvironmental, Inc.
id e t ge e E6 E9 E10 E8 CB-33 One Edgewater Drive Norwood, MA 02062 CB-23 CB-15 XX C2 Phone: (781) 278-3700 Fax: (781) 278-5701 MH1 E7 MH12 INDIAN POINT ENERGY CENTER MH14 BUCHANAN, NEW YORK Rip-rap CONTAMINANT SOURCE MAP OUTFALL Concrete pier No Access this Area Dwg. Date: Figure No.:
Proj. Mgr.: DMW 1-4-2008 3.4 Designed By: MJB/DMW Reviewed By: DMW Hudson River Operator: GAS/EMD Job No.:
41.0017869.10 I:\17869\17869-10\Figures\GIS\MXD Documents\3-4_Contaminant Source Map [17x11]_v3.mxd