ML14195A131: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/14/2014
| issue date = 07/14/2014
| title = Senior Reactor Operator Initial License Retake Examinations-Indian Point Energy Center, Unit 2
| title = Senior Reactor Operator Initial License Retake Examinations-Indian Point Energy Center, Unit 2
| author name = Jackson D E
| author name = Jackson D
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Ventosa J
| addressee name = Ventosa J
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:J. Ventosa UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 Mr. John Ventosa, Site Vice President Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249  
{{#Wiki_filter:J. Ventosa UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 July 14, 2014 Mr. John Ventosa, Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249


==SUBJECT:==
==SUBJECT:==
SENIOR REACTOR OPERATOR INITIAL LICENSE RETAKE EXAMINATIONS INDIAN POINT ENERGY CENTER, UNIT 2
SENIOR REACTOR OPERATOR INITIAL LICENSE RETAKE EXAMINATIONS INDIAN POINT ENERGY CENTER, UNIT 2


==Dear Mr. Ventosa:==
==Dear Mr. Ventosa:==


In a telephone conversation on July 8, 2014, between Mr. D. Silk, Senior Operations Engineer, and Mr. R. Suneson, Senior Instructor, arrangements were made for the administration of licensing retake examinations at Indian Point Unit 2 during the week of September 15, 2014.
In a telephone conversation on July 8, 2014, between Mr. D. Silk, Senior Operations Engineer, and Mr. R. Suneson, Senior Instructor, arrangements were made for the administration of licensing retake examinations at Indian Point Unit 2 during the week of September 15, 2014.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the outline, draft examination, and supporting reference materials by August 15, 2014. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately.
To meet the above schedule, it will be necessary for your staff to furnish the outline, draft examination, and supporting reference materials by August 15, 2014. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately.
Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested operating test, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-302. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating test is being administered. To permit timely NRC review and evaluation, your staff should submit preliminary senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
In order to conduct the requested operating test, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-302. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating test is being administered.
July 14, 2014 J. Ventosa 2  After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
To permit timely NRC review and evaluation, your staff should submit preliminary senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC  20555-0001, or by electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),
Office of Management and Budget, Washington, DC  20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.  


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html.
J. Ventosa                                        2 After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),
Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html.
Thank you for your cooperation in this matter. Mr. R. Suneson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. C. Lally at (610) 337-5124, or me at (610) 337-5306.
Thank you for your cooperation in this matter. Mr. R. Suneson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. C. Lally at (610) 337-5124, or me at (610) 337-5306.
Sincerely,
Sincerely,
      /RA/   Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-247 License No. DPR-26  
                                                /RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.     50-247 License No. DPR-26 cc: Distribution via ListServ


cc: Distribution via ListServ
ML14195A131 Non-Sensitive                       Publicly Available SUNSI Review Sensitive                            Non-Publicly Available OFFICE         RI/DRS/OB           RI/DRS/OB               RI/DRS/OB NAME           CLally/CL           CBixler/CB             DJackson/DJ DATE           07/14/2014           07/11/2014             07/14/2014 J. Ventosa                                   3 Distribution via email:
 
W. Dean, RA             (R1ORAMAIL RESOURCE)
ML14195A131 SUNSI Review  Non-Sensitive Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB   NAME CLally/CL CBixler/CB DJackson/DJ   DATE 07/14/2014 07/11/2014 07/14/2014 J. Ventosa 3 Distribution via email: W. Dean, RA (R1ORAMAIL RESOURCE) D. Lew, DRA (R1ORAMAIL RESOURCE) H. Nieh, DRP (R1DRPMAIL RESOURCE) M. Scott, DRP (R1DRPMAIL RESOURCE) J. Trapp, DRS (R1DRSMAIL RESOURCE) P. Krohn, DRS (R1DRSMAIL RESOURCE) A. Burritt, DRP T. Setzer, DRP L. McKown, DRP J. Petch, DRP S. Stewart, DRP, SRI Ami Patel, DRP, RI G. Newman, DRP, RI D. Hochmuth, DRP, AA F. P. Peduzzi, RI OEDO RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources C. Lally, Chief Examiner, DRS D. Jackson, Operations Branch Chief, DRS DRS Master Exam File (C. Bixler) (w/concurrences)}}
D. Lew, DRA             (R1ORAMAIL RESOURCE)
H. Nieh, DRP           (R1DRPMAIL RESOURCE)
M. Scott, DRP           (R1DRPMAIL RESOURCE)
J. Trapp, DRS           (R1DRSMAIL RESOURCE)
P. Krohn, DRS           (R1DRSMAIL RESOURCE)
A. Burritt, DRP T. Setzer, DRP L. McKown, DRP J. Petch, DRP S. Stewart, DRP, SRI Ami Patel, DRP, RI G. Newman, DRP, RI D. Hochmuth, DRP, AA F. P. Peduzzi, RI OEDO RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources C. Lally, Chief Examiner, DRS D. Jackson, Operations Branch Chief, DRS DRS Master Exam File (C. Bixler) (w/concurrences)}}

Latest revision as of 20:06, 5 February 2020

Senior Reactor Operator Initial License Retake Examinations-Indian Point Energy Center, Unit 2
ML14195A131
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 07/14/2014
From: Diane Jackson
Operations Branch I
To: Ventosa J
Entergy Nuclear Operations
Jackson D
Shared Package
ML14190B006 List:
References
Download: ML14195A131 (4)


Text

J. Ventosa UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 July 14, 2014 Mr. John Ventosa, Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

SENIOR REACTOR OPERATOR INITIAL LICENSE RETAKE EXAMINATIONS INDIAN POINT ENERGY CENTER, UNIT 2

Dear Mr. Ventosa:

In a telephone conversation on July 8, 2014, between Mr. D. Silk, Senior Operations Engineer, and Mr. R. Suneson, Senior Instructor, arrangements were made for the administration of licensing retake examinations at Indian Point Unit 2 during the week of September 15, 2014.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the outline, draft examination, and supporting reference materials by August 15, 2014. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately.

Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested operating test, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-302. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating test is being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

J. Ventosa 2 After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),

Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html.

Thank you for your cooperation in this matter. Mr. R. Suneson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. C. Lally at (610) 337-5124, or me at (610) 337-5306.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-247 License No. DPR-26 cc: Distribution via ListServ

ML14195A131 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CLally/CL CBixler/CB DJackson/DJ DATE 07/14/2014 07/11/2014 07/14/2014 J. Ventosa 3 Distribution via email:

W. Dean, RA (R1ORAMAIL RESOURCE)

D. Lew, DRA (R1ORAMAIL RESOURCE)

H. Nieh, DRP (R1DRPMAIL RESOURCE)

M. Scott, DRP (R1DRPMAIL RESOURCE)

J. Trapp, DRS (R1DRSMAIL RESOURCE)

P. Krohn, DRS (R1DRSMAIL RESOURCE)

A. Burritt, DRP T. Setzer, DRP L. McKown, DRP J. Petch, DRP S. Stewart, DRP, SRI Ami Patel, DRP, RI G. Newman, DRP, RI D. Hochmuth, DRP, AA F. P. Peduzzi, RI OEDO RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources C. Lally, Chief Examiner, DRS D. Jackson, Operations Branch Chief, DRS DRS Master Exam File (C. Bixler) (w/concurrences)