ML15021A189: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/20/2015
| issue date = 01/20/2015
| title = Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection
| title = Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection
| author name = Masters A D
| author name = Masters A
| author affiliation = NRC/RGN-II/DRP/RPB7
| author affiliation = NRC/RGN-II/DRP/RPB7
| addressee name = Taber B K
| addressee name = Taber B
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000424, 05000425
| docket = 05000424, 05000425
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVE N.E., SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVE N.E., SUITE 1200 ATLANTA, GEORGIA 30303 January 20, 2015 Mr. Brian K. Taber Vice President - Vogtle Southern Nuclear Operating Company, Inc.
  "  January 20, 2015  
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
 
Mr. Brian K. Taber Vice President - Vogtle  
 
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830  


==SUBJECT:==
==SUBJECT:==
VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION  
VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION


==Dear Mr. Taber:==
==Dear Mr. Taber:==


The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Vogtle Electric Generating Plant Units 1 and 2 during the weeks of March 16 - 20, 2015, and March 30 - April 3, 2015. The inspection team will be led by Mr. Wesley Deschaine, the NRC's Resident Inspector at Sequoyah Nuclear Plant. This inspection will be conducted in accordance with the baseline inspection procedure (IP) 71152, Problem Identification and Resolution, effective date January 31, 2013.
Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Vogtle Electric Generating Plant Units 1 and 2 during the weeks of March 16 - 20, 2015, and March 30 - April 3, 2015. The inspection team will be led by Mr. Wesley Deschaine, the NRCs Resident Inspector at Sequoyah Nuclear Plant. This inspection will be conducted in accordance with the baseline inspection procedure (IP) 71152, Problem Identification and Resolution, effective date January 31, 2013.
The biennial PI&R inspection and assessment of the licensee's Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and  
The biennial PI&R inspection and assessment of the licensees Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.
 
On January 9, 2015, Mr. Deschaine confirmed with Ms. Karen Morrow of your staff, arrangements for the two-week onsite inspection.
semiannual trend PI&R reviews.
The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than March 2, 2015. Contact Mr. Deschaine with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.
On January 9, 2015, Mr. Deschaine confirmed with Ms. Karen Morrow of your staff, arrangements for the two-week onsite inspection.  
If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mr. Deschaine will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.
 
The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than March 2, 2015. Contact Mr. Deschaine with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.  
 
If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mr. Deschaine will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and  
 
other applicable information.
B. Taber 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Deschaine at (423) 842-8001.
 
Sincerely,
      /RA/
Anthony D. Masters, Chief Reactor Projects Branch 7 Division of Reactor Projects


Docket Nos.: 05000424, 05000425 License Nos.: NPF-68 and NPF-81  
B. Taber                                      2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Deschaine at (423) 842-8001.
Sincerely,
                                                /RA/
Anthony D. Masters, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos.: 05000424, 05000425 License Nos.: NPF-68 and NPF-81


==Enclosure:==
==Enclosure:==
Information Request for Vogtle Electric Generating Plant Problem Identification and Resolution Inspection cc Distribution via ListServ  
Information Request for Vogtle Electric Generating Plant Problem Identification and Resolution Inspection cc Distribution via ListServ


_________________________   SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP     SIGNATURE Via email ADM2 /RA/     NAME WDeschaine AMasters     DATE 1/20/2015 1/20/2015     E-MAIL COPY?    YES NO       YES NO       YES NO       YES NO       YES NO       YES NO       YES NO B. Taber 3 Letter to Brian K. Taber from Anthony D. Masters dated January 20, 2015.  
_________________________               SUNSI REVIEW COMPLETE   FORM 665 ATTACHED OFFICE             RII:DRP       RII:DRP SIGNATURE         Via email     ADM2 /RA/
NAME               WDeschaine   AMasters DATE                   1/20/2015     1/20/2015 E-MAIL COPY?         YES     NO   YES     NO   YES   NO     YES   NO     YES   NO   YES   NO   YES   NO B. Taber                                   3 Letter to Brian K. Taber from Anthony D. Masters dated January 20, 2015.


==SUBJECT:==
==SUBJECT:==
VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION DISTRIBUTION
VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION DISTRIBUTION:
: D. Gamberoni, RII EICS L. Gibson, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMVogtleResource  
D. Gamberoni, RII EICS L. Gibson, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMVogtleResource
 
Enclosure INFORMATION REQUEST FOR VOGTLE ELECTRIC GENERATING PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (March 16 - 20, 2015 and March 30 - April 3, 2015)
Note:  Unless otherwise noted, the information requested below corresponds to documents generated since February 2013. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information. 
: 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to: 
(a)  Corrective action process (b)  Cause evaluation (c)  Operating experience program (d)  Employee concerns program (e)  Self-assessment program (f)    Maintenance rule program and implementing procedures (g)  Operability determination process (h)  Degraded/non-conforming condition process (e.g., RIS 2005-20)
(i)    System health process or equivalent equipment reliability improvement programs (j)    Preventive maintenance deferral and Condition Report (CR) extension process If any of the procedures requested above were revised after February 2013, please provide (or have available) copies of all revisions during the onsite inspection.
: 2. List of top ten risk-significant systems, top ten risk-significant components for each one of the top ten risk-significant systems, and top ten risk-significant operator manual actions 
: 3. List of all CRs initiated including the following information for each CR: 
 
(a)  CR number (b)  Brief, but complete problem description (c)  Priority or level (d)  Affected system (e)  Affected component (f)    Responsible plant department (g)  CR completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below)
CR # Problem  PrioritySystem Component Org Status CR001 "A" RHR Pump failed flow criteria
 
per SR 5.0.5.4 2 RHR 2-RHR-PMP-A ENG Open 2  4. List of outstanding corrective actions including the following information for each action: 
  (a)  Corrective action number (b)  Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc)  (c)  Brief, but complete corrective action description  (d)  Associated CR number  (e)  Corrective action initiation date  (f)    Number of Extensions (g)  Corrective action due date (h)  Completion status 
 
If possible, provide this list in a format compatible with spreadsheet software (example shown below)
Corrective Action # Type Description CR Initiation Date Extensions Due Date StatusAR0034 CAPR Revise Procedure NGK-003-4585 CR0058 01/05/08 2 06/15/08Closed
: 5. List of control room deficiencies with a brief description and corresponding CR and/or work order (WO) number
: 6. List of operator workarounds and operator burdens with a brief description and corresponding CR number
: 7. List of all currently extended CRs or overdue, sorted by initiation date , with the following information: 
 
(a)  CR number (b)  Priority or Significance (c)  CR title and short description
: 8. List of all CRs that have been voided or cancelled. Please provide the following information for each CR: 


(a)  CR Number (b)  Brief, but complete problem description  (c)   Reason voided or cancelled
INFORMATION REQUEST FOR VOGTLE ELECTRIC GENERATING PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (March 16 - 20, 2015 and March 30 - April 3, 2015)
: 9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since February 2013. Please include the following information for each system in (a)(1)
Note: Unless otherwise noted, the information requested below corresponds to documents generated since February 2013. Please provide the requested documents in electronic format.
  (a)   Date of classification in (a)(1)  (b)   Reason for being placed in (a)(1)  
If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.
  (c)   Planned actions and their status 3  10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems. Please include actions completed and current status.
: 1.      Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:
: 11. List of corrective maintenance work orders. Please include the following information for each work order:  
(a) Corrective action process (b)  Cause evaluation (c) Operating experience program (d) Employee concerns program (e) Self-assessment program (fMaintenance rule program and implementing procedures (g) Operability determination process (h) Degraded/non-conforming condition process (e.g., RIS 2005-20)
(i) System health process or equivalent equipment reliability improvement programs (j) Preventive maintenance deferral and Condition Report (CR) extension process If any of the procedures requested above were revised after February 2013, please provide (or have available) copies of all revisions during the onsite inspection.
: 2.       List of top ten risk-significant systems, top ten risk-significant components for each one of the top ten risk-significant systems, and top ten risk-significant operator manual actions
: 3.       List of all CRs initiated including the following information for each CR:
(a)  CR number (b)  Brief, but complete problem description (c)  Priority or level (d)  Affected system (e)  Affected component (f)  Responsible plant department (g)  CR completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below)
CR #            Problem            Priority  System    Component      Org    Status CR001        A RHR Pump                2        RHR        2-RHR-    ENG      Open failed flow criteria                              PMP-A per SR 5.0.5.4 Enclosure


(a)   WO number (b)   Brief, but complete work description (c)   Affected system and components (d)   Date of initiation (e)   Date of completion (if completed)  
2
: 4.      List of outstanding corrective actions including the following information for each action:
(a) Corrective action number (b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc)
(c) Brief, but complete corrective action description (d) Associated CR number (e) Corrective action initiation date (f) Number of Extensions (g) Corrective action due date (h) Completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below)
Corrective Type            Description          CR      Initiation Extensions      Due      Status Action #                                                  Date                    Date AR0034        CAPR Revise                    CR0058    01/05/08        2        06/15/08 Closed Procedure NGK-003-4585
: 5.      List of control room deficiencies with a brief description and corresponding CR and/or work order (WO) number
: 6.      List of operator workarounds and operator burdens with a brief description and corresponding CR number
: 7.      List of all currently extended CRs or overdue, sorted by initiation date, with the following information:
(a) CR number (b) Priority or Significance (c) CR title and short description
: 8.      List of all CRs that have been voided or cancelled. Please provide the following information for each CR:
(a) CR Number (b) Brief, but complete problem description (c) Reason voided or cancelled
: 9.      List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since February 2013. Please include the following information for each system in (a)(1):
(a) Date of classification in (a)(1)
(b) Reason for being placed in (a)(1)
(c) Planned actions and their status


3
: 10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems.
Please include actions completed and current status.
: 11. List of corrective maintenance work orders. Please include the following information for each work order:
(a)  WO number (b)  Brief, but complete work description (c)  Affected system and components (d)  Date of initiation (e)  Date of completion (if completed)
If possible, provide this list in a format compatible with spreadsheet software (example shown below)
If possible, provide this list in a format compatible with spreadsheet software (example shown below)
Work Order # Description System Component Initiation Date Due Date StatusWO01345 Replace breaker 2A-BKR-08-BB4 for 2A SI Pump. SI 2A-SI-PMP, BKR-08-BB4 01/05/08 03/15/09 Closed
Work         Description         System     Component     Initiation   Due      Status Order #                                                          Date     Date WO01345      Replace breaker           SI     2A-SI-PMP,     01/05/08   03/15/09 Closed 2A-BKR-08-BB4                      BKR-08-BB4 for 2A SI Pump.
: 12. Corrective action closeout packages, including CRs with description of corrective actions, for all NRC findings and Licensee ident ified violations. Please include a cross reference linking NRC Finding numbers and LIVs to appropriate CR numbers.  
: 12. Corrective action closeout packages, including CRs with description of corrective actions, for all NRC findings and Licensee identified violations. Please include a cross reference linking NRC Finding numbers and LIVs to appropriate CR numbers.
: 13. Corrective action closeout packages, including CRs with description of corrective actions, for all licensee event reports (LERs) issued. Please include a cross reference linking LER number to appropriate CR number.  
: 13. Corrective action closeout packages, including CRs with description of corrective actions, for all licensee event reports (LERs) issued. Please include a cross reference linking LER number to appropriate CR number.
: 14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.,) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., CR #) for the documents that evaluated the aforementioned OE information.  
: 14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.)
: 15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program.  
and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.,) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., CR #) for the documents that evaluated the aforementioned OE information.
: 16. Copies of all department self-assessments for those programs related to the Corrective Action Program (e.g. Operating Experience, Maintenance Rule, etc)  
: 15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program.
: 17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends  
: 16. Copies of all department self-assessments for those programs related to the Corrective Action Program (e.g. Operating Experience, Maintenance Rule, etc)
: 18. Copy of the latest Corrective Action Program statistics (if exists) such as the number of CRs initiated by department, human performance errors by department, and others as may be available 4    19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while
: 17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends
: 18. Copy of the latest Corrective Action Program statistics (if exists) such as the number of CRs initiated by department, human performance errors by department, and others as may be available


team is onsite.  
4
: 20. List of CRs related to equipment aging issues in the top ten risk significant systems since February 2010 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.; environmental qualification). Please provide the following information for each CR:  
: 19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite.
(a)   CR number (b)   Priority (c) CR problem description  
: 20. List of CRs related to equipment aging issues in the top ten risk significant systems since February 2010 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.;
: 21. If performed, please provide any recent self-assessment of the site safety culture.  
environmental qualification). Please provide the following information for each CR:
: 22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods  
(a) CR number (b) Priority (c) CR problem description
: 23. List of all root cause evaluations with a brief description  
: 21. If performed, please provide any recent self-assessment of the site safety culture.
: 22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
: 23. List of all root cause evaluations with a brief description
: 24. Copy of Probabilistic Risk Assessment importance measures report, if available
: 24. Copy of Probabilistic Risk Assessment importance measures report, if available
: 25. System Health Reports, system design basis documents, and system description information for the top ten risk significant systems}}
: 25. System Health Reports, system design basis documents, and system description information for the top ten risk significant systems}}

Latest revision as of 16:14, 5 February 2020

Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection
ML15021A189
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/20/2015
From: Masters A
Reactor Projects Branch 7
To: Taber B
Southern Nuclear Operating Co
References
Download: ML15021A189 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVE N.E., SUITE 1200 ATLANTA, GEORGIA 30303 January 20, 2015 Mr. Brian K. Taber Vice President - Vogtle Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Mr. Taber:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Vogtle Electric Generating Plant Units 1 and 2 during the weeks of March 16 - 20, 2015, and March 30 - April 3, 2015. The inspection team will be led by Mr. Wesley Deschaine, the NRCs Resident Inspector at Sequoyah Nuclear Plant. This inspection will be conducted in accordance with the baseline inspection procedure (IP) 71152, Problem Identification and Resolution, effective date January 31, 2013.

The biennial PI&R inspection and assessment of the licensees Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.

On January 9, 2015, Mr. Deschaine confirmed with Ms. Karen Morrow of your staff, arrangements for the two-week onsite inspection.

The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than March 2, 2015. Contact Mr. Deschaine with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mr. Deschaine will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.

B. Taber 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Deschaine at (423) 842-8001.

Sincerely,

/RA/

Anthony D. Masters, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos.: 05000424, 05000425 License Nos.: NPF-68 and NPF-81

Enclosure:

Information Request for Vogtle Electric Generating Plant Problem Identification and Resolution Inspection cc Distribution via ListServ

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE Via email ADM2 /RA/

NAME WDeschaine AMasters DATE 1/20/2015 1/20/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO B. Taber 3 Letter to Brian K. Taber from Anthony D. Masters dated January 20, 2015.

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION DISTRIBUTION:

D. Gamberoni, RII EICS L. Gibson, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMVogtleResource

INFORMATION REQUEST FOR VOGTLE ELECTRIC GENERATING PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (March 16 - 20, 2015 and March 30 - April 3, 2015)

Note: Unless otherwise noted, the information requested below corresponds to documents generated since February 2013. Please provide the requested documents in electronic format.

If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.

1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:

(a) Corrective action process (b) Cause evaluation (c) Operating experience program (d) Employee concerns program (e) Self-assessment program (f) Maintenance rule program and implementing procedures (g) Operability determination process (h) Degraded/non-conforming condition process (e.g., RIS 2005-20)

(i) System health process or equivalent equipment reliability improvement programs (j) Preventive maintenance deferral and Condition Report (CR) extension process If any of the procedures requested above were revised after February 2013, please provide (or have available) copies of all revisions during the onsite inspection.

2. List of top ten risk-significant systems, top ten risk-significant components for each one of the top ten risk-significant systems, and top ten risk-significant operator manual actions
3. List of all CRs initiated including the following information for each CR:

(a) CR number (b) Brief, but complete problem description (c) Priority or level (d) Affected system (e) Affected component (f) Responsible plant department (g) CR completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below)

CR # Problem Priority System Component Org Status CR001 A RHR Pump 2 RHR 2-RHR- ENG Open failed flow criteria PMP-A per SR 5.0.5.4 Enclosure

2

4. List of outstanding corrective actions including the following information for each action:

(a) Corrective action number (b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc)

(c) Brief, but complete corrective action description (d) Associated CR number (e) Corrective action initiation date (f) Number of Extensions (g) Corrective action due date (h) Completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below)

Corrective Type Description CR Initiation Extensions Due Status Action # Date Date AR0034 CAPR Revise CR0058 01/05/08 2 06/15/08 Closed Procedure NGK-003-4585

5. List of control room deficiencies with a brief description and corresponding CR and/or work order (WO) number
6. List of operator workarounds and operator burdens with a brief description and corresponding CR number
7. List of all currently extended CRs or overdue, sorted by initiation date, with the following information:

(a) CR number (b) Priority or Significance (c) CR title and short description

8. List of all CRs that have been voided or cancelled. Please provide the following information for each CR:

(a) CR Number (b) Brief, but complete problem description (c) Reason voided or cancelled

9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since February 2013. Please include the following information for each system in (a)(1):

(a) Date of classification in (a)(1)

(b) Reason for being placed in (a)(1)

(c) Planned actions and their status

3

10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems.

Please include actions completed and current status.

11. List of corrective maintenance work orders. Please include the following information for each work order:

(a) WO number (b) Brief, but complete work description (c) Affected system and components (d) Date of initiation (e) Date of completion (if completed)

If possible, provide this list in a format compatible with spreadsheet software (example shown below)

Work Description System Component Initiation Due Status Order # Date Date WO01345 Replace breaker SI 2A-SI-PMP, 01/05/08 03/15/09 Closed 2A-BKR-08-BB4 BKR-08-BB4 for 2A SI Pump.

12. Corrective action closeout packages, including CRs with description of corrective actions, for all NRC findings and Licensee identified violations. Please include a cross reference linking NRC Finding numbers and LIVs to appropriate CR numbers.
13. Corrective action closeout packages, including CRs with description of corrective actions, for all licensee event reports (LERs) issued. Please include a cross reference linking LER number to appropriate CR number.
14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.)

and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.,) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., CR #) for the documents that evaluated the aforementioned OE information.

15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program.
16. Copies of all department self-assessments for those programs related to the Corrective Action Program (e.g. Operating Experience, Maintenance Rule, etc)
17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends
18. Copy of the latest Corrective Action Program statistics (if exists) such as the number of CRs initiated by department, human performance errors by department, and others as may be available

4

19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite.
20. List of CRs related to equipment aging issues in the top ten risk significant systems since February 2010 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.;

environmental qualification). Please provide the following information for each CR:

(a) CR number (b) Priority (c) CR problem description

21. If performed, please provide any recent self-assessment of the site safety culture.
22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
23. List of all root cause evaluations with a brief description
24. Copy of Probabilistic Risk Assessment importance measures report, if available
25. System Health Reports, system design basis documents, and system description information for the top ten risk significant systems