GNRO-2013/00065, Response to Verbal Request for Additional Information Associated with Letter GNRO-2013/00065: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Entergy Operations, Inc.P.o.Box756PortGibson,MS 39150 Kevin MulliganSiteVicePresident Tel.(601)437-7500 GNRO-2015/00008 January 27,2015 u.s.Nuclear Regulatory Commission Attn: DocumentControlDesk Washington,DC20555-0001
{{#Wiki_filter:Entergy Operations, Inc.
P. o. Box 756 Port Gibson, MS 39150 Kevin Mulligan Site Vice President Tel. (601) 437-7500 GNRO-2015/00008 January 27,2015 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Responsetoverbal Request for Additional Information associated with Grand Gulf Nuclear Station Letter GNRO-2013/00065 Grand Gulf NuclearStation,Unit1 DocketNo.50-416LicenseNo.NPF-29
Response to verbal Request for Additional Information associated with Grand Gulf Nuclear Station Letter GNRO-2013/00065 Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29


==REFERENCE:==
==REFERENCE:==
Letter:
Letter: Grand Gulf Nuclear Station Unit 1, Application for Technical Specification Changes; Technical Specification Task Force (TSTF)
Grand Gulf NuclearStationUnit1, Application for Technical Specification Changes;Technical Specification TaskForce(TSTF)
Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specification End States (GNRO-2013/00065) (ML13316B024)
Improved Standard Technical Specification Change Traveler, TSTF-423, Technical SpecificationEndStates (GNRO-2013/00065)(ML 13316B024)


==DearSirorMadam:==
==Dear Sir or Madam:==


Entergy Operations Inc.(Entergy)is providing it's responsestotheverbal request for additional informationreceivedfromthe Nuclear Regulatory CommissiononTuesday, January20,2015.The responses are contained in Attachment1ofthis letterandtherevised Technical Specification(CLEAN)pagesare contained in Attachment2ofthisletter.Thisletter containsnonew commitments.Ifyouhaveany questionsorrequire additional information, please contact JamesNadeauat 601-437-2103.Ideclare under penaltyofperjurythatthe foregoingistrueandcorrect.
Entergy Operations Inc. (Entergy) is providing it's responses to the verbal request for additional information received from the Nuclear Regulatory Commission on Tuesday, January 20, 2015.
Executedonthe27thdayofJanuary,2015.
The responses are contained in Attachment 1 of this letter and the revised Technical Specification (CLEAN) pages are contained in Attachment 2 of this letter.
Sincerely,'.KJM/ram ,.£._--------"-----
This letter contains no new commitments. If you have any questions or require additional information, please contact James Nadeau at 601-437-2103.
Attachments:
th I declare under penalty of perjury that the foregoing is true and correct. Executed on the 27 day of January, 2015.
1.Response to Request For Additional Information Attachment 1 to GNRO-2015/00008 Response to Request For Additional Information Attachment1to GNRO-2015/00008Page1of2 Grand Gulf Nuclear Station's Responses to Request For Additional Informationasreceivedviaphonecallwiththe Nuclear Regulatory Commission Project ManageronTuesday, January 20, 2015.Item1)OnPage3.3-80,Shouldtheline containing"cell containingoneormorefuel assemblies" have been indented?Areviewofthiscleanpage containedinthe submittalandthecurrentpageoftheGrand Gulf NuclearStation(GGNS)
Sincerely,
Technical Specification confirmedthislineshouldhavebeenindented.Therevisedpageis contained in Attachment2of GNRO-2015/00008.Item2)PartA)Page3.6-31,Should numberingforthe RequiredActionbeCorC.1?
,.£._--------"-----
The numbershouldbeC.1.Areviewthecleanpage,as submittedinGGNSLetter GNRO-2013/00065foundthatthe number conventionusedinRequiredActionC.1iscorrectandtheRequiredActionis numbered C.1.No follow-upactionsare warranted.PartB)Page3.6-31, Condition'0'wasadded.Thisnew condition containsthefollowingwording:"ofconditionCnotmet".Isthis just for clarification?Yes.Theintentistoensurethattheuser understandwhichrequiredactionwasnotmet.
KJM/ram Attachments:             1. Response to Request For Additional Information
No follow-up actions are warranted.Item3)Page3.7-7,Verifythenote insertedatRequiredActionC.1is correctsinceMode3isno longerpartoftheTS?YesMODE3is applicabletothisTSandthenoteis applicableasrequested.
 
No follow-up actions are warranted.Item4)Page3.7-3,Should"OR"beunderlined,ornot?Yesthe"OR" statementsshouldbe underlined.Areviewofthecleanpage,as submittedinGGNSLetter GNRO-2013/00065,foundthe"OR" statements areunderlinedin Condition"F." No follow-upactionsare warranted.
Attachment 1 to GNRO-2015/00008 Response to Request For Additional Information to GNRO-2015/00008 Page 1 of 2 Grand Gulf Nuclear Station's Responses to Request For Additional Information as received via phone call with the Nuclear Regulatory Commission Project Manager on Tuesday, January 20, 2015.
Attachment1to GNRO-2015/00008Page2of2Item5)Page3.7-8,Wasthe24MFCLAR already approved?The24MFCLARwas amendment197.Doweneedthe change(18to24 months)orhasitalreadybeen approved?We concurthattherequested FREQUENCY change requested for Surveillance Requirement(SR)3.7.3.3was addressedbythe issuance and implementation of License Amendment197andthis request changeisno longer needed.Therevisedpageis contained in Attachment2of GNRO-2015/00008.Item6)Page3.7-9,Shouldthesymbolusedbea"degrees" symbol?Yes,thisisa degreesymbol.Areviewofthecleanpage,as submittedinGGNSLetter GNRO-2013/00065,foundthatthe degreesymbolis correctly insertedinRequiredActionB.1.
Item 1)
No follow-up actions are warranted.Item7)PartA)Page3.8-4ActionD,Shoulditbe"Systems C Operating" or"Systems-Operating"?Yes,itshouldbe"Systems-operating".
On Page 3.3-80, Should the line containing "cell containing one or more fuel assemblies" have been indented?
No follow-up actions are warranted.PartB)Page3.8-4ActionG, Shouldn'tthe36hoursbe deleted?Yesthe36hour Completiontimeshouldbe deleted from Condition GTherevisedpageis contained in Attachment2of GNRO-2015/00008.Item8)Page3.8-27,Topright-isthetitle correct?Shoulditbe3.8.1insteadof3.8.4?Yes,weagreethetitleandTS numbering are incorrectonthecleanpage submitted inGGNSLetter GNRO-2013/00065.Therevisedpageis contained in Attachment2of GNRO-2015/00008.Item9)Page3.8-39,Topright-isthetitlecorrect?Yes,weagreethetitleandTS numbering are incorrectonthecleanpage submitted inGGNSLetter GNRO-2013/00065.Therevisedpageis contained in Attachment2of GNRO-2015/00008.
A review of this clean page contained in the submittal and the current page of the Grand Gulf Nuclear Station (GGNS) Technical Specification confirmed this line should have been indented.
Attachment 2 to GNRO-2015/00008 Revised (CLEAN)Technical Specification Pages RPS Electric Power Monitoring 3.3.8.2 3.3 INSTRUMENTATION 3.3.8.2 Reactor Protection System (RPS)Electric Power Monitoring LCO 3.3.8.2 APPLICABILITY:
The revised page is contained in Attachment 2 of GNRO-2015/00008.
ACTIONSTwoRPS electric power monitoring assemblies shall be OPERABLE for each inservice RPS motor generator set or alternate power supply.MODES 1, 2, and 3, MODES 4 and 5 with any control rod withdrawn from a core cell containing one or more fuel assemblies.
Item 2)
CONDITIONREQUIREDACTION COMPLETION TIMEA.One or both inservice A.1 Remove associated 72 hours power supplies with inservice power one electric power supply(s)from monitoring assembly service.inoperable.
Part A)
B.One or both inservice B.1 Remove associated 1 hour power supplies with inservice power both electric power supply(s)from monitoring assemblies service.inoperable.
Page 3.6-31, Should numbering for the Required Action be C or C.1?
C.Required Action and C.1-------Note--------
The number should be C.1. A review the clean page, as submitted in GGNS Letter GNRO-2013/00065 found that the number convention used in Required Action C.1 is correct and the Required Action is numbered C.1.
associated Completion LCO 3.0.4.a is not Time of Condition A applicable when or B not met in entering MODE 3.MODE 1, 2, or 3.-------------------
No follow-up actions are warranted.
Be in MODE 3.12 hours (continued)
Part B)
GRAND GULF 3.3-80 Amendment No.__
Page 3.6-31, Condition '0' was added. This new condition contains the following wording: "of condition C not met". Is this just for clarification?
CRFA System 3.7.3 ACTIONS (continued)
Yes. The intent is to ensure that the user understand which required action was not met.
CONDITIONREQUIREDACTION COMPLETION TIME E.Two CRFA subsystems E.1-------NOTE-------
No follow-up actions are warranted.
inoperable in MODE 1, LCO 3.0.4.a is not 2, or 3 for reasons applicable when other than Condition entering MODE 3.B.------------------
Item 3)
Be in MODE 3.12 hours F.Two CRFA subsystems F.1-------NOTE-------
Page 3.7-7, Verify the note inserted at Required Action C.1 is correct since Mode 3 is no longer part of the TS?
Immediately inoperable during LCO 3.0.3 does not OPDRVs.apply.------------------
Yes MODE 3 is applicable to this TS and the note is applicable as requested.
OR-Initiate action to One or more CRFA suspend OPDRVs.subsystems inoperable due to inoperable CRE boundary during OPDRVs.SURVEILLANCE REQUIREMENTS SR 3.7.3.1 SR 3.7.3.2 SR 3.7.3.3 SR 3.7.3.4 SURVEILLANCE Operate each CRFA subsystem for10 continuous hours with the heaters operating.
No follow-up actions are warranted.
Perform required CRFA filter testing in accordance with the Ventilation Filter Testing Program (VFTP).Verify each CRFA subsystem actuates on an actual or simulated initiation signal.Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.FREQUENCY 31 days In accordance with the VFTP 24 months In accordance with the Control Room Envelope Habitability Program GRAND GULF 3.7-8 Arne ndment No.-+/--4-§.,+/--+8-T+/--9-+-r_
Item 4)
ACTIONS (continued)
Page 3.7-3, Should "OR" be underlined, or not?
CONDITIONREQUIREDACTION AC Sources-Operating 3.8.1 COMPLETION TIME D.One required offsite circuit inoperable for reasons other than Condition F.AND One required DG inoperable for reasons other than Condition F.-----------NOTE--------------
Yes the "OR" statements should be underlined. A review of the clean page, as submitted in GGNS Letter GNRO-2013/00065, found the "OR" statements are underlined in Condition "F."
Enter applicable Conditions and Required Actions of LCO 3.8.7,"Distribution Systems-Operating," when any required division isenergized as a result of Condition D.D.1 Restore required 12 hours offsite circuit to OPERABLE status.OR-D.2 Restore required DG 12 hours to OPERABLE status.E.Two required DGs inoperable.
No follow-up actions are warranted.
F.One automatic load sequencer inoperable.
to GNRO-2015/00008 Page 2 of 2 Item 5)
G.Required Action and associated Completion Time of Condition A,B,C,D,E, or F not met.E.1 F.1 G.1 Restore one required DG to OPERABLE status.Restore automatic load sequencer to OPERABLE status.--------NOTE---------
Page 3.7-8, Was the 24 MFC LAR already approved? The 24 MFC LAR was amendment 197. Do we need the change (18 to 24 months) or has it already been approved?
LCO 3.0.4.a is not applicable when entering MODE 3.Be in MODE 3.2 hours OR 24 hours if Division 3 DG is inoperable 24 hours 12 hours (continued)
We concur that the requested FREQUENCY change requested for Surveillance Requirement (SR) 3.7.3.3 was addressed by the issuance and implementation of License Amendment 197 and this request change is no longer needed.
GRAND GULF 3.8-4 Amendment No.
The revised page is contained in Attachment 2 of GNRO-2015/00008.
DC Sources-Operating 3.8.4 ACTIONS (continued)
Item 6)
CONDITION D.Required Action and 0.1 associated Completion Time for Division 1 or 2 DC electrical power subsystem for conditionA,B, or C not met.E.Division 3 DC E.1 electrical power subsystem inoperable for reasons other than Condition A.REQUIREDACTION
Page 3.7-9, Should the symbol used be a "degrees" symbol?
---------NOTELCO 3.0.4.a is not applicable when entering MODE 3.Be in MODE 3.Declare High Pressure Core Spray System inoperable.
Yes, this is a degree symbol. A review of the clean page, as submitted in GGNS Letter GNRO-2013/00065, found that the degree symbol is correctly inserted in Required Action B.1.
COMPLETION TIME 12 hours Immediately F.Required Action and F.1 Be in MODE 3.12 hours associated Completion Time for Division 3 DC AND electrical
No follow-up actions are warranted.
--power subsystem for F.2 Be in MODE 4.36 hours Condition A, B or E not met.SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 SR 3.8.4.2 Verify battery terminal voltage is129 V on float charge.Verify no visible corrosion at battery terminals and connectors.
Item 7)
OR Verify battery connection resistance is1.5 E-4 ohm for inter-cell connections,1.5 E-4 ohm for inter-rack connections,1.5 E-4 ohm for inter-tier connections, and1.5 E-4 ohm for terminal connections.
Part A)
7 days 92 days (continued)
Page 3.8-4 Action D, Should it be "Systems C Operating" or "Systems-Operating"?
GRAND GULF 3.8-27 Amendment No.
Yes, it should be "Systems-operating".
Distribution Systems-Operating 3.8.7 ACTIONS (continued)
No follow-up actions are warranted.
CONDITION C.Required Action and associated Completion Time of Condition A or B not met.C.1REQUIREDACTION LCO 3.0.4.a is not applicable when entering MODE 3.Be in MODE 3.COMPLETION TIME 12 hoursD.One or more Division 3 D.1 AC or DC electrical power distribution subsystems inoperable.
Part B)
E.Two or more divisions E.1 with inoperable distribution subsystems that result in a loss of function.SURVEILLANCE REQUIREMENTS SURVEILLANCE Declare High Pressure Core Spray System inoperable.
Page 3.8-4 Action G, Shouldn't the 36 hours be deleted?
Enter LCO 3.0.3.Immediately Immediately FREQUENCY SR 3.8.7.1 Verify correct breaker alignments and voltage to required AC and DC electrical power distribution subsystems.
Yes the 36 hour Completion time should be deleted from Condition G The revised page is contained in Attachment 2 of GNRO-2015/00008.
7 days GRAND GULF 3.8-39 Amendment No.}}
Item 8)
Page 3.8-27, Top right - is the title correct? Should it be 3.8.1 instead of 3.8.4?
Yes, we agree the title and TS numbering are incorrect on the clean page submitted in GGNS Letter GNRO-2013/00065.
The revised page is contained in Attachment 2 of GNRO-2015/00008.
Item 9)
Page 3.8-39, Top right - is the title correct?
Yes, we agree the title and TS numbering are incorrect on the clean page submitted in GGNS Letter GNRO-2013/00065.
The revised page is contained in Attachment 2 of GNRO-2015/00008.
 
Attachment 2 to GNRO-2015/00008 Revised (CLEAN) Technical Specification Pages
 
RPS Electric Power Monitoring 3.3.8.2 3.3 INSTRUMENTATION 3.3.8.2 Reactor Protection System (RPS) Electric Power Monitoring LCO 3.3.8.2     Two RPS electric power monitoring assemblies shall be OPERABLE for each inservice RPS motor generator set or alternate power supply.
APPLICABILITY:    MODES 1, 2, and 3, MODES 4 and 5 with any control rod withdrawn from a core cell containing one or more fuel assemblies.
ACTIONS CONDITION                  REQUIRED ACTION          COMPLETION TIME A. One or both inservice   A.1     Remove associated       72 hours power supplies with               inservice power one electric power               supply(s) from monitoring assembly               service.
inoperable.
B. One or both inservice   B.1     Remove associated       1 hour power supplies with               inservice power both electric power               supply(s) from monitoring assemblies             service.
inoperable.
C. Required Action and     C.1     -------Note--------
associated Completion             LCO 3.0.4.a is not Time of Condition A               applicable when or B not met in                   entering MODE 3.
MODE 1, 2, or 3.                 -------------------
Be in MODE 3.           12 hours (continued)
GRAND GULF                           3.3-80           Amendment No. ~        __
 
CRFA System 3.7.3 ACTIONS   (continued)
CONDITION                    REQUIRED ACTION              COMPLETION TIME E. Two CRFA subsystems       E.1       -------NOTE-------
inoperable in MODE 1,               LCO 3.0.4.a is not 2, or 3 for reasons                 applicable when other than Condition               entering MODE 3.
B.                                 ------------------
Be in MODE 3.             12 hours F. Two CRFA subsystems       F.1       -------NOTE-------         Immediately inoperable during                   LCO 3.0.3 does not OPDRVs.                             apply.
-OR Initiate action to One or more CRFA                   suspend OPDRVs.
subsystems inoperable due to inoperable CRE boundary during OPDRVs.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.7.3.1     Operate each CRFA subsystem for ~ 10                31 days continuous hours with the heaters operating.
SR 3.7.3.2     Perform required CRFA filter testing in              In accordance accordance with the Ventilation Filter              with the VFTP Testing Program (VFTP).
SR 3.7.3.3      Verify each CRFA subsystem actuates on an            24 months actual or simulated initiation signal.
SR 3.7.3.4      Perform required CRE unfiltered air                  In accordance inleakage testing in accordance with the           with the Control Room Envelope Habitability                  Control Room Program.                                           Envelope Habitability Program GRAND GULF                            3.7-8      Arnendme n t No. -+/--4-§., +/--+8-T +/--9-+-r_
 
AC Sources - Operating 3.8.1 ACTIONS  (continued)
CONDITION                  REQUIRED ACTION          COMPLETION TIME D. One required offsite   -----------NOTE--------------
circuit inoperable for  Enter applicable Conditions reasons other than      and Required Actions of Condition F.            LCO 3.8.7, "Distribution Systems - Operating," when any AND                    required division is de-energized as a result of One required DG        Condition D.
inoperable for reasons other than Condition F.                      D.1     Restore required         12 hours offsite circuit to OPERABLE status.
                            -OR D.2     Restore required DG     12 hours to OPERABLE status.
E. Two required DGs       E.1      Restore one required    2 hours inoperable.                       DG to OPERABLE status.                OR 24 hours if Division 3 DG is inoperable F. One automatic load     F.1      Restore automatic      24 hours sequencer inoperable.            load sequencer to OPERABLE status.
G. Required Action and     G.1       --------NOTE---------
associated Completion            LCO 3.0.4.a is not Time of Condition A,              applicable when B, C, D, E, or F not              entering MODE 3.
met.
Be in MODE 3.           12 hours (continued)
GRAND GULF                           3.8-4             Amendment No. ~
 
DC Sources - Operating 3.8.4 ACTIONS   (continued)
CONDITION                   REQUIRED ACTION            COMPLETION TIME D. Required Action and       0.1     ---------NOTE -----
associated Completion             LCO 3.0.4.a is not Time for Division 1 or             applicable when 2 DC electrical power             entering MODE 3.
subsystem for condition A, B, or C not met.                           Be in MODE 3.            12 hours E. Division 3 DC             E.1     Declare High Pressure    Immediately electrical power                   Core Spray System subsystem inoperable               inoperable.
for reasons other than Condition A.
F. Required Action and      F.1      Be in MODE 3.           12 hours associated Completion Time for Division 3 DC   AND electrical power subsystem for             F.2     Be in MODE 4.           36 hours Condition A, B or E not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                               FREQUENCY SR 3.8.4.1     Verify battery terminal voltage is  ~  129 V   7 days on float charge.
SR  3.8.4.2    Verify no visible corrosion at battery           92 days terminals and connectors.
OR Verify battery connection resistance is
                  ~ 1.5 E-4 ohm for inter-cell connections,
                  ~ 1.5 E-4 ohm for inter-rack connections,
                  ~ 1.5 E-4 ohm for inter-tier connections, and ~ 1.5 E-4 ohm for terminal connections.
(continued)
GRAND GULF                           3.8-27               Amendment No. ~
 
Distribution Systems-Operating 3.8.7 ACTIONS   (continued)
CONDITION                   REQUIRED ACTION          COMPLETION TIME C. Required Action and     C.1      -------NOTE--------
associated Completion            LCO 3.0.4.a is not Time of Condition A              applicable when or B not met.                    entering MODE 3.
Be in MODE 3.           12 hours D. One or more Division 3   D.1     Declare High Pressure  Immediately AC or DC electrical               Core Spray System power distribution               inoperable.
subsystems inoperable.
E. Two or more divisions   E.1     Enter LCO 3.0.3.        Immediately with inoperable distribution subsystems that result in a loss of function.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                             FREQUENCY SR 3.8.7.1     Verify correct breaker alignments and         7 days voltage to required AC and DC electrical power distribution subsystems.
GRAND GULF                           3.8-39           Amendment No. ~,}}

Latest revision as of 15:58, 5 February 2020

Response to Verbal Request for Additional Information Associated with Letter GNRO-2013/00065
ML15028A523
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/27/2015
From: Kevin Mulligan
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2013/00065, GNRO-2015/00008
Download: ML15028A523 (10)


Text

Entergy Operations, Inc.

P. o. Box 756 Port Gibson, MS 39150 Kevin Mulligan Site Vice President Tel. (601) 437-7500 GNRO-2015/00008 January 27,2015 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Response to verbal Request for Additional Information associated with Grand Gulf Nuclear Station Letter GNRO-2013/00065 Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

REFERENCE:

Letter: Grand Gulf Nuclear Station Unit 1, Application for Technical Specification Changes; Technical Specification Task Force (TSTF)

Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specification End States (GNRO-2013/00065) (ML13316B024)

Dear Sir or Madam:

Entergy Operations Inc. (Entergy) is providing it's responses to the verbal request for additional information received from the Nuclear Regulatory Commission on Tuesday, January 20, 2015.

The responses are contained in Attachment 1 of this letter and the revised Technical Specification (CLEAN) pages are contained in Attachment 2 of this letter.

This letter contains no new commitments. If you have any questions or require additional information, please contact James Nadeau at 601-437-2103.

th I declare under penalty of perjury that the foregoing is true and correct. Executed on the 27 day of January, 2015.

Sincerely,

,.£._--------"-----

KJM/ram Attachments: 1. Response to Request For Additional Information

Attachment 1 to GNRO-2015/00008 Response to Request For Additional Information to GNRO-2015/00008 Page 1 of 2 Grand Gulf Nuclear Station's Responses to Request For Additional Information as received via phone call with the Nuclear Regulatory Commission Project Manager on Tuesday, January 20, 2015.

Item 1)

On Page 3.3-80, Should the line containing "cell containing one or more fuel assemblies" have been indented?

A review of this clean page contained in the submittal and the current page of the Grand Gulf Nuclear Station (GGNS) Technical Specification confirmed this line should have been indented.

The revised page is contained in Attachment 2 of GNRO-2015/00008.

Item 2)

Part A)

Page 3.6-31, Should numbering for the Required Action be C or C.1?

The number should be C.1. A review the clean page, as submitted in GGNS Letter GNRO-2013/00065 found that the number convention used in Required Action C.1 is correct and the Required Action is numbered C.1.

No follow-up actions are warranted.

Part B)

Page 3.6-31, Condition '0' was added. This new condition contains the following wording: "of condition C not met". Is this just for clarification?

Yes. The intent is to ensure that the user understand which required action was not met.

No follow-up actions are warranted.

Item 3)

Page 3.7-7, Verify the note inserted at Required Action C.1 is correct since Mode 3 is no longer part of the TS?

Yes MODE 3 is applicable to this TS and the note is applicable as requested.

No follow-up actions are warranted.

Item 4)

Page 3.7-3, Should "OR" be underlined, or not?

Yes the "OR" statements should be underlined. A review of the clean page, as submitted in GGNS Letter GNRO-2013/00065, found the "OR" statements are underlined in Condition "F."

No follow-up actions are warranted.

to GNRO-2015/00008 Page 2 of 2 Item 5)

Page 3.7-8, Was the 24 MFC LAR already approved? The 24 MFC LAR was amendment 197. Do we need the change (18 to 24 months) or has it already been approved?

We concur that the requested FREQUENCY change requested for Surveillance Requirement (SR) 3.7.3.3 was addressed by the issuance and implementation of License Amendment 197 and this request change is no longer needed.

The revised page is contained in Attachment 2 of GNRO-2015/00008.

Item 6)

Page 3.7-9, Should the symbol used be a "degrees" symbol?

Yes, this is a degree symbol. A review of the clean page, as submitted in GGNS Letter GNRO-2013/00065, found that the degree symbol is correctly inserted in Required Action B.1.

No follow-up actions are warranted.

Item 7)

Part A)

Page 3.8-4 Action D, Should it be "Systems C Operating" or "Systems-Operating"?

Yes, it should be "Systems-operating".

No follow-up actions are warranted.

Part B)

Page 3.8-4 Action G, Shouldn't the 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> be deleted?

Yes the 36 hour4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Completion time should be deleted from Condition G The revised page is contained in Attachment 2 of GNRO-2015/00008.

Item 8)

Page 3.8-27, Top right - is the title correct? Should it be 3.8.1 instead of 3.8.4?

Yes, we agree the title and TS numbering are incorrect on the clean page submitted in GGNS Letter GNRO-2013/00065.

The revised page is contained in Attachment 2 of GNRO-2015/00008.

Item 9)

Page 3.8-39, Top right - is the title correct?

Yes, we agree the title and TS numbering are incorrect on the clean page submitted in GGNS Letter GNRO-2013/00065.

The revised page is contained in Attachment 2 of GNRO-2015/00008.

Attachment 2 to GNRO-2015/00008 Revised (CLEAN) Technical Specification Pages

RPS Electric Power Monitoring 3.3.8.2 3.3 INSTRUMENTATION 3.3.8.2 Reactor Protection System (RPS) Electric Power Monitoring LCO 3.3.8.2 Two RPS electric power monitoring assemblies shall be OPERABLE for each inservice RPS motor generator set or alternate power supply.

APPLICABILITY: MODES 1, 2, and 3, MODES 4 and 5 with any control rod withdrawn from a core cell containing one or more fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or both inservice A.1 Remove associated 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> power supplies with inservice power one electric power supply(s) from monitoring assembly service.

inoperable.

B. One or both inservice B.1 Remove associated 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> power supplies with inservice power both electric power supply(s) from monitoring assemblies service.

inoperable.

C. Required Action and C.1 -------Note--------

associated Completion LCO 3.0.4.a is not Time of Condition A applicable when or B not met in entering MODE 3.

MODE 1, 2, or 3. -------------------

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

GRAND GULF 3.3-80 Amendment No. ~ __

CRFA System 3.7.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Two CRFA subsystems E.1 -------NOTE-------

inoperable in MODE 1, LCO 3.0.4.a is not 2, or 3 for reasons applicable when other than Condition entering MODE 3.

B. ------------------

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. Two CRFA subsystems F.1 -------NOTE------- Immediately inoperable during LCO 3.0.3 does not OPDRVs. apply.

-OR Initiate action to One or more CRFA suspend OPDRVs.

subsystems inoperable due to inoperable CRE boundary during OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Operate each CRFA subsystem for ~ 10 31 days continuous hours with the heaters operating.

SR 3.7.3.2 Perform required CRFA filter testing in In accordance accordance with the Ventilation Filter with the VFTP Testing Program (VFTP).

SR 3.7.3.3 Verify each CRFA subsystem actuates on an 24 months actual or simulated initiation signal.

SR 3.7.3.4 Perform required CRE unfiltered air In accordance inleakage testing in accordance with the with the Control Room Envelope Habitability Control Room Program. Envelope Habitability Program GRAND GULF 3.7-8 Arnendme n t No. -+/--4-§., +/--+8-T +/--9-+-r_

AC Sources - Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. One required offsite -----------NOTE--------------

circuit inoperable for Enter applicable Conditions reasons other than and Required Actions of Condition F. LCO 3.8.7, "Distribution Systems - Operating," when any AND required division is de-energized as a result of One required DG Condition D.

inoperable for reasons other than Condition F. D.1 Restore required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> offsite circuit to OPERABLE status.

-OR D.2 Restore required DG 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to OPERABLE status.

E. Two required DGs E.1 Restore one required 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> inoperable. DG to OPERABLE status. OR 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if Division 3 DG is inoperable F. One automatic load F.1 Restore automatic 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> sequencer inoperable. load sequencer to OPERABLE status.

G. Required Action and G.1 --------NOTE---------

associated Completion LCO 3.0.4.a is not Time of Condition A, applicable when B, C, D, E, or F not entering MODE 3.

met.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

GRAND GULF 3.8-4 Amendment No. ~

DC Sources - Operating 3.8.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and 0.1 ---------NOTE -----

associated Completion LCO 3.0.4.a is not Time for Division 1 or applicable when 2 DC electrical power entering MODE 3.

subsystem for condition A, B, or C not met. Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> E. Division 3 DC E.1 Declare High Pressure Immediately electrical power Core Spray System subsystem inoperable inoperable.

for reasons other than Condition A.

F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time for Division 3 DC AND electrical power subsystem for F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Condition A, B or E not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is ~ 129 V 7 days on float charge.

SR 3.8.4.2 Verify no visible corrosion at battery 92 days terminals and connectors.

OR Verify battery connection resistance is

~ 1.5 E-4 ohm for inter-cell connections,

~ 1.5 E-4 ohm for inter-rack connections,

~ 1.5 E-4 ohm for inter-tier connections, and ~ 1.5 E-4 ohm for terminal connections.

(continued)

GRAND GULF 3.8-27 Amendment No. ~

Distribution Systems-Operating 3.8.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 -------NOTE--------

associated Completion LCO 3.0.4.a is not Time of Condition A applicable when or B not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. One or more Division 3 D.1 Declare High Pressure Immediately AC or DC electrical Core Spray System power distribution inoperable.

subsystems inoperable.

E. Two or more divisions E.1 Enter LCO 3.0.3. Immediately with inoperable distribution subsystems that result in a loss of function.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.7.1 Verify correct breaker alignments and 7 days voltage to required AC and DC electrical power distribution subsystems.

GRAND GULF 3.8-39 Amendment No. ~,