NRR E-mail Capture - FW: Grand Gulf Nuclear Station, Unit 1 FOL Page 16f.pdf (MF3175)
ML15027A183
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/27/2015
From: Scarbrough R
Entergy Nuclear Operations
To: Wang A
Plant Licensing Branch IV
References
TAC MF3175
Download: ML15027A183 (3)


Text

NRR-PMDAPEm Resource From: SCARBROUGH, RICHARD A [RSCARBR@entergy.com]

Sent: Tuesday, January 27, 2015 11:11 AM To: Wang, Alan

Subject:

FW: FOL Page 16f.pdf - Adobe Acrobat Professional Attachments: FOL Page 16f.pdf From: Meister, Richard Sent: Tuesday, January 27, 2015 10:08 AM To: SCARBROUGH, RICHARD A

Subject:

FOL Page 16f.pdf - Adobe Acrobat Professional Corrected page with CFR issue corrected.

1

Hearing Identifier: NRR_PMDA Email Number: 1830 Mail Envelope Properties (8D59BEC2A8A1994FAF6BCA7931FB07801D43B366)

Subject:

FW: FOL Page 16f.pdf - Adobe Acrobat Professional Sent Date: 1/27/2015 11:10:35 AM Received Date: 1/27/2015 11:10:55 AM From: SCARBROUGH, RICHARD A Created By: RSCARBR@entergy.com Recipients:

"Wang, Alan" <Alan.Wang@nrc.gov>

Tracking Status: None Post Office: litxmetsp002.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 209 1/27/2015 11:10:55 AM FOL Page 16f.pdf 12110 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

(h) This license condition shall expire upon satisfaction of the requirements in paragraph (f) provided that a visual inspection of the steam dryer does not reveal any new unacceptable flaw or unacceptable flaw growth that is caused by fatigue.

(47) Commitments made as required by standard TSTF safety evaluation, as discussed in the notice of availability, will be maintained as described in UFSAR Section 16, Technical Specifications. This condition applies to the following TSTFs as approved.

TSTF-423 Changes to the commitments can be made in accordance with 10CFR50.59.

D. The facility required exemptions from certain requirements of Appendices A and J to 10 CFR Part 50 and from certain requirements of 10 CFR Part 100. These include: (a) exemption from General Design Criterion 17 of Appendix A until startup following the first refueling outage, for (1) the emergency override of the test mode for the Division 3 diesel engine, (2) the second level undervoltage protection for the Division 3 diesel engine, and (3) the generator ground over current trip function for the Division 1 and 2 diesel generators (Section 8.3.1 of SSER #7) and (b) exemption from the requirements of Paragraph III.D.2(b)(ii) of Appendix J for the containment airlock testing following normal door opening when containment integrity is not required (Section 6.2.6 of SSER #7). These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. In addition, by exemption dated December 20, 1986, the Commission exempted licensees from 10 CFR 100.11(a)(1), insofar as it incorporates the definition of exclusion area in 10 CFR 100.3(a),

until April 30, 1987 regarding demonstration of authority to control all activities within the exclusion area (safety evaluation accompanying Amendment No. 27 to License (NPF-29). This exemption is authorized by law, and will not present an undue risk to the public health and safety, and is consistent with the common defense and security. In addition, special circumstances have been found justifying the exemption. Therefore, these exemptions are hereby granted pursuant to 10 CFR 50.12. with the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act and the rules and regulations of the Commission.

E. The licensee shall fully implement and maintain in effect all provision of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: Physical Security, Safeguards Contingency and Training and Qualification Plan, and were submitted to the NRC on May 18, 2006.

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The licensees CSP was approved by License Amendment No. 186 as supplemented by a change approved by License Amendment No.

192 and 200.

16f Amendment No. 170,178, 186 191, 192, 200 ___