GNRO-2013/00065, Response to Verbal Request for Additional Information Associated with Letter GNRO-2013/00065

From kanterella
Jump to navigation Jump to search

Response to Verbal Request for Additional Information Associated with Letter GNRO-2013/00065
ML15028A523
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/27/2015
From: Kevin Mulligan
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2013/00065, GNRO-2015/00008
Download: ML15028A523 (10)


Text

Entergy Operations, Inc.

P. o. Box 756 Port Gibson, MS 39150 Kevin Mulligan Site Vice President Tel. (601) 437-7500 GNRO-2015/00008 January 27,2015 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Response to verbal Request for Additional Information associated with Grand Gulf Nuclear Station Letter GNRO-2013/00065 Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

REFERENCE:

Letter: Grand Gulf Nuclear Station Unit 1, Application for Technical Specification Changes; Technical Specification Task Force (TSTF)

Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specification End States (GNRO-2013/00065) (ML13316B024)

Dear Sir or Madam:

Entergy Operations Inc. (Entergy) is providing it's responses to the verbal request for additional information received from the Nuclear Regulatory Commission on Tuesday, January 20, 2015.

The responses are contained in Attachment 1 of this letter and the revised Technical Specification (CLEAN) pages are contained in Attachment 2 of this letter.

This letter contains no new commitments. If you have any questions or require additional information, please contact James Nadeau at 601-437-2103.

th I declare under penalty of perjury that the foregoing is true and correct. Executed on the 27 day of January, 2015.

Sincerely,

,.£._--------"-----

KJM/ram Attachments: 1. Response to Request For Additional Information

Attachment 1 to GNRO-2015/00008 Response to Request For Additional Information to GNRO-2015/00008 Page 1 of 2 Grand Gulf Nuclear Station's Responses to Request For Additional Information as received via phone call with the Nuclear Regulatory Commission Project Manager on Tuesday, January 20, 2015.

Item 1)

On Page 3.3-80, Should the line containing "cell containing one or more fuel assemblies" have been indented?

A review of this clean page contained in the submittal and the current page of the Grand Gulf Nuclear Station (GGNS) Technical Specification confirmed this line should have been indented.

The revised page is contained in Attachment 2 of GNRO-2015/00008.

Item 2)

Part A)

Page 3.6-31, Should numbering for the Required Action be C or C.1?

The number should be C.1. A review the clean page, as submitted in GGNS Letter GNRO-2013/00065 found that the number convention used in Required Action C.1 is correct and the Required Action is numbered C.1.

No follow-up actions are warranted.

Part B)

Page 3.6-31, Condition '0' was added. This new condition contains the following wording: "of condition C not met". Is this just for clarification?

Yes. The intent is to ensure that the user understand which required action was not met.

No follow-up actions are warranted.

Item 3)

Page 3.7-7, Verify the note inserted at Required Action C.1 is correct since Mode 3 is no longer part of the TS?

Yes MODE 3 is applicable to this TS and the note is applicable as requested.

No follow-up actions are warranted.

Item 4)

Page 3.7-3, Should "OR" be underlined, or not?

Yes the "OR" statements should be underlined. A review of the clean page, as submitted in GGNS Letter GNRO-2013/00065, found the "OR" statements are underlined in Condition "F."

No follow-up actions are warranted.

to GNRO-2015/00008 Page 2 of 2 Item 5)

Page 3.7-8, Was the 24 MFC LAR already approved? The 24 MFC LAR was amendment 197. Do we need the change (18 to 24 months) or has it already been approved?

We concur that the requested FREQUENCY change requested for Surveillance Requirement (SR) 3.7.3.3 was addressed by the issuance and implementation of License Amendment 197 and this request change is no longer needed.

The revised page is contained in Attachment 2 of GNRO-2015/00008.

Item 6)

Page 3.7-9, Should the symbol used be a "degrees" symbol?

Yes, this is a degree symbol. A review of the clean page, as submitted in GGNS Letter GNRO-2013/00065, found that the degree symbol is correctly inserted in Required Action B.1.

No follow-up actions are warranted.

Item 7)

Part A)

Page 3.8-4 Action D, Should it be "Systems C Operating" or "Systems-Operating"?

Yes, it should be "Systems-operating".

No follow-up actions are warranted.

Part B)

Page 3.8-4 Action G, Shouldn't the 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> be deleted?

Yes the 36 hour4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Completion time should be deleted from Condition G The revised page is contained in Attachment 2 of GNRO-2015/00008.

Item 8)

Page 3.8-27, Top right - is the title correct? Should it be 3.8.1 instead of 3.8.4?

Yes, we agree the title and TS numbering are incorrect on the clean page submitted in GGNS Letter GNRO-2013/00065.

The revised page is contained in Attachment 2 of GNRO-2015/00008.

Item 9)

Page 3.8-39, Top right - is the title correct?

Yes, we agree the title and TS numbering are incorrect on the clean page submitted in GGNS Letter GNRO-2013/00065.

The revised page is contained in Attachment 2 of GNRO-2015/00008.

Attachment 2 to GNRO-2015/00008 Revised (CLEAN) Technical Specification Pages

RPS Electric Power Monitoring 3.3.8.2 3.3 INSTRUMENTATION 3.3.8.2 Reactor Protection System (RPS) Electric Power Monitoring LCO 3.3.8.2 Two RPS electric power monitoring assemblies shall be OPERABLE for each inservice RPS motor generator set or alternate power supply.

APPLICABILITY: MODES 1, 2, and 3, MODES 4 and 5 with any control rod withdrawn from a core cell containing one or more fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or both inservice A.1 Remove associated 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> power supplies with inservice power one electric power supply(s) from monitoring assembly service.

inoperable.

B. One or both inservice B.1 Remove associated 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> power supplies with inservice power both electric power supply(s) from monitoring assemblies service.

inoperable.

C. Required Action and C.1 -------Note--------

associated Completion LCO 3.0.4.a is not Time of Condition A applicable when or B not met in entering MODE 3.

MODE 1, 2, or 3. -------------------

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

GRAND GULF 3.3-80 Amendment No. ~ __

CRFA System 3.7.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Two CRFA subsystems E.1 -------NOTE-------

inoperable in MODE 1, LCO 3.0.4.a is not 2, or 3 for reasons applicable when other than Condition entering MODE 3.

B. ------------------

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. Two CRFA subsystems F.1 -------NOTE------- Immediately inoperable during LCO 3.0.3 does not OPDRVs. apply.

-OR Initiate action to One or more CRFA suspend OPDRVs.

subsystems inoperable due to inoperable CRE boundary during OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Operate each CRFA subsystem for ~ 10 31 days continuous hours with the heaters operating.

SR 3.7.3.2 Perform required CRFA filter testing in In accordance accordance with the Ventilation Filter with the VFTP Testing Program (VFTP).

SR 3.7.3.3 Verify each CRFA subsystem actuates on an 24 months actual or simulated initiation signal.

SR 3.7.3.4 Perform required CRE unfiltered air In accordance inleakage testing in accordance with the with the Control Room Envelope Habitability Control Room Program. Envelope Habitability Program GRAND GULF 3.7-8 Arnendme n t No. -+/--4-§., +/--+8-T +/--9-+-r_

AC Sources - Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. One required offsite -----------NOTE--------------

circuit inoperable for Enter applicable Conditions reasons other than and Required Actions of Condition F. LCO 3.8.7, "Distribution Systems - Operating," when any AND required division is de-energized as a result of One required DG Condition D.

inoperable for reasons other than Condition F. D.1 Restore required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> offsite circuit to OPERABLE status.

-OR D.2 Restore required DG 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to OPERABLE status.

E. Two required DGs E.1 Restore one required 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> inoperable. DG to OPERABLE status. OR 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if Division 3 DG is inoperable F. One automatic load F.1 Restore automatic 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> sequencer inoperable. load sequencer to OPERABLE status.

G. Required Action and G.1 --------NOTE---------

associated Completion LCO 3.0.4.a is not Time of Condition A, applicable when B, C, D, E, or F not entering MODE 3.

met.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

GRAND GULF 3.8-4 Amendment No. ~

DC Sources - Operating 3.8.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and 0.1 ---------NOTE -----

associated Completion LCO 3.0.4.a is not Time for Division 1 or applicable when 2 DC electrical power entering MODE 3.

subsystem for condition A, B, or C not met. Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> E. Division 3 DC E.1 Declare High Pressure Immediately electrical power Core Spray System subsystem inoperable inoperable.

for reasons other than Condition A.

F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time for Division 3 DC AND electrical power subsystem for F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Condition A, B or E not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is ~ 129 V 7 days on float charge.

SR 3.8.4.2 Verify no visible corrosion at battery 92 days terminals and connectors.

OR Verify battery connection resistance is

~ 1.5 E-4 ohm for inter-cell connections,

~ 1.5 E-4 ohm for inter-rack connections,

~ 1.5 E-4 ohm for inter-tier connections, and ~ 1.5 E-4 ohm for terminal connections.

(continued)

GRAND GULF 3.8-27 Amendment No. ~

Distribution Systems-Operating 3.8.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 -------NOTE--------

associated Completion LCO 3.0.4.a is not Time of Condition A applicable when or B not met. entering MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. One or more Division 3 D.1 Declare High Pressure Immediately AC or DC electrical Core Spray System power distribution inoperable.

subsystems inoperable.

E. Two or more divisions E.1 Enter LCO 3.0.3. Immediately with inoperable distribution subsystems that result in a loss of function.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.7.1 Verify correct breaker alignments and 7 days voltage to required AC and DC electrical power distribution subsystems.

GRAND GULF 3.8-39 Amendment No. ~,